{{#Wiki_filter:NRR-PMDAPEm Resource From: | {{#Wiki_filter:1 NRR-PMDAPEm Resource From: | ||
Cotton, Karen Sent: | |||
Tuesday, June 12, 2012 9:45 AM To: | |||
david.heacock@dom.com | |||
==Subject:== | ==Subject:== | ||
| Line 21: | Line 24: | ||
==Dear Mr. Heacock:== | ==Dear Mr. Heacock:== | ||
By {{letter dated|date=April 25, 2012|text=letter dated April 25, 2012}} (Agencywide Documents and Access Management System Accession No. ML12130A217), Virginia Electric and Power Company (Dominion) requested an alternative to the requirement of IWB-2412, Inspection Program B, which requires examination of identified reactor vessel (RV) pressure retaining welds once each ten year interval. The purpose of this e-mail is to provide the results of the U.S. | |||
By letter dated April 25, 2012 (Agencywide Documents and Access Management System Accession No. ML12130A217), Virginia Electric and Power Company (Dominion) requested an alternative to the requirement of IWB-2412, Inspection Program B, which requires examination of identified reactor vessel (RV) pressure retaining welds once each ten year interval. The purpose of this e-mail is to provide the results of the U.S. | |||
Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. | ||
If you have any questions, please contact me at (301) 415-1438. | If you have any questions, please contact me at (301) 415-1438. | ||
Hearing Identifier: | Hearing Identifier: | ||
NRR_PMDA Email Number: | |||
388 Mail Envelope Properties (Karen.Cotton@nrc.gov20120612094500) | |||
==Subject:== | ==Subject:== | ||
ASME SECTION XI INSERVICE INSPECTION (ISI) PROGRAM (RR CMP-007 and CMP-009) | ASME SECTION XI INSERVICE INSPECTION (ISI) PROGRAM (RR CMP-007 and CMP-009) | ||
Sent Date: | Sent Date: | ||
6/12/2012 9:45:17 AM Received Date: | |||
6/12/2012 9:45:00 AM From: | |||
Cotton, Karen Created By: | |||
Karen.Cotton@nrc.gov Recipients: | |||
"david.heacock@dom.com" <david.heacock@dom.com> | "david.heacock@dom.com" <david.heacock@dom.com> | ||
Tracking Status: None Post Office: | Tracking Status: None Post Office: | ||
Files | Files Size Date & Time MESSAGE 2095 6/12/2012 9:45:00 AM Options Priority: | ||
Standard Return Notification: | |||
No Reply Requested: | |||
No Sensitivity: | |||
Normal Expiration Date: | |||
Recipients Received:}} | Recipients Received:}} | ||
Latest revision as of 01:38, 12 January 2025
| ML12164A818 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 06/12/2012 |
| From: | Cotton K Division of Operating Reactor Licensing |
| To: | Heacock D Dominion Generation |
| References | |
| Download: ML12164A818 (2) | |
Text
1 NRR-PMDAPEm Resource From:
Cotton, Karen Sent:
Tuesday, June 12, 2012 9:45 AM To:
david.heacock@dom.com
Subject:
ASME SECTION XI INSERVICE INSPECTION (ISI) PROGRAM (RR CMP-007 and CMP-009)
Dear Mr. Heacock:
By letter dated April 25, 2012 (Agencywide Documents and Access Management System Accession No. ML12130A217), Virginia Electric and Power Company (Dominion) requested an alternative to the requirement of IWB-2412, Inspection Program B, which requires examination of identified reactor vessel (RV) pressure retaining welds once each ten year interval. The purpose of this e-mail is to provide the results of the U.S.
Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1438.
Hearing Identifier:
NRR_PMDA Email Number:
388 Mail Envelope Properties (Karen.Cotton@nrc.gov20120612094500)
Subject:
ASME SECTION XI INSERVICE INSPECTION (ISI) PROGRAM (RR CMP-007 and CMP-009)
Sent Date:
6/12/2012 9:45:17 AM Received Date:
6/12/2012 9:45:00 AM From:
Cotton, Karen Created By:
Karen.Cotton@nrc.gov Recipients:
"david.heacock@dom.com" <david.heacock@dom.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2095 6/12/2012 9:45:00 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: