_EEnC Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Thursday, May 13, 2004 Start Time:
1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer/ Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordinator (SSC)
Shutdown Safety Assessor (SSA)
Site Management (SSM)
General Supervisors First Une Supervisors Agenda
- 1. Safety Issue Discussion (SSC)
- 2. Radiation Protection (RPM)
- 3. Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
- 5. Maintenance Coordinator Turnover (MOC)
- 6. Engineering Coordinator Turnover (EOM)
- 7. Major Projects Update (EOM)
- 8. Schedule Review (SOM)
- 9. Management Expectations (SSM)
- 10. ACEMAN Assessment Results (SOM)
- 11. Shift Goals (SOM)
Items Included In Daily Package:
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule Informaton in s record was deleted in acodance nt hfreedom of Informabon AC
Commitedio Nucicar W:.
Imm n1flT REACH
- DIR21 Point Beach Nuclear Plant U1R28 Refueling Outage
.;'y.,;,,-,CXH L; Safety Topic for week 'of May 9-15::'-::.
Theme for the week This week's theme covers Emernencv Situations. Be It weather, fire or a medical emergency, are we ready to respond to those unexpected situations?
- ,.','.'DallySafetySnippets -*
Sunday "You would be shocked if you found your emerYency egress path blocked" Material is beginning to come out of containment as a lot of work Is wrapping up. Don't pile up tools and equipment In the walkway even for short periods of time. Always keep the egress paths open for use.
Monday
'If strong winds start to blow, do you know where to goP?
Do you know the proper location to go in the event of a tornado warning if you are In the trailers, turbine hall or PAB? NP1.9.21 covers the site's various shelter areas. Plan ahead and take the time now to review the NP with your group.
Tuesday
'Make sure to cleanup or a fire may start during heat up.
OE1 531 0 Indian Point 3 - An oil vapor extractor for the main boiler feed pump failed. The tag out used to repair the extractor resulted In an Increased leakage of oil from the pump bearings onto lagging. A special log was created to monitor the leakage, but no plan existed for dealing with the safety hazards.
Maintenance repaired the extractor, returning It to service. The next day a portion of oil soaked lagging on a main boiler feed pump caught fire and was quickly extinguished by an alert watchstander.
Wednesday
'Take heed - Don't block emergency equipment you may need."
Last week on the 66ft of containment, the NRC noticed we blocked access to 2 fire extinguishers mounted on the stairwell handrail. A scaffold was built In the area that made access questionable. We then added a number of bags of insulation it made access Impossible. Just a question -Why Is the NRC finding this instead of us?.
Thursday "What number do you call if your co-worker takes a serious fall?'
What Is the plant's emergency number? 2911. This number Is only to be used for.emergency situations.
Two weeks ago a work group was having trouble getting through to operations to communicate a change In equipment status. Rather than waiting, the individual Involved decided to contact the control room via the emergency number. Needless to say this was not an appropriate use of 2911.
Friday
'take sure your fire watch Is alert to keep someone from getting hurt" OE1 2607 - LaSalle - A worker using an acetylene torch for cutting through a structural member that was behind a metal wall panel. Wall Insulation behind the member began to bum. The alert fire watch extinguished the fire within one minute of It beginning and no significant damage occurred.
Saturday Debris buildup may result In an unplanned heat up" OE14899 River Bend Station - A small fire occurred under the exhaust piping on a diesel generator during testing. The fire was observed during routine checks of the generator and the control room was Immediately notified. The control room unloaded the generator while the operator extinguished the fire. The cause was Insulation debris that accumulated around the hot piping over time.
2
I I
Point Beach Nuclear Plant Outage 1 R28 DAY 39 Supporting Operational Excellence Path N
P Picture Meets fnnnctn't MApt pyneeds Outage Radiation Performance
- 3.
A.
This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets:
<=75 Rem Actual Cum.
Exceeds:
<=71 Rem Dose:
54.723 Rem Day 39 - May 12 Actual = 0.275 Cumulative = 54.723 Cumulative Forecast = 54.817 Daily PCE goal reforecast on 4/23. Daily dose reforecast on 518104.
Reactor Head Repair Dose for May 12th is 1.959 vs. goal of 1.801.
RV Head Total Dose is 8.172.
Meets: <= 18 Exceeds: <=.12 ActualPCE's:
9 0 68
- ra T]
MS Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure AX Ia w
a g
I E
z 20 18 16 14 12 10 8
6 4
2 0
lI I
i Ii 71
. I P.,
ForecMs MW GMrow E
0-0U) 0 0
03 40-20-0i
- Auat Goal l
0 2 4 6 8 10121416182022242628303234363840424446485052 0 2 4 6 8 1 Of 2141618202224262830323436384(X244464M2
NC Comirt led to Nuclear Excellence Outage Status Report Plant:
Point Beach Unit I Day: Thursday Today's Date / Time:
5/13/04 1600 OutageDuration: Day 40 Of Refueling Outage Number U1IR28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Near misses 0
Total for this outage I
Summary:
Radiological Dose to date 54.723 Projected to date
- 54.817 Outage Goal
- 75 R Difference
-.094
- Reforecast on 5/8 Number of PCEs 9
Summary: Reactor Head Repair Dose for May 12's is 1.959 vs. goal of 1.801. RV Head Total Dose is 8.172.
Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Plant Status Mode:
a Hot Standby (Mode 3) a Hot Shutdown (Abode 4)
E Cold Shutdown (Mode5) 3 Refueling Shutdown (Mode 6)
RCS:
Temperature:
78 Pressure:
Vented to Atmosphere RV Level:
Rod Latch Height Time to Boll:
30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> Shutdown Safety Assessment Protected Equipment:
Major Activities Completed In Last 24 Hours Critical Path and Near CritiLaiPah Activities (Next 24 Hours) 1B01/lB03 Cross Tie
- Continue Reactor Vessel Head Pen #26 Repair
- CVCS Recovery
- Complete 1Xl I Transformer Breaker Maintenance and Recover
- Moved Upper Intermals Lift Rig (to 66' LDA) 480 Volt Bus Alignment Significant Outstanding Issues Date Issue Due Responsibility 5/03/04 Reactor Vessel Head Repair Penetration #26 5/16/04 John Walsh 5/13/04 IP-IA RCP Motor Oil 5/14/04 Dan Laing Upcoming Ma or Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900
_ 1 On-Line 4/30/04 0100 4
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT.
UNIT:
I DATE: _May 13,2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN GREEN GREEN GREEN YELLOW NA PROTECTED EQUIPMENT:
COMMENTS:
RCS Time to Boil is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Using NP 10.3.6 Time To Boil curves.
Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency 1'BF. 1562 Revision 2 10130102 Pefcrences: NP 10.3.6 NP 10.2 1 5 Pape5 nf 9
Defined Critical Path I
I-MAY U
ID I
DESCRIPTION OD RD Cal U SYS EQID TF 13 14
.15 1
iii.
- _t'j8!
2.14.!!16,18,20,2210.2,4,6,8,l10112.4416,18 1
20 I
CEI600R046 P PERFORM REPAIR 24 5 1 1 RC R-1 0
26 - PERFORM REPAIR WELDING OF NOZZLE WELDING OF NOZZLE 16 13476-13MAY04 16:5912MAY04 21:OOA a,'
~
f
- I HOU COOLDOWN O!
REAIE!A 1 CE1600R027 48 HOUR COOLDOWN OF 48 48 1 1 RC R.1 0
CE 00R02748 HOUR COOLDOWN OF REPAIRED AREA REPAIRED AREA 13MAY 417:00 021347681 1 CEI600R029 I FINAL NDE OF REACTOR I 12 12 1 1 RC R-1 0
CEI600R029SNAL NDE OF REACTOR HEAD REPAIR ARE HEAD REPAIR AREA I
I 0213476-16MAY04 04:5915MAY04 17.00 CD)
Run Date 13MAY04 14:02 LT-16 DEFINED CRICAL PATH Shoat i of I C Prlmavera Systems, Inc.
FL-16 DEFINED CRICAL PATH SET
Run Date 13MAY04 14:04 Work Activity Risk Assignment IShet1o1 UI ACT IWO GRPj I HIPE EQUIPMENT Activtty Cal OURt START FINISH MAY ID ST I RISK DesCrIptUon ID
- -s U__ -
CE1600R046 76 CE8 DR-Y ML-Y R.1 P PERFORM REPAIR 1
5 12MAY04 13MAY04 M IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M WELDING OF NOZZLE 21:OOA 16:59 021 476 - 128CE I
CEI600R019 76 CE8 DR.Y ML-Y R-1 P PERFORM WELD ON 1
3 13MAY04 13MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M SLEEVE SAMPLE 12:00 14:59 213475 - 128CE 1
CE1600R027 76 CE8 DR-Y ML-Y R-1 48 HOUR COOLDOWN OF 1
48 13MAY04 15MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M REPAIRED AREA 17:00 16:59 0213476 - 128CE I
CE1600R047 76 CE8 DR-Y ML-Y R-1 P SETUP FOR 206 1
4 13MAY04 13MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M MACHINING 17:00 20:59 0213476 - 128CE I
CE1600R048 76 CE8 DR-Y ML-Y R.1 P.26 - PERFORM WELD 1
4 13MAY04 14MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M SURFACE MACHINING 21:00 00:59 0213476 - 128CE 1
CEI600R054 76 CE8 DR-Y ML-Y R-1 P.26 - INSTALL SEAL ON 1
2 14MAY04 14MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M NOZZLE EXTENSION 01:00 02:59 0213476 - 128CE I
CE1600R028 76 CE8 DR-Y ML-Y R-1 PRELIMINARY NDE OF 1
8 14MAY04 14MAY04 C3REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M REPAIRED AREA (UT/PT) 03:00 10:59 0213476 - 128CE I
CE1600R029 76 CE8 DR-Y ML.Y R-1 FINAL NDE OF REACTOR 1
12 15MAY04 16MAY04
- REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M HEAD REPAIR AREA 17:00 04:59 0213476 - 128CE I
EM0216167 76 EM DR-N ML-N E-01 INSPECT AND MAINTAIN 9
10 13MAY04 14MAY04 Q=rTG-01 TURBINE GENERATOR EXCITER ORT3-N R-M EXCITER FUSES PER MWP 18:00 18:59 0216167 - 128EM 2
IC0408292 70 IC DR-Y ML-Y ICP402 008-1 NI AXIAL OFFSET Z
1 13MAY04 13MAY04 I POWER RANGE AXIAL OFFSET CAL ORT3.Y R-M CALIBRATION 09 00A 12 59 08292 - B08B2 U:
es--E I IC5 11TMG 76 ICI DR-N ML-N ICP-05 011 FEED REG VALVE TIMING 5
1 12MAY04 13MAY04 F
EEDWATER CONTROL VALVES (OUTAGE)
ORT3-N R-M (ICP-5011) 10:OOA 12:59 3008
- 1281C ES I
IT-300C 77 OPS DR-N ML-N O-IT.0300C STROKE TEST MFW I 1 1
12MAY04 113MAY04 NIT I FEED REGULATING VALVE TEST 1....ORT3-N R-M CONTROL& BYPASS 1
[10:OOA 1259259
-120 N M IW ELT-81 HUMAN ERROR RISK BARCHIART SyR I
2 u
FL-W1 HUMAN ERROR POTENTIAL l~CWAA PBNP U1 Refueling 28 Outage C) Primavera Systems, Inc.
after 13MAY04 12:00 l
U1R28 WORKING SCHEDULE after 13MAY04 12:00
.F 14
.St 15
__ST I.
.1 ~I. I
.h. _ 1,101t4.16e1820,2210. 2. 4.6.@8.l192.14,16.18,20221 0, 2,24.,6.,8,1l1t2.l4,TE ST 2
i2g~jjw,=
m a
1 1
AP0215127A APM 76 X-01-A INSPECT CAL AND SET 5
12MAY04 13MAY04 DR-N ML-N 130 _
INSPE CALANDSETX 1-A(COMPLETE)
X-01.A(COMPLETE) 0900A 16.59 ORT3-N R-N MAIN TRANSFO PERHASEA0215 27
- m U_ -
2 1
AP0303688 APR 76 A-01 CALIBRATE 1A-01 70 11MAY04 21MAY04 DR-N ML-N 191 68 CALIB TE IA-01 NON-TEi SPEC RELAYS NON-TECH SPEC 08.00A 14:59 ORT3-N R-N 3
0 L151SO-3 APS F52-151 SWITCHING LINE 151 2
14MAY04 14MAY04 DR-N ML-N L15150S-3 CHG UNE 15 LUT OUT 07:00, 08:59 ORT3-N R-N 4
0 L1510)S-3 APS F52-151 LINE 151 OUT OF 36 14MAY04 15MAY04 DR-N ML-N 0
L151OOS-3U 5OTOF SER CE (SECOND T SERVICE (SECOND 07:00 18:59 ORT3-N R-N S
0 AP0304870A APS 78 H52-OHPVR-DEUVERH52-OSTO 6
14MAY04 14MAY04 DRN MLN 0
AP0304870A0 H52-45TO IAINTENANCE SHCB MAINTENANCE SHOP 08:00 13:59 ORT3-N R-N 030487 13.8 KV/0 AMP VACUUM BF lAKER 6
1 AP0215099 APS 76 F89-112 SPECTICLEANILUBRICA1 3
14MAY04 14MAY04 DR-N ML-N 0
AP0215t99 NSPECT/CLEA/VLIBRICATE OPERAT IR OPERATOR 09.00 11:59 ORT3-N R-N 0215099 X-03 V STN A JX XFMR HIGH SID CIRCUIT SWIT 7
0 ATC151-3 APS F52-151 ATCWORKAT NORTH 32 14MAY04 15MAY04 DR-N ML-N 0
ATC15i-VC MAT NOF APPLETON SIM STATION APPLETON SUB 09 00 16:59 ORT3-N R-N.
