ML16365A036: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Dominion Nuclear Connecticut, Inc.
{{#Wiki_filter:.ir Dominion Nuclear Connecticut, Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060
5000 Dominion Boulevard, Glen Allen, VA 23060  
    .Web Address: www.dom.com
.Web Address: www.dom.com December 22, 2016 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 DOMINION NUCLEAR CONNECTICUT, INC.
.ir December 22, 2016 U.S. Nuclear Regulatory Commission                               Serial No. 16-455 Attention: Document Control Desk                                 NRNDEA      RO Washington, DC 20555                                             Docket Nos. 50-336/423 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNITS 2 AND 3 Serial No.
MILLSTONE POWER STATION UNITS 2 AND 3 RESPONSE TO MARCH 12, 2012 INFORMATION REQUEST HIGH FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR RECOMMENDATION 2.1
16-455 NRNDEA RO Docket Nos.
50-336/423 License Nos.
DPR-65 NPF-49 RESPONSE TO MARCH 12, 2012 INFORMATION REQUEST HIGH FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR RECOMMENDATION 2.1  


==References:==
==References:==
Line 28: Line 30:
: 3. EPRI Report 3002004396, Final Report, High Frequency Program Application Guidance for Functional Confirmation and Fragility Evaluation, July 2015 [ADAMS Accession No. ML15223A102].
: 3. EPRI Report 3002004396, Final Report, High Frequency Program Application Guidance for Functional Confirmation and Fragility Evaluation, July 2015 [ADAMS Accession No. ML15223A102].
: 4. EPRI Report 1025287, Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic, February 2013 [ADAMS Accession No. ML12333A170].
: 4. EPRI Report 1025287, Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic, February 2013 [ADAMS Accession No. ML12333A170].
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 1, Item (4), of Reference 1 requested addressees to provide information related to the functionality of high-frequency sensitive structures, systems, and components (SSCs) under certain circumstances. By letter dated October 27, 2015 (Reference 2), the NRC transmitted final seismic information request tables, which identified that Millstone Units 2 and 3 were to conduct a limited scope seismic evaluation that included a high-frequency (HF) sensitive equipment evaluation.
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status., Item (4), of Reference 1 requested addressees to provide information related to the functionality of high-frequency sensitive structures, systems, and components (SSCs) under certain circumstances. By {{letter dated|date=October 27, 2015|text=letter dated October 27, 2015}} (Reference 2), the NRC transmitted final seismic information request tables, which identified that Millstone Units 2 and 3 were to conduct a limited scope seismic evaluation that included a high-frequency (HF) sensitive equipment evaluation.
Electric Power Research Institute (EPRI) Report 3002004396, High Frequency Program Application Guidance for Functional Confirmation and Fragility Evaluation (Reference 3), provides methods and criteria for evaluating the HF sensitive equipment to the reevaluated ground motion response spectrum (GMRS) hazard levels. This report supplements the guidance provided in the Seismic Evaluation Guidance, Screening,
Electric Power Research Institute (EPRI) Report 3002004396, High Frequency Program Application Guidance for Functional Confirmation and Fragility Evaluation (Reference 3), provides methods and criteria for evaluating the HF sensitive equipment to the reevaluated ground motion response spectrum (GMRS) hazard levels.
                                                                                          ;1 oID
This report supplements the guidance provided in the Seismic Evaluation Guidance, Screening,  
                                                                                          . ~~R-.
;1 o ID
~~R-.  


Serial No. 16-455 Docket Nos. 50-336/423 Page 2 of 3 Prioritization and Implementation Details (SPID) (Reference 4), for plants where the GMRS exceeds the safe shutdown earthquake (SSE) spectrum in the frequency range greater than 10 Hz.
Serial No. 16-455 Docket Nos. 50-336/423 Page 2 of 3 Prioritization and Implementation Details (SPID) (Reference 4), for plants where the GMRS exceeds the safe shutdown earthquake (SSE) spectrum in the frequency range greater than 10 Hz.
Line 38: Line 41:
If you have any questions regarding this information, please contact Diane E. Aitken at (804) 273-2694.
If you have any questions regarding this information, please contact Diane E. Aitken at (804) 273-2694.
Sincerely, David A. Heacock President Dominion Nuclear Dominion Nuclear Connecticut, Inc.
Sincerely, David A. Heacock President Dominion Nuclear Dominion Nuclear Connecticut, Inc.
COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO CRAIG D SLY Notary Public Commonwealth of Virginia Reg.# 7518653 Notaublic                        My Commission Expires December 31, 2~
COMMONWEAL TH OF VIRGINIA COUNTY OF HENRICO Notaublic Commitments made in this letter: No new regulatory commitments Attachments:
Commitments made in this letter: No new regulatory commitments Attachments:
CRAIG D SLY Notary Public Commonwealth of Virginia Reg.# 7518653 My Commission Expires December 31, 2~
: 1. High-Frequency Sensitive Equipment Functional Confirmation for Millstone Unit 2
: 1. High-Frequency Sensitive Equipment Functional Confirmation for Millstone Unit 2
: 2. High-Frequency Sensitive Equipment Functional Confirmation for Millstone Unit 3
: 2. High-Frequency Sensitive Equipment Functional Confirmation for Millstone Unit 3 J


Serial No. 16-455 Docket Nos. 50-336/423 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station 50.54f_Seismic.Resource@nrc.gov
cc:
U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station 50.54f_Seismic.Resource@nrc.gov Serial No. 16-455 Docket Nos. 50-336/423 Page 3 of 3


Serial No. 16-455 Docket Nos. 50-336/423 ATTACHMENT 1 HIGH-FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR MILLSTONE UNIT 2 MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC.
ATTACHMENT 1 Serial No. 16-455 Docket Nos. 50-336/423 HIGH-FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR MILLSTONE UNIT 2 MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 1 of 25
==1.0 INTRODUCTION==
 
1.1 PURPOSE Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 1 of 25 The purpose of this attachment is to provide information requested by the NRC in its March 12, 2012 10 CFR 50.54(f) letter issued to all power reactor licensees and holders of construction permits in active or deferred status (Reference 1 ). Specifically, this attachment provides the results of the High Frequency Confirmation required by Item (4), Enclosure 1, Recommendation 2.1: Seismic, of the letter.
==1.0          INTRODUCTION==
 
1.1          PURPOSE The purpose of this attachment is to provide information requested by the NRC in its March 12, 2012 10 CFR 50.54(f) letter issued to all power reactor licensees and holders of construction permits in active or deferred status (Reference 1). Specifically, this attachment provides the results of the High Frequency Confirmation required by Item (4), Enclosure 1, Recommendation 2.1: Seismic, of the letter.
The High Frequency Confirmation evaluation undertaken for Millstone Power Station Unit 2 (MPS2) used the methodologies in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation" (Reference 8) as described herein.
The High Frequency Confirmation evaluation undertaken for Millstone Power Station Unit 2 (MPS2) used the methodologies in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation" (Reference 8) as described herein.
A summary of the High Frequency Confirmation evaluations and results are provided below.
A summary of the High Frequency Confirmation evaluations and results are provided below.  
 
==1.2          BACKGROUND==


==1.2 BACKGROUND==
Following the accident at the Fukushima Dai-ichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established a Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations and to determine if the agency should make additional improvements to its regulatory system. The NTTF developed a set of recommendations intended to clarify and strengthen the regulatory framework for protection against natural phenomena. Subsequently, the NRC issued a 10 CFR 50.54(f) letter on March 12, 2012 (Reference 1), requesting information to assure that these recommendations are addressed by all U.S. nuclear power plants. The 50.54(f) letter requests that licensees and holders of construction permits under 10 CFR Part 50 reevaluate the seismic hazards at their sites against present-day NRC requirements and guidance. Included in the 50.54(f) letter was a request that licensees perform a "confirmation, if necessary, that SSCs, which may be affected by high-frequency ground motion, will maintain their functions important to safety."
Following the accident at the Fukushima Dai-ichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established a Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations and to determine if the agency should make additional improvements to its regulatory system. The NTTF developed a set of recommendations intended to clarify and strengthen the regulatory framework for protection against natural phenomena. Subsequently, the NRC issued a 10 CFR 50.54(f) letter on March 12, 2012 (Reference 1), requesting information to assure that these recommendations are addressed by all U.S. nuclear power plants. The 50.54(f) letter requests that licensees and holders of construction permits under 10 CFR Part 50 reevaluate the seismic hazards at their sites against present-day NRC requirements and guidance. Included in the 50.54(f) letter was a request that licensees perform a "confirmation, if necessary, that SSCs, which may be affected by high-frequency ground motion, will maintain their functions important to safety."
EPRI Report 1025287, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic" (Reference 6) provided screening, prioritization, and implementation details to the U.S. nuclear utility industry for responding to the NRC 50.54(f) letter. This report was developed with NRC participation and is endorsed by the NRC. The SPID included guidance for determining which plants should perform a High Frequency Confirmation and identified the types of components that should be evaluated in the evaluation.
EPRI Report
: 1025287, "Seismic Evaluation Guidance:
Screening, Prioritization and Implementation Details (SPID) for the resolution of Fukushima Near-Term Task Force Recommendation 2.1:
Seismic" (Reference 6) provided screening, prioritization, and implementation details to the U.S. nuclear utility industry for responding to the NRC 50.54(f) letter. This report was developed with NRC participation and is endorsed by the NRC. The SPID included guidance for determining which plants should perform a High Frequency Confirmation and identified the types of components that should be evaluated in the evaluation.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 2 of 25 Subsequent guidance for performing a High Frequency Confirmation was provided in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation," (Reference 8) and was endorsed by the NRC in a letter dated September 17, 2015 (Reference 3). Final screening identifying plants needing to perform a High Frequency Confirmation was provided by NRC in a letter dated October 27, 2015 (Reference 2).
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 2 of 25 Subsequent guidance for performing a High Frequency Confirmation was provided in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation," (Reference 8) and was endorsed by the NRC in a {{letter dated|date=September 17, 2015|text=letter dated September 17, 2015}} (Reference 3). Final screening identifying plants needing to perform a High Frequency Confirmation was provided by NRC in a {{letter dated|date=October 27, 2015|text=letter dated October 27, 2015}} (Reference 2).
On March 31, 2014, Millstone Power Station submitted a reevaluated seismic hazard to the NRC as a part of the Seismic Hazard and Screening Report (Reference 4). By letter dated October 27, 2015 (Reference 2), the NRC transmitted the results of the screening and prioritization review of the seismic hazards reevaluation.
On March 31, 2014, Millstone Power Station submitted a reevaluated seismic hazard to the NRC as a part of the Seismic Hazard and Screening Report (Reference 4). By {{letter dated|date=October 27, 2015|text=letter dated October 27, 2015}} (Reference 2), the NRC transmitted the results of the screening and prioritization review of the seismic hazards reevaluation.
The reevaluated seismic hazard was developed in order to provide the information requested by the NRC in Reference 1 and does not constitute a new or supplemental seismic design or licensing basis for MPS2. As such, the conclusions of the High Frequency Confirmation review do not result in a challenge to the design basis function of any plant structures, systems, or components important to safety.
The reevaluated seismic hazard was developed in order to provide the information requested by the NRC in Reference 1 and does not constitute a new or supplemental seismic design or licensing basis for MPS2. As such, the conclusions of the High Frequency Confirmation review do not result in a challenge to the design basis function of any plant structures, systems, or components important to safety.
1.3         APPROACH EPRI Report 3002004396 (Reference 8) is used for the MPS2 engineering evaluations described in this attachment. Section 4.1 of Reference 8 provided general steps to follow for the high-frequency confirmation component evaluation. Accordingly, the following topics are addressed in the subsequent sections of this attachment:
1.3 APPROACH EPRI Report 3002004396 (Reference 8) is used for the MPS2 engineering evaluations described in this attachment. Section 4.1 of Reference 8 provided general steps to follow for the high-frequency confirmation component evaluation. Accordingly, the following topics are addressed in the subsequent sections of this attachment:
* MPS2 Safe Shutdown Earthquake (SSE) and Ground Motion Response Spectrum (GMRS) Information
MPS2 Safe Shutdown Earthquake (SSE) and Ground Motion Response Spectrum (GMRS) Information Selection of components and a list of specific components for high-frequency confirmation Estimation of seismic demand for subject components Estimation of seismic capacity for subject components Summary of high-frequency evaluations for subject components Summary of Results 1.4 PLANT SCREENING MPS2 submitted the reevaluated seismic hazard information, including the GMRS, to the NRC on March 31, 2014 (Reference 4). In letters dated December 15, 2015 and March 15, 2016 (References 12 and 13, respectively), the NRC staff concluded that the submitted GMRS adequately characterizes the reevaluated seismic hazard for the MPS site.
* Selection of components and a list of specific components for high-frequency confirmation
The NRC final screening determination letter (Reference 2) concluded that the MPS2 GMRS to SSE comparison resulted in a need to perform a High Frequency Confirmation in accordance  
* Estimation of seismic demand for subject components
* Estimation of seismic capacity for subject components
* Summary of high-frequency evaluations for subject components
* Summary of Results 1.4         PLANT SCREENING MPS2 submitted the reevaluated seismic hazard information, including the GMRS, to the NRC on March 31, 2014 (Reference 4). In letters dated December 15, 2015 and March 15, 2016 (References 12 and 13, respectively), the NRC staff concluded that the submitted GMRS adequately characterizes the reevaluated seismic hazard for the MPS site.
The NRC final screening determination letter (Reference 2) concluded that the MPS2 GMRS to SSE comparison resulted in a need to perform a High Frequency Confirmation in accordance


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 3 of 25 with the screening criteria in the SPID (Reference 6).
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 3 of 25 with the screening criteria in the SPID (Reference 6).
1.5         INITIAL CONDITIONS For the purposes of this High Frequency Confirmation review, the plant is assumed to be operating normally prior to the occurrence of the severe seismic event with offsite power sources available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.
1.5 INITIAL CONDITIONS For the purposes of this High Frequency Confirmation review, the plant is assumed to be operating normally prior to the occurrence of the severe seismic event with offsite power sources available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.
2.0         SELECTION OF COMPONENTS FOR HIGH-FREQUENCY SCREENING The fundamental objective of the high-frequency confirmation review was to determine whether the occurrence of a seismic event could cause critical equipment to fail to perform as necessary.
2.0 SELECTION OF COMPONENTS FOR HIGH-FREQUENCY SCREENING The fundamental objective of the high-frequency confirmation review was to determine whether the occurrence of a seismic event could cause critical equipment to fail to perform as necessary.
An optimized evaluation process was applied that focused on achieving a safe and stable plant state following a seismic event. As described in Reference 8, this state is achieved by confirming that key plant safety functions critical to immediate plant safety are preserved (reactor trip, reactor coolant system inventory and pressure control, and core cooling) and that the plant operators have the necessary power available to achieve and maintain this state immediately following the seismic event (AC/DC power and support systems).
An optimized evaluation process was applied that focused on achieving a safe and stable plant state following a seismic event. As described in Reference 8, this state is achieved by confirming that key plant safety functions critical to immediate plant safety are preserved (reactor trip, reactor coolant system inventory and pressure control, and core cooling) and that the plant operators have the necessary power available to achieve and maintain this state immediately following the seismic event (AC/DC power and support systems).
Within the applicable functions, the components that would need a high-frequency confirmation are contact control devices subject to intermittent states (e.g., relay contact chatter) in seal-in or lockout circuits. Accordingly, the objective of the review, as stated in Section 4.2.1 of Reference 8, was to determine if seismic induced high-frequency relay chatter would prevent the completion of key plant safety functions.
Within the applicable functions, the components that would need a high-frequency confirmation are contact control devices subject to intermittent states (e.g., relay contact chatter) in seal-in or lockout circuits. Accordingly, the objective of the review, as stated in Section 4.2.1 of Reference 8, was to determine if seismic induced high-frequency relay chatter would prevent the completion of key plant safety functions.
For each function, a review was performed to identify plant equipment supporting the function.
For each function, a review was performed to identify plant equipment supporting the function.
The control circuit schematic diagrams for this equipment were then reviewed using the guidance from EPRI NP-7148 (Reference 11) and EPRI Report 3002004396 (Reference 8) to determine whether seismic-induced contact chatter could result in seal-in or lockout (SILO) conditions that could have an adverse impact on the equipment capability to support key plant safety functions. From this review, a list of contact control devices for which contact chatter could result in SILO conditions was identified. These devices (termed "relays" for the purposes of this evaluation) were further evaluated for seismic capacity margin, as described in Sections 3 and 4.
The control circuit schematic diagrams for this equipment were then reviewed using the guidance from EPRI NP-7148 (Reference 11) and EPRI Report 3002004396 (Reference 8) to determine whether seismic-induced contact chatter could result in seal-in or lockout (SILO) conditions that could have an adverse impact on the equipment capability to support key plant safety functions. From this review, a list of contact control devices for which contact chatter could result in SILO conditions was identified. These devices (termed "relays" for the purposes of this evaluation) were further evaluated for seismic capacity margin, as described in Sections 3 and 4.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 4 of 25 2.1          REACTOR TRIP/SCRAM Consistent with the guidance in Reference 8, the design requirements for reactor trip systems preclude the application of seal-in or lockout circuits that prevent reactor trip/SCRAM functions and no high-frequency component chatter review is necessary for this function.
2.1 REACTOR TRIP/SCRAM Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 4 of 25 Consistent with the guidance in Reference 8, the design requirements for reactor trip systems preclude the application of seal-in or lockout circuits that prevent reactor trip/SCRAM functions and no high-frequency component chatter review is necessary for this function.
2.2         REACTOR COOLANT SYSTEM INVENTORY CONTROL The reactor coolant system inventory control systems were reviewed to identify components .
2.2 REACTOR COOLANT SYSTEM INVENTORY CONTROL The reactor coolant system inventory control systems were reviewed to identify components.
that could be susceptible to adverse operation due to contact control devices in SILO circuits that could create loss of coolant-type events, such as inadvertent opening of a pressurizer power-operated relief valve (PORV).
that could be susceptible to adverse operation due to contact control devices in SILO circuits that could create loss of coolant-type events, such as inadvertent opening of a pressurizer power-operated relief valve (PORV).
The following components were identified for control circuit review for SILO conditions:
The following components were identified for control circuit review for SILO conditions:
* Pressurizer PORVs 2.3         REACTOR COOLANT SYSTEM PRESSURE CONTROL Consistent with the guidance in Reference 8, no specific high-frequency component chatter review is required for this function.
Pressurizer PORVs 2.3 REACTOR COOLANT SYSTEM PRESSURE CONTROL Consistent with the guidance in Reference 8, no specific high-frequency component chatter review is required for this function.
2.4         CORE COOLING The core cooling systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that would prevent accomplishment of the core cooling function. The intent of the review was to ensure at least a single train of non-AC power driven. decay heat removal capability was maintained (e.g.,
2.4 CORE COOLING The core cooling systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that would prevent accomplishment of the core cooling function. The intent of the review was to ensure at least a single train of non-AC power driven. decay heat removal capability was maintained (e.g.,
auxiliary feedwater flow from at least one pump to at least one steam generator).
auxiliary feedwater flow from at least one pump to at least one steam generator).
The following components were identified for control circuit review for SILO conditions:
The following components were identified for control circuit review for SILO conditions:
* Auxiliary Feedwater (AFW) Flow Regulating Valves
Auxiliary Feedwater (AFW) Flow Regulating Valves AFW Discharge Header Cross-tie Valve Atmospheric Steam Dump Valves Turbine-driven AFW Pump Steam Supply Valves Turbine-driven AFW Pump Trip-Throttle Valve Turbine-driven AFW Pump 2.5 AC/DC POWER SUPPORT SYSTEMS The AC and DC power support systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that prevent the availability of DC and/or AC power sources. The following AC and DC power support systems  
* AFW Discharge Header Cross-tie Valve
* Atmospheric Steam Dump Valves
* Turbine-driven AFW Pump Steam Supply Valves
* Turbine-driven AFW Pump Trip-Throttle Valve
* Turbine-driven AFW Pump 2.5         AC/DC POWER SUPPORT SYSTEMS The AC and DC power support systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that prevent the availability of DC and/or AC power sources. The following AC and DC power support systems


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 5 of 25 were reviewed:
were reviewed:
* Emergency Diesel Generators (EOG),
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 5 of 25 Emergency Diesel Generators (EOG),
* EOG Support Systems and associated Switchgear, Load Centers, and MCCs,
EOG Support Systems and associated Switchgear, Load Centers, and MCCs, Battery Chargers and Inverters, Vital 125vdc and 120vac Distribution The analysis considered the reactor operating normally at power with no equipment failures prior to the seismic event. The EDGs are not operating, but are available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.
* Battery Chargers and Inverters,
In response to bus under-voltage relaying detecting the LOOP, the Class 1 E control systems must automatically shed loads, start the EDGs, and sequentially load the diesel generators as designed. Ancillary systems required for EOG operation, as well as Class 1 E battery chargers and inverters, must function as necessary.
* Vital 125vdc and 120vac Distribution The analysis considered the reactor operating normally at power with no equipment failures prior to the seismic event. The EDGs are not operating, but are available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.
In response to bus under-voltage relaying detecting the LOOP, the Class 1E control systems must automatically shed loads, start the EDGs, and sequentially load the diesel generators as designed. Ancillary systems required for EOG operation, as well as Class 1E battery chargers and inverters, must function as necessary.
The following components were identified for control circuit review for SILO conditions:
The following components were identified for control circuit review for SILO conditions:
* 4kV Emergency Bus Feeder and Bus Tie Breakers (Emergency and Offsite sources)
4kV Emergency Bus Feeder and Bus Tie Breakers (Emergency and Offsite sources) 480v Emergency Bus Feeder and Tie Breakers 4kV I 480v Emergency Bus Transformers and 4kV Supply Breakers 4kV Emergency Bus Load Breakers to Service Water, AFW, High Pressure Safety Injection, Low Pressure Safety Injection, Containment Spray and Reactor Building Closed Cooling Water Pumps 480v Emergency Bus Load Breakers to 125vdc Battery Chargers, various MCCs, and Load Centers 125vdc Batteries, DC Susses, Battery Chargers, and Distribution System Components 120vac Vital Inverters and Distribution System Components EDGs EOG Air Start System Valves EOG Room Ventilation Fans and Dampers Service Water Pumps and Strainers Service Water System Valves (required for cooling water supply to EDGs)  
* 480v Emergency Bus Feeder and Tie Breakers
* 4kV I 480v Emergency Bus Transformers and 4kV Supply Breakers
* 4kV Emergency Bus Load Breakers to Service Water, AFW, High Pressure Safety Injection, Low Pressure Safety Injection, Containment Spray and Reactor Building Closed Cooling Water Pumps
* 480v Emergency Bus Load Breakers to 125vdc Battery Chargers, various MCCs, and Load Centers
* 125vdc Batteries, DC Susses, Battery Chargers, and Distribution System Components
* 120vac Vital Inverters and Distribution System Components
* EDGs
* EOG Air Start System Valves
* EOG Room Ventilation Fans and Dampers
* Service Water Pumps and Strainers
* Service Water System Valves (required for cooling water supply to EDGs)


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 6 of 25 2.6        
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 6 of 25 2.6  


==SUMMARY==
==SUMMARY==
OF SELECTED COMPONENTS A list of the contact devices requiring a high-frequency confirmation is provided in Appendix 1.
OF SELECTED COMPONENTS A list of the contact devices requiring a high-frequency confirmation is provided in Appendix 1.
3.0         SEISMIC DEMAND ESTIMATE The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the mounting point seismic demand to be determined, which requires the development of in-structure seismic demand based on the GMRS input and the in-cabinet amplification of the in-structure floor motion at the location of the electrical cabinet housing the relay.
3.0 SEISMIC DEMAND ESTIMATE The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the mounting point seismic demand to be determined, which requires the development of in-structure seismic demand based on the GMRS input and the in-cabinet amplification of the in-structure floor motion at the location of the electrical cabinet housing the relay.
The calculation of in-structure response typically requires the development of a foundation input response spectrum (FIRS) and dynamic analysis of the structure. MPS2 has not developed these inputs from the GMRS for plant structures. Therefore, consistent with the guidance in Reference 8, Section 4.3, the in-structure response for buildings and floor elevations where subject relays are located was estimated as described in subsection 3.1 below.
The calculation of in-structure response typically requires the development of a foundation input response spectrum (FIRS) and dynamic analysis of the structure. MPS2 has not developed these inputs from the GMRS for plant structures. Therefore, consistent with the guidance in Reference 8, Section 4.3, the in-structure response for buildings and floor elevations where subject relays are located was estimated as described in subsection 3.1 below.
The mounting point high-frequency seismic demand was determined consistent with the guidance in Reference 8, Sections 4.4 and 4.5, and is described in subsection 3.2 below.
The mounting point high-frequency seismic demand was determined consistent with the guidance in Reference 8, Sections 4.4 and 4.5, and is described in subsection 3.2 below.
3.1         ESTIMATE OF HIGH FREQUENCY IN-STRUCTURE RESPONSE Per Reference 8, Sect. 4.3, the basis for calculating high-frequency seismic demand in the horizontal direction is the horizontal control point GMRS, which was developed in response to Reference 1 and reported in the MPS Seismic Hazard and Screening Report (Reference 4). As noted in Reference 8, Section 3.3, The Control Point GMRS developed for these rock sites are typically appropriate for all rock founded structures and additional FIRS estimates are not deemed necessary for the high frequency confirmation effort.
3.1 ESTIMATE OF HIGH FREQUENCY IN-STRUCTURE RESPONSE Per Reference 8, Sect. 4.3, the basis for calculating high-frequency seismic demand in the horizontal direction is the horizontal control point GMRS, which was developed in response to Reference 1 and reported in the MPS Seismic Hazard and Screening Report (Reference 4). As noted in Reference 8, Section 3.3, The Control Point GMRS developed for these rock sites are typically appropriate for all rock founded structures and additional FIRS estimates are not deemed necessary for the high frequency confirmation effort.
MPS is a rock site, and the MPS2 structures of interest for the high-frequency confirmation (Auxiliary Building and Turbine Building) are rock-founded. Therefore, the control point GMRS was the appropriate review level earthquake (RLE) input for the purposes of the high-frequency confirmation.
MPS is a rock site, and the MPS2 structures of interest for the high-frequency confirmation (Auxiliary Building and Turbine Building) are rock-founded. Therefore, the control point GMRS was the appropriate review level earthquake (RLE) input for the purposes of the high-frequency confirmation.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 7 of 25 3.1.1      HORIZONTAL SEISMIC DEMAND The horizontal response structural amplification factor to be applied for estimating the horizontal in-structure seismic demand is provided in Reference 8, Figure 4-3 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation.
3.1.1 HORIZONTAL SEISMIC DEMAND Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 7 of 25 The horizontal response structural amplification factor to be applied for estimating the horizontal in-structure seismic demand is provided in Reference 8, Figure 4-3 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation.
For the MPS2 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.
For the MPS2 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.
The horizontal seismic demand was calculated in accordance with Reference 8, Equation 4-1 a:
The horizontal seismic demand was calculated in accordance with Reference 8, Equation 4-1 a:
SAcH   =SAGMRS
SAcH = SAGMRS
* AF SH SAcH is the Spectral Acceleration, Clipped Horizontal (i.e., in-structure [floor] horizontal acceleration).
* AF SH SAcH is the Spectral Acceleration, Clipped Horizontal (i.e., in-structure [floor] horizontal acceleration).
SAGMRS is the peak GMRS between 15-40Hz. The SAGMRs value is 0.422g from Reference 4.
SAGMRS is the peak GMRS between 15-40Hz. The SAGMRs value is 0.422g from Reference 4.
The horizontal GMRS is plotted in Figure 3-1.
The horizontal GMRS is plotted in Figure 3-1.
AFsH is the Horizontal Response Structural Amplification Factor from Reference 8, Figure 4-3.
AFsH is the Horizontal Response Structural Amplification Factor from Reference 8, Figure 4-3.
3.1.2       VERTICAL SEISMIC DEMAND The vertical response structural amplification factor to be applied for estimating the vertical in-structure seismic demand is provided in Reference 8, Figure 4-4 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation. For the MPS2 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.
3.1.2 VERTICAL SEISMIC DEMAND The vertical response structural amplification factor to be applied for estimating the vertical in-structure seismic demand is provided in Reference 8, Figure 4-4 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation. For the MPS2 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.
The vertical seismic demand was calculated in accordance with Reference 8, Equation 4-1 b:
The vertical seismic demand was calculated in accordance with Reference 8, Equation 4-1 b:
SAcv =SAvGMRS
SAcv = SAvGMRS
* AF sv SAcv is the Spectral Acceleration, Clipped Vertical (in-structure [floor] vertical acceleration).
* AF sv SAcv is the Spectral Acceleration, Clipped Vertical (in-structure [floor] vertical acceleration).
SAvGMRs is the peak estimated Spectral Acceleration, Vertical GMRS in the 15 to 40Hz frequency range. The peak SAvGMRs is the maximum product of the Vertical-to-Horizontal (V/H) function values and the corresponding horizontal GMRS values between 15 and 40Hz. The GMRS values are from Reference 4. The V/H function is derived from Reference 8, Tables 3-1 and 3-2, utilizing the GMRS peak ground acceleration (PGA) [0.190g] and the shear wave travel time from a depth of 30 meters to the ground surface (Vs30) from Reference 4. For MPS2, the V/H function values are between 0.680 @ 15 Hz and 0.860 @ 40Hz, and are based on the GMRS Horizontal PGA = 0.19g and Vs30 > 1,000 mps corresponding to a site class '8-Hard' per Reference 8, Table 3-2. The maximum product of the V/H function values and the
SAvGMRs is the peak estimated Spectral Acceleration, Vertical GMRS in the 15 to 40Hz frequency range. The peak SAvGMRs is the maximum product of the Vertical-to-Horizontal (V/H) function values and the corresponding horizontal GMRS values between 15 and 40Hz. The GMRS values are from Reference 4. The V/H function is derived from Reference 8, Tables 3-1 and 3-2, utilizing the GMRS peak ground acceleration (PGA) [0.190g] and the shear wave travel time from a depth of 30 meters to the ground surface (Vs30) from Reference 4. For MPS2, the V/H function values are between 0.680 @ 15 Hz and 0.860 @ 40Hz, and are based on the GMRS Horizontal PGA = 0.19g and Vs30 > 1,000 mps corresponding to a site class '8-Hard' per Reference 8, Table 3-2.
                                                                =              =
The maximum product of the V/H function values and the corresponding GMRS is 0.31 g, which occurs at 40Hz (GMRS = 0.36g, V/H = 0.86). The GMRS, estimated vertical GMRS (VGMRS), and V/H Ratio values are plotted in Figure 3-1, along with the SSE spectrum.  
corresponding GMRS is 0.31 g, which occurs at 40Hz (GMRS 0.36g, V/H 0.86). The GMRS, estimated vertical GMRS (VGMRS), and V/H Ratio values are plotted in Figure 3-1, along with the SSE spectrum.


