ML16028A191: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16028A191
| number = ML16028A191
| issue date = 01/20/2016
| issue date = 01/20/2016
| title = Oconee, Technical Specification Base Change
| title = Technical Specification Base Change
| author name = Batson S L
| author name = Batson S
| author affiliation = Duke Energy Corp
| author affiliation = Duke Energy Corp
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:DUKE scotL.Bson ENERGY°2 Vice President LI 4L~~ IOconee Nuclear StationDuke EnergyONO1VP 1 7800 Rochester HwySeneca, SC 29672o: 864.873.3274
{{#Wiki_filter:DUKE scotL.Bson ENERGY°2 Vice President LI 4L~~
: f. 864.873, 4208ON S -201 5 -122 scott. Batson~duke  
IOconee Nuclear Station Duke Energy ONO1VP 1 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3274
-energy.
: f. 864.873, 4208 ON S -201 5 -122 scott. Batson~duke -energy. com January 20, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852
comJanuary 20, 2016ATTN: Document Control DeskU.S. Nuclear Regulatory Commission 11555 Rockville PikeRockville, Maryland 20852


==Subject:==
==Subject:==
Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Numbers 50-269, 50-270, and 50-287 Technical Specification (TS) Bases Change Please find attached changes to the Oconee Nuclear Station (ONS) TS Bases. These changes were processed in accordance with the provisions of Technical Specification 5.5.15, "Technical Specifications (TS) Bases Control Program."
Amendments 394/396/395 were issued for Oconee to revise ONS TS 3.4.15, to define a new time limit for restoring inoperable Reactor Coolant System (RCS) leakage detection instrumentation to operable status and to establish alternate methods of monitoring RCS leakage when one or more required monitors are inoperable in accordance with TS Task Force Traveler (TSTF) 513, Revision 3, "Revise Pressurized-Water Reactor Operability Requirements and actions for Reactor Coolant System Leakage Instrumentation."
The associated TSTF-513 revision to TS Bases 3.4.15 was to clearly define the RCS leakage detection instrumentation Operability requirements in the Limiting Condition for Operation (
LCO) Bases and to eliminate discussion from the Bases that could be erroneously construed as Operability requirements. The Bases were also revised to reflect the changes to the Technical specifications and to more accurately reflect the existing Technical Specifications.
Any questions regarding this information should be directed to Stephen C. Newman, ONS Regulatory Affairs Group, at (864) 873-4388.
Sincerely, Vice President Oconee Nuclear Station Attachment
\\
www.duke-energy.com


Duke Energy Carolinas, LLCOconee Nuclear StationDocket Numbers 50-269, 50-270, and 50-287Technical Specification (TS) Bases ChangePlease find attached changes to the Oconee Nuclear Station (ONS) TS Bases. These changeswere processed in accordance with the provisions of Technical Specification 5.5.15, "Technical Specifications (TS) Bases Control Program."
U. S. Nuclear Regulatory Commission January 20, 2016 Page 2 cc: Ms. Catherine Haney Administrator, Region I1 U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. James R. Hall, Senior Project Manager (ONS)
Amendments 394/396/395 were issued for Oconee to revise ONS TS 3.4.15, to define a newtime limit for restoring inoperable Reactor Coolant System (RCS) leakage detection instrumentation to operable status and to establish alternate methods of monitoring RCSleakage when one or more required monitors are inoperable in accordance with TS Task ForceTraveler (TSTF) 513, Revision 3, "Revise Pressurized-Water Reactor Operability Requirements and actions for Reactor Coolant System Leakage Instrumentation."
(By electronic mail only)
The associated TSTF-513 revision to TS Bases 3.4.15 was to clearly define the RCS leakagedetection instrumentation Operability requirements in the Limiting Condition for Operation (LCO) Bases and to eliminate discussion from the Bases that could be erroneously construed asOperability requirements.
U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852 Mr. Jeffrey A. Whited, Project Manager (By electronic mail only)
The Bases were also revised to reflect the changes to the Technical specifications and to more accurately reflect the existing Technical Specifications.
U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville Pike Mail Stop O-8B1A Rockville, MD 20852 Mr. Eddy Crowe Senior Resident Inspector Oconee Nuclear Station
Any questions regarding this information should be directed to Stephen C. Newman, ONSRegulatory Affairs Group, at (864) 873-4388.
 
Sincerely, Vice President Oconee Nuclear StationAttachment
ONS-201 5-122 January 20, 2016 Attachment Revised Oconee Nuclear Station TSB Manual Pages TSB List of Effective Pages (LOEPs), Rev. 003 LOEP 1-4 TSB 3.4.15, RCS Leakage Detection Instrumentation 3.4.15-1 thru 6 www.duke-energy.com
\www.duke-energy.com U. S. Nuclear Regulatory Commission January 20, 2016Page 2cc: Ms. Catherine HaneyAdministrator, Region I1U.S. Nuclear Regulatory Commission, Region IIMarquis One Tower245 Peachtree Center Ave., NE, Suite 1200Atlanta, GA 30303-1257 Mr. James R. Hall, Senior Project Manager (ONS)(By electronic mail only)U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville PikeMail Stop O-8G9ARockville, MD 20852Mr. Jeffrey A. Whited, Project Manager(By electronic mail only)U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville PikeMail Stop O-8B1ARockville, MD 20852Mr. Eddy CroweSenior Resident Inspector Oconee Nuclear Station ONS-201 5-122January 20, 2016Attachment Revised Oconee Nuclear Station TSB Manual PagesTSB List of Effective Pages (LOEPs),
 
Rev. 003 LOEP 1-4TSB 3.4.15, RCS Leakage Detection Instrumentation 3.4.15-1 thru 6www.duke-energy.com OCONEE NUCLEAR STATIONTECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15LIST OF EFFECTIVE PAGESSECTION/PAGES REVISION NUMBERIMPLEMENTATION DATETOCB 2.1.1B 2.1.2B3.0B 3.1.1B 3.1.2B 3.1.3B 3.1.4B 3.1.5B 3.1.6B 3.1.7B 3.1.8B 3.2.1B3 3.2.2B 3.2.3B 3.3.1B 3.3.2B 3.3.3B 3.3.4B 3.3.5B 3.3.6B 3.3.7B 3.3.8B 3.3.9B 3.3.10B 3.3.11B 3.3.12o000000o000o00000000000000000000000000000000000001000000000000000000000000000o00000009/03/1405/31/1202/06/1410/20/1105/16/1205/16/1206/02/9907/23/1205/16/1207/23/1207/23/1205/16/1205/16/1205/16/1205/16/1209/30/1512/14/0412/10/1412/10/1412/10/1412/10/1412/10/1405/16/1205/16/1205/16/1205/16/1205/16/12Oconee Nuclear StationLEP1Rvso03 LOEP 1Revision 003 OCONEE NUJCLEAR STATIONTECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15LIST OF EFFECTIVE PAGESSECTION/PAGES REVISION NUMBERBASES REVISION DATEB 3.3.13B 3.3.14B 3.3.15B 3.3.16B 3.3.17B 3.3.18B 3.3.19B 3.3.20B 3.3.21B 3.3.22B 3.3.23B 3.3.24B 3.3.25B 3.3.26B 3.3.27B 3.3.28B 3.4.1B 3.4.2B 3.4.3B 3.4.4B 3.4.5B 3.4.6B 3.4.7B 3.4.8B 3.4.9B 3.4.10B 3.4.111B 3.4.12o000000000o000000000000000000000000000000000o00000000000000000000000000000o00001o00000005/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/1 6/1205/16/1209/26/0111/05/0311/05/0312/10/1405/16/1205/16/1212/16/9803/04/1505/16/1205/16/1205/16/1205/16/1205/16/1205/16/1209/21/1510/12/1206/13/14Oconee Nuclear StationLEP2Rvso03 LOEP 2Revision 003 OCONEE NUCLEAR STATIONTECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15LIST OF EFFECTIVE PAGESSECTION/PAGES REVISION NUMBERBASES REVISION DATEB 3.4.13B 3.4.14B 3.4.15B 3.4.16B 3.5.1B 3.5.2B 3.5.3B 3.5.4B 3.6.1B 3.6.2B 3.6.3B 3.6.4B 3.6.5B 3.7.1B 3.7.2B 3.7.3B 3.7.4B 3.7.5B 3.7.6B 3.7.7B 3.7.8B 3.7.9B 3.7.10B 3.7.l0aB 3.7.11B 3.7.12B 3.7.13B 3.7.1400000100100000000100100000000000000000100100000100000100000000000000000000000000000005/16/1209/21/1511/24/1504/02/0705/16/1209/21/1509/21/1505/16/1210/20/1105/16/1205/16/1205/16/1209/21/1509/21/1511/13/1209/21/1505/16/1209/21/1505/16/1212/10/1405/16/1208/28/1409/03/1409/03/1405/16/1205/16/1208/19/1005/16/12Oconee Nuclear StationLEP3Rvso03 LOEP 3Revision 003 OCONEE NUCLEAR STATIONTECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15LIST OF EFFECTIVE PAGESSECTION/PAGES REVISION NUMBERBASES REVISION DATEB 3.7.15B 3.7.16B 3.7.17B 3.7.18B 3.7.19B 3.8.1B 3.8.2B 3.8.3B 3.8.4B 3.8.5B 3.8.6B 3.8.7B 3.8.8B 3.8.9B 3.9.1B 3.9.2B 3.9.3B 3.9.4B 3.9.5B 3.9.6B 3.9.7B 3.9.8B 3.10.1B 3.10.2o00000000000000o00000000000000000000000000000000000000000000000000000000010/24/0705/16/1204/12/0606/15/0606/25/1405/21/1504/07/1104/28/1512/18/0705/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1206/25/1411/05/1411/05/14Note: With the introduction of Fusion in June 2015, all controlled documents require athree-digit revision number. Thus, the revision numbers were set to "000" in the summerof 2015. As such, the revision dates for Revision 000 are based on the implementation dates for revisions in effect prior to this change.Oconee Nuclear StationLEP4Rvso03 LOEP 4Revision 003 RCS Leakage Detection Instrumentation B 3.4.15B 3.4 REACTOR COOLANT SYSTEM (RCS)B 3.4.15 RCS Leakage Detection Instrumentation BASESBACKGROUND ONS Design Criteria (Ref. 1) requires means for detecting RCS LEAKAGE.Although ONS is not committed to Regulatory Guide 1.45, Revision 0(Ref. 2) describes acceptable methods for setting leakage detection systems.Leakage detection systems must have the capability to detect significant reactor coolant pressure boundary (RCPB) degradation as soon afteroccurrence as practical to minimize the potential for propagation to a grossfailure.
OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER IMPLEMENTATION DATE TOC B 2.1.1 B 2.1.2 B3.0 B 3.1.1 B 3.1.2 B 3.1.3 B 3.1.4 B 3.1.5 B 3.1.6 B 3.1.7 B 3.1.8 B 3.2.1 B3 3.2.2 B 3.2.3 B 3.3.1 B 3.3.2 B 3.3.3 B 3.3.4 B 3.3.5 B 3.3.6 B 3.3.7 B 3.3.8 B 3.3.9 B 3.3.10 B 3.3.11 B 3.3.12 o000 000 o000 o00 000 000 000 000 000 000 000 000 000 000 000 001 000 000 000 000 000 000 000 000 000 o000 000 09/03/14 05/31/12 02/06/14 10/20/11 05/16/12 05/16/12 06/02/99 07/23/12 05/16/12 07/23/12 07/23/12 05/16/12 05/16/12 05/16/12 05/16/12 09/30/15 12/14/04 12/10/14 12/10/14 12/10/14 12/10/14 12/10/14 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 Oconee Nuclear StationLEP1Rvso03 LOEP 1 Revision 003
Thus, an early indication or warning signal is necessary to permitproper evaluation of all unidentified LEAKAGE.
 
