| issue date = 09/25/2014
| issue date = 09/25/2014
| title = OEDO-14-00145 - Response Letter to Mike Mulligan for Ltr. 2.206 - Palisades
| title = OEDO-14-00145 - Response Letter to Mike Mulligan for Ltr. 2.206 - Palisades
| author name = Dorman D H
| author name = Dorman D
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name = Mulligan M
| addressee name = Mulligan M
Line 20: Line 20:


==Dear Mr. Mulligan,==
==Dear Mr. Mulligan,==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 25, 2014 Your petition dated March 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14071A006), as supplemented by your addresses to the Petition Review Board (PRB) on April 8, 2014, and September 3, 2014 (ADAMS Accession Nos. ML14143A212 and ML14259A135, respectively), and by e-mail dated May 21, 2014 (ADAMS Accession No. ML14142A101), has been referred to me under Title 10 of the Code of Federal Regulations (1 0 CFR) 2.206, "Requests for Action under This Subpart," of the Commission's regulations. In your petition, you request a number of actions to be taken by the U.S. Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (the licensee, ENO) for equipment failures at Palisades Nuclear Plant (PNP). As the basis for your request, you state that there have been various recent plant events and equipment failures at PNP, such as primary coolant pump (PCP) impeller pieces breaking off and lodging in the reactor vessel (RV), leakage from the safety injection refueling water tank (SIRWT), and flaws in the control-rod drive mechanisms (CRDMs). I would like to note that during the spring 2014 refueling outage, ENO replaced all of the CRDM housings with new CRDM housings that incorporated a design change in an effort to eliminate the cause of the cracking. In 2013, ENO replaced most of the bottom of the SIRWT and made other repairs to ensure that any water leaking from the SIRWT would be captured and collected. No leakage from the SIRWT has been noted since these repairs in 2013. I would also like to express my appreciation to you for voicing your concerns to the NRC regarding these matters.
The PRB comprises representatives from the following technical groups within the NRC's Office of Nuclear Reactor Regulation:
the Component Performance, Non-Destructive Examination, and Testing Branch and the Vessels and Internals Integrity Branch within the Division of Engineering the Reactor Systems Branch and the Nuclear Performance and Code Review Branch within the Division of Safety Systems The PRB initially met in regard to your petition on March 14, 2014. At this meeting, the PRB reviewed your request for immediate action to prevent a PNP restart because of a piece of PCP impeller that was lodged between the RV and the flow skirt. The licensee attempted to remove the lodged piece using several methodologies, including vice grips and hydraulic tools. Despite the application of approximately 3,000 pounds per square inch of force, the piece did not move.
The licensee performed fluid dynamics analysis, structural analysis, and fracture analysis, which concluded that the piece would not move, would not break up, would not impede PCS flow, and would not affect the pressure-retaining capability of the RV. The NRC staff performed an
in-depth independent review of the licensee's analysis and concluded that the impeller piece did not pose a threat to safe operation of the reactor and RV. Therefore, the PRB determined that this event raised no safety-significant concerns that would prevent the plant from restarting as scheduled. Likewise, the PRB reviewed your request to immediately shut down PNP until the PCPs were replaced and determined that the event raised no safety-significant concerns that would require a plant shutdown. This was communicated to you by e-mail dated March 19, 2014 (ADAMS Accession No. ML14083A680).
You addressed the PRB by teleconference on April 8, 2014, and on September 3, 2014, to discuss your petition. The results of that discussion have been considered in the PRB's determination regarding your request for enforcement action and in establishing the schedule for the review of your petition. The PRB met internally on May 19, July 28, and September 3, 2014, to discuss your petition, as supplemented, and with respect to the criteria for review and rejection described in Management Directive (MD) 8.11, "Review Process for 10 CFR 2.206 Petitions." The PRB determined that the following requests from your petition meet the criteria for review in accordance with MD 8.11:
: 1.
Request for PNP to open every PCP for inspection and clear up all flaws.
: 2.
Request for PNP to replace the PCPs with others designed for their intended duty.
: 3.
Request an Office of the Inspector General (OIG) inspection on why different NRC regions have different analysis criteria for similar PCP events.
: 4.
Request a $10 million fine over these events.
: 5.
Request for PNP to return to yellow or red status and for the NRC to intensify its monitoring of PNP.
Your remaining requests do not meet the criteria for review, either because they are not requests for enforcement-related action or because they concern now-resolved issues that have already been the subject of NRC staff review and evaluation. Although many of your requests do not meet the criteria of MD 8.11, the NRC staff appreciates your concerns, and Enclosure 1 to this letter explains why those requests were not accepted into the 2.206 process.
As provided by Section 2.206, the NRC will take action on your request within a reasonable time. I have assigned Jennie Rankin to be the petition manager for your petition. Ms. Rankin can be reached at 301-415-1530. Your petition is being reviewed by the Division of Engineering, the Division of Safety Systems, and the Division of Operating Reactor Licensing within the Office of Nuclear Reactor Regulation in conjunction with the Division of Reactor Projects in Region Ill. I have referred to the OIG those allegations of NRC wrongdoing contained in your petition and in the transcripts of your addresses to the PRB on April 8 and September 3, 2014. I have enclosed for your information a copy of the notice that is being filed with the Office of the Federal Register for publication. I have also enclosed for your information copies of MD 8.11 and the associated brochure, NUREG/BR-0200, "Public Petition Process,"
prepared by the NRC's Office of Public Affairs.


UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 25, 2014 Your petition dated March 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14071A006),
as supplemented by your addresses to the Petition Review Board (PRB) on April 8, 2014, and September 3, 2014 (ADAMS Accession Nos. ML 14143A212 and ML 14259A135, respectively),
and by e-mail dated May 21, 2014 (ADAMS Accession No. ML 14142A101),
has been referred to me under Title 10 of the Code of Federal Regulations (1 0 CFR) 2.206, "Requests for Action under This Subpart,"
of the Commission's regulations.
In your petition, you request a number of actions to be taken by the U.S. Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (the licensee, ENO) for equipment failures at Palisades Nuclear Plant (PNP). As the basis for your request, you state that there have been various recent plant events and equipment failures at PNP, such as primary coolant pump (PCP) impeller pieces breaking off and lodging in the reactor vessel (RV), leakage from the safety injection refueling water tank (SIRWT),
and flaws in the control-rod drive mechanisms (CRDMs).
I would like to note that during the spring 2014 refueling outage, ENO replaced all of the CRDM housings with new CRDM housings that incorporated a design change in an effort to eliminate the cause of the cracking.
In 2013, ENO replaced most of the bottom of the SIRWT and made other repairs to ensure that any water leaking from the SIRWT would be captured and collected.
No leakage from the SIRWT has been noted since these repairs in 2013. I would also like to express my appreciation to you for voicing your concerns to the NRC regarding these matters.
The PRB comprises representatives from the following technical groups within the NRC's Office of Nuclear Reactor Regulation:
* the Component Performance, Non-Destructive Examination, and Testing Branch and the Vessels and Internals Integrity Branch within the Division of Engineering
* the Reactor Systems Branch and the Nuclear Performance and Code Review Branch within the Division of Safety Systems The PRB initially met in regard to your petition on March 14, 2014. At this meeting, the PRB reviewed your request for immediate action to prevent a PNP restart because of a piece of PCP impeller that was lodged between the RV and the flow skirt. The licensee attempted to remove the lodged piece using several methodologies, including vice grips and hydraulic tools. Despite the application of approximately 3,000 pounds per square inch of force, the piece did not move. The licensee performed fluid dynamics
: analysis, structural
: analysis, and fracture
: analysis, which concluded that the piece would not move, would not break up, would not impede PCS flow, and would not affect the pressure-retaining capability of the RV. The NRC staff performed an in-depth independent review of the licensee's analysis and concluded that the impeller piece did not pose a threat to safe operation of the reactor and RV. Therefore, the PRB determined that this event raised no safety-significant concerns that would prevent the plant from restarting as scheduled.
: Likewise, the PRB reviewed your request to immediately shut down PNP until the PCPs were replaced and determined that the event raised no safety-significant concerns that would require a plant shutdown.
This was communicated to you by e-mail dated March 19, 2014 (ADAMS Accession No. ML 14083A680).
You addressed the PRB by teleconference on April 8, 2014, and on September 3, 2014, to discuss your petition.
The results of that discussion have been considered in the PRB's determination regarding your request for enforcement action and in establishing the schedule for the review of your petition.
The PRB met internally on May 19, July 28, and September 3, 2014, to discuss your petition, as supplemented, and with respect to the criteria for review and rejection described in Management Directive (MD) 8.11, "Review Process for 10 CFR 2.206 Petitions."
The PRB determined that the following requests from your petition meet the criteria for review in accordance with MD 8.11: 1. Request for PNP to open every PCP for inspection and clear up all flaws. 2. Request for PNP to replace the PCPs with others designed for their intended duty. 3. Request an Office of the Inspector General (OIG) inspection on why different NRC regions have different analysis criteria for similar PCP events. 4. Request a $10 million fine over these events. 5. Request for PNP to return to yellow or red status and for the NRC to intensify its monitoring of PNP. Your remaining requests do not meet the criteria for review, either because they are not requests for enforcement-related action or because they concern now-resolved issues that have already been the subject of NRC staff review and evaluation.
Although many of your requests do not meet the criteria of MD 8.11, the NRC staff appreciates your concerns, and Enclosure 1 to this letter explains why those requests were not accepted into the 2.206 process.
As provided by Section 2.206, the NRC will take action on your request within a reasonable time. I have assigned Jennie Rankin to be the petition manager for your petition.
Ms. Rankin can be reached at 301-415-1530.
Your petition is being reviewed by the Division of Engineering, the Division of Safety Systems, and the Division of Operating Reactor Licensing within the Office of Nuclear Reactor Regulation in conjunction with the Division of Reactor Projects in Region Ill. I have referred to the OIG those allegations of NRC wrongdoing contained in your petition and in the transcripts of your addresses to the PRB on April 8 and September 3, 2014. I have enclosed for your information a copy of the notice that is being filed with the Office of the Federal Register for publication.
I have also enclosed for your information copies of MD 8.11 and the associated
: brochure, NUREG/BR-0200, "Public Petition Process,"
prepared by the NRC's Office of Public Affairs.
Again, I appreciate you bringing these matters to the attention of the NRC.  
Again, I appreciate you bringing these matters to the attention of the NRC.  


==Enclosures:==
==Enclosures:==
: 1. Disposition of Requests  
: 1. Disposition of Requests
: 2. Federal Register Notice 3. Management Directive 8.11 4. NUREG/BR-0200 cc: Listserv Sincerely, Daniel H. Dorman, Acting Director Office of Nuclear Reactor Regulation Disposition of Requests that Were not Accepted into the 10 CFR 2.206 Process The following  
: 2. Federal Register Notice
: requests, as summarized below, do not meet the criteria for review, either because they are not requests for enforcement-related action or because they concern now-resolved issues that have already been the subject of NRC staff review and evaluation.
: 3. Management Directive 8.11
Although these requests do not meet the criteria of Management Directive (MD) 8.11, "Review Process for 10 CFR 2.206 Petitions,"
: 4. NUREG/BR-0200 cc: Listserv Sincerely, Daniel H. Dorman, Acting Director Office of Nuclear Reactor Regulation  
the U.S. Nuclear Regulatory Commission (NRC) staff appreciates your concerns, and the paragraphs below explain why your requests were not accepted into the 2.206 process.
 
Concerns with NRC staff monitoring of PCP impeller issues (Issue Nos. 1 I 21 11 I 121 and 14 of petition dated March 51 2014) This issue, regarding failure of the PCP impellers resulting in pieces breaking free in the reactor vessel (RV) is being tracked by Region Ill through the Reactor Oversight Process (ROP). Region Ill staff, in addition to the resident inspection staff at PNP, have followed up (and will continue to follow up) with the licensee regarding the licensee's corrective  
Disposition of Requests that Were not Accepted into the 10 CFR 2.206 Process The following requests, as summarized below, do not meet the criteria for review, either because they are not requests for enforcement-related action or because they concern now-resolved issues that have already been the subject of NRC staff review and evaluation.
: actions, in accordance with ROP activities.
Although these requests do not meet the criteria of Management Directive (MD) 8.11, "Review Process for 10 CFR 2.206 Petitions," the U.S. Nuclear Regulatory Commission (NRC) staff appreciates your concerns, and the paragraphs below explain why your requests were not accepted into the 2.206 process.
On August 8, 2012, Region Ill documented a finding of very low safety significance and an associated non-cited violation for the failure of the licensee to operate the PCPs in accordance with their design operating criteria (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12221A340).
Concerns with NRC staff monitoring of PCP impeller issues (Issue Nos. 1 I 21 11 I 121 and 14 of petition dated March 51 2014)
Region Ill recently documented its inspection findings in the PNP integrated inspection report dated May 7, 2014 (ADAMS Accession No. ML 14127A543).
This issue, regarding failure of the PCP impellers resulting in pieces breaking free in the reactor vessel (RV) is being tracked by Region Ill through the Reactor Oversight Process (ROP).
The report states the following:
Region Ill staff, in addition to the resident inspection staff at PNP, have followed up (and will continue to follow up) with the licensee regarding the licensee's corrective actions, in accordance with ROP activities. On August 8, 2012, Region Ill documented a finding of very low safety significance and an associated non-cited violation for the failure of the licensee to operate the PCPs in accordance with their design operating criteria (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12221A340). Region Ill recently documented its inspection findings in the PNP integrated inspection report dated May 7, 2014 (ADAMS Accession No. ML14127A543). The report states the following:
Because the PCP-C impeller was replaced with a new impeller this outage, PCP-8 was the only pump that remained in service with a refurbished impeller that was more susceptible to the fatigue-related failures that have been observed.
Because the PCP-C impeller was replaced with a new impeller this outage, PCP-8 was the only pump that remained in service with a refurbished impeller that was more susceptible to the fatigue-related failures that have been observed. The licensee ensured that PCP-8 was not one of the first two PCPs started following the Spring 2014 refueling outage, which did not expose PCP-8 to the susceptible pressure and flow conditions. However, because PCP-8 continues in service with potential impeller vane cracks there remains a potential for impeller pieces to break off. The inspectors and NRC staff recognized this concern and did not identify any immediate safety concerns, in part due to the extensive operating experience with broken impeller pieces. However, a review of the licensee's evaluation to justify continued operation of PCP-8 with a potentially cracked impeller continues. Additionally, the inspectors continue to review the licensee's corrective actions to date and going forward to determine whether the licensee plans to eliminate the known susceptibility of impeller pieces breaking off.
The licensee ensured that PCP-8 was not one of the first two PCPs started following the Spring 2014 refueling outage, which did not expose PCP-8 to the susceptible pressure and flow conditions.  
In addition to continued monitoring of this issue under the ROP, Region Ill staff addressed this issue at the public End of Cycle meeting conducted in South Haven, Michigan (ADAMS Accession Nos. ML141928384 and ML14175A284 for the meeting summary and NRC meeting slides). During the public End of Cycle meeting, the NRC staff presented a discussion on the RV foreign material inspection that occurred during the 2014 refueling outage and provided a poster session to answer any additional questions regarding foreign material caused by the failure of the impellers.
: However, because PCP-8 continues in service with potential impeller vane cracks there remains a potential for impeller pieces to break off. The inspectors and NRC staff recognized this concern and did not identify any immediate safety concerns, in part due to the extensive operating experience with broken impeller pieces. However, a review of the licensee's evaluation to justify continued operation of PCP-8 with a potentially cracked impeller continues.
In regards to your concerns about why the broken vanes were not reported to the NRC through a licensee event report (LER) or event notification, the requirements for reporting events to the NRC are in accordance with 10 CFR 50.72, "Immediate Notification Requirements for Operating Nuclear Power Reactors," and 50.73, "Licensee Event Report System." NUREG-1022, Revision 3, "Event Report Guidelines 10 CFR 50.72 and 50.73" (ADAMS Accession No. ML13032A220) contains guidelines that the NRC staff considers acceptable for use in meeting the requirements of 10 CFR 50.72 and 10 CFR 50.73. Section 3.0 of NUREG-1022 provides examples and discussion of events that would require event notification or an LER.
Additionally, the inspectors continue to review the licensee's corrective actions to date and going forward to determine whether the licensee plans to eliminate the known susceptibility of impeller pieces breaking off. In addition to continued monitoring of this issue under the ROP, Region Ill staff addressed this issue at the public End of Cycle meeting conducted in South Haven, Michigan (ADAMS Accession Nos. ML 141928384 and ML 14175A284 for the meeting summary and NRC meeting slides).
Region Ill monitors conformance to 10 CFR 50.72 and 50.73 through ROP activities and did not consider the impeller issues at Palisades to warrant notification in accordance with 10 CFR 50.72 and 50. 73.
During the public End of Cycle meeting, the NRC staff presented a discussion on the RV foreign material inspection that occurred during the 2014 refueling outage and provided a poster session to answer any additional questions regarding foreign material caused by the failure of the impellers.
In regards to your concern about plant debris discovered in the primary side of the steam generators, specifically the impact of loose impeller pieces causing potential wear on the steam-generator tubes, Section 5.6.8 of PNP's technical specifications (TSs) requires the licensee to submit a steam-generator tube inspection report to the NRC in accordance with the steam-generator program specified in TS 5.5.8. This report includes the active degradation mechanisms (including wear from foreign objects, regardless of the objects' origin), location and measured sizes of service-induced indications of degradation, and any corrective actions (e.g., tube plugging) taken in response to the inspection findings. The NRC staff reviews these reports to ensure that the licensee is detecting potential tube degradation. The NRC staff documents their review in a letter to the licensee, which was made publicly available in ADAMS.
In regards to your concerns about why the broken vanes were not reported to the NRC through a licensee event report (LER) or event notification, the requirements for reporting events to the Enclosure 1  NRC are in accordance with 10 CFR 50.72, "Immediate Notification Requirements for Operating Nuclear Power Reactors,"
Concerns with the design and operation of the PCP impellers (Issue Nos. 7 and 8 of 2.206 petition dated March 5. 2014. and Issue Nos. 5, 6, and 7 of supplemental e-mail dated May 21. 2014)
and 50.73, "Licensee Event Report System."
You raised the following concerns:
NUREG-1022, Revision 3, "Event Report Guidelines 10 CFR 50.72 and 50.73" (ADAMS Accession No. ML 13032A220) contains guidelines that the NRC staff considers acceptable for use in meeting the requirements of 10 CFR 50.72 and 10 CFR 50.73. Section 3.0 of NUREG-1022 provides examples and discussion of events that would require event notification or an LER. Region Ill monitors conformance to 10 CFR 50.72 and 50.73 through ROP activities and did not consider the impeller issues at Palisades to warrant notification in accordance with 10 CFR 50.72 and 50. 73. In regards to your concern about plant debris discovered in the primary side of the steam generators, specifically the impact of loose impeller pieces causing potential wear on the steam-generator tubes, Section 5.6.8 of PNP's technical specifications (TSs) requires the licensee to submit a steam-generator tube inspection report to the NRC in accordance with the steam-generator program specified in TS 5.5.8. This report includes the active degradation mechanisms (including wear from foreign objects, regardless of the objects' origin),
: a.
location and measured sizes of service-induced indications of degradation, and any corrective actions (e.g., tube plugging) taken in response to the inspection findings.
sequencing of the PCP during startup and shutdown conditions
The NRC staff reviews these reports to ensure that the licensee is detecting potential tube degradation.
: b.
The NRC staff documents their review in a letter to the licensee, which was made publicly available in ADAMS. Concerns with the design and operation of the PCP impellers (Issue Nos. 7 and 8 of 2.206 petition dated March 5. 2014. and Issue Nos. 5, 6, and 7 of supplemental e-mail dated May 21. 2014) You raised the following concerns:  
potential erosion of the coolant piping walls from metal blade particles
: a. sequencing of the PCP during startup and shutdown conditions  
: c.
: b. potential erosion of the coolant piping walls from metal blade particles  
failure of large pieces of the impeller The NRC staff notes that the requests regarding the above three concerns were not a request for an enforcement action and, thus, did not meet the acceptance criteria of MD 8.11. The NRC staff understands your concerns, notes that these concerns are closely related to two of the accepted requests (Numbers 1 and 2 above), and will take your underlying concerns into consideration during the review of the accepted requests.
: c. failure of large pieces of the impeller The NRC staff notes that the requests regarding the above three concerns were not a request for an enforcement action and, thus, did not meet the acceptance criteria of MD 8.11. The NRC staff understands your concerns, notes that these concerns are closely related to two of the accepted requests (Numbers 1 and 2 above), and will take your underlying concerns into consideration during the review of the accepted requests.
Concerns with pieces of broken impeller causing fuel damage (Issue Nos. 1, 2. 3, and 4 of supplemental e-mail dated May 21, 2014)
Concerns with pieces of broken impeller causing fuel damage (Issue Nos. 1, 2. 3, and 4 of supplemental e-mail dated May 21, 2014) Many of your requests stem from your concern that broken pieces of impeller (small metal particles) can ultimately cause fuel damage. As a result of the October 2011 vibration event and the subsequent review of the licensee's operability determination, the NRC staff studied the following potential issues associated with broken impeller pieces of various sizes: a. their interactions within the PCP, including impeding flow, impacting other vanes, impeding pump coastdown, causing pressure-boundary damage, and causing Final Safety Analysis Report (FSAR) impacts   b. their passing through a reactor coolant system's cold leg, including potentially impacting a resistance temperature detector (RTD) and causing pressure-boundary damage c. their passing through or lodging in the RV annulus, including causing pressure-boundary damage d. their behavior after leaving the RV annulus, including potentially causing interactions in the lower plenum, blocking flow channels, damaging fuel cladding, and jamming control rods e. the effects of a piece moving upstream of the PCP The NRC staff concluded that PCP impeller coastdown and the PCP pressure boundary are unlikely to be significantly affected; therefore, the FSAR analyses for core cooling and loss-of-coolant accidents are also unlikely to be significantly affected.
Many of your requests stem from your concern that broken pieces of impeller (small metal particles) can ultimately cause fuel damage. As a result of the October 2011 vibration event and the subsequent review of the licensee's operability determination, the NRC staff studied the following potential issues associated with broken impeller pieces of various sizes:
In addition, the NRC staff examined RTD interactions and concluded that damage to the RTD resulting from an impeller piece contacting the RTD is not a significant safety concern.
: a.
Dynamic flow analyses predicted that broken pieces from the pump would not contact the RTD. However, in the unlikely event that contact should occur, the worst case would result in a small opening in the reactor coolant system boundary, which is bounded by small-break loss-of-coolant accident analyses that have been conducted as part of the design-basis analyses.
their interactions within the PCP, including impeding flow, impacting other vanes, impeding pump coastdown, causing pressure-boundary damage, and causing Final Safety Analysis Report (FSAR) impacts
The NRC staff concluded that, for several reasons, there were no significant safety concerns resulting from broken pieces of impeller causing fuel damage. Impeller pieces are likely to remain stuck at the flow skirt or at the bottom of the RV as evidenced by the discovery of previous pieces. Flow conditions are insufficient to elevate larger pieces that might pass through the gap between the flow skirt and RV wall to the lower core support plate. Should the impeller pieces be small enough to be transported up and through the gaps (a highly unlikely occurrence},
: b.
the impeller piece would have to become lodged in a position to cause erosion of the fuel cladding.
their passing through a reactor coolant system's cold leg, including potentially impacting a resistance temperature detector (RTD) and causing pressure-boundary damage
If this were to occur, the activity levels in the primary coolant system (PCS) would increase.
: c.
Radiation monitoring would detect this increase in PCS activity levels, and the reactor would be shut down in accordance with the licensee's technical specification 3.4.16, "PCS Specific Activity."
their passing through or lodging in the RV annulus, including causing pressure-boundary damage
Requests for licensee information (Issue Nos. 4 and 9 of the 2.206 petition dated March 5. 2014) In regards to your request for Palisades to disclose internal Entergy reports regarding whether the PCPs were operated outside their design bases, the NRC staff does not require the licensee to disclose internal documents for public inspection as part of the 2.206 process.
: d.
As part of the inspection process under the ROP, Entergy documents have been, and will continue to be, reviewed, and any findings will be documented in the applicable inspection reports which are made publicly available.
their behavior after leaving the RV annulus, including potentially causing interactions in the lower plenum, blocking flow channels, damaging fuel cladding, and jamming control rods
In regards to your request for Entergy to explain their decision to conduct weld repair of the PCP impellers and details on how other plants have repaired their impellers, the NRC staff notes that this request is not a request for enforcement-related action and, thus, did not meet the acceptance criteria of MD 8.11. The NRC staff understands your concerns and notes that they   are closely related to two of the accepted requests (Numbers 1 and 3 above). During the process of reviewing accepted request Number 1, the NRC will take your concerns into consideration.
: e.
ENCLOSURE 2 FEDERAL REGISTER NOTICE ENTERGY NUCLEAR OPERATIONS, INC. DOCKET NO. 50-255 NUCLEAR REGULATORY COMMISSION  
the effects of a piece moving upstream of the PCP The NRC staff concluded that PCP impeller coastdown and the PCP pressure boundary are unlikely to be significantly affected; therefore, the FSAR analyses for core cooling and loss-of-coolant accidents are also unlikely to be significantly affected. In addition, the NRC staff examined RTD interactions and concluded that damage to the RTD resulting from an impeller piece contacting the RTD is not a significant safety concern. Dynamic flow analyses predicted that broken pieces from the pump would not contact the RTD. However, in the unlikely event that contact should occur, the worst case would result in a small opening in the reactor coolant system boundary, which is bounded by small-break loss-of-coolant accident analyses that have been conducted as part of the design-basis analyses.
[Docket No. 50-255; Entergy Nuclear Operations, Inc. Palisades Nuclear Plant AGENCY: Nuclear Regulatory Commission.
The NRC staff concluded that, for several reasons, there were no significant safety concerns resulting from broken pieces of impeller causing fuel damage. Impeller pieces are likely to remain stuck at the flow skirt or at the bottom of the RV as evidenced by the discovery of previous pieces. Flow conditions are insufficient to elevate larger pieces that might pass through the gap between the flow skirt and RV wall to the lower core support plate. Should the impeller pieces be small enough to be transported up and through the gaps (a highly unlikely occurrence}, the impeller piece would have to become lodged in a position to cause erosion of the fuel cladding. If this were to occur, the activity levels in the primary coolant system (PCS) would increase. Radiation monitoring would detect this increase in PCS activity levels, and the reactor would be shut down in accordance with the licensee's technical specification 3.4.16, "PCS Specific Activity."
ACTION: 10 CFR 2.206 request; receipt.  
Requests for licensee information (Issue Nos. 4 and 9 of the 2.206 petition dated March 5. 2014)
[7590-01-P]
In regards to your request for Palisades to disclose internal Entergy reports regarding whether the PCPs were operated outside their design bases, the NRC staff does not require the licensee to disclose internal documents for public inspection as part of the 2.206 process. As part of the inspection process under the ROP, Entergy documents have been, and will continue to be, reviewed, and any findings will be documented in the applicable inspection reports which are made publicly available.
SUMMARY:
In regards to your request for Entergy to explain their decision to conduct weld repair of the PCP impellers and details on how other plants have repaired their impellers, the NRC staff notes that this request is not a request for enforcement-related action and, thus, did not meet the acceptance criteria of MD 8.11. The NRC staff understands your concerns and notes that they are closely related to two of the accepted requests (Numbers 1 and 3 above). During the process of reviewing accepted request Number 1, the NRC will take your concerns into consideration.  
The U.S. Nuclear Regulatory Commission (NRC) is giving notice that by petition dated March 5, 2014, as supplemented by e-mail dated May 21, 2014, Michael Mulligan (the petitioner) has requested that the NRC take enforcement action against Entergy Nuclear Operations, Inc., due to recent plant events and equipment failures at Palisades Nuclear Plant (PNP). The petitioner's requests are included in the SUPPLEMENTARY INFORMATION section of this document.
 
ADDRESSES:
ENCLOSURE 2 FEDERAL REGISTER NOTICE ENTERGY NUCLEAR OPERATIONS, INC.
Please refer to Docket ID <INSERT:
DOCKET NO. 50-255  
when contacting the NRC about the availability of information regarding this document.
 
You may obtain available information related to this document using any of the following methods:
NUCLEAR REGULATORY COMMISSION
* Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID <INSERT:
[Docket No. 50-255; NRC~2()'Q'-XX'XX]
NRC-20YY-XXXX>.
Entergy Nuclear Operations, Inc.
Address questions about NRC dockets to Carol Gallagher; telephone:
Palisades Nuclear Plant AGENCY: Nuclear Regulatory Commission.
301-287-3422; e-mail: Caroi.Gallagher@nrc.gov.
ACTION: 10 CFR 2.206 request; receipt.
* NRC's Agencywide Documents Access and Management System (ADAMS):
[7590-01-P]  
You may obtain publicly available documents online in the ADAMS Public Documents collection   at http://www.nrc.gov/reading-rm/adams.html.
 
