ML061320147: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.John White- IPEC Status report Feb. 2                                                                                 Pae1 From:               "McMullin, Kathy" <KMcMull&#xa9;entergy.com>
{{#Wiki_filter:.John White-IPEC Status report Feb. 2 Pae1 From:  
To:                 " (Popopeek~aol.com)" <Popopeek@aol.com>, " Baranski, James"
"McMullin, Kathy" <KMcMull&#xa9;entergy.com>
              <james.baranski@&#xa9;semo.state.ny.us>, " Eddy, Paul" <pauLeddy@ dps.state.ny.us>, " Greeley, Dan"
To:  
              <greeleyd@?co.rockland.ny.us>, " Gross, Steve - Orange PIO" <sgross~co.orange.ny.us>, " Meyer, Sue-Rockland Alt. POIO" <Meyers co.rockland.ny.us>, " Sutton, Tony" <awsl @westchestergov.corr>,
" (Popopeek~aol.com)" <Popopeek@aol.com>, " Baranski, James"
Adam S tiebeling <abspcbes @bestweb.net>, "Albanese, Raymond" <rlal &#xa9; westchestergov.com>, Alf redo Vidal <avidal@ thevidalgroup.com>, "Anthony Sutton (awsl @weschestergov.com)"
<james.baranski@&#xa9;semo.state.ny.us>, " Eddy, Paul" <pauLeddy@ dps.state.ny.us>, " Greeley, Dan"
              <awsl Caweschestergov.com>, "B. Gore" <bgoreCurbanomics.com>, "Baker Nancy (bakerna &#xa9;co.rockland.ny.us)" <bakerna @co.rockland.ny.us>, "Barry, Terrence" <TBarry@ entergy.com>,
<greeleyd@?co.rockland.ny.us>, " Gross, Steve - Orange PIO" <sgross~co.orange.ny.us>, " Meyer, Sue-Rockland Alt. POIO" <Meyers co.rockland.ny.us>, " Sutton, Tony" <awsl @westchestergov.corr>,
              "Benjamin, Liz" <BenjamiL@ co.rockland.ny.us>, "Bentley, Robyn" <rbentle &#xa9;entergy.com>, "Bergmann Ken (ken.bergmann@semo.state.ny.us)" <ken.bergmann@semo.state.ny.us>, Bernie McGarry
Adam S tiebeling <abspcbes @ bestweb.net>, "Albanese, Raymond" <rlal &#xa9; westchestergov.com>, Alf redo Vidal <avidal@ thevidalgroup.com>, "Anthony Sutton (awsl @weschestergov.com)"
              <mcgariy@senate.state.ny.us>, "Blizard, Andrea" <ablizar@ entergy.com>, "Bob Outhouse (rjO4@ westchestergov.com)" <rjO4 @westchestergov.com>, "Bob Outhouse (rjo4 &#xa9;westchestergov.ccm.)"
<awsl Caweschestergov.com>, "B. Gore" <bgoreCurbanomics.com>, "Baker Nancy (bakerna &#xa9; co.rockland.ny.us)" <bakerna @ co.rockland.ny.us>, "Barry, Terrence" <TBarry@ entergy.com>,
              <rjo4 @westchestergov.com>, "Bordewich Jean aean-bordewich @?schumer.senate.gov)"
"Benjamin, Liz" <BenjamiL@ co.rockland.ny.us>, "Bentley, Robyn" <rbentle &#xa9; entergy.com>, "Bergmann Ken (ken.bergmann@semo.state.ny.us)" <ken.bergmann@semo.state.ny.us>, Bernie McGarry
              <jean_bordewich @schumer.senate.gov>, "Bordewich Jean (schumer@ valstar.net)"
<mcgariy@senate.state.ny.us>, "Blizard, Andrea" <ablizar@ entergy.com>, "Bob Outhouse (rjO4@ westchestergov.com)" <rjO4 @ westchestergov.com>, "Bob Outhouse (rjo4 &#xa9;westchestergov.ccm.)"
              <schumEr@?valstar.net>, "Boska John apbl @nrc.gov)" <jpbl @nrc.gov>, "Bowman, Greg"
<rjo4 @ westchestergov.com>, "Bordewich Jean aean-bordewich @?schumer.senate.gov)"
              <GBowrn9O &#xa9;cc--exsO3.prod.entergy.com>, Brian Holian <bjm@&#xa9;nrc.gov>, "Brian Holian (beh&#xa9;nrc.gcv)"
<jean_bordewich @ schumer.senate.gov>, "Bordewich Jean (schumer@ valstar.net)"
              <beh @rirc.gov>, "Bridges Jeff (JBridges @troopers.state.ny.us)" <JBridges @troopers.state.ny.us>, Chief Tubbs <ChiefBTubbs @aol.com>, Chris Schwarz <cschwar@ entergy.com>, "Comiotes, Jim"
<schumEr@?valstar.net>, "Boska John apbl @nrc.gov)" <jpbl @nrc.gov>, "Bowman, Greg"
              <JComiot@entergy.com>, "Conroy, Pat" <PConroy@ entergy.com>, "Cooper Linda (lindac &#xa9;yorktownny.org)" <lindac&#xa9;yorktownny.org>, "Cox, Mark R" <mcox9QOentergy.com>, "Crawiord Garnesha (GcrawfordO urbanomics.com)" <Gcrawford @urbanomics.com>, "Curran, Nick"
<GBowrn9O &#xa9;cc--exsO3.prod.entergy.com>, Brian Holian <bjm@&#xa9;nrc.gov>, "Brian Holian (beh&#xa9;nrc.gcv)"
              <Nick.curran @mail.house.gov>, "Dacimo, Fred" <FDacimo@&#xa9;entergy.com>, David Brand
<beh @ rirc.gov>, "Bridges Jeff (JBridges @troopers.state.ny.us)" <JBridges @ troopers.state.ny.us>, Chief Tubbs <ChiefBTubbs @aol.com>, Chris Schwarz <cschwar@ entergy.com>, "Comiotes, Jim"
              <DavidPBrand@&#xa9;hotmail.com>, David Greene <dgreene @urbanomics.com>, David Weinraub
<JComiot@entergy.com>, "Conroy, Pat" <PConroy@ entergy.com>, "Cooper Linda (lindac &#xa9;yorktownny.org)" <lindac&#xa9;yorktownny.org>, "Cox, Mark R" <mcox9QOentergy.com>, "Crawiord Garnesha (GcrawfordO urbanomics.com)" <Gcrawford @urbanomics.com>, "Curran, Nick"
              <DWeinraub@&#xa9;bmwlobby.com>, "DeGasperis, Edward" <edegasp@&#xa9;entergy.com>, "Dirocco, Anthony"
<Nick.curran @ mail.house.gov>, "Dacimo, Fred" <FDacimo@&#xa9;entergy.com>, David Brand
              <ADirocc@entergy.com>, "Don Maurer (Donald.Maurer~semo.state.ny.us)"
<DavidPBrand@&#xa9;hotmail.com>, David Greene <dgreene @urbanomics.com>, David Weinraub
              <Donalcl.Maurer@semo.state.ny.us>, "Dowling, Adele" <amd2@&#xa9;westchestergov.com>, "Drew Barney (Barney..Drew@ Iafarge-na.com)" <Barney.DrewC&#xa9;lafarge-na.com>, "Elisa Gwilliam (elisagwilliam &#xa9;msn.com)" <elisagwilliam @msn.com>, "Fay, Deborah" <DFayl @entergy.com>, Feathers
<DWeinraub@ &#xa9;bmwlobby.com>, "DeGasperis, Edward" <edegasp@&#xa9;entergy.com>, "Dirocco, Anthony"
              <jdf &#xa9;fcwc-law.com>, "Feeney Andrew (Andrew.Feeney@semo.state.ny.us)"
<ADirocc@entergy.com>, "Don Maurer (Donald.Maurer~semo.state.ny.us)"
              <Andrew.Feeney@semo.state.ny.us>, "Feroe Peter (peter.feroe @mail.house.gov)"
<Donalcl.Maurer@semo.state.ny.us>, "Dowling, Adele" <amd2@&#xa9;westchestergov.com>, "Drew Barney (Barney..Drew@ Iafarge-na.com)" <Barney.DrewC &#xa9;lafarge-na.com>, "Elisa Gwilliam (elisagwilliam &#xa9; msn.com)" <elisagwilliam @ msn.com>, "Fay, Deborah" <DFayl @ entergy.com>, Feathers
              <peter.feroe @mail.house.gov>, Geri Shapiro <gerishapiro@&#xa9;aol.com>, "Gibbons Emily (Emily.GibbonsC&#xa9;mail.house.gov)" <Emily.Gibbons @mail.house.gov>, "Giguere, Kathleen"
<jdf &#xa9; fcwc-law.com>, "Feeney Andrew (Andrew.Feeney@semo.state.ny.us)"
              <KGiguor&#xa9; entergy.com>, "Glenn Troester (grtroes&#xa9;nppd.com)" <grtroes @nppd.com>, "Gottlieb, La ry"
<Andrew.Feeney@semo.state.ny.us>, "Feroe Peter (peter.feroe @ mail.house.gov)"
              <LGottli ~entergy.com>, "Greene, Dominick" <dgreene@co.orange.ny.us>, "Grosjean, Alain"
<peter.feroe @mail.house.gov>, Geri Shapiro <gerishapiro@&#xa9;aol.com>, "Gibbons Emily (Emily.GibbonsC &#xa9;mail.house.gov)" <Emily.Gibbons @ mail.house.gov>, "Giguere, Kathleen"
              <AGrosjeC&#xa9;entergy.com>, "Guiao Frank (Frank.(Guiao@&#xa9;lafarge-na.com)"
<KGiguor&#xa9; entergy.com>, "Glenn Troester (grtroes&#xa9;nppd.com)" <grtroes @ nppd.com>, "Gottlieb, La ry"
              <Frank.Giuiao @Iafarge-na.com>, Harry Giannoulis <harry@theparksidegroup.com>, "Hipschman, Thomas" <thips90 &#xa9;entergy.com>, "Huber, John T." <jhube90 &#xa9;entergy.com>, "Inzirillo, Frank"
<LGottli ~entergy.com>, "Greene, Dominick" <dgreene@co.orange.ny.us>, "Grosjean, Alain"
              <finziri@?entergy.com>, Ira Promisel <ipromiseXtroopers.state.ny.us>, Jack Spath <jpsSnyserda.org>,
<AGrosjeC &#xa9;entergy.com>, "Guiao Frank (Frank.(Guiao@ &#xa9;lafarge-na.com)"
              "Jeff Tkacs aefft@townofcortlandt.com)" <jefftCtownofcortlandt.com>, "Jensen, Chris"
<Frank.Giuiao @ Iafarge-na.com>, Harry Giannoulis <harry@theparksidegroup.com>, "Hipschman, Thomas" <thips90 &#xa9; entergy.com>, "Huber, John T." <jhube90 &#xa9; entergy.com>, "Inzirillo, Frank"
              <jensen.@ co.rockland.ny.us>, JES <JES1 @westchestergov.com>, Jim Cunningham
<finziri@?entergy.com>, Ira Promisel <ipromiseXtroopers.state.ny.us>, Jack Spath <jpsSnyserda.org>,
              <jimrcu ningham &#xa9;nyc.bm.com>, "Jim Seymour aseymour@cityofpeekskill.com)"
"Jeff Tkacs aefft@townofcortlandt.com)" <jefftCtownofcortlandt.com>, "Jensen, Chris"
              <jseymc'ur@ cityofpeekskill.com>, Jim Wright <wright@ senate.state.ny.us>, John Cordo
<jensen.@ co.rockland.ny.us>, JES <JES1 @ westchestergov.com>, Jim Cunningham
              <JLC@lcwc-law.com>, "Jones, T. R." <tjones2@entergy.com>, "Kansler, Michael"
<jimrcu ningham &#xa9; nyc.bm.com>, "Jim Seymour aseymour@cityofpeekskill.com)"
              <MKansle@&#xa9;entergy.com>, Kathleen Wood <kathleen.wood@&#xa9;chamber.state.ny.us>, "Keegan Pat (Pat.keegan @mail.house.gov)" <Pat.keegan @mail.house.gov>, "Kerns, Matt" <MKerns &#xa9; entergy.com>,
<jseymc'ur@ cityofpeekskill.com>, Jim Wright <wright@ senate.state.ny.us>, John Cordo
              "Kopy Mike (MKopy&#xa9; troopers.state.ny.us)" <MKopy@troopers.state.ny.us>, "Kraus Kevin (kevin.kiraus @semo.state.ny.us)" <kevin.kraus @semo.state.ny.us>, "L. Leach"
<JLC@lcwc-law.com>, "Jones, T. R." <tjones2@entergy.com>, "Kansler, Michael"
              <lionelleach@yahoo.com>, "Leach, Don" <DLeach@entergy.com>, "Leibell Vincent (leibell C?senate.state.ny.us)" <leibell &#xa9;senate.state.ny.us>
<MKansle@&#xa9;entergy.com>, Kathleen Wood <kathleen.wood@&#xa9;chamber.state.ny.us>, "Keegan Pat (Pat.keegan @ mail.house.gov)" <Pat.keegan @ mail.house.gov>, "Kerns, Matt" <MKerns &#xa9; entergy.com>,
Date:               2/2/06 5:47PM Subjeci:           IPEC Status report Feb. 2 Indian Point Energy Center Status Report
"Kopy Mike (MKopy&#xa9; troopers.state.ny.us)" <MKopy@troopers.state.ny.us>, "Kraus Kevin (kevin.kiraus @ semo.state.ny.us)" <kevin.kraus @ semo.state.ny.us>, "L. Leach"
<lionelleach@yahoo.com>, "Leach, Don" <DLeach@entergy.com>, "Leibell Vincent (leibell C?senate.state.ny.us)" <leibell &#xa9;senate.state.ny.us>
Date:
2/2/06 5:47PM Subjeci:
IPEC Status report Feb. 2 Indian Point Energy Center Status Report


