ML13018A100: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML13018A100
| number = ML13018A100
| issue date = 01/20/2009
| issue date = 01/20/2009
| title = Drift Study for Abb Model ITE-27H Undervoltage Relays
| title = Drift Study for ABB Model ITE-27H Undervoltage Relays
| author name = Hunter R
| author name = Hunter R
| author affiliation = Entergy Operations, Inc
| author affiliation = Entergy Operations, Inc
Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:ANO-1             ANO-2               GGNS                 IP-2           IP-3             PLP JAF               PNPS                 RBS                   VY             W3 (1)                                           (2)
{{#Wiki_filter:ANO-1 ANO-2 GGNS IP-2 IP-3 PLP JAF PNPS RBS VY W3 CALCULATION COVER PAGE (1) EC #
CALCULATION                    EC #                    11753                  Page 1 of     41 COVER PAGE (3) Design Basis Calc.       YES       NO       (4)       CALCULATION               EC Markup (5 )                                                                                 (6)
11753 (2)Page 1 of 41 (3) Design Basis Calc.
Calculation No: G13.18.6.3-006                                                     Revision: 0 (7)
YES NO (4)
CALCULATION EC Markup (5 ) Calculation No: G13.18.6.3-006 (6) Revision: 0 (7)


==Title:==
==Title:==
Drift Study for ABB Model ITE-27H Undervoltage Relays (8)                                         (9)
Drift Study for ABB Model ITE-27H Undervoltage Relays (8) System(s): 508 (9) Review Org (Department): NSBE3 (I&C Design)
System(s): 508                             Review Org (Department): NSBE3 (I&C Design)
(10) Safety Class:
(10)                                         (11)
Safety / Quality Related Augmented Quality Program Non-Safety Related (11) Component/Equipment/Structure Type/Number:
Safety Class:                              Component/Equipment/Structure Type/Number:
ENS-SWG1A-27-1A ENS-SWG1A-27-1B ENS-SWG1A-27-1C ENS-SWG1B-27-1A ENS-SWG1B-27-1B ENS-SWG1B-27-1C (12) Document Type: F43.02 (13)
Safety / Quality Related              ENS-SWG1A-27-1A             ENS-SWG1A-27-1B Augmented Quality Program Non-Safety Related                    ENS-SWG1A-27-1C             ENS-SWG1B-27-1A ENS-SWG1B-27-1B             ENS-SWG1B-27-1C (12)
Keywords (Description / Topical Codes): Drift G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G REVIEWS (14) Name/Signature/Date R.A. Hunter /  
Document Type: F43.02 (13)
/1-20-09 (15) Name/Signature/Date
Keywords (Description / Topical     G G G G G     G G G G G     G G G G G       G G G G G Codes): Drift G G G G G     G G G G G     G G G G G       G G G G G G G G G G                                   G G G G G     G G G G G     G G G G G       G G G G G REVIEWS (14)                             (15)                              (16)
_R.J. Hannigan /  
Name/Signature/Date               Name/Signature/Date                Name/Signature/Date R.A. Hunter /                  _R.J. Hannigan /
/ 1-20-09 (16) Name/Signature/Date See AS for electronic signature Responsible Engineer Design Verifier Supervisor/Approval Reviewer Comments Attached Comments Attached
                        /1-20-09                                         See AS for electronic signature
                                                            / 1-20-09 Responsible Engineer             Design Verifier                     Supervisor/Approval Reviewer Comments Attached                       Comments Attached


DRIFT ANALYSIS                                               G13.18.6.3-006 ENGINEERING DEPARTMENT                                           Revision 0 RIVER BEND STATION                                         PAGE 2 OF 14 CALCULATION               CALCULATION NO:   G13.18.6.3-006 REFERENCE SHEET            REVISION:   0 I. EC Markups Incorporated None II. Relationships:         Sht Rev   Input Output   Impact   Tracking Doc  Doc        Y/N     No.
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 2 OF 14 CALCULATION REFERENCE SHEET CALCULATION NO:
: 1. 350578                       NA     !    "          N
G13.18.6.3-006 REVISION:
: 2. 350601                       NA     !    "          N
0 I. EC Markups Incorporated None II. Relationships:
: 3. 350720                       NA     !    "          N
Sht Rev Input Doc Output Doc Impact Y/N Tracking No.
: 4. 350863                       NA     !    "          N
: 1. 350578 NA N
: 5. 350864                       NA     !    "          N
: 2. 350601 NA N
: 6. 351061                       NA     !    "          N
: 3. 350720 NA N
: 7. 351062                       NA     !    "          N
: 4. 350863 NA N
: 8. 351119                       NA     !    "          N
: 5. 350864 NA N
: 9. 362704                       NA     !    "          N
: 6. 351061 NA N
: 10. 362705                       NA     !    "          N
: 7. 351062 NA N
: 11. 362707                       NA     !    "          N
: 8. 351119 NA N
: 12. 362708                       NA     !    "          N
: 9. 362704 NA N
: 13. 368038                       NA     !    "          N
: 10. 362705 NA N
: 14. 368039                       NA     !    "          N
: 11. 362707 NA N
: 15. 368040                       NA     !    "          N
: 12. 362708 NA N
: 16. 368041                       NA     !    "          N
: 13. 368038 NA N
: 17. ECH-NE-08-00015             000     !    "          N
: 14. 368039 NA N
: 18. G13.18.6.1-ENS-002       0   000     "    !          Y     11753
: 15. 368040 NA N
: 19. STP-508-1600             1   16     !    "          N
: 16. 368041 NA N
: 20. STP-508-1600             1   16A     !    "          N
: 17. ECH-NE-08-00015 000 N
: 21. STP-508-1600             1   17     !    "          N
: 18. G13.18.6.1-ENS-002 0
: 22. STP-508-1600             1   18     !    "          N
000 Y
: 23. STP-508-1600             2   16     !    "          N
11753
: 24. STP-508-1600             2   16A     !    "          N
: 19. STP-508-1600 1
: 25. STP-508-1600             2   17     !    "          N
16 N
: 26. STP-508-1600             2   18     !    "          N
: 20. STP-508-1600 1
: 27. STP-508-1600             3   18     !    "          N
16A N
: 28. STP-508-1600             4   18     !    "          N
: 21. STP-508-1600 1
: 29. STP-508-1600             5   18     !    "          N
17 N
: 30. STP-508-1600             6   18     !    "          N
: 22. STP-508-1600 1
: 31. STP-508-1600             7   18     !    "          N
18 N
: 32. STP-508-1600             8   18     !    "          N
: 23. STP-508-1600 2
: 33. STP-508-1600             9   18     !    "          N
16 N
: 34. STP-508-1600           10   18     !    "          N
: 24. STP-508-1600 2
: 35. STP-508-1600           11   18     !    "          N
16A N
: 36. STP-508-1600           12   18     !    "          N
: 25. STP-508-1600 2
17 N
: 26. STP-508-1600 2
18 N
: 27. STP-508-1600 3
18 N
: 28. STP-508-1600 4
18 N
: 29. STP-508-1600 5
18 N
: 30. STP-508-1600 6
18 N
: 31. STP-508-1600 7
18 N
: 32. STP-508-1600 8
18 N
: 33. STP-508-1600 9
18 N
: 34. STP-508-1600 10 18 N
: 35. STP-508-1600 11 18 N
: 36. STP-508-1600 12 18 N


DRIFT ANALYSIS                                               G13.18.6.3-006 ENGINEERING DEPARTMENT                                           Revision 0 RIVER BEND STATION                                         PAGE 3 OF 14 CALCULATION                 CALCULATION NO:   G13.18.6.3-006 REFERENCE SHEET            REVISION:   0 II. Relationships (contd): Sht Rev   Input Output   Impact   Tracking Doc  Doc        Y/N     No.
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 3 OF 14 CALCULATION REFERENCE SHEET CALCULATION NO:
: 37. STP-508-1600             13   18     !    "          N
G13.18.6.3-006 REVISION:
: 38. STP-508-1600             14   18     !    "          N
0 II. Relationships (contd):
: 39. STP-508-1600             15   18     !    "          N
Sht Rev Input Doc Output Doc Impact Y/N Tracking No.
: 40. STP-508-1600             16   18     !    "          N
: 37. STP-508-1600 13 18 N
: 41. STP-508-1600             17   18     !    "          N
: 38. STP-508-1600 14 18 N
: 42. STP-508-1600             18   18     !    "          N
: 39. STP-508-1600 15 18 N
: 43. STP-508-1600             19   18     !    "          N
: 40. STP-508-1600 16 18 N
: 44. STP-508-1600             20   18     !    "          N
: 41. STP-508-1600 17 18 N
: 45. STP-508-1600             21   18     !    "          N
: 42. STP-508-1600 18 18 N
: 46. STP-508-1600             22   18     !    "          N
: 43. STP-508-1600 19 18 N
: 47. WO-50688087                     0     !    "          N
: 44. STP-508-1600 20 18 N
: 48. WO-50688088                     0     !    "          N
: 45. STP-508-1600 21 18 N
: 49. WO-50688091                     0     !    "          N
: 46. STP-508-1600 22 18 N
: 50. WO-50688092                     0     !    "          N
: 47. WO-50688087 0
: 51. WO-50688089                     0     !    "          N
N
: 52. WO-50688090                     0     !    "          N
: 48. WO-50688088 0
: 53. WO-50688085                     0     !    "          N
N
: 54. WO-50688086                     0     !    "          N
: 49. WO-50688091 0
: 55. WO-50989677                     0     !    "          N
N
: 56. WO-50989678                     0     !    "          N
: 50. WO-50688092 0
: 57. WO-50990339                     0     !    "          N
N
: 58. WO-50990340                     0     !    "          N
: 51. WO-50688089 0
: 59. WO-50990919                     0     !    "          N
N
: 60. WO-50990920                     0     !    "          N
: 52. WO-50688090 0
: 61. WO-50991471                     0     !    "          N
N
: 62. WO-50991472                     0     !    "          N
: 53. WO-50688085 0
: 63. WO-51034041                     0     !    "          N
N
: 64. WO-51035362                     0     !    "          N
: 54. WO-50688086 0
N
: 55. WO-50989677 0
N
: 56. WO-50989678 0
N
: 57. WO-50990339 0
N
: 58. WO-50990340 0
N
: 59. WO-50990919 0
N
: 60. WO-50990920 0
N
: 61. WO-50991471 0
N
: 62. WO-50991472 0
N
: 63. WO-51034041 0
N
: 64. WO-51035362 0
N


DRIFT ANALYSIS                                                                   G13.18.6.3-006 ENGINEERING DEPARTMENT                                                               Revision 0 RIVER BEND STATION                                                               PAGE 4 OF 14 CALCULATION                       CALCULATION NO:                 G13.18.6.3-006 REFERENCE SHEET                    REVISION:         0 III. CROSS  
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 4 OF 14 CALCULATION REFERENCE SHEET CALCULATION NO:
G13.18.6.3-006 REVISION:
0 III.
CROSS  


==REFERENCES:==
==REFERENCES:==
Line 112: Line 155:
: 4. EPRI TR-103335R1, Statistical Analysis of Instrument Calibration Data; Guidelines for Instrument Calibration Extension / Reduction Programs, October 1998
: 4. EPRI TR-103335R1, Statistical Analysis of Instrument Calibration Data; Guidelines for Instrument Calibration Extension / Reduction Programs, October 1998
: 5. ISA-RP67.04-Part II-2000, Methodologies for the Determination of Setpoints for Nuclear Safety-Related Instrumentation, Second Printing, June 12, 1995
: 5. ISA-RP67.04-Part II-2000, Methodologies for the Determination of Setpoints for Nuclear Safety-Related Instrumentation, Second Printing, June 12, 1995
: 6. NRC Generic Letter 91-04, Changes in Technical Specification Surveillance Requirements to Accommodate a 24 Month Fuel Cycle, April 2, 1991 IV.     SOFTWARE USED:
: 6. NRC Generic Letter 91-04, Changes in Technical Specification Surveillance Requirements to Accommodate a 24 Month Fuel Cycle, April 2, 1991 IV.
SOFTWARE USED:


==Title:==
==Title:==
N/A                   Version/Release:               Disk/CD No.
N/A Version/Release:
V.       DISK/CDS INCLUDED:
Disk/CD No.
V.
DISK/CDS INCLUDED:


==Title:==
==Title:==
N/A                   Version/Release                 Disk/CD No.
N/A Version/Release Disk/CD No.
VI.     OTHER CHANGES:
VI.
OTHER CHANGES:


DRIFT ANALYSIS                             G13.18.6.3-006 ENGINEERING DEPARTMENT                         Revision 0 RIVER BEND STATION                         PAGE 5 OF 14 Revision                 Record of Revision Initial issue.
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 5 OF 14 Revision Record of Revision 0
0
Initial issue.  


DRIFT ANALYSIS                                                                                                                       G13.18.6.3-006 ENGINEERING DEPARTMENT                                                                                                                         Revision 0 RIVER BEND STATION                                                                                                                 PAGE 6 OF 14 TABLE OF CONTENTS 1! Purpose!.................................................................................................................................................!7!
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 6 OF 14 TABLE OF CONTENTS 1!
2! Conclusions!...........................................................................................................................................!8!
Purpose!.................................................................................................................................................!7!
3! Design!Inputs!.........................................................................................................................................!8!
2!
4! References!.............................................................................................................................................!8!
Conclusions!...........................................................................................................................................!8!
5! Assumptions!..........................................................................................................................................!9!
3!
6! Method!of!Analysis................................................................................................................................!9!
Design!Inputs!.........................................................................................................................................!8!
7! Analysis!................................................................................................................................................!10!
4!
8! Attachments!........................................................................................................................................!14!
References!.............................................................................................................................................!8!
!    Attachment 1 - Drift Analysis Supporting Information (Excel Spreadsheet) - 19 pages Attachment 2 - DVR Forms with comments - 8 pages
5!
Assumptions!..........................................................................................................................................!9!
6!
Method!of!Analysis................................................................................................................................!9!
7!
Analysis!................................................................................................................................................!10!
8!
Attachments!........................................................................................................................................!14!
Attachment 1 - Drift Analysis Supporting Information (Excel Spreadsheet) - 19 pages  
- DVR Forms with comments - 8 pages  


DRIFT ANALYSIS                                                                       G13.18.6.3-006 ENGINEERING DEPARTMENT                                                                   Revision 0 RIVER BEND STATION                                                                 PAGE 7 OF 14 1     Purpose 1.1   The purpose of this analysis is to establish more realistic drift values and characteristics to be used by instrument uncertainty calculations for determination of setpoints and allowable values for the subject instrumentation. The drift values are determined by historical As Found / As Left data analysis.
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 7 OF 14 1
1.2   Specifically, this analysis addresses ASEA Brown Boveri (ABB) Model ITE-27H Undervoltage (UV) Relays with tag numbers as shown in Table 1.2-1 below. Also shown in the table are the calibration procedure numbers, device functions, and applicable Technical Specification (TS) sections. The results of this analysis can be conservatively applied to any ABB Model ITE-27H Undervoltage Relay used at River Bend Station that meets the criteria listed in Section 3.5.3 of Reference 4.1.3, Considerations When Combining Instruments Into a Single Group.
Purpose 1.1 The purpose of this analysis is to establish more realistic drift values and characteristics to be used by instrument uncertainty calculations for determination of setpoints and allowable values for the subject instrumentation. The drift values are determined by historical As Found / As Left data analysis.
TABLE 1.2-1 COMPONENT LIST PROCEDURE NO.               TAG NO.                       FUNCTION                 TS SECTION ENS-SWG1A-27-1A Loss of Power (LOP) Instrumentation ENS-SWG1A-27-1B STP-508-1600          ENS-SWG1A-27-1C Divisions 1 and 2 4.16kV Emergency Bus  3.3.8.1.3-1.a STP-508-1601          ENS-SWG1B-27-1A Undervoltage ENS-SWG1B-27-1B ENS-SWG1B-27-1C Loss of Voltage - 4.16 kV basis
1.2 Specifically, this analysis addresses ASEA Brown Boveri (ABB) Model ITE-27H Undervoltage (UV) Relays with tag numbers as shown in Table 1.2-1 below. Also shown in the table are the calibration procedure numbers, device functions, and applicable Technical Specification (TS) sections. The results of this analysis can be conservatively applied to any ABB Model ITE-27H Undervoltage Relay used at River Bend Station that meets the criteria listed in Section 3.5.3 of Reference 4.1.3, Considerations When Combining Instruments Into a Single Group.
TABLE 1.2-1 COMPONENT LIST PROCEDURE NO.
TAG NO.
FUNCTION TS SECTION STP-508-1600 STP-508-1601 ENS-SWG1A-27-1A ENS-SWG1A-27-1B ENS-SWG1A-27-1C ENS-SWG1B-27-1A ENS-SWG1B-27-1B ENS-SWG1B-27-1C Loss of Power (LOP) Instrumentation Divisions 1 and 2 4.16kV Emergency Bus Undervoltage Loss of Voltage - 4.16 kV basis 3.3.8.1.3-1.a


DRIFT ANALYSIS                                                                   G13.18.6.3-006 ENGINEERING DEPARTMENT                                                                 Revision 0 RIVER BEND STATION                                                               PAGE 8 OF 14 2     Conclusions 2.1   The bounding Analyzed Drift (DA) for the ABB Model ITE-27H Undervoltage Relays (See Table 1.2-1) has been determined to be ! 0.392 VAC for 30 months (24 months +
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 8 OF 14 2
Conclusions 2.1 The bounding Analyzed Drift (DA) for the ABB Model ITE-27H Undervoltage Relays (See Table 1.2-1) has been determined to be ! 0.392 VAC for 30 months (24 months +
25%), with no significant bias. The Analyzed Drift should be treated as a normally distributed, 2" value for uncertainty analysis.
25%), with no significant bias. The Analyzed Drift should be treated as a normally distributed, 2" value for uncertainty analysis.
2.2   The results of this analysis can be conservatively applied to all of the Undervoltage relays in Table 1.2-1 and to any ABB Model ITE-27H Undervoltage Relay used at River Bend Station, which meets the criteria listed in Section 3.5.3 of Reference 4.1.3, Considerations When Combining Instruments Into a Single Group.
2.2 The results of this analysis can be conservatively applied to all of the Undervoltage relays in Table 1.2-1 and to any ABB Model ITE-27H Undervoltage Relay used at River Bend Station, which meets the criteria listed in Section 3.5.3 of Reference 4.1.3, Considerations When Combining Instruments Into a Single Group.
3     Design Inputs 3.1   Pages 1 through 3 of Attachment 1 provide a listing of the historical As Left (AL) and As Found (AF) data, as obtained from Reference 4.2.1, with any data exclusions or modifications noted. All dates of calibration are also entered to provide time intervals between calibrations.
3 Design Inputs 3.1 Pages 1 through 3 of Attachment 1 provide a listing of the historical As Left (AL) and As Found (AF) data, as obtained from Reference 4.2.1, with any data exclusions or modifications noted. All dates of calibration are also entered to provide time intervals between calibrations.
4     References 4.1   METHODOLOGY 4.1.1     ANSI/ISA-S67.04-Part I-2000, Setpoints for Nuclear Safety Related Instrumentation 4.1.2     ISA-RP67.04-Part II-2000, "Methodologies for the Determination of Setpoints for Nuclear Safety-Related Instrumentation," Second Printing, June 12, 1995 4.1.3     ECH-NE-08-00015, Instrument Drift Analysis Design Guide," Rev. 0, Generated by EXCEL Services Corporation, July 2008 4.1.4     EPRI TR-103335R1, "Statistical Analysis of Instrument Calibration Data; Guidelines for Instrument Calibration Extension / Reduction Programs," October, 1998 4.1.5     DOE Research and Development Report No. WAPD-TM-1292, "Statistics for Nuclear Engineers and Scientists Part 1: Basic Statistical Inference," February 1981 4.1.6     NRC Generic Letter 91-04, "Changes in Technical Specification Surveillance Requirements to Accommodate a 24 Month Fuel Cycle," April 2, 1991 4.1.7     American National Standard N15.15-1974, "Assessment of the Assumption of Normality (Employing Individual Observed Values)"
4 References 4.1 METHODOLOGY 4.1.1 ANSI/ISA-S67.04-Part I-2000, Setpoints for Nuclear Safety Related Instrumentation 4.1.2 ISA-RP67.04-Part II-2000, "Methodologies for the Determination of Setpoints for Nuclear Safety-Related Instrumentation," Second Printing, June 12, 1995 4.1.3 ECH-NE-08-00015, Instrument Drift Analysis Design Guide," Rev. 0, Generated by EXCEL Services Corporation, July 2008 4.1.4 EPRI TR-103335R1, "Statistical Analysis of Instrument Calibration Data; Guidelines for Instrument Calibration Extension / Reduction Programs," October, 1998 4.1.5 DOE Research and Development Report No. WAPD-TM-1292, "Statistics for Nuclear Engineers and Scientists Part 1: Basic Statistical Inference," February 1981 4.1.6 NRC Generic Letter 91-04, "Changes in Technical Specification Surveillance Requirements to Accommodate a 24 Month Fuel Cycle," April 2, 1991 4.1.7 American National Standard N15.15-1974, "Assessment of the Assumption of Normality (Employing Individual Observed Values)"
4.2   PROCEDURES 4.2.1     Historical Calibration Records from RBS Surveillance Test Procedure Results for STP-508-1600, 1601 4.3   MISCELLANEOUS REFERENCES 4.3.1     None
4.2 PROCEDURES 4.2.1 Historical Calibration Records from RBS Surveillance Test Procedure Results for STP-508-1600, 1601 4.3 MISCELLANEOUS REFERENCES 4.3.1 None


DRIFT ANALYSIS                                                                     G13.18.6.3-006 ENGINEERING DEPARTMENT                                                                   Revision 0 RIVER BEND STATION                                                                 PAGE 9 OF 14 5     Assumptions 5.1   This drift report employs those assumptions customarily used for standard statistical analyses, as directed by Reference 4.1.3, such as the assumption that a distribution is normal and the use of statistical tests to confirm this hypothesis.
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 9 OF 14 5
5.2   This drift report is based on analysis of historical As Found and As Left data from calibration records for the devices listed in Table 1.2-1. The results of this analysis can also apply to any ABB Model ITE-27H Undervoltage Relay used at RBS, but care must be taken when applying these results. Specifically, in order to apply the results of this analysis to other similar devices, the devices must meet the criteria listed in Section 3.5.3 of Reference 4.1.3, Considerations When Combining Instruments Into a Single Group.
Assumptions 5.1 This drift report employs those assumptions customarily used for standard statistical analyses, as directed by Reference 4.1.3, such as the assumption that a distribution is normal and the use of statistical tests to confirm this hypothesis.
6     Method of Analysis 6.1   The methodology used for this analysis is Reference 4.1.3, which is written in accordance with Reference 4.1.4, using References 4.1.1, 4.1.2 and 4.1.7 to supplement. An overview of the methodology is given herein, and any deviation from Reference 4.1.3 or any supplemental methods used herein are described.
5.2 This drift report is based on analysis of historical As Found and As Left data from calibration records for the devices listed in Table 1.2-1. The results of this analysis can also apply to any ABB Model ITE-27H Undervoltage Relay used at RBS, but care must be taken when applying these results. Specifically, in order to apply the results of this analysis to other similar devices, the devices must meet the criteria listed in Section 3.5.3 of Reference 4.1.3, Considerations When Combining Instruments Into a Single Group.
6.2   This analysis determines the drift values for the subject instrumentation by analysis of historical As Found / As Left data from calibration records. Drift for a given device for a calibration period is determined by subtracting the previous As Left setting from a more recent As Found setting. The time interval for that calibration period is determined by subtracting the previous date from the more recent date, in units of days. All retrievable As Left and As Found data is collected for each calibration performed on each device covered by this report, for the study period. From this information, the drift and calibration interval is generated for each possible instance. Per Section 3.4.2 of Reference 4.1.3, "The goal is to collect enough data for the instrument or group to make a statistically valid pool." The devices covered by this report are currently calibrated on an 18 Month basis, and the proposed extension is for a 24 Month nominal calibration interval. Therefore, a study period of 10 years represents more than six of the present calibration cycles, and five of the proposed calibration cycles, which is adequate to understand the component's performance over time. Also, a sufficient number of valid drift values are provided as a result of the selected study period to make a statistically valid pool. Therefore, As Found and As Left Data values are entered from calibrations occurring for approximately the last 10 years.
6 Method of Analysis 6.1 The methodology used for this analysis is Reference 4.1.3, which is written in accordance with Reference 4.1.4, using References 4.1.1, 4.1.2 and 4.1.7 to supplement. An overview of the methodology is given herein, and any deviation from Reference 4.1.3 or any supplemental methods used herein are described.
6.3   Determination of the Analyzed Drift is generally accomplished through the following steps.
6.2 This analysis determines the drift values for the subject instrumentation by analysis of historical As Found / As Left data from calibration records. Drift for a given device for a calibration period is determined by subtracting the previous As Left setting from a more recent As Found setting. The time interval for that calibration period is determined by subtracting the previous date from the more recent date, in units of days. All retrievable As Left and As Found data is collected for each calibration performed on each device covered by this report, for the study period. From this information, the drift and calibration interval is generated for each possible instance. Per Section 3.4.2 of Reference 4.1.3, "The goal is to collect enough data for the instrument or group to make a statistically valid pool." The devices covered by this report are currently calibrated on an 18 Month basis, and the proposed extension is for a 24 Month nominal calibration interval. Therefore, a study period of 10 years represents more than six of the present calibration cycles, and five of the proposed calibration cycles, which is adequate to understand the component's performance over time. Also, a sufficient number of valid drift values are provided as a result of the selected study period to make a statistically valid pool. Therefore, As Found and As Left Data values are entered from calibrations occurring for approximately the last 10 years.
6.3.1     Gather and Generate Raw Drift Data: In addition to gathering the As Found and As Left data, and computing the drift values and time intervals, this step also involves an investigation into whether all of the devices should be analyzed together, or whether they should be separated into smaller analysis groups. Additionally, this step involves careful screening of the input data for errors or other situations that would not allow proper determination of drift.
6.3 Determination of the Analyzed Drift is generally accomplished through the following steps.
6.3.2     Determination of Outliers and Statistical Summary: In order to properly model the drift characteristics for a device, it could be proper to remove up to one more data value, which obviously does not conform to the vast majority of the data. A t-Test is
6.3.1 Gather and Generate Raw Drift Data: In addition to gathering the As Found and As Left data, and computing the drift values and time intervals, this step also involves an investigation into whether all of the devices should be analyzed together, or whether they should be separated into smaller analysis groups. Additionally, this step involves careful screening of the input data for errors or other situations that would not allow proper determination of drift.
6.3.2 Determination of Outliers and Statistical Summary: In order to properly model the drift characteristics for a device, it could be proper to remove up to one more data value, which obviously does not conform to the vast majority of the data. A t-Test is  


DRIFT ANALYSIS                                                                       G13.18.6.3-006 ENGINEERING DEPARTMENT                                                                     Revision 0 RIVER BEND STATION                                                                 PAGE 10 OF 14 performed on the data to detect any outliers, and remove up to one if appropriate, per the guidelines of Reference 4.1.3. Additionally, the basic statistical values which describe the group of drift data are derived in this step, including such parameters as Mean, Standard Deviation, Count, Median, Minimum, Maximum, etc.
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 10 OF 14 performed on the data to detect any outliers, and remove up to one if appropriate, per the guidelines of Reference 4.1.3. Additionally, the basic statistical values which describe the group of drift data are derived in this step, including such parameters as Mean, Standard Deviation, Count, Median, Minimum, Maximum, etc.
6.3.3     Tests for Normality: Per Reference 4.1.3, a statistical test (W or D-Prime, depending on sample size) is performed on the drift data to support the hypothesis that the data conforms to a normal distribution. If this test is unable to support that hypothesis, then a Coverage Analysis is performed to ensure that the data can be conservatively modeled by a normal distribution and to provide an adjustment to the standard deviation of the drift model, if necessary to conservatively envelop the observed data population.
6.3.3 Tests for Normality: Per Reference 4.1.3, a statistical test (W or D-Prime, depending on sample size) is performed on the drift data to support the hypothesis that the data conforms to a normal distribution. If this test is unable to support that hypothesis, then a Coverage Analysis is performed to ensure that the data can be conservatively modeled by a normal distribution and to provide an adjustment to the standard deviation of the drift model, if necessary to conservatively envelop the observed data population.  