8 1
AP0215099A APS 76 F89-1i12 STROKE OPERATOR i
14MAY04 14MAY04 DR-N ML-N 25 AP02i ASTROKE OPEI ATOR DURING TA ING EVOLIUTI DURING TAGGING 12:00 12:59 ORT3-N R-N 021 099X-03 V ST AUX XFMR HIGH SI E CIRCUITSW 9
0 AP0304870B APS 78 H52-DHPVR-RETURN H52-5 TO 6
15MAY04 15MAY04 DR-Y ML-Y 0
AP03048TOB I H52-05 SWITCHYARD 08:00 13:59 ORT3-N R-N 0304870 i3.8 KV 10 0
L151S-3 APS F52-151 SWTCHINGUNE51 IN 2 15MAY04 15MAY04 DRNML-N 64 Ll5lSI3S`
17:00 18:59 ORT3-N R-N E
lEi t!2l --
-M11 -E 11 0O BM0300063 DM 77 VNSBlCC INSPECT AND MAINTAIN 4
14MAY04 14MAY04 IDR-N ML-N 6841 BM03006 NPCTAD I SBCC AIR SBCC AIR 09_00 1259 ORT3-N R-N 0300063 VNSBCC SY MULTI AND/OR UMBERED E EN Z-
~1-I-X1]
=
12 0
CE0310577 CE 75 Z-065A Z-56A INSTALL MR 51 10MAY04 21MAY04 120 EG 1o577 Z-4A ALL MR 03-)44 03-044 07.00A 14:59 13 0
CE0311772 CE 76 Z-065A Z-5A INSTALL HEAT 51 10MAY04 21MAY04 120 EO 1mZ-65A IALL HEATTRACe MR O3-044 TRACE-MR 03044 07.OOA 14:59 14 0
CE307011BB CE 76 D-105 PRE-COAT 3
12MAY04 13MAY04 165 C REAINTERCONNE NGBUSWORK D05(SPARE)
INTERCONNECTING 07D0A 14:59 125V DC ATBNBATTERY 307011 X P"'Z11
]lu[s-.ts 15 o
CE0306041 76 INTAKECRI INSPECTCRIB.INSTALL 1
05APR04 15MAY04 DR-YML-Y 239 ES 1 1INSPE CRIB. INSTALL B VSAND FISH BUOYS AND FISH 10-O0A 07:59 ORT3-Y R-N A
CRIB 03=
Run Date 13MAY04 13:401 LT03 STANDARD PUBLICATION Sheet 1 of 18 C PImavera Systemsg, Inc.
IFL-03 Execution Publication Set 7
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00
.4.6S. B.l0,Di12.14. 1 61 12.14.1 O. 2. 4. R.
I.1012.14.16.1 16 I I CE44CGATR CE3 76 INSUL-MS REM INSUL FOR FAC 63 04APR04 I 17MAY04 PROG. CTMT 44 FT GEN 16D0A 14:59 ARFA II I
DR-Y ML-Y ORT3-Y R-N 450 CE4,CGATR REM iqsuL FOR FAC PRO CTMT 44 FT GEO AREA I
17 1
CE26TGATI CE3 77 IST-SISI REINSULATE-FAC 10 28APR04 13MAY04 DR-Y ML-Y 111 PROG -TRB HALL 26 FT 09 00A 21:59 ORT3-Y R-N GEN AREA 18 I
CE30000TI CE3 76 TG-01-T ENCAPSULATE 10 01MAY04 13MAY04 DR-Y ML-Y 177 INSULAllON ON HP 1200A 21:59 ORT3-Y R-N TURBINE COVER 19 1
CE26TOHTI CE3 77 IST-SISI REINSULATE-FAC 72 04MAY04 19MAY04 DR-Y ML-Y 275 PROG -TURB HALL 26 20OOA 19.59 ORT3-Y R-N FTOVERHD 20 1
CE44CGATI CE3 76 INSUL-MS REINSULATE-FAC 35 12MAY04 14MAY04 DR-Y ML-Y 0
PROG - CTMT 44 FT GEN 17.OOA 22:59 ORT3-Y R-N AREA 21 1
CE309512TI CE3 77 SW-02861 INSTALL INSULATION 8
13MAY04 13MAY04 DR-Y ML-Y 311 ISW-2861 12:00 10:59 ORT3-Y R-N 22 1
CE44POHTI CE3 76 INSUL-MS REINSULATE - FAC 12 13MAY04 14MAY04 DR-Y ML-Y 1
PROG - PAB 44 FT 18:00' 05:59 ORT3-Y R-N OVERHEAD -
23 1
CE26TOHSR CE4 77 IST-SISI REM SCAFF FAG PROG 23 01MAY04 14MAY04 DR-Y ML-Y 296
-TURB HALL26 FT 1960A 14:59 ORT3-Y R-N IN OVERHASDF I 24 1
CE08POHSR CE4 77 IST-SISI REMOVE SCAFF - FAC 32 05MAY04 17MAY04 DR-Y ML-Y 175 PROG -TURB HALL 8 FT 10700A 10:59 ORT3-Y R-N
~OVERHEAD 25 1
CE214035SR CE4 82 CW REMOVE SCAFFOLDING 16 13MAY04 14MAY04 DR-Y ML-Y 191 FOR NASH FLOAT 08 00A 1 59 ORT3-Y R-N 26 1
P1402-SI CE4 77 Z4-22 ZREOV BUILD 24 13MAY04 14MAY04 DR-Y ML-Y 0
SCAFFOLDING FOR 16 :00 15059 ORT3-Y R-N INTERNALS UFT RIG 27 1
CE44POHSR CE4 77 IST-SISI REMOVE SCAFF FOR 4
14MAY04 14MAY04 DR-Y ML-Y 157 FAC PROG - PAB 44 FT 07:00 10:59 ORT3-Y R-N OVERHEAD 28 1
CE44CGASR CE4 77 IST-SISI REMOVESCAFFOLDING 4
14MAY04 15MAY04 DR-Y ML-Y 179 FOR FAC PROG 23100 02 59 ORT3-Y R-N (11214046) 29 1
CE215202SR CE4 76 P4-01A-M REMOVESCAFFOLDING 4
15MAY04 15MAY04 DR-Y ML-Y 173 FOR P-LAEM 0S.-
08 :59 ORT3 Y RN 30 I CE04075189C CE5 7ff T-026 T-026. BDTANK PIPING h 11 107MAYD4 114MAYD4 DR-Y ML-Y 0
INPINGMENT PLATE I I07D0OA I14:59 ORT3-Y R-N
-REPAIR I I I
31 1 CE9929T74 C5 77 INSTALLIMOD I27 IO1MAY04 IB1MAY04 DR-Y ML-Y 24 PLATFORMS I I10:00A I14:59 ORT3-Y R-N 32I CE0305396 CE5 76 W-001BI W.1B2A RE-WELD I8 113MAY04 114MAY04 0
DAMPER PLENUM I I09-00A I11:59 CE2 REINS TE.FAC PROG.
SECONDARY INS R\\VCE INSPECTIOt 0303638 CE ENC TE INSULATIOC ON HP TURBINE C VER HIGH PRESSURE IIRBINE0302153 CE2 REIN T
FAC PROG -
RB HALL 26 FT vERHo CE4 CGAREIN TE.FAC PROG -CTMT 44 FT GEN
_.INSULATION04CP174 CE3 I
1 SINST2INSULATiON 1SW 2861
-5 H2 SIDE SA OIL COOLER OUIYET RELIEF0306006 C 44PORTIR TE-FAC O.PAB44FTOVEFHEAD 0408174 IS TIONLI I
crE2 EOHSRREM SFF*ACPROG *,TIJRB HALL 26 FTt Dl SECONC RYINSERVICE INS ECTION030363 CEO01HREM FAC RHALLS OVERHO CE2 35R REMOt SCFODIG R NASH FLOAT VM LVES O
CW SYSTEM JULTI ANDUOR NON. UMBERED EQt P
-2 S
-Z422 UILD SCAFFOLDIN FOR INTERNALS IFTRIG 0 193_R1 RE CTOR VESSEL M RNALS UFTING CE44POHSRR VE SCAFF FOR I kC PROG. PAB 44 OVERHEAD 0303636 SECONDARY IN ERVICE INSPECTN CE44CGA -RREMOVE SCAF OLDING FOR F 0303 36MSECOND AY INSERVICE E215202SR SCAFFOLD41 0215202_
REACTOR COOI CE 7589CT-026 SD TANK PIPING / I GMENT PLATREPAIR BLOWC jNNTANK 0407589 CEY 17T 4INSTALl.MOD PLATFORMS W-1 A RE-WEL4 DAMPER PLENUM E
_CI CONTAINMENt ACCIDEN T RECIR,ULATION FAN RUM 33 1
CE0305397 CES 82 W-001C1 W-1C2-A. RE-WELD DAMPER PLENUM 16 14MAY04 12.00' 18MAY04 11:59 0
CE030 W 3 97W-1C2.A. RE-1LELD DAMPER PLE I
I-Run Date 13MAY04 13:401 LT-03 STANDARD PUBLICATION Ft.031 Fvxrtionn Ptiltlknn Set I
Sheet 2 of I18 tm Pnv ir Ine I
after 13MAY04 12:00 l
U1R28 WORKING SCHEDULE l
after 13MAY04 12:.00 u
ID RESPI WO EQID DESCRIPTION lRDl ES RISK MF ThU 13 MAY IFri 14 Sat 1 ST 3.11 12.14.1 n i 2.4. 6.
8.1012.14.1.1 LB TNKFOLNGRIGEPAIS 134 1 CE0407589B I CES 76 T-026 CLOSEOUT SD TANK FOLLOWING REPAIRS I -
20 14MAY04 17MAY04 DR-Y ML-Y 15-00 18:59 ORT3-Y R-N 0
CE~W0758913CLOSEOI
. I 4I7673 35 0
CE0210988 CEO 77 SEC SEC SUPPORT MR 99-01 1B 1 681 05APR04 I 11JUN04 07:O0A 11:59 DR-N ML-N ORT3-N R-N CE0;heqR6 SEC SUfPORT MR 9-011-0 36 0
CE0210989 CE5 76 SEC SEC, INSTALLENEW 168 05APR04 IIJUN041 DR-NML-N 3
WEOLIP MR 9N O11E 0BOOA 11:59 ORT3-N R-N 37 1
CE02t0990 CEO 76 SEC SEC REM ABANDONED 171 03MAY04 11JUN04 DR-N ML-N 70 O S.EQUIP MR 991F 0B00A 14:59 ORT3-N R-N 38 1
CE1600R046 CE8 78 R-1 P PERFORM REPA 5
1MAY04 13MAY04 DR-Y ML-Y 0
WELDING OF NOZZLE 21.:0A 16.59 ORT3-Y R-M 39 1
CEI600R019 CES 76 R-1 P-26. PERFORM WELD 3
13MAY04 13MAY04 DR-Y ML-Y 73 ON SLEEVE SAMPLE 1200W 14:59 ORT3-Y R-M 40 1
CE1600R047 CEO 76 R-1 P-26. SETUP FOR 2W6 4
13MAY04 13MAY04 DR-Y ML-Y 0
MACHNING 17:00 0:59 ORT3-Y R-M 41 1
CE1600R027 CE8 78 R-1 48 HOUR COOLDOWN 48 13MAY04 15MAY04 DR-Y ML-Y 0
NOF REPAIRED AREA 17 :00 1659 ORT3-Y R-M 42 1
CE1600R048 CEO 78 R-1 P26-PERFORMNWELD 4
13MAY04 14MAY04 DR-Y ML-Y 0
SURFACE MACHINING 21 :00 00.59 ORT3-Y R-M 43 1
CE1600R054 CE8 76 R-1 P.26 - INSTAC SEAL ON 2 14MAY04 14MAY04 DR5Y ML-Y 0
PNOER I EXTENSION 01:00 0ZS9 OR539Y R-M 44 1
CEI600R028 CEO 76 R-1 PRELIMINARY NDE OF 8
14MAY04 14MAY04 DR-Y ML-Y 30 REPAIRED AREA (UT/PTAE 03:00 10.59 ORT3-Y R-M 45 1
CE4600870 CE8 77 R-1 INCORPORATE DES GN 3
14MAY04 14MAY04 59
_5PAPER NTO REPAIR 070 0159 46 11 CE1600R029 CE8 7B R-1 WLNDE OF REACTOR 1 2 1 SMAY034 1 6MAYD4 DR-Y ML-Y 0
__.HEAD REPAIR AREA 17:00' 04:59 ORT-Y R-M 47 1
CH0300361 CH l 77 CHEM-SAMP RCSCLTSR3.4.52 22 10MAY04 15MAY041 302 II II I05.WA I11:59l 48 1
CH0300374 CHI 77 CHEM-SAMPL RCSWOTSR3.5.1 22 OMAY04 115MAY04 302 I
II 0500OAI11:591 49 CH0300404 CH 77 CHEM-SAMPL RCSBORONSR3.9.1.1 22 10MAY04 15MAY04 302 05:00A I 11:59 CE 10989 SEC.IN AL NEW EQUIP 99-8011E CE 1099 SEC RE ABANDONED EC4PMR 99 °'F 6EII R046P FORM REPAIR VEING OF NOm l
REAC ORVESSELANDASEMBLY0213476 CEll 8019P-286 FORMWELDONSLEEVESAMPLE REACT VESSEL AND ASS MBLY0213475 CEI 00 P
04 P ETUP FOR 206 MA HINING 2134760 REACTOR VESSEL D ASSEMBLY CEI 0R027U HO COOLDOWN OF RAIMD AREA 12 7 RE CE160eRO4
-2 PERFORM SURFACE MA NING 0213476 REACTOR SSE AND ASSE l
CEO6R5 P 26
- INST SEAL ON NO I EXTENSION 0 I3476EREACT VESSELANDASS MBLY Ct lORO 2 S PREUM ONDE OF REP ED AREA (UTIPT) 0213476 REACTOR VES EL AND ASSEMBLY CE-600-701 ORPORATE DESIGI PAPER INTO REPMR PACKAGE 0213476 REACTOR VESSE. AND ASSEMBLY CE1600RM29F 0213476U CHo&
361 RCS CL TSR 3.4.5.2 T-ISC CHE CH 374RCS DCTSR 3.4.5.1 MISC CHE?
~ -
MISC CHE?
