ML092440461: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 09/01/2009 11:24:28 Report 22 09/01/2009
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 09/01/2009 11:24:28 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Saint Lucie INSP
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Saint Lucie INSP-COMPONENT DESIGN BASIS INSPECTION (CDBI) 7 1, 2   IP Component Design Bases Inspection 7111121 08/31/2009 09/04/2009 OL EXAM-INITIAL EXAM PREP 3 1     ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 09/14/2009 09/18/2009 OL EXAM-INITIAL EXAM WEEK 1 3 1     ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 09/28/2009 10/01/2009 OL EXAM-INITIAL EXAM - WEEK 2 3 1     ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 10/05/2009 10/09/2009 OL EXAM-INITIAL EXAM - WEEK 3 3 1     ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 10/19/2009 10/23/2009 OL RQ-REQUAL INSPECTION 2 1, 2   IP Licensed Operator Requalification Program 7111111B 11/16/2009 11/20/2009 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 1, 2   IP Exercise Evaluation 7111401 02/22/2010 02/26/2010 1, 2   IP Emergency Action Level and Emergency Plan Changes 7111404 02/22/2010 02/26/2010 1, 2   IP Performance Indicator Verification 71151 02/22/2010 02/26/2010 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1     IP Identification and Resolution of Problems 71152B 03/01/2010 03/04/2010 1, 2   IP Identification and Resolution of Problems 71152B 03/15/2010 03/19/2010 ISFSI-ISFSI ROUTINE LOADING 2 1, 2   IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/01/2010 06/30/2010 EB3ISI-UNIT 1 INSERVICE INSPECTION 1 1     IP Inservice Inspection Activities - PWR 7111108P 04/12/2010 04/16/2010 EB3TI172-EB3 RCS DM BUTT WELDS 1 1, 2   IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 04/12/2010 04/16/2010 PSB1-RP-RP ACCESS CONTROLS 2 1, 2   IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/10/2010 05/14/2010 1, 2   IP A ccess Control to Radiologically Significant Areas 7112101 05/10/2010 05/14/2010 EB3 HS-HEAT SINK INSPECTION 1 1, 2   IP Heat Sink Performance 7111107T 07/12/2010 07/16/2010 EB1-MODIFICATIONS - 10CFR50.59 2 1, 2   IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 07/26/2010 07/30/2010 1, 2   IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 08/09/2010 08/13/2010 PSB1-RP-RP PUBLIC RADIATION PROTECTION 3 1, 2   IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/30/2010 09/03/2010 This report does not include INPO and OUTAGE activities.
- COMPONENT DESIGN BASIS INSPECTION (CDBI) 7 1, 2 IP Component Design Bases Inspection 7111121 08/31/2009 09/04/2009 OL EXAM
- INITIAL EXAM PREP 3
1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 09/14/2009 09/18/2009 OL EXAM
- INITIAL EXAM WEEK 1 3
1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 09/28/2009 10/01/2009 OL EXAM
- INITIAL EXAM - WEEK 2 3
1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 10/05/2009 10/09/2009 OL EXAM
- INITIAL EXAM - WEEK 3 3
1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 10/19/2009 10/23/2009 OL RQ
- REQUAL INSPECTION 2
1, 2 IP Licensed Operator Requalification Program 7111111B 11/16/2009 11/20/2009 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
1, 2 IP Exercise Evaluation 7111401 02/22/2010 02/26/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 02/22/2010 02/26/2010 1, 2 IP Performance Indicator Verification 71151 02/22/2010 02/26/2010 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 5
1 IP Identification and Resolution of Problems 71152B 03/01/2010 03/04/2010 1, 2 IP Identification and Resolution of Problems 71152B 03/15/2010 03/19/2010 ISFSI
- ISFSI ROUTINE LOADING 2
1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/01/2010 06/30/2010 EB3ISI
- UNIT 1 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 04/12/2010 04/16/2010 EB3TI172
- EB3 RCS DM BUTT WELDS 1
1, 2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 04/12/2010 04/16/2010 PSB1-RP
- RP ACCESS CONTROLS 2
1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/10/2010 05/14/2010 1, 2 IP Access Control to Radiologically Significant Areas 7112101 05/10/2010 05/14/2010 EB3 HS
- HEAT SINK INSPECTION 1
1, 2 IP Heat Sink Performance 7111107T 07/12/2010 07/16/2010 EB1
- MODIFICATIONS - 10CFR50.59 2
1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 07/26/2010 07/30/2010 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 08/09/2010 08/13/2010 PSB1-RP
- RP PUBLIC RADIATION PROTECTION 3
1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/30/2010 09/03/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 09/01/2009 11:24:28 Report 22 09/01/2009
 
