| issue date = 01/30/2008
| issue date = 01/30/2008
| title = Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) 05000440-08-006 (DRS)
| title = Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) 05000440-08-006 (DRS)
| author name = Stone A M
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Allen B S
| addressee name = Allen B
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000440
| docket = 05000440
Line 13: Line 13:
| page count = 9
| page count = 9
}}
}}
See also: [[followed by::IR 05000440/2008006]]
See also: [[see also::IR 05000440/2008006]]


=Text=
=Text=
{{#Wiki_filter:January 30, 2008  
{{#Wiki_filter:January 30, 2008  
  Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant  
P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH  44081-0097  
  SUBJECT: PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION  
Mr. Barry S. Allen  
Site Vice President  
FirstEnergy Nuclear Operating Company  
Perry Nuclear Power Plant  
P. O. Box 97, 10 Center Road, A-PY-290  
Perry, OH  44081-0097  
   
SUBJECT:  
PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN  
NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION  
(CDBI) 05000440/2008006(DRS)  
(CDBI) 05000440/2008006(DRS)  
Dear Mr. Allen:
On May 5, 2008, the NRC will begin a triennial baseline Component Design Bases Inspection
(CDBI) at the Perry Nuclear Power Plant.  A team of six inspectors will perform this 3-week inspection.  This inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.21. 
The CDBI inspection focuses on components that have high risk and low design margins.  The
components to be reviewed during this baseline inspection will be identified during an in-office preparation week prior to the first week of the on-site inspection.  In addition, a number of risk significant operator actions and operating experience issues, associated with the component samples, will also be selected for review. 
   
   
The inspection will include three weeks on-site, including the information gathering during the first on-site week.  The inspection team will consist of six NRC inspectors, of which five will focus on engineering and one on operations.  The current inspection schedule is as follows:   
Dear Mr. Allen:
  * On-site weeks:  May 5, 2008, through May 9, 2008;   May 19, 2008, through May 23, 2008; and   June 2, 2008, through June 6, 2008.  
On May 5, 2008, the NRC will begin a triennial baseline Component Design Bases Inspection
(CDBI) at the Perry Nuclear Power Plant.  A team of six inspectors will perform this
3-week inspection.  This inspection will be performed in accordance with NRC Baseline
Inspection Procedure (IP) 71111.21. 
The CDBI inspection focuses on components that have high risk and low design margins.  The
components to be reviewed during this baseline inspection will be identified during an in-office
preparation week prior to the first week of the on-site inspection.  In addition, a number of risk
significant operator actions and operating experience issues, associated with the component
samples, will also be selected for review. 
The inspection will include three weeks on-site, including the information gathering during the  
first on-site week.  The inspection team will consist of six NRC inspectors, of which five will  
focus on engineering and one on operations.  The current inspection schedule is as follows:   
   
*  
On-site weeks:  May 5, 2008, through May 9, 2008;  
May 19, 2008, through May 23, 2008; and
June 2, 2008, through June 6, 2008.
The team will be preparing for the inspection, mainly during the week of April 28, 2008, as
discussed in the attached enclosure.  A Region III Senior Reactor Analyst may accompany the
inspection team during the week of May 5, 2008, to review probabilistic risk assessment data,
and assist in identifying risk significant components, which will be reviewed during the
inspection.
Experience with previous baseline design inspections of similar depth and length has shown
that these type of inspections are extremely resource intensive, both for the NRC inspectors and
the licensee staff.  In order to minimize the inspection impact on the site and to ensure a
productive inspection for both parties, we have enclosed a request for information needed for
the inspection.  


The team will be preparing for the inspection, mainly during the week of April 28, 2008, as discussed in the attached enclosure.  A Region III Senior Reactor Analyst may accompany the inspection team during the week of May 5, 2008, to review probabilistic risk assessment data, and assist in identifying risk significant components, which will be reviewed during the
B. Allen  
inspection.
-2-  
Experience with previous baseline design inspections of similar depth and length has shown that these type of inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff.  In order to minimize the inspection impact on the site and to ensure a
   
productive inspection for both parties, we have enclosed a request for information needed for the inspection. 
It is important that all of these documents are up to date and complete in order to minimize the  
B. Allen -2-  
number of additional documents requested during the preparation and/or the on-site portions of  
  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of  
the inspection.  Insofar as possible, this information should be provided electronically to the lead  
the inspection.  Insofar as possible, this information should be provided electronically to the lead inspector.  The information request has been divided into three groups:  
inspector.  The information request has been divided into three groups:  
  * The first group lists information necessary for our initial inspection scoping activities.  This information should be provided to the lead inspector no later than March 24, 2008.  By April 11, 2008, the lead inspector will communicate the initial selected set of approximately 30 high risk components.   
   
