{{#Wiki_filter:Committed to Nuclear Ecellonce
{{#Wiki_filter:Committed to Nuclear Ecellonce
_EEnC Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Thursday, May 13, 2004 Start Time:         1800                   NSB Cafeteria               BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
_EEnC Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Thursday, May 13, 2004 Start Time:
1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Maintenance Coordinators (MOC)
Line 38: Line 39:
: 11. Shift Goals (SOM)
: 11. Shift Goals (SOM)
Items Included In Daily Package:
Items Included In Daily Package:
-    Site Communication
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule Informaton in s record was deleted in acodance nt hfreedom of Informabon AC
* Safety Snippet Outage Alara Report
-    Outage Status Report
-    Shutdown Safety Assessment
-    Defined Critical Path
-    Work Activity Risk Assignment Outage Schedule Informaton in s record was deleted inacodance nthfreedom of Informabon AC


Commitedio Nucicar W:.
Commitedio Nucicar W:.
Imm n1flT REACH- DIR21 Point Beach Nuclear Plant U1R28 Refueling Outage
Imm n1flT REACH  
                  .;'y.,;,,-,CXH ''      L; Safety Topic for week 'of May 9-15::'-::.
- DIR21 Point Beach Nuclear Plant U1R28 Refueling Outage
.;'y.,;,,-,CXH L; Safety Topic for week 'of May 9-15::'-::.
Theme for the week This week's theme covers Emernencv Situations. Be It weather, fire or a medical emergency, are we ready to respond to those unexpected situations?
Theme for the week This week's theme covers Emernencv Situations. Be It weather, fire or a medical emergency, are we ready to respond to those unexpected situations?
                                              ;,.','.'DallySafetySnippets-* , ...
;,.','.'DallySafetySnippets -*
Sunday "You would be shocked if you found your emerYency egress path blocked" Material is beginning to come out of containment as a lot of work Is wrapping up. Don't pile up tools and equipment In the walkway even for short periods of time. Always keep the egress paths open for use.
Sunday "You would be shocked if you found your emerYency egress path blocked" Material is beginning to come out of containment as a lot of work Is wrapping up. Don't pile up tools and equipment In the walkway even for short periods of time. Always keep the egress paths open for use.
Monday
Monday
                              'If strong winds start to blow, do you know where to goP?
'If strong winds start to blow, do you know where to goP?
Do you know the proper location to go in the event of a tornado warning if you are In the trailers, turbine hall or PAB? NP1.9.21 covers the site's various shelter areas. Plan ahead and take the time now to review the NP with your group.
Do you know the proper location to go in the event of a tornado warning if you are In the trailers, turbine hall or PAB? NP1.9.21 covers the site's various shelter areas. Plan ahead and take the time now to review the NP with your group.
Tuesday
Tuesday
                              'Make sure to cleanup or a fire may start during heat up.
'Make sure to cleanup or a fire may start during heat up.
OE1 531 0 Indian Point 3 - An oil vapor extractor for the main boiler feed pump failed. The tag out used to repair the extractor resulted In an Increased leakage of oil from the pump bearings onto lagging. A special log was created to monitor the leakage, but no plan existed for dealing with the safety hazards.
OE1 531 0 Indian Point 3 - An oil vapor extractor for the main boiler feed pump failed. The tag out used to repair the extractor resulted In an Increased leakage of oil from the pump bearings onto lagging. A special log was created to monitor the leakage, but no plan existed for dealing with the safety hazards.
Maintenance repaired the extractor, returning It to service. The next day a portion of oil soaked lagging on a main boiler feed pump caught fire and was quickly extinguished by an alert watchstander.
Maintenance repaired the extractor, returning It to service. The next day a portion of oil soaked lagging on a main boiler feed pump caught fire and was quickly extinguished by an alert watchstander.
Wednesday
Wednesday
                          'Take heed - Don't block emergency equipment you may need."
'Take heed - Don't block emergency equipment you may need."
Last week on the 66ft of containment, the NRC noticed we blocked access to 2 fire extinguishers mounted on the stairwell handrail. A scaffold was built Inthe area that made access questionable. We then added a number of bags of insulation it made access Impossible. Just a question -Why Isthe NRC finding this instead of us? .
Last week on the 66ft of containment, the NRC noticed we blocked access to 2 fire extinguishers mounted on the stairwell handrail. A scaffold was built In the area that made access questionable. We then added a number of bags of insulation it made access Impossible. Just a question -Why Is the NRC finding this instead of us?.
Thursday "What number do you call if your co-worker takes a serious fall?'
Thursday "What number do you call if your co-worker takes a serious fall?'
What Is the plant's emergency number? 2911. This number Isonly to be used for.emergency situations.
What Is the plant's emergency number? 2911. This number Is only to be used for.emergency situations.
Two weeks ago a work group was having trouble getting through to operations to communicate a change In equipment status. Rather than waiting, the individual Involved decided to contact the control room via the emergency number. Needless to say this was not an appropriate use of 2911.
Two weeks ago a work group was having trouble getting through to operations to communicate a change In equipment status. Rather than waiting, the individual Involved decided to contact the control room via the emergency number. Needless to say this was not an appropriate use of 2911.
Friday
Friday
            'take sure your fire watch Is alert to keep someone from getting hurt" OE1 2607 - LaSalle - A worker using an acetylene torch for cutting through a structural member that was behind a metal wall panel. Wall Insulation behind the member began to bum. The alert fire watch extinguished the fire within one minute of It beginning and no significant damage occurred.
'take sure your fire watch Is alert to keep someone from getting hurt" OE1 2607 - LaSalle - A worker using an acetylene torch for cutting through a structural member that was behind a metal wall panel. Wall Insulation behind the member began to bum. The alert fire watch extinguished the fire within one minute of It beginning and no significant damage occurred.
Saturday Debris buildup may result In an unplanned heat up" OE14899 River Bend Station - A small fire occurred under the exhaust piping on a diesel generator during testing. The fire was observed during routine checks of the generator and the control room was Immediately notified. The control room unloaded the generator while the operator extinguished the fire. The cause was Insulation debris that accumulated around the hot piping over time.
Saturday Debris buildup may result In an unplanned heat up" OE14899 River Bend Station - A small fire occurred under the exhaust piping on a diesel generator during testing. The fire was observed during routine checks of the generator and the control room was Immediately notified. The control room unloaded the generator while the operator extinguished the fire. The cause was Insulation debris that accumulated around the hot piping over time.
2
2


I                 I Point Beach Nuclear Plant Outage 1R28                                                                                    Path                    Picture DAY           39                                 N     P                   Meets Supporting Operational Excellence Outage Radiation Performance                                                                                                          fnnnctn't MApt     pyneeds
I I
: 3.                   ,                                            -        -      A.
Point Beach Nuclear Plant Outage 1 R28 DAY 39 Supporting Operational Excellence Path N
This indicator measures cumulative dose radiation exposure and                       Day 39 - May 12 Actual = 0.275 total number of personnel-contamination events (PCE's > 5000                         Cumulative = 54.723 cpm) during refueling outages. The dose indicator is measured in                     Cumulative Forecast = 54.817 Rem and individual PCE events.
P Picture Meets fnnnctn't MApt pyneeds Outage Radiation Performance
Daily PCE goal reforecast on 4/23. Daily dose reforecast on 518104.
: 3.
Meets:                <=75 Rem                  Actual Cum.                          Reactor Head Repair Dose for May 12th is 1.959 vs. goal of 1.801.
A.
Exceeds:              <=71 Rem                      Dose:            54.723 Rem    RV Head Total Dose is 8.172.
This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets: <= 18         Exceeds: <=.12           ActualPCE's:                   9 0 68
Meets:
* ra T]   MS         -
<=75 Rem Actual Cum.
Stu Thomas                                                                           I Personnel Contamination Events                                                     Cummulative Dose Exposure 20                                                                            AX l
Exceeds:
18 I Ia 16 I                                                      i w
<=71 Rem Dose:
I                                                                       E                                                                     - Auat 14 i                                                            -,
54.723 Rem Day 39 - May 12 Actual = 0.275 Cumulative = 54.723 Cumulative Forecast = 54.817 Daily PCE goal reforecast on 4/23. Daily dose reforecast on 518104.
a                                                                              0 12                                                      71 0
Reactor Head Repair Dose for May 12th is 1.959 vs. goal of 1.801.
g 10                                  . I                     ..      ForecMs U) 40-                        .
RV Head Total Dose is 8.172.
I                                                                              0                                                                        Goal 8                            P.,
Meets: <= 18 Exceeds: <=.12 ActualPCE's:
MW GMrow     0 6                                                                          03 E                                                                                20-z    4 2                                                                                            0i 0
9 0 68
l 0 2 4 6 8 10121416182022242628303234363840424446485052 0 2 4 6 8 1Of 2141618202224262830323436384(X244464M2
* ra T]
MS Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure AX Ia w
a g
I E
z 20 18 16 14 12 10 8
6 4
2 0
lI I
i Ii 71
. I P.,
ForecMs MW GMrow E
0-0U) 0 0
03 40-20-0i
- Auat Goal l
0 2 4 6 8 10121416182022242628303234363840424446485052 0 2 4 6 8 1 Of 2141618202224262830323436384(X244464M2


NC Comirt led to Nuclear Excellence Outage Status Report Plant:       Point Beach Unit I                     Day: Thursday                         Today's Date / Time:   5/13/04       1600 OutageDuration: Day 40                 Of Refueling Outage Number         U1IR28 Safety Status Industrial - Within the last 12 hours OSHA Recordables             0           First Aid cases         0               Near misses         0 Total for this outage         I Summary:
NC Comirt led to Nuclear Excellence Outage Status Report Plant:
Radiological Dose to date           54.723                             Projected to date
Point Beach Unit I Day: Thursday Today's Date / Time:
* 54.817                 Outage Goal           *75 R Difference               -.094
5/13/04 1600 OutageDuration: Day 40 Of Refueling Outage Number U1IR28 Safety Status Industrial - Within the last 12 hours OSHA Recordables 0
* Reforecast on 5/8                 Number of PCEs           9 Summary: Reactor Head Repair Dose for May 12's is 1.959 vs. goal of 1.801. RV Head Total Dose is 8.172.
First Aid cases 0
Nuclear Significant human performance errors and events in last 24 hours               0 Summary:
Near misses 0
Plant Status Mode:           a Hot Standby (Mode 3)       a   Hot Shutdown (Abode 4)       E Cold Shutdown (Mode5)       3 Refueling Shutdown (Mode 6)
Total for this outage I
RCS:           Temperature:       78                       Pressure:   Vented to Atmosphere       RV Level: Rod Latch Height Time to Boll:             30 hours Shutdown Safety Assessment Protected Equipment:
Summary:
Major Activities Completed In Last 24 Hours                       Critical Path and Near CritiLaiPah Activities (Next 24 Hours)
Radiological Dose to date 54.723 Projected to date
* 1B01/lB03 Cross Tie
* 54.817 Outage Goal  
*75 R Difference  
-.094
* Reforecast on 5/8 Number of PCEs 9
Summary: Reactor Head Repair Dose for May 12's is 1.959 vs. goal of 1.801. RV Head Total Dose is 8.172.
Nuclear Significant human performance errors and events in last 24 hours 0
Summary:
Plant Status Mode:
a Hot Standby (Mode 3) a Hot Shutdown (Abode 4)
E Cold Shutdown (Mode5) 3 Refueling Shutdown (Mode 6)
RCS:
Temperature:
78 Pressure:
Vented to Atmosphere RV Level:
Rod Latch Height Time to Boll:
30 hours Shutdown Safety Assessment Protected Equipment:
Major Activities Completed In Last 24 Hours Critical Path and Near CritiLaiPah Activities (Next 24 Hours) 1B01/lB03 Cross Tie
* Continue Reactor Vessel Head Pen #26 Repair
* Continue Reactor Vessel Head Pen #26 Repair
* CVCS Recovery
* CVCS Recovery
* Complete 1Xl I Transformer Breaker Maintenance and Recover
* Complete 1Xl I Transformer Breaker Maintenance and Recover
* Moved Upper Intermals Lift Rig (to 66' LDA)                                   480 Volt Bus Alignment Significant Outstanding Issues Date                                                     Issue                                             Due           Responsibility 5/03/04       Reactor Vessel Head Repair Penetration #26                                                 5/16/04           John Walsh 5/13/04       IP-IA RCP Motor Oil                                                                         5/14/04           Dan Laing Upcoming   Ma or Milestones Scheduled                 Actual                                     Scheduled                 Actual Date       Time         Date         Time                             Date       Time       Date       Time Cooldown <2000             4/03/04     2100       4/03/04         2230     RCS Fill & Vent       4/23/04       1500 Head Lift                 4/09/04     0900       4/21/04         1550     Heatup >2000         4/25/04       0900 Refueled                   4/14/04     0300       5/02/04         1848     Reactor Critical     4/28/04       0800 RV Headset                 4/18/04     1900             _   1             On-Line               4/30/04       0100 4
* Moved Upper Intermals Lift Rig (to 66' LDA) 480 Volt Bus Alignment Significant Outstanding Issues Date Issue Due Responsibility 5/03/04 Reactor Vessel Head Repair Penetration #26 5/16/04 John Walsh 5/13/04 IP-IA RCP Motor Oil 5/14/04 Dan Laing Upcoming Ma or Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900
_ 1 On-Line 4/30/04 0100 4


Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT.
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT.
UNIT:           I             DATE: _May 13,2004                       TIME:         1400 KEY SAFETY FUNCTIONS:
UNIT:
REACTIVITY:                 GREEN CORE COOLING:               GREEN POWER AVAILABLE:             GREEN INVENTORY:                   GREEN CONTAINMENT:                 YELLOW SFP COOLING:                 NA PROTECTED EQUIPMENT:
I DATE: _May 13,2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN GREEN GREEN GREEN YELLOW NA PROTECTED EQUIPMENT:
COMMENTS:
COMMENTS:
RCS Time to Boil is 30 hours. Using NP 10.3.6 Time To Boil curves.
RCS Time to Boil is 30 hours. Using NP 10.3.6 Time To Boil curves.
Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency 1'BF. 1562                                                                                 Pefcrences: NP 10.3.6 Revision 2 10130102                                5 Pape5 nf 9                                       NP 10.2 1
Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency 1'BF. 1562 Revision 2 10130102 Pefcrences: NP 10.3.6 NP 10.2 1 5 Pape5 nf 9


Defined Critical Path I-MAY                       I U       ID   I       DESCRIPTION         OD RD Cal U iii.
Defined Critical Path I
* SYS  EQID TF
I-MAY U
_t'j8!
ID I
1 132 14                            14
DESCRIPTION OD RD Cal U SYS EQID TF 13 14
                                                                                        . .!!16,18,20,2210.2,4,6,8,l10112.4416,18
.15 1
                                                                                                                                                        .15 1    20 I CEI600R046   P PERFORM REPAIR     24 5 1 1   RC   R-1       0           26 - PERFORM REPAIR WELDING OF NOZZLE WELDING OF NOZZLE       16                                                 13476- 13MAY04 16:5912MAY04 21:OOA a,'
iii.
1 CE1600R027
* _t'j8!
                    ~      f 48 HOUR COOLDOWN OF
2.14.!!16,18,20,2210.2,4,6,8,l10112.4416,18 1
                                      *            *I 48 48 1 1   RC   R.1       0 HOU COOLDOWN O!    REAIE!A CE 00R02748 HOUR COOLDOWN OF REPAIRED AREA REPAIRED AREA                                           13MAY 417:00                                                                         021347681 1 CEI600R029 I FINAL NDE OF REACTOR I 12 12 1 1       RC   R-1       0                                                 CEI600R029SNAL NDE OF REACTOR HEAD REPAIR ARE HEAD REPAIR AREA     I I             _  _      _                                                      0213476- 16MAY04 04:5915MAY04 17.00 CD)
20 I
Run Date                                 13MAY04 14:02           LT-16 DEFINED CRICAL PATH                                               Shoat i of I C Prlmavera Systems, Inc.                       FL-16 DEFINED CRICAL PATH SET
CEI600R046 P PERFORM REPAIR 24 5 1 1 RC R-1 0
26 - PERFORM REPAIR WELDING OF NOZZLE WELDING OF NOZZLE 16 13476-13MAY04 16:5912MAY04 21:OOA a,'  
~
f
*I HOU COOLDOWN O!
REAIE!A 1 CE1600R027 48 HOUR COOLDOWN OF 48 48 1 1 RC R.1 0
CE 00R02748 HOUR COOLDOWN OF REPAIRED AREA REPAIRED AREA 13MAY 417:00 021347681 1 CEI600R029 I FINAL NDE OF REACTOR I 12 12 1 1 RC R-1 0
CEI600R029SNAL NDE OF REACTOR HEAD REPAIR ARE HEAD REPAIR AREA I
I 0213476-16MAY04 04:5915MAY04 17.00 CD)
Run Date 13MAY04 14:02 LT-16 DEFINED CRICAL PATH Shoat i of I C Prlmavera Systems, Inc.
FL-16 DEFINED CRICAL PATH SET


Run Date                                     13MAY04 14:04                     Work Activity Risk Assignment                                   IShet1o1 UI     ACT       IWO GRPjI      HIPE         EQUIPMENT                   Activtty     Cal OURt     START     FINISH                                         MAY ID       ST I           RISK                                   DesCrIptUon     ID
Run Date 13MAY04 14:04 Work Activity Risk Assignment IShet1o1 UI ACT IWO GRPj I HIPE EQUIPMENT Activtty Cal OURt START FINISH MAY ID ST I RISK DesCrIptUon ID
        -s CE1600R046 U__
: -s U__ -
76   CE8
CE1600R046 76 CE8 DR-Y ML-Y R.1 P PERFORM REPAIR 1
                              -DR-Y ML-Y R.1 P PERFORM REPAIR       1 5   12MAY04 13MAY04       M IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M                       WELDING OF NOZZLE                     21:OOA     16:59   021 476 - 128CE I CEI600R019     76   CE8   DR.Y ML-Y           R-1         P PERFORM WELD ON     1     3   13MAY04 13MAY04         REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M                       SLEEVE SAMPLE                           12:00     14:59       213475 - 128CE 1 CE1600R027     76   CE8   DR-Y ML-Y           R-1         48 HOUR COOLDOWN OF       1   48   13MAY04 15MAY04                         REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M                       REPAIRED AREA                           17:00     16:59       0213476   - 128CE I CE1600R047     76   CE8   DR-Y ML-Y           R-1         P SETUP FOR 206       1   4   13MAY04 13MAY04         OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M                       MACHINING                               17:00   20:59       0213476 - 128CE I CE1600R048     76   CE8   DR-Y ML-Y           R.1         P.26 - PERFORM WELD       1     4   13MAY04 14MAY04           OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M                       SURFACE MACHINING                       21:00     00:59         0213476 - 128CE 1 CEI600R054     76   CE8   DR-Y ML-Y           R-1         P.26 - INSTALL SEAL ON     1     2   14MAY04 14MAY04             OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M                       NOZZLE EXTENSION                       01:00     02:59           0213476 - 128CE I CE1600R028     76   CE8   DR-Y ML-Y           R-1         PRELIMINARY NDE OF         1     8   14MAY04 14MAY04             C3REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M                       REPAIRED AREA (UT/PT)                   03:00     10:59           0213476 - 128CE I CE1600R029     76   CE8   DR-Y ML.Y           R-1         FINAL NDE OF REACTOR       1   12   15MAY04 16MAY04                       *REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M                       HEAD REPAIR AREA                       17:00     04:59                     0213476 - 128CE I   EM0216167     76   EM     DR-N ML-N           E-01       INSPECT AND MAINTAIN       9   10   13MAY04 14MAY04           Q=rTG-01 TURBINE GENERATOR EXCITER ORT3-N R-M                       EXCITER FUSES PER MWP                   18:00     18:59         0216167 - 128EM 2   IC0408292     70   IC   DR-Y ML-Y       ICP402 008-1     NI AXIAL OFFSET           Z     1   13MAY04 13MAY04           I POWER RANGE AXIAL OFFSET CAL ORT3.Y R-M                       CALIBRATION                           09 00A     12 59       08292 - B08B2 U:
5 12MAY04 13MAY04 M IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M WELDING OF NOZZLE 21:OOA 16:59 021 476 - 128CE I
I IC5 11TMG es--E 76   ICI   DR-N ML-N       ICP-05 011     FEED REG VALVE TIMING     5     1 12MAY04 13MAY04 F
CEI600R019 76 CE8 DR.Y ML-Y R-1 P PERFORM WELD ON 1
3 13MAY04 13MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M SLEEVE SAMPLE 12:00 14:59 213475 - 128CE 1
CE1600R027 76 CE8 DR-Y ML-Y R-1 48 HOUR COOLDOWN OF 1
48 13MAY04 15MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M REPAIRED AREA 17:00 16:59 0213476 - 128CE I
CE1600R047 76 CE8 DR-Y ML-Y R-1 P SETUP FOR 206 1
4 13MAY04 13MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M MACHINING 17:00 20:59 0213476 - 128CE I
CE1600R048 76 CE8 DR-Y ML-Y R.1 P.26 - PERFORM WELD 1
4 13MAY04 14MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M SURFACE MACHINING 21:00 00:59 0213476 - 128CE 1
CEI600R054 76 CE8 DR-Y ML-Y R-1 P.26 - INSTALL SEAL ON 1
2 14MAY04 14MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M NOZZLE EXTENSION 01:00 02:59 0213476 - 128CE I
CE1600R028 76 CE8 DR-Y ML-Y R-1 PRELIMINARY NDE OF 1
8 14MAY04 14MAY04 C3REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M REPAIRED AREA (UT/PT) 03:00 10:59 0213476 - 128CE I
CE1600R029 76 CE8 DR-Y ML.Y R-1 FINAL NDE OF REACTOR 1
12 15MAY04 16MAY04  
*REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M HEAD REPAIR AREA 17:00 04:59 0213476 - 128CE I
EM0216167 76 EM DR-N ML-N E-01 INSPECT AND MAINTAIN 9
10 13MAY04 14MAY04 Q=rTG-01 TURBINE GENERATOR EXCITER ORT3-N R-M EXCITER FUSES PER MWP 18:00 18:59 0216167 - 128EM 2
IC0408292 70 IC DR-Y ML-Y ICP402 008-1 NI AXIAL OFFSET Z
1 13MAY04 13MAY04 I POWER RANGE AXIAL OFFSET CAL ORT3.Y R-M CALIBRATION 09 00A 12 59 08292 - B08B2 U:
es--E I IC5 11TMG 76 ICI DR-N ML-N ICP-05 011 FEED REG VALVE TIMING 5
1 12MAY04 13MAY04 F
EEDWATER CONTROL VALVES (OUTAGE)
EEDWATER CONTROL VALVES (OUTAGE)
ORT3-N R-M                       (ICP-5011)                             10:OOA     12:59 3008   - 1281C ES         -      _            ____--_
ORT3-N R-M (ICP-5011) 10:OOA 12:59 3008  
1....ORT3-N I    IT-300C     77   OPS   DR-N ML-N       O-IT.0300C     STROKE TEST MFW         I 1     1   12MAY04 113MAY04         NIT I FEED REGULATING VALVE TEST
- 1281C ES I
_____                        R-M                     CONTROL& BYPASS           1       [10:OOA       1259259       -120 N M IW ELT-81       u HUMAN ERROR RISK BARCHIART U1 Refueling 2 SyR l~CWAA I
IT-300C 77 OPS DR-N ML-N O-IT.0300C STROKE TEST MFW I 1 1
PBNP                      28 Outage FL-W1 HUMAN ERROR POTENTIAL C)Primavera Systems, Inc.
12MAY04 113MAY04 NIT I FEED REGULATING VALVE TEST 1....ORT3-N R-M CONTROL& BYPASS 1
[10:OOA 1259259  
-120 N M IW ELT-81 HUMAN ERROR RISK BARCHIART SyR I
2 u
FL-W1 HUMAN ERROR POTENTIAL l~CWAA PBNP U1 Refueling 28 Outage C) Primavera Systems, Inc.


after 13MAY04 12:00                           l     U1R28 WORKING SCHEDULE                                                                     after 13MAY04 12:00
after 13MAY04 12:00 l
# U 1  1
U1R28 WORKING SCHEDULE after 13MAY04 12:00
__ST ID AP0215127A RESP WO APM ST 76 EQID X-01-A DESCRIPTION INSPECT CAL AND SET RD I.
# U ID RESP WO EQID DESCRIPTION RD ES IEF RSK MF MATh 13
5 ES 12MAY04 IEF 13MAY04 RSK
.F 14
                                                                                                  .1  ~I.
.St 15
DR-N ML-N I
__ST I.
MF 130 _
.1 ~I. I
2 13 i2g~jjw,=
.h. _ 1,101t4.16e1820,2210. 2. 4.6.@8.l192.14,16.18,20221 0, 2,24.,6.,8,1l1t2.l4,TE ST 2
INSPE
i2g~jjw,=
                                                                                                                                            .F 14 MATh CALANDSETX 1-A(COMPLETE)
m a
                                                                                                                                                                                .St m15
1 1
                                                                                                                    .h. _ 1,101t4.16e1820,2210. 2. 4.6.@8 .l192.14,16.18,20221 0,2,24.,6.,8,1l1t2.l4,TE a
AP0215127A APM 76 X-01-A INSPECT CAL AND SET 5
X-01.A(COMPLETE)       0900A     16.59   ORT3-N R-N                         MAIN         TRANSFO       PERHASEA0215 27 2 1
12MAY04 13MAY04 DR-N ML-N 130 _
:m AP0303688   APR   76 A-01           CALIBRATE 1A-01 70 11MAY04   21MAY04
INSPE CALANDSETX 1-A(COMPLETE)
                                                                                                -DR-N ML-N U_
X-01.A(COMPLETE) 0900A 16.59 ORT3-N R-N MAIN TRANSFO PERHASEA0215 27
191
:m U_ -
                                                                                                                          - 68 CALIB TE IA-01 NON-TEi SPEC RELAYS NON-TECH SPEC         08.00A     14:59   ORT3-N R-N       _                      .                                                                ._
2 1
0     L151SO-3     APS           F52-151       SWITCHING LINE 151   2 14MAY04   14MAY04   DR-N ML-N                                   L15150S-3     CHG UNE 15       LUT OUT             07:00,     08:59   ORT3-N R-N 4 0   L1510)S-3     APS           F52-151           LINE 151 OUT OF 36 14MAY04   15MAY04   DR-N ML-N         0                         L151OOS-3U     5OTOF SER CE (SECOND T SERVICE (SECOND       07:00     18:59   ORT3-N R-N 0
AP0303688 APR 76 A-01 CALIBRATE 1A-01 70 11MAY04 21MAY04 DR-N ML-N 191 68 CALIB TE IA-01 NON-TEi SPEC RELAYS NON-TECH SPEC 08.00A 14:59 ORT3-N R-N 3
0   AP0304870A   APS   78   H52-OHPVR-       DEUVERH52-OSTO       6 14MAY04   14MAY04   DRN MLN           0                         AP0304870A          H52-45TO IAINTENANCE SHCB MAINTENANCE SHOP         08:00     13:59   ORT3-N R-N                                       030487           13.8 KV/0 AMP VACUUM BF lAKER 6   1   AP0215099   APS   76       F89-112     SPECTICLEANILUBRICA1   3 14MAY04   14MAY04   DR-N ML-N         0                           AP0215t99 NSPECT/CLEA/VLIBRICATE OPERAT IR OPERATOR           09.00     11:59   ORT3-N R-N                                         0215099     X-03 V STN A JX XFMR HIGH SID CIRCUIT SWIT 7   0   ATC151-3     APS           F52-151       ATCWORKAT NORTH     32 14MAY04   15MAY04   DR-N ML-N         0                             ATC15i-       VC MAT NOF APPLETON SIM STATION APPLETON SUB         09 00     16:59   ORT3-N R-N .                                                                       -                  -!
0 L151SO-3 APS F52-151 SWITCHING LINE 151 2
8   1   AP0215099A   APS   76       F89-1i12       STROKE OPERATOR     i 14MAY04   14MAY04   DR-N ML-N       25                               AP02i     ASTROKE OPEI ATOR DURING TA ING EVOLIUTI DURING TAGGING         12:00     12:59 ORT3-N R-N                                             021 099X-03 V ST AUX XFMR HIGH SI E CIRCUITSW 9 0   AP0304870B   APS   78   H52-DHPVR-       RETURN H52-5 TO     6 15MAY04   15MAY04   DR-Y ML-Y         0                                                             AP03048TOB I     H52-05 SWITCHYARD           08:00     13:59   ORT3-N R-N                                                                           0304870         i3.8 KV 10 0     L151S-3     APS           F52-151     SWTCHINGUNE51 IN 2       15MAY04   15MAY04   DRNML-N         64                                                                             Ll5lSI3S`
14MAY04 14MAY04 DR-N ML-N L15150S-3 CHG UNE 15 LUT OUT 07:00, 08:59 ORT3-N R-N 4
11  0O BM0300063      DM    77      VNSBlCC E    INSPECT AND MAINTAIN SBCC AIR 4
0 L1510)S-3 APS F52-151 LINE 151 OUT OF 36 14MAY04 15MAY04 DR-N ML-N 0
17:00 14MAY04 09_00 18:59 1259 ORT3-N R-N 14MAY04 IDR-N ML-N lEit!2l --
L151OOS-3U 5OTOF SER CE (SECOND T SERVICE (SECOND 07:00 18:59 ORT3-N R-N S
ORT3-N R-N 6841                           BM03006 NPCTAD 0300063
0 AP0304870A APS 78 H52-OHPVR-DEUVERH52-OSTO 6
                                                                                                                                                                -              -M11-E I SBCC AIR VNSBCC SY MULTI AND/OR       UMBERED E EN Z-12  0    CE0310577    CE
14MAY04 14MAY04 DRN MLN 0
                        ~1-I-X1]
AP0304870A0 H52-45TO IAINTENANCE SHCB MAINTENANCE SHOP 08:00 13:59 ORT3-N R-N 030487 13.8 KV/0 AMP VACUUM BF lAKER 6
75       Z-065A         Z-56A INSTALL MR   51
1 AP0215099 APS 76 F89-112 SPECTICLEANILUBRICA1 3
                                                                                =
14MAY04 14MAY04 DR-N ML-N 0
10MAY04   21MAY04
AP0215t99 NSPECT/CLEA/VLIBRICATE OPERAT IR OPERATOR 09.00 11:59 ORT3-N R-N 0215099 X-03 V STN A JX XFMR HIGH SID CIRCUIT SWIT 7
                                                                                                - _ -          120 EG1o 5 77 Z-4A ALL MR 03-)44 03-044           07.00A     14:59             ,                                                                                      -
0 ATC151-3 APS F52-151 ATCWORKAT NORTH 32 14MAY04 15MAY04 DR-N ML-N 0
13 0   CE0311772   CE   76       Z-065A       Z-5A INSTALL HEAT   51 10MAY04   21MAY04                   120 EO 1mZ-65A IALL HEATTRACe MR O3-044 TRACE-MR 03044         07.OOA     14:59 14 0   CE307011BB   CE   76       D-105             PRE-COAT       3 12MAY04   13MAY04                 165 C             REAINTERCONNE NGBUSWORKD05(SPARE)
ATC15i-VC MAT NOF APPLETON SIM STATION APPLETON SUB 09 00 16:59 ORT3-N R-N.
INTERCONNECTING         07D0A       14:59                                 125V DC ATBNBATTERY 307011 X P"'Z11 15  o    CE0306041
8 1
                        ]lu[s-.ts 76 INTAKECRI INSPECTCRIB.INSTALL       1 05APR04   15MAY04   DR-YML-Y 239 ES 1       1 INSPE  CRIB. INSTALL B   VSAND FISH BUOYS AND FISH       10-O0A     07:59   ORT3-Y R-N     _                                                                              A   CRIB 03=
AP0215099A APS 76 F89-1i12 STROKE OPERATOR i
Run Date                                       13MAY04 13:401                   LT03   STANDARD PUBLICATION                                                           Sheet 1 of 18 C PImavera Systemsg, Inc.                     IFL-03                 Execution Publication Set                       7
14MAY04 14MAY04 DR-N ML-N 25 AP02i ASTROKE OPEI ATOR DURING TA ING EVOLIUTI DURING TAGGING 12:00 12:59 ORT3-N R-N 021 099X-03 V ST AUX XFMR HIGH SI E CIRCUITSW 9
0 AP0304870B APS 78 H52-DHPVR-RETURN H52-5 TO 6
15MAY04 15MAY04 DR-Y ML-Y 0
AP03048TOB I H52-05 SWITCHYARD 08:00 13:59 ORT3-N R-N 0304870 i3.8 KV 10 0
L151S-3 APS F52-151 SWTCHINGUNE51 IN 2 15MAY04 15MAY04 DRNML-N 64 Ll5lSI3S`
17:00 18:59 ORT3-N R-N E
lEi t!2l --  
-M11 -E 11 0O BM0300063 DM 77 VNSBlCC INSPECT AND MAINTAIN 4
14MAY04 14MAY04 IDR-N ML-N 6841 BM03006 NPCTAD I SBCC AIR SBCC AIR 09_00 1259 ORT3-N R-N 0300063 VNSBCC SY MULTI AND/OR UMBERED E EN Z-  
~1-I-X1]  
=
12 0
CE0310577 CE 75 Z-065A Z-56A INSTALL MR 51 10MAY04 21MAY04 120 EG 1o577 Z-4A ALL MR 03-)44 03-044 07.00A 14:59 13 0
CE0311772 CE 76 Z-065A Z-5A INSTALL HEAT 51 10MAY04 21MAY04 120 EO 1mZ-65A IALL HEATTRACe MR O3-044 TRACE-MR 03044 07.OOA 14:59 14 0
CE307011BB CE 76 D-105 PRE-COAT 3
12MAY04 13MAY04 165 C REAINTERCONNE NGBUSWORK D05(SPARE)
INTERCONNECTING 07D0A 14:59 125V DC ATBNBATTERY 307011 X P"'Z11  
]lu[s-.ts 15 o
CE0306041 76 INTAKECRI INSPECTCRIB.INSTALL 1
05APR04 15MAY04 DR-YML-Y 239 ES 1 1INSPE CRIB. INSTALL B VSAND FISH BUOYS AND FISH 10-O0A 07:59 ORT3-Y R-N A
CRIB 03=
Run Date 13MAY04 13:401 LT03 STANDARD PUBLICATION Sheet 1 of 18 C PImavera Systemsg, Inc.
IFL-03 Execution Publication Set 7


after 13MAY04 12:00                                       U1R28 WORKING SCHEDULE                                                                           after 13MAY04 12:00 MAY
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00
# iu       ID         IRESP   wo     EQID               DESCRIP1ION         RD     ES           EF     RISK     MF Thu 13                                   Frl 14                                   Sat 15 ST                                                                                              12.14.1             O. 2. 4. R. I.1012.14.16.1                     .4.6S. B.l0,Di12.14. 161 16 II    CE44CGATR       CE3   76   INSUL-MS         REM INSUL FOR FAC PROG . CTMT 44 FT GEN 63 04APR04 I 17MAY04 16D0A         14:59 DR-Y ML-Y ORT3-Y R-N 450 CE4,CGATR REM iqsuL FOR FAC PRO               CTMT 44 FT GEO AREA                 I ARFA        II              I 17   1   CE26TGATI       CE3   77   IST-SISI           REINSULATE- FAC       10 28APR04     13MAY04 DR-Y ML-Y   111 CE2          REINS    TE.FAC PROG. RB HALL 26 FT GE AREA PROG -TRB HALL 26 FT             09 00A       21:59 ORT3-Y R-N         U                  SECONDARY INS R\VCE INSPECTIOt 0303638 GEN AREA                           _______
# iu ID IRESP wo ST EQID DESCRIP1ION RD ES EF RISK MF Thu 13 MAY Frl 14 Sat 15
18   I   CE30000TI       CE3   76   TG-01-T             ENCAPSULATE         10 01MAY04       13MAY04 DR-Y ML-Y   177 CE          ENC          TE INSULATIOC ON HP TURBINE C VER INSULAllON ON HP             1200A         21:59 ORT3-Y R-N                             HIGH PRESSURE IIRBINE0302153 TURBINE COVER                         ___
.4.6S. B.l0,Di12.14. 1 61 12.14.1 O. 2. 4. R.
19   1   CE26TOHTI       CE3   77   IST-SISI           REINSULATE- FAC       72 04MAY04     19MAY04 DR-Y ML-Y   275 CE2        REIN      T    FAC PROG -      RB HALL 26 FT vERHo PROG -TURB HALL 26 FTOVERHD 20OOA         19.59 ORT3-Y R-N                 _-
I.1012.14.16.1 16 I I CE44CGATR CE3 76 INSUL-MS REM INSUL FOR FAC 63 04APR04 I 17MAY04 PROG. CTMT 44 FT GEN 16D0A 14:59 ARFA II I
20   1   CE44CGATI       CE3   76   INSUL-MS           REINSULATE- FAC       35 12MAY04     14MAY04 DR-Y ML-Y     0       CE4 CGAREIN TE.FAC PROG -CTMT44 FT GEN PROG - CTMT 44 FT GEN             17.OOA       22:59 ORT3-Y R-N             _.INSULATION04CP174 AREA 21   1   CE309512TI       CE3   77   SW-02861       INSTALL INSULATION         8 13MAY04     13MAY04 DR-Y ML-Y   311 CE3                                1SW  2861 I SINST2INSULATiON ISW-2861               12:00       10:59 ORT3-Y R-N               1
DR-Y ML-Y ORT3-Y R-N 450 CE4,CGATR REM iqsuL FOR FAC PRO CTMT 44 FT GEO AREA I
                                                                                                                                              -5    H2 SIDE SA OIL COOLER OUIYET RELIEF0306006 22  1  CE44POHTI       CE3   76   INSUL-MS           REINSULATE - FAC       12 13MAY04     14MAY04 DR-Y ML-Y       1   C 44PORTIR            TE-FAC      O.PAB44FTOVEFHEAD PROG - PAB 44 FT           18:00'       05:59 ORT3-Y R-N             0408174                      IS TIONLI                                    I OVERHEAD -
17 1
23   1   CE26TOHSR       CE4   77   IST-SISI   REM SCAFF     - FAG PROG 23 01MAY04
CE26TGATI CE3 77 IST-SISI REINSULATE-FAC 10 28APR04 13MAY04 DR-Y ML-Y 111 PROG -TRB HALL 26 FT 09 00A 21:59 ORT3-Y R-N GEN AREA 18 I
                                                        -TURB HALL26 FT             1960A 14MAY04 14:59 DR-Y ML-Y ORT3-Y R-N 296  crE2 EOHSRREM SFF*ACPROG *,TIJRB HALL 26 FTt                      Dl
CE30000TI CE3 76 TG-01-T ENCAPSULATE 10 01MAY04 13MAY04 DR-Y ML-Y 177 INSULAllON ON HP 1200A 21:59 ORT3-Y R-N TURBINE COVER 19 1
* _            SECONC RYINSERVICE INS ECTION030363 24   1   CE08POHSR       CE4   77     IST-SISI     REMOVE SCAFF - FAC 32 05MAY04               17MAY04 DR-Y ML-Y   175 CEO01HREM                        FAC RHALLS                      OVERHO PROG -TURB HALL 8 FT             10700A       10:59 ORT3-Y R-N 25   1   CE214035SR________
CE26TOHTI CE3 77 IST-SISI REINSULATE-FAC 72 04MAY04 19MAY04 DR-Y ML-Y 275 PROG -TURB HALL 26 20OOA 19.59 ORT3-Y R-N FTOVERHD 20 1
CE4   82       CW       REMOVE       SCAFFOLDING IN OVERHASDF      I    16 13MAY04     14MAY04 DR-Y ML-Y   191 CE2    35R    REMOt  SCFODIG              R NASH FLOAT VMLVES FOR NASH FLOAT             08 00A         1 59 ORT3-Y R-N                                                       O CW SYSTEM      JULTIANDUOR NON. UMBERED EQt 26   1     P1402-SI _
CE44CGATI CE3 76 INSUL-MS REINSULATE-FAC 35 12MAY04 14MAY04 DR-Y ML-Y 0
CE4   77     Z4-22               ZREOV   BUILD
PROG - CTMT 44 FT GEN 17.OOA 22:59 ORT3-Y R-N AREA 21 1
                                                              ~OVERHEAD        24 13MAY04     14MAY04 DR-Y ML-Y     0     P      S-2      UILD SCAFFOLDIN
CE309512TI CE3 77 SW-02861 INSTALL INSULATION 8
                                                                                                                                            -Z422
13MAY04 13MAY04 DR-Y ML-Y 311 ISW-2861 12:00 10:59 ORT3-Y R-N 22 1
                                                                                                                                            -                        FOR INTERNALS        IFTRIG SCAFFOLDING FOR               16:00       15059 ORT3-Y R-N           0  193_R1                                          RE CTOR VESSEL M RNALS UFTING INTERNALS UFT RIG 27   1   CE44POHSR       CE4   77   IST-SISI       REMOVE SCAFF FOR           4 14MAY04     14MAY04 DR-Y ML-Y   157                         CE44POHSRR          VE SCAFF FOR I kC PROG . PAB 44          OVERHEAD FAC PROG - PAB 44 FT             07:00       10:59 ORT3-Y R-N                                   0303636          SECONDARY IN ERVICE INSPECTN OVERHEAD 28   1   CE44CGASR       CE4   77   IST-SISI   REMOVESCAFFOLDING             4 14MAY04     15MAY04 DR-Y ML-Y   179                                                     CE44CGA -RREMOVE SCAF OLDING FOR F FOR FAC PROG               23100       02 59 ORT3-Y R-N                                                               0303 36MSECOND AY INSERVICE
CE44POHTI CE3 76 INSUL-MS REINSULATE - FAC 12 13MAY04 14MAY04 DR-Y ML-Y 1
_      _        _                              (11214046) 29   1   CE215202SR       CE4   76   P4-01A-M     REMOVESCAFFOLDING             4 15MAY04     15MAY04 DR-Y ML-Y   173                                                                 E215202SR            SCAFFOLD41 FOR P-LAEM             0S.-         08:59 ORT3 Y RN                                                                           0215202_      REACTOR COOI 30 I CE04075189C CE5 7ff               T-026     T-026. BDTANK PIPING h11 107MAYD4 114MAYD4 DR-Y ML-Y                 0       7589CT-026 SD TANK PIPING / I            GMENT PLATREPAIR INPINGMENT PLATE I I07D0OA I14:59 ORT3-Y R-N CE                                                                      BLOWCjNNTANK 0407589
PROG - PAB 44 FT 18:00' 05:59 ORT3-Y R-N OVERHEAD -
                                                              -REPAIR       I I             I 31 1 CE9929T74 C5               77                         INSTALLIMOD     I27 IO1MAY04 IB1MAY04 DR-Y ML-Y           24 17T 4 INSTALl.MOD PLATFORMS PLATFORMS      I I10:00A I14:59 ORT3-Y R-N CEY                _    _      - -,-,----                                              -                -
23 1
32I   CE0305396 CE5         76   W-001BI         W.1B2A RE-WELD       I8 113MAY04 114MAY04                       0W-1 A RE-WEL4 DAMPER PLENUM
CE26TOHSR CE4 77 IST-SISI REM SCAFF FAG PROG 23 01MAY04 14MAY04 DR-Y ML-Y 296
_ _                                                      DAMPER PLENUM     I I09-00A I11:59                               E    _                             _CI      CONTAINMENt ACCIDEN TRECIR ,ULATION FAN 33  1                                                                          16 14MAY04      18MAY04                0 3 97 W-1C2.A. RE-1LELD DAMPER PLE RUM CE0305397       CES   82   W-001C1         W-1C2-A. RE-WELD                                                                                     CE030 W DAMPER PLENUM               12.00'       11:59                                                                           I I-Run Date                                       13MAY04 13:401                           LT-03 STANDARD PUBLICATION                                                               Sheet 2 of I18 tm Pnv       ir   Ine                                             Ft .031 Fvxrtionn Ptiltlknn        Set                        I I
-TURB HALL26 FT 1960A 14:59 ORT3-Y R-N IN OVERHASDF I 24 1
CE08POHSR CE4 77 IST-SISI REMOVE SCAFF - FAC 32 05MAY04 17MAY04 DR-Y ML-Y 175 PROG -TURB HALL 8 FT 10700A 10:59 ORT3-Y R-N
~OVERHEAD 25 1
CE214035SR CE4 82 CW REMOVE SCAFFOLDING 16 13MAY04 14MAY04 DR-Y ML-Y 191 FOR NASH FLOAT 08 00A 1 59 ORT3-Y R-N 26 1
P1402-SI CE4 77 Z4-22 ZREOV BUILD 24 13MAY04 14MAY04 DR-Y ML-Y 0
SCAFFOLDING FOR 16 :00 15059 ORT3-Y R-N INTERNALS UFT RIG 27 1
CE44POHSR CE4 77 IST-SISI REMOVE SCAFF FOR 4
14MAY04 14MAY04 DR-Y ML-Y 157 FAC PROG - PAB 44 FT 07:00 10:59 ORT3-Y R-N OVERHEAD 28 1
CE44CGASR CE4 77 IST-SISI REMOVESCAFFOLDING 4
14MAY04 15MAY04 DR-Y ML-Y 179 FOR FAC PROG 23100 02 59 ORT3-Y R-N (11214046) 29 1
CE215202SR CE4 76 P4-01A-M REMOVESCAFFOLDING 4
15MAY04 15MAY04 DR-Y ML-Y 173 FOR P-LAEM 0S.-
08 :59 ORT3 Y RN 30 I CE04075189C CE5 7ff T-026 T-026. BDTANK PIPING h 11 107MAYD4 114MAYD4 DR-Y ML-Y 0
INPINGMENT PLATE I I07D0OA I14:59 ORT3-Y R-N
-REPAIR I I I
31 1 CE9929T74 C5 77 INSTALLIMOD I27 IO1MAY04 IB1MAY04 DR-Y ML-Y 24 PLATFORMS I I10:00A I14:59 ORT3-Y R-N 32I CE0305396 CE5 76 W-001BI W.1B2A RE-WELD I8 113MAY04 114MAY04 0
DAMPER PLENUM I I09-00A I11:59 CE2 REINS TE.FAC PROG.
RB HALL 26 FT GE AREA U
SECONDARY INS R\\VCE INSPECTIOt 0303638 CE ENC TE INSULATIOC ON HP TURBINE C VER HIGH PRESSURE IIRBINE0302153 CE2 REIN T
FAC PROG -
RB HALL 26 FT vERHo CE4 CGAREIN TE.FAC PROG -CTMT 44 FT GEN
_.INSULATION04CP174 CE3 I
1 SINST2INSULATiON 1SW 2861
-5 H2 SIDE SA OIL COOLER OUIYET RELIEF0306006 C 44PORTIR TE-FAC O.PAB44FTOVEFHEAD 0408174 IS TIONLI I
crE2 EOHSRREM SFF*ACPROG *,TIJRB HALL 26 FTt Dl SECONC RYINSERVICE INS ECTION030363 CEO01HREM FAC RHALLS OVERHO CE2 35R REMOt SCFODIG R NASH FLOAT VM LVES O
CW SYSTEM JULTI ANDUOR NON. UMBERED EQt P
-2 S
-Z422 UILD SCAFFOLDIN FOR INTERNALS IFTRIG 0 193_R1 RE CTOR VESSEL M RNALS UFTING CE44POHSRR VE SCAFF FOR I kC PROG. PAB 44 OVERHEAD 0303636 SECONDARY IN ERVICE INSPECTN CE44CGA -RREMOVE SCAF OLDING FOR F 0303 36MSECOND AY INSERVICE E215202SR SCAFFOLD41 0215202_
REACTOR COOI CE 7589CT-026 SD TANK PIPING / I GMENT PLATREPAIR BLOWC jNNTANK 0407589 CEY 17T 4INSTALl.MOD PLATFORMS W-1 A RE-WEL4 DAMPER PLENUM E
_CI CONTAINMENt ACCIDEN T RECIR,ULATION FAN RUM 33 1
CE0305397 CES 82 W-001C1 W-1C2-A. RE-WELD DAMPER PLENUM 16 14MAY04 12.00' 18MAY04 11:59 0
CE030 W 3 97W-1C2.A. RE-1LELD DAMPER PLE I
I-Run Date 13MAY04 13:401 LT-03 STANDARD PUBLICATION Ft.031 Fvxrtionn Ptiltlknn Set I
Sheet 2 of I18 tm Pnv ir Ine I


