ML042960209: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:EFW System 3.7.5 3.7 | {{#Wiki_filter:EFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Emergency Feedwater (EFW) System LCO 3.7.5 Two EFW trains shall be OPERABLE. | ||
APPLICABILITY: | APPLICABILITY: | ||
ACTIONS CONDITION | MODES 1, 2, and 3. | ||
pump inoperable. | ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply 7 days the turbine driven EFW to OPERABLE status. | ||
* inoperable for reasons | pump inoperable. | ||
other than Condition A. | AND 10 days from discovery of failure to meet the LCO B. One EFW train B.1 Restore EFW train to 72 hours | ||
* inoperable for reasons OPERABLE status. | |||
other than Condition A. | |||
AND 10 days from discovery of failure to meet the LCO* | |||
*On a one-time basis, an EFW train may be inoperable for up to 14 days to allow performance of EFW Pump (EFP-3) repairs. The ability to apply the 14-day Completion Time will expire on March 31, 2005. | *On a one-time basis, an EFW train may be inoperable for up to 14 days to allow performance of EFW Pump (EFP-3) repairs. The ability to apply the 14-day Completion Time will expire on March 31, 2005. | ||
Crystal River Unit 3 | Crystal River Unit 3 3.7-9 Amendment No. 214}} | ||
Latest revision as of 00:36, 16 January 2025
| ML042960209 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/21/2004 |
| From: | NRC/NRR/DLPM |
| To: | |
| mozafari B, NRR/DLPM, 415-2020 | |
| Shared Package | |
| ML042880048 | List: |
| References | |
| TAC MC1586 | |
| Download: ML042960209 (1) | |
Text
EFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Emergency Feedwater (EFW) System LCO 3.7.5 Two EFW trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply 7 days the turbine driven EFW to OPERABLE status.
pump inoperable.
AND 10 days from discovery of failure to meet the LCO B. One EFW train B.1 Restore EFW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
- inoperable for reasons OPERABLE status.
other than Condition A.
AND 10 days from discovery of failure to meet the LCO*
- On a one-time basis, an EFW train may be inoperable for up to 14 days to allow performance of EFW Pump (EFP-3) repairs. The ability to apply the 14-day Completion Time will expire on March 31, 2005.
Crystal River Unit 3 3.7-9 Amendment No. 214