  * The second group of documents requested are those items needed to support our in-office preparation activities.  This set of documents, including the calculations associated with the initial selected components, should be provided to the lead inspector at the Regional Office no later than April 23, 2008.  During the in-office preparation activities, the team may identify  
*  
The first group lists information necessary for our initial inspection scoping activities.   
This information should be provided to the lead inspector no later than March 24, 2008.  By  
April 11, 2008, the lead inspector will communicate the initial selected set of approximately  
30 high risk components.   
   
*  
The second group of documents requested are those items needed to support our in-office  
preparation activities.  This set of documents, including the calculations associated with the  
initial selected components, should be provided to the lead inspector at the Regional Office  
no later than April 23, 2008.  During the in-office preparation activities, the team may identify  
additional information needed to support the inspection.   
additional information needed to support the inspection.   
  * The last group includes the additional information above as well as plant specific reference material.  This information should be available to the team at Perry on May 5, 2008.  It is also requested that corrective action documents and/or questions developed during the  
   
*  
The last group includes the additional information above as well as plant specific reference  
material.  This information should be available to the team at Perry on May 5, 2008.  It is  
also requested that corrective action documents and/or questions developed during the  
inspection be provided to the lead inspector as the documents are generated.   
inspection be provided to the lead inspector as the documents are generated.   
  The lead inspector for this inspection is Dr. Stuart Sheldon.  We understand that our licensing contact for this inspection is Mr. Kenneth Russell of your organization.  If there are any questions about the inspection or the material requested in the enclosure, please contact the  
   
The lead inspector for this inspection is Dr. Stuart Sheldon.  We understand that our licensing  
contact for this inspection is Mr. Kenneth Russell of your organization.  If there are any  
questions about the inspection or the material requested in the enclosure, please contact the  
lead inspector at (630) 829-9727 or via e-mail at sns2@nrc.gov.  
lead inspector at (630) 829-9727 or via e-mail at sns2@nrc.gov.  
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
   
  Sincerely,  /RA/  Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety   
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
  Docket No. 50-440  
enclosure will be available electronically for public inspection in the NRC Public Document  
Room or from the Publicly Available Records (PARS) component of NRC's document system  
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the  
Public Electronic Reading Room).  
   
Sincerely,  
   
/RA/  
   
Ann Marie Stone, Chief  
Engineering Branch 2  
Division of Reactor Safety   
   
Docket No. 50-440  
License No. NPF-58  
License No. NPF-58  
  Enclosure: Component Design Bases Inspection (CDBI) Document Request  
   
  DISTRIBUTION
Enclosure:  
See next page   
Component Design Bases Inspection (CDBI) Document Request  
  B. Allen -2-  
   
DISTRIBUTION  
See next page  
 
   
B. Allen  
-2-  
   
   
It is important that all of these documents are up to date and complete in order to minimize the number of  
It is important that all of these documents are up to date and complete in order to minimize the number of  
Line 57: Line 133:
Insofar as possible, this information should be provided electronically to the lead inspector.  The  
Insofar as possible, this information should be provided electronically to the lead inspector.  The  
information request has been divided into three groups:  
information request has been divided into three groups:  
  * The first group lists information necessary for our initial inspection scoping activities.  This information should be provided to the lead inspector no later than March 24, 2008.  By April 11, 2008, the lead  
   
*  
The first group lists information necessary for our initial inspection scoping activities.  This information  
should be provided to the lead inspector no later than March 24, 2008.  By April 11, 2008, the lead  
inspector will communicate the initial selected set of approximately 30 high risk components.   
inspector will communicate the initial selected set of approximately 30 high risk components.   
  * The second group of documents requested are those items needed to support our in-office preparation activities.  This set of documents, including the calculations associated with the initial  
   