To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search."
==SUMMARY==
For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4 737, or by e-mail to pdr. resource@nrc.
: The U.S. Nuclear Regulatory Commission (NRC) is giving notice that by petition dated March 5, 2014, as supplemented by e-mail dated May 21, 2014, Michael Mulligan (the petitioner) has requested that the NRC take enforcement action against Entergy Nuclear Operations, Inc., due to recent plant events and equipment failures at Palisades Nuclear Plant (PNP). The petitioner's requests are included in the SUPPLEMENTARY INFORMATION section of this document.
gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.
ADDRESSES: Please refer to Docket ID <INSERT: NRC-20YY~XXXX> when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:
* NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. SUPPLEMENTARY INFORMATION:
Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID <INSERT: NRC-20YY-XXXX>. Address questions about NRC dockets to Carol Gallagher; telephone: 301-287-3422; e-mail: Caroi.Gallagher@nrc.gov.
Notice is hereby given that by petition dated March 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14071A006),
NRC's Agencywide Documents Access and Management System (ADAMS):
as supplemented by email dated May 21, 2014 (ADAMS Accession No. ML 14142A101),
You may obtain publicly available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4 737, or by e-mail to pdr. resource@nrc. gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.
and the petitioner's addresses to the Petition Review Board dated April 8 and September 3, 2014 (ADAMS Accession Nos. ML 14143A212 and ML 14259A135, respectively),
NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
the petitioner, has asked the NRC to take enforcement action against Entergy Nuclear Operations, Inc., due to recent plant events and equipment failures at PNP. The petitioner was particularly concerned with primary coolant pump (PCP) impeller pieces breaking off and lodging in the reactor vessel. The petitioner requests the following actions:
SUPPLEMENTARY INFORMATION:
* Require PNP to open every PCP for inspection and clear up all flaws.
Notice is hereby given that by petition dated March 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14071A006), as supplemented by email dated May 21, 2014 (ADAMS Accession No. ML14142A101), and the petitioner's addresses to the Petition Review Board dated April 8 and September 3, 2014 (ADAMS Accession Nos. ML14143A212 and ML14259A135, respectively), the petitioner, has asked the NRC to take enforcement action against Entergy Nuclear Operations, Inc., due to recent plant events and equipment failures at PNP. The petitioner was particularly concerned with primary coolant pump (PCP) impeller pieces breaking off and lodging in the reactor vessel.
* Require PNP to replace the PCPs with a design for their intended duty.
The petitioner requests the following actions:
* An Office of Inspector General (OIG) inspection on why there are different analysis criteria for similar PCP events between the NRC regions.
Require PNP to open every PCP for inspection and clear up all flaws.
* A ten million dollar fine for these events.
Require PNP to replace the PCPs with a design for their intended duty.
* Intensify NRC monitoring of PNP, and return them to yellow or red status. As the basis for the request, the petitioner stated, in part, the following:
An Office of Inspector General (OIG) inspection on why there are different analysis criteria for similar PCP events between the NRC regions.
* The petitioner cited other recent plant events and equipment  
A ten million dollar fine for these events.
: failures, such as leakage from the safety injection refueling water tank, and flaws in the control rod drive mechanisms.
Intensify NRC monitoring of PNP, and return them to yellow or red status.
* The petitioner asserted the licensee and the NRC staff used non-conservative engineering judgment during the evaluation of the lodged PCP impeller piece and during the operability evaluation of the existing PCP impellers.
As the basis for the request, the petitioner stated, in part, the following:
* The petitioner asserts that the NRC staff was not being aggressive in resolving plant equipment issues, not resolving PCP equipment issues uniformly across the NRC regions, and accommodating the nuclear industry.
The petitioner cited other recent plant events and equipment failures, such as leakage from the safety injection refueling water tank, and flaws in the control rod drive mechanisms.
The request is being treated pursuant to &sect; 2.206 of Title 10 of the Code of Federal Regulations (1 0 CFR), and has been referred to the Director of the Office of Nuclear Reactor Regulation (NRR). In accordance with 10 CFR 2.206, the NRC will take appropriate action on this petition within a reasonable period of time. The petitioner met with the NRR   Petition Review Board on April 8 and September 3, 2014, to discuss the petition.
The petitioner asserted the licensee and the NRC staff used non-conservative engineering judgment during the evaluation of the lodged PCP impeller piece and during the operability evaluation of the existing PCP impellers.
The Petition Review Board considered the results of that discussion in its determination of the petitioner's request for immediate action and in the establishment of the schedule for the review of the petition.
The petitioner asserts that the NRC staff was not being aggressive in resolving plant equipment issues, not resolving PCP equipment issues uniformly across the NRC regions, and accommodating the nuclear industry.
Dated at Rockville,  
The request is being treated pursuant to &sect; 2.206 of Title 10 of the Code of Federal Regulations (1 0 CFR), and has been referred to the Director of the Office of Nuclear Reactor Regulation (NRR). In accordance with 10 CFR 2.206, the NRC will take appropriate action on this petition within a reasonable period of time. The petitioner met with the NRR Petition Review Board on April 8 and September 3, 2014, to discuss the petition. The Petition Review Board considered the results of that discussion in its determination of the petitioner's request for immediate action and in the establishment of the schedule for the review of the petition.
: Maryland, this 251h day of September 2014. For The Nuclear Regulatory Commission.
Dated at Rockville, Maryland, this 251h day of September 2014.
Daniel H. Dorman, Acting Director, Office of Nuclear Reactor Regulation.
For The Nuclear Regulatory Commission.
ENCLOSURE 3 MANAGEMENT DIRECTIVE 8.11 U. S. NUCLEAR REGULATORY COMMISSION
Daniel H. Dorman, Acting Director, Office of Nuclear Reactor Regulation.  
_ iTo:SubjectPurpose:TN: DT-00-20NRC Management Directives Custodians Transmittal of Directive 8.11, "Review Process for 10 CFR2.206 Petitions" Directive and Handbook 8.11 are being revised to addressstakeholder feedback and to improve clarity and make thehandbook easier to use. There are three major changes to thehandbook:  
 
(1) the addition of an opportunity for petitioners toaddress the Petition Review Board after it discusses thepetition; (2) the deletion of criteria for technical meetings with the petitioners; and (3) the addition of a requirement to requestcomments from the petitioner(s) and affected licensee(s) onthe proposed director's  
ENCLOSURE 3 MANAGEMENT DIRECTIVE 8.11  
: decision, with associated steps toresolve, and document the resolution of, those comments.
 
Office andDivision of Origin:Contact:Office of Nuclear Reactor Regulation Andrew J. Kugler, (301) 415-2828 orDonna Skay, (301) 415-1322Date Approved:
U. S. NUCLEAR REGULATORY COMMISSION i
Volume:Directive:
To:
July 1, 1999 (Revised:
Subject
October 25, 2000)8 Licensee Oversight Programs8.11 Review Process for 10 CFR 2.206 Petitions Availability:
 
Rules and Directives BranchOffice of Administration  
==Purpose:==
.David L. Meyer, (301) 415-7162 orDoris Mendiola, (301) 415-6297OFFICE OF ADMINIS TRA TION TN: DT-00-20Significant Changes to the Management Directive 8.11Review Process for 10 CFR 2.206 Petitions The entire document has been revised to improve clarity and make it easier to use. Inparticular, the handbook is now written with actions in chronological order. In addition tothose general changes, the following significant changes have been made:* Addition of an opportunity for the petitioner to address the Petition Review Board(PRB) after the PRB has developed its recommendations on the petition.
TN: DT-00-20 NRC Management Directives Custodians Transmittal of Directive 8.11, "Review Process for 10 CFR 2.206 Petitions" Directive and Handbook 8.11 are being revised to address stakeholder feedback and to improve clarity and make the handbook easier to use. There are three major changes to the handbook: (1) the addition of an opportunity for petitioners to address the Petition Review Board after it discusses the petition; (2) the deletion of criteria for technical meetings with the petitioners; and (3) the addition of a requirement to request comments from the petitioner(s) and affected licensee(s) on the proposed director's decision, with associated steps to resolve, and document the resolution of, those comments.
This meetingor teleconference is similar to those already offered to petitioners before the PRB meets.* Removal of specific restrictions on the amount of time allowed for petitioners to addressthe PRB and also allow petitioners to be assisted by a reasonable number ofrepresentatives.
Office and Division of Origin:
* Deletion of the criteria for meetings between the petitioner and the staff. The staff willhold these meetings whenever the staff feels it will be beneficial to its review.* Addition of a process by which the staff requests and resolves comments from thepetitioner and the licensee on the proposed director's decision (i.e., before it is signed).The comments and the staff's resolution become part of the director's decision.
 
* Revision of the timeliness goal to 120 days from the date of the acknowledgment letteruntil the date the proposed director's decision is sent out for comment.
==Contact:==
Add a new goal of45 days from the end of the comment period until the director's decision is signed.* Addition of a process flow chart and a petition manager's checklist to assist staff personsinvolved with petitions.
Office of Nuclear Reactor Regulation Andrew J. Kugler, (301) 415-2828 or Donna Skay, (301) 415-1322 Date Approved:
2 Review Process for10 CFR 2.206 Petitions Directive 8.1 1 Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Directive 8.11ContentsPolicy .; 1Objectives.
Volume:
1Organizational Responsibilities and Delegations of Authority.
Directive:
2Executive Director for Operations (EDO). 2General Counsel (GC). 2Office Directors.
July 1, 1999 (Revised: October 25, 2000) 8 Licensee Oversight Programs 8.11 Review Process for 10 CFR 2.206 Petitions Availability:
2Regional Administrators.
Rules and Directives Branch Office of Administration.
32.206 PRB Chairperson.
David L. Meyer, (301) 415-7162 or Doris Mendiola, (301) 415-6297 OFFICE OF ADMINIS TRA TION
3Associate Directors  
 
-Office of Nuclear Reactor Regulation (NRR). 4Division Directors.
TN: DT-00-20 Significant Changes to the Management Directive 8.11 Review Process for 10 CFR 2.206 Petitions The entire document has been revised to improve clarity and make it easier to use. In particular, the handbook is now written with actions in chronological order. In addition to those general changes, the following significant changes have been made:
4Director, Division of Licensing Project Management (DLPM),Office of Nuclear Reactor Regulation (NRR). 4Applicability..
* Addition of an opportunity for the petitioner to address the Petition Review Board (PRB) after the PRB has developed its recommendations on the petition. This meeting or teleconference is similar to those already offered to petitioners before the PRB meets.
4Handbook.  
* Removal of specific restrictions on the amount of time allowed for petitioners to address the PRB and also allow petitioners to be assisted by a reasonable number of representatives.
.....................................................
* Deletion of the criteria for meetings between the petitioner and the staff. The staff will hold these meetings whenever the staff feels it will be beneficial to its review.
4Definitions
* Addition of a process by which the staff requests and resolves comments from the petitioner and the licensee on the proposed director's decision (i.e., before it is signed).
............................................................
The comments and the staff's resolution become part of the director's decision.
4References
* Revision of the timeliness goal to 120 days from the date of the acknowledgment letter until the date the proposed director's decision is sent out for comment. Add a new goal of 45 days from the end of the comment period until the director's decision is signed.
...................................................
* Addition of a process flow chart and a petition manager's checklist to assist staff persons involved with petitions.
5Approved:
2
July 1, 1999(Revised:
 
October 25'2000) in U. S. Nuclear Regulatory Commission Volume: 8 Licensee Oversight Programs NRRReview Process for 10 CFR 2.206 Petitions Directive 8.11Policy(8.11-01)
Review Process for 10 CFR 2.206 Petitions Directive 8.1 1
It is the policy of the U.S. Nuclear Regulatory Commission to providemembers of the public with the means to request that the Commission take enforcement-related action (i.e., to modify, suspend, or revoke alicense, or for other appropriate enforcement-related action, asdistinguished from actions such as licensing or rulemaking).
 
This policyis codified at Section 2.206 of Title 10 of the Code ofFederalRegulations (10 CFR 2.206). The Commission may grant a request for action, inwhole or in part, take other action that satisfies the concerns raised bythe requester, or deny the request.
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Directive 8.11 Contents Policy.;
Requests that raise health and safetyand other concerns without requesting enforcement-related action willbe reviewed by means other than the 10 CFR 2.206 process.Objectives (8.11-02)
1 Objectives.
* To ensure the public health and safety, through the prompt andthorough evaluation of any potential problem addressed by apetition filed under 10 CFR 2.206. (021)* To provide for appropriate participation by a petitioner in, andobservation by the public of, NRC's decisionmaking activities related to a 10 CFR 2.206 petition.  
1 Organizational Responsibilities and Delegations of Authority.
(022)* To ensure effective communication with the petitioner and otherstakeholders on the' status of the petition, including providing relevant documents and notification of interactions between theNRC staff and a licensee or certificate holder relevant to thepetition.  
2 Executive Director for Operations (EDO).
(023)Approved:
2 General Counsel (GC).
July 1, 1999 1(Revised:
2 Office Directors.
October 25, 2000)
2 Regional Administrators.
I :-,Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Directive 8.11Organizational Responsibilities andDelegations of Authority (8.11-03)
3 2.206 PRB Chairperson.
Executive Director for Operations (EDO)(031)Receives and assigns action for all petitions filed under 10 CFR 2.206.General Counsel (GC)(032)* Conducts legal reviews and provides advice on 10 CFR 2.206petitions and, upon specific request from the staff in special cases orwhere the petition raises legal issues, reviews drafts of director's decisions.  
3 Associate Directors - Office of Nuclear Reactor Regulation (NRR).
(a)* Provides legal advice to the Commission, EDO, office directors, and staff on other matters related to the 10 CFR 2.206 process.  
4 Division Directors.
(b) K>Office Directors (033)* Have overall responsibility for assigned petitions.
4 Director, Division of Licensing Project Management (DLPM),
Because 10 CFR2.206 petitions request enforcement-related action, petitions areassigned to the Office of Nuclear Reactor Regulation, the Office ofNuclear Material Safety and Safeguards, the Office ofEnforcement, or the Office of the General Counsel.
Office of Nuclear Reactor Regulation (NRR).
Therefore, most of the actions described in this directive and the associated handbook apply only to those. offices.  
4 Applicability..
(a)* Approve or deny a petitioner's request for immediate action. (b)* Sign acknowledgment
4 Handbook.
: letters, FederalRegister notices and director's decisions.
4 Definitions 4
(c)* Provide up-to-date information for the monthly status report on allassigned petitions.  
References 5
(d)* Appoint a petition review board (PRB) chairperson.  
Approved: July 1, 1999 (Revised: October 25'2000) in
(e)* Designate a petition manager for each petition.  
 
(f)Approved:
U. S. Nuclear Regulatory Commission Volume: 8 Licensee Oversight Programs NRR Review Process for 10 CFR 2.206 Petitions Directive 8.11 Policy (8.11-01)
July 1, 19992 (Revised:
It is the policy of the U.S. Nuclear Regulatory Commission to provide members of the public with the means to request that the Commission take enforcement-related action (i.e., to modify, suspend, or revoke a license, or for other appropriate enforcement-related action, as distinguished from actions such as licensing or rulemaking). This policy is codified at Section 2.206 of Title 10 of the Code ofFederalRegulations (10 CFR 2.206). The Commission may grant a request for action, in whole or in part, take other action that satisfies the concerns raised by the requester, or deny the request. Requests that raise health and safety and other concerns without requesting enforcement-related action will be reviewed by means other than the 10 CFR 2.206 process.
October 25, 2000)
Objectives (8.11-02)
Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Directive 8.11Office Directors (033) (continued)
* To ensure the public health and safety, through the prompt and thorough evaluation of any potential problem addressed by a petition filed under 10 CFR 2.206. (021)
* Promptly notify (1) the Office of Investigations of any allegation ofwrongdoing by a licensee or certificate holder, applicant for alicense or certificate, their contractors, or their vendors or (2) theOffice of the Inspector General of any allegation of wrongdoing byan NRC staff person or NRC contractor, that is contained in apetition they may receive.  
* To provide for appropriate participation by a petitioner in, and observation by the public of, NRC's decisionmaking activities related to a 10 CFR 2.206 petition. (022)
(g)* Provide a draft of each director's decisions to the Office ofEnforcement for review. (h)
* To ensure effective communication with the petitioner and other stakeholders on the' status of the petition, including providing relevant documents and notification of interactions between the NRC staff and a licensee or certificate holder relevant to the petition. (023)
* Designate an office coordinator for 2.206 petitions, if applicable.
Approved: July 1, 1999 1
(i)Regional Administrators (034)* As needed, provide support and information for the preparation ofan acknowledgment letter and/or a director's decision on a 2.206petition.
(Revised: October 25, 2000)
(a)* Make the petition manager aware of information that is received orthat is the subject of any correspondence relating to a pendingpetition.
 
(b)* Participate, as necessary, in meetings with the petitioner and public,in technical review of petitions and in deliberations of the PRB. (c)2.206 PRB Chairperson (035)Each office that is assigned a petition will appoint a PRB chairperson, generally a Senior Executive Service manager, who will-* Convene PRB meetings.
I Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Directive 8.11 Organizational Responsibilities and Delegations of Authority (8.11-03)
(a)* Ensure appropriate review of all new petitions in a timelymanner. (b)* Ensure appropriate documentation of PRB meetings.
Executive Director for Operations (EDO)
(c)* Convene periodic PRB meetings with the petition managers todiscuss the status of open petitions and to provide guidance fortimely resolution.
(031)
(d)Approved:
Receives and assigns action for all petitions filed under 10 CFR 2.206.
July 1, 1999(Revised:
General Counsel (GC)
October 25, 2000) 3 A1I-Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Directive 8.11Associate Directors Office of Nuclear Reactor Regulation (NRR)(036)Concur in each extension request from petition managers in theirorganization and forward the extension request to the Office of theEDO for approval.
(032)
Division Directors (037)Concur in each extension request from petition managers in theirorganization and forward the extension request to the Office of theEDO (Associate Director for NRR) for approval.
* Conducts legal reviews and provides advice on 10 CFR 2.206 petitions and, upon specific request from the staff in special cases or where the petition raises legal issues, reviews drafts of director's decisions. (a)
: Director, Division of Licensing Project Management (DLPM),Office of Nuclear Reactor Regulation (NRR)(038)Appoints the Agency 2.206 Petition Coordinator, normally a DLPMstaff person.Applicability (8.11-04)
* Provides legal advice to the Commission, EDO, office directors, and staff on other matters related to the 10 CFR 2.206 process. (b)
The policy and guidance in this directive and handbook apply to allNRC employees.
K>
Handbook(8.11-05)
Office Directors (033)
Handbook 8.11 details the procedures for staff review and disposition of petitions submitted under Section 2.206.Definitions' (8.11-06)
* Have overall responsibility for assigned petitions. Because 10 CFR 2.206 petitions request enforcement-related action, petitions are assigned to the Office of Nuclear Reactor Regulation, the Office of Nuclear Material Safety and Safeguards, the Office of Enforcement, or the Office of the General Counsel. Therefore, most of the actions described in this directive and the associated handbook apply only to those. offices. (a)
A 10 CFR 2.206 Petition.
* Approve or deny a petitioner's request for immediate action. (b)
A written request filed by any person that theCommission modify, suspend, or revoke a license, or take any otherenforcement-related action that may be proper. The request must meetthe criteria for review under 10 CFR 2.206 (see Part III ofHandbook 8.11).Licensee.
* Sign acknowledgment letters, FederalRegister notices and director's decisions. (c)
Throughout the handbook, any references to a licensee shallbe interpreted to include certificate
* Provide up-to-date information for the monthly status report on all assigned petitions. (d)
: holders, applicants for licenses orcertificates, or other affected parties.Approved:
* Appoint a petition review board (PRB) chairperson. (e)
July 1, 19994 (Revised:
* Designate a petition manager for each petition. (f)
October25,2000)
Approved: July 1, 1999 2
Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Directive 8.11References (8.11-07)
(Revised: October 25, 2000)
 
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Directive 8.11 Office Directors (033) (continued)
* Promptly notify (1) the Office of Investigations of any allegation of wrongdoing by a licensee or certificate holder, applicant for a license or certificate, their contractors, or their vendors or (2) the Office of the Inspector General of any allegation of wrongdoing by an NRC staff person or NRC contractor, that is contained in a petition they may receive. (g)
* Provide a draft of each director's decisions to the Office of Enforcement for review. (h)
* Designate an office coordinator for 2.206 petitions, if applicable. (i)
Regional Administrators (034)
* As needed, provide support and information for the preparation of an acknowledgment letter and/or a director's decision on a 2.206 petition. (a)
* Make the petition manager aware of information that is received or that is the subject of any correspondence relating to a pending petition. (b)
* Participate, as necessary, in meetings with the petitioner and public, in technical review of petitions and in deliberations of the PRB. (c) 2.206 PRB Chairperson (035)
Each office that is assigned a petition will appoint a PRB chairperson, generally a Senior Executive Service manager, who will-
* Convene PRB meetings. (a)
* Ensure appropriate review of all new petitions in a timely manner. (b)
* Ensure appropriate documentation of PRB meetings. (c)
* Convene periodic PRB meetings with the petition managers to discuss the status of open petitions and to provide guidance for timely resolution. (d)
Approved: July 1, 1999 (Revised: October 25, 2000) 3
 
A1I-Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Directive 8.11 Associate Directors Office of Nuclear Reactor Regulation (NRR)
(036)
Concur in each extension request from petition managers in their organization and forward the extension request to the Office of the EDO for approval.
Division Directors (037)
Concur in each extension request from petition managers in their organization and forward the extension request to the Office of the EDO (Associate Director for NRR) for approval.
Director, Division of Licensing Project Management (DLPM),
Office of Nuclear Reactor Regulation (NRR)
(038)
Appoints the Agency 2.206 Petition Coordinator, normally a DLPM staff person.
Applicability (8.11-04)
The policy and guidance in this directive and handbook apply to all NRC employees.
Handbook (8.11-05)
Handbook 8.11 details the procedures for staff review and disposition of petitions submitted under Section 2.206.
Definitions' (8.11-06)
A 10 CFR 2.206 Petition. A written request filed by any person that the Commission modify, suspend, or revoke a license, or take any other enforcement-related action that may be proper. The request must meet the criteria for review under 10 CFR 2.206 (see Part III of Handbook 8.11).
Licensee. Throughout the handbook, any references to a licensee shall be interpreted to include certificate holders, applicants for licenses or certificates, or other affected parties.
Approved: July 1, 1999 4
(Revised: October25,2000)
 
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Directive 8.11 References (8.11-07)
Code of Federal Regulations-10 CFR 2.206, "Requests for Action Under This Subpart."
Code of Federal Regulations-10 CFR 2.206, "Requests for Action Under This Subpart."
10 CFR 2.790, "Public Inspections, Exemptions, Requests for Withholding."
10 CFR 2.790, "Public Inspections, Exemptions, Requests for Withholding."
10 CFR 2.1205, "Request for a hearing; petition for leave tointervene."
10 CFR 2.1205, "Request for a hearing; petition for leave to intervene."
Management Directives-
Management Directives-
-3.5, "Public Attendance at Certain Meetings Involving the NRCStaff."-8.8, "Management of Allegations."
-3.5, "Public Attendance at Certain Meetings Involving the NRC Staff."
-12.6, "NRC Sensitive Unclassified Information SecurityProgram."
8.8, "Management of Allegations."
Memorandum of Understanding Between the NRC and theDepartment of Justice, December 12, 1988."Nuclear Regulatory Commission Issuances,".published quarterly asNUREG-0750.
12.6, "NRC Sensitive Unclassified Information Security Program."
Approved:
Memorandum of Understanding Between the NRC and the Department of Justice, December 12, 1988.
July 1, 1999(Revised:
"Nuclear Regulatory Commission Issuances,".published quarterly as NUREG-0750.
October 25,2000)5 Review Process for10 CFR 2.206 Petitions Handbook8.11 Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Parts I -IVContentsPart IIntroduction
Approved: July 1, 1999 (Revised: October 25,2000) 5
...........................................................
 
1Title 10 of the Code of Federal Regulations, Section 2.206(10 CFR 2.206) (A) .................  
Review Process for 10 CFR 2.206 Petitions Handbook 8.11
...............................
 
1General Cautions (B) ....................  
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Parts I -IV Contents Part I Introduction...........................................................
..............................
1 Title 10 of the Code of Federal Regulations, Section 2.206 (10 CFR 2.206) (A).................
1Part IIInitial Staff Actions ......................................................
1 General Cautions (B)....................
3NRC's Receipt of a Petition (A) ......................................
1 Part II Initial Staff Actions......................................................
3Process Summary (1) ...............
3 NRC's Receipt of a Petition (A)......................................
3.............................
3 Process Summary (1)...............
3Assignment of Staff Action (2) .......................................
3........
3Office Action (B) ......................................................
3 Assignment of Staff Action (2).......................................
4Petition Manager Action (C) .............  
3 Office Action (B).
...............................
4 Petition Manager Action (C).............
4K Part IIIPetition Review Board (PRB) ..........................
4 K
.7General (A) ..........................................................
Part III Petition Review Board (PRB) 7 General (A).
7Schedule (1) ..............................
7 Schedule (1)..............................
7Board Composition (2) .............................
7 Board Composition (2) 7 Preparation for the PRB Meeting (B) 8 Criteria for Petition Evaluation (C) 11 Criteria for Reviewing Petitions Under 10 CFR 2.206 (1).................  
.7Preparation for the PRB Meeting (B) ... 8Criteria for Petition Evaluation (C) ..11Criteria for Reviewing Petitions Under 10 CFR 2.206 (1) ................. .11Criteria for Rejecting Petitions Under 10 CFR 2.206 (2) .11Criteria for Consolidating Petitions (3) ..12PRB Meeting (D) .. .....................
. 11 Criteria for Rejecting Petitions Under 10 CFR 2.206 (2).11 Criteria for Consolidating Petitions (3) 12 PRB Meeting (D) 13 Informing the Petitioner of the Results (E) 14 Meeting With the Petitioner (F) 14 Response to the Petitioner (G).........
13Informing the Petitioner of the Results (E) ..14Meeting With the Petitioner (F) ...................
15 Requests That Do Not Meet the Criteria (1).
14Response to the Petitioner (G) .........  
15 Requests That Meet the Criteria (2)..................................
.......................
16 Sending Documents to the Petitioner (H) 16 Supplements to the Petition (I) 17 Approved: July 1, 1999 (Revised: October 25, 2000)
15Requests That Do Not Meet the Criteria (1) ..15Requests That Meet the Criteria (2) ..................................
 
16Sending Documents to the Petitioner (H) .. 16Supplements to the Petition (I) ...........................
I X
17Approved:
t a Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Parts I -IV Contents (continued)
July 1, 1999(Revised:
Part IV Petition Review Activities.
October 25, 2000)
19 Reviewing the Petition (A).............................................
I X t aVolume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Parts I -IVContents (continued)
19 Interoffice Coordination (1).........................................
Part IVPetition Review Activities
19 Request for Licensee Input (2)........................
..........................................
20 Technical Review Meeting With the Petitioner (3).......
19Reviewing the Petition (A) .............................................
20 Additional Petition Review Board (PRB) Meetings (4) 20 Schedule (B)............
19Interoffice Coordination (1) .........................................
20 Schedle (B 2
19Request for Licensee Input (2) ........................
Keeping the Petitioner Informed (C).
........
22 Updates to Management and the Public (D)............
20Technical Review Meeting With the Petitioner (3) ....... ...............
22 Part V The Director's Decision.
20Additional Petition Review Board (PRB) Meetings (4) ...... ............
24 Content and Format (A).............................................
20Schedule (B) ............
24 V
20Schedle (B ........
Final Versus Partial Director's Decisions (B)...........
...................................
25 Granting the Petition (C).............................................
2Keeping the Petitioner Informed (C) .22Updates to Management and the Public (D) ............
25 Denying the Petition (D).............................................
...................
26 Issuing the Proposed Director's Decision for Comment (E)......
22Part VThe Director's Decision
26 Comment Disposition (F)........................
..........................................
27 Issuing the Director's Decision (G)...........
24Content and Format (A) .............................................
27 Administrative Issues (H)........................
24 VFinal Versus Partial Director's Decisions (B) ...........
28 Commission Actions (I)........................
...................
30 Exhibits 1
25Granting the Petition (C) .............................................
Simplified 2.206 Process Flow Chart.31 2
25Denying the Petition (D) .............................................
Petition Manager Checklist.33 3
26Issuing the Proposed Director's Decision for Comment (E) ...... ............
Sample Closure Letter for Requests That Are Not 2.206 Petitions.36 4
26Comment Disposition (F) ........................
Sample Acknowledgment Letter.37 5
27Issuing the Director's Decision (G) ...........
Sample Federal Register Notice.38
...........................
.6 Sample Director's Decision and Cover Letter.39 7
27Administrative Issues (H) ........................
Sample Federal Register Notice for Director's Decision.43 8
28Commission Actions (I) ........................
Sample Letters Requesting Comments on the Proposed Director's Decision.45 Approved: July 1, 1999 iv (Revised: October 25, 2000)
30Exhibits1 Simplified 2.206 Process Flow Chart .312 Petition Manager Checklist
 
.333 Sample Closure Letter for Requests That Are Not 2.206 Petitions
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook' 8.11' Part I Part I Introduction Title 10 of the Code of Federal Regulations, Section 2.206 (10 CFR 2.206) (A)
.364 Sample Acknowledgment Letter .375 Sample Federal Register Notice .38.6 Sample Director's Decision and Cover Letter .397 Sample Federal Register Notice for Director's Decision
This section of the regulations has been a part of the Commission's regulatory framework since the Commission was established in 1975.
.438 Sample Letters Requesting Comments on the ProposedDirector's Decision
Section 2.206 permits any person to file a petition to request that the Commission take enforcement-related action., i.e., to modify, suspend, or revoke a license or to take other appropriate action. (1)
.45Approved:
Section 2.206 requires that the petition be submitted in writing and provide the grounds for taking the proposed action. The NRC staff will not treat general opposition to nuclear power or a general assertion of a safety problem, without supporting facts, as a formal petition under 10 CFR 2.206. The staff will treat general requests as allegations or routine correspondence. Petitioners are encouraged to provide a telephone number or e-mail address through which the staff may make contact. (2)
July 1, 1999iv (Revised:
General Cautions (B)
October 25, 2000)
Management Directive (MD) 8.8, "Management of Allegations,"
Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook' 8.11' Part IPart IIntroduction Title 10 of the Code of Federal Regulations, Section 2.206 (10 CFR 2.206) (A)This section of the regulations has been a part of the Commission's regulatory framework since the Commission was established in 1975.Section 2.206 permits any person to file a petition to request that theCommission take enforcement-related action.,
provides NRC policy with regard to notifying the Office of Investigations (01) and the Office of the Inspector General (OIG) of wrongdoing matters, as well as initiating, prioritizing, and terminating investigations. Each petition manager should become familiar with the current version of MD 8.11 and this handbook and follow the policy and procedures included in them when dealing with issues requiring OI or OIG investigations. (1)
i.e., to modify, suspend,or revoke a license or to take other appropriate action. (1)Section 2.206 requires that the petition be submitted in writing andprovide the grounds for taking the proposed action. The NRC staff willnot treat general opposition to nuclear power or a general assertion of asafety problem, without supporting facts, as a formal petition under10 CFR 2.206. The staff will treat general requests as allegations orroutine correspondence.
Any mention outside NRC of an ongoing OI or OIG investigation, for example, as an explanation for schedule changes, requires the approval of the Director, OI, or the IG, respectively. (2)
Petitioners are encouraged to provide atelephone number or e-mail address through which the staff may makecontact.
Approved: July 1, 1999 (Revised: October 25, 2000) 1
(2)General Cautions (B)Management Directive (MD) 8.8, "Management of Allegations,"
 
provides NRC policy with regard to notifying the Office ofInvestigations (01) and the Office of the Inspector General (OIG) ofwrongdoing matters, as well as initiating, prioritizing, and terminating investigations.
lL Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part I I
Each petition manager should become familiar with thecurrent version of MD 8.11 and this handbook and follow the policy andprocedures included in them when dealing with issues requiring OI orOIG investigations.
I General Cautions (B) (continued)
(1)Any mention outside NRC of an ongoing OI or OIG investigation, forexample, as an explanation for schedule
If the petition contains information on alleged wrongdoing on the part of a licensee or certificate holder, an applicant for a license or certificate, their contractors, or their vendors, treat the petition, or the relevant part of the petition, as an allegation and promptly notify OI. If the petition contains information on alleged wrongdoing involving an NRC employee, NRC contractors, or NRC vendors, promptly notify OIG. (3) 2 Approved: July 1, 1999 (Revised: October25,2000)
: changes, requires the approvalof the Director, OI, or the IG, respectively.
 
