ML101260010: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML101260010
| number = ML101260010
| issue date = 05/05/2010
| issue date = 05/05/2010
| title = 04/28/2010 Summer Meeting Slides
| title = Meeting Slides
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Summer Nuclear Station Annual Assessment Meeting 2009 Reactor Oversight Process Nuclear Regulatory Commission - Region II Enclosure 2
{{#Wiki_filter:Summer Nuclear Station Annual Assessment Meeting 2009 Reactor Oversight Process Nuclear Regulatory Commission - Region II  


NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials Enclosure 2
NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials  


NRC Annual Assessment Summary Summer SCE&G operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
NRC Annual Assessment Summary SCE&G operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
Summer was in the Licensee Response column of the NRCs Action Matrix for the last quarter of 2009.
Summer was in the Licensee Response column of the NRCs Action Matrix for the last quarter of 2009.
Enclosure 2
Summer


NRC Inspection Activities Summer for 2009 3,782 hours of inspection and related activities Two resident inspectors on site - residents perform inspections on a daily basis and issue four quarterly inspection reports per year Five regional inspections One major team inspection Initial License Exam Enclosure 2
NRC Inspection Activities 3,782 hours of inspection and related activities Two resident inspectors on site - residents perform inspections on a daily basis and issue four quarterly inspection reports per year Five regional inspections One major team inspection Initial License Exam Summer for 2009


Summer PIs and Findings January 1 through December 31, 2009 All Green Performance Indicators Enclosure 2
Summer PIs and Findings All Green Performance Indicators January 1 through December 31, 2009  


Summer Inspection Findings January 1 through December 31, 2009 Enclosure 2
Summer Inspection Findings January 1 through December 31, 2009  


NRC Inspection Findings Summer Failure to follow procedure results in inadvertent loss of spent fuel pool inventory Failure to follow procedure and correct previously indentified deficiencies with the operator workaround program Failure to effectively monitor the performance of the emergency air handling system Enclosure 2
NRC Inspection Findings Failure to follow procedure results in inadvertent loss of spent fuel pool inventory Failure to follow procedure and correct previously indentified deficiencies with the operator workaround program Failure to effectively monitor the performance of the emergency air handling system Summer


Significance Threshold Performance Indicators Green   Baseline Inspection White   Requires additional NRC oversight Yellow Requires more NRC oversight Red     Requires most NRC oversight Inspection Findings Green   Very low safety issue White   Low to moderate safety issue Yellow Substantial safety issue Red     High safety issue Enclosure 2
Significance Threshold Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Performance Indicators Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue  


NRC Plans for 2010 NRC plans baseline inspections at Summer for the remainder of 2010. This includes:
NRC Plans for 2010 NRC plans baseline inspections at Summer for the remainder of 2010. This includes:
Triennial Fire Protection Inspection Problem Identification and Resolution Inspection Enclosure 2
Triennial Fire Protection Inspection Problem Identification and Resolution Inspection  


End of Presentation Nuclear Regulatory Commission Region II Atlanta, Ga 4/28/2010 Enclosure 2}}
End of Presentation Nuclear Regulatory Commission Region II Atlanta, Ga 4/28/2010 }}

Latest revision as of 05:08, 14 January 2025

Meeting Slides
ML101260010
Person / Time
Site: Summer 
Issue date: 05/05/2010
From:
NRC/RGN-II
To:
Shared Package
ML101260006 List:
References
Download: ML101260010 (3)


Text

Summer Nuclear Station Annual Assessment Meeting 2009 Reactor Oversight Process Nuclear Regulatory Commission - Region II

NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials

NRC Annual Assessment Summary SCE&G operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

Summer was in the Licensee Response column of the NRCs Action Matrix for the last quarter of 2009.

Summer

NRC Inspection Activities 3,782 hours0.00905 days <br />0.217 hours <br />0.00129 weeks <br />2.97551e-4 months <br /> of inspection and related activities Two resident inspectors on site - residents perform inspections on a daily basis and issue four quarterly inspection reports per year Five regional inspections One major team inspection Initial License Exam Summer for 2009

Summer PIs and Findings All Green Performance Indicators January 1 through December 31, 2009

Summer Inspection Findings January 1 through December 31, 2009

NRC Inspection Findings Failure to follow procedure results in inadvertent loss of spent fuel pool inventory Failure to follow procedure and correct previously indentified deficiencies with the operator workaround program Failure to effectively monitor the performance of the emergency air handling system Summer

Significance Threshold Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Performance Indicators Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue

NRC Plans for 2010 NRC plans baseline inspections at Summer for the remainder of 2010. This includes:

Triennial Fire Protection Inspection Problem Identification and Resolution Inspection

End of Presentation Nuclear Regulatory Commission Region II Atlanta, Ga 4/28/2010