ML15314A105: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(5 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Clinton Power Station ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I JPM417 Editorial JPM418 Editorial JPM429 Editorial JPM247 Editorial JPM501 Editorial JPM531 Editorial JPM534 Editorial JPM537 Editorial -ILT 14-1 NRC Exam Submittal Comments Date Received: 2/13115 Chief Examiner Comment Facility Action/Response Qperatina Test Chanoe estimated comoletion time from 15 minutes to 35 minutes. Chanoed as requested.
{{#Wiki_filter:Clinton Power Station ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I JPM417 Editorial JPM418 Editorial JPM429 Editorial JPM247 Editorial JPM501 Editorial JPM531 Editorial JPM534 Editorial JPM537 Editorial ILT 14-1 NRC Exam Submittal Comments Date Received: 2/13115 Chief Examiner Comment Facility Action/Response Qperatina Test Chanoe estimated comoletion time from 15 minutes to 35 minutes.
* Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested. clockwise rotation and adjust DG speed if necessary, and then turn the synch scope back off. . Step 8.2.12.6 -add comment that JPM can be terminated when VARS are within ranae (500-0 KVAR\ and aenerator load is beina raised.
Chanoed as requested.
* General note -add steps for evaluator to annotate performance of the A and Changed as requested. B FCVs.
Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.
* Step 8.4.2.2. -add cue "If examinee requests to use "double detent'', authorize use.
clockwise rotation and adjust DG speed if necessary, and then turn the synch scope back off.  
* Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the threshold of a minor reactivitv manaoement event.
. Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\\ and aenerator load is beina raised.
* Typo on page 7 -step 4.1 -standard third bullet -remove the word "is" in Changed as requested. front of MIA.
General note - add steps for evaluator to annotate performance of the A and Changed as requested.
* Step 5.8 -add to the cue -If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.
B FCVs.
* Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested. the simulator)
Step 8.4.2.2. - add cue "If examinee requests to use "double detent'',
* Add remaining TCVs (2, 3, 4) to JPM .
authorize use.
* Add cues that the plant is stable .
Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the threshold of a minor reactivitv manaoement event.
* Delete instructor stationed @ P678 -NRC will orovide P678 cue .
Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in Changed as requested.
* Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions. Changed as requested.
front of MIA.
* Add 8.3.2.3 to the initial conditions .
Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.
* Put a copy of 9000.01 in examinee binders Changed as requested. . Put a copy of the blank data sheet in the examlnee binders
Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.
* Chanae Estimated Comoletion Time from 1 O to 20 minutes .
the simulator)
* Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The Incorporated all 6 changes as requested. plant is in Mode 1 ")
Add remaining TCVs (2, 3, 4) to JPM.
* Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
Add cues that the plant is stable.
* Fix typo -8.1.1.3 should be 8.1.2.3 .
Delete instructor stationed @ P678 - NRC will orovide P678 cue.
* Add the following_ to the cue for step 8.1.1.3 -When examinee reoorts that ------.. -****-1B2f.F022B closed fully after the test pushbutton was released, acknowledge -*-the report and state, "Take appropriate action for the valve closure".
Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions.
* On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
Changed as requested.
* Step 8.2.5.2 -Standard -Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue" Clinton.Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# UnSat/Editorial JPM423 Editorial JPM532 Editorial JPM535 Un sat JPM536 Editorial JPM538 Editorial JPM244 Editorial JPM451 Editorial Scenario 1 Editorial ::;cenano 1 *---eai!Orlal Scenario 1 Editorial Scenario 1 Editorial ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment . Step 8.3. 1 .1 #1 on page 8 -change the standard to read "Examinee enters "Open and/or On" in the Original Condition field of CPS 3512.01 F002".
Add 8.3.2.3 to the initial conditions.
* Step 8.3.1.1 #2 on page 8-change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01 F002". . Add 'Today's date is 11/27/14" to the initial conditions block. . JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)
Put a copy of 9000.01 in examinee binders Changed as requested.  
* Change the first sentence of the initial conditions block to read, "The plant was operating at rated thermal power with no out of service equipment."
. Put a copy of the blank data sheet in the examlnee binders Chanae Estimated Comoletion Time from 1 O to 20 minutes.
* Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The Incorporated all 6 changes as requested.
* Change the first bulleted item in the Initiating cue block to read, ''Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
plant is in Mode 1 ")
* JPM step 1 standard -Add ITS 3.6.1.3 A.1 and A.2 to the list.
Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
* Terminating Cues -Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem". Steo 4 Standard -add Channel 3 to the end of the first bulleted line. Step 1 Standard -soecilv reauirements for ITS 3.6.1.3 Action A.1 and A.2
Fix typo - 8.1.1.3 should be 8.1.2.3.
* Step 8.5.8.3 Standard -change the standard to read, "Simulates placing the Main Control Switch in MANUAL 1 and/or Manual 2. . Step 8.2.2 Cue -Add a cue that flow noise can be heard if requested by the examinee.
Add the following_ to the cue for step 8.1.1.3 - When examinee reoorts that 1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".
* Add alarms that are expected to be In to the initial conditions block.
On the marked up copy of CPS 9031.10, delete the N/A'ed steps.
* Step 8.4.6.1 -Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed. Event 4 TDRFP 'A' High Bearing Temperature -the MDRFP. is started per section 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but the scenario quide onlv references section 6.1.3. -cFC'ommen! -sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 to add realism. Event Triggers and Role Play -Event #4 -add EO cue (ii directed to raise cooling water flow\ -"Flow Is hiah in the band". Date Received: 2/13115 Facilit Action/Res onse Changed as requested . Changed as requested . Changed as requested . Chanaed as requested. Chanaed as requested. Changed as requested. Changed as requested. <Cil-* . ... .. ... Added CPS 3103.01 section 8.1.6 to the ATC actions block. NO reas16ie way lo ao llils=lefl as 1s. Added computer points to the simulator lesson plan to cause them to ramp up -30&deg;F over 1 O minutes. Added EO cue #6 to event 4 Clinton Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# I UnSat/Editorial I Scenario 1 Editorial Scenario 1 Editorial Scenario 1 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 1, Editorial 2, and 3 *-... ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment Event Triggers and Role Play -Event #4 -add EO cue (if directed to check TDRFP bearina bubbler flow) -"Bubbler flow is normal." Event Triggers and Role Play -Event #8 -add cue from field concerning local gas boundary inspections. Event Triggers and Role Play -Event #4 -add EO cue to report no abnormalities if requested to check TDAFP 'A' room conditions on the camera. Event 7/8-the actions required to perform "Terminate and prevent LPCS and LPCI injection" are not detailed in the scenario guide. Event 7/8 -the crew may "Anticipate Blowdown" but those actions are not listed in the scenario guide. The critical tasks listing on page 4 of the scenario guide needs to be revised to reflect that EOP-6 does not require a blowdown on high Containment Pressure unless contain.ment pressure cannot be below Fig. N. Event 6 -the actions to terminate HPCS injection are reversed from those contained on the hard card. Event 4 -need to add rising trend to the CAD temperature reported from the area operator. Event 6 -Validation crew swapped the running SPE blowers; those actions are not listed in the Annlicant's Actions or Behavior block of the scenario auide. Event 8 -Validation crew entered ITS 3.4.5 RA B.1 but the ITS reference is not listed in the scenario auide. The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig. Chanae the reported pressure to 1510 psig. Event B -Add SRO action to direct RR Loop emergency isolation Add MCA Baseline data to PPG 10 in the simulator setup instructions. -.. -. Date Received: 2/13/15 Facility Action/Response Added EO cue #7 to event 4 Added EO cue #3 to event 8. Added EO cue #8 to event 4. Added actions required to Terminate and Prevent LPCS and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide. Added "Anticipate Slowdown" to the ATC and SAO actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown. Revised critical task listing PC-7.1 to state, 'Within 10 minutes of exceeding Figure N and containment pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\ Swapped actions to shut 1 E22-F004 and Stop the HPCS oumo in the BOP actions block of event #6. Added trend information to event 4 EO cue 1a. Added open bullet action to the Event 6 BOP actions block. Added ITS 3.4.5 to the SRO Actions block for event 8. Changed all instances of 1540 psig to 1510 psig. Added to ATC & SRO actions for event #8. Added to the Simulator Operator Initial Setup instructions. *-
Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"  
Clinton Power Station ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I JPM417 Editorial JPM418 Editorial JPM429 Editorial JPM247 Editorial JPM501 Editorial JPM531 Editorial JPM534 Editorial JPM537 Editorial -ILT 14-1 NRC Exam Submittal Comments Date Received: 2/13115 Chief Examiner Comment Facility Action/Response Qperatina Test Chanoe estimated comoletion time from 15 minutes to 35 minutes. Chanoed as requested.
 
* Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested. clockwise rotation and adjust DG speed if necessary, and then turn the synch scope back off. . Step 8.2.12.6 -add comment that JPM can be terminated when VARS are within ranae (500-0 KVAR\ and aenerator load is beina raised.
Clinton.Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item#
* General note -add steps for evaluator to annotate performance of the A and Changed as requested. B FCVs.
UnSat/Editorial JPM423 Editorial JPM532 Editorial JPM535 Un sat JPM536 Editorial JPM538 Editorial JPM244 Editorial JPM451 Editorial Scenario 1 Editorial
* Step 8.4.2.2. -add cue "If examinee requests to use "double detent'', authorize use.
::;cenano 1  
* Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the threshold of a minor reactivitv manaoement event.
*---eai!Orlal Scenario 1 Editorial Scenario 1 Editorial ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment  
* Typo on page 7 -step 4.1 -standard third bullet -remove the word "is" in Changed as requested. front of MIA.
. Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters "Open and/or On" in the Original Condition field of CPS 3512.01 F002".
* Step 5.8 -add to the cue -If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.
Step 8.3.1.1 #2 on page 8-change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01 F002".  
* Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested. the simulator)
. Add 'Today's date is 11/27/14" to the initial conditions block.  
* Add remaining TCVs (2, 3, 4) to JPM .
. JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)
* Add cues that the plant is stable .
Change the first sentence of the initial conditions block to read, "The plant was operating at rated thermal power with no out of service equipment."
* Delete instructor stationed @ P678 -NRC will orovide P678 cue .
Delete the 2 00 sentence in the Initial Conditions block (NO LCOs are in effect.)
* Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions. Changed as requested.
Change the first bulleted item in the Initiating cue block to read, ''Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
* Add 8.3.2.3 to the initial conditions .
JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.
* Put a copy of 9000.01 in examinee binders Changed as requested. . Put a copy of the blank data sheet in the examlnee binders
Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".
* Chanae Estimated Comoletion Time from 1 O to 20 minutes .
Steo 4 Standard - add Channel 3 to the end of the first bulleted line.
* Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The Incorporated all 6 changes as requested. plant is in Mode 1 ")
Step 1 Standard - soecilv reauirements for ITS 3.6.1.3 Action A.1 and A.2 Step 8.5.8.3 Standard - change the standard to read, "Simulates placing the Main Control Switch in MANUAL 1 and/or Manual 2.
* Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.
* Fix typo -8.1.1.3 should be 8.1.2.3 .
Add alarms that are expected to be In to the initial conditions block.
* Add the following_ to the cue for step 8.1.1.3 -When examinee reoorts that ------.. -****-1B2f.F022B closed fully after the test pushbutton was released, acknowledge -*-the report and state, "Take appropriate action for the valve closure".
Step 8.4.6.1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.  
* On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
*.~
* Step 8.2.5.2 -Standard -Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue" Clinton.Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# UnSat/Editorial JPM423 Editorial JPM532 Editorial JPM535 Un sat JPM536 Editorial JPM538 Editorial JPM244 Editorial JPM451 Editorial Scenario 1 Editorial ::;cenano 1 *---eai!Orlal Scenario 1 Editorial Scenario 1 Editorial ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment . Step 8.3. 1 .1 #1 on page 8 -change the standard to read "Examinee enters "Open and/or On" in the Original Condition field of CPS 3512.01 F002".
Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but the scenario quide onlv references section 6.1.3.  
* Step 8.3.1.1 #2 on page 8-change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01 F002". . Add 'Today's date is 11/27/14" to the initial conditions block. . JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)
-cFC'ommen! - sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~
* Change the first sentence of the initial conditions block to read, "The plant was operating at rated thermal power with no out of service equipment."
Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 to add realism.
* Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling water flow\\ - "Flow Is hiah in the band".
* Change the first bulleted item in the Initiating cue block to read, ''Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
Date Received: 2/13115 Facilit Action/Res onse Changed as requested.
* JPM step 1 standard -Add ITS 3.6.1.3 A.1 and A.2 to the list.
Changed as requested.
* Terminating Cues -Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem". Steo 4 Standard -add Channel 3 to the end of the first bulleted line. Step 1 Standard -soecilv reauirements for ITS 3.6.1.3 Action A.1 and A.2
Changed as requested.
* Step 8.5.8.3 Standard -change the standard to read, "Simulates placing the Main Control Switch in MANUAL 1 and/or Manual 2. . Step 8.2.2 Cue -Add a cue that flow noise can be heard if requested by the examinee.
Chanaed as requested.
* Add alarms that are expected to be In to the initial conditions block.
Chanaed as requested.
* Step 8.4.6.1 -Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed. Event 4 TDRFP 'A' High Bearing Temperature -the MDRFP. is started per section 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but the scenario quide onlv references section 6.1.3. -cFC'ommen! -sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 to add realism. Event Triggers and Role Play -Event #4 -add EO cue (ii directed to raise cooling water flow\ -"Flow Is hiah in the band". Date Received: 2/13115 Facilit Action/Res onse Changed as requested . Changed as requested . Changed as requested . Chanaed as requested. Chanaed as requested. Changed as requested. Changed as requested. <Cil-* . ... .. ... Added CPS 3103.01 section 8.1.6 to the ATC actions block. NO reas16ie way lo ao llils=lefl as 1s. Added computer points to the simulator lesson plan to cause them to ramp up -30&deg;F over 1 O minutes. Added EO cue #6 to event 4 Clinton Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# I UnSat/Editorial I Scenario 1 Editorial Scenario 1 Editorial Scenario 1 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 1, Editorial 2, and 3 *-... ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment Event Triggers and Role Play -Event #4 -add EO cue (if directed to check TDRFP bearina bubbler flow) -"Bubbler flow is normal." Event Triggers and Role Play -Event #8 -add cue from field concerning local gas boundary inspections. Event Triggers and Role Play -Event #4 -add EO cue to report no abnormalities if requested to check TDAFP 'A' room conditions on the camera. Event 7/8-the actions required to perform "Terminate and prevent LPCS and LPCI injection" are not detailed in the scenario guide. Event 7/8 -the crew may "Anticipate Blowdown" but those actions are not listed in the scenario guide. The critical tasks listing on page 4 of the scenario guide needs to be revised to reflect that EOP-6 does not require a blowdown on high Containment Pressure unless contain.ment pressure cannot be below Fig. N. Event 6 -the actions to terminate HPCS injection are reversed from those contained on the hard card. Event 4 -need to add rising trend to the CAD temperature reported from the area operator. Event 6 -Validation crew swapped the running SPE blowers; those actions are not listed in the Annlicant's Actions or Behavior block of the scenario auide. Event 8 -Validation crew entered ITS 3.4.5 RA B.1 but the ITS reference is not listed in the scenario auide. The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig. Chanae the reported pressure to 1510 psig. Event B -Add SRO action to direct RR Loop emergency isolation Add MCA Baseline data to PPG 10 in the simulator setup instructions. -.. -. Date Received: 2/13/15 Facility Action/Response Added EO cue #7 to event 4 Added EO cue #3 to event 8. Added EO cue #8 to event 4. Added actions required to Terminate and Prevent LPCS and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide. Added "Anticipate Slowdown" to the ATC and SAO actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown. Revised critical task listing PC-7.1 to state, 'Within 10 minutes of exceeding Figure N and containment pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\ Swapped actions to shut 1 E22-F004 and Stop the HPCS oumo in the BOP actions block of event #6. Added trend information to event 4 EO cue 1a. Added open bullet action to the Event 6 BOP actions block. Added ITS 3.4.5 to the SRO Actions block for event 8. Changed all instances of 1540 psig to 1510 psig. Added to ATC & SRO actions for event #8. Added to the Simulator Operator Initial Setup instructions. *-}}
Changed as requested.
Changed as requested.  
<Cil-*  
.... *.~..r::
"~**''"*
*.~.*:~~,M:~~.. ~
Added CPS 3103.01 section 8.1.6 to the ATC actions block.
NO reas16ie way lo ao llils=lefl as 1s.
Added computer points to the simulator lesson plan to cause them to ramp up - 30&deg;F over 1 O minutes.
Added EO cue #6 to event 4  
 