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 8 of 25 AFsv is the Vertical Response Structural Amplification Factor from Reference 8, Figure 4-4.
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 8 of 25 AFsv is the Vertical Response Structural Amplification Factor from Reference 8, Figure 4-4.
3.2         ESTIMATE OF HIGH FREQUENCY MOUNTING POINT SEISMIC DEMAND The mounting point seismic demand was determined by applying in-cabinet amplification factors to the in-structure demand, as described in Reference 8, Sections 4.4 and 4.5.1.
3.2 ESTIMATE OF HIGH FREQUENCY MOUNTING POINT SEISMIC DEMAND The mounting point seismic demand was determined by applying in-cabinet amplification factors to the in-structure demand, as described in Reference 8, Sections 4.4 and 4.5.1.
The in-structure demand was determined as described in Section 3.1 above. The in-cabinet amplification factor is applied to account for the amplification of the structure seismic response at the cabinet anchor points. The in-structure demand (horizontal or vertical) was multiplied by the applicable in-cabinet amplification factor to obtain the mounting point demand.
The in-structure demand was determined as described in Section 3.1 above. The in-cabinet amplification factor is applied to account for the amplification of the structure seismic response at the cabinet anchor points. The in-structure demand (horizontal or vertical) was multiplied by the applicable in-cabinet amplification factor to obtain the mounting point demand.
Horizontal cabinet amplification factors used were:
Horizontal cabinet amplification factors used were:
Motor Control Centers                                       AFc =3.6 Switchgear (flexible panels)                                AFc =7.2 Control Cabinets (e.g., Control Room electrical panels     AFc =4.5 and bench boards, etc.)
Motor Control Centers Switchgear (flexible panels)
AFc = 3.6 AFc = 7.2 Control Cabinets (e.g., Control Room electrical panels AFc = 4.5 and bench boards, etc.)
Cabinet types were determined based on guidance in EPRI NP-7148, "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality" (Reference 11).
Cabinet types were determined based on guidance in EPRI NP-7148, "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality" (Reference 11).
The vertical cabinet amplification factor used was AFc = 4.7 for all three cabinet types.
The vertical cabinet amplification factor used was AFc = 4.7 for all three cabinet types.
For electrical cabinets/enclosures that did not correspond to the listed cabinet types, in-cabinet amplification factors consistent with the cabinet configuration were used and justified on a case-by-case basis.
For electrical cabinets/enclosures that did not correspond to the listed cabinet types, in-cabinet amplification factors consistent with the cabinet configuration were used and justified on a case-by-case basis.
The mounting point demand, ICRSc, used in the horizontal and vertical directions for evaluation of the relays, is equal to the product of the clipped in-structure demand and the applicable cabinet amplification factor within the 15 to 40 Hz frequency range, as described in Reference 8, Sections 4.4:
The mounting point demand, ICRSc, used in the horizontal and vertical directions for evaluation of the relays, is equal to the product of the clipped in-structure demand and the applicable cabinet amplification factor within the 15 to 40 Hz frequency range, as described in Reference 8, Sections 4.4:
ICRScH =AFcH
ICRScH = AF cH
* SAcH ICRScv =AFcv
* SAcH ICRScv = AFcv
* SAcv The cabinet type classification and the mounting point seismic demand are tabulated for each evaluated relay in Appendix 1.
* SAcv The cabinet type classification and the mounting point seismic demand are tabulated for each evaluated relay in Appendix 1.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 9 of 25 Millstone Unit 2 0.50                                                                                .,,,,                                                1 I                                                                   ,;f?i I'''<:''
0.50 0.45 0.40 tlO 0.35 c'
I  I            ~                   ~
0
                                                                                                                  '",.Ill           ..
~ 0.30 cu
                                              * * * * *
] 0.25 u
* VG MRS 0.45
n:J
                          - - - GMRS HF Range    -SSE
] 0.20 u cu Q.
: r. ,.
VI 0.15 0.10 0.05 0.00 0.1 I
1.;. ii I
--- GMRS HF Range
                                                                                                                                            ~
* *V/H Ratio I
0.9
I I
                                                                                                      .   . ~
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 9 of 25 Millstone Unit 2 I I
0.40            -  * *V/H Ratio                                                    ll     '    . ...-~,
,;f?i I'''<:''  
                                                                                                                    ",                             0.8
~  
                - . - - . -I . -.. .. . - . - . - ,1.'1.- . -.. .**"lt .... "*
~ '",.Ill  
                                                                                                                            *~
* * * * *
I;       ~               I tlO  0.35                                                                                                ;~                                  0.7 i*     "'*   \
* VG MRS
c'                                                                                    !'!! .
: r.,.
0                                                                                    ~m.
I  
                                                                                                                        -**II*
~  
                                                                                  ....~ ~ .**~~
-SSE
  ~                                                                                                                                                0.6
. ~ 1.;. ii ll  
  ...cu 0.30 I                            / , _ I ,,~' .                     ..,,..,*' ":~                 *.~,
....-~, ",
                                                                                                                                    ...              .0
I;
                                                                                                                                    *l                 n:J
~..
  ] 0.25                                                                                                                                          0.5 a::
I  
                                                                      ,f ..
*~
I.'     **
... -. -. -,1.'1. -. -. ;~ i* "'*.
1*.*,
\\  
                                                                                          ~;~: *~xi: .......
~m. **"lt II*... "*  
u n:J
,,_ I  
                                                        /                                                          ,..,                **I'          ::c
,,~'  
                                                                    ,I .                                                              : ..,;,..
.. ~
                                                                                                                                          ~'--
":~  
] 0.20                                                                                                                                            0.4 u
/
cu Q.
~
I         ~/ , "'I .***                              **..
**~~
i* "'*
*.~,
                                                              ., ..* 1 I    **                                            :
* l I.'  
VI 0.15                                                                                                                                          0.3
*~xi: 1*.*,  
                                                                                                            *~ i *;:L II      1'                                            P'-~! *
/
                                        ~
,f.
                                                        , ~" .. .**                                           .*
~;~:  
r-... .i I
**I'
0.10                                                                                                                                      0.2
: ~' --
                                                                                                      . :<er
~/
                                            .... ..,'.. .. **                              f                            .";l
, I.
                                                                                                  ~.,,, ~             a 0 .05                                                                            -t                                                      0.1 0.00
i* "'*
                ..... ... ""*,*** t --
'I I
                              ~-.-:****
1 0.9 0.8 0.7 0.6 0...
I                                                       11~ :~al~~llt                                  I    0 0.1                             1                                   10                                                         100 Spectral frequency, Hz Figure 3-1: Plot of Horizontal and Vertical Ground Motion Response Spectra , Safe Shutdown Earthquake Spectrum , and V/H Ratio 4.0               CONTACT DEVICE EVALUATIONS The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the comparison of relay seismic capacity to the applicable seismic demand to determine whether the relay is predicted to experience contact chatter during a GMRS-level seismic event. Seismic demand was determined as described in Section 3.0. The deterministic high confidence of low probability of failure (HCLPF) capacity of the relay device was determined in accordance with the guidance of Reference 8, Section 4.5.
n:J 0.5 a::
4.1               HCLPF COMPONENT CAPACITY The HCLPF capacities of the relays were developed based on the guidance in Reference 8, Section 4.5.2. The effective wide band capacity, TRS , is given by Reference 8, Equation 4-5:
::c -
SAT is the Spectral Acceleration, Effective Spectral Test Capacity (Relay Seismic Capacity) for relays as obtained from one of the following sources:
0.4 >
I I 1'  
..
* 1  
-~
*~
i *;:L P'! *  
~  
~".**
0.3 I r f
. :<er  
.";l  
-t
~.,,, ~ a  
---.i..
11~ :~al~~llt I
~-.-:****...  
""*,***t I 0.2 0.1 0
1 10 100 Spectral frequency, Hz Figure 3-1: Plot of Horizontal and Vertical Ground Motion Response Spectra, Safe Shutdown Earthquake Spectrum, and V/H Ratio 4.0 CONTACT DEVICE EVALUATIONS The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the comparison of relay seismic capacity to the applicable seismic demand to determine whether the relay is predicted to experience contact chatter during a GMRS-level seismic event. Seismic demand was determined as described in Section 3.0. The deterministic high confidence of low probability of failure (HCLPF) capacity of the relay device was determined in accordance with the guidance of Reference 8, Section 4.5.
4.1 HCLPF COMPONENT CAPACITY The HCLPF capacities of the relays were developed based on the guidance in Reference 8, Section 4.5.2. The effective wide band capacity, TRS, is given by Reference 8, Equation 4-5:
SAT is the Spectral Acceleration, Effective Spectral Test Capacity (Relay Seismic Capacity) for relays as obtained from one of the following sources:  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 10 of 25
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 10 of 25 EPRI High Frequency Test Program (References 7 and 8)
* EPRI High Frequency Test Program (References 7 and 8)
Generic Equipment Ruggedness Spectrum (GERS) (Reference 9 and 10)
* Generic Equipment Ruggedness Spectrum (GERS) (Reference 9 and 10)
Seismic Qualification Reporting and Testing Standardization (Reference 14)
* Seismic Qualification Reporting and Testing Standardization (Reference 14)
Site-specific seismic qualification test data Certain relay model numbers identified on the relay list are not explicitly covered by the testing referenced in the list above and a comparison of the relay to other similar relay types having seismic qualification test data (e.g., same manufacturer & same family of relay, similar size, shape, features, construction, etc.) was made in those cases in order to provide a SAT value.
* Site-specific seismic qualification test data Certain relay model numbers identified on the relay list are not explicitly covered by the testing referenced in the list above and a comparison of the relay to other similar relay types having seismic qualification test data (e.g., same manufacturer & same family of relay, similar size, shape, features, construction, etc.) was made in those cases in order to provide a SAT value.
FK is the Conservative Deterministic Failure Margin (CFDM) Knockdown Factor and its value depends on the source of the test value chosen to represent test capacity. FK was obtained from Reference 8, Table 4-2.
FK is the Conservative Deterministic Failure Margin (CFDM) Knockdown Factor and its value depends on the source of the test value chosen to represent test capacity. FK was obtained from Reference 8, Table 4-2.
FMs is the Multi-axis to Single-axis Correction Factor and is equal to either 1.0 or 1.2 depending on the expected seismic response of the relay enclosure cabinet. The value of FMs was chosen consistent with the guidance from Reference 8, Section 4.5.2.
FMs is the Multi-axis to Single-axis Correction Factor and is equal to either 1.0 or 1.2 depending on the expected seismic response of the relay enclosure cabinet. The value of FMs was chosen consistent with the guidance from Reference 8, Section 4.5.2.
The effective wide band capacity, along with the source for the device capacity, is tabulated for each evaluated relay in Appendix 1.
The effective wide band capacity, along with the source for the device capacity, is tabulated for each evaluated relay in Appendix 1.
4.2       SEISMIC MARGIN EVALUATION The seismic margin to the onset of contact chatter was determined by comparing the HCLPF capacity, TRS, to the mounting point seismic demand, ICRSc, to obtain the capacity/demand ratio:
4.2 SEISMIC MARGIN EVALUATION The seismic margin to the onset of contact chatter was determined by comparing the HCLPF capacity, TRS, to the mounting point seismic demand, ICRSc, to obtain the capacity/demand ratio:
CID= TRS / ICRSc (C/D is determined for horizontal and vertical directions)
CID= TRS / ICRSc (C/D is determined for horizontal and vertical directions)
The results of the relay chatter evaluation is tabulated for each evaluated relay in Appendix 1.
The results of the relay chatter evaluation is tabulated for each evaluated relay in Appendix 1.
Two representative sample relay evaluations are included in Appendix 2.
Two representative sample relay evaluations are included in Appendix 2.  


==5.0       CONCLUSION==
==5.0 CONCLUSION==
S 5.1      
S 5.1  


==SUMMARY==
==SUMMARY==
OF RESULTS The high-frequency confirmation review was performed consistent with the guidance in EPRI Report 3002004396 (Reference 8). The following results were obtained:
OF RESULTS The high-frequency confirmation review was performed consistent with the guidance in EPRI Report 3002004396 (Reference 8). The following results were obtained:
* 132 essential plant components were selected for detailed review
132 essential plant components were selected for detailed review 103 components were selected for relay chatter evaluation (the remaining 29 components are non-electrical, and do not require relay chatter evaluation) 363 relays were identified for the 103 components evaluated for relay chatter  
* 103 components were selected for relay chatter evaluation (the remaining 29 components are non-electrical, and do not require relay chatter evaluation)
* 363 relays were identified for the 103 components evaluated for relay chatter


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 11 of 25
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 11 of 25 104 relays were identified with the potential to cause SILO conditions and required seismic margin evaluation 101 relays were determined to have adequate seismic margin to chatter (C/D ratio>/= 1)
* 104 relays were identified with the potential to cause SILO conditions and required seismic margin evaluation
* 101 relays were determined to have adequate seismic margin to chatter (C/D ratio>/= 1)
The high-frequency confirmation review determined there are three relays associated with essential components for which, based on available high-frequency seismic capacity information and the conservatively estimated seismic demand, the seismic capacity is exceeded by the GMRS in-cabinet seismic demand. These relays are identified in the table below. The relays are associated with protection and/or metering for 4kV Emergency Diesel Generator output breakers. The relays are located within the 4kV Emergency Switchgear A3 and A4 cubicles.
The high-frequency confirmation review determined there are three relays associated with essential components for which, based on available high-frequency seismic capacity information and the conservatively estimated seismic demand, the seismic capacity is exceeded by the GMRS in-cabinet seismic demand. These relays are identified in the table below. The relays are associated with protection and/or metering for 4kV Emergency Diesel Generator output breakers. The relays are located within the 4kV Emergency Switchgear A3 and A4 cubicles.
Appendix1               Component ID                         Associated Relay ID(s)
Appendix1 Component ID Associated Relay ID(s)
Item No.               (Breaker ID)                   (Switchgear Cubicle location) 6             15G-12U-2 (52-A312)                           81 (A312) 15             15G-13U-2 (52-A401)                           81 (A401) 18             15G-13U-2 (52-A401)                       51V-A, B & C (A401)
Item No.
(Breaker ID)
(Switchgear Cubicle location) 6 15G-12U-2 (52-A312) 81 (A312) 15 15G-13U-2 (52-A401) 81 (A401) 18 15G-13U-2 (52-A401) 51V-A, B & C (A401)
Chatter of the relays could cause trip and/or prevent closure of the emergency diesel generator (EOG) output breaker at a time when the EOG is required to provide emergency power to the associated 4kV emergency bus (i.e., LOOP).
Chatter of the relays could cause trip and/or prevent closure of the emergency diesel generator (EOG) output breaker at a time when the EOG is required to provide emergency power to the associated 4kV emergency bus (i.e., LOOP).
Further review of the consequences of potential contact chatter associated with these relays determined that operator action guided by existing emergency response procedures would resolve the condition. As part of the immediate actions, response to a reactor trip, as detailed in the Standard Post Trip Actions Emergency Operating Procedure, EOP-2525, the operator in the main control room is directed to check that vital electrical buses are energized. If the 4kV emergency bus(es) is(are) not energized, the procedure provides the immediate action to confirm that the EOG is running and ensure that the output breaker is closed. As part of this action, if the breaker had not closed, or had tripped open, as a result of 81 (frequency) or 51 (time overcurrent) relay device contact chatter, the operator would manually close the output breaker remotely from the panel in the main control room after confirming appropriate permissives are established (also from the main control room) .. This action would resolve the adverse effect that could result from the relay contact chatter. Since this action would take place within the main control room and is guided by an existing procedure, the action to manually close the EOG output breaker to resolve the potential relay contact chatter consequence is not considered to be an excessive operational burden. In addition, the plant would initially reach safe and stable conditions without emergency AC power.
Further review of the consequences of potential contact chatter associated with these relays determined that operator action guided by existing emergency response procedures would resolve the condition. As part of the immediate actions, response to a reactor trip, as detailed in the Standard Post Trip Actions Emergency Operating Procedure, EOP-2525, the operator in the main control room is directed to check that vital electrical buses are energized. If the 4kV emergency bus(es) is(are) not energized, the procedure provides the immediate action to confirm that the EOG is running and ensure that the output breaker is closed. As part of this action, if the breaker had not closed, or had tripped open, as a result of 81 (frequency) or 51 (time overcurrent) relay device contact chatter, the operator would manually close the output breaker remotely from the panel in the main control room after confirming appropriate permissives are established (also from the main control room).. This action would resolve the adverse effect that could result from the relay contact chatter. Since this action would take place within the main control room and is guided by an existing procedure, the action to manually close the EOG output breaker to resolve the potential relay contact chatter consequence is not considered to be an excessive operational burden. In addition, the plant would initially reach safe and stable conditions without emergency AC power.  


==5.2         CONCLUSION==
==5.2 CONCLUSION==
This attachment provides the information required by Enclosure 1, Recommendation 2.1:


This attachment provides the information required by Enclosure 1, Recommendation 2.1:
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 12 of 25 Seismic, Item (4) of the NRC's March 12, 2012 request for information letter (Reference 1 ).
A high-frequency confirmation review has been performed for MPS2 to determine whether the occurrence of a severe seismic event could cause selected essential equipment to fail to perform as necessary. As a result of this review, it is concluded that accomplishment of the key plant safety functions defined in Reference 8 will not be adversely affected due to relay chatter during a severe seismic event equivalent to the level of the reevaluated seismic hazard for Millstone Power Station Unit 2.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 12 of 25 Seismic, Item (4) of the NRC's March 12, 2012 request for information letter (Reference 1).
==6.0 REFERENCES==
A high-frequency confirmation review has been performed for MPS2 to determine whether the occurrence of a severe seismic event could cause selected essential equipment to fail to perform as necessary. As a result of this review, it is concluded that accomplishment of the key plant safety functions defined in Reference 8 will not be adversely affected due to relay chatter during a severe seismic event equivalent to the level of the reevaluated seismic hazard for Millstone Power Station Unit 2.
 