after 13MAY04 12:00                         l     U1R28 WORKING SCHEDULE                                                   l                     after 13MAY04 12:.00
after 13MAY04 12:00 l
  #                    RESPI WO       EQID         DESCRIPTION                 ES                 RISK   MF                                                     MAY u      ID                                                      lRDl ThU 13                   IFri                   14                           Sat 1 ST                                                                               3.11 12.14.1                 n i 2.4. 6. 8.1012.14.1.1 134 1   CE0407589B   I CES   76     T-026     CLOSEOUT SD TANK     20   14MAY04   17MAY04   DR-Y ML-Y   0                                          CE~W0758913CLOSEOI    LB TNKFOLNGRIGEPAIS FOLLOWING REPAIRS              15-00     18:59 ORT3-Y R-N                                               . I 4I7673 I -
U1R28 WORKING SCHEDULE l
35 0   CE0210988     CEO   77     SEC       SEC SUPPORT MR       1681 05APR04   I 11JUN04 DR-N ML-N     CE0;heqR6 SEC SUfPORT MR 9-011-0 99-01 1B              07:O0A      11:59  ORT3-N R-N                                    __-
after 13MAY04 12:.00 u
36 0   CE0210989     CE5   76     SEC       SEC, INSTALLENEW     168 05APR04     IIJUN041 DR-NML-N     3 CE 10989 SEC.IN          AL NEW EQUIP          99-8011E WEOLIP MR 9N O11E     _      0BOOA       11:59 ORT3-N R-N 37 1   CE02t0990     CEO   76     SEC     SEC REM ABANDONED 171 03MAY04           11JUN04 DR-N ML-N   70 CE  1099 SEC RE ABANDONED EC4PMR 99 &deg;'F O S.EQUIPMR 991F             0B00A       14:59 ORT3-N R-N 38 1   CE1600R046     CE8   78       R-1   P PERFORM REPA       5   1MAY04     13MAY04   DR-Y ML-Y   0 6EII  R046P FORM REPAIR VEING OF NOm                                  l WELDING OF NOZZLE             21.:0A     16.59   ORT3-Y R-M                   REAC ORVESSELANDASEMBLY0213476 39 1   CEI600R019     CES   76       R-1     P-26. PERFORM WELD     3   13MAY04   13MAY04   DR-Y ML-Y 73 CEll  8019P-286    -    FORMWELDONSLEEVESAMPLE ON SLEEVE SAMPLE             1200W     14:59 ORT3-Y R-M               REACT        VESSEL AND ASS MBLY0213475 40 1   CE1600R047     CEO   76       R-1     P-26 . SETUP FOR 2W6   4   13MAY04   13MAY04   DR-Y ML-Y   0 CEI  00 04    P - ETUP FOR 206 MA HINING P-26 MACHNING                 17:00       0:59 ORT3-Y R-M           2134760        REACTOR VESSEL            D ASSEMBLY 41 1   CE1600R027     CE8   78       R-1     48 HOUR COOLDOWN       48   13MAY04   15MAY04   DR-Y ML-Y   0 CEI 0R027U HO            COOLDOWN OF RAIMD AREA NOF REPAIRED AREA             17 :00     1659   ORT3-Y R-M           12 7                                                                                RE 42 1   CE1600R048     CEO   78       R-1     P26-PERFORMNWELD       4   13MAY04   14MAY04   DR-Y ML-Y   0         CE160eRO4      -2 PERFORM              SURFACE MA      NING SURFACE MACHINING             21:00     00.59 ORT3-Y R-M                 0213476        REACTOR        SSE AND ASSE                    l 43 1   CE1600R054     CE8   76       R-1   P.26 - INSTACSEAL ON 2       14MAY04   14MAY04   DR5Y ML-Y   0                                 26 CEO6R5 P
ID RESPI WO EQID DESCRIPTION lRDl ES RISK MF ThU 13 MAY IFri 14 Sat 1 ST 3.11 12.14.1 n i 2.4. 6.
* INST                SEAL ON NO I EXTENSION PNOER I EXTENSION         01:00     0ZS9   OR539Y R-M                       0 I3476EREACT            VESSELANDASS MBLY 44 1   CEI600R028     CEO   76       R-1     PRELIMINARY NDE OF 8 14MAY04           14MAY04   DR-Y ML-Y 30                   Ct lORO    2 SPREUM              ONDE OF REP ED AREA (UTIPT)
8.1012.14.1.1 LB TNKFOLNGRIGEPAIS 134 1 CE0407589B I CES 76 T-026 CLOSEOUT SD TANK FOLLOWING REPAIRS I -
REPAIRED AREA (UT/PTAE 03:00               10.59 ORT3-Y R-M                             0213476                REACTOR VES EL AND ASSEMBLY 45 1   CE4600870     CE8   77       R-1   INCORPORATE DES GN 3         14MAY04   14MAY04             59                             CE-600-70 1    ORPORATE DESIGI PAPER INTO REPMR PACKAGE
20 14MAY04 17MAY04 DR-Y ML-Y 15-00 18:59 ORT3-Y R-N 0
_5PAPER NTO REPAIR _        070         0159                                                 0213476        REACTOR VESSE. AND ASSEMBLY 46 11 CE1600R029 CE8         7B       R   WLNDE OF REACTOR 12 1SMAY034            16MAYD4  DR-Y ML-Y   0                                                                                 CE1600RM29F
CE~W0758913CLOSEOI
__.HEAD                                     REPAIR AREA _        17:00'     04:59 ORT-Y R-M                                                                                         0213476U 47 1   CH0300361 CH l 77         CHEM-SAMP     RCSCLTSR3.4.52       22   10MAY04   15MAY041           302 CHo&    361 RCS CL TSR 3.4.5.2 II                                       I05.WA I11:59l                                             _      T-ISC                                                      CHE
. I 4I7673 35 0
_    II 48 1   CH0300374       CHI   77 CHEM-SAMPL   RCSWOTSR3.5.1         22     OMAY04   115MAY04           302 CH      3 7 4RCS  DCTSR 3.4.5.1
CE0210988 CEO 77 SEC SEC SUPPORT MR 99-01 1B 1 681 05APR04 I 11JUN04 07:O0A 11:59 DR-N ML-N ORT3-N R-N CE0;heqR6 SEC SUfPORT MR 9-011-0 36 0
_        I    II                                         0500OAI11:591                                                                                                         MISC CHE?
CE0210989 CE5 76 SEC SEC, INSTALLENEW 168 05APR04 IIJUN041 DR-NML-N 3
49     CH0300404       CH   77 CHEM-SAMPL RCSBORONSR3.9.1.1       22   10MAY04   15MAY04             302 05:00A   I 11:59                                                         ~   -                                     MISC CHE?
WEOLIP MR 9N O11E 0BOOA 11:59 ORT3-N R-N 37 1
50 10   CH0300198       CH   77 ICHEM-SAMPL   BAST BORON TSR       811I 0MAY04     14MAY04             163   JH200119 BAST B4RON TSR 3.5.12 3.5.12                          11:59                                      I               I         MISC Ca-IEMIS RY SAMPUNG0300 198 Run Date                                   13MAY04   13:40                     LT-03 STANDARD PUBLICATION                                                             Sheet 3 of 18 0 Primavera Svemns, nc                     I                   FL03 Execution Publication Set                             I
CE02t0990 CEO 76 SEC SEC REM ABANDONED 171 03MAY04 11JUN04 DR-N ML-N 70 O S.EQUIP MR 991F 0B00A 14:59 ORT3-N R-N 38 1
CE1600R046 CE8 78 R-1 P PERFORM REPA 5
1MAY04 13MAY04 DR-Y ML-Y 0
WELDING OF NOZZLE 21.:0A 16.59 ORT3-Y R-M 39 1
CEI600R019 CES 76 R-1 P-26. PERFORM WELD 3
13MAY04 13MAY04 DR-Y ML-Y 73 ON SLEEVE SAMPLE 1200W 14:59 ORT3-Y R-M 40 1
CE1600R047 CEO 76 R-1 P-26. SETUP FOR 2W6 4
13MAY04 13MAY04 DR-Y ML-Y 0
MACHNING 17:00 0:59 ORT3-Y R-M 41 1
CE1600R027 CE8 78 R-1 48 HOUR COOLDOWN 48 13MAY04 15MAY04 DR-Y ML-Y 0
NOF REPAIRED AREA 17 :00 1659 ORT3-Y R-M 42 1
CE1600R048 CEO 78 R-1 P26-PERFORMNWELD 4
13MAY04 14MAY04 DR-Y ML-Y 0
SURFACE MACHINING 21 :00 00.59 ORT3-Y R-M 43 1
CE1600R054 CE8 76 R-1 P.26 - INSTAC SEAL ON 2 14MAY04 14MAY04 DR5Y ML-Y 0
PNOER I EXTENSION 01:00 0ZS9 OR539Y R-M 44 1
CEI600R028 CEO 76 R-1 PRELIMINARY NDE OF 8
14MAY04 14MAY04 DR-Y ML-Y 30 REPAIRED AREA (UT/PTAE 03:00 10.59 ORT3-Y R-M 45 1
CE4600870 CE8 77 R-1 INCORPORATE DES GN 3
14MAY04 14MAY04 59
_5PAPER NTO REPAIR 070 0159 46 11 CE1600R029 CE8 7B R-1 WLNDE OF REACTOR 1 2 1 SMAY034 1 6MAYD4 DR-Y ML-Y 0
__.HEAD REPAIR AREA 17:00' 04:59 ORT-Y R-M 47 1
CH0300361 CH l 77 CHEM-SAMP RCSCLTSR3.4.52 22 10MAY04 15MAY041 302 II II I05.WA I11:59l 48 1
CH0300374 CHI 77 CHEM-SAMPL RCSWOTSR3.5.1 22 OMAY04 115MAY04 302 I
II 0500OAI11:591 49 CH0300404 CH 77 CHEM-SAMPL RCSBORONSR3.9.1.1 22 10MAY04 15MAY04 302 05:00A I 11:59 CE 10989 SEC.IN AL NEW EQUIP 99-8011E CE 1099 SEC RE ABANDONED EC4PMR 99 &deg;'F 6EII R046P FORM REPAIR VEING OF NOm l
REAC ORVESSELANDASEMBLY0213476 CEll 8019P-286 FORMWELDONSLEEVESAMPLE REACT VESSEL AND ASS MBLY0213475 CEI 00 P
04 P ETUP FOR 206 MA HINING 2134760 REACTOR VESSEL D ASSEMBLY CEI 0R027U HO COOLDOWN OF RAIMD AREA 12 7 RE CE160eRO4
-2 PERFORM SURFACE MA NING 0213476 REACTOR SSE AND ASSE l
CEO6R5 P 26
* INST SEAL ON NO I EXTENSION 0 I3476EREACT VESSELANDASS MBLY Ct lORO 2 S PREUM ONDE OF REP ED AREA (UTIPT) 0213476 REACTOR VES EL AND ASSEMBLY CE-600-701 ORPORATE DESIGI PAPER INTO REPMR PACKAGE 0213476 REACTOR VESSE. AND ASSEMBLY CE1600RM29F 0213476U CHo&
361 RCS CL TSR 3.4.5.2 T-ISC CHE CH 374RCS DCTSR 3.4.5.1 MISC CHE?
~ -
MISC CHE?
50 10 CH0300198 CH 77 ICHEM-SAMPL BAST BORON TSR 3.5.12 811I 0MAY04 14MAY04 11:59 163 JH200119 BAST B4RON TSR 3.5.12 RY SAMPUNG0300 I
I MISC Ca-IEMIS 198 Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 3 of 18 0 Primavera Svemns, nc I
FL03 Execution Publication Set I


after 13MAY04 12:00                           1 U1R28 WORKING SCHEDULE                                                                 I                   after 13MAY04 12:00 DESCRIPTION         RD       ES         EF     RISK       MF                                                   MAY v  U        ID      RESP Wo          EQID Thu13                                    Frd 14                                 sat 15
after 13MAY04 12:00 1 U1R28 WORKING SCHEDULE I
                          . 1 ST                                                                                            1.10 12,14.1               In . 2. 4. R.8.11214.IR.1             1.2.4.6.       4.1012,14.13.
after 13MAY04 12:00 v
I 511 1     CH0300388     CH   77   CHEM-SAMP     SGBDFO GAMMA SCAN I8           I10MAY04     14MAY04                 183  CH0i00388SGBDFO GAMMA SCAN 07.00A     11:59                                             -MISC                        CHEMIS RY SAMPUNG030Y358 52   1   CH0300443     CH   77   CHEM-SAMPL         RE-229 ISOTOPIC         8   10MAY04   14MAY04                 163   ~H0    o4RE-229 OTOPIC 53 54 2
U ID RESP Wo EQID DESCRIPTION RD ES EF RISK 1 ST MF I
2 CH0300484 CH0300501 CH CH 77 77 CHEM-SAMPL RCS BORON SR 3.9.1.1 CHEM-SAMPL       RCS CL TSR 3.4.52         8 8
183 Thu 13 MAY Frd 14 sat 15 1.10 12,14.1 In. 2. 4.
07.00A 10MAY04 07 00A 10MAY04 t1:59 14MAY04 11:59 14MAY04 163 163
R. 8.11214.IR.1 1.2.4.6.
_MISC
4.1012,14.13.
:HOS00URCSCBL
511 1 CH0300388 CH 77 CHEM-SAMP SGBDFO GAMMA SCAN I8 I10MAY04 14MAY04 07.00A 11:59 CH0i00388SGBDFO GAMMA SCAN r
_J CS      0N5R HSol0 RCS CLTS 3.4.5 S 3.9.1.. _
52 1
l CHEMIS RYSAMPLING0303 MISCCHEMIS RYSAMPUNG030C L
CH0300443 CH 77 CHEM-SAMPL RE-229 ISOTOPIC 8
07.00A       11:59                                                                     MISC CHEMIS RY SAMPUNG0300 so1 55 2     CH03ODs14     CH   77   CHEM-SAMPL       RCS DO TSR 3A.5.1         8   1OMAY04   14MAY04                 163 'HoJO0s14RCS DC TSR 3.4.5.1 07.00A       11:59                                                                     MISC CHEMIS RY SAMPUNG030t 514 56 2     CH0300527     CH   77   CHEM-SAMPL SGBDFO GAMMA SCAN               8   10MAY04   14MAY04                 163 :1s0omSG050F          GAMMA SCAN 07.00A       11:59                                                                     MISC CHEMI  RY SAMPUNG 030 27 57   2   CH0300553     CH   77   CHEM-SAMPL         RE-229 ISOTOPIC         8   10MAY04   14MAY04 163 'H:o IL.  -RE-229
10MAY04 14MAY04 163 07.00A t 1:59 53 2
                                                                                                                                            . I      .
CH0300484 CH 77 CHEM-SAMPL RCS BORON SR 3.9.1.1 8
TOPIC 07.OOA       11:59                       _
10MAY04 14MAY04 163 07 00A 11:59 54 2
0553
CH0300501 CH 77 CHEM-SAMPL RCS CL TSR 3.4.52 8
_          I                  _S    MISCCHEMIS      RYSAMPUNG030 58   2   CH0300578     CH   77   CHEM-SAMPL RCS DOSE EQUIVALENT             6   14MAY04   14MAY04               31                           CHO30057SRCS DOSE EOUnVALENI '1-131 1-131                   06:00'     11:59                                                 0300578Mn MISC CHEMIS R SAMPLING 6
10MAY04 14MAY04 163 07.00A 11:59 55 2
59      CAMP-1138C     CH           CAMP-113     CAMP-113 N2SPARGE           3   105MAY04   15MAY04 DR-N ML-N         0                                                                         CAMP 113ECCAMP-11 AND SAMPLE B STEAM                 1300A       15:59 ORT3-N R-N                                                                                                       NITF r
CH03ODs14 CH 77 CHEM-SAMPL RCS DO TSR 3A.5.1 8
80   1   EMO21241     EM   76       41/IE02         RMP 9308 DS-R1        20 14  06MAY04   14MAY04   DR-N ML-N     12   :_m0J12Ml RMP 93#8, DS-lI BREAKER *~AINTENANCE BREAKER                  19.O0A     22:59 ORr3-N R-N         I              uunU      1              I              U        Gr-01 TG EXCII TER FIELD CIRC 1IE 63   1   EM0212645     EM   76     W-03B1-M         -I1A-MREPLACE          70   12MAY04   15MAY04 DR-N ML-N         0 !M01126451Wi          REPLACE MOTOR!BEARINGS MOTOR BEARINGS                 000A       09:59 ORT3-N R-N 62   1   EM0216170     EM   76     FIRE-1ARRI   PERFORM RMP 58 FIRE         20   12MAY04   13MAY04   DR-N ML-Y     6 T   BARRIER (                 21200A       19:59 ORT3N RN 63   1   EMO21502D     EM   76     P-O1A-M     P-1A-M PERFORM OL         41   12MAY04   15MAY04 DR-N ML-N         4
1OMAY04 14MAY04 163 07.00A 11:59 56 2
                                                                                                                            -MOk22 1AM ERFORM OLCoEIFUSH                                lI CHANGEIFLUSH 1   4           00:A     04:59 ORT3-N R-N                                                                       I    I lREAC rOR COOLANTF 64   0   EM0407638c     EM   76       Z-014     MO6ULESHOOTOREPA4           3   12MAY04   13MAY04               2     EM0 63scTROU                                CRANE (SMALL 4OOK)
CH0300527 CH 77 CHEM-SAMPL SGBDFO GAMMA SCAN 8
TSOOIERB
10MAY04 14MAY04 163 07.00A 11:59 57 2
_UTB CRANE (SMALL                 1200A       23:59                                                 TURBINE BDS OVERHEAD CRAN 0407638 65   0   EM0304871     EM   76   A52-DHVR-1           BREAKER             8   13MAY04   13MAY04 DR-N ML-N         0     OM0 B              MAINtENANCE 1200-42 (A52-02)
CH0300553 CH 77 CHEM-SAMPL RE-229 ISOTOPIC 8
MAINTENANCE 150042               20M00A       19:59 ORT3-N R-N                             4I6KVII200 AMP VA MM BREAKER0314871 06   0   EM0405897D     EM   75       D-106       D-1 osPERFORM 48         33   12MAYo4    14MAYD4                       EM~t09D-106            ORM48            FLOAT CHARGE HOUR FLOAT CHARGE                 21 00A     20-59                                                                                   125V DC STATION              0ATERYO 017 0     EM03D48781   EM   761   B52-DB5D04           BREAICER           1121 13MAYC14   13MAY04 DR-N ML-N           3O: . BREAK RMAINTENANCEI 5B50-1 (B52-45)
10MAY04 14MAY04 163 07.OOA 11:59 58 2
_ _MAINTENANCE                                           D850-001     I 00o WA       23:59 ORT3-N R-N                 Wig           _480 VOLT DB-! 0 SWITCHGEAR BR EAKER0304875 68 1     EM0216164G I EM     76   ISOL PHASE REMOVE GROUNDS AN0 10               13MAY04 I 13MAY04   DR-N ML-Y I     0  :MO:                FEGROUNDS AND NSTALL BUS DUCT IUNKS INSTALL BUS DUCT                07.00A     21:59 ORT3-N R-N                               IISOL PHASE DUC '0216164 Run Date                                       13MAY04 13:40l                           LT.03 STANDARD PUBLICATION                                                               Sheet 4 of 18 C Primavera Systems, Inc.                     I                       FL-03 Execution Publication Set                             . I
CH0300578 CH 77 CHEM-SAMPL RCS DOSE EQUIVALENT 6
14MAY04 14MAY04 31 1-131 06:00' 11:59 59 6
CAMP-1138C CH CAMP-113 CAMP-113 N2SPARGE 3
105MAY04 15MAY04 DR-N ML-N 0
AND SAMPLE B STEAM 1300A 15:59 ORT3-N R-N 80 1
EMO21241 EM 76 41/IE02 RMP 9308 DS-R 1 14 20 06MAY04 14MAY04 DR-N ML-N 12 BREAKER 19.O0A 22:59 ORr3-N R-N 63 1
EM0212645 EM 76 W-03B1-M  
-I1A-M REPLACE 70 12MAY04 15MAY04 DR-N ML-N 0
MOTOR BEARINGS 000A 09:59 ORT3-N R-N 62 1
EM0216170 EM 76 FIRE-1ARRI PERFORM RMP 58 FIRE 20 12MAY04 13MAY04 DR-N ML-Y 6
T BARRIER
(
21200A 19:59 ORT3N RN 63 1
EMO21502D EM 76 P-O1A-M P-1A-M PERFORM OL 41 12MAY04 15MAY04 DR-N ML-N 4
CHANGEIFLUSH 1
4 00:A 04:59 ORT3-N R-N 64 0
EM0407638c EM 76 Z-014 MO6ULESHOOTOREPA4 3
12MAY04 13MAY04 2
_UTB CRANE (SMALL 1200A 23:59 65 0
EM0304871 EM 76 A52-DHVR-1 BREAKER 8
13MAY04 13MAY04 DR-N ML-N 0
MAINTENANCE 150042 20M00A 19:59 ORT3-N R-N 06 0
EM0405897D EM 75 D-106 D-1 osPERFORM 48 33 1 2MAYo4 14MAYD4 HOUR FLOAT CHARGE 21 00A 20-59 017 0 EM03D48781 EM 761 B52-DB5D04 BREAICER 1121 13MAYC14 13MAY04 DR-N ML-N
_ _MAINTENANCE D850-001 I
00o WA 23:59 ORT3-N R-N CHO30057SRCS 0300578Mn DOSE EOUnVALENI MISC CHEMIS
'1-131 R SAMPLING CAMP 113ECCAMP-11 NITF TER FIELD CIRC
-MISC CHEMIS RY SAMPUNG030Y 358
~H0 o4RE-229 OTOPIC
_MISC CHEMIS RYSAMPLING0303
:HOS00URCSCBL S 3.9.1.
L
_J CS 0N5R MISCCHEMIS RYSAMPUNG030C HSol0 RCS CLTS 3.4.5 l
MISC CHEMIS RY SAMPUNG0300 so1
'HoJO0s14RCS DC TSR 3.4.5.1 MISC CHEMIS RY SAMPUNG030t 514
:1s0omSG050F GAMMA SCAN MISC CHEMI RY SAMPUNG 030 27 IL. -. I.
'H:o 0 5 5 3RE-229 TOPIC I
_S MISCCHEMIS RYSAMPUNG030
:_m0J12Ml RMP 93#8, DS-lI BREAKER *~AINTENANCE I
I uunU 1 U
1IE Gr-01 TG EXCII
!M01126451Wi REPLACE MOTOR!BEARINGS
-MOk22 1AM ERFORM OLCoEIFUSH lI I
I lREAC rOR COOLANTF EM0 63scTROU TSOOIERB CRANE (SMALL 4OOK)
TURBINE BDS OVERHEAD CRAN 0407638 OM0 B MAINtENANCE 1200-42 (A52-02) 4I6KVII200 AMP VA MM BREAKER0314871 EM~t09D-106 ORM48 FLOAT CHARGE 125V DC STATION 0ATERYO 3O:
:MO:
BREAK Wig RMAINTENANCEI
_480 VOLT DB-!
FE GROUNDS AND IISOL PHASE DUC 5B50-1 (B52-45) 0 SWITCHGEAR BR NSTALL BUS DUCT
'0216164 EAKER0304875 IUNKS 68 1 EM0216164G I EM 76 ISOL PHASE REMOVE GROUNDS AN0 INSTALL BUS DUCT 10 13MAY04 I 13MAY04 DR-N ML-Y I 07.00A 21:59 ORT3-N R-N 0
Run Date 13MAY04 13:40l LT.03 STANDARD PUBLICATION Sheet 4 of 18 C Primavera Systems, Inc.
I FL-03 Execution Publication Set I


after 13MAY04 12:00                                 U1R28 WORKING SCHEDULE                                                                             after 13MAY04 12:00 ID        RESPl WO       EQID           DESCRIPTION     RD     ES                                                                                     MAY13 Fd 14                               S EF        RISK I ST.                                                                               IThu13                                              Fi 14 lb.10112.14.16la820,221 0. 2, 4 *6#t8 1Otl2.14,16.18.2OI221 0.2. 4.6. 8 at 1a12,14;1S 69 11     RP4A-033     EM         O-RP-M0A     RESTORE WALKWAY 1 2     I13MAY04   13MAY041 DR-Y MLY   109 :tP4j .033RESTORI WALKWAY POSTI DO LATCHING POST ROD LATCHING I     I   12:00   13:59   ORT3-N R-N           U 70   1   EM0216169     EM   77       COM     TEST ALL GAI-TRONICS   4   13MAY04 13MAY04   DR-N ML-Y 217       16 116gTESTAI I 1                      .L AITROwnCS 12.00     15:59   ORT3-N R-N MCOM S, STEM MULTI AND/C R NON-NUMBEREC EOUIPMENT02161 71   0   EM0215134     EM   77       COM         GAI-TRONICS TEST   15   13MAY04 14MAY04   DR-N ML-N 694 EMCI                      INICS TEST 12:00     02:59   ORT3-N R-N                                             COM SYS ,EM MULTI ANDIOR NON-NUMBERED EtOUIPMENT0215 1 2 1 72   1   EM0312035A     EM   76     P-028B-M     IP-288-M PERFORM     4   13MAY04 13MAY04   DR-Y ML-Y   0 =MC I 12035A P- 8 -M PERFORM POS1 MCE TEST POST MCE TEST           14:00     17:59   ORT3-N R-N                   MSTE kM GENERATOR FE 0D PUMP MOTOR 0: i12035 73   1   EM0216167     EM   76       E-01     INSPECTAND MAINTAIN 10 EXCITER FUSES PER 13MAY04 18:00 14MAY04 18:59 DR-N ML-N ORT3-N R-M 26    E  102 i 6 I 6 7INSP n1494A47 u--.u-w.,      I ECT AND MAINTAIN EXCITER FUSES P :R MWP 104.
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 I D RESPl WO EQID DESCRIPTION RD ES EF RISK MAY13 Fd 14 S
T      f      tO1 TURBINE GENE    L TOR EXCITER 74   0   EM0207564     EM   76     852-DB50-0     1X- I TO 1B-01 INSP 4   13MAY04 13MAY04   DR-N ML-N   0         EM0207564i (.11 TO 18.01 INSP I NERTIA LATCHIDB *;4B)
I Thu13 Fi 14 at I
INERTIA             20-00     23:59   ORT3-N R-N                 02075641 =480 VOLT DB- P SWITCHGEAR BR EAKER 75   1   EM0215217     EM   76       T-001         TEST HEATER     10   13MAY04 14MAY04   DR-Y ML-Y   0         EM0215217,T              HEATER INSUL kTION RESISTANCE "T
ST.
INSULATION           20:00     05:59   ORT3-N R-N                 02152171                          PRE ,SURtZER TANK 76   1   EM0216539     EM   76   TG-01-VARM     REMOVE TEMPORARY METERING T-MOD 2  14MAY04 07.00 14MAY04 08:59 DR-N ML-N ORT3-N R-N 0                                    EM0216539RE AOVE TEMPORARY METERING T-MO0 02452 0216539K ITG-01 TURBINE G -NERATOR OUTPU VARMETER r 77   0   EM0301793     EM   76   H52-HK-200           BREAKER       16   14MAY04 14MAY04   DR-N ML-N   15                                   EM0301793BR EWKER MAINTENAP CE HK-2000 (H52-2 D)
l b.10112.14.16la820,221 0. 2, 4 *6#t8 1Otl2.14,16.18.2OI221 0.2. 4.6. 8 1a12,14;1S 69 11 RP4A-033 EM O-RP-M0A RESTORE WALKWAY 1 2 I13MAY04 13MAY041 DR-Y MLY POST ROD LATCHING I I 12:00 13:59 ORT3-N R-N 109 :tP4j 70 1
MAINTENANCE HW-2000         07:00     22:59   ORT3-N R-N                                           0301793!                        N 13.8 KVt2000 Al PBREAKER 78   0   EM9925005     EM   76   A52-DHVR-3   3000-1 1X02-IA01 CELL I   14MAY04 14MAY04   DR-N ML-N 339                                     EM9925005S 01 1X02-1A01 CE L. SWITCH INSPEC TION SWITCH INSPECTION         08:00     08:59   ORT3-N R-N                                           99250051 4.16 KV/3000 AMP %4CUUM BREAKER 79   0   EM0301792A     EM   76   A52-DHVR-3 8KR MAINT. PORTION AT 4       14MAY04 14MAY04   DR-N ML-N   0                                   EM0301792AB CR MAINT. PORTIOI I AT CUBICLE (A5i .01) 300041 CUBICLE (A52-01)         08:00     11:59   ORT3-N R.N                                           03017921 M4.16 KVt3000 A AP VACUUM BREAI ,ER
EM0216169 EM 77 COM TEST ALL GAI-TRONICS 4
                                                                                                                                        .-.    . .    .  -... 4~
13MAY04 13MAY04 DR-N ML-Y 217 12.00 15:59 ORT3-N R-N 71 0
80   0   EM0304828     EM   77     P-001AS-M     INSPECT SPARE RCP     4   14MAY04 14MAY04             685                                     EM0304828Itl SPECT SPARE RCF MOTOR MOTOR              08:00     11:59                                                         03048291        SPARE 1t2P-1J /B REACTOR COOt ANT PUMP MOT, 81 1   EM0306911     EM   76   TG-01-VARM     ITG-1-VARM READS     8   14MAY04 14MAY04   DR-N ML-N 141                                       EM0306911 ITG-1.VARM READ HIGH 'REPLACE WETER HIGH REPLACE           0900     16:59   ORT3-N R-N                                             0306911 F1ITG-0              TURBINE GENER) TOR OUTPUTV 82 1   EMORT3C       EM         O-RT-003C ASSIST DURING ORT-3C 4       14MAY04 14MAY04   DR-N ML-N   0                                             EMORI 3CASSIST DURING ORT-3C 11:00   14:59   ORT3-N R-N 83 0   EM0304870     EM   76   HS2-DHPVR-           BREAKER       1B   14MAY04 15MAY04   DR-Y ML-Y   2                                                   130470BREAKER I AAINTENANCE DHR VR-2000 (H52-0!
EM0215134 EM 77 COM GAI-TRONICS TEST 15 13MAY04 14MAY04 DR-N ML-N 694 EMC 12:00 02:59 ORT3-N R-N 72 1
MAINTENANCE             14:00   05:59   ORT3-N R-N                                                       p3048700                        13.8 KV/2000 AMP VA 84 0   EM0405897E     EM   76       D-106       OBTAIN RMP 9046-1   3   14MAY04 14MAY04               0                                                         EM0405897E DBTAIN RMP 904- I DATA FOR D-1I DATA FOR D-1 06         21:00   23:59                                                                               0405897 M125V DC STAT ION BATTERY 85   1   EM0215246     EM   76       62/AO       CAL AND TEST 62/A01   6   15MAY04 15MAY04   DR-N ML-N   0                                                                         EM0215246CAL AND TEST 62AC RELAY PER 1RMP           06:00     11:59   ORT3-N R-N                                                                               0215246m    !IA-01    BUSI 86 1   EM02151998     EM   76     P-O01A-M   P-01A FINAL PMT PER 10     15MAY04 15MAY04   DR-N ML-N   0                                                                       EM0215199BP-O iA FIINAL PMT P 9002-12             06:00     15:59   ORT3-N R-N                                                                               0215199Mn _REA            1
EM0312035A EM 76 P-028B-M IP-288-M PERFORM 4
_5-8501                                                 _1  15A0     5A0       RNM-87 1 0   EM0407B42A I EM     76     852-0B750 REMOVE 852- B75         i00 1   15MYD4   5MAY04 I DRN MLN     C                                                                              EM0407642 AREMOVE B52.
13MAY04 13MAY04 DR-Y ML-Y 0 =MC POST MCE TEST 14:00 17:59 ORT3-N R-N 73 1
FROM 2B52-40C           10:00   10-59   ORT3-N R-N                                                                                     0407U 21480 VOLT a Run Date                                     13MAY04 13:40                     LT-03 STANDARD PUBLICATION                                                                     Sheet 5 of 18 o Prfmavem s stems. Inc.                   I                 FL-03 Execution Publication Set'
EM0216167 EM 76 E-01 INSPECTAND MAINTAIN 10 13MAY04 14MAY04 DR-N ML-N 26 E
EXCITER FUSES PER 18:00 18:59 ORT3-N R-M 74 0
EM0207564 EM 76 852-DB50-0 1X-I TO 1B-01 INSP 4
13MAY04 13MAY04 DR-N ML-N 0
INERTIA 20-00 23:59 ORT3-N R-N 75 1
EM0215217 EM 76 T-001 TEST HEATER 10 13MAY04 14MAY04 DR-Y ML-Y 0
INSULATION 20:00 05:59 ORT3-N R-N 76 1
EM0216539 EM 76 TG-01-VARM REMOVE TEMPORARY 2
14MAY04 14MAY04 DR-N ML-N 0
METERING T-MOD 07.00 08:59 ORT3-N R-N 77 0
EM0301793 EM 76 H52-HK-200 BREAKER 16 14MAY04 14MAY04 DR-N ML-N 15 MAINTENANCE HW-2000 07:00 22:59 ORT3-N R-N 78 0
EM9925005 EM 76 A52-DHVR-3 3000-1 1X02-IA01 CELL I
14MAY04 14MAY04 DR-N ML-N 339 SWITCH INSPECTION 08:00 08:59 ORT3-N R-N 79 0
EM0301792A EM 76 A52-DHVR-3 8KR MAINT. PORTION AT 4 14MAY04 14MAY04 DR-N ML-N 0
CUBICLE (A52-01) 08:00 11:59 ORT3-N R.N 80 0
EM0304828 EM 77 P-001AS-M INSPECT SPARE RCP 4
14MAY04 14MAY04 685 MOTOR 08:00 11:59 81 1
EM0306911 EM 76 TG-01-VARM ITG-1-VARM READS 8
14MAY04 14MAY04 DR-N ML-N 141 HIGH REPLACE 0900 16:59 ORT3-N R-N 82 1
EMORT3C EM O-RT-003C ASSIST DURING ORT-3C 4 14MAY04 14MAY04 DR-N ML-N 0
11:00 14:59 ORT3-N R-N 83 0
EM0304870 EM 76 HS2-DHPVR-BREAKER 1B 14MAY04 15MAY04 DR-Y ML-Y 2
MAINTENANCE 14:00 05:59 ORT3-N R-N 84 0
EM0405897E EM 76 D-106 OBTAIN RMP 9046-1 3
14MAY04 14MAY04 0
DATA FOR D-1 06 21:00 23:59 85 1
EM0215246 EM 76 62/AO CAL AND TEST 62/A01 6
15MAY04 15MAY04 DR-N ML-N 0
RELAY PER 1RMP 06:00 11:59 ORT3-N R-N 86 1
EM02151998 EM 76 P-O01A-M P-01A FINAL PMT PER 10 15MAY04 15MAY04 DR-N ML-N 0
9002-12 06:00 15:59 ORT3-N R-N
_5-8501 1
15A0 5A0 RNM-I I
I
.033RESTORI U
116116gTESTAI MCOM S, 12035A 1P-2 81 MSTE 102i 6I67INSP WALKWAY POSTI
.L AITROwnCS STEM MULTI AND/C INICS TEST COM SYS
-M PERFORM POS1 kM GENERATOR FE ECT AND MAINTAIN DO LATCHING R NON-NUMBEREC
,EM MULTI ANDIOR MCE TEST 0D PUMP MOTOR 0:
EXCITER FUSES P n1494A47 I
T f
u--.u-w.,
EM0207564i 02075641 EM0215217,T 02152171
(.11 TO 18.01 INSP I
=480 VOLT DB-
"T HEATER INSUL PRE EM0216539RE 0216539K EM0301793BR 0301793!
EM9925005S 99250051 EM0301792AB 03017921 4~
EM0304828Itl 03048291 EM0306911 0306911 EMORI NERTIA LATCHIDB P SWITCHGEAR BR kTION RESISTANCE
,SURtZER TANK AOVE TEMPORARY ITG-01 TURBINE G EWKER MAINTENAP 01 1X02-1A01 CE 4.16 KV/3000 AMP %
CR MAINT. PORTIOI M4.16 KVt3000 A SPECT SPARE RCF SPARE 1t2P-1J ITG-1.VARM READ F1ITG-0 3CASSIST DURING 130470BREAKER I p3048700 EM0405897E 0405897 EOUIPMENT02161 NON-NUMBERED E i12035
:R MWP 104.
tO1 TURBINE GENE
*;4B)
EAKER METERING T-MO0
-NERATOR OUTPU CE HK-2000 (H52-2 N 13.8 KVt2000 Al L. SWITCH INSPEC 4CUUM BREAKER I AT CUBICLE (A5i AP VACUUM BREAI MOTOR
/B REACTOR COOt HIGH 'REPLACE TURBINE GENER)
ORT-3C AAINTENANCE DHR 13.8 DBTAIN RMP 904-M125V DC STAT EM0215246CAL 0215246m EM0215199BP-O 0215199Mn EM0407642 0407U tOUIPMENT0215 L TOR EXCITER 02452 r
VARMETER D)
P BREAKER TION
.01) 300041
,ER ANT PUMP MOT, WETER TOR OUTPUTV VR-2000 (H52-0!
KV/2000 AMP VA I DATA FOR D-1I ION BATTERY AND TEST 62AC
!IA-01 BUSI iA FIINAL PMT P
_REA 1
AREMOVE B52.
21480 VOLT a 87 1 0 EM0407B42A I EM 76 852-0B750 REMOVE 852-B75 i00 1
15MYD4 5MAY04 I DRN MLN FROM 2B52-40C 10:00 10-59 ORT3-N R-N C
Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 5 of 18 o Prfmavem s stems. Inc.
I FL-03 Execution Publication Set'