*  
The second group of documents requested are those items needed to support our in-office  
preparation activities.  This set of documents, including the calculations associated with the initial  
selected components, should be provided to the lead inspector at the Regional Office no later than  
selected components, should be provided to the lead inspector at the Regional Office no later than  
April 23, 2008.  During the in-office preparation activities, the team may identify additional information  
April 23, 2008.  During the in-office preparation activities, the team may identify additional information  
needed to support the inspection.   
needed to support the inspection.   
  * The last group includes the additional information above as well as plant specific reference material.  This information should be available to the team at Perry on May 5, 2008.  It is also requested that  
   
*  
The last group includes the additional information above as well as plant specific reference material.   
This information should be available to the team at Perry on May 5, 2008.  It is also requested that  
corrective action documents and/or questions developed during the inspection be provided to the lead  
corrective action documents and/or questions developed during the inspection be provided to the lead  
inspector as the documents are generated.   
inspector as the documents are generated.   
   
   
The lead inspector for this inspection is Dr. Stuart Sheldon.  We understand that our licensing contact for this inspection is Mr. Kenneth Russell of your organization.  If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9727  
The lead inspector for this inspection is Dr. Stuart Sheldon.  We understand that our licensing contact for  
this inspection is Mr. Kenneth Russell of your organization.  If there are any questions about the  
inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9727  
or via e-mail at sns2@nrc.gov.  
or via e-mail at sns2@nrc.gov.  
   
   
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure  
will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
will be available electronically for public inspection in the NRC Public Document Room or from the  
 
Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the  
Sincerely,  
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
  /RA/   
Sincerely,  
   
/RA/  
   
Ann Marie Stone, Chief  
Ann Marie Stone, Chief  
Engineering Branch 2  
Engineering Branch 2  
Division of Reactor Safety   
Division of Reactor Safety   
  Docket No. 50-440 License No. NPF-58  
   
Docket No. 50-440  
License No. NPF-58  
Enclosure:
Component Design Bases Inspection (CDBI) Document Request
DISTRIBUTION
See next page
G:\\DRS\\Work in Progress\\Ltr  01  08 Perry Request for Information SNS.doc
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence  box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copy
OFFICE: RIII
RIII
RIII
RIII
NAME:
SSheldon:  ls
AMStone
DATE:
01/28/08
01/30/08
OFFICIAL RECORD COPY


   
   
Enclosure: Component Design Bases Inspection (CDBI) Document Request
Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January  , 2008.
SUBJECT:  
PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN
NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION
(CDBI) 05000440/2008006(DRS)
cc w/encl:
J. Hagan, President and Chief Nuclear Officer - FENOC
J. Lash, Senior Vice President of Operations and
  Chief Operating Officer - FENOC
D. Pace, Senior Vice President, Fleet Engineering - FENOC
J. Rinckel, Vice President, Fleet Oversight - FENOC
Director, Fleet Regulatory Affairs - FENOC
Manager, Fleet Licensing - FENOC
Manager, Site Regulatory Compliance - FENOC
D. Jenkins, Attorney, FirstEnergy Corp.
Public Utilities Commission of Ohio
Ohio State Liaison Officer
R. Owen, Ohio Department of Health


   
   
DISTRIBUTION See next page
   
   
Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January  , 2008.
SUBJECT:
PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN
NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION
(CDBI) 05000440/2008006(DRS)
cc w/encl:
J. Hagan, President and Chief Nuclear Officer - FENOC
J. Lash, Senior Vice President of Operations and
  Chief Operating Officer - FENOC
D. Pace, Senior Vice President, Fleet Engineering - FENOC
J. Rinckel, Vice President, Fleet Oversight - FENOC
Director, Fleet Regulatory Affairs - FENOC
Manager, Fleet Licensing - FENOC
   
   
G:\DRS\Work in Progress\Ltr  01  08 Perry Request for Information SNS.doc  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive
   
To receive a copy of this document, indicate in the concurrence  box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
Manager, Site Regulatory Compliance - FENOC  
OFFICE: RIII  RIII  RIII  RIII  NAME: SSheldon:  ls AMStone  DATE: 01/28/08 01/30/08 
OFFICIAL RECORD COPY
  Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January  , 2008.
D. Jenkins, Attorney, FirstEnergy Corp.  
SUBJECT: PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI) 05000440/2008006(DRS)
cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC  J. Lash, Senior Vice President of Operations and    Chief Operating Officer - FENOC  D. Pace, Senior Vice President, Fleet Engineering - FENOC
   