50 10 CH0300198 CH 77 ICHEM-SAMPL BAST BORON TSR 3.5.12 811I 0MAY04 14MAY04 11:59 163 JH200119 BAST B4RON TSR 3.5.12 RY SAMPUNG0300 I
I MISC Ca-IEMIS 198 Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 3 of 18 0 Primavera Svemns, nc I
FL03 Execution Publication Set I
after 13MAY04 12:00 1 U1R28 WORKING SCHEDULE I
after 13MAY04 12:00 v
U ID RESP Wo EQID DESCRIPTION RD ES EF RISK 1 ST MF I
183 Thu 13 MAY Frd 14 sat 15 1.10 12,14.1 In. 2. 4.
R. 8.11214.IR.1 1.2.4.6.
4.1012,14.13.
511 1 CH0300388 CH 77 CHEM-SAMP SGBDFO GAMMA SCAN I8 I10MAY04 14MAY04 07.00A 11:59 CH0i00388SGBDFO GAMMA SCAN r
52 1
CH0300443 CH 77 CHEM-SAMPL RE-229 ISOTOPIC 8
10MAY04 14MAY04 163 07.00A t 1:59 53 2
CH0300484 CH 77 CHEM-SAMPL RCS BORON SR 3.9.1.1 8
10MAY04 14MAY04 163 07 00A 11:59 54 2
CH0300501 CH 77 CHEM-SAMPL RCS CL TSR 3.4.52 8
10MAY04 14MAY04 163 07.00A 11:59 55 2
CH03ODs14 CH 77 CHEM-SAMPL RCS DO TSR 3A.5.1 8
1OMAY04 14MAY04 163 07.00A 11:59 56 2
CH0300527 CH 77 CHEM-SAMPL SGBDFO GAMMA SCAN 8
10MAY04 14MAY04 163 07.00A 11:59 57 2
CH0300553 CH 77 CHEM-SAMPL RE-229 ISOTOPIC 8
10MAY04 14MAY04 163 07.OOA 11:59 58 2
CH0300578 CH 77 CHEM-SAMPL RCS DOSE EQUIVALENT 6
14MAY04 14MAY04 31 1-131 06:00' 11:59 59 6
CAMP-1138C CH CAMP-113 CAMP-113 N2SPARGE 3
105MAY04 15MAY04 DR-N ML-N 0
AND SAMPLE B STEAM 1300A 15:59 ORT3-N R-N 80 1
EMO21241 EM 76 41/IE02 RMP 9308 DS-R 1 14 20 06MAY04 14MAY04 DR-N ML-N 12 BREAKER 19.O0A 22:59 ORr3-N R-N 63 1
EM0212645 EM 76 W-03B1-M
-I1A-M REPLACE 70 12MAY04 15MAY04 DR-N ML-N 0
MOTOR BEARINGS 000A 09:59 ORT3-N R-N 62 1
EM0216170 EM 76 FIRE-1ARRI PERFORM RMP 58 FIRE 20 12MAY04 13MAY04 DR-N ML-Y 6
T BARRIER
(
21200A 19:59 ORT3N RN 63 1
EMO21502D EM 76 P-O1A-M P-1A-M PERFORM OL 41 12MAY04 15MAY04 DR-N ML-N 4
CHANGEIFLUSH 1
4 00:A 04:59 ORT3-N R-N 64 0
EM0407638c EM 76 Z-014 MO6ULESHOOTOREPA4 3
12MAY04 13MAY04 2
_UTB CRANE (SMALL 1200A 23:59 65 0
EM0304871 EM 76 A52-DHVR-1 BREAKER 8
13MAY04 13MAY04 DR-N ML-N 0
MAINTENANCE 150042 20M00A 19:59 ORT3-N R-N 06 0
EM0405897D EM 75 D-106 D-1 osPERFORM 48 33 1 2MAYo4 14MAYD4 HOUR FLOAT CHARGE 21 00A 20-59 017 0 EM03D48781 EM 761 B52-DB5D04 BREAICER 1121 13MAYC14 13MAY04 DR-N ML-N
_ _MAINTENANCE D850-001 I
00o WA 23:59 ORT3-N R-N CHO30057SRCS 0300578Mn DOSE EOUnVALENI MISC CHEMIS
'1-131 R SAMPLING CAMP 113ECCAMP-11 NITF TER FIELD CIRC
-MISC CHEMIS RY SAMPUNG030Y 358
~H0 o4RE-229 OTOPIC
_MISC CHEMIS RYSAMPLING0303
- HOS00URCSCBL S 3.9.1.
L
_J CS 0N5R MISCCHEMIS RYSAMPUNG030C HSol0 RCS CLTS 3.4.5 l
MISC CHEMIS RY SAMPUNG0300 so1
'HoJO0s14RCS DC TSR 3.4.5.1 MISC CHEMIS RY SAMPUNG030t 514
- 1s0omSG050F GAMMA SCAN MISC CHEMI RY SAMPUNG 030 27 IL. -. I.
'H:o 0 5 5 3RE-229 TOPIC I
_S MISCCHEMIS RYSAMPUNG030
- _m0J12Ml RMP 93#8, DS-lI BREAKER *~AINTENANCE I
I uunU 1 U
1IE Gr-01 TG EXCII
!M01126451Wi REPLACE MOTOR!BEARINGS
-MOk22 1AM ERFORM OLCoEIFUSH lI I
I lREAC rOR COOLANTF EM0 63scTROU TSOOIERB CRANE (SMALL 4OOK)
TURBINE BDS OVERHEAD CRAN 0407638 OM0 B MAINtENANCE 1200-42 (A52-02) 4I6KVII200 AMP VA MM BREAKER0314871 EM~t09D-106 ORM48 FLOAT CHARGE 125V DC STATION 0ATERYO 3O:
- MO:
BREAK Wig RMAINTENANCEI
_480 VOLT DB-!
FE GROUNDS AND IISOL PHASE DUC 5B50-1 (B52-45) 0 SWITCHGEAR BR NSTALL BUS DUCT
'0216164 EAKER0304875 IUNKS 68 1 EM0216164G I EM 76 ISOL PHASE REMOVE GROUNDS AN0 INSTALL BUS DUCT 10 13MAY04 I 13MAY04 DR-N ML-Y I 07.00A 21:59 ORT3-N R-N 0
Run Date 13MAY04 13:40l LT.03 STANDARD PUBLICATION Sheet 4 of 18 C Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 I D RESPl WO EQID DESCRIPTION RD ES EF RISK MAY13 Fd 14 S
I Thu13 Fi 14 at I
ST.
l b.10112.14.16la820,221 0. 2, 4 *6#t8 1Otl2.14,16.18.2OI221 0.2. 4.6. 8 1a12,14;1S 69 11 RP4A-033 EM O-RP-M0A RESTORE WALKWAY 1 2 I13MAY04 13MAY041 DR-Y MLY POST ROD LATCHING I I 12:00 13:59 ORT3-N R-N 109 :tP4j 70 1
EM0216169 EM 77 COM TEST ALL GAI-TRONICS 4
13MAY04 13MAY04 DR-N ML-Y 217 12.00 15:59 ORT3-N R-N 71 0
EM0215134 EM 77 COM GAI-TRONICS TEST 15 13MAY04 14MAY04 DR-N ML-N 694 EMC 12:00 02:59 ORT3-N R-N 72 1
EM0312035A EM 76 P-028B-M IP-288-M PERFORM 4
13MAY04 13MAY04 DR-Y ML-Y 0 =MC POST MCE TEST 14:00 17:59 ORT3-N R-N 73 1
EM0216167 EM 76 E-01 INSPECTAND MAINTAIN 10 13MAY04 14MAY04 DR-N ML-N 26 E
EXCITER FUSES PER 18:00 18:59 ORT3-N R-M 74 0
EM0207564 EM 76 852-DB50-0 1X-I TO 1B-01 INSP 4
13MAY04 13MAY04 DR-N ML-N 0
INERTIA 20-00 23:59 ORT3-N R-N 75 1
EM0215217 EM 76 T-001 TEST HEATER 10 13MAY04 14MAY04 DR-Y ML-Y 0
INSULATION 20:00 05:59 ORT3-N R-N 76 1
EM0216539 EM 76 TG-01-VARM REMOVE TEMPORARY 2
14MAY04 14MAY04 DR-N ML-N 0
METERING T-MOD 07.00 08:59 ORT3-N R-N 77 0
EM0301793 EM 76 H52-HK-200 BREAKER 16 14MAY04 14MAY04 DR-N ML-N 15 MAINTENANCE HW-2000 07:00 22:59 ORT3-N R-N 78 0
EM9925005 EM 76 A52-DHVR-3 3000-1 1X02-IA01 CELL I
14MAY04 14MAY04 DR-N ML-N 339 SWITCH INSPECTION 08:00 08:59 ORT3-N R-N 79 0
EM0301792A EM 76 A52-DHVR-3 8KR MAINT. PORTION AT 4 14MAY04 14MAY04 DR-N ML-N 0
CUBICLE (A52-01) 08:00 11:59 ORT3-N R.N 80 0
EM0304828 EM 77 P-001AS-M INSPECT SPARE RCP 4
14MAY04 14MAY04 685 MOTOR 08:00 11:59 81 1
EM0306911 EM 76 TG-01-VARM ITG-1-VARM READS 8
14MAY04 14MAY04 DR-N ML-N 141 HIGH REPLACE 0900 16:59 ORT3-N R-N 82 1
EMORT3C EM O-RT-003C ASSIST DURING ORT-3C 4 14MAY04 14MAY04 DR-N ML-N 0
11:00 14:59 ORT3-N R-N 83 0
EM0304870 EM 76 HS2-DHPVR-BREAKER 1B 14MAY04 15MAY04 DR-Y ML-Y 2
MAINTENANCE 14:00 05:59 ORT3-N R-N 84 0
EM0405897E EM 76 D-106 OBTAIN RMP 9046-1 3
14MAY04 14MAY04 0
DATA FOR D-1 06 21:00 23:59 85 1
EM0215246 EM 76 62/AO CAL AND TEST 62/A01 6
15MAY04 15MAY04 DR-N ML-N 0
RELAY PER 1RMP 06:00 11:59 ORT3-N R-N 86 1
EM02151998 EM 76 P-O01A-M P-01A FINAL PMT PER 10 15MAY04 15MAY04 DR-N ML-N 0
9002-12 06:00 15:59 ORT3-N R-N
_5-8501 1
15A0 5A0 RNM-I I
I
.033RESTORI U
116116gTESTAI MCOM S, 12035A 1P-2 81 MSTE 102i 6I67INSP WALKWAY POSTI
.L AITROwnCS STEM MULTI AND/C INICS TEST COM SYS
-M PERFORM POS1 kM GENERATOR FE ECT AND MAINTAIN DO LATCHING R NON-NUMBEREC
,EM MULTI ANDIOR MCE TEST 0D PUMP MOTOR 0:
EXCITER FUSES P n1494A47 I
T f
u--.u-w.,
EM0207564i 02075641 EM0215217,T 02152171
(.11 TO 18.01 INSP I
=480 VOLT DB-
"T HEATER INSUL PRE EM0216539RE 0216539K EM0301793BR 0301793!
EM9925005S 99250051 EM0301792AB 03017921 4~
EM0304828Itl 03048291 EM0306911 0306911 EMORI NERTIA LATCHIDB P SWITCHGEAR BR kTION RESISTANCE
,SURtZER TANK AOVE TEMPORARY ITG-01 TURBINE G EWKER MAINTENAP 01 1X02-1A01 CE 4.16 KV/3000 AMP %
CR MAINT. PORTIOI M4.16 KVt3000 A SPECT SPARE RCF SPARE 1t2P-1J ITG-1.VARM READ F1ITG-0 3CASSIST DURING 130470BREAKER I p3048700 EM0405897E 0405897 EOUIPMENT02161 NON-NUMBERED E i12035
- R MWP 104.
tO1 TURBINE GENE
- 4B)
EAKER METERING T-MO0
-NERATOR OUTPU CE HK-2000 (H52-2 N 13.8 KVt2000 Al L. SWITCH INSPEC 4CUUM BREAKER I AT CUBICLE (A5i AP VACUUM BREAI MOTOR
/B REACTOR COOt HIGH 'REPLACE TURBINE GENER)
ORT-3C AAINTENANCE DHR 13.8 DBTAIN RMP 904-M125V DC STAT EM0215246CAL 0215246m EM0215199BP-O 0215199Mn EM0407642 0407U tOUIPMENT0215 L TOR EXCITER 02452 r
VARMETER D)
P BREAKER TION
.01) 300041
,ER ANT PUMP MOT, WETER TOR OUTPUTV VR-2000 (H52-0!
KV/2000 AMP VA I DATA FOR D-1I ION BATTERY AND TEST 62AC
!IA-01 BUSI iA FIINAL PMT P
_REA 1
AREMOVE B52.
21480 VOLT a 87 1 0 EM0407B42A I EM 76 852-0B750 REMOVE 852-B75 i00 1
15MYD4 5MAY04 I DRN MLN FROM 2B52-40C 10:00 10-59 ORT3-N R-N C
Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 5 of 18 o Prfmavem s stems. Inc.