====6.3.4 Time-Dependency====
====6.3.4 Time-Dependency====
Per Reference 4.1.3, Scatter Plots and a time-based Binning Analysis are developed for the data to establish the time-dependency of the drift. If enough drift data exists for significantly different time intervals, regression analysis is performed to aid in the determination of time-dependency. The drift data is determined to be strongly time dependent or moderately time dependent, for the purpose of extrapolation.
Per Reference 4.1.3, Scatter Plots and a time-based Binning Analysis are developed for the data to establish the time-dependency of the drift. If enough drift data exists for significantly different time intervals, regression analysis is performed to aid in the determination of time-dependency. The drift data is determined to be strongly time dependent or moderately time dependent, for the purpose of extrapolation.
6.3.5     Analyzed Drift Derivation and Characterization: The drift values are determined for the current calibration interval. These values are conservatively extrapolated to the desired calibration interval, based on the methods prescribed in Reference 4.1.3, depending on the degree of time-dependency derived for the drift data.
6.3.5 Analyzed Drift Derivation and Characterization: The drift values are determined for the current calibration interval. These values are conservatively extrapolated to the desired calibration interval, based on the methods prescribed in Reference 4.1.3, depending on the degree of time-dependency derived for the drift data.
6.4   The mathematical computations of the statistical analysis are performed within an Excel spreadsheet. Supporting information from the spreadsheet is printed out in the form of Attachment 1 to this analysis. Microsoft Excel spreadsheets generally compute values to an approximate 15 decimal resolution, which is well beyond any required rounding for engineering analyses. However, for printing and display purposes, most values are displayed to lesser resolution. It is possible that hand computations will produce slightly different results, because of using rounded numbers in initial and intermediate steps, but the Excel computed values are considered highly accurate in comparison.
6.4 The mathematical computations of the statistical analysis are performed within an Excel spreadsheet. Supporting information from the spreadsheet is printed out in the form of to this analysis. Microsoft Excel spreadsheets generally compute values to an approximate 15 decimal resolution, which is well beyond any required rounding for engineering analyses. However, for printing and display purposes, most values are displayed to lesser resolution. It is possible that hand computations will produce slightly different results, because of using rounded numbers in initial and intermediate steps, but the Excel computed values are considered highly accurate in comparison.
6.5   Acceptance Criteria: Since the purpose of the analysis is to generate a value and description of the characteristics of the drift of the evaluated make/model, there are no specific acceptance criteria.
6.5 Acceptance Criteria: Since the purpose of the analysis is to generate a value and description of the characteristics of the drift of the evaluated make/model, there are no specific acceptance criteria.
7     Analysis 7.1   Gather and Generate Raw Error Data 7.1.1     Specifically, this analysis addresses ABB Model ITE-27H Undervoltage Relays, with the tag numbers as shown in Table 1.2-1 of this analysis. These relays have identical manufacturer and model numbers, identical settings, and are used in identical applications. Therefore, all data is properly pooled for analysis, and no specific pooling tests are required.
7 Analysis 7.1 Gather and Generate Raw Error Data 7.1.1 Specifically, this analysis addresses ABB Model ITE-27H Undervoltage Relays, with the tag numbers as shown in Table 1.2-1 of this analysis. These relays have identical manufacturer and model numbers, identical settings, and are used in identical applications. Therefore, all data is properly pooled for analysis, and no specific pooling tests are required.
7.1.2     A screening of the initial input data from pages 1 through 3 of Attachment 1 was performed. To help identify erroneous data, an informal critical T-test was performed, with the Critical T values reduced incrementally until approximately 10%
7.1.2 A screening of the initial input data from pages 1 through 3 of Attachment 1 was performed. To help identify erroneous data, an informal critical T-test was performed, with the Critical T values reduced incrementally until approximately 10%
of the data population was identified as outliers. Those outliers were researched,
of the data population was identified as outliers. Those outliers were researched,  


DRIFT ANALYSIS                                                                     G13.18.6.3-006 ENGINEERING DEPARTMENT                                                                   Revision 0 RIVER BEND STATION                                                             PAGE 11 OF 14 and no data errors were revealed as shown in Table 7.1.4-1. The specific informal T-tests performed are not documented, as they are only used as tools to identify potentially erroneous data and do not contribute to the analysis of the valid data.
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 11 OF 14 and no data errors were revealed as shown in Table 7.1.4-1. The specific informal T-tests performed are not documented, as they are only used as tools to identify potentially erroneous data and do not contribute to the analysis of the valid data.
7.1.3   Pages 1 through 3 of Attachment 1 provide a listing of the initial As Found and As Left data from available historical plant calibration records for the subject UV Relays. Note that the calibration dates are also recorded, and notes are provided to clarify the activities performed or to provide additional information about the data, as appropriate. This data was entered into an Excel spreadsheet for computation of the drift values, time intervals between calibrations and statistical analysis.
7.1.3 Pages 1 through 3 of Attachment 1 provide a listing of the initial As Found and As Left data from available historical plant calibration records for the subject UV Relays. Note that the calibration dates are also recorded, and notes are provided to clarify the activities performed or to provide additional information about the data, as appropriate. This data was entered into an Excel spreadsheet for computation of the drift values, time intervals between calibrations and statistical analysis.
7.1.4   Data not entered into the analysis is listed in the table below, showing the reasoning used in not entering the data.
7.1.4 Data not entered into the analysis is listed in the table below, showing the reasoning used in not entering the data.
Table 7.1.4-1 Data Not Entered in the Drift Analysis Procedure           Tag Number       Surveillance           Comments/Disposition Number                                  Date(s)
Table 7.1.4-1 Data Not Entered in the Drift Analysis Procedure Number Tag Number Surveillance Date(s)
None                 None             None       None 7.1.5   Per the methodology of Section 4.1.1.11 of Reference 4.1.3, drift is computed by subtracting the As Left data of one calibration from the As Found data of the next calibration, as documented in pages 4 through 6 of Attachment 1. These pages also document the time interval between calibrations (in the number of days and months) by subtracting the As Left date of one calibration from the As Found date of the next calibration, per Section 4.1.1.10 of Reference 4.1.3. Pages 4 through 6 of Attachment 1 import the Sequence ID, the Tag No., the AF / AL flags, the dates of calibration and the As Found and As Left data from pages 1 through 3 of Attachment 1 and computes the interval between calibrations. Pages 4 and 5 of Attachment 1 compute the drift values and summarize the time intervals computed.
Comments/Disposition None None None None 7.1.5 Per the methodology of Section 4.1.1.11 of Reference 4.1.3, drift is computed by subtracting the As Left data of one calibration from the As Found data of the next calibration, as documented in pages 4 through 6 of Attachment 1. These pages also document the time interval between calibrations (in the number of days and months) by subtracting the As Left date of one calibration from the As Found date of the next calibration, per Section 4.1.1.10 of Reference 4.1.3. Pages 4 through 6 of import the Sequence ID, the Tag No., the AF / AL flags, the dates of calibration and the As Found and As Left data from pages 1 through 3 of and computes the interval between calibrations. Pages 4 and 5 of compute the drift values and summarize the time intervals computed.
As an example of the equations used, the first drift value and time interval are computed as follows. The rest of the values are computed identically.
As an example of the equations used, the first drift value and time interval are computed as follows. The rest of the values are computed identically.
Drift (Seq 1)= AF (2/17/08) - AL (5/08/06) [For Tag ENS-SWG1A-27-1A]
Drift (Seq 1)= AF (2/17/08) - AL (5/08/06) [For Tag ENS-SWG1A-27-1A]  
                                = 48.90 (From Seq. 1 on Left) - 49.09 (From Seq. 4 on Left)
= 48.90 (From Seq. 1 on Left) - 49.09 (From Seq. 4 on Left)  
                                = -0.19 VAC Cal Interval (Seq 1) = 2/17/08 - 5/08/06
= -0.19 VAC Cal Interval (Seq 1) = 2/17/08 - 5/08/06  
                                = 650 Days Cal Interval (Mo.)     = Cal Interval (Days) x 12 Months / 365.25 Days
= 650 Days Cal Interval (Mo.)  
                                = 21.4 Months
= Cal Interval (Days) x 12 Months / 365.25 Days  
= 21.4 Months  


DRIFT ANALYSIS                                                                     G13.18.6.3-006 ENGINEERING DEPARTMENT                                                                   Revision 0 RIVER BEND STATION                                                               PAGE 12 OF 14 7.2   Determination of Outliers and Statistical Summary 7.2.1   The outlier analysis is recorded on pages 7 and 8 of Attachment 1 to this drift analysis. This page displays the Sequence No., Tag No., Drift, and Calibration Interval (in units of Days). The critical T value used in the outlier analysis comes directly from Table 2 of Reference 4.1.3. As shown on page 7 of Attachment 1, one outlier was detected and removed. The Final Data Set (FDS) for this analysis is documented on pages 7 through 8 of Attachment 1 and, except for the one removed outlier, is identical to the original data set.
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 12 OF 14 7.2 Determination of Outliers and Statistical Summary 7.2.1 The outlier analysis is recorded on pages 7 and 8 of Attachment 1 to this drift analysis. This page displays the Sequence No., Tag No., Drift, and Calibration Interval (in units of Days). The critical T value used in the outlier analysis comes directly from Table 2 of Reference 4.1.3. As shown on page 7 of Attachment 1, one outlier was detected and removed. The Final Data Set (FDS) for this analysis is documented on pages 7 through 8 of Attachment 1 and, except for the one removed outlier, is identical to the original data set.
7.2.2   A summary of the required statistical values for the Final Data Set, per Section 4.2 of Reference 4.1.3, is developed on page 7 of Attachment 1. Cell formulas for the determinations of statistical quantities are used directly from Section 4.2 of Reference 4.1.3.
7.2.2 A summary of the required statistical values for the Final Data Set, per Section 4.2 of Reference 4.1.3, is developed on page 7 of Attachment 1. Cell formulas for the determinations of statistical quantities are used directly from Section 4.2 of Reference 4.1.3.
7.3   Tests for Normality 7.3.1   Since the FDS contains less than 50 samples, the W Test is performed on the data to test for normality, as shown on page 9 of Attachment 1. Per the methodology of Section 3.7.2 of Reference 4.1.3, the details of the W Test methodology are shown in Reference 4.1.7. Equations used are listed on page 9 of Attachment 1. Since the calculated W statistic (0.9569) is greater than the critical value for W (0.9410), this test does not reject the assumption of normality for this data set. Therefore, the data is established as normally distributed, and no coverage analysis is necessary.
7.3 Tests for Normality 7.3.1 Since the FDS contains less than 50 samples, the W Test is performed on the data to test for normality, as shown on page 9 of Attachment 1. Per the methodology of Section 3.7.2 of Reference 4.1.3, the details of the W Test methodology are shown in Reference 4.1.7. Equations used are listed on page 9 of Attachment 1. Since the calculated W statistic (0.9569) is greater than the critical value for W (0.9410), this test does not reject the assumption of normality for this data set. Therefore, the data is established as normally distributed, and no coverage analysis is necessary.
7.3.2   Since the W Test did not reject the assumption of normality, a Coverage Analysis is not necessary, but a Histogram is developed for information only. The Histogram is developed and documented on pages 10 and 11 of Attachment 1, per Sections 3.7.5 and 4.4 of Reference 4.1.3. To generate the Histogram data, the drift values are categorized into 12 bins, in relation to the mean and standard deviation. These bins are generated in multiples of 1/2 Standard Deviation increments, and the bin maximum values are derived in accordance with the methods given in Section 19 of Reference 4.1.4. (See page 10 of Attachment 1 for specific formulas used for the maximums.)
7.3.2 Since the W Test did not reject the assumption of normality, a Coverage Analysis is not necessary, but a Histogram is developed for information only. The Histogram is developed and documented on pages 10 and 11 of Attachment 1, per Sections 3.7.5 and 4.4 of Reference 4.1.3. To generate the Histogram data, the drift values are categorized into 12 bins, in relation to the mean and standard deviation. These bins are generated in multiples of 1/2 Standard Deviation increments, and the bin maximum values are derived in accordance with the methods given in Section 19 of Reference 4.1.4. (See page 10 of Attachment 1 for specific formulas used for the maximums.)
The expected populations within each bin are developed from normal distribution percentages, as shown on page 10 of Attachment 1.
The expected populations within each bin are developed from normal distribution percentages, as shown on page 10 of Attachment 1.
7.4   Time-Dependency 7.4.1   In order to determine time-dependency of the drift data, the data is first plotted as a scatter plot on page 12 of Attachment 1, in accordance with the methodology of Section 4.5.1 of Reference 4.1.3. The trend line within this scatter plot starts at a small negative value and crosses zero towards the end of the analysis period. The data scatter appears to increase slightly over time. The trend line and the associated equation are noted on the scatter plot on page 12 of Attachment 1.
7.4 Time-Dependency 7.4.1 In order to determine time-dependency of the drift data, the data is first plotted as a scatter plot on page 12 of Attachment 1, in accordance with the methodology of Section 4.5.1 of Reference 4.1.3. The trend line within this scatter plot starts at a small negative value and crosses zero towards the end of the analysis period. The data scatter appears to increase slightly over time. The trend line and the associated equation are noted on the scatter plot on page 12 of Attachment 1.
7.4.2   The binning analysis is performed on page 13 of Attachment 1. The drift and time interval data are divided into bins, based on the intervals between calibrations as defined in Section 3.8.3.1 of Reference 4.1.3. Statistical summaries for each bin, including count, mean, standard deviation, mean time interval and maximum observed time interval are computed. Excel functions are used to determine the statistical summary values for each bin, and are used explicitly from Sections 4.2.1,
7.4.2 The binning analysis is performed on page 13 of Attachment 1. The drift and time interval data are divided into bins, based on the intervals between calibrations as defined in Section 3.8.3.1 of Reference 4.1.3. Statistical summaries for each bin, including count, mean, standard deviation, mean time interval and maximum observed time interval are computed. Excel functions are used to determine the statistical summary values for each bin, and are used explicitly from Sections 4.2.1,  


DRIFT ANALYSIS                                                                     G13.18.6.3-006 ENGINEERING DEPARTMENT                                                                   Revision 0 RIVER BEND STATION                                                               PAGE 13 OF 14 4.2.2, 4.2.3 and 4.2.7 of Reference 4.1.3. This information is presented on page 13 of Attachment 1. Per Section 3.8.3.4 of Reference 4.1.3, after removing those bins with 5 or less data points and those with less than or equal to 10% of total population, only Bins 4 and 5 remain.
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 13 OF 14 4.2.2, 4.2.3 and 4.2.7 of Reference 4.1.3. This information is presented on page 13 of Attachment 1. Per Section 3.8.3.4 of Reference 4.1.3, after removing those bins with 5 or less data points and those with less than or equal to 10% of total population, only Bins 4 and 5 remain.
Page 14 of Attachment 1 displays a plot of the mean and standard deviations of the drift data versus the average time interval between calibrations for the subject bins, in accordance with Section 4.5.2 of Reference 4.1.3. It also provides all of the binning parameters and statistics that are a part of the binning analysis. The mean value of the data starts from a negative value in Bin 4, crosses zero and goes positive for Bin 5. Also, from this plot, the standard deviation increases from Bin 4 to Bin 5. In addition, the ratio of the variances (Bin 5 / Bin 4) is compared to the F critical value, as directed by Section 4.5.2 of Reference 4.1.3. Only the standard deviation plot could be indicative of potential time dependency, but strong time dependency is not indicated from the variance test (Sections 3.8.3.4 and 4.5.2 of Reference 4.1.3).
Page 14 of Attachment 1 displays a plot of the mean and standard deviations of the drift data versus the average time interval between calibrations for the subject bins, in accordance with Section 4.5.2 of Reference 4.1.3. It also provides all of the binning parameters and statistics that are a part of the binning analysis. The mean value of the data starts from a negative value in Bin 4, crosses zero and goes positive for Bin 5. Also, from this plot, the standard deviation increases from Bin 4 to Bin 5. In addition, the ratio of the variances (Bin 5 / Bin 4) is compared to the F critical value, as directed by Section 4.5.2 of Reference 4.1.3. Only the standard deviation plot could be indicative of potential time dependency, but strong time dependency is not indicated from the variance test (Sections 3.8.3.4 and 4.5.2 of Reference 4.1.3).
7.4.3   Per Section 3.8.4 of Reference 4.1.3, a drift regression analysis is performed within pages 15 and 16 of Attachment 1 (labeled Regression-Drift). The equations and functions used by Excel are taken specifically from Section 3.8.4 of Reference 4.1.3.
7.4.3 Per Section 3.8.4 of Reference 4.1.3, a drift regression analysis is performed within pages 15 and 16 of Attachment 1 (labeled Regression-Drift). The equations and functions used by Excel are taken specifically from Section 3.8.4 of Reference 4.1.3.
The regression analysis output shows an R Squared Value (0.042874) less than 0.09, a P Value greater than 0.05 (0.193957) and F Value (1.746985) less than F Critical (3.238096). These results all indicate a bias portion of drift that is not time-dependent. Also, the regression line crosses zero within the analysis period, which per the last paragraph of Section 3.8.4 of Reference 4.1.3, is not expected and is an improper model of the drift-versus-time characteristic of the device. The fact that this is an improper model of the drift-versus-time characteristic of the device confirms the time-independent conclusion of the three statistical tests. The bias portion of drift is conservatively treated as moderately time-dependent for the purpose of extrapolation.
The regression analysis output shows an R Squared Value (0.042874) less than 0.09, a P Value greater than 0.05 (0.193957) and F Value (1.746985) less than F Critical (3.238096). These results all indicate a bias portion of drift that is not time-dependent. Also, the regression line crosses zero within the analysis period, which per the last paragraph of Section 3.8.4 of Reference 4.1.3, is not expected and is an improper model of the drift-versus-time characteristic of the device. The fact that this is an improper model of the drift-versus-time characteristic of the device confirms the time-independent conclusion of the three statistical tests. The bias portion of drift is conservatively treated as moderately time-dependent for the purpose of extrapolation.
7.4.4   Per Section 3.8.4 of Reference 4.1.3, an absolute value drift regression analysis is performed within pages 17 and 18 of Attachment 1 (labeled Regression - AV of Drift). The drift data is converted into absolute value via the Excel ABS function for each drift data value. The equations and functions used by Excel for the Regression analysis are taken specifically from Section 3.8.4 of Reference 4.1.3.
7.4.4 Per Section 3.8.4 of Reference 4.1.3, an absolute value drift regression analysis is performed within pages 17 and 18 of Attachment 1 (labeled Regression - AV of Drift). The drift data is converted into absolute value via the Excel ABS function for each drift data value. The equations and functions used by Excel for the Regression analysis are taken specifically from Section 3.8.4 of Reference 4.1.3.
This regression analysis output shows an R Squared Value (0.023738) less than 0.09, a P Value (0.336156) greater than 0.05, and an F Value (0.948294) less than F Critical (3.238096). These results all indicate a random portion of drift that is not significantly time-dependent. The absolute value drift regression line increases over time, and the binning plot shows an increasing standard deviation over time. Based on these results, per Section 3.8.4 of Reference 4.1.3, the random portion of drift is conservatively treated as moderately time-dependent for the purpose of extrapolation.
This regression analysis output shows an R Squared Value (0.023738) less than 0.09, a P Value (0.336156) greater than 0.05, and an F Value (0.948294) less than F Critical (3.238096). These results all indicate a random portion of drift that is not significantly time-dependent. The absolute value drift regression line increases over time, and the binning plot shows an increasing standard deviation over time. Based on these results, per Section 3.8.4 of Reference 4.1.3, the random portion of drift is conservatively treated as moderately time-dependent for the purpose of extrapolation.
7.5   Analyzed Drift (DA) Derivation and Characterization 7.5.1   As shown on page 19 of Attachment 1, per Section 3.11 of Reference 4.1.3, the drift bias error is evaluated for significance. The critical value for significance of the bias term is computed and shown therein. The bias is determined to be negligible.
7.5 Analyzed Drift (DA) Derivation and Characterization 7.5.1 As shown on page 19 of Attachment 1, per Section 3.11 of Reference 4.1.3, the drift bias error is evaluated for significance. The critical value for significance of the bias term is computed and shown therein. The bias is determined to be negligible.
Therefore, the computed Analyzed Drift Bias term (DAbias) is negligible.
Therefore, the computed Analyzed Drift Bias term (DAbias) is negligible.  


DRIFT ANALYSIS                                                                     G13.18.6.3-006 ENGINEERING DEPARTMENT                                                                   Revision 0 RIVER BEND STATION                                                               PAGE 14 OF 14 7.5.2     Per Section 4.6.6 of Reference 4.1.3, the random portion of the Analyzed Drift is determined from multiplying the standard deviation of Bin 5 by the Tolerance Interval Factor (TIF), and extrapolating as required to a calibration interval of 30 months. The random portion of drift has been determined to be moderately time-dependent for the purpose of extrapolation. For conservatism, the standard deviation of Bin 5 is used with the average observed time interval from Bin 5 on page 13 of Attachment 1 as the starting point. The TIF is obtained from Table 1 of Reference 4.1.3 as 2.445 for a 95/95 significance. The computation of this value is shown on page 19 of Attachment 1 to result in a DArandom(extrap) term of ! 0.392 VAC for a 30 month (24 months + 25%) calibration interval.
DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 14 OF 14 7.5.2 Per Section 4.6.6 of Reference 4.1.3, the random portion of the Analyzed Drift is determined from multiplying the standard deviation of Bin 5 by the Tolerance Interval Factor (TIF), and extrapolating as required to a calibration interval of 30 months. The random portion of drift has been determined to be moderately time-dependent for the purpose of extrapolation. For conservatism, the standard deviation of Bin 5 is used with the average observed time interval from Bin 5 on page 13 of Attachment 1 as the starting point. The TIF is obtained from Table 1 of Reference 4.1.3 as 2.445 for a 95/95 significance. The computation of this value is shown on page 19 of Attachment 1 to result in a DArandom(extrap) term of ! 0.392 VAC for a 30 month (24 months + 25%) calibration interval.
8     Attachments Attachment 1 - Analysis Spreadsheet (19 pages)
8 Attachments - Analysis Spreadsheet (19 pages)
Spreadsheet Contents Pages Input Data                                                                       1-3 AF-AL Data                                                                       4-6 Outliers & Summary                                                               7-8 W Test                                                                             9 Histogram                                                                       10-11 Scatter Plot                                                                     12 Binning Analysis                                                               13-14 Regression - Drift                                                             15-16 Regression - AV of Drift                                                       17-18 Analyzed Drift (DA)                                                               19 Attachment 2 - DVR Form (8 pages)
Spreadsheet Contents Pages Input Data 1-3 AF-AL Data 4-6 Outliers & Summary 7-8 W Test 9
Histogram 10-11 Scatter Plot 12 Binning Analysis 13-14 Regression - Drift 15-16 Regression - AV of Drift 17-18 Analyzed Drift (DA) 19 - DVR Form (8 pages)  


DRIFT ANALYSIS                                           ABB/ITE-27H                           G13.18.6.3-006 Rev 0 RIVER BEND STATION                                    Undervoltage Relays                              Attachment 1 Input Data                                    Page 1 of19 AF/        AF / AL Seq. ID Tag ID           Date     Procedure   Make/Model     AL   Setpt Data   Units Comments 1     ENS-SWG1A-27-1A (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H   AF   49.0 48.90 VAC 2     ENS-SWG1A-27-1A (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H   AL   49.0 48.90 VAC 3     ENS-SWG1A-27-1A (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H   AF   49.0 49.10 VAC 4     ENS-SWG1A-27-1A (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H   AL   49.0 49.09 VAC 5     ENS-SWG1A-27-1A (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H   AF   49.0 49.10 VAC 6     ENS-SWG1A-27-1A (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H   AL   49.0 49.10 VAC 7     ENS-SWG1A-27-1A (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H   AF   49.0 48.80 VAC 8     ENS-SWG1A-27-1A (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H   AL   49.0 49.01 VAC 9     ENS-SWG1A-27-1A (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H   AF   49.0 49.00 VAC 10   ENS-SWG1A-27-1A (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H   AL   49.0 49.00 VAC 11   ENS-SWG1A-27-1A (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H   AF   49.0 48.90 VAC 12   ENS-SWG1A-27-1A (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H   AL   49.0 48.90 VAC 13   ENS-SWG1A-27-1A (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H   AF   49.0 49.00 VAC 14   ENS-SWG1A-27-1A (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H   AL   49.0 49 0 49.00 49 00  VAC 15   ENS-SWG1A-27-1A (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H   AF   49.0 49.00 VAC 16   ENS-SWG1A-27-1A (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H   AL   49.0 49.00 VAC 17   ENS-SWG1A-27-1B (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H   AF   49.0 49.90 VAC 18   ENS-SWG1A-27-1B (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H   AL   49.0 49.30 VAC 19   ENS-SWG1A-27-1B (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H   AF   49.0 49.22 VAC 20   ENS-SWG1A-27-1B (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H   AL   49.0 49.18 VAC 21   ENS-SWG1A-27-1B (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H   AF   49.0 49.10 VAC 22   ENS-SWG1A-27-1B (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H   AL   49.0 49.10 VAC 23   ENS-SWG1A-27-1B (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H   AF   49.0 48.40 VAC 24   ENS-SWG1A-27-1B (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H   AL   49.0 49.10 VAC 25   ENS-SWG1A-27-1B (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H   AF   49.0 48.50 VAC 26   ENS-SWG1A-27-1B (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H   AL   49.0 48.50 VAC 27   ENS-SWG1A-27-1B (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H   AF   49.0 48.50 VAC 28   ENS-SWG1A-27-1B (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H   AL   49.0 48.50 VAC 29   ENS-SWG1A-27-1B (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H   AF   49.0 48.60 VAC 30   ENS-SWG1A-27-1B (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H   AL   49.0 48.60 VAC 31   ENS-SWG1A-27-1B (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H   AF   49.0 48.60 VAC 32   ENS-SWG1A-27-1B (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H   AL   49.0 48.60 VAC 33   ENS-SWG1A-27-1C (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H   AF   49.0 50.00 VAC 34   ENS-SWG1A-27-1C (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H   AL   49.0 49.20 VAC 35   ENS-SWG1A-27-1C (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H   AF   49.0 48.80 VAC 36   ENS-SWG1A-27-1C (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H   AL   49.0 49.70 VAC
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Input Data G13.18.6.3-006 Rev 0 Page 1 of19 Seq. ID Tag ID Date Procedure Make/Model AF/
AL Setpt AF / AL Data Units Comments 1
ENS-SWG1A-27-1A (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AF 49.0 48.90 VAC 2
ENS-SWG1A-27-1A (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AL 49.0 48.90 VAC 3
ENS-SWG1A-27-1A (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AF 49.0 49.10 VAC 4
ENS-SWG1A-27-1A (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AL 49.0 49.09 VAC 5
ENS-SWG1A-27-1A (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AF 49.0 49.10 VAC 6
ENS-SWG1A-27-1A (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AL 49.0 49.10 VAC 7
ENS-SWG1A-27-1A (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AF 49.0 48.80 VAC 8
ENS-SWG1A-27-1A (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AL 49.0 49.01 VAC 9
ENS-SWG1A-27-1A (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AF 49.0 49.00 VAC 10 ENS-SWG1A-27-1A (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AL 49.0 49.00 VAC 11 ENS-SWG1A-27-1A (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AF 49.0 48.90 VAC 12 ENS-SWG1A-27-1A (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AL 49.0 48.90 VAC 13 ENS-SWG1A-27-1A (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AF 49.0 49.00 VAC 14 ENS-SWG1A-27-1A (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AL 49 0 49 00 VAC 14 ENS-SWG1A-27-1A (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AL 49.0 49.00 VAC 15 ENS-SWG1A-27-1A (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AF 49.0 49.00 VAC 16 ENS-SWG1A-27-1A (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AL 49.0 49.00 VAC 17 ENS-SWG1A-27-1B (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AF 49.0 49.90 VAC 18 ENS-SWG1A-27-1B (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AL 49.0 49.30 VAC 19 ENS-SWG1A-27-1B (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AF 49.0 49.22 VAC 20 ENS-SWG1A-27-1B (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AL 49.0 49.18 VAC 21 ENS-SWG1A-27-1B (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AF 49.0 49.10 VAC 22 ENS-SWG1A-27-1B (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AL 49.0 49.10 VAC 23 ENS-SWG1A-27-1B (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AF 49.0 48.40 VAC 24 ENS-SWG1A-27-1B (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AL 49.0 49.10 VAC 25 ENS-SWG1A-27-1B (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AF 49.0 48.50 VAC 26 ENS-SWG1A-27-1B (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AL 49.0 48.50 VAC 27 ENS-SWG1A-27-1B (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AF 49.0 48.50 VAC 28 ENS-SWG1A-27-1B (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AL 49.0 48.50 VAC 29 ENS-SWG1A-27-1B (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AF 49.0 48.60 VAC 30 ENS-SWG1A-27-1B (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AL 49.0 48.60 VAC 31 ENS-SWG1A-27-1B (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AF 49.0 48.60 VAC 32 ENS-SWG1A-27-1B (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AL 49.0 48.60 VAC 33 ENS-SWG1A-27-1C (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AF 49.0 50.00 VAC 34 ENS-SWG1A-27-1C (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AL 49.0 49.20 VAC 35 ENS-SWG1A-27-1C (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AF 49.0 48.80 VAC 36 ENS-SWG1A-27-1C (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AL 49.0 49.70 VAC


