| number = ML082880702
| number = ML082880702
| issue date = 11/06/2008
| issue date = 11/06/2008
| title = 10/15/08 Summary of Meeting Between NRC and Monticello Licensee Regarding a Future Application for Extended Power Uprate
| title = Summary of Meeting Between NRC and Monticello Licensee Regarding a Future Application for Extended Power Uprate
| author name = Tam P S
| author name = Tam P
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000263
| docket = 05000263
| license number = DPR-022
| license number = DPR-022
| contact person = Tam P S
| contact person = Tam P
| case reference number = TAC MD9305
| case reference number = TAC MD9305
| package number = ML082880712
| package number = ML082880712
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:November 6, 2008  
{{#Wiki_filter:November 6, 2008 LICENSEE:
 
Northern States Power Company FACILITY:
LICENSEE: Northern States Power Company
Monticello Nuclear Generating Plant  
 
FACILITY: Monticello Nuclear Generating Plant  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE OCTOBER 15, 2008, MEETING WITH THE LICENSEE TO DISCUSS PRE-APPLICATION ISSUES RELATED TO A FUTURE EXTENDED POWER UPRATE AMENDMENT APPLICATION (TAC NO. MD9305)  
OF THE OCTOBER 15, 2008, MEETING WITH THE LICENSEE TO DISCUSS PRE-APPLICATION ISSUES RELATED TO A FUTURE EXTENDED POWER UPRATE AMENDMENT APPLICATION (TAC NO. MD9305)
 
On October 15, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of Northern States Power Company at NRC offices located at 11545, Rockville Pike, Rockville, Maryland. The purpose of this meeting was to specifically discuss with the NRC staff the licensees proposed approach to address the three issues (steam dryer structural integrity, instrument setpoint methodology, and equipment qualification) set forth in the {{letter dated|date=June 26, 2008|text=June 26, 2008, letter}} to the licensee (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081770338). The licensee also proposed to give an update regarding grid stability analysis. A list of attendees is provided as Enclosure 1. The licensee=s handout material (Enclosure 2) has been docketed and is publicly available at Accession No. ML082890357.
On October 15, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of Northern States Power Company at NRC offices located at 11545, Rockville Pike, Rockville, Maryland. The purpose of this meeting was to specifically discuss with the NRC staff the licensee's proposed approach to address the three issues (steam dryer structural integrity, instrument setpoint methodology, and equipment qualification) set forth in the June 26, 2008, letter to the licensee (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081770338). The licensee also proposed to give an update  
The licensees presentation, depicting its approach to address the issues listed above, was outlined by the handout material. The NRC staff discussed with the licensee various aspects of the approach, but did not raise any significant technical concerns. A full transcript of this meeting was made (Enclosure 3) and is available at Accession No. ML082980438. The NRC staff did not convey any major comment on the licensees description of the upcoming application for extended power uprate.
 
No portion of this meeting was closed to the public because no proprietary information was used by the participants.
regarding grid stability analysis. A list of attendees is provided as Enclosure 1. The licensee
Before the meeting adjourned, members of the public were given the opportunity to communicate with the NRC staff both verbally and through the use of public meeting feedback forms. No comment or feedback was received at this time.  
=s handout material (Enclosure 2) has been docketed and is publicly available at Accession No. ML082890357.  
 
The licensee's presentation, depicting its approach to address the issues listed above, was outlined by the handout material. The NRC staff discussed with the licensee various aspects of the approach, but did not raise any significant technical concerns. A full transcript of this meeting was made (Enclosure 3) and is available at Accession No. ML082980438. The NRC staff did not convey any major comment on the licensee's description of the upcoming application for extended power uprate.
 
No portion of this meeting was closed to the public because no proprietary information was used by the participants.  
 
Before the meeting adjourned, members of the public were given the opportunity to communicate with the NRC staff both verbally and through the use of public meeting feedback forms. No comment or feedback was received at this time.
 
Please direct any inquiries to the undersigned at 301-415-1451, or peter.tam@nrc.gov
 
Sincerely,
      /RA/  Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


Docket No. 50-263  
Please direct any inquiries to the undersigned at 301-415-1451, or peter.tam@nrc.gov Sincerely,
/RA/
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263  


==Enclosures:==
==Enclosures:==
As stated cc w/encl: Additional Distribution via ListServ


As stated
Please direct any inquiries to the undersigned at 301-415-1451, or peter.tam@nrc.gov Sincerely,  
 
/RA/
cc w/encl:  Additional Distribution via ListServ
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263  
 
Please direct any inquiries to the undersigned at 301-415-1451, or peter.tam@nrc.gov
 