I FL-03 Execution Publication Set'
after 13MAY04 12:00 U1 2 W R IN7 CH D L after 13MA Y04 12: 00 U U ID RESP WO EQID DESCRIPTION RPI_
ES I
EP I
RSK MP MAY 88 IIE0042 EM 751 B152-D0B75-0 B52-DB75-001 RESET IS1MAY04 15MAY04 DR-N ML-N 0
EM04 642 852-0875 AMPTECTOR 12-00 16:59 ORT3-N R-N 04 642~48 819 I EAMRCP-B1 EM 76 P-O1A-M REPLACE 'ARCP 2
15MAY04 15MAY04 OR-Y ML-Y 252 IARCP`-B1 REP FLOOR PANEL 1600 17:59 ORT3-N R-N 0215199EF 90 1
EM0215205 EM 76 P-001B-M INSPECT AND MAINTAIN 1 0 15MAAY04 16MAY04 0
=M02lM520SF REACTOR COOLANT 15:00 01:59 0215205IIIIIII 91 1
EM0215203 EM.
87 P-001A-M P-001AM-M2ND MCE 3
15MAY04 15MAY04I DR-V MI-V 01 EM0215203 TEST(1A52-041IA-01) 17:00 10:59 ORT3-N R-N 021520 92 1
852-427CE EMV 75 8-42 BUS STAB PMT 1
13MAY04 13MAY04 OR-N ML-N 142 j 5 7C BUS STJ PMT "IRC-5W8
'IRC-5968 1200 12:59 ORT3-N R-N 48VMOTOF CONTROL CENE PAB SAFEGUARD0257 93 0
EM04058968 EMV 76 W-0219 W-0218 REMOVE 4
15MAY014 15MAY04 OR-N ML-N 0
M0405890BW~
JUMPER IWP 17:00 20-59 ORT3-N R-N 0405896M 94 FLP~CRCOM2 EP E
IP 1
EP QUARTERLY 2 DIGIT 3
13MAY04 I14MAY04
¶87 P R-COM2EP AR L2 DIGIT
~SELECT& CR 0MM CECK DIAL SELECT & CR 13.0 07.59-IILi-g
-I
-Ugm 95 1
NG44CFClEV EPI 77 IST-SISI ENG EVAL FOR FAC I
29APR04 14MAY04 DR-Y ML-Y 2
CFCIEV ENO VAIL FOR FAC PO - CTMT 44FT GE AREA PROG - CTMT 44FT GEN 08-OOA 14:59 ORT3-Y R-N SECONDARY INSERVICE INS IECTION 030189 96 0
EP0306799 EPI 77 SERVICE FLAMMABLE STORAGE 2
14MAY04 14MAY04 16 P0079 ETDRAG LCE NP LOCKER INSPECTION 07-00 08.59 0306799 MISC EQOUIPMENT EPIR/SR CE 97 0
FG0302077 FOI 77 MNOEPI PUMP ELECTRICAL 8
14MAY04 14MAY04 160 FG0302077PUO ELECTRICAL NOESUMPS MANHOLE SUMPS 07.00' 14:59 0302077 PoR
-ELECTRICAL M&HOLE SUMP PU 95 1
Z22FG030 FGI 7-7 Z-W2 Z-022-INTIERNALS LIFT 1 2 14MAY04 15MAY04 DR-VYML-Y 0
Z22FGO Z-W2 -INTERNA LFT RIG.- STR RIG - STRIP PAINT FOR 22:00 09-59 ORT3-Y R-N 03019R-RECO 0 F031151 FG2 7`7 VNEIC INSPECTANDSEVC 271 12MAY04 15MAY04 DR-V ML-297 :o: 05 INSPEC-AND ERVICE IC HAC EQUIP 100 0
FG0300135 FG Z 77 HX-378A SERVICE HX-378A SBCC 1 0 15MAY04 15MAY04 DR-V ML-V 656 FG03001 35S C
X38 LIGHT WIRING 10-00 19.59 ORT3-N R-N 983723 020 FG307011S1 FG3 75 D-105 BUILD SCAFFOLD FOR 5
10MAY04 13MAY04 319 G30 ~jUID fCAFFOLD FOR 0-1 Y5 REPILACEMENT D-105 REPLACEMENT 12:OOA 15:.59 125V ICSTATION BATTE V0307011 Run Date 13MAY04 13:401 LT.03 STANDARD PUBLICATION Sheet 6ofl
-8 C Primavera Systems, Inc.
I FL.03 Execution Publication Set I
after 13MAY04 12:00 U1 2 O K N C E U Eafter 13MAY04 12:00 7i i ID RESP WO I EQID I
DESCRIPTION RD ES EF RISK NLp AY
--Thu13
~Fri 14 Sat 15 I jjjjI jgjjj 103 0 FG0309951 FG3 77 SERVICE FLAMMABLE STORAGE 161 14MAY014 17MAY0415 FG03095 FS MAL STORAG CABINETtINSPECIN CAB3INET INSPECTION 07.00' 14:59 03099513I i'u--
104 0 FG0309946 FG3 77 SERVICE FLAMMABLE STORAGE 24 14MAY04 18MAY04 144 FG0309948 L STORAG CABINET INSPEC 1.N CABINET INSPECTION 07 00, 14:59 0309946 105 2 ICD40829 IC 70 ICP-02.008 NI AXIAL OFFSET I
13MAY04 13MAY04 DR-YML-Y 170 41 OFFSET CkLRATION CALIBRATION 0900A 12.59 ORT3-Y R-M NI POWER R E AXIAL OFECAL 106 1 1C5.50ALM IC 76 ICP-05.050 VERIFY ALMS ON GEN 1
13MAY04 13MAY04 DR-YML-Y 359 Ccs ALVERIFY MS ON GEN H2 P 6NL H2 PANEL.
12:OD0 12.59 ORT3-Y R-N SECONDARPLANT MIDRANGE PRESSURE INSTRI MENTS 0300870 107 0 1C0311805 IC 76 FS-00230 RE-230 CLEAN FLOW 2
14MAY04 14MAY04 DRY YML-Y 166 IC0311805RE 230 CLEAN FLOW' WITCH SWITCH 07.00' 08.59 ORT3-Y R-N 031 1805N RE.230 WASTE WAE EFFLUENT MO I1TOR INLET FL(
108 1 IC5.9RTRAL.
IC 76 ICP-05.009 VERIFY ROTOR I
14MAY04 14MAY04 DR-Y ML-Y 323 C5.9RTRALERIFROTOR STOPPED ARMCLEAR OPPE ALARM CES 17:00 17:59 ORT3-Y R-N 0300851 NTUR NNE INSTUMENT TION - MISCEL 109 1 1C0306828A IC 75 S-06050A I S-60RIA REPLACE 2
14MAY04 14MAY04 DR-Y ML-Y 323 10030662SA1 -MA REPLACE PROE GAP PROBE GAP 17:00 18:59 ORT3-Y R-N 0306628ET INEENETVERSPEED P 110 I IC5.54A IC 75 ICP-05.054 P598 SO BdU PUMP 3
14MAY04 14MAY04 DR-Y ML-Y 322 1C5.54APS98 BAJ PUMP STAI FUNCTION START FUNICTION 17:00 1 959 ORT3-Y R-N 03008T4 CNDR PLANT OW RANGE PI III I
IC5.47-1IC10 76 ICP-05.047 SECONDARY LEVEL.
15 19APR04 15MAY0-4 DR-Y ML-Y 0 CS 1SECONDA YLEVEL CONTR tLES AND SWIT CONTROLLERS AND II.-MA 09:59 ORT3-Y R-N
-SECONDARY1 112 1 1C5.53 ICI 76 IC.503 IP55 EODR 10MAY04 14MAY04 DR-Y ML-Y CS.1 1CP 5.5 SEC )NDA HIGH PRE SURE HIGH PRESSURE 0800MA 1 1:59 ORT3-Y R-N SECONDARYECINDART HIGH PRESS JRE INSTRUME 113 1 IC5.53A IC1 78 ICP-05.053 ICP 5.53 REPLACE 11 I10MAY04 14MAY04 DR-Y ML-Y 69 CS AE).3 LACE PS-21SM PS-2196 1600A 11:59 ORT3-Y R-ISECONDARY I.ATHIGH PRESS JRE INSTRUME 114 1
ICS.1ITMG IC1 75 ICP-05.011 FEED REG VALVE 1
12MAY0 4 13MAY04 jDR-N ML-N 4
YU
~FE G VALVE TIMING (ICP.5.011)
TIMING 1000OA 12.59 bRT3-N R-M FEW CONTROL VALVES (OUTAGE) 0300853 115 0 1C0300662 ICI 76 I&C MISC MISCELLANEOUS FAN I
13MAY04 13MAY0-4 DR-Y ML-Y 17FU AN FILTERS FILTERS 09:00A 12.59 ORT3-Y R-N MISC IC W XACTMVT1ES 116 0 1C0300665 101 77 RM MONTHLY PM ON RAD 1
13MAY04 13MAY04 DR-Y ML-Y 170 AO PM ON RA MONITORING S MONITORING SYSTEM 09:(X0A 12.59 ORT3-Y R-N RSYSTEM MULTI ANDIOR NO -NUMBERED EQUIF MENT 117 0
1C0407300 IC1 76 FT-03298B REMOVE PAB 3
13MAY04 13MAY04 DR-Y ML-Y 320 C4 700 REMOV PAB ISOKDINEIC SACK MONITOR ISOKINETIC STACK 13:00r 15:59 ORT3-Y R-N PAB3V I STACK ISOKINE IC FLOW TRANsmr E 0407300 118 1
105.54B I01 76 ICP-05.054 LC-2393 CHECK 1
14MAY04 14MAY04 DR-Y ML-Y 84 1C5.548LG 293 CHECK FMT GS TIGHT/ LEAK CEC FITTINGS TIGHTI LEAK 07:00 07:59 ORT3-Y R-N 03008741S CONDARY PLANT -OW RANGE PRES URE INISTRUME 119 I1 CORT3C 101 O-RT-003C PERFORM ORT-3C 4
14MAY04 14MAY04 DR-N ML-N 0
ICOR 3CPERFORM ORT-IC 11:00 14:59 ORT3-N R-N-12 C.47A 101 6
Icp-05.c4 VERItFY DRN BOTTLE 2
15MAY04 15MAY04 DR-Y ML-Y 294 5.A ORN BOT LLALARMS 05:00 09:59 ORT3-Y R-N 03008671 SECONDARYI Run Date 13MAY04 i3:401 LT-03 STANDARD PUBLICATION Sheet 7 of 1 8 C Primavera Systems. Inc.
FL-03 Execution Publication Set
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00
8
_l 8
4 1;*
[ q
- uemr :CI-S t 121 1 IC5.47B IC1 76 ICP-05.047 VERIFYSTLG MNFLD I
15MAY04 15MAY04 DR-Y ML-Y 294 _ICSA7E STLG M LVL ALARMS 09:00 09.59 ORT3-Y R-N 0300867 SECONDARY 122 1 IC5.47C IC1 76 ICP-05.047 VERIFY LO COND HILO I
15MAY04 15MAY04 DR-Y ML-Y 171 IC5.4TC LO CON I
LVL ALM 09:00 0959 ORT3-Y R-N 0300887 SECONDARY 123 1 IC5A7D IC1 76 ICP-05.047 VERIFY GEN LVL ALMS 1
15MAY04 15MAY04 DR-Y ML-Y 314 IC5.47E GEN L 0900 09 59 ORT3-Y R-N 0300867 SECONDARY 1 1;;1i*
S E 124 2 IC10301009 1C2 76 ICP-04.021 CHEMICALAND VOLUME 11 10MAY04 14MAY04 DR-Y ML-Y 0
IC03 1009CHEMt*
AND VOLUME CC NTROL SYSTEM CONTROL SYSTEM 18:00A 04:59 ORT3-Y R-N CHEM CAL AND VOLUME ONTROL SYSTEM 301009 125 1
IC2.22 IC2 76 11CP-02.02 POWER RANGE NIS 3
13MAY04 13MAY04 DR-N ML-Y 19 IC222 RANGE NIS TE 1NG (POST-REFUE TESTING (POST-REFUEL 18:00 2059 ORT3-N R-N 0306921 NIS POWER RANG CHANNELS SHUM OM SURV TEST 126 0 IC0300710 IC2 77 HP-07736 CLEAN CONTAMINATION 12 13MAY04 14MAY04 DR-Y ML-Y 270 030010 CONTAINATIO MONTOR MONITOR 18:00' 18:59 ORT3-Y R-N 0300710T "
PE SONNEL CONTAM NATION MONIT 127 0 IC0300711 IC2 77 HP-07739 CLEAN CONTAMINATION 12 13MAY04 14MAY04 DR-Y ML-Y 270 300711 CONTAMINATIO MONITOR MONITOR 18:05o 18:59 ORT3-Y R-N 0300711 I PE SONNEL CONTAM NATION MONIT 128 0 10300713 IC2 77 HP-O306 CLEAN CONTAMINATION 12 13MAY04 14MAY04 DR-Y ML-Y 270 300713CLEN CONTAMINAT MONITOR MONITOR 1_:0o 16:59 ORT3-Y R-N 0300713 I-PE SONNEL CONTAM NATION MONrT
- D3 lZXEi 1-S Xl 1291 1 IC5.50 I0ICS 78 ICP-05.050 lCp 5.50 SECONDARY 11 28APRO4 14MAY04 DR-Y ML-Y 0 5C. ICP£50SEC NNDARYM1DRANG PRESSURE MIDRANGE PRESSURE 09:o00A 11:59 ORT3-Y R-N SECONDARY PLANT MIDRANGE RESSURE INST 130 1 IC0300795C I ICS 76 1I&C MISC C-158 RELAY 5
13MAY04 13MAY04 DR-Y ML-Y 66 0790-158F V-AYMAINTENAN EPc431EX I
MAINTENANCE-08:00A 16:59 ORT3-Y R-N MISC ' WORKACTMTE 0300795 131 1 1C0300795B CS 76 I&C MISC ESFRELAY 27 13MAY04 15MAY04 DR-Y ML-Y V
003 079 58ESFRE AY MAINTENAN IN LOGIC CABINET 3 MAINTENANCE IN LOGIC 08WOOA 16:59 ORT3-YRN R-i 132 1
IC0300795A ICS 76 1I&C MISC REACTOR PROTECTION 27 13MAY04 15MAY04 DR-Y ML-Y 0 C03 O795AREACTR PROTECTION L4C CAB RELAY ANCE LGC CAB RELAY lttOOA 16:59 ORT3-YRN l
133 1
ICTUVIBSUP ICS 76 T-SUPERVIS INSTALITURBINE 8
14MAY04 14MAY04 DR-Y ML-Y 52 ICTUVBSUP 1
N 1TURBINEVIB TONSENSORS VIBRATION SENSORS 06:00 13:59 ORT3-Y R-N 03009s51 TURBINE PER ISORYINS7 UMENTATION 134 1 IC5.8 ICS 76 ICP-05.008 TURBINE SUPERVISORY 60 14MAY04 19MAY04 DR-Y ML-Y 0
1C5.8 INE SUPERVISOR INST CALS l.