(2)Approved: July 1, 1999(Revised:
Volume 8,, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part II Part II Initial Staff Actions NRC's Receipt of a Petition (A)
October 25, 2000) 1
Process Summary (1)
-lLVolume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Part II IGeneral Cautions (B) (continued)
After NRC receives a petition, the Executive Director for Operations (EDO) assigns it to the director of the appropriate office for evaluation and response. The original incoming petition is sent to the office and a copy of the petition is sent to the Office of the General Counsel (OGC).
If the petition contains information on alleged wrongdoing on the partof a licensee or certificate holder, an applicant for a license orcertificate, their contractors, or their vendors, treat the petition, or therelevant part of the petition, as an allegation and promptly notify OI. Ifthe petition contains information on alleged wrongdoing involving anNRC employee, NRC contractors, or NRC vendors, promptly notifyOIG. (3)2Approved:
The official response is the office director's written decision addressing the issues raised in the petition. The office director can grant, partially grant, or deny the petition. The Commission may, on its own initiative, review the director's decision within 25 days of the date of the decision, although it will not entertain a request for review of the director's decision.
July 1, 1999(Revised:
Assignment of Staff Action (2)
October25,2000)
Petitions maybe in the form of requests for NRC action that may or may not cite 10 CFR 2.206 and may initially be directed to staff other than the EDO. In any of these cases, the staff person who receives the document should make an initial evaluation as to whether the document meets the criteria for review under 10 CFR 2.206 provided in Part III of this handbook. Staff persons who are uncertain whether or not the document meets the criteria should consult their management or office coordinators for further guidance. If a petition meets the criteria but does not specifically cite 10 CFR 2.206, the staff will attempt to contact the petitioner by telephone to determine if he or she wants the request processed pursuant to 10 CFR 2.206. The staff may determine that a request forwarded for staff action is not a petition for enforcement-related action but, rather, a petition for rulemaking, for example. If there is any uncertainty about whether or not a request is a peiition under 10 CFR 2.206, it should be treated as one so that a petition review -board (PRB) can make its recommendations, as described in Part III of this handbook. (a)
Volume 8,, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IIPart IIInitial Staff ActionsNRC's Receipt of a Petition (A)Process Summary (1)After NRC receives a petition, the Executive Director for Operations (EDO) assigns it to the director of the appropriate office for evaluation and response.
Approved: July 1, 1999 (Revised: October25,2000)-
The original incoming petition is sent to the office and acopy of the petition is sent to the Office of the General Counsel (OGC).The official response is the office director's written decision addressing the issues raised in the petition.
3
The office director can grant, partially grant, or deny the petition.
 
The Commission may, on its own initiative, review the director's decision within 25 days of the date of the decision, although it will not entertain a request for review of the director's decision.
ALL.-
Assignment of Staff Action (2)Petitions maybe in the form of requests for NRC action that may or maynot cite 10 CFR 2.206 and may initially be directed to staff other thanthe EDO. In any of these cases, the staff person who receives thedocument should make an initial evaluation as to whether thedocument meets the criteria for review under 10 CFR 2.206 provided inPart III of this handbook. Staff persons who are uncertain whether ornot the document meets the criteria should consult their management or office coordinators for further guidance.
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part II NRC's Receipt of a Petition (A) (continued)
If a petition meets thecriteria but does not specifically cite 10 CFR 2.206, the staff willattempt to contact the petitioner by telephone to determine if he or shewants the request processed pursuant to 10 CFR 2.206. The staff maydetermine that a request forwarded for staff action is not a petition forenforcement-related action but, rather, a petition for rulemaking, forexample.
If there is any uncertainty about whether or not a request is apeiition under 10 CFR 2.206, it should be treated as one so that apetition review -board (PRB) can make its recommendations, asdescribed in Part III of this handbook.
(a)Approved:
July 1, 1999(Revised:
October25,2000)-
3 ALL.-Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IINRC's Receipt of a Petition (A) (continued)
Assignment of Staff Action (2) (continued)
Assignment of Staff Action (2) (continued)
If the staff receives a request that it believes is a 10 CFR 2.206 petition, it will forward the request to the Office of the EDO (OEDO) forassignment of action. Petitions also may be forwarded to the OEDOfrom the Atomic Safety and Licensing Board Panel or from a Presiding Officer in accordance with 10 CFR 2.1205(l)(2).
If the staff receives a request that it believes is a 10 CFR 2.206 petition, it will forward the request to the Office of the EDO (OEDO) for assignment of action. Petitions also may be forwarded to the OEDO from the Atomic Safety and Licensing Board Panel or from a Presiding Officer in accordance with 10 CFR 2.1205(l)(2). The EDO will assign each petition to the appropriate office for action. If the document does not cite 10 CFR 2.206 and does not meet the criteria for review under that section, the staff will respond to it under some other process (e.g.,
The EDO will assigneach petition to the appropriate office for action. If the document doesnot cite 10 CFR 2.206 and does not meet the criteria for review underthat section, the staff will respond to it under some other process (e.g.,routine correspondence, allegations).  
routine correspondence, allegations). (b)
(b)Petitions that cite 10 CFR 2.206 and are addressed to the EDO will beadded to the Agencywide Documents Access and Management System(ADAMS) by OEDO. OEDO will not declare these petitions officialagency records nor will it make them publicly available.
Petitions that cite 10 CFR 2.206 and are addressed to the EDO will be added to the Agencywide Documents Access and Management System (ADAMS) by OEDO. OEDO will not declare these petitions official agency records nor will it make them publicly available. Those steps will be carried out by the assigned office as described below. (c)
Those stepswill be carried out by the assigned office as described below. (c)Office Action (B)Upon receipt, office management will assign the petition to a petitionmanager.  
Office Action (B)
(1)The Agency 2.206 Petition Coordinator (appointed by the Director, Division of Licensing Project Management, Office of Nuclear ReactorRegulation (NRR)), receives copies of all 2.206 petitions from OEDOand will add them to the 2.206 database.  
Upon receipt, office management will assign the petition to a petition manager. (1)
(2)Petition Manager Action (c)The petition manager will promptly review the petition and determine whether or not it contains allegations or sensitive information.
The Agency 2.206 Petition Coordinator (appointed by the Director, Division of Licensing Project Management, Office of Nuclear Reactor Regulation (NRR)), receives copies of all 2.206 petitions from OEDO and will add them to the 2.206 database. (2)
The timingof this step is particularly important for petitions that are not addressed tothe EDO. Normally, these documents have been entered into ADAMSthrough the Document Control Desk (DCD) and are released to thepublic after a specified period of time. The delay allows the staff time toreview the petition for allegations or other sensitive information.
Petition Manager Action (c)
If thepetition manager determines that a document contains allegations orother sensitive information-,
The petition manager will promptly review the petition and determine whether or not it contains allegations or sensitive information. The timing of this step is particularly important for petitions that are not addressed to the EDO. Normally, these documents have been entered into ADAMS through the Document Control Desk (DCD) and are released to the public after a specified period of time. The delay allows the staff time to review the petition for allegations or other sensitive information. If the petition manager determines that a document contains allegations or other sensitive information-, he or she should immediately contact the ADAMS Help Desk (301415-1234) to prevent releasing the document to the public. (1)
he or she should immediately contact theADAMS Help Desk (301415-1234) to prevent releasing the documentto the public. (1)Approved:
Approved: July 1, 1999 4
July 1, 19994 (Revised:
(Revised: October 25, 2000)
October 25, 2000)
 
Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IIPetition Manager Action (c) (continued)
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part II Petition Manager Action (c) (continued)
Before the petition is released to the public, before the PRB meeting,and in any event within 1 week of receipt of the petition by the assignedoffice, the petition manager will inform the petitioner by telephone that the 2.206 petition process is a public process in which the petitionand all the information in it will be made public. If the petitioner requests anonymity and that the petition not be made public, thepetition manager will advise the petitioner that, because of its publicnature, the 2.206 process cannot provide protection of the petitioner's identity.
Before the petition is released to the public, before the PRB meeting, and in any event within 1 week of receipt of the petition by the assigned office, the petition manager will inform the petitioner by telephone that the 2.206 petition process is a public process in which the petition and all the information in it will be made public. If the petitioner requests anonymity and that the petition not be made public, the petition manager will advise the petitioner that, because of its public nature, the 2.206 process cannot provide protection of the petitioner's identity. In these cases, the petition manager must obtain the agreement of the petitioner as to how the matterwill be handled (i.e., as an allegation or not) and document the petitioner's agreement in writing, usually in the form of a memorandum to file. In cases where the staff identifies certain issues in a petition that it believes are more appropriately addressed using the allegation process, the petition manager will obtain the agreement of the petitioner as to how these issues will be handled (i.e., as an allegation or not) and document the petitioner's agreement in writing. If all or part of the petition is treated as an allegation, this fact will be documented in the allegation acknowledgment letter (see Management Directive (MD) 8.8, "Management of Allegations"). (2)
In these cases, the petition manager must obtain theagreement of the petitioner as to how the matterwill be handled (i.e., asan allegation or not) and document the petitioner's agreement inwriting, usually in the form of a memorandum to file. In cases where thestaff identifies certain issues in a petition that it believes are moreappropriately addressed using the allegation  
If the request clearly does not meet the criteria for review as a 10 CFR 2.206 petition, the petition manager will also discuss this issue with the petitioner. The petitioner may be able to help the petition manager better understand the basis for the petition or the petitioner may realize that a 10 CFR 2.206 petition is not the correct forum for the issues raised in the request. Finally, the petition manager will offer the petitioner an opportunity to have one or more representatives give a presentation to the PRB and cognizant supporting staff either by telephone (or videoconference, if available) or in person. This is an opportunity for the petitioner to provide any relevant additional explanation and support for the request. This type of meeting is described in more detail in Part III of this handbook. (3)
: process, the petitionmanager will obtain the agreement of the petitioner as to how theseissues will be handled (i.e., as an allegation or not) and document thepetitioner's agreement in writing.
After the initial contact with the petitioner, the petition manager will promptly advise the licensee(s) of the petition, send the appropriate licensee(s) a copy of the petition for information, and ensure that the petition and all subsequent related correspondence are made available to the public. (Note that if the petitioner wishes to have the request handled as an allegation, the request is no longer a 2.206 petition.) Any information related to allegations or other sensitive information that Approved: July 1, 1999 (Revised: October 25,2000) 5
If all or part of the petition is treatedas an allegation, this fact will be documented in the allegation acknowledgment letter (see Management Directive (MD) 8.8,"Management of Allegations").  
 
(2)If the request clearly does not meet the criteria for review as a 10 CFR2.206 petition, the petition manager will also discuss this issue with thepetitioner.
I A-L Volume 8, Licensee Oversight Programs
The petitioner may be able to help the petition managerbetter understand the basis for the petition or the petitioner mayrealize that a 10 CFR 2.206 petition is not the correct forum for theissues raised in the request.  
, Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part II Petition Manager Action (C) (continued) make up a part of the petition will be redacted from copies sent to the licensee or made available to the public. For allegations, the petition manager should refer to MD 8.8. As discussed in MD 8.8, allegations must be forwarded to the associated Office Allegations Coordinator expeditiously. MD 8.8 also addresses the referral of wrongdoing issues to the Office of Investigations and the Office of the Inspector General. (4)
: Finally, the petition manager will offer thepetitioner an opportunity to have one or more representatives give apresentation to the PRB and cognizant supporting staff either bytelephone (or videoconference, if available) or in person. This is anopportunity for the petitioner to provide any relevant additional explanation and support for the request.
See Exhibit 1, Simplified 2.206 Process Flow Chart, and Exhibit 2, Petition Manager Checklist, for further information on petition manager actions. (5)
This type of meeting isdescribed in more detail in Part III of this handbook.  
K-6 Approved: July 1, 1999 (Revised: October 25, 2000)
(3)After the initial contact with the petitioner, the petition manager willpromptly advise the licensee(s) of the petition, send the appropriate licensee(s) a copy of the petition for information, and ensure that thepetition and all subsequent related correspondence are made available to the public. (Note that if the petitioner wishes to have the requesthandled as an allegation, the request is no longer a 2.206 petition.)
 
Anyinformation related to allegations or other sensitive information thatApproved:
-Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Part III Petition Review Board (PRB)
July 1, 1999(Revised:
General (A)
October 25,2000) 5 I A-LVolume 8, Licensee Oversight Programs, Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IIPetition Manager Action (C) (continued) make up a part of the petition will be redacted from copies sent to thelicensee or made available to the public. For allegations, the petitionmanager should refer to MD 8.8. As discussed in MD 8.8, allegations must be forwarded to the associated Office Allegations Coordinator expeditiously.
Schedule (1)
MD 8.8 also addresses the referral of wrongdoing issuesto the Office of Investigations and the Office of the Inspector General.  
The assigned office holds a PRB meeting to review the 2.206 petition.
(4)See Exhibit 1, Simplified 2.206 Process Flow Chart, and Exhibit 2,Petition Manager Checklist, for further information on petitionmanager actions.  
The PRB meeting is normally held within 2 weeks of receipt of the petition. The PRB meeting may be held much sooner if staff decisions are required on short-term, immediate actions (e.g., a request to shut down an operating facility or prevent restart of a facility that is ready to restart). In unusual situations, it may not be possible to hold the meeting in time to address any immediate action requests. In these cases, the staff will decide how any immediate actions requested will be addressed and obtain appropriate management concurrence as soon as possible. If the staff plans to take an action that is contrary to an immediate action requested in the petition before issuing the acknowledgment letter (such as permitting restart of a facility when the petitioner has requested that restart not be permitted), the petition manager must promptly notify the petitioner by telephone of the pending staff action.,
(5)K-6Approved:
Board Composition (2)
July 1, 1999(Revised:
The PRB consists of(a)
October 25, 2000)  
* A PRB chairperson (generally a Senior Executive Service manager) (i)
-Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IIIPart IIIPetition Review Board (PRB)General (A)Schedule (1)The assigned office holds a PRB meeting to review the 2.206 petition.
* A petition manager (ii)
The PRB meeting is normally held within 2 weeks of receipt of thepetition.
! Cognnt management and staf, as necessary (iii)
The PRB meeting may be held much sooner if staff decisions are required on short-term, immediate actions (e.g., a request to shutdown an operating facility or prevent restart of a facility that is ready torestart).
* A representative from the Office of Investigations (OI), as needed (iv)
In unusual situations, it may not be possible to hold themeeting in time to address any immediate action requests.
* A representative from the Office of Enforcement (OE) and, for petitions assigned to the Office of Nuclear Reactor Regulation (NRR), the NRR Senior Enforcement Coordinator, as needed (v)
In thesecases, the staff will decide how any immediate actions requested will beaddressed and obtain appropriate management concurrence as soon aspossible.
Approved: July 1, 1999 (Revised: October 25,2000) 7
If the staff plans to take an action that is contrary to animmediate action requested in the petition before issuing theacknowledgment letter (such as permitting restart of a facility when thepetitioner has requested that restart not be permitted),
 
the petitionmanager must promptly notify the petitioner by telephone of thepending staff action.,Board Composition (2)The PRB consists of(a)* A PRB chairperson (generally a Senior Executive Service manager)  
I
(i)* A petition manager (ii)! Cognnt management and staf, as necessary (iii)* A representative from the Office of Investigations (OI), as needed (iv)* A representative from the Office of Enforcement (OE) and, forpetitions assigned to the Office of Nuclear Reactor Regulation (NRR), the NRR Senior Enforcement Coordinator, as needed (v)Approved: July 1, 1999(Revised:
:EU Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III General (A) (continued)
October 25,2000) 7 I :EUVolume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IIIGeneral (A) (continued)
Board Composition (2) (continued)
Board Composition (2) (continued)
In addition, a representative from the Office of the General Counsel(OGC) will normally participate.  
In addition, a representative from the Office of the General Counsel (OGC) will normally participate. (b)
(b)Preparation for the PRB Meeting (B)The petition manager will provide copies of the petition to PRB andassist in scheduling the review board meeting.
Preparation for the PRB Meeting (B)
The petition manageralso will arrange for cognizant technical staff members to attend themeeting, as necessary, and prepare a presentation for the review board.In assigning technical staff members to the petition, management willconsider any potential conflict from assigning any staff person who waspreviously involved with the issue that gave rise to the petition.  
The petition manager will provide copies of the petition to PRB and assist in scheduling the review board meeting. The petition manager also will arrange for cognizant technical staff members to attend the meeting, as necessary, and prepare a presentation for the review board.
(1)The petition manager's presentation to PRB should include-(2)
In assigning technical staff members to the petition, management will consider any potential conflict from assigning any staff person who was previously involved with the issue that gave rise to the petition. (1)
* A recommendation as to whether or not the petition meets thecriteria for review under 10 CFR 2.206 (a)* A discussion of the safety significance of the issues raised (b)* Recommendations for any immediate action (whether requested ornot) (c)* Recommendations on whether or not assistance from 01, OE, orOGC is necessary (d)* A request for confirmation concerning referral to OI or the Officeof the Inspector General (OIG), as appropriate (e)* The proposed  
The petition manager's presentation to PRB should include-(2)
: schedule, including the review schedule for theaffected technical branches (f)The petition manager also will offer a meeting or teleconference between the petitioner and the PRB before the board reviews thepetition.
* A recommendation as to whether or not the petition meets the criteria for review under 10 CFR 2.206 (a)
This meeting or teleconference, if held, is an opportunity forthe petitioner to provide any relevant additional explanation andsupport for the request in advance of the PRB's evaluation.
* A discussion of the safety significance of the issues raised (b)
The staffwill hold this type of meeting if the petitioner desires it. If a decision.
* Recommendations for any immediate action (whether requested or not) (c)
isrequired on a petitioner's request for immediate action before thepetitioner's presentation can be scheduled, that decision will not bedelayed.  
* Recommendations on whether or not assistance from 01, OE, or OGC is necessary (d)
(3)Approved:
* A request for confirmation concerning referral to OI or the Office of the Inspector General (OIG), as appropriate (e)
July 1, 19998 (Revised:
* The proposed schedule, including the review schedule for the affected technical branches (f)
October 25, 2000)
The petition manager also will offer a meeting or teleconference between the petitioner and the PRB before the board reviews the petition. This meeting or teleconference, if held, is an opportunity for the petitioner to provide any relevant additional explanation and support for the request in advance of the PRB's evaluation. The staff will hold this type of meeting if the petitioner desires it. If a decision. is required on a petitioner's request for immediate action before the petitioner's presentation can be scheduled, that decision will not be delayed. (3)
Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IIIPreparation for the PRB Meeting (B) (continued)
Approved: July 1, 1999 8
The petition manager also will invite the licensee to participate in themeeting or teleconference to' ensure that itunderstands the concernsabout its facilityor activities.
(Revised: October 25, 2000)
The PRB members may ask any questions needed to'clarify the petitioner's request. The licensee may also askquestions to clarify the issues raised by the petitioner.
 
Any member ofthe public may attend (or listen in by telephone for a teleconference) asan observer.
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Preparation for the PRB Meeting (B) (continued)
Meetings between PRB and the petitioner normally willbe held at NRC headquarters in Rockville,  
The petition manager also will invite the licensee to participate in the meeting or teleconference to' ensure that itunderstands the concerns about its facilityor activities. The PRB members may ask any questions needed to'clarify the petitioner's request. The licensee may also ask questions to clarify the issues raised by the petitioner. Any member of the public may attend (or listen in by telephone for a teleconference) as an observer. Meetings between PRB and the petitioner normally will be held at NRC headquarters in Rockville, Maryland, with provisions for participation by telephone or videoconference. This public meeting or teleconference is separate from the (closed) PRB meeting during which the PRB members develop their recommendations with respect to the petition. (4)
: Maryland, with provisions for participation by telephone or videoconference.
The petition manager will ensure that all staff persons at the meeting or teleconference are aware of the need to protect sensitive information from disclosure. Sensitive information includes safeguards or facility security information,. proprietary or confidential commercial information, or information relating to an ongoing investigation of wrongdoing. (5)
This public meetingor teleconference is separate from the (closed)
If 'the petitioner chooses to address PRB by telephone, it is not considered a meeting and no public notice is necessary. The petition manager will establish a mutually agreeable time and date and arrange to conduct the teleconference on a recorded line through the NRC Headquarters Operations Center (301-816-5100). The tape recording from the Operations Center is converted to a printed transcript that is treated as a supplement to the petition and is sent to the petitioner and the same distribution as the original petition. The petition manager will make arrangements for transcription service by submitting an NRC Form 587 to the Atomic Safety and Licensing Board Panel or by sending an e-mail. to "Court Reporter," giving the same information as requested on the Form 587. (6)
PRB meeting duringwhich the PRB members develop their recommendations with respectto the petition.  
If the petitioner chooses to attend in person, the meetingwill take place at NRC headquarters at a'mutually agreeable time. For the meeting, the petition manager will follow the prior public notice period and other provisions: of Management' Directive (MD) 3.5, "Public Attendance at Certain Meetings Involving the NRC Staff." However, time constraints associated with this type of meeting will often dictate that the 10-day public notice period described in MD 3.5 will not be Approved: July 1, 1999 (Reused: October 25,2000) 9
(4)The petition manager will ensure that all staff persons at the meeting orteleconference are aware of the need to protect sensitive information from disclosure.
 
Sensitive information includes safeguards or facilitysecurity information,  
-Si Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Preparation for the PRB Meeting (B) (continued) met. MD 3.5 allows for less than 10 days' public notice, if necessary, with appropriate management concurrence. The meeting should be noticed as a meeting between the NRC staff, the petitioner, and the licensee (unless the licensee chooses not to participate). The licensee is invited to participate, as in the teleconference described above, and members of the public may attend as observers. The meeting is transcribed and the transcript is treated in the same manner as in the case of a telephone briefing. (7)
.proprietary or confidential commercial information, or information relating to an ongoing investigation ofwrongdoing.  
The petitioner may request that a reasonable number of associates be permitted to assist him or her in addressing PRB concerning the petition. The petition manager will (1) discuss this request with the petitioner, (2) determine the number of speakers, and (3) allot a reasonable amount of time for the presentation so that the staff can acquire the information needed for its review in an efficient manner. (8)
(5)If 'the petitioner chooses to address PRB by telephone, it is notconsidered a meeting and no public notice is necessary.
At the meeting or teleconference, the chairperson will provide a brief summary of the 2.206 process, the petition, and the purpose of the discussion that will follow. The NRC staff and the licensee will have an opportunity to ask the petitioner questions for purposes of clarification.
The petitionmanager will establish a mutually agreeable time and date and arrangeto conduct the teleconference on a recorded line through the NRCHeadquarters Operations Center (301-816-5100).
PRB may meet in closed session before and/or after the meeting with the petitioner to conduct its normal business. (9)
The tape recording from the Operations Center is converted to a printed transcript that istreated as a supplement to the petition and is sent to the petitioner andthe same distribution as the original petition.
The requirements for scheduling-and holding the petitioner presentation may impact the established time goals for holding the regular PRB meeting and issuing the acknowledgment letter. Any impacts should be kept to a minimum. (10)
The petition manager willmake arrangements for transcription service by submitting an NRCForm 587 to the Atomic Safety and Licensing Board Panel or by sendingan e-mail. to "Court Reporter,"
The petition manager will review the transcript and, where necessary, edit it to ensure it accurately reflects what was said in the meeting or teleconference. Corrections are only necessary for errors that affect the meaning of the text of the transcript. The petition manager is not expected to correct inconsequential errors. (11)
giving the same information asrequested on the Form 587. (6)If the petitioner chooses to attend in person, the meetingwill take placeat NRC headquarters at a'mutually agreeable time. For the meeting,the petition manager will follow the prior public notice period andother provisions:
After editing, the petition manager will ensure that the transcript gets the same distribution (petitioner, licensee, publicly available, etc.) as the original petition. For meetings, this step should be accomplished by attaching the transcript to a brief meeting summary.
of Management' Directive (MD) 3.5, "PublicAttendance at Certain Meetings Involving the NRC Staff." However,time constraints associated with this type of meeting will often dictatethat the 10-day public notice period described in MD 3.5 will not beApproved:
For
July 1, 1999(Reused: October 25,2000) 9  
- teleconferences, the petition manager may attach the transcript to a memorandum to file. (12)
--SiVolume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IIIPreparation for the PRB Meeting (B) (continued) met. MD 3.5 allows for less than 10 days' public notice, if necessary, with appropriate management concurrence.
Approved: July 1, 1999 10 (Revised: October 25,2000)
The meeting should benoticed as a meeting between the NRC staff, the petitioner, and thelicensee (unless the licensee chooses not to participate).
 