t Jhn0~it -IPEC Status reportfeb_~_2                                                                                       Page Paie 22I 1 I John WhiteIPEC
t Jhn0~it -IPEC Status reportfeb_~_2 Page 2 1 I John White
                                                        -   Status   Feb.2 report February 2, 2006 Operaticonal Status Indian Point Unit 2 is operating at 100% and has been online 42 days.
- IPEC Status report Feb.2 Paie 2I February 2, 2006 Operaticonal Status Indian Point Unit 2 is operating at 100% and has been online 42 days.
Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 121 days.
Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 121 days.
Update on Tritium Investigation BM_40154*           Spent fuel pool liner inspection. A coating material has been evaluated and approved for coating/repair to the stainless steel liner in the IP2 spent fuel pool. A video inspection of the liner previously identified six areas where there were potential flaws. Three of these areas have been inspected and vacuum box tested. The remaining three areas on the north and west walls of the spent fuel pool will be tested by divers and all six locations coated.
Update on Tritium Investigation BM_40154*
* Well installation. The last well in the phase 1 drilling is being installed in the IP2 turbine building.
Spent fuel pool liner inspection. A coating material has been evaluated and approved for coating/repair to the stainless steel liner in the IP2 spent fuel pool. A video inspection of the liner previously identified six areas where there were potential flaws. Three of these areas have been inspected and vacuum box tested. The remaining three areas on the north and west walls of the spent fuel pool will be tested by divers and all six locations coated.
Well installation. The last well in the phase 1 drilling is being installed in the IP2 turbine building.
This well (MW-37) is on the west side of the discharge canal. Three wells in phase 2 are already under construction.
This well (MW-37) is on the west side of the discharge canal. Three wells in phase 2 are already under construction.
* Monitoring Well Sample Results. The most recent test results from on-site wells have shown no appreciable change in tritium levels. On January 24, samples were collected from three surface water locations off-site. Sample results obtained from an off-site lab showed levels of tritium that are just at the limit of detection (500 pCi/L). All previous sample results from these locations have shown no detectable tritium activity. These locations are included in the routine environmental sampling program and have not previously indicated activity. Since these test results are inconsistent with previous samples and would not be expected due to the hydrologic model of ground water flow on site, Entergy has collected additional test samples from these locations and has sent them for tritium analysis at two different test labs. These results should be available early next week. It should be noted that these results are about 1/40th of EPA reference drinking water standards I and do not impact any public or private water supplies.
Monitoring Well Sample Results. The most recent test results from on-site wells have shown no appreciable change in tritium levels. On January 24, samples were collected from three surface water locations off-site. Sample results obtained from an off-site lab showed levels of tritium that are just at the limit of detection (500 pCi/L). All previous sample results from these locations have shown no detectable tritium activity. These locations are included in the routine environmental sampling program and have not previously indicated activity. Since these test results are inconsistent with previous samples and would not be expected due to the hydrologic model of ground water flow on site, Entergy has collected additional test samples from these locations and has sent them for tritium analysis at two different test labs. These results should be available early next week. It should be noted that these results are about 1/40th of EPA reference drinking water standards I and do not impact any public or private water supplies.
The NRC', New York State DEC, and Entergy will collect split samples from the phase 1 wells and possibly off-site locations next week.
The NRC', New York State DEC, and Entergy will collect split samples from the phase 1 wells and possibly off-site locations next week.
Date Location Tritium Results (pCVL) 1/24/06 Gypsum plant out-fall 390
Date Location Tritium Results (pCVL) 1/24/06 Gypsum plant out-fall 390