INST CALS 06:00-1059 ORT3Y R-N 0300850 135 1
IC5.50F&V
[C5 76 ICP-05.050 ICP 5.50 LT-2532 HDT 2
14MAY04 14MAY04 l DR-Y ML-Y 69 ICI5 ClP 5.50 LT.2532 DT LVIL BACK FILL VENT LVL BACK FILL & VENT M1000 11:59 ORT3-Y R-N S
08 ESECONDARY I MIDRANGE FRESURE IN 13 1t IC10303383 ICV 78 lS0009668 SC-96B POST MTN 4
13MAY04 13MAY04 DR-Y ML-Y 12 C03 3383596BoST MTN DIAGNO MC DIAGNOSTIC 15:00' 18:59 ORT3-N R-N 0 383=
UOUIDSAMPLE C NTAINMENT ISOUTION 137 1
IC0300922 ICV 78 MS-05958-O MS-5958 DIAGNOSTIC 4
13MAY04 13MAY04 DR-Y ML-Y V
0 300922 MS-58DIAGNOSTIC C ECK CHECK 18:00 21:59 ORT3-N R-N 0300922 HX-IA SG BLOW WNISOLATION OF ERATOR Run Date 13MAY04 13:401 LT.03 STANDARD PUBLICATION l
Sheet 8 of 18 O Prmavers Systems, Inc.
I FL-03 Execution Publication Set I
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 8 U ID RESP W EQD DESCRIPTION RD ES EF RISK MF-h.
Fd MA Snt 15 Fd Sat jjj j
jjj15 Io I.
S._..-
.1012,1416.1120,2210. 2,4. 6. 8.101214.116,18,2.221A 0i 2.4, 6. 8.10012,14.16,1 138 1 IC0300942 ICV 78 RM-03200C-RM-3200C DIAGNOSTIC 4
13MAY04 13MAY04 DR-Y ML-Y 0
300942 200C0DIAGNOSTICCHECK CHECK 18:00 21:59 ORT3-N R-N 0300942 RE-211/RE212 M NITOR SUPPLY OP RATOR 139 1 IC0408038 ICV 76 MS-05959-O MS 59;-O AIR LEAK 4
13MAY04 13MAY04 DR-Y ML-Y 42 040803SM5-59.OAIRLEAK 18:00 21:59 ORT3-Y R-N 0408038 HX-1 B SG BL ISOLATION O ERATOR 140 1
IC5.49D ICV 87 ICP-05.049 ICP 5.49 CS-2273 3
15MAY04 15MAY04 DR-Y ML-Y 72 IC5.49DICP.49 CS.2273 H HEATER BYPASS UMIT 06:00 08:59 ORT3-YR-N 0300869 SECONDARY 141 1
IC0214110 ICV 76 MS-02018 MS.2018 POST 7
15MAY04 15MAY04 DR-Y ML-Y 0
IC02 I110MS2018 INSPECTION 1Z.0Qr 18:59 ORT3-N R-N 021 110 142 1 ICMS2018 ICV 78 MS-02018-O MS-2018 MSV 7
15MAY04 15MAY04 DR-Y ML-Y 0
ICM I MS-2018 M DIAGNOSTIC 1Z00*
18:59 ORT3-NR.
0 03 143 O SWR2004 IT ERDS SWR-2004-001 4
14MAY044 14MY0 161 SWR.2004 001 PE FORMTESTING ERDS SOPTW PERFORM TESTING OF 10:00C 13:59 144 1 MM9924975A MMI 76 HS-1 HS-1 REBUILD& TEST 15 26APR04 14MAY04 DR-Y ML-Y 0
24975AHS1,
& TEST BER (SHOP)
SNUBBER (SHOP) 06:00A 15:59 ORT3-N R-N
_-XHA
- MAIN STEAM UN WEST SNUBBE 145 1 MM9933444A MMI 76 W-001C2-A W-1C2A INSTALL 10 10MAY04 14MAY04 45 133444AW-1 INSTALDAMP BRACING DAMPER BRACING 18:00A 03:59 C
MENT COOLING F N DISCHARGE DA? IPER9933444 146 1 Z22MM020 MMI 76 R-1 MOVE UPPER 2
13MAY04 13MAY04 DR-Y ML-Y 2
M020MOVEU TER I
NALS RIG (TO W LDA INTERNALS UFT RIG (TO 13:00 14:59 ORT3-N R-N EREACTOf VESSEL AND ASS MBLY0214134 147 1 MM0213114 MM1 76 Z-022 Z-022 - REMOVE ROPES I
13 13MAY 13MAY04 DR YML-Y 63 M0 13 114Z22-EMOVE ROPES SEURING CRANK LE SECURING CRANK 14:00 14:59 ORT3Y R-N R-1 REA OR VESSELINTE UFTING RIG 13114 148 1 MM0407989 MMI 76 CPP-14B ICPP-14B, ROTATE PIPE 10 13MAY04 14MAY04 DR-Y ML.Y 121 M A04079"ICP.148, ROTATE PP ENDS DOWN FOR CONCERN ENDS DOWN FOR FME 18 00' 03:59 ORT3-N R-N 0407989 UIC P1 PENETRATION-ONTAINMENTPRE SURETRAN 149 t
MM9924975B MM1 76 HS-1 HSt. REINSTALL 6
14MAY04 15MAY04 DR-YML-Y 94 M
M 24975BHS.1. R STALLSNUBB AS-LEFTVT4 SNUBBER, AS-LEFT 1600 1059 ORT3-N RIN 99249750 1
ASGM 150 1I MM0408272 MMI 10 W-003A IW-003A. REMOVE 5
15MAY04 15MAY04 0
MM040827 17 3A. REMOVE SEALS FROM LOUVERS 07 00 11:59 0408272 CONTAINI 151 1 MM0408030 MMI 10 W-003B IW-0038. REMOVE 1
15MAY04 15MAY04 151 MMO4 0301W-0038, SEALS FROM LOUVERS 12:00 12.59 c3OECONTmi 1521 1 MM0304995 MM2 76 P-028B P-028B.OVERHAUL 12 30APR04 14MAY04 DR-Y ML-Y 0 H 04995P028B OVERHAUL MAIN *D PUMPmp MAIN FEED PUMP 1500A 12:59 ORT3-N R-N STEAM GENC R
ATOR FEED PUM 0304995 153 1
MM0407390 MM2l 76 P-028B 1P-28BINSPECTSPEED 26 01MAY04 15MAY04 DR-YML-Y 0 MM orsgolP-289 NSPECTSPEEDINTREASER INCREASER 0900A 15 59 ORT3-N R-N U
T 154 1
MM9919654 MM2 77 P-0288 IP-28BSTOPOL 4
06MAY04 13MAY04 DR-YML-Y 8
a j
1P28BTOLLEAOIIN ALLBAFFLE LEAKnNSTALL BAFFLE 0500A 15 59 ORT3-N R-N STEAM PENERATOR FEED MP9919654 Run Date 13MAY04 13:40 LT.03 STANDARD PUBLICATION Sheet 9 of 18 C Primavera Systems, Inc.
FL-03 Execution Publication Set
after 13MAY04 12:00 U1 2 O K N C
E U Eafter 13MAY04 12:00
- U 1m RESPWOEWDESCRIPTIONjRD ES E
RIK MFI MAY 1551 01 MM0201475 MmZ 76 VNTI3 INSPECTISERVICE OPS 3
12MAY04 13MAY04 0 M01 INSPEC ISERVICE OPS SH HVAC EQU1P SHOP W-AC EQUIP 1000OA
'1459 VNBSYSTM MULTI ANDIO NON-NUMBEREDEOUIPMENTO201147; 155 0
MM03057B4 MM2 76 W-129 INSPECT AND MAINTAIN 3
13MAY04 13MAY04 0 M05.4INsm rAND MAINTAIN NlAO FAN VENTILATION FAN 1 1:00A 14.59 HX-200 N B1 3RD FLOOR VE TINFAN (AC-1i 0305784 157' 0 MM0201630 MM2 76 W-048 INSPECTALUBRICATE 4
13MAY0-4 13MAY04 0
M 020i 630I~
IBJAE BEARINGS FAN BEARINGS 18:00 21:59 021630 APNGRO GFAN 158 1 MM0302663A MM2 76 FS-02852 FS-2852. REPLACE 20 13MAY04 15IMAY04 0 MY )32663A~5 ELC AD MAL PIPING "WLEAKS)
ADDImONAL PIPING 18:00' 0,2.59 03063 KP-308 CY P SEAL WATER 159 0 MM0305786 MM2 76 W-131 INSPECT AND MAINTAIN 4
14MAY04 14MAY04 0
MM030576 INS CTAND MAINTAI VENTILATION FAN IIVENTILATION FAN 06:00 09:59 0305786 HX-202 NSB 5TH F OOR VENTILATIO1 FAN (AC-3) 160 0
MM0305787 MM2 76 HX-245A INSPECT AND CLEAN 4
14MAY034 14MAY04 0
MM0305787N5 AND CLEAN AlIHANDLING UNIT AIR HANDLING UNIT 06:00 M~.59 0305787 OPS BLDG AIR W DUNG UNIT 161 1
MM0306052 MMZ 76 CS-02297 INSPECT & MAINTAIN 3
14MAY04 14MAY04 DR-Y ML-Y 0
MM03060 2INSPECT & MNAIR P-2813 SEAL VATER PCV 11P-28B SEAL WATER 10:.00 12:59 ORT3-N R-N 03060! 2 1P-288 SGF SEAL WATER DM1 LEAKOFF PR[
162 1 MM030653 MM2 78 CS-0228 INSPECT & MAINTAIN 3
14MAY04 14MAY04 DR-Y ML-Y 14 MM0300 3INSPECT & MWAN IP-288 SEAL YATER PCV I1P-288BSEAL WATER 10:.00 12-59 ORT3-N R-N 03060!M 1P.2813SGF SEAL WATER IN? D LEAKOFF PRE 163 1 MM0301116 MM2 77 P-028A DRAW OILSAMPLE FOR 2
14MAY04 14MAY04 DR-Y ML-Y 0
MMO301I16DRA 1OILSAMPLEFOF ANALYSIS ANALYSIS 18:00r 19.59 ORT3-N R-N 0310111,6K GENERATO FEED PUMP 164 0
MM0201 676 MM2 76 HX-258 INSPECT AND CLEAN 4
14MAY04 14MAY04 0
MM0201676 CTADCLEAN H AC UNIT VAC UNIT 18:00 21:59 02016f76 TELEPHONE EQ PMENT RM AC 165 1 MM03011117 MM2 77 P.028B DRAW OL SAMPLE FOR 2
14MAY04 14MAY04 DR-Y ML-Y 1
MM0301117D WOIL SAMPLE IOR ANALYSIS ANALYSIS 20.00' 21:59 ORT3-N RN 0301117 STEAM GENERATR FEED PUMP 1166 1 MM02131019 MMV 781 Cg-M038C 1CS-00038CBODYTO 3 119APR04 13MAY04I DR-Y ML-Y 19 0319 3BBODYTOBON E LEAK BONNETLEAK 090OOA 14:59 ORT3-N R-N IHX-1 SG9D HX CLG FL( W RETURN TO ISC 4A COND 0213109 157 1 MM0214110 MMW 76 MS-02018 MS-2018 -OPEN &
48 03MAY04 1MY4 DR-YML-Y 0 M O 1 MS-201 -0PEN&tNSPEC1VA1.VE-RMP93M INSPECT VALVE -
22.-OOA I 1159sgl3 ORT3-N R-N H
X-IA SG 168 1 MM0303383A MWV 76 SC-00966B SC-9688VALVE 3
13MAY04 13MAY04 DR-Y ML-Y 0 M naSC-9S
-VALVE LEAINE BY. CONT. REPAIt LEAKING BY. CONT.
060OOA 14:59 OR3NRNPZR D
0SAMPLE CONTAI ENT ISOLATION 03383.