after 13MAY04 12:00                                     U1 2           W R IN7                 CH D L                                       after 13MA Y04 12:00 U   U         ID       RESP   WO         EQID           DESCRIPTION     RPI_     ES   I     EP   I     RSK   MP                                       MAY 88   IIE0042             EM   751 B152-D0B75-0       B52-DB75-001 RESET       IS1MAY04   15MAY04     DR-N ML-N   0                                                             EM04     642 852-0875 AMPTECTOR             12-00     16:59   ORT3-N R-N                                                                       04   642~48 819 I   EAMRCP-B1       EM   76     P-O1A-M           REPLACE 'ARCP     2   15MAY04     15MAY04     OR-Y ML-Y 252                                                                       IARCP`-B1 REP FLOOR PANEL             1600     17:59   ORT3-N R-N                                                                             0215199EF 90 1   EM0215205     EM   76     P-001B-M     INSPECT AND MAINTAIN 10    15MAAY04   16MAY04                 0                                                                       =M02lM520SF REACTOR COOLANT             15:00     01:59                                                                                           0215205IIIIIII 91 1   EM0215203     EM. 87     P-001A-M         P-001AM-M2ND MCE   3   15MAY04   15MAY04I DR-V MI-V       01                                                                       EM0215203 TEST(1A52-041IA-01)         17:00     10:59   ORT3-N R-N                                                                               021520 92 1     852-427CE     EMV   75         8-42           BUS STAB PMT     1   13MAY04   13MAY04   OR-N ML-N   142 j 5 7C BUS STJ PMT "IRC-5W8
after 13MAY04 12:00 U1 2 W R IN7 CH D L after 13MA Y04 12: 00 U U ID RESP WO EQID DESCRIPTION RPI_
                                                            'IRC-5968             1200     12:59   ORT3-N R-N           48VMOTOF CONTROL CENE PAB SAFEGUARD0257 93 0   EM04058968     EMV   76     W-0219           W-0218 REMOVE     4   15MAY014   15MAY04   OR-N ML-N     0                                                                       M0405890BW~
ES I
JUMPER IWP             17:00     20-59   ORT3-N R-N                                                                               0405896M 94           FLP~CRCOM2 EP         E         1 IP EP QUARTERLY 2 DIGIT   3   13MAY04 I14MAY04                 &#xb6;87 P R-COM2EP       AR   L2 DIGIT     ~SELECT& CR   0MM CECK
EP I
                                                                                            -          -Ugm                                                -
RSK MP MAY 88 IIE0042 EM 751 B152-D0B75-0 B52-DB75-001 RESET IS1MAY04 15MAY04 DR-N ML-N 0
DIAL SELECT & CR         13.0       07.59-95  1  NG44CFClEV IILi- g EPI  77
EM04 642 852-0875 AMPTECTOR 12-00 16:59 ORT3-N R-N 04 642~48 819 I EAMRCP-B1 EM 76 P-O1A-M REPLACE 'ARCP 2
                                        -I IST-SISI       ENG EVAL FOR FAC   I   29APR04     14MAY04     DR-Y ML-Y   2     CFCIEV ENO VAIL FOR FAC PO   - CTMT 44FT GE AREA PROG - CTMT 44FT GEN         08-OOA     14:59   ORT3-Y R-N       -                                    SECONDARY INSERVICE INS IECTION 030189 96 0     EP0306799     EPI   77     SERVICE       FLAMMABLE STORAGE     2   14MAY04     14MAY04               16                       P0079             ETDRAG LCE NP LOCKER INSPECTION           07-00     08.59                                           0306799 MISC EQOUIPMENT EPIR/SR CE 97 0     FG0302077     FOI   77   MNOEPI             PUMP ELECTRICAL     8   14MAY04     14MAY04               160                     FG0302077PUO ELECTRICAL       NOESUMPS MANHOLE SUMPS           07.00'     14:59                                         0302077       _  PoR     -ELECTRICAL   M&HOLE SUMP PU 95   1   Z22FG030     FGI   7-7       Z-W2       Z-022- INTIERNALS LIFT 12  14MAY04   15MAY04     DR-VYML-Y   0                                           Z22FGO Z-W2 -INTERNA         LFT RIG.- STR RIG - STRIP PAINT FOR       22:00     09-59   ORT3-Y R-N                                                 03019R-RECO 0F031151      FG2   7`7       VNEIC     INSPECTANDSEVC         271 12MAY04     15MAY04     DR-VML-   297 :o: 05 INSPEC-AND ERVICE IC HAC EQUIP 100 0     FG0300135     FGZ  77     HX-378A       SERVICE HX-378A SBCC 10 15MAY04       15MAY04     DR-V ML-V 656                                                       FG03001 3 5 S    C   X38 LIGHT WIRING           10-00     19.59   ORT3-N R-N                                                                 983723 020 FG307011S1     FG3   75       D-105       BUILD SCAFFOLD FOR   5   10MAY04     13MAY04               319 G30   ~jUID fCAFFOLD FOR 0-1   Y5REPILACEMENT D-105 REPLACEMENT         12:OOA     15:.59                             125V ICSTATION BATTE V0307011 Run Date                                       13MAY04 13:401                       LT.03 STANDARD PUBLICATION                                                   Sheet 6ofl       -8 C Primavera Systems, Inc.                       I                 FL.03 Execution Publication Set                       I
15MAY04 15MAY04 OR-Y ML-Y 252 IARCP`-B1 REP FLOOR PANEL 1600 17:59 ORT3-N R-N 0215199EF 90 1
EM0215205 EM 76 P-001B-M INSPECT AND MAINTAIN 1 0 15MAAY04 16MAY04 0  
=M02lM520SF REACTOR COOLANT 15:00 01:59 0215205IIIIIII 91 1
EM0215203 EM.
87 P-001A-M P-001AM-M2ND MCE 3
15MAY04 15MAY04I DR-V MI-V 01 EM0215203 TEST(1A52-041IA-01) 17:00 10:59 ORT3-N R-N 021520 92 1
852-427CE EMV 75 8-42 BUS STAB PMT 1
13MAY04 13MAY04 OR-N ML-N 142 j 5 7C BUS STJ PMT "IRC-5W8
'IRC-5968 1200 12:59 ORT3-N R-N 48VMOTOF CONTROL CENE PAB SAFEGUARD0257 93 0
EM04058968 EMV 76 W-0219 W-0218 REMOVE 4
15MAY014 15MAY04 OR-N ML-N 0
M0405890BW~
JUMPER IWP 17:00 20-59 ORT3-N R-N 0405896M 94 FLP~CRCOM2 EP E
IP 1
EP QUARTERLY 2 DIGIT 3
13MAY04 I14MAY04  
&#xb6;87 P R-COM2EP AR L2 DIGIT  
~SELECT& CR 0MM CECK DIAL SELECT & CR 13.0 07.59-IILi-g  
-I  
-Ugm 95 1
NG44CFClEV EPI 77 IST-SISI ENG EVAL FOR FAC I
29APR04 14MAY04 DR-Y ML-Y 2
CFCIEV ENO VAIL FOR FAC PO - CTMT 44FT GE AREA PROG - CTMT 44FT GEN 08-OOA 14:59 ORT3-Y R-N SECONDARY INSERVICE INS IECTION 030189 96 0
EP0306799 EPI 77 SERVICE FLAMMABLE STORAGE 2
14MAY04 14MAY04 16 P0079 ETDRAG LCE NP LOCKER INSPECTION 07-00 08.59 0306799 MISC EQOUIPMENT EPIR/SR CE 97 0
FG0302077 FOI 77 MNOEPI PUMP ELECTRICAL 8
14MAY04 14MAY04 160 FG0302077PUO ELECTRICAL NOESUMPS MANHOLE SUMPS 07.00' 14:59 0302077 PoR  
-ELECTRICAL M&HOLE SUMP PU 95 1
Z22FG030 FGI 7-7 Z-W2 Z-022-INTIERNALS LIFT 1 2 14MAY04 15MAY04 DR-VYML-Y 0
Z22FGO Z-W2 -INTERNA LFT RIG.- STR RIG - STRIP PAINT FOR 22:00 09-59 ORT3-Y R-N 03019R-RECO 0 F031151 FG2 7`7 VNEIC INSPECTANDSEVC 271 12MAY04 15MAY04 DR-V ML-297 :o: 05 INSPEC-AND ERVICE IC HAC EQUIP 100 0
FG0300135 FG Z 77 HX-378A SERVICE HX-378A SBCC 1 0 15MAY04 15MAY04 DR-V ML-V 656 FG03001 35S C
X38 LIGHT WIRING 10-00 19.59 ORT3-N R-N 983723 020 FG307011S1 FG3 75 D-105 BUILD SCAFFOLD FOR 5
10MAY04 13MAY04 319 G30 ~jUID fCAFFOLD FOR 0-1 Y5 REPILACEMENT D-105 REPLACEMENT 12:OOA 15:.59 125V ICSTATION BATTE V0307011 Run Date 13MAY04 13:401 LT.03 STANDARD PUBLICATION Sheet 6ofl  
-8 C Primavera Systems, Inc.
I FL.03 Execution Publication Set I


after 13MAY04 12:00                                   U1 2               O K N             C E U Eafter                                               13MAY04 12:00 7i i           ID         RESP WO I       EQID   I       DESCRIPTION   RD     ES
after 13MAY04 12:00 U1 2 O K N C E U Eafter 13MAY04 12:00 7i i ID RESP WO I EQID I
                                                                                        --Thu13 EF      RISK
DESCRIPTION RD ES EF RISK NLp AY
                                                                                                                                        ~Fri I jjjjI AY NLp 14 jgjjj Sat 15 103 0   FG0309951         FG3   77     SERVICE     FLAMMABLE STORAGE     161 14MAY014   17MAY0415                                       FG03095 FS MAL STORAG CABINETtINSPECIN CAB3INET INSPECTION       07.00'     14:59                                           03099513I               i'u--
--Thu13  
104 0     FG0309946       FG3   77     SERVICE     FLAMMABLE STORAGE     24   14MAY04   18MAY04               144                       FG0309948               L STORAG CABINET INSPEC 1.N CABINET INSPECTION         07 00,     14:59                                           0309946 105 2     ICD40829           IC 70   ICP-02.008       NI AXIAL OFFSET   I   13MAY04   13MAY04   DR-YML-Y   170 41       OFFSET CkLRATION CALIBRATION         0900A     12.59   ORT3-Y R-M           NI POWER R   E AXIAL OFECAL 106 1     1C5.50ALM         IC 76   ICP-05.050   VERIFY ALMS ON GEN   1   13MAY04 13MAY04     DR-YML-Y   359 Ccs ALVERIFY MS ON GEN H2 P 6NL H2 PANEL.           12:OD0 12.59     ORT3-Y R-N           SECONDARPLANT MIDRANGE PRESSURE INSTRI MENTS 0300870 107 0     1C0311805         IC 76     FS-00230     RE-230 CLEAN FLOW     2   14MAY04   14MAY04   DRYYML-Y   166                       IC0311805RE 230 CLEAN FLOW' WITCH SWITCH           07.00'     08.59   ORT3-Y R-N                               031 1805N RE.230 WASTE WAE EFFLUENT MO I1TOR INLET FL(
~Fri 14 Sat 15 I jjjjI jgjjj 103 0 FG0309951 FG3 77 SERVICE FLAMMABLE STORAGE 161 14MAY014 17MAY0415 FG03095 FS MAL STORAG CABINETtINSPECIN CAB3INET INSPECTION 07.00' 14:59 03099513I i'u--
108 1   IC5.9RTRAL.         IC 76   ICP-05.009         VERIFY ROTOR     I   14MAY04   14MAY04   DR-Y ML-Y 323                                     C5.9RTRALERIFROTOR STOPPED ARMCLEAR OPPE ALARM CES             17:00     17:59   ORT3-Y R-N                                                 0300851 NTUR NNE INSTUMENT TION - MISCEL 1
104 0 FG0309946 FG3 77 SERVICE FLAMMABLE STORAGE 24 14MAY04 18MAY04 144 FG0309948 L STORAG CABINET INSPEC 1.N CABINET INSPECTION 07 00, 14:59 0309946 105 2 ICD40829 IC 70 ICP-02.008 NI AXIAL OFFSET I
109 1     1C0306828A         IC 75     S-06050A     I S-60RIA REPLACE   2   14MAY04   14MAY04   DR-Y ML-Y 323                                     10030662SA        -MA REPLACE PROE GAP PROBE GAP           17:00     18:59   ORT3-Y R-N                                                 0306628ET         INEENETVERSPEED P 110 I       IC5.54A         IC 75   ICP-05.054     P598 SO BdU PUMP   3   14MAY04   14MAY04   DR-Y ML-Y 322                                             1C5.54APS9 8    BAJ PUMP STAI   FUNCTION START FUNICTION         17:00     1 959   ORT3-Y R-N                                                 03008T4         CNDR       PLANT OW RANGE PI III I     IC5.47-1IC10         76   ICP-05.047     SECONDARY LEVEL. 15   19APR04   15MAY0-4   DR-Y ML-Y   0 CS   1SECONDA YLEVEL CONTR tLES AND SWIT CONTROLLERS AND           II.-MA     09:59   ORT3-Y R-N       -        -SECONDARY1 112 1         1C5.53       ICI 76   IC.503       IP55 EODR             10MAY04     14MAY04   DR-Y ML-Y     CS.1 1CP 5.5 SEC )NDA     HIGH PRE SURE HIGH PRESSURE         0800MA     11:59   ORT3-Y R-N                                                 SECONDARYECINDART HIGH PRESS JRE INSTRUME 113 1       IC5.53A         IC1 78   ICP-05.053       ICP 5.53 REPLACE 11I10MAY04    14MAY04   DR-Y ML-Y   69 CS AE).3         LACE PS-21SM PS-2196           1600A     11:59   ORT3-Y R-                                         ISECONDARY I.ATHIGH PRESS JRE INSTRUME 114 1   ICS.1ITMG         IC1 75   ICP-05.011       FEED REG VALVE   1   12MAY0 4 13MAY04 jDR-N ML-N     4     ~FE       YUG VALVE TIMING             (ICP.5.011)
13MAY04 13MAY04 DR-YML-Y 170 41 OFFSET CkLRATION CALIBRATION 0900A 12.59 ORT3-Y R-M NI POWER R E AXIAL OFECAL 106 1 1C5.50ALM IC 76 ICP-05.050 VERIFY ALMS ON GEN 1
TIMING           1000OA     12.59   bRT3-N R-M           FEW         CONTROL VALVES (OUTAGE) 0300853 115 0     1C0300662       ICI 76     I&C MISC     MISCELLANEOUS FAN     I   13MAY04   13MAY0-4   DR-Y ML-Y 17FU                 AN FILTERS FILTERS           09:00A     12.59   ORT3-Y R-N           MISC ICW  XACTMVT1ES 116 0     1C0300665       101 77         RM       MONTHLY PM ON RAD     1   13MAY04   13MAY04   DR-Y ML-Y 170 AO       PM ON RA MONITORING S MONITORING SYSTEM         09:(X0A   12.59   ORT3-Y R-N           RSYSTEM MULTI ANDIOR NO -NUMBERED EQUIF MENT 117 0     1C0407300       IC1 76   FT-03298B           REMOVE PAB     3   13MAY04   13MAY04   DR-Y ML-Y 320 C4 700 REMOV PAB ISOKDINEIC SACK MONITOR ISOKINETIC STACK         13:00r   15:59   ORT3-Y R-N                 PAB3V I STACK ISOKINE IC FLOW TRANsmr E 0407300 118 1       105.54B       I01 76   ICP-05.054         LC-2393 CHECK   1   14MAY04   14MAY04   DR-Y ML-Y   84                           1C5.548LG 293 CHECK FMT GS TIGHT/ LEAK CEC FITTINGS TIGHTI LEAK       07:00     07:59   ORT3-Y R-N                               03008741S CONDARY PLANT -OW RANGE PRES URE INISTRUME 119 I1     CORT3C         101       O-RT-003C       PERFORM ORT-3C     4   14MAY04   14MAY04   DR-N ML-N   0                               ICOR 3CPERFORM ORT- IC 11:00     14:59   ORT3-N R-N-12       C.47A         101   6     Icp-05.c4     VERItFY DRN BOTTLE   2   15MAY04   15MAY04   DR-Y ML-Y 294                                                                         5.A       ORN BOT LLALARMS           05:00     09:59   ORT3-Y R-N                                                                         03008671   SECONDARYI Run Date                                         13MAY04 i3:401                     LT-03 STANDARD PUBLICATION                                                           Sheet 7 of 18 C Primavera Systems. Inc.                                     FL-03 Execution Publication Set
13MAY04 13MAY04 DR-YML-Y 359 Ccs ALVERIFY MS ON GEN H2 P 6NL H2 PANEL.
12:OD0 12.59 ORT3-Y R-N SECONDARPLANT MIDRANGE PRESSURE INSTRI MENTS 0300870 107 0 1C0311805 IC 76 FS-00230 RE-230 CLEAN FLOW 2
14MAY04 14MAY04 DRY YML-Y 166 IC0311805RE 230 CLEAN FLOW' WITCH SWITCH 07.00' 08.59 ORT3-Y R-N 031 1805N RE.230 WASTE WAE EFFLUENT MO I1TOR INLET FL(
108 1 IC5.9RTRAL.
IC 76 ICP-05.009 VERIFY ROTOR I
14MAY04 14MAY04 DR-Y ML-Y 323 C5.9RTRALERIFROTOR STOPPED ARMCLEAR OPPE ALARM CES 17:00 17:59 ORT3-Y R-N 0300851 NTUR NNE INSTUMENT TION - MISCEL 109 1 1C0306828A IC 75 S-06050A I S-60RIA REPLACE 2
14MAY04 14MAY04 DR-Y ML-Y 323 10030662SA1 -MA REPLACE PROE GAP PROBE GAP 17:00 18:59 ORT3-Y R-N 0306628ET INEENETVERSPEED P 110 I IC5.54A IC 75 ICP-05.054 P598 SO BdU PUMP 3
14MAY04 14MAY04 DR-Y ML-Y 322 1C5.54APS98 BAJ PUMP STAI FUNCTION START FUNICTION 17:00 1 959 ORT3-Y R-N 03008T4 CNDR PLANT OW RANGE PI III I
IC5.47-1IC10 76 ICP-05.047 SECONDARY LEVEL.
15 19APR04 15MAY0-4 DR-Y ML-Y 0 CS 1SECONDA YLEVEL CONTR tLES AND SWIT CONTROLLERS AND II.-MA 09:59 ORT3-Y R-N  
-SECONDARY1 112 1 1C5.53 ICI 76 IC.503 IP55 EODR 10MAY04 14MAY04 DR-Y ML-Y CS.1 1CP 5.5 SEC )NDA HIGH PRE SURE HIGH PRESSURE 0800MA 1 1:59 ORT3-Y R-N SECONDARYECINDART HIGH PRESS JRE INSTRUME 113 1 IC5.53A IC1 78 ICP-05.053 ICP 5.53 REPLACE 11 I10MAY04 14MAY04 DR-Y ML-Y 69 CS AE).3 LACE PS-21SM PS-2196 1600A 11:59 ORT3-Y R-ISECONDARY I.ATHIGH PRESS JRE INSTRUME 114 1
ICS.1ITMG IC1 75 ICP-05.011 FEED REG VALVE 1
12MAY0 4 13MAY04 jDR-N ML-N 4
YU
~FE G VALVE TIMING (ICP.5.011)
TIMING 1000OA 12.59 bRT3-N R-M FEW CONTROL VALVES (OUTAGE) 0300853 115 0 1C0300662 ICI 76 I&C MISC MISCELLANEOUS FAN I
13MAY04 13MAY0-4 DR-Y ML-Y 17FU AN FILTERS FILTERS 09:00A 12.59 ORT3-Y R-N MISC IC W XACTMVT1ES 116 0 1C0300665 101 77 RM MONTHLY PM ON RAD 1
13MAY04 13MAY04 DR-Y ML-Y 170 AO PM ON RA MONITORING S MONITORING SYSTEM 09:(X0A 12.59 ORT3-Y R-N RSYSTEM MULTI ANDIOR NO -NUMBERED EQUIF MENT 117 0
1C0407300 IC1 76 FT-03298B REMOVE PAB 3
13MAY04 13MAY04 DR-Y ML-Y 320 C4 700 REMOV PAB ISOKDINEIC SACK MONITOR ISOKINETIC STACK 13:00r 15:59 ORT3-Y R-N PAB3V I STACK ISOKINE IC FLOW TRANsmr E 0407300 118 1
105.54B I01 76 ICP-05.054 LC-2393 CHECK 1
14MAY04 14MAY04 DR-Y ML-Y 84 1C5.548LG 293 CHECK FMT GS TIGHT/ LEAK CEC FITTINGS TIGHTI LEAK 07:00 07:59 ORT3-Y R-N 03008741S CONDARY PLANT -OW RANGE PRES URE INISTRUME 119 I1 CORT3C 101 O-RT-003C PERFORM ORT-3C 4
14MAY04 14MAY04 DR-N ML-N 0
ICOR 3CPERFORM ORT-IC 11:00 14:59 ORT3-N R-N-12 C.47A 101 6
Icp-05.c4 VERItFY DRN BOTTLE 2
15MAY04 15MAY04 DR-Y ML-Y 294 5.A ORN BOT LLALARMS 05:00 09:59 ORT3-Y R-N 03008671 SECONDARYI Run Date 13MAY04 i3:401 LT-03 STANDARD PUBLICATION Sheet 7 of 1 8 C Primavera Systems. Inc.
FL-03 Execution Publication Set


after 13MAY04 12:00                                       U1R28 WORKING SCHEDULE                                                                             after 13MAY04 12:00
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00
  # U                 to         RESPl WO I           ECND           DESCRIPNON       RD       ES       EF       RISK                                                             MMFAY ST                                           _l                                                                              4     8                                         8       4 1;*       [q         *uemr :CI-         St 121 1             IC5.47B       IC1     76     ICP-05.047       VERIFYSTLG MNFLD       I   15MAY04   15MAY04   DR-Y ML-Y 294 _ICSA7E                                                                                       STLG M LVL ALARMS               09:00   09.59   ORT3-Y R-N                     .                                                            0300867 SECONDARY 122     1         IC5.47C       IC1     76     ICP-05.047   VERIFY LO COND HILO       I   15MAY04   15MAY04   DR-Y ML-Y 171                                                                               IC5.4TC         LO CON I                               LVL ALM               09:00   0959     ORT3-Y R-N                                                                                   0300887 SECONDARY 123     1         IC5A7D         IC1     76     ICP-05.047   VERIFY GEN LVL ALMS       1   15MAY04   15MAY04   DR-Y ML-Y 314                                                                               IC5.47E         GEN L 0900     09 59   ORT3-Y R-N                                                                                   0300867 SECONDARY 11;;1i*                     S E 124 2           IC10301009       1C2   76     ICP-04.021 CHEMICALAND VOLUME 11           10MAY04   14MAY04   DR-Y ML-Y   IC03 0    1 00 9CHEMt*         AND VOLUME CC NTROL SYSTEM CONTROL SYSTEM             18:00A   04:59   ORT3-Y R-N                                           CHEM CAL AND VOLUME ONTROL SYSTEM 301009 125     1         IC2.22       IC2     76       11CP-02.02     POWER RANGE NIS       3   13MAY04   13MAY04   DR-N ML-Y 19         IC222             RANGE NIS TE 1NG (POST-REFUE TESTING (POST-REFUEL             18:00   2059     ORT3-N R-N           0306921           NIS POWER RANG CHANNELS SHUM OM SURV TEST 126 0           IC0300710       IC2     77       HP-07736 CLEAN CONTAMINATION 12         13MAY04   14MAY04   DR-Y ML-Y 270       030010             CONTAINATIO         MONTOR MONITOR               18:00'   18:59   ORT3-Y R-N           0300710T"                                                 PE SONNEL CONTAM NATION MONIT 127 0           IC0300711       IC2     77       HP-07739 CLEAN CONTAMINATION 12         13MAY04   14MAY04   DR-Y ML-Y 270       300711             CONTAMINATIO         MONITOR MONITOR               18:05o   18:59   ORT3-Y R-N           0300711     I                                           PE SONNEL CONTAM NATION MONIT 128     0       10300713         IC2     77       HP-O306   CLEAN CONTAMINATION 12         13MAY04   14MAY04   DR-Y ML-Y 270         300713CLEN CONTAMINAT                 MONITOR MONITOR               1_:0o     16:59   ORT3-Y R-N           0300713                     .          .      I-     PE     SONNEL CONTAM NATION MONrT
# U to RESPl WO I ECND DESCRIPNON RD ES EF RISK MMFAY ST 4
:                                      *D3     S Xl1-lZXEi 1291   1         IC5.50     I0ICS     78     ICP-05.050     lCp 5.50 SECONDARY MIDRANGE PRESSURE 11   28APRO4 09:o00A 14MAY04 11:59 DR-Y ML-Y ORT3-Y R-N 0 5C. ICP&#xa3;50SEC NNDARYM1DRANG PRESSURE SECONDARY PLANT MIDRANGE             RESSURE INST 130 1         IC0300795C     I ICS     76     1I&C MISC           C-158 RELAY         5   13MAY04   13MAY04   DR-Y ML-Y 66     0790-158F             V-AYMAINTENAN EPc431EX I     MAINTENANCE-             08:00A     16:59   ORT3-Y R-N                     MISC ' WORKACTMTE 0300795 131 1         1C0300795B         CS   76       I&C MISC           ESFRELAY         27   13MAY04 15MAY04     DR-Y ML-Y V     003 07 9 5 8ESFRE AY       MAINTENAN       IN LOGIC CABINET 3 MAINTENANCE INLOGIC            08WOOA 16:59       ORT3-YRN R-i 132     1     IC0300795A         ICS   76     1I&C MISC   REACTOR PROTECTION 27 13MAY04           15MAY04   DR-Y ML-Y   0 C03 O795AREACTR PROTECTION L4C CAB RELAY                               ANCE             ;
8
LGC CAB RELAY         lttOOA       16:59   ORT3-YRN                             l           -              _
_l 8
133     1   ICTUVIBSUP           ICS   76     T-SUPERVIS         INSTALITURBINE       8   14MAY04   14MAY04   DR-Y ML-Y 52                         ICTUVBSUP N 1              1TURBINEVIB     TONSENSORS VIBRATION SENSORS             06:00     13:59   ORT3-Y R-N                                   03009s51                   TURBINE     PER     ISORYINS7   UMENTATION 134 1               IC5.8         ICS   76       ICP-05.008 TURBINE SUPERVISORY 60         14MAY04   19MAY04   DR-Y ML-Y   0                                 1C5.8       INE SUPERVISOR       INST CALS         l.
4 1;*
INST CALS               06:00-   1059   ORT3Y R-N                                   0300850 135     1       IC5.50F&V       [C5   76       ICP-05.050     ICP 5.50 LT-2532 HDT   2   14MAY04   14MAY04 l DR-Y ML-Y   69                                     ICI5         ClP 5.50 LT.2532 DT LVIL BACK FILL VENT LVL BACK FILL & VENT             M1000   11:59   ORT3-Y R-N                                             08   ESECONDARY S            I     MIDRANGE FRESURE IN 13       1t     IC10303383       ICV   78 lS0009668             SC-96B POST MTN       4   13MAY04   13MAY04   DR-Y ML-Y 12 C03 3383596BoST MTN DIAGNO MC DIAGNOSTIC       .      15:00'   18:59   ORT3-N R-N     0 383=                 UOUIDSAMPLEC          NTAINMENT ISOUTION 137     1       IC0300922       ICV   78     MS-05958-O     MS-5958 DIAGNOSTIC       4   13MAY04   13MAY04   DR-Y ML-Y V   0       300 9 2 2 MS-   58DIAGNOSTIC C ECK CHECK                 18:00     21:59   ORT3-N R-N           0300922       HX-IA SG BLOW WNISOLATIONOF ERATOR Run Date                                                   13MAY04 13:401                         LT.03 STANDARD PUBLICATION                                   l                             Sheet 8 of 18 O Prmavers Systems, Inc.                         I                   FL-03 Execution Publication Set                               I
[ q  
*uemr :CI-S t 121 1 IC5.47B IC1 76 ICP-05.047 VERIFYSTLG MNFLD I
15MAY04 15MAY04 DR-Y ML-Y 294 _ICSA7E STLG M LVL ALARMS 09:00 09.59 ORT3-Y R-N 0300867 SECONDARY 122 1 IC5.47C IC1 76 ICP-05.047 VERIFY LO COND HILO I
15MAY04 15MAY04 DR-Y ML-Y 171 IC5.4TC LO CON I
LVL ALM 09:00 0959 ORT3-Y R-N 0300887 SECONDARY 123 1 IC5A7D IC1 76 ICP-05.047 VERIFY GEN LVL ALMS 1
15MAY04 15MAY04 DR-Y ML-Y 314 IC5.47E GEN L 0900 09 59 ORT3-Y R-N 0300867 SECONDARY 1 1;;1i*
S E 124 2 IC10301009 1C2 76 ICP-04.021 CHEMICALAND VOLUME 11 10MAY04 14MAY04 DR-Y ML-Y 0
IC03 1009CHEMt*
AND VOLUME CC NTROL SYSTEM CONTROL SYSTEM 18:00A 04:59 ORT3-Y R-N CHEM CAL AND VOLUME ONTROL SYSTEM 301009 125 1
IC2.22 IC2 76 11CP-02.02 POWER RANGE NIS 3
13MAY04 13MAY04 DR-N ML-Y 19 IC222 RANGE NIS TE 1NG (POST-REFUE TESTING (POST-REFUEL 18:00 2059 ORT3-N R-N 0306921 NIS POWER RANG CHANNELS SHUM OM SURV TEST 126 0 IC0300710 IC2 77 HP-07736 CLEAN CONTAMINATION 12 13MAY04 14MAY04 DR-Y ML-Y 270 030010 CONTAINATIO MONTOR MONITOR 18:00' 18:59 ORT3-Y R-N 0300710T "
PE SONNEL CONTAM NATION MONIT 127 0 IC0300711 IC2 77 HP-07739 CLEAN CONTAMINATION 12 13MAY04 14MAY04 DR-Y ML-Y 270 300711 CONTAMINATIO MONITOR MONITOR 18:05o 18:59 ORT3-Y R-N 0300711 I PE SONNEL CONTAM NATION MONIT 128 0 10300713 IC2 77 HP-O306 CLEAN CONTAMINATION 12 13MAY04 14MAY04 DR-Y ML-Y 270 300713CLEN CONTAMINAT MONITOR MONITOR 1_:0o 16:59 ORT3-Y R-N 0300713 I-PE SONNEL CONTAM NATION MONrT
*D3 lZXEi 1-S Xl 1291 1 IC5.50 I0ICS 78 ICP-05.050 lCp 5.50 SECONDARY 11 28APRO4 14MAY04 DR-Y ML-Y 0 5C. ICP&#xa3;50SEC NNDARYM1DRANG PRESSURE MIDRANGE PRESSURE 09:o00A 11:59 ORT3-Y R-N SECONDARY PLANT MIDRANGE RESSURE INST 130 1 IC0300795C I ICS 76 1I&C MISC C-158 RELAY 5
13MAY04 13MAY04 DR-Y ML-Y 66 0790-158F V-AYMAINTENAN EPc431EX I
MAINTENANCE-08:00A 16:59 ORT3-Y R-N MISC ' WORKACTMTE 0300795 131 1 1C0300795B CS 76 I&C MISC ESFRELAY 27 13MAY04 15MAY04 DR-Y ML-Y V
003 079 58ESFRE AY MAINTENAN IN LOGIC CABINET 3 MAINTENANCE IN LOGIC 08WOOA 16:59 ORT3-YRN R-i 132 1
IC0300795A ICS 76 1I&C MISC REACTOR PROTECTION 27 13MAY04 15MAY04 DR-Y ML-Y 0 C03 O795AREACTR PROTECTION L4C CAB RELAY ANCE LGC CAB RELAY lttOOA 16:59 ORT3-YRN l
133 1
ICTUVIBSUP ICS 76 T-SUPERVIS INSTALITURBINE 8
14MAY04 14MAY04 DR-Y ML-Y 52 ICTUVBSUP 1
N 1TURBINEVIB TONSENSORS VIBRATION SENSORS 06:00 13:59 ORT3-Y R-N 03009s51 TURBINE PER ISORYINS7 UMENTATION 134 1 IC5.8 ICS 76 ICP-05.008 TURBINE SUPERVISORY 60 14MAY04 19MAY04 DR-Y ML-Y 0
1C5.8 INE SUPERVISOR INST CALS l.
INST CALS 06:00-1059 ORT3Y R-N 0300850 135 1
IC5.50F&V
[C5 76 ICP-05.050 ICP 5.50 LT-2532 HDT 2
14MAY04 14MAY04 l DR-Y ML-Y 69 ICI5 ClP 5.50 LT.2532 DT LVIL BACK FILL VENT LVL BACK FILL & VENT M1000 11:59 ORT3-Y R-N S
08 ESECONDARY I MIDRANGE FRESURE IN 13 1t IC10303383 ICV 78 lS0009668 SC-96B POST MTN 4
13MAY04 13MAY04 DR-Y ML-Y 12 C03 3383596BoST MTN DIAGNO MC DIAGNOSTIC 15:00' 18:59 ORT3-N R-N 0 383=
UOUIDSAMPLE C NTAINMENT ISOUTION 137 1
IC0300922 ICV 78 MS-05958-O MS-5958 DIAGNOSTIC 4
13MAY04 13MAY04 DR-Y ML-Y V
0 300922 MS-58DIAGNOSTIC C ECK CHECK 18:00 21:59 ORT3-N R-N 0300922 HX-IA SG BLOW WNISOLATION OF ERATOR Run Date 13MAY04 13:401 LT.03 STANDARD PUBLICATION l
Sheet 8 of 18 O Prmavers Systems, Inc.
I FL-03 Execution Publication Set I


after 13MAY04 12:00                                     U1R28 WORKING SCHEDULE                                                                     after 13MAY04 12:00 8 U         ID Io I .
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 8 U ID RESP W EQD DESCRIPTION RD ES EF RISK MF-h.
RESP   W S._..-
Fd MA Snt 15 Fd Sat jjj j
EQD           DESCRIPTION       RD     ES       EF RISK MF-h.
jjj15 Io I.
Fd jjjFd MA
S._..-
                                                                                                                      .1012,1416.1120,2210. 2,4. 6. 8 .101214.116,18,2.221A j              jjj15 Snt 15
.1012,1416.1120,2210. 2,4. 6. 8.101214.116,18,2.221A 0i 2.4, 6. 8.10012,14.16,1 138 1 IC0300942 ICV 78 RM-03200C-RM-3200C DIAGNOSTIC 4
                                                                                                                                                                                                      - Sat 0i 2 .4, 6. 8.10012,14.16,1 138 1     IC0300942       ICV   78     RM-03200C- RM-3200C DIAGNOSTIC         4 13MAY04   13MAY04   DR-Y ML-Y     0         300942       200C0DIAGNOSTICCHECK CHECK               18:00   21:59 ORT3-N R-N             0300942         RE-211/RE212 M NITOR SUPPLY OP RATOR 139 1     IC0408038       ICV 76     MS-05959-O     MS     59;-O AIR LEAK 4 13MAY04   13MAY04   DR-Y ML-Y   42       0 40 8 0 3SM5- 59.OAIRLEAK 18:00     21:59 ORT3-Y R-N             0408038         HX-1 B SG BL             ISOLATION O ERATOR 140   1       IC5.49D       ICV 87     ICP-05.049     ICP 5.49 CS-2273     3 15MAY04   15MAY04   DR-Y ML-Y   72                                                                       IC5.49DICP .49 CS.2273 H HEATER BYPASS UMIT           06:00     08:59 ORT3-YR-N                                                                             0300869         SECONDARY 141   1   IC0214110       ICV 76       MS-02018         MS.2018 POST       7 15MAY04   15MAY04   DR-Y ML-Y     0                                                                             IC02 I110MS2018 INSPECTION             1Z.0Qr   18:59 ORT3-N R-N                                                                                       021 110 142 1       ICMS2018       ICV 78     MS-02018-O         MS-2018 MSV         7 15MAY04   15MAY04   DR-Y ML-Y     0                                                                               ICM     I MS-2018 M DIAGNOSTIC             1Z00*     18:59 ORT3-NR.                                                                                         0 03 143   O     SWR2004         IT           ERDS           SWR-2004-001       4 14MAY044 14MY0                 161                                           SWR.2004 001 PE FORMTESTING               ERDS SOPTW
13MAY04 13MAY04 DR-Y ML-Y 0
_                                            PERFORM TESTING OF           10:00C 13:59 144 1     MM9924975A     MMI   76         HS-1     HS-1 REBUILD& TEST       15 26APR04   14MAY04   DR-Y ML-Y     0     24975AHS1,                 & TEST         BER (SHOP)
300942 200C0DIAGNOSTICCHECK CHECK 18:00 21:59 ORT3-N R-N 0300942 RE-211/RE212 M NITOR SUPPLY OP RATOR 139 1 IC0408038 ICV 76 MS-05959-O MS 59;-O AIR LEAK 4
SNUBBER (SHOP)           06:00A     15:59 ORT3-N R-N   _-XHA                                                             *MAIN   STEAM UN WEST SNUBBE 145 1     MM9933444A     MMI   76     W-001C2-A       W-1C2A INSTALL       10 10MAY04   14MAY04               45     133444AW-1         INSTALDAMP           BRACING DAMPER BRACING             18:00A   03:59                                                   C       MENT COOLING F N DISCHARGE DA? IPER9933444 146   1   Z22MM020       MMI   76         R-1           MOVE UPPER         2 13MAY04   13MAY04   DR-Y ML-Y       2   M020 MOVEU            I TERNALS          RIG (TO W LDA INTERNALS UFT RIG (TO           13:00   14:59 ORT3-N R-N             EREACTOf VESSEL AND ASS MBLY0214134 147 1     MM0213114       MM1   76         Z-022   Z-022 - REMOVE ROPES     I 13 13MAY 13MAY04   DR YML-Y     63 M0   13 1 14 Z22-   EMOVE ROPES SEURING CRANK                   LE SECURING CRANK             14:00   14:59 ORT3Y R-N           .        R-1 REA   OR VESSELINTE             UFTING RIG     13114 148 1     MM0407989       MMI   76       CPP-14B   ICPP-14B, ROTATE PIPE 10     13MAY04   14MAY04   DR-Y ML.Y   121   M A04079"ICP .148, ROTATE PP ENDS DOWN FOR                     CONCERN ENDS DOWN FOR FME             18 00'   03:59 ORT3-N R-N             0407989                   UIC P1 PENETRATION- ONTAINMENTPRE SURETRAN 149   t   MM9924975B       MM1   76         HS-1         HSt. REINSTALL       6 14MAY04   15MAY04   DR-YML-Y     94                                       M M     2 49 7 5BHS.1. R   STALLSNUBB           AS-LEFTVT4 SNUBBER, AS-LEFT             1600     1059   ORT3-N RIN                                                   99249750 1                                     ASGM 150   1I MM0408272       MMI   10       W-003A       IW-003A. REMOVE       5 15MAY04   15MAY04                 0                                                                   MM04082771          3A. REMOVE SEALS FROM LOUVERS           07 00     11:59                                                                                         0408272             CONTAINI 151 1     MM0408030       MMI   10       W-003B     IW-0038. REMOVE         1 15MAY04   15MAY04               151                                                                             MMO4     0 3 01W-0038, SEALS FROM LOUVERS           12:00     12.59                                                                                                       c3OECONTmi 1521 1   MM0304995       MM2   76       P-028B     P-028B.OVERHAUL       12 30APR04   14MAY04   DR-Y ML-Y     0H    0 4 9 95 P028B    OVERHAUL MAIN *D         PUMPmp MAIN FEED PUMP           1500A     12:59 ORT3-N R-N                                                         STEAMR GENCATOR FEED PUM 0304995 153   1   MM0407390       MM2l 76       P-028B   1P-28BINSPECTSPEED 26       01MAY04   15MAY04   DR-YML-Y     0 MM   orsgolP-2 8 9 NSPECTSPEEDINTREASER INCREASER           0900A     15 59 ORT3-N R-N                                           U                                                           T 154   1   MM9919654       MM2   77       P-0288         IP-28BSTOPOL         4 06MAY04   13MAY04   DR-YML-Y     8     j       1P28BTOLLEAOIIN a                    ALLBAFFLE LEAKnNSTALL BAFFLE         0500A     15 59 ORT3-N R-N                     STEAM PENERATOR FEED MP9919654 Run Date                                         13MAY04 13:40                       LT.03 STANDARD PUBLICATION                                                             Sheet 9 of 18 C Primavera Systems, Inc.                                       FL-03 Execution Publication Set
13MAY04 13MAY04 DR-Y ML-Y 42 040803SM5-59.OAIRLEAK 18:00 21:59 ORT3-Y R-N 0408038 HX-1 B SG BL ISOLATION O ERATOR 140 1
IC5.49D ICV 87 ICP-05.049 ICP 5.49 CS-2273 3
15MAY04 15MAY04 DR-Y ML-Y 72 IC5.49DICP.49 CS.2273 H HEATER BYPASS UMIT 06:00 08:59 ORT3-YR-N 0300869 SECONDARY 141 1
IC0214110 ICV 76 MS-02018 MS.2018 POST 7
15MAY04 15MAY04 DR-Y ML-Y 0
IC02 I110MS2018 INSPECTION 1Z.0Qr 18:59 ORT3-N R-N 021 110 142 1 ICMS2018 ICV 78 MS-02018-O MS-2018 MSV 7
15MAY04 15MAY04 DR-Y ML-Y 0
ICM I MS-2018 M DIAGNOSTIC 1Z00*
18:59 ORT3-NR.
0 03 143 O SWR2004 IT ERDS SWR-2004-001 4
14MAY044 14MY0 161 SWR.2004 001 PE FORMTESTING ERDS SOPTW PERFORM TESTING OF 10:00C 13:59 144 1 MM9924975A MMI 76 HS-1 HS-1 REBUILD& TEST 15 26APR04 14MAY04 DR-Y ML-Y 0
24975AHS1,  
& TEST BER (SHOP)
SNUBBER (SHOP) 06:00A 15:59 ORT3-N R-N
_-XHA  
*MAIN STEAM UN WEST SNUBBE 145 1 MM9933444A MMI 76 W-001C2-A W-1C2A INSTALL 10 10MAY04 14MAY04 45 133444AW-1 INSTALDAMP BRACING DAMPER BRACING 18:00A 03:59 C
MENT COOLING F N DISCHARGE DA? IPER9933444 146 1 Z22MM020 MMI 76 R-1 MOVE UPPER 2
13MAY04 13MAY04 DR-Y ML-Y 2
M020MOVEU TER I
NALS RIG (TO W LDA INTERNALS UFT RIG (TO 13:00 14:59 ORT3-N R-N EREACTOf VESSEL AND ASS MBLY0214134 147 1 MM0213114 MM1 76 Z-022 Z-022 - REMOVE ROPES I
13 13MAY 13MAY04 DR YML-Y 63 M0 13 114Z22-EMOVE ROPES SEURING CRANK LE SECURING CRANK 14:00 14:59 ORT3Y R-N R-1 REA OR VESSELINTE UFTING RIG 13114 148 1 MM0407989 MMI 76 CPP-14B ICPP-14B, ROTATE PIPE 10 13MAY04 14MAY04 DR-Y ML.Y 121 M A04079"ICP.148, ROTATE PP ENDS DOWN FOR CONCERN ENDS DOWN FOR FME 18 00' 03:59 ORT3-N R-N 0407989 UIC P1 PENETRATION-ONTAINMENTPRE SURETRAN 149 t
MM9924975B MM1 76 HS-1 HSt. REINSTALL 6
14MAY04 15MAY04 DR-YML-Y 94 M
M 24975BHS.1. R STALLSNUBB AS-LEFTVT4 SNUBBER, AS-LEFT 1600 1059 ORT3-N RIN 99249750 1
ASGM 150 1I MM0408272 MMI 10 W-003A IW-003A. REMOVE 5
15MAY04 15MAY04 0
MM040827 17 3A. REMOVE SEALS FROM LOUVERS 07 00 11:59 0408272 CONTAINI 151 1 MM0408030 MMI 10 W-003B IW-0038. REMOVE 1
15MAY04 15MAY04 151 MMO4 0301W-0038, SEALS FROM LOUVERS 12:00 12.59 c3OECONTmi 1521 1 MM0304995 MM2 76 P-028B P-028B.OVERHAUL 12 30APR04 14MAY04 DR-Y ML-Y 0 H 04995P028B OVERHAUL MAIN *D PUMPmp MAIN FEED PUMP 1500A 12:59 ORT3-N R-N STEAM GENC R
ATOR FEED PUM 0304995 153 1
MM0407390 MM2l 76 P-028B 1P-28BINSPECTSPEED 26 01MAY04 15MAY04 DR-YML-Y 0 MM orsgolP-289 NSPECTSPEEDINTREASER INCREASER 0900A 15 59 ORT3-N R-N U
T 154 1
MM9919654 MM2 77 P-0288 IP-28BSTOPOL 4
06MAY04 13MAY04 DR-YML-Y 8
a j
1P28BTOLLEAOIIN ALLBAFFLE LEAKnNSTALL BAFFLE 0500A 15 59 ORT3-N R-N STEAM PENERATOR FEED MP9919654 Run Date 13MAY04 13:40 LT.03 STANDARD PUBLICATION Sheet 9 of 18 C Primavera Systems, Inc.
FL-03 Execution Publication Set