The licensee isinvited to participate, as in the teleconference described above, andmembers of the public may attend as observers.
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Criteria for Petition Evaluation (c)
The meeting istranscribed and the transcript is treated in the same manner as in thecase of a telephone briefing.  
The staff will use the criteria discussed in this section to determine whether or not a petition should be considered under 10 CFR 2.206 and whether or not similar petitions should be consolidated.
(7)The petitioner may request that a reasonable number of associates bepermitted to assist him or her in addressing PRB concerning thepetition.
Criteria for Reviewing Petitions Under 10 CFR 2.206 (1)
The petition manager will (1) discuss this request with thepetitioner, (2) determine the number of speakers, and (3) allot areasonable amount of time for the presentation so that the staff canacquire the information needed for its review in an efficient manner. (8)At the meeting or teleconference, the chairperson will provide a briefsummary of the 2.206 process, the petition, and the purpose of thediscussion that will follow. The NRC staff and the licensee will have anopportunity to ask the petitioner questions for purposes of clarification.
The staff will review a petition under the requirements of 10 CFR 2.206 if the request meets all of the following criteria-(a)
PRB may meet in closed session before and/or after the meeting withthe petitioner to conduct its normal business.  
* The petition contains a request for enforcement-related action such as issuing an order modifying, suspending, or revoking a license, issuing a notice of violation,withorwithout a proposed civil penalty, etc. (i)
(9)The requirements for scheduling-and holding the petitioner presentation may impact the established time goals for holding theregular PRB meeting and issuing the acknowledgment letter. Anyimpacts should be kept to a minimum.  
* The facts that constitute the bases for taking the particular action are specified. The petitioner must provide some element of support beyond the bare assertion. The supporting facts must be credible and sufficient to warrant further inquiry. (ii)
(10)The petition manager will review the transcript and, where necessary, edit it to ensure it accurately reflects what was said in the meeting orteleconference.
* There is no NRC proceeding available in which the petitioner is or could be a party and through which the petitioner's concerns could be addressed. If there is a proceeding available, for example, if a petitioner raises an issue that he or she has raised or could raise in an ongoing licensing proceeding, the staff will inform the petitioner of the ongoing proceeding and will not treat the request under 10 CFR 2.206. (iii)
Corrections are only necessary for errors that affect themeaning of the text of the transcript.
An exception to the first two criteria is any petition to intervene and request for hearing in a licensing proceeding that is referred to the 10 CFR 2.206 process in accordance with 10 CFR 2.1205()(2). These
The petition manager is notexpected to correct inconsequential errors. (11)After editing, the petition manager will ensure that the transcript getsthe same distribution (petitioner,  
- referrals may be made when the petition does not satisfy the legal requirements for a hearing or intervention and the Atomic Safety and LicensingBoardPanel or the Presiding Officerdetermines that referral to the 10 CFR 2.206 process is appropriate. For these referrals, the substantive issues in the request for a hearing or intervention will be read as an implicit request for enforcement-related action, thus satisfying the criteria for treatment under the 10 CFR 2.206 review process. (b)
: licensee, publicly available, etc.) asthe original petition.
Criteria for Rejecting Petitions Under 10 CER 2.206 (2)
For meetings, this step should be accomplished byattaching the transcript to a brief meeting summary.
The staff will not review a petition under 10 CFR 2.206, whether specifically cited or not, under the following circumstances-Approved: July 1, 1999 (Revised: October 25, 2000) 11
For-teleconferences, the petition manager may attach the transcript to amemorandum to file. (12)Approved:
 
July 1, 199910 (Revised:
I AkL_
October 25,2000)
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Criteria for Petition Evaluation (C) (continued)
Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IIICriteria for Petition Evaluation (c)The staff will use the criteria discussed in this section to determine whether or not a petition should be considered under 10 CFR 2.206 andwhether or not similar petitions should be consolidated.
Criteria for Reviewing Petitions Under 10 CFR 2.206 (1)The staff will review a petition under the requirements of 10 CFR 2.206if the request meets all of the following criteria-(a)
* The petition contains a request for enforcement-related actionsuch as issuing an order modifying, suspending, or revoking  
: alicense, issuing a notice of violation,withorwithout a proposed civilpenalty, etc. (i)* The facts that constitute the bases for taking the particular actionare specified.
The petitioner must provide some element of supportbeyond the bare assertion.
The supporting facts must be credibleand sufficient to warrant further inquiry.  
(ii)* There is no NRC proceeding available in which the petitioner is orcould be a party and through which the petitioner's concerns couldbe addressed.
If there is a proceeding available, for example, if apetitioner raises an issue that he or she has raised or could raise inan ongoing licensing proceeding, the staff will inform the petitioner of the ongoing proceeding and will not treat the request under10 CFR 2.206. (iii)An exception to the first two criteria is any petition to intervene andrequest for hearing in a licensing proceeding that is referred to the10 CFR 2.206 process in accordance with 10 CFR 2.1205()(2).
These-referrals may be made when the petition does not satisfy the legalrequirements for a hearing or intervention and the Atomic Safety andLicensingBoardPanel or the Presiding Officerdetermines that referralto the 10 CFR 2.206 process is appropriate.
For these referrals, thesubstantive issues in the request for a hearing or intervention will beread as an implicit request for enforcement-related action, thussatisfying the criteria for treatment under the 10 CFR 2.206 reviewprocess.  
(b)-Criteria for Rejecting Petitions Under 10 CER 2.206 (2)The staff will not review a petition under 10 CFR 2.206, whetherspecifically cited or not, under the following circumstances-Approved:
July 1, 1999(Revised:
October 25, 2000) 11 I AkL_Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IIICriteria for Petition Evaluation (C) (continued)
Criteria for Rejecting Petitions Under 10 CFR 2.206 (2) (continued)
Criteria for Rejecting Petitions Under 10 CFR 2.206 (2) (continued)
The incoming correspondence does not ask for anenforcement-related action or fails to provide sufficient facts tosupport the petition but simply alleges wrongdoing, violations ofNRC regulations, or existence of safety concerns.
The incoming correspondence does not ask for an enforcement-related action or fails to provide sufficient facts to support the petition but simply alleges wrongdoing, violations of NRC regulations, or existence of safety concerns. The request cannot be simply a general statement of opposition to nuclear power or a general assertion without supporting facts (e.g., the quality assurance at the facility is inadequate). These assertions will be treated as routine correspondence or as allegations that will be referred for appropriate action in accordance with MD 8.8, "Management of Allegations." (a)
The requestcannot be simply a general statement of opposition to nuclearpower or a general assertion without supporting facts (e.g., thequality assurance at the facility is inadequate).
* The petitioner raises issues that have already been the subject of NRC staff review and evaluation either on that facility, other similar facilities, or on a generic basis, for which a resolution has been achieved, the issues have been resolved, and the resolution is applicable to the facility in question. This would include requests to reconsider or reopen a previous enforcement action (including a decision not to initiate an enforcement action) or a director's decision. These requests will not be treated as a 2.206 petition unless they present significant new information. (b)
These assertions willbe treated as routine correspondence or as allegations that will bereferred for appropriate action in accordance with MD 8.8,"Management of Allegations."
* The request is to deny a license application or amendment. This type of request should initially be addressed in the context of the
(a)* The petitioner raises issues that have already been the subject ofNRC staff review and evaluation either on that facility, othersimilar facilities, or on a generic basis, for which a resolution hasbeen achieved, the issues have been resolved, and the resolution isapplicable to the facility in question.
This would include requests toreconsider or reopen a previous enforcement action (including adecision not to initiate an enforcement action) or a director's decision.
These requests will not be treated as a 2.206 petitionunless they present significant new information.
(b)* The request is to deny a license application or amendment.
Thistype of request should initially be addressed in the context of therelevant licensing action, not under 10 CFR 2.206. (c)* The
E Ensure assigned office management agrees with the PRB final recommendations.
E Ensure assigned office management agrees with the PRB final recommendations.
E If the assigned office's management agrees with the PRB that the request is not a 2.206 petition, send aletter to the petitioner, treat any open issues under the appropriate process (e.g., rulemaking).
E If the assigned office's management agrees with the PRB that the request is not a 2.206 petition, send a letter to the petitioner, treat any open issues under the appropriate process (e.g., rulemaking). Stop here.
Stophere.o If the assigned office's management agrees with the PRB that the request is a 2.206 petition, continuewith this checklist.
o If the assigned office's management agrees with the PRB that the request is a 2.206 petition, continue with this checklist.
O Add petitioner to appropriate service list(s).O Issue acknowledgment letter and associated Federal Register notice.O If licensee input is needed, send a written request.0 If further petitioner input is needed, arrange for a technical review meeting.l Make periodic status updates to the petitioner.
O Add petitioner to appropriate service list(s).
0 Prepare the director's  
O Issue acknowledgment letter and associated Federal Register notice.
: decision, addressing:
O If licensee input is needed, send a written request.
-Each of the petitioners' issues-The safety significance of each issue-The staff's evaluation of each issue and actions takenEl Ensure all referenced documents are added to ADAMS and made publicly available.
0 If further petitioner input is needed, arrange for a technical review meeting.
El Send the proposed director's decision to the petitioner and licensee for comment.E After the comment period closes, give the schedule for the director's decision to the Agency 2.206Petition Coordinator for inclusion in the next status report.El Include comments received and their resolution in the director's decision.
l Make periodic status updates to the petitioner.
0 Prepare the director's decision, addressing:
Each of the petitioners' issues The safety significance of each issue The staff's evaluation of each issue and actions taken El Ensure all referenced documents are added to ADAMS and made publicly available.
El Send the proposed director's decision to the petitioner and licensee for comment.
E After the comment period closes, give the schedule for the director's decision to the Agency 2.206 Petition Coordinator for inclusion in the next status report.
El Include comments received and their resolution in the director's decision.
El Prepare the Federal Register notice for the director's decision.
El Prepare the Federal Register notice for the director's decision.
E As soon as the director's decision is signed:-Inform the petitioner of the substance of the decision and that issuance is imminent.
E As soon as the director's decision is signed:
-Hand-carry two full copies of the package (including the incoming(s) and distribution and service lists)and five additional copies to the Rulemakings and Adjudication Staff in SECY-Hand-carry the original signed Federal Register notice (ONLY), five copies of the notice, and a diskwiththe notice on it, to the Rules and Directives Branch. Do NOT include the director's decision in thispackage.Approved:
Inform the petitioner of the substance of the decision and that issuance is imminent.
July 1, 199934. (Revised:
Hand-carry two full copies of the package (including the incoming(s) and distribution and service lists) and five additional copies to the Rulemakings and Adjudication Staff in SECY Hand-carry the original signed Federal Register notice (ONLY), five copies of the notice, and a diskwith the notice on it, to the Rules and Directives Branch. Do NOT include the director's decision in this package.
October 25, 2000)
Approved: July 1, 1999
Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 ExhibitsExhibit 2 (continued)
: 34.
-Immediately dispatch the signed original letter and decision and a copy of the Federal Register notice tothe petitioner.
(Revised: October 25, 2000)
 
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 2 (continued)
Immediately dispatch the signed original letter and decision and a copy of the Federal Register notice to the petitioner.
within 2 working days of issuing the Director's decision:
within 2 working days of issuing the Director's decision:
-Provide a copy of the director's decision to the OGC special counsel assigned to 2.206 matters.-E-mail and send two paper copies of the director's decision to the NRC Issuances Project Officer inOCIO.-E-mail a signed, dated, and numbered copy of the director's decision to "NRCWEB."
Provide a copy of the director's decision to the OGC special counsel assigned to 2.206 matters.
-E-mail headnotes on the petition to the NRC Issuances Project Officer in OCIO.Approved:
E-mail and send two paper copies of the director's decision to the NRC Issuances Project Officer in OCIO.
July 1, 1999.(Revised:
E-mail a signed, dated, and numbered copy of the director's decision to "NRCWEB."
October25,2000) 35  
E-mail headnotes on the petition to the NRC Issuances Project Officer in OCIO.
-1 AL-Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 ExhibitsExhibit 3Sample Closure Letter for RequestsThat Are Not 2.206 Petitions
Approved: July 1, 1999.
[Petitioner's Name][Petitioner's Address]
(Revised: October25,2000) 35
 
-1 AL-Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 3 Sample Closure Letter for Requests That Are Not 2.206 Petitions
[Petitioner's Name]
[Petitioner's Address]


==Dear Mr.:==
==Dear Mr.:==
Your petition dated [insert date] and addressed to the [insert addressee]
Your petition dated [insert date] and addressed to the [insert addressee] has been referred to the Office of [insert] pursuant to 10 CFR 2.206 of the Commission's regulations. You request [state petitioner's requests]. As the basis for your request, you state that [insert basis for request].
has been referredto the Office of [insert]
pursuant to 10 CFR 2.206 of the Commission's regulations.
Yourequest [state petitioner's requests].
As the basis for your request, you state that [insertbasis for request].
[You met with our petition review board (PRB) on [insert date] to discuss your petition.
[You met with our petition review board (PRB) on [insert date] to discuss your petition.
The results of that discussion have been considered in the PRB's determination regarding your request for immediate action and whether or not the petition meets the criteria forconsideration under 10 CFR 2.2061. OR [Our petition review board has reviewed yoursubmittal].
The results of that discussion have been considered in the PRB's determination regarding your request for immediate action and whether or not the petition meets the criteria for consideration under 10 CFR 2.2061. OR [Our petition review board has reviewed your submittal]. The staff has concluded that your submittal does not meet the criteria for consideration under 10 CFR 2.206 because [explain our basis, addressing all aspects of the submittal and making reference to the appropriate criteria in this MD].
The staff has concluded that your submittal does not meet the criteria forconsideration under 10 CFR 2.206 because [explain our basis, addressing all aspects of thesubmittal and making reference to the appropriate criteria in this MD].[Provide the staff's response, if available, to the issues raised].
[Provide the staff's response, if available, to the issues raised]. AND/OR [Explain what further actions, if any, the staff intends to take in response to the request (e.g., treat it as an allegation or routine correspondence)].
AND/OR [Explain whatfurther actions, if any, the staff intends to take in response to the request (e.g., treat it asan allegation or routine correspondence)].
Thank you for bringing these issues to the attention of the NRC.
Thank you for bringing these issues to the attention of the NRC.Sincerely,
Sincerely,
[Insert Division Director's Name][Office of [insert Office Name]Docket Nos. [ ]cc: [Licensee (w/copy of incoming 2.206 request)  
[Insert Division Director's Name]
& Service List]Approved:
[Office of [insert Office Name]
July 1, 199936 (Revised:
Docket Nos. [ ]
October 25, 2000)
cc: [Licensee (w/copy of incoming 2.206 request) & Service List]
Volume 8, Licensee Oversight ProgramsRevew Process for 10 CFR 2.206 Petitions Handbook 8.11 ExhibitsExhibit 4Sample Acknowledgment Letter[Petitioner's Name][Petitioner's Address]
Approved: July 1, 1999 36 (Revised: October 25, 2000)
 
Volume 8, Licensee Oversight Programs Revew Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 4 Sample Acknowledgment Letter
[Petitioner's Name]
[Petitioner's Address]


==Dear Mr.:==
==Dear Mr.:==
Your petition dated [insert date] and addressed to the [insert addressee]
Your petition dated [insert date] and addressed to the [insert addressee] has been referred to me pursuant to 10 CFR 2.206 of the Commission's regulations. You request [state petitioner's requests]. As the basis for your request, you state that [insert basis for request]. I would like to express my sincere appreciation for your effort in bringing these matters to the attention of the NRC.
has been referredto me pursuant to 10 CFR 2.206 of the Commission's regulations.
[You met with our Petition Review Board (PRB) on [insert date] to discuss your petition.
You request [statepetitioner's requests].
As the basis for your request, you state that  
[insert basis forrequest].
I would like to express my sincere appreciation for your effort in bringing thesematters to the attention of the NRC.[You met with our Petition Review Board (PRB) on  
[insert date] to discuss your petition.
The results of that discussion have been considered in the PRB's determination regarding
The results of that discussion have been considered in the PRB's determination regarding
[your request for immediate action and in establishing]
[your request for immediate action and in establishing] the schedule for the review of your petition]. Your request to [insert request for immediate action] at [insert facility name] is
the schedule for the review of yourpetition].
\\ _J
Your request to [insert request for immediate action] at [insert facility name] is\ _J [granted or denied] because [staff to provide explanation].
[granted or denied] because [staff to provide explanation].
As provided by Section 2.206, we will take action on your request within a reasonable time.I have assigned  
As provided by Section 2.206, we will take action on your request within a reasonable time.
[First and last name of petition manager]
I have assigned [First and last name of petition manager] to be the petition manager for your petition. Mr. [last name of petition manager] can be reached at [301415-extension of petition manager] Your petition is being reviewed by [organizational units] within the Office of [name of appropriate Office]. [If necessary, add: I have referred to the NRC Office of the Inspector General (OIG) those allegations of NRC wrongdoing contained in' your petition]. I have enclosed for your information a copy of the notice that is being filed with the Office of the Federal Register for publication. I have also enclosed for your information a copy of Management Directive 8.11 "Review Process for 10 CFR 2.206 Petitions," and the associated brochure NUREG/BR-0200, "Public Petition Process,"
to be the petition manager foryour petition.
prepared by the NRC Office of Public Affairs.
Mr. [last name of petition manager]
Sincerely,
can be reached at [301415-extension ofpetition manager]
Your petition is being reviewed by [organizational units] within theOffice of [name of appropriate Office].  
[If necessary, add: I have referred to the NRCOffice of the Inspector General (OIG) those allegations of NRC wrongdoing contained in'your petition].
I have enclosed for your information a copy of the notice that is being filedwith the Office of the Federal Register for publication.
I have also enclosed for yourinformation a copy of Management Directive 8.11 "Review Process for 10 CFR 2.206Petitions,"
and the associated brochure NUREG/BR-0200, "Public Petition Process,"
prepared by the NRC Office of Public Affairs.Sincerely,
[Office Director]
[Office Director]


==Enclosures:==
==Enclosures:==
Federal Register Notice Management Directive 8.11 NUREG/BR-0200 cc: [Licensee (w/copy of incoming 2.206 request) & Service List]
Approved: July 1, 1999 (Revised: October 25, 2000) 37


Federal Register NoticeManagement Directive 8.11NUREG/BR-0200 cc: [Licensee (w/copy of incoming 2.206 request)
kLL Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 :Exhibits Exhibit 5
& Service List]Approved:
[7590-01-P]
July 1, 1999(Revised:
Sample Federal Register Notice U.S. NUCLEAR REGULATORY COMMISSION Docket No(s).
October 25, 2000) 37 kLLVolume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 :Exhibits Exhibit 5[7590-01-P]
License No(s).
Sample Federal Register NoticeU.S. NUCLEAR REGULATORY COMMISSION Docket No(s).License No(s).[Name of Licensee]
[Name of Licensee]
RECEIPT OF REQUEST FOR ACTION UNDER 10 CFR 2.206Notice is hereby given that by petition dated [insert date]; [insert petitioner's name](petitioner) has requested that the NRC take action with regard to [insert facility orlicensee name]. The petitioner requests  
RECEIPT OF REQUEST FOR ACTION UNDER 10 CFR 2.206 Notice is hereby given that by petition dated [insert date]; [insert petitioner's name]
[state petitioner's requests].
(petitioner) has requested that the NRC take action with regard to [insert facility or licensee name]. The petitioner requests [state petitioner's requests].
As the basis for this request, the petitioner states that [state petitioner's basis forrequest].
As the basis for this request, the petitioner states that [state petitioner's basis for request].
The request is being treated pursuant to 10 CFR 2.206 of the Commission's regulations.
The request is being treated pursuant to 10 CFR 2.206 of the Commission's regulations. The request has been referred to the Director of the Office of [insert action office]. As provided by Section 2.206, appropriate action will be taken on this petition within a reasonable time. [The petitioner met with the [insert action office] petition review board on [insert date] to discuss the petition. The results of that discussion were considered in the board's determination regarding [the petitioner's request for immediate action and in establishing] the schedule for the review of the petition]. [If necessary, add] By letter dated
The request has been referred to the Director of the Office of [insert actionoffice].
,the Director (granted or denied) petitioner's request for [insert request for immediate action] at [insert facility/licensee name]. A copy of the petition is available in ADAMS for inspection at the Commission's Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, and from the ADAMS Public Library component on the NRC's Web site, http://wwwnrc.gov (the Public Electronic Reading Room).
As provided by Section 2.206, appropriate action will be taken on this petitionwithin a reasonable time. [The petitioner met with the [insert action office] petition reviewboard on [insert date] to discuss the petition.
FOR THE NUCLEAR REGULATORY COMMISSION
The results of that discussion were considered in the board's determination regarding  
[the petitioner's request for immediate action andin establishing]
the schedule for the review of the petition].  
[If necessary, add] By letterdated ,the Director (granted or denied) petitioner's request for [insert requestfor immediate action] at [insert facility/licensee name]. A copy of the petition is available in ADAMS for inspection at the Commission's Public Document Room, located at OneWhite Flint North, 11555 Rockville Pike (first floor), Rockville,  
: Maryland, and from theADAMS Public Library component on the NRC's Web site, http://wwwnrc.gov (the PublicElectronic Reading Room).FOR THE NUCLEAR REGULATORY COMMISSION
[Office Director]
[Office Director]
Dated at Rockville, MarylandThis day of , 200X.Approved:
Dated at Rockville, Maryland This day of  
July 1, 199938 (Revised:
, 200X.
October 25, 2000)
Approved: July 1, 1999 38 (Revised: October 25, 2000)
Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 ExhibitsExhibit 6Sample Director's Decision and Cover Letter[Insert petitioner's name & address]Dear [insert petitioner's name]:This letter responds to the petition you filed with [EDO or other addressee of petition]
 
pursuant to Section 2.206 of Title 10 of the Code of Federal Regulations (10 CFR 2.206) on[date of petition]
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 6 Sample Director's Decision and Cover Letter
as supplemented on [dates of any supplements].
[Insert petitioner's name & address]
In your petition yourequested that the NRC [list requested actions].
 
On [date of acknowledgment letter] the NRC staff acknowledged receiving your petitionand stated pursuant to 10 CFR 2.206 that your petition was being referred to me for actionand that it would be acted upon within a reasonable time. You were also told that [staffresponse to any request for immediate action].[You met with the petition review board on [date(s) of the pre-and/or post-PRBmeeting(s)] to clarify the bases for your petition.
==Dear [insert petitioner's name]:==
The transcript(s) of this/these mreeting(s) was/were treated as (a) supplement(s) to the petition and are available in ADAMS forinspection at the Commission's Public Document Room, located at One White Flint North,11555 Rockville Pike (first floor), Rockville,  
This letter responds to the petition you filed with [EDO or other addressee of petition]
: Maryland, and from the ADAMS PublicLibrary component on the NRC's Web site, http:llwwwnrcgov (the Public Electronic Reading Room)].[By letter dated [insert date], the NRC staff requested  
pursuant to Section 2.206 of Title 10 of the Code of Federal Regulations (10 CFR 2.206) on
[name of licensee] to provide information related to the petition.  
[date of petition] as supplemented on [dates of any supplements]. In your petition you requested that the NRC [list requested actions].
[Name of licensee]
On [date of acknowledgment letter] the NRC staff acknowledged receiving your petition and stated pursuant to 10 CFR 2.206 that your petition was being referred to me for action and that it would be acted upon within a reasonable time. You were also told that [staff response to any request for immediate action].
responded on [insert date] and theinformation provided was considered by the staff in its evaluation of the petition].
[You met with the petition review board on [date(s) of the pre-and/or post-PRB meeting(s)] to clarify the bases for your petition. The transcript(s) of this/these mreeting(s) was/were treated as (a) supplement(s) to the petition and are available in ADAMS for inspection at the Commission's Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, and from the ADAMS Public Library component on the NRC's Web site, http:llwwwnrcgov (the Public Electronic Reading Room)].
In your petition you stated that [summarize the issues raised].  
[By letter dated [insert date], the NRC staff requested [name of licensee] to provide information related to the petition. [Name of licensee] responded on [insert date] and the information provided was considered by the staff in its evaluation of the petition].
[Briefly summarize thesafety significance of the issues and the staffs response].
In your petition you stated that [summarize the issues raised]. [Briefly summarize the safety significance of the issues and the staffs response].
[The NRC issued a Partial Director's Decision (DD-YY-XX) dated [insert]
[The NRC issued a Partial Director's Decision (DD-YY-XX) dated [insert] which [explain what aspects of the petition were addressed]. [Explain which issues remained to be addressed in this director's decision and briefly explain the reason for the delay on these issues)).
which [explainwhat aspects of the petition were addressed].  
The staff sent a copy of the proposed director's decision to you and to [licensee(s)] for comment on [date]. [You responded with comments on [date] and the licensee responded on [date]. The comments and the staff's response to them are included in the director's decision]. OR The staff did not receive any comments on the proposed director's decision].
[Explain which issues remained to beaddressed in this director's decision and briefly explain the reason for the delay on theseissues]].
Approved: July 1, 1999 (Revised: October 25, 2000) 39
The staff sent a copy of the proposed director's decision to you and to [licensee(s)]
 
forcomment on [date]. [You responded with comments on [date] and the licensee responded on [date]. The comments and the staff's response to them are included in the director's decision].
I J 11 Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 6 (continued)
OR The staff did not receive any comments on the proposed director's decision].
Approved:
July 1, 1999(Revised:
October 25, 2000) 39 I J 11Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 ExhibitsExhibit 6 (continued)
[Summarize the issues addressed in this director's decision and the staff's response].
[Summarize the issues addressed in this director's decision and the staff's response].
A copy of the Director's Decision (DD-YY-XX) will be filed with the Secretary of theCommission for the Commission to review in accordance with 10 CFR 2.206(c).
A copy of the Director's Decision (DD-YY-XX) will be filed with the Secretary of the Commission for the Commission to review in accordance with 10 CFR 2.206(c). As provided for by this regulation, the decision will constitute the final action of the Commission 25 days after the date of the decision unless the Commission, on its own motion, institutes a review of the decision within that time. [The documents cited in the enclosed decision are available in ADAMS for inspection at the Commission's Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor),
Asprovided for by this regulation, the decision will constitute the final action of theCommission 25 days after the date of the decision unless the Commission, on its ownmotion, institutes a review of the decision within that time. [The documents cited in theenclosed decision are available in ADAMS for inspection at the Commission's PublicDocument Room, located at One White Flint North, 11555 Rockville Pike (first floor),Rockville,  
Rockville, Maryland, and from the ADAMS Public Library component on the NRC's Web site; http://www.nrc.gov (the Public Electronic Reading Room) (cite any exceptions involving proprietary or other protected information)].
: Maryland, and from the ADAMS Public Library component on the NRC's Website; http://www.nrc.gov (the Public Electronic Reading Room) (cite any exceptions involving proprietary or other protected information)].
I have also enclosed a copy of the notice of "Issuance of the Director's Decision Under 10 CFR 2.206" that has been filed with the Office of the Federal Register for publication.
I have also enclosed a copy of the notice of "Issuance of the Director's Decision Under10 CFR 2.206" that has been filed with the Office of the Federal Register for publication.
[If appropriate, acknowledge the efforts of the petitioner in bringing the issues to the attention of the NRC]. Please feel free to contact [petition manager name and number] to discuss any questions related to this petition.
[If appropriate, acknowledge the efforts of the petitioner in bringing the issues to theattention of the NRC]. Please feel free to contact [petition manager name and number] todiscuss any questions related to this petition.
Sincerely,
Sincerely,
[Insert Office Director's Name]Docket Nos. [ ]
[Insert Office Director's Name]
Docket Nos. [ ]


==Enclosures:==
==Enclosures:==
Director's Decision YY-XX Federal Register Notice Approved: July 1, 1999 40 (Revised: October 25, 2000)


Director's Decision YY-XXFederal Register NoticeApproved:
. -. I 1, Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits DD-YY-XX UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFFICE OF [INSERT]
July 1, 199940 (Revised:
[Office Director Name], Director In the Matter of  
October 25, 2000)
)
.-. I 1,Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 ExhibitsDD-YY-XXUNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSION OFFICE OF [INSERT][Office Director Name], DirectorIn the Matter of ) Docket No(s). [Insert]))[LICENSEE NAME] ) License No(s). [Insert]* )([Plant or facility name(s)])  
Docket No(s). [Insert]
) (10 CER 2.206)DIRECTOR'S DECISION UNDER 10 CFR 2.206X> I. Introduction By letter dated [insert date], as supplemented on [dates of supplements],  
))
[petitioner namesand, if applicable, represented organizations]
[LICENSEE NAME]  
filed a Petition pursuant to Title 10 of theCode of Federal Regulations, Section 2.206. The petitioner(s) requested that the U.S.Nuclear Regulatory Commission (NRC) take the following actions:  
)
[list requests].
License No(s). [Insert]
Thebases for the requests were -[describe].
)
In a letter dated [insert],
([Plant or facility name(s)])  
the NRC informed the Petitioners that their request for [listimmediate actions requested]
)
was approved/denied and that the issues in the Petition werebeing referred to the Office of [insert]
(10 CER 2.206)
for appropriate action.[The Petitioner(s) met with the (assigned office abbreviation) petition review board on[date(s) of the pre- and/or post-PRB meeting(s)]
DIRECTOR'S DECISION UNDER 10 CFR 2.206 X>
to clarify the bases for the Petition.
I. Introduction By letter dated [insert date], as supplemented on [dates of supplements], [petitioner names and, if applicable, represented organizations] filed a Petition pursuant to Title 10 of the Code of Federal Regulations, Section 2.206. The petitioner(s) requested that the U.S.
Thetranscript(s) of this/these meeting(s) was/were treated as (a) supplement(s) to the petitionand are available in ADAMS for inspection at the Commission's Public Document Room,located at One White Flint North, 11555 Rockville Pike (first floor), Rockville,  
Nuclear Regulatory Commission (NRC) take the following actions: [list requests]. The bases for the requests were -[describe].
: Maryland, and from the ADAMS Public Library component on the NRC's Web site, http://www.
In a letter dated [insert], the NRC informed the Petitioners that their request for [list immediate actions requested] was approved/denied and that the issues in the Petition were being referred to the Office of [insert] for appropriate action.
nrc.gov (the Public Electronic Reading Room)].[By letter dated [insert date], the NRC staff requested  
[The Petitioner(s) met with the (assigned office abbreviation) petition review board on
[name of licensee]
[date(s) of the pre-and/or post-PRB meeting(s)] to clarify the bases for the Petition. The transcript(s) of this/these meeting(s) was/were treated as (a) supplement(s) to the petition and are available in ADAMS for inspection at the Commission's Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, and from the ADAMS Public Library component on the NRC's Web site, http://www.
to provideinformation related to the petition.  
nrc.gov (the Public Electronic Reading Room)].
[Name of licensee]
[By letter dated [insert date], the NRC staff requested [name of licensee] to provide information related to the petition. [Name of licensee] responded on [insert date] and the information provided was considered by the staff in its evaluation of the petition].
responded on [insert date] and theinformation provided was considered by the staff in its evaluation of the petition].
[The NRC issued a Partial Director's Decision (DD-YY-XX) dated [insert] which [explain what aspects of the petition were addressed]. [Explain which issues remained to be Approved: July 1, 1999 (Revised: -October 25, 2000) 41
[The NRC issued a Partial Director's Decision (DD-YY-XX) dated [insert]
 
which [explainwhat aspects of the petition were addressed].  
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits addressed in this director's decision and briefly explain the reason for the delay on these issues)).
[Explain which issues remained to beApproved:
The NRC sent a copy of the proposed director's decision to the Petitioner and to
July 1, 1999(Revised:  
[licensee(s)] for comment on [date]. [The Petitioner responded with comments on [date]
-October 25, 2000) 41 Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibitsaddressed in this director's decision and briefly explain the reason for the delay on theseissues]].
and the licensee(s) responded on [date]. The comments and the NRC staff's response to them are included in the director's decision]. OR [The staff did not receive any comments on the proposed director's decision].
The NRC sent a copy of the proposed director's decision to the Petitioner and to[licensee(s)]
for comment on [date]. [The Petitioner responded with comments on [date]and the licensee(s) responded on [date]. The comments and the NRC staff's response tothem are included in the director's decision].
OR [The staff did not receive any commentson the proposed director's decision].
II. Discussion
II. Discussion
[Discuss the issues raised, the significance of the issues (or lack thereof),
[Discuss the issues raised, the significance of the issues (or lack thereof), and the staff's response with supporting bases. Acknowledge any validated issues, even if the staff or the licensee decided to take corrective actions other than those requested by the petitioner.
and the staff'sresponse with supporting bases. Acknowledge any validated issues, even if the staff or thelicensee decided to take corrective actions other than those requested by the petitioner.
Clearly explain all actions taken by the staff or the licensee to address the issues, even if these actions were under way or completed before the petition was received. This discussion must clearly present the staff response to all of the valid issues so that it is clear that they have been addressed].
Clearly explain all actions taken by the staff or the licensee to address the issues, even ifthese actions were under way or completed before the petition was received.
Thisdiscussion must clearly present the staff response to all of the valid issues so that it isclear that they have been addressed].
III. Conclusion
III. Conclusion
[Summarize the staff's conclusions with respect to the issues raised and how they havebeen, or will be, addressed].
[Summarize the staff's conclusions with respect to the issues raised and how they have been, or will be, addressed].
As provided in 10 CFR 2.206(c),
As provided in 10 CFR 2.206(c), a copy of this Director's Decision will be filed with the Secretary of the Commission for the Commission to review. As provided for by this regulation, the decision will constitute the final action of the Commission 25 days after the date of the decision unless the Commission, on its own motion, institutes a review of the decision within that time.
a copy of this Director's Decision will be filed with theSecretary of the Commission for the Commission to review. As provided for by thisregulation, the decision will constitute the final action of the Commission 25 days after thedate of the decision unless the Commission, on its own motion, institutes a review of thedecision within that time.Dated at Rockville,  
Dated at Rockville, Maryland, this [insert date] day of [insert month, year].
: Maryland, this [insert date] day of [insert month, year].[Office director's name], DirectorOffice of [insert]Approved:
[Office director's name], Director Office of [insert]
July 1, 199942 (Revised:
Approved: July 1, 1999 42 (Revised: October 25, 2000)
October 25, 2000)
 