Clinton Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# I UnSat/Editorial I Scenario 1 Editorial Scenario 1 Editorial Scenario 1 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 1, Editorial 2, and 3 ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment Event Triggers and Role Play - Event #4 - add EO cue (if directed to check TDRFP bearina bubbler flow) - "Bubbler flow is normal."
Event Triggers and Role Play - Event #8 - add cue from field concerning local gas boundary inspections.
Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if requested to check TDAFP 'A' room conditions on the camera.
Event 7/8-the actions required to perform "Terminate and prevent LPCS and LPCI injection" are not detailed in the scenario guide.
Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in the scenario guide.
The critical tasks listing on page 4 of the scenario guide needs to be revised to reflect that EOP-6 does not require a blowdown on high Containment Pressure unless contain.ment pressure cannot be low~red below Fig. N.
Event 6 - the actions to terminate HPCS injection are reversed from those contained on the hard card.
Event 4 - need to add rising trend to the CAD temperature reported from the area operator.
Event 6 - Validation crew swapped the running SPE blowers; those actions are not listed in the Annlicant's Actions or Behavior block of the scenario auide.
Event 8 - Validation crew entered ITS 3.4.5 RA B.1 but the ITS reference is not listed in the scenario auide.
The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.
Chanae the reported pressure to 1510 psig.
Event B - Add SRO action to direct RR Loop emergency isolation Add MCA Baseline data to PPG 10 in the simulator setup instructions.
Date Received: 2/13/15 Facility Action/Response Added EO cue #7 to event 4 Added EO cue #3 to event 8.
Added EO cue #8 to event 4.
Added actions required to Terminate and Prevent LPCS and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.
Added "Anticipate Slowdown" to the ATC and SAO actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.
Revised critical task listing PC-7.1 to state, 'W ithin 10 minutes of exceeding Figure N and containment pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\\
Swapped actions to shut 1 E22-F004 and Stop the HPCS oumo in the BOP actions block of event #6.
Added trend information to event 4 EO cue 1a.
Added open bullet action to the Event 6 BOP actions block.
Added ITS 3.4.5 to the SRO Actions block for event 8.
Changed all instances of 1540 psig to 1510 psig.
Added to ATC & SRO actions for event #8.
Added to the Simulator Operator Initial Setup instructions.  
 