after 13MAY04 12:00                                   U1 2               O K N               C E U Eafter                                               13MAY04 12:00
after 13MAY04 12:00 U1 2 O K N C
#   U       1m   RESPWOEWDESCRIPTIONjRD                                         ES       E       RIK     MFI                                               MAY 1551 01 MM0201475     MmZ   76       VNTI3       INSPECTISERVICE OPS   3 12MAY04     13MAY04                   0 M01         INSPEC ISERVICE OPS SH HVAC EQU1P SHOP W-AC EQUIP         1000OA     '1459                             VNBSYSTM MULTI ANDIO NON-NUMBEREDEOUIPMENTO201147; 155 0   MM03057B4     MM2   76       W-129     INSPECT AND MAINTAIN   3 13MAY04     13MAY04                   0 M05.4INsm rAND MAINTAIN               NlAO FAN VENTILATION FAN         11:00A     14.59                             HX-200 N B13RD FLOOR VE           TINFAN (AC-1i 0305784 157' 0   MM0201630     MM2   76       W-048       INSPECTALUBRICATE     4 13MAY0-4   13MAY04                   0 M 02 0 i 6 30 I~     IBJAE           BEARINGS FAN BEARINGS           18:00     21:59                         021630           APNGRO                 GFAN 158 1   MM0302663A   MM2   76     FS-02852         FS-2852. REPLACE   20 13MAY04     15IMAY04                 0 MY )32663A~5             ELC AD           MAL PIPING "WLEAKS)
E U Eafter 13MAY04 12:00
ADDImONAL PIPING         18:00'     0,2.59                       03063                                             KP-308 CY P SEAL WATER 159 0   MM0305786     MM2   76       W-131     INSPECT AND MAINTAIN   4 14MAY04     14MAY04                   0                       MM030576 INS     CTAND MAINTAI VENTILATION FAN IIVENTILATION                     FAN         06:00     09:59                                               0305786       HX-202 NSB 5TH F OORVENTILATIO1 FAN (AC-3) 160 0   MM0305787     MM2   76     HX-245A       INSPECT AND CLEAN   4   14MAY034   14MAY04                   0                       MM0305787N5         AND CLEAN AlIHANDLING UNIT AIR HANDLING UNIT         06:00       M~.59                                             0305787       OPS BLDG AIR W DUNG UNIT 161 1   MM0306052     MMZ   76   CS-02297       INSPECT & MAINTAIN   3 14MAY04     14MAY04   DR-Y ML-Y       0                             MM03060 2INSPECT & MNAIR P-2813 SEAL VATER PCV 11P-28B SEAL WATER         10:.00     12:59   ORT3-N R-N                                       03060! 2     1P-288 SGF SEAL WATER       DM1 LEAKOFF PR[
# U 1m RESPWOEWDESCRIPTIONjRD ES E
162 1   MM030653     MM2   78   CS-0228         INSPECT & MAINTAIN   3 14MAY04     14MAY04   DR-Y ML-Y     14                             MM0300 3INSPECT & MWAN IP-288 SEAL YATER PCV I1P-288BSEAL WATER         10:.00     12-59   ORT3-N R-N                                       03060!M 1P.2813SGF SEAL WATER IN? D LEAKOFF PRE 163 1   MM0301116     MM2   77       P-028A     DRAW OILSAMPLE FOR     2 14MAY04     14MAY04   DR-Y ML-Y       0                                           MMO301I16DRA   1 OILSAMPLEFOF  ANALYSIS ANALYSIS           18:00r     19.59   ORT3-N R-N                                                     0310111,6K         GENERATO FEED PUMP 164 0   MM0201 676   MM2   76       HX-258       INSPECT AND CLEAN     4 14MAY04     14MAY04                   0                                           MM0201676       CTADCLEAN H AC UNIT VAC UNIT           18:00     21:59                                                                 02016f76       TELEPHONE EQ PMENT RM AC 165 1   MM03011117   MM2   77       P.028B     DRAW OL SAMPLE FOR     2 14MAY04     14MAY04   DR-Y ML-Y     1                                               MM0301117D     WOIL SAMPLE IOR ANALYSIS ANALYSIS           20.00'     21:59   ORT3-N RN                                                         0301117     STEAM GENERATR FEED PUMP 1166   1 MM02131019   MMV   781 Cg-M038C         1CS-00038CBODYTO     3 119APR04     13MAY04I DR-Y ML-Y       19 0319               3BBODYTOBON E LEAK BONNETLEAK           090OOA     14:59   ORT3-N R-N                 IHX-1       SG9D HX CLG FL( W RETURN TO ISC 4A COND 0213109 157 1   MM0214110     MMW   76   MS-02018           MS-2018 -OPEN &   48 03MAY04     1MY4     DR-YML-Y       0 M   O 1 MS-201 -0PEN&tNSPEC1VA1.VE-RMP93M INSPECT VALVE -         22.-OOA   I 1159sgl3ORT3-N R-N                                                                               - ---  HX-IA SG 168 1   MM0303383A   MWV   76   SC-00966B         SC-9688VALVE       3   13MAY04   13MAY04   DR-Y ML-Y       0 M     naSC-9S       -VALVE LEAINEBY. CONT. REPAIt LEAKING BY. CONT.         060OOA     14:59   OR3NRNPZR                             0SAMPLE CONTAI ENT ISOLATION 03383.
RIK MFI MAY 1551 01 MM0201475 MmZ 76 VNTI3 INSPECTISERVICE OPS 3
D 159   1 NG44CFCIND     NDE   77     IST-SISI     NDE FOR FAC PROG -4     26APR04     13MAY04   DRYLY         8     CCNOE FOR FAC PROG -C NTAINMENT 44 FT 1EN AREA CONTAINMENT 44 FT         080OOA     15:59   OR3YRNSCNARY                               INSERVICE IN3PECTION 0301897 170 1     EP0301909   NDE   77   UJt-CONTAIN VISUAL INSPECTIONO0F       5 30APR04     13MAYD4   DR-Y ML-Y     80     g     VUA NSPECTION OFCTf LINER PLATE CTMTULNER PLATE         080OOA     16:59   ORT3-Y R-N                     UNIT' CONTAINMENT03 1909 171 1   ND0407589B   NDE   76       T-026             T-026- NDElI    5 12MAY04     14MAY04   DRY YML Y       0     75 9     T.2   NOE IRADIOGRAP 4 OF PIPING RADIOGRAPHY OF         1900A       02:59   ORT3-Y R-N       -UBLOWDO                                 TANK 0407673 172 1     EP04080,43   NDE   77   StMI-01A           1I-SMIAPERF RT     31MY414MAY04                             0                                             EP0408043 1IS IAPERFRTC CKVAL"' -UlR CHECK VALVE-U1R           19:00'     21:59                                                                   04080430P-ISA SI PUMPDIO CH ECIRC TO Run Date                                     13MAY04 13:                         LT.03 STANDARD PUBLICATION                                                           Sheet ID of 18
12MAY04 13MAY04 0 M01 INSPEC ISERVICE OPS SH HVAC EQU1P SHOP W-AC EQUIP 1000OA  
                  @Primavera System,. Inc.                 3T                     FL.03 Execution Publication Sat                             I
'1459 VNBSYSTM MULTI ANDIO NON-NUMBEREDEOUIPMENTO201147; 155 0
MM03057B4 MM2 76 W-129 INSPECT AND MAINTAIN 3
13MAY04 13MAY04 0 M05.4INsm rAND MAINTAIN NlAO FAN VENTILATION FAN 1 1:00A 14.59 HX-200 N B1 3RD FLOOR VE TINFAN (AC-1i 0305784 157' 0 MM0201630 MM2 76 W-048 INSPECTALUBRICATE 4
13MAY0-4 13MAY04 0
M 020i 630I~
IBJAE BEARINGS FAN BEARINGS 18:00 21:59 021630 APNGRO GFAN 158 1 MM0302663A MM2 76 FS-02852 FS-2852. REPLACE 20 13MAY04 15IMAY04 0 MY )32663A~5 ELC AD MAL PIPING "WLEAKS)
ADDImONAL PIPING 18:00' 0,2.59 03063 KP-308 CY P SEAL WATER 159 0 MM0305786 MM2 76 W-131 INSPECT AND MAINTAIN 4
14MAY04 14MAY04 0
MM030576 INS CTAND MAINTAI VENTILATION FAN IIVENTILATION FAN 06:00 09:59 0305786 HX-202 NSB 5TH F OOR VENTILATIO1 FAN (AC-3) 160 0
MM0305787 MM2 76 HX-245A INSPECT AND CLEAN 4
14MAY034 14MAY04 0
MM0305787N5 AND CLEAN AlIHANDLING UNIT AIR HANDLING UNIT 06:00 M~.59 0305787 OPS BLDG AIR W DUNG UNIT 161 1
MM0306052 MMZ 76 CS-02297 INSPECT & MAINTAIN 3
14MAY04 14MAY04 DR-Y ML-Y 0
MM03060 2INSPECT & MNAIR P-2813 SEAL VATER PCV 11P-28B SEAL WATER 10:.00 12:59 ORT3-N R-N 03060! 2 1P-288 SGF SEAL WATER DM1 LEAKOFF PR[
162 1 MM030653 MM2 78 CS-0228 INSPECT & MAINTAIN 3
14MAY04 14MAY04 DR-Y ML-Y 14 MM0300 3INSPECT & MWAN IP-288 SEAL YATER PCV I1P-288BSEAL WATER 10:.00 12-59 ORT3-N R-N 03060!M 1P.2813SGF SEAL WATER IN? D LEAKOFF PRE 163 1 MM0301116 MM2 77 P-028A DRAW OILSAMPLE FOR 2
14MAY04 14MAY04 DR-Y ML-Y 0
MMO301I16DRA 1OILSAMPLEFOF ANALYSIS ANALYSIS 18:00r 19.59 ORT3-N R-N 0310111,6K GENERATO FEED PUMP 164 0
MM0201 676 MM2 76 HX-258 INSPECT AND CLEAN 4
14MAY04 14MAY04 0
MM0201676 CTADCLEAN H AC UNIT VAC UNIT 18:00 21:59 02016f76 TELEPHONE EQ PMENT RM AC 165 1 MM03011117 MM2 77 P.028B DRAW OL SAMPLE FOR 2
14MAY04 14MAY04 DR-Y ML-Y 1
MM0301117D WOIL SAMPLE IOR ANALYSIS ANALYSIS 20.00' 21:59 ORT3-N RN 0301117 STEAM GENERATR FEED PUMP 1166 1 MM02131019 MMV 781 Cg-M038C 1CS-00038CBODYTO 3 119APR04 13MAY04I DR-Y ML-Y 19 0319 3BBODYTOBON E LEAK BONNETLEAK 090OOA 14:59 ORT3-N R-N IHX-1 SG9D HX CLG FL( W RETURN TO ISC 4A COND 0213109 157 1 MM0214110 MMW 76 MS-02018 MS-2018 -OPEN &
48 03MAY04 1MY4 DR-YML-Y 0 M O 1 MS-201 -0PEN&tNSPEC1VA1.VE-RMP93M INSPECT VALVE -
22.-OOA I 1159sgl3 ORT3-N R-N H
X-IA SG 168 1 MM0303383A MWV 76 SC-00966B SC-9688VALVE 3
13MAY04 13MAY04 DR-Y ML-Y 0 M naSC-9S  
-VALVE LEAINE BY. CONT. REPAIt LEAKING BY. CONT.
060OOA 14:59 OR3NRNPZR D
0SAMPLE CONTAI ENT ISOLATION 03383.
159 1 NG44CFCIND NDE 77 IST-SISI NDE FOR FAC PROG -4 26APR04 13MAY04 DRYLY 8
CCNOE FOR FAC PROG -C NTAINMENT 44 FT 1EN AREA CONTAINMENT 44 FT 080OOA 15:59 OR3YRNSCNARY INSERVICE IN 3PECTION 0301897 170 1 EP0301909 NDE 77 UJt-CONTAIN VISUAL INSPECTIONO0F 5
30APR04 13MAYD4 DR-Y ML-Y 80 g
VUA NSPECTION OFCTf LINER PLATE CTMTULNER PLATE 080OOA 16:59 ORT3-Y R-N UNIT' CONTAINMENT03 1909 171 1
ND0407589B NDE 76 T-026 T-026-NDEl I 5
12MAY04 14MAY04 DRY YML Y 0
75 9 T.2 NOE IRADIOGRAP 4 OF PIPING RADIOGRAPHY OF 1900A 02:59 ORT3-Y R-N  
-UBLOWDO TANK 0407673 172 1 EP04080,43 NDE 77 StMI-01A 1I-SMIAPERF RT 31MY414MAY04 0
EP04080431IS IAPERFRTC CKVAL"' -UlR CHECK VALVE-U1R 19:00' 21:59 04080430P-ISA SI PUMPDIO CH ECIRC TO Run Date 13MAY04 13:
LT.03 STANDARD PUBLICATION Sheet ID of 18
@ Primavera System,. Inc.
3T FL.03 Execution Publication Sat I


after 13MAY04 12:00                                 U1R28 WORKING SCHEDULE                                                                       after 13MAY04 12:00 10 RESPI WO                                                                                                                                   MAY IE1CRSM
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 10 RESPI WO IE1CRSM MAY
_ U         IO                       E00           DESCRIPTION     RD     ES       EF       RISK     MF   ThU 13                 .                  Fd 14             .                  Sat 15 ST                       .    ..                          ..                    .10 12.14.16.11&20.2210, 2.4. B. 8.l.14,116,18.20.2210.*2.4. 6. 8 .10112,14,16, 173 E 1   EP0408044   NDE   77     SI-00891B     1Sl,891 BPERF RT   3   14MAY04   14MAY04               65 1      jjfl0,2                          EP0408044ISla9B PERF RTCH CKVALVE U1 CHECKVALVE-U1R28           190-00   21:59                                                                     0408044-P158 SI PUMP D 3CH RECIRCT 174 1   P1402NDE     NDE   77       Z-022     Z 022- INTERNALS LIFT 12   15MAY04   15MAY04   DR-Y ML-Y     0                                                                       P1402     Z-022..1NTE RIG NDE EXAM           10_00     2!59   ORT3-Y R-N                                                                                 03019 3 150 O002s ora   7     0751               PERFORM         I   07MAYD4   13MrAY04 DR-N r^L-N                           M 708 O01254 PERFoF MArNTENANCE CN THE SCELA 1780     0P030124     CPU   77                 MAINTENANCE ON THE         07.0A     12:59. ORT3-N R-N                       M JNTENANCE MPERIODIC OF TH     HSCBA03012-178 o   OP0301248   orPo   77     O-PC-             BnNEEKLY       I   13MAYD4  13MAYU4              170 o~     248BONVEEM LY OPERATIONICHI CK OF BAIRON II OPERATIONCHECK OF           1Z:00'   12S59                         CK OF BARD q 11HIGH PRESS BR ATHING AIR                 M0301248 177 0   OP0301240   OP0   77   O-PC-021.4           WEEKLY       5   13MAY04   14MAY04               166 OP0 012 4 0 WEDQ: MNSCELLANEOUS DATA READINGS MISCELLANEOUS DATA           12:00'   08:59                                                               .WEEKLY MISC         EOUS DATA     INGS0301240 178 0   oP0301283   OPo   77   O-PC-075.8         AOP 10A FAN     4   14MAY04   14MAY04               164                           oP0 3 0 12 83A       FAN SURVE LANCE SURVEILrANCE             07:00     10"59                                                 0301283-AOP 10A FAN S RVEIU.NCE 179 0   OP0215335   OPO   77   O-PCr-774       DRY PIPE SYSTEM   8   14MAY04   14MAY04               160                           OP0215330DR PIPESYSTEM CH CK CHECK               07.-0'   14:59                                                 0215335                   DR -PIPE FPS VALVE       -TESTy 180 2   OP0301572   OP1   77   O-TS-O010AB TS-10A.U2CAIR LOCK   2   14MAY04   14MAY04               202             OP03( 1 5 72 TS-IOA,U2C RLOCKDOORS LTEST DOOR SEAL TEST           00-00'     01:59                                   031 1572-U2 CONT R LOCK DOOR SEA TEST 181 0   OP0301293   OPI   77   O-PC-MIDS OPERATIONS MID SHIFT 49       14MAY04   20MAY04               155             OPo   1 2 93OPERATlONS        DSHIFT WEEKLY ROUTINE
_ U IO E00 DESCRIPTION RD ES EF RISK MF ThU 13 Fd 14 Sat 15 ST  
_ _                  _    _                    WEEKLY ROUTINE           00-00'     06:59                                   03     2       31_
.10 12.14.16.11&20.2210, 2.4. B. 8.l.14,116,18.20.2210.*2.4. 6. 8.10112,14,16, E
182 2   OP0301590   OPI   77   TS-RE-004         FLUX DIFFERENCE 2   15MAY04   15MAY04               195                                                       OP03 5 90AXIALFLUXD          RENCEAN UAD POWER QAND            _  0000'     01:59                                                                             03 590UAXIA FL         DIFFERENCE 83 2   OP0301581   OPI   77   O-PC-023.5     CHARGING PUMP       3         Y04 15MAY04               194                                                       OP03 158 CHARGING           ROTATION ROTATION AND           00c'_     02:59                                                                             030 h581     CHARG     PUMP ROTAT w-h                                         w                   EwI                     w~                         --                                    -            -                    -
1 jjfl0,2 173 1
184 0   OP030 1332 185 0 1P0301394 OP2 OP3 I.
EP0408044 NDE 77 SI-00891B 1Sl,891 BPERF RT 3
76 76 o-PC-DAYS OPERATIONS DAY SHT 21 O-PC-SWiNG WEEKLY ROUTINE OPS SWING SHIFT 42 10MAY04 08:00A 12MAY04 16MAY04 11:59 18MAY04 DR-Y ML-Y ORT3-Y R-N .
14MAY04 14MAY04 65 EP0408044ISla9B PERF RTCH CKVALVE U1 CHECKVALVE-U1R28 190-00 21:59 0408044-P158 SI PUMP D 3CH RECIRCT 174 1
18  _
P1402NDE NDE 77 Z-022 Z 022-INTERNALS LIFT 12 15MAY04 15MAY04 DR-Y ML-Y 0
l 168 p0 332OPERA I394 OPS NS DAY SHIFT EKLY ROUTINE NOSHiFTrWEEKL ROUTINE sv1 -
P1402 Z-022..1NTE RIG NDE EXAM 10_00 2!59 ORT3-Y R-N 03019 3 150 O002s ora 7
WEEKLY ROUTINE           16:00A     22.59 186 2   OP0301645     OP3   77     O-IT-M013     IT-13,2P-1IA/BCCW   2   13MAY04   13MAY04               208     0 1645IT13.2     I1A1BCCWPUMP VALVES, PUMPS1VALVES.           16800'   17:59                       0 1645E2P-1A B COMPONENT OOLING WATER PiMPSIVALVES 187 0   OP0301409     OP3   77   O-PC-045.3         PUMP OUT       3   13MAY04   13MAY04               207 PO 01409PUMP             CIRCULATING ATER PUMP PITS CIRCULATING WATER           16:00'   18 59                       0 01409C1CULA NO WATERPP PIT PUMPIN 188 0   OP0301326   OP3   76     O-IT-0072   IT-72,SERVICEWATER   11   13MAY04   14MAY04               199 pO 013261T7ZS RVICEWATERV                     S VALVES             1650     19:59                       0101326                 -            I           M           CEWATERV     VES Run Date                                     13MAY04 13:401                   LT-03 STANDARD PUBLICATION                                                             Sheet 11 of 18 C Primavera Systems, Inc.                   I                 FL-03 Execution Publication Set                             I
0751 PERFORM I
07MAYD4 1 3MrAY04 DR-N r^L-N 708 O01254 PERFoF M MArNTENANCE C N THE SCELA 1780 0P030124 CPU 77 MAINTENANCE ON THE 07.0A 12:59.
ORT3-N R-N MPERIODIC M JNTENANCE OF TH HSCBA03012-178 o OP0301248 orPo 77 O-PC-BnNEEKLY I
1 3MAYD4 1 3MAYU4 170 o~
248BONVEEM LY OPERATIONICHI CK OF BAIRON II OPERATIONCHECK OF 1Z:00' 12S59 CK OF BARD q 11 HIGH PRESS BR ATHING AIR M0301248 177 0 OP0301240 OP0 77 O-PC-021.4 WEEKLY 5
13MAY04 14MAY04 166 OP0 0124 0WEDQ: MNSCELLANEOUS DATA READINGS MISCELLANEOUS DATA 12:00' 08:59  
.WEEKLY MISC EOUS DATA INGS0301240 178 0 oP0301283 OPo 77 O-PC-075.8 AOP 10A FAN 4
14MAY04 14MAY04 164 oP03012 83A FAN SURVE LANCE SURVEILrANCE 07:00 10"59 0301283-AOP 10A FAN S RVEIU.NCE 179 0 OP0215335 OPO 77 O-PCr-774 DRY PIPE SYSTEM 8
14MAY04 14MAY04 160 OP0215330DR PIPESYSTEM CH CK CHECK 07.-0' 14:59 0215335 DR -PIPE FPS VALVE  
-TESTy 180 2 OP0301572 OP1 77 O-TS-O010AB TS-10A.U2CAIR LOCK 2
14MAY04 14MAY04 202 OP03( 1572 TS-IOA,U2C RLOCKDOORS LTEST DOOR SEAL TEST 00-00' 01:59 031 1572-U2 CONT R LOCK DOOR SEA TEST 181 0
OP0301293 OPI 77 O-PC-MIDS OPERATIONS MID SHIFT 49 14MAY04 20MAY04 155 OPo 1293OPERATlONS DSHIFT WEEKLY ROUTINE WEEKLY ROUTINE 00-00' 06:59 03 2
31_
182 2
OP0301590 OPI 77 TS-RE-004 FLUX DIFFERENCE 2
15MAY04 15MAY04 195 OP03 590AXIALFLUXD RENCEAN QAND UAD POWER 0000' 01:59 03 590UAXIA FL DIFFERENCE 83 2 OP0301581 OPI 77 O-PC-023.5 CHARGING PUMP 3
Y04 15MAY04 194 OP03 158 CHARGING ROTATION ROTATION AND 00c'_
02:59 030 h581 CHARG PUMP ROTAT w-h w
EwI w~
184 0 OP030 1332 OP2 76 o-PC-DAYS OPERATIONS DAY SHT 21 10MAY04 16MAY04 DR-Y ML-Y 18 332 OPERA NS DAY SHIFT EKLY ROUTINE WEEKLY ROUTINE 08:00A 11:59 ORT3-Y R-N I.
l sv1 w
185 0 1P0301394 OP3 76 O-PC-SWiNG OPS SWING SHIFT 42 12MAY04 18MAY04 168 p0 I394 OPS NOSHiFTrWEEKL ROUTINE WEEKLY ROUTINE 16:00A 22.59 186 2 OP0301645 OP3 77 O-IT-M013 IT-13,2P-1IA/BCCW 2
13MAY04 13MAY04 208 0 1645IT13.2 I1A1BCCWPUMP VALVES, PUMPS1VALVES.
16800' 17:59 0 1645E2P-1A B COMPONENT OOLING WATER PiMPSIVALVES 187 0 OP0301409 OP3 77 O-PC-045.3 PUMP OUT 3
13MAY04 13MAY04 207 PO 01409PUMP CIRCULATING ATER PUMP PITS CIRCULATING WATER 16:00' 18 59 0 01409C1CULA NO WATERPP PIT PUMPIN 188 0 OP0301326 OP3 76 O-IT-0072 IT-72,SERVICEWATER 11 13MAY04 14MAY04 199 pO 013261T7ZS RVICEWATERV S
VALVES 1650 19:59 0101326 I
M CEWATERV VES Run Date 13MAY04 13:401 LT-03 STANDARD PUBLICATION Sheet 11 of 18 C Primavera Systems, Inc.
I FL-03 Execution Publication Set I