159 1 NG44CFCIND NDE 77 IST-SISI NDE FOR FAC PROG -4 26APR04 13MAY04 DRYLY 8
CCNOE FOR FAC PROG -C NTAINMENT 44 FT 1EN AREA CONTAINMENT 44 FT 080OOA 15:59 OR3YRNSCNARY INSERVICE IN 3PECTION 0301897 170 1 EP0301909 NDE 77 UJt-CONTAIN VISUAL INSPECTIONO0F 5
30APR04 13MAYD4 DR-Y ML-Y 80 g
VUA NSPECTION OFCTf LINER PLATE CTMTULNER PLATE 080OOA 16:59 ORT3-Y R-N UNIT' CONTAINMENT03 1909 171 1
ND0407589B NDE 76 T-026 T-026-NDEl I 5
12MAY04 14MAY04 DRY YML Y 0
75 9 T.2 NOE IRADIOGRAP 4 OF PIPING RADIOGRAPHY OF 1900A 02:59 ORT3-Y R-N
-UBLOWDO TANK 0407673 172 1 EP04080,43 NDE 77 StMI-01A 1I-SMIAPERF RT 31MY414MAY04 0
EP04080431IS IAPERFRTC CKVAL"' -UlR CHECK VALVE-U1R 19:00' 21:59 04080430P-ISA SI PUMPDIO CH ECIRC TO Run Date 13MAY04 13:
LT.03 STANDARD PUBLICATION Sheet ID of 18
@ Primavera System,. Inc.
3T FL.03 Execution Publication Sat I
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 10 RESPI WO IE1CRSM MAY
_ U IO E00 DESCRIPTION RD ES EF RISK MF ThU 13 Fd 14 Sat 15 ST
.10 12.14.16.11&20.2210, 2.4. B. 8.l.14,116,18.20.2210.*2.4. 6. 8.10112,14,16, E
1 jjfl0,2 173 1
EP0408044 NDE 77 SI-00891B 1Sl,891 BPERF RT 3
14MAY04 14MAY04 65 EP0408044ISla9B PERF RTCH CKVALVE U1 CHECKVALVE-U1R28 190-00 21:59 0408044-P158 SI PUMP D 3CH RECIRCT 174 1
P1402NDE NDE 77 Z-022 Z 022-INTERNALS LIFT 12 15MAY04 15MAY04 DR-Y ML-Y 0
P1402 Z-022..1NTE RIG NDE EXAM 10_00 2!59 ORT3-Y R-N 03019 3 150 O002s ora 7
0751 PERFORM I
07MAYD4 1 3MrAY04 DR-N r^L-N 708 O01254 PERFoF M MArNTENANCE C N THE SCELA 1780 0P030124 CPU 77 MAINTENANCE ON THE 07.0A 12:59.
ORT3-N R-N MPERIODIC M JNTENANCE OF TH HSCBA03012-178 o OP0301248 orPo 77 O-PC-BnNEEKLY I
1 3MAYD4 1 3MAYU4 170 o~
248BONVEEM LY OPERATIONICHI CK OF BAIRON II OPERATIONCHECK OF 1Z:00' 12S59 CK OF BARD q 11 HIGH PRESS BR ATHING AIR M0301248 177 0 OP0301240 OP0 77 O-PC-021.4 WEEKLY 5
13MAY04 14MAY04 166 OP0 0124 0WEDQ: MNSCELLANEOUS DATA READINGS MISCELLANEOUS DATA 12:00' 08:59
.WEEKLY MISC EOUS DATA INGS0301240 178 0 oP0301283 OPo 77 O-PC-075.8 AOP 10A FAN 4
14MAY04 14MAY04 164 oP03012 83A FAN SURVE LANCE SURVEILrANCE 07:00 10"59 0301283-AOP 10A FAN S RVEIU.NCE 179 0 OP0215335 OPO 77 O-PCr-774 DRY PIPE SYSTEM 8
14MAY04 14MAY04 160 OP0215330DR PIPESYSTEM CH CK CHECK 07.-0' 14:59 0215335 DR -PIPE FPS VALVE
-TESTy 180 2 OP0301572 OP1 77 O-TS-O010AB TS-10A.U2CAIR LOCK 2
14MAY04 14MAY04 202 OP03( 1572 TS-IOA,U2C RLOCKDOORS LTEST DOOR SEAL TEST 00-00' 01:59 031 1572-U2 CONT R LOCK DOOR SEA TEST 181 0
OP0301293 OPI 77 O-PC-MIDS OPERATIONS MID SHIFT 49 14MAY04 20MAY04 155 OPo 1293OPERATlONS DSHIFT WEEKLY ROUTINE WEEKLY ROUTINE 00-00' 06:59 03 2
31_
182 2
OP0301590 OPI 77 TS-RE-004 FLUX DIFFERENCE 2
15MAY04 15MAY04 195 OP03 590AXIALFLUXD RENCEAN QAND UAD POWER 0000' 01:59 03 590UAXIA FL DIFFERENCE 83 2 OP0301581 OPI 77 O-PC-023.5 CHARGING PUMP 3
Y04 15MAY04 194 OP03 158 CHARGING ROTATION ROTATION AND 00c'_
02:59 030 h581 CHARG PUMP ROTAT w-h w
EwI w~
184 0 OP030 1332 OP2 76 o-PC-DAYS OPERATIONS DAY SHT 21 10MAY04 16MAY04 DR-Y ML-Y 18 332 OPERA NS DAY SHIFT EKLY ROUTINE WEEKLY ROUTINE 08:00A 11:59 ORT3-Y R-N I.
l sv1 w
185 0 1P0301394 OP3 76 O-PC-SWiNG OPS SWING SHIFT 42 12MAY04 18MAY04 168 p0 I394 OPS NOSHiFTrWEEKL ROUTINE WEEKLY ROUTINE 16:00A 22.59 186 2 OP0301645 OP3 77 O-IT-M013 IT-13,2P-1IA/BCCW 2
13MAY04 13MAY04 208 0 1645IT13.2 I1A1BCCWPUMP VALVES, PUMPS1VALVES.
16800' 17:59 0 1645E2P-1A B COMPONENT OOLING WATER PiMPSIVALVES 187 0 OP0301409 OP3 77 O-PC-045.3 PUMP OUT 3
13MAY04 13MAY04 207 PO 01409PUMP CIRCULATING ATER PUMP PITS CIRCULATING WATER 16:00' 18 59 0 01409C1CULA NO WATERPP PIT PUMPIN 188 0 OP0301326 OP3 76 O-IT-0072 IT-72,SERVICEWATER 11 13MAY04 14MAY04 199 pO 013261T7ZS RVICEWATERV S
VALVES 1650 19:59 0101326 I
M CEWATERV VES Run Date 13MAY04 13:401 LT-03 STANDARD PUBLICATION Sheet 11 of 18 C Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 13MAY04 12:00 U1R28 WORKING SCHEDULE Iafer13MAY0412:00 ID RESPI WO EQID DESCRIPTION RD ES EF RISK MF MY14 i
2-10.
468 1
6
'2 189 2 U2GNDR015 OP3 TG-01 DRAIN U2 MAIN 1
14MAY04 14MAY04 0
U2GNDR015D N U2 MAIN ELEC1 RCAL GENERA ELECTRICAL 19-00 19-59 NGERTI
~~~~GENERATOR PER PC ANGNRT 190 0 0P0301428 OP3 77 O-P078 3 MONTHLY NORTH I
15MAY04 15MAY 195 OP=01428MON SERVICE BUILDING 15:00' 16:59 030`14293M 191 1
IT-510B6A OP4 70 04T-0510B PREPS FOR WRPM TEST 4
14MAY04 14MAY04 DR-N ML-N 0 _
IT510A FOR LRPM TEST SI TEST LINE OF SI TEST LINE 06 0959 ORT3-N R-N 0215912
_U1 SlTEST PYAD EDUCTU(
REDUCTOP
,-Eu z U -
-E_
192 1 CVCSPMT OPS CV PERFORM CVCS 8
12MAY04 13MAY04 DR-N ML-N 178 PMTPERFOR A CVCS WAL I FOR PMT WALKDOWN FOR PMT 08OCA 19.59 ORT3-N R-N 193 1 IT-300C OPS 77 04T-0300C STROKE TEST MFW 1
12MAY04 13MAY04 DR-N ML-N 0 T STRO ST MFW CONTROL BYPASS VALVES CONTROL & BYPASS 10:00A 1Z59 ORT3-N R-M UNIT 1 FEED REGULATINGVAL\\ *TEST0215906
____VALVES 194 1 O-RT-059 OPS 77 O-RT-059 LLRT TRAIN A CONT I
13MAY04 13MAY04 OR-N MR-N 0
LLRT l
IN A CONT SPRAY r IV SPRAYCIV`
040OOA 12.59 ORT3-N R-N P-4A PUMP,
-SW2A DISCH CHK S 4AA1ISL (P-54) )215992 195 0 TRAIN-CE OPS REDUCED INVENTORY 2
13MAY04 13MAY04 117 EREDUCE INVENTORY Jr REW E JITT. CREW E 12:00 13:59 196 1 EP0403494A OPS 76 PT-RCS-1 OPERATING SUPPORT 4
13MAY04 13MAY04 DR-Y ML-Y 174 OPEi TING SUPPORT OF NITIAL RCS WALKDOWN OF INITIAL RCS 12:00' 15:59 ORT3-N R-N REACT R COOANT SYS (RCS) PRESSUR TEST-IN/04O349 WALJ(DOWN 197 1 O-RT-035B OPS CPP-28A LLRT HOT LEG SAMPLE 4
13MAY04 13MAY04 DR-N ML-N 170 R
CT lEG SAMPLE LlN - POSTORT UNE-POSTORT 12:00 15:59 ORT3-NR-N HOTLE SAMPLEUN 198 1 O-RT-0538 OPS 77 O-RT-053 LLRT RCDT TO GAS 4
13MAY04 13MAY04 DR-N ML-N 208 RC TR TO GAS A-lALY POST ORT ANALYZER-POST ORT 1200-15:59 ORT3-N R-N RCDT1 GAS ANALYZER 1 -34D)0215988 199 1 O-RT-064A OPS 77 O-RT-464 LLRT RE-2111212 4
13MAY04 13MAY04 DR-Y ML-Y 0
LLRTE 2111212 SUPPLY-REORT SUPPLY-PRE ORT 12.00-15:59 ORT3-N R-N RE-211 WDNRE-212SUPPL '(PX-1)0215995 200 1 O-RT-067B OPS 77 O-RT-067 POST LLRT EX STDN HX 8
13MAY04 13MAY04 DR-N MI-N 153 POST U EX C
TOAN HX CC INES CONTINGE 2CY CCOWLINES 12.00 19:59 ORT3-N R-N CZNTO AND FROM CESLETDOWN HX(P-1W/-20)0216 CONTINGENCY 201 1
0148-050 OPS T-036 FILL MFP P-28A & B LUBE 8
13MAY04 13MAY04 DR-N ML-N 22 01U MFP
- 28A & B LUBE OL RESERVIORS OIL RESERVIORS 1200' 19:59 ORT3-N R-N L
SYSTEM MULTI A DIDOR NON-NUMBElRED ECUIPMENT 202 1 SOPBS7B OPS T-013 LOWER RWST LEVEL T7 12 13MAY04 13MAY04 90go 5LJWER LEVEL iTO1 41%
12Z00 23:59 203 1 01-132 OPS01-132 FILL & VENT CONT 16 13MAY04 14MAY04 DR-N M0-Y 0
- ONTSPRAY SPRAY 13
- 00 04:59 CRT3-N R-N 204 01 TRAIN-CDO PS REDUCED INVENTORY 2
13MAY04 13MAY04 114 RA4 REDUCE II NVENTORY JITT, -REWN 0 JITTT, CREW D 15:00 18:59 205 1 OP0300942 OPS 76 RM03200-C RM3200C PMT STROKE I
13MAY04 13MAY04 DR-Y ML-Y 143 oP30°° 2RM-3200C P1R212 OKN PER SP 330 PER IT330 22.00 2259 ORT3-N R-N 0309 2RE-211/IRE-212 N
ITOroRSUPPLY C ERATOR 206 1 SOP-B01Z OPS B-401 SUPPLY 1B-01 FROM 3
14MAY04 14MAY04 DR-N ML-N 0
SOP oiZSUPPLY 1-1 FROM iA-01 IAWIOP-480-01 1A-01 IAW 1-SOP-480-001 00:00 02:59 ORT3-N R-N Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 12 of 18 C Prlmavera Systems, Inc.
