| number = ML080080329
| number = ML080080329
| issue date = 01/04/2008
| issue date = 01/04/2008
| title = Ltr 01/04/08 LaSalle Notification of NRC Inspection and Request for Information
| title = Notification of NRC Inspection and Request for Information
| author name = Hills D E
| author name = Hills D
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1
| addressee name = Pardee C G
| addressee name = Pardee C
| addressee affiliation = Exelon Generation Co, LLC
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000373, 05000374
| docket = 05000373, 05000374
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:January 4, 2008  
{{#Wiki_filter:January 4, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555  
 
Mr. Charles G. Pardee  
 
Chief Nuclear Officer and  
 
Senior Vice President
 
Exelon Generation Company, LLC  
 
4300 Winfield Road  
 
Warrenville IL 60555  


==SUBJECT:==
==SUBJECT:==
Line 33: Line 21:


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
On February 11, 2008, the NRC will begin the Baseline Inservice Inspection (NRC Inspection Procedure (IP) 71111.08) at the LaSalle Nuclear Power Station, Unit 1. This inspection is scheduled to be performed February 11 through February 14, 2008.
Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your resources and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection.
These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. P. Holland, of your organization. If there are any questions about this inspection or the material requested, please contact the inspector Mr. J. Jandovitz at (630) 829-9763.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's


On February 11, 2008, the NRC will begin the Baseline Inservice Inspection (NRC Inspection
C. Pardee document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Procedure (IP) 71111.08) at the LaSalle Nuclear Power Station, Unit 1. This inspection is
 
scheduled to be performed February 11 through February 14, 2008.
 
Experience has shown that this inspection is resource intensive both for the NRC inspector and
 
your staff. In order to minimize the impact to your resources and to ensure a productive
 
inspection for both sides, we have enclosed a request for documents needed for this inspection.
 
These documents have been divided into two groups. The first group identifies information
 
necessary to ensure that the inspector is adequately prepared. The second group identifies the
 
information the inspector will need upon arrival at the site. It is important that all of these
 
documents are up to date and complete in order to minimize the number of additional
 
documents requested during the preparation and/or the portions of the inspection.
 
We have discussed the schedule for these inspection activities with your staff and understand
 
that our regulatory contact for this inspection will be Mr. P. Holland, of your organization. If
 
there are any questions about this inspection or the material requested, please contact the
 
inspector Mr. J. Jandovitz at (630) 829-9763.
 
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and
 
its enclosure will be available electronically for public inspection in the NRC Public
 
Document Room or from the Publicly Av ailable Records (PARS) component of NRC's 
 
C. Pardee    
 
document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
 
Sincerely,  
Sincerely,  
/RA/
/RA/
David Hills, Chief Engineering Branch 1 Division of Reactor Safety
David Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18  
 
Docket Nos. 50-373; 50-374  
 
License Nos. NPF-11; NPF-18  


==Enclosure:==
==Enclosure:==
INSERVICE INSPECTION DOCUMENT REQUEST  
INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl:
 
Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission  
cc w/encl: Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission  
 
C. Pardee     
 
document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


C. Pardee document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,  
Sincerely,  
/RA/         David Hills, Chief Engineering Branch 1 Division of Reactor Safety
/RA/
 
David Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18  
Docket Nos. 50-373; 50-374  
 
License Nos. NPF-11; NPF-18  


==Enclosure:==
==Enclosure:==
INSERVICE INSPECTION DOCUMENT REQUEST  
INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl:
 
Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission DOCUMENT NAME: Ltr 01__08 LaSalle ISI RFI JSJ.doc To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII C RIII N RIII N
cc w/encl: Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission  
NAME JJandovitz: jb DHills DATE 01/04/08 01/04/08 OFFICIAL RECORD COPY


DOCUMENT NAME:  Ltr 01__08 LaSalle ISI RFI JSJ.doc To receive a copy of this document, indicate in the box:
Letter to Charles G. Pardee from David E. Hills dated January 4, 2008.  
  "C" = Copy without attachment/enclosure  "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII C RIII NRIII N  NAME JJandovitz:  jb DHills  DATE 01/04/08 01/04/08 OFFICIAL RECORD COPY
 
Letter to Charles G. Pardee from David E. Hills dated January 4, 2008                           .  