after 13MAY04 12:00                                       U1R28 WORKING SCHEDULE                                               Iafer13MAY0412:00
after 13MAY04 12:00 U1R28 WORKING SCHEDULE Iafer13MAY0412:00 ID RESPI WO EQID DESCRIPTION RD ES EF RISK MF MY14 i
_            ID         RESPI WO EQID DESCRIPTION       RD     ES         EF RISK   MF 1
2-10.
MY14 6        2-10.'2 468 i
468 1
189 2   U2GNDR015         OP3             TG-01           DRAIN U2 MAIN       1 14MAY04       14MAY04               0                                         U2GNDR015D       N U2 MAIN ELEC1 RCAL GENERA ELECTRICAL             19-00       19-59                                                                               NGERTI
6
________                          ~~~~GENERATOR   PER PC                           ____                                                                        ANGNRT 190 0   0P0301428         OP3     77 O-P078 3         MONTHLY NORTH         I 15MAY04       15MAY               195                                                                         OP=01428MON SERVICE BUILDING           15:00'       16:59                                                                                             030`14293M 191 1     IT-510B6A       OP4     70 04T-0510B     PREPS FOR WRPM TEST       4 14MAY04       14MAY04 DR-N ML-N     0 _                     IT510A           FOR LRPM TEST       SI TEST LINE 192 1
'2 189 2 U2GNDR015 OP3 TG-01 DRAIN U2 MAIN 1
            ,-Eu z           CVCSPMT         OPS               CV OF SI TEST LINE PERFORM CVCS         8 06 12MAY04 0959 13MAY04
14MAY04 14MAY04 0
                                                                                                        -ORT3-N R-N DR-N ML-N U178 PMTPERFOR ACVCS WAL 0215912
U2GNDR015D N U2 MAIN ELEC1 RCAL GENERA ELECTRICAL 19-00 19-59 NGERTI
_U1 SlTEST I FOR PMT PYAD EDUCTU(
~~~~GENERATOR PER PC ANGNRT 190 0 0P0301428 OP3 77 O-P078 3 MONTHLY NORTH I
                                                                                                                                                                                                  -E_
15MAY04 15MAY 195 OP=01428MON SERVICE BUILDING 15:00' 16:59 030`14293M 191 1
REDUCTOP WALKDOWN FOR PMT             08OCA         19.59 ORT3-N R-N 193 1       IT-300C       OPS     77 04T-0300C       STROKE TEST MFW       1 12MAY04       13MAY04 DR-N ML-N     0T      STRO       ST MFW CONTROL BYPASS VALVES CONTROL & BYPASS           10:00A       1Z59   ORT3-N R-M           UNIT 1 FEED REGULATINGVAL\ *TEST0215906
IT-510B6A OP4 70 04T-0510B PREPS FOR WRPM TEST 4
_____            ____VALVES 194 1     O-RT-059         OPS     77   O-RT-059       LLRT TRAIN A CONT     I 13MAY04       13MAY04 OR-N MR-N     0 l       LLRT    INA CONT SPRAY rIV SPRAYCIV`           040OOA       12.59 ORT3-N R-N           P-4A PUMP, -SW2ADISCH CHK S         4AA1ISL (P-54) )215992 195 0     TRAIN-CE         OPS                         REDUCED INVENTORY       2 13MAY04       13MAY04             117       EREDUCE   INVENTORY Jr     REW E JITT. CREW E           12:00       13:59 196 1   EP0403494A       OPS     76   PT-RCS-1     OPERATING SUPPORT       4 13MAY04       13MAY04   DR-Y ML-Y 174           OPEi TING SUPPORT OF NITIAL RCS WALKDOWN OF INITIAL RCS           12:00'       15:59 ORT3-N R-N               REACT RCOOANT SYS           (RCS) PRESSUR TEST- IN/04O349
14MAY04 14MAY04 DR-N ML-N 0 _
_______            ______              WALJ(DOWN             _    _  __              _  _
IT510A FOR LRPM TEST SI TEST LINE OF SI TEST LINE 06 0959 ORT3-N R-N 0215912
197 1   O-RT-035B         OPS           CPP-28A     LLRT HOT LEG SAMPLE       4 13MAY04       13MAY04 DR-N ML-N   170           R CT lEG SAMPLE LlN     - POSTORT UNE-POSTORT               12:00       15:59 ORT3-NR-N                 HOTLE SAMPLEUN 198 1   O-RT-0538         OPS     77   O-RT-053       LLRT RCDT TO GAS       4 13MAY04       13MAY04   DR-N ML-N 208               RC TR TO GAS A-lALY       POST ORT ANALYZER- POST ORT           1200-       15:59 ORT3-N R-N               RCDT1 GAS ANALYZER 1-34D)0215988 199 1     O-RT-064A       OPS     77   O-RT-464         LLRT RE-2111212     4 13MAY04       13MAY04   DR-Y ML-Y   0         LLRTE 2111212 SUPPLY- REORT SUPPLY- PRE ORT           12.00-       15:59 ORT3-N R-N               RE-211 WDNRE-212SUPPL '(PX-1)0215995 200 1   O-RT-067B         OPS     77   O-RT-067     POST LLRT EX STDN     HX 8 13MAY04       13MAY04   DR-N MI-N 153         POST U C EX TOAN HX CC INES CONTINGE                     2CY CCOWLINES             12.00       19:59 ORT3-N R-N                     CZNTO AND FROM CESLETDOWN HX(P-1W/-20)0216
_U1 SlTEST PYAD EDUCTU(
_________________                    CONTINGENCY           _    _  _
REDUCTOP
201 1     0148-050       OPS             T-036     FILL MFP P-28A & B LUBE 8   13MAY04       13MAY04   DR-N ML-N   22 01U         MFP *28A & B LUBE OL RESERVIORS OIL RESERVIORS           1200'       19:59 ORT3-N R-N                   L   SYSTEM MULTI A DIDOR NON-NUMBElRED ECUIPMENT 202 1     SOPBS7B         OPS             T-013     LOWER RWST LEVEL T7 12     13MAY04       13MAY04               90go   5LJWER           LEVEL   iTO1 41%               12Z00       23:59 203 1       01-132       OPS             01-132       FILL & VENT CONT     16 13MAY04       14MAY04   DR-N M0-Y   0       !    _    ;ONTSPRAY SPRAY               13:00       04:59 CRT3-N R-N 204 01   TRAIN-CDO         PS                       REDUCED INVENTORY       2 13MAY04       13MAY04             114 RA4     REDUCE II NVENTORY JITT, -REWN 0 JITTT, CREW D           15:00       18:59 205 1   OP0300942         OPS     76 RM03200-C RM3200C PMT STROKE           I 13MAY04       13MAY04   DR-Y ML-Y 143         oP30&deg;&deg; 2RM-3200C P1R212     OKNPER  SP330 PER IT330             22.00       2259   ORT3-N R-N                 0309 2RE-211/IRE-212       ITOroRSUPPLY N              C ERATOR 206 1     SOP-B01Z         OPS               B-401     SUPPLY 1B-01 FROM       3 14MAY04       14MAY04 DR-N ML-N     0             SOP   oiZSUPPLY 1-1 FROM iA-01 IAWIOP-480-01 1A-01 IAW 1-SOP-480-001       00:00       02:59 ORT3-N R-N                           -
,-Eu z U -
Run Date                                           13MAY04 13:40                       LT-03 STANDARD PUBLICATION                                                       Sheet 12 of 18 C Prlmavera Systems, Inc.                                             FL.03 Execution Publication Set                       I
-E_
192 1 CVCSPMT OPS CV PERFORM CVCS 8
12MAY04 13MAY04 DR-N ML-N 178 PMTPERFOR A CVCS WAL I FOR PMT WALKDOWN FOR PMT 08OCA 19.59 ORT3-N R-N 193 1 IT-300C OPS 77 04T-0300C STROKE TEST MFW 1
12MAY04 13MAY04 DR-N ML-N 0 T STRO ST MFW CONTROL BYPASS VALVES CONTROL & BYPASS 10:00A 1Z59 ORT3-N R-M UNIT 1 FEED REGULATINGVAL\\ *TEST0215906
____VALVES 194 1 O-RT-059 OPS 77 O-RT-059 LLRT TRAIN A CONT I
13MAY04 13MAY04 OR-N MR-N 0
LLRT l
IN A CONT SPRAY r IV SPRAYCIV`
040OOA 12.59 ORT3-N R-N P-4A PUMP,  
-SW2A DISCH CHK S 4AA1ISL (P-54) )215992 195 0 TRAIN-CE OPS REDUCED INVENTORY 2
13MAY04 13MAY04 117 EREDUCE INVENTORY Jr REW E JITT. CREW E 12:00 13:59 196 1 EP0403494A OPS 76 PT-RCS-1 OPERATING SUPPORT 4
13MAY04 13MAY04 DR-Y ML-Y 174 OPEi TING SUPPORT OF NITIAL RCS WALKDOWN OF INITIAL RCS 12:00' 15:59 ORT3-N R-N REACT R COOANT SYS (RCS) PRESSUR TEST-IN/04O349 WALJ(DOWN 197 1 O-RT-035B OPS CPP-28A LLRT HOT LEG SAMPLE 4
13MAY04 13MAY04 DR-N ML-N 170 R
CT lEG SAMPLE LlN - POSTORT UNE-POSTORT 12:00 15:59 ORT3-NR-N HOTLE SAMPLEUN 198 1 O-RT-0538 OPS 77 O-RT-053 LLRT RCDT TO GAS 4
13MAY04 13MAY04 DR-N ML-N 208 RC TR TO GAS A-lALY POST ORT ANALYZER-POST ORT 1200-15:59 ORT3-N R-N RCDT1 GAS ANALYZER 1 -34D)0215988 199 1 O-RT-064A OPS 77 O-RT-464 LLRT RE-2111212 4
13MAY04 13MAY04 DR-Y ML-Y 0
LLRTE 2111212 SUPPLY-REORT SUPPLY-PRE ORT 12.00-15:59 ORT3-N R-N RE-211 WDNRE-212SUPPL '(PX-1)0215995 200 1 O-RT-067B OPS 77 O-RT-067 POST LLRT EX STDN HX 8
13MAY04 13MAY04 DR-N MI-N 153 POST U EX C
TOAN HX CC INES CONTINGE 2CY CCOWLINES 12.00 19:59 ORT3-N R-N CZNTO AND FROM CESLETDOWN HX(P-1W/-20)0216 CONTINGENCY 201 1
0148-050 OPS T-036 FILL MFP P-28A & B LUBE 8
13MAY04 13MAY04 DR-N ML-N 22 01U MFP  
*28A & B LUBE OL RESERVIORS OIL RESERVIORS 1200' 19:59 ORT3-N R-N L
SYSTEM MULTI A DIDOR NON-NUMBElRED ECUIPMENT 202 1 SOPBS7B OPS T-013 LOWER RWST LEVEL T7 12 13MAY04 13MAY04 90go 5LJWER LEVEL iTO1 41%
12Z00 23:59 203 1 01-132 OPS 01-132 FILL & VENT CONT 16 13MAY04 14MAY04 DR-N M0-Y 0  
;ONTSPRAY SPRAY 13:00 04:59 CRT3-N R-N 204 01 TRAIN-CDO PS REDUCED INVENTORY 2
13MAY04 13MAY04 114 RA4 REDUCE II NVENTORY JITT, -REWN 0 JITTT, CREW D 15:00 18:59 205 1 OP0300942 OPS 76 RM03200-C RM3200C PMT STROKE I
13MAY04 13MAY04 DR-Y ML-Y 143 oP30&deg;&deg; 2RM-3200C P1R212 OKN PER SP 330 PER IT330 22.00 2259 ORT3-N R-N 0309 2RE-211/IRE-212 N
ITOroRSUPPLY C ERATOR 206 1 SOP-B01Z OPS B-401 SUPPLY 1B-01 FROM 3
14MAY04 14MAY04 DR-N ML-N 0
SOP oiZSUPPLY 1-1 FROM iA-01 IAWIOP-480-01 1A-01 IAW 1-SOP-480-001 00:00 02:59 ORT3-N R-N Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 12 of 18 C Prlmavera Systems, Inc.
FL.03 Execution Publication Set I


after 13MAY04 12:00                                     U1R28 WORKING SCHEDULE                                                                                       after 13MAY04 12:00
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00
# U           HID     RESPj WO         EQID           DESCRnPWON             RD           ES             EF         RISK       MF                                                 MAY
# U HID RESPj WO EQID DESCRnPWON RD ES EF RISK MF MAY 13Frl14 sat is
_ST                                 . .                                        E.l-t                                                         12i4.6r8 2l4--2o210 13Frl14                                  rn'12,1416182022,4,6,8,l0112,14,'I sat is 207   1 O-RT-055B       OPS     77   O-RT-055       POST LLRT HX-1A           4       14MAY04       14MAY04 I DR-N ML-N I         15 O-RT0 )jMP0ST LLRT H LIA BLOWDOWN (C ONTINGENCY)
_ST E.l-t 2l4--2o210 12i4.6r8 rn'12,1416182022,4,6,8,l0112,14,'I 207 1
BLOWDOWN                          00:00         03:59     ORT3-N R-N 021 5990MA STEA GENERATOR BL8 NDOWN (P-S1) 208   1     X03-010     OPS             X-03         IPTE BRIEF TO           2       14MAY04       14MAY04       DR-N ML-N         0                     XOM01-OPTE BR!! FTO DE-ENERGIZE X.03 DE-ENERGtZE X-03                     03:00         04:59     ORT3-N R-N
O-RT-055B OPS 77 O-RT-055 POST LLRT HX-1A BLOWDOWN 4
* HIGH rOLTAGE STATION) ,UXILARY TRANSF( )RMER 209   1 ORT-003C1       O       -    O-RT-003C     PREPARATIONS FOR             4       14MAY04       14MAYD4       DR-N ML-N         0              0 IT-003C1 PREPAR) fONS FOR ORT-3 (ORT-3C)
14MAY04 14MAY04 I DR-N ML-N I 00:00 03:59 ORT3-N R-N 15 O-RT0 021 208 1
ORT-3C (ORT-3C)                     03:00         06:59     ORT3-N R-N                                                                 TH L PSS OF SAFEGUARI IS AC MS1 CTUA 210   1 O-RT-059A       OPS     77   O-RT-059   COMPLETE LEAK CHE0t             1     14MAY04       14MAY04       DR-Y ML-Y         0 O.RT.059ACOMP (EELEAK CHECKl 'ER 0-RT.59 PER O-RT-59                       05:00         05:59     ORT3-N R-N                                   0215992EP-14 PUMP/SI-862A DIS 'H CHKISI-s64A IS( L (P-54) 211   1 O-RT-060A       OPS     77   O-RT-060   COMPLETE LEAK CHEU             I     14MAY04       14MAY04       DR-Y ML-Y         0 O.RT-M6ACOMP {ETE LEAK CHECK 'ER O-RT-0I PER O-RT.60                       05:00         05:59     ORT3-N R-N 02159931P.14 PUMPISI-8M28 DIS H CHKSI-864B IS( P1-      (P-55) 212   1     X03-020     OPS             X-03       DEENERGIZE X-03           2       14MAY04       14MAY04       DR-N ML-N         0                         X03-020 DEEN IRGZE X403 05:00         06:59     ORT3-N R-N EHII H VOLTAGE STATIC INAUXILIARYTRAN SFORMER 213   1 OP0303383       OPS   76   SC-00966B   SC-966B - PMT STROKE           I     14MAY04       14MAY04       DR-Y ML-Y         0                                         96GB - PMT STROK 'PER IT 60 PER IT 60                      07:00         07:59     ORT3-N R-N 03033831F    R LIQUID SAMPLE MONTAINMENT ISO ATION 214   1 ORT-003C2       OPS         O-RT-003C     IPTE BRIEF FOR AUX           4       14MAY04       14MAY04       DR-N ML-N         0                         ORT-003C2W1P E BRIEF FOR AUX FILED TEST FEED TEST                       07:00r         10:59     ORT3-N R-N U  "si ACTUATION v ITH LOSS OF SAFE 3UARDS AC 215   1 0P0303382       OPS     82   SC-00953     SC-953 -PMT STROKE             I     14MAY04       14MAY04       DR-N ML-N     151 PER IT 60                       1:o0.C         10a59     ORT3-N R-N 0P030331 SC 953-PMT STRI PKE PER IT 60 03033! 2&sect;PZR UOUID SPA lE SAMPLE CONTA NMENT ISOLAT 216   1 O-RT-03B         OPS   77   O-RT-038   POST LLRT PZR UQUID           4       14MAY04       14MAY04       DR-N ML-N     148 O-RT-03( ;11POST LLRT PZR LIOUID SAMPLE UNL SAMPLE LINE                       10:00         13:59     ORT3-N R-N 02159% IPPRESSURE ER UQUID SAMPLM LINE (P-28B)
X03-010 OPS X-03 IPTE BRIEF TO 2
[T-510s a LRPM TEST OF SI hEST UNE 217   1   IT-51oBB       OPS   70   04T-0s1OB   LRPM TEST OF SI TEST         6       14MAY04       14MAY04       DR-Y ML-Y       77 LINE               _        1a000         15:59     ORT3-N R-N 021591 2U1              SITE ST UNE/SPY ADD  O DUCT LKG RED 218   1 ORT-003C3       OPS   70   O-RT-003C       PERFORM ORT-3C             4       14MAY04       14MAY04       DR-N ML-N         0 ORT.002 C3 PERFORM ORT- CI 11:00         14:59     ORT3-N R-N 0215 155=AUXLIAR1 'FEEDWATER SYS EM AND AMSAf 219   1   852-427C       OPS   76       B-42         BUS STAB PMT               I     14MAY04       14MAY04       DR-N ML-N     184 B52-427C BUS STM kPMT I1RC-596
14MAY04 14MAY04 DR-N ML-N 0
_ _1RC-596                     15:0           15:59     ORT3-N R-N 02025273480V        PTOR CONTROL C fTER PAB SAFE 220   1   OP13A110       OPS           TG-01-T     PLACE TURBINE ON             2     14MAY04       14MAY04       DR-N ML-N         0                                         P13A110 PLACE        lRBINE ON TURNINS ;GEAR TURNING GEAR                       15:00         16:59     ORT3-N R-N                                                                       URBINE      ERAT IRTURNING GE Z21   1 ORT4003C4       OPS         O-RT-003C       RECOVER FROM             4       14MAY04       14MAY04       DR-N ML-N         0                                         RT-003C4RECOVEF FROM ORT-3C ORT-3C                       15:00         18:59     ORT3-N R-N 222   1   oP13A120       OPS-         OP-13A       FILL CONDENSER             4       14MAY04       14MAY04       DRN ML-N     116-                                           IOP13AI20FLLI ONDENSER H            ELL HOTWELL                         18:00         21:59     ORT3-N R-N I
DE-ENERGtZE X-03 03:00 04:59 ORT3-N R-N 209 1
223   71 CL13B010       OPT -       CL-13B     CONDENSATE VALVE             16     14MAY04       15MAY04       DR-N ML-N         0                                             CL13BO10CON )ENSATE VALVE          4EUPS
ORT-003C1 O
_LNEUPS                       18:00         09:59     ORT3-N R-N (CL-13B)__                       _  _  _  _  _ _  _  __ _  _  _ _                                                        Iw                              JCONDENSATE 2   1     IT-740       OPS   77   0-4T-0740     IT-740, MAIN STEAM           I     14MAY04       14MAY04       DR-N ML-N     232 BLOWDOWN                         19:00         1k59     ORT3-N R-N                                                             IIT740 IT- 40. MAIN STEAM BI OWVDOWN 02159251      rr 1 MAiN STEAMNT ILOWDOWN VAI u   I   l     v     w'ra                           MPIV~v   I .rgjr~l   4       lqfpv.Fu.4 I 1-*MI%1Ui                     bb                                                TRAIN-CCRE SUCED neVENTO~a JITT, CREW C JITT. CREW C                      19:00.         20:59
O-RT-003C PREPARATIONS FOR 4
_                                                                        I .. II                         I             I   . I               I.I.I.I Run Date                                       13MAY04 13:401                               LT-03 STANDARD PUBLICATION                                           l                         Sheet 13 of 18 0 Primavera Systems, In.                     I                             FL-03 Execution Publication Set                                     I
14MAY04 14MAYD4 DR-N ML-N 0
ORT-3C (ORT-3C) 03:00 06:59 ORT3-N R-N 210 1
O-RT-059A OPS 77 O-RT-059 COMPLETE LEAK CHE0t 1
14MAY04 14MAY04 DR-Y ML-Y 0
PER O-RT-59 05:00 05:59 ORT3-N R-N 211 1
O-RT-060A OPS 77 O-RT-060 COMPLETE LEAK CHEU I
14MAY04 14MAY04 DR-Y ML-Y 0
PER O-RT.60 05:00 05:59 ORT3-N R-N 212 1
X03-020 OPS X-03 DEENERGIZE X-03 2
14MAY04 14MAY04 DR-N ML-N 0
05:00 06:59 ORT3-N R-N 213 1
OP0303383 OPS 76 SC-00966B SC-966B - PMT STROKE I
14MAY04 14MAY04 DR-Y ML-Y 0
PER IT 60 07:00 07:59 ORT3-N R-N 214 1
ORT-003C2 OPS O-RT-003C IPTE BRIEF FOR AUX 4
14MAY04 14MAY04 DR-N ML-N 0
FEED TEST 07:00r 10:59 ORT3-N R-N 215 1
0P0303382 OPS 82 SC-00953 SC-953 -PMT STROKE I
14MAY04 14MAY04 DR-N ML-N 151 PER IT 60 1:o0.C 10a59 ORT3-N R-N 216 1
O-RT-03B OPS 77 O-RT-038 POST LLRT PZR UQUID 4
14MAY04 14MAY04 DR-N ML-N 148 SAMPLE LINE 10:00 13:59 ORT3-N R-N 217 1
IT-51oBB OPS 70 04T-0s1OB LRPM TEST OF SI TEST 6
14MAY04 14MAY04 DR-Y ML-Y 77 LINE 1a000 15:59 ORT3-N R-N 218 1
ORT-003C3 OPS 70 O-RT-003C PERFORM ORT-3C 4
14MAY04 14MAY04 DR-N ML-N 0
11:00 14:59 ORT3-N R-N 219 1 852-427C OPS 76 B-42 BUS STAB PMT I
14MAY04 14MAY04 DR-N ML-N 184
_ _1RC-596 15:0 15:59 ORT3-N R-N 220 1
OP13A110 OPS TG-01-T PLACE TURBINE ON 2
14MAY04 14MAY04 DR-N ML-N 0
TURNING GEAR 15:00 16:59 ORT3-N R-N Z21 1
ORT4003C4 OPS O-RT-003C RECOVER FROM 4
14MAY04 14MAY04 DR-N ML-N 0
ORT-3C 15:00 18:59 ORT3-N R-N 222 1
oP13A120 OPS-OP-13A FILL CONDENSER 4
14MAY04 14MAY04 DRN ML-N 116-HOTWELL 18:00 21:59 ORT3-N R-N 223 71 CL13B010 OPT -
CL-13B CONDENSATE VALVE 16 14MAY04 15MAY04 DR-N ML-N 0
_LNEUPS 18:00 09:59 ORT3-N R-N (CL-13B)__
2 1
IT-740 OPS 77 0-4T-0740 IT-740, MAIN STEAM I
14MAY04 14MAY04 DR-N ML-N 232 BLOWDOWN 19:00 1k59 ORT3-N R-N 0
)jMP0ST LLRT H 5990MA STEA XOM01-OPTE BR!!
* HIGH IT-003C1 PREPAR)
MS1 O.RT.059ACOMP 0215992EP-14 O.RT-M6ACOMP 02159931P.14 X03-020 DEEN EHII 03033831F ORT-003C2W1P U
0P030331 03033!
O-RT-03(
02159%
[T-510s 021591 ORT.002 0215 LIA BLOWDOWN (C GENERATOR BL8 FTO DE-ENERGIZE rOLTAGE STATION) fONS FOR ORT-3 CTUA TH L (EELEAK CHECKl PUMP/SI-862A DIS
{ETE LEAK CHECK PUMPISI-8M28 DIS IRGZE X403 H VOLTAGE STATIC 96GB - PMT STROK R LIQUID SAMPLE E BRIEF FOR AUX FI "si ACTUATION v SC 953-PMT STRI 2&sect;PZR UOUID SPA
;11POST LLRT PZR LI IPPRESSURE a LRPM TEST OF SI 2U1 SITE C3 PERFORM ORT-155=AUXLIAR1 B52-427C BUS STM 02025273480V P13A110 PLACE RT-003C4RECOVEF IOP13AI20FLLI CL13BO10CON Iw I IT740 IT-02159251 TRAIN-CCRE ONTINGENCY)
NDOWN (P-S1)
X.03
,UXILARY TRANSF(
(ORT-3C)
PSS OF SAFEGUARI
'ER 0-RT.59
'H CHKISI-s64A IS(
'ER O-RT-0I H CHKSI-864B IS(
INAUXILIARYTRAN
'PER IT 60 MONTAINMENT ISO LED TEST ITH LOSS OF SAFE PKE PER IT 60 lE SAMPLE CONTA OUID SAMPLE UNL ER UQUID SAMPLM hEST UNE ST UNE/SPY ADD O
CI
'FEEDWATER SYS k PMT I1RC-596 PTOR CONTROL C lRBINE ON TURNINS URBINE ERAT FROM ORT-3C ONDENSER H I
)ENSATE VALVE
: 40. MAIN STEAM BI rr 1 MAiN STEAMNT SUCED neVENTO~a
)RMER IS AC L (P-54)
P1-(P-55)
SFORMER ATION 3UARDS AC NMENT ISOLAT LINE (P-28B)
DUCT LKG RED EM AND AMSAf fTER PAB SAFE
;GEAR IR TURNING GE ELL 4EUPS JCONDENSATE OWVDOWN ILOWDOWN VAI JITT, CREW C u
I l v
w'ra MPIV~v I  
.rgjr~l JITT. CREW C 4
lqfpv.Fu.4 I 1-*MI%1Ui 19:00.
20:59 bb I
II I
I I
I.I.I.I Run Date 13MAY04 13:401 LT-03 STANDARD PUBLICATION l
Sheet 13 of 18 0 Primavera Systems, In.
I FL-03 Execution Publication Set I


arter 13MAY04 12:00                               U1 2               O K N               C E U E                         Iafter                   13MA Y04 12:00O
arter 13MAY04 12:00 U1 2 O K N C E U E Iafter 13MA Y04 12:00O
# u           ID       REsp   WO I     ECQID       DESCRIPTION     jRDj   ES                   RIKEF           hiFrM1AYt1 280   0P0405897F     OPS   781     0.106     PLACE 01-1081310-103    15MAY04   15MAY04               670                                                   oP~O4   g~PLACE D-10     10 INSERVICI INSERVICE ON D-04         00:00     02.59                                                                           04     7125V DC TlNBATTEI 22I       X03-06       OPS             X-03   RE-ENERGIZE X-03 W     2 15MAY04   15MAY04   DR-N ML-N     0                                                                               3-SRE-ENE SAT               14:00     15:59   ORT3-N R-N                                                                                         NHIG~
# u ID REsp WO I ECQID DESCRIPTION jRDj ES RIKEF hiFrM1AYt1 280 0P0405897F OPS 781 0.106 PLACE 01-1081310-10 3 15MAY04 15MAY04 670 oP~O4 g~PLACE D-10 10 INSERVICI INSERVICE ON D-04 00:00 02.59 04 7125V DC TlNBATTEI 22I X03-06 OPS X-03 RE-ENERGIZE X-03 W 2
228 0       OI-39J     OPS                         SECURE PAB         1 15MAY04   15MAY04                 0                                                                               Of-39JSE VENTILATION FOR         15.-0     15:59                                                                                                       1 22I     SOP-803A                       -03 BP        PREPARATION TO j12     15MAY04   16MAY04   OR-N ML-N     0                                                                             SOP4803A SUPPLY 16-0 FROM           16-00     03:59   ORT3-N R-N 23I       SIA02Z       PG         MILESTONE   CLOSECTMTSPRAYA         0 13MAY04   13MAY041 DR-N ML-N       0IstAo zCLOSE         m SPRAY ATRAIN P 14A WNINDOW TRAIN P.14A WNDOW           13:00     12.59   ORT3-N R-N           lEND WORK (,TTSPRAY ATRA NP-14A 23 1     13KVXOIA       PGX-03               START WVSTATION AUX     0 14MAY04   14MAY0-4   OR-N MI.-N   0                     13KVXOIASTART WSTATJON AUX XFVR WORK (XQ3)
15MAY04 15MAY04 DR-N ML-N 0
XFMR WORK (X03)           03:00     02.59   ORT3-N R-N                                   IHIGH VO AGE STATION AUI TRANSFORMER 232 1     48OVXOIZ       PPG           8-01       801 BUS RELATED     0 14MAY04   14MAY04   DR-N ML-N     0                       O8(VXO1Z6BO1 US I ELATED ENERG       WORK COPE ENERGIZED WORK           03:00     02:59   ORT3-N R-N                                   lEND OF E 313US WORK WIN OW 233 1       4KVAO1Z       PPG           A-01       CLOSE A01 BUS       0 15MAY04   15MAY04   DR-N ML-N   125                                                                         4H AOIZCLOSE A RELATED WORK             13:00     12:59   ORT3-N R-N                                                                                       ko1 B3US 1     I3KVX01Z      PPG           X-03   CLOSE W'STATION AX0         15MAY04   15M1AY04 jDR-N ML-N     0                                                                             13KVX01ZCLO XFMRWORK(X03)             16.00     15:59   ORT3-N R-N                                                                                           lHr-251 0123A-040       RP           0I-23A REOEADDISPOSE           4 15MAY04   15MAY04     DR-Y ML-Y   00                                                                               .4REM0 TRI NUKE FILTERS         14:00     17.59   ORT3-Y R-N-23I    Z22RPOOS       RPI   77'     Z-M2     Z-22 INTERNALS LIFT   'I 13MAY04   13MAY04     DR-Y ML Y   0         0 5 Z-22 INT   NL LIFT RIG. R 1WA P'REPS RIG - RP1 WDA PREPS       12:00     12:59   ORT3-Y R-N           JR-1 REAcTo VESSEL INE               LIsFTING iRIG 0301913 271   Z22RP020       RPI   77     Z-02   Z-022 - INTERNALS UIFT   1 13MAY04   13MAY04   DR-Y ML Y     0 2 F2        Z.022. IrRNALS LIFT RIG COMPLETE LOA RIG -COMPLETE LDA           15:00     15:59   ORT3-Y R-N       03 913&sect;R.1R CTORVESSELI MRNALSLIFT1NGRIC 2381   1 RPSH004-.R       RPI       PACKAGE 4 REMOVE SHIELDING ON       3 14MAY04   14MAY04     DR-Y ML-Y   0                         RPSII004-R REM )VESHlELDING 0N REGEN HEAT EXCI LNER REGEN HEAT             06:00r     08:59   ORT3-Y R-N 2391 11   RPSHOl1-lR     RPI1       PACKAGE I11 REMOVE SHIELDING.-     5 14MAY04   14MAY0-4   DR-Y ML-Y 165                             RPSH01II1.REOV SHIELDIN       *REGEN   DOOR G k REGEN DOOR GAP           09:001   13:59   ORT3-Y R-N 2401   1 Z22RP025       RPI   77     Z-M2   Z4022 - INTERNALS LIFT   6 14MAY04   14MAY04     DR-Y ML-Y   0                                         Z22P025Z.O2 2 -I TENALS LIFT R     DECON RIG.-DECON             16:00     21:59   ORT3-Y R-N                                                 0301913         R-1IREACTOR VE 3EL INTE 2411 2 1RPSHO097-R       RPI       PACKAGE 96   REMOVE SHIELDING     2 15MAY04   15MAY04   DR-Y ML-Y   46                                                               RPSH1097-RR 61VE SHIELDIN FOR SC-955           07:00r     08:59   ORT3-Y R-N 2421   1 RPIF-152C       RlPI       O FILE I     DAY SHIFT UPPER     S 15MA0     15IMAY04 IDR-YML-Y       0RPJF1                                                                         CDAY SHIFT CAVITIYDECON4 BRIEF         11:00     15:59   ORT-Y R-N                                               ~
3-SRE-ENE SAT 14:00 15:59 ORT3-N R-N NHIG~
Ru ae13MAY04                               13:401                 LT-03 STANDARD PUBLICATION                                                           Sheet 14 of 18 C Prlmavera Sysems. Inc.                   I                 FL.03 iExeCution Pub iication Set
228 0 OI-39J OPS SECURE PAB 1
15MAY04 15MAY04 0
Of-39JSE VENTILATION FOR 15.-0 15:59 1
22I SOP-803A BP
-03 PREPARATION TO j12 15MAY04 16MAY04 OR-N ML-N 0
SOP4803A SUPPLY 16-0 FROM 16-00 03:59 ORT3-N R-N 23I SIA02Z PG MILESTONE CLOSECTMTSPRAYA 0
13MAY04 13MAY041 DR-N ML-N 0I stAo zCLOSE m SPRAY ATRAIN P 14A WNINDOW TRAIN P.14A WNDOW 13:00 12.59 ORT3-N R-N lEND WORK (,TTSPRAY ATRA NP-14A 23 1
13KVXOIA PGX-03 START WVSTATION AUX 0
14MAY04 14MAY0-4 OR-N MI.-N 0
13KVXOIASTART WSTATJON AUX XFVR WORK (XQ3)
XFMR WORK (X03) 03:00 02.59 ORT3-N R-N IHIGH VO AGE STATION AUI TRANSFORMER 232 1 48OVXOIZ PPG 8-01 801 BUS RELATED 0
14MAY04 14MAY04 DR-N ML-N 0
O8(VXO1Z6BO1 US I ELATED ENERG WORK COPE ENERGIZED WORK 03:00 02:59 ORT3-N R-N lEND OF E 313US WORK WIN OW 233 1 4KVAO1Z PPG A-01 CLOSE A01 BUS 0
15MAY04 15MAY04 DR-N ML-N 125 4H AOIZCLOSE A RELATED WORK 13:00 12:59 ORT3-N R-N ko1 B3US 1
I 3KVX01Z PPG X-03 CLOSE W' STATION AX0 15MAY04 15M1AY04 jDR-N ML-N 0
13KVX01ZCLO XFMRWORK(X03) 16.00 15:59 ORT3-N R-N lHr-251 0123A-040 RP 0I-23A REOEADDISPOSE 4
15MAY04 15MAY04 DR-Y ML-Y 00  
.4REM0 TRI NUKE FILTERS 14:00 17.59 ORT3-Y R-N-23 I Z22RPOOS RPI 77' Z-M2 Z-22 INTERNALS LIFT  
'I 13MAY04 13MAY04 DR-Y ML Y 0
05Z-22 INT NL LIFT RIG.
1 R
WA P'REPS RIG - RP1 WDA PREPS 12:00 12:59 ORT3-Y R-N JR-1 REAcTo VESSEL INE LIs FTING iRIG 0301913 271 Z22RP020 RPI 77 Z-02 Z-022 - INTERNALS UIFT 1
13MAY04 13MAY04 DR-Y ML Y 0 2 2
F Z.022. IrRNALS LIFT RIG COMPLETE LOA RIG -COMPLETE LDA 15:00 15:59 ORT3-Y R-N 03 913&sect;R.1R CTORVESSELI MRNALSLIFT1NGRIC 2381 1 RPSH004-.R RPI PACKAGE 4 REMOVE SHIELDING ON 3
14MAY04 14MAY04 DR-Y ML-Y 0
RPSII004-R REM )VESHlELDING 0N REGEN HEAT EXCI LNER REGEN HEAT 06:00r 08:59 ORT3-Y R-N 2391 11 RPSHOl1-lR RPI1 PACKAGE I11 REMOVE SHIELDING.-
5 14MAY04 14MAY0-4 DR-Y ML-Y 165 RPSH01II1.REOV SHIELDIN  
*REGEN DOOR G k REGEN DOOR GAP 09:001 13:59 ORT3-Y R-N 2401 1
Z22RP025 RPI 77 Z-M2 Z4022 - INTERNALS LIFT 6
14MAY04 14MAY04 DR-Y ML-Y 0
Z22P025Z.O2 2 -I TENALS LIFT R DECON RIG.- DECON 16:00 21:59 ORT3-Y R-N 0301913 R-1IREACTOR VE 3EL INTE 2411 2 1RPSHO097-R RPI PACKAGE 96 REMOVE SHIELDING 2
15MAY04 15MAY04 DR-Y ML-Y 46 RPSH1097-RR 61VE SHIELDIN FOR SC-955 07:00r 08:59 ORT3-Y R-N 2421 1
RPIF-152C RlPI O FILE I DAY SHIFT UPPER S
15MA0 15IMAY04 IDR-YML-Y 0RPJF1 CDAY SHIFT CAVITIYDECON4 BRIEF 11:00 15:59 ORT-Y R-N  
~
Ru ae13MAY04 13:401 LT-03 STANDARD PUBLICATION Sheet 14 of 18 C Prlmavera Sysems. Inc.
I FL.03 iExeCution Pub iication Set


after 13MAY04 12:00                                               U1R28 WORKING SCHEDULE                                                                   I                 after 13MAY04 12:00 MAY D       RESPI wo         EQID               DESCRIPTION             RD       ES                   RISK       MF Thu 13                                            Frl 14                              Sat 15 ST                                                                                                          12.14A.I.1                       ..2 4.A.I i.10i12.14.1             1. 2 . A.Rff 8.1112,14.1FLI I
after 13MAY04 12:00 U1R28 WORKING SCHEDULE I
243      SDGSI-191      SDS            CONT                ENGINEERING                    08APR04     1BMAY04   DR-Y ML-Y     24 3D.. 4S1.1 IENGINqERING WAL.KD0W -SUMIiRWTRUSIOI~IISSUES WALKDOWN - SUMP                      08O0A        14:59  ORT3-Y R-N                          -. ,                                                    -
after 13MAY04 12:00 D
                                                      -INTRUSION ISSUES 244 0   SE031 1T72A    SEC   76       ZU065A        SECURITY SUPPORT                51    10MAY04 0700A 21MAY04 14:59 1 2 VEOhj.LmASECUItk                   SUPPORT Z=J!~- R OM Z-065A - MR 03-044                                                                                                                            -  I -,               -
RESPI wo ST EQID 243 SDGSI-191 SDS CONT ZU065A DESCRIPTION ENGINEERING WALKDOWN - SUMP
                                                        - .    >.. - - _. 1. _'
-INTRUSION ISSUES SECURITY SUPPORT Z-065A - MR 03-044
pF-2451 1 TGSUPPORT        TGG           TG-01.T           PROVIDE CRANE, RIGGERF AND 45 1 13APR04 I 17MAY04 090O0A I     16:59 DR-Y ML-Y ORT3-Y R-N 214 rGsPPoRT
: 1. _ '
                                                                                                                                      - U-                  urn.
PROVIDE CRANE, RIGGERF AND TOOLROOM MAY RD I
CRAN               AND TOOLROOM WUPPORT(P12)
51 ES RISK 12.14A.I.1
                                                                                                                                                                                        -                   mm              .
..2 4.A.I i.10i12.14.1
TOOLROOM 246 1 I-TGO213967A ITGGI 76 I PIPINGCROI                       REPLACE                 5 107MAY04 I 14MAY04 I DR-Y ML-Y I           6 GL39g7AREPI4CE CROSS-UNDER                              Y CROSS-UNDER                     1 09:00A I 08:59 1 ORT3-Y R-N               _    HiP                                            TURBINE EXHA ST TO MSRS 0213 76T I             I9I7_                             MANWAYS                   I         I     . A I     .. I 2471 1     TG-30890     TGG   76     TG-01.T     INSTALL HP CYLINDER I 11 I 12MAY04 I 14MAY04                   DR-Y ML-Y        U            NSTA            CYLNDER HTGLAND EAM PIPI 1 G HTGIGLAND STEAM                   1 07:OOA I 14:59       ORT3-Y R-N
: 1. 2.
                                                                                                                                              *g     H               IGTAHL                   HIGH PR         TURBINEDD2153 PIPING          I    I                                                    0 248 1     TG-30930     TGG   76     TG-01-T       INSTALL HP TURBINE               4   12MAY04     13MAY04   DR-Y ML-Y   141       g 30 NSTALL I IP TURBINE MANWj LYCOVERS MANWAY COVERS                       0800A         15:59 ORT3-Y R-N                       HIGH PItESSURETURBINEI 213969 249 1     TG-30720     TGG   76     TG-01-T         INSTALL GOVERNOR               I 13MAY04 13MAY04           DR-Y ML-Y     10 72 0INSTA1LL ;OVERNOR PEDES1 AL COVER PEDESTALCOVER                       I1100A    I1259     ORT3-Y R-N I EHIGH PRESS LRETURBINE03021 53 250 1     TG-30810     TGG   76     TG-01-T             INSTALL HP-LP             4   13MAY04     13MAY04   DR-Y ML-Y       0 rG-3      I19INSTALL I 1P-LP COUPLING GI lARD COUPUNG GUARD                         13:00*       16:59 ORT3-Y R-N               l        HIGH 'RESSURETURBINI :0302153 251   1   TG-30905     TGG   76     TG-01-T     INSTALL#2-3BEARING                 8   14MAY04 14MAY04       DR-Y ML-Y   160                                     TG.309051NS TALL #2-3 BEARIK PEDESTAL COVEI PEDESTAL COVER                       07:00       14:59 ORT3-Y R-N                                               0302153E            HIGH PRE SSURETURBINE 252   1     CL-2B       WCC             CL 2BF         MODE 6 TO MODE5I1591 25APR04 I 20MAY04                   DR-N ML-N         0 CL2 MODE STO MODE SCHECKLIST 2531   I T-2E         WCCl   -      CL2E CHECKLIST MODE 3RTOCMODEM   R I0800A 2 32 02MAY04 127MAY04 02359  ORT3-N R-N MLN
A. Rff 8.1112,14.1FLI MF Thu 13 Frl 14 Sat 15 08APR04 08O0A 1BMAY04 DR-Y ML-Y 14:59 ORT3-Y R-N 24 3D.. 4S1.1 IENGINqERING WAL.KD0W -SUMIiRWTRUSIOI~IISSUES 244 0
                                                                                                                                      *L -~D 09DRN CL2 MODE 3TO 1OE2CHECKLIST
SE031 1 T72A TGSUPPORT SEC 76 10MAY04 21MAY04 0700A 14:59 12 VEOhj.LmASECUItk SUPPORT Z=J!~- R OM pF- -
                                                                                                                                                                          -HUI .- -- I-                                    I I I    T             C                     I           CHECKLIST             I 2     1930A       03M59 1ORT34N RN 254 1 l     CL-2F       WCC             CL2F   lMODE2 TO MODE1                     348-1 02MAY04     27MAY04   DR-N ML-N         0 CL.2 MODE 2 TO MODE I CHECKLIST                                        _      _
I -,
ml~_                                                    -_
2451 1 TGG TG-01.T 45 1 13APR04 I 17MAY04 090O0A I 16:59 DR-Y ML-Y ORT3-Y R-N 214 rGsPPoRT CRAN AND TOOLROOM WUPPORT(P12)
1900A 1CHECKLIST  23:59   ORT3-N R-N 255   1   T-8839-R     WCC           CRDM/RPI       I   RCCRDMWRPITEM                1   13MAY04 13MAY04                       69           IRIRC CRDI k1RPI EM REVO-2 1-es REV02             l         12:00       12:59                           II RC CRDIW          tPI EM REV0-200181 39 25BI 1 lT-0460H         WCCI           MS-5958     I MS MS-5958IC REVD-I 2 l13MAYD4                 l13MAY04 lI                   4 r.04    HIMS MS-I i58IC REV0-I I I         I                                                I I 12:00       1 13:59 11                               MIMS MS-5 58IC REVO-1 00104 O 2571 1 lT-8808-R         WCCI             P-28B I1CS P28B EM REVQ31 2 113MAY04                         113MAY04 IDR-Y ML-Y I 0 1-88          -RI CS P-281 EM REV03-1 III         III                                                     I1Z.00   I 13.59 1ORT3-NR-Nl                     MICS P-288 EM REV0.3-i1001884 '8 2581 1 I T-9"9-R         WC         ICW SYSTEMl I1CW CWSYSTEM MM I 3 113MAY04                          113MAY041l                 901-96     -RI CW Cw! ,YSTEM MM REVO-I III              II                            REV0-1I                    12:00 114:591                                MI CWCU SYSTEM MM REVO- 1000969 e5911    T6397jR-     WCL           II-300C           1 UsII-30L(X UP'S             I I 13MATU4   I 1;5MAYLK                 1j T-63 7.RI CSIT-30 ICOPS REV041 REV0-1                      13:00       13:59                           HI CSIT-30CCOPS REV0-1 0016 197 Run Date                                       13MAY04 13:40l                                   LT-03 STANDARD PUBLICATION                                               I                         Sheet 15 of 18 C Primavera Systems, Inc.                             l                       FL-03 Execution Publication Set                                           I