DRIFT ANALYSIS                                           ABB/ITE-27H                           G13.18.6.3-006 Rev 0 RIVER BEND STATION                                    Undervoltage Relays                              Attachment 1 Input Data                                    Page 2 of19 AF/        AF / AL Seq. ID Tag ID           Date     Procedure   Make/Model     AL   Setpt Data   Units Comments 37   ENS-SWG1A-27-1C (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H   AF   49.0 49.20 VAC 38   ENS-SWG1A-27-1C (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H   AL   49.0 49.20 VAC 39   ENS-SWG1A-27-1C (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H   AF   49.0 48.32 VAC 40   ENS-SWG1A-27-1C (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H   AL   49.0 49.06 VAC 41   ENS-SWG1A-27-1C (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H   AF   49.0 48.21 VAC 42   ENS-SWG1A-27-1C (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H   AL   49.0 48.21 VAC 43   ENS-SWG1A-27-1C (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H   AF   49.0 48.30 VAC 44   ENS-SWG1A-27-1C (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H   AL   49.0 48.30 VAC 45   ENS-SWG1A-27-1C (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H   AF   49.0 48.30 VAC 46   ENS-SWG1A-27-1C (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H   AL   49.0 48.30 VAC 47   ENS-SWG1A-27-1C (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H   AF   49.0 48.20 VAC 48   ENS-SWG1A-27-1C (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H   AL   49.0 48.30 VAC 49   ENS-SWG1B-27-1A (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H   AF   49.0 48.90 VAC 50   ENS-SWG1B-27-1A ENS SWG1B 27 1A (UV) 2/1/2008 STP-302-1601 STP 302 1601  ABB/ITE-27H ABB/ITE 27H  AL   49.0 49 0  48.90 48 90  VAC 51   ENS-SWG1B-27-1A (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H   AF   49.0 48.68 VAC 52   ENS-SWG1B-27-1A (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H   AL   49.0 48.78 VAC 53   ENS-SWG1B-27-1A (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H   AF   49.0 48.70 VAC 54   ENS-SWG1B-27-1A (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H   AL   49.0 48.70 VAC 55   ENS-SWG1B-27-1A (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H   AF   49.0 48.80 VAC 56   ENS-SWG1B-27-1A (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H   AL   49.0 48.80 VAC 57   ENS-SWG1B-27-1A (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H   AF   49.0 48.83 VAC 58   ENS-SWG1B-27-1A (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H   AL   49.0 48.83 VAC 59   ENS-SWG1B-27-1A (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H   AF   49.0 48.75 VAC 60   ENS-SWG1B-27-1A (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H   AL   49.0 48.85 VAC 61   ENS-SWG1B-27-1A (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H   AF   49.0 48.83 VAC 62   ENS-SWG1B-27-1A (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H   AL   49.0 48.83 VAC 63   ENS-SWG1B-27-1A (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H   AF   49.0 48.80 VAC 64   ENS-SWG1B-27-1A (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H   AL   49.0 48.80 VAC 65   ENS-SWG1B-27-1B (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H   AF   49.0 48.97 VAC 66   ENS-SWG1B-27-1B (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H   AL   49.0 49.00 VAC 67   ENS-SWG1B-27-1B (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H   AF   49.0 48.77 VAC 68   ENS-SWG1B-27-1B (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H   AL   49.0 48.77 VAC 69   ENS-SWG1B-27-1B (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H   AF   49.0 48.80 VAC 70   ENS-SWG1B-27-1B (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H   AL   49.0 48.80 VAC 71   ENS-SWG1B-27-1B (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H   AF   49.0 48.80 VAC 72   ENS-SWG1B-27-1B (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H   AL   49.0 48.80 VAC
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Input Data G13.18.6.3-006 Rev 0 Page 2 of19 Seq. ID Tag ID Date Procedure Make/Model AF/
AL Setpt AF / AL Data Units Comments 37 ENS-SWG1A-27-1C (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AF 49.0 49.20 VAC 38 ENS-SWG1A-27-1C (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AL 49.0 49.20 VAC 39 ENS-SWG1A-27-1C (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AF 49.0 48.32 VAC 40 ENS-SWG1A-27-1C (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AL 49.0 49.06 VAC 41 ENS-SWG1A-27-1C (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AF 49.0 48.21 VAC 42 ENS-SWG1A-27-1C (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AL 49.0 48.21 VAC 43 ENS-SWG1A-27-1C (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AF 49.0 48.30 VAC 44 ENS-SWG1A-27-1C (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AL 49.0 48.30 VAC 45 ENS-SWG1A-27-1C (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AF 49.0 48.30 VAC 46 ENS-SWG1A-27-1C (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AL 49.0 48.30 VAC 47 ENS-SWG1A-27-1C (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AF 49.0 48.20 VAC 48 ENS-SWG1A-27-1C (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AL 49.0 48.30 VAC 49 ENS-SWG1B-27-1A (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AF 49.0 48.90 VAC 50 ENS SWG1B 27 1A (UV) 2/1/2008 STP 302 1601 ABB/ITE 27H AL 49 0 48 90 VAC 50 ENS-SWG1B-27-1A (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AL 49.0 48.90 VAC 51 ENS-SWG1B-27-1A (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AF 49.0 48.68 VAC 52 ENS-SWG1B-27-1A (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AL 49.0 48.78 VAC 53 ENS-SWG1B-27-1A (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AF 49.0 48.70 VAC 54 ENS-SWG1B-27-1A (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AL 49.0 48.70 VAC 55 ENS-SWG1B-27-1A (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 56 ENS-SWG1B-27-1A (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AL 49.0 48.80 VAC 57 ENS-SWG1B-27-1A (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AF 49.0 48.83 VAC 58 ENS-SWG1B-27-1A (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AL 49.0 48.83 VAC 59 ENS-SWG1B-27-1A (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AF 49.0 48.75 VAC 60 ENS-SWG1B-27-1A (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AL 49.0 48.85 VAC 61 ENS-SWG1B-27-1A (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AF 49.0 48.83 VAC 62 ENS-SWG1B-27-1A (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AL 49.0 48.83 VAC 63 ENS-SWG1B-27-1A (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 64 ENS-SWG1B-27-1A (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AL 49.0 48.80 VAC 65 ENS-SWG1B-27-1B (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AF 49.0 48.97 VAC 66 ENS-SWG1B-27-1B (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AL 49.0 49.00 VAC 67 ENS-SWG1B-27-1B (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AF 49.0 48.77 VAC 68 ENS-SWG1B-27-1B (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AL 49.0 48.77 VAC 69 ENS-SWG1B-27-1B (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 70 ENS-SWG1B-27-1B (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AL 49.0 48.80 VAC 71 ENS-SWG1B-27-1B (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 72 ENS-SWG1B-27-1B (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AL 49.0 48.80 VAC


DRIFT ANALYSIS                                           ABB/ITE-27H                           G13.18.6.3-006 Rev 0 RIVER BEND STATION                                    Undervoltage Relays                              Attachment 1 Input Data                                    Page 3 of19 AF/        AF / AL Seq. ID Tag ID           Date     Procedure   Make/Model     AL   Setpt Data   Units Comments 73   ENS-SWG1B-27-1B (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H   AF   49.0 48.72 VAC 74   ENS-SWG1B-27-1B (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H   AL   49.0 48.72 VAC 75   ENS-SWG1B-27-1B (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H   AF   49.0 48.80 VAC 76   ENS-SWG1B-27-1B (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H   AL   49.0 48.75 VAC 77   ENS-SWG1B-27-1B (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H   AF   49.0 48.82 VAC 78   ENS-SWG1B-27-1B (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H   AL   49.0 48.83 VAC 79   ENS-SWG1B-27-1B (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H   AF   49.0 48.60 VAC 80   ENS-SWG1B-27-1B (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H   AL   49.0 48.70 VAC 81   ENS-SWG1B-27-1C (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H   AF   49.0 48.90 VAC 82   ENS-SWG1B-27-1C (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H   AL   49.0 48.92 VAC 83   ENS-SWG1B-27-1C (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H   AF   49.0 48.78 VAC 84   ENS-SWG1B-27-1C (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H   AL   49.0 48.88 VAC 85   ENS-SWG1B-27-1C (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H   AF   49.0 48.70 VAC 86   ENS-SWG1B-27-1C ENS SWG1B 27 1C (UV) 10/31/2004 STP-302-1601 STP 302 1601  ABB/ITE-27H ABB/ITE 27H  AL   49.0 49 0  48.70 48 70  VAC 87   ENS-SWG1B-27-1C (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H   AF   49.0 48.80 VAC 88   ENS-SWG1B-27-1C (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H   AL   49.0 48.80 VAC 89   ENS-SWG1B-27-1C (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H   AF   49.0 48.72 VAC 90   ENS-SWG1B-27-1C (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H   AL   49.0 48.72 VAC 91   ENS-SWG1B-27-1C (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H   AF   49.0 48.84 VAC 92   ENS-SWG1B-27-1C (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H   AL   49.0 48.84 VAC 93   ENS-SWG1B-27-1C (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H   AF   49.0 48.83 VAC 94   ENS-SWG1B-27-1C (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H   AL   49.0 48.73 VAC 95   ENS-SWG1B-27-1C (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H   AF   49.0 48.80 VAC 96   ENS-SWG1B-27-1C (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H   AL   49.0 48.70 VAC
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Input Data G13.18.6.3-006 Rev 0 Page 3 of19 Seq. ID Tag ID Date Procedure Make/Model AF/
AL Setpt AF / AL Data Units Comments 73 ENS-SWG1B-27-1B (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AF 49.0 48.72 VAC 74 ENS-SWG1B-27-1B (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AL 49.0 48.72 VAC 75 ENS-SWG1B-27-1B (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 76 ENS-SWG1B-27-1B (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AL 49.0 48.75 VAC 77 ENS-SWG1B-27-1B (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AF 49.0 48.82 VAC 78 ENS-SWG1B-27-1B (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AL 49.0 48.83 VAC 79 ENS-SWG1B-27-1B (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AF 49.0 48.60 VAC 80 ENS-SWG1B-27-1B (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AL 49.0 48.70 VAC 81 ENS-SWG1B-27-1C (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AF 49.0 48.90 VAC 82 ENS-SWG1B-27-1C (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AL 49.0 48.92 VAC 83 ENS-SWG1B-27-1C (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AF 49.0 48.78 VAC 84 ENS-SWG1B-27-1C (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AL 49.0 48.88 VAC 85 ENS-SWG1B-27-1C (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AF 49.0 48.70 VAC 86 ENS SWG1B 27 1C (UV) 10/31/2004 STP 302 1601 ABB/ITE 27H AL 49 0 48 70 VAC 86 ENS-SWG1B-27-1C (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AL 49.0 48.70 VAC 87 ENS-SWG1B-27-1C (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 88 ENS-SWG1B-27-1C (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AL 49.0 48.80 VAC 89 ENS-SWG1B-27-1C (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AF 49.0 48.72 VAC 90 ENS-SWG1B-27-1C (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AL 49.0 48.72 VAC 91 ENS-SWG1B-27-1C (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AF 49.0 48.84 VAC 92 ENS-SWG1B-27-1C (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AL 49.0 48.84 VAC 93 ENS-SWG1B-27-1C (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AF 49.0 48.83 VAC 94 ENS-SWG1B-27-1C (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AL 49.0 48.73 VAC 95 ENS-SWG1B-27-1C (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 96 ENS-SWG1B-27-1C (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AL 49.0 48.70 VAC


DRIFT ANALYSIS                                                         ABB/ITE-27H                                                       G13.18.6.3-006 Rev 0 RIVER BEND STATION                                                Undervoltage Relays                                                                Attachment 1 AF-AL Data                                                                    Page 4 of19 CAL INTERVAL =                            DRIFT = (Current    CAL INTERVAL =
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays AF-AL Data G13.18.6.3-006 Rev 0 Page 4 of19 Seq.
AF/AL DATA   OUTLIERS Seq.                                       CAL DATE  AF/AL                            (Current Date - Seq.                      Cal AF Data - Prev   (Current Date -
CAL DATE AF/AL AF/AL DATA VALUE OUTLIERS COMMENTS Seq.
VALUE    COMMENTS Previous Date)                              Cal AL Data)      Previous Date)
DRIFT = (Current Cal AF Data - Prev Cal AL Data)
ID Make/Model Number       Tag ID         mm/dd/yy Status   (VAC)                 Days     Months ID       Tag Number           (VAC)         Days     Months 1     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 02/17/08   AF     48.90                   650       21.4   1 ENS-SWG1A-27-1A (UV)       -0.19         650       21.4 2     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 02/17/08   AL     48.90                                     3 ENS-SWG1A-27-1A (UV)         0.00         543       17.8 3     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 05/08/06   AF     49.10                   543       17.8   5 ENS-SWG1A-27-1A (UV)         0.09         593       19.5 4     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 05/08/06   AL     49.09                                     7 ENS-SWG1A-27-1A (UV)       -0.20         548       18.0 5     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 11/11/04   AF     49.10                   593       19.5   9 ENS-SWG1A-27-1A (UV)         0.10         566       18.6 6     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 11/11/04   AL     49.10                                   11 ENS-SWG1A-27-1A (UV)       -0.10         324       10.6 7     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 03/29/03   AF     48.80                   548       18.0   13 ENS-SWG1A-27-1A (UV)       0.00         579       19.0 8     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 03/29/03   AL     49.01 9     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 09/27/01   AF     49.00                   566       18.6   17 ENS-SWG1A-27-1B (UV)         0.72         650       21.4 10     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 09/27/01   AL     49.00                                   19 ENS-SWG1A-27-1B (UV)         0.12         543       17.8 11     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 03/10/00   AF     48.90                   324       10.6   21 ENS-SWG1A-27-1B (UV)         0.00         593       19.5 12     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 03/10/00   AL     48.90                                   23 ENS-SWG1A-27-1B (UV)       -0.10         548       18.0 13     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 04/21/99   AF     49.00                   579       19.0   25 ENS-SWG1A-27-1B (UV)         0.00         566       18.6 14     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 04/21/99   AL     49.00                                   27 ENS-SWG1A-27-1B (UV)       -0.10         324       10.6 15     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 09/19/97   AF     49.00                                   29 ENS-SWG1A-27-1B (UV)       0.00         579       19.0 16     ABB/ITE-27H   ENS-SWG1A-27-1A (UV) 09/19/97   AL     49.00 Identified as 17     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 02/17/08   AF     49.90     Outlier and   650       21.4   33 ENS-SWG1A-27-1C (UV)         0.30         650       21.4 removed 18     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 02/17/08   AL     49.30                                   35 ENS-SWG1A-27-1C (UV)       -0.40         543       17.8 19     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 05/08/06   AF     49.22                   543       17.8   37 ENS-SWG1A-27-1C (UV)         0.14         593       19.5 20     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 05/08/06   AL     49.18                                   39 ENS-SWG1A-27-1C (UV)         0.11         548       18.0 21     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 11/11/04   AF     49.10                   593       19.5   41 ENS-SWG1A-27-1C (UV)       -0.09         566       18.6 22     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 11/11/04   AL     49.10                                   43 ENS-SWG1A-27-1C (UV)         0.00         324       10.6 23     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 03/29/03   AF     48.40                   548       18.0   45 ENS-SWG1A-27-1C (UV)       0.00         579       19.0 24     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 03/29/03   AL     49.10 25     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 09/27/01   AF     48.50                   566       18.6   49 ENS-SWG1B-27-1A (UV)         0.12         643       21.1 26     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 09/27/01   AL     48.50                                   51 ENS-SWG1B-27-1A (UV)       -0.02         545       17.9 27     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 03/10/00   AF     48.50                   324       10.6   53 ENS-SWG1B-27-1A (UV)       -0.10         591       19.4 28     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 03/10/00   AL     48.50                                   55 ENS-SWG1B-27-1A (UV)       -0.03         530       17.4 29     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 04/21/99   AF     48.60                   579       19.0   57 ENS-SWG1B-27-1A (UV)       -0.02         560       18.4 30     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 04/21/99   AL     48.60                                   59 ENS-SWG1B-27-1A (UV)       -0.08         330       10.8 31     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 09/19/97   AF     48.60                                   61 ENS-SWG1B-27-1A (UV)       0.03         573       18.8 32     ABB/ITE-27H   ENS-SWG1A-27-1B (UV) 09/19/97   AL     48.60 33     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 02/17/08   AF     50.00                   650       21.4   65 ENS-SWG1B-27-1B (UV)         0.20         643       21.1 34     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 02/17/08   AL     49.20                                   67 ENS-SWG1B-27-1B (UV)       -0.03         545       17.9
ID Make/Model Number Tag ID mm/dd/yy Status (VAC)
Days Months ID Tag Number (VAC)
Days Months 1
ABB/ITE-27H ENS-SWG1A-27-1A (UV) 02/17/08 AF 48.90 650 21.4 1
ENS-SWG1A-27-1A (UV)
-0.19 650 21.4 2
ABB/ITE-27H ENS-SWG1A-27-1A (UV) 02/17/08 AL 48.90 3
ENS-SWG1A-27-1A (UV) 0.00 543 17.8 3
ABB/ITE-27H ENS-SWG1A-27-1A (UV) 05/08/06 AF 49.10 543 17.8 5
ENS-SWG1A-27-1A (UV) 0.09 593 19.5 4
ABB/ITE-27H ENS-SWG1A-27-1A (UV) 05/08/06 AL 49.09 7
ENS-SWG1A-27-1A (UV)
-0.20 548 18.0 5
ABB/ITE-27H ENS-SWG1A-27-1A (UV) 11/11/04 AF 49.10 593 19.5 9
ENS-SWG1A-27-1A (UV) 0.10 566 18.6 6
ABB/ITE-27H ENS-SWG1A-27-1A (UV) 11/11/04 AL 49.10 11 ENS-SWG1A-27-1A (UV)
-0.10 324 10.6 7
ABB/ITE-27H ENS-SWG1A-27-1A (UV) 03/29/03 AF 48.80 548 18.0 13 ENS-SWG1A-27-1A (UV) 0.00 579 19.0 8
ABB/ITE-27H ENS-SWG1A-27-1A (UV) 03/29/03 AL 49.01 9
ABB/ITE-27H ENS-SWG1A-27-1A (UV) 09/27/01 AF 49.00 566 18.6 17 ENS-SWG1A-27-1B (UV) 0.72 650 21.4 10 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 09/27/01 AL 49.00 19 ENS-SWG1A-27-1B (UV) 0.12 543 17.8 11 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 03/10/00 AF 48.90 324 10.6 21 ENS-SWG1A-27-1B (UV) 0.00 593 19.5 12 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 03/10/00 AL 48.90 23 ENS-SWG1A-27-1B (UV)
-0.10 548 18.0 13 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 04/21/99 AF 49.00 579 19.0 25 ENS-SWG1A-27-1B (UV) 0.00 566 18.6 CAL INTERVAL =
(Current Date -
Previous Date)
CAL INTERVAL =
(Current Date -
Previous Date) 14 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 04/21/99 AL 49.00 27 ENS-SWG1A-27-1B (UV)
-0.10 324 10.6 15 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 09/19/97 AF 49.00 29 ENS-SWG1A-27-1B (UV) 0.00 579 19.0 16 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 09/19/97 AL 49.00 17 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 02/17/08 AF 49.90 Identified as Outlier and removed 650 21.4 33 ENS-SWG1A-27-1C (UV) 0.30 650 21.4 18 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 02/17/08 AL 49.30 35 ENS-SWG1A-27-1C (UV)
-0.40 543 17.8 19 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 05/08/06 AF 49.22 543 17.8 37 ENS-SWG1A-27-1C (UV) 0.14 593 19.5 20 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 05/08/06 AL 49.18 39 ENS-SWG1A-27-1C (UV) 0.11 548 18.0 21 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 11/11/04 AF 49.10 593 19.5 41 ENS-SWG1A-27-1C (UV)
-0.09 566 18.6 22 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 11/11/04 AL 49.10 43 ENS-SWG1A-27-1C (UV) 0.00 324 10.6 23 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 03/29/03 AF 48.40 548 18.0 45 ENS-SWG1A-27-1C (UV) 0.00 579 19.0 24 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 03/29/03 AL 49.10 25 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 09/27/01 AF 48.50 566 18.6 49 ENS-SWG1B-27-1A (UV) 0.12 643 21.1 26 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 09/27/01 AL 48.50 51 ENS-SWG1B-27-1A (UV)
-0.02 545 17.9 27 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 03/10/00 AF 48.50 324 10.6 53 ENS-SWG1B-27-1A (UV)
-0.10 591 19.4 28 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 03/10/00 AL 48.50 55 ENS-SWG1B-27-1A (UV)
-0.03 530 17.4 29 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 04/21/99 AF 48.60 579 19.0 57 ENS-SWG1B-27-1A (UV)
-0.02 560 18.4 30 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 04/21/99 AL 48.60 59 ENS-SWG1B-27-1A (UV)
-0.08 330 10.8 31 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 09/19/97 AF 48.60 61 ENS-SWG1B-27-1A (UV) 0.03 573 18.8 32 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 09/19/97 AL 48.60 33 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 02/17/08 AF 50.00 650 21.4 65 ENS-SWG1B-27-1B (UV) 0.20 643 21.1 34 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 02/17/08 AL 49.20 67 ENS-SWG1B-27-1B (UV)
-0.03 545 17.9


DRIFT ANALYSIS                                                         ABB/ITE-27H                                                   G13.18.6.3-006 Rev 0 RIVER BEND STATION                                                Undervoltage Relays                                                            Attachment 1 AF-AL Data                                                                Page 5 of19 CAL INTERVAL =                            DRIFT = (Current    CAL INTERVAL =
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays AF-AL Data G13.18.6.3-006 Rev 0 Page 5 of19 Seq.
AF/AL DATA   OUTLIERS Seq.                                       CAL DATE  AF/AL                        (Current Date - Seq.                      Cal AF Data - Prev   (Current Date -
CAL DATE AF/AL AF/AL DATA VALUE OUTLIERS COMMENTS Seq.
VALUE    COMMENTS Previous Date)                              Cal AL Data)      Previous Date)
DRIFT = (Current Cal AF Data - Prev Cal AL Data)
ID Make/Model Number       Tag ID         mm/dd/yy Status   (VAC)             Days     Months ID       Tag Number           (VAC)         Days     Months 35     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 05/08/06   AF     48.80               543       17.8   69 ENS-SWG1B-27-1B (UV)         0.00         591       19.4 36     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 05/08/06   AL     49.70                               71 ENS-SWG1B-27-1B (UV)         0.08         530       17.4 37     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 11/11/04   AF     49.20               593       19.5   73 ENS-SWG1B-27-1B (UV)       -0.03         560       18.4 38     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 11/11/04   AL     49.20                               75 ENS-SWG1B-27-1B (UV)       -0.03         330       10.8 39     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 03/29/03   AF     48.32               548       18.0   77 ENS-SWG1B-27-1B (UV)       0.12         573       18.8 40     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 03/29/03   AL     49.06 41     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 09/27/01   AF     48.21               566       18.6   81 ENS-SWG1B-27-1C (UV)         0.02         643       21.1 42     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 09/27/01   AL     48.21                               83 ENS-SWG1B-27-1C (UV)         0.08         545       17.9 43     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 03/10/00   AF     48.30               324       10.6   85 ENS-SWG1B-27-1C (UV)       -0.10         591       19.4 44     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 03/10/00   AL     48.30                               87 ENS-SWG1B-27-1C (UV)         0.08         530       17.4 45     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 04/21/99   AF     48.30               579       19.0   89 ENS-SWG1B-27-1C (UV)       -0.12         560       18.4 46     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 04/21/99   AL     48.30                               91 ENS-SWG1B-27-1C (UV)         0.11         330       10.8 47     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 09/19/97   AF     48.20                               93 ENS-SWG1B-27-1C (UV)         0.13         573       18.8 48     ABB/ITE-27H   ENS-SWG1A-27-1C (UV) 09/19/97   AL     48.30 49     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 02/01/08   AF     48.90               643       21.1 50     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 02/01/08   AL     48.90 51     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 04/29/06   AF     48.68               545       17.9 52     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 04/29/06   AL     48.78 53     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 10/31/04   AF     48.70               591       19.4 54     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 10/31/04   AL     48.70 55     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 03/20/03   AF     48.80               530       17.4 56     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 03/20/03   AL     48.80 57     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 10/06/01   AF     48.83               560       18.4 58     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 10/06/01   AL     48.83 59     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 03/25/00   AF     48.75               330       10.8 60     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 03/25/00   AL     48.85 61     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 04/30/99   AF     48.83               573       18.8 62     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 04/30/99   AL     48.83 63     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 10/04/97   AF     48.80 64     ABB/ITE-27H   ENS-SWG1B-27-1A (UV) 10/04/97   AL     48.80 65     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 02/01/08   AF     48.97               643       21.1 66     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 02/01/08   AL     49.00 67     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 04/29/06   AF     48.77               545       17.9 68     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 04/29/06   AL     48.77 69     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 10/31/04   AF     48.80               591       19.4 70     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 10/31/04   AL     48.80
ID Make/Model Number Tag ID mm/dd/yy Status (VAC)
Days Months ID Tag Number (VAC)
Days Months CAL INTERVAL =
(Current Date -
Previous Date)
CAL INTERVAL =
(Current Date -
Previous Date) 35 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 05/08/06 AF 48.80 543 17.8 69 ENS-SWG1B-27-1B (UV) 0.00 591 19.4 36 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 05/08/06 AL 49.70 71 ENS-SWG1B-27-1B (UV) 0.08 530 17.4 37 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 11/11/04 AF 49.20 593 19.5 73 ENS-SWG1B-27-1B (UV)
-0.03 560 18.4 38 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 11/11/04 AL 49.20 75 ENS-SWG1B-27-1B (UV)
-0.03 330 10.8 39 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 03/29/03 AF 48.32 548 18.0 77 ENS-SWG1B-27-1B (UV) 0.12 573 18.8 40 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 03/29/03 AL 49.06 41 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 09/27/01 AF 48.21 566 18.6 81 ENS-SWG1B-27-1C (UV) 0.02 643 21.1 42 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 09/27/01 AL 48.21 83 ENS-SWG1B-27-1C (UV) 0.08 545 17.9 43 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 03/10/00 AF 48.30 324 10.6 85 ENS-SWG1B-27-1C (UV)
-0.10 591 19.4 44 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 03/10/00 AL 48.30 87 ENS-SWG1B-27-1C (UV) 0.08 530 17.4 45 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 04/21/99 AF 48.30 579 19.0 89 ENS-SWG1B-27-1C (UV)
-0.12 560 18.4 46 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 04/21/99 AL 48.30 91 ENS-SWG1B-27-1C (UV) 0.11 330 10.8 47 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 09/19/97 AF 48.20 93 ENS-SWG1B-27-1C (UV) 0.13 573 18.8 48 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 09/19/97 AL 48.30 49 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 02/01/08 AF 48.90 643 21.1 50 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 02/01/08 AL 48.90 51 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 04/29/06 AF 48.68 545 17.9 52 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 04/29/06 AL 48.78 53 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/31/04 AF 48.70 591 19.4 54 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/31/04 AL 48.70 55 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 03/20/03 AF 48.80 530 17.4 56 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 03/20/03 AL 48.80 57 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/06/01 AF 48.83 560 18.4 58 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/06/01 AL 48.83 59 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 03/25/00 AF 48.75 330 10.8 60 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 03/25/00 AL 48.85 61 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 04/30/99 AF 48.83 573 18.8 62 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 04/30/99 AL 48.83 63 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/04/97 AF 48.80 64 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/04/97 AL 48.80 65 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 02/01/08 AF 48.97 643 21.1 66 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 02/01/08 AL 49.00 67 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 04/29/06 AF 48.77 545 17.9 68 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 04/29/06 AL 48.77 69 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/31/04 AF 48.80 591 19.4 70 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/31/04 AL 48.80