==6.0         REFERENCES==
: 1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012.
: 1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012.
: 2. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
: 2. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
Line 261: Line 257:
1990.
1990.
: 12. NRC Letter, "Millstone Power Station, Units 2 and 3 - Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f),
: 12. NRC Letter, "Millstone Power Station, Units 2 and 3 - Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f),
Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF3968 and MF3969),"
Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF3968 and MF3969),"  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 13 of 25 dated December 15, 2015.
dated December 15, 2015.
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 13 of 25
: 13. NRC Letter, "Millstone Power Station, Units 2 and 3 - Supplement to Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (CAC Nos. MF3968 and MF3969)," dated March 15, 2016.
: 13. NRC Letter, "Millstone Power Station, Units 2 and 3 - Supplement to Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (CAC Nos. MF3968 and MF3969)," dated March 15, 2016.
: 14. EPRI Report 1019309, "Seismic Qualification Reporting and Testing Standardization (SQURTS) Test Report Database v2.0," 2009.
: 14. EPRI Report 1019309, "Seismic Qualification Reporting and Testing Standardization (SQURTS) Test Report Database v2.0," 2009.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 14 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List                                   Demand                         Seismic Capacity Item Equipment                        Key Safety                         Cabinet                                                         Seismic Capacity Source Evaluation No.      ID    Eauioment Descriotion Function         RelavlDfsl         Tvoe     Bid a Elev   ICRS,M ICRS,v   Relav Mfa. & Model               Document             TRS       Result 15G-12U-2  4KV EMERGENCY BUS       AC/DC       51-A, B & C (A302}   Switchgear TURB 31'-6" 4.810 1.866   GE 121AC53A101A             SQURTS 7S015SE           8.747 Capacity meets or 1  (52-A312}    24C (A3} FEEDER     Power and                                                                                                                               exceeds demand BREAKER FROM EOG "A"     Support CH7Al           Svstems 15G-12U-2  4KV EMERGENCY BUS       AC/DC         51GS (A302}       Switchgear TURB 31'-6" 4.810 1.866     GE 121AC53A3A               SQURTS 7S015SE           8.747 Capacity meets or 2  (52-A312)    24C (A3) FEEDER     Power and                                                                                                                               exceeds demand BREAKER FROM EDG "A"     Support fH7Al           Svstems 15G-12U-2  4KV EMERGENCY BUS       AC/DC     51V-A, B & C (A312)   Switchgear TURB 31'-6" 4.810 1.866   GE 121JCV52A9A               SQURTS 50098. 7         5.463 Capacity meets or 3  (52-A312)    24C(A3)FEEDER       Power and                                                                                                                               exceeds demand BREAKER FROM EDG "A"     Support fH7Al           Svstems 15G-12U-2  4KV EMERGENCY BUS       AC/DC           59 (C38)         Control   AUX 14'-6" 3.987 2.905   GE 12NGV12A11A       EPRl NP-7147-Sl, GERS-RLY-     5.333 Capacity meets or 4  (52-A312}    24C (A3) FEEDER     Power and                           Cabinet                                                                   PPM.4                     exceeds demand BREAKER FROM EDG "A"     Support CH7Al           Svstems 15G-12U-2  4KV EMERGENCY BUS       AC/DC   5X (reviewed for H-7A) Control   AUX 14'-6" 3.987 2.905   TELEMECHANlQUE       EPRI TR-105988-V2 (SQURTS),     9.467 Capacity meets or 5  (52-A312)    24C (A3) FEEDER     Power and           (T040)         Cabinet                                 CLASS J13P3211                   Table 3-1                 exceeds demand BREAKER FROM EDG "A"     Support fH7Al           Svstems 15G-12U-2  4KV EMERGENCY BUS       AC/DC           81 (A312}       Switchgear TURB 31'-6" 4.810 1.866   GE 12CFF12A63A               SQURTS 50098. 7         4.370   Close Breaker 6  (52-A312}    24C (A3) FEEDER     Power and                                                                                                                                 from Control BREAKER FROM EDG "A"     Support                                                                                                                                 Room (COB}
Item Equipment No.
(H7A)           Systems
ID 1
15G-12U-2 (52-A312}
2 15G-12U-2 (52-A312) 3 15G-12U-2 (52-A312) 4 15G-12U-2 (52-A312}
5 15G-12U-2 (52-A312) 15G-12U-2 6
(52-A312}
7 15G-12U-2 (52-A312) 8 15G-12U-2 (52-A312}
9 15G-12U-2 (52-A312) 15G-12U-2 10 (52-A312) 11 15G-12U-2 (52-A312) 12 15G-12U-2 (52-A312) 13 15G-13U-2 (52-A401)
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 14 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Eauioment Descriotion Function RelavlDfsl Tvoe Bid a Elev ICRS,M ICRS,v Relav Mfa. & Model Document TRS Result 4KV EMERGENCY BUS AC/DC 51-A, B & C (A302}
Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53A101A SQURTS 7S015SE 8.747 Capacity meets or 24C (A3} FEEDER Power and exceeds demand BREAKER FROM EOG "A" Support CH7Al Svstems 4KV EMERGENCY BUS AC/DC 51GS (A302}
Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53A3A SQURTS 7S015SE 8.747 Capacity meets or 24C (A3) FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support fH7Al Svstems 4KV EMERGENCY BUS AC/DC 51V-A, B & C (A312)
Switchgear TURB 31'-6" 4.810 1.866 GE 121JCV52A9A SQURTS 50098. 7 5.463 Capacity meets or 24C(A3)FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support fH7Al Svstems 4KV EMERGENCY BUS AC/DC 59 (C38)
Control AUX 14'-6" 3.987 2.905 GE 12NGV12A11A EPRl NP-7147-Sl, GERS-RLY-5.333 Capacity meets or 24C (A3) FEEDER Power and Cabinet PPM.4 exceeds demand BREAKER FROM EDG "A" Support CH7Al Svstems 4KV EMERGENCY BUS AC/DC 5X (reviewed for H-7 A)
Control AUX 14'-6" 3.987 2.905 TELEMECHANlQUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or 24C (A3) FEEDER Power and (T040)
Cabinet CLASS J13P3211 Table 3-1 exceeds demand BREAKER FROM EDG "A" Support fH7Al Svstems 4KV EMERGENCY BUS AC/DC 81 (A312}
Switchgear TURB 31'-6" 4.810 1.866 GE 12CFF12A63A SQURTS 50098. 7 4.370 Close Breaker 24C (A3) FEEDER Power and from Control BREAKER FROM EDG "A" Support Room (COB}
(H7A)
Systems
[2]
[2]
15G-12U-2  4KV EMERGENCY BUS       AC/DC           86 (A312)       Switchgear TURB 31'-6" 4.810 1.866   GE 12HEA61B235       EPRl NP-7147-SL, GERS-RLY-     8.000 Capacity meets or 7  (52-A312)    24C (A3} FEEDER     Power and                                                                                                     AL0.2                     exceeds demand BREAKER FROM EDG "A"     Support (H7A)           Svstems 15G-12U-2  4KV EMERGENCY BUS       AC/DC   86-2/22S3-24C-2 (A302} Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC)           EPRI 3002002997         16.385 Capacity meets or 8  (52-A312}    24C (A3) FEEDER     Power and                                                                                                                               exceeds demand BREAKER FROM EDG "A"     Support CH7Al           Svstems 15G-12U-2  4KV EMERGENCY BUS       AC/DC     87-A, B & C (A312X)   Switchgear TURB 31'-6" 0.886 0.628     GE 121JD52A11A             SQURTS 61267.2           1.717 Capacity meets or 9  (52-A312)    24C (A3) FEEDER     Power and                                                                                                                               exceeds demand BREAKER FROM EDG "A"     Support (H7A)           Systems 15G-12U-2  4KV EMERGENCY BUS       AC/DC     BUS A3 LOAD SHED       Control   AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-2665, Design Verification of 8.200 Capacity meets or 10  (52-A312)    24C (A3} FEEDER     Power and     (K534A) (RC02B)     Cabinet                                     PN01-M             the Davis-Besse SFAS and             exceeds demand BREAKER FROM EDG "A"     Support                                                                                             Millstone Unit 2 ESAS (H7A)           Systems                                                                                       Replacement Relays, Revision 0, June 2004 15G-12U-2  4KV EMERGENCY BUS       AC/DC         HSR(T040)         Control   AUX 14'-6" 3.987 2.905   GE CR120BD09041       EPRl NP-7147-SL, GERS-RLY-     5.667 Capacity meets or 11  (52-A312)    24C (A3} FEEDER     Power and                         Cabinet                                                     Al1.4 (increased by SQURTS TR-         exceeds demand BREAKER FROM EDG "A"     Support                                                                                             105988-V2, Table 3-1)
4KV EMERGENCY BUS AC/DC 86 (A312)
(H7Al           Systems 15G-12U-2  4KV EMERGENCY BUS       AC/DC   SDR (reviewed for H-7A) Control   AUX 14'-6" 3.987 2.905   TELEMECHANIQUE       EPRl TR-105988-V2 (SQURTS),     9.467 Capacity meets or 12  (52-A312)    24C (A3) FEEDER     Power and           (T040}         Cabinet                                 CLASS J13P8111                   Table 3-1                 exceeds demand BREAKER FROM EDG "A"     Support (H7A)           Systems 15G-13U-2  4KV EMERGENCY BUS       AC/DC     51-A, B & C (A411)   Switchgear TURB 56'-6" 6.379 2.468   GE 121AC53A101A             SQURTS 7S015SE           8.747 Capacity meets or 13  (52-A401)    24D (A4) FEEDER     Power and                                                                                                                               exceeds demand BREAKER FROM EDG "B"     Support CH7Bl           Systems
Switchgear TURB 31'-6" 4.810 1.866 GE 12HEA61B235 EPRl NP-7147-SL, GERS-RL Y-8.000 Capacity meets or 24C (A3} FEEDER Power and AL0.2 exceeds demand BREAKER FROM EDG "A" Support (H7A)
Svstems 4KV EMERGENCY BUS AC/DC 86-2/22S3-24C-2 (A302}
Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC)
EPRI 3002002997 16.385 Capacity meets or 24C (A3) FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support CH7Al Svstems 4KV EMERGENCY BUS AC/DC 87-A, B & C (A312X)
Switchgear TURB 31'-6" 0.886 0.628 GE 121JD52A11A SQURTS 61267.2 1.717 Capacity meets or 24C (A3) FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support (H7A)
Systems 4KV EMERGENCY BUS AC/DC BUS A3 LOAD SHED Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or 24C (A3} FEEDER Power and (K534A) (RC02B)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BREAKER FROM EDG "A" Support Millstone Unit 2 ESAS (H7A)
Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC HSR(T040)
Control AUX 14'-6" 3.987 2.905 GE CR120BD09041 EPRl NP-7147-SL, GERS-RLY-5.667 Capacity meets or 24C (A3} FEEDER Power and Cabinet Al1.4 (increased by SQURTS TR-exceeds demand BREAKER FROM EDG "A" Support 105988-V2, Table 3-1)
(H7Al Systems 4KV EMERGENCY BUS AC/DC SDR (reviewed for H-7A)
Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRl TR-105988-V2 (SQURTS),
9.467 Capacity meets or 24C (A3) FEEDER Power and (T040}
Cabinet CLASS J13P8111 Table 3-1 exceeds demand BREAKER FROM EDG "A" Support (H7A)
Systems 4KV EMERGENCY BUS AC/DC 51-A, B & C (A411)
Switchgear TURB 56'-6" 6.379 2.468 GE 121AC53A101A SQURTS 7S015SE 8.747 Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support CH7Bl Systems  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 15 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List                                   Demand                         Seismic Capacity Item Equipment                          Key Safety                         Cabinet                                                         Seismic Capacity Source               Evaluation No.      ID      Eouioment Description Function         Relav ID{sl       Tvoe     BldQ Elev   ICRS,H ICRS,v   Relay Mfq. & Model               Document             TRS       Result 15G-13U-2    4KV EMERGENCY BUS       AC/DC         51GS (A411)       Switchgear TURB 56'-6" 6.379 2.468     GE 121AC53A3A             SQURTS 7S015SE           8.747 Capacity meets or 14 (52-A401)      24D (A4) FEEDER     Power and                                                                                                                                 exceeds demand BREAKER FROM EDG "B"     Support
Item Equipment No.
{H7Bl           Systems 15G-13U-2    4KV EMERGENCY BUS       AC/DC     51V-A, B & C (A401)   Switchgear TURB 56'-6" 6.379 2.468   GE 121JCV52A9A             SQURTS 50098.7           5.463   Close Breaker 15  (52-A401)      24D(A4)FEEDER       Power and                                                                                                                                   from Control BREAKER FROM EDG "B"     Support                                                                                                                                   Room (COB)
ID 14 15G-13U-2 (52-A401) 15G-13U-2 15 (52-A401) 16 15G-13U-2 (52-A401) 15G-13U-2 17 (52-A401) 15G-13U-2 18 (52-A401) 19 15G-13U-2 (52-A401) 15G-13U-2 20 (52-A401) 21 15G-13U-2 (52-A401) 15G-13U-2 22 (52-A401) 23 15G-13U-2 (52-A401) 15G-13U-2 24 (52-A401) 24C1-2 (52-25 A303)
(H7B)           Systems                                                                                                                                       [2]
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 15 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Eouioment Description Function Relav ID{sl Tvoe BldQ Elev ICRS,H ICRS,v Relay Mfq. & Model Document TRS Result 4KV EMERGENCY BUS AC/DC 51GS (A411)
15G-13U-2    4KV EMERGENCY BUS       AC/DC           59 (C39)       Control   AUX 14'-6" 3.987 2.905   GE 12NGV12A11A       EPRI NP-7147-SL, GERS-RLY-     5.333 Capacity meets or 16  (52-A401)    24D (A4) FEEDER     Power and                           Cabinet                                                                   PPM.4                     exceeds demand BREAKER FROM EDG "B"     Support
Switchgear TURB 56'-6" 6.379 2.468 GE 121AC53A3A SQURTS 7S015SE 8.747 Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support
                          <H7Bl           Svstems 15G-13U-2    4KV EMERGENCY BUS       AC/DC   SX (reviewed for H-7B) Control   AUX 14'-6" 3.987 2.905   TELEMECHANIQUE       EPRI TR-105988-V2 (SQURTS),     9.467 Capacity meets or 17  (52-A401)    24D (A4) FEEDER     Power and           (T041)         Cabinet                                 CLASS J13P3211                   Table 3-1                   exceeds demand BREAKER FROM EDG "B"     Support
{H7Bl Systems 4KV EMERGENCY BUS AC/DC 51V-A, B & C (A401)
{H7Bl           Systems 15G-13U-2    4KV EMERGENCY BUS       AC/DC           81 (A401)       Switchgear TURB 56'-6" 6.379 2.468   GE 12CFF12A63A               SQURTS 50098.7           4.370   Close Breaker 18  (52-A401)    24D (A4) FEEDER     Power and                                                                                                                                 from Control BREAKER FROM EDG "B"     Support                                                                                                                                   Room (COB)
Switchgear TURB 56'-6" 6.379 2.468 GE 121JCV52A9A SQURTS 50098.7 5.463 Close Breaker 24D(A4)FEEDER Power and from Control BREAKER FROM EDG "B" Support Room (COB)
(H7B)           Systems                                                                                                                                       [2]
(H7B)
15G-13U-2    4KV EMERGENCY BUS       AC/DC           86 (A401)       Switchgear TURB 56'-6" 6.379 2.468   GE 12HEA61B235       EPRI NP-7147-SL, GERS-RLY-     8.000 Capacity meets or 19  (52-A401)    24D (A4) FEEDER     Power and                                                                                                     AL0.2                     exceeds demand BREAKER FROM EOG "B"     Support
Systems
{H7Bl           Systems 15G-13U-2    4KV EMERGENCY BUS       AC/DC   86-2/22S3-24D-2 (A411) Switchgear TURB 56'-6" 6.379 2.468 GE 12HFA151A2H (DC)             EPRI 3002002997         16.385 Capacity meets or 20  (52-A401)    24D (A4) FEEDER     Power and                                                                                                                               exceeds demand BREAKER FROM EDG "B"     Support (H7B)           Svstems 15G-13U-2    4KV EMERGENCY BUS       AC/DC     87-A, B & C (A401X)   Switchgear TURB 56'-6" 0.886 0.628     GE 121JD52A11A             SQURTS 61267.2           1.717 Capacity meets or 21  (52-A401)    24D(A4)FEEDER       Power and                                                                                                                               exceeds demand BREAKER FROM EDG "B"     Support fH7Bl           Svstems 15G-13U-2    4KV EMERGENCY BUS       AC/DC     BUS A3 LOAD SHED       Control   AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-2665, Design Verification of 8.200 Capacity meets or 22  (52-A401)    24D (A4) FEEDER     Power and   (K634A) (RC02C)       Cabinet                                     PN01-M             the Davis-Besse SFAS and             exceeds demand BREAKER FROM EDG "B"     Support                                                                                             Millstone Unit 2 ESAS (H7B)           Systems                                                                                       Replacement Relays, Revision 0, June 2004 15G-13U-2    4KV EMERGENCY BUS       AC/DC         HSR (T041)       Control   AUX 14'-6" 3.987 2.905   TELEMECHANIQUE       EPRI TR-105988-V2 (SQURTS),     9.467 Capacity meets or 23  (52-A401)    24D (A4) FEEDER     Power and                         Cabinet                                 CLASS J13P6511                   Table 3-1                   exceeds demand BREAKER FROM EDG "B"     Support fH7Bl           Svstems 15G-13U-2    4KV EMERGENCY BUS       AC/DC   SDR (reviewed for H-7B) Control   AUX 14'-6" 3.987 2.905   TELEMECHANIQUE       EPRI TR-105988-V2 (SQURTS),       9.467 Capacity meets or 24  (52-A401)    24D (A4) FEEDER     Power and           (T041)         Cabinet                                 CLASS J13P8111                   Table 3-1                   exceeds demand BREAKER FROM EDG "B"     Support (H7B)           Systems 24C1-2 (52-  4KV EMERGENCY BUS       AC/DC           3 (A303)       Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC)           EPRI 3002002997         16.385 Capacity meets or 25    A303)      24C (A3) FEEDER     Power and                                                                                                                               exceeds demand BREAKER TO UBS       Support Svstems
[2]
4KV EMERGENCY BUS AC/DC 59 (C39)
Control AUX 14'-6" 3.987 2.905 GE 12NGV12A11A EPRI NP-7147-SL, GERS-RLY-5.333 Capacity meets or 24D (A4) FEEDER Power and Cabinet PPM.4 exceeds demand BREAKER FROM EDG "B" Support  
<H7Bl Svstems 4KV EMERGENCY BUS AC/DC SX (reviewed for H-7B)
Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or 24D (A4) FEEDER Power and (T041)
Cabinet CLASS J13P3211 Table 3-1 exceeds demand BREAKER FROM EDG "B" Support
{H7Bl Systems 4KV EMERGENCY BUS AC/DC 81 (A401)
Switchgear TURB 56'-6" 6.379 2.468 GE 12CFF12A63A SQURTS 50098.7 4.370 Close Breaker 24D (A4) FEEDER Power and from Control BREAKER FROM EDG "B" Support Room (COB)
(H7B)
Systems
[2]
4KV EMERGENCY BUS AC/DC 86 (A401)
Switchgear TURB 56'-6" 6.379 2.468 GE 12HEA61B235 EPRI NP-7147-SL, GERS-RLY-8.000 Capacity meets or 24D (A4) FEEDER Power and AL0.2 exceeds demand BREAKER FROM EOG "B" Support
{H7Bl Systems 4KV EMERGENCY BUS AC/DC 86-2/22S3-24D-2 (A411)
Switchgear TURB 56'-6" 6.379 2.468 GE 12HFA151A2H (DC)
EPRI 3002002997 16.385 Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support (H7B)
Svstems 4KV EMERGENCY BUS AC/DC 87-A, B & C (A401X)
Switchgear TURB 56'-6" 0.886 0.628 GE 121JD52A11A SQURTS 61267.2 1.717 Capacity meets or 24D(A4)FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support fH7Bl Svstems 4KV EMERGENCY BUS AC/DC BUS A3 LOAD SHED Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or 24D (A4) FEEDER Power and (K634A) (RC02C)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BREAKER FROM EDG "B" Support Millstone Unit 2 ESAS (H7B)
Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC HSR (T041)
Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or 24D (A4) FEEDER Power and Cabinet CLASS J13P6511 Table 3-1 exceeds demand BREAKER FROM EDG "B" Support fH7Bl Svstems 4KV EMERGENCY BUS AC/DC SDR (reviewed for H-7B)
Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or 24D (A4) FEEDER Power and (T041)
Cabinet CLASS J13P8111 Table 3-1 exceeds demand BREAKER FROM EDG "B" Support (H7B)
Systems 4KV EMERGENCY BUS AC/DC 3 (A303)
Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC)
EPRI 3002002997 16.385 Capacity meets or 24C (A3) FEEDER Power and exceeds demand BREAKER TO UBS Support Svstems  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 16 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List                                   Demand                           Seismic Capacity Item Equipment                          Key Safety                         Cabinet                                                           Seismic Capacity Source               Evaluation No.      ID    Equipment Description   Function       Relay ID{s)       Type     Bld!l Elev   ICRS,tt ICRS,v   Relay Mf!l. & Model               Document             TRS     Result 24C1-2 (52- 4KV EMERGENCY BUS       AC/DC     50/51-A, B & C (A303) Switchgear TURB   31'-6" 4.810   1.866 GE 121AC53B104A for all         SQURTS S1430SE           7.964 Capacity meets or 26    A303)      24C (A3) FEEDER     Power and                                                                                                                                 exceeds demand BREAKER TO UBS       Support Svstems 24C1-2 (52- 4KV EMERGENCY BUS         AC/DC       50GS (A303)       Switchgear TURB   31'-6" 4.810   1.866   GE 12PJC11AV1A               EPRI 3002002997           7.027 Capacity meets or 27    A303)      24C(A3)FEEDER       Power and                                                                                                                                 exceeds demand BREAKER TO UBS       Support Systems 24C-2T-2    4KV EMERGENCY BUS       AC/DC   S0/51-A, B & C (A505) Switchgear TURB   31'-6" 4.810   1.866   GE 121AC53B810A               SQURTS S1430SE           7.964 Capacity meets or 28  (52-A305)  24C (A3) BREAKER - TIE Power and                                                                                                                                 exceeds demand TO 4KV BUS 24E (A5)   Support Svstems 24C-2T-2    4KV EMERGENCY BUS       AC/DC     51-A, B & C (A305)   Switchgear TURB   31'-6" 4.810   1.866   GE 121AC53A101A               SQURTS 7S01SSE           8.747 Capacity meets or 29  (52-A305)  24C (A3) BREAKER - TIE Power and                                                                                                                                 exceeds demand TO 4KV BUS 24E (A5)   Support Systems 24C-2T-2    4KV EMERGENCY BUS       AC/DC       51GS (A305)       Switchgear TURB   31'-6" 4.810   1.866   GE 121ACS3A3A               SQURTS 7S015SE           8.747 Capacity meets or 30  (52-A305)  24C (A3) BREAKER - TIE Power and                                                                                                                                 exceeds demand TO 4KV BUS 24E (A5)   Support Svstems 24C-2T-2  4KV EMERGENCY BUS       AC/DC       62GS (A505)       Switchgear TURB   31'-6" 4.810   1.866   GE 12SAM11B22A         EPRI NP-7147-SL, GERS-RLY-     8.000 Capacity meets or 31  (52-A305)  24C (A3) BREAKER - TIE Power and                                                                                                       PPM.4                     exceeds demand TO 4KV BUS 24E (A5)   Support Svstems 24C-2T-2  4KV EMERGENCY BUS       AC/DC         86 (A305)       Switchgear TURB   31'-6" 4.810   1.866 GE 12HFA151A2H (DC)             EPRI 3002004396           16.385 Capacity meets or 32  (52-A30S)  24C (A3) BREAKER - TIE Power and                                                                                           (12HFA1S1A2F), July 201S             exceeds demand TO 4KV BUS 24E (AS)   Support Svstems 24C-2T-2  4KV EMERGENCY BUS       AC/DC   86-1/34B-24E-2 (ASOS) Switchgear TURB   31'-6" 4.810   1.866   GE HFAS1A (DC)         EPRI NP-7147-SL, GERS-RLY-     4.800 Capacity meets or 33  (S2-A30S)  24C (A3) BREAKER - TIE Power and                                                                                                       ARH.S                     exceeds demand TO 4KV BUS 24E (AS)   Support Systems 24C-2T-2  4KV EMERGENCY BUS       AC/DC         86-2 (ASOS)     Switchgear TURB   31'-6" 4.810   1.866   GE HFAS1A (DC)         EPRI NP-7147-SL, GERS-RLY-     4.800 Capacity meets or 34  (S2-A30S)  24C (A3) BREAKER - TIE Power and                                                                                                       ARH.5                     exceeds demand TO 4KV BUS 24E (A5)   Support Systems 24C-2T-2  4KV EMERGENCY BUS       AC/DC         86X (A305)       Switchgear TURB   31'-6" 4.810   1.866 GE 12HGA11J52 (DC)       EPRI NP-7147-SL, GERS-RLY-     7.040 Capacity meets or 35  (S2-A305)  24C (A3) BREAKER - TIE Power and                                                                                                       ARH.5                     exceeds demand TO 4KV BUS 24E (AS)   Support Systems 24C3-2 (52-  4KV EMERGENCY BUS       AC/DC       K5341/(SEQ 0)     Control   AUX   36'-6" 3.987   3.436 MPRASSOC. 0200-0068-     MPR-2665, Design Verification of 8.200 Capacity meets or 36    A307)    24C (A3) BREAKER TO   Power and (RC02B)K534U(SEQ 4)     Cabinet                                       PN01-M             the Davis-Besse SFAS and             exceeds demand P9A           Support         (RC02B)                                                                               Millstone Unit 2 ESAS Systems                                                                                         Replacement Relays, Revision 0, June 2004 24C4-2 (52-  4KV EMERGENCY BUS       AC/DC   SIAS-1/SEQ. 1 (K514A)   Control   AUX   36'-6" 3.987   3.436 MPR ASSOC. 0200-0068-   MPR-2665, Design Verification of 8.200 Capacity meets or 37    A308)    24C (A3) BREAKER TO   Power and         (RC02B)         Cabinet                                       PN01-M             the Davis-Besse SFAS and             exceeds demand P41A           Support                                                                                               Millstone Unit 2 ESAS Systems                                                                                         Replacement Relays, Revision 0, June2004
Item Equipment No.
ID 24C1-2 (52-26 A303) 24C1-2 (52-27 A303) 28 24C-2T-2 (52-A305) 29 24C-2T-2 (52-A305) 30 24C-2T-2 (52-A305) 24C-2T-2 31 (52-A305) 32 24C-2T-2 (52-A30S) 24C-2T-2 33 (S2-A30S) 34 24C-2T-2 (S2-A30S) 24C-2T-2 35 (S2-A305) 24C3-2 (52-36 A307) 24C4-2 (52-37 A308)
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 16 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Equipment Description Function Relay ID{s)
Type Bld!l Elev ICRS,tt ICRS,v Relay Mf!l. & Model Document TRS Result 4KV EMERGENCY BUS AC/DC 50/51-A, B & C (A303)
Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53B104A for all SQURTS S1430SE 7.964 Capacity meets or 24C (A3) FEEDER Power and exceeds demand BREAKER TO UBS Support Svstems 4KV EMERGENCY BUS AC/DC 50GS (A303)
Switchgear TURB 31'-6" 4.810 1.866 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or 24C(A3)FEEDER Power and exceeds demand BREAKER TO UBS Support Systems 4KV EMERGENCY BUS AC/DC S0/51-A, B & C (A505)
Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53B810A SQURTS S1430SE 7.964 Capacity meets or 24C (A3) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (A5)
Support Svstems 4KV EMERGENCY BUS AC/DC 51-A, B & C (A305)
Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53A101A SQURTS 7S01SSE 8.747 Capacity meets or 24C (A3) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (A5)
Support Systems 4KV EMERGENCY BUS AC/DC 51GS (A305)
Switchgear TURB 31'-6" 4.810 1.866 GE 121ACS3A3A SQURTS 7S015SE 8.747 Capacity meets or 24C (A3) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (A5)
Support Svstems 4KV EMERGENCY BUS AC/DC 62GS (A505)
Switchgear TURB 31'-6" 4.810 1.866 GE 12SAM11B22A EPRI NP-7147-SL, GERS-RLY-8.000 Capacity meets or 24C (A3) BREAKER - TIE Power and PPM.4 exceeds demand TO 4KV BUS 24E (A5)
Support Svstems 4KV EMERGENCY BUS AC/DC 86 (A305)
Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC)
EPRI 3002004396 16.385 Capacity meets or 24C (A3) BREAKER - TIE Power and (12HFA1S1A2F), July 201S exceeds demand TO 4KV BUS 24E (AS)
Support Svstems 4KV EMERGENCY BUS AC/DC 86-1/34B-24E-2 (ASOS)
Switchgear TURB 31'-6" 4.810 1.866 GE HFAS1A (DC)
EPRI NP-7147-SL, GERS-RLY-4.800 Capacity meets or 24C (A3) BREAKER - TIE Power and ARH.S exceeds demand TO 4KV BUS 24E (AS)
Support Systems 4KV EMERGENCY BUS AC/DC 86-2 (ASOS)
Switchgear TURB 31'-6" 4.810 1.866 GE HFAS1A (DC)
EPRI NP-7147-SL, GERS-RLY-4.800 Capacity meets or 24C (A3) BREAKER - TIE Power and ARH.5 exceeds demand TO 4KV BUS 24E (A5)
Support Systems 4KV EMERGENCY BUS AC/DC 86X (A305)
Switchgear TURB 31'-6" 4.810 1.866 GE 12HGA11J52 (DC)
EPRI NP-7147-SL, GERS-RLY-7.040 Capacity meets or 24C (A3) BREAKER - TIE Power and ARH.5 exceeds demand TO 4KV BUS 24E (AS)
Support Systems 4KV EMERGENCY BUS AC/DC K5341/(SEQ 0)
Control AUX 36'-6" 3.987 3.436 MPRASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or 24C (A3) BREAKER TO Power and (RC02B)K534U(SEQ 4)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P9A Support (RC02B)
Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC SIAS-1/SEQ. 1 (K514A)
Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or 24C (A3) BREAKER TO Power and (RC02B)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P41A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June2004  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 17 of 25 Appendix 1 - Relay List and Evaluation Data Seismic Hi!:!h-frequency Review Equipment List                                   Demand                         Seismic Capacity Item Equipment                            Key Safety                       Cabinet                                                           Seismic Capacity Source Evaluation No.      ID      Eauioment Descriotion     Function       Relav IDlsl       Tvoe     Bid a Elev   ICRS,H ICRS,v   Relav Mfa. & Model                 Document             TRS       Result 24CS*2 (S2-  4KV EMERGENCY BUS         AC/DC     SIAS SEQ. 3 (KS17A)   Control   AUX   36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-266S, Design Verification of 8.200 Capacity meets or 38      A309)    24C (A3) BREAKER TO     Power and         (RC02B)         Cabinet                                     PN01-M             the Davis-Besse SFAS and               exceeds demand P42A             Support                                                                                             Millstone Unit 2 ESAS Systems                                                                                       Replacement Relays, Revision 0, June 2004 24C6-2 (S2-  4KV EMERGENCY BUS           AC/DC   CSAS1 SEQ. 3 (KS09A)   Control   AUX   36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-266S, Design Verification of 8.200 Capacity meets or 39      A310)    24C (A3) BREAKER TO     Power and         (RC02B)         Cabinet                                     PN01-M             the Davis-Besse SFAS and               exceeds demand P43A             Support                                                                                             Millstone Unit 2 ESAS Systems                                                                                       Replacement Relays, Revision 0, June 2004 24C7-2 (S2-  4KV EMERGENCY BUS           AC/DC   SIAS 1/SEQ 2 (KS16A)   Control   AUX   36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-266S, Design Verification of 8.200 Capacity meets or 40    A311)    24C (A3) BREAKER TO     Power and         (RC02B)         Cabinet                                       PN01-M             the Davis-Besse SFAS and               exceeds demand P11A             Support                                                                                             Millstone Unit 2 ESAS Systems                                                                                       Replacement Relays, Revision 0, June 2004 24D1-2 (S2-  4KV EMERGENCY BUS           AC/DC   SIAS 2/SEQ 2 (K616A)   Control   AUX   36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-266S, Design Verification of 8.200 Capacity meets or 41    A402)    24D (A4) BREAKER TO     Power and         (RC02C)         Cabinet                                       PN01-M             the Davis-Besse SFAS and               exceeds demand P11C             Support                                                                                             Millstone Unit 2 ESAS Systems                                                                                       Replacement Relays, Revision 0, June 2004 24D2-2 (S2-  4KV EMERGENCY BUS         AC/DC   SIAS-2/SEQ. 1 (K614A) Control   AUX   36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-266S, Design Verification of 8.200 Capacity meets or 42    A403)    24D (A4) BREAKER TO     Power and         (RC02C)         Cabinet                                       PN01-M             the Davis-Besse SFAS and               exceeds demand P41C             Support                                                                                             Millstone Unit 2 ESAS Systems                                                                                       Replacement Relays, Revision 0, June 2004 24D-2T-2    4KV EMERGENCY BUS         AC/DC     S1-A, B & C (A408) Switchgear TURB S6'..S" 6.379 2.468   GE 121ACS3A101A             SQURTS 7S01SSE           8.747 Capacity meets or 43  (S2-A408)  24D (A4) BREAKER - TIE   Power and                                                                                                                                 exceeds demand TO 4KV BUS 24E (AS)     Support Systems 24D-2T-2    4KV EMERGENCY BUS         AC/DC       S1GS (A408)     Switchgear TURB S6'..S" 6.379 2.468     GE 121ACS3A3A               SQURTS 7S01SSE           8.747 Capacity meets or 44  (S2-A408)  24D (A4) BREAKER - TIE   Power and                                                                                                                                 exceeds demand TO 4KV BUS 24E (AS)     Support Systems 24D-2T-2    4KV EMERGENCY BUS         AC/DC         86 (A408)       Switchgear TURB S6'..S" 6.379 2.468 GE 12HFA1S1A2H (DC)           EPRI 3002002997           16.38S Capacity meets or 4S  (S2-A408)  24D (A4) BREAKER - TIE   Power and                                                                                                                                 exceeds demand TO 4KV BUS 24E (AS)     Support Svstems 24D-2T-2    4KV EMERGENCY BUS         AC/DC   86-1/34B-24E-2 (ASOS) Switchgear TURB 31'..S" 4.810 1.866   GE HFAS1A (DC) (       EPRI NP-7147-SL, GERS-RLY-     4.800 Capacity meets or 46  (S2-A408)  24D (A4) BREAKER - TIE   Power and                                                                                                     ARH.S                     exceeds demand TO 4KV BUS 24E (AS)     Support Svstems 24D-2T-2    4KV EMERGENCY BUS         AC/DC         86X (A408)     Switchgear TURB S6'..S" 6.379 2.468   GE 12HGA11JS2 (DC)     EPRI NP-7147-SL, GERS-RLY-     7.040 Capacity meets or 47  (S2-A408)  24D (A4) BREAKER - TIE   Power and                                                                                                     ARH.S                     exceeds demand TO 4KV BUS 24E (AS)     Support Svstems 2403-2 (S2-  4KV EMERGENCY BUS         AC/DC   SIAS2 SEQ. 3 (K617A)   Control   AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-266S, Design Verification of 8.200 Capacity meets or 48    A404)    24D (A4) BREAKER TO     Power and       (RC02C)         Cabinet                                       PN01-M             the Davis-Besse SFAS and             exceeds demand P42B             Support                                                                                             Millstone Unit 2 ESAS Systems                                                                                       Replacement Relays, Revision 0, June 2004
Item Equipment No.
ID 24CS*2 (S2-38 A309) 24C6-2 (S2-39 A310) 24C7-2 (S2-40 A311) 24D1-2 (S2-41 A402) 24D2-2 (S2-42 A403) 24D-2T-2 43 (S2-A408) 24D-2T-2 44 (S2-A408) 4S 24D-2T-2 (S2-A408) 46 24D-2T-2 (S2-A408) 24D-2T-2 47 (S2-A408) 2403-2 (S2-48 A404)
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 17 of 25 Appendix 1 - Relay List and Evaluation Data Seismic Hi!:!h-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Eauioment Descriotion Function Relav IDlsl Tvoe Bid a Elev ICRS,H ICRS,v Relav Mfa. & Model Document TRS Result 4KV EMERGENCY BUS AC/DC SIAS SEQ. 3 (KS17A)
Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24C (A3) BREAKER TO Power and (RC02B)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P42A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC CSAS1 SEQ. 3 (KS09A)
Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24C (A3) BREAKER TO Power and (RC02B)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P43A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC SIAS 1/SEQ 2 (KS16A)
Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24C (A3) BREAKER TO Power and (RC02B)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P11A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC SIAS 2/SEQ 2 (K616A)
Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and (RC02C)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P11C Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC SIAS-2/SEQ. 1 (K614A)
Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and (RC02C)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P41C Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC S1-A, B & C (A408)
Switchgear TURB S6'..S" 6.379 2.468 GE 121ACS3A101A SQURTS 7S01SSE 8.747 Capacity meets or 24D (A4) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (AS)
Support Systems 4KV EMERGENCY BUS AC/DC S1GS (A408)
Switchgear TURB S6'..S" 6.379 2.468 GE 121ACS3A3A SQURTS 7S01SSE 8.747 Capacity meets or 24D (A4) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (AS)
Support Systems 4KV EMERGENCY BUS AC/DC 86 (A408)
Switchgear TURB S6'..S" 6.379 2.468 GE 12HFA1S1A2H (DC)
EPRI 3002002997 16.38S Capacity meets or 24D (A4) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (AS)
Support Svstems 4KV EMERGENCY BUS AC/DC 86-1/34B-24E-2 (ASOS)
Switchgear TURB 31'..S" 4.810 1.866 GE HFAS1A (DC) (
EPRI NP-7147-SL, GERS-RLY-4.800 Capacity meets or 24D (A4) BREAKER - TIE Power and ARH.S exceeds demand TO 4KV BUS 24E (AS)
Support Svstems 4KV EMERGENCY BUS AC/DC 86X (A408)
Switchgear TURB S6'..S" 6.379 2.468 GE 12HGA11JS2 (DC)
EPRI NP-7147-SL, GERS-RLY-7.040 Capacity meets or 24D (A4) BREAKER - TIE Power and ARH.S exceeds demand TO 4KV BUS 24E (AS)
Support Svstems 4KV EMERGENCY BUS AC/DC SIAS2 SEQ. 3 (K617A)
Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and (RC02C)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P42B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 18 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List                                       Demand                         Seismic Capacitv Item Equipment                          Key Safety                           Cabinet                                                         Seismic Capacity Source                 Evaluation No.      ID      Eauioment Descriotion   Function           Relav ID{sl       Tvoe     Bid a Elev   ICRS,H ICRS,v   Relav Mfa. & Model               Document               TRS       Result 24D4-2 (S2-  4KV EMERGENCY BUS       AC/DC     CSAS2 SEQ. 3 (K609A)     Control   AUX   36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-266S, Design Verification of 8.200 Capacity meets or 49    A40S)    24D (A4) BREAKER TO     Power and           (RC02C)         Cabinet                                     PN01-M             the Davis-Besse SFAS and               exceeds demand P43B           Support                                                                                                 Millstone Unit 2 ESAS Systems                                                                                           Replacement Relays, Revision 0, June 2004 24DS-2 (S2-  4KV EMERGENCY BUS         AC/DC     K634U(SEQ 0) (RC02C)     Control   AUX   36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-266S, Design Verification of 8.200 Capacity meets or so    A406)    24D (A4) BREAKER TO     Power and                           Cabinet                                     PN01-M             the Davis-Besse SFAS and               exceeds demand P9B           Support                                                                                                 Millstone Unit 2 ESAS Systems                                                                                           Replacement Relays, Revision 0, June2004 24D5-2 (S2-  4KV EMERGENCY BUS         AC/DC     K634M/(SEQ 4) (RC02C)   Control   AUX   36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-266S, Design Verification of 8.200 Capacity meets or S1    A406)      24D (A4) BREAKER TO   Power and                           Cabinet                                       PN01-M             the Davis-Besse SFAS and               exceeds demand P9B           Support                                                                                                 Millstone Unit 2 ESAS Systems                                                                                           Replacement Relays, Revision 0, June 2004 24D7-2 (S2-  4KV EMERGENCY BUS         AC/DC             3 (A409)       Switchgear TURB   S6'-6" 6.379 2.468 GE 12HFA1S1A2H (DC)           EPRI 3002002997           16.38S Capacity meets or S2    A409)        24D (A4) FEEDER     Power and                                                                                                                                   exceeds demand BREAKER TO UB6       Support Svstems 24D7-2 (S2-  4KV EMERGENCY BUS         AC/DC     SO/S 1-A. B & C (A409) Switchgear TURB   S6'-6" 6.379 2.468   GE 121ACS3B101A             SQURTS S1430SE             7.964 Capacity meets or S3    A409)        24D (A4) FEEDER     Power and                                                                                                                                   exceeds demand BREAKER TO UB6       Support Svstems 24D7-2 (S2-  4KV EMERGENCY BUS         AC/DC           SOGS (A409)       Switchgear TURB   S6'-6" 6.379 2.468   GE 12PJC11AV1A             EPRI 3002002997           7.027 Capacity meets or 54    A409)        24D (A4) FEEDER     Power and                                                                                                                                   exceeds demand BREAKER TO UB6       Support Systems 24E2-2 (S2-  4KV EMERGENCY BUS         AC/DC         KSS14B (RC02E)       Control   AUX   36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-266S, Design Verification of 8.200 Capacity meets or SS    AS03)      24E (AS) BREAKER TO   Power and       KS614B (RC02E)       Cabinet                                       PN01-M             the Davis-Besse SFAS and               exceeds demand P41B           Support                                                                                                 Millstone Unit 2 ESAS Systems                                                                                           Replacement Relays, Revision 0, June 2004 24E3-2 (S2-  4KV EMERGENCY BUS         AC/DC     SIAS S/SEQ 2 (KSS16B)   Control   AUX   36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-266S, Design Verification of 8.200 Capacity meets or S6    AS04)      24E (AS) BREAKER TO   Power and           (RC02E)         Cabinet                                       PN01-M             the Davis-Besse SFAS and               exceeds demand P11B           Support   SIAS S/SEQ 2 (KS616B)                                                                       Millstone Unit 2 ESAS Systems           (RC02E)                                                                         Replacement Relays, Revision 0, June 2004 2-FW-43A      SIG NO. 1 STEAM     Core Cooling   .20XIZ1-S276 (COS)     Control   AUX   36'-6" 3.987 3.436 GE 12HFA1S1A2H (DC)           EPRI 3002002997           13.654 Capacity meets or S7                GENERATOR AUX                                             Cabinet                                                                                                 exceeds demand FEEDWATER REGULATING VALVE -
Item Equipment No.
AVAILABLE TO THROTILE 2-FW-43B      SIG NO. 2 STEAM     Core Cooling   20X/Z2-S279 (COS)     Control   AUX   36'-6" 3.987 3.436 GE 12HFA1S1A2H (DC)           EPRI 3002002997           13.654 Capacity meets or S8                GENERATOR AUX                                             Cabinet                                                                                                 exceeds demand FEEDWATER REGULATING VALVE -