Clinton Power Station ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I JPM417 Editorial JPM418 Editorial JPM429 Editorial JPM247 Editorial JPM501 Editorial JPM531 Editorial JPM534 Editorial JPM537 Editorial ILT 14-1 NRC Exam Submittal Comments Date Received: 2/13115 Chief Examiner Comment Facility Action/Response Qperatina Test Chanoe estimated comoletion time from 15 minutes to 35 minutes.
Chanoed as requested.
Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.
clockwise rotation and adjust DG speed if necessary, and then turn the synch scope back off.  
. Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\\ and aenerator load is beina raised.
General note - add steps for evaluator to annotate performance of the A and Changed as requested.
B FCVs.
Step 8.4.2.2. - add cue "If examinee requests to use "double detent'',
authorize use.
Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the threshold of a minor reactivitv manaoement event.
Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in Changed as requested.
front of MIA.
Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.
Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.
the simulator)
Add remaining TCVs (2, 3, 4) to JPM.
Add cues that the plant is stable.
Delete instructor stationed @ P678 - NRC will orovide P678 cue.
Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions.
Changed as requested.
Add 8.3.2.3 to the initial conditions.
Put a copy of 9000.01 in examinee binders Changed as requested.  
. Put a copy of the blank data sheet in the examlnee binders Chanae Estimated Comoletion Time from 1 O to 20 minutes.
Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The Incorporated all 6 changes as requested.
plant is in Mode 1 ")
Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
Fix typo - 8.1.1.3 should be 8.1.2.3.
Add the following_ to the cue for step 8.1.1.3 - When examinee reoorts that 1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".
On the marked up copy of CPS 9031.10, delete the N/A'ed steps.
Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"  
 