l John White - IPEC Staitus report Feb-.2                                                                                   'Page Paqe 31 31 John White- IPEC Status reDort Feb. 2 1/24/06 Trap Rcck Quarry 510 1/24/06 Algonquin Creek outfall 409
l John White - IPEC Staitus report Feb-. 2
* Hydrologic model. The current model of ground water flow at Indian Point appears to indicate that water movement on site is heavily influenced by the excavation and construction activities, which occurred when the plants were built in the 1950's-1 970's. Wells installed on the north and south ends of the site show water levels at higher elevations than found in the transformer yard and IP2 spent fuel pool areas.
'Page 31 John White-IPEC Status reDort Feb. 2 Paqe 31 1/24/06 Trap Rcck Quarry 510 1/24/06 Algonquin Creek outfall 409 Hydrologic model. The current model of ground water flow at Indian Point appears to indicate that water movement on site is heavily influenced by the excavation and construction activities, which occurred when the plants were built in the 1950's-1 970's. Wells installed on the north and south ends of the site show water levels at higher elevations than found in the transformer yard and IP2 spent fuel pool areas.
There appears to be a hydrostatic pressure gradient which would contain ground water on site and create a reservoir effect on site and limit flow of water off-site. The dominant flow pattern on site is toward the discharge canal and the Hudson River.
There appears to be a hydrostatic pressure gradient which would contain ground water on site and create a reservoir effect on site and limit flow of water off-site. The dominant flow pattern on site is toward the discharge canal and the Hudson River.
The phase 2 investigation should help confirm and provide additional detail for these preliminary conclusions.
The phase 2 investigation should help confirm and provide additional detail for these preliminary conclusions.
Line 71: Line 76:
If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.
If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.