==SUBJECT:==
==SUBJECT:==
LASALLE NUCLEAR POWER STATION, UNIT 1 NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION  
LASALLE NUCLEAR POWER STATION, UNIT 1 NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:
RAG1 TEB SPS1 RidsNrrDirsIrib MAS KGO JKH3 DEK CAA1 LSL (electronic IRs only)
C. Pederson, DRP (hard copy - IRs only)
DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)


DISTRIBUTION:
INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 1
RAG1 TEB SPS1 RidsNrrDirsIrib
Inspection Dates:
February 11 through February 14, 2008 Inspection Procedure:
IP 71111.08, Inservice Inspection (ISI) Activities Inspector:
John Jandovitz, (630) 829-9763 A
ISI/Welding Programs and Schedule Information The following information (electronic copy - CD ROM if possible) is requested by January 30, 2008, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on-site to your staff.
We request that the specific items selected from the lists be available and ready for review on the first day of inspection. If you have any questions regarding this information, please call the inspector as soon as possible.
: 1.
A detailed schedule (including preliminary dates) of:
: a.
Nondestructive examinations (NDEs) planned for Class 1 and 2 Systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs during the upcoming outage.
Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400 (Do not provide separately if other documentation requested contains this information)
: b.
A copy of the NDE procedures used to perform the examinations identified in above (including calibration procedures). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers).
: c.
Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs)
: d.
A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.


MAS KGO JKH3 DEK CAA1 LSL (electronic IR's only)
INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 2
 
: e.
C. Pederson, DRP (hard copy - IR's only)
A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual VT-1, VT-2, and VT-3), which have identified recordable indications (geometric or flaw) on Code Class 1 and 2 Systems, since the beginning of the last refueling outage. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.
 
: f.
DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 Systems, which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.
 
: g.
INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 1 Inspection Dates:  February 11 through February 14, 2008
If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.
 
: h.
Inspection Procedure:  IP 71111.08, "Inservice Inspection (ISI) Activities"
Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
 
: i.
Inspector:  John Jandovitz, (630) 829-9763
A list of any temporary non-code repairs in service (e.g., pinhole leaks).
 
: j.
A ISI/Welding Programs and Schedule Information The following information (electronic copy - CD ROM if possible) is requested by
Provide copies of the most recent self-assessments for the ISI, Welding, and Augmented ISI Programs.
 
: k.
January 30, 2008, to facilitate the selection of specific items that will be reviewed during
A list of training, and respective schedules, required to observe these examinations; (e.g., confined space, scaffolding, fall protection, etc.).
 
: 2.
the on-site inspection week. The inspector will select specific items from the information
Additional information related to all ISI activities a
 
A list with a brief description of ISI related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage. For example, a list based upon data base searches using key words related to piping such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, or errors in piping.
requested below and request a list of additional documents needed on-site to your staff. 
 
We request that the specific items selected from the lists be available and ready for
 
review on the first day of inspection. If you have any questions regarding this
 
information, please call the inspector as soon as possible.
: 1. A detailed schedule (including preliminary dates) of:
: a. Nondestructive examinations (NDEs) planned for Class 1 and 2 Systems and containment, performed as part of your ASME Section XI, Risk Informed (if
 
applicable), and augmented ISI Programs during the upcoming outage.
* Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400 (Do not provide separately if other documentation
 
requested contains this information)
: b. A copy of the NDE procedures used to perform the examinations identified in above (including calibration procedures). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide documentation supporting the procedure qualification (e.g., the EPRI
 
performance demonstration qualification summary sheets). Also, include
 
documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers). 
: c. Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs)
: d. A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above. 
 
INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 2e. A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual VT-1, VT-2, and VT-3), which have identified recordable indications (geometric or flaw) on Code Class 1 and 2 Systems, since the beginning of the
 
last refueling outage. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.  
: f. A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 Systems, which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.
: g. If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to  
 
be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these  
 
examinations.  
: h. Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the  
 
last refueling outage.  
: i. A list of any temporary non-code repairs in service (e.g., pinhole leaks).  
: j. Provide copies of the most recent self-assessments for the ISI, Welding, and Augmented ISI Programs.
: k. A list of training, and respective schedules, required to observe these examinations; (e.g., confined space, scaffolding, fall protection, etc.).  
: 2. Additional information related to all ISI activities a A list with a brief description of ISI related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling  
 
outage. For example, a list based upon data base searches using key words related to piping such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, or errors in piping.
b Please provide names and phone numbers for the following program leads:
b Please provide names and phone numbers for the following program leads:
* ISI contacts (Examination, planning)
ISI contacts (Examination, planning)
* Containment Exams
Containment Exams Snubbers and Supports Repair and Replacement Program Manager Licensing Contact Site Welding Engineer  
* Snubbers and Supports
* Repair and Replacement Program Manager
* Licensing Contact
* Site Welding Engineer  


INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 3B. Information to be provided to the inspector at the entrance meeting (October 30, 2007):
INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 3
B.
Information to be provided to the inspector at the entrance meeting (October 30, 2007):
1 ISI/Welding Programs and Schedule Information
1 ISI/Welding Programs and Schedule Information
: a. Updated schedules for ISI/NDE activities, including planned welding activities, and schedule showing contingency repair plans, if available.  
: a.
: b. For ASME Class 1 and 2 welds selected by the inspector from the lists provided from Section A of this enclosure, please provide copies of the following  
Updated schedules for ISI/NDE activities, including planned welding activities, and schedule showing contingency repair plans, if available.
 