In addition to meeting theOPERABILITY requirements, the monitors are typically set to provide themost sensitive response without causing an excessive number of spuriousalarms.The reactor coolant contains radioactivity that, when released to thecontainment, may be detected by radiation monitoring instrumentation.
OCONEE NUJCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.3.13 B 3.3.14 B 3.3.15 B 3.3.16 B 3.3.17 B 3.3.18 B 3.3.19 B 3.3.20 B 3.3.21 B 3.3.22 B 3.3.23 B 3.3.24 B 3.3.25 B 3.3.26 B 3.3.27 B 3.3.28 B 3.4.1 B 3.4.2 B 3.4.3 B 3.4.4 B 3.4.5 B 3.4.6 B 3.4.7 B 3.4.8 B 3.4.9 B 3.4.10 B 3.4.111 B 3.4.12 o000 000 000 o00 000 000 000 000 000 000 000 000 000 000 0o00 000 000 000 000 000 000 000 000 000 o00 001 o000 000 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/1 6/12 05/16/12 09/26/01 11/05/03 11/05/03 12/10/14 05/16/12 05/16/12 12/16/98 03/04/15 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 09/21/15 10/12/12 06/13/14 Oconee Nuclear StationLEP2Rvso03 LOEP 2 Revision 003
Radioactivity detection systems are included for monitoring both particulate and gaseous activities because of their sensitivities and rapid responses toRCS LEAKAGE.Other indications may be used to detect an increase in unidentified LEAKAGE;  
 
: however, they are not required to be OPERABLE by this LCO.Air temperature and pressure monitoring methods may be used to inferunidentified LEAKAGE to the containment.
OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.4.13 B 3.4.14 B 3.4.15 B 3.4.16 B 3.5.1 B 3.5.2 B 3.5.3 B 3.5.4 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.7.1 B 3.7.2 B 3.7.3 B 3.7.4 B 3.7.5 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.10 B 3.7.l0a B 3.7.11 B 3.7.12 B 3.7.13 B 3.7.14 000 001 001 000 000 001 001 000 000 000 000 000 001 001 000 001 000 001 000 000 000 000 000 000 000 000 000 000 05/16/12 09/21/15 11/24/15 04/02/07 05/16/12 09/21/15 09/21/15 05/16/12 10/20/11 05/16/12 05/16/12 05/16/12 09/21/15 09/21/15 11/13/12 09/21/15 05/16/12 09/21/15 05/16/12 12/10/14 05/16/12 08/28/14 09/03/14 09/03/14 05/16/12 05/16/12 08/19/10 05/16/12 Oconee Nuclear StationLEP3Rvso03 LOEP 3 Revision 003
Containment temperature andpressure fluctuate slightly during unit operation, but a rise above thenormally indicated range of values may indicate ROS LEAKAGE into thecontainment.
 
The relevance of temperature and pressure measurements is affected by containment free volume and, for temperature, detectorlocation.
OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.7.15 B 3.7.16 B 3.7.17 B 3.7.18 B 3.7.19 B 3.8.1 B 3.8.2 B 3.8.3 B 3.8.4 B 3.8.5 B 3.8.6 B 3.8.7 B 3.8.8 B 3.8.9 B 3.9.1 B 3.9.2 B 3.9.3 B 3.9.4 B 3.9.5 B 3.9.6 B 3.9.7 B 3.9.8 B 3.10.1 B 3.10.2 o00 000 000 000 000 o000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 10/24/07 05/16/12 04/12/06 06/15/06 06/25/14 05/21/15 04/07/11 04/28/15 12/18/07 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 06/25/14 11/05/14 11/05/14 Note: With the introduction of Fusion in June 2015, all controlled documents require a three-digit revision number. Thus, the revision numbers were set to "000" in the summer of 2015. As such, the revision dates for Revision 000 are based on the implementation dates for revisions in effect prior to this change.
Signals from these instruments can be valuable in recognizing rapid and sizable leakage to the containment.
Oconee Nuclear StationLEP4Rvso03 LOEP 4 Revision 003
Temperature and pressuremonitors are not required by this LCO.The above-mentioned LEAKAGE detection methods or systems differ insensitivity and response time. Some of these systems could serve as earlyalarm systems signaling the operators that closer examination of otherdetection systems is necessary to determine the extent of any corrective action that may be required.
 
OCONEE UNITS 1, 2, & 3B34151ASSRVIO01 B 3.4.15-1BASES REVISION 001 RCS Leakage Detection Instrumentation B 3.4.15BASES (continued)
RCS Leakage Detection Instrumentation B 3.4.15 B 3.4 REACTOR COOLANT SYSTEM (RCS)
APPLICABLE The need to evaluate the severity of an alarm or an indication is important SAFETY ANALYSES to the operators, and the ability to compare and verify with indications fromother systems is necessary.
B 3.4.15 RCS Leakage Detection Instrumentation BASES BACKGROUND ONS Design Criteria (Ref. 1) requires means for detecting RCS LEAKAGE.
The safety significance of RCS LEAKAGE varies widely depending on itssource, rate, and duration.
Although ONS is not committed to Regulatory Guide 1.45, Revision 0 (Ref. 2) describes acceptable methods for setting leakage detection systems.
Therefore, detecting and monitoring reactorcoolant LEAKAGE into the containment area are necessary.
Leakage detection systems must have the capability to detect significant reactor coolant pressure boundary (RCPB) degradation as soon after occurrence as practical to minimize the potential for propagation to a gross failure. Thus, an early indication or warning signal is necessary to permit proper evaluation of all unidentified LEAKAGE. In addition to meeting the OPERABILITY requirements, the monitors are typically set to provide the most sensitive response without causing an excessive number of spurious alarms.
Separating the identified LEAKAGE from the unidentified LEAKAGE providesquantitative information to the operators, allowing them to take corrective action should a leak occur detrimental to the safety of the unit and thepublic.ROS leakage detection instrumentation satisfies Criterion 1 of10 CFR 50.36.LCO This LCO requires instruments of diverse monitoring principles to beOPERABLE to provide confidence that small amounts of unidentified LEAKAGE are detected in time to allow actions to place the unit in a safecondition when RCS LEAKAGE indicates possible RCPB degradation.
The reactor coolant contains radioactivity that, when released to the containment, may be detected by radiation monitoring instrumentation.
The LCO requires two instruments of diverse monitoring principles (sumplevel indication and atmosphere radioactivity monitoring) to be OPERABLE.
Radioactivity detection systems are included for monitoring both particulate and gaseous activities because of their sensitivities and rapid responses to RCS LEAKAGE.
The containment sump is used to collect unidentified LEAKAGE.
Other indications may be used to detect an increase in unidentified LEAKAGE; however, they are not required to be OPERABLE by this LCO.
Thecontainment sump consists of the normal sump and the emergency sump.The LCO requirements apply to the total amount of unidentified LEAKAGEcollected in the normal sump. The monitor on the containment sumpdetects level and is instrumented to detect when there is leakage of 1 gpm.The identification of an increase in unidentified LEAKAGE will be delayedby the time required for the unidentified LEAKAGE to travel to thecontainment sump and it may take longer than one hour to detect a 1 gpmincrease in unidentified  
Air temperature and pressure monitoring methods may be used to infer unidentified LEAKAGE to the containment. Containment temperature and pressure fluctuate slightly during unit operation, but a rise above the normally indicated range of values may indicate ROS LEAKAGE into the containment. The relevance of temperature and pressure measurements is affected by containment free volume and, for temperature, detector location. Signals from these instruments can be valuable in recognizing rapid and sizable leakage to the containment. Temperature and pressure monitors are not required by this LCO.
: LEAKAGE, depending on the origin and magnitude of the LEAKAGE.
The above-mentioned LEAKAGE detection methods or systems differ in sensitivity and response time. Some of these systems could serve as early alarm systems signaling the operators that closer examination of other detection systems is necessary to determine the extent of any corrective action that may be required.
This sensitivity is acceptable for containment sumpmonitor OPERABILITY.
OCONEE UNITS 1, 2, & 3B34151ASSRVIO01 B 3.4.15-1 BASES REVISION 001
The reactor coolant contains radioactivity that, when released to thecontainment, may be detected by the gaseous or particulate containment atmosphere radioactivity monitor.
 
Only one of the two detectors is requiredto be OPERABLE.
RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)
Radioactivity detection systems are included formonitoring both particulate and gaseous activities because of theirsensitivities and rapid responses to RCS LEAKAGE, but have recognized limitations.
APPLICABLE The need to evaluate the severity of an alarm or an indication is important SAFETY ANALYSES to the operators, and the ability to compare and verify with indications from other systems is necessary.
Reactor coolant radioactivity levels will be low during initialreactor startup and for a few weeks thereafter, until activated corrosion products have been formed and fission products appear from fuel elementcladding contamination or cladding defects.
The safety significance of RCS LEAKAGE varies widely depending on its source, rate, and duration. Therefore, detecting and monitoring reactor coolant LEAKAGE into the containment area are necessary. Separating the identified LEAKAGE from the unidentified LEAKAGE provides quantitative information to the operators, allowing them to take corrective action should a leak occur detrimental to the safety of the unit and the public.
If there are few fuel elementcladding defects and low levels of activation  
ROS leakage detection instrumentation satisfies Criterion 1 of 10 CFR 50.36.
: products, it may not beOCONEE UNITS 1, 2, & 3B34152ASSRVIO01 B 3.4.15-2 RCS Leakage Detection Instrumentation B 3.4.15BASES (continued)
LCO This LCO requires instruments of diverse monitoring principles to be OPERABLE to provide confidence that small amounts of unidentified LEAKAGE are detected in time to allow actions to place the unit in a safe condition when RCS LEAKAGE indicates possible RCPB degradation.
LCO (continued) possible for the gaseous or particulate containment atmosphere radioactivity monitors to detect a 1 gpm increase within 1 hour duringnormal operation.  
The LCO requires two instruments of diverse monitoring principles (sump level indication and atmosphere radioactivity monitoring) to be OPERABLE.
: However, the gaseous or particulate containment atmosphere radioactivity monitor is OPERABLE when it is capable ofdetecting a 1 gpm increase in unidentified LEAKAGE within 1 hour givenan RCS activity equivalent to that assumed in the design calculations forthe monitors (Ref. 3).The LCO requirements are satisfied when instruments of diversemeasurement means are available.
The containment sump is used to collect unidentified LEAKAGE. The containment sump consists of the normal sump and the emergency sump.
Thus, the containment normal sumplevel indication, in combination with a particulate (RIA-47) or gaseousradioactivity monitor (RIA-49),
The LCO requirements apply to the total amount of unidentified LEAKAGE collected in the normal sump. The monitor on the containment sump detects level and is instrumented to detect when there is leakage of 1 gpm.
provides an acceptable minimum.APPLICABILITY Because of elevated RCS temperature and pressure in MODES 1, 2, 3,and 4, RCS leakage detection instrumentation is required to beOPERABLE.
The identification of an increase in unidentified LEAKAGE will be delayed by the time required for the unidentified LEAKAGE to travel to the containment sump and it may take longer than one hour to detect a 1 gpm increase in unidentified LEAKAGE, depending on the origin and magnitude of the LEAKAGE. This sensitivity is acceptable for containment sump monitor OPERABILITY.
In MODE 5 or 6, the temperature is < 200&deg;F and pressure is maintained low or at atmospheric pressure.
The reactor coolant contains radioactivity that, when released to the containment, may be detected by the gaseous or particulate containment atmosphere radioactivity monitor. Only one of the two detectors is required to be OPERABLE. Radioactivity detection systems are included for monitoring both particulate and gaseous activities because of their sensitivities and rapid responses to RCS LEAKAGE, but have recognized limitations. Reactor coolant radioactivity levels will be low during initial reactor startup and for a few weeks thereafter, until activated corrosion products have been formed and fission products appear from fuel element cladding contamination or cladding defects. If there are few fuel element cladding defects and low levels of activation products, it may not be OCONEE UNITS 1, 2, & 3B34152ASSRVIO01 B 3.4.15-2
Since the temperatures and pressures arefar lower than those for MODES 1, 2, 3, and 4, the likelihood of leakageand crack propagation is much smaller.
 
Therefore, the requirements of thisLCO are not applicable in MODES 5 and 6.ACTIONS The Actions are modified by a Note indicating that the provisions ofLCO 3.0.4 do not apply. As a result, a MODE change is allowed when thenormal sump level indication and required radioactivity monitor areinoperable.
RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)
This allowance is provided because other instrumentation isavailable to monitor RCS LEAKAGE.A.1 and A.2With the containment normal sump level indication inoperable, no otherform of sampling can provide the equivalent information.
LCO (continued) possible for the gaseous or particulate containment atmosphere radioactivity monitors to detect a 1 gpm increase within 1 hour during normal operation. However, the gaseous or particulate containment atmosphere radioactivity monitor is OPERABLE when it is capable of detecting a 1 gpm increase in unidentified LEAKAGE within 1 hour given an RCS activity equivalent to that assumed in the design calculations for the monitors (Ref. 3).
: However, the containment atmosphere activity monitor will provideindications of changes in leakage.
The LCO requirements are satisfied when instruments of diverse measurement means are available. Thus, the containment normal sump level indication, in combination with a particulate (RIA-47) or gaseous radioactivity monitor (RIA-49), provides an acceptable minimum.
Together with the containment atmosphere radioactivity  
APPLICABILITY Because of elevated RCS temperature and pressure in MODES 1, 2, 3, and 4, RCS leakage detection instrumentation is required to be OPERABLE.
: monitor, the periodic surveillance for RCSinventory
In MODE 5 or 6, the temperature is < 200&deg;F and pressure is maintained low or at atmospheric pressure. Since the temperatures and pressures are far lower than those for MODES 1, 2, 3, and 4, the likelihood of leakage and crack propagation is much smaller. Therefore, the requirements of this LCO are not applicable in MODES 5 and 6.
: balance, SR 3.4.13.1, water inventory  
ACTIONS The Actions are modified by a Note indicating that the provisions of LCO 3.0.4 do not apply. As a result, a MODE change is allowed when the normal sump level indication and required radioactivity monitor are inoperable. This allowance is provided because other instrumentation is available to monitor RCS LEAKAGE.
: balance, must beperformed at an increased frequency of 24 hours to provide information that is adequate to detect leakage.
A.1 and A.2 With the containment normal sump level indication inoperable, no other form of sampling can provide the equivalent information.
A Note is added allowing that SR3.4.13.1 is not required to be performed until 12 hours after steady stateoperation (stable RCS pressure, temperature, power level, pressurizer andmakeup tank levels, makeup and letdown, and RCP seal injection andreturn flows). The 12 hour allowance provides sufficient time to collect andOCONEE UNITS 1, 2, & 3B34153ASSRVIO01 B 3.4.15-3BASES REVISION 001 I RCS Leakage Detection Instrumentation B 3.4.15BASES (continued)
However, the containment atmosphere activity monitor will provide indications of changes in leakage. Together with the containment atmosphere radioactivity monitor, the periodic surveillance for RCS inventory balance, SR 3.4.13.1, water inventory balance, must be performed at an increased frequency of 24 hours to provide information that is adequate to detect leakage. A Note is added allowing that SR 3.4.13.1 is not required to be performed until 12 hours after steady state operation (stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows). The 12 hour allowance provides sufficient time to collect and OCONEE UNITS 1, 2, & 3B34153ASSRVIO01 B 3.4.15-3 BASES REVISION 001 I
 
RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)
ACTIONS A.1 and A.2 (continued) process all necessary data after stable plant conditions are established.
ACTIONS A.1 and A.2 (continued) process all necessary data after stable plant conditions are established.
Restoration of the normal sump level indication to OPERABLE status isrequired to regain the function in a Completion Time of 30 days after levelindication failure.
Restoration of the normal sump level indication to OPERABLE status is required to regain the function in a Completion Time of 30 days after level indication failure. This time is acceptable considering the frequency and adequacy of the RCS water inventory balance required by Required Action A.1.
This time is acceptable considering the frequency andadequacy of the RCS water inventory balance required by RequiredAction A.1.B.1.1, B.1.2. and B.2With required gaseous or particulate containment atmosphere radioactivity monitoring instrumentation channel inoperable, alternative action isrequired.
B.1.1, B.1.2. and B.2 With required gaseous or particulate containment atmosphere radioactivity monitoring instrumentation channel inoperable, alternative action is required. Either grab samples of the containment atmosphere must be taken and analyzed or water inventory balances, in accordance with SR 3.4.13.1, must be performed to provide alternate periodic information.
Either grab samples of the containment atmosphere must betaken and analyzed or water inventory  
With a sample obtained and analyzed or a water inventory balance performed every 24 hours, the reactor may be operated for up to 30 days to allow restoration of the radioactivity monitor.
: balances, in accordance withSR 3.4.13.1, must be performed to provide alternate periodic information.
The 24 hour interval for SR 3.4.13.1 provides periodic information that is adequate to detect leakage. A Note is added allowing that SR 3.4.13.1 is not required to be performed until 12 hours after steady state operation (stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows).
With a sample obtained and analyzed or a water inventory balanceperformed every 24 hours, the reactor may be operated for up to 30 daysto allow restoration of the radioactivity monitor.The 24 hour interval for SR 3.4.13.1 provides periodic information that isadequate to detect leakage.
The 12 hour allowance provides sufficient time to collect and process all necessary data after stable plant conditions are established. The 30 day Completion Time recognizes at least one other form of leak detection is available.
A Note is added allowing that SR 3.4.13.1 isnot required to be performed until 12 hours after steady state operation (stable RCS pressure, temperature, power level, pressurizer and makeuptank levels, makeup and letdown, and RCP seal injection and return flows).The 12 hour allowance provides sufficient time to collect and process allnecessary data after stable plant conditions are established.
C.1 and C.2 With containment normal sump level indication inoperable, the only means of detecting LEAKAGE is the required containment atmosphere radioactivity monitor. A Note clarifies that this Condition is applicable when the only OPERABLE monitor is the containment atmosphere gaseous radioactivity monitor. The containment atmosphere gaseous radioactivity monitor typically cannot detect a 1 gpm leak within one hour when RCS activity is low. In addition, this configuration does not provide the required diverse means of leakage detection. Indirect methods of monitoring RCS leakage must be implemented. Grab samples of the containment atmosphere must be taken and analyzed to provide alternate periodic information. The 12 hour interval is sufficient to detect increasing RCS leakage. The Required Action provides 7 days to restore another RCS OCONEE UNITS 1, 2, & 3B34154ASSRVIO01 B 3.4.15-4 BASES REVISION 001
The 30 dayCompletion Time recognizes at least one other form of leak detection isavailable.
 
C.1 and C.2With containment normal sump level indication inoperable, the only meansof detecting LEAKAGE is the required containment atmosphere radioactivity monitor.
RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)
A Note clarifies that this Condition is applicable whenthe only OPERABLE monitor is the containment atmosphere gaseousradioactivity monitor.
The containment atmosphere gaseous radioactivity monitor typically cannot detect a 1 gpm leak within one hour when RCSactivity is low. In addition, this configuration does not provide the requireddiverse means of leakage detection.
Indirect methods of monitoring RCSleakage must be implemented.
Grab samples of the containment atmosphere must be taken and analyzed to provide alternate periodicinformation.
The 12 hour interval is sufficient to detect increasing RCSleakage.
The Required Action provides 7 days to restore another RCSOCONEE UNITS 1, 2, & 3B34154ASSRVIO01 B 3.4.15-4BASES REVISION 001 RCS Leakage Detection Instrumentation B 3.4.15BASES (continued)
ACTIONS C.1 and 0.2 (continued),
ACTIONS C.1 and 0.2 (continued),
leakage monitor to OPERABLE status to regain the intended leakagedetection diversity.
leakage monitor to OPERABLE status to regain the intended leakage detection diversity. The 7 day Completion Time ensures that the unit will not be operated in a degraded configuration for a lengthy time period.
The 7 day Completion Time ensures that the unit willnot be operated in a degraded configuration for a lengthy time period.D.1 and D.2If a Required Action of Condition A, B or C cannot be met within therequired Completion Time, the unit must be brought to a MODE in whichthe LCO does not apply. To achieve this status, the unit must be broughtto at least MODE 3 within 12 hours and to MODE 5 within 36 hours. Theallowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderlymanner and without challenging unit systems.E.1If both required leakage detection instruments (normal sump levelindication and containment atmosphere radioactivity monitor) areinoperable, no automatic means of monitoring leakage are available, andimmediate plant shutdown in accordance with LCO 3.0.3 is required.
D.1 and D.2 If a Required Action of Condition A, B or C cannot be met within the required Completion Time, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 within 12 hours and to MODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.
SURVEILLANCE SR 3.4.15.1REQUIREMENTS SR 3.4.15.1 requires the performance of a CHANNEL CHECK of therequired containment atmosphere radioactivity monitor.
E.1 If both required leakage detection instruments (normal sump level indication and containment atmosphere radioactivity monitor) are inoperable, no automatic means of monitoring leakage are available, and immediate plant shutdown in accordance with LCO 3.0.3 is required.
The check givesreasonable confidence that each channel is operating properly.
SURVEILLANCE SR 3.4.15.1 REQUIREMENTS SR 3.4.15.1 requires the performance of a CHANNEL CHECK of the required containment atmosphere radioactivity monitor. The check gives reasonable confidence that each channel is operating properly. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
TheSurveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.SR 3.4.15.2SR 3.4.15.2 requires the performance of a CHANNEL FUNCTIONAL TESTof the required containment atmosphere radioactivity monitor.
SR 3.4.15.2 SR 3.4.15.2 requires the performance of a CHANNEL FUNCTIONAL TEST of the required containment atmosphere radioactivity monitor. The test ensures that the monitor can perform its function in the desired manner.
The testensures that the monitor can perform its function in the desired manner.The test verifies the alarm setpoint and relative accuracy of the instrument string.OCONEE UNITS 1, 2, & 3B34155ASSRVIO01 B 3.4.15-5BASES REVISION 001 RCS Leakage Detection Instrumentation B 3.4.15BASES (continued)
The test verifies the alarm setpoint and relative accuracy of the instrument string.
SURVEILLANCE SR 3.4.15.3 and SR 3.4.15.4REQUIREMENTS (continued)
OCONEE UNITS 1, 2, & 3B34155ASSRVIO01 B 3.4.15-5 BASES REVISION 001
These SRs require the performance of a CHANNEL CALIBRATION foreach of the required RCS leakage detection instrumentation channels.
 
Thecalibration verifies the accuracy of the instrument string, including theinstruments located inside containment.
RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)
The Surveillance Frequency isbased on operating experience, equipment reliability, and plant risk and iscontrolled under the Surveillance Frequency Control Program.REFERENCES  
SURVEILLANCE SR 3.4.15.3 and SR 3.4.15.4 REQUIREMENTS (continued)
: 1. UFSAR, Section 3.1.16, "Criterion 16 -Monitoring Reactor CoolantPressure Boundary (Category B)."2. Regulatory Guide 1.45, Revision 0, "Reactor Coolant PressureBoundary Leakage Detection System,"
These SRs require the performance of a CHANNEL CALIBRATION for each of the required RCS leakage detection instrumentation channels. The calibration verifies the accuracy of the instrument string, including the instruments located inside containment. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
May 1973.3. UFSAR, Section 5.2.3.10.5, "Leak Detection."
REFERENCES
OCONEE UNITS 1, 2, & 3B34156ASSRVIO01 B 3.4.15-6BASES REVISION 001 I DUKE scotL.Bson ENERGY&deg;2 Vice President LI 4L~~ IOconee Nuclear StationDuke EnergyONO1VP 1 7800 Rochester HwySeneca, SC 29672o: 864.873.3274
: 1.
: f. 864.873, 4208ON S -201 5 -122 scott. Batson~duke  
UFSAR, Section 3.1.16, "Criterion 16 - Monitoring Reactor Coolant Pressure Boundary (Category B)."
-energy.
: 2.
comJanuary 20, 2016ATTN: Document Control DeskU.S. Nuclear Regulatory Commission 11555 Rockville PikeRockville, Maryland 20852
Regulatory Guide 1.45, Revision 0, "Reactor Coolant Pressure Boundary Leakage Detection System," May 1973.
: 3.
UFSAR, Section 5.2.3.10.5, "Leak Detection."
OCONEE UNITS 1, 2, & 3B34156ASSRVIO01 B 3.4.15-6 BASES REVISION 001 I
 
DUKE scotL.Bson ENERGY&deg;2 Vice President LI 4L~~
IOconee Nuclear Station Duke Energy ONO1VP 1 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3274
: f. 864.873, 4208 ON S -201 5 -122 scott. Batson~duke -energy. com January 20, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852


==Subject:==
==Subject:==
Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Numbers 50-269, 50-270, and 50-287 Technical Specification (TS) Bases Change Please find attached changes to the Oconee Nuclear Station (ONS) TS Bases. These changes were processed in accordance with the provisions of Technical Specification 5.5.15, "Technical Specifications (TS) Bases Control Program."
Amendments 394/396/395 were issued for Oconee to revise ONS TS 3.4.15, to define a new time limit for restoring inoperable Reactor Coolant System (RCS) leakage detection instrumentation to operable status and to establish alternate methods of monitoring RCS leakage when one or more required monitors are inoperable in accordance with TS Task Force Traveler (TSTF) 513, Revision 3, "Revise Pressurized-Water Reactor Operability Requirements and actions for Reactor Coolant System Leakage Instrumentation."
The associated TSTF-513 revision to TS Bases 3.4.15 was to clearly define the RCS leakage detection instrumentation Operability requirements in the Limiting Condition for Operation (
LCO) Bases and to eliminate discussion from the Bases that could be erroneously construed as Operability requirements. The Bases were also revised to reflect the changes to the Technical specifications and to more accurately reflect the existing Technical Specifications.
Any questions regarding this information should be directed to Stephen C. Newman, ONS Regulatory Affairs Group, at (864) 873-4388.
Sincerely, Vice President Oconee Nuclear Station Attachment
\\
www.duke-energy.com


Duke Energy Carolinas, LLCOconee Nuclear StationDocket Numbers 50-269, 50-270, and 50-287Technical Specification (TS) Bases ChangePlease find attached changes to the Oconee Nuclear Station (ONS) TS Bases. These changeswere processed in accordance with the provisions of Technical Specification 5.5.15, "Technical Specifications (TS) Bases Control Program."
U. S. Nuclear Regulatory Commission January 20, 2016 Page 2 cc: Ms. Catherine Haney Administrator, Region I1 U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. James R. Hall, Senior Project Manager (ONS)
Amendments 394/396/395 were issued for Oconee to revise ONS TS 3.4.15, to define a newtime limit for restoring inoperable Reactor Coolant System (RCS) leakage detection instrumentation to operable status and to establish alternate methods of monitoring RCSleakage when one or more required monitors are inoperable in accordance with TS Task ForceTraveler (TSTF) 513, Revision 3, "Revise Pressurized-Water Reactor Operability Requirements and actions for Reactor Coolant System Leakage Instrumentation."
(By electronic mail only)
The associated TSTF-513 revision to TS Bases 3.4.15 was to clearly define the RCS leakagedetection instrumentation Operability requirements in the Limiting Condition for Operation (LCO) Bases and to eliminate discussion from the Bases that could be erroneously construed asOperability requirements.
U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852 Mr. Jeffrey A. Whited, Project Manager (By electronic mail only)
The Bases were also revised to reflect the changes to the Technical specifications and to more accurately reflect the existing Technical Specifications.
U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville Pike Mail Stop O-8B1A Rockville, MD 20852 Mr. Eddy Crowe Senior Resident Inspector Oconee Nuclear Station
Any questions regarding this information should be directed to Stephen C. Newman, ONSRegulatory Affairs Group, at (864) 873-4388.
 