Volume8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 ExhibitsExhibit 7[7590-01  
Volume8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 7
-P]Sample Federal Register Notice for Director's DecisionU.S. NUCLEAR REGULATORY COMMISSION Docket No(s).License No(s).[Name of Licensee]
[7590-01 -P]
NOTICE OF ISSUANCE OF DIRECTOR'S DECISION UNDER 10 CFR 2.206 Notice is hereby given that the Director,  
Sample Federal Register Notice for Director's Decision U.S. NUCLEAR REGULATORY COMMISSION Docket No(s).
[name of office],
License No(s).
has issued a director's K..> decision with regard to a petition dated [insert date], filed by [insert petitioner's name],hereinafter referred to as the "petitioner."  
[Name of Licensee]
[The petition was supplemented on [insert date,include transcripts from meeting(s) with the PRB]]. The petition concerns the operation ofthe [insert facility or licensee name].The petition requested that [insert facility or licensee name] should be [insertrequest for enforcement-related action].  
NOTICE OF ISSUANCE OF DIRECTOR'S DECISION UNDER 10 CFR 2.206 Notice is hereby given that the Director, [name of office], has issued a director's K..>
[If necessary, add] The petitioner also requested that a public meeting be held to discuss this matter in the'Washington, DC, area.As the basis for the [insert date]  
decision with regard to a petition dated [insert date], filed by [insert petitioner's name],
;request, the petition&r raised concerns'stemming from [insert petitioners supporting basis for the request]. The  
hereinafter referred to as the "petitioner." [The petition was supplemented on [insert date, include transcripts from meeting(s) with the PRB)). The petition concerns the operation of the [insert facility or licensee name].
[insert petitioners name]considers such operation to be potentially unsafe and to bein violation of Federalregulations.
The petition requested that [insert facility or licensee name] should be [insert request for enforcement-related action]. [If necessary, add] The petitioner also requested that a public meeting be held to discuss this matter in the'Washington, DC, area.
In'the petition, a number of references to [insert references]
As the basis for the [insert date] ;request, the petition&r raised concerns'stemming from [insert petitioners supporting basis for the request]. The [insert petitioners name]
were cited thatthe petitioner believes prohibit operation of the facility with [insert the cause'for therequested enforcement-related action].  
considers such operation to be potentially unsafe and to bein violation of Federal regulations. In'the petition, a number of references to [insert references] were cited that the petitioner believes prohibit operation of the facility with [insert the cause'for the requested enforcement-related action]. -
-The petition of [insert date] raises concerns originating from [insert summaryinformation on more bases/rationale/discussion and supporting facts used in thedisposition of the petition and the development of the'director's decision].
The petition of [insert date] raises concerns originating from [insert summary information on more bases/rationale/discussion and supporting facts used in the disposition of the petition and the development of the'director's decision].
Approved:
Approved: July 1, 1999 (Revised: October25,2000) 43
July 1, 1999(Revised:
 
October25,2000) 43 Volume 8, Licensee.
Volume 8, Licensee. Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 7 (continued)
Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 ExhibitsExhibit 7 (continued)
[On [insert date], the petitioner [and the licensee] met with the staff's petition review board]. [On [insert date of public meeting], the NRC conducted a meeting regarding [insert facility or licensee name]. The(se) meeting(s) gave the petitioner and the licensee an opportunity to provide additional information and to clarify issues raised in the petition].
[On [insert date], the petitioner  
The NRC sent a copy of the proposed Director's Decision to the Petitioner and to
[and the licensee]
[licensee(s)] for comment on [date]. [The Petitioner responded with comments on [date] and the licensee(s) responded on [date]. The comments and the NRC staffs response to them are included in the Director's Decision]. OR [The staff did not receive any comments on the proposed Director's Decision].
met with the staff's petition reviewboard]. [On [insert date of public meeting],
The Director of the Office of [name of office] has determined that the request(s), to require [insert facility or licensee name] to be [insert request for enforcement-related action], be [granted/denied]. The reasons for this decision are explained in the director's decision pursuant to 10 CFR 2.206 [Insert DD No.], the complete text of which is available in ADAMS for inspection at the Commission's Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, and via the NRC's Web site (http:/lwwwnrc.gov) on the World Wide Web, under the "Public Involvement" icon.
the NRC conducted a meeting regarding  
[Briefly summarize the staff's findings and conclusions].
[insertfacility or licensee name]. The(se) meeting(s) gave the petitioner and the licensee anopportunity to provide additional information and to clarify issues raised in the petition].
A copy of the director's decision will be filed with the Secretary of the Commission for the Commission's review in accordance with 10 CFR 2.206 of the Commission's regulations. As provided for by this regulation, the director's decision will constitute the final action of the Commission 25 days after the date of the decision, unless the Commission, on its own motion, institutes a review of the director's decision in that time.
The NRC sent a copy of the proposed Director's Decision to the Petitioner and to[licensee(s)]
Dated at Rockville, Maryland, this [insert date] day of [insert month, year].
for comment on [date]. [The Petitioner responded with comments on [date] andthe licensee(s) responded on [date]. The comments and the NRC staffs response to them areincluded in the Director's Decision].
FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By
OR [The staff did not receive any comments on theproposed Director's Decision].
[Insert Office Director's Name]
The Director of the Office of [name of office] has determined that the request(s),
Office of [insert Office Name]
torequire [insert facility or licensee name] to be [insert request for enforcement-related action],
Approved: July 1, 1999 44 (Revised: October 25, 2000)
be [granted/denied].
 
The reasons for this decision are explained in the director's decision pursuant to 10 CFR 2.206 [Insert DD No.], the complete text of which is available in ADAMS for inspection at the Commission's Public Document Room, located at OneWhite Flint North, 11555 Rockville Pike (first floor), Rockville,  
Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 8 Sample Letters Requesting Comments on the Proposed Director's Decision (Note: For clarity, separate letters will need to be sent to the petitioner and the licensee.
: Maryland, and via theNRC's Web site (http:/lwwwnrc.gov) on the World Wide Web, under the "PublicInvolvement" icon.[Briefly summarize the staff's findings and conclusions].
A copy of the director's decision will be filed with the Secretary of the Commission for the Commission's review in accordance with 10 CFR 2.206 of the Commission's regulations.
As provided for by this regulation, the director's decision will constitute thefinal action of the Commission 25 days after the date of the decision, unless theCommission, on its own motion, institutes a review of the director's decision in that time.Dated at Rockville,  
: Maryland, this [insert date] day of [insert month, year].FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By[Insert Office Director's Name]Office of [insert Office Name]Approved:
July 1, 199944 (Revised:
October 25, 2000)  
.........
Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 ExhibitsExhibit 8Sample Letters Requesting Comments on the ProposedDirector's Decision(Note: For clarity, separate letters will need to be sent to the petitioner and the licensee.
This sample provides guidance for both letters.)
This sample provides guidance for both letters.)
[Insert petitioner's address]  
[Insert petitioner's address]
.Dear [Insert petitioner's name]Your petition dated [insert date] and addressed to the [insert addressee]
Dear [Insert petitioner's name]
has been reviewedby the NRC staff pursuant to 10 CFR 2.206 of the Commission's regulations.
Your petition dated [insert date] and addressed to the [insert addressee] has been reviewed by the NRC staff pursuant to 10 CFR 2.206 of the Commission's regulations. The staff's proposed director's decision on the petition is enclosed. I request that you provide comments to me on any portions of the decision that you believe involve errors or any issues in the petition that you believe have not been fully addressed. The staff is making a similar request of the licensee. The staff will then review any comments provided by you and the licensee and consider them in the final version of the director's decision with no further opportunity to comment.
The staff'sproposed director's decision on the petition is enclosed.
Please provide your comments by [insert date, nominally 2 weeks from the date of this letter].
I request that you providecomments to me on any portions of the decision that you believe involve errors or anyissues in the petition that you believe have not been fully addressed.
Sincerely,
The staff is making asimilar request of the licensee.
The staff will then review any comments provided by youand the licensee and consider them in the final version of the director's decision with nofurther opportunity to comment.Please provide your comments by [insert date, nominally 2 weeks from the date of thisletter].Sincerely,
[Signed by Division Director]
[Signed by Division Director]
Docket Nos. []cc w/o end: [Service List][Insert licensee's address]Dear [Insert licensee's name]By letter dated [insert date], [insert name of petitioner]
Docket Nos. []
submitted a petition pursuant to10 CFR 2.206 of the Commission's regulations with respect to [insert name(s) of affectedfacilities].
cc w/o end: [Service List]
The petition has been reviewed by the NRC staff and the staff's proposed director's decision on the petition is enclosed.
[Insert licensee's address]
I request that you provide comments to me on any* portions of the decision that you believe involve errors or any issues in the petition that youbelieve have not been fully addressed.
Dear [Insert licensee's name]
The staff is making a similar request of the petitioner.
By letter dated [insert date], [insert name of petitioner] submitted a petition pursuant to 10 CFR 2.206 of the Commission's regulations with respect to [insert name(s) of affected facilities]. The petition has been reviewed by the NRC staff and the staff's proposed director's decision on the petition is enclosed. I request that you provide comments to me on any portions of the decision that you believe involve errors or any issues in the petition that you believe have not been fully addressed. The staff is making a similar request of the petitioner.
The staff will then review any comments provided by you and the petitioner and considerthem in the final version of the director's decision with no further opportunity to comment.Approved:
The staff will then review any comments provided by you and the petitioner and consider them in the final version of the director's decision with no further opportunity to comment.
July 1, 1999(Revised:
Approved: July 1, 1999 (Revised: October 25,2000) 45
October 25,2000) 45 kLJ11Volume 8, Licensee Oversight ProgramsReview Process for 10 CFR 2.206 Petitions Handbook 8.11 ExhibitsK>-Exhibit 8 (continued)
 
Please provide your comments by [insert date, nominally 2 weeks from the date of thisletter].Sincerely,
kLJ1 Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits K>-
Exhibit 8 (continued)
Please provide your comments by [insert date, nominally 2 weeks from the date of this letter].
Sincerely,
[Signed by Division Director]
[Signed by Division Director]
Docket Nos. [ ]cc w/encl: [Service List]-i46Approved:
Docket Nos. [ ]
July 1, 1999(Revised:
cc w/encl: [Service List]
October 25, 2000).
-i 46 Approved: July 1, 1999 (Revised: October 25, 2000).
ENCLOSURE 4 NUREG/BR-0200
 
--------------------------------
ENCLOSURE 4 NUREG/BR-0200  
 
resolution of the entire petition. A final director's decision is issued at the conclusion of the effort.
The Commission will not entertain requests for review of a director's decision. However, on its own, it may review a decision within 25 calendar days.
NRC Management Directive 8. 11, "Review Process for IO CFR 2.206 Petitions," contains more detailed information on citizen petitions.
For a free copy of the directive, write to the Superintendent of Documents, U.S.
Government Printing Office, P.O. Box 37082, Washington, DC 20013-7082, or call 202-512-1800.
Electronic Access Those parts of the monthly status report on 2.206 petitions that are not of a sensitive nature, as well as recently issued director's decisions, and Management Directive 8. 11, are placed on the NRC's web site at http://
www.nrc. gov/reading-rm/doc-collections/
petitions-2-206/index.html and in the agency's Public Document Room.
Other Processes for Public Involvement In addition to the 2.206 petition process, NRC has several other ways that permit the public to express concerns on matters related to the NRC's regulatory activities.
* The NRC's allegation process affords individuals who raise safety concerns a degree of protection of their identity.
* Under the provisions of 10 CFR 2.802, NRC provides an opportunity for the public to petition the agency for a rulemaking.
* The NRC's licensing process offers members of the public, who are specifically affected by a licensing action, an opportunity to formally participate in licensing proceedings. This process applies not only to the initial licensing actions but also to license amendments and other activities such as decom-missioning and license renewals.
* For major regulatory actions involving preparation of environmental impact statements, NRC offers separate opportunities for public participation in its environmental proceedings.
* The public can attend a number of meetings including open Commission and staff meetings, periodic media briefings by Regional Administrators, and special meetings held near affected facilities to inform local communities and respond to their questions.
More information on these activities can be found in NRC's pamphlet entitled, "Public Involvement in the Nuclear Regulatory Process," NUREG/BR-0215.


resolution of the entire petition.
Office of Public Affairs U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Telephone 301-415-8200 or 1-800-368-5642 NUREG/BR-0200, Rev. 5 February 2003 e
A finaldirector's decision is issued at theconclusion of the effort.The Commission will not entertain requestsfor review of a director's decision.
However,on its own, it may review a decision within 25calendar days.NRC Management Directive
: 8. 11, "ReviewProcess for IO CFR 2.206 Petitions," contains more detailed information on citizen petitions.
For a free copy of the directive, write to theSuperintendent of Documents, U.S.Government Printing Office, P.O. Box 37082,Washington, DC 20013-7082, or call 202-512-1800.
Electronic AccessThose parts of the monthly status report on2.206 petitions that are not of a sensitive nature, as well as recently issued director's decisions, and Management Directive
: 8. 11, areplaced on the NRC's web site at http://www.nrc.
gov/reading-rm/doc-collections/
petitions-2-206/index.html and in the agency'sPublic Document Room.Other Processes for Public Involvement In addition to the 2.206 petition process, NRChas several other ways that permit the publicto express concerns on matters related to theNRC's regulatory activities.
* The NRC's allegation process affordsindividuals who raise safety concerns adegree of protection of their identity.
* Under the provisions of 10 CFR 2.802,NRC provides an opportunity for thepublic to petition the agency for arulemaking.
* The NRC's licensing process offersmembers of the public, who arespecifically affected by a licensing action,an opportunity to formally participate inlicensing proceedings.
This processapplies not only to the initial licensing actions but also to license amendments and other activities such as decom-missioning and license renewals.
* For major regulatory actions involving preparation of environmental impactstatements, NRC offers separateopportunities for public participation in itsenvironmental proceedings.
* The public can attend a number ofmeetings including open Commission andstaff meetings, periodic media briefings by Regional Administrators, and specialmeetings held near affected facilities toinform local communities and respond totheir questions.
More information on these activities can befound in NRC's pamphlet
: entitled, "PublicInvolvement in the Nuclear Regulatory Process,"
NUREG/BR-0215.
-IOffice of Public AffairsU. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Telephone 301-415-8200 or1-800-368-5642 NUREG/BR-0200, Rev. 5February 2003e OFFICE NAME DATE OFFICE NAME DATE M. Mulligan Again, I appreciate you bringing these matters to the attention of the NRC. Sincerely, IRA/ Daniel H. Dorman, Acting Director Office of Nuclear Reactor Regulation


==Enclosures:==
ML14071A005 (Package)
: 1. Disposition of Requests
ML14071A006 (Incoming petition)
: 2. Federal Register Notice 3. Management Directive 8.11 4. NUREG/BR-0200 cc: Listserv DISTRIBUTION:
ML14237A726 (Acknowledgement Letter)
Ticket: OED0-14-00145 PUBLIC LPL3-1 r/f RidsOcaMaiiCenter Resource RidsNrrLAMHenderson Resource RidsNrrDorllp13-1 Resource RidsRgn3MaiiCenter Resource RidsAcrsAcnwMaiiCenter RidsRgn3MaiiCenter Resource RidsNrrPMPalisades Resource RidsOgcMaiiCenter Resource RidsNrrMaiiCenter Resource RidsEdoMaiiCenter Resource RidsSecyMaiiCenter Resource RidsOeMaiiCenter Resource RidsAdmMaiiCenter Resource BMetzger RAnzalone RHaskell RWolfgang EGarmoe Wlyon DAiley SBurnell ADAMS Accession Nos. ML 14071A005 (Package)
ML14237A727 (Federal Register Notice)
ML 14071A006 (Incoming petition)
ML050900248 (NUREG/BR-0200)
ML 14237 A726 (Acknowledgement Letter) ML 14237 A727 (Federal Register Notice) ML050900248 (NUREG/BR-0200)
ML041770328 (Management Directive 8.11)
ML041770328 (Management Directive 8.11) DORLILPL3-1/PM DORLILPL3-1/LA DPR/PGCB/PM*
DORLILPL3-1/PM DORLILPL3-1/LA DPR/PGCB/PM*
JRankin MHenderson MBanic 9/3/14 8/29/14 9/5/14 RIII/DPR/BC*
JRankin MHenderson MBanic 9/3/14 8/29/14 9/5/14 RIII/DPR/BC*
DSS/SRXB/BC OGC EDuncan US hoop CHair 9/11/14 9/11/14 9/15/14 Tech Editor* JDougherty 9/9/14 DORLID Llund 9/15/14 OFFICIAL RECORD COPY RidsNrrOd Resource RidsNrrDorl Resource RidsOpaMail Resource RidsNrrDpr Resource RidsNrrDpr Resource RidsOpaMail Resource EBoston JKaizer BBickett LBanic *via e-mail FRN Editor* DORLILPL3-1/BC Cleatherbury DPelton 9/10/14 9/11/14 NRR/D DOorman 9/25/14}}
DSS/SRXB/BC OGC EDuncan US hoop CHair 9/11/14 9/11/14 9/15/14 Tech Editor*
JDougherty 9/9/14 DORLID Llund 9/15/14}}

Latest revision as of 17:17, 10 January 2025

OEDO-14-00145 - Response Letter to Mike Mulligan for Ltr. 2.206 - Palisades
ML14237A726
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/25/2014
From: Dan Dorman
Office of Nuclear Reactor Regulation
To: Mulligan M
- No Known Affiliation
Jennivine Rankin, NRR/DORL
Shared Package
ML14071A005 List:
References
2.206, OEDO-14-00145
Download: ML14237A726 (77)


Text

Mr. Michael Mulligan P.O. Box 161 Hinsdale, NH 03451

Dear Mr. Mulligan,

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 25, 2014 Your petition dated March 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14071A006), as supplemented by your addresses to the Petition Review Board (PRB) on April 8, 2014, and September 3, 2014 (ADAMS Accession Nos. ML14143A212 and ML14259A135, respectively), and by e-mail dated May 21, 2014 (ADAMS Accession No. ML14142A101), has been referred to me under Title 10 of the Code of Federal Regulations (1 0 CFR) 2.206, "Requests for Action under This Subpart," of the Commission's regulations. In your petition, you request a number of actions to be taken by the U.S. Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (the licensee, ENO) for equipment failures at Palisades Nuclear Plant (PNP). As the basis for your request, you state that there have been various recent plant events and equipment failures at PNP, such as primary coolant pump (PCP) impeller pieces breaking off and lodging in the reactor vessel (RV), leakage from the safety injection refueling water tank (SIRWT), and flaws in the control-rod drive mechanisms (CRDMs). I would like to note that during the spring 2014 refueling outage, ENO replaced all of the CRDM housings with new CRDM housings that incorporated a design change in an effort to eliminate the cause of the cracking. In 2013, ENO replaced most of the bottom of the SIRWT and made other repairs to ensure that any water leaking from the SIRWT would be captured and collected. No leakage from the SIRWT has been noted since these repairs in 2013. I would also like to express my appreciation to you for voicing your concerns to the NRC regarding these matters.

The PRB comprises representatives from the following technical groups within the NRC's Office of Nuclear Reactor Regulation:

the Component Performance, Non-Destructive Examination, and Testing Branch and the Vessels and Internals Integrity Branch within the Division of Engineering the Reactor Systems Branch and the Nuclear Performance and Code Review Branch within the Division of Safety Systems The PRB initially met in regard to your petition on March 14, 2014. At this meeting, the PRB reviewed your request for immediate action to prevent a PNP restart because of a piece of PCP impeller that was lodged between the RV and the flow skirt. The licensee attempted to remove the lodged piece using several methodologies, including vice grips and hydraulic tools. Despite the application of approximately 3,000 pounds per square inch of force, the piece did not move.

The licensee performed fluid dynamics analysis, structural analysis, and fracture analysis, which concluded that the piece would not move, would not break up, would not impede PCS flow, and would not affect the pressure-retaining capability of the RV. The NRC staff performed an

in-depth independent review of the licensee's analysis and concluded that the impeller piece did not pose a threat to safe operation of the reactor and RV. Therefore, the PRB determined that this event raised no safety-significant concerns that would prevent the plant from restarting as scheduled. Likewise, the PRB reviewed your request to immediately shut down PNP until the PCPs were replaced and determined that the event raised no safety-significant concerns that would require a plant shutdown. This was communicated to you by e-mail dated March 19, 2014 (ADAMS Accession No. ML14083A680).

You addressed the PRB by teleconference on April 8, 2014, and on September 3, 2014, to discuss your petition. The results of that discussion have been considered in the PRB's determination regarding your request for enforcement action and in establishing the schedule for the review of your petition. The PRB met internally on May 19, July 28, and September 3, 2014, to discuss your petition, as supplemented, and with respect to the criteria for review and rejection described in Management Directive (MD) 8.11, "Review Process for 10 CFR 2.206 Petitions." The PRB determined that the following requests from your petition meet the criteria for review in accordance with MD 8.11:

1.

Request for PNP to open every PCP for inspection and clear up all flaws.

2.

Request for PNP to replace the PCPs with others designed for their intended duty.

3.

Request an Office of the Inspector General (OIG) inspection on why different NRC regions have different analysis criteria for similar PCP events.

4.

Request a $10 million fine over these events.

5.

Request for PNP to return to yellow or red status and for the NRC to intensify its monitoring of PNP.

Your remaining requests do not meet the criteria for review, either because they are not requests for enforcement-related action or because they concern now-resolved issues that have already been the subject of NRC staff review and evaluation. Although many of your requests do not meet the criteria of MD 8.11, the NRC staff appreciates your concerns, and Enclosure 1 to this letter explains why those requests were not accepted into the 2.206 process.

As provided by Section 2.206, the NRC will take action on your request within a reasonable time. I have assigned Jennie Rankin to be the petition manager for your petition. Ms. Rankin can be reached at 301-415-1530. Your petition is being reviewed by the Division of Engineering, the Division of Safety Systems, and the Division of Operating Reactor Licensing within the Office of Nuclear Reactor Regulation in conjunction with the Division of Reactor Projects in Region Ill. I have referred to the OIG those allegations of NRC wrongdoing contained in your petition and in the transcripts of your addresses to the PRB on April 8 and September 3, 2014. I have enclosed for your information a copy of the notice that is being filed with the Office of the Federal Register for publication. I have also enclosed for your information copies of MD 8.11 and the associated brochure, NUREG/BR-0200, "Public Petition Process,"

prepared by the NRC's Office of Public Affairs.

Again, I appreciate you bringing these matters to the attention of the NRC.

Enclosures:

1. Disposition of Requests
2. Federal Register Notice
3. Management Directive 8.11
4. NUREG/BR-0200 cc: Listserv Sincerely, Daniel H. Dorman, Acting Director Office of Nuclear Reactor Regulation

Disposition of Requests that Were not Accepted into the 10 CFR 2.206 Process The following requests, as summarized below, do not meet the criteria for review, either because they are not requests for enforcement-related action or because they concern now-resolved issues that have already been the subject of NRC staff review and evaluation.

Although these requests do not meet the criteria of Management Directive (MD) 8.11, "Review Process for 10 CFR 2.206 Petitions," the U.S. Nuclear Regulatory Commission (NRC) staff appreciates your concerns, and the paragraphs below explain why your requests were not accepted into the 2.206 process.

Concerns with NRC staff monitoring of PCP impeller issues (Issue Nos. 1 I 21 11 I 121 and 14 of petition dated March 51 2014)

This issue, regarding failure of the PCP impellers resulting in pieces breaking free in the reactor vessel (RV) is being tracked by Region Ill through the Reactor Oversight Process (ROP).

Region Ill staff, in addition to the resident inspection staff at PNP, have followed up (and will continue to follow up) with the licensee regarding the licensee's corrective actions, in accordance with ROP activities. On August 8, 2012, Region Ill documented a finding of very low safety significance and an associated non-cited violation for the failure of the licensee to operate the PCPs in accordance with their design operating criteria (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12221A340). Region Ill recently documented its inspection findings in the PNP integrated inspection report dated May 7, 2014 (ADAMS Accession No. ML14127A543). The report states the following:

Because the PCP-C impeller was replaced with a new impeller this outage, PCP-8 was the only pump that remained in service with a refurbished impeller that was more susceptible to the fatigue-related failures that have been observed. The licensee ensured that PCP-8 was not one of the first two PCPs started following the Spring 2014 refueling outage, which did not expose PCP-8 to the susceptible pressure and flow conditions. However, because PCP-8 continues in service with potential impeller vane cracks there remains a potential for impeller pieces to break off. The inspectors and NRC staff recognized this concern and did not identify any immediate safety concerns, in part due to the extensive operating experience with broken impeller pieces. However, a review of the licensee's evaluation to justify continued operation of PCP-8 with a potentially cracked impeller continues. Additionally, the inspectors continue to review the licensee's corrective actions to date and going forward to determine whether the licensee plans to eliminate the known susceptibility of impeller pieces breaking off.

In addition to continued monitoring of this issue under the ROP, Region Ill staff addressed this issue at the public End of Cycle meeting conducted in South Haven, Michigan (ADAMS Accession Nos. ML141928384 and ML14175A284 for the meeting summary and NRC meeting slides). During the public End of Cycle meeting, the NRC staff presented a discussion on the RV foreign material inspection that occurred during the 2014 refueling outage and provided a poster session to answer any additional questions regarding foreign material caused by the failure of the impellers.

In regards to your concerns about why the broken vanes were not reported to the NRC through a licensee event report (LER) or event notification, the requirements for reporting events to the NRC are in accordance with 10 CFR 50.72, "Immediate Notification Requirements for Operating Nuclear Power Reactors," and 50.73, "Licensee Event Report System." NUREG-1022, Revision 3, "Event Report Guidelines 10 CFR 50.72 and 50.73" (ADAMS Accession No. ML13032A220) contains guidelines that the NRC staff considers acceptable for use in meeting the requirements of 10 CFR 50.72 and 10 CFR 50.73. Section 3.0 of NUREG-1022 provides examples and discussion of events that would require event notification or an LER.

Region Ill monitors conformance to 10 CFR 50.72 and 50.73 through ROP activities and did not consider the impeller issues at Palisades to warrant notification in accordance with 10 CFR 50.72 and 50. 73.

