{{#Wiki_filter:Page 1 of 2                                                                                      Robinson 08/30/2006    15:40:16                                                                Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                      on Site       Start    End              Type 2515/169       - TI 2515/169 - MSPI VERIFICATION                                                                           1 2            IP 2515/169              Mitigating Systems Performance Index Verification                                                    08/01/2006 12/31/2006 Safety Issues DRP/BR4       - PI&R                                                                                                     3 2            IP 71152B                Identification and Resolution of Problems                                                            10/02/2006 10/20/2006 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                                         5 2               V23242               ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES                                                     01/08/2007 01/12/2007 Not Applicable PSB1-RP        - RP PUBLIC INSPECTION                                                                                      3 2           IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                       01/08/2007 01/12/2007 Baseline Inspections 2           IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             01/08/2007 01/12/2007 Baseline Inspections 2           IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P             01/08/2007 01/12/2007 Baseline Inspections 2           IP 71151                Performance Indicator Verification                                                                   01/08/2007 01/12/2007 Baseline Inspections OL EXAM        - INITIAL EXAM                                                                                              5 2               V23242               ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES                                                     02/05/2007 02/16/2007 Not Applicable OL RQ         - REQUAL INSPECTION                                                                                         3 2            IP 7111111B              Licensed Operator Requalification Program                                                            02/26/2007 03/02/2007 Baseline Inspections EB3-ISI       - U2 INSERVICE INSPECTION                                                                                   1 2            IP 7111108P              Inservice Inspection Activities - PWR                                                                04/16/2007 04/20/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE INSP                                                                             2 2            IP 7112101              Access Control to Radiologically Significant Areas                                                   04/16/2007 04/20/2007 Baseline Inspections 2           IP 7112102              ALARA Planning and Controls                                                                         04/16/2007 04/20/2007 Baseline Inspections 2           IP 71151                Performance Indicator Verification                                                                   04/16/2007 04/20/2007 Baseline Inspections EB3SGISI       - U2 STEAM GENERATOR ISI                                                                                   1 2            IP 7111108P              Inservice Inspection Activities - PWR                                                                04/23/2007 04/27/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)                                                                         2 2            IP 71111                Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity                             04/29/2007 05/04/2007 Baseline Inspections PS2-EP         - EP INSP                                                                                                   1 2            IP 71151                Performance Indicator Verification                                                                  06/25/2007 06/29/2007 Baseline Inspections EB1-CDB       - COMPONENT DESIGN BASES INSPECTION                                                                         6 2            IP 7111121              Component Design Bases Inspection                                                                    06/25/2007 06/29/2007 Baseline Inspections 2           IP 7111121              Component Design Bases Inspection                                                                   07/16/2007 07/20/2007 Baseline Inspections 2           IP 7111121              Component Design Bases Inspection                                                                   07/30/2007 08/03/2007 Baseline Inspections 2           IP 7111121              Component Design Bases Inspection                                                                   08/13/2007 08/17/2007 Baseline Inspections 60855.1       - OPERATIONAL ISFSI INSPECTION BY RESIDENT                                                                 1 2           IP 60855.1               Operation of an Independent Spent Fuel Storage Installation at Operating Plants                     07/09/2007 07/13/2007 Other Routine This report does not include INPO and OUTAGE activities.                                                                                                 Enclosure This report shows only on-site and announced inspection procedures.
{{#Wiki_filter:Robinson Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 15:40:16 Report 22 1
2515/169
- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 2
2515/169 IP Mitigating Systems Performance Index Verification 3
DRP/BR4
- PI&R Baseline Inspections 10/02/2006 10/20/2006 2
71152B IP Identification and Resolution of Problems 5
OL PREP
- INITIAL EXAM PREP Not Applicable 01/08/2007 01/12/2007 2
V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3
PSB1-RP
- RP PUBLIC INSPECTION Baseline Inspections 01/08/2007 01/12/2007 2
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/08/2007 01/12/2007 2
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 01/08/2007 01/12/2007 2
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 01/08/2007 01/12/2007 2
71151 IP Performance Indicator Verification 5
OL EXAM
- INITIAL EXAM Not Applicable 02/05/2007 02/16/2007 2
V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3
OL RQ
- REQUAL INSPECTION Baseline Inspections 02/26/2007 03/02/2007 2
7111111B IP Licensed Operator Requalification Program 1
EB3-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 04/16/2007 04/20/2007 2
7111108P IP Inservice Inspection Activities - PWR 2
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP Baseline Inspections 04/16/2007 04/20/2007 2
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/16/2007 04/20/2007 2
7112102 IP ALARA Planning and Controls Baseline Inspections 04/16/2007 04/20/2007 2
71151 IP Performance Indicator Verification 1
EB3SGISI
- U2 STEAM GENERATOR ISI Baseline Inspections 04/23/2007 04/27/2007 2
7111108P IP Inservice Inspection Activities - PWR 2
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Baseline Inspections 04/29/2007 05/04/2007 2
71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 1
PS2-EP
- EP INSP Baseline Inspections 06/25/2007 06/29/2007 2
71151 IP Performance Indicator Verification 6
EB1-CDB
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 06/25/2007 06/29/2007 2
7111121 IP Component Design Bases Inspection Baseline Inspections 07/16/2007 07/20/2007 2
7111121 IP Component Design Bases Inspection Baseline Inspections 07/30/2007 08/03/2007 2
7111121 IP Component Design Bases Inspection Baseline Inspections 08/13/2007 08/17/2007 2
7111121 IP Component Design Bases Inspection 1
60855.1
- OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 2
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure


Page 2 of 2                                                                                Robinson 08/30/2006    15:40:16                                                          Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                      No. of Staff   Planned Dates        Inspection Number      Inspection Activity                                              Title                        on Site       Start    End            Type TFP           - TRIENNIAL FP - INFO TRIP                                                             5 2            IP 7111105T              Fire Protection [Triennial]                                                      10/02/2007 10/04/2007 Baseline Inspections TFP            - TRIENNIAL FIRE PROTECTION INSP                                                        5 2           IP 7111105T              Fire Protection [Triennial]                                                     10/22/2007 10/26/2007 Baseline Inspections 2           IP 7111105T              Fire Protection [Triennial]                                                     11/05/2007 11/09/2007 Baseline Inspections PS2-EP         - EP EXERCISE                                                                           2 2            IP 7111401              Exercise Evaluation                                                             12/03/2007 12/07/2007 Baseline Inspections 2           IP 7111404              Emergency Action Level and Emergency Plan Changes                               12/03/2007 12/07/2007 Baseline Inspections 2           IP 71151-EP01           Drill/Exercise Performance                                                       12/03/2007 12/07/2007 Baseline Inspections 2           IP 71151-EP02           ERO Drill Participation                                                         12/03/2007 12/07/2007 Baseline Inspections 2           IP 71151-EP03           Alert & Notification System                                                     12/03/2007 12/07/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
Robinson Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 15:40:16 Report 22 5
TFP
- TRIENNIAL FP - INFO TRIP Baseline Inspections 10/02/2007 10/04/2007 2
7111105T IP Fire Protection [Triennial]
5 TFP
- TRIENNIAL FIRE PROTECTION INSP Baseline Inspections 10/22/2007 10/26/2007 2
7111105T IP Fire Protection [Triennial]
Baseline Inspections 11/05/2007 11/09/2007 2
7111105T IP Fire Protection [Triennial]
2 PS2-EP
- EP EXERCISE Baseline Inspections 12/03/2007 12/07/2007 2
7111401 IP Exercise Evaluation Baseline Inspections 12/03/2007 12/07/2007 2
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/03/2007 12/07/2007 2
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 12/03/2007 12/07/2007 2
71151-EP02 IP ERO Drill Participation Baseline Inspections 12/03/2007 12/07/2007 2
71151-EP03 IP Alert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 07:11, 15 January 2025

Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/08
ML062430442
Person / Time
Site: Robinson, 07200003, 07200060  
Issue date: 08/31/2006
From: Binoy Desai
NRC/RGN-II/DRP/RPB4
To: Walt T
Carolina Power & Light Co
Shared Package
ML062430434 List:
References
Download: ML062430442 (2)


Text

Robinson Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 15:40:16 Report 22 1

2515/169

- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 2

2515/169 IP Mitigating Systems Performance Index Verification 3

DRP/BR4

- PI&R Baseline Inspections 10/02/2006 10/20/2006 2

71152B IP Identification and Resolution of Problems 5

OL PREP

- INITIAL EXAM PREP Not Applicable 01/08/2007 01/12/2007 2

V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3

PSB1-RP

- RP PUBLIC INSPECTION Baseline Inspections 01/08/2007 01/12/2007 2

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/08/2007 01/12/2007 2

7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 01/08/2007 01/12/2007 2

7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 01/08/2007 01/12/2007 2

71151 IP Performance Indicator Verification 5

OL EXAM

- INITIAL EXAM Not Applicable 02/05/2007 02/16/2007 2

V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3

OL RQ

- REQUAL INSPECTION Baseline Inspections 02/26/2007 03/02/2007 2

7111111B IP Licensed Operator Requalification Program 1

EB3-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 04/16/2007 04/20/2007 2

7111108P IP Inservice Inspection Activities - PWR 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP Baseline Inspections 04/16/2007 04/20/2007 2

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/16/2007 04/20/2007 2

7112102 IP ALARA Planning and Controls Baseline Inspections 04/16/2007 04/20/2007 2

71151 IP Performance Indicator Verification 1

EB3SGISI

- U2 STEAM GENERATOR ISI Baseline Inspections 04/23/2007 04/27/2007 2

7111108P IP Inservice Inspection Activities - PWR 2

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Baseline Inspections 04/29/2007 05/04/2007 2

71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 1

PS2-EP

- EP INSP Baseline Inspections 06/25/2007 06/29/2007 2

71151 IP Performance Indicator Verification 6

EB1-CDB

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 06/25/2007 06/29/2007 2

7111121 IP Component Design Bases Inspection Baseline Inspections 07/16/2007 07/20/2007 2

7111121 IP Component Design Bases Inspection Baseline Inspections 07/30/2007 08/03/2007 2

7111121 IP Component Design Bases Inspection Baseline Inspections 08/13/2007 08/17/2007 2

7111121 IP Component Design Bases Inspection 1

60855.1

- OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 2

60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Robinson Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 15:40:16 Report 22 5

TFP

- TRIENNIAL FP - INFO TRIP Baseline Inspections 10/02/2007 10/04/2007 2

7111105T IP Fire Protection [Triennial]

5 TFP

- TRIENNIAL FIRE PROTECTION INSP Baseline Inspections 10/22/2007 10/26/2007 2

7111105T IP Fire Protection [Triennial]

Baseline Inspections 11/05/2007 11/09/2007 2

7111105T IP Fire Protection [Triennial]

2 PS2-EP

- EP EXERCISE Baseline Inspections 12/03/2007 12/07/2007 2

7111401 IP Exercise Evaluation Baseline Inspections 12/03/2007 12/07/2007 2

7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/03/2007 12/07/2007 2

71151-EP01 IP Drill/Exercise Performance Baseline Inspections 12/03/2007 12/07/2007 2

71151-EP02 IP ERO Drill Participation Baseline Inspections 12/03/2007 12/07/2007 2

71151-EP03 IP Alert & Notification System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.