lJohn White-TEXT.htin                                                                                         Page1 Indian Point Energy Center Status Report February 2, 2006 Operational Status Indian Point Unit 2 is operating at 100% and has been online 42 days.
lJohn White-TEXT.htin Page1 Indian Point Energy Center Status Report February 2, 2006 Operational Status Indian Point Unit 2 is operating at 100% and has been online 42 days.
Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 121 day;.
Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 121 day;.
Update on Tritium Investigation
Update on Tritium Investigation Spent fuel pool liner inspection. A coating material has been evaluated and approved for coating/repair to the stainless steel liner in the IP2 spent fuel pool. A video inspection of the liner previously identified six areas where there were potential flaws.
* Spent fuel pool liner inspection. A coating material has been evaluated and approved for coating/repair to the stainless steel liner in the IP2 spent fuel pool. A video inspection of the liner previously identified six areas where there were potential flaws.
Three of these areas have been inspected and vacuum box tested. The remaining three areas on the north and west walls of the spent fuel pool will be tested by divers and all six locations coated.
Three of these areas have been inspected and vacuum box tested. The remaining three areas on the north and west walls of the spent fuel pool will be tested by divers and all six locations coated.
* Well installation. The last well in the phase 1 drilling is being installed in the IP2 turbine building. This well (MW-37) is on the west side of the discharge canal. Three wells in phase 2 are already under construction.
Well installation. The last well in the phase 1 drilling is being installed in the IP2 turbine building. This well (MW-37) is on the west side of the discharge canal. Three wells in phase 2 are already under construction.
* Monitoring Well Sample Results. The most recent test results from on-site wells have shown no appreciable change in tritium levels. On January 24, samples were collected from three surface water locations off-site. Sample results obtained from an off-site lab showed levels of tritium that are just at the limit of detection (500 pCi/L). All previous sample results from these locations have shown no detectable tritium activity.
Monitoring Well Sample Results. The most recent test results from on-site wells have shown no appreciable change in tritium levels. On January 24, samples were collected from three surface water locations off-site. Sample results obtained from an off-site lab showed levels of tritium that are just at the limit of detection (500 pCi/L). All previous sample results from these locations have shown no detectable tritium activity.
These locations are included in the routine environmental sampling program and have not previously indicated activity. Since these test results are inconsistent with previous samples and would not be expected due to the hydrologic model of ground water flow on site, Entergy has collected additional test samples from these locations and has sent them for tritium analysis at two different test labs. These results should be available early next week. It should be noted that these results are about 1/ 4 0th of EPA reference drinking water standards and do not impact any public or private water supplies.
These locations are included in the routine environmental sampling program and have not previously indicated activity. Since these test results are inconsistent with previous samples and would not be expected due to the hydrologic model of ground water flow on site, Entergy has collected additional test samples from these locations and has sent them for tritium analysis at two different test labs. These results should be available early next week. It should be noted that these results are about 1/40th of EPA reference drinking water standards and do not impact any public or private water supplies.