In regards to your concern about plant debris discovered in the primary side of the steam generators, specifically the impact of loose impeller pieces causing potential wear on the steam-generator tubes, Section 5.6.8 of PNP's technical specifications (TSs) requires the licensee to submit a steam-generator tube inspection report to the NRC in accordance with the steam-generator program specified in TS 5.5.8. This report includes the active degradation mechanisms (including wear from foreign objects, regardless of the objects' origin), location and measured sizes of service-induced indications of degradation, and any corrective actions (e.g., tube plugging) taken in response to the inspection findings. The NRC staff reviews these reports to ensure that the licensee is detecting potential tube degradation. The NRC staff documents their review in a letter to the licensee, which was made publicly available in ADAMS.

Concerns with the design and operation of the PCP impellers (Issue Nos. 7 and 8 of 2.206 petition dated March 5. 2014. and Issue Nos. 5, 6, and 7 of supplemental e-mail dated May 21. 2014)

You raised the following concerns:

a.

sequencing of the PCP during startup and shutdown conditions

b.

potential erosion of the coolant piping walls from metal blade particles

c.

failure of large pieces of the impeller The NRC staff notes that the requests regarding the above three concerns were not a request for an enforcement action and, thus, did not meet the acceptance criteria of MD 8.11. The NRC staff understands your concerns, notes that these concerns are closely related to two of the accepted requests (Numbers 1 and 2 above), and will take your underlying concerns into consideration during the review of the accepted requests.

Concerns with pieces of broken impeller causing fuel damage (Issue Nos. 1, 2. 3, and 4 of supplemental e-mail dated May 21, 2014)

Many of your requests stem from your concern that broken pieces of impeller (small metal particles) can ultimately cause fuel damage. As a result of the October 2011 vibration event and the subsequent review of the licensee's operability determination, the NRC staff studied the following potential issues associated with broken impeller pieces of various sizes:

a.

their interactions within the PCP, including impeding flow, impacting other vanes, impeding pump coastdown, causing pressure-boundary damage, and causing Final Safety Analysis Report (FSAR) impacts

b.

their passing through a reactor coolant system's cold leg, including potentially impacting a resistance temperature detector (RTD) and causing pressure-boundary damage

c.

their passing through or lodging in the RV annulus, including causing pressure-boundary damage

d.

their behavior after leaving the RV annulus, including potentially causing interactions in the lower plenum, blocking flow channels, damaging fuel cladding, and jamming control rods

e.

the effects of a piece moving upstream of the PCP The NRC staff concluded that PCP impeller coastdown and the PCP pressure boundary are unlikely to be significantly affected; therefore, the FSAR analyses for core cooling and loss-of-coolant accidents are also unlikely to be significantly affected. In addition, the NRC staff examined RTD interactions and concluded that damage to the RTD resulting from an impeller piece contacting the RTD is not a significant safety concern. Dynamic flow analyses predicted that broken pieces from the pump would not contact the RTD. However, in the unlikely event that contact should occur, the worst case would result in a small opening in the reactor coolant system boundary, which is bounded by small-break loss-of-coolant accident analyses that have been conducted as part of the design-basis analyses.

The NRC staff concluded that, for several reasons, there were no significant safety concerns resulting from broken pieces of impeller causing fuel damage. Impeller pieces are likely to remain stuck at the flow skirt or at the bottom of the RV as evidenced by the discovery of previous pieces. Flow conditions are insufficient to elevate larger pieces that might pass through the gap between the flow skirt and RV wall to the lower core support plate. Should the impeller pieces be small enough to be transported up and through the gaps (a highly unlikely occurrence}, the impeller piece would have to become lodged in a position to cause erosion of the fuel cladding. If this were to occur, the activity levels in the primary coolant system (PCS) would increase. Radiation monitoring would detect this increase in PCS activity levels, and the reactor would be shut down in accordance with the licensee's technical specification 3.4.16, "PCS Specific Activity."

Requests for licensee information (Issue Nos. 4 and 9 of the 2.206 petition dated March 5. 2014)

In regards to your request for Palisades to disclose internal Entergy reports regarding whether the PCPs were operated outside their design bases, the NRC staff does not require the licensee to disclose internal documents for public inspection as part of the 2.206 process. As part of the inspection process under the ROP, Entergy documents have been, and will continue to be, reviewed, and any findings will be documented in the applicable inspection reports which are made publicly available.

In regards to your request for Entergy to explain their decision to conduct weld repair of the PCP impellers and details on how other plants have repaired their impellers, the NRC staff notes that this request is not a request for enforcement-related action and, thus, did not meet the acceptance criteria of MD 8.11. The NRC staff understands your concerns and notes that they are closely related to two of the accepted requests (Numbers 1 and 3 above). During the process of reviewing accepted request Number 1, the NRC will take your concerns into consideration.

ENCLOSURE 2 FEDERAL REGISTER NOTICE ENTERGY NUCLEAR OPERATIONS, INC.

DOCKET NO. 50-255

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-255; NRC~2()'Q'-XX'XX]

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant AGENCY: Nuclear Regulatory Commission.

ACTION: 10 CFR 2.206 request; receipt.

[7590-01-P]

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) is giving notice that by petition dated March 5, 2014, as supplemented by e-mail dated May 21, 2014, Michael Mulligan (the petitioner) has requested that the NRC take enforcement action against Entergy Nuclear Operations, Inc., due to recent plant events and equipment failures at Palisades Nuclear Plant (PNP). The petitioner's requests are included in the SUPPLEMENTARY INFORMATION section of this document.

ADDRESSES: Please refer to Docket ID <INSERT: NRC-20YY~XXXX> when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:

Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID <INSERT: NRC-20YY-XXXX>. Address questions about NRC dockets to Carol Gallagher; telephone: 301-287-3422; e-mail: Caroi.Gallagher@nrc.gov.

NRC's Agencywide Documents Access and Management System (ADAMS):

You may obtain publicly available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4 737, or by e-mail to pdr. resource@nrc. gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.

NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.

SUPPLEMENTARY INFORMATION:

Notice is hereby given that by petition dated March 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14071A006), as supplemented by email dated May 21, 2014 (ADAMS Accession No. ML14142A101), and the petitioner's addresses to the Petition Review Board dated April 8 and September 3, 2014 (ADAMS Accession Nos. ML14143A212 and ML14259A135, respectively), the petitioner, has asked the NRC to take enforcement action against Entergy Nuclear Operations, Inc., due to recent plant events and equipment failures at PNP. The petitioner was particularly concerned with primary coolant pump (PCP) impeller pieces breaking off and lodging in the reactor vessel.

The petitioner requests the following actions:

Require PNP to open every PCP for inspection and clear up all flaws.

Require PNP to replace the PCPs with a design for their intended duty.

An Office of Inspector General (OIG) inspection on why there are different analysis criteria for similar PCP events between the NRC regions.

A ten million dollar fine for these events.

Intensify NRC monitoring of PNP, and return them to yellow or red status.

As the basis for the request, the petitioner stated, in part, the following:

The petitioner cited other recent plant events and equipment failures, such as leakage from the safety injection refueling water tank, and flaws in the control rod drive mechanisms.

The petitioner asserted the licensee and the NRC staff used non-conservative engineering judgment during the evaluation of the lodged PCP impeller piece and during the operability evaluation of the existing PCP impellers.

The petitioner asserts that the NRC staff was not being aggressive in resolving plant equipment issues, not resolving PCP equipment issues uniformly across the NRC regions, and accommodating the nuclear industry.

The request is being treated pursuant to § 2.206 of Title 10 of the Code of Federal Regulations (1 0 CFR), and has been referred to the Director of the Office of Nuclear Reactor Regulation (NRR). In accordance with 10 CFR 2.206, the NRC will take appropriate action on this petition within a reasonable period of time. The petitioner met with the NRR Petition Review Board on April 8 and September 3, 2014, to discuss the petition. The Petition Review Board considered the results of that discussion in its determination of the petitioner's request for immediate action and in the establishment of the schedule for the review of the petition.

Dated at Rockville, Maryland, this 251h day of September 2014.

For The Nuclear Regulatory Commission.

Daniel H. Dorman, Acting Director, Office of Nuclear Reactor Regulation.

ENCLOSURE 3 MANAGEMENT DIRECTIVE 8.11

U. S. NUCLEAR REGULATORY COMMISSION i

To:

Subject

Purpose:

TN: DT-00-20 NRC Management Directives Custodians Transmittal of Directive 8.11, "Review Process for 10 CFR 2.206 Petitions" Directive and Handbook 8.11 are being revised to address stakeholder feedback and to improve clarity and make the handbook easier to use. There are three major changes to the handbook: (1) the addition of an opportunity for petitioners to address the Petition Review Board after it discusses the petition; (2) the deletion of criteria for technical meetings with the petitioners; and (3) the addition of a requirement to request comments from the petitioner(s) and affected licensee(s) on the proposed director's decision, with associated steps to resolve, and document the resolution of, those comments.

Office and Division of Origin:

Contact:

Office of Nuclear Reactor Regulation Andrew J. Kugler, (301) 415-2828 or Donna Skay, (301) 415-1322 Date Approved:

Volume:

Directive:

July 1, 1999 (Revised: October 25, 2000) 8 Licensee Oversight Programs 8.11 Review Process for 10 CFR 2.206 Petitions Availability:

Rules and Directives Branch Office of Administration.

David L. Meyer, (301) 415-7162 or Doris Mendiola, (301) 415-6297 OFFICE OF ADMINIS TRA TION

TN: DT-00-20 Significant Changes to the Management Directive 8.11 Review Process for 10 CFR 2.206 Petitions The entire document has been revised to improve clarity and make it easier to use. In particular, the handbook is now written with actions in chronological order. In addition to those general changes, the following significant changes have been made:

  • Addition of an opportunity for the petitioner to address the Petition Review Board (PRB) after the PRB has developed its recommendations on the petition. This meeting or teleconference is similar to those already offered to petitioners before the PRB meets.
  • Removal of specific restrictions on the amount of time allowed for petitioners to address the PRB and also allow petitioners to be assisted by a reasonable number of representatives.
  • Deletion of the criteria for meetings between the petitioner and the staff. The staff will hold these meetings whenever the staff feels it will be beneficial to its review.
  • Addition of a process by which the staff requests and resolves comments from the petitioner and the licensee on the proposed director's decision (i.e., before it is signed).

The comments and the staff's resolution become part of the director's decision.

  • Revision of the timeliness goal to 120 days from the date of the acknowledgment letter until the date the proposed director's decision is sent out for comment. Add a new goal of 45 days from the end of the comment period until the director's decision is signed.
  • Addition of a process flow chart and a petition manager's checklist to assist staff persons involved with petitions.

2

Review Process for 10 CFR 2.206 Petitions Directive 8.1 1

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Directive 8.11 Contents Policy.;

1 Objectives.

1 Organizational Responsibilities and Delegations of Authority.

2 Executive Director for Operations (EDO).

2 General Counsel (GC).

2 Office Directors.

2 Regional Administrators.

3 2.206 PRB Chairperson.

3 Associate Directors - Office of Nuclear Reactor Regulation (NRR).

4 Division Directors.

4 Director, Division of Licensing Project Management (DLPM),

Office of Nuclear Reactor Regulation (NRR).

4 Applicability..

4 Handbook.

4 Definitions 4

References 5

Approved: July 1, 1999 (Revised: October 25'2000) in

U. S. Nuclear Regulatory Commission Volume: 8 Licensee Oversight Programs NRR Review Process for 10 CFR 2.206 Petitions Directive 8.11 Policy (8.11-01)

It is the policy of the U.S. Nuclear Regulatory Commission to provide members of the public with the means to request that the Commission take enforcement-related action (i.e., to modify, suspend, or revoke a license, or for other appropriate enforcement-related action, as distinguished from actions such as licensing or rulemaking). This policy is codified at Section 2.206 of Title 10 of the Code ofFederalRegulations (10 CFR 2.206). The Commission may grant a request for action, in whole or in part, take other action that satisfies the concerns raised by the requester, or deny the request. Requests that raise health and safety and other concerns without requesting enforcement-related action will be reviewed by means other than the 10 CFR 2.206 process.

Objectives (8.11-02)

  • To ensure the public health and safety, through the prompt and thorough evaluation of any potential problem addressed by a petition filed under 10 CFR 2.206. (021)
  • To provide for appropriate participation by a petitioner in, and observation by the public of, NRC's decisionmaking activities related to a 10 CFR 2.206 petition. (022)
  • To ensure effective communication with the petitioner and other stakeholders on the' status of the petition, including providing relevant documents and notification of interactions between the NRC staff and a licensee or certificate holder relevant to the petition. (023)

Approved: July 1, 1999 1

(Revised: October 25, 2000)

I Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Directive 8.11 Organizational Responsibilities and Delegations of Authority (8.11-03)

Executive Director for Operations (EDO)

(031)

Receives and assigns action for all petitions filed under 10 CFR 2.206.

General Counsel (GC)

(032)

  • Conducts legal reviews and provides advice on 10 CFR 2.206 petitions and, upon specific request from the staff in special cases or where the petition raises legal issues, reviews drafts of director's decisions. (a)
  • Provides legal advice to the Commission, EDO, office directors, and staff on other matters related to the 10 CFR 2.206 process. (b)

K>

Office Directors (033)

  • Have overall responsibility for assigned petitions. Because 10 CFR 2.206 petitions request enforcement-related action, petitions are assigned to the Office of Nuclear Reactor Regulation, the Office of Nuclear Material Safety and Safeguards, the Office of Enforcement, or the Office of the General Counsel. Therefore, most of the actions described in this directive and the associated handbook apply only to those. offices. (a)
  • Approve or deny a petitioner's request for immediate action. (b)
  • Sign acknowledgment letters, FederalRegister notices and director's decisions. (c)
  • Provide up-to-date information for the monthly status report on all assigned petitions. (d)
  • Appoint a petition review board (PRB) chairperson. (e)
  • Designate a petition manager for each petition. (f)

Approved: July 1, 1999 2

(Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Directive 8.11 Office Directors (033) (continued)

  • Promptly notify (1) the Office of Investigations of any allegation of wrongdoing by a licensee or certificate holder, applicant for a license or certificate, their contractors, or their vendors or (2) the Office of the Inspector General of any allegation of wrongdoing by an NRC staff person or NRC contractor, that is contained in a petition they may receive. (g)
  • Provide a draft of each director's decisions to the Office of Enforcement for review. (h)
  • Designate an office coordinator for 2.206 petitions, if applicable. (i)

Regional Administrators (034)

  • As needed, provide support and information for the preparation of an acknowledgment letter and/or a director's decision on a 2.206 petition. (a)
  • Make the petition manager aware of information that is received or that is the subject of any correspondence relating to a pending petition. (b)
  • Participate, as necessary, in meetings with the petitioner and public, in technical review of petitions and in deliberations of the PRB. (c) 2.206 PRB Chairperson (035)

Each office that is assigned a petition will appoint a PRB chairperson, generally a Senior Executive Service manager, who will-

  • Convene PRB meetings. (a)
  • Ensure appropriate review of all new petitions in a timely manner. (b)
  • Ensure appropriate documentation of PRB meetings. (c)
  • Convene periodic PRB meetings with the petition managers to discuss the status of open petitions and to provide guidance for timely resolution. (d)

Approved: July 1, 1999 (Revised: October 25, 2000) 3

A1I-Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Directive 8.11 Associate Directors Office of Nuclear Reactor Regulation (NRR)

(036)

Concur in each extension request from petition managers in their organization and forward the extension request to the Office of the EDO for approval.

Division Directors (037)

Concur in each extension request from petition managers in their organization and forward the extension request to the Office of the EDO (Associate Director for NRR) for approval.

Director, Division of Licensing Project Management (DLPM),

Office of Nuclear Reactor Regulation (NRR)

(038)

Appoints the Agency 2.206 Petition Coordinator, normally a DLPM staff person.

Applicability (8.11-04)

The policy and guidance in this directive and handbook apply to all NRC employees.

Handbook (8.11-05)

Handbook 8.11 details the procedures for staff review and disposition of petitions submitted under Section 2.206.

Definitions' (8.11-06)

A 10 CFR 2.206 Petition. A written request filed by any person that the Commission modify, suspend, or revoke a license, or take any other enforcement-related action that may be proper. The request must meet the criteria for review under 10 CFR 2.206 (see Part III of Handbook 8.11).

Licensee. Throughout the handbook, any references to a licensee shall be interpreted to include certificate holders, applicants for licenses or certificates, or other affected parties.

Approved: July 1, 1999 4

(Revised: October25,2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Directive 8.11 References (8.11-07)

Code of Federal Regulations-10 CFR 2.206, "Requests for Action Under This Subpart."

10 CFR 2.790, "Public Inspections, Exemptions, Requests for Withholding."

10 CFR 2.1205, "Request for a hearing; petition for leave to intervene."

Management Directives-

-3.5, "Public Attendance at Certain Meetings Involving the NRC Staff."

8.8, "Management of Allegations."

12.6, "NRC Sensitive Unclassified Information Security Program."

Memorandum of Understanding Between the NRC and the Department of Justice, December 12, 1988.

"Nuclear Regulatory Commission Issuances,".published quarterly as NUREG-0750.

Approved: July 1, 1999 (Revised: October 25,2000) 5

Review Process for 10 CFR 2.206 Petitions Handbook 8.11

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Parts I -IV Contents Part I Introduction...........................................................

1 Title 10 of the Code of Federal Regulations, Section 2.206 (10 CFR 2.206) (A).................

1 General Cautions (B)....................

1 Part II Initial Staff Actions......................................................

3 NRC's Receipt of a Petition (A)......................................

3 Process Summary (1)...............

3........

3 Assignment of Staff Action (2).......................................

3 Office Action (B).

4 Petition Manager Action (C).............

4 K

Part III Petition Review Board (PRB) 7 General (A).

7 Schedule (1)..............................

7 Board Composition (2) 7 Preparation for the PRB Meeting (B) 8 Criteria for Petition Evaluation (C) 11 Criteria for Reviewing Petitions Under 10 CFR 2.206 (1).................

. 11 Criteria for Rejecting Petitions Under 10 CFR 2.206 (2).11 Criteria for Consolidating Petitions (3) 12 PRB Meeting (D) 13 Informing the Petitioner of the Results (E) 14 Meeting With the Petitioner (F) 14 Response to the Petitioner (G).........

15 Requests That Do Not Meet the Criteria (1).

15 Requests That Meet the Criteria (2)..................................

16 Sending Documents to the Petitioner (H) 16 Supplements to the Petition (I) 17 Approved: July 1, 1999 (Revised: October 25, 2000)

I X

t a Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Parts I -IV Contents (continued)

Part IV Petition Review Activities.

19 Reviewing the Petition (A).............................................

19 Interoffice Coordination (1).........................................

19 Request for Licensee Input (2)........................

20 Technical Review Meeting With the Petitioner (3).......

20 Additional Petition Review Board (PRB) Meetings (4) 20 Schedule (B)............

20 Schedle (B 2

Keeping the Petitioner Informed (C).

22 Updates to Management and the Public (D)............

22 Part V The Director's Decision.

24 Content and Format (A).............................................

24 V

Final Versus Partial Director's Decisions (B)...........

25 Granting the Petition (C).............................................

25 Denying the Petition (D).............................................

26 Issuing the Proposed Director's Decision for Comment (E)......

26 Comment Disposition (F)........................

27 Issuing the Director's Decision (G)...........

27 Administrative Issues (H)........................

28 Commission Actions (I)........................

30 Exhibits 1

Simplified 2.206 Process Flow Chart.31 2

Petition Manager Checklist.33 3

Sample Closure Letter for Requests That Are Not 2.206 Petitions.36 4

Sample Acknowledgment Letter.37 5

Sample Federal Register Notice.38

.6 Sample Director's Decision and Cover Letter.39 7

Sample Federal Register Notice for Director's Decision.43 8

Sample Letters Requesting Comments on the Proposed Director's Decision.45 Approved: July 1, 1999 iv (Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook' 8.11' Part I Part I Introduction Title 10 of the Code of Federal Regulations, Section 2.206 (10 CFR 2.206) (A)

This section of the regulations has been a part of the Commission's regulatory framework since the Commission was established in 1975.

Section 2.206 permits any person to file a petition to request that the Commission take enforcement-related action., i.e., to modify, suspend, or revoke a license or to take other appropriate action. (1)

Section 2.206 requires that the petition be submitted in writing and provide the grounds for taking the proposed action. The NRC staff will not treat general opposition to nuclear power or a general assertion of a safety problem, without supporting facts, as a formal petition under 10 CFR 2.206. The staff will treat general requests as allegations or routine correspondence. Petitioners are encouraged to provide a telephone number or e-mail address through which the staff may make contact. (2)

General Cautions (B)

Management Directive (MD) 8.8, "Management of Allegations,"

provides NRC policy with regard to notifying the Office of Investigations (01) and the Office of the Inspector General (OIG) of wrongdoing matters, as well as initiating, prioritizing, and terminating investigations. Each petition manager should become familiar with the current version of MD 8.11 and this handbook and follow the policy and procedures included in them when dealing with issues requiring OI or OIG investigations. (1)

Any mention outside NRC of an ongoing OI or OIG investigation, for example, as an explanation for schedule changes, requires the approval of the Director, OI, or the IG, respectively. (2)

Approved: July 1, 1999 (Revised: October 25, 2000) 1

lL Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part I I

I General Cautions (B) (continued)

If the petition contains information on alleged wrongdoing on the part of a licensee or certificate holder, an applicant for a license or certificate, their contractors, or their vendors, treat the petition, or the relevant part of the petition, as an allegation and promptly notify OI. If the petition contains information on alleged wrongdoing involving an NRC employee, NRC contractors, or NRC vendors, promptly notify OIG. (3) 2 Approved: July 1, 1999 (Revised: October25,2000)

Volume 8,, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part II Part II Initial Staff Actions NRC's Receipt of a Petition (A)

Process Summary (1)

After NRC receives a petition, the Executive Director for Operations (EDO) assigns it to the director of the appropriate office for evaluation and response. The original incoming petition is sent to the office and a copy of the petition is sent to the Office of the General Counsel (OGC).

The official response is the office director's written decision addressing the issues raised in the petition. The office director can grant, partially grant, or deny the petition. The Commission may, on its own initiative, review the director's decision within 25 days of the date of the decision, although it will not entertain a request for review of the director's decision.

Assignment of Staff Action (2)

Petitions maybe in the form of requests for NRC action that may or may not cite 10 CFR 2.206 and may initially be directed to staff other than the EDO. In any of these cases, the staff person who receives the document should make an initial evaluation as to whether the document meets the criteria for review under 10 CFR 2.206 provided in Part III of this handbook. Staff persons who are uncertain whether or not the document meets the criteria should consult their management or office coordinators for further guidance. If a petition meets the criteria but does not specifically cite 10 CFR 2.206, the staff will attempt to contact the petitioner by telephone to determine if he or she wants the request processed pursuant to 10 CFR 2.206. The staff may determine that a request forwarded for staff action is not a petition for enforcement-related action but, rather, a petition for rulemaking, for example. If there is any uncertainty about whether or not a request is a peiition under 10 CFR 2.206, it should be treated as one so that a petition review -board (PRB) can make its recommendations, as described in Part III of this handbook. (a)

Approved: July 1, 1999 (Revised: October25,2000)-

3

ALL.-

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part II NRC's Receipt of a Petition (A) (continued)

Assignment of Staff Action (2) (continued)

If the staff receives a request that it believes is a 10 CFR 2.206 petition, it will forward the request to the Office of the EDO (OEDO) for assignment of action. Petitions also may be forwarded to the OEDO from the Atomic Safety and Licensing Board Panel or from a Presiding Officer in accordance with 10 CFR 2.1205(l)(2). The EDO will assign each petition to the appropriate office for action. If the document does not cite 10 CFR 2.206 and does not meet the criteria for review under that section, the staff will respond to it under some other process (e.g.,

routine correspondence, allegations). (b)

Petitions that cite 10 CFR 2.206 and are addressed to the EDO will be added to the Agencywide Documents Access and Management System (ADAMS) by OEDO. OEDO will not declare these petitions official agency records nor will it make them publicly available. Those steps will be carried out by the assigned office as described below. (c)

Office Action (B)

Upon receipt, office management will assign the petition to a petition manager. (1)

The Agency 2.206 Petition Coordinator (appointed by the Director, Division of Licensing Project Management, Office of Nuclear Reactor Regulation (NRR)), receives copies of all 2.206 petitions from OEDO and will add them to the 2.206 database. (2)

Petition Manager Action (c)

The petition manager will promptly review the petition and determine whether or not it contains allegations or sensitive information. The timing of this step is particularly important for petitions that are not addressed to the EDO. Normally, these documents have been entered into ADAMS through the Document Control Desk (DCD) and are released to the public after a specified period of time. The delay allows the staff time to review the petition for allegations or other sensitive information. If the petition manager determines that a document contains allegations or other sensitive information-, he or she should immediately contact the ADAMS Help Desk (301415-1234) to prevent releasing the document to the public. (1)

Approved: July 1, 1999 4

(Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part II Petition Manager Action (c) (continued)

Before the petition is released to the public, before the PRB meeting, and in any event within 1 week of receipt of the petition by the assigned office, the petition manager will inform the petitioner by telephone that the 2.206 petition process is a public process in which the petition and all the information in it will be made public. If the petitioner requests anonymity and that the petition not be made public, the petition manager will advise the petitioner that, because of its public nature, the 2.206 process cannot provide protection of the petitioner's identity. In these cases, the petition manager must obtain the agreement of the petitioner as to how the matterwill be handled (i.e., as an allegation or not) and document the petitioner's agreement in writing, usually in the form of a memorandum to file. In cases where the staff identifies certain issues in a petition that it believes are more appropriately addressed using the allegation process, the petition manager will obtain the agreement of the petitioner as to how these issues will be handled (i.e., as an allegation or not) and document the petitioner's agreement in writing. If all or part of the petition is treated as an allegation, this fact will be documented in the allegation acknowledgment letter (see Management Directive (MD) 8.8, "Management of Allegations"). (2)

If the request clearly does not meet the criteria for review as a 10 CFR 2.206 petition, the petition manager will also discuss this issue with the petitioner. The petitioner may be able to help the petition manager better understand the basis for the petition or the petitioner may realize that a 10 CFR 2.206 petition is not the correct forum for the issues raised in the request. Finally, the petition manager will offer the petitioner an opportunity to have one or more representatives give a presentation to the PRB and cognizant supporting staff either by telephone (or videoconference, if available) or in person. This is an opportunity for the petitioner to provide any relevant additional explanation and support for the request. This type of meeting is described in more detail in Part III of this handbook. (3)

After the initial contact with the petitioner, the petition manager will promptly advise the licensee(s) of the petition, send the appropriate licensee(s) a copy of the petition for information, and ensure that the petition and all subsequent related correspondence are made available to the public. (Note that if the petitioner wishes to have the request handled as an allegation, the request is no longer a 2.206 petition.) Any information related to allegations or other sensitive information that Approved: July 1, 1999 (Revised: October 25,2000) 5

I A-L Volume 8, Licensee Oversight Programs

, Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part II Petition Manager Action (C) (continued) make up a part of the petition will be redacted from copies sent to the licensee or made available to the public. For allegations, the petition manager should refer to MD 8.8. As discussed in MD 8.8, allegations must be forwarded to the associated Office Allegations Coordinator expeditiously. MD 8.8 also addresses the referral of wrongdoing issues to the Office of Investigations and the Office of the Inspector General. (4)

See Exhibit 1, Simplified 2.206 Process Flow Chart, and Exhibit 2, Petition Manager Checklist, for further information on petition manager actions. (5)

K-6 Approved: July 1, 1999 (Revised: October 25, 2000)

-Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Part III Petition Review Board (PRB)

General (A)

Schedule (1)

The assigned office holds a PRB meeting to review the 2.206 petition.

The PRB meeting is normally held within 2 weeks of receipt of the petition. The PRB meeting may be held much sooner if staff decisions are required on short-term, immediate actions (e.g., a request to shut down an operating facility or prevent restart of a facility that is ready to restart). In unusual situations, it may not be possible to hold the meeting in time to address any immediate action requests. In these cases, the staff will decide how any immediate actions requested will be addressed and obtain appropriate management concurrence as soon as possible. If the staff plans to take an action that is contrary to an immediate action requested in the petition before issuing the acknowledgment letter (such as permitting restart of a facility when the petitioner has requested that restart not be permitted), the petition manager must promptly notify the petitioner by telephone of the pending staff action.,

Board Composition (2)

The PRB consists of(a)

  • A PRB chairperson (generally a Senior Executive Service manager) (i)
  • A petition manager (ii)

! Cognnt management and staf, as necessary (iii)

  • A representative from the Office of Investigations (OI), as needed (iv)
  • A representative from the Office of Enforcement (OE) and, for petitions assigned to the Office of Nuclear Reactor Regulation (NRR), the NRR Senior Enforcement Coordinator, as needed (v)

Approved: July 1, 1999 (Revised: October 25,2000) 7

I

EU Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III General (A) (continued)

Board Composition (2) (continued)

In addition, a representative from the Office of the General Counsel (OGC) will normally participate. (b)

Preparation for the PRB Meeting (B)

The petition manager will provide copies of the petition to PRB and assist in scheduling the review board meeting. The petition manager also will arrange for cognizant technical staff members to attend the meeting, as necessary, and prepare a presentation for the review board.