Sincerely,  
 
      /RA/ Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
 
Docket No. 50-263  


==Enclosures:==
==Enclosures:==
As stated cc w/encl: Additional Distribution via ListServ DISTRIBUTION:
PUBLIC LPL3-1 r/f RidsNrrDorlLpl3-1Resource RidsNrrPMPTamResource RidsNrrLATHarrisResource RidsOgcRpResource RidsAcrsAcnw_MailCTRResource TBloomer, EDO RidsRgn3MailCenterResource TAlexion, NRR KManoly, NRR NPatel, NRR CBasavaraju, NRR SMazumdar, NRR RMathew, NRR CTucci, NRR DPelton, EDO RIII Package: ML082880712 Summary Accession No.: ML082880702 Meeting Notice Accession No.: ML082730437 Licensee=s Handout Accession No.: ML082890357 Meeting Transcript: ML082980438 OFFICE LPL3-1/PM LPL3-1/LA EMCB/BC EEEB/BC EICB/BC LPL3-1/BC NAME PTam THarris KManoly GWilson WKemper LJames DATE 10/24/08 10/24/08 10/27/08 10/27/08 10/27/08 11/6/08 OFFICIAL RECORD COPY


As stated
MEETING BETWEEN NUCLEAR REGULATORY COMMISSION (NRC) AND NORTHERN STATES POWER COMPANY (NSPM)
 
cc w/encl:  Additional Distribution via ListServ
 
DISTRIBUTION:
PUBLIC    LPL3-1 r/f  RidsNrrDorlLpl3-1Resource RidsNrrPMPTamResource RidsNrrLATHarrisResource RidsOgcRpResource RidsAcrsAcnw_MailCTRResource  TBloomer, EDO RidsRgn3MailCenterResource  TAlexion, NRR KManoly, NRR  NPatel, NRR  CBasavaraju, NRR SMazumdar, NRR  RMathew, NRR CTucci, NRR  DPelton, EDO RIII Package:  ML082880712  Summary Accession No.:  ML082880702 Meeting Notice Accession No.:  ML082730437  Licensee=s Handout Accession No.:  ML082890357 Meeting Transcript:  ML082980438 OFFICE LPL3-1/PM LPL3-1/LA EMCB/BC EEEB/BC EICB/BC LPL3-1/BC NAME PTam THarris KManoly GWilson WKemper LJames DATE 10/24/08 10/24/08 10/27/08 10/27/08 10/27/08 11/6/08 OFFICIAL RECORD COPY MEETING BETWEEN NUCLEAR REGULATORY COMMISSION (NRC) AND NORTHERN STATES POWER COMPANY (NSPM)
LIST OF ATTENDEES MONTICELLO NUCLEAR GENERATING PLANT EXTENDED POWER UPRATE (EPU)
LIST OF ATTENDEES MONTICELLO NUCLEAR GENERATING PLANT EXTENDED POWER UPRATE (EPU)
OCTOBER 15, 2008 Name     Organization Tom Alexion   NRC/NRR/Generic Communication & Power Uprate         Branch (Lead Project Manager for EPU)
OCTOBER 15, 2008 Name Organization Tom Alexion NRC/NRR/Generic Communication & Power Uprate Branch (Lead Project Manager for EPU)
John Bozga     NRC/Region III Chakrapani (Pani) Basaravaju NRC/NRR/Mechanical & Civil Engineering Branch Steve Hammer   NSPM Kirk Jenks     Constellation Soo Bee Kok   SIA Kamal Manoly   NRC/NRR/Mechanical and Civil Engineering Branch Roy Mathew   NRC/NRR/Electrical Engineering Branch Subinoy Mazumdar   NRC/NRR/Instrumentation and Controls Branch Nitin Patel     NRC/NRR/Electrical Engineering Branch Gabe Salamon   NSPM Peter Tam     NRC/NRR/Plant Licensing Branch III-1 Allen Williams   NSPM  
John Bozga NRC/Region III Chakrapani (Pani) Basaravaju NRC/NRR/Mechanical & Civil Engineering Branch Steve Hammer NSPM Kirk Jenks Constellation Soo Bee Kok SIA Kamal Manoly NRC/NRR/Mechanical and Civil Engineering Branch Roy Mathew NRC/NRR/Electrical Engineering Branch Subinoy Mazumdar NRC/NRR/Instrumentation and Controls Branch Nitin Patel NRC/NRR/Electrical Engineering Branch Gabe Salamon NSPM Peter Tam NRC/NRR/Plant Licensing Branch III-1 Allen Williams NSPM  
 
Monticello Nuclear Generating Plant cc:
 
Commissioner Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN  55155-4194
 
Commissioner Minnesota Department of Health 717 Delaware Street, S. E.
Minneapolis, MN  55440
 
Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN  55313
 
Commissioner Minnesota Department of Commerce 85 7th Place East, Suite 500 St. Paul, MN  55101-2198
 
Manager - Environmental Protection Division Minnesota Attorney General
=s Office 445 Minnesota S t., Suite 900 St. Paul, MN  55101-2127


Additional distribution via Listserv}}
Monticello Nuclear Generating Plant cc:
Commissioner Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN 55155-4194 Commissioner Minnesota Department of Health 717 Delaware Street, S. E.
Minneapolis, MN 55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313 Commissioner Minnesota Department of Commerce 85 7th Place East, Suite 500 St. Paul, MN 55101-2198 Manager - Environmental Protection Division Minnesota Attorney General=s Office 445 Minnesota St., Suite 900 St. Paul, MN 55101-2127 Additional distribution via Listserv}}