Sincerely, Vice President Oconee Nuclear StationAttachment
ONS-201 5-122 January 20, 2016 Attachment Revised Oconee Nuclear Station TSB Manual Pages TSB List of Effective Pages (LOEPs), Rev. 003 LOEP 1-4 TSB 3.4.15, RCS Leakage Detection Instrumentation 3.4.15-1 thru 6 www.duke-energy.com
\www.duke-energy.com U. S. Nuclear Regulatory Commission January 20, 2016Page 2cc: Ms. Catherine HaneyAdministrator, Region I1U.S. Nuclear Regulatory Commission, Region IIMarquis One Tower245 Peachtree Center Ave., NE, Suite 1200Atlanta, GA 30303-1257 Mr. James R. Hall, Senior Project Manager (ONS)(By electronic mail only)U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville PikeMail Stop O-8G9ARockville, MD 20852Mr. Jeffrey A. Whited, Project Manager(By electronic mail only)U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville PikeMail Stop O-8B1ARockville, MD 20852Mr. Eddy CroweSenior Resident Inspector Oconee Nuclear Station ONS-201 5-122January 20, 2016Attachment Revised Oconee Nuclear Station TSB Manual PagesTSB List of Effective Pages (LOEPs),
 
Rev. 003 LOEP 1-4TSB 3.4.15, RCS Leakage Detection Instrumentation 3.4.15-1 thru 6www.duke-energy.com OCONEE NUCLEAR STATIONTECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15LIST OF EFFECTIVE PAGESSECTION/PAGES REVISION NUMBERIMPLEMENTATION DATETOCB 2.1.1B 2.1.2B3.0B 3.1.1B 3.1.2B 3.1.3B 3.1.4B 3.1.5B 3.1.6B 3.1.7B 3.1.8B 3.2.1B3 3.2.2B 3.2.3B 3.3.1B 3.3.2B 3.3.3B 3.3.4B 3.3.5B 3.3.6B 3.3.7B 3.3.8B 3.3.9B 3.3.10B 3.3.11B 3.3.12o000000o000o00000000000000000000000000000000000001000000000000000000000000000o00000009/03/1405/31/1202/06/1410/20/1105/16/1205/16/1206/02/9907/23/1205/16/1207/23/1207/23/1205/16/1205/16/1205/16/1205/16/1209/30/1512/14/0412/10/1412/10/1412/10/1412/10/1412/10/1405/16/1205/16/1205/16/1205/16/1205/16/12Oconee Nuclear StationLEP1Rvso03 LOEP 1Revision 003 OCONEE NUJCLEAR STATIONTECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15LIST OF EFFECTIVE PAGESSECTION/PAGES REVISION NUMBERBASES REVISION DATEB 3.3.13B 3.3.14B 3.3.15B 3.3.16B 3.3.17B 3.3.18B 3.3.19B 3.3.20B 3.3.21B 3.3.22B 3.3.23B 3.3.24B 3.3.25B 3.3.26B 3.3.27B 3.3.28B 3.4.1B 3.4.2B 3.4.3B 3.4.4B 3.4.5B 3.4.6B 3.4.7B 3.4.8B 3.4.9B 3.4.10B 3.4.111B 3.4.12o000000000o000000000000000000000000000000000o00000000000000000000000000000o00001o00000005/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/1 6/1205/16/1209/26/0111/05/0311/05/0312/10/1405/16/1205/16/1212/16/9803/04/1505/16/1205/16/1205/16/1205/16/1205/16/1205/16/1209/21/1510/12/1206/13/14Oconee Nuclear StationLEP2Rvso03 LOEP 2Revision 003 OCONEE NUCLEAR STATIONTECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15LIST OF EFFECTIVE PAGESSECTION/PAGES REVISION NUMBERBASES REVISION DATEB 3.4.13B 3.4.14B 3.4.15B 3.4.16B 3.5.1B 3.5.2B 3.5.3B 3.5.4B 3.6.1B 3.6.2B 3.6.3B 3.6.4B 3.6.5B 3.7.1B 3.7.2B 3.7.3B 3.7.4B 3.7.5B 3.7.6B 3.7.7B 3.7.8B 3.7.9B 3.7.10B 3.7.l0aB 3.7.11B 3.7.12B 3.7.13B 3.7.1400000100100000000100100000000000000000100100000100000100000000000000000000000000000005/16/1209/21/1511/24/1504/02/0705/16/1209/21/1509/21/1505/16/1210/20/1105/16/1205/16/1205/16/1209/21/1509/21/1511/13/1209/21/1505/16/1209/21/1505/16/1212/10/1405/16/1208/28/1409/03/1409/03/1405/16/1205/16/1208/19/1005/16/12Oconee Nuclear StationLEP3Rvso03 LOEP 3Revision 003 OCONEE NUCLEAR STATIONTECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15LIST OF EFFECTIVE PAGESSECTION/PAGES REVISION NUMBERBASES REVISION DATEB 3.7.15B 3.7.16B 3.7.17B 3.7.18B 3.7.19B 3.8.1B 3.8.2B 3.8.3B 3.8.4B 3.8.5B 3.8.6B 3.8.7B 3.8.8B 3.8.9B 3.9.1B 3.9.2B 3.9.3B 3.9.4B 3.9.5B 3.9.6B 3.9.7B 3.9.8B 3.10.1B 3.10.2o00000000000000o00000000000000000000000000000000000000000000000000000000010/24/0705/16/1204/12/0606/15/0606/25/1405/21/1504/07/1104/28/1512/18/0705/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1205/16/1206/25/1411/05/1411/05/14Note: With the introduction of Fusion in June 2015, all controlled documents require athree-digit revision number. Thus, the revision numbers were set to "000" in the summerof 2015. As such, the revision dates for Revision 000 are based on the implementation dates for revisions in effect prior to this change.Oconee Nuclear StationLEP4Rvso03 LOEP 4Revision 003 RCS Leakage Detection Instrumentation B 3.4.15B 3.4 REACTOR COOLANT SYSTEM (RCS)B 3.4.15 RCS Leakage Detection Instrumentation BASESBACKGROUND ONS Design Criteria (Ref. 1) requires means for detecting RCS LEAKAGE.Although ONS is not committed to Regulatory Guide 1.45, Revision 0(Ref. 2) describes acceptable methods for setting leakage detection systems.Leakage detection systems must have the capability to detect significant reactor coolant pressure boundary (RCPB) degradation as soon afteroccurrence as practical to minimize the potential for propagation to a grossfailure.
OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER IMPLEMENTATION DATE TOC B 2.1.1 B 2.1.2 B3.0 B 3.1.1 B 3.1.2 B 3.1.3 B 3.1.4 B 3.1.5 B 3.1.6 B 3.1.7 B 3.1.8 B 3.2.1 B3 3.2.2 B 3.2.3 B 3.3.1 B 3.3.2 B 3.3.3 B 3.3.4 B 3.3.5 B 3.3.6 B 3.3.7 B 3.3.8 B 3.3.9 B 3.3.10 B 3.3.11 B 3.3.12 o000 000 o000 o00 000 000 000 000 000 000 000 000 000 000 000 001 000 000 000 000 000 000 000 000 000 o000 000 09/03/14 05/31/12 02/06/14 10/20/11 05/16/12 05/16/12 06/02/99 07/23/12 05/16/12 07/23/12 07/23/12 05/16/12 05/16/12 05/16/12 05/16/12 09/30/15 12/14/04 12/10/14 12/10/14 12/10/14 12/10/14 12/10/14 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 Oconee Nuclear StationLEP1Rvso03 LOEP 1 Revision 003
Thus, an early indication or warning signal is necessary to permitproper evaluation of all unidentified LEAKAGE.
 
In addition to meeting theOPERABILITY requirements, the monitors are typically set to provide themost sensitive response without causing an excessive number of spuriousalarms.The reactor coolant contains radioactivity that, when released to thecontainment, may be detected by radiation monitoring instrumentation.
OCONEE NUJCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.3.13 B 3.3.14 B 3.3.15 B 3.3.16 B 3.3.17 B 3.3.18 B 3.3.19 B 3.3.20 B 3.3.21 B 3.3.22 B 3.3.23 B 3.3.24 B 3.3.25 B 3.3.26 B 3.3.27 B 3.3.28 B 3.4.1 B 3.4.2 B 3.4.3 B 3.4.4 B 3.4.5 B 3.4.6 B 3.4.7 B 3.4.8 B 3.4.9 B 3.4.10 B 3.4.111 B 3.4.12 o000 000 000 o00 000 000 000 000 000 000 000 000 000 000 0o00 000 000 000 000 000 000 000 000 000 o00 001 o000 000 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/1 6/12 05/16/12 09/26/01 11/05/03 11/05/03 12/10/14 05/16/12 05/16/12 12/16/98 03/04/15 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 09/21/15 10/12/12 06/13/14 Oconee Nuclear StationLEP2Rvso03 LOEP 2 Revision 003
Radioactivity detection systems are included for monitoring both particulate and gaseous activities because of their sensitivities and rapid responses toRCS LEAKAGE.Other indications may be used to detect an increase in unidentified LEAKAGE;  
 
: however, they are not required to be OPERABLE by this LCO.Air temperature and pressure monitoring methods may be used to inferunidentified LEAKAGE to the containment.
OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.4.13 B 3.4.14 B 3.4.15 B 3.4.16 B 3.5.1 B 3.5.2 B 3.5.3 B 3.5.4 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.7.1 B 3.7.2 B 3.7.3 B 3.7.4 B 3.7.5 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.10 B 3.7.l0a B 3.7.11 B 3.7.12 B 3.7.13 B 3.7.14 000 001 001 000 000 001 001 000 000 000 000 000 001 001 000 001 000 001 000 000 000 000 000 000 000 000 000 000 05/16/12 09/21/15 11/24/15 04/02/07 05/16/12 09/21/15 09/21/15 05/16/12 10/20/11 05/16/12 05/16/12 05/16/12 09/21/15 09/21/15 11/13/12 09/21/15 05/16/12 09/21/15 05/16/12 12/10/14 05/16/12 08/28/14 09/03/14 09/03/14 05/16/12 05/16/12 08/19/10 05/16/12 Oconee Nuclear StationLEP3Rvso03 LOEP 3 Revision 003
Containment temperature andpressure fluctuate slightly during unit operation, but a rise above thenormally indicated range of values may indicate ROS LEAKAGE into thecontainment.
 
The relevance of temperature and pressure measurements is affected by containment free volume and, for temperature, detectorlocation.
OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.7.15 B 3.7.16 B 3.7.17 B 3.7.18 B 3.7.19 B 3.8.1 B 3.8.2 B 3.8.3 B 3.8.4 B 3.8.5 B 3.8.6 B 3.8.7 B 3.8.8 B 3.8.9 B 3.9.1 B 3.9.2 B 3.9.3 B 3.9.4 B 3.9.5 B 3.9.6 B 3.9.7 B 3.9.8 B 3.10.1 B 3.10.2 o00 000 000 000 000 o000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 10/24/07 05/16/12 04/12/06 06/15/06 06/25/14 05/21/15 04/07/11 04/28/15 12/18/07 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 06/25/14 11/05/14 11/05/14 Note: With the introduction of Fusion in June 2015, all controlled documents require a three-digit revision number. Thus, the revision numbers were set to "000" in the summer of 2015. As such, the revision dates for Revision 000 are based on the implementation dates for revisions in effect prior to this change.
Signals from these instruments can be valuable in recognizing rapid and sizable leakage to the containment.
Oconee Nuclear StationLEP4Rvso03 LOEP 4 Revision 003
Temperature and pressuremonitors are not required by this LCO.The above-mentioned LEAKAGE detection methods or systems differ insensitivity and response time. Some of these systems could serve as earlyalarm systems signaling the operators that closer examination of otherdetection systems is necessary to determine the extent of any corrective action that may be required.
 