Clinton.Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item#
UnSat/Editorial JPM423 Editorial JPM532 Editorial JPM535 Un sat JPM536 Editorial JPM538 Editorial JPM244 Editorial JPM451 Editorial Scenario 1 Editorial
::;cenano 1  
*---eai!Orlal Scenario 1 Editorial Scenario 1 Editorial ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment  
. Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters "Open and/or On" in the Original Condition field of CPS 3512.01 F002".
Step 8.3.1.1 #2 on page 8-change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01 F002".  
. Add 'Today's date is 11/27/14" to the initial conditions block.  
. JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)
Change the first sentence of the initial conditions block to read, "The plant was operating at rated thermal power with no out of service equipment."
Delete the 2 00 sentence in the Initial Conditions block (NO LCOs are in effect.)
Change the first bulleted item in the Initiating cue block to read, ''Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.
Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".
Steo 4 Standard - add Channel 3 to the end of the first bulleted line.
Step 1 Standard - soecilv reauirements for ITS 3.6.1.3 Action A.1 and A.2 Step 8.5.8.3 Standard - change the standard to read, "Simulates placing the Main Control Switch in MANUAL 1 and/or Manual 2.
Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.
Add alarms that are expected to be In to the initial conditions block.
Step 8.4.6.1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.  
*.~
Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but the scenario quide onlv references section 6.1.3.  
-cFC'ommen! - sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~
Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 to add realism.
Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling water flow\\ - "Flow Is hiah in the band".
Date Received: 2/13115 Facilit Action/Res onse Changed as requested.
Changed as requested.
Changed as requested.
Chanaed as requested.
Chanaed as requested.
Changed as requested.
Changed as requested.  
<Cil-*  
.... *.~..r::
"~**''"*
*.~.*:~~,M:~~.. ~
Added CPS 3103.01 section 8.1.6 to the ATC actions block.
NO reas16ie way lo ao llils=lefl as 1s.
Added computer points to the simulator lesson plan to cause them to ramp up - 30&deg;F over 1 O minutes.
Added EO cue #6 to event 4  
 