ID 24D4-2 (S2-49 A40S) 24DS-2 (S2-so A406) 24D5-2 (S2-S1 A406) 24D7-2 (S2-S2 A409) 24D7-2 (S2-S3 A409) 24D7-2 (S2-54 A409) 24E2-2 (S2-SS AS03) 24E3-2 (S2-S6 AS04) 2-FW-43A S7 2-FW-43B S8 S9 2-FW-44 Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 18 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacitv Evaluation Key Safety Cabinet Seismic Capacity Source Eauioment Descriotion Function Relav ID{sl Tvoe Bid a Elev ICRS,H ICRS,v Relav Mfa. & Model Document TRS Result 4KV EMERGENCY BUS AC/DC CSAS2 SEQ. 3 (K609A)
AVAILABLE TO THROTILE 2-FW-44    AFW PUMP DISCHARGE     Core Cooling     42-C/a (B6203)       MCC       AUX   36'-6" 0.886 0.731 STARTER/CONTACTOR         EPRI NP-S223-SLR1, GERS-         1.200 Capacity meets or S9                                                                                                                                                        MCC.9 HEADER CROSSTIE                                                                                           [1]                                                     exceeds demand VALVE
Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and (RC02C)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P43B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC K634U(SEQ 0) (RC02C)
Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P9B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June2004 4KV EMERGENCY BUS AC/DC K634M/(SEQ 4) (RC02C)
Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P9B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC 3 (A409)
Switchgear TURB S6'-6" 6.379 2.468 GE 12HFA1S1A2H (DC)
EPRI 3002002997 16.38S Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER TO UB6 Support Svstems 4KV EMERGENCY BUS AC/DC SO/S 1-A. B & C (A409)
Switchgear TURB S6'-6" 6.379 2.468 GE 121ACS3B101A SQURTS S1430SE 7.964 Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER TO UB6 Support Svstems 4KV EMERGENCY BUS AC/DC SOGS (A409)
Switchgear TURB S6'-6" 6.379 2.468 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER TO UB6 Support Systems 4KV EMERGENCY BUS AC/DC KSS14B (RC02E)
Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24E (AS) BREAKER TO Power and KS614B (RC02E)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P41B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC SIAS S/SEQ 2 (KSS16B)
Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24E (AS) BREAKER TO Power and (RC02E)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P11B Support SIAS S/SEQ 2 (KS616B)
Millstone Unit 2 ESAS Systems (RC02E)
Replacement Relays, Revision 0, June 2004 SIG NO. 1 STEAM Core Cooling  
.20XIZ1-S276 (COS)
Control AUX 36'-6" 3.987 3.436 GE 12HFA1S1A2H (DC)
EPRI 3002002997 13.654 Capacity meets or GENERATOR AUX Cabinet exceeds demand FEEDWATER REGULATING VALVE -
AVAILABLE TO THROTILE SIG NO. 2 STEAM Core Cooling 20X/Z2-S279 (COS)
Control AUX 36'-6" 3.987 3.436 GE 12HFA1S1A2H (DC)
EPRI 3002002997 13.654 Capacity meets or GENERATOR AUX Cabinet exceeds demand FEEDWATER REGULATING VALVE -
AVAILABLE TO THROTILE AFW PUMP DISCHARGE Core Cooling 42-C/a (B6203)
MCC AUX 36'-6" 0.886 0.731 STARTER/CONTACTOR EPRI NP-S223-SLR1, GERS-1.200 Capacity meets or HEADER CROSSTIE
[1]
MCC.9 exceeds demand VALVE  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 19 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List                             Demand                         Seismic Capacity Item Equipment                        Key Safety                   Cabinet                                                         Seismic Capacity Source                 Evaluation No. ID    Eauipment Description Function     Relay ID(sl   Type     Bid a Elev ICRS,H ICRS,v   Relav Mfa. & Model               Document               TRS       Result 2-MS-201  TDAFW STEAM SUPPLY     Core Cooling 42-C/a (B5202)   MCC       AUX 38'.Q" 0.886 0.731 STARTER/CONTACTOR         EPRI NP-5223-SLR1, GERS-         1.200 Capacity meets or 60 VALVE FROM S/G NO. 1                                                                               [1]                         MCC.9                       exceeds demand H-7A      EMERGENCY DIESEL       AC/DC     5/DG02 (T040)   Control   AUX 14'.Q" 3.987 2.905 AGASTAT E7022PE002     EPRI NP-7147-SL, GERS-RLY-       6.667 Capacity meets or 61            GENERATOR H-7A- DC     Power and                   Cabinet                                                                     PNT.7                     exceeds demand CONTROL POWER FROM       Support DV10             Svstems H-7A      EMERGENCY DIESEL       AC/DC       5X (T040)   Control   AUX 14'.Q" 3.987 2.905   TELEMECHANIOUE         EPRI TR-105988-V2 (SQURTS),     9.467 Capacity meets or 62            GENERATOR H-7A - DC                               Cabinet                                                                   Table 3-1 Power and                                                          CLASS J13P3211                                                exceeds demand CONTROL POWER FROM       Support DV10             Svstems H-7A      EMERGENCY DIESEL       AC/DC         86 (A312)   Switchgear TURB 31'.Q" 4.810 1.866   GE 12HEA618235       EPRI NP-7147-SL, GERS-RLY-       8.000 Capacity meets or 63            GENERATOR H-7A- DC     Power and                                                                                               AL0.2                     exceeds demand CONTROL POWER FROM       Support DV10             Svstems H-7A      EMERGENCY DIESEL       AC/DC     EOR(T040)     Control   AUX 14'.Q" 3.987 2.905   TELEMECHANIQUE         EPRI TR-105988-V2 (SOURTS),     9.467 Capacity meets or 64            GENERATOR H-7A- DC     Power and                   Cabinet                                 CLASS J13P4111                   Table 3-1                   exceeds demand CONTROL POWER FROM       Support DV10             Svstems H-7A      EMERGENCY DIESEL       AC/DC         ESS       Control   AUX 14'.Q" 3.987 2.905   TELEMECHANIOUE         EPRI TR-105988-V2 (SQURTS),       9.467 Capacity meets or 65            GENERATOR H-7A- DC     Power and                   Cabinet                                 CLASS J13P4111                   Table 3-1                   exceeds demand CONTROL POWER FROM       Support DV10             Svstems H-7A      EMERGENCY DIESEL       AC/DC       K4 (C38)     Control   AUX 14'.Q" 3.987 2.905 ALLEN BRADLEY 700DC-           EPRI 3002002997           12.821 Capacity meets or 66            GENERATOR H-7A- DC     Power and                   Cabinet                                     P800Z1                                                   exceeds demand CONTROL POWER FROM       Support DV10             Systems H-7A      EMERGENCY DIESEL       AC/DC     K524C (SIAS1)   Control   AUX 36'.Q" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-2665, Design Verification of 8.200 Capacity meets or 67            GENERATOR H-7A - DC   Power and                   Cabinet                                     PN01-M             the Davis-Besse SFAS and               exceeds demand CONTROL POWER FROM       Support                                                                                       Millstone Unit 2 ESAS DV10             Systems                                                                                 Replacement Relays, Revision 0, June 2004 H-7A      EMERGENCY DIESEL       AC/DC     K530A (LP1)   Control   AUX 36'.Q" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-2665, Design Verification of 8.200 Capacity meets or 68            GENERATOR H-7A - DC   Power and                   Cabinet                                     PN01-M             the Davis-Besse SFAS and               exceeds demand CONTROL POWER FROM       Support                                                                                       Millstone Unit 2 ESAS DV10             Systems                                                                                 Replacement Relays, Revision 0, June 2004 H-7A      EMERGENCY DIESEL       AC/DC       OP1 (T040)   Control   AUX 14'.Q" 3.987 2.905   TELEMECHANIQUE         EPRI TR-105988-V2 (SQURTS),     9.467 Capacity meets or 69            GENERATOR H-7A- DC     Power and                   Cabinet                                 CLASS J13P6111                   Table 3-1                   exceeds demand CONTROL POWER FROM       Support DV10             Systems H-7A      EMERGENCY DIESEL       AC/DC       OP2 (T040)   Control   AUX 14'.Q" 3.987 2.905   TELEMECHANIQUE         EPRI TR-105988-V2 (SQURTS),       9.467 Capacity meets or 70            GENERATOR H-7A- DC     Power and                   Cabinet                                 CLASS J13P6111                   Table 3-1                   exceeds demand CONTROL POWER FROM       Support DV10             Svstems H-7A    EMERGENCY DIESEL       AC/DC       OP3 (T040)   Control   AUX 14'.Q" 3.987 2.905   TELEMECHANIQUE         EPRI TR-105988-VZ (SQURTS),       9.467 Capacity meets or 71            GENERATOR H-7A- DC     Power and                   Cabinet                                 CLASS J13P6111                   Table 3-1                   exceeds demand CONTROL POWER FROM       Support DV10             Systems
Item Equipment No.
ID 60 2-MS-201 61 H-7A 62 H-7A 63 H-7A 64 H-7A 65 H-7A 66 H-7A H-7A 67 H-7A 68 69 H-7A 70 H-7A 71 H-7A Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 19 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Eauipment Description Function Relay ID(sl Type Bid a Elev ICRS,H ICRS,v Relav Mfa. & Model Document TRS Result TDAFW STEAM SUPPLY Core Cooling 42-C/a (B5202)
MCC AUX 38'.Q" 0.886 0.731 STARTER/CONTACTOR EPRI NP-5223-SLR1, GERS-1.200 Capacity meets or VALVE FROM S/G NO. 1
[1]
MCC.9 exceeds demand EMERGENCY DIESEL AC/DC 5/DG02 (T040)
Control AUX 14'.Q" 3.987 2.905 AGASTAT E7022PE002 EPRI NP-7147-SL, GERS-RLY-6.667 Capacity meets or GENERATOR H-7A-DC Power and Cabinet PNT.7 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC 5X (T040)
Control AUX 14'.Q" 3.987 2.905 TELEMECHANIOUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or GENERA TOR H-7 A - DC Power and Cabinet CLASS J13P3211 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC 86 (A312)
Switchgear TURB 31'.Q" 4.810 1.866 GE 12HEA618235 EPRI NP-7147-SL, GERS-RLY-8.000 Capacity meets or GENERATOR H-7A-DC Power and AL0.2 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC EOR(T040)
Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SOURTS),
9.467 Capacity meets or GENERATOR H-7A-DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC ESS Control AUX 14'.Q" 3.987 2.905 TELEMECHANIOUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or GENERATOR H-7A-DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC K4 (C38)
Control AUX 14'.Q" 3.987 2.905 ALLEN BRADLEY 700DC-EPRI 3002002997 12.821 Capacity meets or GENERATOR H-7A-DC Power and Cabinet P800Z1 exceeds demand CONTROL POWER FROM Support DV10 Systems EMERGENCY DIESEL AC/DC K524C (SIAS1)
Control AUX 36'.Q" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or GENERA TOR H-7 A - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV10 Systems Replacement Relays, Revision 0, June 2004 EMERGENCY DIESEL AC/DC K530A (LP1)
Control AUX 36'.Q" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or GENERA TOR H-7 A - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV10 Systems Replacement Relays, Revision 0, June 2004 EMERGENCY DIESEL AC/DC OP1 (T040)
Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or GENERATOR H-7A-DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Systems EMERGENCY DIESEL AC/DC OP2 (T040)
Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or GENERATOR H-7 A-DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC OP3 (T040)
Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-VZ (SQURTS),
9.467 Capacity meets or GENERATOR H-7A-DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Systems  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 20of25 Appendix 1 - Relay List and Evaluation Data Seismic Hicth-frequencv Review Equipment List                           Demand                         Seismic Capacity Item Equipment                        Key Safety                   Cabinet                                                         Seismic Capacity Source               Evaluation No. ID    Eauioment Descriotion Function     Relay ID(s)     Tvoe     Bldg Elev   ICRS,H ICRS,v   Relay Mfg. & Model                 Document             TRS       Result H-7A      EMERGENCY DIESEL       AC/DC       OPL 1 (T040)   Control   AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO.       EPRI NP-5223-SLR1, GERS-       4.000 Capacity meets or 72            GENERATOR H-7 A - DC Power and                   Cabinet                               222-10/COLTEC                       PS.5                     exceeds demand CONTROL POWER FROM       Support                                                       INDUSTRIES INC. 11 906 DV10           Systems                                                                 729 H-7A      EMERGENCY DIESEL       AC/DC       OPL2 (T040)   Control   AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO.       EPRI NP-5223-SLR1, GERS-       4.000 Capacity meets or 73            GENERATOR H-7A- DC   Power and                   Cabinet                               222-10/ COLTEC                       PS.5                     exceeds demand CONTROL POWER FROM       Support                                                       INDUSTRIES INC. 11 906 DV10           Systems                                                                 729 H-7A      EMERGENCY DIESEL       AC/DC       OPL3 (T040)   Control   AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO.       EPRI NP-5223-SLR1, GERS-       4.000 Capacity meets or 74            GENERATOR H-7 A- DC   Power and                   Cabinet                               222-10 I COLTEC                     PS.5                     exceeds demand CONTROL POWER FROM       Support                                                       INDUSTRIES INC. 11 906 DV10           Svstems                                                                 729 H-7A      EMERGENCY DIESEL       AC/DC     Relay 4 (T040) Control   AUX 14'-6" 3.987 2.905   GE CR120BD05041         EPRI NP-7147-SL, GERS-RLY-     5.667 Capacity meets or 75            GENERATOR H-7A- DC   Power and                   Cabinet                                                     Al1.4 (increased by SOURTS TR-           exceeds demand CONTROL POWER FROM       Support                                                                                       105988-V2, Table 3-1)
Item Equipment No.
DV10           Svstems H-7A      EMERGENCY DIESEL       AC/DC       SDR (T040)     Control   AUX 14'-6" 3.987 2.905   TELEMECHANIQUE         EPRI TR-105988-V2 (SQURTS),     9.467 Capacity meets or 76            GENERATOR H-7A- DC   Power and                   Cabinet                               CLASS J13P8111                     Table 3-1                   exceeds demand CONTROL POWER FROM       Support DV10           Systems H-7B      EMERGENCY DIESEL       AC/DC     5/DG02 (T041)   Control   AUX 14'-6" 3.987 2.905 AGASTAT E7022PE002       EPRI NP-7147-SL, GERS-RLY-     6.667 Capacity meets or 77            GENERATOR H-7B - DC   Power and                   Cabinet                                                                   PNT.7                     exceeds demand CONTROL POWER FROM       Support DV20           Systems H-7B      EMERGENCY DIESEL       AC/DC       5X (T041)     Control   AUX 14'-6" 3.987 2.905   TELEMECHANIQUE         EPRI TR-105988-V2 (SQURTS),     9.467 Capacity meets or 78            GENERATOR H-7B - DC   Power and                   Cabinet                               CLASS J13P3211                     Table 3-1                   exceeds demand CONTROL POWER FROM       Support DV20           Systems H-7B      EMERGENCY DIESEL       AC/DC       86 (A401)   Switchgear TURB 56'-6" 6.379 2.468   GE 12HEA61B235         EPRI NP-7147-SL, GERS-RLY-     8.000 Capacity meets or 79            GENERATOR H-7B - DC   Power and                                                                                               AL0.2                     exceeds demand CONTROL POWER FROM       Support DV20           Systems H-7B      EMERGENCY DIESEL       AC/DC       EOR (T041)     Control   AUX 14'-6" 3.987 2.905   TELEMECHANIQUE         EPRI TR-105988-V2 (SQURTS),     9.467 Capacity meets or 80            GENERATOR H DC   Power and                   Cabinet                               CLASS J13P4111                     Table 3-1                   exceeds demand CONTROL POWER FROM       Support DV20           Svstems H-7B      EMERGENCY DIESEL       AC/DC           ESS       Control   AUX 14'-6" 3.987 2.905   TELEMECHANIQUE         EPRI TR-105988-V2 (SOURTS),     9.467 Capacity meets or 81            GENERATOR H-7B - DC   Power and                   Cabinet                               CLASS J13P4111                     Table 3-1                   exceeds demand CONTROL POWER FROM       Support DV20           Systems H-7B      EMERGENCY DIESEL       AC/DC         K4 (C39)     Control   AUX 14'-6" 3.987 2.905 ALLEN BRADLEY 700DC-             EPRI 3002002997         12.821 Capacity meets or 82            GENERATOR H-7B - DC   Power and                   Cabinet                                     P800Z1                                                   exceeds demand CONTROL POWER FROM       Support DV20           Svstems H-7B      EMERGENCY DIESEL       AC/DC     K624C (SIAS2)   Control   AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-2665, Design Verification of 8.200 Capacity meets or 83            GENERATOR H-7B - DC   Power and                   Cabinet                                     PN01-M             the Davis-Besse SFAS and             exceeds demand CONTROL POWER FROM       Support                                                                                       Millstone Unit 2 ESAS DV20           Systems                                                                                 Replacement Relays, Revision 0, June 2004
ID 72 H-7A H-7A 73 74 H-7A 75 H-7A 76 H-7A 77 H-7B 78 H-7B 79 H-7B H-7B 80 81 H-7B 82 H-7B H-7B 83 Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 20of25 Appendix 1 - Relay List and Evaluation Data Seismic Hicth-frequencv Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Eauioment Descriotion Function Relay ID(s)
Tvoe Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Document TRS Result EMERGENCY DIESEL AC/DC OPL 1 (T040)
Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO.
EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERATOR H-7 A - DC Power and Cabinet 222-10/COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV10 Systems 729 EMERGENCY DIESEL AC/DC OPL2 (T040)
Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO.
EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERATOR H-7A-DC Power and Cabinet 222-10/ COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV10 Systems 729 EMERGENCY DIESEL AC/DC OPL3 (T040)
Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO.
EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERA TOR H-7 A-DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV10 Svstems 729 EMERGENCY DIESEL AC/DC Relay 4 (T040)
Control AUX 14'-6" 3.987 2.905 GE CR120BD05041 EPRI NP-7147-SL, GERS-RLY-5.667 Capacity meets or GENERATOR H-7A-DC Power and Cabinet Al1.4 (increased by SOURTS TR-exceeds demand CONTROL POWER FROM Support 105988-V2, Table 3-1)
DV10 Svstems EMERGENCY DIESEL AC/DC SDR (T040)
Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or GENERATOR H-7A-DC Power and Cabinet CLASS J13P8111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Systems EMERGENCY DIESEL AC/DC 5/DG02 (T041)
Control AUX 14'-6" 3.987 2.905 AGASTAT E7022PE002 EPRI NP-7147-SL, GERS-RLY-6.667 Capacity meets or GENERATOR H-7B - DC Power and Cabinet PNT.7 exceeds demand CONTROL POWER FROM Support DV20 Systems EMERGENCY DIESEL AC/DC 5X (T041)
Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P3211 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Systems EMERGENCY DIESEL AC/DC 86 (A401)
Switchgear TURB 56'-6" 6.379 2.468 GE 12HEA61B235 EPRI NP-7147-SL, GERS-RLY-8.000 Capacity meets or GENERATOR H-7B - DC Power and AL0.2 exceeds demand CONTROL POWER FROM Support DV20 Systems EMERGENCY DIESEL AC/DC EOR (T041)
Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or GENERATOR H DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Svstems EMERGENCY DIESEL AC/DC ESS Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SOURTS),
9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Systems EMERGENCY DIESEL AC/DC K4 (C39)
Control AUX 14'-6" 3.987 2.905 ALLEN BRADLEY 700DC-EPRI 3002002997 12.821 Capacity meets or GENERATOR H-7B - DC Power and Cabinet P800Z1 exceeds demand CONTROL POWER FROM Support DV20 Svstems EMERGENCY DIESEL AC/DC K624C (SIAS2)
Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or GENERATOR H-7B - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV20 Systems Replacement Relays, Revision 0, June 2004  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 21 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List                                     Demand                         Seismic Capacity Item Equipment                          Key Safety                       Cabinet                                                           Seismic Capacity Source Evaluation No. ID    EQuipment Description     Function       Relay ID(sl       Type     BldQ Elev   ICRS,M ICRS,v   Relay MfQ. & Model               Document             TRS       Result H-7B      EMERGENCY DIESEL         AC/DC         K630A (LP2)       Control   AUX 36'-6'.' 3.987 3.436 MPR ASSOC. 0200-0068-   MPR-2665, Design Verification of 8.200 Capacity meets or 84            GENERATOR H-7B - DC     Power and                         Cabinet                                       PN01-M             the Davis-Besse SFAS and             exceeds demand CONTROL POWER FROM         Support                                                                                             Millstone Unit 2 ESAS DV20             Systems                                                                                       Replacement Relays, Revision 0, June 2004 H-7B      EMERGENCY DIESEL         AC/DC         OP1 (T041)       Control   AUX 14'-6"   3.987 2.905   TELEMECHANIQUE       EPRI TR-105988-V2 (SQURTS),     9.467 Capacity meets or 85            GENERATOR H-7B - DC     Power and                         Cabinet                                   CLASS J13P6111                   Table 3-1                   exceeds demand CONTROL POWER FROM         Support DV20             Svstems H-7B      EMERGENCY DIESEL         AC/DC         OP2 (T041}       Control   AUX 14'-6"   3.987 2.905   TELEMECHANIQUE       EPRI TR-105988-V2 (SQURTS},     9.467 Capacity meets or 86            GENERATOR H-7B - DC     Power and                         Cabinet                                                                   Table 3-1 CLASS J13P6111                                              exceeds demand CONTROL POWER FROM         Support DV20             Systems H-7B      EMERGENCY DIESEL         AC/DC         OP3 (T041}       Control   AUX 14'-6"   3.987 2.905   TELEMECHANIQUE       EPRI TR-105988-V2 (SQURTS},     9.467 Capacity meets or 87            GENERATOR H-7B - DC     Power and                         Cabinet                                   CLASS J13P6111                   Table 3-1                   exceeds demand CONTROL POWER FROM         Support DV20             Svstems H-7B      EMERGENCY DIESEL         AC/DC         OPL1 (T041}       Control   AUX 14'-6"   0.886 0.618 DETROIT SWITCH NO.       EPRI NP-5223-SLR1, GERS-       4.000 Capacity meets or 88            GENERATOR H-7B - DC     Power and                         Cabinet                                   222-10 I COLTEC                   PS.5                     exceeds demand CONTROL POWER FROM         Support                                                               INDUSTRIES INC. 11 906 DV20             Svstems                                                                         729 H-7B      EMERGENCY DIESEL         AC/DC         OPL2 (T041}       Control   AUX 14'-6"   0.886 0.618 DETROIT SWITCH NO.       EPRI NP-5223-SLR1, GERS-       4.000 Capacity meets or 89            GENERATOR H-7B - DC     Power and                         Cabinet                                   222-10 I COLTEC                   PS.5                     exceeds demand CONTROL POWER FROM         Support                                                               INDUSTRIES INC. 11 906 DV20             Systems                                                                         729 H-7B      EMERGENCY DIESEL         AC/DC         OPL3 (T041}       Control   AUX 14'-6"   0.886 0.618 DETROIT SWITCH NO.       EPRI NP-5223-SLR1, GERS-       4.000 Capacity meets or 90            GENERATOR H-7B - DC     Power and                         Cabinet                                   222-10 I COLTEC                   PS.5                     exceeds demand CONTROL POWER FROM         Support                                                               INDUSTRIES INC. 11 906 DV20             Systems                                                                         729 H-7B      EMERGENCY DIESEL         AC/DC       Relay 4 (T041 }   Control   AUX 14'-6"   3.987 2.905   GE CR120BD05041       EPRI NP-7147-SL, GERS-RLY-       5.667 Capacity meets or 91            GENERATOR H-7B - DC     Power and                         Cabinet                                                       Al1.4 (increased by SOURTS TR-           exceeds demand CONTROL POWER FROM         Support                                                                                             105988-V2, Table 3-1)
Item Equipment No.
DV20             Systems H-7B      EMERGENCY DIESEL         AC/DC         SDR (T041}       Control   AUX 14'-6"   3.987 2.905   TELEMECHANIQUE       EPRI TR-105988-V2 (SQURTS},     9.467 Capacity meets or 92            GENERATOR H-7B - DC     Power and                         Cabinet                                   CLASS J13P8111                   Table 3-1                   exceeds demand CONTROL POWER FROM         Support DV20             Systems P-5A    SERVICE WATER PUMP A       AC/DC           3 (A306}       Switchgear TURB 31'-6"   4.810 1.866 GE 12HFA151A2H (DC}           EPRI 3002002997         16.385 Capacity meets or 93            (AC POWER FROM 4KV       Power and                                                                                                                               exceeds demand BUS 24C IA3], 24C2-2 l52-   Support A306ll             Svstems P-5A  SERVICE WATER PUMP A       AC/DC   50/51-A, B & C (A306} Switchgear TURB 31'-6"   4.810 1.866     GE 121AC66K8A               EPRI 3002002997         6.923 Capacity meets or 94            (AC POWER FROM 4KV       Power and                                                                                                                               exceeds demand BUS 24C [A3], 24C2-2 [52-   Support A3061)           Systems P-5A  SERVICE WATER PUMP A       AC/DC         50GS (A306}     Switchgear TURB 31'-6"   4.810 1.866   GE 12PJC11AV1A               EPRI 3002002997         7.027 Capacity meets or 95            (AC POWER FROM 4KV       Power and                                                                                                                               exceeds demand BUS 24C [A3], 24C2-2 [52-   Support A3061)             Systems
ID H-7B 84 85 H-7B 86 H-7B 87 H-7B 88 H-7B 89 H-7B 90 H-7B 91 H-7B 92 H-7B 93 P-5A 94 P-5A 95 P-5A Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 21 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source EQuipment Description Function Relay ID(sl Type BldQ Elev ICRS,M ICRS,v Relay MfQ. & Model Document TRS Result EMERGENCY DIESEL AC/DC K630A (LP2)
Control AUX 36'-6'.'
3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or GENERATOR H-7B - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV20 Systems Replacement Relays, Revision 0, June 2004 EMERGENCY DIESEL AC/DC OP1 (T041)
Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS),
9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Svstems EMERGENCY DIESEL AC/DC OP2 (T041}
Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS},
9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Systems EMERGENCY DIESEL AC/DC OP3 (T041}
Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS},
9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Svstems EMERGENCY DIESEL AC/DC OPL1 (T041}
Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO.
EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERATOR H-7B - DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV20 Svstems 729 EMERGENCY DIESEL AC/DC OPL2 (T041}
Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO.
EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERATOR H-7B - DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV20 Systems 729 EMERGENCY DIESEL AC/DC OPL3 (T041}
Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO.
EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERATOR H-7B - DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV20 Systems 729 EMERGENCY DIESEL AC/DC Relay 4 (T041 }
Control AUX 14'-6" 3.987 2.905 GE CR120BD05041 EPRI NP-7147-SL, GERS-RLY-5.667 Capacity meets or GENERATOR H-7B - DC Power and Cabinet Al1.4 (increased by SOURTS TR-exceeds demand CONTROL POWER FROM Support 105988-V2, Table 3-1)
DV20 Systems EMERGENCY DIESEL AC/DC SDR (T041}
Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS},
9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P8111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Systems SERVICE WATER PUMP A AC/DC 3 (A306}
Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC}
EPRI 3002002997 16.385 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24C IA3], 24C2-2 l52-Support A306ll Svstems SERVICE WATER PUMP A AC/DC 50/51-A, B & C (A306}
Switchgear TURB 31'-6" 4.810 1.866 GE 121AC66K8A EPRI 3002002997 6.923 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24C [A3], 24C2-2 [52-Support A3061)
Systems SERVICE WATER PUMP A AC/DC 50GS (A306}
Switchgear TURB 31'-6" 4.810 1.866 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24C [A3], 24C2-2 [52-Support A3061)
Systems  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 22 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List                                     Demand                           Seismic Capacity Item  Equipment                            Key Safety                       Cabinet                                                           Seismic Capacity Source Evaluation No.      ID      E<1uipment Description   Function       Relav IDCsl       Tvpe     Bld<1 Elev   ICRS," ICRS,v   Relav Mf<1. & Model               Document               TRS       Result P-5A    SERVICE WATER PUMP A         AC/DC     LOAD SHED (K529A)     Control   AUX   36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-     MPR-2665, Design Verification of 8.200 Capacity meets or 96              (AC POWER FROM 4KV       Power and       (RC02B)         Cabinet                                     PN01-M               the Davis-Besse SFAS and               exceeds demand BUS 24C [A3], 24C2-2 [52-   Support                                                                                             Millstone Unit 2 ESAS A306])           Systems                                                                                         Replacement Relays, Revision 0, June2004 P-5B    SERVICE WATER PUMP B         AC/DC         3 (AS02)       Switchgear TURB   31'-6" 4.810 1.866 GE 12HFA1S1A2H (DC)           EPRI 3002002997           16.38S Capacity meets or 97                (SWING) (AC POWER       Power and                                                                                                                                 exceeds demand FROM 4KV BUS 24E [AS],     Support 24E1-2 IS2-AS02ll     Svstems P-SB    SERVICE WATER PUMP B         AC/DC   SO/S1-A, B & C (AS02) Switchgear TURB   31'-6" 4.810 1.866     GE 121AC66K8A               EPRI 3002002997           6.923 Capacity meets or 98                (SWING) (AC POWER       Power and                                                                                                                                 exceeds demand FROM 4KV BUS 24E [AS],     Support 24E1-2 f52-A502ll     Svstems P-SB    SERVICE WATER PUMP B         AC/DC       SOGS (AS02)       Switchgear TURB   31'-6" 4.810 1.866   GE 12PJC11AV1A               EPRI 3002002997           7.027 Capacity meets or 99              (SWING) (AC POWER       Power and                                                                                                                                 exceeds demand FROM 4KV BUS 24E [A5].     Support 24E1-2 f52-A502ll     Svstems P-5B    SERVICE WATER PUMP B         AC/DC   LOAD SHED (KSS31A,     Control   AUX   36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-     MPR-2665. Design Verification of 8.200 Capacity meets or 100              (SWING) (AC POWER       Power and   KS631A) (RC02E)     Cabinet                                     PN01-M               the Davis-Besse SFAS and               exceeds demand FROM 4KV BUS 24E [A5],     Support                                                                                             Millstone Unit 2 ESAS 24E1-2 [52-AS02])     Systems                                                                                         Replacement Relays, Revision 0, June 2004 P-5C    SERVICE WATER PUMP C         AC/DC         3 (A407)       Switchgear TURB   S6'-6" 6.379 2.468 GE 12HFA1S1A2H (DC)           EPRI 3002002997           16.385 Capacity meets or 101              (AC POWER FROM 4KV       Power and                                                                                                                                 exceeds demand BUS 24D [A4], 24D6-2 [52-   Support A4071)           Systems P-5C    SERVICE WATER PUMP C         AC/DC   SO/S1-A, B & C (A407) Switchgear TURB   S6'-6" 6.379 2.468     GE 121AC66K8A               EPRI 3002002997           6.923 Capacity meets or 102              (AC POWER FROM 4KV       Power and                                                                                                                                 exceeds demand BUS 24D [A4], 24D6-2 [52-   Support A407ll           Svstems P-5C    SERVICE WATER PUMP C         AC/DC       50GS (A407)       Switchgear TURB   56'-6" 6.379 2.468   GE 12PJC11AV1A               EPRI 3002002997           7.027 Capacity meets or 103              (AC POWER FROM 4KV       Power and                                                                                                                                 exceeds demand BUS 24D [A4], 24D6-2 [52-   Support A407ll           Svstems P-5C    SERVICE WATER PUMP C         AC/DC     LOAD SHED (K629A)     Control   AUX   36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-     MPR-2665, Design Verification of 8.200 Capacity meets or 104              (AC POWER FROM 4KV       Power and       (RC02C)         Cabinet                                     PN01-M               the Davis-Besse SFAS and               exceeds demand BUS 24D [A4], 24D6-2 [52-   Support                                                                                             Millstone Unit 2 ESAS A407])           Systems                                                                                         Replacement Relays, Revision o, June 2004 Notes:
Item Equipment No.
ID P-5A 96 97 P-5B 98 P-SB 99 P-SB P-5B 100 101 P-5C 102 P-5C 103 P-5C P-5C 104 Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 22 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source E<1uipment Description Function Relav IDCsl Tvpe Bld<1 Elev ICRS,"
ICRS,v Relav Mf<1. & Model Document TRS Result SERVICE WATER PUMP A AC/DC LOAD SHED (K529A)
Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or (AC POWER FROM 4KV Power and (RC02B)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BUS 24C [A3], 24C2-2 [52-Support Millstone Unit 2 ESAS A306])
Systems Replacement Relays, Revision 0, June2004 SERVICE WATER PUMP B AC/DC 3 (AS02)
Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA1S1A2H (DC)
EPRI 3002002997 16.38S Capacity meets or (SWING) (AC POWER Power and exceeds demand FROM 4KV BUS 24E [AS],
Support 24E1-2 IS2-AS02ll Svstems SERVICE WATER PUMP B AC/DC SO/S1-A, B & C (AS02)
Switchgear TURB 31'-6" 4.810 1.866 GE 121AC66K8A EPRI 3002002997 6.923 Capacity meets or (SWING) (AC POWER Power and exceeds demand FROM 4KV BUS 24E [AS],
Support 24E1-2 f52-A502ll Svstems SERVICE WATER PUMP B AC/DC SOGS (AS02)
Switchgear TURB 31'-6" 4.810 1.866 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or (SWING) (AC POWER Power and exceeds demand FROM 4KV BUS 24E [A5].
Support 24E1-2 f52-A502ll Svstems SERVICE WATER PUMP B AC/DC LOAD SHED (KSS31A, Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665. Design Verification of 8.200 Capacity meets or (SWING) (AC POWER Power and KS631A) (RC02E)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand FROM 4KV BUS 24E [A5],
Support Millstone Unit 2 ESAS 24E1-2 [52-AS02])
Systems Replacement Relays, Revision 0, June 2004 SERVICE WATER PUMP C AC/DC 3 (A407)
Switchgear TURB S6'-6" 6.379 2.468 GE 12HFA1S1A2H (DC)
EPRI 3002002997 16.385 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24D [A4], 24D6-2 [52-Support A4071)
Systems SERVICE WATER PUMP C AC/DC SO/S1-A, B & C (A407)
Switchgear TURB S6'-6" 6.379 2.468 GE 121AC66K8A EPRI 3002002997 6.923 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24D [A4], 24D6-2 [52-Support A407ll Svstems SERVICE WATER PUMP C AC/DC 50GS (A407)
Switchgear TURB 56'-6" 6.379 2.468 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24D [A4], 24D6-2 [52-Support A407ll Svstems SERVICE WATER PUMP C AC/DC LOAD SHED (K629A)
Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or (AC POWER FROM 4KV Power and (RC02C)
Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BUS 24D [A4], 24D6-2 [52-Support Millstone Unit 2 ESAS A407])
Systems Replacement Relays, Revision o, June 2004 Notes:
: 1. GERS capacity data for starter/contactors from EPRI NP-5223-SLR1, GERS-MCC.9 is not model-specific.
: 1. GERS capacity data for starter/contactors from EPRI NP-5223-SLR1, GERS-MCC.9 is not model-specific.
: 2. See Section 5.1.
: 2. See Section 5.1.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 23 of 25 Appendix 2 - Representative Sample Component Evaluations This appendix provides two (2) representative sample component evaluations for relays selected from the list in Appendix 1.
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 23 of 25 Appendix 2 - Representative Sample Component Evaluations This appendix provides two (2) representative sample component evaluations for relays selected from the list in Appendix 1.
1st Example - Equipment ID 15G-12U-2 (52-A312) [Line Item 7 from Appendix 1]
1st Example - Equipment ID 15G-12U-2 (52-A312) [Line Item 7 from Appendix 1]
Description of component:
Description of component:
Equipment ID 15G-12U-2 (52-A312) - 4KV EMERGENCY BUS 24C (A3) FEEDER BREAKER FROM EOG "A" (H7A) - supporting the AC/DC Power and Support Systems function. Relay from seal-in/ lockout circuit analysis - relay 86 (A312). Relay is a GE Model 12HEA61B235.
Equipment ID 15G-12U-2 (52-A312) - 4KV EMERGENCY BUS 24C (A3) FEEDER BREAKER FROM EOG "A" (H7 A) - supporting the AC/DC Power and Support Systems function. Relay from seal-in/ lockout circuit analysis - relay 86 (A312). Relay is a GE Model 12HEA61B235.
Plant Location:
Plant Location:
Mounted in panel A312 in the Turbine Building, Vital 4kV Electrical Equipment Room, Elevation 31'6". Cabinet type: Switchgear.
Mounted in panel A312 in the Turbine Building, Vital 4kV Electrical Equipment Room, Elevation 31'6". Cabinet type: Switchgear.
Description of Mounting Point Demand Estimate:
Description of Mounting Point Demand Estimate:
Horizontal Response Estimate - Turbine Building foundation elevation: 14' 6". Panel A312 is 31'6" -14'6" = 17 feet above foundation. AFsH = 1.583 (from Reference 8, Figure 4-3). SAGMRs
Horizontal Response Estimate - Turbine Building foundation elevation: 14' 6". Panel A312 is 31'6" -14'6" = 17 feet above foundation. AFsH = 1.583 (from Reference 8, Figure 4-3). SAGMRs  
=                                           =              =
= 0.422g (from Reference 4). Then, SAcH = 0.422
0.422g (from Reference 4). Then, SAcH 0.422
* 1.583 = 0.668g.
* 1.583 0.668g.
Vertical Response Estimate - As described in Section 3.1.2, SAvGMRs = 0.309g. AFsv = 1.283 (from Reference 8, Figure 4-4). Then, SAcv = 0.309
Vertical Response Estimate - As described in Section 3.1.2, SAvGMRs     = 0.309g. AFsv = 1.283
* 1.283 = 0.397g.
                                              =              =
For cabinet type Switchgear, AFcH = 7.2 and AFcv = 4.7 (from Reference 8, Section 4.4). Then, mounting point demand is:
(from Reference 8, Figure 4-4). Then, SAcv 0.309
ICRScH = 0.668
* 1.283 0.397g.
* 7.2 = 4.81 Og ICRScv = 0.397
For cabinet type Switchgear, AFcH   =7.2 and AFcv =4.7 (from Reference 8, Section 4.4). Then, mounting point demand is:
ICRScH =0.668
* 7.2 =4.81 Og ICRScv = 0.397
* 4. 7 = 1.866g Description of Relay Capacity:
* 4. 7 = 1.866g Description of Relay Capacity:
The capacity of the relay is based on EPRI GERS - GERS-RLY-AL0.2 (Reference 9 and 10).
The capacity of the relay is based on EPRI GERS - GERS-RLY-AL0.2 (Reference 9 and 10).
For this relay, GERS capacity for non-operating, normally closed contact is applicable - SAT =
For this relay, GERS capacity for non-operating, normally closed contact is applicable - SAT =
10g.
10g.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 24 of 25 Appendix 2 - Representative Sample Component Evaluations The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.2 was selected based on the base-mounted cantilever cabinet (switchgear) relay mounting.
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 24 of 25 Appendix 2 - Representative Sample Component Evaluations The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.2 was selected based on the base-mounted cantilever cabinet (switchgear) relay mounting.
Then, TRS = (10/1.5)
Then, TRS = (10/1.5)
* 1.2 = 8g.
* 1.2 = 8g.
Capacity I Demand Ratio:
Capacity I Demand Ratio:
CID  =TRS / ICRSc
C I D = TRS / ICRSc  
= 8g / 4.81 Og =1.663 - Horizontal (governing) - acceptable Capacity exceeds demand.
= 8g / 4.81 Og = 1.663 - Horizontal (governing) - acceptable Capacity exceeds demand.
2"d Example - Equipment ID 2-FW-43A [Line Item 57 from Appendix 1]
2"d Example - Equipment ID 2-FW-43A [Line Item 57 from Appendix 1]
Description of component:
Description of component:
Equipment ID 2-FW-43A - SIG NO. 1 STEAM GENERATOR AUX FEEDWATER REGULATING VALVE -AVAILABLE TO THROTTLE - supporting the Core Cooling (turbine-driven AFW pump feedwater flow to steam generator) function. Relay from seal-in I lockout circuit analysis -
Equipment ID 2-FW-43A - SIG NO. 1 STEAM GENERATOR AUX FEEDWATER REGULATING VALVE -AVAILABLE TO THROTTLE - supporting the Core Cooling (turbine-driven AFW pump feedwater flow to steam generator) function.
Relay from seal-in I lockout circuit analysis -
20X/Z1-5276 (C05). Relay is a GE Model 12HFA151A2H (DC).
20X/Z1-5276 (C05). Relay is a GE Model 12HFA151A2H (DC).
Plant Location:
Plant Location:
Line 342: Line 563:
SAGMRS = 0.422g (from Reference 4). Then, SAcH = 0.422
SAGMRS = 0.422g (from Reference 4). Then, SAcH = 0.422
* 2.1 = 0.886g.
* 2.1 = 0.886g.
Vertical Response Estimate - As described in Section 3.1.2, SAvGMRS   = 0.309g. AFsv = 2.367 (from Reference 8, Figure 4-4). Then, SAcv = 0.309
Vertical Response Estimate - As described in Section 3.1.2, SAvGMRS = 0.309g. AFsv = 2.367 (from Reference 8, Figure 4-4). Then, SAcv = 0.309
* 2.367 = 0.731g.
* 2.367 = 0.731g.
For cabinet type Control Cabinet, AFcH =4.5 and AFcv = 4.7 (from Reference 8,     Section 4.4).
For cabinet type Control Cabinet, AFcH = 4.5 and AFcv = 4.7 (from Reference 8, Section 4.4).  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 1 MPS2 HF Sensitive Equipment Functional Confirmation Page 25 of 25 Appendix 2 - Representative Sample Component Evaluations Then, mounting point demand is:
Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 25 of 25 Appendix 2 - Representative Sample Component Evaluations Then, mounting point demand is:
ICRScH = 0.886
ICRScH = 0.886
* 4.5 = 3.987g ICRScv =0.731
* 4.5 = 3.987g ICRScv = 0.731
* 4.7   =3.436g Description of Relay Capacity:
* 4.7 = 3.436g Description of Relay Capacity:
The capacity of the relay is based on EPRI Report 3002002997 (Reference 7) fragility threshold
The capacity of the relay is based on EPRI Report 3002002997 (Reference 7) fragility threshold test results for GE 12HFA 151A2F: SAr = 21.3g. Test results for GE 12HFA 151A2F were used based on similarity with the installed GE 12HFA151A2H relay.
                                          =
test results for GE 12HFA151A2F: SAr 21.3g. Test results for GE 12HFA151A2F were used based on similarity with the installed GE 12HFA151A2H relay.
The CDFM knockdown factor, FK, of 1.56 was selected based on Reference 8, Table 4-2 (HF Test Program, Fragility Threshold). The FMs factor value of 1.0 was selected based on the benchboard cabinet relay mounting (similar stiffness in three directions).
The CDFM knockdown factor, FK, of 1.56 was selected based on Reference 8, Table 4-2 (HF Test Program, Fragility Threshold). The FMs factor value of 1.0 was selected based on the benchboard cabinet relay mounting (similar stiffness in three directions).
Then, TRS   =(21.3/1.56)
Then, TRS = (21.3/1.56)
* 1.0 =13.654g.
* 1.0 = 13.654g.
Capacity I Demand Ratio:
Capacity I Demand Ratio:
CID    =TRS / ICRSc
C I D = TRS / ICRSc  
= 13.654g / 3.987g = 3.425 - Horizontal (governing) - acceptable Capacity exceeds demand.
= 13.654g / 3.987g = 3.425 - Horizontal (governing) - acceptable Capacity exceeds demand.  
 