DRIFT ANALYSIS                                                         ABB/ITE-27H                                         G13.18.6.3-006 Rev 0 RIVER BEND STATION                                                Undervoltage Relays                                                  Attachment 1 AF-AL Data                                                      Page 6 of19 CAL INTERVAL =                  DRIFT = (Current    CAL INTERVAL =
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays AF-AL Data G13.18.6.3-006 Rev 0 Page 6 of19 Seq.
AF/AL DATA   OUTLIERS Seq.                                       CAL DATE  AF/AL                        (Current Date - Seq.            Cal AF Data - Prev   (Current Date -
CAL DATE AF/AL AF/AL DATA VALUE OUTLIERS COMMENTS Seq.
VALUE    COMMENTS Previous Date)                    Cal AL Data)      Previous Date)
DRIFT = (Current Cal AF Data - Prev Cal AL Data)
ID Make/Model Number       Tag ID         mm/dd/yy Status   (VAC)             Days     Months ID Tag Number       (VAC)         Days     Months 71     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 03/20/03   AF     48.80               530       17.4 72     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 03/20/03   AL     48.80 73     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 10/06/01   AF     48.72               560       18.4 74     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 10/06/01   AL     48.72 75     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 03/25/00   AF     48.80               330       10.8 76     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 03/25/00   AL     48.75 77     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 04/30/99   AF     48.82               573       18.8 78     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 04/30/99   AL     48.83 79     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 10/04/97   AF     48.60 80     ABB/ITE-27H   ENS-SWG1B-27-1B (UV) 10/04/97   AL     48.70 81     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 02/01/08   AF     48.90               643       21.1 82     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 02/01/08   AL     48.92 83     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 04/29/06   AF     48.78               545       17.9 84     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 04/29/06   AL     48.88 85     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 10/31/04   AF     48.70               591       19.4 86     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 10/31/04   AL     48.70 87     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 03/20/03   AF     48.80               530       17.4 88     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 03/20/03   AL     48.80 89     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 10/06/01   AF     48.72               560       18.4 90     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 10/06/01   AL     48.72 91     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 03/25/00   AF     48.84               330       10.8 92     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 03/25/00   AL     48.84 93     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 04/30/99   AF     48.83               573       18.8 94     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 04/30/99   AL     48.73 95     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 10/04/97   AF     48.80 96     ABB/ITE-27H   ENS-SWG1B-27-1C (UV) 10/04/97   AL     48.70
ID Make/Model Number Tag ID mm/dd/yy Status (VAC)
Days Months ID Tag Number (VAC)
Days Months CAL INTERVAL =
(Current Date -
Previous Date)
CAL INTERVAL =
(Current Date -
Previous Date) 71 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 03/20/03 AF 48.80 530 17.4 72 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 03/20/03 AL 48.80 73 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/06/01 AF 48.72 560 18.4 74 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/06/01 AL 48.72 75 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 03/25/00 AF 48.80 330 10.8 76 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 03/25/00 AL 48.75 77 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 04/30/99 AF 48.82 573 18.8 78 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 04/30/99 AL 48.83 79 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/04/97 AF 48.60 80 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/04/97 AL 48.70 81 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 02/01/08 AF 48.90 643 21.1 82 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 02/01/08 AL 48.92 83 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 04/29/06 AF 48.78 545 17.9 84 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 04/29/06 AL 48.88 85 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/31/04 AF 48.70 591 19.4 86 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/31/04 AL 48.70 87 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 03/20/03 AF 48.80 530 17.4 88 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 03/20/03 AL 48.80 89 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/06/01 AF 48.72 560 18.4 90 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/06/01 AL 48.72 91 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 03/25/00 AF 48.84 330 10.8 92 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 03/25/00 AL 48.84 93 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 04/30/99 AF 48.83 573 18.8 94 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 04/30/99 AL 48.73 95 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/04/97 AF 48.80 96 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/04/97 AL 48.70


DRIFT ANALYSIS                                                 ABB/ITE-27H                                                         G13.18.6.3-006 Rev 0 RIVER BEND STATION                                          Undervoltage Relays                                                              Attachment 1 Outliers & Summary                                                                Page 7 of19 Extreme                                                                          Final Drift Drift Cal Interval                                                                                                Cal Interval Seq. ID       Tag ID                             Studentized                                                                        Data Set (VAC)   (Days)                                                                                                      (Days)
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Outliers & Summary G13.18.6.3-006 Rev 0 Page 7 of19 Seq. ID Tag ID Drift (VAC)
Deviate (T)                                                                         (VAC) 1   ENS-SWG1A-27-1A (UV) -0.19     650         1.281                                                                             -0.19         650 3   ENS-SWG1A-27-1A (UV)   0.00     543         0.118                   Raw Drift Data Statistics Summary                          0.00         543 5   ENS-SWG1A-27-1A (UV)   0.09     593         0.433                             (Initial Data Set)                              0.09         593 7   ENS-SWG1A-27-1A (UV) -0.20     548         1.342       Mean (Average)                                 0.0193               -0.20         548 9   ENS-SWG1A-27-1A (UV)   0.10     566         0.494       Variance                                       0.0267                 0.10         566 11   ENS-SWG1A-27-1A (UV) -0.10     324         0.730       Std. Dev.                                       0.1634               -0.10         324 13   ENS-SWG1A-27-1A (UV)   0.00     579         0.118       Sample Size (Count)                               42                 0.00         579 Maximum                                           0.72 17   ENS-SWG1A-27-1B (UV)   0.72     650         4.288       Median                                           0.00             OUTLIER     OUTLIER 19   ENS-SWG1A-27-1B (UV)   0.12     543         0.616       Minimum                                         -0.40                 0.12         543 21   ENS-SWG1A-27-1B (UV)   0.00     593         0.118       Range                                             1.12                 0.00         593 23   ENS-SWG1A-27-1B (UV) -0.10     548         0.730       Sum                                             0.810               -0.10         548 25   ENS-SWG1A-27-1B (UV)   0.00     566         0.118       Kurtosis                                         8.098                 0.00         566 27   ENS-SWG1A-27-1B (UV) -0.10     324         0.730       Skewness                                         1.607               -0.10         324 29   ENS SWG1A 27 1B (UV)
Cal Interval (Days)
ENS-SWG1A-27-1B       0 00 0.00     579         0 118 0.118                                                                               0 00 0.00         579 Critical T-Value (Upper 5% Signif.)               2.92 33   ENS-SWG1A-27-1C (UV)   0.30     650         1.718                                                                               0.30         650 35   ENS-SWG1A-27-1C (UV) -0.40     543         2.566       Equation for Each Studentized Deviate: T= lDrift-Meanl/Std. Dev.     -0.40         543 37   ENS-SWG1A-27-1C (UV)   0.14     593         0.739       Crit T Value Lookup Value from Ref. 4.1.3 Table 2, per sample         0.14         593 39   ENS-SWG1A-27-1C (UV)   0.11     548         0.555       size. See Sections 3.6.1 and 3.6.2 of Reference 4.1.3.                 0.11         548 41   ENS-SWG1A-27-1C (UV) -0.09     566         0.669       Outliers will be Denoted as such in "Final Data Set" column.         -0.09         566 43   ENS-SWG1A-27-1C (UV)   0.00     324         0.118       One Outlier Detected and Removed (Seq. 17)                             0.00         324 45   ENS-SWG1A-27-1C (UV)   0.00     579         0.118                                                                               0.00         579 Drift Data Statistics Summary 49   ENS-SWG1B-27-1A (UV)   0.12     643         0.616                             (Final Data Set)                                0.12         643 51   ENS-SWG1B-27-1A (UV) -0.02     545         0.240       Mean (Average)                                 0.0022               -0.02         545 53   ENS-SWG1B-27-1A (UV) -0.10     591         0.730       Variance                                       0.0148               -0.10         591 55   ENS-SWG1B-27-1A (UV) -0.03     530         0.302       Std. Dev.                                       0.1216               -0.03         530 57   ENS-SWG1B-27-1A (UV) -0.02     560         0.240       Sample Size (Count)                               41                 -0.02         560 59   ENS-SWG1B-27-1A (UV) -0.08     330         0.608       Maximum                                           0.30               -0.08         330 61   ENS-SWG1B-27-1A (UV)   0.03     573         0.066       Median                                           0.00                 0.03         573 Minimum                                         -0.40 65   ENS-SWG1B-27-1B (UV)   0.20     643         1.106       Range                                             0.70                 0.20         643 67   ENS-SWG1B-27-1B (UV) -0.03     545         0.302       Sum                                             0.090               -0.03         545 69   ENS-SWG1B-27-1B (UV) 0.00     591         0.118       Kurtosis                                         2.234                 0.00         591 71   ENS-SWG1B-27-1B (UV) 0.08     530         0.372       Skewness                                       -0.581                 0.08         530
Extreme Studentized Deviate (T)
Final Drift Data Set (VAC)
Cal Interval (Days) 1 ENS-SWG1A-27-1A (UV)
-0.19 650 1.281
-0.19 650 3
ENS-SWG1A-27-1A (UV) 0.00 543 0.118 0.00 543 5
ENS-SWG1A-27-1A (UV) 0.09 593 0.433 0.09 593 7
ENS-SWG1A-27-1A (UV)
-0.20 548 1.342 Mean (Average) 0.0193
-0.20 548 9
ENS-SWG1A-27-1A (UV) 0.10 566 0.494 Variance 0.0267 0.10 566 11 ENS-SWG1A-27-1A (UV)
-0.10 324 0.730 Std. Dev.
0.1634
-0.10 324 13 ENS-SWG1A-27-1A (UV) 0.00 579 0.118 Sample Size (Count) 42 0.00 579 Maximum 0.72 17 ENS-SWG1A-27-1B (UV) 0.72 650 4.288 Median 0.00 OUTLIER OUTLIER 19 ENS-SWG1A-27-1B (UV) 0.12 543 0.616 Minimum
-0.40 0.12 543 21 ENS-SWG1A-27-1B (UV) 0.00 593 0.118 Range 1.12 0.00 593 23 ENS-SWG1A-27-1B (UV)
-0.10 548 0.730 Sum 0.810
-0.10 548 25 ENS-SWG1A-27-1B (UV) 0.00 566 0.118 Kurtosis 8.098 0.00 566 27 ENS-SWG1A-27-1B (UV)
-0.10 324 0.730 Skewness 1.607
-0.10 324 29 ENS SWG1A 27 1B (UV) 0 00 579 0 118 0 00 579 (Initial Data Set)
Raw Drift Data Statistics Summary 29 ENS-SWG1A-27-1B (UV) 0.00 579 0.118 0.00 579 Critical T-Value (Upper 5% Signif.)
2.92 33 ENS-SWG1A-27-1C (UV) 0.30 650 1.718 0.30 650 35 ENS-SWG1A-27-1C (UV)
-0.40 543 2.566 Equation for Each Studentized Deviate: T= lDrift-Meanl/Std. Dev.  
-0.40 543 37 ENS-SWG1A-27-1C (UV) 0.14 593 0.739 Crit T Value Lookup Value from Ref. 4.1.3 Table 2, per sample 0.14 593 39 ENS-SWG1A-27-1C (UV) 0.11 548 0.555 size. See Sections 3.6.1 and 3.6.2 of Reference 4.1.3.
0.11 548 41 ENS-SWG1A-27-1C (UV)
-0.09 566 0.669 Outliers will be Denoted as such in "Final Data Set" column.
-0.09 566 43 ENS-SWG1A-27-1C (UV) 0.00 324 0.118 One Outlier Detected and Removed (Seq. 17) 0.00 324 45 ENS-SWG1A-27-1C (UV) 0.00 579 0.118 0.00 579 49 ENS-SWG1B-27-1A (UV) 0.12 643 0.616 0.12 643 51 ENS-SWG1B-27-1A (UV)
-0.02 545 0.240 Mean (Average) 0.0022
-0.02 545 53 ENS-SWG1B-27-1A (UV)
-0.10 591 0.730 Variance 0.0148
-0.10 591 55 ENS-SWG1B-27-1A (UV)
-0.03 530 0.302 Std. Dev.
0.1216
-0.03 530 57 ENS-SWG1B-27-1A (UV)
-0.02 560 0.240 Sample Size (Count) 41
-0.02 560 59 ENS-SWG1B-27-1A (UV)
-0.08 330 0.608 Maximum 0.30
-0.08 330 61 ENS-SWG1B-27-1A (UV) 0.03 573 0.066 Median 0.00 0.03 573 Minimum
-0.40 65 ENS-SWG1B-27-1B (UV) 0.20 643 1.106 Range 0.70 0.20 643 67 ENS-SWG1B-27-1B (UV)
-0.03 545 0.302 Sum 0.090
-0.03 545 69 ENS-SWG1B-27-1B (UV) 0.00 591 0.118 Kurtosis 2.234 0.00 591 71 ENS-SWG1B-27-1B (UV) 0.08 530 0.372 Skewness
-0.581 0.08 530 (Final Data Set)
Drift Data Statistics Summary


DRIFT ANALYSIS                                                 ABB/ITE-27H     G13.18.6.3-006 Rev 0 RIVER BEND STATION                                          Undervoltage Relays            Attachment 1 Outliers & Summary              Page 8 of19 Extreme                      Final Drift Drift Cal Interval                                              Cal Interval Seq. ID       Tag ID                             Studentized                      Data Set (VAC)   (Days)                                                    (Days)
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Outliers & Summary G13.18.6.3-006 Rev 0 Page 8 of19 Seq. ID Tag ID Drift (VAC)
Deviate (T)                       (VAC) 73   ENS-SWG1B-27-1B (UV) -0.03     560         0.302                           -0.03         560 75   ENS-SWG1B-27-1B (UV) -0.03     330         0.302                           -0.03         330 77   ENS-SWG1B-27-1B (UV)   0.12     573         0.616                           0.12         573 81   ENS-SWG1B-27-1C (UV)   0.02     643         0.004                           0.02         643 83   ENS-SWG1B-27-1C (UV)   0.08     545         0.372                           0.08         545 85   ENS-SWG1B-27-1C (UV) -0.10     591         0.730                           -0.10         591 87   ENS-SWG1B-27-1C (UV)   0.08     530         0.372                           0.08         530 89   ENS-SWG1B-27-1C (UV) -0.12     560         0.852                           -0.12         560 91   ENS-SWG1B-27-1C (UV) 0.11     330         0.555                           0.11         330 93   ENS-SWG1B-27-1C (UV) 0.13     573         0.678                           0.13         573
Cal Interval (Days)
Extreme Studentized Deviate (T)
Final Drift Data Set (VAC)
Cal Interval (Days) 73 ENS-SWG1B-27-1B (UV)
-0.03 560 0.302
-0.03 560 75 ENS-SWG1B-27-1B (UV)
-0.03 330 0.302
-0.03 330 77 ENS-SWG1B-27-1B (UV) 0.12 573 0.616 0.12 573 81 ENS-SWG1B-27-1C (UV) 0.02 643 0.004 0.02 643 83 ENS-SWG1B-27-1C (UV) 0.08 545 0.372 0.08 545 85 ENS-SWG1B-27-1C (UV)
-0.10 591 0.730
-0.10 591 87 ENS-SWG1B-27-1C (UV) 0.08 530 0.372 0.08 530 89 ENS-SWG1B-27-1C (UV)
-0.12 560 0.852
-0.12 560 91 ENS-SWG1B-27-1C (UV) 0.11 330 0.555 0.11 330 93 ENS-SWG1B-27-1C (UV) 0.13 573 0.678 0.13 573


DRIFT ANALYSIS                                               ABB/ITE-27H                                                               G13.18.6.3-006 Rev 0 RIVER BEND STATION                                      Undervoltage Relays                                                                      Attachment 1 W Test                                                                          Page 9 of19 Drift bi (Per Values   "i"     an-i+1*
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays W Test G13.18.6.3-006 Rev 0 Page 9 of19 Drift Values "i"
Step 4)
an-i+1 bi (Per Step 4)
        -0.40   1     0.3940         0.2758     Specific W Normality Test Methodology from Reference 4.1.7 and Section 19 of Reference 4.1.4
-0.40 1
        -0.20   2     0.2719         0.1088
0.3940 0.2758 Specific W Normality Test Methodology from Reference 4.1.7 and Section 19 of Reference 4.1.4
        -0.19   3     0.2357         0.0778     Steps to Perform:
-0.20 2
        -0.12   4     0.2091         0.0523 1. Paste all final drift data into column 1.
0.2719 0.1088
        -0.10   5     0.1876         0.0413 2. Sort in ascending order.
-0.19 3
2
0.2357 0.0778 Steps to Perform:
        -0.10   6     0.1693         0.0372 3. Calculate S taking the variance of the drift data adjusted by (Count-1)
-0.12 4
        -0.10   7     0.1531         0.0337
0.2091 0.0523
        -0.10   8     0.1384         0.0291                   S2 = (n-1)(Variance (Drift))
: 1. Paste all final drift data into column 1.
        -0.10   9     0.1249         0.0262
-0.10 5
        -0.09   10     0.1123         0.0213               where: n = Count
0.1876 0.0413
        -0.08   11     0.1004         0.0171
: 2. Sort in ascending order.
        -0.03   12     0.0891         0.0098 4. Calculate the Quantity b:
-0.10 6
        -0.03   13     0.0782         0.0086
0.1693 0.0372
        -0.03   14     0.0677         0.0074     b = Sum[(an-i+1)(xn-i+1 - xi)]
: 3. Calculate S2 taking the variance of the drift data adjusted by (Count-1)
        -0.03   15     0.0575         0.0034
-0.10 7
        -0.02   16     0.0476         0.0019               where: i = 1 to k
0.1531 0.0337
        -0.02   17     0.0379         0.0008                         k = (n-1)/2 0.00   18     0.0283         0.0000                         xi = Drift value at point number i 0.00   19     0.0188         0.0000                         an-i+1 values are taken from Table 1 of Reference 4.1.7.
-0.10 8
2 0.00   20     0.0094         0.0000 5. Calculate b .
0.1384 0.0291 S2 = (n-1)(Variance (Drift))
0.00                                   6. Compute the W Statistic and compare to the critical value at the 5% confidence 0.00                 b=     0.7525     level. The table of critical values is given as Table 2 on page 9 of Reference 4.1.7.
-0.10 9
0.00                     (Per Step 4) 2 2 0.00
0.1249 0.0262
* From Table 1 of Ref. 4.1.7.                     W = b /S                          Results:
-0.09 10 0.1123 0.0213 where: n = Count
0.00                                                                                     Since the W statistic, 0.9569, is greater than the 0.02                                     Computed Values                                 critical value for W, 0.9410, this test does not 0.03                                                     S2 =       0.5917               reject the assumption of normality for this data set.
-0.08 11 0.1004 0.0171
0.08                                                     b=         0.7525 0.08                                                     b2 =       0.5662 0.08                                             Count (n):           41 0.09                                           W = b2/S2 =         0.9569 0.10                                         W Critical =         0.9410     5% Significance From Table 2 of Reference 4.1.7.
-0.03 12 0.0891 0.0098
: 4. Calculate the Quantity b:
-0.03 13 0.0782 0.0086
-0.03 14 0.0677 0.0074 b = Sum[(an-i+1)(xn-i+1 - xi)]
-0.03 15 0.0575 0.0034
-0.02 16 0.0476 0.0019 where: i = 1 to k
-0.02 17 0.0379 0.0008 k = (n-1)/2 0.00 18 0.0283 0.0000 xi = Drift value at point number i 0.00 19 0.0188 0.0000 an-i+1 values are taken from Table 1 of Reference 4.1.7.
0.00 20 0.0094 0.0000
: 5. Calculate b2.
0.00
: 6. Compute the W Statistic and compare to the critical value at the 5% confidence 0.00 b =
0.7525 level. The table of critical values is given as Table 2 on page 9 of Reference 4.1.7.
0.00 (Per Step 4) 0.00
* From Table 1 of Ref. 4.1.7.
W = b2/S2 Results:
0.00 Since the W statistic, 0.9569, is greater than the 0.02 Computed Values critical value for W, 0.9410, this test does not 0.03 S2 =
0.5917 reject the assumption of normality for this data set.
0.08 b =
0.7525 0.08 b2 =
0.5662 0.08 Count (n):
41 0.09 W = b2/S2 =
0.9569 0.10 W Critical =
0.9410 5% Significance From Table 2 of Reference 4.1.7.
0.11 0.11 0.12 0.12 0.12 0.13 0.14 0.20 0.30
0.11 0.11 0.12 0.12 0.12 0.13 0.14 0.20 0.30


DRIFT ANALYSIS                                                                                   ABB/ITE-27H                                                                   G13.18.6.3-006 Rev 0 RIVER BEND STATION                                                                        Undervoltage Relays                                                                          Attachment 1 Histogram                                                                            Page 10 of19 Normal Cumulative                                    Expected Bin                                                     No. StDev          Bin Maximums =              Observed                                      Distribution Bin Descriptions                                                                                   Probability (CPi)                                Frequency No.                                                       (NS)         Mean + (NS*StDev)             Frequency                                       Probability (Table 18-2 Ref 4.1.4)                          (Ei = Pnorm*N)
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Histogram G13.18.6.3-006 Rev 0 Page 10 of19 Bin No.
(Pnorm = CPi-CPi-1) 1     Up to - 2.5 Standard Deviations from Mean           -2.5                 -0.3019                     1                 0.0062                   0.0062             0.2542 2     -2.5 to -2.0 Standard Deviations from Mean         -2.0                 -0.2411                     0                 0.0228                   0.0166             0.6786 3     -2.0 to -1.5 Standard Deviations from Mean         -1.5                 -0.1802                     2                 0.0668                   0.0441             1.8061 4     -1.5 to -1.0 Standard Deviations from Mean         -1.0                 -0.1194                     1                 0.1587                   0.0919             3.7659 5     -1.0 to -0.5 Standard Deviations from Mean         -0.5                 -0.0586                     7                 0.3086                   0.1499             6.1459 6     -0.5 Standard Deviations from Mean to Mean           0.0                 0.0022                     14               0.5000                     0.1915             7.8495 7     Mean to +0.5 Standard Deviations from Mean           0.5                 0.0630                       2                 0.6915                   0.1915             7.8495 8     +0.5 to +1.0 Standard Deviations from Mean           1.0                 0.1238                     10               0.8414                     0.1499             6.1459 9     +1.0 to +1.5 Standard Deviations from Mean           1.5                 0.1846                       2                 0.9332                   0.0919             3.7659 10     +1.5 to +2.0 Standard Deviations from Mean           2.0                 0.2454                       1                 0.9773                   0.0441             1.8061 11     +2.0 to +2.5 Standard Deviations from Mean           2.5                 0.3063                       1                 0.9938                   0.0166             0.6786 12     More than Mean + 2.5 Standard Deviations           More                   More                       0                 1.0000                   0.0062             0.2542 Totals         41                                                                 41 Percentage for Observed              Observed
Bin Descriptions No. StDev (NS)
                                +/- Sigma Bounds                                                                     Normal Drift Values         Percentages Distribution 2.5 (Bins 2-11)                       40                 97.56%                                                                   Mean               0.0022 2 (Bins 3-10)                       39                 95.12%                   95.45%                                         Std. Dev.           0.1216 1.5 (Bins 4-9)                       36                 87.80%                                                               Sample Size               41 1 (Bins 5-8)                       33                 80.49%                   68.27%
Bin Maximums =
0.5 (Bins 6-7)                       16                 39.02%
Mean + (NS*StDev)
Observed Frequency Cumulative Probability (CPi)
(Table 18-2 Ref 4.1.4)
Normal Distribution Probability (Pnorm = CPi-CPi-1)
Expected Frequency (Ei = Pnorm*N) 1 Up to - 2.5 Standard Deviations from Mean
-2.5
-0.3019 1
0.0062 0.0062 0.2542 2
-2.5 to -2.0 Standard Deviations from Mean
-2.0
-0.2411 0
0.0228 0.0166 0.6786 3
-2.0 to -1.5 Standard Deviations from Mean
-1.5
-0.1802 2
0.0668 0.0441 1.8061 4
-1.5 to -1.0 Standard Deviations from Mean
-1.0
-0.1194 1
0.1587 0.0919 3.7659 5
-1.0 to -0.5 Standard Deviations from Mean
-0.5
-0.0586 7
0.3086 0.1499 6.1459 6
-0.5 Standard Deviations from Mean to Mean 0.0 0.0022 14 0.5000 0.1915 7.8495 7
Mean to +0.5 Standard Deviations from Mean 0.5 0.0630 2
0.6915 0.1915 7.8495 8
+0.5 to +1.0 Standard Deviations from Mean 1.0 0.1238 10 0.8414 0.1499 6.1459 9
+1.0 to +1.5 Standard Deviations from Mean 1.5 0.1846 2
0.9332 0.0919 3.7659 10
+1.5 to +2.0 Standard Deviations from Mean 2.0 0.2454 1
0.9773 0.0441 1.8061 11
+2.0 to +2.5 Standard Deviations from Mean 2.5 0.3063 1
0.9938 0.0166 0.6786 12 More than Mean + 2.5 Standard Deviations More More 0
1.0000 0.0062 0.2542 Totals 41 41 Percentage for
+/- Sigma Bounds Observed Drift Values Observed Percentages Percentage for Normal Distribution 2.5 (Bins 2-11) 40 97.56%
Mean 0.0022 2 (Bins 3-10) 39 95.12%
95.45%
Std. Dev.
0.1216 1.5 (Bins 4-9) 36 87.80%
Sample Size 41 1 (Bins 5-8) 33 80.49%
68.27%
0.5 (Bins 6-7) 16 39.02%
Methodology for Histogram Taken from Section 19 of Reference 4.1.4 and Section 3.7.5 of Reference 4.1.3
Methodology for Histogram Taken from Section 19 of Reference 4.1.4 and Section 3.7.5 of Reference 4.1.3
: 1. Order the drift data in ascending order.
: 1. Order the drift data in ascending order.
Line 266: Line 509:
: 5. Manually compute the number of observed drift data points within each bin, and list under observed frequency.
: 5. Manually compute the number of observed drift data points within each bin, and list under observed frequency.
: 6. Plot the Expected Frequency and the Observed Frequency Data on the Histogram for comparison to each other.
: 6. Plot the Expected Frequency and the Observed Frequency Data on the Histogram for comparison to each other.
Results: Since the data passed the W Test for normality, a Coverage Analysis is not necessary. The Histogram shows that the data conforms closely to a normal distribution.
Results: Since the data passed the W Test for normality, a Coverage Analysis is not necessary. The Histogram shows that the data conforms closely to a normal distribution.  