[ J-6116 Wfiite___-_TEXT.htrn                                                                                     Page Paqe 22 I John White TEXT.htrn The NRC, New York State DEC, and Entergy will collect split samples from the phase 1 wells and possibly off-site locations next week.
[ J-6116 Wfiite___-_TEXT.htrn Page 2 I John White - TEXT.htrn Paqe 2 The NRC, New York State DEC, and Entergy will collect split samples from the phase 1 wells and possibly off-site locations next week.
Date                     Location                       Tritium Results (pCi/L) 1/24/06         Gypsum plant out-fall                   390 1/24/O6         rap Rock Quarry                       510 1/24/06         Algonquin Creek outfall                 409
Date Location Tritium Results (pCi/L) 1/24/06 Gypsum plant out-fall 390 1/24/O6 rap Rock Quarry 510 1/24/06 Algonquin Creek outfall 409 Hydrologic model. The current model of ground water flow at Indian Point appears to indicate that water movement on site is heavily influenced by the excavation and construction activities, which occurred when the plants were built in the 1950's-1970's. Wells installed on the north and south ends of the site show water levels at higher elevations than found in the transformer yard and IP2 spent fuel pool areas.
* Hydrologic model. The current model of ground water flow at Indian Point appears to indicate that water movement on site is heavily influenced by the excavation and construction activities, which occurred when the plants were built in the 1950's-1970's. Wells installed on the north and south ends of the site show water levels at higher elevations than found in the transformer yard and IP2 spent fuel pool areas.
There appears to be a hydrostatic pressure gradient which would contain ground water on site and create a reservoir effect on site and limit flow of water off-site. The dominant flow pattern on site is toward the discharge canal and the Hudson River.
There appears to be a hydrostatic pressure gradient which would contain ground water on site and create a reservoir effect on site and limit flow of water off-site. The dominant flow pattern on site is toward the discharge canal and the Hudson River.
The phase 2 investigation should help confirm and provide additional detail for these preliminary conclusions.
The phase 2 investigation should help confirm and provide additional detail for these preliminary conclusions.
Line 88: Line 91:
Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.
Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.