  J. Rinckel, Vice President, Fleet Oversight - FENOC  Director, Fleet Regulatory Affairs - FENOC  Manager, Fleet Licensing - FENOC  Manager, Site Regulatory Compliance - FENOC   D. Jenkins, Attorney, FirstEnergy Corp.   Public Utilities Commission of Ohio  Ohio State Liaison Officer
Public Utilities Commission of Ohio  
  R. Owen, Ohio Department of Health
   
 
Ohio State Liaison Officer  
  Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January  , 2008.
  SUBJECT: PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI) 05000440/2008006(DRS)
  cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC  J. Lash, Senior Vice President of Operations and    Chief Operating Officer - FENOC
R. Owen, Ohio Department of Health  
  D. Pace, Senior Vice President, Fleet Engineering - FENOC  J. Rinckel, Vice President, Fleet Oversight - FENOC  Director, Fleet Regulatory Affairs - FENOC  Manager, Fleet Licensing - FENOC  Manager, Site Regulatory Compliance - FENOC  D. Jenkins, Attorney, FirstEnergy Corp.  Public Utilities Commission of Ohio  
  Ohio State Liaison Officer   R. Owen, Ohio Department of Health  
  DISTRIBUTION
DISTRIBUTION:
: RAG1 TJW2 TEB RidsNrrDirslpab  
RAG1  
TJW2  
TEB  
RidsNrrDirslpab  
JLC1   
JLC1   
GEG KGO RML2 SRI Perry  DRPIII  
GEG  
DRSIII  PLB1 TXN ROPreports@nrc.gov  
KGO  
RML2  
SRI Perry   
DRPIII  
DRSIII   
PLB1  
TXN  
ROPreports@nrc.gov  
   
   
     
 
   
 
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT  
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT  
COMPONENT DESING BASES INSPECTION (CDBI)
Enclosure
1 Inspection Report:  05000440/2008006(DRS)
   
   
  Inspection Dates:  May 5, 2008, through May 9, 2008;     May 19, 2008, through May 23, 2008; and     June 2, 2008, through June 6, 2008.  
COMPONENT DESING BASES INSPECTION (CDBI)
 
Enclosure
1
Inspection Report:
   
05000440/2008006(DRS)
Inspection Dates:  
   
May 5, 2008, through May 9, 2008;  
May 19, 2008, through May 23, 2008; and
June 2, 2008, through June 6, 2008.  
Inspection Procedure: 
IP 71111.21 Component Design Bases Inspection
Lead Inspector:
Stuart Sheldon, Lead Inspector 
(630) 829-9727 
sns2@nrc.gov
   
   
Inspection Procedure: IP 71111.21 "Component Design Bases Inspection"
I.
Information Requested Prior to the On-site Information Gathering/Inspection Week  
   
   
Lead Inspector:  Stuart Sheldon, Lead Inspector  (630) 829-9727      sns2@nrc.gov
The following information is requested by March 24, 2008, or sooner, to facilitate  
  I. Information Requested Prior to the On-site Information Gathering/Inspection Week
inspection preparation.  If you have any questions regarding this information, please call  
  The following information is requested by March 24, 2008, or sooner, to facilitate  
the team leader as soon as possible.  (Please provide the information electronically in  
inspection preparation.  If you have any questions regarding this information, please call the team leader as soon as possible.  (Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on CDROM.  The CDROM should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.  Information in "lists" should contain enough information to be easily understood by  
pdf files, Excel, or other searchable formats, preferably on CDROM.  The CDROM  
should contain descriptive names, and be indexed and hyperlinked to facilitate ease of  
use.  Information in lists should contain enough information to be easily understood by  
someone who has knowledge of boiling water reactor technology).  
someone who has knowledge of boiling water reactor technology).  
  1. Risk ranking of top 150 components from your site specific probabilistic safety analysis (PSA) sorted by Risk Achievement Worth (RAW).  Include values for Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)  
   
1.  
Risk ranking of top 150 components from your site specific probabilistic safety  
analysis (PSA) sorted by Risk Achievement Worth (RAW).  Include values for  
Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)  
(as applicable).  
(as applicable).  
  2. Provide a list of the top 200 cut-sets from your PSA.  
   