DRIFT ANALYSIS                                                                         ABB/ITE-27H                                                         G13.18.6.3-006 Rev 0 RIVER BEND STATION                                                                  Undervoltage Relays                                                            Attachment 1 Histogram                                                                  Page 11 of19 Histogram of Drift - River Bend Station ABB/ITE-27H Undervoltage Relays 16 14 Observed Frequency 12                                                                                                Normal Distribution 10 Population 8
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Histogram G13.18.6.3-006 Rev 0 Page 11 of19 10 12 14 16 n
6 4
Histogram of Drift - River Bend Station ABB/ITE-27H Undervoltage Relays Observed Frequency Normal Distribution 0
2 0
2 4
                                  -0.3019   -0.2411   -0.1802   -0.1194   -0.0586       0.0022   0.0630   0.1238   0.1846   0.2454         0.3063   More Drift (VAC)
6 8
-0.3019
-0.2411
-0.1802
-0.1194
-0.0586 0.0022 0.0630 0.1238 0.1846 0.2454 0.3063 More Populatio Drift (VAC)


DRIFT ANALYSIS                                                                   ABB/ITE-27H                                             G13.18.6.3-006 Rev 0 RIVER BEND STATION                                                            Undervoltage Relays                                                Attachment 1 Scatter Plot                                                    Page 12 of19 Scatter Plot - River Bend Station ABB/ITE-27H Undervoltage Relays 0.4 y = 0.0003x - 0.1415 0.3 Linear (Drift) 0.2 0.1 Drift (VAC C) 0 0 0.0
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Scatter Plot G13.18.6.3-006 Rev 0 Page 12 of19 y = 0.0003x - 0.1415 0 0 0.1 0.2 0.3 0.4 C)
                                    -0.1
Scatter Plot - River Bend Station ABB/ITE-27H Undervoltage Relays Linear (Drift)
                                    -0.2
                                    -0.3
                                    -0.4
                                    -0.5 0          100              200        300          400          500          600  700 Time (Days)
Note: Equation on Scatter Plot is computer generated, based on the associated trend line.
Note: Equation on Scatter Plot is computer generated, based on the associated trend line.
-0.5
-0.4
-0.3
-0.2
-0.1 0.0 0
100 200 300 400 500 600 700 Drift (VAC Time (Days)


DRIFT ANALYSIS                                           ABB/ITE-27H                                       G13.18.6.3-006 Rev 0 RIVER BEND STATION                                  Undervoltage Relays                                            Attachment 1 Binning Analysis                                            Page 13 of19 Bin Statistics Bin 1         Bin 2         Bin 3       Bin 4     Bin 5 Bin 6 Bin 7 Count                                                           6         35 Standard Dev.                                               0.0809   0.1272 Mean                                                       -0.0333   0.0083 Mean Interval                                               327.00     574.66 Max Interval                                                   330       650 Bin Definition and Selection Bin Hi                                   Valid Limit         Bin       Population     Bins Bins         (Days)       Count       Percentage Included 1             45             0           0.0%
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Binning Analysis G13.18.6.3-006 Rev 0 Page 13 of19 Bin Statistics Bin 1 Bin 2 Bin 3 Bin 4 Bin 5 Bin 6 Bin 7 Count 6
2             135             0           0.0%
35 Standard Dev.
3             230             0           0.0%
0.0809 0.1272 Mean
4             460             6           14.6%         4 5             690           35           85.4%         5 6             915             0           0.0%
-0.0333 0.0083 Mean Interval 327.00 574.66 Max Interval 330 650 Bin Definition and Selection Bin Hi Valid Limit Bin Population Bins Bins (Days)
7             Over           0           0.0%
Count Percentage Included Bins (Days)
Total Count:                         41           100%
Count Percentage Included 1
45 0
0.0%
2 135 0
0.0%
3 230 0
0.0%
4 460 6
14.6%
4 5
690 35 85.4%
5 6
915 0
0.0%
7 Over 0
0.0%
Total Count:
41 100%
See Section 3.8.3 of Reference 4.1.3 for Binning Analysis Methodology.
See Section 3.8.3 of Reference 4.1.3 for Binning Analysis Methodology.


DRIFT ANALYSIS                                                         ABB/ITE-27H                                     G13.18.6.3-006 Rev 0 RIVER BEND STATION                                                  Undervoltage Relays                                        Attachment 1 Binning Analysis                                          Page 14 of19 Graph Summary Bin           Time         Std Dev   Mean 4           327.00         0.0809   -0.0333                             Binning Analysis - River Bend Station 5           574.66         0.1272   0.0083                               ABB/ITE-27H Undervoltage Relays 0.14 Test of Variances                                     0.12 F Critical                       4.481                            0.10 Variance Ratio                  2.471                            0.08 Potential Strong TD of Drift (VAC)
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Binning Analysis G13.18.6.3-006 Rev 0 Page 14 of19 Bin Time Std Dev Mean 4
Random Drift?
327.00 0.0809
No                               0.06 0 06                                                            Std Dev 0.04 Mean 0.02 0.00
-0.0333 5
                                                                  -0.02
574.66 0.1272 0.0083 4.481 2.471 Graph Summary Test of Variances F Critical Variance Ratio Potential Strong TD of No 0 06 0.08 0.10 0.12 0.14 C)
                                                                  -0.04
Binning Analysis - River Bend Station ABB/ITE-27H Undervoltage Relays Random Drift?
                                                                  -0.06 0       200         400         600         800 Time (Days)
No
-0.06
-0.04
-0.02 0.00 0.02 0.04 0.06 0
200 400 600 800 Drift (VA Time (Days)
Std Dev Mean


DRIFT ANALYSIS                                                   ABB/ITE-27H                                         G13.18.6.3-006 Rev 0 RIVER BEND STATION                                            Undervoltage Relays                                            Attachment 1 Regression - Drift                                            Page 15 of19 Regression Analysis - Drift REGRESSION ANALYSIS                                         F Critical
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Regression - Drift G13.18.6.3-006 Rev 0 Page 15 of19 Regression Analysis - Drift REGRESSION ANALYSIS F Critical


==SUMMARY==
==SUMMARY==
OUTPUT                                               3.238096 Regression Statistics Multiple R             0.207060 R Square               0.042874 Adjusted R Square     0.018332 Standard Error         0.120505 Observations               41 ANOVA df           SS           MS         F       Significance F Regression                 1       0.0253686   0.0253686   1.746985       0.193957 Residual                   39       0.5663338   0.0145214 Total                     40       0.5917024 Coefficients Standard Error   t Stat     P-value     Lower 95%     Upper 95% Lower 95.0% Upper 95.0%
OUTPUT 3.238096 Regression Statistics Multiple R 0.207060 R Square 0.042874 Adjusted R Square 0.018332 Standard Error 0.120505 Observations 41 ANOVA df SS MS F
Intercept             -0.141518     0.110347   -1.282478   0.207245     -0.364716     0.081680 -0.364716   0.0816803 X Variable 1           0.000267     0.000202   1.321736   0.193957     -0.000142     0.000675 -0.000142   0.0006754 Refer to Section 3.8.4 of Reference 4.1.3 for Methodology for Regression Analysis.
Significance F Regression 1
0.0253686 0.0253686 1.746985 0.193957 Residual 39 0.5663338 0.0145214 Total 40 0.5917024 Coefficients Standard Error t Stat P-value Lower 95%
Upper 95%
Lower 95.0%
Upper 95.0%
Intercept
-0.141518 0.110347
-1.282478 0.207245
-0.364716 0.081680
-0.364716 0.0816803 X Variable 1 0.000267 0.000202 1.321736 0.193957
-0.000142 0.000675
-0.000142 0.0006754 Refer to Section 3.8.4 of Reference 4.1.3 for Methodology for Regression Analysis.


DRIFT ANALYSIS                                   ABB/ITE-27H                     G13.18.6.3-006 Rev 0 RIVER BEND STATION                            Undervoltage Relays                        Attachment 1 Regression - Drift                        Page 16 of19 Drift Regression Line Fit Plot 0.4 0.3 0.2 Drift (VAC) 0.1 0.0                                                  Drift 01
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Regression - Drift G13.18.6.3-006 Rev 0 Page 16 of19 0 1 0.0 0.1 0.2 0.3 0.4 (VAC)
                      -0.1                                                Predicted Drift
Drift Regression Line Fit Plot Drift Predicted Drift
                      -0.2
-0.5
                      -0.3
-0.4
                      -0.4
-0.3
                      -0.5 0     200       400         600       800 Time (Days)
-0.2
-0.1 0
200 400 600 800 Drift Time (Days)
Predicted Drift


DRIFT ANALYSIS                                                     ABB/ITE-27H                                             G13.18.6.3-006 Rev 0 RIVER BEND STATION                                            Undervoltage Relays                                                  Attachment 1 Regression - AV of Drift                                              Page 17 of19 Regression Analysis - AV of Drift ABSOLUTE VALUE REGRESSION ANALYSIS                                             F Critical
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Regression - AV of Drift G13.18.6.3-006 Rev 0 Page 17 of19 Regression Analysis - AV of Drift ABSOLUTE VALUE REGRESSION ANALYSIS F Critical


==SUMMARY==
==SUMMARY==
OUTPUT                                                   3.238096 Regression Statistics Multiple R                   0.154072 R Square                   0.023738 Adjusted R Square           -0.001294 Standard Error               0.083877 Observations                       41 ANOVA df           SS             MS         F     Significance F Regression                         1     0.0066715   0.0066715   0.948294       0.336156 Residual                           39     0.2743772   0.0070353 Total                             40     0.2810488 Coefficients   Standard Error   t Stat   P-value   Lower 95%     Upper 95%   Lower 95.0% Upper 95.0%
OUTPUT 3.238096 Regression Statistics Multiple R 0.154072 R Square 0.023738 Adjusted R Square
Intercept                   0.013374       0.076807   0.174131   0.862663     -0.141982     0.168730   -0.141982     0.168730 X Variable 1                 0.000137       0.000141   0.973804   0.336156     -0.000147     0.000421   -0.000147     0.000421 Refer to Section 3.8.4 of Reference 4.1.3 for Methodology for Regression Analysis.
-0.001294 Standard Error 0.083877 Observations 41 ANOVA df SS MS F
Significance F Regression 1
0.0066715 0.0066715 0.948294 0.336156 Residual 39 0.2743772 0.0070353 Total 40 0.2810488 Coefficients Standard Error t Stat P-value Lower 95%
Upper 95%
Lower 95.0%
Upper 95.0%
Intercept 0.013374 0.076807 0.174131 0.862663
-0.141982 0.168730
-0.141982 0.168730 X Variable 1 0.000137 0.000141 0.973804 0.336156
-0.000147 0.000421
-0.000147 0.000421 Refer to Section 3.8.4 of Reference 4.1.3 for Methodology for Regression Analysis.


DRIFT ANALYSIS                                           ABB/ITE-27H                               G13.18.6.3-006 Rev 0 RIVER BEND STATION                                    Undervoltage Relays                                  Attachment 1 Regression - AV of Drift                              Page 18 of19 AV of Drift Regression Line Fit Plot 0.45 0.40 AV of Drifft (VAC) 0.35 0.30 0.25                                              AV of Drift 0.20 Predicted AV of Drift 0.15 0.10 0.05 0.00 200       400           600     800 Time (Days)
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Regression - AV of Drift G13.18.6.3-006 Rev 0 Page 18 of19 0.25 0.30 0.35 0.40 0.45 ft (VAC)
AV of Drift Regression Line Fit Plot AV of Drift 0.00 0.05 0.10 0.15 0.20 0
200 400 600 800 AV of Drif Time (Days)
Predicted AV of Drift


DRIFT ANALYSIS                                                                                 ABB/ITE-27H                                 G13.18.6.3-006 Rev 0 RIVER BEND STATION                                                                      Undervoltage Relays                                        Attachment 1 Analyzed Drift (DA)                                      Page 19 of19 Drift Bias Determination First, the bias term is evaluated for significance per Section 3.10 of Reference 4.1.3.
DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Analyzed Drift (DA)
Per Outlier Statistical Summary, Count (N)                                                       41 Drift Data Points Drift Bias Term (Mean)                                     0.0022 VAC Standard Deviation (Stdev))                               0.1216 VAC t for Count = 41 Data Points                               2.000                     (Ref. 4.1.3, Table 4)
G13.18.6.3-006 Rev 0 Page 19 of19 Drift Bias Determination First, the bias term is evaluated for significance per Section 3.10 of Reference 4.1.3.
Per Outlier Statistical Summary, Count (N) 41 Drift Data Points Drift Bias Term (Mean) 0.0022 VAC Standard Deviation (Stdev))
0.1216 VAC t for Count = 41 Data Points 2.000 (Ref. 4.1.3, Table 4)
[Bias (Crit) = t
[Bias (Crit) = t
* Stdev / (N)^0.5]
* Stdev / (N)^0.5]
Signficant Bias Critical Value                             0.038 VAC Therefore, the bias value for this drift data set is not signficant, since the magnitude of the Bias is less than the Critical Bias Value.
Signficant Bias Critical Value 0.038 VAC Therefore, the bias value for this drift data set is not signficant, since the magnitude of the Bias is less than the Critical Bias Value.
DAbias = Negligible R d Random            D ift Determination Drift    D t           i ti Time Dependency                                         Moderate Count (N)                                                       41 Drift Data Points Bin 5 Standard Deviation (Stdev)                           0.1272 VAC Mean Bin 5 Time Interval                                       575 Days Maximum Required Cal Interval                                 915 Days Tolerance Interval Factor (TIF)                             2.445                     (Ref. 4.1.3, Table 1)
DAbias = Negligible R
d D ift D t i
ti Random Drift Determination Time Dependency Moderate Count (N) 41 Drift Data Points Bin 5 Standard Deviation (Stdev) 0.1272 VAC Mean Bin 5 Time Interval 575 Days Maximum Required Cal Interval 915 Days Tolerance Interval Factor (TIF) 2.445 (Ref. 4.1.3, Table 1)
[Current Interval Drift = Stdev
[Current Interval Drift = Stdev
* TIF]
* TIF]
DArandom (current) = +/-     0.311 VAC
DArandom (current) = +/-
0.311 VAC
[Extrap Drift = DArandom (current) * (Required Cal Interval / Mean Bin 5 Cal Interval)1/2]
[Extrap Drift = DArandom (current) * (Required Cal Interval / Mean Bin 5 Cal Interval)1/2]
DArandom (extrap) = +/-     0.392 VAC for up to 915 Days
DArandom (extrap) = +/-
0.392 VAC for up to 915 Days


G13.18.6.3-006 Attachment 2 Page 1 of 8 DESIGN VERIFICATION COVER PAGE ANO-1         ANO-2             IP-2         IP-3             JAF         PLP PNPS           VY                 GGNS         RBS             W3           NP Document No.         G13.18.6.3-006                   Revision No. Page 1 of 0
G13.18.6.3-006 Page 1 of 8 DESIGN VERIFICATION COVER PAGE ANO-1 ANO-2 IP-2 IP-3 JAF PLP PNPS VY GGNS RBS W3 NP Document No.
G13.18.6.3-006 Revision No.
0 Page 1 of


==Title:==
==Title:==
Drift Study for ABB Model ITE-27H Undervoltage Relays Quality Related         Augmented Quality Related DV Method:     Design Review           Alternate Calculation         Qualification Testing VERIFICATION REQUIRED               DISCIPLINE                 VERIFICATION COMPLETE AND COMMENTS RESOLVED (DV print, sign, and date)
Drift Study for ABB Model ITE-27H Undervoltage Relays Quality Related Augmented Quality Related DV Method:
Electrical Mechanical Richard J. Hannigan Instrument and Control 1-20-09 Civil/Structural Nuclear Originator:
Design Review Alternate Calculation Qualification Testing VERIFICATION REQUIRED DISCIPLINE VERIFICATION COMPLETE AND COMMENTS RESOLVED (DV print, sign, and date)
R.A. Hunter                                     1-20-09 Print/Sign/Date After Comments Have Been Resolved
Electrical Mechanical Instrument and Control Richard J. Hannigan 1-20-09 Civil/Structural Nuclear Originator:
R.A. Hunter 1-20-09 Print/Sign/Date After Comments Have Been Resolved  


G13.18.6.3-006 Attachment 2 Page 2 of 8 DESIGN VERIFICATION CHECKLIST                                             SHEET 1 OF 3 IDENTIFICATION:                                                                                     DISCIPLINE:
G13.18.6.3-006 Page 2 of 8 DESIGN VERIFICATION CHECKLIST SHEET 1 OF 3 IDENTIFICATION:
Civil/Structural Document
DISCIPLINE:
Civil/Structural Electrical I & C Mechanical Nuclear Other Document


==Title:==
==Title:==
Drift Study for ABB Model ITE-27H Undervoltage Electrical Relays Doc. No.:G13.18.6.3-006                                           Rev. 0   QA Cat. 1                 I&C Mechanical Nuclear Richard J. Hannigan                                     1-20-09 Verifier:                            Print                   Sign                 Date             Other Manager authorization for supervisor performing Verification.
Drift Study for ABB Model ITE-27H Undervoltage Relays Doc. No.:G13.18.6.3-006 Rev. 0 QA Cat. 1 Verifier:
N/A Print                 Sign         Date METHOD OF VERIFICATION:
Richard J. Hannigan 1-20-09 Print Sign Date Manager authorization for supervisor performing Verification.
Design Review                                   Alternate Calculations                     Qualification Test The following basic questions are addressed as applicable, during the performance of any design verification. These questions are based on the requirements of ANSI N45.2.11 - 1974.
N/A Print Sign Date METHOD OF VERIFICATION:
NOTE           The reviewer can use the Comments/Continuation sheet at the end for entering any comment/resolution along with the appropriate question number. Additional items with new question numbers can also be entered.
Design Review Alternate Calculations Qualification Test The following basic questions are addressed as applicable, during the performance of any design verification. These questions are based on the requirements of ANSI N45.2.11 - 1974.
: 1.       Design Inputs - Were the inputs correctly selected and incorporated into the design?
NOTE The reviewer can use the Comments/Continuation sheet at the end for entering any comment/resolution along with the appropriate question number. Additional items with new question numbers can also be entered.
: 1.
Design Inputs - Were the inputs correctly selected and incorporated into the design?
(Design inputs include design bases, plant operational conditions, performance requirements, regulatory requirements and commitments, codes, standards, field data, etc.
(Design inputs include design bases, plant operational conditions, performance requirements, regulatory requirements and commitments, codes, standards, field data, etc.
All information used as design inputs should have been reviewed and approved by the responsible design organization, as applicable.
All information used as design inputs should have been reviewed and approved by the responsible design organization, as applicable.
All inputs need to be retrievable or excerpts of documents used should be attached.
All inputs need to be retrievable or excerpts of documents used should be attached.
See site specific design input procedures for guidance in identifying inputs.)
See site specific design input procedures for guidance in identifying inputs.)
Yes                 No                 N/A
Yes No N/A
: 2.       Assumptions - Are assumptions necessary to perform the design activity adequately described and reasonable? Where necessary, are assumptions identified for subsequent re-verification when the detailed activities are completed? Are the latest applicable revisions of design documents utilized?
: 2.
Yes                 No                 N/A
Assumptions - Are assumptions necessary to perform the design activity adequately described and reasonable? Where necessary, are assumptions identified for subsequent re-verification when the detailed activities are completed? Are the latest applicable revisions of design documents utilized?
: 3.       Quality Assurance - Are the appropriate quality and quality assurance requirements specified?
Yes No N/A
Yes                 No                 N/A
: 3.
Quality Assurance - Are the appropriate quality and quality assurance requirements specified?
Yes No N/A  


G13.18.6.3-006 Attachment 2 Page 3 of 8 DESIGN VERIFICATION CHECKLIST                                           SHEET 2 OF 3
G13.18.6.3-006 Page 3 of 8 DESIGN VERIFICATION CHECKLIST SHEET 2 OF 3
: 4. Codes, Standards and Regulatory Requirements - Are the applicable codes, standards and regulatory requirements, including issue and addenda properly identified and are their requirements for design met?
: 4.
Yes               No                 N/A
Codes, Standards and Regulatory Requirements - Are the applicable codes, standards and regulatory requirements, including issue and addenda properly identified and are their requirements for design met?
: 5. Construction and Operating Experience - Have applicable construction and operating experience been considered?
Yes No N/A
Yes               No                 N/A
: 5.
: 6. Interfaces - Have the design interface requirements been satisfied and documented?
Construction and Operating Experience - Have applicable construction and operating experience been considered?
Yes               No                 N/A
Yes No N/A
: 7. Methods - Was an appropriate design or analytical (for calculations) method used?
: 6.
Yes               No                 N/A
Interfaces - Have the design interface requirements been satisfied and documented?
: 8. Design Outputs - Is the output reasonable compared to the inputs?
Yes No N/A
Yes               No                 N/A
: 7.
: 9. Parts, Equipment and Processes - Are the specified parts, equipment, and processes suitable for the required application?
Methods - Was an appropriate design or analytical (for calculations) method used?
Yes               No                 N/A
Yes No N/A
: 10. Materials Compatibility - Are the specified materials compatible with each other and the design environmental conditions to which the material will be exposed?
: 8.
Yes               No                 N/A
Design Outputs - Is the output reasonable compared to the inputs?
: 11. Maintenance requirements - Have adequate maintenance features and requirements been specified?
Yes No N/A
Yes               No                 N/A
: 9.
: 12. Accessibility for Maintenance - Are accessibility and other design provisions adequate for performance of needed maintenance and repair?
Parts, Equipment and Processes - Are the specified parts, equipment, and processes suitable for the required application?
Yes               No                 N/A
Yes No N/A
: 13. Accessibility for In-service Inspection - Has adequate accessibility been provided to perform the in-service inspection expected to be required during the plant life?
: 10.
Yes               No                 N/A
Materials Compatibility - Are the specified materials compatible with each other and the design environmental conditions to which the material will be exposed?
: 14. Radiation Exposure - Has the design properly considered radiation exposure to the public and plant personnel?
Yes No N/A
Yes               No                 N/A
: 11.
: 15. Acceptance Criteria - Are the acceptance criteria incorporated in the design documents sufficient to allow verification that design requirements have been satisfactorily accomplished?
Maintenance requirements - Have adequate maintenance features and requirements been specified?
Yes               No                 N/A
Yes No N/A
: 16. Test Requirements - Have adequate pre-operational and subsequent periodic test requirements been appropriately specified?
: 12.
Yes               No                 N/A
Accessibility for Maintenance - Are accessibility and other design provisions adequate for performance of needed maintenance and repair?
Yes No N/A
: 13.
Accessibility for In-service Inspection - Has adequate accessibility been provided to perform the in-service inspection expected to be required during the plant life?
Yes No N/A
: 14.
Radiation Exposure - Has the design properly considered radiation exposure to the public and plant personnel?
Yes No N/A
: 15.
Acceptance Criteria - Are the acceptance criteria incorporated in the design documents sufficient to allow verification that design requirements have been satisfactorily accomplished?
Yes No N/A
: 16.
Test Requirements - Have adequate pre-operational and subsequent periodic test requirements been appropriately specified?
Yes No N/A  


G13.18.6.3-006 Attachment 2 Page 4 of 8 DESIGN VERIFICATION CHECKLIST                                         SHEET 3 OF 3
G13.18.6.3-006 Page 4 of 8 DESIGN VERIFICATION CHECKLIST SHEET 3 OF 3
: 17. Handling, Storage, Cleaning and Shipping - Are adequate handling, storage, cleaning and shipping requirements specified?
: 17.
Yes                 No               N/A
Handling, Storage, Cleaning and Shipping - Are adequate handling, storage, cleaning and shipping requirements specified?
: 18. Identification Requirements - Are adequate identification requirements specified?
Yes No N/A
Yes                 No               N/A
: 18.
: 19. Records and Documentation - Are requirements for record preparation, review, approval, retention, etc., adequately specified? Are all documents prepared in a clear legible manner suitable for microfilming and/or other documentation storage method? Have all impacted documents been identified for update as necessary?
Identification Requirements - Are adequate identification requirements specified?
Yes                 No               N/A
Yes No N/A
: 20. Software Quality Assurance- ENN sites: For a calculation that utilized software applications (e.g., GOTHIC, SYMCORD), was it properly verified and validated in accordance with EN- IT-104 or previous site SQA Program?
: 19.
Records and Documentation - Are requirements for record preparation, review, approval, retention, etc., adequately specified? Are all documents prepared in a clear legible manner suitable for microfilming and/or other documentation storage method? Have all impacted documents been identified for update as necessary?
Yes No N/A
: 20.
Software Quality Assurance-ENN sites: For a calculation that utilized software applications (e.g., GOTHIC, SYMCORD), was it properly verified and validated in accordance with EN-IT-104 or previous site SQA Program?
ENS sites: This is an EN-IT-104 task. However, per ENS-DC-126, for exempt software, was it verified in the calculation?
ENS sites: This is an EN-IT-104 task. However, per ENS-DC-126, for exempt software, was it verified in the calculation?
Yes                 No               N/A
Yes No N/A 21.
: 21. Has adverse impact on peripheral components and systems, outside the boundary of the document being verified, been considered?
Has adverse impact on peripheral components and systems, outside the boundary of the document being verified, been considered?
Yes                 No               N/A
Yes No N/A  


