ML080240085: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML080240085
| number = ML080240085
| issue date = 01/23/2008
| issue date = 01/23/2008
| title = Monticello - Tech Specs - Issuance of Amendment Two Inoperable Control Room Ventilation Subsystems Per TSTF-447
| title = Tech Specs - Issuance of Amendment Two Inoperable Control Room Ventilation Subsystems Per TSTF-447
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:Control Room Ventilation System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Control Room Ventilation System LCO 3.7.5 APPLICABILITY:
{{#Wiki_filter:Control Room Ventilation System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Control Room Ventilation System LCO 3.7.5 APPLICABILITY:
Two control room ventilation subsystems shall be OPERABLE.MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).  
Two control room ventilation subsystems shall be OPERABLE.
*ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One control room A.1 Restore control room 30 days ventilation subsystem ventilation subsystem to inoperable.
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
OPERABLE status.B. Two control room B.1 Verify control room area Once per 4 hours ventilation subsystems temperature  
* ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One control room A.1 Restore control room 30 days ventilation subsystem ventilation subsystem to inoperable.
< 90 0 F.inoperable.
OPERABLE status.
AND B.2 Restore one control room 72 hours ventilation subsystem to OPERABLE status.C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time of Condition A or B AND not met in MODE 1, 2, or 3. C.2 Be in MODE 4. 36 hours D. Required Action and -- ---------  
B. Two control room B.1 Verify control room area Once per 4 hours ventilation subsystems temperature < 90 0F.
------- NOTE ----------
inoperable.
associated Completion LCO 3.0.3 is not applicable.
AND B.2 Restore one control room 72 hours ventilation subsystem to OPERABLE status.
Time of Condition A not ---------------
C. Required Action and C.1 Be in MODE 3.
------........-------------...
12 hours associated Completion Time of Condition A or B AND not met in MODE 1, 2, or 3.
met during movement of recently irradiated fuel D. 1 Place OPERABLE control Immediately assemblies in the room ventilation subsystem secondary containment in operation.
C.2 Be in MODE 4.
or during OPDRVs.Monticello 3.7.5-1 Amendment No. 146,1-48, 154 Control Room Ventilation System 3.7.5 ACTIONS (continued)
36 hours D. Required Action and --
NOTE associated Completion LCO 3.0.3 is not applicable.
Time of Condition A not met during movement of recently irradiated fuel D. 1 Place OPERABLE control Immediately assemblies in the room ventilation subsystem secondary containment in operation.
or during OPDRVs.
Monticello 3.7.5-1 Amendment No. 146,1-48, 154
 
Control Room Ventilation System 3.7.5 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME OR D.2.1 Suspend movement of Immediately recently irradiated fuel assemblies in the secondary containment.
CONDITION REQUIRED ACTION COMPLETION TIME OR D.2.1 Suspend movement of Immediately recently irradiated fuel assemblies in the secondary containment.
AND D.2.2 Initiate action to suspend Immediately OPDRVs.E. Required Action and ---..-----
AND D.2.2 Initiate action to suspend Immediately OPDRVs.
NOTE --------associated Completion LCO 3.0.3 is not applicable.
E. Required Action and NOTE associated Completion LCO 3.0.3 is not applicable.
Tim e of Condition B not ----------
Tim e of Condition B not met during movement of recently irradiated fuel E.1 Suspend movement of Immediately assemblies in the recently irradiated fuel secondary containment assemblies in the or during OPDRVs.
.- ....... ................--
secondary containment.
------met during movement of recently irradiated fuel E.1 Suspend movement of Immediately assemblies in the recently irradiated fuel secondary containment assemblies in the or during OPDRVs. secondary containment.
AND E.2 Initiate actions to suspend Immediately OPDRVs.
AND E.2 Initiate actions to suspend Immediately OPDRVs.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.5.1 Verify'each control room ventilation subsystem has 24 months the capability to remove the assumed heat load.Monticello 3.7.5-2 Amendment No. 4,6, !48,154}}
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.5.1 Verify'each control room ventilation subsystem has 24 months the capability to remove the assumed heat load.
Monticello 3.7.5-2 Amendment No. 4,6, !48,154}}

Latest revision as of 18:34, 14 January 2025

Tech Specs - Issuance of Amendment Two Inoperable Control Room Ventilation Subsystems Per TSTF-447
ML080240085
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/23/2008
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Peter Tam, NRR/DORL 415-1451
Shared Package
ML080240068 List:
References
TAC MD6770
Download: ML080240085 (2)


Text

Control Room Ventilation System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Control Room Ventilation System LCO 3.7.5 APPLICABILITY:

Two control room ventilation subsystems shall be OPERABLE.

MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One control room A.1 Restore control room 30 days ventilation subsystem ventilation subsystem to inoperable.

OPERABLE status.

B. Two control room B.1 Verify control room area Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ventilation subsystems temperature < 90 0F.

inoperable.

AND B.2 Restore one control room 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ventilation subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or B AND not met in MODE 1, 2, or 3.

C.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D. Required Action and --

NOTE associated Completion LCO 3.0.3 is not applicable.

Time of Condition A not met during movement of recently irradiated fuel D. 1 Place OPERABLE control Immediately assemblies in the room ventilation subsystem secondary containment in operation.

or during OPDRVs.

Monticello 3.7.5-1 Amendment No. 146,1-48, 154

Control Room Ventilation System 3.7.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME OR D.2.1 Suspend movement of Immediately recently irradiated fuel assemblies in the secondary containment.

AND D.2.2 Initiate action to suspend Immediately OPDRVs.

E. Required Action and NOTE associated Completion LCO 3.0.3 is not applicable.

Tim e of Condition B not met during movement of recently irradiated fuel E.1 Suspend movement of Immediately assemblies in the recently irradiated fuel secondary containment assemblies in the or during OPDRVs.

secondary containment.

AND E.2 Initiate actions to suspend Immediately OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.5.1 Verify'each control room ventilation subsystem has 24 months the capability to remove the assumed heat load.

Monticello 3.7.5-2 Amendment No. 4,6, !48,154