Serial No. 16-455 Docket Nos. 50-336/423 ATTACHMENT 2 HIGH-FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR MILLSTONE UNIT 3 MILLSTONE POWER STATION UNIT 3 DOMINION NUCLEAR CONNECTICUT, INC.
 
Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 1 of 54


==1.0          INTRODUCTION==
ATTACHMENT 2 Serial No. 16-455 Docket Nos. 50-336/423 HIGH-FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR MILLSTONE UNIT 3 MILLSTONE POWER STATION UNIT 3 DOMINION NUCLEAR CONNECTICUT, INC.  


1.1         PURPOSE The purpose of this attachment is to provide information requested by the NRC in its March 12, 2012 10 CFR 50.54(f) letter issued to all power reactor licensees and holders of construction permits in active or deferred status (Reference 1). Specifically, this attachment provides the results of the High Frequency Confirmation required by Item (4), Enclosure 1, Recommendation 2.1: Seismic, of the letter.
==1.0 INTRODUCTION==
1.1 PURPOSE Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 1 of 54 The purpose of this attachment is to provide information requested by the NRC in its March 12, 2012 10 CFR 50.54(f) letter issued to all power reactor licensees and holders of construction permits in active or deferred status (Reference 1 ). Specifically, this attachment provides the results of the High Frequency Confirmation required by Item (4), Enclosure 1, Recommendation 2.1: Seismic, of the letter.
The High Frequency Confirmation evaluation undertaken for MPS Unit 3 (MPS3) used the methodologies in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation" (Reference 8) as described herein.
The High Frequency Confirmation evaluation undertaken for MPS Unit 3 (MPS3) used the methodologies in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation" (Reference 8) as described herein.
A summary of the High Frequency Confirmation evaluations and results are provided below.
A summary of the High Frequency Confirmation evaluations and results are provided below.  


==1.2         BACKGROUND==
==1.2 BACKGROUND==
Following the accident at the Fukushima Dai-ichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established a Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations and to determine if the agency should make additional improvements to its regulatory system. The NTIF developed a set of recommendations intended to clarify and strengthen the regulatory framework for protection against natural phenomena. Subsequently, the NRC issued a 10 CFR 50.54(f) letter on March 12, 2012 (Reference 1 ), requesting information to assure that these recommendations are addressed by all U.S. nuclear power plants. The 10 CFR 50.54(f) letter requests that licensees and holders of construction permits under 10 CFR Part 50 reevaluate the seismic hazards at their sites against present-day NRC requirements and guidance. Included in the 50.54(f) letter was a request that licensees perform a "confirmation, if necessary, that SSCs, which may be affected by high-frequency ground motion, will maintain their functions important to safety."
EPRI Report
: 1025287, "Seismic Evaluation Guidan~e: Screening, Prioritization and Implementation Details (SPID) for the resolution of Fukushima Near-Term Task Force Recommendation 2.1:
Seismic" (Reference 6) provided screening, prioritization, and implementation details to the U.S. nuclear utility industry for responding to the NRC 50.54(f) letter. This report was developed with NRC participation and is endorsed by the NRC. The SPID included guiaance for determining which plants should perform a High Frequency Confirmation and identified the types of components that should be evaluated in the evaluation.


Following the accident at the Fukushima Dai-ichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established a Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations and to determine if the agency should make additional improvements to its regulatory system. The NTIF developed a set of recommendations intended to clarify and strengthen the regulatory framework for protection against natural phenomena. Subsequently, the NRC issued a 10 CFR 50.54(f) letter on March 12, 2012 (Reference 1), requesting information to assure that these recommendations are addressed by all U.S. nuclear power plants. The 10 CFR 50.54(f) letter requests that licensees and holders of construction permits under 10 CFR Part 50 reevaluate the seismic hazards at their sites against present-day NRC requirements and guidance. Included in the 50.54(f) letter was a request that licensees perform a "confirmation, if necessary, that SSCs, which may be affected by high-frequency ground motion, will maintain their functions important to safety."
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 2 of 54 Subsequent guidance for performing a High Frequency Confirmation was provided in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation," (Reference 8) and was endorsed by the NRC in a {{letter dated|date=September 17, 2015|text=letter dated September 17, 2015}} (Reference 3). Final screening identifying plants needing to perform a High Frequency Confirmation was provided by NRC in a {{letter dated|date=October 27, 2015|text=letter dated October 27, 2015}} (Reference 2).
EPRI Report 1025287, "Seismic Evaluation Guidan~e: Screening, Prioritization and Implementation Details (SPID) for the resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic" (Reference 6) provided screening, prioritization, and implementation details to the U.S. nuclear utility industry for responding to the NRC 50.54(f) letter. This report was developed with NRC participation and is endorsed by the NRC. The SPID included guiaance for determining which plants should perform a High Frequency Confirmation and identified the types of components that should be evaluated in the evaluation.
On March 31, 2014, Millstone Power Station submitted a reevaluated seismic hazard to the NRC as a part of the Seismic Hazard and Screening Report (Reference 4). By {{letter dated|date=October 27, 2015|text=letter dated October 27, 2015}} (Reference 2), the NRC transmitted the results of. the screening and prioritization review of the seismic hazards reevaluation.
 
Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 2 of 54 Subsequent guidance for performing a High Frequency Confirmation was provided in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation," (Reference 8) and was endorsed by the NRC in a letter dated September 17, 2015 (Reference 3). Final screening identifying plants needing to perform a High Frequency Confirmation was provided by NRC in a letter dated October 27, 2015 (Reference 2).
On March 31, 2014, Millstone Power Station submitted a reevaluated seismic hazard to the NRC as a part of the Seismic Hazard and Screening Report (Reference 4). By letter dated October 27, 2015 (Reference 2), the NRC transmitted the results of. the screening and prioritization review of the seismic hazards reevaluation.
The reevaluated seismic hazard was developed in order to provide the information requested by the NRC in Reference 1 and does not constitute a new or supplemental seismic design or licensing basis for MPS3. As such, the conclusions of the High Frequency Confirmation review do not result in a challenge to the design basis function of any plant structures, systems, or components important to safety.
The reevaluated seismic hazard was developed in order to provide the information requested by the NRC in Reference 1 and does not constitute a new or supplemental seismic design or licensing basis for MPS3. As such, the conclusions of the High Frequency Confirmation review do not result in a challenge to the design basis function of any plant structures, systems, or components important to safety.
1.3         APPROACH EPRI Report 3002004396 (Reference 8) was used for the MPS3 engineering evaluations described in this attachment. Section 4.1 of Reference 8 provided general steps to follow for the high-frequency confirmation component evaluation. Accordingly, the following topics are addressed in the subsequent sections of this attachment:
1.3 APPROACH EPRI Report 3002004396 (Reference 8) was used for the MPS3 engineering evaluations described in this attachment. Section 4.1 of Reference 8 provided general steps to follow for the high-frequency confirmation component evaluation. Accordingly, the following topics are addressed in the subsequent sections of this attachment:
* MPS3 Safe Shutdown Earthquake (SSE) and Ground Motion Response Spectrum (GMRS) Information
MPS3 Safe Shutdown Earthquake (SSE) and Ground Motion Response Spectrum (GMRS) Information Selection of components and a list of specific components for high-frequency confirmation Estimation of seismic demand for subject components Estimation of seismic capacity for subject components Summary of high-frequency evaluations for subject components Summary of Results 1.4 PLANT SCREENING MPS3 submitted the reevaluated seismic hazard information, including the GMRS, to the NRC on March 31, 2014 (Reference 4). In letters dated December 15, 2015 and March 15, 2016 (References 12 and 13, respectively), the NRC staff concluded that the submitted GMRS adequately characterizes the reevaluated seismic hazard for the MPS site.  
* Selection of components and a list of specific components for high-frequency confirmation
* Estimation of seismic demand for subject components
* Estimation of seismic capacity for subject components
* Summary of high-frequency evaluations for subject components
* Summary of Results 1.4         PLANT SCREENING MPS3 submitted the reevaluated seismic hazard information, including the GMRS, to the NRC on March 31, 2014 (Reference 4). In letters dated December 15, 2015 and March 15, 2016 (References 12 and 13, respectively), the NRC staff concluded that the submitted GMRS adequately characterizes the reevaluated seismic hazard for the MPS site.


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 3 of 54 The NRC final screening determination letter (Reference 2) concluded that the MPS3 GMRS to SSE comparison resulted in a need to perform a High Frequency Confirmation in accordance with the screening criteria in the SPID (Reference 6).
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 3 of 54 The NRC final screening determination letter (Reference 2) concluded that the MPS3 GMRS to SSE comparison resulted in a need to perform a High Frequency Confirmation in accordance with the screening criteria in the SPID (Reference 6).
1.5         INITIAL CONDITIONS For the purposes of this High Frequency Confirmation review, the plant is assumed to be operating normally prior to the occurrence of the severe seismic event with offsite power sources available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.
1.5 INITIAL CONDITIONS For the purposes of this High Frequency Confirmation review, the plant is assumed to be operating normally prior to the occurrence of the severe seismic event with offsite power sources available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.
2.0         SELECTION OF COMPONENTS FOR HIGH-FREQUENCY SCREENING The fundamental objective of the high-frequency confirmation review was to determine whether the occurrence of a seismic event could cause critical equipment to fail to perform as necessary.
2.0 SELECTION OF COMPONENTS FOR HIGH-FREQUENCY SCREENING The fundamental objective of the high-frequency confirmation review was to determine whether the occurrence of a seismic event could cause critical equipment to fail to perform as necessary.
An optimized evaluation process was applied that focused on achieving a safe and stable plant state following a seismic event. As described in Reference 8, this state is achieved by confirming that key plant safety functions critical to immediate plant safety are preserved (reactor trip, reactor coolant system inventory and pressure control, and core cooling) and that the plant operators have the necessary power available to achieve and maintain this state immediately following the seismic event (AC/DC power and support systems).
An optimized evaluation process was applied that focused on achieving a safe and stable plant state following a seismic event. As described in Reference 8, this state is achieved by confirming that key plant safety functions critical to immediate plant safety are preserved (reactor trip, reactor coolant system inventory and pressure control, and core cooling) and that the plant operators have the necessary power available to achieve and maintain this state immediately following the seismic event (AC/DC power and support systems).
Within the applicable functions, the components that would need a high-frequency confirmation are contact control devices subject to intermittent states (e.g., relay contact chatter) in seal-in or lockout circuits. Accordingly, the objective of the review, as stated in Section 4.2.1 of Reference 8, was to determine if seismic induced high-frequency relay chatter would prevent the completion of key plant safety functions.
Within the applicable functions, the components that would need a high-frequency confirmation are contact control devices subject to intermittent states (e.g., relay contact chatter) in seal-in or lockout circuits. Accordingly, the objective of the review, as stated in Section 4.2.1 of Reference 8, was to determine if seismic induced high-frequency relay chatter would prevent the completion of key plant safety functions.
For each function, a review was performed to identify plant equipment supporting the function.
For each function, a review was performed to identify plant equipment supporting the function.
The control circuit schematic diagrams for this equipment were then reviewed using the guidance from EPRI NP-7148 (Reference 11) and EPRI Report 3002004396 (Reference 8) to determine whether seismic-induced contact chatter could result in seal-in or loc~out (SILO) conditions that could have an adverse impact on the equipment capability to support key plant safety functions. From this review, a list of contact control devices for which contact chatter could result in SILO conditions was identified. These devices (termed "relays" for the purposes of this evaluation) were further evaluated for seismic capacity margin, as described in Sections 3 and 4.
The control circuit schematic diagrams for this equipment were then reviewed using the guidance from EPRI NP-7148 (Reference 11) and EPRI Report 3002004396 (Reference 8) to determine whether seismic-induced contact chatter could result in seal-in or loc~out (SILO) conditions that could have an adverse impact on the equipment capability to support key plant safety functions. From this review, a list of contact control devices for which contact chatter could result in SILO conditions was identified. These devices (termed "relays" for the purposes of this evaluation) were further evaluated for seismic capacity margin, as described in Sections 3 and 4.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 4 of 54 2.1        REACTOR TRIP/SCRAM Consistent with the guidance in Reference 8, the design requirements for reactor trip systems preclude the application of seal-in or lockout circuits that prevent reactor trip/SCRAM functions and no high-frequency component chatter review is necessary for this function.
2.1 REACTOR TRIP/SCRAM Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 4 of 54 Consistent with the guidance in Reference 8, the design requirements for reactor trip systems preclude the application of seal-in or lockout circuits that prevent reactor trip/SCRAM functions and no high-frequency component chatter review is necessary for this function.
2.2         REACTOR COOLANT SYSTEM INVENTORY CONTROL The reactor coolant system inventory control systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that could create loss of coolant-type events, such as inadvertent opening of a pressurizer power-operated relief valve (PORV).
2.2 REACTOR COOLANT SYSTEM INVENTORY CONTROL The reactor coolant system inventory control systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that could create loss of coolant-type events, such as inadvertent opening of a pressurizer power-operated relief valve (PORV).
The following components were identified for control circuit review for SILO conditions:
The following components were identified for control circuit review for SILO conditions:
* Pressurizer PORVs 2.3         REACTOR COOLANT SYSTEM PRESSURE CONTROL Consistent with the guidance in Reference 8, no specific high-frequency component chatter review is required for this function.
Pressurizer PORVs 2.3 REACTOR COOLANT SYSTEM PRESSURE CONTROL Consistent with the guidance in Reference 8, no specific high-frequency component chatter review is required for this function.
2.4         CORE COOLING The core cooling systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that would prevent accomplishment of the core cooling function. The intent of the review was to ensure at least a single train of non-AC power driven decay heat removal capability was maintained (e.g.,
2.4 CORE COOLING The core cooling systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that would prevent accomplishment of the core cooling function. The intent of the review was to ensure at least a single train of non-AC power driven decay heat removal capability was maintained (e.g.,
auxiliary feedwater flow from at least one pump to at least one steam generator).
auxiliary feedwater flow from at least one pump to at least one steam generator).
The following components were identified for control circuit review for SILO conditions:
The following components were identified for control circuit review for SILO conditions:
* Auxiliary Feedwater (AFW) Flow Regulating Valves
Auxiliary Feedwater (AFW) Flow Regulating Valves AFW Discharge Header Cross-tie Valve Atmospheric Steam Dump Valves Turbine-driven AFW Pump Steam Supply Valves Turbine-driven AFW Pump Trip-Throttle Valve Turbine-driven AFW Pump 2.5 AC/DC POWER SUPPORT SYSTEMS The AC and DC power support systems were reviewed to identify components that could be  
* AFW Discharge Header Cross-tie Valve
* Atmospheric Steam Dump Valves
* Turbine-driven AFW Pump Steam Supply Valves
* Turbine-driven AFW Pump Trip-Throttle Valve
* Turbine-driven AFW Pump 2.5         AC/DC POWER SUPPORT SYSTEMS The AC and DC power support systems were reviewed to identify components that could be


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 5 of 54 susceptible to adverse operation due to contact control devices in SILO circuits that prevent the availability of DC and/or AC power sources. The following AC and DC power support systems were reviewed:
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 5 of 54 susceptible to adverse operation due to contact control devices in SILO circuits that prevent the availability of DC and/or AC power sources. The following AC and DC power support systems were reviewed:
* Emergency Diesel Generators (EOG),
Emergency Diesel Generators (EOG),
* EOG Support Systems and associated Switchgear, Load Centers, and MCCs,
EOG Support Systems and associated Switchgear, Load Centers, and MCCs, Battery Chargers and Inverters, Vital 125vdc and 120vac Distribution The analysis considered the reactor operating normally at power with no equipment failures prior to the seismic event. The EDGs are not operating, but are available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.
* Battery Chargers and Inverters,
In response to bus under-voltage relaying detecting the LOOP, the Class 1 E control systems must automatically shed loads, start the EDGs, and sequentially load the diesel generators as designed. Ancillary systems required for EOG operation, as well as Class 1 E battery chargers and inverters, must function as necessary.
* Vital 125vdc and 120vac Distribution The analysis considered the reactor operating normally at power with no equipment failures prior to the seismic event. The EDGs are not operating, but are available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip.
In response to bus under-voltage relaying detecting the LOOP, the Class 1E control systems must automatically shed loads, start the EDGs, and sequentially load the diesel generators as designed. Ancillary systems required for EOG operation, as well as Class 1E battery chargers and inverters, must function as necessary.
The following components were identified for control circuit review for SILO conditions:
The following components were identified for control circuit review for SILO conditions:
* 4kV Emergency Bus Feeder Breakers (Emergency and Offsite sources)
4kV Emergency Bus Feeder Breakers (Emergency and Offsite sources) 480v Emergency Bus Feeder Breakers 4kV I 480v Emergency Bus Transformers and 4kV Supply Breakers 4kV Emergency Bus Load Breakers to Service Water, AFW, Containment Recirculation, Charging, Safety Injection, Residual Heat Removal, Quench Spray, and Reactor Plant Component Cooling Water Pumps and Control Building Chiller Units 480v Emergency Bus Load Breakers to 125vdc Battery Chargers, various MCCs, and Load Centers 125vdc Batteries, DC Susses, Battery Chargers, and Distribution System Components 120vac Vital Inverters and Distribution System Components EDGs EOG Air Start, Lubricating Oil, and Fuel Oil Systems EOG Room Ventilation Fans and Dampers Service Water Pumps and Strainers Service Water System Valves (required for cooling water supply to EDGs) 2.6  
* 480v Emergency Bus Feeder Breakers
* 4kV I 480v Emergency Bus Transformers and 4kV Supply Breakers
* 4kV Emergency Bus Load Breakers to Service Water, AFW, Containment Recirculation, Charging, Safety Injection, Residual Heat Removal, Quench Spray, and Reactor Plant Component Cooling Water Pumps and Control Building Chiller Units
* 480v Emergency Bus Load Breakers to 125vdc Battery Chargers, various MCCs, and Load Centers
* 125vdc Batteries, DC Susses, Battery Chargers, and Distribution System Components
* 120vac Vital Inverters and Distribution System Components
* EDGs
* EOG Air Start, Lubricating Oil, and Fuel Oil Systems
* EOG Room Ventilation Fans and Dampers
* Service Water Pumps and Strainers
* Service Water System Valves (required for cooling water supply to EDGs) 2.6        


==SUMMARY==
==SUMMARY==
OF SELECTED COMPONENTS A list of the contact devices requiring a high-frequency confirmation is provided in Appendix 1.
OF SELECTED COMPONENTS A list of the contact devices requiring a high-frequency confirmation is provided in Appendix 1.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 6 of 54 3.0        SEISMIC DEMAND ESTIMATE The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the mounting point seismic demand, which requires the development of in-structure seismic demand based on the GMRS input and the in-cabinet amplification of the in-structure floor motion at the location of the electrical cabinet housing the relay.
3.0 SEISMIC DEMAND ESTIMATE Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 6 of 54 The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the mounting point seismic demand, which requires the development of in-structure seismic demand based on the GMRS input and the in-cabinet amplification of the in-structure floor motion at the location of the electrical cabinet housing the relay.
The calculation of in-structure response typically requires the development of a foundation input response spectrum (FIRS) and dynamic analysis of the structure. MPS3 has not developed these inputs from the GMRS for plant structures. Therefore, consistent with the guidance in Reference 8, Section 4.3, the in-structure response. for buildings and floor elevations where subject relays are located was estimated as described in subsection 3.1 below.
The calculation of in-structure response typically requires the development of a foundation input response spectrum (FIRS) and dynamic analysis of the structure. MPS3 has not developed these inputs from the GMRS for plant structures. Therefore, consistent with the guidance in Reference 8, Section 4.3, the in-structure response. for buildings and floor elevations where subject relays are located was estimated as described in subsection 3.1 below.
The mounting point high-frequency seismic demand was determined consistent with the guidance in Reference 8, Sections 4.4 and 4.5, and is described in subsection 3.2 below.
The mounting point high-frequency seismic demand was determined consistent with the guidance in Reference 8, Sections 4.4 and 4.5, and is described in subsection 3.2 below.
3.1         ESTIMATE OF HIGH FREQUENCY IN-STRUCTURE RESPONSE Per Reference 8, Sect. 4.3, the basis for calculating high-frequency seismic demand in the horizontal direction is the horizontal control point GMRS, which was developed in response to Reference 1 and reported in the MPS Seismic Hazard and Screening Report (Reference 4). As noted in Reference 8, Section 3.3, The Control Point GMRS developed for these rock sites are typically appropriate for all rock founded structures and additional FIRS estimates are not deemed necessary for the high frequency confirmation effort.
3.1 ESTIMATE OF HIGH FREQUENCY IN-STRUCTURE RESPONSE Per Reference 8, Sect. 4.3, the basis for calculating high-frequency seismic demand in the horizontal direction is the horizontal control point GMRS, which was developed in response to Reference 1 and reported in the MPS Seismic Hazard and Screening Report (Reference 4). As noted in Reference 8, Section 3.3, The Control Point GMRS developed for these rock sites are typically appropriate for all rock founded structures and additional FIRS estimates are not deemed necessary for the high frequency confirmation effort.
The structures of interest for the high-frequency confirmation are the Control Building, the Emergency Generator Enclosure Building, the Auxiliary Building and the Engineered Safety Features (ESF) Building. MPS is a rock site, and the Auxiliary Building and ESF Building are founded on bedrock. The Control Building and. the Emergency Generator Enclosure Building are founded on shallow soil overburden over bedrock.
The structures of interest for the high-frequency confirmation are the Control Building, the Emergency Generator Enclosure Building, the Auxiliary Building and the Engineered Safety Features (ESF) Building. MPS is a rock site, and the Auxiliary Building and ESF Building are founded on bedrock. The Control Building and. the Emergency Generator Enclosure Building are founded on shallow soil overburden over bedrock.
The Control Building is founded on basal till, of thickness varying between 1 foot on the east side and 15 feet on the west, overlying bedrock. Isolated zones of softened till were excavated and replaced with fill concrete or compacted structural backfill. The Emergency Generator Enclosure Building wall footings are founded on basal till varying in thickness from less than 1O feet to 30 feet overlying bedrock. Based on velocity measurements obtained during site subsurface explorations conducted for initial plant construction, a representative shear wave velocity 0fs) for the dense basal till overburden material is 2200 fps.
The Control Building is founded on basal till, of thickness varying between 1 foot on the east side and 15 feet on the west, overlying bedrock. Isolated zones of softened till were excavated and replaced with fill concrete or compacted structural backfill. The Emergency Generator Enclosure Building wall footings are founded on basal till varying in thickness from less than 1 O feet to 30 feet overlying bedrock.
Based on velocity measurements obtained during site subsurface explorations conducted for initial plant construction, a representative shear wave velocity 0fs) for the dense basal till overburden material is 2200 fps.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 7 of 54 Section 3.3 of Reference 8 describes that, for buildings on shallow soil layers at rock sites, the soil layers typically shift the frequency range of seismic input towards the lower frequency range of the response spectrum. Given the guidance from Reference 8, for purposes of high-frequency sensitive equipment evaluations in this attachment, the GMRS is likely to be richer in high-frequency content than a FIRS for a shallow layer soil-founded structure at a rock site such as the Control Building and the Emergency Generator Enclosure Building. Therefore, the control point GMRS is an appropriate review level earthquake (RLE) input for the purposes of the high-frequency confirmation .
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 7 of 54 Section 3.3 of Reference 8 describes that, for buildings on shallow soil layers at rock sites, the soil layers typically shift the frequency range of seismic input towards the lower frequency range of the response spectrum. Given the guidance from Reference 8, for purposes of high-frequency sensitive equipment evaluations in this attachment, the GMRS is likely to be richer in high-frequency content than a FIRS for a shallow layer soil-founded structure at a rock site such as the Control Building and the Emergency Generator Enclosure Building. Therefore, the control point GMRS is an appropriate review level earthquake (RLE) input for the purposes of the high-frequency confirmation.  
.3.1.1       HORIZONTAL SEISMIC DEMAND The horizontal response structural amplification factor to be applied for estimating the horizontal in-structure seismic demand is provided in Reference 8, Figure 4-3 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation.
. 3.1.1 HORIZONTAL SEISMIC DEMAND The horizontal response structural amplification factor to be applied for estimating the horizontal in-structure seismic demand is provided in Reference 8, Figure 4-3 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation.
For the MPS3 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.
For the MPS3 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.
The horizontal seismic demand was calculated in accordance with Reference 8, Equation 4-1 a:
The horizontal seismic demand was calculated in accordance with Reference 8, Equation 4-1 a:
SAcH =SAGMRS
SAcH = SAGMRS
* AF SH SAcH is the Spectral Acceleration, Clipped Horizontal (i.e., in-structure [floor] horizontal acceleration).
* AF SH SAcH is the Spectral Acceleration, Clipped Horizontal (i.e., in-structure [floor] horizontal acceleration).
SAGMRS is the peak GMRS between 15-40Hz. The SAGMRs value is 0.422g from Reference 4.
SAGMRS is the peak GMRS between 15-40Hz. The SAGMRs value is 0.422g from Reference 4.
The horizontal GMRS is plotted in Figure 3-1.
The horizontal GMRS is plotted in Figure 3-1.
AFsH is the Horizontal Response Structural Amplification Factor from Reference 8, Figure 4-3.
AFsH is the Horizontal Response Structural Amplification Factor from Reference 8, Figure 4-3.
3.1.2       VERTICAL SEISMIC DEMAND The vertical response structural amplification factor to be applied for estimating the vertical in-structure seismic demand is provided in Reference 8, Figure 4-4 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation. For the MPS3 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.
3.1.2 VERTICAL SEISMIC DEMAND The vertical response structural amplification factor to be applied for estimating the vertical in-structure seismic demand is provided in Reference 8, Figure 4-4 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation. For the MPS3 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage.
The vertical seismic demand was calculated in accordance with Reference 8, Equation 4-1 b:
The vertical seismic demand was calculated in accordance with Reference 8, Equation 4-1 b:
SAcv = SAvGMRS
SAcv = SAvGMRS
* AF sv SAcv is the Spectral Acceleration, Clipped Vertical (in-structure [floor] vertical acceleration).
* AF sv SAcv is the Spectral Acceleration, Clipped Vertical (in-structure [floor] vertical acceleration).  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 8 of 54 SAvGMRs is the peak estimated Spectral Acceleration, Vertical GMRS in the 15 to 40Hz range ..
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 8 of 54 SAvGMRs is the peak estimated Spectral Acceleration, Vertical GMRS in the 15 to 40Hz range..
The peak SAvGMRs is the maximum product of the Vertical-to-Horizontal (V/H) function values and the corresponding horizontal GMRS values between 15 and 40Hz. The GMRS values are from Reference 4. The V/H function is derived from Reference 8, Tables 3-1 and 3-2, utilizing the GMRS peak ground acceleration (PGA) (0.190g] and the shear wave travel time from a depth of 30 meters to the ground surface (Vs30) from Reference 4. For MPS3, the V/H function values are between 0.680 @ 15 Hz and 0.860 @ 40Hz, and are based on the GMRS Horizontal PGA = 0.19g and Vs30 > 1, 000 mps corresponding to a site class 'B-Hard' per Reference 8, Table 3-2. The maximum product of the V/H function values and the corresponding GMRS is 0.31g, which occurs at 40Hz (GMRS = 0.36g, V/H = 0.86). The GMRS, estimated vertical GMRS (VGMRS), and the V/H Ratio values are plotted in Figure 3-1, along with the SSE spectrum.
The peak SAvGMRs is the maximum product of the Vertical-to-Horizontal (V/H) function values and the corresponding horizontal GMRS values between 15 and 40Hz. The GMRS values are from Reference 4. The V/H function is derived from Reference 8, Tables 3-1 and 3-2, utilizing the GMRS peak ground acceleration (PGA) (0.190g] and the shear wave travel time from a depth of 30 meters to the ground surface (Vs30) from Reference 4. For MPS3, the V/H function values are between 0.680 @ 15 Hz and 0.860 @ 40Hz, and are based on the GMRS Horizontal PGA = 0.19g and Vs30 > 1, 000 mps corresponding to a site class 'B-Hard' per Reference 8, Table 3-2. The maximum product of the V/H function values and the corresponding GMRS is 0.31g, which occurs at 40Hz (GMRS = 0.36g, V/H = 0.86). The GMRS, estimated vertical GMRS (VGMRS), and the V/H Ratio values are plotted in Figure 3-1, along with the SSE spectrum.
AFsv is the Vertical Response Structural Amplification Factor from Reference 8, Figure 4-4.
AFsv is the Vertical Response Structural Amplification Factor from Reference 8, Figure 4-4.
3.2         ESTIMATE OF HIGH FREQUENCY MOUNTING POINT SEISMIC DEMAND The mounting point seismic demand was determined by applying in-cabinet amplification factors to the in-structure demand, as described in Reference 8, Sections 4.4 and 4.5.1.
3.2 ESTIMATE OF HIGH FREQUENCY MOUNTING POINT SEISMIC DEMAND The mounting point seismic demand was determined by applying in-cabinet amplification factors to the in-structure demand, as described in Reference 8, Sections 4.4 and 4.5.1.
The in-structure demand was determined as described in Section 3.1 above. The in-cabinet amplification factor is applied to account for the amplification of the structure seismic response at the cabinet anchor points. The in-structure demand (horizontal or vertical) was multiplied by the applicable in-cabinet amplification factor to obtain the mounting point demand.
The in-structure demand was determined as described in Section 3.1 above. The in-cabinet amplification factor is applied to account for the amplification of the structure seismic response at the cabinet anchor points. The in-structure demand (horizontal or vertical) was multiplied by the applicable in-cabinet amplification factor to obtain the mounting point demand.
Horizontal cabinet amplification factors used were:
Horizontal cabinet amplification factors used were:
Motor Control Centers                                       AFc =3.6 Switchgear (flexible panels)                                AFc =7.2 Control Cabinets (e.g., Control Room electrical panels     AFc =4.5 and bench boards, etc.)
Motor Control Centers Switchgear (flexible panels)
AFc = 3.6 AFc = 7.2 Control Cabinets (e.g., Control Room electrical panels AFc = 4.5 and bench boards, etc.)
Cabinet types were determined based on guidance in EPRI NP-7148, "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality" (Reference 11).
Cabinet types were determined based on guidance in EPRI NP-7148, "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality" (Reference 11).
The vertical cabinet amplification factor used was AFc   =4.7 for all three cabinet types.
The vertical cabinet amplification factor used was AFc = 4.7 for all three cabinet types.
For electrical cabinets/enclosures that did not correspond to the listed cabinet types, in-cabinet amplification factors consistent with the cabinet configuration were used and justified on a case-by-case basis.
For electrical cabinets/enclosures that did not correspond to the listed cabinet types, in-cabinet amplification factors consistent with the cabinet configuration were used and justified on a case-by-case basis.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 9 of 54 The mounting point demand , ICRSc, used in the horizontal and vertical directions for evaluation of the relays was the product of the clipped in-structure demand and the applicable cabinet amplification factor within the 15 to 40 Hz frequency range, as described in Reference 8, Sections 4.4:
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 9 of 54 The mounting point demand, ICRSc, used in the horizontal and vertical directions for evaluation of the relays was the product of the clipped in-structure demand and the applicable cabinet amplification factor within the 15 to 40 Hz frequency range, as described in Reference 8, Sections 4.4:
ICRScH =AFcH
ICRScH = AFcH
* SAcH ICRScv =AFcv
* SAcH ICRScv = AFcv
* SAcv The cabinet type classification and the mounting point seismic demand are tabulated for each evaluated relay in Appendix 1.
* SAcv The cabinet type classification and the mounting point seismic demand are tabulated for each evaluated relay in Appendix 1.
0.50 Millstone Unit 3                                  1
0.50 0.45 0.40  
                    - - - GMRS 0.45         -          SSE
":tl.35 c:
                    * * * * *
0  
* VG MRS 0.40         -          HF Range
~0. 30 QJ  
                    -      * *V/H
]0.25 u
  ":tl.35 c:
111  
0
~0.20 u
~0 . 30 QJ
QJ  
]0.25 u
~. 15 0.10 0.05 0.00 0.1 GMRS SSE
111
* * * * *
~0
* VG MRS HF Range
.... .20 u
* *V/H 1
QJ
Millstone Unit 3 1
~ . 15 0.10 0.05 0.00 0.1                           1                         10                   100 Spectral frequency, Hz Figure 3-1: Plot of Horizontal and Vertical Ground Motion Response Spectra , Safe Shutdown Earthquake Spectrum, and V/H Ratio
10 100 Spectral frequency, Hz Figure 3-1: Plot of Horizontal and Vertical Ground Motion Response Spectra, Safe Shutdown Earthquake Spectrum, and V/H Ratio  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 10 of 54 4.0         CONTACT DEVICE EVALUATIONS The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the comparison of relay seismic capacity to the applicable seismic demand to determine whether the relay is predicted to experience contact chatter during a GMRS-level seismic event. Seismic demand was determined as described in Section 3.0. The deterministic high confidence of low probability of failure (HCLPF) capacity of the relay device was determined in accordance with the guidance of Reference 8, Section 4.5.
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 10 of 54 4.0 CONTACT DEVICE EVALUATIONS The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the comparison of relay seismic capacity to the applicable seismic demand to determine whether the relay is predicted to experience contact chatter during a GMRS-level seismic event. Seismic demand was determined as described in Section 3.0. The deterministic high confidence of low probability of failure (HCLPF) capacity of the relay device was determined in accordance with the guidance of Reference 8, Section 4.5.
4.1         HCLPF Component Capacity The HCLPF capacities of the relays were developed based on the guidance in Reference 8, Section 4.5.2. The effective wide band capacity, TRS, is given by Reference 8, Equation 4-5:
4.1 HCLPF Component Capacity The HCLPF capacities of the relays were developed based on the guidance in Reference 8, Section 4.5.2. The effective wide band capacity, TRS, is given by Reference 8, Equation 4-5:
SAT is the Spectral Acceleration, Effective Spectral Test Capacity (Relay Seismic Capacity) for relays as obtained from one of the following sources:
SAT is the Spectral Acceleration, Effective Spectral Test Capacity (Relay Seismic Capacity) for relays as obtained from one of the following sources:
* EPRI High Frequency Test Program (References 7 and 8)
EPRI High Frequency Test Program (References 7 and 8)
* Generic Equipment Ruggedness Spectrum (GERS) (Reference 9 and 10)
Generic Equipment Ruggedness Spectrum (GERS) (Reference 9 and 10)
* Seismic Qualification Reporting and Testing Standardization (SQURTS) (Reference 14)
Seismic Qualification Reporting and Testing Standardization (SQURTS) (Reference 14)
* Site-specific seismic qualification test data Certain relay model numbers identified on the relay list are not explicitly covered by the testing referenced in the list above and a comparison of the relay to other similar relay types having seismic qualification test data (e.g., same manufacturer & same family of relay, similar size, shape, features, construction, etc.) was made in those cases in order to provide a SAT value.
Site-specific seismic qualification test data Certain relay model numbers identified on the relay list are not explicitly covered by the testing referenced in the list above and a comparison of the relay to other similar relay types having seismic qualification test data (e.g., same manufacturer & same family of relay, similar size, shape, features, construction, etc.) was made in those cases in order to provide a SAT value.
As an alternative to relay-specific seismic margin evaluations, the adequacy of relay seismic capacity (with respect to the GMRS) for selected relays not covered by EPRI High Frequency Test Program testing, GERS, or SQURTS has been evaluated through an assessment of the original site specific seismic qualification basis for electrical components. The MPS3 seismic licensing basis is IEEE-323 1974 (Reference 15) and IEEE-344 1975 (Reference 16), and safety related relays contained within plant control panels, motor control centers, switchgear, etc., were qualified to the MPS3 SSE per the requirements of IEEE-344 1975 (Reference 16).
As an alternative to relay-specific seismic margin evaluations, the adequacy of relay seismic capacity (with respect to the GMRS) for selected relays not covered by EPRI High Frequency Test Program testing, GERS, or SQURTS has been evaluated through an assessment of the original site specific seismic qualification basis for electrical components. The MPS3 seismic licensing basis is IEEE-323 1974 (Reference 15) and IEEE-344 1975 (Reference 16), and safety related relays contained within plant control panels, motor control centers, switchgear, etc., were qualified to the MPS3 SSE per the requirements of IEEE-344 1975 (Reference 16).
Seismic qualification was performed to design specifications which established, based on the SSE, the applicable mounting point seismic demand for each component (panels, motor control centers, switchgear, etc.) based on applicable structure and floor acceleration response spectra.
Seismic qualification was performed to design specifications which established, based on the SSE, the applicable mounting point seismic demand for each component (panels, motor control centers, switchgear, etc.) based on applicable structure and floor acceleration response spectra.
Subsequent changes to the plant have maintained the original seismic qualification of electrical components through the MPS3 Design Control Program.
Subsequent changes to the plant have maintained the original seismic qualification of electrical components through the MPS3 Design Control Program.
Comparing the peak spectral acceleration from the MPS3 SSE (0.459g between 2 and 6 Hz from Reference 4) to the peak spectral acceleration from the GMRS (0.422g at 15 Hz from
Comparing the peak spectral acceleration from the MPS3 SSE (0.459g between 2 and 6 Hz from Reference 4) to the peak spectral acceleration from the GMRS (0.422g at 15 Hz from  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 11of54 Reference 4), the SSE peak exceeds the GMRS peak by approximately 9%. This exceedance would be expected to translate to a higher in-structure response and mounting point seismic demand with respect to the demand estimated for the GMRS (refer to Section 3.0), although the peak would occur at lower spectral frequencies. From the EPRI High Frequency Test Program (References 7 and 8), the capacity of relays (with respect to contact chatter) in the high-frequency range was shown to be equal to or greater than the capacity of the relay in the lower frequency range . It follows, then, that relays qualified to the MPS3 design basis SSE (to higher accelerations at lower frequencies) would be expected to function acceptably at the (lower acceleration, higher frequency) GMRS-level mounting point demand. Based on the relay-specific seismic margin evaluation performed for the majority (approximately 75%) of MPS3 relays (see Appendix 1) that concludes that there is considerable margin to contact chatter, this alternative approach to show margin to contact chatter for a portion of the relays (approximately 25%) is reasonable for MPS3.
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 11of54 Reference 4), the SSE peak exceeds the GMRS peak by approximately 9%. This exceedance would be expected to translate to a higher in-structure response and mounting point seismic demand with respect to the demand estimated for the GMRS (refer to Section 3.0), although the peak would occur at lower spectral frequencies. From the EPRI High Frequency Test Program (References 7 and 8), the capacity of relays (with respect to contact chatter) in the high-frequency range was shown to be equal to or greater than the capacity of the relay in the lower frequency range. It follows, then, that relays qualified to the MPS3 design basis SSE (to higher accelerations at lower frequencies) would be expected to function acceptably at the (lower acceleration, higher frequency) GMRS-level mounting point demand.
Based on the relay-specific seismic margin evaluation performed for the majority (approximately 75%) of MPS3 relays (see Appendix 1) that concludes that there is considerable margin to contact chatter, this alternative approach to show margin to contact chatter for a portion of the relays (approximately 25%) is reasonable for MPS3.
FK is the Conservative Deterministic Failure Margin (CFDM) Knockdown Factor and its value depends on the source of the test value chosen to represent test capacity. FK was obtained from Reference 8, Table 4-2.
FK is the Conservative Deterministic Failure Margin (CFDM) Knockdown Factor and its value depends on the source of the test value chosen to represent test capacity. FK was obtained from Reference 8, Table 4-2.
FMs is the Multi-axis to Single-axis Correction Factor and is equal to either 1.0 or 1.2 depending on the expected seismic response of the relay enclosure cabinet. The value of FMs was chosen consistent with the guidance from Reference 8, Section 4.5.2.
FMs is the Multi-axis to Single-axis Correction Factor and is equal to either 1.0 or 1.2 depending on the expected seismic response of the relay enclosure cabinet. The value of FMs was chosen consistent with the guidance from Reference 8, Section 4.5.2.
The effective wide band capacity, along with the source for the device capacity, is tabulated for each evaluated relay in Appendix 1.
The effective wide band capacity, along with the source for the device capacity, is tabulated for each evaluated relay in Appendix 1.
4.2         SEISMIC MARGIN EVALUATION The seismic margin to the onset of contact chatter was determined by comparing the HCLPF capacity, TRS, to the mounting point seismic demand, ICRSc, to obtain the capacity/demand ratio:
4.2 SEISMIC MARGIN EVALUATION The seismic margin to the onset of contact chatter was determined by comparing the HCLPF capacity, TRS, to the mounting point seismic demand, ICRSc, to obtain the capacity/demand ratio:
CID= TRS I ICRSc (C/D is determined for horizontal and vertical directions) .
CID= TRS I ICRSc (C/D is determined for horizontal and vertical directions).
The results of the relay chatter evaluation is tabulated for each evaluated relay in Appendix 1.
The results of the relay chatter evaluation is tabulated for each evaluated relay in Appendix 1.
Two representative sample relay evaluations are included in Appendix 2.
Two representative sample relay evaluations are included in Appendix 2.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 12 of 54
==5.0 CONCLUSION==
 