G13.18.6.3-006 Attachment 2 Page 5 of 8 DESIGN VERIFICATION COMMENT SHEET                                   SHEET 1 OF 1 Comments / Continuation Sheet Question               Comments                         Resolution             Initial/Date NONE
G13.18.6.3-006 Page 5 of 8 DESIGN VERIFICATION COMMENT SHEET SHEET 1 OF 1 Comments / Continuation Sheet Question Comments Resolution Initial/Date NONE


G13.18.6.3-006 Attachment 2 Page 6 of 8 During the independent review of calculation G13.18.6.3-006, alternate applications Lotus 1-2-3 and Quattro Pro were used to validate the results generated by MS Excel in the calculation. The reviewer independently generated the G13.18.6.3-006 results. In the table below the results of the validation for the G13.18.6.3-006 values and the values produced by Lotus 1-2-3 and Quattro Pro are illustrated for the Final Data Set - after removal of the single outlier. The results from Lotus 1-2-3 and Quattro Pro validated the calculation G13.18.6.3-006 results generated by MS Excel. Minor differences in the values between the MS Excel generated results and the Lotus 1-2-3 and Quattro Pro generated results were reviewed and can be attributed to rounding and conversion between applications. Below is a partial listing of some of the values from G13.18.6.3-006 that were validated:
G13.18.6.3-006 Page 6 of 8 During the independent review of calculation G13.18.6.3-006, alternate applications Lotus 1-2-3 and Quattro Pro were used to validate the results generated by MS Excel in the calculation. The reviewer independently generated the G13.18.6.3-006 results. In the table below the results of the validation for the G13.18.6.3-006 values and the values produced by Lotus 1-2-3 and Quattro Pro are illustrated for the Final Data Set - after removal of the single outlier. The results from Lotus 1-2-3 and Quattro Pro validated the calculation G13.18.6.3-006 results generated by MS Excel. Minor differences in the values between the MS Excel generated results and the Lotus 1-2-3 and Quattro Pro generated results were reviewed and can be attributed to rounding and conversion between applications. Below is a partial listing of some of the values from G13.18.6.3-006 that were validated:
Validation Parameter           G13.18.6.3-006 value       Validation value       application   Valid?
Parameter G13.18.6.3-006 value Validation value Validation application Valid?
Mean                     0.0022                   0.0022           Lotus 1-2-3     Yes Variance                   0.0148                   0.0148           Lotus 1-2-3     Yes Standard                   0.1216                   0.1216           Lotus 1-2-3     Yes Deviation Count                       41                         41           Lotus 1-2-3     Yes Max                       0.30                       0.30           Lotus 1-2-3     Yes Median                     0.00                     0.00           Lotus 1-2-3     Yes Min                     -0.40                     -0.40           Lotus 1-2-3     Yes Range                     0.70                     0.70           Lotus 1-2-3     Yes Sum                     0.090                     0.090           Lotus 1-2-3     Yes Kurtosis                   2.234                     2.234           Lotus 1-2-3     Yes Skewness                   -0.581                     -0.581           Lotus 1-2-3     Yes Outliers           Sequ. ID 17 identified   Sequ. ID 17 identified   Lotus 1-2-3     Yes as an outlier and        as an outlier and removed                  removed Visual inspection Drift scatter plot               N/A               shows agreement         Lotus 1-2-3     Yes with trend line                                  between the scatter plots and trend lines Drift scatter plot trend line         Y = 0.0003x - 0.1415   Y = 0.000267x - 0.142     Lotus 1-2-3     Yes W Test Value         0.9569 (does not reject 0.9569 (does not reject   Lotus 1-2-3     Yes assumption of            assumption of normality)                normality)
Mean 0.0022 0.0022 Lotus 1-2-3 Yes Variance 0.0148 0.0148 Lotus 1-2-3 Yes Standard Deviation 0.1216 0.1216 Lotus 1-2-3 Yes Count 41 41 Lotus 1-2-3 Yes Max 0.30 0.30 Lotus 1-2-3 Yes Median 0.00 0.00 Lotus 1-2-3 Yes Min
Visual inspection Histogram                     N/A               shows agreement         Lotus 1-2-3     Yes between the histograms
-0.40
-0.40 Lotus 1-2-3 Yes Range 0.70 0.70 Lotus 1-2-3 Yes Sum 0.090 0.090 Lotus 1-2-3 Yes Kurtosis 2.234 2.234 Lotus 1-2-3 Yes Skewness
-0.581
-0.581 Lotus 1-2-3 Yes Outliers Sequ. ID 17 identified as an outlier and removed Sequ. ID 17 identified as an outlier and removed Lotus 1-2-3 Yes Drift scatter plot with trend line N/A Visual inspection shows agreement between the scatter plots and trend lines Lotus 1-2-3 Yes Drift scatter plot trend line Y = 0.0003x - 0.1415 Y = 0.000267x - 0.142 Lotus 1-2-3 Yes W Test Value 0.9569 (does not reject assumption of normality) 0.9569 (does not reject assumption of normality)
Lotus 1-2-3 Yes Histogram N/A Visual inspection shows agreement between the histograms Lotus 1-2-3 Yes


G13.18.6.3-006 Attachment 2 Page 7 of 8 Validation Parameter     G13.18.6.3-006   Validation value     application     Valid?
G13.18.6.3-006 Page 7 of 8 Parameter G13.18.6.3-006 value Validation value Validation application Valid?
value Data within 0.5 Standard Deviations       16                 16         Lotus 1-2-3     Yes Data within 1.0 Standard Deviation         33                 33         Lotus 1-2-3     Yes Data within 1.5 Standard Deviations       36                 36         Lotus 1-2-3     Yes Data within 2.0 Standard Deviations       39                 39         Lotus 1-2-3     Yes Data within 2.5 Standard Deviations       40                 40         Lotus 1-2-3     Yes Bin 4 count           6                   6         Lotus 1-2-3     Yes Bin 4 drift Standard Deviation     0.0809             0.0809         Lotus 1-2-3     Yes Bin 4 drift mean     -0.0333           -0.0333         Lotus 1-2-3     Yes Bin 4 interval mean     327.00             327.00         Lotus 1-2-3     Yes Bin 4 interval       330                 330         Lotus 1-2-3     Yes maximum Bin 5 count           35                 35         Lotus 1-2-3     Yes Bin 5 drift Standard Deviation     0.1272             0.1272         Lotus 1-2-3     Yes Bin 5 drift mean       0.0083             0.0083         Lotus 1-2-3     Yes Bin 5 interval mean     574.66             574.66         Lotus 1-2-3     Yes Bin 5 interval       650                 650         Lotus 1-2-3     Yes maximum Binning Analysis 2.471             2.471         Lotus 1-2-3     Yes Ratio of Variances Binning Analysis 4.481             4.481         Quattro Pro     Yes F Critical Visual inspection Drift Regression         NA       shows agreement       Lotus 1-2-3      Yes Scatter Plot                      between the two scatter plots and trend lines.
Data within 0.5 Standard Deviations 16 16 Lotus 1-2-3 Yes Data within 1.0 Standard Deviation 33 33 Lotus 1-2-3 Yes Data within 1.5 Standard Deviations 36 36 Lotus 1-2-3 Yes Data within 2.0 Standard Deviations 39 39 Lotus 1-2-3 Yes Data within 2.5 Standard Deviations 40 40 Lotus 1-2-3 Yes Bin 4 count 6
Drift Regression Scatter Plot Trend Y = 0.000267x     Y = 0.000267x       Quattro Pro      Yes Line        -0.141518          -0.141518 Drift Regression R Square Value       0.042874           0.042874         Quattro Pro     Yes Drift Regression                                                         Yes F Value         1.746985           1.746985         Quattro Pro F Crit Value       3.238096           3.238096         Quattro Pro     Yes Drift Regression P-Value         0.193957           0.193766         Quattro Pro     Yes
6 Lotus 1-2-3 Yes Bin 4 drift Standard Deviation 0.0809 0.0809 Lotus 1-2-3 Yes Bin 4 drift mean  
-0.0333
-0.0333 Lotus 1-2-3 Yes Bin 4 interval mean 327.00 327.00 Lotus 1-2-3 Yes Bin 4 interval maximum 330 330 Lotus 1-2-3 Yes Bin 5 count 35 35 Lotus 1-2-3 Yes Bin 5 drift Standard Deviation 0.1272 0.1272 Lotus 1-2-3 Yes Bin 5 drift mean 0.0083 0.0083 Lotus 1-2-3 Yes Bin 5 interval mean 574.66 574.66 Lotus 1-2-3 Yes Bin 5 interval maximum 650 650 Lotus 1-2-3 Yes Binning Analysis Ratio of Variances 2.471 2.471 Lotus 1-2-3 Yes Binning Analysis F Critical 4.481 4.481 Quattro Pro Yes Drift Regression Scatter Plot NA Visual inspection shows agreement between the two scatter plots and trend lines.
Lotus 1-2-3 Yes Drift Regression Scatter Plot Trend Line Y = 0.000267x
-0.141518 Y = 0.000267x
-0.141518 Quattro Pro Yes Drift Regression R Square Value 0.042874 0.042874 Quattro Pro Yes Drift Regression F Value 1.746985 1.746985 Quattro Pro Yes F Crit Value 3.238096 3.238096 Quattro Pro Yes Drift Regression P-Value 0.193957 0.193766 Quattro Pro Yes


G13.18.6.3-006 Attachment 2 Page 8 of 8 Validation Parameter             G13.18.6.3-006       Validation value       application     Valid?
G13.18.6.3-006 Page 8 of 8 Parameter G13.18.6.3-006 value Validation value Validation application Valid?
value Visual inspection AV Drift Regression             NA           shows agreement       Lotus 1-2-3      Yes Scatter Plot                                between the two scatter plots and trend lines.
AV Drift Regression Scatter Plot NA Visual inspection shows agreement between the two scatter plots and trend lines.
AV Drift Regression       Y = 0.000137x         Y = 0.000137x Scatter Plot Trend          +0.013374             +0.013374          Quattro Pro       Yes Line AV Drift Regression R Square Value             0.023738             0.023738           Quattro Pro       Yes AV Drift Regression F Value                 0.948294             0.948294           Quattro Pro       Yes F Crit Value             3.238096             3.238096           Quattro Pro       Yes AV Drift Regression P-Value                 0.336156             0.336006           Quattro Pro       Yes Other values, including those based on the above parameters, were checked using hand calculations.}}
Lotus 1-2-3 Yes AV Drift Regression Scatter Plot Trend Line Y = 0.000137x
+0.013374 Y = 0.000137x
+0.013374 Quattro Pro Yes AV Drift Regression R Square Value 0.023738 0.023738 Quattro Pro Yes AV Drift Regression F Value 0.948294 0.948294 Quattro Pro Yes F Crit Value 3.238096 3.238096 Quattro Pro Yes AV Drift Regression P-Value 0.336156 0.336006 Quattro Pro Yes Other values, including those based on the above parameters, were checked using hand calculations.}}

Latest revision as of 19:07, 11 January 2025

Drift Study for ABB Model ITE-27H Undervoltage Relays
ML13018A100
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/20/2009
From: Hunter R
Entergy Operations
To: Wang A
Plant Licensing Branch IV
Wang A
Shared Package
ML13018A081 List:
References
TAC ME7767 G13.18.6.3-006
Download: ML13018A100 (41)


Text

ANO-1 ANO-2 GGNS IP-2 IP-3 PLP JAF PNPS RBS VY W3 CALCULATION COVER PAGE (1) EC # 11753 (2)Page 1 of 41 (3) Design Basis Calc.

YES NO (4)

CALCULATION EC Markup (5 ) Calculation No: G13.18.6.3-006 (6) Revision: 0 (7)

Title:

Drift Study for ABB Model ITE-27H Undervoltage Relays (8) System(s): 508 (9) Review Org (Department): NSBE3 (I&C Design)

(10) Safety Class:

Safety / Quality Related Augmented Quality Program Non-Safety Related (11) Component/Equipment/Structure Type/Number:

ENS-SWG1A-27-1A ENS-SWG1A-27-1B ENS-SWG1A-27-1C ENS-SWG1B-27-1A ENS-SWG1B-27-1B ENS-SWG1B-27-1C (12) Document Type: F43.02 (13)

Keywords (Description / Topical Codes): Drift G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G REVIEWS (14) Name/Signature/Date R.A. Hunter /

/1-20-09 (15) Name/Signature/Date

_R.J. Hannigan /

/ 1-20-09 (16) Name/Signature/Date See AS for electronic signature Responsible Engineer Design Verifier Supervisor/Approval Reviewer Comments Attached Comments Attached

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 2 OF 14 CALCULATION REFERENCE SHEET CALCULATION NO:

G13.18.6.3-006 REVISION:

0 I. EC Markups Incorporated None II. Relationships:

Sht Rev Input Doc Output Doc Impact Y/N Tracking No.

1. 350578 NA N
2. 350601 NA N
3. 350720 NA N
4. 350863 NA N
5. 350864 NA N
6. 351061 NA N
7. 351062 NA N
8. 351119 NA N
9. 362704 NA N
10. 362705 NA N
11. 362707 NA N
12. 362708 NA N
13. 368038 NA N
14. 368039 NA N
15. 368040 NA N
16. 368041 NA N
17. ECH-NE-08-00015 000 N
18. G13.18.6.1-ENS-002 0

000 Y

11753

19. STP-508-1600 1

16 N

20. STP-508-1600 1

16A N

21. STP-508-1600 1

17 N

22. STP-508-1600 1

18 N

23. STP-508-1600 2

16 N

24. STP-508-1600 2

16A N

25. STP-508-1600 2

17 N

26. STP-508-1600 2

18 N

27. STP-508-1600 3

18 N

28. STP-508-1600 4

18 N

29. STP-508-1600 5

18 N

30. STP-508-1600 6

18 N

31. STP-508-1600 7

18 N

32. STP-508-1600 8

18 N

33. STP-508-1600 9

18 N

34. STP-508-1600 10 18 N
35. STP-508-1600 11 18 N
36. STP-508-1600 12 18 N

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 3 OF 14 CALCULATION REFERENCE SHEET CALCULATION NO:

G13.18.6.3-006 REVISION:

0 II. Relationships (contd):

Sht Rev Input Doc Output Doc Impact Y/N Tracking No.

37. STP-508-1600 13 18 N
38. STP-508-1600 14 18 N
39. STP-508-1600 15 18 N
40. STP-508-1600 16 18 N
41. STP-508-1600 17 18 N
42. STP-508-1600 18 18 N
43. STP-508-1600 19 18 N
44. STP-508-1600 20 18 N
45. STP-508-1600 21 18 N
46. STP-508-1600 22 18 N
47. WO-50688087 0

N

48. WO-50688088 0

N

49. WO-50688091 0

N

50. WO-50688092 0

N

51. WO-50688089 0

N

52. WO-50688090 0

N

53. WO-50688085 0

N

54. WO-50688086 0

N

55. WO-50989677 0

N

56. WO-50989678 0

N

57. WO-50990339 0

N

58. WO-50990340 0

N

59. WO-50990919 0

N

60. WO-50990920 0

N

61. WO-50991471 0

N

62. WO-50991472 0

N

63. WO-51034041 0

N

64. WO-51035362 0

N

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 4 OF 14 CALCULATION REFERENCE SHEET CALCULATION NO:

G13.18.6.3-006 REVISION:

0 III.

CROSS

REFERENCES:

1. American National Standard N15.15-1974, Assessment of the Assumption of Normality (Employing Individual Observed Values)
2. ANSI/ISA-S67.04-Part I-2000, Setpoints for Nuclear Safety Related Instrumentation
3. DOE Research and Development Report No. WAPD-TM-1292, Statistics for Nuclear Engineers and Scientists Part 1: Basic Statistical Inference, February 1981
4. EPRI TR-103335R1, Statistical Analysis of Instrument Calibration Data; Guidelines for Instrument Calibration Extension / Reduction Programs, October 1998
5. ISA-RP67.04-Part II-2000, Methodologies for the Determination of Setpoints for Nuclear Safety-Related Instrumentation, Second Printing, June 12, 1995
6. NRC Generic Letter 91-04, Changes in Technical Specification Surveillance Requirements to Accommodate a 24 Month Fuel Cycle, April 2, 1991 IV.

SOFTWARE USED:

Title:

N/A Version/Release:

Disk/CD No.

V.

DISK/CDS INCLUDED:

Title:

N/A Version/Release Disk/CD No.

VI.

OTHER CHANGES:

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 5 OF 14 Revision Record of Revision 0

Initial issue.

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 6 OF 14 TABLE OF CONTENTS 1!

Purpose!.................................................................................................................................................!7!

2!

Conclusions!...........................................................................................................................................!8!

3!

Design!Inputs!.........................................................................................................................................!8!

4!

References!.............................................................................................................................................!8!

5!

Assumptions!..........................................................................................................................................!9!

6!

Method!of!Analysis................................................................................................................................!9!

7!

Analysis!................................................................................................................................................!10!

8!

Attachments!........................................................................................................................................!14!

Attachment 1 - Drift Analysis Supporting Information (Excel Spreadsheet) - 19 pages

- DVR Forms with comments - 8 pages

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 7 OF 14 1

Purpose 1.1 The purpose of this analysis is to establish more realistic drift values and characteristics to be used by instrument uncertainty calculations for determination of setpoints and allowable values for the subject instrumentation. The drift values are determined by historical As Found / As Left data analysis.

1.2 Specifically, this analysis addresses ASEA Brown Boveri (ABB) Model ITE-27H Undervoltage (UV) Relays with tag numbers as shown in Table 1.2-1 below. Also shown in the table are the calibration procedure numbers, device functions, and applicable Technical Specification (TS) sections. The results of this analysis can be conservatively applied to any ABB Model ITE-27H Undervoltage Relay used at River Bend Station that meets the criteria listed in Section 3.5.3 of Reference 4.1.3, Considerations When Combining Instruments Into a Single Group.

TABLE 1.2-1 COMPONENT LIST PROCEDURE NO.

TAG NO.

FUNCTION TS SECTION STP-508-1600 STP-508-1601 ENS-SWG1A-27-1A ENS-SWG1A-27-1B ENS-SWG1A-27-1C ENS-SWG1B-27-1A ENS-SWG1B-27-1B ENS-SWG1B-27-1C Loss of Power (LOP) Instrumentation Divisions 1 and 2 4.16kV Emergency Bus Undervoltage Loss of Voltage - 4.16 kV basis 3.3.8.1.3-1.a

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 8 OF 14 2

Conclusions 2.1 The bounding Analyzed Drift (DA) for the ABB Model ITE-27H Undervoltage Relays (See Table 1.2-1) has been determined to be ! 0.392 VAC for 30 months (24 months +

25%), with no significant bias. The Analyzed Drift should be treated as a normally distributed, 2" value for uncertainty analysis.

2.2 The results of this analysis can be conservatively applied to all of the Undervoltage relays in Table 1.2-1 and to any ABB Model ITE-27H Undervoltage Relay used at River Bend Station, which meets the criteria listed in Section 3.5.3 of Reference 4.1.3, Considerations When Combining Instruments Into a Single Group.

3 Design Inputs 3.1 Pages 1 through 3 of Attachment 1 provide a listing of the historical As Left (AL) and As Found (AF) data, as obtained from Reference 4.2.1, with any data exclusions or modifications noted. All dates of calibration are also entered to provide time intervals between calibrations.

4 References 4.1 METHODOLOGY 4.1.1 ANSI/ISA-S67.04-Part I-2000, Setpoints for Nuclear Safety Related Instrumentation 4.1.2 ISA-RP67.04-Part II-2000, "Methodologies for the Determination of Setpoints for Nuclear Safety-Related Instrumentation," Second Printing, June 12, 1995 4.1.3 ECH-NE-08-00015, Instrument Drift Analysis Design Guide," Rev. 0, Generated by EXCEL Services Corporation, July 2008 4.1.4 EPRI TR-103335R1, "Statistical Analysis of Instrument Calibration Data; Guidelines for Instrument Calibration Extension / Reduction Programs," October, 1998 4.1.5 DOE Research and Development Report No. WAPD-TM-1292, "Statistics for Nuclear Engineers and Scientists Part 1: Basic Statistical Inference," February 1981 4.1.6 NRC Generic Letter 91-04, "Changes in Technical Specification Surveillance Requirements to Accommodate a 24 Month Fuel Cycle," April 2, 1991 4.1.7 American National Standard N15.15-1974, "Assessment of the Assumption of Normality (Employing Individual Observed Values)"

4.2 PROCEDURES 4.2.1 Historical Calibration Records from RBS Surveillance Test Procedure Results for STP-508-1600, 1601 4.3 MISCELLANEOUS REFERENCES 4.3.1 None

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 9 OF 14 5

Assumptions 5.1 This drift report employs those assumptions customarily used for standard statistical analyses, as directed by Reference 4.1.3, such as the assumption that a distribution is normal and the use of statistical tests to confirm this hypothesis.

5.2 This drift report is based on analysis of historical As Found and As Left data from calibration records for the devices listed in Table 1.2-1. The results of this analysis can also apply to any ABB Model ITE-27H Undervoltage Relay used at RBS, but care must be taken when applying these results. Specifically, in order to apply the results of this analysis to other similar devices, the devices must meet the criteria listed in Section 3.5.3 of Reference 4.1.3, Considerations When Combining Instruments Into a Single Group.

6 Method of Analysis 6.1 The methodology used for this analysis is Reference 4.1.3, which is written in accordance with Reference 4.1.4, using References 4.1.1, 4.1.2 and 4.1.7 to supplement. An overview of the methodology is given herein, and any deviation from Reference 4.1.3 or any supplemental methods used herein are described.

6.2 This analysis determines the drift values for the subject instrumentation by analysis of historical As Found / As Left data from calibration records. Drift for a given device for a calibration period is determined by subtracting the previous As Left setting from a more recent As Found setting. The time interval for that calibration period is determined by subtracting the previous date from the more recent date, in units of days. All retrievable As Left and As Found data is collected for each calibration performed on each device covered by this report, for the study period. From this information, the drift and calibration interval is generated for each possible instance. Per Section 3.4.2 of Reference 4.1.3, "The goal is to collect enough data for the instrument or group to make a statistically valid pool." The devices covered by this report are currently calibrated on an 18 Month basis, and the proposed extension is for a 24 Month nominal calibration interval. Therefore, a study period of 10 years represents more than six of the present calibration cycles, and five of the proposed calibration cycles, which is adequate to understand the component's performance over time. Also, a sufficient number of valid drift values are provided as a result of the selected study period to make a statistically valid pool. Therefore, As Found and As Left Data values are entered from calibrations occurring for approximately the last 10 years.

6.3 Determination of the Analyzed Drift is generally accomplished through the following steps.

6.3.1 Gather and Generate Raw Drift Data: In addition to gathering the As Found and As Left data, and computing the drift values and time intervals, this step also involves an investigation into whether all of the devices should be analyzed together, or whether they should be separated into smaller analysis groups. Additionally, this step involves careful screening of the input data for errors or other situations that would not allow proper determination of drift.

6.3.2 Determination of Outliers and Statistical Summary: In order to properly model the drift characteristics for a device, it could be proper to remove up to one more data value, which obviously does not conform to the vast majority of the data. A t-Test is

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 10 OF 14 performed on the data to detect any outliers, and remove up to one if appropriate, per the guidelines of Reference 4.1.3. Additionally, the basic statistical values which describe the group of drift data are derived in this step, including such parameters as Mean, Standard Deviation, Count, Median, Minimum, Maximum, etc.

6.3.3 Tests for Normality: Per Reference 4.1.3, a statistical test (W or D-Prime, depending on sample size) is performed on the drift data to support the hypothesis that the data conforms to a normal distribution. If this test is unable to support that hypothesis, then a Coverage Analysis is performed to ensure that the data can be conservatively modeled by a normal distribution and to provide an adjustment to the standard deviation of the drift model, if necessary to conservatively envelop the observed data population.

6.3.4 Time-Dependency

Per Reference 4.1.3, Scatter Plots and a time-based Binning Analysis are developed for the data to establish the time-dependency of the drift. If enough drift data exists for significantly different time intervals, regression analysis is performed to aid in the determination of time-dependency. The drift data is determined to be strongly time dependent or moderately time dependent, for the purpose of extrapolation.

6.3.5 Analyzed Drift Derivation and Characterization: The drift values are determined for the current calibration interval. These values are conservatively extrapolated to the desired calibration interval, based on the methods prescribed in Reference 4.1.3, depending on the degree of time-dependency derived for the drift data.

6.4 The mathematical computations of the statistical analysis are performed within an Excel spreadsheet. Supporting information from the spreadsheet is printed out in the form of to this analysis. Microsoft Excel spreadsheets generally compute values to an approximate 15 decimal resolution, which is well beyond any required rounding for engineering analyses. However, for printing and display purposes, most values are displayed to lesser resolution. It is possible that hand computations will produce slightly different results, because of using rounded numbers in initial and intermediate steps, but the Excel computed values are considered highly accurate in comparison.

6.5 Acceptance Criteria: Since the purpose of the analysis is to generate a value and description of the characteristics of the drift of the evaluated make/model, there are no specific acceptance criteria.

7 Analysis 7.1 Gather and Generate Raw Error Data 7.1.1 Specifically, this analysis addresses ABB Model ITE-27H Undervoltage Relays, with the tag numbers as shown in Table 1.2-1 of this analysis. These relays have identical manufacturer and model numbers, identical settings, and are used in identical applications. Therefore, all data is properly pooled for analysis, and no specific pooling tests are required.

7.1.2 A screening of the initial input data from pages 1 through 3 of Attachment 1 was performed. To help identify erroneous data, an informal critical T-test was performed, with the Critical T values reduced incrementally until approximately 10%

of the data population was identified as outliers. Those outliers were researched,

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 11 OF 14 and no data errors were revealed as shown in Table 7.1.4-1. The specific informal T-tests performed are not documented, as they are only used as tools to identify potentially erroneous data and do not contribute to the analysis of the valid data.

7.1.3 Pages 1 through 3 of Attachment 1 provide a listing of the initial As Found and As Left data from available historical plant calibration records for the subject UV Relays. Note that the calibration dates are also recorded, and notes are provided to clarify the activities performed or to provide additional information about the data, as appropriate. This data was entered into an Excel spreadsheet for computation of the drift values, time intervals between calibrations and statistical analysis.

7.1.4 Data not entered into the analysis is listed in the table below, showing the reasoning used in not entering the data.

Table 7.1.4-1 Data Not Entered in the Drift Analysis Procedure Number Tag Number Surveillance Date(s)

Comments/Disposition None None None None 7.1.5 Per the methodology of Section 4.1.1.11 of Reference 4.1.3, drift is computed by subtracting the As Left data of one calibration from the As Found data of the next calibration, as documented in pages 4 through 6 of Attachment 1. These pages also document the time interval between calibrations (in the number of days and months) by subtracting the As Left date of one calibration from the As Found date of the next calibration, per Section 4.1.1.10 of Reference 4.1.3. Pages 4 through 6 of import the Sequence ID, the Tag No., the AF / AL flags, the dates of calibration and the As Found and As Left data from pages 1 through 3 of and computes the interval between calibrations. Pages 4 and 5 of compute the drift values and summarize the time intervals computed.

As an example of the equations used, the first drift value and time interval are computed as follows. The rest of the values are computed identically.

Drift (Seq 1)= AF (2/17/08) - AL (5/08/06) [For Tag ENS-SWG1A-27-1A]

= 48.90 (From Seq. 1 on Left) - 49.09 (From Seq. 4 on Left)

= -0.19 VAC Cal Interval (Seq 1) = 2/17/08 - 5/08/06

= 650 Days Cal Interval (Mo.)