: b.
documentation for each subject weld:
For ASME Class 1 and 2 welds selected by the inspector from the lists provided from Section A of this enclosure, please provide copies of the following documentation for each subject weld:
* Weld data sheet (traveler)
Weld data sheet (traveler)
* Weld configuration and system location
Weld configuration and system location Applicable Code Edition and Addenda for weldment Applicable Code Edition and Addenda for welding procedures Applicable weld procedures (WPS) used to fabricate the welds Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v Copies of mechanical test reports identified in the PQRs above Copies of the nonconformance reports for the selected welds. (If Applicable)
* Applicable Code Edition and Addenda for weldment
Radiographs of the selected welds and access to equipment to allow viewing radiographs. (If RT was performed.)
* Applicable Code Edition and Addenda for welding procedures
Copies of the pre-service examination records for the selected welds.
* Applicable weld procedures (WPS) used to fabricate the welds
Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS. (At least six months prior to date subject work.)
* Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v
Copies of NDE personnel qualifications (VT, PT, UT, RT). As applicable
* Copies of mechanical test reports identified in the PQRs above
: c.
* Copies of the nonconformance reports for the selected welds. (If Applicable)
For the ISI related corrective action issues selected by the inspector from Section A of this enclosure, provide a copy of the corrective actions and supporting documentation.
* Radiographs of the selected welds and access to equipment to allow viewing radiographs. (If RT was performed.)
: d.
* Copies of the pre-service examination records for the selected welds.
For the NDE reports with recordable indications on Code Class 1 and 2 Systems selected by the inspector from Section A and above, provide a copy of the  
* Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the  
 
applicable welding processes specified in the WPS. (At least six months  
 
prior to date subject work.)
* Copies of NDE personnel qualifications (VT, PT, UT, RT).
As applicable
: c. For the ISI related corrective action issues selected by the inspector from Section A of this enclosure, provide a copy of the corrective actions and supporting  
 
documentation.  
: d. For the NDE reports with recordable indications on Code Class 1 and 2 Systems selected by the inspector from Section A and above, provide a copy of the
 
INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 4 examination records, examiner qualific ation records, and associated corrective action documents.
: e. A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval. 
: f. Provide documentation that the ISI Program Manager has reviewed NDE personnel certification records for personnel performing NDE during the current
 
refueling outage. Also, for each NDE UT examiner qualified to Appendix VII  and VIII, of Section XI, provide the records (with dates) for the most recent completion of their practical hands on training.
: g. Copy of the most recently completed Section XI reactor coolant system pressure test, documenting the results of VT-2 inspections.
: 2. Codes and Standards
: a. Ready access to: (i.e., copies provided to the inspector to use for the duration of the inspection at the inspection location, or room number and location where
 
available).
: b. Applicable editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program. 
 
If you have questions regarding any of the information requested, please contact the lead


inspector.}}
INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 4
examination records, examiner qualification records, and associated corrective action documents.
: e.
A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval.
: f.
Provide documentation that the ISI Program Manager has reviewed NDE personnel certification records for personnel performing NDE during the current refueling outage. Also, for each NDE UT examiner qualified to Appendix VII and VIII, of Section XI, provide the records (with dates) for the most recent completion of their practical hands on training.
: g.
Copy of the most recently completed Section XI reactor coolant system pressure test, documenting the results of VT-2 inspections.
: 2.
Codes and Standards
: a.
Ready access to: (i.e., copies provided to the inspector to use for the duration of the inspection at the inspection location, or room number and location where available).
: b.
Applicable editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program.
If you have questions regarding any of the information requested, please contact the lead inspector.}}

Latest revision as of 19:04, 14 January 2025

Notification of NRC Inspection and Request for Information
ML080080329
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/04/2008
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Pardee C
Exelon Generation Co
References
Download: ML080080329 (8)


Text

January 4, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555

SUBJECT:

LASALLE NUCLEAR POWER STATION, UNIT 1 NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Pardee:

On February 11, 2008, the NRC will begin the Baseline Inservice Inspection (NRC Inspection Procedure (IP) 71111.08) at the LaSalle Nuclear Power Station, Unit 1. This inspection is scheduled to be performed February 11 through February 14, 2008.

Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your resources and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection.

These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. P. Holland, of your organization. If there are any questions about this inspection or the material requested, please contact the inspector Mr. J. Jandovitz at (630) 829-9763.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's

C. Pardee document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl:

Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission

C. Pardee document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl:

Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission DOCUMENT NAME: Ltr 01__08 LaSalle ISI RFI JSJ.doc To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII C RIII N RIII N

NAME JJandovitz: jb DHills DATE 01/04/08 01/04/08 OFFICIAL RECORD COPY

Letter to Charles G. Pardee from David E. Hills dated January 4, 2008.

SUBJECT:

LASALLE NUCLEAR POWER STATION, UNIT 1 NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:

RAG1 TEB SPS1 RidsNrrDirsIrib MAS KGO JKH3 DEK CAA1 LSL (electronic IRs only)

C. Pederson, DRP (hard copy - IRs only)

DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 1

Inspection Dates:

February 11 through February 14, 2008 Inspection Procedure:

IP 71111.08, Inservice Inspection (ISI) Activities Inspector:

John Jandovitz, (630) 829-9763 A

ISI/Welding Programs and Schedule Information The following information (electronic copy - CD ROM if possible) is requested by January 30, 2008, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on-site to your staff.

We request that the specific items selected from the lists be available and ready for review on the first day of inspection. If you have any questions regarding this information, please call the inspector as soon as possible.

1.

A detailed schedule (including preliminary dates) of:

a.

Nondestructive examinations (NDEs) planned for Class 1 and 2 Systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs during the upcoming outage.

Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400 (Do not provide separately if other documentation requested contains this information)

b.

A copy of the NDE procedures used to perform the examinations identified in above (including calibration procedures). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers).

c.

Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs)

d.

A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.

INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 2

e.

A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual VT-1, VT-2, and VT-3), which have identified recordable indications (geometric or flaw) on Code Class 1 and 2 Systems, since the beginning of the last refueling outage. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.

f.

A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 Systems, which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.

g.

If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.

h.

Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.

i.

A list of any temporary non-code repairs in service (e.g., pinhole leaks).

j.

Provide copies of the most recent self-assessments for the ISI, Welding, and Augmented ISI Programs.

k.

A list of training, and respective schedules, required to observe these examinations; (e.g., confined space, scaffolding, fall protection, etc.).

2.

Additional information related to all ISI activities a

A list with a brief description of ISI related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage. For example, a list based upon data base searches using key words related to piping such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, or errors in piping.

b Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams Snubbers and Supports Repair and Replacement Program Manager Licensing Contact Site Welding Engineer

INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 3

B.

Information to be provided to the inspector at the entrance meeting (October 30, 2007):

1 ISI/Welding Programs and Schedule Information

a.

Updated schedules for ISI/NDE activities, including planned welding activities, and schedule showing contingency repair plans, if available.

b.

For ASME Class 1 and 2 welds selected by the inspector from the lists provided from Section A of this enclosure, please provide copies of the following documentation for each subject weld:

Weld data sheet (traveler)

Weld configuration and system location Applicable Code Edition and Addenda for weldment Applicable Code Edition and Addenda for welding procedures Applicable weld procedures (WPS) used to fabricate the welds Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v Copies of mechanical test reports identified in the PQRs above Copies of the nonconformance reports for the selected welds. (If Applicable)

Radiographs of the selected welds and access to equipment to allow viewing radiographs. (If RT was performed.)

Copies of the pre-service examination records for the selected welds.

Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS. (At least six months prior to date subject work.)

Copies of NDE personnel qualifications (VT, PT, UT, RT). As applicable

c.

For the ISI related corrective action issues selected by the inspector from Section A of this enclosure, provide a copy of the corrective actions and supporting documentation.

d.

For the NDE reports with recordable indications on Code Class 1 and 2 Systems selected by the inspector from Section A and above, provide a copy of the

INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 4

examination records, examiner qualification records, and associated corrective action documents.

e.

A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval.

f.

Provide documentation that the ISI Program Manager has reviewed NDE personnel certification records for personnel performing NDE during the current refueling outage. Also, for each NDE UT examiner qualified to Appendix VII and VIII, of Section XI, provide the records (with dates) for the most recent completion of their practical hands on training.

g.

Copy of the most recently completed Section XI reactor coolant system pressure test, documenting the results of VT-2 inspections.

2.

Codes and Standards

a.

Ready access to: (i.e., copies provided to the inspector to use for the duration of the inspection at the inspection location, or room number and location where available).

b.

Applicable editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program.

If you have questions regarding any of the information requested, please contact the lead inspector.