S 5.1  
==5.0         CONCLUSION==
S 5.1        


==SUMMARY==
==SUMMARY==
OF RESULTS The high-frequency .confirmation review was performed consistent with the guidance in EPRI Report 3002004396 (Reference 8). The following results were obtained:
OF RESULTS Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 12 of 54 The high-frequency. confirmation review was performed consistent with the guidance in EPRI Report 3002004396 (Reference 8). The following results were obtained:
* 229 plant components supporting the key safety functions were selected for detailed review
229 plant components supporting the key safety functions were selected for detailed review 192 components were selected for relay chatter evaluation (the remaining 37 components are non-electrical, and do not require relay chatter evaluation) 410 relays were identified for the 192 components evaluated for relay chatter 212 relays were identified with the potential to cause SILO conditions and required seismic margin evaluation 212 relays were determined to have adequate seismic margin to chatter (CID ratio >/= 1)  
* 192 components were selected for relay chatter evaluation (the remaining 37 components are non-electrical, and do not require relay chatter evaluation)
* 410 relays were identified for the 192 components evaluated for relay chatter
* 212 relays were identified with the potential to cause SILO conditions and required seismic margin evaluation
* 212 relays were determined to have adequate seismic margin to chatter (CID ratio >/= 1)


==5.2         CONCLUSION==
==5.2 CONCLUSION==
 
This attachment provides information required by Enclosure 1, Recommendation 2.1: Seismic, Item (4) of the NRC's March 12, 2012 request for information letter (Reference 1 ).
This attachment provides information required by Enclosure 1, Recommendation 2.1: Seismic, Item (4) of the NRC's March 12, 2012 request for information letter (Reference 1).
A high-frequency confirmation review has been performed for MPS3 to determine whether the occurrence of a severe seismic event could cause selected essential equipment to fail to perform as necessary. As a result of the review, it is concluded that accomplishment of the key plant safety functions defined in Reference 8 will not be adversely affected due to relay chatter
A high-frequency confirmation review has been performed for MPS3 to determine whether the occurrence of a severe seismic event could cause selected essential equipment to fail to perform as necessary. As a result of the review, it is concluded that accomplishment of the key plant safety functions defined in Reference 8 will not be adversely affected due to relay chatter
* during a severe seismic event equivalent to the level of the reevaluated seismic hazard for Millstone Power Station Unit 3.
* during a severe seismic event equivalent to the level of the reevaluated seismic hazard for Millstone Power Station Unit 3.  