  3. Risk ranking of operator actions from your site specific PSA sorted by RAW.  
2.  
  Provide copies of your human reliability worksheets for these items.  
Provide a list of the top 200 cut-sets from your PSA.  
  4. If you have an External Events or Fire PSA Model, provide the information requested in Items 1 and 2 for external events and fire.  Provide narrative description of each coded event (including fire, flood zone description).  
   
  5. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal etc.).  
3.  
 
Risk ranking of operator actions from your site specific PSA sorted by RAW.  
 
   
Provide copies of your human reliability worksheets for these items.  
   
4.  
If you have an External Events or Fire PSA Model, provide the information  
requested in Items 1 and 2 for external events and fire.  Provide narrative  
description of each coded event (including fire, flood zone description).  
   
5.  
Any pre-existing evaluation or list of components and associated calculations  
with low design margins, (i.e., pumps closest to the design limit for flow or  
pressure, diesel generator close to design required output, heat exchangers  
close to rated design heat removal etc.).  
 
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT
COMPONENT DESING BASES INSPECTION (CDBI)
Enclosure
2
6.
List of available design (setup) margins for valves in the motor-operated valve
(MOV) and air-operated valve (AOV) programs.
7.
List of high risk Maintenance Rule systems/components based on engineering or
expert panel judgment.
8.
Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)
category.
9.
Site top ten issues list (if applicable). 
10.
A list of operating experience evaluations for the last 3 years.
11.
Information of any common cause failure of components experienced in the last
5 years at your facility.
12.
List of Root Cause Evaluations associated with component failures or design
issues initiated/completed in the last 5 years.
13.
Current management and engineering organizational chart.
14.
Electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical Requirements
Manual.
II.
Information requested (for the approx. 30 selected components) to be available by
April 23, 2008, (will be reviewed by the team in the Regional office during the week
of April 28, 2008).  This information should be separated for each selected
component, especially if provided electronically (e.g., folder with component
name that includes calculations, condition reports, maintenance history, etc).
1.
List of condition reports (corrective action documents) associated with each of
the selected components for the last 4 years.
2.
The corrective maintenance history associated with each of the selected
components for the last 4 years.
3.
Copies of calculations associated with each of the selected components (if not
previously provided), excluding data files.  Please review the calculations and
also provide copies of referenced material (such as drawings, engineering
requests, and vendor letters).
4.
System Health Reports, System Descriptions, and/or Design Basis Documents
that are associated with each of the selected components.
 
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT  
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT  
  COMPONENT DESING BASES INSPECTION (CDBI)  
   
  Enclosure
2 6. List of available design (setup) margins for valves in the motor-operated valve (MOV) and air-operated valve (AOV) programs.
COMPONENT DESIGN BASES INSPECTION (CDBI)  
  7. List of high risk Maintenance Rule systems/components based on engineering or expert panel judgment.
   
  8. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) category.
   
9. Site top ten issues list (if applicable). 
   
10. A list of operating experience evaluations for the last 3 years.
Enclosure
11. Information of any common cause failure of components experienced in the last 5 years at your facility.
3
12. List of Root Cause Evaluations associated with component failures or design issues initiated/completed in the last 5 years.
5.  
13. Current management and engineering organizational chart.
A list of modifications associated with each of the selected components.  
14. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual. II. Information requested (for the approx. 30 selected components) to be available by April 23, 2008, (will be reviewed by the team in the Regional office during the week of April 28, 2008).  This information should be separated for each selected component, especially if provided electronically (e.g., folder with component
6.  
name that includes calculations, condition reports, maintenance history, etc). 1. List of condition reports (corrective action documents) associated with each of the selected components for the last 4 years. 2. The corrective maintenance history associated with each of the selected components for the last 4 years. 3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files.  Please review the calculations and also provide copies of referenced material (such as drawings, engineering requests, and vendor letters). 4. System Health Reports, System Descriptions, and/or Design Basis Documents that are associated with each of the selected components.  
Copies of operability evaluations associated with each of the selected  
  INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT
   