In assigning technical staff members to the petition, management will consider any potential conflict from assigning any staff person who was previously involved with the issue that gave rise to the petition. (1)

The petition manager's presentation to PRB should include-(2)

  • A recommendation as to whether or not the petition meets the criteria for review under 10 CFR 2.206 (a)
  • A discussion of the safety significance of the issues raised (b)
  • Recommendations for any immediate action (whether requested or not) (c)
  • Recommendations on whether or not assistance from 01, OE, or OGC is necessary (d)
  • A request for confirmation concerning referral to OI or the Office of the Inspector General (OIG), as appropriate (e)
  • The proposed schedule, including the review schedule for the affected technical branches (f)

The petition manager also will offer a meeting or teleconference between the petitioner and the PRB before the board reviews the petition. This meeting or teleconference, if held, is an opportunity for the petitioner to provide any relevant additional explanation and support for the request in advance of the PRB's evaluation. The staff will hold this type of meeting if the petitioner desires it. If a decision. is required on a petitioner's request for immediate action before the petitioner's presentation can be scheduled, that decision will not be delayed. (3)

Approved: July 1, 1999 8

(Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Preparation for the PRB Meeting (B) (continued)

The petition manager also will invite the licensee to participate in the meeting or teleconference to' ensure that itunderstands the concerns about its facilityor activities. The PRB members may ask any questions needed to'clarify the petitioner's request. The licensee may also ask questions to clarify the issues raised by the petitioner. Any member of the public may attend (or listen in by telephone for a teleconference) as an observer. Meetings between PRB and the petitioner normally will be held at NRC headquarters in Rockville, Maryland, with provisions for participation by telephone or videoconference. This public meeting or teleconference is separate from the (closed) PRB meeting during which the PRB members develop their recommendations with respect to the petition. (4)

The petition manager will ensure that all staff persons at the meeting or teleconference are aware of the need to protect sensitive information from disclosure. Sensitive information includes safeguards or facility security information,. proprietary or confidential commercial information, or information relating to an ongoing investigation of wrongdoing. (5)

If 'the petitioner chooses to address PRB by telephone, it is not considered a meeting and no public notice is necessary. The petition manager will establish a mutually agreeable time and date and arrange to conduct the teleconference on a recorded line through the NRC Headquarters Operations Center (301-816-5100). The tape recording from the Operations Center is converted to a printed transcript that is treated as a supplement to the petition and is sent to the petitioner and the same distribution as the original petition. The petition manager will make arrangements for transcription service by submitting an NRC Form 587 to the Atomic Safety and Licensing Board Panel or by sending an e-mail. to "Court Reporter," giving the same information as requested on the Form 587. (6)

If the petitioner chooses to attend in person, the meetingwill take place at NRC headquarters at a'mutually agreeable time. For the meeting, the petition manager will follow the prior public notice period and other provisions: of Management' Directive (MD) 3.5, "Public Attendance at Certain Meetings Involving the NRC Staff." However, time constraints associated with this type of meeting will often dictate that the 10-day public notice period described in MD 3.5 will not be Approved: July 1, 1999 (Reused: October 25,2000) 9

-Si Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Preparation for the PRB Meeting (B) (continued) met. MD 3.5 allows for less than 10 days' public notice, if necessary, with appropriate management concurrence. The meeting should be noticed as a meeting between the NRC staff, the petitioner, and the licensee (unless the licensee chooses not to participate). The licensee is invited to participate, as in the teleconference described above, and members of the public may attend as observers. The meeting is transcribed and the transcript is treated in the same manner as in the case of a telephone briefing. (7)

The petitioner may request that a reasonable number of associates be permitted to assist him or her in addressing PRB concerning the petition. The petition manager will (1) discuss this request with the petitioner, (2) determine the number of speakers, and (3) allot a reasonable amount of time for the presentation so that the staff can acquire the information needed for its review in an efficient manner. (8)

At the meeting or teleconference, the chairperson will provide a brief summary of the 2.206 process, the petition, and the purpose of the discussion that will follow. The NRC staff and the licensee will have an opportunity to ask the petitioner questions for purposes of clarification.

PRB may meet in closed session before and/or after the meeting with the petitioner to conduct its normal business. (9)

The requirements for scheduling-and holding the petitioner presentation may impact the established time goals for holding the regular PRB meeting and issuing the acknowledgment letter. Any impacts should be kept to a minimum. (10)

The petition manager will review the transcript and, where necessary, edit it to ensure it accurately reflects what was said in the meeting or teleconference. Corrections are only necessary for errors that affect the meaning of the text of the transcript. The petition manager is not expected to correct inconsequential errors. (11)

After editing, the petition manager will ensure that the transcript gets the same distribution (petitioner, licensee, publicly available, etc.) as the original petition. For meetings, this step should be accomplished by attaching the transcript to a brief meeting summary.

For

- teleconferences, the petition manager may attach the transcript to a memorandum to file. (12)

Approved: July 1, 1999 10 (Revised: October 25,2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Criteria for Petition Evaluation (c)

The staff will use the criteria discussed in this section to determine whether or not a petition should be considered under 10 CFR 2.206 and whether or not similar petitions should be consolidated.

Criteria for Reviewing Petitions Under 10 CFR 2.206 (1)

The staff will review a petition under the requirements of 10 CFR 2.206 if the request meets all of the following criteria-(a)

  • The petition contains a request for enforcement-related action such as issuing an order modifying, suspending, or revoking a license, issuing a notice of violation,withorwithout a proposed civil penalty, etc. (i)
  • The facts that constitute the bases for taking the particular action are specified. The petitioner must provide some element of support beyond the bare assertion. The supporting facts must be credible and sufficient to warrant further inquiry. (ii)
  • There is no NRC proceeding available in which the petitioner is or could be a party and through which the petitioner's concerns could be addressed. If there is a proceeding available, for example, if a petitioner raises an issue that he or she has raised or could raise in an ongoing licensing proceeding, the staff will inform the petitioner of the ongoing proceeding and will not treat the request under 10 CFR 2.206. (iii)

An exception to the first two criteria is any petition to intervene and request for hearing in a licensing proceeding that is referred to the 10 CFR 2.206 process in accordance with 10 CFR 2.1205()(2). These

- referrals may be made when the petition does not satisfy the legal requirements for a hearing or intervention and the Atomic Safety and LicensingBoardPanel or the Presiding Officerdetermines that referral to the 10 CFR 2.206 process is appropriate. For these referrals, the substantive issues in the request for a hearing or intervention will be read as an implicit request for enforcement-related action, thus satisfying the criteria for treatment under the 10 CFR 2.206 review process. (b)

Criteria for Rejecting Petitions Under 10 CER 2.206 (2)

The staff will not review a petition under 10 CFR 2.206, whether specifically cited or not, under the following circumstances-Approved: July 1, 1999 (Revised: October 25, 2000) 11

I AkL_

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Criteria for Petition Evaluation (C) (continued)

Criteria for Rejecting Petitions Under 10 CFR 2.206 (2) (continued)

The incoming correspondence does not ask for an enforcement-related action or fails to provide sufficient facts to support the petition but simply alleges wrongdoing, violations of NRC regulations, or existence of safety concerns. The request cannot be simply a general statement of opposition to nuclear power or a general assertion without supporting facts (e.g., the quality assurance at the facility is inadequate). These assertions will be treated as routine correspondence or as allegations that will be referred for appropriate action in accordance with MD 8.8, "Management of Allegations." (a)

  • The petitioner raises issues that have already been the subject of NRC staff review and evaluation either on that facility, other similar facilities, or on a generic basis, for which a resolution has been achieved, the issues have been resolved, and the resolution is applicable to the facility in question. This would include requests to reconsider or reopen a previous enforcement action (including a decision not to initiate an enforcement action) or a director's decision. These requests will not be treated as a 2.206 petition unless they present significant new information. (b)
  • The request is to deny a license application or amendment. This type of request should initially be addressed in the context of the relevant licensing action, not under 10 CFR 2.206. (c)
  • The request addresses deficiencies within existing NRC rules. This type of request should be addressed as a petition for rulemaking. (d)

Criteria for Consolidating Petitions (3)

Generally, all requests submitted by different individuals will be treated and evaluated separately. When two or more petitions request action against the same licensee, specify essentially the same bases, provide adequate supporting information, and are submitted at about the same time, PRB will consider the benefits of consolidating the petitions against the potential of diluting the importance of anypetition and recommend whether or not consolidation is appropriate. The assigned office director will determine whether or not to consolidate the petitions.

Approved: July 1, 1999 12 (Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III PRB Meeting (D)

PRB ensures that an appropriate petition review process is followed.

The purposes of the PRB process are to-(1)

  • Determine whether or not the' petitioner's request meets the criteria for review as a 10 CFR 2.206 petition (see Part III(C) of this handbook) '(a)
  • Determine whether or not the petitioner should be offered or informed of an alternative process (e.g., consideration of issues as allegations, consideration of issues in a pending license proceeding, or rulemaking) (b)
  • Determine whether there is a need for any immediate actions (whether requested or'not)' (c)
  • Establish 'a schedule for responding to the petitioner so that a commitment is made by management and the technical review staff to respond to the petition inma timely manner (see Part IV of this handbook for guidance regarding schedules) (d)
  • Address the possibility of issuing a partial director's decision (e)
  • Determine whether or not the petition should be consolidated with another petition (f)
  • Determine whether or not referral to OI or OIG is appropriate (g)
  • Determine whether or not there is a need for OGC to participate in the review (h)
  • Determine whether or not the licensee should be requested to respond to the petition (i)
  • Determine whether or not the petition is sufficiently complex that additional review board meetings should be scheduled to ensure that suitable progress' is being made ')

The PRB meeting is a closed meeting, separate from any meeting with the petitioner and the licensee,'during'which the PRB members develop their recommendations with respect to the petition. At the meeting, the petition manager briefs PRB on the petitioner's request(s), any background'information, the need for an independent technical review, and a proposed plan for resolution, including target completion dates. The petition manager, with the assistance of the Approved: July 1, 1999 (Revised: October 25, 2000) 13

I - _

AIL-Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III, PRB Meeting (D) (continued)

Agency 2.206 Petition Coordinator, ensures appropriate documentation of all PRB recommendations in the summary of the PRB meeting. (2)

The OGC representative provides legal review and advice on 10 CFR 2.206 petitions. OGC may be assigned as the responsible office for the review, if appropriate. (3)

Informing the Petitioner of the Results (E)

After PRB meets, and before issuing the acknowledgment letter, the petition manager will ensure that appropriate levels of management (as determined by the assigned office) are informed of the board's recommendations and that they concur. The petition managerwill then inform the petitioner by telephone as to whether or not the petition meets the criteria for review under 10 CFR 2.206, of the disposition of any requests for immediate action, of how the review will proceed, and that'an acknowledgment letter is forthcoming. If the staff plans to take an action that is contrary to an immediate action requested in the petition before issuing the acknowledgment letter, the petition manager must notify the petitioner promptly by telephone of the pending staff action. An example of a contrary action would be if NRC permitted restart of a facility when the petitioner had requested that restart not be permitted. The petitioner will not be advised of any wrongdoing investigation being conducted by 01 or OIG.

Meeting With the Petitioner (F)

After informing the petitioner of the pertinent PRB recommendations, the petition manager will offer the petitioner an opportunity to comment on the recommendations.. This opportunity will be in the form of a meeting or teleconference between the petitioner and the PRB. If the petitioner accepts this offer, the petition manager will establish a mutually agreeable date for the meeting or teleconference with the petitioner. The petition manager also will invite the licensee to participate and will. coordinate the schedules and dates with the licensee. The meeting or teleconference should be scheduled so as not to adversely affect the established petition review schedule. (i)

Approved: July 1, 1999 14 (Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Meeting With the Petitioner (F) (continued)

This meeting or teleconference, if held, is an opportunity for the petitioner to provide any relevant additional explanation and support for the request in light of PRB's recommendations. The PRB members may ask questions to clarify the petitioner's request. If staff decisions on any of the petitioner's immediate action'requests are required before the petitioner's presentation can be scheduled, those decisions will not be delayed. The format of the meeting or teleconference, application of MD 3.5, transcription, etc., and the requirements to edit and distribute the transcript are the same as for a meeting or teleconference held prior to the PRB's review of the petition. (2)

After this discussion, PRB will consider the need to modify any of its recommendations. The final recommendations will be included in the acknowledgment letter. The acknowledgment letter will address any comments the petitioner made concerning the initial PRB

-recommendations and the staff's response. The petitioner will be notified promptly of staff decisions on any immediate action requests.

If the petitioner presents significant new information to the staff, PRB may determine that this new information constitutes a new petition that will be treated separately from the initial petition. (3)

The requirements for scheduling and holding the petitioner presentation may impact the established time goals for issuing the acknowledgment letter. These impacts should be kept to a minimum. (4)

Response to the Petitioner (G After PRB finalizes its recommendations, the petition manager prepares a written response to the petitioner.

Requests That Do Not Meet the Criteria (1)

If PRB, with office-level management concurrence, determines that the petition does not meet the criteria for review 'as a 10 CFR 2.206 petition, the petition manager then prepares a letter that (1) explains why the request is not being reviewed under 10 CFR 2.206; (2) responds, to the extent possible at that time, to the issues in the petitioner's request; and (3) explains what further'actions, if any, the staff intends to take in response to the request (e.g.'; treat it as an allegation or routine correspondence). See Exhibit 3 for an example. (a)

The petition manager will attach the original petition and any enclosure(s) to the Reading File copy of the letter. (b)

Approved: July 1, 1999 (Revised: October 25, 2000) 15

I-A t

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Response to the Petitioner (G) (continued)

Requests That Meet the Criteria (2)

If the PRB finds that the petition meets the criteria for review as a 10 CFR 2.206

petition, the petition manager prepares an acknowledgment letter and associated Federal Register notice (see Exhibits 4 and 5). The letter should acknowledge the petitioner's efforts in bringing issues to the staff's attention. If the petition contains a request for immediate action by the NRC, such as a request for immediate suspension of facility operation until final action is taken on the request, the acknowledgment letter must explain the staff's response to the immediate action requested and the basis for that response. (a)

The petition manager ensures that a copy of this management directive and of the pamphlet "Public Petition Process," prepared by the Office of Public Affairs, are included with the acknowledgment letter. The acknowledgment letter also should include the name and telephone number of the petition manager, identify the technical staff organizational units that will participate in the review, and provide the planned schedule for the staff's review. A copy of the acknowledgment letter must be sent to the appropriate licensee and the docket service list(s). (b)

The petition manager will attach the original 2.206 petition and any enclosure(s) to the Reading File copy of the acknowledgment letter. (c)

In rare cases the staff may be prepared to respond to the merits of the petition immediately. In this case, the staff can combine the functions of the acknowledgment letter and the director's decision into one document. A similar approach would be taken in combining the associated Federal Register notices. (d)

Sending Documents to the Petitioner (H)

If the PRB determines that the request is a 2.206 petition, then the petition manager will-(1)

  • Add the petitioner to the service list(s) for the topic (if one exists).

Add the petitioner to the headquarters and regional service lists for the licensee(s) that is(are) the subject of the petition. (a)

Approved: July 1, 1999 16 (Revised: October 25,2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CER 2.206 Petitions Handbook 8.11 Part III Sending Documents to the Petitioner (H) (continued)

  • Request the licensee to send copies of any future correspondence related to the petition-to the petitioner; with due regard for proprietary, safeguards, and other sensitive information. (b)
  • To the extent that the petition manager is aware of these documents, ensure that the petitioner is placed on distribution for other NRC correspondence relating to the issues raised in the petition, including relevant generic letters or bulletins that are issued during the pendency of the NRC's consideration of the petition. This does not include NRC correspondence or documentation related to an 01 or OIG investigation, which will not be released outside NRC without the approval of the Director, 01, or the IG, respectively. (c)

These three actions will remain in effect until 90 days after the director's decision is issued if the petitioner desires it. (2)

Supplements to the Petition (I)

A petitioner will sometimes submit a supplement to his or her petition.

The petition manager will review the supplement promptly and determine whether or not it contains allegations or sensitive information. If the supplement appears to contain information of this nature, the petition manager must obtain the agreement of the petitioner as to how these issues will be handled (i.e., as an allegation or not) and document the petitioner's agreement in writing, usually in the form of a memorandum to file. If all or part of the supplement is treated as an allegation, this fact will be documented in the allegation acknowledgment letter (see MD 8.8, "Management of Allegations").

See Part II(C) of this handbook for more detailed information. (1)

The petition manager will also ensure the supplement receives the same distribution as the petition and will forward a copy of the supplement to the PRB members. The PRB members will review the supplement and determine whether they need to meet formally to discuss it and, if so, whether or not to offer the petitioner an opportunity to discuss the' supplement with the PRB members before the board reviews the supplement (see Part III(B) of this handbook). In deciding whether a'formal PRB meeting is needed, the PRB members will consider the safety'significance and complexity of the information in the supplement. Clarifications of previous information will generally not require a new PRB meeting. If a new PRB meeting is not convened, the petition manager will include the supplement in the ongoing petition review and no further action is necessary. (2)

Approved: July 1, 1999 (Revised: October 25,2000) 17

I 2

t Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part III Supplements to the Petition (I) (continued)

If a new PRB meeting is convened, the PRB members will determine whether or not-(3)

  • There is a need for any immediate actions (whether requested or not) (a)
  • The supplement should be consolidated with the existing petition (b)
  • To issue a partial director's decision (c)
  • Referral to OI or OIG is appropriate (d)
  • To revise the review schedule for the petition based on the supplement (see Part IV of this handbook for guidance regarding schedules) (e)
  • To send an acknowledgment letter for the supplement. (An acknowledgment letter should be sent if the supplement provides significant new information, causes the staff to reconsider a previous determination, or requires a schedule change beyond the original 120-day goal. See Part III(G) of this handbook for information on acknowledgment letters.) (f)
  • To offer the petitioner a meeting or teleconference with PRB to discuss its recommendations with respect to the supplement. (See Part III(F) of this handbook for information on this type of meeting or teleconference.) (g)

If the staff determines that the schedule for the petition must be extended beyond the original 120-day goal as a result of the supplement, the assigned office should send an acknowledgment letter to the petitioner, reset the 120-day clock to the date of the new acknowledgment letter, and inform the Office of the Executive Director for Operations (OEDO). (4)

If PRB determines thatthe supplementwill be treated as a newpetition (i.e., not consolidated with the existing petition), the assigned office must contact OEDO and obtain a new tracking number in the Work Item Tracking System. (5)

Approved: July 1, 1999 18 (Revised: October 25,,2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IV Part IV

'Petition Review Activities Reviewing the Petition (A)

Interoffice Coordination (1)

The petition manager coordinates all information required for the petition review.- The petition manager also advises his or her management of the need for review and advice from the Office of the General Counsel (OGC) regarding a petition in special cases. When appropriate, an Associate Director in the Office of Nuclear Reactor Regulation, a Division Director in the Office of Nuclear Material Safety and Safeguards,'or the"Director of the Office of Enforcement requests OGC involvement through the OGC special counsel assigned to 2.206 matters. (a)

All information related to a wrongdoing investigation by the Office of Investigations (OI) or the Office of the Inspector General (OIG), or even the fact that -an investigation is being conducted, will receive limited distribution within NRC and will not be released outside NRC without the approval of the Director, OI, or the IG, respectively (see Management 'Directive (MD)' 8.8). Within NRC, access to this information is limited to those having a need-to-know. Regarding a 2.206 petition, the assigned office 'director, or his designee, maintains copies of any documents required and erisures that no copies of documents related to an OI or OIG investigation are placed in the docket file or the Agencywide Documents Access and Management System (ADAMS) without the approval of the Director, OI, or the IG, respectively. (b)

Approved: July 1, 1999 (Revised: October 25, 2000) 1

I Al.

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IV Reviewing the Petition (A) (continued)

Request for Licensee Input (2)

If appropriate, the petition manager will request the licensee to provide a voluntary response to the NRC on the issues specified in the petition, usually within 30 days. This staff request will usually be made in writing. The petition manager will advise the licensee that the NRC will make the licensee's response publicly available and remind the licensee to provide a copy of the response to the petitioner. The licensee may voluntarily submit information relative to the petition, even if the NRC staff has not requested any such information. (a)

Unless necessary for NRC's proper evaluation of the petition, the licensee should avoid using proprietary, or personal privacy information that requires protection from public disclosure. If such information is necessary to respond to the petition completely, the petition manager ensures the information is protected in accordance with 10 CFR 2.790. (b)

Technical Review Meeting With the Petitioner (3)

A technical review meeting with the petitioner will be held whenever the staff believes that such a meeting (whether requested by the petitioner, the licensee, or the staff) would be beneficial to the staff's review of the petition. Meeting guidance is provided in MD 3.5. The petition manager will ensure that the meeting does not compromise the protection of sensitive information. A meeting will not be held simply

  • because the petitioner claims to have additional information and will not present it in any other forum.

Additional Petition Review Board (PRB) Meetings (4)

Additional PRB meetings may be scheduled for complex issues.

Additional meetings also may be appropriate if the petition manager finds that significant changes must be made to the original plan for the resolution of the petition.

Schedule (B)

The first goal is to issue the proposed director's decision for comment within 120 days after issuing the acknowledgment letter. The proposed director's decision for uncomplicated petitions should be issued in less than 120 days. The second goal is to issue the director's decision within 45 days of the end of the comment period for the proposed Approved: July 1, 1999 20 (Revised: October 25,2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IV Schedule (B) (continued) director's decision. The actual schedule should be shorter if the number and complexity of the comments allow. The Office of the Executive Director for Operations (OEDO) tracks the first target date, and any change of the date requires approval by the EDO. The petition manager monitors the progress of any PI investigation and related enforcement actions. Enforcement actions that are prerequisites to a director's decision should be-expedited and completed in time to meet the 120-day goal. Investigations by OI and OIG associated with petitions should be expedited to the extent practicable. However, the goal of issuing the proposed director's decision for comment within 120 days after issuing the acknowledgment letter applies only to petitions whose review schedules are within the staff's control. If issues in a petition are the subject of an investigation by OI or OIG, or a referral to the Department of Justice (DOJ), or if NRC decides to await a Department of Labor decision, the clock for the 120-day goal is stopped for the portion of the petition awaiting disposition by those organizations. The clock will start again when the staff receives the results of the investigation. If the staff can respond to some portions of the petition without the results of the investigation, then a proposed partial director's decision should be issued for comment within the original 120- days. When the staff receives the results of the investigation, it will promptly develop and issue a proposed final director's decision for comment. See Part V of this handbook for a discussion of partial director's decisions. (1)

If the proposed director's decision cannot be issued in 120 days for

-other reasons (e.g., very -complex issues), the appropriate level of management in the assigned office determines the need for an extension of the schedule and requests the extension from the EDO. In addition, the petition manager will contact the petitioner promptly to explain the reason(s) for the delay and will maintain a record of the contact. (2)

After the comment period closes on a proposed director's decision, the assigned office -will review the comments received and provide the schedule to issue the director's decision to the Agency 2.206 Petition Coordinator for inclusion in the next status report. (3)

Approved: July 1, 1999 (Revised: October 25, 2000) 21

a' Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part IV Keeping the Petitioner Informed (c)

The petition manager ensures that the petitioner is notified at least every 60 days of the status of the petition, or more frequently if a significant action occurs. If a significant action will be reported in the monthly status report prepared by the Agency 2.206 Petition Coordinator, the petition manager will inform the petitioner before the status report is issued. The petition manager makes the status reports to the petitioner by telephone. The petition manager should speak directly to the petitioner if reasonably possible. The petition manager keeps up-to-date on the status of the petition so that reasonable detail can be provided with the status reports. However, the status report to the petitioner will not indicate-

  • An ongoing OI or OIG investigation, unless approved by the Director, OI, or the IG (1)
  • The referral of the matter to DOJ (2)
  • Enforcement action under consideration (3)

Updates to Management and the Public (D)

On a monthly basis, the Agency 2.206 Petition Coordinator will contact all petition managers reminding them to prepare a status report regarding 2.206 petitions in their offices. The petition managers should e-mail the status report for each open petition; with the exception of sensitive information as described below, to "Petition." The Agency 2.206 Petition Coordinator combines all the status reports, including staff performance metrics for petitions processed under 10 CFR 2.206 for the current year, in a monthly report to the EDO from the Associate Director, Project Licensing and Technical Analysis. The Agency 2.206 Petition Coordinator also ensures the document is added to ADAMS and made publicly available and e-mails a copy to "NRCWEB" for placement on the NRC's Web site. (1)

If the status of the petition includes sensitive information that mayneed to be protected from disclosure, the petition managerwill so indicate in the e-mail and in the status report itself. Sensitive information includes safeguards or facility security information, proprietary or confidential commercial information, information relating to an ongoing investigation of wrongdoing or enforcement actions under development, or information about referral of matters to the DOJ and should be handled in accordance with MD 12.6, "NRC Sensitive Unclassified Information Security Program." The Agency 2.206

- Approved: July 1, 1999' 22 (Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part TV Updates to Management and the Public (D) (continued)

Petition Coordinator will protect this information from disclosure by placing the affected status report(s) in a separate enclosure to the status report, clearly marking the status report to the EDO, and redactingthe sensitive information from the version of the report that is made public. (2)

The NRC's Web site provides the up-to-date status of pending 2.206 petitions, director's decisions issued, and other related information.

The NRC external Web site (http://www.nrc.gov) is accessible via the World Wide Web, and documents related to petitions maybe found on the "Public Involvement" page under the section on Petitions.

Director's decisions are also published in NRC Issuances (NUREG-0750). (3)

Approved: July 1, 1999 (Revised: October 25,2000) 23

I ALL-Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part V Part V The Director's Decision Content and Format (A)

The petition manager prepares the proposed director's decision on the petition and the associated Federal Register notice for the office director's consideration, including coordination with the appropriate staff supporting the review. See Exhibits 6 and 7 for a sample director's decision with cover letter and the associated Federal Register notice, respectively. The petition manager will also prepare letters to the K

petitioner and the licensee that will enclose the proposed director's decision and request comments on it (see Exhibit 8). These letters will be routed with the director's decision for concurrence. (1)

The director's decision will clearly describe the issues raised by the petitioner, provide a discussion of the safety significance of the issues, and clearly explain the staff's disposition for each issue. The petition manager will bear in mind the broader audience (i.e., the public) when preparing the explanation of technical issues. Refer to the NRC Plain Language Action Plan, available on the internal Web site, for further guidance. In addition, the petition manager will ensure that any documents referenced in the decision are available to the public. If a partial director's decision was issued previously, the final director's decision will refer to, but does not have to repeat the content of, the partial director's decision. After management's review, the petition manager incorporates any proposed revisions in the decision. (2)

If appropriate, the decision and the transmittal letter for the director's decision or partial director's decision should. acknowledge that the petitioner identified valid issues and should specify the corrective actions that have been or will be taken to address these issues, notwithstanding that some or all of the petitioner's specific requests for action have not been granted. (3)

Approved: July 1, 1999 24 (Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part V Content and Format (A) (continued)

If the Office of Investigations (OI) has completed its investigation of a potential wrongdoing issue and the matter has been referred to the Department of Justice (DOJ), the petition rninagerwill contact OI and the Office of Enforcement (OE) to coordiniate NRC's actions. For petitions assigned to the Office of Nuclear Reactor Regulation (NRR),

the petition manager also will contact the NRR Senior Enforcement Coordinator. The staff may need to withhold action on the petition in keeping with the Memorandum of Understanding with DOJ. (4)

If the results of a wrongdoing investigation by Ol in relation to the petition are available, the staff will consider these results in completing the action on the petition..O must concur in the accuracy and characterization of the OI findings and conclusions that are used in the decision. (5)

The petition manager will obtain OE's review of the director's decision for potential enforcement implications. For petitions assigned to NRR, the petition manager also will provide a copy of the director's decision to the NRR Senior Enforcement Coordinator. (6)

Final Versus. Partial Director's Decisions (B)

The staff will consider preparing a partial director's decision when some of the issues associated with the 2.206 petition are resolved in advance of other issues and if significant schedule delays are anticipated before resolution of the entire petition. (1)

The format, content, and method of processing a partial director's decision are the same-as that of a director's decision (as described above) and an accompanying Federal Register notice would still be prepared (see Exhibit 7). However, the partial director's decision should clearly indicate those portions of the petition that remain open, explain the reasons for the delay to the extent practical, and provide the staff's schedule for the final director's decision. If all of the issues in the petition can be resolved together, then the director's decision will address all of the issues. (2)

Granting the Petition (c)

Once the staff has determined that the petitionwill be granted, inwhole or in part, the petition manager will prepare a "Director's Decision Under 10 CFR 2.206" for the office director's signature. The decision will explain the bases upon which the petition has been granted and identify the actions that NRC staff has taken or will take to grant all or that portion of the petition. -The decision also should describe any Approved: July 1, 1999 (Revised: October 25,2000) 25

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part V Granting the Petition (C) (continued) actions the licensee took voluntarily that address aspects of the petition. The Commission maygrant a request for enforcement-related action, in whole or in part, and also may take other action to satisfy the concerns raised by the petition. A petition is characterized as being granted in part when the NRC grants only some of the actions requested and/or takes actions other than those requested to address the underlying problem. If the petition is granted in full, the director's decision will explain the bases for granting the petition and state that the Commission's action resulting from the director's decision is outlined in the Commission's order or other appropriate communication. If the petition is granted in part, the director's decision will clearly indicate the portions of the petition that are being denied and the staff's bases for the denial.

Denying the Petition (D)

Once the staff has determined that the petition will be denied, the petition manager will prepare a "Director's Decision Under 10 CFR 2.206" for the office director's signature. The decision will explain the bases for the denial and discuss all matters raised by the petitioner in support of the request.