==6.0         REFERENCES==
==6.0 REFERENCES==
: 1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012.
: 1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012.
: 2. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
: 2. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
Regarding Recommendation 2.1 "Seismic" of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated October 27, 2015.
Regarding Recommendation 2.1 "Seismic" of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated October 27, 2015.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 13 of 54
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 13 of 54
: 3. NRC Letter, "Endorsement of Electric Power Research Institute Final Draft Report 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility"," dated September 17, 2015.
: 3. NRC Letter, "Endorsement of Electric Power Research Institute Final Draft Report 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility"," dated September 17, 2015.
: 4. Dominion Nuclear Connecticut, Inc. Letter, "Millstone Power Station Units 2 and 3, Response to March 12, 2012 Information Request - Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1," dated March 31, 2014.
: 4. Dominion Nuclear Connecticut, Inc. Letter, "Millstone Power Station Units 2 and 3, Response to March 12, 2012 Information Request - Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1," dated March 31, 2014.
Line 543: Line 733:
: 13. NRC Letter, "Millstone Power Station, Units 2 and 3 - Supplement to Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (CAC Nos. MF3968 and MF3969)," dated March 15, 2016.
: 13. NRC Letter, "Millstone Power Station, Units 2 and 3 - Supplement to Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (CAC Nos. MF3968 and MF3969)," dated March 15, 2016.
: 14. EPRI Report 1019309, "Seismic Qualification Reporting and Testing Standardization (SQURTS) Test Report Database v2.0," 2009.
: 14. EPRI Report 1019309, "Seismic Qualification Reporting and Testing Standardization (SQURTS) Test Report Database v2.0," 2009.
: 15. The Institute of Electrical and Electronics Engineers (IEEE) Standard IEEE-323 1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations
: 15. The Institute of Electrical and Electronics Engineers (IEEE) Standard IEEE-323 1974, IEEE Standard for Qualifying Class 1 E Equipment for Nuclear Power Generating Stations
: 16. IEEE-344 1975, IEEE Recommended Practices for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations.
: 16. IEEE-344 1975, IEEE Recommended Practices for Seismic Qualification of Class 1 E Equipment for Nuclear Power Generating Stations.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 14 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                   Seismic Capacity Item              Equipment         Key Safety               Cabinet                                                     Seismic Capacity Evaluation No. Equipment ID  Description       Function   Relay ID(s)   Type   Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document       TRS     Result 1  3EGS*EGA      DIESEL           AC/DC           5       Control EMER 24'-6"   3.132 1.936 AGASTAT 7022PE     EPRI NP-7147-SLR1,     4.000   Capacity GENERATOR A       POWER AND                 Cabinet GEN                                               GERS-RLY-PNT.7               meets or SUPPORT                           ENCL                                                                             exceeds SYSTEMS                                                                                                             demand 2  3EGS*EGA      DIESEL           AC/DC         4A       Control EMER 24'-6"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2     9.467   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                           J13P3012       (SQURTS), Table 3-1             meets or SUPPORT                           ENCL                                                                             exceeds SYSTEMS                                                                                                             demand 3  3EGS*EGA      DIESEL           AC/DC         48       Control EMER 24'-6"   3.132 1.936   GOULD/ ITE       EPRI TR-105988-V2     9.467   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                           J13P3012       (SQURTS), Table 3-1             meets or SUPPORT                           ENCL                                                                             exceeds SYSTEMS                                                                                                             demand 4  3EGS*EGA      DIESEL           AC/DC         5E       Control EMER 24'-6"   3.132 1.936 AGASTAT 7022PE     EPRI NP-7147-SLR1,     4.000   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                                               GERS-RLY-PNT.7               meets or SUPPORT                           ENCL                                                                             exceeds SYSTEMS                                                                                                             demand 5  3EGS*EGA      DIESEL           AC/DC     ESCNXK90     Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity GENERATOR A       POWER AND                 Cabinet BLDG                                               GERS-RLY-ARS.4               meets or SUPPORT                                                                             (increased by EPRI             exceeds SYSTEMS                                                                                 TR-105988                 demand
Item No.
[SQURTS], Table 3-1) 6  3EGS*EGA      DIESEL           AC/DC     ESCA/XK91     Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity GENERATOR A       POWER AND                 Cabinet BLDG                                               GERS-RLY-ARS.4               meets or SUPPORT                                                                             (increased by EPRI             exceeds SYSTEMS                                                                                   TR-105988                 demand
Equipment ID 1
[SQURTS], Table 3-1) 7  3EGS*EGA      DIESEL           AC/DC         OP1       Control EMER 24'-6"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2     9.467   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                             J13P3012       (SQURTS), Table 3-1             meets or SUPPORT                           ENCL                                                                             exceeds SYSTEMS                                                                                                             demand 8  3EGS*EGA      DIESEL           AC/DC         OP2       Control EMER 24'-6"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2     9.467   Capacity GENERATOR A       POWER AND                   Cabinet GEN                             J13P3012       (SQURTS), Table 3-1             meets or SUPPORT                           ENCL                                                                             exceeds SYSTEMS                                                                                                             demand
3EGS*EGA 2
3EGS*EGA 3
3EGS*EGA 4
3EGS*EGA 5
3EGS*EGA 6
3EGS*EGA 7
3EGS*EGA 8
3EGS*EGA Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 14 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result DIESEL AC/DC 5
Control EMER 24'-6" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 4A Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 48 Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 5E Control EMER 24'-6" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC ESCNXK90 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATOR A POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)
DIESEL AC/DC ESCA/XK91 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATOR A POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)
DIESEL AC/DC OP1 Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OP2 Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 15 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                   Seismic Capacity Item              Equipment         Key Safety               Cabinet                                                     Seismic Capacity Evaluation No. Equipment ID  Description       Function   Relay ID(s)   Type   Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document     TRS     Result 9  3EGS*EGA      DIESEL           AC/DC         OP3       Control EMER 24'-6"   3.132 1.936   GOULD/ ITE       EPRI TR-105988-V2   9.467   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                           J13P3012       (SQURTS), Table 3-1           meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 10  3EGS*EGA      DIESEL           AC/DC       OPL1       Control EMER 24'-6"   0.696 0.412 DETROIT SWITCH     EPRI NP-5223-SLR1,   4.000   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                         INC. 222-1024         GERS-PS.5                 meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 11  3EGS*EGA      DIESEL           AC/DC       OPL2       Control EMER 24'-6"   0.696 0.412 DETROIT SWITCH     EPRI NP-5223-SLR1,   4.000   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                         INC. 222-1024         GERS-PS.5                 meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 12  3EGS*EGA      DIESEL           AC/DC       OPL3       Control EMER 24'-6"   0.696 0.412 DETROIT SWITCH     EPRI NP-5223-SLR1,   4.000   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                         INC. 222-1024         GERS-PS.5                 meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 13  3EGS*EGA      DIESEL           AC/DC         SDR       Control EMER 24'-6"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2   9.467   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                           J13P2012       (SQURTS), Table 3-1           meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 14  3EGS*EGA      DIESEL           AC/DC         SFR       Control EMER 24'-6"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2   9.467   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                           J13P3012       (SQURTS), Table 3-1           meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 15  3EGS*EGA      DIESEL           AC/DC         T2A       Control EMER 24'-6"   3.132 1.936 AGASTAT 7012PC     EPRI NP-7147-SLR1,   8.333   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                                             GERS-RLY-PNT.7               meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 16  3EGS*EGA      DIESEL           AC/DC         T2S       Control EMER 24'-6"   3.132 1.936 AGASTAT 7012PC     EPRI NP-7147-SLR1,   8.333   Capacity GENERATOR A       POWER AND                 Cabinet   GEN                                             GERS-RLY-PNT.7               meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 17  3EGS*EGS      DIESEL           AC/DC           5       Control EMER 24'-6"   3.132 1.936 AGASTAT 7022PE     EPRI NP-7147-SLR1,   4.000   Capacity GENERATORS       POWER AND                 Cabinet   GEN                                             GERS-RLY-PNT.7               meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 18  3EGS*EGS      DIESEL           AC/DC         4A       Control EMER 24'-6"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2   9.467   Capacity GENERATORS       POWER AND                 Cabinet   GEN                           J13P3012       (SQURTS), Table 3-1           meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 19  3EGS*EGS      DIESEL           AC/DC         4S       Control EMER 24'-6"   3.132 1.936   GOULD/ ITE       EPRI TR-105988-V2   9.467   Capacity GENERATORS       POWER AND                 Cabinet   GEN                             J13P3012       (SQURTS), Table 3-1           meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand
Item No.
Equipment ID 9
3EGS*EGA 10 3EGS*EGA 11 3EGS*EGA 12 3EGS*EGA 13 3EGS*EGA 14 3EGS*EGA 15 3EGS*EGA 16 3EGS*EGA 17 3EGS*EGS 18 3EGS*EGS 19 3EGS*EGS Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 15 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result DIESEL AC/DC OP3 Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL1 Control EMER 24'-6" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL2 Control EMER 24'-6" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL3 Control EMER 24'-6" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC SDR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC SFR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC T2A Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RL Y-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC T2S Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RL Y-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 5
Control EMER 24'-6" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATORS POWER AND Cabinet GEN GERS-RL Y-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 4A Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 4S Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 16 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                   Seismic Capacity Item              Equipment         Key Safety               Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID  Description       Function   Relay ID(s)   Type   Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document       TRS     Result 20  3EGS*EGB      DIESEL           AC/DC         5E       Control EMER 24'-<3"   3.132 1.936 AGASTAT 7022PE     EPRI NP-7147-SLR1,     4.000   Capacity GENERATORS       POWER AND                 Cabinet   GEN                                             GERS-RLY-PNT.7               meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 21  3EGS*EGB      DIESEL           AC/DC     ESCB/XK90     Control CNTL 47'-<3"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity GENERATOR B       POWER AND                 Cabinet BLDG                                             GERS-RLY-ARS.4               meets or SUPPORT                                                                             (increased by EPRI             exceeds SYSTEMS                                                                                 TR-105988                 demand
Item No.
[SQURTS], Table 3-1) 22  3EGS*EGB      DIESEL           AC/DC     ESCB/XK91     Control CNTL 47'-<3"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity GENERATORB       POWER AND                 Cabinet BLDG                                             GERS-RLY-ARS.4               meets or SUPPORT                                                                             (increased by EPRI             exceeds SYSTEMS                                                                                 TR-105988                 demand
Equipment ID 20 3EGS*EGB 21 3EGS*EGB 22 3EGS*EGB 23 3EGS*EGB 24 3EGS*EGB 25 3EGS*EGB 26 3EGS*EGB 27 3EGS*EGB 28 3EGS*EGB Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 16 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
[SQURTS], Table 3-1) 23  3EGS*EGB      DIESEL           AC/DC         OP1       Control EMER 24'-<3"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2     9.467   Capacity GENERATOR B       POWER AND                 Cabinet   GEN                           J13P3012       (SQURTS), Table 3-1             meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 24  3EGS*EGB      DIESEL           AC/DC         OP2       Control EMER 24'-<3"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2     9.467   Capacity GENERATOR B       POWER AND                 Cabinet   GEN                           J13P3012       (SQURTS}, Table 3-1             meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 25  3EGS*EGB      DIESEL           AC/DC         OP3       Control EMER 24'-<3"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2     9.467   Capacity GENERATORB       POWER AND                 Cabinet   GEN                           J13P3012       (SQURTS), Table 3-1             meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 26  3EGS*EGB      DIESEL           AC/DC       OPL1       Control EMER 24'-<3"   0.696 0.412 DETROIT SWITCH     EPRI NP-5223-SLR1,     4.000   Capacity GENERATORB       POWER AND                 *Cabinet   GEN                         INC. 222-1024         GERS-PS.5                 meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 27  3EGS*EGB      DIESEL           AC/DC       OPL2       Control EMER 24'-<3"   0.696 0.412 DETROIT SWITCH     EPRI NP-5223-SLR1,     4.000   Capacity GENERATOR B       POWER AND                 Cabinet   GEN                         INC. 222-1024         GERS-PS.5                 meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 28  3EGS*EGB      DIESEL           AC/DC       OPL3       Control EMER 24'-<3"   0.696 0.412 DETROIT SWITCH     EPRI NP-5223-SLR1,     4.000   Capacity GENERATOR B       POWER AND                 Cabinet   GEN                         INC. 222-1024         GERS-PS.5                 meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result DIESEL AC/DC 5E Control EMER 24'-<3" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATORS POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC ESCB/XK90 Control CNTL 47'-<3" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATOR B POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)
DIESEL AC/DC ESCB/XK91 Control CNTL 47'-<3" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATORB POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)
DIESEL AC/DC OP1 Control EMER 24'-<3" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR B POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OP2 Control EMER 24'-<3" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR B POWER AND Cabinet GEN J13P3012 (SQURTS}, Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OP3 Control EMER 24'-<3" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORB POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL1 Control EMER 24'-<3" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATORB POWER AND  
*Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL2 Control EMER 24'-<3" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR B POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL3 Control EMER 24'-<3" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR B POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 17 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                   Seismic Capacity Item                                                            Cabinet                                                    Seismic Capacity Evaluation Equipment         Key Safety No. Equipment ID    Description         Function   Relay ID(s)   Type   Bldg Elev   ICRScH ICRScv Relay Mfg. & Model   Source Document       TRS     Result 29  3EGS*EGB        DIESEL             AC/DC         SDR       Control EMER 24'-6"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2     9.467   Capacity GENERATORS         POWER AND                 Cabinet   GEN                           J13P2012       (SQURTS), Table 3-1             meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 30  3EGS*EGB        DIESEL             AC/DC         SFR       Control EMER 24'-6"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2     9.467   Capacity GENERATORS         POWER AND                 Cabinet   GEN                           J13P3012       (SQURTS), Table 3-1             meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 31  3EGS*EGB        DIESEL             AC/DC         T2A       Control EMER 24'-6"   3.132 1.936 AGASTAT 7012PC     EPRI NP-7147-SLR1,     8.333   Capacity GENERATORS         POWER AND                 Cabinet   GEN                                             GERS-RLY-PNT. 7               meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 32  3EGS*EGB        DIESEL             AC/DC         T28       Control EMER 24'-6"   3.132 1.936 AGASTAT 7012PC     EPRI NP-7147-SLR1,     8.333   Capacity GENERATORS         POWER AND                 Cabinet   GEN                                             GERS-RLY-PNT.7               meets or SUPPORT                           ENCL                                                                           exceeds SYSTEMS                                                                                                           demand 33 3ENS*ACB-10A 4KV EMERGENCY           AC/DC     ESCNXK39     Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34C10-2) BUS 34C (SWGR A)     POWER AND     (Bypass)   Cabinet BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3CCP*P1C           SYSTEMS                                                                                 TR-105988                 demand
Item No.
[SQURTS], Table 3-1) 34 3ENS*ACB-10A 4KV EMERGENCY           AC/DC     ESCA/XK43     Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34C10-2) BUS 34C (SWGR A)     POWER AND       (SSS)     Cabinet BLDG                                             GERS-RLY-ARS.4               meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3CCP*P1C           SYSTEMS                                                                                 TR-105988                 demand
Equipment ID 29 3EGS*EGB 30 3EGS*EGB 31 3EGS*EGB 32 3EGS*EGB 33 3ENS*ACB-10A (34C10-2) 34 3ENS*ACB-10A (34C10-2)
[SQURTS], Table 3-1)
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 17 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Type Bldg Elev ICRScH ICRScv Relay Mfg. & Model Source Document TRS Result DIESEL AC/DC SDR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC SFR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC T2A Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATORS POWER AND Cabinet GEN GERS-RL Y-PNT. 7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC T28 Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATORS POWER AND Cabinet GEN GERS-RL Y-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand 4KV EMERGENCY AC/DC ESCNXK39 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND (Bypass)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1C SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK43 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND (SSS)
Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1C SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 18 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment         Key Safety                 Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 35  3ENS*ACB-15B  4KV EMERGENCY         AC/DC           3       Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA154B25F         QTR97P1230,         4.916   Capacity (34D15-2)  BUS 34D (SWGR B)   POWER AND                             BLDG                             (DC)             Qualification Test             meets or BREAKER TO         SUPPORT                                                                               Report for Qualified             exceeds 3FWA*P1B         SYSTEMS                                                                                 General Electric               demand Relays Northeast Utilities Systems -
Item No.
Millstone Nuclear Power Station, Order
Equipment ID 35 3ENS*ACB-15B (34D15-2) 36 3ENS*ACB-15B (34D15-2) 37 3ENS*ACB-15B (34D15-2) 38 3ENS*ACB-15B (34D15-2)
                                                                                                                            #02044599, REV. 001, REV. 0, November 5, 1997 36 3ENS*ACB-15B  4KV EMERGENCY         AC/DC     AMSAC(B)/K104 Control   CNTL 47'-6"   3.987 2.491 WESTINGHOUSE                   [1]           [1]   Capacity (34D15-2)  BUS 34D (SWGR B)   POWER AND                   Cabinet   BLDG                           405A10H01                                         meets or BREAKER TO         SUPPORT                                                                                                               exceeds 3FWA*P1B         SYSTEMS                                                                                                               demand [1]
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 18 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
37 3ENS*ACB-15B  4KV EMERGENCY         AC/DC       ESCB/XK47   Control   CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34D15-2)  BUS 34D (SWGR B)   POWER AND                   Cabinet   BLDG                                             GERS-RLY-ARS.4                   meets or BREAKER TO         SUPPORT                                                                               (increased by EPRI               exceeds 3FWA*P1B         SYSTEMS                                                                                   TR-105988                   demand
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 3
[SQURTS], Table 3-1) 38 3ENS*ACB-15B  4KV EMERGENCY         AC/DC     PSCA1/K640   Control   CNTL 47'-6"   3.987 2.491     POTTER &         EPRI NP-7147-SLR1,       6.667   Capacity (34D15-2)  BUS 34D (SWGR B)   POWER AND                   Cabinet   BLDG                       BRUMFIELD MDR-       GERS-RLY-ARR.3                   meets or BREAKER TO         SUPPORT                                                           134-1 (NON-                                         exceeds 3FWA*P1B         SYSTEMS                                                             LATCHING)                                         demand
Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3FWA*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC AMSAC(B)/K104 Control CNTL 47'-6" 3.987 2.491 WESTINGHOUSE
[1]
[1]
Capacity BUS 34D (SWGR B)
POWER AND Cabinet BLDG 405A10H01 meets or BREAKER TO SUPPORT exceeds 3FWA*P1B SYSTEMS demand [1]
4KV EMERGENCY AC/DC ESCB/XK47 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3FWA*P1B SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC PSCA1/K640 Control CNTL 47'-6" 3.987 2.491 POTTER &
EPRI NP-7147-SLR1, 6.667 Capacity BUS 34D (SWGR B)
POWER AND Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or BREAKER TO SUPPORT 134-1 (NON-exceeds 3FWA*P1B SYSTEMS LATCHING) demand  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 19 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment         Key Safety                 Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 39  3ENS.ACB-16A  4KV EMERGENCY           AC/DC           3       Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA154B25F         QTR97P1230,         4.916   Capacity (34C16-2)  BUS 34C (SWGR A)     POWER AND                             BLDG                             (DC)           Qualification Test             meets or BREAKER TO         SUPPORT                                                                               Report for Qualified             exceeds 3FWNP1A           SYSTEMS                                                                                 General Electric               demand Relays Northeast Utilities Systems -
Item No.
Millstone Nuclear Power Station, Order
Equipment ID 39 3ENS.ACB-16A (34C16-2) 40 3ENS.ACB-16A (34C16-2) 41 3ENS.ACB-16A (34C16-2) 42 3ENS.ACB-16A (34C16-2) 43 3ENS.ACB-16B (34D16-2)
                                                                                                                                    #02044599, REV. 001, REV. 0, November 5, 1997 40 3ENS.ACB-16A  4KV EMERGENCY           AC/DC     AMSAC(A)/K104 Control   CNTL 47'-6"   3.967 2.491 WESTINGHOUSE                   [1]           [1]   Capacity (34C16-2)  BUS 34C (SWGR A)     POWER AND                   Cabinet   BLDG                           405A10H01                                         meets or BREAKER TO         SUPPORT                                                                                                               exceeds 3FWNP1A           SYSTEMS                                                                                                               demand [1]
L__ __
41 3ENS.ACB-16A  4KV EMERGENCY           AC/DC       ESCNXK47     Control   CNTL 47'-6"   3.967 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34C16-2)  BUS 34C (SWGR A)     POWER AND                   Cabinet   BLDG                                             GERS-RLY-ARS.4                   meets or BREAKER TO         SUPPORT                                                                               (increased by EPRI               exceeds 3FWNP1A           SYSTEMS                                                                                   TR-105966                   demand
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 19 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
[SQURTS], Table 3-1) 42 3ENS.ACB-16A  4KV EMERGENCY           AC/DC     PSCA1/K640   Control   CNTL 47'-6"   3.987 2.491     POTTER&         EPRI NP-7147-SLR1,       6.667   Capacity (34C16-2)  BUS 34C (SWGR A)     POWER AND                   Cabinet   BLDG                       BRUMFIELD MDR-       GERS-RLY-ARR.3                   meets or BREAKER TO         SUPPORT                                                           134-1 (NON-                                         exceeds 3FWNP1A           SYSTEMS                                                             LATCHING)                                         demand 43 3ENS.ACB-16B  4KV EMERGENCY         AC/DC           62     Switchgear CNTL 4'-6"   3.643 1.452     AGASTAT         EPRI NP-7147-SLR1,       10.000   Capacity (34D16-2)  BUS 34D (SWGR B)     POWER AND                             BLDG                         E7012PC001         GERS-RLY-PNT.7                 meets or BREAKER TO         SUPPORT                                                                                                               exceeds 3SWP*P1B         SYSTEMS                                                                                                               demand L__ _ _
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 3
Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3FWNP1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC AMSAC(A)/K104 Control CNTL 47'-6" 3.967 2.491 WESTINGHOUSE
[1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND Cabinet BLDG 405A10H01 meets or BREAKER TO SUPPORT exceeds 3FWNP1A SYSTEMS demand [1]
4KV EMERGENCY AC/DC ESCNXK47 Control CNTL 47'-6" 3.967 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3FWNP1A SYSTEMS TR-105966 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC PSCA1/K640 Control CNTL 47'-6" 3.987 2.491 POTTER&
EPRI NP-7147-SLR1, 6.667 Capacity BUS 34C (SWGR A)
POWER AND Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or BREAKER TO SUPPORT 134-1 (NON-exceeds 3FWNP1A SYSTEMS LATCHING) demand 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D (SWGR B)
POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 20 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment         Key Safety                   Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)     Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 44  3ENS.ACB-16B  4KV EMERGENCY           AC/DC     50/51-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 121FC66K1A                 [1]             [1]   Capacity (34D16-2)  BUS 34D (SWGR B)     PDWERAND                               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1B         SYSTEMS                                                                                                               demand [1]
Item No.
45 3ENS*ACB-16B  4KV EMERGENCY           AC/DC           50GS     Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFC21B1A                   [1]           [1]   Capacity (34016-2)  BUS 34D (SWGR B)     POWER AND                               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1B         SYSTEMS                                                                                                               demand [1]
Equipment ID 44 3ENS.ACB-16B (34D16-2) 45 3ENS*ACB-16B (34016-2) 46 3ENS*ACB-16B (34D16-2) 47 3ENS*ACB-16B (34D16-2}
46 3ENS*ACB-16B  4KV EMERGENCY           AC/DC           86E     Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA154B25F         QTR97P1230,           4.916   Capacity (34D16-2)  BUS 34D (SWGR B)     POWER AND                               BLDG                             (DC)           Qualification Test             meets or BREAKER TO         SUPPORT                                                                               Report for Qualified             exceeds 3SWP*P1B         SYSTEMS                                                                                 General Electric               demand Relays Northeast Utilities Systems -
48 3ENS*ACB-16B (34D16-2)
Millstone Nuclear Power Station, Order
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 20 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
                                                                                                                              #02044599, REV. 001, REV. 0, November 5, 1997 47 3ENS*ACB-16B  4KV EMERGENCY           AC/DC       86HBED3-     Switchgear CNTL 4'-6"   3.643 1.452         GE           EPRI NP-7147-SLR1,       8.000   Capacity (34D16-2}  BUS 34D (SWGR B}     POWER AND       3ENSB02               BLDG                       12HEA61 C239X2       GERS-RLY-AL0.2                   meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1B         SYSTEMS                                                                                                                 demand 48 3ENS*ACB-16B  4KV EMERGENCY         AC/DC     87BE-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12PVD99AB1A                   [1]           [1]   Capacity (34D16-2)  BUS 34D (SWGR B}     POWER AND       (3ENSB02}               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1B         SYSTEMS                                                                                                               demand [1]
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A
[1]
[1]
Capacity BUS 34D (SWGR B)
PDWERAND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand [1]
4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A
[1]
[1]
Capacity BUS 34D (SWGR B)
POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand [1]
4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HBED3-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B}
POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34D (SWGR B}
POWER AND (3ENSB02}
BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand [1]  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 21 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                               Demand                   Seismic Capacity Cabinet                                                    Seismic Capacity Evaluation Item                  Equipment         Key Safety No. Equipment ID    Description       Function     Relay ID(s)     Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document       TRS     Result 49  3ENS*ACB-16B  4KV EMERGENCY           AC/DC       ESCB/XK18       Control   CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34D16-2)  BUS 34D (SWGR B)     POWER AND         (MSB)         Cabinet   BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                                   (increased by EPRI             exceeds 3SWP*P1B         SYSTEMS                                                                                       TR-105988                 demand
Item No.
[SQURTS], Table 3-1) 50 3ENS*ACB-16B  4KV EMERGENCY         AC/DC       ESCB/XK34       Control   CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34D16-2)  BUS 34D (SWGR B)     POWER AND         (LOP)       Cabinet   BLDG                                             GERS-RLY-ARS.4               meets or BREAKER TO         SUPPORT                                                                                   (increased by EPRI             exceeds 3SWP*P1B         SYSTEMS                                                                                       TR-105988                 demand
Equipment ID 49 3ENS*ACB-16B (34D16-2) 50 3ENS*ACB-16B (34D16-2) 51 3ENS*ACB-17A (34C17-2) 52 3ENS*ACB-17A (34C17-2) 53 3ENS*ACB-17A (34C17-2)
[SQURTS], Table 3-1) 51 3ENS*ACB-17A  4KV EMERGENCY         AC/DC             62       Switchgear CNTL 4'-6"   3.643 1.452     AGASTAT         EPRI NP-7147-SLR1,     10.000   Capacity (34C17-2)  BUS 34C (SWGR A)     POWER AND                                 BLDG                         E7012PC001         GERS-RLY-PNT.7               meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1A         SYSTEMS                                                                                                                 demand 52 3ENS*ACB-17A  4KV EMERGENCY         AC/DC     50/50/51-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 121FC66K1A                 [1]           [1]   Capacity (34C17-2)  BUS 34C (SWGR A)     POWER AND                                 BLDG                       GE 121FC66D1A                                       meets or BREAKER TO         SUPPORT                                                             GE 121FC66K1A                                       exceeds 3SWP*P1A         SYSTEMS                                                                                                                 demand [1]
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 21 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
53 3ENS*ACB-17A  4KV EMERGENCY         AC/DC           50GS       Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFC21B1A                 [1]           [1]   Capacity (34C17-2)  BUS 34C (SWGR A)     POWER AND                                 BLDG                                                                           meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1A         SYSTEMS                                                                                                                 demand [1]
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC ESCB/XK18 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND (MSB)
Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1B SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK34 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND (LOP)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1B SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C (SWGR A)
POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand 4KV EMERGENCY AC/DC 50/50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A
[1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND BLDG GE 121FC66D1A meets or BREAKER TO SUPPORT GE 121FC66K1A exceeds 3SWP*P1A SYSTEMS demand [1]
4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A
[1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand [1]  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 22 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment         Key Safety                 Cabinet                                                     Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model     Source Document         TRS   Result 54  3ENS*ACB-17A  4KV EMERGENCY           AC/DC           86E     Switchgear CNTL 4'-B"   3.643 1.452 GE 12HFA154B25F           QTR97P1230,         4.916   Capacity (34C17-2)  BUS 34C (SWGR A)     POWER AND                             BLDG                             (DC)             Qualification Test             meets or BREAKER TO         SUPPORT                                                                                 Report for Qualified           exceeds 3SWP*P1A         SYSTEMS                                                                                   General Electric             demand Relays Northeast Utilities Systems -
Item No.
Millstone Nuclear Power Station, Order
Equipment ID 54 3ENS*ACB-17A (34C17-2) 55 3ENS*ACB-17A (34C17-2) 56 3ENS*ACB-17A (34C17-2) 57 3ENS*ACB-17A (34C17-2) 58 3ENS*ACB-17A (34C17-2)
                                                                                                                              #02044599, REV. 001, REV. 0, November 5, 1997 55 3ENS*ACB-17A  4KV EMERGENCY           AC/DC       86HAED3-   Switchgear CNTL 4'-B"   3.643 1.452         GE           EPRI NP-7147-SLR1,       8.000   Capacity (34C17-2)  BUS 34C (SWGR A)     POWER AND       3ENSA02               BLDG                       12HEA61C239X2         GERS-RLY-AL0.2                 meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1A         SYSTEMS                                                                                                                 demand 56 3ENS*ACB-17A  4KV EMERGENCY           AC/DC     87AE-A, B & C Switchgear CNTL 4'-B"   3.643 1.452 GE 12PVD99AB1A                   [1]           [1]   Capacity (34C17-2)  BUS 34C (SWGR A)     POWER AND     (3ENSA02)               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1A         SYSTEMS                                                                                                               demand [1]
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 22 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
57 3ENS*ACB-17A  4KV EMERGENCY         AC/DC       ESCNXK18     Control   CNTL 47'-B"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34C17-2)  BUS 34C (SWGR A)     POWER AND         (MSB)     Cabinet   BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                                 (increased by EPRI             exceeds 3SWP*P1A         SYSTEMS                                                                                     TR-105988                 demand
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A)
[SQURTS], Table 3-1) 58 3ENS*ACB-17A  4KV EMERGENCY         AC/DC       ESCA/XK34     Control   CNTL 47'-B"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34C17-2)  BUS 34C (SWGR A)     POWER AND         (LOP)     Cabinet   BLDG                                               GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                                 (increased by EPRI             exceeds 3SWP*P1A         SYSTEMS                                                                                     TR-105988                 demand
POWER AND BLDG (DC)
[SQURTS], Table 3-1)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HAED3-Switchgear CNTL 4'-B" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A)
POWER AND 3ENSA02 BLDG 12HEA61C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND (3ENSA02)
BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand [1]
4KV EMERGENCY AC/DC ESCNXK18 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND (MSB)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1A SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK34 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND (LOP)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1A SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 23 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment         Key Safety                   Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)     Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 59  3ENS*ACB-17B  4KV EMERGENCY           AC/DC           62       Switchgear CNTL 4'-6"   3.643 1.452     AGASTAT         EPRI NP-7147-SLR1,       10.000   Capacity (34D17-2)  BUS 34D (SWGR B)     POWER AND                               BLDG                         E7012PC001         GERS-RLY-PNT.7                   meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1D         SYSTEMS                                                                                                                 demand 60 3ENS*ACB-17B  4KV EMERGENCY           AC/DC     50/51-A. B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 121FC66K1A                 [1]             [1]   Capacity (34D17-2)  BUS 34D (SWGR B)     POWER AND                               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1D         SYSTEMS                                                                                                               demand [1]
Item No.
61 3ENS*ACB-17B  4KV EMERGENCY           AC/DC         50GS       Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFC21 B1A                 [1]           [1]   Capacity (34D17-2)  BUS 34D (SWGR B}     POWER AND                               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1D         SYSTEMS                                                                                                               demand [1]
Equipment ID 59 3ENS*ACB-17B (34D17-2) 60 3ENS*ACB-17B (34D17-2) 61 3ENS*ACB-17B (34D17-2) 62 3ENS*ACB-17B (34D17-2) 63 3ENS*ACB-17B (34D17-2)
62 3ENS*ACB-17B  4KV EMERGENCY           AC/DC           86E       Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA154B25F         QTR97P1230,           4.916   Capacity (34D17-2)  BUS 34D (SWGR B)     POWER AND                               BLDG                             (DC)           Qualification Test             meets or BREAKER TO         SUPPORT                                                                               Report for Qualified             exceeds 3SWP*P1D         SYSTEMS                                                                                 General Electric               demand Relays Northeast Utilities Systems -
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 23 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Millstone Nuclear Power Station, Order
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D (SWGR B)
                                                                                                                              #02044599, REV. 001, REV. 0, November 5, 1997 63 3ENS*ACB-17B  4KV EMERGENCY         AC/DC       86HBED3-     Switchgear CNTL 4'-6"   3.643 1.452         GE           EPRI NP-7147-SLR1,       8.000   Capacity (34D17-2)  BUS 34D (SWGR B)     POWER AND       3ENSB02                 BLDG                       12HEA61 C239X2       GERS-RLY-AL0.2                   meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3SWP*P1D         SYSTEMS                                                                                                                 demand
POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand 4KV EMERGENCY AC/DC 50/51-A. B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A
[1]
[1]
Capacity BUS 34D (SWGR B)
POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand [1]
4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21 B1A
[1]
[1]
Capacity BUS 34D (SWGR B}
POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand [1]
4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP*P1D SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HBED3-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B)
POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 24 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List               ~           Demand                   Seismic Capacity Item                  Equipment         Key Safety                   Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)     Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document       TRS     Result 64  3ENS*ACB-17B  4KV EMERGENCY         AC/DC     87BE-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12PVD99AB1A               [1]             [1]   Capacity (34D17-2)  BUS 34D (SWGR B)   POWER AND     (3ENSB02)               BLDG                                                                           meets or BREAKER TO         SUPPORT                                                                                                               exceeds 3SWP*P1D         SYSTEMS                                                                                                               demand [1]
Item No.
65 3ENS*ACB-17B  4KV EMERGENCY         AC/DC       ESCB/XK18     Control   CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34D17-2)  BUS 34D (SWGR B)   POWER AND         (MSB)       Cabinet   BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                                 (increased by EPRI             exceeds 3SWP*P1D         SYSTEMS                                                                                     TR-105988                 demand
Equipment ID 64 3ENS*ACB-17B (34D17-2) 65 3ENS*ACB-17B (34D17-2) 66 3ENS*ACB-17B (34D17-2) 67 3ENS*ACB-18A (34C18-2) 68 3ENS*ACB-18A (34C18-2) 69 3ENS*ACB-18A (34C18-2)
[SQURTS], Table3-1) 66 3ENS*ACB-17B  4KV EMERGENCY         AC/DC       ESCB/XK38     Control   CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34D17-2)  BUS 34D (SWGR B)   POWER AND         (LOP)       Cabinet   BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                                 (increased by EPRI             exceeds 3SWP*P1D         SYSTEMS                                                                                     TR-105988                 demand
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 24 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List  
[SQURTS], Table 3-1) 67 3ENS*ACB-18A  4KV EMERGENCY         AC/DC           62       Switchgear CNTL 4'-6"   3.643 1.452     AGASTAT         EPRI NP-7147-SLR1,     10.000   Capacity (34C18-2)  BUS 34C (SWGR A)   POWER AND                               BLDG                         E7012PC001         GERS-RLY-PNT.7               meets or BREAKER TO         SUPPORT                                                                                                               exceeds 3SWP*P1C         SYSTEMS                                                                                                               demand 68 3ENS*ACB-18A  4KV EMERGENCY         AC/DC     50/51-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 121FC66K1A               [1]             [1]   Capacity (34C18-2)  BUS 34C (SWGR A)   POWER AND                               BLDG                                                                           meets or BREAKER TO         SUPPORT                                                                                                               exceeds 3SWP*P1C         SYSTEMS                                                                                                               demand [1]
~
69 3ENS*ACB-18A  4KV EMERGENCY         AC/DC         50GS       Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFC21B1A               [1]             [1]   Capacity (34C18-2)  BUS 34C (SWGR A)   POWER AND                               BLDG                                                                           meets or BREAKER TO         SUPPORT                                                                                                               exceeds 3SWP*P1C         SYSTEMS                                                                                                               demand [1]
Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34D (SWGR B)
POWER AND (3ENSB02)
BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand [1]
4KV EMERGENCY AC/DC ESCB/XK18 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND (MSB)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1D SYSTEMS TR-105988 demand
[SQURTS], Table3-1) 4KV EMERGENCY AC/DC ESCB/XK38 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND (LOP)
Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1D SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C (SWGR A)
POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1C SYSTEMS demand 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A
[1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1C SYSTEMS demand [1]
4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A
[1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1C SYSTEMS demand [1]  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 25 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment         Key Safety                 Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 70  3ENS.ACB-18A  4KV EMERGENCY           AC/DC           86E     Switchgear CNTL 4"-6"   3.643 1.452 GE 12HFA154B25F         QTR97P1230,         4.916   Capacity (34C18-2)  BUS 34C (SWGR A}     POWER AND                             BLDG                             (DC}           Qualification Test             meets or BREAKER TO         SUPPORT                                                                               Report for Qualified             exceeds 3SWP.P1C         SYSTEMS                                                                                 General Electric               demand Relays Northeast Utilities Systems -
Item No.
Millstone Nuclear Power Station, Order
Equipment ID 70 3ENS.ACB-18A (34C18-2) 71 3ENS*ACB-18A (34C18-2) 72 3ENS*ACB-18A (34C18-2}
                                                                                                                              #02044599, REV. 001, REV. 0, November 5, 1997 71 3ENS*ACB-18A  4KV EMERGENCY           AC/DC       86HAED3-   Switchgear CNTL 4'-6"   3.643 1.452         GE           EPRI NP-7147-SLR1,       8.000   Capacity (34C18-2)  BUS 34C (SWGR A}     POWER AND       3ENSA02               BLDG                       12HEA61 C239X2       GERS-RLY-AL0.2                   meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3swp*p1c         SYSTEMS                                                                                                                 demand 72 3ENS*ACB-18A  4KV EMERGENCY           AC/DC     87AE-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12PVD99AB1A                   [1]           [1]   Capacity (34C18-2}  BUS 34C (SWGR A}     POWER AND     (3ENSA02}               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3swp*p1c         SYSTEMS                                                                                                               demand [1]
73 3ENS.ACB-18A (34C18-2}
73 3ENS.ACB-18A  4KV EMERGENCY         AC/DC       ESCNXK18     Control   CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34C18-2}  BUS 34C (SWGR A}     POWER AND         (MSB}     Cabinet   BLDG                                             GERS-RLY-ARS.4                   meets or BREAKER TO         SUPPORT                                                                               (increased by EPRI               exceeds 3swp*p1c         SYSTEMS                                                                                     TR-105988                   demand
74 3ENS.ACB-18A (34C18-2}
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 25 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4"-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A}
POWER AND BLDG (DC}
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP.P1C SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HAED3-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A}
POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RL Y-AL0.2 meets or BREAKER TO SUPPORT exceeds 3swp*p1c SYSTEMS demand 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34C (SWGR A}
POWER AND (3ENSA02}
BLDG meets or BREAKER TO SUPPORT exceeds 3swp*p1c SYSTEMS demand [1]
4KV EMERGENCY AC/DC ESCNXK18 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A}
POWER AND (MSB}
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3swp*p1c SYSTEMS TR-105988 demand
[SQ U RTS], Table 3-1 }
[SQ U RTS], Table 3-1 }
74 3ENS.ACB-18A  4KV EMERGENCY         AC/DC       ESCNXK38     Control   CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34C18-2}  BUS 34C (SWGR A}     POWER AND         (LOP}     Cabinet   BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                               (increased by EPRI               exceeds 3swp*p1c         SYSTEMS                                                                                     TR-105988                   demand
4KV EMERGENCY AC/DC ESCNXK38 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A}
[SQURTS], Table 3-1)
POWER AND (LOP}
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3swp*p1c SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 26 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                                 Demand                   Seismic Capacity Item                  Equipment         Key Safety                 Cabinet                                                         Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type     Bldg   Elev       ICRS,H ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 75  3ENS*ACB-18B  4KV EMERGENCY           AC/DC           1X     Switchgear CNTL     4'-6"       3.643 1.452 GE 12HGA111J2G     EPRI NP-7147-SLR1,       7.040   Capacity (34D18-2)  BUS 34D (SWGR B)     POWER AND                             BLDG                                                   GERS-RLY-ARH.5                   meets or BREAKER TO         SUPPORT                                                                                                                     exceeds 3Rss*P1B         SYSTEMS                                                                                                                     demand 76  3ENS.ACB-18B  4KV EMERGENCY           AC/DC     3-3RHS*P1B   Switchgear CNTL     4'-6"       3.643 1.452 GE 12HFA154B25F       QTR97P1230,           4.916   Capacity (34D18-2)  BUS 34D (SWGR B)     POWER AND                             BLDG                                     (DC)         Qualification Test             meets or BREAKER TO         SUPPORT                                                                                     Report for Qualified             exceeds 3Rss*P1B         SYSTEMS                                                                                       General Electric               demand Relays Northeast Utilities Systems -
Item No.
Millstone Nuclear Power Station, Order
Equipment ID 75 3ENS*ACB-18B (34D18-2) 76 3ENS.ACB-18B (34D18-2) 77 3ENS*ACB-18B (34D18-2) 78 3ENS.ACB-18B (34D18-2)
                                                                                                                                  #02044599, REV. 001, REV. 0, November 5, 1997 77 3ENS*ACB-18B  4KV EMERGENCY           AC/DC     3QSS*LS54B     Field     ESF   16'-6"       0.886 0.574   STATIC-0-RING,   EPRI NP-5223-SLR1,       2.000   Capacity (34D18-2)  BUS 34D (SWGR B)     POWER AND                             BLDG. (SWITCH                     INC. 12N6BB4-U8-         GERS-PS.5                   meets or BREAKER TO         SUPPORT                                   EL.) - 4'-6"                   C1A-JJTTNQ                                         exceeds 3Rss*P1B         SYSTEMS                                     (FLOOR                                                                           demand EL) 78 3ENS.ACB-18B  4KV EMERGENCY         AC/DC     3QSS*LS54D     Field     ESF   16'-6"       0.886 0.574   STATIC-0-RING,   EPRI NP-5223-SLR1,       2.000   Capacity (34D18-2)  BUS 34D (SWGR B)     POWER AND                             BLDG. (SWITCH                     INC. 12N6BB4-U8-         GERS-PS.5                   meets or BREAKER TO         SUPPORT                                   EL) - 4'-6"                   C1A-JJTTNQ                                         exceeds 3RSS*P1B         SYSTEMS                                     (FLOOR                                                                           demand EL.)
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 26 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 1X Switchgear CNTL 4'-6" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity BUS 34D (SWGR B)
POWER AND BLDG GERS-RL Y-ARH.5 meets or BREAKER TO SUPPORT exceeds 3Rss*P1B SYSTEMS demand 4KV EMERGENCY AC/DC 3-3RHS*P1B Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3Rss*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 3QSS*LS54B Field ESF 16'-6" 0.886 0.574 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity BUS 34D (SWGR B)
POWER AND BLDG.
(SWITCH INC. 12N6BB4-U8-GERS-PS.5 meets or BREAKER TO SUPPORT EL.) - 4'-6" C1A-JJTTNQ exceeds 3Rss*P1B SYSTEMS (FLOOR demand EL) 4KV EMERGENCY AC/DC 3QSS*LS54D Field ESF 16'-6" 0.886 0.574 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity BUS 34D (SWGR B)
POWER AND BLDG.
(SWITCH INC. 12N6BB4-U8-GERS-PS.5 meets or BREAKER TO SUPPORT EL) - 4'-6" C1A-JJTTNQ exceeds 3RSS*P1B SYSTEMS (FLOOR demand EL.)  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 27 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                     Seismic Capacity Item                  Equipment         Key Safety                 Cabinet                                                     Seismic Capacity Evaluation No. Equipment JD    Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,tt ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 79  3ENS*ACB-18B  4KV EMERGENCY         AC/DC     86E1-3RSSB01 Switchgear CNTL 4'-B"   3.643   1.452 GE 12HFA154B22F         QTR97P1230,         4.916   Capacity (34D18-2)  BUS 34D (SWGR B)   POWER AND                             BLDG                               (DC)             Qualification Test             meets or BREAKER TO         SUPPORT                                                                                 Report for Qualified             exceeds 3RSS*P1B         SYSTEMS                                                                                   General Electric               demand Relays Northeast Utilities Systems -
Item No.
Millstone Nuclear Power Station, Order
Equipment JD 79 3ENS*ACB-18B (34D18-2) 80 3ENS*ACB-18B (34D18-2) 81 3ENS*ACB-19A (34C19-2) 82 3ENS*ACB-19A (34C19-2)