= Cal Interval (Days) x 12 Months / 365.25 Days

= 21.4 Months

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 12 OF 14 7.2 Determination of Outliers and Statistical Summary 7.2.1 The outlier analysis is recorded on pages 7 and 8 of Attachment 1 to this drift analysis. This page displays the Sequence No., Tag No., Drift, and Calibration Interval (in units of Days). The critical T value used in the outlier analysis comes directly from Table 2 of Reference 4.1.3. As shown on page 7 of Attachment 1, one outlier was detected and removed. The Final Data Set (FDS) for this analysis is documented on pages 7 through 8 of Attachment 1 and, except for the one removed outlier, is identical to the original data set.

7.2.2 A summary of the required statistical values for the Final Data Set, per Section 4.2 of Reference 4.1.3, is developed on page 7 of Attachment 1. Cell formulas for the determinations of statistical quantities are used directly from Section 4.2 of Reference 4.1.3.

7.3 Tests for Normality 7.3.1 Since the FDS contains less than 50 samples, the W Test is performed on the data to test for normality, as shown on page 9 of Attachment 1. Per the methodology of Section 3.7.2 of Reference 4.1.3, the details of the W Test methodology are shown in Reference 4.1.7. Equations used are listed on page 9 of Attachment 1. Since the calculated W statistic (0.9569) is greater than the critical value for W (0.9410), this test does not reject the assumption of normality for this data set. Therefore, the data is established as normally distributed, and no coverage analysis is necessary.

7.3.2 Since the W Test did not reject the assumption of normality, a Coverage Analysis is not necessary, but a Histogram is developed for information only. The Histogram is developed and documented on pages 10 and 11 of Attachment 1, per Sections 3.7.5 and 4.4 of Reference 4.1.3. To generate the Histogram data, the drift values are categorized into 12 bins, in relation to the mean and standard deviation. These bins are generated in multiples of 1/2 Standard Deviation increments, and the bin maximum values are derived in accordance with the methods given in Section 19 of Reference 4.1.4. (See page 10 of Attachment 1 for specific formulas used for the maximums.)

The expected populations within each bin are developed from normal distribution percentages, as shown on page 10 of Attachment 1.

7.4 Time-Dependency 7.4.1 In order to determine time-dependency of the drift data, the data is first plotted as a scatter plot on page 12 of Attachment 1, in accordance with the methodology of Section 4.5.1 of Reference 4.1.3. The trend line within this scatter plot starts at a small negative value and crosses zero towards the end of the analysis period. The data scatter appears to increase slightly over time. The trend line and the associated equation are noted on the scatter plot on page 12 of Attachment 1.

7.4.2 The binning analysis is performed on page 13 of Attachment 1. The drift and time interval data are divided into bins, based on the intervals between calibrations as defined in Section 3.8.3.1 of Reference 4.1.3. Statistical summaries for each bin, including count, mean, standard deviation, mean time interval and maximum observed time interval are computed. Excel functions are used to determine the statistical summary values for each bin, and are used explicitly from Sections 4.2.1,

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 13 OF 14 4.2.2, 4.2.3 and 4.2.7 of Reference 4.1.3. This information is presented on page 13 of Attachment 1. Per Section 3.8.3.4 of Reference 4.1.3, after removing those bins with 5 or less data points and those with less than or equal to 10% of total population, only Bins 4 and 5 remain.

Page 14 of Attachment 1 displays a plot of the mean and standard deviations of the drift data versus the average time interval between calibrations for the subject bins, in accordance with Section 4.5.2 of Reference 4.1.3. It also provides all of the binning parameters and statistics that are a part of the binning analysis. The mean value of the data starts from a negative value in Bin 4, crosses zero and goes positive for Bin 5. Also, from this plot, the standard deviation increases from Bin 4 to Bin 5. In addition, the ratio of the variances (Bin 5 / Bin 4) is compared to the F critical value, as directed by Section 4.5.2 of Reference 4.1.3. Only the standard deviation plot could be indicative of potential time dependency, but strong time dependency is not indicated from the variance test (Sections 3.8.3.4 and 4.5.2 of Reference 4.1.3).

7.4.3 Per Section 3.8.4 of Reference 4.1.3, a drift regression analysis is performed within pages 15 and 16 of Attachment 1 (labeled Regression-Drift). The equations and functions used by Excel are taken specifically from Section 3.8.4 of Reference 4.1.3.

The regression analysis output shows an R Squared Value (0.042874) less than 0.09, a P Value greater than 0.05 (0.193957) and F Value (1.746985) less than F Critical (3.238096). These results all indicate a bias portion of drift that is not time-dependent. Also, the regression line crosses zero within the analysis period, which per the last paragraph of Section 3.8.4 of Reference 4.1.3, is not expected and is an improper model of the drift-versus-time characteristic of the device. The fact that this is an improper model of the drift-versus-time characteristic of the device confirms the time-independent conclusion of the three statistical tests. The bias portion of drift is conservatively treated as moderately time-dependent for the purpose of extrapolation.

7.4.4 Per Section 3.8.4 of Reference 4.1.3, an absolute value drift regression analysis is performed within pages 17 and 18 of Attachment 1 (labeled Regression - AV of Drift). The drift data is converted into absolute value via the Excel ABS function for each drift data value. The equations and functions used by Excel for the Regression analysis are taken specifically from Section 3.8.4 of Reference 4.1.3.

This regression analysis output shows an R Squared Value (0.023738) less than 0.09, a P Value (0.336156) greater than 0.05, and an F Value (0.948294) less than F Critical (3.238096). These results all indicate a random portion of drift that is not significantly time-dependent. The absolute value drift regression line increases over time, and the binning plot shows an increasing standard deviation over time. Based on these results, per Section 3.8.4 of Reference 4.1.3, the random portion of drift is conservatively treated as moderately time-dependent for the purpose of extrapolation.

7.5 Analyzed Drift (DA) Derivation and Characterization 7.5.1 As shown on page 19 of Attachment 1, per Section 3.11 of Reference 4.1.3, the drift bias error is evaluated for significance. The critical value for significance of the bias term is computed and shown therein. The bias is determined to be negligible.

Therefore, the computed Analyzed Drift Bias term (DAbias) is negligible.

DRIFT ANALYSIS G13.18.6.3-006 ENGINEERING DEPARTMENT Revision 0 RIVER BEND STATION PAGE 14 OF 14 7.5.2 Per Section 4.6.6 of Reference 4.1.3, the random portion of the Analyzed Drift is determined from multiplying the standard deviation of Bin 5 by the Tolerance Interval Factor (TIF), and extrapolating as required to a calibration interval of 30 months. The random portion of drift has been determined to be moderately time-dependent for the purpose of extrapolation. For conservatism, the standard deviation of Bin 5 is used with the average observed time interval from Bin 5 on page 13 of Attachment 1 as the starting point. The TIF is obtained from Table 1 of Reference 4.1.3 as 2.445 for a 95/95 significance. The computation of this value is shown on page 19 of Attachment 1 to result in a DArandom(extrap) term of ! 0.392 VAC for a 30 month (24 months + 25%) calibration interval.

8 Attachments - Analysis Spreadsheet (19 pages)

Spreadsheet Contents Pages Input Data 1-3 AF-AL Data 4-6 Outliers & Summary 7-8 W Test 9

Histogram 10-11 Scatter Plot 12 Binning Analysis 13-14 Regression - Drift 15-16 Regression - AV of Drift 17-18 Analyzed Drift (DA) 19 - DVR Form (8 pages)

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Input Data G13.18.6.3-006 Rev 0 Page 1 of19 Seq. ID Tag ID Date Procedure Make/Model AF/

AL Setpt AF / AL Data Units Comments 1

ENS-SWG1A-27-1A (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AF 49.0 48.90 VAC 2

ENS-SWG1A-27-1A (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AL 49.0 48.90 VAC 3

ENS-SWG1A-27-1A (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AF 49.0 49.10 VAC 4

ENS-SWG1A-27-1A (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AL 49.0 49.09 VAC 5

ENS-SWG1A-27-1A (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AF 49.0 49.10 VAC 6

ENS-SWG1A-27-1A (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AL 49.0 49.10 VAC 7

ENS-SWG1A-27-1A (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AF 49.0 48.80 VAC 8

ENS-SWG1A-27-1A (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AL 49.0 49.01 VAC 9

ENS-SWG1A-27-1A (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AF 49.0 49.00 VAC 10 ENS-SWG1A-27-1A (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AL 49.0 49.00 VAC 11 ENS-SWG1A-27-1A (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AF 49.0 48.90 VAC 12 ENS-SWG1A-27-1A (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AL 49.0 48.90 VAC 13 ENS-SWG1A-27-1A (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AF 49.0 49.00 VAC 14 ENS-SWG1A-27-1A (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AL 49 0 49 00 VAC 14 ENS-SWG1A-27-1A (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AL 49.0 49.00 VAC 15 ENS-SWG1A-27-1A (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AF 49.0 49.00 VAC 16 ENS-SWG1A-27-1A (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AL 49.0 49.00 VAC 17 ENS-SWG1A-27-1B (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AF 49.0 49.90 VAC 18 ENS-SWG1A-27-1B (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AL 49.0 49.30 VAC 19 ENS-SWG1A-27-1B (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AF 49.0 49.22 VAC 20 ENS-SWG1A-27-1B (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AL 49.0 49.18 VAC 21 ENS-SWG1A-27-1B (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AF 49.0 49.10 VAC 22 ENS-SWG1A-27-1B (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AL 49.0 49.10 VAC 23 ENS-SWG1A-27-1B (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AF 49.0 48.40 VAC 24 ENS-SWG1A-27-1B (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AL 49.0 49.10 VAC 25 ENS-SWG1A-27-1B (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AF 49.0 48.50 VAC 26 ENS-SWG1A-27-1B (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AL 49.0 48.50 VAC 27 ENS-SWG1A-27-1B (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AF 49.0 48.50 VAC 28 ENS-SWG1A-27-1B (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AL 49.0 48.50 VAC 29 ENS-SWG1A-27-1B (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AF 49.0 48.60 VAC 30 ENS-SWG1A-27-1B (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AL 49.0 48.60 VAC 31 ENS-SWG1A-27-1B (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AF 49.0 48.60 VAC 32 ENS-SWG1A-27-1B (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AL 49.0 48.60 VAC 33 ENS-SWG1A-27-1C (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AF 49.0 50.00 VAC 34 ENS-SWG1A-27-1C (UV) 2/17/2008 STP-302-1600 ABB/ITE-27H AL 49.0 49.20 VAC 35 ENS-SWG1A-27-1C (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AF 49.0 48.80 VAC 36 ENS-SWG1A-27-1C (UV) 5/8/2006 STP-302-1600 ABB/ITE-27H AL 49.0 49.70 VAC

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Input Data G13.18.6.3-006 Rev 0 Page 2 of19 Seq. ID Tag ID Date Procedure Make/Model AF/

AL Setpt AF / AL Data Units Comments 37 ENS-SWG1A-27-1C (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AF 49.0 49.20 VAC 38 ENS-SWG1A-27-1C (UV) 11/11/2004 STP-302-1600 ABB/ITE-27H AL 49.0 49.20 VAC 39 ENS-SWG1A-27-1C (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AF 49.0 48.32 VAC 40 ENS-SWG1A-27-1C (UV) 3/29/2003 STP-302-1600 ABB/ITE-27H AL 49.0 49.06 VAC 41 ENS-SWG1A-27-1C (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AF 49.0 48.21 VAC 42 ENS-SWG1A-27-1C (UV) 9/27/2001 STP-302-1600 ABB/ITE-27H AL 49.0 48.21 VAC 43 ENS-SWG1A-27-1C (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AF 49.0 48.30 VAC 44 ENS-SWG1A-27-1C (UV) 3/10/2000 STP-302-1600 ABB/ITE-27H AL 49.0 48.30 VAC 45 ENS-SWG1A-27-1C (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AF 49.0 48.30 VAC 46 ENS-SWG1A-27-1C (UV) 4/21/1999 STP-302-1600 ABB/ITE-27H AL 49.0 48.30 VAC 47 ENS-SWG1A-27-1C (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AF 49.0 48.20 VAC 48 ENS-SWG1A-27-1C (UV) 9/19/1997 STP-302-1600 ABB/ITE-27H AL 49.0 48.30 VAC 49 ENS-SWG1B-27-1A (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AF 49.0 48.90 VAC 50 ENS SWG1B 27 1A (UV) 2/1/2008 STP 302 1601 ABB/ITE 27H AL 49 0 48 90 VAC 50 ENS-SWG1B-27-1A (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AL 49.0 48.90 VAC 51 ENS-SWG1B-27-1A (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AF 49.0 48.68 VAC 52 ENS-SWG1B-27-1A (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AL 49.0 48.78 VAC 53 ENS-SWG1B-27-1A (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AF 49.0 48.70 VAC 54 ENS-SWG1B-27-1A (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AL 49.0 48.70 VAC 55 ENS-SWG1B-27-1A (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 56 ENS-SWG1B-27-1A (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AL 49.0 48.80 VAC 57 ENS-SWG1B-27-1A (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AF 49.0 48.83 VAC 58 ENS-SWG1B-27-1A (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AL 49.0 48.83 VAC 59 ENS-SWG1B-27-1A (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AF 49.0 48.75 VAC 60 ENS-SWG1B-27-1A (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AL 49.0 48.85 VAC 61 ENS-SWG1B-27-1A (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AF 49.0 48.83 VAC 62 ENS-SWG1B-27-1A (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AL 49.0 48.83 VAC 63 ENS-SWG1B-27-1A (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 64 ENS-SWG1B-27-1A (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AL 49.0 48.80 VAC 65 ENS-SWG1B-27-1B (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AF 49.0 48.97 VAC 66 ENS-SWG1B-27-1B (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AL 49.0 49.00 VAC 67 ENS-SWG1B-27-1B (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AF 49.0 48.77 VAC 68 ENS-SWG1B-27-1B (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AL 49.0 48.77 VAC 69 ENS-SWG1B-27-1B (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 70 ENS-SWG1B-27-1B (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AL 49.0 48.80 VAC 71 ENS-SWG1B-27-1B (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 72 ENS-SWG1B-27-1B (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AL 49.0 48.80 VAC

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Input Data G13.18.6.3-006 Rev 0 Page 3 of19 Seq. ID Tag ID Date Procedure Make/Model AF/

AL Setpt AF / AL Data Units Comments 73 ENS-SWG1B-27-1B (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AF 49.0 48.72 VAC 74 ENS-SWG1B-27-1B (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AL 49.0 48.72 VAC 75 ENS-SWG1B-27-1B (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 76 ENS-SWG1B-27-1B (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AL 49.0 48.75 VAC 77 ENS-SWG1B-27-1B (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AF 49.0 48.82 VAC 78 ENS-SWG1B-27-1B (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AL 49.0 48.83 VAC 79 ENS-SWG1B-27-1B (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AF 49.0 48.60 VAC 80 ENS-SWG1B-27-1B (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AL 49.0 48.70 VAC 81 ENS-SWG1B-27-1C (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AF 49.0 48.90 VAC 82 ENS-SWG1B-27-1C (UV) 2/1/2008 STP-302-1601 ABB/ITE-27H AL 49.0 48.92 VAC 83 ENS-SWG1B-27-1C (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AF 49.0 48.78 VAC 84 ENS-SWG1B-27-1C (UV) 4/29/2006 STP-302-1601 ABB/ITE-27H AL 49.0 48.88 VAC 85 ENS-SWG1B-27-1C (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AF 49.0 48.70 VAC 86 ENS SWG1B 27 1C (UV) 10/31/2004 STP 302 1601 ABB/ITE 27H AL 49 0 48 70 VAC 86 ENS-SWG1B-27-1C (UV) 10/31/2004 STP-302-1601 ABB/ITE-27H AL 49.0 48.70 VAC 87 ENS-SWG1B-27-1C (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 88 ENS-SWG1B-27-1C (UV) 3/20/2003 STP-302-1601 ABB/ITE-27H AL 49.0 48.80 VAC 89 ENS-SWG1B-27-1C (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AF 49.0 48.72 VAC 90 ENS-SWG1B-27-1C (UV) 10/6/2001 STP-302-1601 ABB/ITE-27H AL 49.0 48.72 VAC 91 ENS-SWG1B-27-1C (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AF 49.0 48.84 VAC 92 ENS-SWG1B-27-1C (UV) 3/25/2000 STP-302-1601 ABB/ITE-27H AL 49.0 48.84 VAC 93 ENS-SWG1B-27-1C (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AF 49.0 48.83 VAC 94 ENS-SWG1B-27-1C (UV) 4/30/1999 STP-302-1601 ABB/ITE-27H AL 49.0 48.73 VAC 95 ENS-SWG1B-27-1C (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AF 49.0 48.80 VAC 96 ENS-SWG1B-27-1C (UV) 10/4/1997 STP-302-1601 ABB/ITE-27H AL 49.0 48.70 VAC

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays AF-AL Data G13.18.6.3-006 Rev 0 Page 4 of19 Seq.

CAL DATE AF/AL AF/AL DATA VALUE OUTLIERS COMMENTS Seq.

DRIFT = (Current Cal AF Data - Prev Cal AL Data)

ID Make/Model Number Tag ID mm/dd/yy Status (VAC)

Days Months ID Tag Number (VAC)

Days Months 1

ABB/ITE-27H ENS-SWG1A-27-1A (UV) 02/17/08 AF 48.90 650 21.4 1

ENS-SWG1A-27-1A (UV)

-0.19 650 21.4 2

ABB/ITE-27H ENS-SWG1A-27-1A (UV) 02/17/08 AL 48.90 3

ENS-SWG1A-27-1A (UV) 0.00 543 17.8 3

ABB/ITE-27H ENS-SWG1A-27-1A (UV) 05/08/06 AF 49.10 543 17.8 5

ENS-SWG1A-27-1A (UV) 0.09 593 19.5 4

ABB/ITE-27H ENS-SWG1A-27-1A (UV) 05/08/06 AL 49.09 7

ENS-SWG1A-27-1A (UV)

-0.20 548 18.0 5

ABB/ITE-27H ENS-SWG1A-27-1A (UV) 11/11/04 AF 49.10 593 19.5 9

ENS-SWG1A-27-1A (UV) 0.10 566 18.6 6

ABB/ITE-27H ENS-SWG1A-27-1A (UV) 11/11/04 AL 49.10 11 ENS-SWG1A-27-1A (UV)

-0.10 324 10.6 7

ABB/ITE-27H ENS-SWG1A-27-1A (UV) 03/29/03 AF 48.80 548 18.0 13 ENS-SWG1A-27-1A (UV) 0.00 579 19.0 8

ABB/ITE-27H ENS-SWG1A-27-1A (UV) 03/29/03 AL 49.01 9

ABB/ITE-27H ENS-SWG1A-27-1A (UV) 09/27/01 AF 49.00 566 18.6 17 ENS-SWG1A-27-1B (UV) 0.72 650 21.4 10 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 09/27/01 AL 49.00 19 ENS-SWG1A-27-1B (UV) 0.12 543 17.8 11 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 03/10/00 AF 48.90 324 10.6 21 ENS-SWG1A-27-1B (UV) 0.00 593 19.5 12 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 03/10/00 AL 48.90 23 ENS-SWG1A-27-1B (UV)

-0.10 548 18.0 13 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 04/21/99 AF 49.00 579 19.0 25 ENS-SWG1A-27-1B (UV) 0.00 566 18.6 CAL INTERVAL =

(Current Date -

Previous Date)

CAL INTERVAL =

(Current Date -

Previous Date) 14 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 04/21/99 AL 49.00 27 ENS-SWG1A-27-1B (UV)

-0.10 324 10.6 15 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 09/19/97 AF 49.00 29 ENS-SWG1A-27-1B (UV) 0.00 579 19.0 16 ABB/ITE-27H ENS-SWG1A-27-1A (UV) 09/19/97 AL 49.00 17 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 02/17/08 AF 49.90 Identified as Outlier and removed 650 21.4 33 ENS-SWG1A-27-1C (UV) 0.30 650 21.4 18 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 02/17/08 AL 49.30 35 ENS-SWG1A-27-1C (UV)

-0.40 543 17.8 19 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 05/08/06 AF 49.22 543 17.8 37 ENS-SWG1A-27-1C (UV) 0.14 593 19.5 20 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 05/08/06 AL 49.18 39 ENS-SWG1A-27-1C (UV) 0.11 548 18.0 21 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 11/11/04 AF 49.10 593 19.5 41 ENS-SWG1A-27-1C (UV)

-0.09 566 18.6 22 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 11/11/04 AL 49.10 43 ENS-SWG1A-27-1C (UV) 0.00 324 10.6 23 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 03/29/03 AF 48.40 548 18.0 45 ENS-SWG1A-27-1C (UV) 0.00 579 19.0 24 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 03/29/03 AL 49.10 25 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 09/27/01 AF 48.50 566 18.6 49 ENS-SWG1B-27-1A (UV) 0.12 643 21.1 26 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 09/27/01 AL 48.50 51 ENS-SWG1B-27-1A (UV)

-0.02 545 17.9 27 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 03/10/00 AF 48.50 324 10.6 53 ENS-SWG1B-27-1A (UV)

-0.10 591 19.4 28 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 03/10/00 AL 48.50 55 ENS-SWG1B-27-1A (UV)

-0.03 530 17.4 29 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 04/21/99 AF 48.60 579 19.0 57 ENS-SWG1B-27-1A (UV)

-0.02 560 18.4 30 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 04/21/99 AL 48.60 59 ENS-SWG1B-27-1A (UV)

-0.08 330 10.8 31 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 09/19/97 AF 48.60 61 ENS-SWG1B-27-1A (UV) 0.03 573 18.8 32 ABB/ITE-27H ENS-SWG1A-27-1B (UV) 09/19/97 AL 48.60 33 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 02/17/08 AF 50.00 650 21.4 65 ENS-SWG1B-27-1B (UV) 0.20 643 21.1 34 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 02/17/08 AL 49.20 67 ENS-SWG1B-27-1B (UV)

-0.03 545 17.9

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays AF-AL Data G13.18.6.3-006 Rev 0 Page 5 of19 Seq.

CAL DATE AF/AL AF/AL DATA VALUE OUTLIERS COMMENTS Seq.

DRIFT = (Current Cal AF Data - Prev Cal AL Data)

ID Make/Model Number Tag ID mm/dd/yy Status (VAC)

Days Months ID Tag Number (VAC)

Days Months CAL INTERVAL =

(Current Date -

Previous Date)

CAL INTERVAL =

(Current Date -

Previous Date) 35 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 05/08/06 AF 48.80 543 17.8 69 ENS-SWG1B-27-1B (UV) 0.00 591 19.4 36 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 05/08/06 AL 49.70 71 ENS-SWG1B-27-1B (UV) 0.08 530 17.4 37 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 11/11/04 AF 49.20 593 19.5 73 ENS-SWG1B-27-1B (UV)

-0.03 560 18.4 38 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 11/11/04 AL 49.20 75 ENS-SWG1B-27-1B (UV)

-0.03 330 10.8 39 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 03/29/03 AF 48.32 548 18.0 77 ENS-SWG1B-27-1B (UV) 0.12 573 18.8 40 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 03/29/03 AL 49.06 41 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 09/27/01 AF 48.21 566 18.6 81 ENS-SWG1B-27-1C (UV) 0.02 643 21.1 42 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 09/27/01 AL 48.21 83 ENS-SWG1B-27-1C (UV) 0.08 545 17.9 43 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 03/10/00 AF 48.30 324 10.6 85 ENS-SWG1B-27-1C (UV)

-0.10 591 19.4 44 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 03/10/00 AL 48.30 87 ENS-SWG1B-27-1C (UV) 0.08 530 17.4 45 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 04/21/99 AF 48.30 579 19.0 89 ENS-SWG1B-27-1C (UV)

-0.12 560 18.4 46 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 04/21/99 AL 48.30 91 ENS-SWG1B-27-1C (UV) 0.11 330 10.8 47 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 09/19/97 AF 48.20 93 ENS-SWG1B-27-1C (UV) 0.13 573 18.8 48 ABB/ITE-27H ENS-SWG1A-27-1C (UV) 09/19/97 AL 48.30 49 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 02/01/08 AF 48.90 643 21.1 50 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 02/01/08 AL 48.90 51 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 04/29/06 AF 48.68 545 17.9 52 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 04/29/06 AL 48.78 53 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/31/04 AF 48.70 591 19.4 54 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/31/04 AL 48.70 55 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 03/20/03 AF 48.80 530 17.4 56 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 03/20/03 AL 48.80 57 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/06/01 AF 48.83 560 18.4 58 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/06/01 AL 48.83 59 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 03/25/00 AF 48.75 330 10.8 60 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 03/25/00 AL 48.85 61 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 04/30/99 AF 48.83 573 18.8 62 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 04/30/99 AL 48.83 63 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/04/97 AF 48.80 64 ABB/ITE-27H ENS-SWG1B-27-1A (UV) 10/04/97 AL 48.80 65 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 02/01/08 AF 48.97 643 21.1 66 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 02/01/08 AL 49.00 67 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 04/29/06 AF 48.77 545 17.9 68 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 04/29/06 AL 48.77 69 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/31/04 AF 48.80 591 19.4 70 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/31/04 AL 48.80

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays AF-AL Data G13.18.6.3-006 Rev 0 Page 6 of19 Seq.

CAL DATE AF/AL AF/AL DATA VALUE OUTLIERS COMMENTS Seq.

DRIFT = (Current Cal AF Data - Prev Cal AL Data)

ID Make/Model Number Tag ID mm/dd/yy Status (VAC)

Days Months ID Tag Number (VAC)

Days Months CAL INTERVAL =

(Current Date -

Previous Date)

CAL INTERVAL =

(Current Date -

Previous Date) 71 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 03/20/03 AF 48.80 530 17.4 72 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 03/20/03 AL 48.80 73 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/06/01 AF 48.72 560 18.4 74 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/06/01 AL 48.72 75 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 03/25/00 AF 48.80 330 10.8 76 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 03/25/00 AL 48.75 77 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 04/30/99 AF 48.82 573 18.8 78 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 04/30/99 AL 48.83 79 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/04/97 AF 48.60 80 ABB/ITE-27H ENS-SWG1B-27-1B (UV) 10/04/97 AL 48.70 81 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 02/01/08 AF 48.90 643 21.1 82 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 02/01/08 AL 48.92 83 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 04/29/06 AF 48.78 545 17.9 84 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 04/29/06 AL 48.88 85 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/31/04 AF 48.70 591 19.4 86 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/31/04 AL 48.70 87 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 03/20/03 AF 48.80 530 17.4 88 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 03/20/03 AL 48.80 89 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/06/01 AF 48.72 560 18.4 90 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/06/01 AL 48.72 91 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 03/25/00 AF 48.84 330 10.8 92 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 03/25/00 AL 48.84 93 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 04/30/99 AF 48.83 573 18.8 94 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 04/30/99 AL 48.73 95 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/04/97 AF 48.80 96 ABB/ITE-27H ENS-SWG1B-27-1C (UV) 10/04/97 AL 48.70

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Outliers & Summary G13.18.6.3-006 Rev 0 Page 7 of19 Seq. ID Tag ID Drift (VAC)

Cal Interval (Days)

Extreme Studentized Deviate (T)

Final Drift Data Set (VAC)

Cal Interval (Days) 1 ENS-SWG1A-27-1A (UV)

-0.19 650 1.281

-0.19 650 3

ENS-SWG1A-27-1A (UV) 0.00 543 0.118 0.00 543 5

ENS-SWG1A-27-1A (UV) 0.09 593 0.433 0.09 593 7

ENS-SWG1A-27-1A (UV)

-0.20 548 1.342 Mean (Average) 0.0193

-0.20 548 9

ENS-SWG1A-27-1A (UV) 0.10 566 0.494 Variance 0.0267 0.10 566 11 ENS-SWG1A-27-1A (UV)

-0.10 324 0.730 Std. Dev.