OCONEE UNITS 1, 2, & 3B34151ASSRVIO01 B 3.4.15-1BASES REVISION 001 RCS Leakage Detection Instrumentation B 3.4.15BASES (continued)
RCS Leakage Detection Instrumentation B 3.4.15 B 3.4 REACTOR COOLANT SYSTEM (RCS)
APPLICABLE The need to evaluate the severity of an alarm or an indication is important SAFETY ANALYSES to the operators, and the ability to compare and verify with indications fromother systems is necessary.
B 3.4.15 RCS Leakage Detection Instrumentation BASES BACKGROUND ONS Design Criteria (Ref. 1) requires means for detecting RCS LEAKAGE.
The safety significance of RCS LEAKAGE varies widely depending on itssource, rate, and duration.
Although ONS is not committed to Regulatory Guide 1.45, Revision 0 (Ref. 2) describes acceptable methods for setting leakage detection systems.
Therefore, detecting and monitoring reactorcoolant LEAKAGE into the containment area are necessary.
Leakage detection systems must have the capability to detect significant reactor coolant pressure boundary (RCPB) degradation as soon after occurrence as practical to minimize the potential for propagation to a gross failure. Thus, an early indication or warning signal is necessary to permit proper evaluation of all unidentified LEAKAGE. In addition to meeting the OPERABILITY requirements, the monitors are typically set to provide the most sensitive response without causing an excessive number of spurious alarms.
Separating the identified LEAKAGE from the unidentified LEAKAGE providesquantitative information to the operators, allowing them to take corrective action should a leak occur detrimental to the safety of the unit and thepublic.ROS leakage detection instrumentation satisfies Criterion 1 of10 CFR 50.36.LCO This LCO requires instruments of diverse monitoring principles to beOPERABLE to provide confidence that small amounts of unidentified LEAKAGE are detected in time to allow actions to place the unit in a safecondition when RCS LEAKAGE indicates possible RCPB degradation.
The reactor coolant contains radioactivity that, when released to the containment, may be detected by radiation monitoring instrumentation.
The LCO requires two instruments of diverse monitoring principles (sumplevel indication and atmosphere radioactivity monitoring) to be OPERABLE.
Radioactivity detection systems are included for monitoring both particulate and gaseous activities because of their sensitivities and rapid responses to RCS LEAKAGE.
The containment sump is used to collect unidentified LEAKAGE.
Other indications may be used to detect an increase in unidentified LEAKAGE; however, they are not required to be OPERABLE by this LCO.
Thecontainment sump consists of the normal sump and the emergency sump.The LCO requirements apply to the total amount of unidentified LEAKAGEcollected in the normal sump. The monitor on the containment sumpdetects level and is instrumented to detect when there is leakage of 1 gpm.The identification of an increase in unidentified LEAKAGE will be delayedby the time required for the unidentified LEAKAGE to travel to thecontainment sump and it may take longer than one hour to detect a 1 gpmincrease in unidentified  
Air temperature and pressure monitoring methods may be used to infer unidentified LEAKAGE to the containment. Containment temperature and pressure fluctuate slightly during unit operation, but a rise above the normally indicated range of values may indicate ROS LEAKAGE into the containment. The relevance of temperature and pressure measurements is affected by containment free volume and, for temperature, detector location. Signals from these instruments can be valuable in recognizing rapid and sizable leakage to the containment. Temperature and pressure monitors are not required by this LCO.
: LEAKAGE, depending on the origin and magnitude of the LEAKAGE.
The above-mentioned LEAKAGE detection methods or systems differ in sensitivity and response time. Some of these systems could serve as early alarm systems signaling the operators that closer examination of other detection systems is necessary to determine the extent of any corrective action that may be required.
This sensitivity is acceptable for containment sumpmonitor OPERABILITY.
OCONEE UNITS 1, 2, & 3B34151ASSRVIO01 B 3.4.15-1 BASES REVISION 001
The reactor coolant contains radioactivity that, when released to thecontainment, may be detected by the gaseous or particulate containment atmosphere radioactivity monitor.
 
Only one of the two detectors is requiredto be OPERABLE.
RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)
Radioactivity detection systems are included formonitoring both particulate and gaseous activities because of theirsensitivities and rapid responses to RCS LEAKAGE, but have recognized limitations.
APPLICABLE The need to evaluate the severity of an alarm or an indication is important SAFETY ANALYSES to the operators, and the ability to compare and verify with indications from other systems is necessary.
Reactor coolant radioactivity levels will be low during initialreactor startup and for a few weeks thereafter, until activated corrosion products have been formed and fission products appear from fuel elementcladding contamination or cladding defects.
The safety significance of RCS LEAKAGE varies widely depending on its source, rate, and duration. Therefore, detecting and monitoring reactor coolant LEAKAGE into the containment area are necessary. Separating the identified LEAKAGE from the unidentified LEAKAGE provides quantitative information to the operators, allowing them to take corrective action should a leak occur detrimental to the safety of the unit and the public.
If there are few fuel elementcladding defects and low levels of activation  
ROS leakage detection instrumentation satisfies Criterion 1 of 10 CFR 50.36.
: products, it may not beOCONEE UNITS 1, 2, & 3B34152ASSRVIO01 B 3.4.15-2 RCS Leakage Detection Instrumentation B 3.4.15BASES (continued)
LCO This LCO requires instruments of diverse monitoring principles to be OPERABLE to provide confidence that small amounts of unidentified LEAKAGE are detected in time to allow actions to place the unit in a safe condition when RCS LEAKAGE indicates possible RCPB degradation.
LCO (continued) possible for the gaseous or particulate containment atmosphere radioactivity monitors to detect a 1 gpm increase within 1 hour duringnormal operation.  
The LCO requires two instruments of diverse monitoring principles (sump level indication and atmosphere radioactivity monitoring) to be OPERABLE.
: However, the gaseous or particulate containment atmosphere radioactivity monitor is OPERABLE when it is capable ofdetecting a 1 gpm increase in unidentified LEAKAGE within 1 hour givenan RCS activity equivalent to that assumed in the design calculations forthe monitors (Ref. 3).The LCO requirements are satisfied when instruments of diversemeasurement means are available.
The containment sump is used to collect unidentified LEAKAGE. The containment sump consists of the normal sump and the emergency sump.
Thus, the containment normal sumplevel indication, in combination with a particulate (RIA-47) or gaseousradioactivity monitor (RIA-49),
The LCO requirements apply to the total amount of unidentified LEAKAGE collected in the normal sump. The monitor on the containment sump detects level and is instrumented to detect when there is leakage of 1 gpm.
provides an acceptable minimum.APPLICABILITY Because of elevated RCS temperature and pressure in MODES 1, 2, 3,and 4, RCS leakage detection instrumentation is required to beOPERABLE.
The identification of an increase in unidentified LEAKAGE will be delayed by the time required for the unidentified LEAKAGE to travel to the containment sump and it may take longer than one hour to detect a 1 gpm increase in unidentified LEAKAGE, depending on the origin and magnitude of the LEAKAGE. This sensitivity is acceptable for containment sump monitor OPERABILITY.
In MODE 5 or 6, the temperature is < 200&deg;F and pressure is maintained low or at atmospheric pressure.
The reactor coolant contains radioactivity that, when released to the containment, may be detected by the gaseous or particulate containment atmosphere radioactivity monitor. Only one of the two detectors is required to be OPERABLE. Radioactivity detection systems are included for monitoring both particulate and gaseous activities because of their sensitivities and rapid responses to RCS LEAKAGE, but have recognized limitations. Reactor coolant radioactivity levels will be low during initial reactor startup and for a few weeks thereafter, until activated corrosion products have been formed and fission products appear from fuel element cladding contamination or cladding defects. If there are few fuel element cladding defects and low levels of activation products, it may not be OCONEE UNITS 1, 2, & 3B34152ASSRVIO01 B 3.4.15-2
Since the temperatures and pressures arefar lower than those for MODES 1, 2, 3, and 4, the likelihood of leakageand crack propagation is much smaller.
 
Therefore, the requirements of thisLCO are not applicable in MODES 5 and 6.ACTIONS The Actions are modified by a Note indicating that the provisions ofLCO 3.0.4 do not apply. As a result, a MODE change is allowed when thenormal sump level indication and required radioactivity monitor areinoperable.
RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)
This allowance is provided because other instrumentation isavailable to monitor RCS LEAKAGE.A.1 and A.2With the containment normal sump level indication inoperable, no otherform of sampling can provide the equivalent information.
LCO (continued) possible for the gaseous or particulate containment atmosphere radioactivity monitors to detect a 1 gpm increase within 1 hour during normal operation. However, the gaseous or particulate containment atmosphere radioactivity monitor is OPERABLE when it is capable of detecting a 1 gpm increase in unidentified LEAKAGE within 1 hour given an RCS activity equivalent to that assumed in the design calculations for the monitors (Ref. 3).
: However, the containment atmosphere activity monitor will provideindications of changes in leakage.
The LCO requirements are satisfied when instruments of diverse measurement means are available. Thus, the containment normal sump level indication, in combination with a particulate (RIA-47) or gaseous radioactivity monitor (RIA-49), provides an acceptable minimum.
Together with the containment atmosphere radioactivity  
APPLICABILITY Because of elevated RCS temperature and pressure in MODES 1, 2, 3, and 4, RCS leakage detection instrumentation is required to be OPERABLE.
: monitor, the periodic surveillance for RCSinventory
In MODE 5 or 6, the temperature is < 200&deg;F and pressure is maintained low or at atmospheric pressure. Since the temperatures and pressures are far lower than those for MODES 1, 2, 3, and 4, the likelihood of leakage and crack propagation is much smaller. Therefore, the requirements of this LCO are not applicable in MODES 5 and 6.
: balance, SR 3.4.13.1, water inventory  
ACTIONS The Actions are modified by a Note indicating that the provisions of LCO 3.0.4 do not apply. As a result, a MODE change is allowed when the normal sump level indication and required radioactivity monitor are inoperable. This allowance is provided because other instrumentation is available to monitor RCS LEAKAGE.
: balance, must beperformed at an increased frequency of 24 hours to provide information that is adequate to detect leakage.
A.1 and A.2 With the containment normal sump level indication inoperable, no other form of sampling can provide the equivalent information.
A Note is added allowing that SR3.4.13.1 is not required to be performed until 12 hours after steady stateoperation (stable RCS pressure, temperature, power level, pressurizer andmakeup tank levels, makeup and letdown, and RCP seal injection andreturn flows). The 12 hour allowance provides sufficient time to collect andOCONEE UNITS 1, 2, & 3B34153ASSRVIO01 B 3.4.15-3BASES REVISION 001 I RCS Leakage Detection Instrumentation B 3.4.15BASES (continued)
However, the containment atmosphere activity monitor will provide indications of changes in leakage. Together with the containment atmosphere radioactivity monitor, the periodic surveillance for RCS inventory balance, SR 3.4.13.1, water inventory balance, must be performed at an increased frequency of 24 hours to provide information that is adequate to detect leakage. A Note is added allowing that SR 3.4.13.1 is not required to be performed until 12 hours after steady state operation (stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows). The 12 hour allowance provides sufficient time to collect and OCONEE UNITS 1, 2, & 3B34153ASSRVIO01 B 3.4.15-3 BASES REVISION 001 I
 
RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)
ACTIONS A.1 and A.2 (continued) process all necessary data after stable plant conditions are established.
ACTIONS A.1 and A.2 (continued) process all necessary data after stable plant conditions are established.
Restoration of the normal sump level indication to OPERABLE status isrequired to regain the function in a Completion Time of 30 days after levelindication failure.
Restoration of the normal sump level indication to OPERABLE status is required to regain the function in a Completion Time of 30 days after level indication failure. This time is acceptable considering the frequency and adequacy of the RCS water inventory balance required by Required Action A.1.
This time is acceptable considering the frequency andadequacy of the RCS water inventory balance required by RequiredAction A.1.B.1.1, B.1.2. and B.2With required gaseous or particulate containment atmosphere radioactivity monitoring instrumentation channel inoperable, alternative action isrequired.
B.1.1, B.1.2. and B.2 With required gaseous or particulate containment atmosphere radioactivity monitoring instrumentation channel inoperable, alternative action is required. Either grab samples of the containment atmosphere must be taken and analyzed or water inventory balances, in accordance with SR 3.4.13.1, must be performed to provide alternate periodic information.
Either grab samples of the containment atmosphere must betaken and analyzed or water inventory  
With a sample obtained and analyzed or a water inventory balance performed every 24 hours, the reactor may be operated for up to 30 days to allow restoration of the radioactivity monitor.
: balances, in accordance withSR 3.4.13.1, must be performed to provide alternate periodic information.
The 24 hour interval for SR 3.4.13.1 provides periodic information that is adequate to detect leakage. A Note is added allowing that SR 3.4.13.1 is not required to be performed until 12 hours after steady state operation (stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows).
With a sample obtained and analyzed or a water inventory balanceperformed every 24 hours, the reactor may be operated for up to 30 daysto allow restoration of the radioactivity monitor.The 24 hour interval for SR 3.4.13.1 provides periodic information that isadequate to detect leakage.
The 12 hour allowance provides sufficient time to collect and process all necessary data after stable plant conditions are established. The 30 day Completion Time recognizes at least one other form of leak detection is available.
A Note is added allowing that SR 3.4.13.1 isnot required to be performed until 12 hours after steady state operation (stable RCS pressure, temperature, power level, pressurizer and makeuptank levels, makeup and letdown, and RCP seal injection and return flows).The 12 hour allowance provides sufficient time to collect and process allnecessary data after stable plant conditions are established.
C.1 and C.2 With containment normal sump level indication inoperable, the only means of detecting LEAKAGE is the required containment atmosphere radioactivity monitor. A Note clarifies that this Condition is applicable when the only OPERABLE monitor is the containment atmosphere gaseous radioactivity monitor. The containment atmosphere gaseous radioactivity monitor typically cannot detect a 1 gpm leak within one hour when RCS activity is low. In addition, this configuration does not provide the required diverse means of leakage detection. Indirect methods of monitoring RCS leakage must be implemented. Grab samples of the containment atmosphere must be taken and analyzed to provide alternate periodic information. The 12 hour interval is sufficient to detect increasing RCS leakage. The Required Action provides 7 days to restore another RCS OCONEE UNITS 1, 2, & 3B34154ASSRVIO01 B 3.4.15-4 BASES REVISION 001
The 30 dayCompletion Time recognizes at least one other form of leak detection isavailable.
 