Issuing the Proposed Director's Decision for Comment (E)

After the assigned office director has concurred in the proposed director's decision, the petition manager will issue the letters to the petitioner and the licensee enclosing the proposed director's decision and requesting comments on it. The letters, with the enclosure, will be made available to the public through the Agencywide Documents Access and Management System (ADAMS). (1)

The intent of this step is to give the petitioner and the licensee an opportunity to identify errors in the decision. The letters will request a response within a set period of time, nominally 2 weeks. The amount of time allowed for the response may be adjusted depending on circumstances. For example, forvery complex technical issues it maybe appropriate to allow more time for the petitioner and licensee to develop their comments. The letters, including the proposed director's decision, should be transmitted to the recipients electronically or by fax, if possible. (2)

Approved: July 1, 1999 26 (Revised: October 25,2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part V Comment Disposition (F)

After the comment period closes on the proposed director's decision, the assigned office will review the comments received and provide the schedule to issue the director's decision to the Agency 2.206 Petition Coordinator for inclusion in the next status report. The petition manager will then evaluate any comments received on the proposed decision, obtaining the assistance of the technical staff, as appropriate.

Although the staff requested comments from only the petitioner and the licensee, comments from other sources (e.g., other members of the public) may be received. These additional comments should be addressed in the same manner as the comments from the petitioner and licensee. A copy of the comments received and the associated staff responses will be included in the director's decision. An attachment to the decision will generally be used for this purpose. (1).

If no comments are received on the proposed decision, the petition manager will include in the director's decision a reference to the letters that requested comments and a statement that no comments were received. (2)

If the comments from the petitioner include new information, the petition reviewboard will be reconvened to determine whether to treat the new information as part of the current petition or as a new petition. (3)

Issuing the Director's Decision (G)

A decision under 10 CFR 2.206 consists of a letter to the petitioner, the director's decision,, and the Federal Register notice. The petition manager will obtain a director's decision number (i.e., DD-YY-XX) from the Office of the Secretary (SECY). A director's decision number is assigned to each director's'decision in numerical sequence. This number is included on the letter to the petitioner, the director's decision, and the Federal Register notice. Note that the director's decision itself is not published in the FederalRegister; only the notice of its availability, containing a summary of the substance of the decision, is published (see Exhibits 6 and 7). (1)

The petition manager will prepare a letter to transmit the director's decision to the petitioner and will also prepare the associated Federal Register notice. If the staff's response to the petition involves issuing an order, the petition man agerwill prepare a letter to transmit the order to the licensee. The petition manager also will include a copy of the order Approved: July 1, 1999 (Revised: October 25, 2000) 27

I XI-Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part V Issuing the Director's Decision (G) (continued) in the letter to the petitioner. When the director's decision has been signed, the petition manager will promptly send a copy of the decision, electronically or by fax if possible, to the petitioner. Copies of the director's decision and Federal Register notice that are sent to the licensee and individuals on the service list(s) are dispatched simultaneously with the petitioner's 'copy. Before dispatching the director's decision (or partial decision), the petition manager will inform the petitioner of the imminent issuance of the decision and the substance of the decision. The petition manager will also ask the petitioner whether he or she wishes to continue receiving documents related to the petition. (2)

The assigned office director will sign the cover letter, the director's decision, and the Federal Register notice. After the notice is signed, the staff forwards it to the Rules and Directives Branch, Office of Administration (ADM/DAS/RDB), for transmittal to the Office of the Federal Register for publication. The staff shall NOT include a copy of the director's decision in the package that is sent to RDB. RDB only forwards the Federal Register notice to be published. (3)

Administrative Issues (H)

The administrative staff of the assigned office will review the 10 CFR 2.206 package before it is dispatched and determine appropriate distribution. The administrative staff also will immediately (same day) hand -carry the listed material to the following offices (in the case of the petitioner, promptly dispatch the copies.)-(1)

  • Rulemakings and Adjudications staff, SECY (a)
  • Five copies of the director's decision (i)
  • Two courtesycopies ofthe entire decision package including the distribution and service lists (ii)
  • Two copies of the incoming petition and any supplement(s) (iii)
  • Petitioner (b)
  • Signed original letter (i)
  • Signed director's decision (ii)
  • A copy of the Federal Register notice (iii)

Approved: July 1, 1999 28 (Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part V Administrative Issues (H) (continued)

  • Chief, Rules and Directives Branch (c)
  • Original signed Federal Register notice only (do not include the director's decision) (i)
  • Five paper copies of the notice (ii)
  • A disk with a WordPerfect file that contains the Federal Register notice (iii)

The staff must fulfill these requirements promptly because the Commission has 25 calendar days from the date of the decision to determine whether or not the director's decision should be reviewed. (2)

The staff will use the following guidelines when distributing copies internally and externally-(3)

  • When action on a 2.206 petition is completed, the petition manager will ensure that all publicly releasable documentation is available to the public in ADAMS. (a)
  • The assigned office will determine the appropriate individuals and offices to include on the distribution list. (b)

The administrative staff of the assigned office will complete the following actions within 2 working days of issuance of the director's decision: (4)

  • Provide one paper copy of the director's decision to the special counsel in the Office of the General Counsel assigned to 2.206 matters. (a)
  • E-mail the final version of the director's decision to the NRC Issuances (NRCI) Project Officer, Publishing Services Branch (PSB),

Office of the Chief Information Officer (OCIO). If other information (opinions, partial information (such as errata), or footnotes) is included in the e-mail, clearly identify the director's decision number at the beginning of each file to avoid administrative delays and improve the technical production schedule for proofreading, editing, and composing the documents. In addition, send two paper copies of the signed director's decision to the NRCI Project Officer. (b)

Approved: July 1, 1999 (Revised: October 25, 2000) 29

IL_

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Part V Administrative Issues (H) (continued)

  • E-mail a signed, dated, and numbered copy of the director's decision to "NRCWEB" for posting on the NRC's Web site. (c)

The petition manager will prepare headnotes, which are a summary of the petition, consisting of no more than a few paragraphs describing what the petition requested and how the director's decision resolved or closed out the petition. The petition manager will e-mail the headnotes to the NRCI Project Officer, PSB, OCIO, for monthly publication in the NRC Issuances, NUREG-0750. The headnotes should reach PSB before the 5th day of the month following the issuance of the director's decision. (5)

Finally, 90 days after issuance of the director's decision, the petition manager will remove the petitioner's name from distribution and/or the service list(s) and inform the licensee that it may also stop sending documents associated with the petition to the petitioner. (6)

Commission Actions (I)

SECY will inform the Commission of the availability of the director's decision. The Commission, at its discretion, may determine to review the director's decision within 25 days of the date of the decision and may direct the staff to take some other action than that in the director's decision. If the Commission does not act on the director's decision within 25 days (unless the Commission extends the review time), the director's decision becomes the final agency action and SECY sends a letter to the petitioner informing the petitioner that the Commission has taken no further action on the petition.

Approved: July 1, 1999 30 (Revised: October 25,2000)

c C

CD t..

u1\\c n

tn\\0 00 m#-I

_W O.1 mla w

U)

S0 nQ sD F

I-CD, C)

!t

cn 10 0

0

)W0 CD CL wo us us It 01 Pa PF.-

ED rAl 0

0ul O o CDt C

A:

_so:

C

(

(

Volume 8, Licensee Oversight Programs Review'Process for 10 CFR 2.206 Petitions Handbook 8.11 'Exhibits Exhibit 2 Petition Manager Checklist O Review the petition for allegations and sensitive material. If sensitive, prevent releasing the document to the public. Also determine whether or not any immediate actions requested require expedited staff response.

o Contact the petitioner and discuss the public nature of the process. Offer a pre-PRB meeting or telecon to the petitioner.

E Send a copy of the incoming petition to the licensee and Document Control Desk (Public), with redactions as appropriate.

o If a pre-PRB meeting or telecon is held, notice it (meeting only) and arrange for it to be recorded and transcribed (meeting or telecon). Arrange the meeting and the PRB meeting which will follow it.

E Prepare a PRB presentation. Include the following information:

Does the request meet the criteria for review under 2.206?

What are the issues and their significance?

K)

-Is there a need for immediate action (whether requested or not)?

Is there a need for OE, OI, OIG, or OGC involvement?

What is your recommended approach to the response?

What schedule is proposed?

o Hold the pre-PRB meeting or telecon.

E Address the PRB at its meeting.

0 Ensure assigned office management agrees with the PRB recommendations.

o Inform the petitioner of the PRB recommendations. Offer a post-PRB meeting.

E If a post-PRB meeting or telecon is held, notice it (meeting only) and arrange for it to be recorded and transcribed. Arrange the meeting and the PRB meeting which will follow it El Hold the post-PRB meeting or telecon.

O Address the PRB at its meeting.

0 Prepare a meeting summary for the pre-and post-PRB meetings, if held. This step is not required for a telecon.

El Ensure the transcripts of the pre-and post-PRB meetings or telecons, if held, are added to ADAMS and made publicly available. For meetings, this step can be done using the meeting summary.

Approved: July 1, 1999 (Revised: October 25,'2000) 33

u-i Volume 8, Licensee Oversight Programs Review Process for 10 CFR-2.206 Petitions Handbook 8.11 Exhibits Exhibit 2 (continued)

E Ensure assigned office management agrees with the PRB final recommendations.

E If the assigned office's management agrees with the PRB that the request is not a 2.206 petition, send a letter to the petitioner, treat any open issues under the appropriate process (e.g., rulemaking). Stop here.

o If the assigned office's management agrees with the PRB that the request is a 2.206 petition, continue with this checklist.

O Add petitioner to appropriate service list(s).

O Issue acknowledgment letter and associated Federal Register notice.

O If licensee input is needed, send a written request.

0 If further petitioner input is needed, arrange for a technical review meeting.

l Make periodic status updates to the petitioner.

0 Prepare the director's decision, addressing:

Each of the petitioners' issues The safety significance of each issue The staff's evaluation of each issue and actions taken El Ensure all referenced documents are added to ADAMS and made publicly available.

El Send the proposed director's decision to the petitioner and licensee for comment.

E After the comment period closes, give the schedule for the director's decision to the Agency 2.206 Petition Coordinator for inclusion in the next status report.

El Include comments received and their resolution in the director's decision.

El Prepare the Federal Register notice for the director's decision.

E As soon as the director's decision is signed:

Inform the petitioner of the substance of the decision and that issuance is imminent.

Hand-carry two full copies of the package (including the incoming(s) and distribution and service lists) and five additional copies to the Rulemakings and Adjudication Staff in SECY Hand-carry the original signed Federal Register notice (ONLY), five copies of the notice, and a diskwith the notice on it, to the Rules and Directives Branch. Do NOT include the director's decision in this package.

Approved: July 1, 1999

34.

(Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 2 (continued)

Immediately dispatch the signed original letter and decision and a copy of the Federal Register notice to the petitioner.

within 2 working days of issuing the Director's decision:

Provide a copy of the director's decision to the OGC special counsel assigned to 2.206 matters.

E-mail and send two paper copies of the director's decision to the NRC Issuances Project Officer in OCIO.

E-mail a signed, dated, and numbered copy of the director's decision to "NRCWEB."

E-mail headnotes on the petition to the NRC Issuances Project Officer in OCIO.

Approved: July 1, 1999.

(Revised: October25,2000) 35

-1 AL-Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 3 Sample Closure Letter for Requests That Are Not 2.206 Petitions

[Petitioner's Name]

[Petitioner's Address]

Dear Mr.:

Your petition dated [insert date] and addressed to the [insert addressee] has been referred to the Office of [insert] pursuant to 10 CFR 2.206 of the Commission's regulations. You request [state petitioner's requests]. As the basis for your request, you state that [insert basis for request].

[You met with our petition review board (PRB) on [insert date] to discuss your petition.

The results of that discussion have been considered in the PRB's determination regarding your request for immediate action and whether or not the petition meets the criteria for consideration under 10 CFR 2.2061. OR [Our petition review board has reviewed your submittal]. The staff has concluded that your submittal does not meet the criteria for consideration under 10 CFR 2.206 because [explain our basis, addressing all aspects of the submittal and making reference to the appropriate criteria in this MD].

[Provide the staff's response, if available, to the issues raised]. AND/OR [Explain what further actions, if any, the staff intends to take in response to the request (e.g., treat it as an allegation or routine correspondence)].

Thank you for bringing these issues to the attention of the NRC.

Sincerely,

[Insert Division Director's Name]

[Office of [insert Office Name]

Docket Nos. [ ]

cc: [Licensee (w/copy of incoming 2.206 request) & Service List]

Approved: July 1, 1999 36 (Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Revew Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 4 Sample Acknowledgment Letter

[Petitioner's Name]

[Petitioner's Address]

Dear Mr.:

Your petition dated [insert date] and addressed to the [insert addressee] has been referred to me pursuant to 10 CFR 2.206 of the Commission's regulations. You request [state petitioner's requests]. As the basis for your request, you state that [insert basis for request]. I would like to express my sincere appreciation for your effort in bringing these matters to the attention of the NRC.

[You met with our Petition Review Board (PRB) on [insert date] to discuss your petition.

The results of that discussion have been considered in the PRB's determination regarding

[your request for immediate action and in establishing] the schedule for the review of your petition]. Your request to [insert request for immediate action] at [insert facility name] is

\\ _J

[granted or denied] because [staff to provide explanation].

As provided by Section 2.206, we will take action on your request within a reasonable time.

I have assigned [First and last name of petition manager] to be the petition manager for your petition. Mr. [last name of petition manager] can be reached at [301415-extension of petition manager] Your petition is being reviewed by [organizational units] within the Office of [name of appropriate Office]. [If necessary, add: I have referred to the NRC Office of the Inspector General (OIG) those allegations of NRC wrongdoing contained in' your petition]. I have enclosed for your information a copy of the notice that is being filed with the Office of the Federal Register for publication. I have also enclosed for your information a copy of Management Directive 8.11 "Review Process for 10 CFR 2.206 Petitions," and the associated brochure NUREG/BR-0200, "Public Petition Process,"

prepared by the NRC Office of Public Affairs.

Sincerely,

[Office Director]

Enclosures:

Federal Register Notice Management Directive 8.11 NUREG/BR-0200 cc: [Licensee (w/copy of incoming 2.206 request) & Service List]

Approved: July 1, 1999 (Revised: October 25, 2000) 37

kLL Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 :Exhibits Exhibit 5

[7590-01-P]

Sample Federal Register Notice U.S. NUCLEAR REGULATORY COMMISSION Docket No(s).

License No(s).

[Name of Licensee]

RECEIPT OF REQUEST FOR ACTION UNDER 10 CFR 2.206 Notice is hereby given that by petition dated [insert date]; [insert petitioner's name]

(petitioner) has requested that the NRC take action with regard to [insert facility or licensee name]. The petitioner requests [state petitioner's requests].

As the basis for this request, the petitioner states that [state petitioner's basis for request].

The request is being treated pursuant to 10 CFR 2.206 of the Commission's regulations. The request has been referred to the Director of the Office of [insert action office]. As provided by Section 2.206, appropriate action will be taken on this petition within a reasonable time. [The petitioner met with the [insert action office] petition review board on [insert date] to discuss the petition. The results of that discussion were considered in the board's determination regarding [the petitioner's request for immediate action and in establishing] the schedule for the review of the petition]. [If necessary, add] By letter dated

,the Director (granted or denied) petitioner's request for [insert request for immediate action] at [insert facility/licensee name]. A copy of the petition is available in ADAMS for inspection at the Commission's Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, and from the ADAMS Public Library component on the NRC's Web site, http://wwwnrc.gov (the Public Electronic Reading Room).

FOR THE NUCLEAR REGULATORY COMMISSION

[Office Director]

Dated at Rockville, Maryland This day of

, 200X.

Approved: July 1, 1999 38 (Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 6 Sample Director's Decision and Cover Letter

[Insert petitioner's name & address]

Dear [insert petitioner's name]:

This letter responds to the petition you filed with [EDO or other addressee of petition]

pursuant to Section 2.206 of Title 10 of the Code of Federal Regulations (10 CFR 2.206) on

[date of petition] as supplemented on [dates of any supplements]. In your petition you requested that the NRC [list requested actions].

On [date of acknowledgment letter] the NRC staff acknowledged receiving your petition and stated pursuant to 10 CFR 2.206 that your petition was being referred to me for action and that it would be acted upon within a reasonable time. You were also told that [staff response to any request for immediate action].

[You met with the petition review board on [date(s) of the pre-and/or post-PRB meeting(s)] to clarify the bases for your petition. The transcript(s) of this/these mreeting(s) was/were treated as (a) supplement(s) to the petition and are available in ADAMS for inspection at the Commission's Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, and from the ADAMS Public Library component on the NRC's Web site, http:llwwwnrcgov (the Public Electronic Reading Room)].

[By letter dated [insert date], the NRC staff requested [name of licensee] to provide information related to the petition. [Name of licensee] responded on [insert date] and the information provided was considered by the staff in its evaluation of the petition].

In your petition you stated that [summarize the issues raised]. [Briefly summarize the safety significance of the issues and the staffs response].

[The NRC issued a Partial Director's Decision (DD-YY-XX) dated [insert] which [explain what aspects of the petition were addressed]. [Explain which issues remained to be addressed in this director's decision and briefly explain the reason for the delay on these issues)).

The staff sent a copy of the proposed director's decision to you and to [licensee(s)] for comment on [date]. [You responded with comments on [date] and the licensee responded on [date]. The comments and the staff's response to them are included in the director's decision]. OR The staff did not receive any comments on the proposed director's decision].

Approved: July 1, 1999 (Revised: October 25, 2000) 39

I J 11 Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 6 (continued)

[Summarize the issues addressed in this director's decision and the staff's response].

A copy of the Director's Decision (DD-YY-XX) will be filed with the Secretary of the Commission for the Commission to review in accordance with 10 CFR 2.206(c). As provided for by this regulation, the decision will constitute the final action of the Commission 25 days after the date of the decision unless the Commission, on its own motion, institutes a review of the decision within that time. [The documents cited in the enclosed decision are available in ADAMS for inspection at the Commission's Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor),

Rockville, Maryland, and from the ADAMS Public Library component on the NRC's Web site; http://www.nrc.gov (the Public Electronic Reading Room) (cite any exceptions involving proprietary or other protected information)].

I have also enclosed a copy of the notice of "Issuance of the Director's Decision Under 10 CFR 2.206" that has been filed with the Office of the Federal Register for publication.

[If appropriate, acknowledge the efforts of the petitioner in bringing the issues to the attention of the NRC]. Please feel free to contact [petition manager name and number] to discuss any questions related to this petition.

Sincerely,

[Insert Office Director's Name]

Docket Nos. [ ]

Enclosures:

Director's Decision YY-XX Federal Register Notice Approved: July 1, 1999 40 (Revised: October 25, 2000)

. -. I 1, Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits DD-YY-XX UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFFICE OF [INSERT]

[Office Director Name], Director In the Matter of

)

Docket No(s). [Insert]

))

[LICENSEE NAME]

)

License No(s). [Insert]

)

([Plant or facility name(s)])

)

(10 CER 2.206)

DIRECTOR'S DECISION UNDER 10 CFR 2.206 X>

I. Introduction By letter dated [insert date], as supplemented on [dates of supplements], [petitioner names and, if applicable, represented organizations] filed a Petition pursuant to Title 10 of the Code of Federal Regulations, Section 2.206. The petitioner(s) requested that the U.S.

Nuclear Regulatory Commission (NRC) take the following actions: [list requests]. The bases for the requests were -[describe].

In a letter dated [insert], the NRC informed the Petitioners that their request for [list immediate actions requested] was approved/denied and that the issues in the Petition were being referred to the Office of [insert] for appropriate action.

[The Petitioner(s) met with the (assigned office abbreviation) petition review board on

[date(s) of the pre-and/or post-PRB meeting(s)] to clarify the bases for the Petition. The transcript(s) of this/these meeting(s) was/were treated as (a) supplement(s) to the petition and are available in ADAMS for inspection at the Commission's Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, and from the ADAMS Public Library component on the NRC's Web site, http://www.

nrc.gov (the Public Electronic Reading Room)].

[By letter dated [insert date], the NRC staff requested [name of licensee] to provide information related to the petition. [Name of licensee] responded on [insert date] and the information provided was considered by the staff in its evaluation of the petition].

[The NRC issued a Partial Director's Decision (DD-YY-XX) dated [insert] which [explain what aspects of the petition were addressed]. [Explain which issues remained to be Approved: July 1, 1999 (Revised: -October 25, 2000) 41

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits addressed in this director's decision and briefly explain the reason for the delay on these issues)).

The NRC sent a copy of the proposed director's decision to the Petitioner and to

[licensee(s)] for comment on [date]. [The Petitioner responded with comments on [date]

and the licensee(s) responded on [date]. The comments and the NRC staff's response to them are included in the director's decision]. OR [The staff did not receive any comments on the proposed director's decision].

II. Discussion

[Discuss the issues raised, the significance of the issues (or lack thereof), and the staff's response with supporting bases. Acknowledge any validated issues, even if the staff or the licensee decided to take corrective actions other than those requested by the petitioner.

Clearly explain all actions taken by the staff or the licensee to address the issues, even if these actions were under way or completed before the petition was received. This discussion must clearly present the staff response to all of the valid issues so that it is clear that they have been addressed].

III. Conclusion

[Summarize the staff's conclusions with respect to the issues raised and how they have been, or will be, addressed].

As provided in 10 CFR 2.206(c), a copy of this Director's Decision will be filed with the Secretary of the Commission for the Commission to review. As provided for by this regulation, the decision will constitute the final action of the Commission 25 days after the date of the decision unless the Commission, on its own motion, institutes a review of the decision within that time.

Dated at Rockville, Maryland, this [insert date] day of [insert month, year].

[Office director's name], Director Office of [insert]

Approved: July 1, 1999 42 (Revised: October 25, 2000)

Volume8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 7

[7590-01 -P]

Sample Federal Register Notice for Director's Decision U.S. NUCLEAR REGULATORY COMMISSION Docket No(s).

License No(s).

[Name of Licensee]

NOTICE OF ISSUANCE OF DIRECTOR'S DECISION UNDER 10 CFR 2.206 Notice is hereby given that the Director, [name of office], has issued a director's K..>

decision with regard to a petition dated [insert date], filed by [insert petitioner's name],

hereinafter referred to as the "petitioner." [The petition was supplemented on [insert date, include transcripts from meeting(s) with the PRB)). The petition concerns the operation of the [insert facility or licensee name].

The petition requested that [insert facility or licensee name] should be [insert request for enforcement-related action]. [If necessary, add] The petitioner also requested that a public meeting be held to discuss this matter in the'Washington, DC, area.

As the basis for the [insert date] ;request, the petition&r raised concerns'stemming from [insert petitioners supporting basis for the request]. The [insert petitioners name]

considers such operation to be potentially unsafe and to bein violation of Federal regulations. In'the petition, a number of references to [insert references] were cited that the petitioner believes prohibit operation of the facility with [insert the cause'for the requested enforcement-related action]. -

The petition of [insert date] raises concerns originating from [insert summary information on more bases/rationale/discussion and supporting facts used in the disposition of the petition and the development of the'director's decision].

Approved: July 1, 1999 (Revised: October25,2000) 43

Volume 8, Licensee. Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 7 (continued)

[On [insert date], the petitioner [and the licensee] met with the staff's petition review board]. [On [insert date of public meeting], the NRC conducted a meeting regarding [insert facility or licensee name]. The(se) meeting(s) gave the petitioner and the licensee an opportunity to provide additional information and to clarify issues raised in the petition].

The NRC sent a copy of the proposed Director's Decision to the Petitioner and to

[licensee(s)] for comment on [date]. [The Petitioner responded with comments on [date] and the licensee(s) responded on [date]. The comments and the NRC staffs response to them are included in the Director's Decision]. OR [The staff did not receive any comments on the proposed Director's Decision].

The Director of the Office of [name of office] has determined that the request(s), to require [insert facility or licensee name] to be [insert request for enforcement-related action], be [granted/denied]. The reasons for this decision are explained in the director's decision pursuant to 10 CFR 2.206 [Insert DD No.], the complete text of which is available in ADAMS for inspection at the Commission's Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, and via the NRC's Web site (http:/lwwwnrc.gov) on the World Wide Web, under the "Public Involvement" icon.

[Briefly summarize the staff's findings and conclusions].

A copy of the director's decision will be filed with the Secretary of the Commission for the Commission's review in accordance with 10 CFR 2.206 of the Commission's regulations. As provided for by this regulation, the director's decision will constitute the final action of the Commission 25 days after the date of the decision, unless the Commission, on its own motion, institutes a review of the director's decision in that time.

Dated at Rockville, Maryland, this [insert date] day of [insert month, year].

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By

[Insert Office Director's Name]

Office of [insert Office Name]

Approved: July 1, 1999 44 (Revised: October 25, 2000)

Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits Exhibit 8 Sample Letters Requesting Comments on the Proposed Director's Decision (Note: For clarity, separate letters will need to be sent to the petitioner and the licensee.

This sample provides guidance for both letters.)

[Insert petitioner's address]

Dear [Insert petitioner's name]

Your petition dated [insert date] and addressed to the [insert addressee] has been reviewed by the NRC staff pursuant to 10 CFR 2.206 of the Commission's regulations. The staff's proposed director's decision on the petition is enclosed. I request that you provide comments to me on any portions of the decision that you believe involve errors or any issues in the petition that you believe have not been fully addressed. The staff is making a similar request of the licensee. The staff will then review any comments provided by you and the licensee and consider them in the final version of the director's decision with no further opportunity to comment.

Please provide your comments by [insert date, nominally 2 weeks from the date of this letter].

Sincerely,

[Signed by Division Director]

Docket Nos. []

cc w/o end: [Service List]

[Insert licensee's address]

Dear [Insert licensee's name]

By letter dated [insert date], [insert name of petitioner] submitted a petition pursuant to 10 CFR 2.206 of the Commission's regulations with respect to [insert name(s) of affected facilities]. The petition has been reviewed by the NRC staff and the staff's proposed director's decision on the petition is enclosed. I request that you provide comments to me on any portions of the decision that you believe involve errors or any issues in the petition that you believe have not been fully addressed. The staff is making a similar request of the petitioner.

The staff will then review any comments provided by you and the petitioner and consider them in the final version of the director's decision with no further opportunity to comment.

Approved: July 1, 1999 (Revised: October 25,2000) 45

kLJ1 Volume 8, Licensee Oversight Programs Review Process for 10 CFR 2.206 Petitions Handbook 8.11 Exhibits K>-

Exhibit 8 (continued)

Please provide your comments by [insert date, nominally 2 weeks from the date of this letter].

Sincerely,

[Signed by Division Director]

Docket Nos. [ ]

cc w/encl: [Service List]

-i 46 Approved: July 1, 1999 (Revised: October 25, 2000).

ENCLOSURE 4 NUREG/BR-0200

resolution of the entire petition. A final director's decision is issued at the conclusion of the effort.

The Commission will not entertain requests for review of a director's decision. However, on its own, it may review a decision within 25 calendar days.

NRC Management Directive 8. 11, "Review Process for IO CFR 2.206 Petitions," contains more detailed information on citizen petitions.

For a free copy of the directive, write to the Superintendent of Documents, U.S.

Government Printing Office, P.O. Box 37082, Washington, DC 20013-7082, or call 202-512-1800.

Electronic Access Those parts of the monthly status report on 2.206 petitions that are not of a sensitive nature, as well as recently issued director's decisions, and Management Directive 8. 11, are placed on the NRC's web site at http://

www.nrc. gov/reading-rm/doc-collections/

petitions-2-206/index.html and in the agency's Public Document Room.

Other Processes for Public Involvement In addition to the 2.206 petition process, NRC has several other ways that permit the public to express concerns on matters related to the NRC's regulatory activities.

  • The NRC's allegation process affords individuals who raise safety concerns a degree of protection of their identity.
  • Under the provisions of 10 CFR 2.802, NRC provides an opportunity for the public to petition the agency for a rulemaking.
  • The NRC's licensing process offers members of the public, who are specifically affected by a licensing action, an opportunity to formally participate in licensing proceedings. This process applies not only to the initial licensing actions but also to license amendments and other activities such as decom-missioning and license renewals.
  • For major regulatory actions involving preparation of environmental impact statements, NRC offers separate opportunities for public participation in its environmental proceedings.
  • The public can attend a number of meetings including open Commission and staff meetings, periodic media briefings by Regional Administrators, and special meetings held near affected facilities to inform local communities and respond to their questions.

More information on these activities can be found in NRC's pamphlet entitled, "Public Involvement in the Nuclear Regulatory Process," NUREG/BR-0215.

Office of Public Affairs U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Telephone 301-415-8200 or 1-800-368-5642 NUREG/BR-0200, Rev. 5 February 2003 e

ML14071A005 (Package)

ML14071A006 (Incoming petition)

ML14237A726 (Acknowledgement Letter)

ML14237A727 (Federal Register Notice)

ML050900248 (NUREG/BR-0200)

ML041770328 (Management Directive 8.11)

DORLILPL3-1/PM DORLILPL3-1/LA DPR/PGCB/PM*

JRankin MHenderson MBanic 9/3/14 8/29/14 9/5/14 RIII/DPR/BC*

DSS/SRXB/BC OGC EDuncan US hoop CHair 9/11/14 9/11/14 9/15/14 Tech Editor*

JDougherty 9/9/14 DORLID Llund 9/15/14