Clinton Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# I UnSat/Editorial I Scenario 1 Editorial Scenario 1 Editorial Scenario 1 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 1, Editorial 2, and 3 ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment Event Triggers and Role Play - Event #4 - add EO cue (if directed to check TDRFP bearina bubbler flow) - "Bubbler flow is normal."
Event Triggers and Role Play - Event #8 - add cue from field concerning local gas boundary inspections.
Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if requested to check TDAFP 'A' room conditions on the camera.
Event 7/8-the actions required to perform "Terminate and prevent LPCS and LPCI injection" are not detailed in the scenario guide.
Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in the scenario guide.
The critical tasks listing on page 4 of the scenario guide needs to be revised to reflect that EOP-6 does not require a blowdown on high Containment Pressure unless contain.ment pressure cannot be low~red below Fig. N.
Event 6 - the actions to terminate HPCS injection are reversed from those contained on the hard card.
Event 4 - need to add rising trend to the CAD temperature reported from the area operator.
Event 6 - Validation crew swapped the running SPE blowers; those actions are not listed in the Annlicant's Actions or Behavior block of the scenario auide.
Event 8 - Validation crew entered ITS 3.4.5 RA B.1 but the ITS reference is not listed in the scenario auide.
The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.
Chanae the reported pressure to 1510 psig.
Event B - Add SRO action to direct RR Loop emergency isolation Add MCA Baseline data to PPG 10 in the simulator setup instructions.
Date Received: 2/13/15 Facility Action/Response Added EO cue #7 to event 4 Added EO cue #3 to event 8.
Added EO cue #8 to event 4.
Added actions required to Terminate and Prevent LPCS and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.
Added "Anticipate Slowdown" to the ATC and SAO actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.
Revised critical task listing PC-7.1 to state, 'W ithin 10 minutes of exceeding Figure N and containment pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\\
Swapped actions to shut 1 E22-F004 and Stop the HPCS oumo in the BOP actions block of event #6.
Added trend information to event 4 EO cue 1a.
Added open bullet action to the Event 6 BOP actions block.
Added ITS 3.4.5 to the SRO Actions block for event 8.
Changed all instances of 1540 psig to 1510 psig.
Added to ATC & SRO actions for event #8.
Added to the Simulator Operator Initial Setup instructions.  
*-}}

Latest revision as of 06:38, 10 January 2025

2015 Clinton Power Station Initial License Examination Submittal Comments
ML15314A105
Person / Time
Site: Clinton 
Issue date: 11/10/2015
From:
Division of Reactor Safety III
To:
Zoia, C D
Shared Package
ML15124A054 List:
References
Download: ML15314A105 (3)


Text

Clinton Power Station ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I JPM417 Editorial JPM418 Editorial JPM429 Editorial JPM247 Editorial JPM501 Editorial JPM531 Editorial JPM534 Editorial JPM537 Editorial ILT 14-1 NRC Exam Submittal Comments Date Received: 2/13115 Chief Examiner Comment Facility Action/Response Qperatina Test Chanoe estimated comoletion time from 15 minutes to 35 minutes.

Chanoed as requested.

Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.

clockwise rotation and adjust DG speed if necessary, and then turn the synch scope back off.

. Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\\ and aenerator load is beina raised.

General note - add steps for evaluator to annotate performance of the A and Changed as requested.

B FCVs.

Step 8.4.2.2. - add cue "If examinee requests to use "double detent,

authorize use.

Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the threshold of a minor reactivitv manaoement event.

Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in Changed as requested.

front of MIA.

Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.

Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.

the simulator)

Add remaining TCVs (2, 3, 4) to JPM.

Add cues that the plant is stable.

Delete instructor stationed @ P678 - NRC will orovide P678 cue.

Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions.

Changed as requested.

Add 8.3.2.3 to the initial conditions.

Put a copy of 9000.01 in examinee binders Changed as requested.

. Put a copy of the blank data sheet in the examlnee binders Chanae Estimated Comoletion Time from 1 O to 20 minutes.

Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The Incorporated all 6 changes as requested.

plant is in Mode 1 ")

Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".

Fix typo - 8.1.1.3 should be 8.1.2.3.

Add the following_ to the cue for step 8.1.1.3 - When examinee reoorts that 1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".

On the marked up copy of CPS 9031.10, delete the N/A'ed steps.

Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"

Clinton.Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item#

UnSat/Editorial JPM423 Editorial JPM532 Editorial JPM535 Un sat JPM536 Editorial JPM538 Editorial JPM244 Editorial JPM451 Editorial Scenario 1 Editorial

cenano 1
  • ---eai!Orlal Scenario 1 Editorial Scenario 1 Editorial ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment

. Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters "Open and/or On" in the Original Condition field of CPS 3512.01 F002".

Step 8.3.1.1 #2 on page 8-change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01 F002".

. Add 'Today's date is 11/27/14" to the initial conditions block.

. JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)

Change the first sentence of the initial conditions block to read, "The plant was operating at rated thermal power with no out of service equipment."

Delete the 2 00 sentence in the Initial Conditions block (NO LCOs are in effect.)

Change the first bulleted item in the Initiating cue block to read, Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.

JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.

Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".

Steo 4 Standard - add Channel 3 to the end of the first bulleted line.

Step 1 Standard - soecilv reauirements for ITS 3.6.1.3 Action A.1 and A.2 Step 8.5.8.3 Standard - change the standard to read, "Simulates placing the Main Control Switch in MANUAL 1 and/or Manual 2.

Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.

Add alarms that are expected to be In to the initial conditions block.

Step 8.4.6.1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.

  • .~

Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but the scenario quide onlv references section 6.1.3.

-cFC'ommen! - sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~

Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 to add realism.

Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling water flow\\ - "Flow Is hiah in the band".

Date Received: 2/13115 Facilit Action/Res onse Changed as requested.

Changed as requested.

Changed as requested.

Chanaed as requested.

Chanaed as requested.

Changed as requested.

Changed as requested.

<Cil-*

.... *.~..r::

"~**"*

  • .~.*:~~,M:~~.. ~

Added CPS 3103.01 section 8.1.6 to the ATC actions block.

NO reas16ie way lo ao llils=lefl as 1s.

Added computer points to the simulator lesson plan to cause them to ramp up - 30°F over 1 O minutes.

Added EO cue #6 to event 4

Clinton Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# I UnSat/Editorial I Scenario 1 Editorial Scenario 1 Editorial Scenario 1 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 1, Editorial 2, and 3 ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment Event Triggers and Role Play - Event #4 - add EO cue (if directed to check TDRFP bearina bubbler flow) - "Bubbler flow is normal."

Event Triggers and Role Play - Event #8 - add cue from field concerning local gas boundary inspections.

Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if requested to check TDAFP 'A' room conditions on the camera.

Event 7/8-the actions required to perform "Terminate and prevent LPCS and LPCI injection" are not detailed in the scenario guide.

Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in the scenario guide.

The critical tasks listing on page 4 of the scenario guide needs to be revised to reflect that EOP-6 does not require a blowdown on high Containment Pressure unless contain.ment pressure cannot be low~red below Fig. N.

Event 6 - the actions to terminate HPCS injection are reversed from those contained on the hard card.

Event 4 - need to add rising trend to the CAD temperature reported from the area operator.

Event 6 - Validation crew swapped the running SPE blowers; those actions are not listed in the Annlicant's Actions or Behavior block of the scenario auide.

Event 8 - Validation crew entered ITS 3.4.5 RA B.1 but the ITS reference is not listed in the scenario auide.

The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.

Chanae the reported pressure to 1510 psig.

Event B - Add SRO action to direct RR Loop emergency isolation Add MCA Baseline data to PPG 10 in the simulator setup instructions.

Date Received: 2/13/15 Facility Action/Response Added EO cue #7 to event 4 Added EO cue #3 to event 8.

Added EO cue #8 to event 4.

Added actions required to Terminate and Prevent LPCS and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.

Added "Anticipate Slowdown" to the ATC and SAO actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.

Revised critical task listing PC-7.1 to state, 'W ithin 10 minutes of exceeding Figure N and containment pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\\

Swapped actions to shut 1 E22-F004 and Stop the HPCS oumo in the BOP actions block of event #6.

Added trend information to event 4 EO cue 1a.

Added open bullet action to the Event 6 BOP actions block.

Added ITS 3.4.5 to the SRO Actions block for event 8.

Changed all instances of 1540 psig to 1510 psig.

Added to ATC & SRO actions for event #8.

Added to the Simulator Operator Initial Setup instructions.

Clinton Power Station ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I JPM417 Editorial JPM418 Editorial JPM429 Editorial JPM247 Editorial JPM501 Editorial JPM531 Editorial JPM534 Editorial JPM537 Editorial ILT 14-1 NRC Exam Submittal Comments Date Received: 2/13115 Chief Examiner Comment Facility Action/Response Qperatina Test Chanoe estimated comoletion time from 15 minutes to 35 minutes.

Chanoed as requested.

Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.

clockwise rotation and adjust DG speed if necessary, and then turn the synch scope back off.

. Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\\ and aenerator load is beina raised.

General note - add steps for evaluator to annotate performance of the A and Changed as requested.

B FCVs.

Step 8.4.2.2. - add cue "If examinee requests to use "double detent,

authorize use.

Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the threshold of a minor reactivitv manaoement event.

Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in Changed as requested.

front of MIA.

Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.

Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.

the simulator)

Add remaining TCVs (2, 3, 4) to JPM.

Add cues that the plant is stable.

Delete instructor stationed @ P678 - NRC will orovide P678 cue.

Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions.

Changed as requested.

Add 8.3.2.3 to the initial conditions.

Put a copy of 9000.01 in examinee binders Changed as requested.