C.1 and C.2With containment normal sump level indication inoperable, the only meansof detecting LEAKAGE is the required containment atmosphere radioactivity monitor.
RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)
A Note clarifies that this Condition is applicable whenthe only OPERABLE monitor is the containment atmosphere gaseousradioactivity monitor.
The containment atmosphere gaseous radioactivity monitor typically cannot detect a 1 gpm leak within one hour when RCSactivity is low. In addition, this configuration does not provide the requireddiverse means of leakage detection.
Indirect methods of monitoring RCSleakage must be implemented.
Grab samples of the containment atmosphere must be taken and analyzed to provide alternate periodicinformation.
The 12 hour interval is sufficient to detect increasing RCSleakage.
The Required Action provides 7 days to restore another RCSOCONEE UNITS 1, 2, & 3B34154ASSRVIO01 B 3.4.15-4BASES REVISION 001 RCS Leakage Detection Instrumentation B 3.4.15BASES (continued)
ACTIONS C.1 and 0.2 (continued),
ACTIONS C.1 and 0.2 (continued),
leakage monitor to OPERABLE status to regain the intended leakagedetection diversity.
leakage monitor to OPERABLE status to regain the intended leakage detection diversity. The 7 day Completion Time ensures that the unit will not be operated in a degraded configuration for a lengthy time period.
The 7 day Completion Time ensures that the unit willnot be operated in a degraded configuration for a lengthy time period.D.1 and D.2If a Required Action of Condition A, B or C cannot be met within therequired Completion Time, the unit must be brought to a MODE in whichthe LCO does not apply. To achieve this status, the unit must be broughtto at least MODE 3 within 12 hours and to MODE 5 within 36 hours. Theallowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderlymanner and without challenging unit systems.E.1If both required leakage detection instruments (normal sump levelindication and containment atmosphere radioactivity monitor) areinoperable, no automatic means of monitoring leakage are available, andimmediate plant shutdown in accordance with LCO 3.0.3 is required.
D.1 and D.2 If a Required Action of Condition A, B or C cannot be met within the required Completion Time, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 within 12 hours and to MODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.
SURVEILLANCE SR 3.4.15.1REQUIREMENTS SR 3.4.15.1 requires the performance of a CHANNEL CHECK of therequired containment atmosphere radioactivity monitor.
E.1 If both required leakage detection instruments (normal sump level indication and containment atmosphere radioactivity monitor) are inoperable, no automatic means of monitoring leakage are available, and immediate plant shutdown in accordance with LCO 3.0.3 is required.
The check givesreasonable confidence that each channel is operating properly.
SURVEILLANCE SR 3.4.15.1 REQUIREMENTS SR 3.4.15.1 requires the performance of a CHANNEL CHECK of the required containment atmosphere radioactivity monitor. The check gives reasonable confidence that each channel is operating properly. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
TheSurveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.SR 3.4.15.2SR 3.4.15.2 requires the performance of a CHANNEL FUNCTIONAL TESTof the required containment atmosphere radioactivity monitor.
SR 3.4.15.2 SR 3.4.15.2 requires the performance of a CHANNEL FUNCTIONAL TEST of the required containment atmosphere radioactivity monitor. The test ensures that the monitor can perform its function in the desired manner.
The testensures that the monitor can perform its function in the desired manner.The test verifies the alarm setpoint and relative accuracy of the instrument string.OCONEE UNITS 1, 2, & 3B34155ASSRVIO01 B 3.4.15-5BASES REVISION 001 RCS Leakage Detection Instrumentation B 3.4.15BASES (continued)
The test verifies the alarm setpoint and relative accuracy of the instrument string.
SURVEILLANCE SR 3.4.15.3 and SR 3.4.15.4REQUIREMENTS (continued)
OCONEE UNITS 1, 2, & 3B34155ASSRVIO01 B 3.4.15-5 BASES REVISION 001
These SRs require the performance of a CHANNEL CALIBRATION foreach of the required RCS leakage detection instrumentation channels.
 
Thecalibration verifies the accuracy of the instrument string, including theinstruments located inside containment.
RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)
The Surveillance Frequency isbased on operating experience, equipment reliability, and plant risk and iscontrolled under the Surveillance Frequency Control Program.REFERENCES  
SURVEILLANCE SR 3.4.15.3 and SR 3.4.15.4 REQUIREMENTS (continued)
: 1. UFSAR, Section 3.1.16, "Criterion 16 -Monitoring Reactor CoolantPressure Boundary (Category B)."2. Regulatory Guide 1.45, Revision 0, "Reactor Coolant PressureBoundary Leakage Detection System,"
These SRs require the performance of a CHANNEL CALIBRATION for each of the required RCS leakage detection instrumentation channels. The calibration verifies the accuracy of the instrument string, including the instruments located inside containment. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
May 1973.3. UFSAR, Section 5.2.3.10.5, "Leak Detection."
REFERENCES
OCONEE UNITS 1, 2, & 3B34156ASSRVIO01 B 3.4.15-6BASES REVISION 001 I}}
: 1.
UFSAR, Section 3.1.16, "Criterion 16 - Monitoring Reactor Coolant Pressure Boundary (Category B)."
: 2.
Regulatory Guide 1.45, Revision 0, "Reactor Coolant Pressure Boundary Leakage Detection System," May 1973.
: 3.
UFSAR, Section 5.2.3.10.5, "Leak Detection."
OCONEE UNITS 1, 2, & 3B34156ASSRVIO01 B 3.4.15-6 BASES REVISION 001 I}}

Latest revision as of 05:17, 10 January 2025

Technical Specification Base Change
ML16028A191
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/20/2016
From: Batson S
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONS -2015-122
Download: ML16028A191 (13)


Text

DUKE scotL.Bson ENERGY°2 Vice President LI 4L~~

IOconee Nuclear Station Duke Energy ONO1VP 1 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3274

f. 864.873, 4208 ON S -201 5 -122 scott. Batson~duke -energy. com January 20, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Numbers 50-269, 50-270, and 50-287 Technical Specification (TS) Bases Change Please find attached changes to the Oconee Nuclear Station (ONS) TS Bases. These changes were processed in accordance with the provisions of Technical Specification 5.5.15, "Technical Specifications (TS) Bases Control Program."

Amendments 394/396/395 were issued for Oconee to revise ONS TS 3.4.15, to define a new time limit for restoring inoperable Reactor Coolant System (RCS) leakage detection instrumentation to operable status and to establish alternate methods of monitoring RCS leakage when one or more required monitors are inoperable in accordance with TS Task Force Traveler (TSTF) 513, Revision 3, "Revise Pressurized-Water Reactor Operability Requirements and actions for Reactor Coolant System Leakage Instrumentation."

The associated TSTF-513 revision to TS Bases 3.4.15 was to clearly define the RCS leakage detection instrumentation Operability requirements in the Limiting Condition for Operation (

LCO) Bases and to eliminate discussion from the Bases that could be erroneously construed as Operability requirements. The Bases were also revised to reflect the changes to the Technical specifications and to more accurately reflect the existing Technical Specifications.

Any questions regarding this information should be directed to Stephen C. Newman, ONS Regulatory Affairs Group, at (864) 873-4388.

Sincerely, Vice President Oconee Nuclear Station Attachment

\\

www.duke-energy.com

U. S. Nuclear Regulatory Commission January 20, 2016 Page 2 cc: Ms. Catherine Haney Administrator, Region I1 U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. James R. Hall, Senior Project Manager (ONS)

(By electronic mail only)

U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852 Mr. Jeffrey A. Whited, Project Manager (By electronic mail only)

U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville Pike Mail Stop O-8B1A Rockville, MD 20852 Mr. Eddy Crowe Senior Resident Inspector Oconee Nuclear Station

ONS-201 5-122 January 20, 2016 Attachment Revised Oconee Nuclear Station TSB Manual Pages TSB List of Effective Pages (LOEPs), Rev. 003 LOEP 1-4 TSB 3.4.15, RCS Leakage Detection Instrumentation 3.4.15-1 thru 6 www.duke-energy.com

OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER IMPLEMENTATION DATE TOC B 2.1.1 B 2.1.2 B3.0 B 3.1.1 B 3.1.2 B 3.1.3 B 3.1.4 B 3.1.5 B 3.1.6 B 3.1.7 B 3.1.8 B 3.2.1 B3 3.2.2 B 3.2.3 B 3.3.1 B 3.3.2 B 3.3.3 B 3.3.4 B 3.3.5 B 3.3.6 B 3.3.7 B 3.3.8 B 3.3.9 B 3.3.10 B 3.3.11 B 3.3.12 o000 000 o000 o00 000 000 000 000 000 000 000 000 000 000 000 001 000 000 000 000 000 000 000 000 000 o000 000 09/03/14 05/31/12 02/06/14 10/20/11 05/16/12 05/16/12 06/02/99 07/23/12 05/16/12 07/23/12 07/23/12 05/16/12 05/16/12 05/16/12 05/16/12 09/30/15 12/14/04 12/10/14 12/10/14 12/10/14 12/10/14 12/10/14 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 Oconee Nuclear StationLEP1Rvso03 LOEP 1 Revision 003

OCONEE NUJCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.3.13 B 3.3.14 B 3.3.15 B 3.3.16 B 3.3.17 B 3.3.18 B 3.3.19 B 3.3.20 B 3.3.21 B 3.3.22 B 3.3.23 B 3.3.24 B 3.3.25 B 3.3.26 B 3.3.27 B 3.3.28 B 3.4.1 B 3.4.2 B 3.4.3 B 3.4.4 B 3.4.5 B 3.4.6 B 3.4.7 B 3.4.8 B 3.4.9 B 3.4.10 B 3.4.111 B 3.4.12 o000 000 000 o00 000 000 000 000 000 000 000 000 000 000 0o00 000 000 000 000 000 000 000 000 000 o00 001 o000 000 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/1 6/12 05/16/12 09/26/01 11/05/03 11/05/03 12/10/14 05/16/12 05/16/12 12/16/98 03/04/15 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 09/21/15 10/12/12 06/13/14 Oconee Nuclear StationLEP2Rvso03 LOEP 2 Revision 003

OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.4.13 B 3.4.14 B 3.4.15 B 3.4.16 B 3.5.1 B 3.5.2 B 3.5.3 B 3.5.4 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.7.1 B 3.7.2 B 3.7.3 B 3.7.4 B 3.7.5 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.10 B 3.7.l0a B 3.7.11 B 3.7.12 B 3.7.13 B 3.7.14 000 001 001 000 000 001 001 000 000 000 000 000 001 001 000 001 000 001 000 000 000 000 000 000 000 000 000 000 05/16/12 09/21/15 11/24/15 04/02/07 05/16/12 09/21/15 09/21/15 05/16/12 10/20/11 05/16/12 05/16/12 05/16/12 09/21/15 09/21/15 11/13/12 09/21/15 05/16/12 09/21/15 05/16/12 12/10/14 05/16/12 08/28/14 09/03/14 09/03/14 05/16/12 05/16/12 08/19/10 05/16/12 Oconee Nuclear StationLEP3Rvso03 LOEP 3 Revision 003

OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.7.15 B 3.7.16 B 3.7.17 B 3.7.18 B 3.7.19 B 3.8.1 B 3.8.2 B 3.8.3 B 3.8.4 B 3.8.5 B 3.8.6 B 3.8.7 B 3.8.8 B 3.8.9 B 3.9.1 B 3.9.2 B 3.9.3 B 3.9.4 B 3.9.5 B 3.9.6 B 3.9.7 B 3.9.8 B 3.10.1 B 3.10.2 o00 000 000 000 000 o000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 10/24/07 05/16/12 04/12/06 06/15/06 06/25/14 05/21/15 04/07/11 04/28/15 12/18/07 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 06/25/14 11/05/14 11/05/14 Note: With the introduction of Fusion in June 2015, all controlled documents require a three-digit revision number. Thus, the revision numbers were set to "000" in the summer of 2015. As such, the revision dates for Revision 000 are based on the implementation dates for revisions in effect prior to this change.

Oconee Nuclear StationLEP4Rvso03 LOEP 4 Revision 003

RCS Leakage Detection Instrumentation B 3.4.15 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.15 RCS Leakage Detection Instrumentation BASES BACKGROUND ONS Design Criteria (Ref. 1) requires means for detecting RCS LEAKAGE.

Although ONS is not committed to Regulatory Guide 1.45, Revision 0 (Ref. 2) describes acceptable methods for setting leakage detection systems.

Leakage detection systems must have the capability to detect significant reactor coolant pressure boundary (RCPB) degradation as soon after occurrence as practical to minimize the potential for propagation to a gross failure. Thus, an early indication or warning signal is necessary to permit proper evaluation of all unidentified LEAKAGE. In addition to meeting the OPERABILITY requirements, the monitors are typically set to provide the most sensitive response without causing an excessive number of spurious alarms.