John White - TEXT.htrn                                                                             Page 3 If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914- 271-7132.}}
John White - TEXT.htrn Page 3 If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.}}

Latest revision as of 09:01, 15 January 2025

E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for Feb 2
ML061320147
Person / Time
Site: Indian Point  
Issue date: 02/02/2006
From: Mcmullin K
Entergy Nuclear Operations
To: Boska J, Brian Holian
NRC/FSME
References
FOIA/PA-2006-0140
Download: ML061320147 (6)


Text

.John White-IPEC Status report Feb. 2 Pae1 From:

"McMullin, Kathy" <KMcMull©entergy.com>

To:

" (Popopeek~aol.com)" <Popopeek@aol.com>, " Baranski, James"

<james.baranski@©semo.state.ny.us>, " Eddy, Paul" <pauLeddy@ dps.state.ny.us>, " Greeley, Dan"

<greeleyd@?co.rockland.ny.us>, " Gross, Steve - Orange PIO" <sgross~co.orange.ny.us>, " Meyer, Sue-Rockland Alt. POIO" <Meyers co.rockland.ny.us>, " Sutton, Tony" <awsl @westchestergov.corr>,

Adam S tiebeling <abspcbes @ bestweb.net>, "Albanese, Raymond" <rlal © westchestergov.com>, Alf redo Vidal <avidal@ thevidalgroup.com>, "Anthony Sutton (awsl @weschestergov.com)"

<awsl Caweschestergov.com>, "B. Gore" <bgoreCurbanomics.com>, "Baker Nancy (bakerna © co.rockland.ny.us)" <bakerna @ co.rockland.ny.us>, "Barry, Terrence" <TBarry@ entergy.com>,

"Benjamin, Liz" <BenjamiL@ co.rockland.ny.us>, "Bentley, Robyn" <rbentle © entergy.com>, "Bergmann Ken (ken.bergmann@semo.state.ny.us)" <ken.bergmann@semo.state.ny.us>, Bernie McGarry

<mcgariy@senate.state.ny.us>, "Blizard, Andrea" <ablizar@ entergy.com>, "Bob Outhouse (rjO4@ westchestergov.com)" <rjO4 @ westchestergov.com>, "Bob Outhouse (rjo4 ©westchestergov.ccm.)"

<rjo4 @ westchestergov.com>, "Bordewich Jean aean-bordewich @?schumer.senate.gov)"

<jean_bordewich @ schumer.senate.gov>, "Bordewich Jean (schumer@ valstar.net)"

<schumEr@?valstar.net>, "Boska John apbl @nrc.gov)" <jpbl @nrc.gov>, "Bowman, Greg"

<GBowrn9O ©cc--exsO3.prod.entergy.com>, Brian Holian <bjm@©nrc.gov>, "Brian Holian (beh©nrc.gcv)"

<beh @ rirc.gov>, "Bridges Jeff (JBridges @troopers.state.ny.us)" <JBridges @ troopers.state.ny.us>, Chief Tubbs <ChiefBTubbs @aol.com>, Chris Schwarz <cschwar@ entergy.com>, "Comiotes, Jim"

<JComiot@entergy.com>, "Conroy, Pat" <PConroy@ entergy.com>, "Cooper Linda (lindac ©yorktownny.org)" <lindac©yorktownny.org>, "Cox, Mark R" <mcox9QOentergy.com>, "Crawiord Garnesha (GcrawfordO urbanomics.com)" <Gcrawford @urbanomics.com>, "Curran, Nick"