U -
urn.
mm 246 1 I-TGO213967A ITGGI 76 I PIPINGCROI REPLACE 5 1 07MAY04 I 14MAY04 I DR-Y ML-Y I 6
CROSS-UNDER 1 09:00A I 08:59 1 ORT3-Y R-N I
I9I7_
MANWAYS I
I A I I
GL39g7AREPI4CE CROSS-UNDER Y
2471 1 TG-30890 TGG 76 TG-01.T INSTALL HP CYLINDER I 11 I 12MAY04 I 14MAY04 HTGIGLAND STEAM 1 07:OOA I 14:59 PIPING I
I DR-Y ML-Y ORT3-Y R-N U
HiP TURBINE EXHA ST TO MSRS 0213 76T NSTA CYLNDER HTGLAND EAM PIPI1G
*g 0
H IGTAHL HIGH PR TURBINEDD2153 248 1 TG-30930 TGG 76 TG-01-T INSTALL HP TURBINE 4
12MAY04 13MAY04 DR-Y ML-Y 141 MANWAY COVERS 0800A 15:59 ORT3-Y R-N 249 1 TG-30720 TGG 76 TG-01-T INSTALL GOVERNOR I
13MAY04 13MAY04 DR-Y ML-Y 10 PEDESTALCOVER I 11 00A I1259 ORT3-Y R-N 250 1 TG-30810 TGG 76 TG-01-T INSTALL HP-LP 4
13MAY04 13MAY04 DR-Y ML-Y 0
COUPUNG GUARD 13:00*
16:59 ORT3-Y R-N 251 1 TG-30905 TGG 76 TG-01-T INSTALL#2-3BEARING 8
14MAY04 14MAY04 DR-Y ML-Y 160 PEDESTAL COVER 07:00 14:59 ORT3-Y R-N 252 1
CL-2B WCC CL 2BF MODE 6 TO MODE5 I1591 25APR04 I 20MAY04 DR-N ML-N 0
CHECKLIST I0800A 02359 ORT3-N R-N 2531 I
T-2E WCCl CL2E MODE 3RTOCMODEM 2
R 32 02MAY04 127MAY04 9DRN MLN 0
I I
T C
I CHECKLIST I 2 1930A 03M59 1ORT34N RN 254 1 l CL-2F WCC CL2F lMODE2 TO MODE1 348-1 02MAY04 27MAY04 DR-N ML-N 0
1CHECKLIST 1900A 23:59 ORT3-N R-N 255 1
T-8839-R WCC CRDM/RPI I
RC CRDMWRPITEM 1
13MAY04 13MAY04 69 REV02 l
12:00 12:59 25BI 1 lT-0460H WCCI MS-5958 I MS MS-5958IC REVD-I 2 l13MAYD4 l13MAY04 lI 4
I I
I I
I 12:00 1 13:59 11 2571 1 lT-8808-R WCCI P-28B I1CS P28B EM REVQ31 2 113MAY04 113MAY04 IDR-Y ML-Y I 0
III III I1Z.00 I 13.59 1ORT3-NR-Nl 2581 1 I T-9"9-R WC ICW SYSTEMl I1CW CWSYSTEM MM I 3 1 13MAY04 113MAY041l 90 III II REV0-1I 12:00 114:591 I
rG-3 g30NSTALL I HIGH PI 720INSTA1LL EHIGH PRESS I19INSTALL I
l HIGH IP TURBINE MANWj tESSURETURBINEI
;OVERNOR PEDES1 LRETURBINE03021 1P-LP COUPLING GI
'RESSURETURBINI TG.309051NS 0302153E LY COVERS 213969 AL COVER 53 lARD
:0302153 TALL #2-3 BEARIK HIGH PRE PEDESTAL COVEI SSURETURBINE CL2 MODE STO MODE S CHECKLIST
*L -~D
-HUI.- --
I-CL2 MODE 3TO 1OE2CHECKLIST I
CL.2 MODE 2 TO MODE I CHECKLIST ml~_
1-es r.04 1-88 1-96 T-63 IRI RC CRDI II RC CRDIW HI MS MS-I MI MS MS-5
-RI CS P-281 MI CS P-288
-RI CW Cw!
MI CWCU 7.RI CSIT-30 HI CSIT-30C k1RPI EM REVO-2 tPI EM REV0-200181 i58IC REV0-I 58IC REVO-1 00104 EM REV03-1 EM REV0.3-i1001884
,YSTEM MM REVO-I SYSTEM MM REVO-IC OPS REV041 C OPS REV0-1 0016 39 O
'8 1000969 197 e591 1 T6397jR-WCL II-300C 1 Us II-30L(X UP'S REV0-1 I I 13MATU4 I 1;5MAYLK 13:00 13:59 1j Run Date 13MAY04 13:40l LT-03 STANDARD PUBLICATION I
Sheet 15 of 18 C Primavera Systems, Inc.
l FL-03 Execution Publication Set I


after 13MAY04 12:00                         1       U1R28 WORKING SCHEDULE                                                         l                   afer 13MAY04 12:00 V
after 13MAY04 12:00 1 U1R28 WORKING SCHEDULE l
lU       I     IRESP   WO       ED               DESCRIPON         RD     ES         EF       RISK     -                                                        MAY ST E     IThuSP13I1112.14,16 I.4.6i8.l12
afer 13MAY04 12:00 V
_ _            _                          ::      .    .                        ta20.2210.                E dFr14                            sat 15 681 2(12210,2.4.6.8.1012.14,1
lU I
                          =                                             -.                                            . .                                                                          I 26011(   T201475R     WCC           VNTB       REMOVE TAG (0VNTB I        13MAY04  I 13MAY04              705t o20175RREMOVE              rAG (0 VNTB VNTB    AM REVO-2)
IRESP WO ED DESCRIPON RD ES EF RISK MAY IThuSP13 E dFr14 sat 15 ST E I1112.14,16 ta20.2210.
VNTB MM REV0-2) I         15:00     15:59 2811 0   T201630H   1WCC           W-04m       HANG TAG (OVNAFW      I   13MAY04    13MAY04                  2 `201 30HHANG TA 3(0 VNAFW W-46 s AREVO-1)
I.4.6i8.l12 681 2(12210,2.4.6.8.1012.14,1
W-46 MM REVO-1)         15:00       15:59                                   I 4                                             _                                          ., -.    .
=
281210I  T305784R     WCCI           W-129     REMOVE TAG (0VNNSB      1  13MAY04 I 13MAY04 I              705 130! U4RREMOVE rAG (0VNNSB W:1                   MMREV0.1)
I 26011(
W.129MMREVO01)_           15:00     15:59 263 1   T-0472-H     WCC         RM-3200C         1 RM RM-3200C IC     2 13MAY04   13MAY04   DR-Y ML-Y       0         472441 RM RI I-3200C IC REVO-1 REV0-1               16:00     17:59 ORT3-Y R-N               0i 10472E1 RN RM-3200C IC REV(
T201475R WCC VNTB REMOVE TAG (0 VNTB I VNTB MM REV0-2)
284 1   T-7048-R     WCC           P-288       1 CS P-288 EM REV2-1   3 13MAY04   13MAY04   DR-Y ML-Y     47           T-7048-R t CS P-28B EM REV2-1 18:00     20:59 ORT3-N R-N                   0017048mn      I CS P-28B EM REM 265 1   T-0472-R     WCC         RM-3200C         1 RM RM-3200C IC     1 13MAY04   13MAY04   DR-Y ML-Y   107                     T.0472- I1 RM RM-3200C K REVO-1 REVO-1               22:00     22:59 ORT3-Y R-N                           00104' 211 RM RM-32XDC C REV0-1 268 1   T-7110-R     WCC         TG-010G     1TU TG-01-G EM REVS-1 I     13MAY04   13MAY04               _                      T.7110- 1 TUTG-01-G EM EVS1 22:00     2259                                         001711 O1 TUTG-01-GE I REV5-1 267 0   T201 630R   WCC           W-046     REMOVE TAG (0VNAFW        I 13MAY04   13MAY04               698                   T201630 IREMOVE TAG (O 4AF          W-46 MM RE A1)
I 13MAY04 I 13MAY04 15:00 15:59 705t o201
W.46 MM REVD-1)           22:00     22:59                                                 I 268 1   T.0460-R     WCC         MS-5958     I MS MS-5958 IC REVD-1   2 13MAY04   13MAY04                 O                   T-0460- I MS MS-5958 IC I EV0.1 22:00     23:59                                       001041 owl MS MS-5958 C REVO-1 269 0   T305786H     WCC           W-131       HANG TAG (0VNNSB       1 14MAY04   14MAY04                 5                       T305 '86H HANG TAG (0 NNSBW-131 MMR Z-01)
`201 2811 0 T201630H 1WCC W-04m HANG TAG (O VNAFW I
W-131 MM REV0-1)         00W00       00W59                                                   I 270 0   T305787H     WCC         HX-245A       HANG TAG (0VNOPS      1 14MAY04   14MAY04                 5                       T305 r87H HANG TAG (0 NOPS HX-245A MA REVO-1)
W-46 MM REVO-1) 13MAY04 13MAY04 15:00 15:59 2
HX.245A MM REV0-1)         00:00-     00:59                                                   I 271  1  T-9025-R     WCC            X-13        1 480VX-13 LOADING  I1   14MAY04  I 14MAY04              439                              T.9025RI 480V X- 3 LOADING CAUT CPS REV0-I CAUT OPS REV1             03:00     03:59                                                 001902531 480V: .13 LOADING CAUT OPS REVO-1 272 2   T301009R     WCC         ICP-06.021       REMOVE TAG (2 CV     1 14MAY04    14MAY04              691                                T301009RREMO        TAG (2CV F-39A IC REV 0.1)
4 28121 0I T305784R WCCI W-129 REMOVE TAG (0 VNNSB 1
F-39A IC REV 0.1)         05:00      05:59 I
W.129MMREVO01)_
273 1   T-9779-R     WCC             PZR         1 RC PZR HTRS EM     1 14MAY04   14MAY04 DR-Y ML-Y   202                                   T.9779-R1 RC PZR HTRS EM REV I1-REVD-1               06:00     06:59 ORT3-Y R-N                                         0009779R1      PZR HTRS EM REV0-1 274   1   T-3778-H   WCC           F89-112       1 345KV F89-1 12 APS   2 14MAY04   14MAY04                 0                                   T.3778-H 1 3 5KV F89-112 APS FEVO-I REV0.1               07.00     08:59                                                       0013778E 1345KVF89-112AF SREV0D1 275   1 T-1763-R     WCC         SC-9668         I SC SC-966B MMV     2 14MAY04   14MAY04                 O                                     T-1763-R1 ;C SC-966B MMV R REVO-1               08:00     09.59                                                         00117631 II SC SC-966B MM /REiV0 1 278 1   T-0703-H     WCC           ORT-3C         I AF ORT-3C OPS     2 14MAY04   14MAY04                 C                                       T.070341 I AF ORT.3C OPS F EVO-1 REV0-1               09:00     10"59                                                           0010703 *I AF ORT.3C OF SREV0-1 277 0   T305786R     WCC           W-131     REMOVE TAG (OVNNS9      1 14MAY04   14MAY04               686                                         T305ni tREMOVE TAG (O NNSB W-131 MM R :V.I)
13MAY04 I 13MAY04 I 15:00 15:59 705 130!
W-131 MM REV0-1)           10W00     10:59 278 0   T305787R     WCC         HX-245A     REMOVE TAG (OVNOPS      I  14MAY04  I 14MAY04              688                                        T305787 R                  NOPS HX-245A MM REMII)
0i 263 1 T-0472-H WCC RM-3200C 1 RM RM-3200C IC 2
HX-245A MM REVO-1)         10W00. 1059 Run Date                                   13MAY04 13:40                       LT.03 STANDARD PUBLICATION                                                                   Sheet 16 of 18 o Prmavera Systems, Inc.                   I                   FL-03 Execution Publication Set
13MAY04 13MAY04 DR-Y ML-Y 0
REV0-1 16:00 17:59 ORT3-Y R-N 284 1 T-7048-R WCC P-288 1 CS P-288 EM REV2-1 3
13MAY04 13MAY04 DR-Y ML-Y 47 18:00 20:59 ORT3-N R-N 265 1 T-0472-R WCC RM-3200C 1 RM RM-3200C IC 1
13MAY04 13MAY04 DR-Y ML-Y 107 REVO-1 22:00 22:59 ORT3-Y R-N 268 1 T-7110-R WCC TG-010G 1 TU TG-01-G EM REVS-1 I
13MAY04 13MAY04 22:00 2259 267 0 T201 630R WCC W-046 REMOVE TAG (0 VNAFW I
13MAY04 13MAY04 698 W.46 MM REVD-1) 22:00 22:59 268 1 T.0460-R WCC MS-5958 I MS MS-5958 IC REVD-1 2
13MAY04 13MAY04 O
22:00 23:59 269 0 T305786H WCC W-131 HANG TAG (0VNNSB 1
14MAY04 14MAY04 5
W-131 MM REV0-1) 00W00 00W59 270 0 T305787H WCC HX-245A HANG TAG (0 VNOPS 1
14MAY04 14MAY04 5
HX.245A MM REV0-1) 00:00-00:59 75RREMOVE 30HHANG TA I
U4RREMOVE 472441 RM RI 10472E1 RN T-7048-R t CS 0017048mn T.0472-00104' T.7110-001711 T201630 T-0460-001041 T305 T305 rAG (0 VNTB VNTB 3(0 VNAFW W-46 s rAG (0 VNNSB W:1 I-3200C IC REVO-1 RM-3200C IC REV(
P-28B EM REV2-1 I CS P-28B EM REM I1 RM RM-3200C K 211 RM RM-32XDC 1 TUTG-01-G EM O1 TUTG-01-GE IREMOVE TAG (O I
I MS MS-5958 IC I owl MS MS-5958
'86H HANG TAG (0 I
r87H HANG TAG (0 I
T.9025RI 480V X-001902531 480V:
T301009RREMO I
T.9779-R1 RC 0009779R1 T.3778-H 1 3 0013778E T-1763-R1 00117631 T.070341 0010703 T305ni T305787 AM REVO-2)
AREVO-1)
MMREV0.1) 271 1
T-9025-R WCC X-13 1 480VX-13 LOADING I 1 CAUT OPS REV1 14MAY04 I 14MAY04 03:00 03:59 439 REVO-1 C REV0-1 EVS1 I REV5-1 4AF W-46 MM RE EV0.1 C REVO-1 NNSBW-131 MMR NOPS HX-245A MA 3 LOADING CAUT C
.13 LOADING CAUT TAG (2 CV F-39A PZR HTRS EM REV PZR HTRS EM RE 5KV F89-112 APS F 1 345KVF89-112AF
;C SC-966B MMV R II SC SC-966B MM I AF ORT.3C OPS F
*I AF ORT.3C OF tREMOVE TAG (O R
272 2
T301009R WCC ICP-06.021 REMOVE TAG (2 CV 1
F-39A IC REV 0.1) 14MAY04 14MAY04 05:00 05:59 691 A1)
Z-01)
REVO-1)
PS REV0-I OPS REVO-1 IC REV 0.1)
I1-V0-1 EVO-I S REV0D1
/REiV0 1 EVO-1 S REV0-1 NNSB W-131 MM R NOPS HX-245A MM 273 1 T-9779-R WCC PZR 1 RC PZR HTRS EM 1
14MAY04 14MAY04 DR-Y ML-Y 202 REVD-1 06:00 06:59 ORT3-Y R-N 274 1
T-3778-H WCC F89-112 1 345KV F89-1 12 APS 2
14MAY04 14MAY04 0
REV0.1 07.00 08:59 275 1
T-1763-R WCC SC-9668 I SC SC-966B MMV 2
14MAY04 14MAY04 O
REVO-1 08:00 09.59 278 1 T-0703-H WCC ORT-3C I AF ORT-3C OPS 2
14MAY04 14MAY04 C
REV0-1 09:00 10"59 277 0 T305786R WCC W-131 REMOVE TAG (O VNNS9 1
14MAY04 14MAY04 686 W-131 MM REV0-1) 10W00 10:59
:V.I)
REMII) 278 0
T305787R WCC HX-245A REMOVE TAG (O VNOPS HX-245A MM REVO-1)
I 14MAY04 I 14MAY04 10W00.
1059 688 Run Date 13MAY04 13:40 LT.03 STANDARD PUBLICATION Sheet 16 of 18 o Prmavera Systems, Inc.
I FL-03 Execution Publication Set


after 13MAY04 12:00                                   U1R28 WORKING SCHEDULE                                                                   after 13MAY04 12:00 4T U l     I         RESP   WO I     EO               DESCRIPTION       RD     ES         EF         RISK     MF                                       Frl 14                                 Sat 15
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 4T U l I
__ST                                         -- -..10i12,141l6l2012210,2,4.6,.8l1al2.1416,18,20,2210 2,4 6 810112.144. 61 V3 53i6 _I Wl WW ,I'j,
RESP WO I EO DESCRIPTION RD ES EF RISK MF Frl 14 Sat 15
        -*__1 2791 1   T-3778-R     WCC         F89-112   I   1 345KVF59-112APS 12       14MAY04    14MAY04                    0
__ST  
* T-37 8-R ' 345KV F89-I 2APS REVO-1 REV0-1               12.00     13:59                                                         3778E1 345KV FE -12 APS REVO-1 280 1   T-0510-R     WCC         W-1B111B2     1 VNCCW-1B1/1B2MM       3 14MAY04   14MAY04                   70                             T-00 0-RI VNCCW-tBI 192 MM REV0-1 REVO-1               12.00     14:59                                                     001 351CM1 VNCCV -1B1/1B2MM REVC 1 281 1   T-0703-R     WCC         ORT-3C           1 AFORT-3COPS         1 14MAY04   14MAY04                     3                                   T-0703-R 1 AF ORT W OPS REVO-1 REVO-1              15:00     15:59                                                         001070331 AFOF r-3C OPS REVo-1 282 0   T201676H     WCC         HX-258         HANG TAG (OVNTB        I 14MAY04   14MAY04                     2                                   W20167T6H HANG TA 1(0 VNTB HX-25S 7 M REV0-1)
-- -..10i12,141l6l2012210,2,4.6,.8l1al2.1416,18,20,2210 2,4 6 810112.144. 61 V3 53i6  
HX-258 MM REVO-1)         15:00-     15:59                                                                   I 283 0   T201676R     WCC         HX-258       REMOVE TAG (0 VNTB       1 14MAY04   14MAY04                   674                                               T20167E tREMOVE TAG (0 'TB HX-258 MU HX-258 MM REV-1)           22-00       22:59 284 1   T-8928-R     WCC         FS-2852         1 SW FS-2852 MM       I 15MAY04   15MAY04                   50                                                       T.8928-RI SW FS- 852 MM REV2-1 REV2-1             03:00       03:59                                                                             001892811 SWF ;-2852 MM REV2 1
-*__1 _ I Wl WW,I'j, 2791 1 T-3778-R WCC F89-112 I 1 345KVF59-112APS 12 REV0-1 14MAY04 14MAY04 12.00 13:59 0
285  1    T-7043-R     WCC         P-028A-M     I CS P-28A-M EM REVO-1     I 15MAY04   15MAY04     DR-Y ML-Y     0                                                         T-7043-R CS P`:UA-M EM REV0-04.00       04:59     ORT3-Y R-N                                                               001704331 CSJ -28A-M EM REV 2861 1   T-7047-H   IWCC         P-028A-M     1 CS P-28A-M EM REV1-1     I 15MAY04 I 15MAY04   I DR-Y ML-Y     0                                                        T-70474H1 CS P.:8A-M EM REVI-04:00       04:59     ORT3-Y R-N                                                               001704731 CS I -28A-M EM REV 4                 ---                   4                         4-4                     _              _      _
280 1
287 1     T-0964-H     WCC           ;2tA01         1 MRR 621AO1 RMP       1 15MAY04    15MAY04                    0                                                          T-096-H 1 MRF 1A01 RMP 931 9302-1 EM REVO-1         05:00       05:59                                                                                 001096431 M R 62/A01 RMP9 l'
T-0510-R WCC W-1B111B2 1 VNCCW-1B1/1B2MM 3
288 1   T-3310-R     WCC       P-OOIA-M     1 RC P-1A-M RMP 9002-1     1 15MAY04   15MAY04                     0                                                         T.3310-R1 RCI -1A-M RMP 900S EM REVI-1             05:00       05:59                                                                                 001331031 RC P-IA-M RMP 90 289 1     T-7047-R     WCC         P-028A-M     1 CS P-28AM EM REV1-1       1 15MAY04   15MAY04     DR-Y ML-Y     100                                                               T-7047-R 1 CS P-28A-M El 09:00       09 59     ORT3-Y R-N                                                                       0017047 1 CS P-28A-M 290 1   T-0964-R     WCC         62/A01         1 MRR 62A01 RMP       1 15MAYD4   15MAY04     DR-Y ML-Y       0                                                                     T40! 64-R I MRR 2UA 9302-1 EM REVO-1           1Z-00     12:59     ORT3-Y R-N                                                                             001 S9431 MRR86 1
14MAY04 14MAY04 70 REVO-1 12.00 14:59 281 1
291  1    T-2709-R     WCC         MS-2018         1 MS MS-2018 MMV       1 15MAY04   15MAY04                     0                                                                     T-2Z 09R MS MS-2(
T-0703-R WCC ORT-3C 1 AFORT-3COPS 1
REVO-1               1200       1Z59                                                                                             001 270931 MS MS 292 1   T-8293-H     WCC         HX-1H         IMS HX-1B SMP OPS       I 15MAY04   15MAY04     DR-Y ML-Y       0                                                                     T-8 934H1 MS HX-1 REV1-1         _    1Z00       12:59     ORT3-YR-N                                                                             001 829311 MS HX-293 1   T-3180-H     WCC       P-001A-M       1 RC P-IA-M BALANCE     1 15MAY04   15MAY04                     0                                                                       T- 1g" I RC P.11 EM REV0-1             13:00     13:59                                                                                             0 11318031 RC P 294 1   T-8024-H     WCC           IWP       1 480VIWPC01.128-E-FN     2 15MAY04   15MAY04                     0                                                                           T.802441 480%
14MAY04 14MAY04 3
(01-39) EM REV0-2         15:00     16:59                                                                                                 0018024K14 295 1   T-3180-R     WCC       P-001A-M       1 RC P-IA-M BALANCE     1 15MAY04   15MAY04                 402                                                                             T-3180- 1 RC EM REVO-1             16:00     16:59                                                                                                   001318031 F 29B 1   T-3322-R     WCC       P-001A-M       RC P-1A-M RMP 9002-1     I 15MAY04   15MAY04                     0                                                                           T.3322.RRC F EM REV2-1             18 t:0     16:59                                                                                                   001332231 F 2971 1   T-8293-R     WCC         HX-1B         1 MS HX-IB SMP OPS       I 15MAY04 I 15MAY04 I DR-Y MLY         111                                                                            T-8293-RI MS REVI-1              18B00   I 6:S9     ORT3-Y R-N                                                                                   001829331 A Run Date                                     13MAY04 13:40                       LT-03 STANDARD PUBLICATION                                                           Sheet 17 of 18 C Primavera SWems Inc.                       I                   FL.03 Execution Publication Set                           I
REVO-1 15:00 15:59 282 0
T201676H WCC HX-258 HANG TAG (O VNTB I
14MAY04 14MAY04 2
HX-258 MM REVO-1) 15:00-15:59 283 0
T201676R WCC HX-258 REMOVE TAG (0 VNTB 1
14MAY04 14MAY04 674 HX-258 MM REV-1) 22-00 22:59 284 1
T-8928-R WCC FS-2852 1 SW FS-2852 MM I
15MAY04 15MAY04 50 REV2-1 03:00 03:59 285 1
T-7043-R WCC P-028A-M I CS P-28A-M EM REVO-1 I
15MAY04 15MAY04 DR-Y ML-Y 0
04.00 04:59 ORT3-Y R-N
* T-37 T-00 001 8-R ' 345KV F89-I 3778E1 345KV FE 0-RI VNCCW-tBI 351CM1 VNCCV T-0703-R1 AF ORT 001070331 AFOF W20167T6H HANG TA I
T20167E 2861 1 T-7047-H IWCC P-028A-M 1 CS P-28A-M EM REV1-1 I
15MAY04 I 15MAY04 I DR-Y ML-Y 04:00 04:59 ORT3-Y R-N 0
2APS REVO-1
-12 APS REVO-1 192 MM REV0-1
-1B1/1B2MM REVC W OPS REVO-1 r-3C OPS REVo-1 1(0 VNTB HX-25S 7 tREMOVE TAG (0 T.8928-RI SW FS-001892811 SWF T-7043-R 1 CS P`:
001704331 CSJ T-70474H1 CS P.:
001704731 CS I T-096-H 1 MRF 001096431 M T.3310-R1 RCI 001331031 RC T-7047-R 0017047 T40!
001 T-2Z 001 T-8 001 T-0 4  
---
4 4-4 1
287 1 T-0964-H WCC
;2tA01 1 MRR 621AO1 RMP 9302-1 EM REVO-1 1
15MAY04 15MAY04 05:00 05:59 0
l' 288 1
T-3310-R WCC P-OOIA-M 1 RC P-1A-M RMP 9002-1 1
15MAY04 15MAY04 0
EM REVI-1 05:00 05:59 289 1 T-7047-R WCC P-028A-M 1 CS P-28AM EM REV1-1 1
15MAY04 15MAY04 DR-Y ML-Y 100 09:00 09 59 ORT3-Y R-N 290 1
T-0964-R WCC 62/A01 1 MRR 62A01 RMP 1
15MAYD4 15MAY04 DR-Y ML-Y 0
9302-1 EM REVO-1 1Z-00 12:59 ORT3-Y R-N 291 1
T-2709-R WCC MS-2018 1 MS MS-2018 MMV 1
15MAY04 15MAY04 0
REVO-1 1200 1Z59 292 1
T-8293-H WCC HX-1H IMS HX-1B SMP OPS I
15MAY04 15MAY04 DR-Y ML-Y 0
REV1-1 1Z00 12:59 ORT3-YR-N 293 1
T-3180-H WCC P-001A-M 1 RC P-IA-M BALANCE 1
15MAY04 15MAY04 0
EM REV0-1 13:00 13:59 294 1 T-8024-H WCC IWP 1 480VIWPC01.128-E-FN 2
15MAY04 15MAY04 0
(01-39) EM REV0-2 15:00 16:59 295 1
T-3180-R WCC P-001A-M 1 RC P-IA-M BALANCE 1
15MAY04 15MAY04 402 EM REVO-1 16:00 16:59 29B 1
T-3322-R WCC P-001A-M RC P-1A-M RMP 9002-1 I
15MAY04 15MAY04 0
EM REV2-1 18 t:0 16:59 M REV0-1)
'TB HX-258 MU 852 MM REV2-1
;-2852 MM REV2 UA-M EM REV0-
-28A-M EM REV 8A-M EM REVI-
-28A-M EM REV 1A01 RMP 931 R 62/A01 RMP9
-1A-M RMP 900S P-IA-M RMP 90 1 CS P-28A-M El 1 CS P-28A-M 64-R I MRR 2UA S9431 MRR86 09R 1 MS MS-2(
270931 MS MS 934H1 MS HX-1 829311 MS HX-1 g" I RC P.11 11318031 RC P T.802441 480%
0018024K14 T-3180- 1 RC 001318031 F T.3322.RRC F 001332231 F T-8293-RI MS 001829331 A 2971 1 T-8293-R WCC HX-1B 1 MS HX-IB SMP OPS REVI-1 I
15MAY04 I 15MAY04 I DR-Y MLY 18B00 I 6:S9 ORT3-Y R-N 111 Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 17 of 18 C Primavera SWems Inc.
I FL.03 Execution Publication Set I


after 13MAY04 12:00                           U1R28 WORKING SCHEDULE                             after 13MAY04 12:00 I U I     ID     RESP   WO J   EQID       DESCRIpIbON     RD     ES       EF     RISK   MIF Thu 13 1 Ed MA 14                   St1 t6:00     19 59 ORT3-Y R-                                         0011302_
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 I
1 4 299   1   T-2407-H   WCC           RMP     1 4.16KV RMP 9364-1 1 15MAY04   1 MAY04             14                                     T.2407H UMBLICAL CORD EM         17,00     17:59                                                   001240711 i
U I ID RESP WO J EQID DESCRIpIbON RD ES EF RISK MIF MA Thu 13 1
Run Date                               13MAY04 13:40                 LT.03 STANDARD PUBUCATION                     Sheet 18 of 18 Pfkemvem P        Syems. Im:                 I               FL-03 Execution Publication Set}}
Ed 14 St1 t6:00 19 59 ORT3-Y R-0011302_
299 1
T-2407-H WCC RMP 1 4.16KV RMP 9364-1 1
15MAY04 1 MAY04 14 T.2407H 1 4 UMBLICAL CORD EM 17,00 17:59 001240711 i
Run Date 13MAY04 13:40 LT.03 STANDARD PUBUCATION Sheet 18 of 18 P
Pfkemvem Syems. Im:
I FL-03 Execution Publication Set}}

Latest revision as of 17:23, 15 January 2025

U1R28 OCC Interactive Turnover
ML051950421
Person / Time
Site: Point Beach 
Issue date: 05/13/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051950421 (25)


Text

Committed to Nuclear Ecellonce

_EEnC Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Thursday, May 13, 2004 Start Time:

1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer/ Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors First Une Supervisors Agenda

1. Safety Issue Discussion (SSC)
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
5. Maintenance Coordinator Turnover (MOC)
6. Engineering Coordinator Turnover (EOM)
7. Major Projects Update (EOM)
8. Schedule Review (SOM)
9. Management Expectations (SSM)
10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM)

Items Included In Daily Package:

Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule Informaton in s record was deleted in acodance nt hfreedom of Informabon AC

Commitedio Nucicar W:.

Imm n1flT REACH

- DIR21 Point Beach Nuclear Plant U1R28 Refueling Outage

.;'y.,;,,-,CXH L; Safety Topic for week 'of May 9-15::'-::.

Theme for the week This week's theme covers Emernencv Situations. Be It weather, fire or a medical emergency, are we ready to respond to those unexpected situations?

,.','.'DallySafetySnippets -*

Sunday "You would be shocked if you found your emerYency egress path blocked" Material is beginning to come out of containment as a lot of work Is wrapping up. Don't pile up tools and equipment In the walkway even for short periods of time. Always keep the egress paths open for use.

Monday

'If strong winds start to blow, do you know where to goP?

Do you know the proper location to go in the event of a tornado warning if you are In the trailers, turbine hall or PAB? NP1.9.21 covers the site's various shelter areas. Plan ahead and take the time now to review the NP with your group.

Tuesday

'Make sure to cleanup or a fire may start during heat up.

OE1 531 0 Indian Point 3 - An oil vapor extractor for the main boiler feed pump failed. The tag out used to repair the extractor resulted In an Increased leakage of oil from the pump bearings onto lagging. A special log was created to monitor the leakage, but no plan existed for dealing with the safety hazards.

Maintenance repaired the extractor, returning It to service. The next day a portion of oil soaked lagging on a main boiler feed pump caught fire and was quickly extinguished by an alert watchstander.

Wednesday

'Take heed - Don't block emergency equipment you may need."

Last week on the 66ft of containment, the NRC noticed we blocked access to 2 fire extinguishers mounted on the stairwell handrail. A scaffold was built In the area that made access questionable. We then added a number of bags of insulation it made access Impossible. Just a question -Why Is the NRC finding this instead of us?.

Thursday "What number do you call if your co-worker takes a serious fall?'

What Is the plant's emergency number? 2911. This number Is only to be used for.emergency situations.

Two weeks ago a work group was having trouble getting through to operations to communicate a change In equipment status. Rather than waiting, the individual Involved decided to contact the control room via the emergency number. Needless to say this was not an appropriate use of 2911.

Friday

'take sure your fire watch Is alert to keep someone from getting hurt" OE1 2607 - LaSalle - A worker using an acetylene torch for cutting through a structural member that was behind a metal wall panel. Wall Insulation behind the member began to bum. The alert fire watch extinguished the fire within one minute of It beginning and no significant damage occurred.

Saturday Debris buildup may result In an unplanned heat up" OE14899 River Bend Station - A small fire occurred under the exhaust piping on a diesel generator during testing. The fire was observed during routine checks of the generator and the control room was Immediately notified. The control room unloaded the generator while the operator extinguished the fire. The cause was Insulation debris that accumulated around the hot piping over time.

2

I I

Point Beach Nuclear Plant Outage 1 R28 DAY 39 Supporting Operational Excellence Path N

P Picture Meets fnnnctn't MApt pyneeds Outage Radiation Performance

3.

A.

This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.

Meets:

<=75 Rem Actual Cum.

Exceeds:

<=71 Rem Dose:

54.723 Rem Day 39 - May 12 Actual = 0.275 Cumulative = 54.723 Cumulative Forecast = 54.817 Daily PCE goal reforecast on 4/23. Daily dose reforecast on 518104.

Reactor Head Repair Dose for May 12th is 1.959 vs. goal of 1.801.

RV Head Total Dose is 8.172.

Meets: <= 18 Exceeds: <=.12 ActualPCE's:

9 0 68

  • ra T]

MS Stu Thomas I

Personnel Contamination Events Cummulative Dose Exposure AX Ia w

a g

I E

z 20 18 16 14 12 10 8

6 4

2 0

lI I

i Ii 71

. I P.,

ForecMs MW GMrow E

0-0U) 0 0

03 40-20-0i

- Auat Goal l

0 2 4 6 8 10121416182022242628303234363840424446485052 0 2 4 6 8 1 Of 2141618202224262830323436384(X244464M2

NC Comirt led to Nuclear Excellence Outage Status Report Plant:

Point Beach Unit I Day: Thursday Today's Date / Time:

5/13/04 1600 OutageDuration: Day 40 Of Refueling Outage Number U1IR28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0

First Aid cases 0

Near misses 0

Total for this outage I

Summary:

Radiological Dose to date 54.723 Projected to date

  • 54.817 Outage Goal
  • 75 R Difference

-.094

  • Reforecast on 5/8 Number of PCEs 9

Summary: Reactor Head Repair Dose for May 12's is 1.959 vs. goal of 1.801. RV Head Total Dose is 8.172.

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

Summary:

Plant Status Mode:

a Hot Standby (Mode 3) a Hot Shutdown (Abode 4)

E Cold Shutdown (Mode5) 3 Refueling Shutdown (Mode 6)

RCS:

Temperature:

78 Pressure:

Vented to Atmosphere RV Level:

Rod Latch Height Time to Boll:

30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> Shutdown Safety Assessment Protected Equipment:

Major Activities Completed In Last 24 Hours Critical Path and Near CritiLaiPah Activities (Next 24 Hours) 1B01/lB03 Cross Tie

  • Continue Reactor Vessel Head Pen #26 Repair
  • Complete 1Xl I Transformer Breaker Maintenance and Recover
  • Moved Upper Intermals Lift Rig (to 66' LDA) 480 Volt Bus Alignment Significant Outstanding Issues Date Issue Due Responsibility 5/03/04 Reactor Vessel Head Repair Penetration #26 5/16/04 John Walsh 5/13/04 IP-IA RCP Motor Oil 5/14/04 Dan Laing Upcoming Ma or Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900

_ 1 On-Line 4/30/04 0100 4

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT.

UNIT:

I DATE: _May 13,2004 TIME:

1400 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN GREEN GREEN GREEN YELLOW NA PROTECTED EQUIPMENT:

COMMENTS:

RCS Time to Boil is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Using NP 10.3.6 Time To Boil curves.

Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency 1'BF. 1562 Revision 2 10130102 Pefcrences: NP 10.3.6 NP 10.2 1 5 Pape5 nf 9

Defined Critical Path I

I-MAY U

ID I

DESCRIPTION OD RD Cal U SYS EQID TF 13 14

.15 1

iii.

  • _t'j8!

2.14.!!16,18,20,2210.2,4,6,8,l10112.4416,18 1

20 I

CEI600R046 P PERFORM REPAIR 24 5 1 1 RC R-1 0

26 - PERFORM REPAIR WELDING OF NOZZLE WELDING OF NOZZLE 16 13476-13MAY04 16:5912MAY04 21:OOA a,'

~

f

  • I HOU COOLDOWN O!

REAIE!A 1 CE1600R027 48 HOUR COOLDOWN OF 48 48 1 1 RC R.1 0

CE 00R02748 HOUR COOLDOWN OF REPAIRED AREA REPAIRED AREA 13MAY 417:00 021347681 1 CEI600R029 I FINAL NDE OF REACTOR I 12 12 1 1 RC R-1 0

CEI600R029SNAL NDE OF REACTOR HEAD REPAIR ARE HEAD REPAIR AREA I

I 0213476-16MAY04 04:5915MAY04 17.00 CD)

Run Date 13MAY04 14:02 LT-16 DEFINED CRICAL PATH Shoat i of I C Prlmavera Systems, Inc.

FL-16 DEFINED CRICAL PATH SET

Run Date 13MAY04 14:04 Work Activity Risk Assignment IShet1o1 UI ACT IWO GRPj I HIPE EQUIPMENT Activtty Cal OURt START FINISH MAY ID ST I RISK DesCrIptUon ID

-s U__ -

CE1600R046 76 CE8 DR-Y ML-Y R.1 P PERFORM REPAIR 1

5 12MAY04 13MAY04 M IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M WELDING OF NOZZLE 21:OOA 16:59 021 476 - 128CE I

CEI600R019 76 CE8 DR.Y ML-Y R-1 P PERFORM WELD ON 1

3 13MAY04 13MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M SLEEVE SAMPLE 12:00 14:59 213475 - 128CE 1

CE1600R027 76 CE8 DR-Y ML-Y R-1 48 HOUR COOLDOWN OF 1

48 13MAY04 15MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M REPAIRED AREA 17:00 16:59 0213476 - 128CE I

CE1600R047 76 CE8 DR-Y ML-Y R-1 P SETUP FOR 206 1

4 13MAY04 13MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M MACHINING 17:00 20:59 0213476 - 128CE I

CE1600R048 76 CE8 DR-Y ML-Y R.1 P.26 - PERFORM WELD 1

4 13MAY04 14MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M SURFACE MACHINING 21:00 00:59 0213476 - 128CE 1

CEI600R054 76 CE8 DR-Y ML-Y R-1 P.26 - INSTALL SEAL ON 1

2 14MAY04 14MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M NOZZLE EXTENSION 01:00 02:59 0213476 - 128CE I

CE1600R028 76 CE8 DR-Y ML-Y R-1 PRELIMINARY NDE OF 1

8 14MAY04 14MAY04 C3REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M REPAIRED AREA (UT/PT) 03:00 10:59 0213476 - 128CE I

CE1600R029 76 CE8 DR-Y ML.Y R-1 FINAL NDE OF REACTOR 1

12 15MAY04 16MAY04

  • REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M HEAD REPAIR AREA 17:00 04:59 0213476 - 128CE I

EM0216167 76 EM DR-N ML-N E-01 INSPECT AND MAINTAIN 9

10 13MAY04 14MAY04 Q=rTG-01 TURBINE GENERATOR EXCITER ORT3-N R-M EXCITER FUSES PER MWP 18:00 18:59 0216167 - 128EM 2

IC0408292 70 IC DR-Y ML-Y ICP402 008-1 NI AXIAL OFFSET Z

1 13MAY04 13MAY04 I POWER RANGE AXIAL OFFSET CAL ORT3.Y R-M CALIBRATION 09 00A 12 59 08292 - B08B2 U:

es--E I IC5 11TMG 76 ICI DR-N ML-N ICP-05 011 FEED REG VALVE TIMING 5

1 12MAY04 13MAY04 F

EEDWATER CONTROL VALVES (OUTAGE)

ORT3-N R-M (ICP-5011) 10:OOA 12:59 3008

- 1281C ES I

IT-300C 77 OPS DR-N ML-N O-IT.0300C STROKE TEST MFW I 1 1

12MAY04 113MAY04 NIT I FEED REGULATING VALVE TEST 1....ORT3-N R-M CONTROL& BYPASS 1

[10:OOA 1259259

-120 N M IW ELT-81 HUMAN ERROR RISK BARCHIART SyR I

2 u

FL-W1 HUMAN ERROR POTENTIAL l~CWAA PBNP U1 Refueling 28 Outage C) Primavera Systems, Inc.

after 13MAY04 12:00 l

U1R28 WORKING SCHEDULE after 13MAY04 12:00

  1. U ID RESP WO EQID DESCRIPTION RD ES IEF RSK MF MATh 13

.F 14

.St 15

__ST I.

.1 ~I. I

.h. _ 1,101t4.16e1820,2210. 2. 4.6.@8.l192.14,16.18,20221 0, 2,24.,6.,8,1l1t2.l4,TE ST 2

i2g~jjw,=

m a

1 1

AP0215127A APM 76 X-01-A INSPECT CAL AND SET 5

12MAY04 13MAY04 DR-N ML-N 130 _

INSPE CALANDSETX 1-A(COMPLETE)

X-01.A(COMPLETE) 0900A 16.59 ORT3-N R-N MAIN TRANSFO PERHASEA0215 27

m U_ -

2 1

AP0303688 APR 76 A-01 CALIBRATE 1A-01 70 11MAY04 21MAY04 DR-N ML-N 191 68 CALIB TE IA-01 NON-TEi SPEC RELAYS NON-TECH SPEC 08.00A 14:59 ORT3-N R-N 3

0 L151SO-3 APS F52-151 SWITCHING LINE 151 2

14MAY04 14MAY04 DR-N ML-N L15150S-3 CHG UNE 15 LUT OUT 07:00, 08:59 ORT3-N R-N 4

0 L1510)S-3 APS F52-151 LINE 151 OUT OF 36 14MAY04 15MAY04 DR-N ML-N 0

L151OOS-3U 5OTOF SER CE (SECOND T SERVICE (SECOND 07:00 18:59 ORT3-N R-N S

0 AP0304870A APS 78 H52-OHPVR-DEUVERH52-OSTO 6

14MAY04 14MAY04 DRN MLN 0

AP0304870A0 H52-45TO IAINTENANCE SHCB MAINTENANCE SHOP 08:00 13:59 ORT3-N R-N 030487 13.8 KV/0 AMP VACUUM BF lAKER 6