The reactor coolant contains radioactivity that, when released to the containment, may be detected by radiation monitoring instrumentation.

Radioactivity detection systems are included for monitoring both particulate and gaseous activities because of their sensitivities and rapid responses to RCS LEAKAGE.

Other indications may be used to detect an increase in unidentified LEAKAGE; however, they are not required to be OPERABLE by this LCO.

Air temperature and pressure monitoring methods may be used to infer unidentified LEAKAGE to the containment. Containment temperature and pressure fluctuate slightly during unit operation, but a rise above the normally indicated range of values may indicate ROS LEAKAGE into the containment. The relevance of temperature and pressure measurements is affected by containment free volume and, for temperature, detector location. Signals from these instruments can be valuable in recognizing rapid and sizable leakage to the containment. Temperature and pressure monitors are not required by this LCO.

The above-mentioned LEAKAGE detection methods or systems differ in sensitivity and response time. Some of these systems could serve as early alarm systems signaling the operators that closer examination of other detection systems is necessary to determine the extent of any corrective action that may be required.

OCONEE UNITS 1, 2, & 3B34151ASSRVIO01 B 3.4.15-1 BASES REVISION 001

RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)

APPLICABLE The need to evaluate the severity of an alarm or an indication is important SAFETY ANALYSES to the operators, and the ability to compare and verify with indications from other systems is necessary.

The safety significance of RCS LEAKAGE varies widely depending on its source, rate, and duration. Therefore, detecting and monitoring reactor coolant LEAKAGE into the containment area are necessary. Separating the identified LEAKAGE from the unidentified LEAKAGE provides quantitative information to the operators, allowing them to take corrective action should a leak occur detrimental to the safety of the unit and the public.

ROS leakage detection instrumentation satisfies Criterion 1 of 10 CFR 50.36.

LCO This LCO requires instruments of diverse monitoring principles to be OPERABLE to provide confidence that small amounts of unidentified LEAKAGE are detected in time to allow actions to place the unit in a safe condition when RCS LEAKAGE indicates possible RCPB degradation.

The LCO requires two instruments of diverse monitoring principles (sump level indication and atmosphere radioactivity monitoring) to be OPERABLE.

The containment sump is used to collect unidentified LEAKAGE. The containment sump consists of the normal sump and the emergency sump.

The LCO requirements apply to the total amount of unidentified LEAKAGE collected in the normal sump. The monitor on the containment sump detects level and is instrumented to detect when there is leakage of 1 gpm.

The identification of an increase in unidentified LEAKAGE will be delayed by the time required for the unidentified LEAKAGE to travel to the containment sump and it may take longer than one hour to detect a 1 gpm increase in unidentified LEAKAGE, depending on the origin and magnitude of the LEAKAGE. This sensitivity is acceptable for containment sump monitor OPERABILITY.

The reactor coolant contains radioactivity that, when released to the containment, may be detected by the gaseous or particulate containment atmosphere radioactivity monitor. Only one of the two detectors is required to be OPERABLE. Radioactivity detection systems are included for monitoring both particulate and gaseous activities because of their sensitivities and rapid responses to RCS LEAKAGE, but have recognized limitations. Reactor coolant radioactivity levels will be low during initial reactor startup and for a few weeks thereafter, until activated corrosion products have been formed and fission products appear from fuel element cladding contamination or cladding defects. If there are few fuel element cladding defects and low levels of activation products, it may not be OCONEE UNITS 1, 2, & 3B34152ASSRVIO01 B 3.4.15-2

RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)

LCO (continued) possible for the gaseous or particulate containment atmosphere radioactivity monitors to detect a 1 gpm increase within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> during normal operation. However, the gaseous or particulate containment atmosphere radioactivity monitor is OPERABLE when it is capable of detecting a 1 gpm increase in unidentified LEAKAGE within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> given an RCS activity equivalent to that assumed in the design calculations for the monitors (Ref. 3).

The LCO requirements are satisfied when instruments of diverse measurement means are available. Thus, the containment normal sump level indication, in combination with a particulate (RIA-47) or gaseous radioactivity monitor (RIA-49), provides an acceptable minimum.

APPLICABILITY Because of elevated RCS temperature and pressure in MODES 1, 2, 3, and 4, RCS leakage detection instrumentation is required to be OPERABLE.

In MODE 5 or 6, the temperature is < 200°F and pressure is maintained low or at atmospheric pressure. Since the temperatures and pressures are far lower than those for MODES 1, 2, 3, and 4, the likelihood of leakage and crack propagation is much smaller. Therefore, the requirements of this LCO are not applicable in MODES 5 and 6.

ACTIONS The Actions are modified by a Note indicating that the provisions of LCO 3.0.4 do not apply. As a result, a MODE change is allowed when the normal sump level indication and required radioactivity monitor are inoperable. This allowance is provided because other instrumentation is available to monitor RCS LEAKAGE.

A.1 and A.2 With the containment normal sump level indication inoperable, no other form of sampling can provide the equivalent information.

However, the containment atmosphere activity monitor will provide indications of changes in leakage. Together with the containment atmosphere radioactivity monitor, the periodic surveillance for RCS inventory balance, SR 3.4.13.1, water inventory balance, must be performed at an increased frequency of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to provide information that is adequate to detect leakage. A Note is added allowing that SR 3.4.13.1 is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after steady state operation (stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows). The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> allowance provides sufficient time to collect and OCONEE UNITS 1, 2, & 3B34153ASSRVIO01 B 3.4.15-3 BASES REVISION 001 I

RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)

ACTIONS A.1 and A.2 (continued) process all necessary data after stable plant conditions are established.

Restoration of the normal sump level indication to OPERABLE status is required to regain the function in a Completion Time of 30 days after level indication failure. This time is acceptable considering the frequency and adequacy of the RCS water inventory balance required by Required Action A.1.

B.1.1, B.1.2. and B.2 With required gaseous or particulate containment atmosphere radioactivity monitoring instrumentation channel inoperable, alternative action is required. Either grab samples of the containment atmosphere must be taken and analyzed or water inventory balances, in accordance with SR 3.4.13.1, must be performed to provide alternate periodic information.

With a sample obtained and analyzed or a water inventory balance performed every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the reactor may be operated for up to 30 days to allow restoration of the radioactivity monitor.

The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> interval for SR 3.4.13.1 provides periodic information that is adequate to detect leakage. A Note is added allowing that SR 3.4.13.1 is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after steady state operation (stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows).

The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> allowance provides sufficient time to collect and process all necessary data after stable plant conditions are established. The 30 day Completion Time recognizes at least one other form of leak detection is available.

C.1 and C.2 With containment normal sump level indication inoperable, the only means of detecting LEAKAGE is the required containment atmosphere radioactivity monitor. A Note clarifies that this Condition is applicable when the only OPERABLE monitor is the containment atmosphere gaseous radioactivity monitor. The containment atmosphere gaseous radioactivity monitor typically cannot detect a 1 gpm leak within one hour when RCS activity is low. In addition, this configuration does not provide the required diverse means of leakage detection. Indirect methods of monitoring RCS leakage must be implemented. Grab samples of the containment atmosphere must be taken and analyzed to provide alternate periodic information. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval is sufficient to detect increasing RCS leakage. The Required Action provides 7 days to restore another RCS OCONEE UNITS 1, 2, & 3B34154ASSRVIO01 B 3.4.15-4 BASES REVISION 001

RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)

ACTIONS C.1 and 0.2 (continued),

leakage monitor to OPERABLE status to regain the intended leakage detection diversity. The 7 day Completion Time ensures that the unit will not be operated in a degraded configuration for a lengthy time period.

D.1 and D.2 If a Required Action of Condition A, B or C cannot be met within the required Completion Time, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

E.1 If both required leakage detection instruments (normal sump level indication and containment atmosphere radioactivity monitor) are inoperable, no automatic means of monitoring leakage are available, and immediate plant shutdown in accordance with LCO 3.0.3 is required.

SURVEILLANCE SR 3.4.15.1 REQUIREMENTS SR 3.4.15.1 requires the performance of a CHANNEL CHECK of the required containment atmosphere radioactivity monitor. The check gives reasonable confidence that each channel is operating properly. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

SR 3.4.15.2 SR 3.4.15.2 requires the performance of a CHANNEL FUNCTIONAL TEST of the required containment atmosphere radioactivity monitor. The test ensures that the monitor can perform its function in the desired manner.

The test verifies the alarm setpoint and relative accuracy of the instrument string.

OCONEE UNITS 1, 2, & 3B34155ASSRVIO01 B 3.4.15-5 BASES REVISION 001

RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)

SURVEILLANCE SR 3.4.15.3 and SR 3.4.15.4 REQUIREMENTS (continued)

These SRs require the performance of a CHANNEL CALIBRATION for each of the required RCS leakage detection instrumentation channels. The calibration verifies the accuracy of the instrument string, including the instruments located inside containment. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

REFERENCES

1.

UFSAR, Section 3.1.16, "Criterion 16 - Monitoring Reactor Coolant Pressure Boundary (Category B)."

2.

Regulatory Guide 1.45, Revision 0, "Reactor Coolant Pressure Boundary Leakage Detection System," May 1973.

3.

UFSAR, Section 5.2.3.10.5, "Leak Detection."

OCONEE UNITS 1, 2, & 3B34156ASSRVIO01 B 3.4.15-6 BASES REVISION 001 I

DUKE scotL.Bson ENERGY°2 Vice President LI 4L~~

IOconee Nuclear Station Duke Energy ONO1VP 1 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3274

f. 864.873, 4208 ON S -201 5 -122 scott. Batson~duke -energy. com January 20, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Numbers 50-269, 50-270, and 50-287 Technical Specification (TS) Bases Change Please find attached changes to the Oconee Nuclear Station (ONS) TS Bases. These changes were processed in accordance with the provisions of Technical Specification 5.5.15, "Technical Specifications (TS) Bases Control Program."

Amendments 394/396/395 were issued for Oconee to revise ONS TS 3.4.15, to define a new time limit for restoring inoperable Reactor Coolant System (RCS) leakage detection instrumentation to operable status and to establish alternate methods of monitoring RCS leakage when one or more required monitors are inoperable in accordance with TS Task Force Traveler (TSTF) 513, Revision 3, "Revise Pressurized-Water Reactor Operability Requirements and actions for Reactor Coolant System Leakage Instrumentation."

The associated TSTF-513 revision to TS Bases 3.4.15 was to clearly define the RCS leakage detection instrumentation Operability requirements in the Limiting Condition for Operation (

LCO) Bases and to eliminate discussion from the Bases that could be erroneously construed as Operability requirements. The Bases were also revised to reflect the changes to the Technical specifications and to more accurately reflect the existing Technical Specifications.

Any questions regarding this information should be directed to Stephen C. Newman, ONS Regulatory Affairs Group, at (864) 873-4388.

Sincerely, Vice President Oconee Nuclear Station Attachment

\\

www.duke-energy.com

U. S. Nuclear Regulatory Commission January 20, 2016 Page 2 cc: Ms. Catherine Haney Administrator, Region I1 U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. James R. Hall, Senior Project Manager (ONS)

(By electronic mail only)

U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852 Mr. Jeffrey A. Whited, Project Manager (By electronic mail only)

U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville Pike Mail Stop O-8B1A Rockville, MD 20852 Mr. Eddy Crowe Senior Resident Inspector Oconee Nuclear Station

ONS-201 5-122 January 20, 2016 Attachment Revised Oconee Nuclear Station TSB Manual Pages TSB List of Effective Pages (LOEPs), Rev. 003 LOEP 1-4 TSB 3.4.15, RCS Leakage Detection Instrumentation 3.4.15-1 thru 6 www.duke-energy.com

OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER IMPLEMENTATION DATE TOC B 2.1.1 B 2.1.2 B3.0 B 3.1.1 B 3.1.2 B 3.1.3 B 3.1.4 B 3.1.5 B 3.1.6 B 3.1.7 B 3.1.8 B 3.2.1 B3 3.2.2 B 3.2.3 B 3.3.1 B 3.3.2 B 3.3.3 B 3.3.4 B 3.3.5 B 3.3.6 B 3.3.7 B 3.3.8 B 3.3.9 B 3.3.10 B 3.3.11 B 3.3.12 o000 000 o000 o00 000 000 000 000 000 000 000 000 000 000 000 001 000 000 000 000 000 000 000 000 000 o000 000 09/03/14 05/31/12 02/06/14 10/20/11 05/16/12 05/16/12 06/02/99 07/23/12 05/16/12 07/23/12 07/23/12 05/16/12 05/16/12 05/16/12 05/16/12 09/30/15 12/14/04 12/10/14 12/10/14 12/10/14 12/10/14 12/10/14 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 Oconee Nuclear StationLEP1Rvso03 LOEP 1 Revision 003