  COMPONENT DESIGN BASES INSPECTION (CDBI)
components and plans for restoring operability, if applicable.  
  Enclosure
7.  
35. A list of modifications associated with each of the selected components. 6. Copies of operability evaluations associated with each of the selected  components and plans for restoring operability, if applicable. 7. Copies of selected operator work-around evaluations associated with each of the  selected components and plans for resolution, if applicable. 8. Copies of any open temporary modifications associated with each of the selected  components, if applicable. 9. Trend data on the selected electrical/mechanical components' performance for last 3 years (For example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., as applicable). 10. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection. 11. A copy of engineering/operations related audits completed in the last 2 years.  
Copies of selected operator work-around evaluations associated with each of the  
12. Provide list of PRA assumptions regarding operator actions and the associated procedures. III. Additional Information to be provided on May 5, 2008 on-site (for final 15 - 20 selected components)  
   
During the in-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection.  The lead inspector will provide a list of the additional information needed during the week of April 28, 2008.  IV. Information Requested to be provided throughout the inspection
selected components and plans for resolution, if applicable.  
  1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member). 3. One complete set of P&IDs and one line electrical drawings (paper copies). 4. Reference materials.  (make available if needed during all on-site weeks):  
8.  
  INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT  
Copies of any open temporary modifications associated with each of the selected  
  COMPONENT DESIGN BASES INSPECTION (CDBI)  
   
  Enclosure  
components, if applicable.  
4*  IPE/PRA report;  
9.  
*  Procurement documents for components selected (verify retrievable);  
Trend data on the selected electrical/mechanical components performance for  
*  Plant procedures (normal, abnormal, emergency, surveillance, etc.); and  
last 3 years (For example, pumps performance including in-service testing, other  
* Vendor manuals.  
vibration monitoring, oil sample results, etc., as applicable).  
  If you have questions regarding the information requested, please contact the lead inspector.
10.  
A copy of any internal/external self-assessments and associated corrective  
action documents generated in preparation for the inspection.  
11.  
A copy of engineering/operations related audits completed in the last 2 years.  
12.  
Provide list of PRA assumptions regarding operator actions and the associated  
procedures.  
III.  
Additional Information to be provided on May 5, 2008 on-site (for final 15 - 20  
selected components)
During the in-office preparation activities, the team will be making final selections and  
may identify additional information needed to support the inspection.  The lead inspector  
will provide a list of the additional information needed during the week of April 28, 2008.   
IV.  
Information Requested to be provided throughout the inspection  
1.  
Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.  
2.  
Copies of the list of questions submitted by the team members and the  
status/resolution of the information requested (provide daily during the inspection  
to each team member).  
3.  
One complete set of P&IDs and one line electrical drawings (paper copies).  
4.  
Reference materials.  (make available if needed during all on-site weeks):
 
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT  
COMPONENT DESIGN BASES INSPECTION (CDBI)  
Enclosure  
4
*  
   
IPE/PRA report;  
*  
   
Procurement documents for components selected (verify retrievable);  
*  
   
Plant procedures (normal, abnormal, emergency, surveillance, etc.); and  
*  
Vendor manuals.  
   
If you have questions regarding the information requested, please contact the lead inspector.
}}
}}

Latest revision as of 18:27, 14 January 2025

Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) 05000440-08-006 (DRS)
ML080310280
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/30/2008
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Allen B
FirstEnergy Nuclear Operating Co
References
Download: ML080310280 (9)


See also: IR 05000440/2008006

Text

January 30, 2008

Mr. Barry S. Allen

Site Vice President

FirstEnergy Nuclear Operating Company

Perry Nuclear Power Plant

P. O. Box 97, 10 Center Road, A-PY-290

Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN

NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION

(CDBI) 05000440/2008006(DRS)

Dear Mr. Allen:

On May 5, 2008, the NRC will begin a triennial baseline Component Design Bases Inspection

(CDBI) at the Perry Nuclear Power Plant. A team of six inspectors will perform this

3-week inspection. This inspection will be performed in accordance with NRC Baseline

Inspection Procedure (IP) 71111.21.

The CDBI inspection focuses on components that have high risk and low design margins. The

components to be reviewed during this baseline inspection will be identified during an in-office

preparation week prior to the first week of the on-site inspection. In addition, a number of risk

significant operator actions and operating experience issues, associated with the component

samples, will also be selected for review.

The inspection will include three weeks on-site, including the information gathering during the

first on-site week. The inspection team will consist of six NRC inspectors, of which five will

focus on engineering and one on operations. The current inspection schedule is as follows:

On-site weeks: May 5, 2008, through May 9, 2008;

May 19, 2008, through May 23, 2008; and

June 2, 2008, through June 6, 2008.