FL.03 Execution Publication Set I
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00
_ST E.l-t 2l4--2o210 12i4.6r8 rn'12,1416182022,4,6,8,l0112,14,'I 207 1
O-RT-055B OPS 77 O-RT-055 POST LLRT HX-1A BLOWDOWN 4
14MAY04 14MAY04 I DR-N ML-N I 00:00 03:59 ORT3-N R-N 15 O-RT0 021 208 1
X03-010 OPS X-03 IPTE BRIEF TO 2
14MAY04 14MAY04 DR-N ML-N 0
DE-ENERGtZE X-03 03:00 04:59 ORT3-N R-N 209 1
ORT-003C1 O
O-RT-003C PREPARATIONS FOR 4
14MAY04 14MAYD4 DR-N ML-N 0
ORT-3C (ORT-3C) 03:00 06:59 ORT3-N R-N 210 1
O-RT-059A OPS 77 O-RT-059 COMPLETE LEAK CHE0t 1
14MAY04 14MAY04 DR-Y ML-Y 0
PER O-RT-59 05:00 05:59 ORT3-N R-N 211 1
O-RT-060A OPS 77 O-RT-060 COMPLETE LEAK CHEU I
14MAY04 14MAY04 DR-Y ML-Y 0
PER O-RT.60 05:00 05:59 ORT3-N R-N 212 1
X03-020 OPS X-03 DEENERGIZE X-03 2
14MAY04 14MAY04 DR-N ML-N 0
05:00 06:59 ORT3-N R-N 213 1
OP0303383 OPS 76 SC-00966B SC-966B - PMT STROKE I
14MAY04 14MAY04 DR-Y ML-Y 0
PER IT 60 07:00 07:59 ORT3-N R-N 214 1
ORT-003C2 OPS O-RT-003C IPTE BRIEF FOR AUX 4
14MAY04 14MAY04 DR-N ML-N 0
FEED TEST 07:00r 10:59 ORT3-N R-N 215 1
0P0303382 OPS 82 SC-00953 SC-953 -PMT STROKE I
14MAY04 14MAY04 DR-N ML-N 151 PER IT 60 1:o0.C 10a59 ORT3-N R-N 216 1
O-RT-03B OPS 77 O-RT-038 POST LLRT PZR UQUID 4
14MAY04 14MAY04 DR-N ML-N 148 SAMPLE LINE 10:00 13:59 ORT3-N R-N 217 1
IT-51oBB OPS 70 04T-0s1OB LRPM TEST OF SI TEST 6
14MAY04 14MAY04 DR-Y ML-Y 77 LINE 1a000 15:59 ORT3-N R-N 218 1
ORT-003C3 OPS 70 O-RT-003C PERFORM ORT-3C 4
14MAY04 14MAY04 DR-N ML-N 0
11:00 14:59 ORT3-N R-N 219 1 852-427C OPS 76 B-42 BUS STAB PMT I
14MAY04 14MAY04 DR-N ML-N 184
_ _1RC-596 15:0 15:59 ORT3-N R-N 220 1
OP13A110 OPS TG-01-T PLACE TURBINE ON 2
14MAY04 14MAY04 DR-N ML-N 0
TURNING GEAR 15:00 16:59 ORT3-N R-N Z21 1
ORT4003C4 OPS O-RT-003C RECOVER FROM 4
14MAY04 14MAY04 DR-N ML-N 0
ORT-3C 15:00 18:59 ORT3-N R-N 222 1
oP13A120 OPS-OP-13A FILL CONDENSER 4
14MAY04 14MAY04 DRN ML-N 116-HOTWELL 18:00 21:59 ORT3-N R-N 223 71 CL13B010 OPT -
CL-13B CONDENSATE VALVE 16 14MAY04 15MAY04 DR-N ML-N 0
_LNEUPS 18:00 09:59 ORT3-N R-N (CL-13B)__
2 1
IT-740 OPS 77 0-4T-0740 IT-740, MAIN STEAM I
14MAY04 14MAY04 DR-N ML-N 232 BLOWDOWN 19:00 1k59 ORT3-N R-N 0
)jMP0ST LLRT H 5990MA STEA XOM01-OPTE BR!!
- HIGH IT-003C1 PREPAR)
MS1 O.RT.059ACOMP 0215992EP-14 O.RT-M6ACOMP 02159931P.14 X03-020 DEEN EHII 03033831F ORT-003C2W1P U
0P030331 03033!
O-RT-03(
02159%
[T-510s 021591 ORT.002 0215 LIA BLOWDOWN (C GENERATOR BL8 FTO DE-ENERGIZE rOLTAGE STATION) fONS FOR ORT-3 CTUA TH L (EELEAK CHECKl PUMP/SI-862A DIS
{ETE LEAK CHECK PUMPISI-8M28 DIS IRGZE X403 H VOLTAGE STATIC 96GB - PMT STROK R LIQUID SAMPLE E BRIEF FOR AUX FI "si ACTUATION v SC 953-PMT STRI 2§PZR UOUID SPA
- 11POST LLRT PZR LI IPPRESSURE a LRPM TEST OF SI 2U1 SITE C3 PERFORM ORT-155=AUXLIAR1 B52-427C BUS STM 02025273480V P13A110 PLACE RT-003C4RECOVEF IOP13AI20FLLI CL13BO10CON Iw I IT740 IT-02159251 TRAIN-CCRE ONTINGENCY)
NDOWN (P-S1)
X.03
,UXILARY TRANSF(
(ORT-3C)
PSS OF SAFEGUARI
'ER 0-RT.59
'H CHKISI-s64A IS(
'ER O-RT-0I H CHKSI-864B IS(
INAUXILIARYTRAN
'PER IT 60 MONTAINMENT ISO LED TEST ITH LOSS OF SAFE PKE PER IT 60 lE SAMPLE CONTA OUID SAMPLE UNL ER UQUID SAMPLM hEST UNE ST UNE/SPY ADD O
CI
'FEEDWATER SYS k PMT I1RC-596 PTOR CONTROL C lRBINE ON TURNINS URBINE ERAT FROM ORT-3C ONDENSER H I
)ENSATE VALVE
- 40. MAIN STEAM BI rr 1 MAiN STEAMNT SUCED neVENTO~a
)RMER IS AC L (P-54)
P1-(P-55)
SFORMER ATION 3UARDS AC NMENT ISOLAT LINE (P-28B)
DUCT LKG RED EM AND AMSAf fTER PAB SAFE
I l v
w'ra MPIV~v I
.rgjr~l JITT. CREW C 4
lqfpv.Fu.4 I 1-*MI%1Ui 19:00.
20:59 bb I
II I
I I
I.I.I.I Run Date 13MAY04 13:401 LT-03 STANDARD PUBLICATION l
Sheet 13 of 18 0 Primavera Systems, In.
I FL-03 Execution Publication Set I
arter 13MAY04 12:00 U1 2 O K N C E U E Iafter 13MA Y04 12:00O
- u ID REsp WO I ECQID DESCRIPTION jRDj ES RIKEF hiFrM1AYt1 280 0P0405897F OPS 781 0.106 PLACE 01-1081310-10 3 15MAY04 15MAY04 670 oP~O4 g~PLACE D-10 10 INSERVICI INSERVICE ON D-04 00:00 02.59 04 7125V DC TlNBATTEI 22I X03-06 OPS X-03 RE-ENERGIZE X-03 W 2
15MAY04 15MAY04 DR-N ML-N 0
3-SRE-ENE SAT 14:00 15:59 ORT3-N R-N NHIG~
228 0 OI-39J OPS SECURE PAB 1
15MAY04 15MAY04 0
Of-39JSE VENTILATION FOR 15.-0 15:59 1
22I SOP-803A BP
-03 PREPARATION TO j12 15MAY04 16MAY04 OR-N ML-N 0
SOP4803A SUPPLY 16-0 FROM 16-00 03:59 ORT3-N R-N 23I SIA02Z PG MILESTONE CLOSECTMTSPRAYA 0
13MAY04 13MAY041 DR-N ML-N 0I stAo zCLOSE m SPRAY ATRAIN P 14A WNINDOW TRAIN P.14A WNDOW 13:00 12.59 ORT3-N R-N lEND WORK (,TTSPRAY ATRA NP-14A 23 1
13KVXOIA PGX-03 START WVSTATION AUX 0
14MAY04 14MAY0-4 OR-N MI.-N 0
13KVXOIASTART WSTATJON AUX XFVR WORK (XQ3)
XFMR WORK (X03) 03:00 02.59 ORT3-N R-N IHIGH VO AGE STATION AUI TRANSFORMER 232 1 48OVXOIZ PPG 8-01 801 BUS RELATED 0
14MAY04 14MAY04 DR-N ML-N 0
O8(VXO1Z6BO1 US I ELATED ENERG WORK COPE ENERGIZED WORK 03:00 02:59 ORT3-N R-N lEND OF E 313US WORK WIN OW 233 1 4KVAO1Z PPG A-01 CLOSE A01 BUS 0
15MAY04 15MAY04 DR-N ML-N 125 4H AOIZCLOSE A RELATED WORK 13:00 12:59 ORT3-N R-N ko1 B3US 1
I 3KVX01Z PPG X-03 CLOSE W' STATION AX0 15MAY04 15M1AY04 jDR-N ML-N 0
13KVX01ZCLO XFMRWORK(X03) 16.00 15:59 ORT3-N R-N lHr-251 0123A-040 RP 0I-23A REOEADDISPOSE 4
15MAY04 15MAY04 DR-Y ML-Y 00
.4REM0 TRI NUKE FILTERS 14:00 17.59 ORT3-Y R-N-23 I Z22RPOOS RPI 77' Z-M2 Z-22 INTERNALS LIFT
'I 13MAY04 13MAY04 DR-Y ML Y 0
05Z-22 INT NL LIFT RIG.
1 R
WA P'REPS RIG - RP1 WDA PREPS 12:00 12:59 ORT3-Y R-N JR-1 REAcTo VESSEL INE LIs FTING iRIG 0301913 271 Z22RP020 RPI 77 Z-02 Z-022 - INTERNALS UIFT 1
13MAY04 13MAY04 DR-Y ML Y 0 2 2
F Z.022. IrRNALS LIFT RIG COMPLETE LOA RIG -COMPLETE LDA 15:00 15:59 ORT3-Y R-N 03 913§R.1R CTORVESSELI MRNALSLIFT1NGRIC 2381 1 RPSH004-.R RPI PACKAGE 4 REMOVE SHIELDING ON 3
14MAY04 14MAY04 DR-Y ML-Y 0
RPSII004-R REM )VESHlELDING 0N REGEN HEAT EXCI LNER REGEN HEAT 06:00r 08:59 ORT3-Y R-N 2391 11 RPSHOl1-lR RPI1 PACKAGE I11 REMOVE SHIELDING.-
5 14MAY04 14MAY0-4 DR-Y ML-Y 165 RPSH01II1.REOV SHIELDIN
- REGEN DOOR G k REGEN DOOR GAP 09:001 13:59 ORT3-Y R-N 2401 1
Z22RP025 RPI 77 Z-M2 Z4022 - INTERNALS LIFT 6
14MAY04 14MAY04 DR-Y ML-Y 0
Z22P025Z.O2 2 -I TENALS LIFT R DECON RIG.- DECON 16:00 21:59 ORT3-Y R-N 0301913 R-1IREACTOR VE 3EL INTE 2411 2 1RPSHO097-R RPI PACKAGE 96 REMOVE SHIELDING 2
15MAY04 15MAY04 DR-Y ML-Y 46 RPSH1097-RR 61VE SHIELDIN FOR SC-955 07:00r 08:59 ORT3-Y R-N 2421 1
RPIF-152C RlPI O FILE I DAY SHIFT UPPER S
15MA0 15IMAY04 IDR-YML-Y 0RPJF1 CDAY SHIFT CAVITIYDECON4 BRIEF 11:00 15:59 ORT-Y R-N
~
Ru ae13MAY04 13:401 LT-03 STANDARD PUBLICATION Sheet 14 of 18 C Prlmavera Sysems. Inc.
I FL.03 iExeCution Pub iication Set
after 13MAY04 12:00 U1R28 WORKING SCHEDULE I
after 13MAY04 12:00 D
RESPI wo ST EQID 243 SDGSI-191 SDS CONT ZU065A DESCRIPTION ENGINEERING WALKDOWN - SUMP
-INTRUSION ISSUES SECURITY SUPPORT Z-065A - MR 03-044
- 1. _ '
PROVIDE CRANE, RIGGERF AND TOOLROOM MAY RD I
51 ES RISK 12.14A.I.1
..2 4.A.I i.10i12.14.1
- 1. 2.
A. Rff 8.1112,14.1FLI MF Thu 13 Frl 14 Sat 15 08APR04 08O0A 1BMAY04 DR-Y ML-Y 14:59 ORT3-Y R-N 24 3D.. 4S1.1 IENGINqERING WAL.KD0W -SUMIiRWTRUSIOI~IISSUES 244 0
SE031 1 T72A TGSUPPORT SEC 76 10MAY04 21MAY04 0700A 14:59 12 VEOhj.LmASECUItk SUPPORT Z=J!~- R OM pF- -
I -,
2451 1 TGG TG-01.T 45 1 13APR04 I 17MAY04 090O0A I 16:59 DR-Y ML-Y ORT3-Y R-N 214 rGsPPoRT CRAN AND TOOLROOM WUPPORT(P12)
U -
urn.
mm 246 1 I-TGO213967A ITGGI 76 I PIPINGCROI REPLACE 5 1 07MAY04 I 14MAY04 I DR-Y ML-Y I 6
CROSS-UNDER 1 09:00A I 08:59 1 ORT3-Y R-N I
I9I7_
MANWAYS I
I A I I
GL39g7AREPI4CE CROSS-UNDER Y
2471 1 TG-30890 TGG 76 TG-01.T INSTALL HP CYLINDER I 11 I 12MAY04 I 14MAY04 HTGIGLAND STEAM 1 07:OOA I 14:59 PIPING I
I DR-Y ML-Y ORT3-Y R-N U
HiP TURBINE EXHA ST TO MSRS 0213 76T NSTA CYLNDER HTGLAND EAM PIPI1G
- g 0
H IGTAHL HIGH PR TURBINEDD2153 248 1 TG-30930 TGG 76 TG-01-T INSTALL HP TURBINE 4
12MAY04 13MAY04 DR-Y ML-Y 141 MANWAY COVERS 0800A 15:59 ORT3-Y R-N 249 1 TG-30720 TGG 76 TG-01-T INSTALL GOVERNOR I
13MAY04 13MAY04 DR-Y ML-Y 10 PEDESTALCOVER I 11 00A I1259 ORT3-Y R-N 250 1 TG-30810 TGG 76 TG-01-T INSTALL HP-LP 4
13MAY04 13MAY04 DR-Y ML-Y 0
COUPUNG GUARD 13:00*
16:59 ORT3-Y R-N 251 1 TG-30905 TGG 76 TG-01-T INSTALL#2-3BEARING 8
14MAY04 14MAY04 DR-Y ML-Y 160 PEDESTAL COVER 07:00 14:59 ORT3-Y R-N 252 1
CL-2B WCC CL 2BF MODE 6 TO MODE5 I1591 25APR04 I 20MAY04 DR-N ML-N 0
CHECKLIST I0800A 02359 ORT3-N R-N 2531 I
T-2E WCCl CL2E MODE 3RTOCMODEM 2
R 32 02MAY04 127MAY04 9DRN MLN 0
I I
T C
I CHECKLIST I 2 1930A 03M59 1ORT34N RN 254 1 l CL-2F WCC CL2F lMODE2 TO MODE1 348-1 02MAY04 27MAY04 DR-N ML-N 0
1CHECKLIST 1900A 23:59 ORT3-N R-N 255 1
T-8839-R WCC CRDM/RPI I
RC CRDMWRPITEM 1
13MAY04 13MAY04 69 REV02 l
12:00 12:59 25BI 1 lT-0460H WCCI MS-5958 I MS MS-5958IC REVD-I 2 l13MAYD4 l13MAY04 lI 4
I I
I I
I 12:00 1 13:59 11 2571 1 lT-8808-R WCCI P-28B I1CS P28B EM REVQ31 2 113MAY04 113MAY04 IDR-Y ML-Y I 0
III III I1Z.00 I 13.59 1ORT3-NR-Nl 2581 1 I T-9"9-R WC ICW SYSTEMl I1CW CWSYSTEM MM I 3 1 13MAY04 113MAY041l 90 III II REV0-1I 12:00 114:591 I
rG-3 g30NSTALL I HIGH PI 720INSTA1LL EHIGH PRESS I19INSTALL I
l HIGH IP TURBINE MANWj tESSURETURBINEI
'RESSURETURBINI TG.309051NS 0302153E LY COVERS 213969 AL COVER 53 lARD
- 0302153 TALL #2-3 BEARIK HIGH PRE PEDESTAL COVEI SSURETURBINE CL2 MODE STO MODE S CHECKLIST
- L -~D
-HUI.- --
I-CL2 MODE 3TO 1OE2CHECKLIST I
CL.2 MODE 2 TO MODE I CHECKLIST ml~_
1-es r.04 1-88 1-96 T-63 IRI RC CRDI II RC CRDIW HI MS MS-I MI MS MS-5
-RI CW Cw!