1 AP0215099 APS 76 F89-112 SPECTICLEANILUBRICA1 3

14MAY04 14MAY04 DR-N ML-N 0

AP0215t99 NSPECT/CLEA/VLIBRICATE OPERAT IR OPERATOR 09.00 11:59 ORT3-N R-N 0215099 X-03 V STN A JX XFMR HIGH SID CIRCUIT SWIT 7

0 ATC151-3 APS F52-151 ATCWORKAT NORTH 32 14MAY04 15MAY04 DR-N ML-N 0

ATC15i-VC MAT NOF APPLETON SIM STATION APPLETON SUB 09 00 16:59 ORT3-N R-N.

8 1

AP0215099A APS 76 F89-1i12 STROKE OPERATOR i

14MAY04 14MAY04 DR-N ML-N 25 AP02i ASTROKE OPEI ATOR DURING TA ING EVOLIUTI DURING TAGGING 12:00 12:59 ORT3-N R-N 021 099X-03 V ST AUX XFMR HIGH SI E CIRCUITSW 9

0 AP0304870B APS 78 H52-DHPVR-RETURN H52-5 TO 6

15MAY04 15MAY04 DR-Y ML-Y 0

AP03048TOB I H52-05 SWITCHYARD 08:00 13:59 ORT3-N R-N 0304870 i3.8 KV 10 0

L151S-3 APS F52-151 SWTCHINGUNE51 IN 2 15MAY04 15MAY04 DRNML-N 64 Ll5lSI3S`

17:00 18:59 ORT3-N R-N E

lEi t!2l --

-M11 -E 11 0O BM0300063 DM 77 VNSBlCC INSPECT AND MAINTAIN 4

14MAY04 14MAY04 IDR-N ML-N 6841 BM03006 NPCTAD I SBCC AIR SBCC AIR 09_00 1259 ORT3-N R-N 0300063 VNSBCC SY MULTI AND/OR UMBERED E EN Z-

~1-I-X1]

=

12 0

CE0310577 CE 75 Z-065A Z-56A INSTALL MR 51 10MAY04 21MAY04 120 EG 1o577 Z-4A ALL MR 03-)44 03-044 07.00A 14:59 13 0

CE0311772 CE 76 Z-065A Z-5A INSTALL HEAT 51 10MAY04 21MAY04 120 EO 1mZ-65A IALL HEATTRACe MR O3-044 TRACE-MR 03044 07.OOA 14:59 14 0

CE307011BB CE 76 D-105 PRE-COAT 3

12MAY04 13MAY04 165 C REAINTERCONNE NGBUSWORK D05(SPARE)

INTERCONNECTING 07D0A 14:59 125V DC ATBNBATTERY 307011 X P"'Z11

]lu[s-.ts 15 o

CE0306041 76 INTAKECRI INSPECTCRIB.INSTALL 1

05APR04 15MAY04 DR-YML-Y 239 ES 1 1INSPE CRIB. INSTALL B VSAND FISH BUOYS AND FISH 10-O0A 07:59 ORT3-Y R-N A

CRIB 03=

Run Date 13MAY04 13:401 LT03 STANDARD PUBLICATION Sheet 1 of 18 C PImavera Systemsg, Inc.

IFL-03 Execution Publication Set 7

after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00

  1. iu ID IRESP wo ST EQID DESCRIP1ION RD ES EF RISK MF Thu 13 MAY Frl 14 Sat 15

.4.6S. B.l0,Di12.14. 1 61 12.14.1 O. 2. 4. R.

I.1012.14.16.1 16 I I CE44CGATR CE3 76 INSUL-MS REM INSUL FOR FAC 63 04APR04 I 17MAY04 PROG. CTMT 44 FT GEN 16D0A 14:59 ARFA II I

DR-Y ML-Y ORT3-Y R-N 450 CE4,CGATR REM iqsuL FOR FAC PRO CTMT 44 FT GEO AREA I

17 1

CE26TGATI CE3 77 IST-SISI REINSULATE-FAC 10 28APR04 13MAY04 DR-Y ML-Y 111 PROG -TRB HALL 26 FT 09 00A 21:59 ORT3-Y R-N GEN AREA 18 I

CE30000TI CE3 76 TG-01-T ENCAPSULATE 10 01MAY04 13MAY04 DR-Y ML-Y 177 INSULAllON ON HP 1200A 21:59 ORT3-Y R-N TURBINE COVER 19 1

CE26TOHTI CE3 77 IST-SISI REINSULATE-FAC 72 04MAY04 19MAY04 DR-Y ML-Y 275 PROG -TURB HALL 26 20OOA 19.59 ORT3-Y R-N FTOVERHD 20 1

CE44CGATI CE3 76 INSUL-MS REINSULATE-FAC 35 12MAY04 14MAY04 DR-Y ML-Y 0

PROG - CTMT 44 FT GEN 17.OOA 22:59 ORT3-Y R-N AREA 21 1

CE309512TI CE3 77 SW-02861 INSTALL INSULATION 8

13MAY04 13MAY04 DR-Y ML-Y 311 ISW-2861 12:00 10:59 ORT3-Y R-N 22 1

CE44POHTI CE3 76 INSUL-MS REINSULATE - FAC 12 13MAY04 14MAY04 DR-Y ML-Y 1

PROG - PAB 44 FT 18:00' 05:59 ORT3-Y R-N OVERHEAD -

23 1

CE26TOHSR CE4 77 IST-SISI REM SCAFF FAG PROG 23 01MAY04 14MAY04 DR-Y ML-Y 296

-TURB HALL26 FT 1960A 14:59 ORT3-Y R-N IN OVERHASDF I 24 1

CE08POHSR CE4 77 IST-SISI REMOVE SCAFF - FAC 32 05MAY04 17MAY04 DR-Y ML-Y 175 PROG -TURB HALL 8 FT 10700A 10:59 ORT3-Y R-N

~OVERHEAD 25 1

CE214035SR CE4 82 CW REMOVE SCAFFOLDING 16 13MAY04 14MAY04 DR-Y ML-Y 191 FOR NASH FLOAT 08 00A 1 59 ORT3-Y R-N 26 1

P1402-SI CE4 77 Z4-22 ZREOV BUILD 24 13MAY04 14MAY04 DR-Y ML-Y 0

SCAFFOLDING FOR 16 :00 15059 ORT3-Y R-N INTERNALS UFT RIG 27 1

CE44POHSR CE4 77 IST-SISI REMOVE SCAFF FOR 4

14MAY04 14MAY04 DR-Y ML-Y 157 FAC PROG - PAB 44 FT 07:00 10:59 ORT3-Y R-N OVERHEAD 28 1

CE44CGASR CE4 77 IST-SISI REMOVESCAFFOLDING 4

14MAY04 15MAY04 DR-Y ML-Y 179 FOR FAC PROG 23100 02 59 ORT3-Y R-N (11214046) 29 1

CE215202SR CE4 76 P4-01A-M REMOVESCAFFOLDING 4

15MAY04 15MAY04 DR-Y ML-Y 173 FOR P-LAEM 0S.-

08 :59 ORT3 Y RN 30 I CE04075189C CE5 7ff T-026 T-026. BDTANK PIPING h 11 107MAYD4 114MAYD4 DR-Y ML-Y 0

INPINGMENT PLATE I I07D0OA I14:59 ORT3-Y R-N

-REPAIR I I I

31 1 CE9929T74 C5 77 INSTALLIMOD I27 IO1MAY04 IB1MAY04 DR-Y ML-Y 24 PLATFORMS I I10:00A I14:59 ORT3-Y R-N 32I CE0305396 CE5 76 W-001BI W.1B2A RE-WELD I8 113MAY04 114MAY04 0

DAMPER PLENUM I I09-00A I11:59 CE2 REINS TE.FAC PROG.

RB HALL 26 FT GE AREA U

SECONDARY INS R\\VCE INSPECTIOt 0303638 CE ENC TE INSULATIOC ON HP TURBINE C VER HIGH PRESSURE IIRBINE0302153 CE2 REIN T

FAC PROG -

RB HALL 26 FT vERHo CE4 CGAREIN TE.FAC PROG -CTMT 44 FT GEN

_.INSULATION04CP174 CE3 I

1 SINST2INSULATiON 1SW 2861

-5 H2 SIDE SA OIL COOLER OUIYET RELIEF0306006 C 44PORTIR TE-FAC O.PAB44FTOVEFHEAD 0408174 IS TIONLI I

crE2 EOHSRREM SFF*ACPROG *,TIJRB HALL 26 FTt Dl SECONC RYINSERVICE INS ECTION030363 CEO01HREM FAC RHALLS OVERHO CE2 35R REMOt SCFODIG R NASH FLOAT VM LVES O

CW SYSTEM JULTI ANDUOR NON. UMBERED EQt P

-2 S

-Z422 UILD SCAFFOLDIN FOR INTERNALS IFTRIG 0 193_R1 RE CTOR VESSEL M RNALS UFTING CE44POHSRR VE SCAFF FOR I kC PROG. PAB 44 OVERHEAD 0303636 SECONDARY IN ERVICE INSPECTN CE44CGA -RREMOVE SCAF OLDING FOR F 0303 36MSECOND AY INSERVICE E215202SR SCAFFOLD41 0215202_

REACTOR COOI CE 7589CT-026 SD TANK PIPING / I GMENT PLATREPAIR BLOWC jNNTANK 0407589 CEY 17T 4INSTALl.MOD PLATFORMS W-1 A RE-WEL4 DAMPER PLENUM E

_CI CONTAINMENt ACCIDEN T RECIR,ULATION FAN RUM 33 1

CE0305397 CES 82 W-001C1 W-1C2-A. RE-WELD DAMPER PLENUM 16 14MAY04 12.00' 18MAY04 11:59 0

CE030 W 3 97W-1C2.A. RE-1LELD DAMPER PLE I

I-Run Date 13MAY04 13:401 LT-03 STANDARD PUBLICATION Ft.031 Fvxrtionn Ptiltlknn Set I

Sheet 2 of I18 tm Pnv ir Ine I

after 13MAY04 12:00 l

U1R28 WORKING SCHEDULE l

after 13MAY04 12:.00 u

ID RESPI WO EQID DESCRIPTION lRDl ES RISK MF ThU 13 MAY IFri 14 Sat 1 ST 3.11 12.14.1 n i 2.4. 6.

8.1012.14.1.1 LB TNKFOLNGRIGEPAIS 134 1 CE0407589B I CES 76 T-026 CLOSEOUT SD TANK FOLLOWING REPAIRS I -

20 14MAY04 17MAY04 DR-Y ML-Y 15-00 18:59 ORT3-Y R-N 0

CE~W0758913CLOSEOI

. I 4I7673 35 0

CE0210988 CEO 77 SEC SEC SUPPORT MR 99-01 1B 1 681 05APR04 I 11JUN04 07:O0A 11:59 DR-N ML-N ORT3-N R-N CE0;heqR6 SEC SUfPORT MR 9-011-0 36 0

CE0210989 CE5 76 SEC SEC, INSTALLENEW 168 05APR04 IIJUN041 DR-NML-N 3

WEOLIP MR 9N O11E 0BOOA 11:59 ORT3-N R-N 37 1

CE02t0990 CEO 76 SEC SEC REM ABANDONED 171 03MAY04 11JUN04 DR-N ML-N 70 O S.EQUIP MR 991F 0B00A 14:59 ORT3-N R-N 38 1

CE1600R046 CE8 78 R-1 P PERFORM REPA 5

1MAY04 13MAY04 DR-Y ML-Y 0

WELDING OF NOZZLE 21.:0A 16.59 ORT3-Y R-M 39 1

CEI600R019 CES 76 R-1 P-26. PERFORM WELD 3

13MAY04 13MAY04 DR-Y ML-Y 73 ON SLEEVE SAMPLE 1200W 14:59 ORT3-Y R-M 40 1

CE1600R047 CEO 76 R-1 P-26. SETUP FOR 2W6 4

13MAY04 13MAY04 DR-Y ML-Y 0

MACHNING 17:00 0:59 ORT3-Y R-M 41 1

CE1600R027 CE8 78 R-1 48 HOUR COOLDOWN 48 13MAY04 15MAY04 DR-Y ML-Y 0

NOF REPAIRED AREA 17 :00 1659 ORT3-Y R-M 42 1

CE1600R048 CEO 78 R-1 P26-PERFORMNWELD 4

13MAY04 14MAY04 DR-Y ML-Y 0

SURFACE MACHINING 21 :00 00.59 ORT3-Y R-M 43 1

CE1600R054 CE8 76 R-1 P.26 - INSTAC SEAL ON 2 14MAY04 14MAY04 DR5Y ML-Y 0

PNOER I EXTENSION 01:00 0ZS9 OR539Y R-M 44 1

CEI600R028 CEO 76 R-1 PRELIMINARY NDE OF 8

14MAY04 14MAY04 DR-Y ML-Y 30 REPAIRED AREA (UT/PTAE 03:00 10.59 ORT3-Y R-M 45 1

CE4600870 CE8 77 R-1 INCORPORATE DES GN 3

14MAY04 14MAY04 59

_5PAPER NTO REPAIR 070 0159 46 11 CE1600R029 CE8 7B R-1 WLNDE OF REACTOR 1 2 1 SMAY034 1 6MAYD4 DR-Y ML-Y 0

__.HEAD REPAIR AREA 17:00' 04:59 ORT-Y R-M 47 1

CH0300361 CH l 77 CHEM-SAMP RCSCLTSR3.4.52 22 10MAY04 15MAY041 302 II II I05.WA I11:59l 48 1

CH0300374 CHI 77 CHEM-SAMPL RCSWOTSR3.5.1 22 OMAY04 115MAY04 302 I

II 0500OAI11:591 49 CH0300404 CH 77 CHEM-SAMPL RCSBORONSR3.9.1.1 22 10MAY04 15MAY04 302 05:00A I 11:59 CE 10989 SEC.IN AL NEW EQUIP 99-8011E CE 1099 SEC RE ABANDONED EC4PMR 99 °'F 6EII R046P FORM REPAIR VEING OF NOm l

REAC ORVESSELANDASEMBLY0213476 CEll 8019P-286 FORMWELDONSLEEVESAMPLE REACT VESSEL AND ASS MBLY0213475 CEI 00 P

04 P ETUP FOR 206 MA HINING 2134760 REACTOR VESSEL D ASSEMBLY CEI 0R027U HO COOLDOWN OF RAIMD AREA 12 7 RE CE160eRO4

-2 PERFORM SURFACE MA NING 0213476 REACTOR SSE AND ASSE l

CEO6R5 P 26

  • INST SEAL ON NO I EXTENSION 0 I3476EREACT VESSELANDASS MBLY Ct lORO 2 S PREUM ONDE OF REP ED AREA (UTIPT) 0213476 REACTOR VES EL AND ASSEMBLY CE-600-701 ORPORATE DESIGI PAPER INTO REPMR PACKAGE 0213476 REACTOR VESSE. AND ASSEMBLY CE1600RM29F 0213476U CHo&

361 RCS CL TSR 3.4.5.2 T-ISC CHE CH 374RCS DCTSR 3.4.5.1 MISC CHE?

~ -

MISC CHE?

50 10 CH0300198 CH 77 ICHEM-SAMPL BAST BORON TSR 3.5.12 811I 0MAY04 14MAY04 11:59 163 JH200119 BAST B4RON TSR 3.5.12 RY SAMPUNG0300 I

I MISC Ca-IEMIS 198 Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 3 of 18 0 Primavera Svemns, nc I

FL03 Execution Publication Set I

after 13MAY04 12:00 1 U1R28 WORKING SCHEDULE I

after 13MAY04 12:00 v

U ID RESP Wo EQID DESCRIPTION RD ES EF RISK 1 ST MF I

183 Thu 13 MAY Frd 14 sat 15 1.10 12,14.1 In. 2. 4.

R. 8.11214.IR.1 1.2.4.6.

4.1012,14.13.

511 1 CH0300388 CH 77 CHEM-SAMP SGBDFO GAMMA SCAN I8 I10MAY04 14MAY04 07.00A 11:59 CH0i00388SGBDFO GAMMA SCAN r

52 1

CH0300443 CH 77 CHEM-SAMPL RE-229 ISOTOPIC 8

10MAY04 14MAY04 163 07.00A t 1:59 53 2

CH0300484 CH 77 CHEM-SAMPL RCS BORON SR 3.9.1.1 8

10MAY04 14MAY04 163 07 00A 11:59 54 2

CH0300501 CH 77 CHEM-SAMPL RCS CL TSR 3.4.52 8

10MAY04 14MAY04 163 07.00A 11:59 55 2

CH03ODs14 CH 77 CHEM-SAMPL RCS DO TSR 3A.5.1 8

1OMAY04 14MAY04 163 07.00A 11:59 56 2

CH0300527 CH 77 CHEM-SAMPL SGBDFO GAMMA SCAN 8

10MAY04 14MAY04 163 07.00A 11:59 57 2

CH0300553 CH 77 CHEM-SAMPL RE-229 ISOTOPIC 8

10MAY04 14MAY04 163 07.OOA 11:59 58 2

CH0300578 CH 77 CHEM-SAMPL RCS DOSE EQUIVALENT 6

14MAY04 14MAY04 31 1-131 06:00' 11:59 59 6

CAMP-1138C CH CAMP-113 CAMP-113 N2SPARGE 3

105MAY04 15MAY04 DR-N ML-N 0

AND SAMPLE B STEAM 1300A 15:59 ORT3-N R-N 80 1

EMO21241 EM 76 41/IE02 RMP 9308 DS-R 1 14 20 06MAY04 14MAY04 DR-N ML-N 12 BREAKER 19.O0A 22:59 ORr3-N R-N 63 1

EM0212645 EM 76 W-03B1-M

-I1A-M REPLACE 70 12MAY04 15MAY04 DR-N ML-N 0

MOTOR BEARINGS 000A 09:59 ORT3-N R-N 62 1

EM0216170 EM 76 FIRE-1ARRI PERFORM RMP 58 FIRE 20 12MAY04 13MAY04 DR-N ML-Y 6

T BARRIER

(

21200A 19:59 ORT3N RN 63 1

EMO21502D EM 76 P-O1A-M P-1A-M PERFORM OL 41 12MAY04 15MAY04 DR-N ML-N 4

CHANGEIFLUSH 1

4 00:A 04:59 ORT3-N R-N 64 0

EM0407638c EM 76 Z-014 MO6ULESHOOTOREPA4 3

12MAY04 13MAY04 2

_UTB CRANE (SMALL 1200A 23:59 65 0

EM0304871 EM 76 A52-DHVR-1 BREAKER 8

13MAY04 13MAY04 DR-N ML-N 0

MAINTENANCE 150042 20M00A 19:59 ORT3-N R-N 06 0

EM0405897D EM 75 D-106 D-1 osPERFORM 48 33 1 2MAYo4 14MAYD4 HOUR FLOAT CHARGE 21 00A 20-59 017 0 EM03D48781 EM 761 B52-DB5D04 BREAICER 1121 13MAYC14 13MAY04 DR-N ML-N

_ _MAINTENANCE D850-001 I

00o WA 23:59 ORT3-N R-N CHO30057SRCS 0300578Mn DOSE EOUnVALENI MISC CHEMIS

'1-131 R SAMPLING CAMP 113ECCAMP-11 NITF TER FIELD CIRC

-MISC CHEMIS RY SAMPUNG030Y 358

~H0 o4RE-229 OTOPIC

_MISC CHEMIS RYSAMPLING0303

HOS00URCSCBL S 3.9.1.

L

_J CS 0N5R MISCCHEMIS RYSAMPUNG030C HSol0 RCS CLTS 3.4.5 l

MISC CHEMIS RY SAMPUNG0300 so1

'HoJO0s14RCS DC TSR 3.4.5.1 MISC CHEMIS RY SAMPUNG030t 514

1s0omSG050F GAMMA SCAN MISC CHEMI RY SAMPUNG 030 27 IL. -. I.

'H:o 0 5 5 3RE-229 TOPIC I

_S MISCCHEMIS RYSAMPUNG030

_m0J12Ml RMP 93#8, DS-lI BREAKER *~AINTENANCE I

I uunU 1 U

1IE Gr-01 TG EXCII

!M01126451Wi REPLACE MOTOR!BEARINGS

-MOk22 1AM ERFORM OLCoEIFUSH lI I

I lREAC rOR COOLANTF EM0 63scTROU TSOOIERB CRANE (SMALL 4OOK)

TURBINE BDS OVERHEAD CRAN 0407638 OM0 B MAINtENANCE 1200-42 (A52-02) 4I6KVII200 AMP VA MM BREAKER0314871 EM~t09D-106 ORM48 FLOAT CHARGE 125V DC STATION 0ATERYO 3O:

MO:

BREAK Wig RMAINTENANCEI

_480 VOLT DB-!

FE GROUNDS AND IISOL PHASE DUC 5B50-1 (B52-45) 0 SWITCHGEAR BR NSTALL BUS DUCT

'0216164 EAKER0304875 IUNKS 68 1 EM0216164G I EM 76 ISOL PHASE REMOVE GROUNDS AN0 INSTALL BUS DUCT 10 13MAY04 I 13MAY04 DR-N ML-Y I 07.00A 21:59 ORT3-N R-N 0

Run Date 13MAY04 13:40l LT.03 STANDARD PUBLICATION Sheet 4 of 18 C Primavera Systems, Inc.

I FL-03 Execution Publication Set I

after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 I D RESPl WO EQID DESCRIPTION RD ES EF RISK MAY13 Fd 14 S

I Thu13 Fi 14 at I

ST.

l b.10112.14.16la820,221 0. 2, 4 *6#t8 1Otl2.14,16.18.2OI221 0.2. 4.6. 8 1a12,14;1S 69 11 RP4A-033 EM O-RP-M0A RESTORE WALKWAY 1 2 I13MAY04 13MAY041 DR-Y MLY POST ROD LATCHING I I 12:00 13:59 ORT3-N R-N 109 :tP4j 70 1

EM0216169 EM 77 COM TEST ALL GAI-TRONICS 4

13MAY04 13MAY04 DR-N ML-Y 217 12.00 15:59 ORT3-N R-N 71 0

EM0215134 EM 77 COM GAI-TRONICS TEST 15 13MAY04 14MAY04 DR-N ML-N 694 EMC 12:00 02:59 ORT3-N R-N 72 1

EM0312035A EM 76 P-028B-M IP-288-M PERFORM 4

13MAY04 13MAY04 DR-Y ML-Y 0 =MC POST MCE TEST 14:00 17:59 ORT3-N R-N 73 1

EM0216167 EM 76 E-01 INSPECTAND MAINTAIN 10 13MAY04 14MAY04 DR-N ML-N 26 E

EXCITER FUSES PER 18:00 18:59 ORT3-N R-M 74 0

EM0207564 EM 76 852-DB50-0 1X-I TO 1B-01 INSP 4

13MAY04 13MAY04 DR-N ML-N 0

INERTIA 20-00 23:59 ORT3-N R-N 75 1

EM0215217 EM 76 T-001 TEST HEATER 10 13MAY04 14MAY04 DR-Y ML-Y 0

INSULATION 20:00 05:59 ORT3-N R-N 76 1

EM0216539 EM 76 TG-01-VARM REMOVE TEMPORARY 2

14MAY04 14MAY04 DR-N ML-N 0

METERING T-MOD 07.00 08:59 ORT3-N R-N 77 0

EM0301793 EM 76 H52-HK-200 BREAKER 16 14MAY04 14MAY04 DR-N ML-N 15 MAINTENANCE HW-2000 07:00 22:59 ORT3-N R-N 78 0

EM9925005 EM 76 A52-DHVR-3 3000-1 1X02-IA01 CELL I

14MAY04 14MAY04 DR-N ML-N 339 SWITCH INSPECTION 08:00 08:59 ORT3-N R-N 79 0

EM0301792A EM 76 A52-DHVR-3 8KR MAINT. PORTION AT 4 14MAY04 14MAY04 DR-N ML-N 0

CUBICLE (A52-01) 08:00 11:59 ORT3-N R.N 80 0

EM0304828 EM 77 P-001AS-M INSPECT SPARE RCP 4

14MAY04 14MAY04 685 MOTOR 08:00 11:59 81 1

EM0306911 EM 76 TG-01-VARM ITG-1-VARM READS 8

14MAY04 14MAY04 DR-N ML-N 141 HIGH REPLACE 0900 16:59 ORT3-N R-N 82 1

EMORT3C EM O-RT-003C ASSIST DURING ORT-3C 4 14MAY04 14MAY04 DR-N ML-N 0

11:00 14:59 ORT3-N R-N 83 0

EM0304870 EM 76 HS2-DHPVR-BREAKER 1B 14MAY04 15MAY04 DR-Y ML-Y 2

MAINTENANCE 14:00 05:59 ORT3-N R-N 84 0

EM0405897E EM 76 D-106 OBTAIN RMP 9046-1 3

14MAY04 14MAY04 0

DATA FOR D-1 06 21:00 23:59 85 1

EM0215246 EM 76 62/AO CAL AND TEST 62/A01 6

15MAY04 15MAY04 DR-N ML-N 0

RELAY PER 1RMP 06:00 11:59 ORT3-N R-N 86 1

EM02151998 EM 76 P-O01A-M P-01A FINAL PMT PER 10 15MAY04 15MAY04 DR-N ML-N 0

9002-12 06:00 15:59 ORT3-N R-N

_5-8501 1

15A0 5A0 RNM-I I

I

.033RESTORI U

116116gTESTAI MCOM S, 12035A 1P-2 81 MSTE 102i 6I67INSP WALKWAY POSTI

.L AITROwnCS STEM MULTI AND/C INICS TEST COM SYS

-M PERFORM POS1 kM GENERATOR FE ECT AND MAINTAIN DO LATCHING R NON-NUMBEREC

,EM MULTI ANDIOR MCE TEST 0D PUMP MOTOR 0:

EXCITER FUSES P n1494A47 I

T f

u--.u-w.,

EM0207564i 02075641 EM0215217,T 02152171

(.11 TO 18.01 INSP I

=480 VOLT DB-

"T HEATER INSUL PRE EM0216539RE 0216539K EM0301793BR 0301793!

EM9925005S 99250051 EM0301792AB 03017921 4~

EM0304828Itl 03048291 EM0306911 0306911 EMORI NERTIA LATCHIDB P SWITCHGEAR BR kTION RESISTANCE

,SURtZER TANK AOVE TEMPORARY ITG-01 TURBINE G EWKER MAINTENAP 01 1X02-1A01 CE 4.16 KV/3000 AMP %

CR MAINT. PORTIOI M4.16 KVt3000 A SPECT SPARE RCF SPARE 1t2P-1J ITG-1.VARM READ F1ITG-0 3CASSIST DURING 130470BREAKER I p3048700 EM0405897E 0405897 EOUIPMENT02161 NON-NUMBERED E i12035

R MWP 104.

tO1 TURBINE GENE

  • 4B)

EAKER METERING T-MO0

-NERATOR OUTPU CE HK-2000 (H52-2 N 13.8 KVt2000 Al L. SWITCH INSPEC 4CUUM BREAKER I AT CUBICLE (A5i AP VACUUM BREAI MOTOR

/B REACTOR COOt HIGH 'REPLACE TURBINE GENER)

ORT-3C AAINTENANCE DHR 13.8 DBTAIN RMP 904-M125V DC STAT EM0215246CAL 0215246m EM0215199BP-O 0215199Mn EM0407642 0407U tOUIPMENT0215 L TOR EXCITER 02452 r

VARMETER D)

P BREAKER TION

.01) 300041

,ER ANT PUMP MOT, WETER TOR OUTPUTV VR-2000 (H52-0!

KV/2000 AMP VA I DATA FOR D-1I ION BATTERY AND TEST 62AC

!IA-01 BUSI iA FIINAL PMT P

_REA 1

AREMOVE B52.

21480 VOLT a 87 1 0 EM0407B42A I EM 76 852-0B750 REMOVE 852-B75 i00 1

15MYD4 5MAY04 I DRN MLN FROM 2B52-40C 10:00 10-59 ORT3-N R-N C

Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 5 of 18 o Prfmavem s stems. Inc.

I FL-03 Execution Publication Set'

after 13MAY04 12:00 U1 2 W R IN7 CH D L after 13MA Y04 12: 00 U U ID RESP WO EQID DESCRIPTION RPI_

ES I

EP I

RSK MP MAY 88 IIE0042 EM 751 B152-D0B75-0 B52-DB75-001 RESET IS1MAY04 15MAY04 DR-N ML-N 0

EM04 642 852-0875 AMPTECTOR 12-00 16:59 ORT3-N R-N 04 642~48 819 I EAMRCP-B1 EM 76 P-O1A-M REPLACE 'ARCP 2

15MAY04 15MAY04 OR-Y ML-Y 252 IARCP`-B1 REP FLOOR PANEL 1600 17:59 ORT3-N R-N 0215199EF 90 1

EM0215205 EM 76 P-001B-M INSPECT AND MAINTAIN 1 0 15MAAY04 16MAY04 0

=M02lM520SF REACTOR COOLANT 15:00 01:59 0215205IIIIIII 91 1

EM0215203 EM.

87 P-001A-M P-001AM-M2ND MCE 3

15MAY04 15MAY04I DR-V MI-V 01 EM0215203 TEST(1A52-041IA-01) 17:00 10:59 ORT3-N R-N 021520 92 1

852-427CE EMV 75 8-42 BUS STAB PMT 1

13MAY04 13MAY04 OR-N ML-N 142 j 5 7C BUS STJ PMT "IRC-5W8

'IRC-5968 1200 12:59 ORT3-N R-N 48VMOTOF CONTROL CENE PAB SAFEGUARD0257 93 0

EM04058968 EMV 76 W-0219 W-0218 REMOVE 4

15MAY014 15MAY04 OR-N ML-N 0

M0405890BW~

JUMPER IWP 17:00 20-59 ORT3-N R-N 0405896M 94 FLP~CRCOM2 EP E

IP 1

EP QUARTERLY 2 DIGIT 3

13MAY04 I14MAY04

¶87 P R-COM2EP AR L2 DIGIT

~SELECT& CR 0MM CECK DIAL SELECT & CR 13.0 07.59-IILi-g

-I

-Ugm 95 1

NG44CFClEV EPI 77 IST-SISI ENG EVAL FOR FAC I

29APR04 14MAY04 DR-Y ML-Y 2

CFCIEV ENO VAIL FOR FAC PO - CTMT 44FT GE AREA PROG - CTMT 44FT GEN 08-OOA 14:59 ORT3-Y R-N SECONDARY INSERVICE INS IECTION 030189 96 0

EP0306799 EPI 77 SERVICE FLAMMABLE STORAGE 2

14MAY04 14MAY04 16 P0079 ETDRAG LCE NP LOCKER INSPECTION 07-00 08.59 0306799 MISC EQOUIPMENT EPIR/SR CE 97 0

FG0302077 FOI 77 MNOEPI PUMP ELECTRICAL 8

14MAY04 14MAY04 160 FG0302077PUO ELECTRICAL NOESUMPS MANHOLE SUMPS 07.00' 14:59 0302077 PoR

-ELECTRICAL M&HOLE SUMP PU 95 1

Z22FG030 FGI 7-7 Z-W2 Z-022-INTIERNALS LIFT 1 2 14MAY04 15MAY04 DR-VYML-Y 0

Z22FGO Z-W2 -INTERNA LFT RIG.- STR RIG - STRIP PAINT FOR 22:00 09-59 ORT3-Y R-N 03019R-RECO 0 F031151 FG2 7`7 VNEIC INSPECTANDSEVC 271 12MAY04 15MAY04 DR-V ML-297 :o: 05 INSPEC-AND ERVICE IC HAC EQUIP 100 0

FG0300135 FG Z 77 HX-378A SERVICE HX-378A SBCC 1 0 15MAY04 15MAY04 DR-V ML-V 656 FG03001 35S C

X38 LIGHT WIRING 10-00 19.59 ORT3-N R-N 983723 020 FG307011S1 FG3 75 D-105 BUILD SCAFFOLD FOR 5

10MAY04 13MAY04 319 G30 ~jUID fCAFFOLD FOR 0-1 Y5 REPILACEMENT D-105 REPLACEMENT 12:OOA 15:.59 125V ICSTATION BATTE V0307011 Run Date 13MAY04 13:401 LT.03 STANDARD PUBLICATION Sheet 6ofl

-8 C Primavera Systems, Inc.

I FL.03 Execution Publication Set I

after 13MAY04 12:00 U1 2 O K N C E U Eafter 13MAY04 12:00 7i i ID RESP WO I EQID I

DESCRIPTION RD ES EF RISK NLp AY

--Thu13

~Fri 14 Sat 15 I jjjjI jgjjj 103 0 FG0309951 FG3 77 SERVICE FLAMMABLE STORAGE 161 14MAY014 17MAY0415 FG03095 FS MAL STORAG CABINETtINSPECIN CAB3INET INSPECTION 07.00' 14:59 03099513I i'u--

104 0 FG0309946 FG3 77 SERVICE FLAMMABLE STORAGE 24 14MAY04 18MAY04 144 FG0309948 L STORAG CABINET INSPEC 1.N CABINET INSPECTION 07 00, 14:59 0309946 105 2 ICD40829 IC 70 ICP-02.008 NI AXIAL OFFSET I

13MAY04 13MAY04 DR-YML-Y 170 41 OFFSET CkLRATION CALIBRATION 0900A 12.59 ORT3-Y R-M NI POWER R E AXIAL OFECAL 106 1 1C5.50ALM IC 76 ICP-05.050 VERIFY ALMS ON GEN 1

13MAY04 13MAY04 DR-YML-Y 359 Ccs ALVERIFY MS ON GEN H2 P 6NL H2 PANEL.

12:OD0 12.59 ORT3-Y R-N SECONDARPLANT MIDRANGE PRESSURE INSTRI MENTS 0300870 107 0 1C0311805 IC 76 FS-00230 RE-230 CLEAN FLOW 2

14MAY04 14MAY04 DRY YML-Y 166 IC0311805RE 230 CLEAN FLOW' WITCH SWITCH 07.00' 08.59 ORT3-Y R-N 031 1805N RE.230 WASTE WAE EFFLUENT MO I1TOR INLET FL(

108 1 IC5.9RTRAL.

IC 76 ICP-05.009 VERIFY ROTOR I

14MAY04 14MAY04 DR-Y ML-Y 323 C5.9RTRALERIFROTOR STOPPED ARMCLEAR OPPE ALARM CES 17:00 17:59 ORT3-Y R-N 0300851 NTUR NNE INSTUMENT TION - MISCEL 109 1 1C0306828A IC 75 S-06050A I S-60RIA REPLACE 2

14MAY04 14MAY04 DR-Y ML-Y 323 10030662SA1 -MA REPLACE PROE GAP PROBE GAP 17:00 18:59 ORT3-Y R-N 0306628ET INEENETVERSPEED P 110 I IC5.54A IC 75 ICP-05.054 P598 SO BdU PUMP 3

14MAY04 14MAY04 DR-Y ML-Y 322 1C5.54APS98 BAJ PUMP STAI FUNCTION START FUNICTION 17:00 1 959 ORT3-Y R-N 03008T4 CNDR PLANT OW RANGE PI III I

IC5.47-1IC10 76 ICP-05.047 SECONDARY LEVEL.

15 19APR04 15MAY0-4 DR-Y ML-Y 0 CS 1SECONDA YLEVEL CONTR tLES AND SWIT CONTROLLERS AND II.-MA 09:59 ORT3-Y R-N

-SECONDARY1 112 1 1C5.53 ICI 76 IC.503 IP55 EODR 10MAY04 14MAY04 DR-Y ML-Y CS.1 1CP 5.5 SEC )NDA HIGH PRE SURE HIGH PRESSURE 0800MA 1 1:59 ORT3-Y R-N SECONDARYECINDART HIGH PRESS JRE INSTRUME 113 1 IC5.53A IC1 78 ICP-05.053 ICP 5.53 REPLACE 11 I10MAY04 14MAY04 DR-Y ML-Y 69 CS AE).3 LACE PS-21SM PS-2196 1600A 11:59 ORT3-Y R-ISECONDARY I.ATHIGH PRESS JRE INSTRUME 114 1

ICS.1ITMG IC1 75 ICP-05.011 FEED REG VALVE 1

12MAY0 4 13MAY04 jDR-N ML-N 4

YU

~FE G VALVE TIMING (ICP.5.011)

TIMING 1000OA 12.59 bRT3-N R-M FEW CONTROL VALVES (OUTAGE) 0300853 115 0 1C0300662 ICI 76 I&C MISC MISCELLANEOUS FAN I

13MAY04 13MAY0-4 DR-Y ML-Y 17FU AN FILTERS FILTERS 09:00A 12.59 ORT3-Y R-N MISC IC W XACTMVT1ES 116 0 1C0300665 101 77 RM MONTHLY PM ON RAD 1

13MAY04 13MAY04 DR-Y ML-Y 170 AO PM ON RA MONITORING S MONITORING SYSTEM 09:(X0A 12.59 ORT3-Y R-N RSYSTEM MULTI ANDIOR NO -NUMBERED EQUIF MENT 117 0

1C0407300 IC1 76 FT-03298B REMOVE PAB 3

13MAY04 13MAY04 DR-Y ML-Y 320 C4 700 REMOV PAB ISOKDINEIC SACK MONITOR ISOKINETIC STACK 13:00r 15:59 ORT3-Y R-N PAB3V I STACK ISOKINE IC FLOW TRANsmr E 0407300 118 1

105.54B I01 76 ICP-05.054 LC-2393 CHECK 1

14MAY04 14MAY04 DR-Y ML-Y 84 1C5.548LG 293 CHECK FMT GS TIGHT/ LEAK CEC FITTINGS TIGHTI LEAK 07:00 07:59 ORT3-Y R-N 03008741S CONDARY PLANT -OW RANGE PRES URE INISTRUME 119 I1 CORT3C 101 O-RT-003C PERFORM ORT-3C 4

14MAY04 14MAY04 DR-N ML-N 0

ICOR 3CPERFORM ORT-IC 11:00 14:59 ORT3-N R-N-12 C.47A 101 6

Icp-05.c4 VERItFY DRN BOTTLE 2

15MAY04 15MAY04 DR-Y ML-Y 294 5.A ORN BOT LLALARMS 05:00 09:59 ORT3-Y R-N 03008671 SECONDARYI Run Date 13MAY04 i3:401 LT-03 STANDARD PUBLICATION Sheet 7 of 1 8 C Primavera Systems. Inc.

FL-03 Execution Publication Set

after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00

  1. U to RESPl WO I ECND DESCRIPNON RD ES EF RISK MMFAY ST 4

8

_l 8

4 1;*

[ q

  • uemr :CI-S t 121 1 IC5.47B IC1 76 ICP-05.047 VERIFYSTLG MNFLD I

15MAY04 15MAY04 DR-Y ML-Y 294 _ICSA7E STLG M LVL ALARMS 09:00 09.59 ORT3-Y R-N 0300867 SECONDARY 122 1 IC5.47C IC1 76 ICP-05.047 VERIFY LO COND HILO I

15MAY04 15MAY04 DR-Y ML-Y 171 IC5.4TC LO CON I

LVL ALM 09:00 0959 ORT3-Y R-N 0300887 SECONDARY 123 1 IC5A7D IC1 76 ICP-05.047 VERIFY GEN LVL ALMS 1

15MAY04 15MAY04 DR-Y ML-Y 314 IC5.47E GEN L 0900 09 59 ORT3-Y R-N 0300867 SECONDARY 1 1;;1i*

S E 124 2 IC10301009 1C2 76 ICP-04.021 CHEMICALAND VOLUME 11 10MAY04 14MAY04 DR-Y ML-Y 0

IC03 1009CHEMt*

AND VOLUME CC NTROL SYSTEM CONTROL SYSTEM 18:00A 04:59 ORT3-Y R-N CHEM CAL AND VOLUME ONTROL SYSTEM 301009 125 1

IC2.22 IC2 76 11CP-02.02 POWER RANGE NIS 3

13MAY04 13MAY04 DR-N ML-Y 19 IC222 RANGE NIS TE 1NG (POST-REFUE TESTING (POST-REFUEL 18:00 2059 ORT3-N R-N 0306921 NIS POWER RANG CHANNELS SHUM OM SURV TEST 126 0 IC0300710 IC2 77 HP-07736 CLEAN CONTAMINATION 12 13MAY04 14MAY04 DR-Y ML-Y 270 030010 CONTAINATIO MONTOR MONITOR 18:00' 18:59 ORT3-Y R-N 0300710T "

PE SONNEL CONTAM NATION MONIT 127 0 IC0300711 IC2 77 HP-07739 CLEAN CONTAMINATION 12 13MAY04 14MAY04 DR-Y ML-Y 270 300711 CONTAMINATIO MONITOR MONITOR 18:05o 18:59 ORT3-Y R-N 0300711 I PE SONNEL CONTAM NATION MONIT 128 0 10300713 IC2 77 HP-O306 CLEAN CONTAMINATION 12 13MAY04 14MAY04 DR-Y ML-Y 270 300713CLEN CONTAMINAT MONITOR MONITOR 1_:0o 16:59 ORT3-Y R-N 0300713 I-PE SONNEL CONTAM NATION MONrT

  • D3 lZXEi 1-S Xl 1291 1 IC5.50 I0ICS 78 ICP-05.050 lCp 5.50 SECONDARY 11 28APRO4 14MAY04 DR-Y ML-Y 0 5C. ICP£50SEC NNDARYM1DRANG PRESSURE MIDRANGE PRESSURE 09:o00A 11:59 ORT3-Y R-N SECONDARY PLANT MIDRANGE RESSURE INST 130 1 IC0300795C I ICS 76 1I&C MISC C-158 RELAY 5

13MAY04 13MAY04 DR-Y ML-Y 66 0790-158F V-AYMAINTENAN EPc431EX I

MAINTENANCE-08:00A 16:59 ORT3-Y R-N MISC ' WORKACTMTE 0300795 131 1 1C0300795B CS 76 I&C MISC ESFRELAY 27 13MAY04 15MAY04 DR-Y ML-Y V

003 079 58ESFRE AY MAINTENAN IN LOGIC CABINET 3 MAINTENANCE IN LOGIC 08WOOA 16:59 ORT3-YRN R-i 132 1

IC0300795A ICS 76 1I&C MISC REACTOR PROTECTION 27 13MAY04 15MAY04 DR-Y ML-Y 0 C03 O795AREACTR PROTECTION L4C CAB RELAY ANCE LGC CAB RELAY lttOOA 16:59 ORT3-YRN l

133 1

ICTUVIBSUP ICS 76 T-SUPERVIS INSTALITURBINE 8

14MAY04 14MAY04 DR-Y ML-Y 52 ICTUVBSUP 1

N 1TURBINEVIB TONSENSORS VIBRATION SENSORS 06:00 13:59 ORT3-Y R-N 03009s51 TURBINE PER ISORYINS7 UMENTATION 134 1 IC5.8 ICS 76 ICP-05.008 TURBINE SUPERVISORY 60 14MAY04 19MAY04 DR-Y ML-Y 0

1C5.8 INE SUPERVISOR INST CALS l.

INST CALS 06:00-1059 ORT3Y R-N 0300850 135 1

IC5.50F&V

[C5 76 ICP-05.050 ICP 5.50 LT-2532 HDT 2

14MAY04 14MAY04 l DR-Y ML-Y 69 ICI5 ClP 5.50 LT.2532 DT LVIL BACK FILL VENT LVL BACK FILL & VENT M1000 11:59 ORT3-Y R-N S

08 ESECONDARY I MIDRANGE FRESURE IN 13 1t IC10303383 ICV 78 lS0009668 SC-96B POST MTN 4

13MAY04 13MAY04 DR-Y ML-Y 12 C03 3383596BoST MTN DIAGNO MC DIAGNOSTIC 15:00' 18:59 ORT3-N R-N 0 383=

UOUIDSAMPLE C NTAINMENT ISOUTION 137 1

IC0300922 ICV 78 MS-05958-O MS-5958 DIAGNOSTIC 4

13MAY04 13MAY04 DR-Y ML-Y V

0 300922 MS-58DIAGNOSTIC C ECK CHECK 18:00 21:59 ORT3-N R-N 0300922 HX-IA SG BLOW WNISOLATION OF ERATOR Run Date 13MAY04 13:401 LT.03 STANDARD PUBLICATION l

Sheet 8 of 18 O Prmavers Systems, Inc.

I FL-03 Execution Publication Set I

after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 8 U ID RESP W EQD DESCRIPTION RD ES EF RISK MF-h.

Fd MA Snt 15 Fd Sat jjj j

jjj15 Io I.

S._..-

.1012,1416.1120,2210. 2,4. 6. 8.101214.116,18,2.221A 0i 2.4, 6. 8.10012,14.16,1 138 1 IC0300942 ICV 78 RM-03200C-RM-3200C DIAGNOSTIC 4

13MAY04 13MAY04 DR-Y ML-Y 0

300942 200C0DIAGNOSTICCHECK CHECK 18:00 21:59 ORT3-N R-N 0300942 RE-211/RE212 M NITOR SUPPLY OP RATOR 139 1 IC0408038 ICV 76 MS-05959-O MS 59;-O AIR LEAK 4

13MAY04 13MAY04 DR-Y ML-Y 42 040803SM5-59.OAIRLEAK 18:00 21:59 ORT3-Y R-N 0408038 HX-1 B SG BL ISOLATION O ERATOR 140 1

IC5.49D ICV 87 ICP-05.049 ICP 5.49 CS-2273 3

15MAY04 15MAY04 DR-Y ML-Y 72 IC5.49DICP.49 CS.2273 H HEATER BYPASS UMIT 06:00 08:59 ORT3-YR-N 0300869 SECONDARY 141 1

IC0214110 ICV 76 MS-02018 MS.2018 POST 7

15MAY04 15MAY04 DR-Y ML-Y 0

IC02 I110MS2018 INSPECTION 1Z.0Qr 18:59 ORT3-N R-N 021 110 142 1 ICMS2018 ICV 78 MS-02018-O MS-2018 MSV 7

15MAY04 15MAY04 DR-Y ML-Y 0

ICM I MS-2018 M DIAGNOSTIC 1Z00*

18:59 ORT3-NR.

0 03 143 O SWR2004 IT ERDS SWR-2004-001 4

14MAY044 14MY0 161 SWR.2004 001 PE FORMTESTING ERDS SOPTW PERFORM TESTING OF 10:00C 13:59 144 1 MM9924975A MMI 76 HS-1 HS-1 REBUILD& TEST 15 26APR04 14MAY04 DR-Y ML-Y 0

24975AHS1,

& TEST BER (SHOP)

SNUBBER (SHOP) 06:00A 15:59 ORT3-N R-N

_-XHA

  • MAIN STEAM UN WEST SNUBBE 145 1 MM9933444A MMI 76 W-001C2-A W-1C2A INSTALL 10 10MAY04 14MAY04 45 133444AW-1 INSTALDAMP BRACING DAMPER BRACING 18:00A 03:59 C

MENT COOLING F N DISCHARGE DA? IPER9933444 146 1 Z22MM020 MMI 76 R-1 MOVE UPPER 2

13MAY04 13MAY04 DR-Y ML-Y 2

M020MOVEU TER I

NALS RIG (TO W LDA INTERNALS UFT RIG (TO 13:00 14:59 ORT3-N R-N EREACTOf VESSEL AND ASS MBLY0214134 147 1 MM0213114 MM1 76 Z-022 Z-022 - REMOVE ROPES I

13 13MAY 13MAY04 DR YML-Y 63 M0 13 114Z22-EMOVE ROPES SEURING CRANK LE SECURING CRANK 14:00 14:59 ORT3Y R-N R-1 REA OR VESSELINTE UFTING RIG 13114 148 1 MM0407989 MMI 76 CPP-14B ICPP-14B, ROTATE PIPE 10 13MAY04 14MAY04 DR-Y ML.Y 121 M A04079"ICP.148, ROTATE PP ENDS DOWN FOR CONCERN ENDS DOWN FOR FME 18 00' 03:59 ORT3-N R-N 0407989 UIC P1 PENETRATION-ONTAINMENTPRE SURETRAN 149 t

MM9924975B MM1 76 HS-1 HSt. REINSTALL 6

14MAY04 15MAY04 DR-YML-Y 94 M

M 24975BHS.1. R STALLSNUBB AS-LEFTVT4 SNUBBER, AS-LEFT 1600 1059 ORT3-N RIN 99249750 1

ASGM 150 1I MM0408272 MMI 10 W-003A IW-003A. REMOVE 5

15MAY04 15MAY04 0

MM040827 17 3A. REMOVE SEALS FROM LOUVERS 07 00 11:59 0408272 CONTAINI 151 1 MM0408030 MMI 10 W-003B IW-0038. REMOVE 1

15MAY04 15MAY04 151 MMO4 0301W-0038, SEALS FROM LOUVERS 12:00 12.59 c3OECONTmi 1521 1 MM0304995 MM2 76 P-028B P-028B.OVERHAUL 12 30APR04 14MAY04 DR-Y ML-Y 0 H 04995P028B OVERHAUL MAIN *D PUMPmp MAIN FEED PUMP 1500A 12:59 ORT3-N R-N STEAM GENC R

ATOR FEED PUM 0304995 153 1

MM0407390 MM2l 76 P-028B 1P-28BINSPECTSPEED 26 01MAY04 15MAY04 DR-YML-Y 0 MM orsgolP-289 NSPECTSPEEDINTREASER INCREASER 0900A 15 59 ORT3-N R-N U

T 154 1

MM9919654 MM2 77 P-0288 IP-28BSTOPOL 4

06MAY04 13MAY04 DR-YML-Y 8

a j

1P28BTOLLEAOIIN ALLBAFFLE LEAKnNSTALL BAFFLE 0500A 15 59 ORT3-N R-N STEAM PENERATOR FEED MP9919654 Run Date 13MAY04 13:40 LT.03 STANDARD PUBLICATION Sheet 9 of 18 C Primavera Systems, Inc.

FL-03 Execution Publication Set

after 13MAY04 12:00 U1 2 O K N C

E U Eafter 13MAY04 12:00

  1. U 1m RESPWOEWDESCRIPTIONjRD ES E

RIK MFI MAY 1551 01 MM0201475 MmZ 76 VNTI3 INSPECTISERVICE OPS 3

12MAY04 13MAY04 0 M01 INSPEC ISERVICE OPS SH HVAC EQU1P SHOP W-AC EQUIP 1000OA

'1459 VNBSYSTM MULTI ANDIO NON-NUMBEREDEOUIPMENTO201147; 155 0

MM03057B4 MM2 76 W-129 INSPECT AND MAINTAIN 3

13MAY04 13MAY04 0 M05.4INsm rAND MAINTAIN NlAO FAN VENTILATION FAN 1 1:00A 14.59 HX-200 N B1 3RD FLOOR VE TINFAN (AC-1i 0305784 157' 0 MM0201630 MM2 76 W-048 INSPECTALUBRICATE 4

13MAY0-4 13MAY04 0

M 020i 630I~

IBJAE BEARINGS FAN BEARINGS 18:00 21:59 021630 APNGRO GFAN 158 1 MM0302663A MM2 76 FS-02852 FS-2852. REPLACE 20 13MAY04 15IMAY04 0 MY )32663A~5 ELC AD MAL PIPING "WLEAKS)

ADDImONAL PIPING 18:00' 0,2.59 03063 KP-308 CY P SEAL WATER 159 0 MM0305786 MM2 76 W-131 INSPECT AND MAINTAIN 4

14MAY04 14MAY04 0

MM030576 INS CTAND MAINTAI VENTILATION FAN IIVENTILATION FAN 06:00 09:59 0305786 HX-202 NSB 5TH F OOR VENTILATIO1 FAN (AC-3) 160 0

MM0305787 MM2 76 HX-245A INSPECT AND CLEAN 4

14MAY034 14MAY04 0

MM0305787N5 AND CLEAN AlIHANDLING UNIT AIR HANDLING UNIT 06:00 M~.59 0305787 OPS BLDG AIR W DUNG UNIT 161 1

MM0306052 MMZ 76 CS-02297 INSPECT & MAINTAIN 3

14MAY04 14MAY04 DR-Y ML-Y 0

MM03060 2INSPECT & MNAIR P-2813 SEAL VATER PCV 11P-28B SEAL WATER 10:.00 12:59 ORT3-N R-N 03060! 2 1P-288 SGF SEAL WATER DM1 LEAKOFF PR[

162 1 MM030653 MM2 78 CS-0228 INSPECT & MAINTAIN 3

14MAY04 14MAY04 DR-Y ML-Y 14 MM0300 3INSPECT & MWAN IP-288 SEAL YATER PCV I1P-288BSEAL WATER 10:.00 12-59 ORT3-N R-N 03060!M 1P.2813SGF SEAL WATER IN? D LEAKOFF PRE 163 1 MM0301116 MM2 77 P-028A DRAW OILSAMPLE FOR 2

14MAY04 14MAY04 DR-Y ML-Y 0

MMO301I16DRA 1OILSAMPLEFOF ANALYSIS ANALYSIS 18:00r 19.59 ORT3-N R-N 0310111,6K GENERATO FEED PUMP 164 0

MM0201 676 MM2 76 HX-258 INSPECT AND CLEAN 4

14MAY04 14MAY04 0

MM0201676 CTADCLEAN H AC UNIT VAC UNIT 18:00 21:59 02016f76 TELEPHONE EQ PMENT RM AC 165 1 MM03011117 MM2 77 P.028B DRAW OL SAMPLE FOR 2

14MAY04 14MAY04 DR-Y ML-Y 1

MM0301117D WOIL SAMPLE IOR ANALYSIS ANALYSIS 20.00' 21:59 ORT3-N RN 0301117 STEAM GENERATR FEED PUMP 1166 1 MM02131019 MMV 781 Cg-M038C 1CS-00038CBODYTO 3 119APR04 13MAY04I DR-Y ML-Y 19 0319 3BBODYTOBON E LEAK BONNETLEAK 090OOA 14:59 ORT3-N R-N IHX-1 SG9D HX CLG FL( W RETURN TO ISC 4A COND 0213109 157 1 MM0214110 MMW 76 MS-02018 MS-2018 -OPEN &

48 03MAY04 1MY4 DR-YML-Y 0 M O 1 MS-201 -0PEN&tNSPEC1VA1.VE-RMP93M INSPECT VALVE -

22.-OOA I 1159sgl3 ORT3-N R-N H

X-IA SG 168 1 MM0303383A MWV 76 SC-00966B SC-9688VALVE 3

13MAY04 13MAY04 DR-Y ML-Y 0 M naSC-9S

-VALVE LEAINE BY. CONT. REPAIt LEAKING BY. CONT.

060OOA 14:59 OR3NRNPZR D

0SAMPLE CONTAI ENT ISOLATION 03383.

159 1 NG44CFCIND NDE 77 IST-SISI NDE FOR FAC PROG -4 26APR04 13MAY04 DRYLY 8

CCNOE FOR FAC PROG -C NTAINMENT 44 FT 1EN AREA CONTAINMENT 44 FT 080OOA 15:59 OR3YRNSCNARY INSERVICE IN 3PECTION 0301897 170 1 EP0301909 NDE 77 UJt-CONTAIN VISUAL INSPECTIONO0F 5

30APR04 13MAYD4 DR-Y ML-Y 80 g

VUA NSPECTION OFCTf LINER PLATE CTMTULNER PLATE 080OOA 16:59 ORT3-Y R-N UNIT' CONTAINMENT03 1909 171 1

ND0407589B NDE 76 T-026 T-026-NDEl I 5

12MAY04 14MAY04 DRY YML Y 0

75 9 T.2 NOE IRADIOGRAP 4 OF PIPING RADIOGRAPHY OF 1900A 02:59 ORT3-Y R-N

-UBLOWDO TANK 0407673 172 1 EP04080,43 NDE 77 StMI-01A 1I-SMIAPERF RT 31MY414MAY04 0

EP04080431IS IAPERFRTC CKVAL"' -UlR CHECK VALVE-U1R 19:00' 21:59 04080430P-ISA SI PUMPDIO CH ECIRC TO Run Date 13MAY04 13:

LT.03 STANDARD PUBLICATION Sheet ID of 18

@ Primavera System,. Inc.

3T FL.03 Execution Publication Sat I

after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 10 RESPI WO IE1CRSM MAY

_ U IO E00 DESCRIPTION RD ES EF RISK MF ThU 13 Fd 14 Sat 15 ST

.10 12.14.16.11&20.2210, 2.4. B. 8.l.14,116,18.20.2210.*2.4. 6. 8.10112,14,16, E

1 jjfl0,2 173 1

EP0408044 NDE 77 SI-00891B 1Sl,891 BPERF RT 3

14MAY04 14MAY04 65 EP0408044ISla9B PERF RTCH CKVALVE U1 CHECKVALVE-U1R28 190-00 21:59 0408044-P158 SI PUMP D 3CH RECIRCT 174 1

P1402NDE NDE 77 Z-022 Z 022-INTERNALS LIFT 12 15MAY04 15MAY04 DR-Y ML-Y 0

P1402 Z-022..1NTE RIG NDE EXAM 10_00 2!59 ORT3-Y R-N 03019 3 150 O002s ora 7

0751 PERFORM I

07MAYD4 1 3MrAY04 DR-N r^L-N 708 O01254 PERFoF M MArNTENANCE C N THE SCELA 1780 0P030124 CPU 77 MAINTENANCE ON THE 07.0A 12:59.

ORT3-N R-N MPERIODIC M JNTENANCE OF TH HSCBA03012-178 o OP0301248 orPo 77 O-PC-BnNEEKLY I

1 3MAYD4 1 3MAYU4 170 o~

248BONVEEM LY OPERATIONICHI CK OF BAIRON II OPERATIONCHECK OF 1Z:00' 12S59 CK OF BARD q 11 HIGH PRESS BR ATHING AIR M0301248 177 0 OP0301240 OP0 77 O-PC-021.4 WEEKLY 5

13MAY04 14MAY04 166 OP0 0124 0WEDQ: MNSCELLANEOUS DATA READINGS MISCELLANEOUS DATA 12:00' 08:59

.WEEKLY MISC EOUS DATA INGS0301240 178 0 oP0301283 OPo 77 O-PC-075.8 AOP 10A FAN 4

14MAY04 14MAY04 164 oP03012 83A FAN SURVE LANCE SURVEILrANCE 07:00 10"59 0301283-AOP 10A FAN S RVEIU.NCE 179 0 OP0215335 OPO 77 O-PCr-774 DRY PIPE SYSTEM 8

14MAY04 14MAY04 160 OP0215330DR PIPESYSTEM CH CK CHECK 07.-0' 14:59 0215335 DR -PIPE FPS VALVE

-TESTy 180 2 OP0301572 OP1 77 O-TS-O010AB TS-10A.U2CAIR LOCK 2

14MAY04 14MAY04 202 OP03( 1572 TS-IOA,U2C RLOCKDOORS LTEST DOOR SEAL TEST 00-00' 01:59 031 1572-U2 CONT R LOCK DOOR SEA TEST 181 0

OP0301293 OPI 77 O-PC-MIDS OPERATIONS MID SHIFT 49 14MAY04 20MAY04 155 OPo 1293OPERATlONS DSHIFT WEEKLY ROUTINE WEEKLY ROUTINE 00-00' 06:59 03 2

31_

182 2

OP0301590 OPI 77 TS-RE-004 FLUX DIFFERENCE 2

15MAY04 15MAY04 195 OP03 590AXIALFLUXD RENCEAN QAND UAD POWER 0000' 01:59 03 590UAXIA FL DIFFERENCE 83 2 OP0301581 OPI 77 O-PC-023.5 CHARGING PUMP 3

Y04 15MAY04 194 OP03 158 CHARGING ROTATION ROTATION AND 00c'_

02:59 030 h581 CHARG PUMP ROTAT w-h w

EwI w~

184 0 OP030 1332 OP2 76 o-PC-DAYS OPERATIONS DAY SHT 21 10MAY04 16MAY04 DR-Y ML-Y 18 332 OPERA NS DAY SHIFT EKLY ROUTINE WEEKLY ROUTINE 08:00A 11:59 ORT3-Y R-N I.

l sv1 w

185 0 1P0301394 OP3 76 O-PC-SWiNG OPS SWING SHIFT 42 12MAY04 18MAY04 168 p0 I394 OPS NOSHiFTrWEEKL ROUTINE WEEKLY ROUTINE 16:00A 22.59 186 2 OP0301645 OP3 77 O-IT-M013 IT-13,2P-1IA/BCCW 2

13MAY04 13MAY04 208 0 1645IT13.2 I1A1BCCWPUMP VALVES, PUMPS1VALVES.

16800' 17:59 0 1645E2P-1A B COMPONENT OOLING WATER PiMPSIVALVES 187 0 OP0301409 OP3 77 O-PC-045.3 PUMP OUT 3

13MAY04 13MAY04 207 PO 01409PUMP CIRCULATING ATER PUMP PITS CIRCULATING WATER 16:00' 18 59 0 01409C1CULA NO WATERPP PIT PUMPIN 188 0 OP0301326 OP3 76 O-IT-0072 IT-72,SERVICEWATER 11 13MAY04 14MAY04 199 pO 013261T7ZS RVICEWATERV S

VALVES 1650 19:59 0101326 I

M CEWATERV VES Run Date 13MAY04 13:401 LT-03 STANDARD PUBLICATION Sheet 11 of 18 C Primavera Systems, Inc.

I FL-03 Execution Publication Set I

after 13MAY04 12:00 U1R28 WORKING SCHEDULE Iafer13MAY0412:00 ID RESPI WO EQID DESCRIPTION RD ES EF RISK MF MY14 i

2-10.

468 1

6

'2 189 2 U2GNDR015 OP3 TG-01 DRAIN U2 MAIN 1

14MAY04 14MAY04 0

U2GNDR015D N U2 MAIN ELEC1 RCAL GENERA ELECTRICAL 19-00 19-59 NGERTI