The team will be preparing for the inspection, mainly during the week of April 28, 2008, as

discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the

inspection team during the week of May 5, 2008, to review probabilistic risk assessment data,

and assist in identifying risk significant components, which will be reviewed during the

inspection.

Experience with previous baseline design inspections of similar depth and length has shown

that these type of inspections are extremely resource intensive, both for the NRC inspectors and

the licensee staff. In order to minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for information needed for

the inspection.

B. Allen

-2-

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than March 24, 2008. By

April 11, 2008, the lead inspector will communicate the initial selected set of approximately

30 high risk components.

The second group of documents requested are those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with the

initial selected components, should be provided to the lead inspector at the Regional Office

no later than April 23, 2008. During the in-office preparation activities, the team may identify

additional information needed to support the inspection.

The last group includes the additional information above as well as plant specific reference

material. This information should be available to the team at Perry on May 5, 2008. It is

also requested that corrective action documents and/or questions developed during the

inspection be provided to the lead inspector as the documents are generated.

The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our licensing

contact for this inspection is Mr. Kenneth Russell of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at (630) 829-9727 or via e-mail at sns2@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure:

Component Design Bases Inspection (CDBI) Document Request

DISTRIBUTION

See next page

B. Allen

-2-

It is important that all of these documents are up to date and complete in order to minimize the number of

additional documents requested during the preparation and/or the on-site portions of the inspection.

Insofar as possible, this information should be provided electronically to the lead inspector. The

information request has been divided into three groups:

The first group lists information necessary for our initial inspection scoping activities. This information

should be provided to the lead inspector no later than March 24, 2008. By April 11, 2008, the lead

inspector will communicate the initial selected set of approximately 30 high risk components.

The second group of documents requested are those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with the initial

selected components, should be provided to the lead inspector at the Regional Office no later than

April 23, 2008. During the in-office preparation activities, the team may identify additional information

needed to support the inspection.

The last group includes the additional information above as well as plant specific reference material.

This information should be available to the team at Perry on May 5, 2008. It is also requested that

corrective action documents and/or questions developed during the inspection be provided to the lead

inspector as the documents are generated.

The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our licensing contact for

this inspection is Mr. Kenneth Russell of your organization. If there are any questions about the

inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9727

or via e-mail at sns2@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure:

Component Design Bases Inspection (CDBI) Document Request

DISTRIBUTION

See next page

G:\\DRS\\Work in Progress\\Ltr 01 08 Perry Request for Information SNS.doc

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE: RIII

RIII

RIII

RIII

NAME:

SSheldon: ls

AMStone

DATE:

01/28/08

01/30/08

OFFICIAL RECORD COPY

Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January , 2008.

SUBJECT:

PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN

NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION

(CDBI) 05000440/2008006(DRS)

cc w/encl:

J. Hagan, President and Chief Nuclear Officer - FENOC

J. Lash, Senior Vice President of Operations and

Chief Operating Officer - FENOC

D. Pace, Senior Vice President, Fleet Engineering - FENOC

J. Rinckel, Vice President, Fleet Oversight - FENOC

Director, Fleet Regulatory Affairs - FENOC

Manager, Fleet Licensing - FENOC

Manager, Site Regulatory Compliance - FENOC

D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio

Ohio State Liaison Officer

R. Owen, Ohio Department of Health

Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January , 2008.

SUBJECT:

PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN

NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION

(CDBI) 05000440/2008006(DRS)

cc w/encl:

J. Hagan, President and Chief Nuclear Officer - FENOC

J. Lash, Senior Vice President of Operations and

Chief Operating Officer - FENOC

D. Pace, Senior Vice President, Fleet Engineering - FENOC

J. Rinckel, Vice President, Fleet Oversight - FENOC

Director, Fleet Regulatory Affairs - FENOC

Manager, Fleet Licensing - FENOC

Manager, Site Regulatory Compliance - FENOC

D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio

Ohio State Liaison Officer

R. Owen, Ohio Department of Health

DISTRIBUTION:

RAG1

TJW2

TEB

RidsNrrDirslpab

JLC1

GEG

KGO

RML2

SRI Perry

DRPIII

DRSIII

PLB1

TXN

ROPreports@nrc.gov

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESING BASES INSPECTION (CDBI)

Enclosure

1

Inspection Report: 05000440/2008006(DRS)

Inspection Dates:

May 5, 2008, through May 9, 2008;

May 19, 2008, through May 23, 2008; and

June 2, 2008, through June 6, 2008.

