ML14196A419: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:--------------------------------------------NOTE-------------------------------------------- Momentary transients above the [secondary] containment pressure limit are permitted. --------------------------------------------------------------------------------------------------
{{#Wiki_filter:[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-1 Rev. 4.0 3.6 CONTAINMENT SYSTEMS 3.6.4.1
[Secondary] Containment LCO 3.6.4.1 The [secondary] containment shall be OPERABLE.
--------------------------------------------NOTE--------------------------------------------
Momentary transients above the [secondary] containment pressure limit are permitted.
APPLICABILITY:
MODES 1, 2, and 3, During movement of [recently] irradiated fuel assemblies in the
[secondary] containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. [Secondary] containment inoperable in MODE 1, 2, or 3.
A.1 Restore [secondary]
containment to OPERABLE status.
4 hours B. Required Action and associated Completion Time of Condition A not met.
B.1
---------------NOTE--------------
LCO 3.0.4.a is not applicable when entering MODE 3.
Be in MODE 3.
12 hours C. [Secondary] containment inoperable during movement of [recently]
irradiated fuel assemblies in the
[secondary] containment or during OPDRVs.
C.1
---------------NOTE--------------
LCO 3.0.3 is not applicable.
Suspend movement of
[recently] irradiated fuel assemblies in the
[secondary] containment.
AND C.2 Initiate action to suspend Immediately Immediately BWROG-129, Rev. 0


, except when the access opening is being used for entry and exit}}
[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-2 Rev. 4.0 CONDITION REQUIRED ACTION COMPLETION TIME OPDRVs.
BWROG-129, Rev. 0
 
[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-3 Rev. 4.0 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1
[ Verify [secondary] containment vacuum is
[0.25] inch of vacuum water gauge.
[ 24 hours OR In accordance with the Surveillance Frequency Control Program ] ]
SR 3.6.4.1.2 Verify all [secondary] containment equipment hatches are closed and sealed.
[ 31 days OR In accordance with the Surveillance Frequency Control Program ]
SR 3.6.4.1.3 Verify one [secondary] containment access door in each access opening is closed, except when the access opening is being used for entry and exit.
[ 31 days OR In accordance with the Surveillance Frequency Control Program ]
BWROG-129, Rev. 0
 
[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-4 Rev. 4.0 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.4.1.4
[ Verify [secondary] containment can be drawn down to [0.25] inch of vacuum water gauge in
[120] seconds using one standby gas treatment (SGT) subsystem.
[ [18] months on a STAGGERED TEST BASIS for each subsystem OR In accordance with the Surveillance Frequency Control Program ] ]
SR 3.6.4.1.5 Verify the [secondary] containment can be maintained [0.25] inch of vacuum water gauge for 1 hour using one SGT subsystem at a flow rate
[4000] cfm.
[ [18] months on a STAGGERED TEST BASIS for each SGT subsystem OR In accordance with the Surveillance Frequency Control Program ]
BWROG-129, Rev. 0}}

Latest revision as of 17:56, 10 January 2025

TSTF Handout from 7/10/14 Meeting Draft Secondary Containment TS Markup
ML14196A419
Person / Time
Site: Technical Specifications Task Force
Issue date: 07/07/2014
From: Mann A
- No Known Affiliation
To:
Shared Package
ML14196A409 List:
References
Download: ML14196A419 (4)


Text

[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-1 Rev. 4.0 3.6 CONTAINMENT SYSTEMS 3.6.4.1

[Secondary] Containment LCO 3.6.4.1 The [secondary] containment shall be OPERABLE.


NOTE--------------------------------------------

Momentary transients above the [secondary] containment pressure limit are permitted.

APPLICABILITY:

MODES 1, 2, and 3, During movement of [recently] irradiated fuel assemblies in the

[secondary] containment, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. [Secondary] containment inoperable in MODE 1, 2, or 3.

A.1 Restore [secondary]

containment to OPERABLE status.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B. Required Action and associated Completion Time of Condition A not met.

B.1


NOTE--------------

LCO 3.0.4.a is not applicable when entering MODE 3.

Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. [Secondary] containment inoperable during movement of [recently]

irradiated fuel assemblies in the

[secondary] containment or during OPDRVs.

C.1


NOTE--------------

LCO 3.0.3 is not applicable.

Suspend movement of

[recently] irradiated fuel assemblies in the

[secondary] containment.

AND C.2 Initiate action to suspend Immediately Immediately BWROG-129, Rev. 0

[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-2 Rev. 4.0 CONDITION REQUIRED ACTION COMPLETION TIME OPDRVs.

BWROG-129, Rev. 0

[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-3 Rev. 4.0 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1

[ Verify [secondary] containment vacuum is

[0.25] inch of vacuum water gauge.

[ 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OR In accordance with the Surveillance Frequency Control Program ] ]

SR 3.6.4.1.2 Verify all [secondary] containment equipment hatches are closed and sealed.

[ 31 days OR In accordance with the Surveillance Frequency Control Program ]

SR 3.6.4.1.3 Verify one [secondary] containment access door in each access opening is closed, except when the access opening is being used for entry and exit.

[ 31 days OR In accordance with the Surveillance Frequency Control Program ]

BWROG-129, Rev. 0

[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-4 Rev. 4.0 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.4.1.4

[ Verify [secondary] containment can be drawn down to [0.25] inch of vacuum water gauge in

[120] seconds using one standby gas treatment (SGT) subsystem.

[ [18] months on a STAGGERED TEST BASIS for each subsystem OR In accordance with the Surveillance Frequency Control Program ] ]

SR 3.6.4.1.5 Verify the [secondary] containment can be maintained [0.25] inch of vacuum water gauge for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> using one SGT subsystem at a flow rate

[4000] cfm.

[ [18] months on a STAGGERED TEST BASIS for each SGT subsystem OR In accordance with the Surveillance Frequency Control Program ]

BWROG-129, Rev. 0