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Saint Lucie PSB1-RP-RP PUBLIC RADIATION PROTECTION 3 1, 2   IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/30/2010 09/03/2010 1, 2   IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/30/2010 09/03/2010 1, 2   IP Performance Indicator Verification 71151 08/30/2010 09/03/2010 EB3ISI-UNIT 2 INSERVICE INSPECTION 1 2   IP Inservice Inspection Activities - PWR 7111108P 11/22/2010 11/26/2010 EB3TI172-EB3 RX COOLANT SYS DM BUTT WELDS 1 2   IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 11/22/2010 11/26/2010 EB3SGISI-UNIT 2 SG INSERVICE INSPECTION 1 2   IP Inservice Inspection Activities - PWR 7111108P 11/29/2010 12/03/2010 This report does not include INPO and OUTAGE activities.
Inspection / Activity Plan Page 2 of 2 09/01/2009 11:24:28 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Saint Lucie PSB1-RP
- RP PUBLIC RADIATION PROTECTION 3
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/30/2010 09/03/2010 1, 2 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/30/2010 09/03/2010 1, 2 IP Performance Indicator Verification 71151 08/30/2010 09/03/2010 EB3ISI
- UNIT 2 INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 11/22/2010 11/26/2010 EB3TI172
- EB3 RX COOLANT SYS DM BUTT WELDS 1
2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 11/22/2010 11/26/2010 EB3SGISI
- UNIT 2 SG INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 11/29/2010 12/03/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 09:32, 14 January 2025

Inspection/Activity Plan, Report 22, 09/01/2009 - 12/31/2010
ML092440461
Person / Time
Site: Saint Lucie, 07200061  
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Shared Package
ML092440450 List:
References
Download: ML092440461 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 11:24:28 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Saint Lucie INSP

- COMPONENT DESIGN BASIS INSPECTION (CDBI) 7 1, 2 IP Component Design Bases Inspection 7111121 08/31/2009 09/04/2009 OL EXAM

- INITIAL EXAM PREP 3

1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 09/14/2009 09/18/2009 OL EXAM

- INITIAL EXAM WEEK 1 3

1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 09/28/2009 10/01/2009 OL EXAM

- INITIAL EXAM - WEEK 2 3

1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 10/05/2009 10/09/2009 OL EXAM

- INITIAL EXAM - WEEK 3 3

1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 10/19/2009 10/23/2009 OL RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 11/16/2009 11/20/2009 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2 IP Exercise Evaluation 7111401 02/22/2010 02/26/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 02/22/2010 02/26/2010 1, 2 IP Performance Indicator Verification 71151 02/22/2010 02/26/2010 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

1 IP Identification and Resolution of Problems 71152B 03/01/2010 03/04/2010 1, 2 IP Identification and Resolution of Problems 71152B 03/15/2010 03/19/2010 ISFSI

- ISFSI ROUTINE LOADING 2

1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/01/2010 06/30/2010 EB3ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 04/12/2010 04/16/2010 EB3TI172

- EB3 RCS DM BUTT WELDS 1

1, 2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 04/12/2010 04/16/2010 PSB1-RP

- RP ACCESS CONTROLS 2

1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/10/2010 05/14/2010 1, 2 IP Access Control to Radiologically Significant Areas 7112101 05/10/2010 05/14/2010 EB3 HS

- HEAT SINK INSPECTION 1

1, 2 IP Heat Sink Performance 7111107T 07/12/2010 07/16/2010 EB1

- MODIFICATIONS - 10CFR50.59 2

1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 07/26/2010 07/30/2010 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 08/09/2010 08/13/2010 PSB1-RP

- RP PUBLIC RADIATION PROTECTION 3

1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/30/2010 09/03/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 09/01/2009 11:24:28 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Saint Lucie PSB1-RP

- RP PUBLIC RADIATION PROTECTION 3

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/30/2010 09/03/2010 1, 2 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/30/2010 09/03/2010 1, 2 IP Performance Indicator Verification 71151 08/30/2010 09/03/2010 EB3ISI

- UNIT 2 INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 11/22/2010 11/26/2010 EB3TI172

- EB3 RX COOLANT SYS DM BUTT WELDS 1

2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 11/22/2010 11/26/2010 EB3SGISI

- UNIT 2 SG INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 11/29/2010 12/03/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.