Inspection Procedure:

IP 71111.21 Component Design Bases Inspection

Lead Inspector:

Stuart Sheldon, Lead Inspector

(630) 829-9727

sns2@nrc.gov

I.

Information Requested Prior to the On-site Information Gathering/Inspection Week

The following information is requested by March 24, 2008, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the team leader as soon as possible. (Please provide the information electronically in

pdf files, Excel, or other searchable formats, preferably on CDROM. The CDROM

should contain descriptive names, and be indexed and hyperlinked to facilitate ease of

use. Information in lists should contain enough information to be easily understood by

someone who has knowledge of boiling water reactor technology).

1.

Risk ranking of top 150 components from your site specific probabilistic safety

analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for

Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)

(as applicable).

2.

Provide a list of the top 200 cut-sets from your PSA.

3.

Risk ranking of operator actions from your site specific PSA sorted by RAW.

Provide copies of your human reliability worksheets for these items.

4.

If you have an External Events or Fire PSA Model, provide the information

requested in Items 1 and 2 for external events and fire. Provide narrative

description of each coded event (including fire, flood zone description).

5.

Any pre-existing evaluation or list of components and associated calculations

with low design margins, (i.e., pumps closest to the design limit for flow or

pressure, diesel generator close to design required output, heat exchangers

close to rated design heat removal etc.).

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESING BASES INSPECTION (CDBI)

Enclosure

2

6.

List of available design (setup) margins for valves in the motor-operated valve

(MOV) and air-operated valve (AOV) programs.

7.

List of high risk Maintenance Rule systems/components based on engineering or

expert panel judgment.

8.

Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)

category.

9.

Site top ten issues list (if applicable).

10.

A list of operating experience evaluations for the last 3 years.

11.

Information of any common cause failure of components experienced in the last

5 years at your facility.

12.

List of Root Cause Evaluations associated with component failures or design

issues initiated/completed in the last 5 years.

13.

Current management and engineering organizational chart.

14.

Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

II.

Information requested (for the approx. 30 selected components) to be available by

April 23, 2008, (will be reviewed by the team in the Regional office during the week

of April 28, 2008). This information should be separated for each selected

component, especially if provided electronically (e.g., folder with component

name that includes calculations, condition reports, maintenance history, etc).

1.

List of condition reports (corrective action documents) associated with each of

the selected components for the last 4 years.

2.

The corrective maintenance history associated with each of the selected

components for the last 4 years.

3.

Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and

also provide copies of referenced material (such as drawings, engineering

requests, and vendor letters).

4.

System Health Reports, System Descriptions, and/or Design Basis Documents

that are associated with each of the selected components.

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

3

5.

A list of modifications associated with each of the selected components.

6.

Copies of operability evaluations associated with each of the selected

components and plans for restoring operability, if applicable.

7.

Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

8.

Copies of any open temporary modifications associated with each of the selected

components, if applicable.

9.

Trend data on the selected electrical/mechanical components performance for

last 3 years (For example, pumps performance including in-service testing, other

vibration monitoring, oil sample results, etc., as applicable).

10.

A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

11.

A copy of engineering/operations related audits completed in the last 2 years.

12.

Provide list of PRA assumptions regarding operator actions and the associated

procedures.

III.

Additional Information to be provided on May 5, 2008 on-site (for final 15 - 20

selected components)

During the in-office preparation activities, the team will be making final selections and

may identify additional information needed to support the inspection. The lead inspector

will provide a list of the additional information needed during the week of April 28, 2008.

IV.

Information Requested to be provided throughout the inspection

1.

Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

3.

One complete set of P&IDs and one line electrical drawings (paper copies).

4.

Reference materials. (make available if needed during all on-site weeks):

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

4

IPE/PRA report;

Procurement documents for components selected (verify retrievable);

Plant procedures (normal, abnormal, emergency, surveillance, etc.); and

Vendor manuals.

If you have questions regarding the information requested, please contact the lead inspector.