<Nick.curran @ mail.house.gov>, "Dacimo, Fred" <FDacimo@©entergy.com>, David Brand

<DavidPBrand@©hotmail.com>, David Greene <dgreene @urbanomics.com>, David Weinraub

<DWeinraub@ ©bmwlobby.com>, "DeGasperis, Edward" <edegasp@©entergy.com>, "Dirocco, Anthony"

<ADirocc@entergy.com>, "Don Maurer (Donald.Maurer~semo.state.ny.us)"

<Donalcl.Maurer@semo.state.ny.us>, "Dowling, Adele" <amd2@©westchestergov.com>, "Drew Barney (Barney..Drew@ Iafarge-na.com)" <Barney.DrewC ©lafarge-na.com>, "Elisa Gwilliam (elisagwilliam © msn.com)" <elisagwilliam @ msn.com>, "Fay, Deborah" <DFayl @ entergy.com>, Feathers

<jdf © fcwc-law.com>, "Feeney Andrew (Andrew.Feeney@semo.state.ny.us)"

<Andrew.Feeney@semo.state.ny.us>, "Feroe Peter (peter.feroe @ mail.house.gov)"

<peter.feroe @mail.house.gov>, Geri Shapiro <gerishapiro@©aol.com>, "Gibbons Emily (Emily.GibbonsC ©mail.house.gov)" <Emily.Gibbons @ mail.house.gov>, "Giguere, Kathleen"

<KGiguor© entergy.com>, "Glenn Troester (grtroes©nppd.com)" <grtroes @ nppd.com>, "Gottlieb, La ry"

<LGottli ~entergy.com>, "Greene, Dominick" <dgreene@co.orange.ny.us>, "Grosjean, Alain"

<AGrosjeC ©entergy.com>, "Guiao Frank (Frank.(Guiao@ ©lafarge-na.com)"

<Frank.Giuiao @ Iafarge-na.com>, Harry Giannoulis <harry@theparksidegroup.com>, "Hipschman, Thomas" <thips90 © entergy.com>, "Huber, John T." <jhube90 © entergy.com>, "Inzirillo, Frank"

<finziri@?entergy.com>, Ira Promisel <ipromiseXtroopers.state.ny.us>, Jack Spath <jpsSnyserda.org>,

"Jeff Tkacs aefft@townofcortlandt.com)" <jefftCtownofcortlandt.com>, "Jensen, Chris"

<jensen.@ co.rockland.ny.us>, JES <JES1 @ westchestergov.com>, Jim Cunningham

<jimrcu ningham © nyc.bm.com>, "Jim Seymour aseymour@cityofpeekskill.com)"

<jseymc'ur@ cityofpeekskill.com>, Jim Wright <wright@ senate.state.ny.us>, John Cordo

<JLC@lcwc-law.com>, "Jones, T. R." <tjones2@entergy.com>, "Kansler, Michael"

<MKansle@©entergy.com>, Kathleen Wood <kathleen.wood@©chamber.state.ny.us>, "Keegan Pat (Pat.keegan @ mail.house.gov)" <Pat.keegan @ mail.house.gov>, "Kerns, Matt" <MKerns © entergy.com>,

"Kopy Mike (MKopy© troopers.state.ny.us)" <MKopy@troopers.state.ny.us>, "Kraus Kevin (kevin.kiraus @ semo.state.ny.us)" <kevin.kraus @ semo.state.ny.us>, "L. Leach"

<lionelleach@yahoo.com>, "Leach, Don" <DLeach@entergy.com>, "Leibell Vincent (leibell C?senate.state.ny.us)" <leibell ©senate.state.ny.us>

Date:

2/2/06 5:47PM Subjeci:

IPEC Status report Feb. 2 Indian Point Energy Center Status Report

t Jhn0~it -IPEC Status reportfeb_~_2 Page 2 1 I John White

- IPEC Status report Feb.2 Paie 2I February 2, 2006 Operaticonal Status Indian Point Unit 2 is operating at 100% and has been online 42 days.

Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 121 days.

Update on Tritium Investigation BM_40154*

Spent fuel pool liner inspection. A coating material has been evaluated and approved for coating/repair to the stainless steel liner in the IP2 spent fuel pool. A video inspection of the liner previously identified six areas where there were potential flaws. Three of these areas have been inspected and vacuum box tested. The remaining three areas on the north and west walls of the spent fuel pool will be tested by divers and all six locations coated.

Well installation. The last well in the phase 1 drilling is being installed in the IP2 turbine building.

This well (MW-37) is on the west side of the discharge canal. Three wells in phase 2 are already under construction.