0.1634

-0.10 324 13 ENS-SWG1A-27-1A (UV) 0.00 579 0.118 Sample Size (Count) 42 0.00 579 Maximum 0.72 17 ENS-SWG1A-27-1B (UV) 0.72 650 4.288 Median 0.00 OUTLIER OUTLIER 19 ENS-SWG1A-27-1B (UV) 0.12 543 0.616 Minimum

-0.40 0.12 543 21 ENS-SWG1A-27-1B (UV) 0.00 593 0.118 Range 1.12 0.00 593 23 ENS-SWG1A-27-1B (UV)

-0.10 548 0.730 Sum 0.810

-0.10 548 25 ENS-SWG1A-27-1B (UV) 0.00 566 0.118 Kurtosis 8.098 0.00 566 27 ENS-SWG1A-27-1B (UV)

-0.10 324 0.730 Skewness 1.607

-0.10 324 29 ENS SWG1A 27 1B (UV) 0 00 579 0 118 0 00 579 (Initial Data Set)

Raw Drift Data Statistics Summary 29 ENS-SWG1A-27-1B (UV) 0.00 579 0.118 0.00 579 Critical T-Value (Upper 5% Signif.)

2.92 33 ENS-SWG1A-27-1C (UV) 0.30 650 1.718 0.30 650 35 ENS-SWG1A-27-1C (UV)

-0.40 543 2.566 Equation for Each Studentized Deviate: T= lDrift-Meanl/Std. Dev.

-0.40 543 37 ENS-SWG1A-27-1C (UV) 0.14 593 0.739 Crit T Value Lookup Value from Ref. 4.1.3 Table 2, per sample 0.14 593 39 ENS-SWG1A-27-1C (UV) 0.11 548 0.555 size. See Sections 3.6.1 and 3.6.2 of Reference 4.1.3.

0.11 548 41 ENS-SWG1A-27-1C (UV)

-0.09 566 0.669 Outliers will be Denoted as such in "Final Data Set" column.

-0.09 566 43 ENS-SWG1A-27-1C (UV) 0.00 324 0.118 One Outlier Detected and Removed (Seq. 17) 0.00 324 45 ENS-SWG1A-27-1C (UV) 0.00 579 0.118 0.00 579 49 ENS-SWG1B-27-1A (UV) 0.12 643 0.616 0.12 643 51 ENS-SWG1B-27-1A (UV)

-0.02 545 0.240 Mean (Average) 0.0022

-0.02 545 53 ENS-SWG1B-27-1A (UV)

-0.10 591 0.730 Variance 0.0148

-0.10 591 55 ENS-SWG1B-27-1A (UV)

-0.03 530 0.302 Std. Dev.

0.1216

-0.03 530 57 ENS-SWG1B-27-1A (UV)

-0.02 560 0.240 Sample Size (Count) 41

-0.02 560 59 ENS-SWG1B-27-1A (UV)

-0.08 330 0.608 Maximum 0.30

-0.08 330 61 ENS-SWG1B-27-1A (UV) 0.03 573 0.066 Median 0.00 0.03 573 Minimum

-0.40 65 ENS-SWG1B-27-1B (UV) 0.20 643 1.106 Range 0.70 0.20 643 67 ENS-SWG1B-27-1B (UV)

-0.03 545 0.302 Sum 0.090

-0.03 545 69 ENS-SWG1B-27-1B (UV) 0.00 591 0.118 Kurtosis 2.234 0.00 591 71 ENS-SWG1B-27-1B (UV) 0.08 530 0.372 Skewness

-0.581 0.08 530 (Final Data Set)

Drift Data Statistics Summary

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Outliers & Summary G13.18.6.3-006 Rev 0 Page 8 of19 Seq. ID Tag ID Drift (VAC)

Cal Interval (Days)

Extreme Studentized Deviate (T)

Final Drift Data Set (VAC)

Cal Interval (Days) 73 ENS-SWG1B-27-1B (UV)

-0.03 560 0.302

-0.03 560 75 ENS-SWG1B-27-1B (UV)

-0.03 330 0.302

-0.03 330 77 ENS-SWG1B-27-1B (UV) 0.12 573 0.616 0.12 573 81 ENS-SWG1B-27-1C (UV) 0.02 643 0.004 0.02 643 83 ENS-SWG1B-27-1C (UV) 0.08 545 0.372 0.08 545 85 ENS-SWG1B-27-1C (UV)

-0.10 591 0.730

-0.10 591 87 ENS-SWG1B-27-1C (UV) 0.08 530 0.372 0.08 530 89 ENS-SWG1B-27-1C (UV)

-0.12 560 0.852

-0.12 560 91 ENS-SWG1B-27-1C (UV) 0.11 330 0.555 0.11 330 93 ENS-SWG1B-27-1C (UV) 0.13 573 0.678 0.13 573

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays W Test G13.18.6.3-006 Rev 0 Page 9 of19 Drift Values "i"

an-i+1 bi (Per Step 4)

-0.40 1

0.3940 0.2758 Specific W Normality Test Methodology from Reference 4.1.7 and Section 19 of Reference 4.1.4

-0.20 2

0.2719 0.1088

-0.19 3

0.2357 0.0778 Steps to Perform:

-0.12 4

0.2091 0.0523

1. Paste all final drift data into column 1.

-0.10 5

0.1876 0.0413

2. Sort in ascending order.

-0.10 6

0.1693 0.0372

3. Calculate S2 taking the variance of the drift data adjusted by (Count-1)

-0.10 7

0.1531 0.0337

-0.10 8

0.1384 0.0291 S2 = (n-1)(Variance (Drift))

-0.10 9

0.1249 0.0262

-0.09 10 0.1123 0.0213 where: n = Count

-0.08 11 0.1004 0.0171

-0.03 12 0.0891 0.0098

4. Calculate the Quantity b:

-0.03 13 0.0782 0.0086

-0.03 14 0.0677 0.0074 b = Sum[(an-i+1)(xn-i+1 - xi)]

-0.03 15 0.0575 0.0034

-0.02 16 0.0476 0.0019 where: i = 1 to k

-0.02 17 0.0379 0.0008 k = (n-1)/2 0.00 18 0.0283 0.0000 xi = Drift value at point number i 0.00 19 0.0188 0.0000 an-i+1 values are taken from Table 1 of Reference 4.1.7.

0.00 20 0.0094 0.0000

5. Calculate b2.

0.00

6. Compute the W Statistic and compare to the critical value at the 5% confidence 0.00 b =

0.7525 level. The table of critical values is given as Table 2 on page 9 of Reference 4.1.7.

0.00 (Per Step 4) 0.00

  • From Table 1 of Ref. 4.1.7.

W = b2/S2 Results:

0.00 Since the W statistic, 0.9569, is greater than the 0.02 Computed Values critical value for W, 0.9410, this test does not 0.03 S2 =

0.5917 reject the assumption of normality for this data set.

0.08 b =

0.7525 0.08 b2 =

0.5662 0.08 Count (n):

41 0.09 W = b2/S2 =

0.9569 0.10 W Critical =

0.9410 5% Significance From Table 2 of Reference 4.1.7.

0.11 0.11 0.12 0.12 0.12 0.13 0.14 0.20 0.30

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Histogram G13.18.6.3-006 Rev 0 Page 10 of19 Bin No.

Bin Descriptions No. StDev (NS)

Bin Maximums =

Mean + (NS*StDev)

Observed Frequency Cumulative Probability (CPi)

(Table 18-2 Ref 4.1.4)

Normal Distribution Probability (Pnorm = CPi-CPi-1)

Expected Frequency (Ei = Pnorm*N) 1 Up to - 2.5 Standard Deviations from Mean

-2.5

-0.3019 1

0.0062 0.0062 0.2542 2

-2.5 to -2.0 Standard Deviations from Mean

-2.0

-0.2411 0

0.0228 0.0166 0.6786 3

-2.0 to -1.5 Standard Deviations from Mean

-1.5

-0.1802 2

0.0668 0.0441 1.8061 4

-1.5 to -1.0 Standard Deviations from Mean

-1.0

-0.1194 1

0.1587 0.0919 3.7659 5

-1.0 to -0.5 Standard Deviations from Mean

-0.5

-0.0586 7

0.3086 0.1499 6.1459 6

-0.5 Standard Deviations from Mean to Mean 0.0 0.0022 14 0.5000 0.1915 7.8495 7

Mean to +0.5 Standard Deviations from Mean 0.5 0.0630 2

0.6915 0.1915 7.8495 8

+0.5 to +1.0 Standard Deviations from Mean 1.0 0.1238 10 0.8414 0.1499 6.1459 9

+1.0 to +1.5 Standard Deviations from Mean 1.5 0.1846 2

0.9332 0.0919 3.7659 10

+1.5 to +2.0 Standard Deviations from Mean 2.0 0.2454 1

0.9773 0.0441 1.8061 11

+2.0 to +2.5 Standard Deviations from Mean 2.5 0.3063 1

0.9938 0.0166 0.6786 12 More than Mean + 2.5 Standard Deviations More More 0

1.0000 0.0062 0.2542 Totals 41 41 Percentage for

+/- Sigma Bounds Observed Drift Values Observed Percentages Percentage for Normal Distribution 2.5 (Bins 2-11) 40 97.56%

Mean 0.0022 2 (Bins 3-10) 39 95.12%

95.45%

Std. Dev.

0.1216 1.5 (Bins 4-9) 36 87.80%

Sample Size 41 1 (Bins 5-8) 33 80.49%

68.27%

0.5 (Bins 6-7) 16 39.02%

Methodology for Histogram Taken from Section 19 of Reference 4.1.4 and Section 3.7.5 of Reference 4.1.3

1. Order the drift data in ascending order.
2. Obtain mean, standard deviation, and sample size.
3. Establishing bins in 1/2 sigma increments from the mean to 2.5 sigma in both directions, derive the upper bin limits, in units of drift, based on the values of the mean and standard deviation.
4. Obtain expected frequency for a normal distribution in each bin.
5. Manually compute the number of observed drift data points within each bin, and list under observed frequency.
6. Plot the Expected Frequency and the Observed Frequency Data on the Histogram for comparison to each other.

Results: Since the data passed the W Test for normality, a Coverage Analysis is not necessary. The Histogram shows that the data conforms closely to a normal distribution.

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Histogram G13.18.6.3-006 Rev 0 Page 11 of19 10 12 14 16 n

Histogram of Drift - River Bend Station ABB/ITE-27H Undervoltage Relays Observed Frequency Normal Distribution 0

2 4

6 8

-0.3019

-0.2411

-0.1802

-0.1194

-0.0586 0.0022 0.0630 0.1238 0.1846 0.2454 0.3063 More Populatio Drift (VAC)

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Scatter Plot G13.18.6.3-006 Rev 0 Page 12 of19 y = 0.0003x - 0.1415 0 0 0.1 0.2 0.3 0.4 C)

Scatter Plot - River Bend Station ABB/ITE-27H Undervoltage Relays Linear (Drift)

Note: Equation on Scatter Plot is computer generated, based on the associated trend line.

-0.5

-0.4

-0.3

-0.2

-0.1 0.0 0

100 200 300 400 500 600 700 Drift (VAC Time (Days)

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Binning Analysis G13.18.6.3-006 Rev 0 Page 13 of19 Bin Statistics Bin 1 Bin 2 Bin 3 Bin 4 Bin 5 Bin 6 Bin 7 Count 6

35 Standard Dev.

0.0809 0.1272 Mean

-0.0333 0.0083 Mean Interval 327.00 574.66 Max Interval 330 650 Bin Definition and Selection Bin Hi Valid Limit Bin Population Bins Bins (Days)

Count Percentage Included Bins (Days)

Count Percentage Included 1

45 0

0.0%

2 135 0

0.0%

3 230 0

0.0%

4 460 6

14.6%

4 5

690 35 85.4%

5 6

915 0

0.0%

7 Over 0

0.0%

Total Count:

41 100%

See Section 3.8.3 of Reference 4.1.3 for Binning Analysis Methodology.

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Binning Analysis G13.18.6.3-006 Rev 0 Page 14 of19 Bin Time Std Dev Mean 4

327.00 0.0809

-0.0333 5

574.66 0.1272 0.0083 4.481 2.471 Graph Summary Test of Variances F Critical Variance Ratio Potential Strong TD of No 0 06 0.08 0.10 0.12 0.14 C)

Binning Analysis - River Bend Station ABB/ITE-27H Undervoltage Relays Random Drift?

No

-0.06

-0.04

-0.02 0.00 0.02 0.04 0.06 0

200 400 600 800 Drift (VA Time (Days)

Std Dev Mean

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Regression - Drift G13.18.6.3-006 Rev 0 Page 15 of19 Regression Analysis - Drift REGRESSION ANALYSIS F Critical

SUMMARY

OUTPUT 3.238096 Regression Statistics Multiple R 0.207060 R Square 0.042874 Adjusted R Square 0.018332 Standard Error 0.120505 Observations 41 ANOVA df SS MS F

Significance F Regression 1

0.0253686 0.0253686 1.746985 0.193957 Residual 39 0.5663338 0.0145214 Total 40 0.5917024 Coefficients Standard Error t Stat P-value Lower 95%

Upper 95%

Lower 95.0%

Upper 95.0%

Intercept

-0.141518 0.110347

-1.282478 0.207245

-0.364716 0.081680

-0.364716 0.0816803 X Variable 1 0.000267 0.000202 1.321736 0.193957

-0.000142 0.000675

-0.000142 0.0006754 Refer to Section 3.8.4 of Reference 4.1.3 for Methodology for Regression Analysis.

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Regression - Drift G13.18.6.3-006 Rev 0 Page 16 of19 0 1 0.0 0.1 0.2 0.3 0.4 (VAC)

Drift Regression Line Fit Plot Drift Predicted Drift

-0.5

-0.4

-0.3

-0.2

-0.1 0

200 400 600 800 Drift Time (Days)

Predicted Drift

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Regression - AV of Drift G13.18.6.3-006 Rev 0 Page 17 of19 Regression Analysis - AV of Drift ABSOLUTE VALUE REGRESSION ANALYSIS F Critical

SUMMARY

OUTPUT 3.238096 Regression Statistics Multiple R 0.154072 R Square 0.023738 Adjusted R Square

-0.001294 Standard Error 0.083877 Observations 41 ANOVA df SS MS F

Significance F Regression 1

0.0066715 0.0066715 0.948294 0.336156 Residual 39 0.2743772 0.0070353 Total 40 0.2810488 Coefficients Standard Error t Stat P-value Lower 95%

Upper 95%

Lower 95.0%

Upper 95.0%

Intercept 0.013374 0.076807 0.174131 0.862663

-0.141982 0.168730

-0.141982 0.168730 X Variable 1 0.000137 0.000141 0.973804 0.336156

-0.000147 0.000421

-0.000147 0.000421 Refer to Section 3.8.4 of Reference 4.1.3 for Methodology for Regression Analysis.

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Regression - AV of Drift G13.18.6.3-006 Rev 0 Page 18 of19 0.25 0.30 0.35 0.40 0.45 ft (VAC)

AV of Drift Regression Line Fit Plot AV of Drift 0.00 0.05 0.10 0.15 0.20 0

200 400 600 800 AV of Drif Time (Days)

Predicted AV of Drift

DRIFT ANALYSIS RIVER BEND STATION ABB/ITE-27H Undervoltage Relays Analyzed Drift (DA)

G13.18.6.3-006 Rev 0 Page 19 of19 Drift Bias Determination First, the bias term is evaluated for significance per Section 3.10 of Reference 4.1.3.

Per Outlier Statistical Summary, Count (N) 41 Drift Data Points Drift Bias Term (Mean) 0.0022 VAC Standard Deviation (Stdev))

0.1216 VAC t for Count = 41 Data Points 2.000 (Ref. 4.1.3, Table 4)

[Bias (Crit) = t

  • Stdev / (N)^0.5]

Signficant Bias Critical Value 0.038 VAC Therefore, the bias value for this drift data set is not signficant, since the magnitude of the Bias is less than the Critical Bias Value.

DAbias = Negligible R

d D ift D t i

ti Random Drift Determination Time Dependency Moderate Count (N) 41 Drift Data Points Bin 5 Standard Deviation (Stdev) 0.1272 VAC Mean Bin 5 Time Interval 575 Days Maximum Required Cal Interval 915 Days Tolerance Interval Factor (TIF) 2.445 (Ref. 4.1.3, Table 1)

[Current Interval Drift = Stdev

  • TIF]

DArandom (current) = +/-

0.311 VAC

[Extrap Drift = DArandom (current) * (Required Cal Interval / Mean Bin 5 Cal Interval)1/2]

DArandom (extrap) = +/-

0.392 VAC for up to 915 Days

G13.18.6.3-006 Page 1 of 8 DESIGN VERIFICATION COVER PAGE ANO-1 ANO-2 IP-2 IP-3 JAF PLP PNPS VY GGNS RBS W3 NP Document No.

G13.18.6.3-006 Revision No.

0 Page 1 of

Title:

Drift Study for ABB Model ITE-27H Undervoltage Relays Quality Related Augmented Quality Related DV Method:

Design Review Alternate Calculation Qualification Testing VERIFICATION REQUIRED DISCIPLINE VERIFICATION COMPLETE AND COMMENTS RESOLVED (DV print, sign, and date)

Electrical Mechanical Instrument and Control Richard J. Hannigan 1-20-09 Civil/Structural Nuclear Originator:

R.A. Hunter 1-20-09 Print/Sign/Date After Comments Have Been Resolved

G13.18.6.3-006 Page 2 of 8 DESIGN VERIFICATION CHECKLIST SHEET 1 OF 3 IDENTIFICATION:

DISCIPLINE:

Civil/Structural Electrical I & C Mechanical Nuclear Other Document

Title:

Drift Study for ABB Model ITE-27H Undervoltage Relays Doc. No.:G13.18.6.3-006 Rev. 0 QA Cat. 1 Verifier:

Richard J. Hannigan 1-20-09 Print Sign Date Manager authorization for supervisor performing Verification.

N/A Print Sign Date METHOD OF VERIFICATION:

Design Review Alternate Calculations Qualification Test The following basic questions are addressed as applicable, during the performance of any design verification. These questions are based on the requirements of ANSI N45.2.11 - 1974.

NOTE The reviewer can use the Comments/Continuation sheet at the end for entering any comment/resolution along with the appropriate question number. Additional items with new question numbers can also be entered.

1.

Design Inputs - Were the inputs correctly selected and incorporated into the design?

(Design inputs include design bases, plant operational conditions, performance requirements, regulatory requirements and commitments, codes, standards, field data, etc.

All information used as design inputs should have been reviewed and approved by the responsible design organization, as applicable.

All inputs need to be retrievable or excerpts of documents used should be attached.

See site specific design input procedures for guidance in identifying inputs.)

Yes No N/A

2.

Assumptions - Are assumptions necessary to perform the design activity adequately described and reasonable? Where necessary, are assumptions identified for subsequent re-verification when the detailed activities are completed? Are the latest applicable revisions of design documents utilized?

Yes No N/A

3.

Quality Assurance - Are the appropriate quality and quality assurance requirements specified?

Yes No N/A

G13.18.6.3-006 Page 3 of 8 DESIGN VERIFICATION CHECKLIST SHEET 2 OF 3

4.

Codes, Standards and Regulatory Requirements - Are the applicable codes, standards and regulatory requirements, including issue and addenda properly identified and are their requirements for design met?

Yes No N/A

5.

Construction and Operating Experience - Have applicable construction and operating experience been considered?

Yes No N/A

6.

Interfaces - Have the design interface requirements been satisfied and documented?

Yes No N/A

7.

Methods - Was an appropriate design or analytical (for calculations) method used?

Yes No N/A

8.

Design Outputs - Is the output reasonable compared to the inputs?

Yes No N/A

9.

Parts, Equipment and Processes - Are the specified parts, equipment, and processes suitable for the required application?

Yes No N/A

10.

Materials Compatibility - Are the specified materials compatible with each other and the design environmental conditions to which the material will be exposed?

Yes No N/A

11.

Maintenance requirements - Have adequate maintenance features and requirements been specified?

Yes No N/A

12.

Accessibility for Maintenance - Are accessibility and other design provisions adequate for performance of needed maintenance and repair?

Yes No N/A

13.

Accessibility for In-service Inspection - Has adequate accessibility been provided to perform the in-service inspection expected to be required during the plant life?

Yes No N/A

14.

Radiation Exposure - Has the design properly considered radiation exposure to the public and plant personnel?

Yes No N/A

15.

Acceptance Criteria - Are the acceptance criteria incorporated in the design documents sufficient to allow verification that design requirements have been satisfactorily accomplished?

Yes No N/A

16.

Test Requirements - Have adequate pre-operational and subsequent periodic test requirements been appropriately specified?

Yes No N/A

G13.18.6.3-006 Page 4 of 8 DESIGN VERIFICATION CHECKLIST SHEET 3 OF 3

17.

Handling, Storage, Cleaning and Shipping - Are adequate handling, storage, cleaning and shipping requirements specified?

Yes No N/A

18.

Identification Requirements - Are adequate identification requirements specified?

Yes No N/A

19.

Records and Documentation - Are requirements for record preparation, review, approval, retention, etc., adequately specified? Are all documents prepared in a clear legible manner suitable for microfilming and/or other documentation storage method? Have all impacted documents been identified for update as necessary?

Yes No N/A

20.

Software Quality Assurance-ENN sites: For a calculation that utilized software applications (e.g., GOTHIC, SYMCORD), was it properly verified and validated in accordance with EN-IT-104 or previous site SQA Program?

ENS sites: This is an EN-IT-104 task. However, per ENS-DC-126, for exempt software, was it verified in the calculation?

Yes No N/A 21.

Has adverse impact on peripheral components and systems, outside the boundary of the document being verified, been considered?

Yes No N/A

G13.18.6.3-006 Page 5 of 8 DESIGN VERIFICATION COMMENT SHEET SHEET 1 OF 1 Comments / Continuation Sheet Question Comments Resolution Initial/Date NONE

G13.18.6.3-006 Page 6 of 8 During the independent review of calculation G13.18.6.3-006, alternate applications Lotus 1-2-3 and Quattro Pro were used to validate the results generated by MS Excel in the calculation. The reviewer independently generated the G13.18.6.3-006 results. In the table below the results of the validation for the G13.18.6.3-006 values and the values produced by Lotus 1-2-3 and Quattro Pro are illustrated for the Final Data Set - after removal of the single outlier. The results from Lotus 1-2-3 and Quattro Pro validated the calculation G13.18.6.3-006 results generated by MS Excel. Minor differences in the values between the MS Excel generated results and the Lotus 1-2-3 and Quattro Pro generated results were reviewed and can be attributed to rounding and conversion between applications. Below is a partial listing of some of the values from G13.18.6.3-006 that were validated:

Parameter G13.18.6.3-006 value Validation value Validation application Valid?

Mean 0.0022 0.0022 Lotus 1-2-3 Yes Variance 0.0148 0.0148 Lotus 1-2-3 Yes Standard Deviation 0.1216 0.1216 Lotus 1-2-3 Yes Count 41 41 Lotus 1-2-3 Yes Max 0.30 0.30 Lotus 1-2-3 Yes Median 0.00 0.00 Lotus 1-2-3 Yes Min

-0.40

-0.40 Lotus 1-2-3 Yes Range 0.70 0.70 Lotus 1-2-3 Yes Sum 0.090 0.090 Lotus 1-2-3 Yes Kurtosis 2.234 2.234 Lotus 1-2-3 Yes Skewness

-0.581

-0.581 Lotus 1-2-3 Yes Outliers Sequ. ID 17 identified as an outlier and removed Sequ. ID 17 identified as an outlier and removed Lotus 1-2-3 Yes Drift scatter plot with trend line N/A Visual inspection shows agreement between the scatter plots and trend lines Lotus 1-2-3 Yes Drift scatter plot trend line Y = 0.0003x - 0.1415 Y = 0.000267x - 0.142 Lotus 1-2-3 Yes W Test Value 0.9569 (does not reject assumption of normality) 0.9569 (does not reject assumption of normality)

Lotus 1-2-3 Yes Histogram N/A Visual inspection shows agreement between the histograms Lotus 1-2-3 Yes

G13.18.6.3-006 Page 7 of 8 Parameter G13.18.6.3-006 value Validation value Validation application Valid?

Data within 0.5 Standard Deviations 16 16 Lotus 1-2-3 Yes Data within 1.0 Standard Deviation 33 33 Lotus 1-2-3 Yes Data within 1.5 Standard Deviations 36 36 Lotus 1-2-3 Yes Data within 2.0 Standard Deviations 39 39 Lotus 1-2-3 Yes Data within 2.5 Standard Deviations 40 40 Lotus 1-2-3 Yes Bin 4 count 6

6 Lotus 1-2-3 Yes Bin 4 drift Standard Deviation 0.0809 0.0809 Lotus 1-2-3 Yes Bin 4 drift mean

-0.0333

-0.0333 Lotus 1-2-3 Yes Bin 4 interval mean 327.00 327.00 Lotus 1-2-3 Yes Bin 4 interval maximum 330 330 Lotus 1-2-3 Yes Bin 5 count 35 35 Lotus 1-2-3 Yes Bin 5 drift Standard Deviation 0.1272 0.1272 Lotus 1-2-3 Yes Bin 5 drift mean 0.0083 0.0083 Lotus 1-2-3 Yes Bin 5 interval mean 574.66 574.66 Lotus 1-2-3 Yes Bin 5 interval maximum 650 650 Lotus 1-2-3 Yes Binning Analysis Ratio of Variances 2.471 2.471 Lotus 1-2-3 Yes Binning Analysis F Critical 4.481 4.481 Quattro Pro Yes Drift Regression Scatter Plot NA Visual inspection shows agreement between the two scatter plots and trend lines.

Lotus 1-2-3 Yes Drift Regression Scatter Plot Trend Line Y = 0.000267x

-0.141518 Y = 0.000267x

-0.141518 Quattro Pro Yes Drift Regression R Square Value 0.042874 0.042874 Quattro Pro Yes Drift Regression F Value 1.746985 1.746985 Quattro Pro Yes F Crit Value 3.238096 3.238096 Quattro Pro Yes Drift Regression P-Value 0.193957 0.193766 Quattro Pro Yes

G13.18.6.3-006 Page 8 of 8 Parameter G13.18.6.3-006 value Validation value Validation application Valid?

AV Drift Regression Scatter Plot NA Visual inspection shows agreement between the two scatter plots and trend lines.

Lotus 1-2-3 Yes AV Drift Regression Scatter Plot Trend Line Y = 0.000137x

+0.013374 Y = 0.000137x

+0.013374 Quattro Pro Yes AV Drift Regression R Square Value 0.023738 0.023738 Quattro Pro Yes AV Drift Regression F Value 0.948294 0.948294 Quattro Pro Yes F Crit Value 3.238096 3.238096 Quattro Pro Yes AV Drift Regression P-Value 0.336156 0.336006 Quattro Pro Yes Other values, including those based on the above parameters, were checked using hand calculations.