Latest revision as of 14:46, 14 January 2025

Summary of Meeting Between NRC and Monticello Licensee Regarding a Future Application for Extended Power Uprate
ML082880702
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/06/2008
From: Tam P
Plant Licensing Branch III
To:
Tam P
Shared Package
ML082880712 List:
References
TAC MD9305
Download: ML082880702 (5)


Text

November 6, 2008 LICENSEE:

Northern States Power Company FACILITY:

Monticello Nuclear Generating Plant

SUBJECT:

SUMMARY

OF THE OCTOBER 15, 2008, MEETING WITH THE LICENSEE TO DISCUSS PRE-APPLICATION ISSUES RELATED TO A FUTURE EXTENDED POWER UPRATE AMENDMENT APPLICATION (TAC NO. MD9305)

On October 15, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of Northern States Power Company at NRC offices located at 11545, Rockville Pike, Rockville, Maryland. The purpose of this meeting was to specifically discuss with the NRC staff the licensees proposed approach to address the three issues (steam dryer structural integrity, instrument setpoint methodology, and equipment qualification) set forth in the June 26, 2008, letter to the licensee (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081770338). The licensee also proposed to give an update regarding grid stability analysis. A list of attendees is provided as Enclosure 1. The licensee=s handout material (Enclosure 2) has been docketed and is publicly available at Accession No. ML082890357.

The licensees presentation, depicting its approach to address the issues listed above, was outlined by the handout material. The NRC staff discussed with the licensee various aspects of the approach, but did not raise any significant technical concerns. A full transcript of this meeting was made (Enclosure 3) and is available at Accession No. ML082980438. The NRC staff did not convey any major comment on the licensees description of the upcoming application for extended power uprate.

No portion of this meeting was closed to the public because no proprietary information was used by the participants.

Before the meeting adjourned, members of the public were given the opportunity to communicate with the NRC staff both verbally and through the use of public meeting feedback forms. No comment or feedback was received at this time.

Please direct any inquiries to the undersigned at 301-415-1451, or peter.tam@nrc.gov Sincerely,

/RA/

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosures:

As stated cc w/encl: Additional Distribution via ListServ

Please direct any inquiries to the undersigned at 301-415-1451, or peter.tam@nrc.gov Sincerely,

/RA/

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosures:

As stated cc w/encl: Additional Distribution via ListServ DISTRIBUTION:

PUBLIC LPL3-1 r/f RidsNrrDorlLpl3-1Resource RidsNrrPMPTamResource RidsNrrLATHarrisResource RidsOgcRpResource RidsAcrsAcnw_MailCTRResource TBloomer, EDO RidsRgn3MailCenterResource TAlexion, NRR KManoly, NRR NPatel, NRR CBasavaraju, NRR SMazumdar, NRR RMathew, NRR CTucci, NRR DPelton, EDO RIII Package: ML082880712 Summary Accession No.: ML082880702 Meeting Notice Accession No.: ML082730437 Licensee=s Handout Accession No.: ML082890357 Meeting Transcript: ML082980438 OFFICE LPL3-1/PM LPL3-1/LA EMCB/BC EEEB/BC EICB/BC LPL3-1/BC NAME PTam THarris KManoly GWilson WKemper LJames DATE 10/24/08 10/24/08 10/27/08 10/27/08 10/27/08 11/6/08 OFFICIAL RECORD COPY

MEETING BETWEEN NUCLEAR REGULATORY COMMISSION (NRC) AND NORTHERN STATES POWER COMPANY (NSPM)

LIST OF ATTENDEES MONTICELLO NUCLEAR GENERATING PLANT EXTENDED POWER UPRATE (EPU)

OCTOBER 15, 2008 Name Organization Tom Alexion NRC/NRR/Generic Communication & Power Uprate Branch (Lead Project Manager for EPU)

John Bozga NRC/Region III Chakrapani (Pani) Basaravaju NRC/NRR/Mechanical & Civil Engineering Branch Steve Hammer NSPM Kirk Jenks Constellation Soo Bee Kok SIA Kamal Manoly NRC/NRR/Mechanical and Civil Engineering Branch Roy Mathew NRC/NRR/Electrical Engineering Branch Subinoy Mazumdar NRC/NRR/Instrumentation and Controls Branch Nitin Patel NRC/NRR/Electrical Engineering Branch Gabe Salamon NSPM Peter Tam NRC/NRR/Plant Licensing Branch III-1 Allen Williams NSPM

Monticello Nuclear Generating Plant cc:

Commissioner Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN 55155-4194 Commissioner Minnesota Department of Health 717 Delaware Street, S. E.

Minneapolis, MN 55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313 Commissioner Minnesota Department of Commerce 85 7th Place East, Suite 500 St. Paul, MN 55101-2198 Manager - Environmental Protection Division Minnesota Attorney General=s Office 445 Minnesota St., Suite 900 St. Paul, MN 55101-2127 Additional distribution via Listserv