~~~~GENERATOR PER PC ANGNRT 190 0 0P0301428 OP3 77 O-P078 3 MONTHLY NORTH I

15MAY04 15MAY 195 OP=01428MON SERVICE BUILDING 15:00' 16:59 030`14293M 191 1

IT-510B6A OP4 70 04T-0510B PREPS FOR WRPM TEST 4

14MAY04 14MAY04 DR-N ML-N 0 _

IT510A FOR LRPM TEST SI TEST LINE OF SI TEST LINE 06 0959 ORT3-N R-N 0215912

_U1 SlTEST PYAD EDUCTU(

REDUCTOP

,-Eu z U -

-E_

192 1 CVCSPMT OPS CV PERFORM CVCS 8

12MAY04 13MAY04 DR-N ML-N 178 PMTPERFOR A CVCS WAL I FOR PMT WALKDOWN FOR PMT 08OCA 19.59 ORT3-N R-N 193 1 IT-300C OPS 77 04T-0300C STROKE TEST MFW 1

12MAY04 13MAY04 DR-N ML-N 0 T STRO ST MFW CONTROL BYPASS VALVES CONTROL & BYPASS 10:00A 1Z59 ORT3-N R-M UNIT 1 FEED REGULATINGVAL\\ *TEST0215906

____VALVES 194 1 O-RT-059 OPS 77 O-RT-059 LLRT TRAIN A CONT I

13MAY04 13MAY04 OR-N MR-N 0

LLRT l

IN A CONT SPRAY r IV SPRAYCIV`

040OOA 12.59 ORT3-N R-N P-4A PUMP,

-SW2A DISCH CHK S 4AA1ISL (P-54) )215992 195 0 TRAIN-CE OPS REDUCED INVENTORY 2

13MAY04 13MAY04 117 EREDUCE INVENTORY Jr REW E JITT. CREW E 12:00 13:59 196 1 EP0403494A OPS 76 PT-RCS-1 OPERATING SUPPORT 4

13MAY04 13MAY04 DR-Y ML-Y 174 OPEi TING SUPPORT OF NITIAL RCS WALKDOWN OF INITIAL RCS 12:00' 15:59 ORT3-N R-N REACT R COOANT SYS (RCS) PRESSUR TEST-IN/04O349 WALJ(DOWN 197 1 O-RT-035B OPS CPP-28A LLRT HOT LEG SAMPLE 4

13MAY04 13MAY04 DR-N ML-N 170 R

CT lEG SAMPLE LlN - POSTORT UNE-POSTORT 12:00 15:59 ORT3-NR-N HOTLE SAMPLEUN 198 1 O-RT-0538 OPS 77 O-RT-053 LLRT RCDT TO GAS 4

13MAY04 13MAY04 DR-N ML-N 208 RC TR TO GAS A-lALY POST ORT ANALYZER-POST ORT 1200-15:59 ORT3-N R-N RCDT1 GAS ANALYZER 1 -34D)0215988 199 1 O-RT-064A OPS 77 O-RT-464 LLRT RE-2111212 4

13MAY04 13MAY04 DR-Y ML-Y 0

LLRTE 2111212 SUPPLY-REORT SUPPLY-PRE ORT 12.00-15:59 ORT3-N R-N RE-211 WDNRE-212SUPPL '(PX-1)0215995 200 1 O-RT-067B OPS 77 O-RT-067 POST LLRT EX STDN HX 8

13MAY04 13MAY04 DR-N MI-N 153 POST U EX C

TOAN HX CC INES CONTINGE 2CY CCOWLINES 12.00 19:59 ORT3-N R-N CZNTO AND FROM CESLETDOWN HX(P-1W/-20)0216 CONTINGENCY 201 1

0148-050 OPS T-036 FILL MFP P-28A & B LUBE 8

13MAY04 13MAY04 DR-N ML-N 22 01U MFP

  • 28A & B LUBE OL RESERVIORS OIL RESERVIORS 1200' 19:59 ORT3-N R-N L

SYSTEM MULTI A DIDOR NON-NUMBElRED ECUIPMENT 202 1 SOPBS7B OPS T-013 LOWER RWST LEVEL T7 12 13MAY04 13MAY04 90go 5LJWER LEVEL iTO1 41%

12Z00 23:59 203 1 01-132 OPS01-132 FILL & VENT CONT 16 13MAY04 14MAY04 DR-N M0-Y 0

ONTSPRAY SPRAY 13
00 04:59 CRT3-N R-N 204 01 TRAIN-CDO PS REDUCED INVENTORY 2

13MAY04 13MAY04 114 RA4 REDUCE II NVENTORY JITT, -REWN 0 JITTT, CREW D 15:00 18:59 205 1 OP0300942 OPS 76 RM03200-C RM3200C PMT STROKE I

13MAY04 13MAY04 DR-Y ML-Y 143 oP30°° 2RM-3200C P1R212 OKN PER SP 330 PER IT330 22.00 2259 ORT3-N R-N 0309 2RE-211/IRE-212 N

ITOroRSUPPLY C ERATOR 206 1 SOP-B01Z OPS B-401 SUPPLY 1B-01 FROM 3

14MAY04 14MAY04 DR-N ML-N 0

SOP oiZSUPPLY 1-1 FROM iA-01 IAWIOP-480-01 1A-01 IAW 1-SOP-480-001 00:00 02:59 ORT3-N R-N Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 12 of 18 C Prlmavera Systems, Inc.

FL.03 Execution Publication Set I

after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00

  1. U HID RESPj WO EQID DESCRnPWON RD ES EF RISK MF MAY 13Frl14 sat is

_ST E.l-t 2l4--2o210 12i4.6r8 rn'12,1416182022,4,6,8,l0112,14,'I 207 1

O-RT-055B OPS 77 O-RT-055 POST LLRT HX-1A BLOWDOWN 4

14MAY04 14MAY04 I DR-N ML-N I 00:00 03:59 ORT3-N R-N 15 O-RT0 021 208 1

X03-010 OPS X-03 IPTE BRIEF TO 2

14MAY04 14MAY04 DR-N ML-N 0

DE-ENERGtZE X-03 03:00 04:59 ORT3-N R-N 209 1

ORT-003C1 O

O-RT-003C PREPARATIONS FOR 4

14MAY04 14MAYD4 DR-N ML-N 0

ORT-3C (ORT-3C) 03:00 06:59 ORT3-N R-N 210 1

O-RT-059A OPS 77 O-RT-059 COMPLETE LEAK CHE0t 1

14MAY04 14MAY04 DR-Y ML-Y 0

PER O-RT-59 05:00 05:59 ORT3-N R-N 211 1

O-RT-060A OPS 77 O-RT-060 COMPLETE LEAK CHEU I

14MAY04 14MAY04 DR-Y ML-Y 0

PER O-RT.60 05:00 05:59 ORT3-N R-N 212 1

X03-020 OPS X-03 DEENERGIZE X-03 2

14MAY04 14MAY04 DR-N ML-N 0

05:00 06:59 ORT3-N R-N 213 1

OP0303383 OPS 76 SC-00966B SC-966B - PMT STROKE I

14MAY04 14MAY04 DR-Y ML-Y 0

PER IT 60 07:00 07:59 ORT3-N R-N 214 1

ORT-003C2 OPS O-RT-003C IPTE BRIEF FOR AUX 4

14MAY04 14MAY04 DR-N ML-N 0

FEED TEST 07:00r 10:59 ORT3-N R-N 215 1

0P0303382 OPS 82 SC-00953 SC-953 -PMT STROKE I

14MAY04 14MAY04 DR-N ML-N 151 PER IT 60 1:o0.C 10a59 ORT3-N R-N 216 1

O-RT-03B OPS 77 O-RT-038 POST LLRT PZR UQUID 4

14MAY04 14MAY04 DR-N ML-N 148 SAMPLE LINE 10:00 13:59 ORT3-N R-N 217 1

IT-51oBB OPS 70 04T-0s1OB LRPM TEST OF SI TEST 6

14MAY04 14MAY04 DR-Y ML-Y 77 LINE 1a000 15:59 ORT3-N R-N 218 1

ORT-003C3 OPS 70 O-RT-003C PERFORM ORT-3C 4

14MAY04 14MAY04 DR-N ML-N 0

11:00 14:59 ORT3-N R-N 219 1 852-427C OPS 76 B-42 BUS STAB PMT I

14MAY04 14MAY04 DR-N ML-N 184

_ _1RC-596 15:0 15:59 ORT3-N R-N 220 1

OP13A110 OPS TG-01-T PLACE TURBINE ON 2

14MAY04 14MAY04 DR-N ML-N 0

TURNING GEAR 15:00 16:59 ORT3-N R-N Z21 1

ORT4003C4 OPS O-RT-003C RECOVER FROM 4

14MAY04 14MAY04 DR-N ML-N 0

ORT-3C 15:00 18:59 ORT3-N R-N 222 1

oP13A120 OPS-OP-13A FILL CONDENSER 4

14MAY04 14MAY04 DRN ML-N 116-HOTWELL 18:00 21:59 ORT3-N R-N 223 71 CL13B010 OPT -

CL-13B CONDENSATE VALVE 16 14MAY04 15MAY04 DR-N ML-N 0

_LNEUPS 18:00 09:59 ORT3-N R-N (CL-13B)__

2 1

IT-740 OPS 77 0-4T-0740 IT-740, MAIN STEAM I

14MAY04 14MAY04 DR-N ML-N 232 BLOWDOWN 19:00 1k59 ORT3-N R-N 0

)jMP0ST LLRT H 5990MA STEA XOM01-OPTE BR!!

  • HIGH IT-003C1 PREPAR)

MS1 O.RT.059ACOMP 0215992EP-14 O.RT-M6ACOMP 02159931P.14 X03-020 DEEN EHII 03033831F ORT-003C2W1P U

0P030331 03033!

O-RT-03(

02159%

[T-510s 021591 ORT.002 0215 LIA BLOWDOWN (C GENERATOR BL8 FTO DE-ENERGIZE rOLTAGE STATION) fONS FOR ORT-3 CTUA TH L (EELEAK CHECKl PUMP/SI-862A DIS

{ETE LEAK CHECK PUMPISI-8M28 DIS IRGZE X403 H VOLTAGE STATIC 96GB - PMT STROK R LIQUID SAMPLE E BRIEF FOR AUX FI "si ACTUATION v SC 953-PMT STRI 2§PZR UOUID SPA

11POST LLRT PZR LI IPPRESSURE a LRPM TEST OF SI 2U1 SITE C3 PERFORM ORT-155=AUXLIAR1 B52-427C BUS STM 02025273480V P13A110 PLACE RT-003C4RECOVEF IOP13AI20FLLI CL13BO10CON Iw I IT740 IT-02159251 TRAIN-CCRE ONTINGENCY)

NDOWN (P-S1)

X.03

,UXILARY TRANSF(

(ORT-3C)

PSS OF SAFEGUARI

'ER 0-RT.59

'H CHKISI-s64A IS(

'ER O-RT-0I H CHKSI-864B IS(

INAUXILIARYTRAN

'PER IT 60 MONTAINMENT ISO LED TEST ITH LOSS OF SAFE PKE PER IT 60 lE SAMPLE CONTA OUID SAMPLE UNL ER UQUID SAMPLM hEST UNE ST UNE/SPY ADD O

CI

'FEEDWATER SYS k PMT I1RC-596 PTOR CONTROL C lRBINE ON TURNINS URBINE ERAT FROM ORT-3C ONDENSER H I

)ENSATE VALVE

40. MAIN STEAM BI rr 1 MAiN STEAMNT SUCED neVENTO~a

)RMER IS AC L (P-54)

P1-(P-55)

SFORMER ATION 3UARDS AC NMENT ISOLAT LINE (P-28B)

DUCT LKG RED EM AND AMSAf fTER PAB SAFE

GEAR IR TURNING GE ELL 4EUPS JCONDENSATE OWVDOWN ILOWDOWN VAI JITT, CREW C u

I l v

w'ra MPIV~v I

.rgjr~l JITT. CREW C 4

lqfpv.Fu.4 I 1-*MI%1Ui 19:00.

20:59 bb I

II I

I I

I.I.I.I Run Date 13MAY04 13:401 LT-03 STANDARD PUBLICATION l

Sheet 13 of 18 0 Primavera Systems, In.

I FL-03 Execution Publication Set I

arter 13MAY04 12:00 U1 2 O K N C E U E Iafter 13MA Y04 12:00O

  1. u ID REsp WO I ECQID DESCRIPTION jRDj ES RIKEF hiFrM1AYt1 280 0P0405897F OPS 781 0.106 PLACE 01-1081310-10 3 15MAY04 15MAY04 670 oP~O4 g~PLACE D-10 10 INSERVICI INSERVICE ON D-04 00:00 02.59 04 7125V DC TlNBATTEI 22I X03-06 OPS X-03 RE-ENERGIZE X-03 W 2

15MAY04 15MAY04 DR-N ML-N 0

3-SRE-ENE SAT 14:00 15:59 ORT3-N R-N NHIG~

228 0 OI-39J OPS SECURE PAB 1

15MAY04 15MAY04 0

Of-39JSE VENTILATION FOR 15.-0 15:59 1

22I SOP-803A BP

-03 PREPARATION TO j12 15MAY04 16MAY04 OR-N ML-N 0

SOP4803A SUPPLY 16-0 FROM 16-00 03:59 ORT3-N R-N 23I SIA02Z PG MILESTONE CLOSECTMTSPRAYA 0

13MAY04 13MAY041 DR-N ML-N 0I stAo zCLOSE m SPRAY ATRAIN P 14A WNINDOW TRAIN P.14A WNDOW 13:00 12.59 ORT3-N R-N lEND WORK (,TTSPRAY ATRA NP-14A 23 1

13KVXOIA PGX-03 START WVSTATION AUX 0

14MAY04 14MAY0-4 OR-N MI.-N 0

13KVXOIASTART WSTATJON AUX XFVR WORK (XQ3)

XFMR WORK (X03) 03:00 02.59 ORT3-N R-N IHIGH VO AGE STATION AUI TRANSFORMER 232 1 48OVXOIZ PPG 8-01 801 BUS RELATED 0

14MAY04 14MAY04 DR-N ML-N 0

O8(VXO1Z6BO1 US I ELATED ENERG WORK COPE ENERGIZED WORK 03:00 02:59 ORT3-N R-N lEND OF E 313US WORK WIN OW 233 1 4KVAO1Z PPG A-01 CLOSE A01 BUS 0

15MAY04 15MAY04 DR-N ML-N 125 4H AOIZCLOSE A RELATED WORK 13:00 12:59 ORT3-N R-N ko1 B3US 1

I 3KVX01Z PPG X-03 CLOSE W' STATION AX0 15MAY04 15M1AY04 jDR-N ML-N 0

13KVX01ZCLO XFMRWORK(X03) 16.00 15:59 ORT3-N R-N lHr-251 0123A-040 RP 0I-23A REOEADDISPOSE 4

15MAY04 15MAY04 DR-Y ML-Y 00

.4REM0 TRI NUKE FILTERS 14:00 17.59 ORT3-Y R-N-23 I Z22RPOOS RPI 77' Z-M2 Z-22 INTERNALS LIFT

'I 13MAY04 13MAY04 DR-Y ML Y 0

05Z-22 INT NL LIFT RIG.

1 R

WA P'REPS RIG - RP1 WDA PREPS 12:00 12:59 ORT3-Y R-N JR-1 REAcTo VESSEL INE LIs FTING iRIG 0301913 271 Z22RP020 RPI 77 Z-02 Z-022 - INTERNALS UIFT 1

13MAY04 13MAY04 DR-Y ML Y 0 2 2

F Z.022. IrRNALS LIFT RIG COMPLETE LOA RIG -COMPLETE LDA 15:00 15:59 ORT3-Y R-N 03 913§R.1R CTORVESSELI MRNALSLIFT1NGRIC 2381 1 RPSH004-.R RPI PACKAGE 4 REMOVE SHIELDING ON 3

14MAY04 14MAY04 DR-Y ML-Y 0

RPSII004-R REM )VESHlELDING 0N REGEN HEAT EXCI LNER REGEN HEAT 06:00r 08:59 ORT3-Y R-N 2391 11 RPSHOl1-lR RPI1 PACKAGE I11 REMOVE SHIELDING.-

5 14MAY04 14MAY0-4 DR-Y ML-Y 165 RPSH01II1.REOV SHIELDIN

  • REGEN DOOR G k REGEN DOOR GAP 09:001 13:59 ORT3-Y R-N 2401 1

Z22RP025 RPI 77 Z-M2 Z4022 - INTERNALS LIFT 6

14MAY04 14MAY04 DR-Y ML-Y 0

Z22P025Z.O2 2 -I TENALS LIFT R DECON RIG.- DECON 16:00 21:59 ORT3-Y R-N 0301913 R-1IREACTOR VE 3EL INTE 2411 2 1RPSHO097-R RPI PACKAGE 96 REMOVE SHIELDING 2

15MAY04 15MAY04 DR-Y ML-Y 46 RPSH1097-RR 61VE SHIELDIN FOR SC-955 07:00r 08:59 ORT3-Y R-N 2421 1

RPIF-152C RlPI O FILE I DAY SHIFT UPPER S

15MA0 15IMAY04 IDR-YML-Y 0RPJF1 CDAY SHIFT CAVITIYDECON4 BRIEF 11:00 15:59 ORT-Y R-N

~

Ru ae13MAY04 13:401 LT-03 STANDARD PUBLICATION Sheet 14 of 18 C Prlmavera Sysems. Inc.

I FL.03 iExeCution Pub iication Set

after 13MAY04 12:00 U1R28 WORKING SCHEDULE I

after 13MAY04 12:00 D

RESPI wo ST EQID 243 SDGSI-191 SDS CONT ZU065A DESCRIPTION ENGINEERING WALKDOWN - SUMP

-INTRUSION ISSUES SECURITY SUPPORT Z-065A - MR 03-044

1. _ '

PROVIDE CRANE, RIGGERF AND TOOLROOM MAY RD I

51 ES RISK 12.14A.I.1

..2 4.A.I i.10i12.14.1

1. 2.

A. Rff 8.1112,14.1FLI MF Thu 13 Frl 14 Sat 15 08APR04 08O0A 1BMAY04 DR-Y ML-Y 14:59 ORT3-Y R-N 24 3D.. 4S1.1 IENGINqERING WAL.KD0W -SUMIiRWTRUSIOI~IISSUES 244 0

SE031 1 T72A TGSUPPORT SEC 76 10MAY04 21MAY04 0700A 14:59 12 VEOhj.LmASECUItk SUPPORT Z=J!~- R OM pF- -

I -,

2451 1 TGG TG-01.T 45 1 13APR04 I 17MAY04 090O0A I 16:59 DR-Y ML-Y ORT3-Y R-N 214 rGsPPoRT CRAN AND TOOLROOM WUPPORT(P12)

U -

urn.

mm 246 1 I-TGO213967A ITGGI 76 I PIPINGCROI REPLACE 5 1 07MAY04 I 14MAY04 I DR-Y ML-Y I 6

CROSS-UNDER 1 09:00A I 08:59 1 ORT3-Y R-N I

I9I7_

MANWAYS I

I A I I

GL39g7AREPI4CE CROSS-UNDER Y

2471 1 TG-30890 TGG 76 TG-01.T INSTALL HP CYLINDER I 11 I 12MAY04 I 14MAY04 HTGIGLAND STEAM 1 07:OOA I 14:59 PIPING I

I DR-Y ML-Y ORT3-Y R-N U

HiP TURBINE EXHA ST TO MSRS 0213 76T NSTA CYLNDER HTGLAND EAM PIPI1G

  • g 0

H IGTAHL HIGH PR TURBINEDD2153 248 1 TG-30930 TGG 76 TG-01-T INSTALL HP TURBINE 4

12MAY04 13MAY04 DR-Y ML-Y 141 MANWAY COVERS 0800A 15:59 ORT3-Y R-N 249 1 TG-30720 TGG 76 TG-01-T INSTALL GOVERNOR I

13MAY04 13MAY04 DR-Y ML-Y 10 PEDESTALCOVER I 11 00A I1259 ORT3-Y R-N 250 1 TG-30810 TGG 76 TG-01-T INSTALL HP-LP 4

13MAY04 13MAY04 DR-Y ML-Y 0

COUPUNG GUARD 13:00*

16:59 ORT3-Y R-N 251 1 TG-30905 TGG 76 TG-01-T INSTALL#2-3BEARING 8

14MAY04 14MAY04 DR-Y ML-Y 160 PEDESTAL COVER 07:00 14:59 ORT3-Y R-N 252 1

CL-2B WCC CL 2BF MODE 6 TO MODE5 I1591 25APR04 I 20MAY04 DR-N ML-N 0

CHECKLIST I0800A 02359 ORT3-N R-N 2531 I

T-2E WCCl CL2E MODE 3RTOCMODEM 2

R 32 02MAY04 127MAY04 9DRN MLN 0

I I

T C

I CHECKLIST I 2 1930A 03M59 1ORT34N RN 254 1 l CL-2F WCC CL2F lMODE2 TO MODE1 348-1 02MAY04 27MAY04 DR-N ML-N 0

1CHECKLIST 1900A 23:59 ORT3-N R-N 255 1

T-8839-R WCC CRDM/RPI I

RC CRDMWRPITEM 1

13MAY04 13MAY04 69 REV02 l

12:00 12:59 25BI 1 lT-0460H WCCI MS-5958 I MS MS-5958IC REVD-I 2 l13MAYD4 l13MAY04 lI 4

I I

I I

I 12:00 1 13:59 11 2571 1 lT-8808-R WCCI P-28B I1CS P28B EM REVQ31 2 113MAY04 113MAY04 IDR-Y ML-Y I 0

III III I1Z.00 I 13.59 1ORT3-NR-Nl 2581 1 I T-9"9-R WC ICW SYSTEMl I1CW CWSYSTEM MM I 3 1 13MAY04 113MAY041l 90 III II REV0-1I 12:00 114:591 I

rG-3 g30NSTALL I HIGH PI 720INSTA1LL EHIGH PRESS I19INSTALL I

l HIGH IP TURBINE MANWj tESSURETURBINEI

OVERNOR PEDES1 LRETURBINE03021 1P-LP COUPLING GI

'RESSURETURBINI TG.309051NS 0302153E LY COVERS 213969 AL COVER 53 lARD

0302153 TALL #2-3 BEARIK HIGH PRE PEDESTAL COVEI SSURETURBINE CL2 MODE STO MODE S CHECKLIST
  • L -~D

-HUI.- --

I-CL2 MODE 3TO 1OE2CHECKLIST I

CL.2 MODE 2 TO MODE I CHECKLIST ml~_

1-es r.04 1-88 1-96 T-63 IRI RC CRDI II RC CRDIW HI MS MS-I MI MS MS-5

-RI CS P-281 MI CS P-288

-RI CW Cw!

MI CWCU 7.RI CSIT-30 HI CSIT-30C k1RPI EM REVO-2 tPI EM REV0-200181 i58IC REV0-I 58IC REVO-1 00104 EM REV03-1 EM REV0.3-i1001884

,YSTEM MM REVO-I SYSTEM MM REVO-IC OPS REV041 C OPS REV0-1 0016 39 O

'8 1000969 197 e591 1 T6397jR-WCL II-300C 1 Us II-30L(X UP'S REV0-1 I I 13MATU4 I 1;5MAYLK 13:00 13:59 1j Run Date 13MAY04 13:40l LT-03 STANDARD PUBLICATION I

Sheet 15 of 18 C Primavera Systems, Inc.

l FL-03 Execution Publication Set I

after 13MAY04 12:00 1 U1R28 WORKING SCHEDULE l

afer 13MAY04 12:00 V

lU I

IRESP WO ED DESCRIPON RD ES EF RISK MAY IThuSP13 E dFr14 sat 15 ST E I1112.14,16 ta20.2210.

I.4.6i8.l12 681 2(12210,2.4.6.8.1012.14,1

=

I 26011(

T201475R WCC VNTB REMOVE TAG (0 VNTB I VNTB MM REV0-2)

I 13MAY04 I 13MAY04 15:00 15:59 705t o201

`201 2811 0 T201630H 1WCC W-04m HANG TAG (O VNAFW I

W-46 MM REVO-1) 13MAY04 13MAY04 15:00 15:59 2

4 28121 0I T305784R WCCI W-129 REMOVE TAG (0 VNNSB 1

W.129MMREVO01)_

13MAY04 I 13MAY04 I 15:00 15:59 705 130!

0i 263 1 T-0472-H WCC RM-3200C 1 RM RM-3200C IC 2

13MAY04 13MAY04 DR-Y ML-Y 0

REV0-1 16:00 17:59 ORT3-Y R-N 284 1 T-7048-R WCC P-288 1 CS P-288 EM REV2-1 3

13MAY04 13MAY04 DR-Y ML-Y 47 18:00 20:59 ORT3-N R-N 265 1 T-0472-R WCC RM-3200C 1 RM RM-3200C IC 1

13MAY04 13MAY04 DR-Y ML-Y 107 REVO-1 22:00 22:59 ORT3-Y R-N 268 1 T-7110-R WCC TG-010G 1 TU TG-01-G EM REVS-1 I

13MAY04 13MAY04 22:00 2259 267 0 T201 630R WCC W-046 REMOVE TAG (0 VNAFW I

13MAY04 13MAY04 698 W.46 MM REVD-1) 22:00 22:59 268 1 T.0460-R WCC MS-5958 I MS MS-5958 IC REVD-1 2

13MAY04 13MAY04 O

22:00 23:59 269 0 T305786H WCC W-131 HANG TAG (0VNNSB 1

14MAY04 14MAY04 5

W-131 MM REV0-1) 00W00 00W59 270 0 T305787H WCC HX-245A HANG TAG (0 VNOPS 1

14MAY04 14MAY04 5

HX.245A MM REV0-1) 00:00-00:59 75RREMOVE 30HHANG TA I

U4RREMOVE 472441 RM RI 10472E1 RN T-7048-R t CS 0017048mn T.0472-00104' T.7110-001711 T201630 T-0460-001041 T305 T305 rAG (0 VNTB VNTB 3(0 VNAFW W-46 s rAG (0 VNNSB W:1 I-3200C IC REVO-1 RM-3200C IC REV(

P-28B EM REV2-1 I CS P-28B EM REM I1 RM RM-3200C K 211 RM RM-32XDC 1 TUTG-01-G EM O1 TUTG-01-GE IREMOVE TAG (O I

I MS MS-5958 IC I owl MS MS-5958

'86H HANG TAG (0 I

r87H HANG TAG (0 I

T.9025RI 480V X-001902531 480V:

T301009RREMO I

T.9779-R1 RC 0009779R1 T.3778-H 1 3 0013778E T-1763-R1 00117631 T.070341 0010703 T305ni T305787 AM REVO-2)

AREVO-1)

MMREV0.1) 271 1

T-9025-R WCC X-13 1 480VX-13 LOADING I 1 CAUT OPS REV1 14MAY04 I 14MAY04 03:00 03:59 439 REVO-1 C REV0-1 EVS1 I REV5-1 4AF W-46 MM RE EV0.1 C REVO-1 NNSBW-131 MMR NOPS HX-245A MA 3 LOADING CAUT C

.13 LOADING CAUT TAG (2 CV F-39A PZR HTRS EM REV PZR HTRS EM RE 5KV F89-112 APS F 1 345KVF89-112AF

C SC-966B MMV R II SC SC-966B MM I AF ORT.3C OPS F
  • I AF ORT.3C OF tREMOVE TAG (O R

272 2

T301009R WCC ICP-06.021 REMOVE TAG (2 CV 1

F-39A IC REV 0.1) 14MAY04 14MAY04 05:00 05:59 691 A1)

Z-01)

REVO-1)

PS REV0-I OPS REVO-1 IC REV 0.1)

I1-V0-1 EVO-I S REV0D1

/REiV0 1 EVO-1 S REV0-1 NNSB W-131 MM R NOPS HX-245A MM 273 1 T-9779-R WCC PZR 1 RC PZR HTRS EM 1

14MAY04 14MAY04 DR-Y ML-Y 202 REVD-1 06:00 06:59 ORT3-Y R-N 274 1

T-3778-H WCC F89-112 1 345KV F89-1 12 APS 2

14MAY04 14MAY04 0

REV0.1 07.00 08:59 275 1

T-1763-R WCC SC-9668 I SC SC-966B MMV 2

14MAY04 14MAY04 O

REVO-1 08:00 09.59 278 1 T-0703-H WCC ORT-3C I AF ORT-3C OPS 2

14MAY04 14MAY04 C

REV0-1 09:00 10"59 277 0 T305786R WCC W-131 REMOVE TAG (O VNNS9 1

14MAY04 14MAY04 686 W-131 MM REV0-1) 10W00 10:59

V.I)

REMII) 278 0

T305787R WCC HX-245A REMOVE TAG (O VNOPS HX-245A MM REVO-1)

I 14MAY04 I 14MAY04 10W00.

1059 688 Run Date 13MAY04 13:40 LT.03 STANDARD PUBLICATION Sheet 16 of 18 o Prmavera Systems, Inc.

I FL-03 Execution Publication Set

after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 4T U l I

RESP WO I EO DESCRIPTION RD ES EF RISK MF Frl 14 Sat 15

__ST

-- -..10i12,141l6l2012210,2,4.6,.8l1al2.1416,18,20,2210 2,4 6 810112.144. 61 V3 53i6

-*__1 _ I Wl WW,I'j, 2791 1 T-3778-R WCC F89-112 I 1 345KVF59-112APS 12 REV0-1 14MAY04 14MAY04 12.00 13:59 0

280 1

T-0510-R WCC W-1B111B2 1 VNCCW-1B1/1B2MM 3

14MAY04 14MAY04 70 REVO-1 12.00 14:59 281 1

T-0703-R WCC ORT-3C 1 AFORT-3COPS 1

14MAY04 14MAY04 3

REVO-1 15:00 15:59 282 0

T201676H WCC HX-258 HANG TAG (O VNTB I

14MAY04 14MAY04 2

HX-258 MM REVO-1) 15:00-15:59 283 0

T201676R WCC HX-258 REMOVE TAG (0 VNTB 1

14MAY04 14MAY04 674 HX-258 MM REV-1) 22-00 22:59 284 1

T-8928-R WCC FS-2852 1 SW FS-2852 MM I

15MAY04 15MAY04 50 REV2-1 03:00 03:59 285 1

T-7043-R WCC P-028A-M I CS P-28A-M EM REVO-1 I

15MAY04 15MAY04 DR-Y ML-Y 0

04.00 04:59 ORT3-Y R-N

  • T-37 T-00 001 8-R ' 345KV F89-I 3778E1 345KV FE 0-RI VNCCW-tBI 351CM1 VNCCV T-0703-R1 AF ORT 001070331 AFOF W20167T6H HANG TA I

T20167E 2861 1 T-7047-H IWCC P-028A-M 1 CS P-28A-M EM REV1-1 I

15MAY04 I 15MAY04 I DR-Y ML-Y 04:00 04:59 ORT3-Y R-N 0

2APS REVO-1

-12 APS REVO-1 192 MM REV0-1

-1B1/1B2MM REVC W OPS REVO-1 r-3C OPS REVo-1 1(0 VNTB HX-25S 7 tREMOVE TAG (0 T.8928-RI SW FS-001892811 SWF T-7043-R 1 CS P`:

001704331 CSJ T-70474H1 CS P.:

001704731 CS I T-096-H 1 MRF 001096431 M T.3310-R1 RCI 001331031 RC T-7047-R 0017047 T40!

001 T-2Z 001 T-8 001 T-0 4

---

4 4-4 1

287 1 T-0964-H WCC

2tA01 1 MRR 621AO1 RMP 9302-1 EM REVO-1 1

15MAY04 15MAY04 05:00 05:59 0

l' 288 1

T-3310-R WCC P-OOIA-M 1 RC P-1A-M RMP 9002-1 1

15MAY04 15MAY04 0

EM REVI-1 05:00 05:59 289 1 T-7047-R WCC P-028A-M 1 CS P-28AM EM REV1-1 1

15MAY04 15MAY04 DR-Y ML-Y 100 09:00 09 59 ORT3-Y R-N 290 1

T-0964-R WCC 62/A01 1 MRR 62A01 RMP 1

15MAYD4 15MAY04 DR-Y ML-Y 0

9302-1 EM REVO-1 1Z-00 12:59 ORT3-Y R-N 291 1

T-2709-R WCC MS-2018 1 MS MS-2018 MMV 1

15MAY04 15MAY04 0

REVO-1 1200 1Z59 292 1

T-8293-H WCC HX-1H IMS HX-1B SMP OPS I

15MAY04 15MAY04 DR-Y ML-Y 0

REV1-1 1Z00 12:59 ORT3-YR-N 293 1

T-3180-H WCC P-001A-M 1 RC P-IA-M BALANCE 1

15MAY04 15MAY04 0

EM REV0-1 13:00 13:59 294 1 T-8024-H WCC IWP 1 480VIWPC01.128-E-FN 2

15MAY04 15MAY04 0

(01-39) EM REV0-2 15:00 16:59 295 1

T-3180-R WCC P-001A-M 1 RC P-IA-M BALANCE 1

15MAY04 15MAY04 402 EM REVO-1 16:00 16:59 29B 1

T-3322-R WCC P-001A-M RC P-1A-M RMP 9002-1 I

15MAY04 15MAY04 0

EM REV2-1 18 t:0 16:59 M REV0-1)

'TB HX-258 MU 852 MM REV2-1

-2852 MM REV2 UA-M EM REV0-

-28A-M EM REV 8A-M EM REVI-

-28A-M EM REV 1A01 RMP 931 R 62/A01 RMP9

-1A-M RMP 900S P-IA-M RMP 90 1 CS P-28A-M El 1 CS P-28A-M 64-R I MRR 2UA S9431 MRR86 09R 1 MS MS-2(

270931 MS MS 934H1 MS HX-1 829311 MS HX-1 g" I RC P.11 11318031 RC P T.802441 480%

0018024K14 T-3180- 1 RC 001318031 F T.3322.RRC F 001332231 F T-8293-RI MS 001829331 A 2971 1 T-8293-R WCC HX-1B 1 MS HX-IB SMP OPS REVI-1 I

15MAY04 I 15MAY04 I DR-Y MLY 18B00 I 6:S9 ORT3-Y R-N 111 Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 17 of 18 C Primavera SWems Inc.

I FL.03 Execution Publication Set I

after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 I

U I ID RESP WO J EQID DESCRIpIbON RD ES EF RISK MIF MA Thu 13 1

Ed 14 St1 t6:00 19 59 ORT3-Y R-0011302_

299 1

T-2407-H WCC RMP 1 4.16KV RMP 9364-1 1

15MAY04 1 MAY04 14 T.2407H 1 4 UMBLICAL CORD EM 17,00 17:59 001240711 i

Run Date 13MAY04 13:40 LT.03 STANDARD PUBUCATION Sheet 18 of 18 P

Pfkemvem Syems. Im:

I FL-03 Execution Publication Set