MI CWCU 7.RI CSIT-30 HI CSIT-30C k1RPI EM REVO-2 tPI EM REV0-200181 i58IC REV0-I 58IC REVO-1 00104 EM REV03-1 EM REV0.3-i1001884
,YSTEM MM REVO-I SYSTEM MM REVO-IC OPS REV041 C OPS REV0-1 0016 39 O
'8 1000969 197 e591 1 T6397jR-WCL II-300C 1 Us II-30L(X UP'S REV0-1 I I 13MATU4 I 1;5MAYLK 13:00 13:59 1j Run Date 13MAY04 13:40l LT-03 STANDARD PUBLICATION I
Sheet 15 of 18 C Primavera Systems, Inc.
l FL-03 Execution Publication Set I
after 13MAY04 12:00 1 U1R28 WORKING SCHEDULE l
afer 13MAY04 12:00 V
lU I
IRESP WO ED DESCRIPON RD ES EF RISK MAY IThuSP13 E dFr14 sat 15 ST E I1112.14,16 ta20.2210.
I.4.6i8.l12 681 2(12210,2.4.6.8.1012.14,1
=
I 26011(
T201475R WCC VNTB REMOVE TAG (0 VNTB I VNTB MM REV0-2)
I 13MAY04 I 13MAY04 15:00 15:59 705t o201
`201 2811 0 T201630H 1WCC W-04m HANG TAG (O VNAFW I
W-46 MM REVO-1) 13MAY04 13MAY04 15:00 15:59 2
4 28121 0I T305784R WCCI W-129 REMOVE TAG (0 VNNSB 1
W.129MMREVO01)_
13MAY04 I 13MAY04 I 15:00 15:59 705 130!
0i 263 1 T-0472-H WCC RM-3200C 1 RM RM-3200C IC 2
13MAY04 13MAY04 DR-Y ML-Y 0
REV0-1 16:00 17:59 ORT3-Y R-N 284 1 T-7048-R WCC P-288 1 CS P-288 EM REV2-1 3
13MAY04 13MAY04 DR-Y ML-Y 47 18:00 20:59 ORT3-N R-N 265 1 T-0472-R WCC RM-3200C 1 RM RM-3200C IC 1
13MAY04 13MAY04 DR-Y ML-Y 107 REVO-1 22:00 22:59 ORT3-Y R-N 268 1 T-7110-R WCC TG-010G 1 TU TG-01-G EM REVS-1 I
13MAY04 13MAY04 22:00 2259 267 0 T201 630R WCC W-046 REMOVE TAG (0 VNAFW I
13MAY04 13MAY04 698 W.46 MM REVD-1) 22:00 22:59 268 1 T.0460-R WCC MS-5958 I MS MS-5958 IC REVD-1 2
13MAY04 13MAY04 O
22:00 23:59 269 0 T305786H WCC W-131 HANG TAG (0VNNSB 1
14MAY04 14MAY04 5
W-131 MM REV0-1) 00W00 00W59 270 0 T305787H WCC HX-245A HANG TAG (0 VNOPS 1
14MAY04 14MAY04 5
HX.245A MM REV0-1) 00:00-00:59 75RREMOVE 30HHANG TA I
U4RREMOVE 472441 RM RI 10472E1 RN T-7048-R t CS 0017048mn T.0472-00104' T.7110-001711 T201630 T-0460-001041 T305 T305 rAG (0 VNTB VNTB 3(0 VNAFW W-46 s rAG (0 VNNSB W:1 I-3200C IC REVO-1 RM-3200C IC REV(
P-28B EM REV2-1 I CS P-28B EM REM I1 RM RM-3200C K 211 RM RM-32XDC 1 TUTG-01-G EM O1 TUTG-01-GE IREMOVE TAG (O I
I MS MS-5958 IC I owl MS MS-5958
'86H HANG TAG (0 I
r87H HANG TAG (0 I
T.9025RI 480V X-001902531 480V:
T301009RREMO I
T.9779-R1 RC 0009779R1 T.3778-H 1 3 0013778E T-1763-R1 00117631 T.070341 0010703 T305ni T305787 AM REVO-2)
AREVO-1)
MMREV0.1) 271 1
T-9025-R WCC X-13 1 480VX-13 LOADING I 1 CAUT OPS REV1 14MAY04 I 14MAY04 03:00 03:59 439 REVO-1 C REV0-1 EVS1 I REV5-1 4AF W-46 MM RE EV0.1 C REVO-1 NNSBW-131 MMR NOPS HX-245A MA 3 LOADING CAUT C
.13 LOADING CAUT TAG (2 CV F-39A PZR HTRS EM REV PZR HTRS EM RE 5KV F89-112 APS F 1 345KVF89-112AF
- I AF ORT.3C OF tREMOVE TAG (O R
272 2
T301009R WCC ICP-06.021 REMOVE TAG (2 CV 1
F-39A IC REV 0.1) 14MAY04 14MAY04 05:00 05:59 691 A1)
Z-01)
REVO-1)
PS REV0-I OPS REVO-1 IC REV 0.1)
I1-V0-1 EVO-I S REV0D1
/REiV0 1 EVO-1 S REV0-1 NNSB W-131 MM R NOPS HX-245A MM 273 1 T-9779-R WCC PZR 1 RC PZR HTRS EM 1
14MAY04 14MAY04 DR-Y ML-Y 202 REVD-1 06:00 06:59 ORT3-Y R-N 274 1
T-3778-H WCC F89-112 1 345KV F89-1 12 APS 2
14MAY04 14MAY04 0
REV0.1 07.00 08:59 275 1
T-1763-R WCC SC-9668 I SC SC-966B MMV 2
14MAY04 14MAY04 O
REVO-1 08:00 09.59 278 1 T-0703-H WCC ORT-3C I AF ORT-3C OPS 2
14MAY04 14MAY04 C
REV0-1 09:00 10"59 277 0 T305786R WCC W-131 REMOVE TAG (O VNNS9 1
14MAY04 14MAY04 686 W-131 MM REV0-1) 10W00 10:59
- V.I)
REMII) 278 0
T305787R WCC HX-245A REMOVE TAG (O VNOPS HX-245A MM REVO-1)
I 14MAY04 I 14MAY04 10W00.
1059 688 Run Date 13MAY04 13:40 LT.03 STANDARD PUBLICATION Sheet 16 of 18 o Prmavera Systems, Inc.
I FL-03 Execution Publication Set
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 4T U l I
RESP WO I EO DESCRIPTION RD ES EF RISK MF Frl 14 Sat 15
__ST
-- -..10i12,141l6l2012210,2,4.6,.8l1al2.1416,18,20,2210 2,4 6 810112.144. 61 V3 53i6
-*__1 _ I Wl WW,I'j, 2791 1 T-3778-R WCC F89-112 I 1 345KVF59-112APS 12 REV0-1 14MAY04 14MAY04 12.00 13:59 0
280 1
T-0510-R WCC W-1B111B2 1 VNCCW-1B1/1B2MM 3
14MAY04 14MAY04 70 REVO-1 12.00 14:59 281 1
T-0703-R WCC ORT-3C 1 AFORT-3COPS 1
14MAY04 14MAY04 3
REVO-1 15:00 15:59 282 0
T201676H WCC HX-258 HANG TAG (O VNTB I
14MAY04 14MAY04 2
HX-258 MM REVO-1) 15:00-15:59 283 0
T201676R WCC HX-258 REMOVE TAG (0 VNTB 1
14MAY04 14MAY04 674 HX-258 MM REV-1) 22-00 22:59 284 1
T-8928-R WCC FS-2852 1 SW FS-2852 MM I
15MAY04 15MAY04 50 REV2-1 03:00 03:59 285 1
T-7043-R WCC P-028A-M I CS P-28A-M EM REVO-1 I
15MAY04 15MAY04 DR-Y ML-Y 0
04.00 04:59 ORT3-Y R-N
- T-37 T-00 001 8-R ' 345KV F89-I 3778E1 345KV FE 0-RI VNCCW-tBI 351CM1 VNCCV T-0703-R1 AF ORT 001070331 AFOF W20167T6H HANG TA I
T20167E 2861 1 T-7047-H IWCC P-028A-M 1 CS P-28A-M EM REV1-1 I
15MAY04 I 15MAY04 I DR-Y ML-Y 04:00 04:59 ORT3-Y R-N 0
2APS REVO-1
-12 APS REVO-1 192 MM REV0-1
-1B1/1B2MM REVC W OPS REVO-1 r-3C OPS REVo-1 1(0 VNTB HX-25S 7 tREMOVE TAG (0 T.8928-RI SW FS-001892811 SWF T-7043-R 1 CS P`:
001704331 CSJ T-70474H1 CS P.:
001704731 CS I T-096-H 1 MRF 001096431 M T.3310-R1 RCI 001331031 RC T-7047-R 0017047 T40!
001 T-2Z 001 T-8 001 T-0 4
---
4 4-4 1
287 1 T-0964-H WCC
15MAY04 15MAY04 05:00 05:59 0
l' 288 1
T-3310-R WCC P-OOIA-M 1 RC P-1A-M RMP 9002-1 1
15MAY04 15MAY04 0
EM REVI-1 05:00 05:59 289 1 T-7047-R WCC P-028A-M 1 CS P-28AM EM REV1-1 1
15MAY04 15MAY04 DR-Y ML-Y 100 09:00 09 59 ORT3-Y R-N 290 1
T-0964-R WCC 62/A01 1 MRR 62A01 RMP 1
15MAYD4 15MAY04 DR-Y ML-Y 0
9302-1 EM REVO-1 1Z-00 12:59 ORT3-Y R-N 291 1
T-2709-R WCC MS-2018 1 MS MS-2018 MMV 1
15MAY04 15MAY04 0
REVO-1 1200 1Z59 292 1
T-8293-H WCC HX-1H IMS HX-1B SMP OPS I
15MAY04 15MAY04 DR-Y ML-Y 0
REV1-1 1Z00 12:59 ORT3-YR-N 293 1
T-3180-H WCC P-001A-M 1 RC P-IA-M BALANCE 1
15MAY04 15MAY04 0
EM REV0-1 13:00 13:59 294 1 T-8024-H WCC IWP 1 480VIWPC01.128-E-FN 2
15MAY04 15MAY04 0
(01-39) EM REV0-2 15:00 16:59 295 1
T-3180-R WCC P-001A-M 1 RC P-IA-M BALANCE 1
15MAY04 15MAY04 402 EM REVO-1 16:00 16:59 29B 1
T-3322-R WCC P-001A-M RC P-1A-M RMP 9002-1 I
15MAY04 15MAY04 0
EM REV2-1 18 t:0 16:59 M REV0-1)
'TB HX-258 MU 852 MM REV2-1
- -2852 MM REV2 UA-M EM REV0-
-28A-M EM REV 1A01 RMP 931 R 62/A01 RMP9
-1A-M RMP 900S P-IA-M RMP 90 1 CS P-28A-M El 1 CS P-28A-M 64-R I MRR 2UA S9431 MRR86 09R 1 MS MS-2(
270931 MS MS 934H1 MS HX-1 829311 MS HX-1 g" I RC P.11 11318031 RC P T.802441 480%
0018024K14 T-3180- 1 RC 001318031 F T.3322.RRC F 001332231 F T-8293-RI MS 001829331 A 2971 1 T-8293-R WCC HX-1B 1 MS HX-IB SMP OPS REVI-1 I
15MAY04 I 15MAY04 I DR-Y MLY 18B00 I 6:S9 ORT3-Y R-N 111 Run Date 13MAY04 13:40 LT-03 STANDARD PUBLICATION Sheet 17 of 18 C Primavera SWems Inc.
I FL.03 Execution Publication Set I
after 13MAY04 12:00 U1R28 WORKING SCHEDULE after 13MAY04 12:00 I
U I ID RESP WO J EQID DESCRIpIbON RD ES EF RISK MIF MA Thu 13 1
Ed 14 St1 t6:00 19 59 ORT3-Y R-0011302_
299 1
T-2407-H WCC RMP 1 4.16KV RMP 9364-1 1
15MAY04 1 MAY04 14 T.2407H 1 4 UMBLICAL CORD EM 17,00 17:59 001240711 i
Run Date 13MAY04 13:40 LT.03 STANDARD PUBUCATION Sheet 18 of 18 P
Pfkemvem Syems. Im:
I FL-03 Execution Publication Set