OCONEE NUJCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.3.13 B 3.3.14 B 3.3.15 B 3.3.16 B 3.3.17 B 3.3.18 B 3.3.19 B 3.3.20 B 3.3.21 B 3.3.22 B 3.3.23 B 3.3.24 B 3.3.25 B 3.3.26 B 3.3.27 B 3.3.28 B 3.4.1 B 3.4.2 B 3.4.3 B 3.4.4 B 3.4.5 B 3.4.6 B 3.4.7 B 3.4.8 B 3.4.9 B 3.4.10 B 3.4.111 B 3.4.12 o000 000 000 o00 000 000 000 000 000 000 000 000 000 000 0o00 000 000 000 000 000 000 000 000 000 o00 001 o000 000 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/1 6/12 05/16/12 09/26/01 11/05/03 11/05/03 12/10/14 05/16/12 05/16/12 12/16/98 03/04/15 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 09/21/15 10/12/12 06/13/14 Oconee Nuclear StationLEP2Rvso03 LOEP 2 Revision 003

OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.4.13 B 3.4.14 B 3.4.15 B 3.4.16 B 3.5.1 B 3.5.2 B 3.5.3 B 3.5.4 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.7.1 B 3.7.2 B 3.7.3 B 3.7.4 B 3.7.5 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.10 B 3.7.l0a B 3.7.11 B 3.7.12 B 3.7.13 B 3.7.14 000 001 001 000 000 001 001 000 000 000 000 000 001 001 000 001 000 001 000 000 000 000 000 000 000 000 000 000 05/16/12 09/21/15 11/24/15 04/02/07 05/16/12 09/21/15 09/21/15 05/16/12 10/20/11 05/16/12 05/16/12 05/16/12 09/21/15 09/21/15 11/13/12 09/21/15 05/16/12 09/21/15 05/16/12 12/10/14 05/16/12 08/28/14 09/03/14 09/03/14 05/16/12 05/16/12 08/19/10 05/16/12 Oconee Nuclear StationLEP3Rvso03 LOEP 3 Revision 003

OCONEE NUCLEAR STATION TECHNICAL SPECIFICATIONS-BASES REVISED 11/24/15 LIST OF EFFECTIVE PAGES SECTION/PAGES REVISION NUMBER BASES REVISION DATE B 3.7.15 B 3.7.16 B 3.7.17 B 3.7.18 B 3.7.19 B 3.8.1 B 3.8.2 B 3.8.3 B 3.8.4 B 3.8.5 B 3.8.6 B 3.8.7 B 3.8.8 B 3.8.9 B 3.9.1 B 3.9.2 B 3.9.3 B 3.9.4 B 3.9.5 B 3.9.6 B 3.9.7 B 3.9.8 B 3.10.1 B 3.10.2 o00 000 000 000 000 o000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 10/24/07 05/16/12 04/12/06 06/15/06 06/25/14 05/21/15 04/07/11 04/28/15 12/18/07 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 05/16/12 06/25/14 11/05/14 11/05/14 Note: With the introduction of Fusion in June 2015, all controlled documents require a three-digit revision number. Thus, the revision numbers were set to "000" in the summer of 2015. As such, the revision dates for Revision 000 are based on the implementation dates for revisions in effect prior to this change.

Oconee Nuclear StationLEP4Rvso03 LOEP 4 Revision 003

RCS Leakage Detection Instrumentation B 3.4.15 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.15 RCS Leakage Detection Instrumentation BASES BACKGROUND ONS Design Criteria (Ref. 1) requires means for detecting RCS LEAKAGE.

Although ONS is not committed to Regulatory Guide 1.45, Revision 0 (Ref. 2) describes acceptable methods for setting leakage detection systems.

Leakage detection systems must have the capability to detect significant reactor coolant pressure boundary (RCPB) degradation as soon after occurrence as practical to minimize the potential for propagation to a gross failure. Thus, an early indication or warning signal is necessary to permit proper evaluation of all unidentified LEAKAGE. In addition to meeting the OPERABILITY requirements, the monitors are typically set to provide the most sensitive response without causing an excessive number of spurious alarms.

The reactor coolant contains radioactivity that, when released to the containment, may be detected by radiation monitoring instrumentation.

Radioactivity detection systems are included for monitoring both particulate and gaseous activities because of their sensitivities and rapid responses to RCS LEAKAGE.

Other indications may be used to detect an increase in unidentified LEAKAGE; however, they are not required to be OPERABLE by this LCO.

Air temperature and pressure monitoring methods may be used to infer unidentified LEAKAGE to the containment. Containment temperature and pressure fluctuate slightly during unit operation, but a rise above the normally indicated range of values may indicate ROS LEAKAGE into the containment. The relevance of temperature and pressure measurements is affected by containment free volume and, for temperature, detector location. Signals from these instruments can be valuable in recognizing rapid and sizable leakage to the containment. Temperature and pressure monitors are not required by this LCO.

The above-mentioned LEAKAGE detection methods or systems differ in sensitivity and response time. Some of these systems could serve as early alarm systems signaling the operators that closer examination of other detection systems is necessary to determine the extent of any corrective action that may be required.

OCONEE UNITS 1, 2, & 3B34151ASSRVIO01 B 3.4.15-1 BASES REVISION 001

RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)

APPLICABLE The need to evaluate the severity of an alarm or an indication is important SAFETY ANALYSES to the operators, and the ability to compare and verify with indications from other systems is necessary.

The safety significance of RCS LEAKAGE varies widely depending on its source, rate, and duration. Therefore, detecting and monitoring reactor coolant LEAKAGE into the containment area are necessary. Separating the identified LEAKAGE from the unidentified LEAKAGE provides quantitative information to the operators, allowing them to take corrective action should a leak occur detrimental to the safety of the unit and the public.

ROS leakage detection instrumentation satisfies Criterion 1 of 10 CFR 50.36.

LCO This LCO requires instruments of diverse monitoring principles to be OPERABLE to provide confidence that small amounts of unidentified LEAKAGE are detected in time to allow actions to place the unit in a safe condition when RCS LEAKAGE indicates possible RCPB degradation.

The LCO requires two instruments of diverse monitoring principles (sump level indication and atmosphere radioactivity monitoring) to be OPERABLE.

The containment sump is used to collect unidentified LEAKAGE. The containment sump consists of the normal sump and the emergency sump.

The LCO requirements apply to the total amount of unidentified LEAKAGE collected in the normal sump. The monitor on the containment sump detects level and is instrumented to detect when there is leakage of 1 gpm.

The identification of an increase in unidentified LEAKAGE will be delayed by the time required for the unidentified LEAKAGE to travel to the containment sump and it may take longer than one hour to detect a 1 gpm increase in unidentified LEAKAGE, depending on the origin and magnitude of the LEAKAGE. This sensitivity is acceptable for containment sump monitor OPERABILITY.

The reactor coolant contains radioactivity that, when released to the containment, may be detected by the gaseous or particulate containment atmosphere radioactivity monitor. Only one of the two detectors is required to be OPERABLE. Radioactivity detection systems are included for monitoring both particulate and gaseous activities because of their sensitivities and rapid responses to RCS LEAKAGE, but have recognized limitations. Reactor coolant radioactivity levels will be low during initial reactor startup and for a few weeks thereafter, until activated corrosion products have been formed and fission products appear from fuel element cladding contamination or cladding defects. If there are few fuel element cladding defects and low levels of activation products, it may not be OCONEE UNITS 1, 2, & 3B34152ASSRVIO01 B 3.4.15-2

RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)

LCO (continued) possible for the gaseous or particulate containment atmosphere radioactivity monitors to detect a 1 gpm increase within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> during normal operation. However, the gaseous or particulate containment atmosphere radioactivity monitor is OPERABLE when it is capable of detecting a 1 gpm increase in unidentified LEAKAGE within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> given an RCS activity equivalent to that assumed in the design calculations for the monitors (Ref. 3).

The LCO requirements are satisfied when instruments of diverse measurement means are available. Thus, the containment normal sump level indication, in combination with a particulate (RIA-47) or gaseous radioactivity monitor (RIA-49), provides an acceptable minimum.

APPLICABILITY Because of elevated RCS temperature and pressure in MODES 1, 2, 3, and 4, RCS leakage detection instrumentation is required to be OPERABLE.

In MODE 5 or 6, the temperature is < 200°F and pressure is maintained low or at atmospheric pressure. Since the temperatures and pressures are far lower than those for MODES 1, 2, 3, and 4, the likelihood of leakage and crack propagation is much smaller. Therefore, the requirements of this LCO are not applicable in MODES 5 and 6.

ACTIONS The Actions are modified by a Note indicating that the provisions of LCO 3.0.4 do not apply. As a result, a MODE change is allowed when the normal sump level indication and required radioactivity monitor are inoperable. This allowance is provided because other instrumentation is available to monitor RCS LEAKAGE.

A.1 and A.2 With the containment normal sump level indication inoperable, no other form of sampling can provide the equivalent information.

However, the containment atmosphere activity monitor will provide indications of changes in leakage. Together with the containment atmosphere radioactivity monitor, the periodic surveillance for RCS inventory balance, SR 3.4.13.1, water inventory balance, must be performed at an increased frequency of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to provide information that is adequate to detect leakage. A Note is added allowing that SR 3.4.13.1 is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after steady state operation (stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows). The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> allowance provides sufficient time to collect and OCONEE UNITS 1, 2, & 3B34153ASSRVIO01 B 3.4.15-3 BASES REVISION 001 I

RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)

ACTIONS A.1 and A.2 (continued) process all necessary data after stable plant conditions are established.

Restoration of the normal sump level indication to OPERABLE status is required to regain the function in a Completion Time of 30 days after level indication failure. This time is acceptable considering the frequency and adequacy of the RCS water inventory balance required by Required Action A.1.

B.1.1, B.1.2. and B.2 With required gaseous or particulate containment atmosphere radioactivity monitoring instrumentation channel inoperable, alternative action is required. Either grab samples of the containment atmosphere must be taken and analyzed or water inventory balances, in accordance with SR 3.4.13.1, must be performed to provide alternate periodic information.

With a sample obtained and analyzed or a water inventory balance performed every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the reactor may be operated for up to 30 days to allow restoration of the radioactivity monitor.

The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> interval for SR 3.4.13.1 provides periodic information that is adequate to detect leakage. A Note is added allowing that SR 3.4.13.1 is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after steady state operation (stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows).

The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> allowance provides sufficient time to collect and process all necessary data after stable plant conditions are established. The 30 day Completion Time recognizes at least one other form of leak detection is available.

C.1 and C.2 With containment normal sump level indication inoperable, the only means of detecting LEAKAGE is the required containment atmosphere radioactivity monitor. A Note clarifies that this Condition is applicable when the only OPERABLE monitor is the containment atmosphere gaseous radioactivity monitor. The containment atmosphere gaseous radioactivity monitor typically cannot detect a 1 gpm leak within one hour when RCS activity is low. In addition, this configuration does not provide the required diverse means of leakage detection. Indirect methods of monitoring RCS leakage must be implemented. Grab samples of the containment atmosphere must be taken and analyzed to provide alternate periodic information. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval is sufficient to detect increasing RCS leakage. The Required Action provides 7 days to restore another RCS OCONEE UNITS 1, 2, & 3B34154ASSRVIO01 B 3.4.15-4 BASES REVISION 001

RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)

ACTIONS C.1 and 0.2 (continued),

leakage monitor to OPERABLE status to regain the intended leakage detection diversity. The 7 day Completion Time ensures that the unit will not be operated in a degraded configuration for a lengthy time period.

D.1 and D.2 If a Required Action of Condition A, B or C cannot be met within the required Completion Time, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

E.1 If both required leakage detection instruments (normal sump level indication and containment atmosphere radioactivity monitor) are inoperable, no automatic means of monitoring leakage are available, and immediate plant shutdown in accordance with LCO 3.0.3 is required.

SURVEILLANCE SR 3.4.15.1 REQUIREMENTS SR 3.4.15.1 requires the performance of a CHANNEL CHECK of the required containment atmosphere radioactivity monitor. The check gives reasonable confidence that each channel is operating properly. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

SR 3.4.15.2 SR 3.4.15.2 requires the performance of a CHANNEL FUNCTIONAL TEST of the required containment atmosphere radioactivity monitor. The test ensures that the monitor can perform its function in the desired manner.

The test verifies the alarm setpoint and relative accuracy of the instrument string.

OCONEE UNITS 1, 2, & 3B34155ASSRVIO01 B 3.4.15-5 BASES REVISION 001

RCS Leakage Detection Instrumentation B 3.4.15 BASES (continued)

SURVEILLANCE SR 3.4.15.3 and SR 3.4.15.4 REQUIREMENTS (continued)

These SRs require the performance of a CHANNEL CALIBRATION for each of the required RCS leakage detection instrumentation channels. The calibration verifies the accuracy of the instrument string, including the instruments located inside containment. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

REFERENCES

1.

UFSAR, Section 3.1.16, "Criterion 16 - Monitoring Reactor Coolant Pressure Boundary (Category B)."

2.

Regulatory Guide 1.45, Revision 0, "Reactor Coolant Pressure Boundary Leakage Detection System," May 1973.

3.

UFSAR, Section 5.2.3.10.5, "Leak Detection."

OCONEE UNITS 1, 2, & 3B34156ASSRVIO01 B 3.4.15-6 BASES REVISION 001 I