Monitoring Well Sample Results. The most recent test results from on-site wells have shown no appreciable change in tritium levels. On January 24, samples were collected from three surface water locations off-site. Sample results obtained from an off-site lab showed levels of tritium that are just at the limit of detection (500 pCi/L). All previous sample results from these locations have shown no detectable tritium activity. These locations are included in the routine environmental sampling program and have not previously indicated activity. Since these test results are inconsistent with previous samples and would not be expected due to the hydrologic model of ground water flow on site, Entergy has collected additional test samples from these locations and has sent them for tritium analysis at two different test labs. These results should be available early next week. It should be noted that these results are about 1/40th of EPA reference drinking water standards I and do not impact any public or private water supplies.

The NRC', New York State DEC, and Entergy will collect split samples from the phase 1 wells and possibly off-site locations next week.

Date Location Tritium Results (pCVL) 1/24/06 Gypsum plant out-fall 390

l John White - IPEC Staitus report Feb-. 2

'Page 31 John White-IPEC Status reDort Feb. 2 Paqe 31 1/24/06 Trap Rcck Quarry 510 1/24/06 Algonquin Creek outfall 409 Hydrologic model. The current model of ground water flow at Indian Point appears to indicate that water movement on site is heavily influenced by the excavation and construction activities, which occurred when the plants were built in the 1950's-1 970's. Wells installed on the north and south ends of the site show water levels at higher elevations than found in the transformer yard and IP2 spent fuel pool areas.

There appears to be a hydrostatic pressure gradient which would contain ground water on site and create a reservoir effect on site and limit flow of water off-site. The dominant flow pattern on site is toward the discharge canal and the Hudson River.

The phase 2 investigation should help confirm and provide additional detail for these preliminary conclusions.

Updated Dry Cask Storage Factsheets Available Entergy has produced an updated informational brochure, available in electronic and hardcopy format that explains the details of dry cask storage. Contact Andrea Blizard at 914-271-7081 or by return email at kmcmull~entergy.com mailto:kmcmull@entergy.com> for a copy.

Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.

If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.

lJohn White-TEXT.htin Page1 Indian Point Energy Center Status Report February 2, 2006 Operational Status Indian Point Unit 2 is operating at 100% and has been online 42 days.

Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 121 day;.

Update on Tritium Investigation Spent fuel pool liner inspection. A coating material has been evaluated and approved for coating/repair to the stainless steel liner in the IP2 spent fuel pool. A video inspection of the liner previously identified six areas where there were potential flaws.

Three of these areas have been inspected and vacuum box tested. The remaining three areas on the north and west walls of the spent fuel pool will be tested by divers and all six locations coated.

Well installation. The last well in the phase 1 drilling is being installed in the IP2 turbine building. This well (MW-37) is on the west side of the discharge canal. Three wells in phase 2 are already under construction.

Monitoring Well Sample Results. The most recent test results from on-site wells have shown no appreciable change in tritium levels. On January 24, samples were collected from three surface water locations off-site. Sample results obtained from an off-site lab showed levels of tritium that are just at the limit of detection (500 pCi/L). All previous sample results from these locations have shown no detectable tritium activity.

These locations are included in the routine environmental sampling program and have not previously indicated activity. Since these test results are inconsistent with previous samples and would not be expected due to the hydrologic model of ground water flow on site, Entergy has collected additional test samples from these locations and has sent them for tritium analysis at two different test labs. These results should be available early next week. It should be noted that these results are about 1/40th of EPA reference drinking water standards and do not impact any public or private water supplies.

[ J-6116 Wfiite___-_TEXT.htrn Page 2 I John White - TEXT.htrn Paqe 2 The NRC, New York State DEC, and Entergy will collect split samples from the phase 1 wells and possibly off-site locations next week.

Date Location Tritium Results (pCi/L) 1/24/06 Gypsum plant out-fall 390 1/24/O6 rap Rock Quarry 510 1/24/06 Algonquin Creek outfall 409 Hydrologic model. The current model of ground water flow at Indian Point appears to indicate that water movement on site is heavily influenced by the excavation and construction activities, which occurred when the plants were built in the 1950's-1970's. Wells installed on the north and south ends of the site show water levels at higher elevations than found in the transformer yard and IP2 spent fuel pool areas.

There appears to be a hydrostatic pressure gradient which would contain ground water on site and create a reservoir effect on site and limit flow of water off-site. The dominant flow pattern on site is toward the discharge canal and the Hudson River.

The phase 2 investigation should help confirm and provide additional detail for these preliminary conclusions.

Updated Dry Cask Storage Factsheets Available Entergy has produced an updated informational brochure, available in electronic and hardcopy format that explains the details of dry cask storage. Contact Andrea Blizard at 914-271-7081 or by return email at kmcmull3enterpv.com for a copy.

Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.

John White - TEXT.htrn Page 3 If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.