. Put a copy of the blank data sheet in the examlnee binders Chanae Estimated Comoletion Time from 1 O to 20 minutes.

Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The Incorporated all 6 changes as requested.

plant is in Mode 1 ")

Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".

Fix typo - 8.1.1.3 should be 8.1.2.3.

Add the following_ to the cue for step 8.1.1.3 - When examinee reoorts that 1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".

On the marked up copy of CPS 9031.10, delete the N/A'ed steps.

Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"

Clinton.Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item#

UnSat/Editorial JPM423 Editorial JPM532 Editorial JPM535 Un sat JPM536 Editorial JPM538 Editorial JPM244 Editorial JPM451 Editorial Scenario 1 Editorial

cenano 1
  • ---eai!Orlal Scenario 1 Editorial Scenario 1 Editorial ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment

. Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters "Open and/or On" in the Original Condition field of CPS 3512.01 F002".

Step 8.3.1.1 #2 on page 8-change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01 F002".

. Add 'Today's date is 11/27/14" to the initial conditions block.

. JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)

Change the first sentence of the initial conditions block to read, "The plant was operating at rated thermal power with no out of service equipment."

Delete the 2 00 sentence in the Initial Conditions block (NO LCOs are in effect.)

Change the first bulleted item in the Initiating cue block to read, Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.

JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.

Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".

Steo 4 Standard - add Channel 3 to the end of the first bulleted line.

Step 1 Standard - soecilv reauirements for ITS 3.6.1.3 Action A.1 and A.2 Step 8.5.8.3 Standard - change the standard to read, "Simulates placing the Main Control Switch in MANUAL 1 and/or Manual 2.

Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.

Add alarms that are expected to be In to the initial conditions block.

Step 8.4.6.1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.

  • .~

Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but the scenario quide onlv references section 6.1.3.

-cFC'ommen! - sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~

Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 to add realism.

Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling water flow\\ - "Flow Is hiah in the band".

Date Received: 2/13115 Facilit Action/Res onse Changed as requested.

Changed as requested.

Changed as requested.

Chanaed as requested.

Chanaed as requested.

Changed as requested.

Changed as requested.

<Cil-*

.... *.~..r::

"~**"*

  • .~.*:~~,M:~~.. ~

Added CPS 3103.01 section 8.1.6 to the ATC actions block.

NO reas16ie way lo ao llils=lefl as 1s.

Added computer points to the simulator lesson plan to cause them to ramp up - 30°F over 1 O minutes.

Added EO cue #6 to event 4

Clinton Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# I UnSat/Editorial I Scenario 1 Editorial Scenario 1 Editorial Scenario 1 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 1, Editorial 2, and 3 ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment Event Triggers and Role Play - Event #4 - add EO cue (if directed to check TDRFP bearina bubbler flow) - "Bubbler flow is normal."

Event Triggers and Role Play - Event #8 - add cue from field concerning local gas boundary inspections.

Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if requested to check TDAFP 'A' room conditions on the camera.

Event 7/8-the actions required to perform "Terminate and prevent LPCS and LPCI injection" are not detailed in the scenario guide.

Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in the scenario guide.

The critical tasks listing on page 4 of the scenario guide needs to be revised to reflect that EOP-6 does not require a blowdown on high Containment Pressure unless contain.ment pressure cannot be low~red below Fig. N.

Event 6 - the actions to terminate HPCS injection are reversed from those contained on the hard card.

Event 4 - need to add rising trend to the CAD temperature reported from the area operator.

Event 6 - Validation crew swapped the running SPE blowers; those actions are not listed in the Annlicant's Actions or Behavior block of the scenario auide.

Event 8 - Validation crew entered ITS 3.4.5 RA B.1 but the ITS reference is not listed in the scenario auide.

The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.

Chanae the reported pressure to 1510 psig.

Event B - Add SRO action to direct RR Loop emergency isolation Add MCA Baseline data to PPG 10 in the simulator setup instructions.

Date Received: 2/13/15 Facility Action/Response Added EO cue #7 to event 4 Added EO cue #3 to event 8.

Added EO cue #8 to event 4.

Added actions required to Terminate and Prevent LPCS and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.

Added "Anticipate Slowdown" to the ATC and SAO actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.

Revised critical task listing PC-7.1 to state, 'W ithin 10 minutes of exceeding Figure N and containment pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\\

Swapped actions to shut 1 E22-F004 and Stop the HPCS oumo in the BOP actions block of event #6.

Added trend information to event 4 EO cue 1a.

Added open bullet action to the Event 6 BOP actions block.

Added ITS 3.4.5 to the SRO Actions block for event 8.

Changed all instances of 1540 psig to 1510 psig.

Added to ATC & SRO actions for event #8.

Added to the Simulator Operator Initial Setup instructions.

  • -