                                                                                                                              #02044599, REV. 001, REV. 0, November 5, 1997 80 3ENS*ACB-18B  4KV EMERGENCY         AC/DC       ESCB/XK60   Control   CNTL 47'-B"   3.987   2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34D18-2)  BUS 34D (SWGR B)   POWER AND         (SSS)     Cabinet   BLDG                                             GERS-RLY-ARS.4                   meets or BREAKER TO         SUPPORT                                                                                 (increased by EPRI               exceeds 3RSS*P1B         SYSTEMS                                                                                     TR-105988                   demand
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 27 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
[SQURTS], Table 3-1) 81 3ENS*ACB-19A  4KV EMERGENCY         AC/DC           1X     Switchgear CNTL 4'-B"   3.643   1.452 GE 12HGA111J2G       EPRI NP-7147-SLR1,       7.040   Capacity (34C19-2)  BUS 34C (SWGR A)   POWER AND                             BLDG                                             GERS-RLY-ARH.5                   meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3RSS*P1A         SYSTEMS                                                                                                                 demand 82 3ENS*ACB-19A  4KV EMERGENCY         AC/DC       3-3RHS*P1A   Switchgear CNTL 4'-B"   3.643   1.452 GE 12HFA154B25F         QTR97P1230,         4.916   Capacity (34C19-2)  BUS 34C (SWGR A)   POWER AND                             BLDG                               (DC)             Qualification Test             meets or BREAKER TO         SUPPORT                                                                                 Report for Qualified             exceeds 3RSS*P1A         SYSTEMS                                                                                   General Electric               demand Relays Northeast Utilities Systems -
Type Bldg Elev ICRS,tt ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 86E1-3RSSB01 Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B22F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B)
Millstone Nuclear Power Station, Order
POWER AND BLDG (DC)
                                                                                                                              #02044599, REV. 001, REV. 0, November 5, 1997
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3RSS*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC ESCB/XK60 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND (SSS)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RSS*P1B SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 1X Switchgear CNTL 4'-B" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity BUS 34C (SWGR A)
POWER AND BLDG GERS-RL Y-ARH.5 meets or BREAKER TO SUPPORT exceeds 3RSS*P1A SYSTEMS demand 4KV EMERGENCY AC/DC 3-3RHS*P1A Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3RSS*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation
Item No.
* Page 28 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                               Demand                     Seismic Capacity Item                  Equipment         Key Safety                 Cabinet                                                         Seismic Capacity Evaluation No. Equipment ID  . Description       Function     Relay ID(s)   Type     Bldg   Elev   ICRScH ICRScv Relay Mfg. & Model   Source Document         TRS     Result 83 3ENS*ACB-19A  4KV EMERGENCY           AC/DC     3Qss*LS54A     Field     ESF   15'-4"   0.886   0.568 STATIC-0-RING,     EPRI NP-5223-SLR1,       2.000   Capacity (34C19-2)  BUS 34C (SWGR A)     POWER AND                             BLDG. (SWITCH                   INC. 12N6BB4-U8-         GERS-PS.5                   meets or BREAKER TO         SUPPORT                                   EL)-4'.Q"                   C1A-JJTTNQ                                         exceeds 3Rss*P1A         SYSTEMS                                     (FLOOR                                                                         demand EL) 84 3ENS.ACB-19A  4KV EMERGENCY           AC/DC     3QSS*LS54C     Field     ESF   18'-4"   0.886   0.584 STATIC-0-RING,     EPRI NP-5223-SLR1,       2.000   Capacity (34C19-2)  BUS 34C (SWGR A)     POWER AND                             BLDG. (SWITCH                   INC. 12N6BB4-U8-         GERS-PS.5                   meets or BREAKER TO         SUPPORT                                   EL)-4'.Q"                   C1A-JJTTNQ                                         exceeds 3Rss*P1A         SYSTEMS                                     (FLOOR                                                                         demand EL) 85 3ENS*ACB-19A  4KV EMERGENCY           AC/DC     86E-3RSSA01 Switchgear CNTL     4'.Q"   3.643   1.452 GE 12HFA154B22F         QTR97P1230,         4.916   Capacity (34C19-2)  BUS 34C (SWGR A)     POWER AND                             BLDG                                   (DC)           Qualification Test             meets or BREAKER TO         SUPPORT                                                                                   Report for Qualified             exceeds 3Rss*P1A         SYSTEMS                                                                                     General Electric               demand Relays Northeast Utilities Systems -
Equipment ID 83 3ENS*ACB-19A (34C19-2) 84 3ENS.ACB-19A (34C19-2) 85 3ENS*ACB-19A (34C19-2) 86 3ENS*ACB-19A (34C19-2) 87 3ENS*ACB-19B (34D19-2)
Millstone Nuclear Power Station, Order
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 28 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity  
                                                                                                                                #02044599, REV. 001, REV. 0, November 5, 1997 86 3ENS*ACB-19A  4KV EMERGENCY         AC/DC       ESCA/XK60   Control   CNTL     47'.Q"   3.987   2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34C19-2)  BUS 34C (SWGR A)     POWER AND         (SSS)     Cabinet   BLDG                                                 GERS-RLY-ARS.4                   meets or BREAKER TO         SUPPORT                                                                                   (increased by EPRI               exceeds 3Rss*P1A         SYSTEMS                                                                                         TR-105988                   demand
. Description Function Relay ID(s)
[SQURTS], Table 3-1) 87 3ENS*ACB-19B  4KV EMERGENCY         AC/DC           3     Switchgear CNTL     4'.Q"   3.643   1.452 GE 12HFA151A2H     EPRI NP-7147-SLR1,       16.385   Capacity (34D19-2)  BUS 34D (SWGR B)     POWER AND                             BLDG                                   (DC)           GERS-RLY-ARH.5                   meets or BREAKER TO         SUPPORT                                                                                                                     exceeds 3RSS'P1D         SYSTEMS                                                                                                                     demand
Type Bldg Elev ICRScH ICRScv Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 3Qss*LS54A Field ESF 15'-4" 0.886 0.568 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity BUS 34C (SWGR A)
POWER AND BLDG.
(SWITCH INC. 12N6BB4-U8-GERS-PS.5 meets or BREAKER TO SUPPORT EL)-4'.Q" C1A-JJTTNQ exceeds 3Rss*P1A SYSTEMS (FLOOR demand EL) 4KV EMERGENCY AC/DC 3QSS*LS54C Field ESF 18'-4" 0.886 0.584 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity BUS 34C (SWGR A)
POWER AND BLDG.
(SWITCH INC. 12N6BB4-U8-GERS-PS.5 meets or BREAKER TO SUPPORT EL)-4'.Q" C1A-JJTTNQ exceeds 3Rss*P1A SYSTEMS (FLOOR demand EL) 4KV EMERGENCY AC/DC 86E-3RSSA01 Switchgear CNTL 4'.Q" 3.643 1.452 GE 12HFA154B22F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3Rss*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC ESCA/XK60 Control CNTL 47'.Q" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND (SSS)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3Rss*P1A SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 3
Switchgear CNTL 4'.Q" 3.643 1.452 GE 12HFA151A2H EPRI NP-7147-SLR1, 16.385 Capacity BUS 34D (SWGR B)
POWER AND BLDG (DC)
GERS-RLY-ARH.5 meets or BREAKER TO SUPPORT exceeds 3RSS'P1D SYSTEMS demand  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 29 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                   Seismic Capacity Item                  Equipment         Key Safety               Cabinet                                                     Seismic Capacity Evaluation No. Equipment ID    Description       Function   Relay ID(s)   Type   Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document       TRS     Result 88  3ENS*ACB-19B  4KV EMERGENCY         AC/DC         62A     Switchgear CNTL 4'-6"   3.643 1.452     AGASTAT         EPRI NP-7147-SLR1,     10.000   Capacity (34D19-2)  BUS 34D (SWGR B)   POWER AND                           BLDG                         E7012PC002         GERS-RLY-PNT.7               meets or BREAKER TO         SUPPORT                                                                                                             exceeds 3RSS*P1D         SYSTEMS                                                                                                             demand 89 3ENS*ACB-19B  4KV EMERGENCY         AC/DC     ESCB/XK-62   Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34D19-2)  BUS 34D (SWGR B)   POWER AND       (SSS)     Cabinet   BLDG                                             GERS-RLY-ARS.4               meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3RSS*P1D         SYSTEMS                                                                                 TR-105988                 demand
Item No.
[SQURTS], Table 3-1) 90  3ENS*ACB-1 B 4KV EMERGENCY         AC/DC     ESCB/XK46     Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34D1-2)  BUS 34D (SWGR B)   POWER AND                 Cabinet   BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3HVK*CHL1B         SYSTEMS                                                                                   TR-105988                 demand
Equipment ID 88 3ENS*ACB-19B (34D19-2) 89 3ENS*ACB-19B (34D19-2) 90 3ENS*ACB-1 B (34D1-2) 91 3ENS*AC B-20A (34C20-2) 92 3ENS*ACB-20A (34C20-2) 93 3ENS*ACB-2DA (34C20-2)
[SQURTS], Table 3-1) 91 3ENS*AC B-20A 4KV EMERGENCY         AC/DC         3       Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA151A2H       EPRI 3002002997     16.385   Capacity (34C20-2)  BUS 34C (SWGR A)   POWER AND                           BLDG                             (DC)                                         meets or BREAKER TO         SUPPORT                                                                                                             exceeds 3RSS*P1C         SYSTEMS                                                                                                             demand 92 3ENS*ACB-20A  4KV EMERGENCY         AC/DC         62A     Switchgear CNTL 4'-6"   3.643 1.452     AGASTAT         EPRI NP-7147-SLR1,     10.000   Capacity (34C20-2)  BUS 34C (SWGR A)   POWER AND                           BLDG                         E7012PC002         GERS-RLY-PNT.7               meets or BREAKER TO         SUPPORT                                                                                                             exceeds 3RSS*P1C         SYSTEMS                                                                                                             demand 93 3ENS*ACB-2DA  4KV EMERGENCY         AC/DC     ESCA/XK-62   Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34C20-2)  BUS 34C (SWGR A)   POWER AND       (SSS)     Cabinet   BLDG                                             GERS-RLY-ARS.4               meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3RSS*P1C         SYSTEMS                                                                                   TR-105988                 demand
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 29 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Equipment Key Safety Cabinet Seismic Capacity Evaluation Description Function Relay ID(s)
[SQURTS], Table 3-1)
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 62A Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D (SWGR B)
POWER AND BLDG E7012PC002 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3RSS*P1D SYSTEMS demand 4KV EMERGENCY AC/DC ESCB/XK-62 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND (SSS)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RSS*P1D SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK46 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3HVK*CHL1B SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 3
Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2H EPRI 3002002997 16.385 Capacity BUS 34C (SWGR A)
POWER AND BLDG (DC) meets or BREAKER TO SUPPORT exceeds 3RSS*P1C SYSTEMS demand 4KV EMERGENCY AC/DC 62A Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C (SWGR A)
POWER AND BLDG E7012PC002 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3RSS*P1C SYSTEMS demand 4KV EMERGENCY AC/DC ESCA/XK-62 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND (SSS)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RSS*P1C SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 30 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                     Seismic Capacity Item                  Equipment         Key Safety               Cabinet                                                     Seismic Capacity Evaluation No. Equipment ID    Description       Function   Relay ID(s)   Type   Bldg Elev   ICRS,tt ICRS,v Relay Mfg. & Model   Source Document       TRS     Result 94  3ENS*ACB-20B  4KV EMERGENCY         AC/DC     ESCB/XK21     Control CNTL 47'-6"   3.987   2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34D20-2)  BUS 34D (SWGR B)   POWER AND                 Cabinet BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3CHS*P3B         SYSTEMS                                                                                 TR-105988                 demand
Item No.
[SQURTS], Table 3-1) 95 3ENS*ACB-21A  4KV EMERGENCY         AC/DC     ESCA/XK21     Control CNTL 47'-6"   3.987   2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34C21-2)  BUS 34C (SWGR A)   POWER AND                 Cabinet BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3CHS*P3A         SYSTEMS                                                                                 TR-105988                 demand
Equipment ID 94 3ENS*ACB-20B (34D20-2) 95 3ENS*ACB-21A (34C21-2) 96 3ENS*ACB-21 B (34D21-2) 97 3ENS*ACB-22A (34C22-2) 98 3ENS*ACB-2A (34C2-2)
[SQURTS], Table 3-1) 96 3ENS*ACB-21 B 4KV EMERGENCY         AC/DC     ESCB/XK23     Control CNTL 47'-6"   3.987   2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34D21-2)  BUS 34D (SWGR B)   POWER AND                 Cabinet BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3CHS*P3C         SYSTEMS                                                                                 TR-105988                 demand
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 30 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
[SQURTS], Table 3-1) 97 3ENS*ACB-22A  4KV EMERGENCY         AC/DC     ESCA/XK23     Control CNTL 47'-6"   3.987   2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34C22-2)  BUS 34C (SWGR A)   POWER AND                 Cabinet BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3CHS*P3C         SYSTEMS                                                                                 TR-105988                 demand
Type Bldg Elev ICRS,tt ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC ESCB/XK21 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
[SQURTS], Table 3-1) 98  3ENS*ACB-2A  4KV EMERGENCY         AC/DC     ESCA/XK46     Control CNTL 47'-6"   3.987   2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34C2-2)  BUS 34C (SWGR A)   POWER AND                 Cabinet BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3HVK*CHL1A         SYSTEMS                                                                                 TR-105988                 demand
POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3B SYSTEMS TR-105988 demand
[SQURTS]. Table 3-1)
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK21 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3A SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK23 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3C SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK23 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3C SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK46 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3HVK*CHL1A SYSTEMS TR-105988 demand
[SQURTS]. Table 3-1)  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 31 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                   Seismic Capacity Item                  Equipment         Key Safety               Cabinet                                                     Seismic Capacity Evaluation No. Equipment ID    Description       Function   Relay ID(s)   Type   Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 99  3ENS*ACB-5B  4KV EMERGENCY           AC/DC     ESCB/XK-25   Control   CNTL 47'-B"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34D5-2)  BUS 34D (SWGR B)     POWER AND                 Cabinet   BLDG                                             GERS-RLY-ARS.4                   meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI               exceeds 3Qss*P3B         SYSTEMS                                                                                   TR-105988                   demand
Item No.
[SQURTS], Table 3-1) 100 3ENS*ACB-BA  4KV EMERGENCY           AC/DC         3       Switchgear CNTL 4'-B"   3.643 1.452 GE 12HFA154B25F         QTR97P1230,         6.110   Capacity (34C6-2)  BUS 34C (SWGR A)     POWER AND                           BLDG                             (DC)           Qualification Test             meets or BREAKER TO         SUPPORT                                                                             Report for Qualified             exceeds 3QSS.P3A         SYSTEMS                                                                               General Electric               demand Relays Northeast Utilities Systems -
Equipment ID 99 3ENS*ACB-5B (34D5-2) 100 3ENS*ACB-BA (34C6-2) 101 3ENS*ACB-BA (34C6-2) 102 3ENS*ACB-BB (34D6-2)
Millstone Nuclear Power Station, Order
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 31 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
                                                                                                                          #02044599, REV. 001, REV. 0, November 5, 1997 101 3ENS*ACB-BA  4KV EMERGENCY           AC/DC     ESCNXK-25     Control CNTL 47'-B"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34C6-2)  BUS 34C (SWGR A)     POWER AND                 Cabinet   BLDG                                             GERS-RLY-ARS.4                   meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI               exceeds 3QSS.P3A         SYSTEMS                                                                                   TR-105988                   demand
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC ESCB/XK-25 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
[SQURTS], Table 3-1) 102 3ENS*ACB-BB  4KV EMERGENCY         AC/DC     ESCB/XK-29   Control CNTL 47'-B"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34D6-2)  BUS 34D (SWGR B)     POWER AND       (SSS)     Cabinet   BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                             (increased by EP RI             exceeds 3RHS.P1B         SYSTEMS                                                                                   TR-105988                   demand
POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3Qss*P3B SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 3
Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 6.110 Capacity BUS 34C (SWGR A)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3QSS.P3A SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC ESCNXK-25 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3QSS.P3A SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK-29 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND (SSS)
Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EP RI exceeds 3RHS.P1B SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 32 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                   Seismic Capacity Item                  Equipment         Key Safety               Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function   Relay ID(s)   Type   Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 103 3ENS*ACB-7A  4KV EMERGENCY           AC/DC         3       Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA154B25F         QTR97P1230,         6.110   Capacity (34C7-2)  BUS 34C (SWGR A)     POWER AND                           BLDG                             (DC)           Qualification Test             meets or BREAKER TO         SUPPORT                                                                             Report for Qualified             exceeds 3RHS*P1A         SYSTEMS                                                                               General Electric               demand Relays Northeast Utilities Systems -
Item No.
Millstone Nuclear Power Station, Order
Equipment ID 103 3ENS*ACB-7 A (34C7-2) 104 3ENS*ACB-7 A (34C7-2) 105 3ENS*ACB-7B (3407-2) 106 3ENS*ACB-8A (34C8-2)
                                                                                                                          #02044599, REV. 001, REV. 0, November 5, 1997 104 3ENS*ACB-7A  4KV EMERGENCY           AC/DC     ESCA/XK-29   Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34C7-2)  BUS 34C (SWGR A)     POWER AND       (SSS)     Cabinet   BLDG                                             GERS-RLY-ARS.4                   meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI               exceeds 3RHS*P1A         SYSTEMS                                                                                   TR-105988                   demand ISQURTS], Table 3-1) 105 3ENS*ACB-7B  4KV EMERGENCY         AC/DC     ESCA/XK27     Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (3407-2)  BUS 34D (SWGR B)     POWER AND                 Cabinet   BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI               exceeds 3SIH*P1B         SYSTEMS                                                                                   TR-105988                   demand
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 32 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
[SQURTS], Table 3-1) 106 3ENS*ACB-8A  4KV EMERGENCY         AC/DC     ESCA/XK-27   Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34C8-2)  BUS 34C (SWGR A)     POWER AND                 Cabinet   BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI               exceeds 3SIH*P1A         SYSTEMS                                                                                   TR-105988                   demand
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 3
[SQURTS], Table 3-1)
Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 6.110 Capacity BUS 34C (SWGR A)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3RHS*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC ESCA/XK-29 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND (SSS)
Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RHS*P1A SYSTEMS TR-105988 demand ISQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK27 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SIH*P1B SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK-27 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SIH*P1A SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 33 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                   Seismic Capacity Item                Equipment         Key Safety               Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function   Relay ID(s)   Type   Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document       TRS     Result 107 3ENS*ACB-8B  4KV EMERGENCY         AC/DC     ESCB/XK40   Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34D8-2)  BUS 34D (SWGR B)   POWER AND       (SSS)     Cabinet BLDG                                             GERS-RLY-ARS.4                 meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3CCP*P1B         SYSTEMS                                                                                 TR-105988                 demand
Item No.
[SQURTS], Table 3-1) 108 3ENS*ACB-8B  4KV EMERGENCY         AC/DC     ESCB/XK42     Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34D8-2)  BUS 34D (SWGR B)   POWER AND     (Bypass)   Cabinet BLDG                                             GERS-RLY-ARS.4               meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3CCP*P1B         SYSTEMS                                                                                 TR-105988                 demand
Equipment ID 107 3ENS*ACB-8B (34D8-2) 108 3ENS*ACB-8B (34D8-2) 109 3ENS*ACB-9A (34C9-2) 110 3ENS*ACB-9A (34C9-2) 111 3ENS*ACB-9B (34D9-2)
[SQURTS], Table 3-1) 109 3ENS*ACB-9A  4KV EMERGENCY         AC/DC     ESCA/XK40     Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34C9-2)  BUS 34C (SWGR A)   POWER AND       (SSS)     Cabinet BLDG                                             GERS-RLY-ARS.4               meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3CCP*P1A         SYSTEMS                                                                                 TR-105988                 demand
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 33 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
[SQURTS], Table 3-1) 110 3ENS*ACB-9A  4KV EMERGENCY         AC/DC     ESCA/XK42     Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1. 9.333   Capacity (34C9-2)  BUS 34C (SWGR A)   POWER AND     (Bypass)   Cabinet BLDG                                             GERS-RLY-ARS.4               meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3CCP*P1A         SYSTEMS                                                                                 TR-105988                 demand
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC ESCB/XK40 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
[SQURTS], Table 3-1) 111 3ENS*ACB-9B  4KV EMERGENCY         AC/DC     ESCB/XK39     Control CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity (34D9-2)  BUS 34D (SWGR B)   POWER AND     (Bypass)   Cabinet BLDG                                             GERS-RLY-ARS.4               meets or BREAKER TO         SUPPORT                                                                             (increased by EPRI             exceeds 3CCP*P1C         SYSTEMS                                                                                 TR-105988                 demand
POWER AND (SSS)
[SQURTS], Table 3-1)
Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1B SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK42 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND (Bypass)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1B SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK40 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)
POWER AND (SSS)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1A SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK42 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1.
9.333 Capacity BUS 34C (SWGR A)
POWER AND (Bypass)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1A SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK39 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
POWER AND (Bypass)
Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1C SYSTEMS TR-105988 demand
[SQURTS], Table 3-1)  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 34 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                             Demand                   Seismic Capacity Item                  Equipment       Key Safety                   Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)     Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 112 3ENS.ACB-9B  4KV EMERGENCY         AC/DC       ESCB/XK43     Control   CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,       9.333   Capacity (34D9-2)  BUS 34D (SWGR B)   POWER AND         (SSS)       Cabinet   BLDG                                             GERS-RLY-ARS.4                   meets or BREAKER TO         SUPPORT                                                                                 (increased by EPRI               exceeds 3ccp*p1c         SYSTEMS                                                                                     TR-105988                   demand
Item No.
[SQURTS], Table 3-1) 113 3ENS*ACB-AA  4KV EMERGENCY         AC/DC     50/51-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 121FC53BD1A     EPRI NP-7147-SLR1,       6.000   Capacity (34C3-2)  BUS 34C (SWGR A)   POWER AND                               BLDG                                             GERS-RLY-PP1.5                 meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJs*uS-1A       SYSTEMS                                                                                                                 demand 114 3ENS*ACB-AA  4KV EMERGENCY         AC/DC         50GS       Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFC21B1A                   [1]           [1]   Capacity (34C3-2)  BUS 34C (SWGR A)   POWER AND                               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJs*us-1A       SYSTEMS                                                                                                                 demand [1]
Equipment ID 112 3ENS.ACB-9B (34D9-2) 113 3ENS*ACB-AA (34C3-2) 114 3ENS*ACB-AA (34C3-2) 115 3ENS*ACB-AA (34C3-2) 116 3ENS*ACB-AA (34C3-2)
115 3ENS*ACB-AA  4KV EMERGENCY         AC/DC           86E       Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA154B25F         QTR97P1230,         4.916   Capacity (34C3-2)  BUS 34C (SWGR A)   POWER AND                               BLDG                             (DC)             Qualification Test             meets or BREAKER TO         SUPPORT                                                                                 Report for Qualified             exceeds 3EJs*uS-1A       SYSTEMS                                                                                   General Electric               demand Relays Northeast Utilities Systems -
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 34 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Millstone Nuclear Power Station, Order
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC ESCB/XK43 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)
                                                                                                                            #02044599, REV. 001, REV. 0, November 5, 1997 116 3ENS*ACB-AA  4KV EMERGENCY         AC/DC       86HAED1-     Switchgear CNTL 4'-6"   3.643 1.452         GE           EPRI NP-7147-SLR1,       8.000   Capacity (34C3-2)  BUS 34C (SWGR A)   POWER AND       3ENSA02                 BLDG                       12HEA61 C239X2       GERS-RLY-AL0.2                 meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJs*uS-1A       SYSTEMS                                                                                                                 demand
POWER AND (SSS)
Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3ccp*p1c SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity BUS 34C (SWGR A)
POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJs*uS-1A SYSTEMS demand 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A
[1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-1A SYSTEMS demand [1]
4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJs*uS-1A SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HAED1-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A)
POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJs*uS-1A SYSTEMS demand  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 35 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment       Key Safety                   Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)     Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 117 3ENS*ACB-AA  4KV EMERGENCY         AC/DC     87AE-A, B & C Switchgear CNTL 4'-B"   3.643 1.452 GE 12PVD99AB1A                 [1]             [1]   Capacity (34C3-2)  BUS 34C (SWGR A)   POWER AND     (3ENSA02)               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJs*us-1A       SYSTEMS                                                                                                               demand [1]
Item No.
118 3ENS*ACB-AC  4KV EMERGENCY         AC/DC     50/51-A, B & C Switchgear CNTL 4'-B"   3.643 1.452 GE 121FC53BD1A     EPRI NP-7147-SLR1,       6.000   Capacity (34C5-2)  BUS 34C (SWGR A)   POWER AND                               BLDG                                           GERS-RLY-PP1.5                   meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJs*uS-3A       SYSTEMS                                                                                                                 demand 119 3ENS.ACB-AC  4KV EMERGENCY         AC/DC         50GS       Switchgear CNTL 4'-B"   3.643 1.452 GE 12HFC21B1A                   [1]           [1]   Capacity (34C5-2)  BUS 34C (SWGR A)   POWER AND                               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJs*us-3A       SYSTEMS                                                                                                               demand [1]
Equipment ID 117 3ENS*ACB-AA (34C3-2) 118 3ENS*ACB-AC (34C5-2) 119 3ENS.ACB-AC (34C5-2) 120 3ENS.ACB-AC (34C5-2) 121 3ENS*ACB-AC (34C5-2)
120 3ENS.ACB-AC  4KV EMERGENCY         AC/DC           86E       Switchgear CNTL 4'-B"   3.643 1.452 GE 12HFA154B25F         QTR97P1230,           4.916   Capacity (34C5-2)  BUS 34C (SWGR A)   POWER AND                               BLDG                             (DC)           Qualification Test             meets or BREAKER TO         SUPPORT                                                                               Report for Qualified             exceeds 3EJs*us-3A       SYSTEMS                                                                                 General Electric               demand Relays Northeast Utilities Systems -
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 35 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Millstone Nuclear Power Station, Order
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 12PVD99AB1A
                                                                                                                            #02044599, REV. 001, REV. 0, November 5, 1997 121 3ENS*ACB-AC  4KV EMERGENCY         AC/DC       86HAED1-     Switchgear CNTL 4'-B"   3.643 1.452         GE           EPRI NP-7147-SLR1,       8.000   Capacity (34C5-2)  BUS 34C (SWGR A)   POWER AND       3ENSA02                 BLDG                       12HEA61 C239X2       GERS-RLY-AL0.2                   meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJS*US-3A       SYSTEMS                                                                                                                 demand
[1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND (3ENSA02)
BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-1A SYSTEMS demand [1]
4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity BUS 34C (SWGR A)
POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJs*uS-3A SYSTEMS demand 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFC21B1A
[1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-3A SYSTEMS demand [1]
4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJs*us-3A SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HAED1-Switchgear CNTL 4'-B" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A)
POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RL Y-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJS*US-3A SYSTEMS demand  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 36 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                             Demand                   Seismic Capacity Item                  Equipment         Key Safety                   Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document     TRS     Result 122 3ENS*ACB-AC  4KV EMERGENCY           AC/DC       87AE-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12PVD99AB1A             [1]           [1]   Capacity (34C5-2)  BUS 34C (SWGR A)     POWER AND       (3ENSA02)               BLDG                                                                         meets or BREAKER TO         SUPPORT                                                                                                             exceeds 3EJS*US-3A         SYSTEMS                                                                                                           demand [1]
Item No.
123 3ENS*ACB-AR  4KV EMERGENCY           AC/DC       27A, B, C&D   Switchgear CNTL 4'-6"   3.643 1.452 GE 12NGV13B21A             [1]           [1]   Capacity BUS 34C BREAKER     POWER AND       (3ENSA02)               BLDG                                                                         meets or CONNECTING TO       SUPPORT                                                                                                             exceeds RESERVE OFFSITE       SYSTEMS                                                                                                           demand [1]
Equipment ID 122 3ENS*ACB-AC (34C5-2) 123 3ENS*ACB-AR 124 3ENS*ACB-AR 125 3ENS*ACB-AR 126 3ENS*ACB-AR Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 36 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
POWER 124 3ENS*ACB-AR  4KV EMERGENCY           AC/DC     27A,B-3NNSA02 Switchgear CNTL 4'-6"   3.643 1.452       GE           EPRI NP-7147-SLR1,   12.000   Capacity BUS 34C BREAKER     POWER AND                               BLDG                         12NGV13A11A       GERS-RLY-PPM.4               meets or CONNECTING TO       SUPPORT                                                                                                             exceeds RESERVE OFFSITE       SYSTEMS                                                                                                             demand POWER 125 3ENS*ACB-AR  4KV EMERGENCY         AC/DC     27R (3ENSA18}   Control   CNTL 47'-6"   3.987 2.491     ITE-27H       EPRI NP-7147-SLR1,   10.000   Capacity BUS 34C BREAKER     POWER AND                     Cabinet   BLDG                                           GERS-RLY-PPM.4               meets or CONNECTING TO       SUPPORT                                                                                                             exceeds RESERVE OFFSITE       SYSTEMS                                                                                                             demand POWER 126 3ENS*ACB-AR  4KV EMERGENCY         AC/DC     27RX-3ENSA02   Control   CNTL 47'-6"   3.987 2.491     POTTER&         EPRI NP-7147-SLR1,   6.667   Capacity BUS 34C BREAKER     POWER AND                     Cabinet   BLDG                       BRUMFIELD MDR-       GERS-RlY-ARR.3               meets or CONNECTING TO       SUPPORT                                                                 137-8                                       exceeds RESERVE OFFSITE       SYSTEMS                                                                                                             demand POWER
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND (3ENSA02)
BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-3A SYSTEMS demand [1]
4KV EMERGENCY AC/DC 27A, B, C&D Switchgear CNTL 4'-6" 3.643 1.452 GE 12NGV13B21A
[1]
[1]
Capacity BUS 34C BREAKER POWER AND (3ENSA02)
BLDG meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand [1]
POWER 4KV EMERGENCY AC/DC 27A,B-3NNSA02 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 12.000 Capacity BUS 34C BREAKER POWER AND BLDG 12NGV13A11A GERS-RL Y-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC 27R (3ENSA18}
Control CNTL 47'-6" 3.987 2.491 ITE-27H EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C BREAKER POWER AND Cabinet BLDG GERS-RL Y-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC 27RX-3ENSA02 Control CNTL 47'-6" 3.987 2.491 POTTER&
EPRI NP-7147-SLR1, 6.667 Capacity BUS 34C BREAKER POWER AND Cabinet BLDG BRUMFIELD MDR-GERS-Rl Y-ARR.3 meets or CONNECTING TO SUPPORT 137-8 exceeds RESERVE OFFSITE SYSTEMS demand POWER  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 37 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment         Key Safety                   Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)     Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document           TRS     Result 127 3ENS*ACB-AR  4KV EMERGENCY           AC/DC     62V/3NNSA02   Switchgear CNTL 4'-B"   3.643 1.452 AGASTAT 7012PB     EPRI NP-7147-SLR1,       10.000   Capacity BUS 34C BREAKER     POWER AND                               BLDG                                           GERS-RLY-PNT.7                   meets or CONNECTING TO       SUPPORT                                                                                                                 exceeds RESERVE OFFSITE       SYSTEMS                                                                                                                 demand POWER 128 3ENS*ACB-AR  4KV EMERGENCY           AC/DC       BB (BG30)     Control   CNTL 4'-B"   2.277 1.452         NIA                     [1]             [1]   Capacity BUS 34C BREAKER     POWER AND                     Cabinet   BLDG                                                                             meets or CONNECTING TO       SUPPORT                                                                                                                 exceeds RESERVE OFFSITE       SYSTEMS                                                                                                               demand [1]
Item No.
POWER 129 3ENS*ACB-BA  4KV EMERGENCY         AC/DC     50/51-A, B & C Switchgear CNTL 4'-B"   3.643 1.452 GE 121FC53BD1A     EPRI NP-7147-SLR1,       6.000   Capacity (34D2-2)  BUS 34D (SWGR B)     POWER AND                               BLDG                                           GERS-RLY-PP1.5                   meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJS*US-1B       SYSTEMS                                                                                                                 demand 130 3ENS*ACB-BA  4KV EMERGENCY         AC/DC         50GS       Switchgear CNTL 4'-B"   3.643 1.452 GE 12HFC21B1A                   [1]           [1]   Capacity (34D2-2)  BUS 34D (SWGR B)     POWER AND                               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJs*us-1B         SYSTEMS                                                                                                               demand [1]
Equipment ID 127 3ENS*ACB-AR 128 3ENS*ACB-AR 129 3ENS*ACB-BA (34D2-2) 130 3ENS*ACB-BA (34D2-2) 131 3ENS*ACB-BA (34D2-2)
131 3ENS*ACB-BA  4KV EMERGENCY         AC/DC           86E       Switchgear CNTL 4'-B"   3.643 1.452 GE 12HFA154B25F         QTR97P1230,           4.916   Capacity (34D2-2)  BUS 34D (SWGR B}     POWER AND                               BLDG                             (DC)           Qualification Test             meets or BREAKER TO         SUPPORT                                                                               Report for Qualified             exceeds 3EJS*US-1B       SYSTEMS                                                                                 General Electric               demand Relays Northeast Utilities Systems -
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 37 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Millstone Nuclear Power Station, Order
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 62V/3NNSA02 Switchgear CNTL 4'-B" 3.643 1.452 AGASTAT 7012PB EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C BREAKER POWER AND BLDG GERS-RL Y-PNT.7 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC BB (BG30)
                                                                                                                            #02044599, REV. 001, REV. 0, November 5, 1997
Control CNTL 4'-B" 2.277 1.452 NIA
[1]
[1]
Capacity BUS 34C BREAKER POWER AND Cabinet BLDG meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand [1]
POWER 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity BUS 34D (SWGR B)
POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJS*US-1B SYSTEMS demand 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFC21B1A
[1]
[1]
Capacity BUS 34D (SWGR B)
POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-1B SYSTEMS demand [1]
4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B}
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJS*US-1B SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 38 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment       Key Safety                   Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)     Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document         TRS     Result 132 3ENS*ACB-BA  4KV EMERGENCY         AC/DC       86HBED1-     Switchgear CNTL 4'-6"   3.643 1.452         GE         EPRI NP-7147-SLR1,       8.000   Capacity (34D2-2)  BUS 34D (SWGR B)   POWER AND       3ENSB02               BLDG                       12HEA61 C239X2       GERS-RLY-AL0.2                   meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJS*US-1B       SYSTEMS                                                                                                                 demand 133 3ENS*ACB-BA  4KV EMERGENCY         AC/DC     87BE-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12PVD99AB1A                   [1]           [1]   Capacity (34D2-2)  BUS 34D (SWGR B)   POWER AND*     (3ENSB02)               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJS*US-1B       SYSTEMS                                                                                                               demand [1]
Item No.
134 3ENS*ACB-BC  4KV EMERGENCY         AC/DC     50/51-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 121FC53BD1A     EPRI NP-7147-SLR1,       6.000   Capacity (34D4-2)  BUS 34D (SWGR B)   POWER AND                               BLDG                                           GERS-RLY-PP1.5                   meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJS*US-3B       SYSTEMS                                                                                                                 demand 135 3ENS*ACB-BC  4KV EMERGENCY         AC/DC           SOGS     Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFC21B1A                   [1]           [1]   Capacity (34D4-2)  BUS 34D (SWGR B)   POWER AND                               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                 exceeds 3EJS*US-3B       SYSTEMS                                                                                                               demand [1]
Equipment ID 132 3ENS*ACB-BA (34D2-2) 133 3ENS*ACB-BA (34D2-2) 134 3ENS*ACB-BC (34D4-2) 135 3ENS*ACB-BC (34D4-2) 136 3ENS*ACB-BC (34D4-2)
136 3ENS*ACB-BC  4KV EMERGENCY         AC/DC           86E     Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA154B25F         QTR97P1230,           4.916   Capacity (34D4-2)  BUS 34D (SWGR B)   POWER AND                               BLDG                             (DC)           Qualification Test             meets or BREAKER TO         SUPPORT                                                                               Report for Qualified             exceeds 3EJS*US-3B       SYSTEMS                                                                                 General Electric               demand Relays Northeast Utilities Systems -
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 38 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Millstone Nuclear Power Station, Order
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 86HBED1-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B)
                                                                                                                            #02044599, REV. 001, REV. 0, November 5, 1997
POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJS*US-1B SYSTEMS demand 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34D (SWGR B)
POWER AND*
(3ENSB02)
BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-1B SYSTEMS demand [1]
4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity BUS 34D (SWGR B)
POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand 4KV EMERGENCY AC/DC SOGS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A
[1]
[1]
Capacity BUS 34D (SWGR B)
POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand [1]
4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B)
POWER AND BLDG (DC)
Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJS*US-3B SYSTEMS General Electric demand Relays Northeast Utilities Systems -
Millstone Nuclear Power Station, Order  
#02044599, REV. 001, REV. 0, November 5, 1997  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 39 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                             Demand                   Seismic Capacity Item                    Equipment       Key Safety                   Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document     TRS     Result 137  3ENS*ACB-BC  4KV EMERGENCY         AC/DC         86HBED1-   Switchgear CNTL 4'-6"   3.643 1.452         GE         EPRI NP-7147-SLR1,   8.000   Capacity (34D4-2)  BUS 34D (SWGR B)   POWER AND       3ENSB02               BLDG                       12HEA61 C239X2     GERS-RLY-AL0.2               meets or BREAKER TO         SUPPORT                                                                                                             exceeds 3EJS*US-3B       SYSTEMS                                                                                                             demand 138  3ENS*ACB-BC  4KV EMERGENCY         AC/DC       87BE-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12PVD99AB1A             [1]           [1]   Capacity (34D4-2)  BUS 34D (SWGR B)   POWER AND       (3ENSB02)               BLDG                                                                         meets or BREAKER TO         SUPPORT                                                                                                             exceeds 3EJS*US-3B       SYSTEMS                                                                                                           demand [1]
Item No.
139  3ENS*ACB-BR  4KV EMERGENCY         AC/DC       27A, B, C&D   Switchgear CNTL 4'-6"   3.643 1.452 GE 12NGV13B21A             [1]           [1]   Capacity BUS 34D BREAKER     POWER AND
Equipment ID 137 3ENS*ACB-BC (34D4-2) 138 3ENS*ACB-BC (34D4-2) 139 3ENS*ACB-BR 140 3ENS*ACB-BR 141 3ENS.ACB-BR Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 39 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
    -              CONNECTING TO      SUPPORT (3ENSB02)               BLDG                                                                         meets or exceeds RESERVE OFFSITE     SYSTEMS                                                                                                           demand [1]
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 86HBED1-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B)
POWER 140  3ENS*ACB-BR  4KV EMERGENCY         AC/DC     27A,B-3NNSB02   Switchgear CNTL 4'-6"   3.643 1.452         GE         EPRI NP-7147-SLR1,   12.000   Capacity BUS 34D BREAKER     POWER AND                               BLDG                         12NGV13A11A       GERS-RLY-PPM.4               meets or CONNECTING TO       SUPPORT                                                                                                             exceeds RESERVE OFFSITE     SYSTEMS                                                                                                             demand POWER 141  3ENS.ACB-BR  4KV EMERGENCY         AC/DC     27R (3ENSB18)   Control   CNTL 47'-6"   3.987 2.491       ITE-27H       EPRI NP-7147-SLR1,   10.000   Capacity BUS 34D BREAKER     POWER AND                     Cabinet   BLDG                                           GERS-RLY-PPM.4               meets or CONNECTING TO       SUPPORT                                                                                                             exceeds RESERVE OFFSITE     SYSTEMS                                                                                                             demand POWER
POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RL Y-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34D (SWGR B)
POWER AND (3ENSB02)
BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand [1]
4KV EMERGENCY AC/DC 27A, B, C&D Switchgear CNTL 4'-6" 3.643 1.452 GE 12NGV13B21A
[1]
[1]
Capacity BUS 34D BREAKER POWER AND (3ENSB02)
BLDG meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand [1]
POWER 4KV EMERGENCY AC/DC 27A,B-3NNSB02 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 12.000 Capacity BUS 34D BREAKER POWER AND BLDG 12NGV13A11A GERS-RLY-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC 27R (3ENSB18)
Control CNTL 47'-6" 3.987 2.491 ITE-27H EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D BREAKER POWER AND Cabinet BLDG GERS-RL Y-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 40 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment       Key Safety                 Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document     TRS     Result 142 3ENS*ACB-BR  4KV EMERGENCY         AC/DC     27RX-3ENSB02   Control   CNTL 47'-6"   3.987 2.491     POTIER&         EPRI NP-7147-SLR1,   6.667   Capacity BUS 34D BREAKER     POWER AND                   Cabinet   BLDG                       BRUMFIELD MOR-       GERS-RLY-ARR.3               meets or CONNECTING TO       SUPPORT                                                               137-8                                       exceeds RESERVE OFFSITE     SYSTEMS                                                                                                           demand POWER 143 3ENS*ACB-BR  4KV EMERGENCY         AC/DC       62V/3NNSB02 Switchgear CNTL 4'-6"   3.643 1.452 AGASTAT 7012PB     EPRI NP-7147-SLR1,   10.000   Capacity BUS 34D BREAKER     POWER AND                             BLDG                                           GERS-RLY-PNT.7               meets or CONNECTING TO       SUPPORT                                                                                                           exceeds RESERVE OFFSITE     SYSTEMS                                                                                                           demand POWER 144 3ENS*ACB-BR  4KV EMERGENCY         AC/DC       BB (BG3P)   Control   CNTL 4'-6"   2.277 1.452       N/A                 [1]           [1]   Capacity BUS 34D BREAKER     POWER AND                   Cabinet   BLDG                                                                         meets or CONNECTING TO       SUPPORT                                                                                                           exceeds RESERVE OFFSITE     SYSTEMS                                                                                                           demand [1]
Item No.
POWER 145 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC             32     Switchgear CNTL 4'-6"   3.643 1.452 GE 121CW51A2A             [1]           [1]   Capacity BUS 34C BREAKER     POWER AND                             BLDG                                                                         meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGA           SYSTEMS                                                                                                           demand [1]
Equipment ID 142 3ENS*ACB-BR 143 3ENS*ACB-BR 144 3ENS*ACB-BR 145 3ENS*ACB-G-A 146 3ENS*ACB-G-A 147 3ENS*ACB-G-A Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 40 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
146 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC             40     Switchgear CNTL 4'-6"   3.643 1.452 GE 12CEH51A1A             [1]           [1]   Capacily BUS 34C BREAKER     POWER AND                             BLDG                                                                         meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGA           SYSTEMS                                                                                                           demand [1]
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 27RX-3ENSB02 Control CNTL 47'-6" 3.987 2.491 POTIER&
147 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC           32X     Switchgear CNTL 4'-6"   3.643 1.452   ELECTRO MAX               [1]           [1]   Capacity BUS 34C BREAKER     POWER AND                             BLDG                         CAT TRIP IND.                                   meets or CONNECTING TO       SUPPORT                                                           RELAY 6319234                                   exceeds EDGA           SYSTEMS                                                                                                           demand [1]
EPRI NP-7147-SLR1, 6.667 Capacity BUS 34D BREAKER POWER AND Cabinet BLDG BRUMFIELD MOR-GERS-RL Y-ARR.3 meets or CONNECTING TO SUPPORT 137-8 exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC 62V/3NNSB02 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT 7012PB EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D BREAKER POWER AND BLDG GERS-RL Y-PNT.7 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC BB (BG3P)
Control CNTL 4'-6" 2.277 1.452 N/A
[1]
[1]
Capacity BUS 34D BREAKER POWER AND Cabinet BLDG meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand [1]
POWER 4KV EMERGENCY AC/DC 32 Switchgear CNTL 4'-6" 3.643 1.452 GE 121CW51A2A
[1]
[1]
Capacity BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]
4KV EMERGENCY AC/DC 40 Switchgear CNTL 4'-6" 3.643 1.452 GE 12CEH51A1A
[1]
[1]
Capacily BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]
4KV EMERGENCY AC/DC 32X Switchgear CNTL 4'-6" 3.643 1.452 ELECTRO MAX
[1]
[1]
Capacity BUS 34C BREAKER POWER AND BLDG CAT TRIP IND.
meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDGA SYSTEMS demand [1]  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 41 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment         Key Safety                 Cabinet                                                 Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document     TRS     Result 148 3ENS*ACB-G-A  4KV EMERGENCY           AC/DC           40X     Switchgear CNTL 4'-6"   3.643 1.452   ELECTROMAX               [1]           [1]   Capacity BUS 34C BREAKER     POWER AND                             BLDG                       CAT TRIP IND.                                   meets or CONNECTING TO       SUPPORT                                                           RELAY 6319234                                   exceeds EDGA           SYSTEMS                                                                                                         demand [1]
Item No.
149 3ENS.ACB-G-A  4KV EMERGENCY           AC/DC           51N     Switchgear CNTL 4'-6"   3.643 1.452 GE 121FC51AD1A             [1]           [1]   Capacity BUS 34C BREAKER     POWER AND                             BLDG                                                                       meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGA           SYSTEMS                                                                                                         demand [1]
Equipment ID 148 3ENS*ACB-G-A 149 3ENS.ACB-G-A 150 3ENS.ACB-G-A 151 3ENS.ACB-G-A 152 3ENS.ACB-G-A 153 3ENS.ACB-G-A 154 3ENS*ACB-G-A Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 41 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
150 3ENS.ACB-G-A  4KV EMERGENCY         AC/DC     51NX-3ENSA07 Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA151A2P       EPRI 3002002997     5.769   Capacity BUS 34C BREAKER     POWER AND                             BLDG                         CD42 (DC)                                     meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGA           SYSTEMS                                                                                                           demand 151 3ENS.ACB-G-A  4KV EMERGENCY         AC/DC       51V-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12JJCV51B21A             [1]           [1]   Capacity BUS 34C BREAKER     POWER AND                             BLDG                                                                       meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGA           SYSTEMS                                                                                                         demand [1]
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 40X Switchgear CNTL 4'-6" 3.643 1.452 ELECTROMAX
152 3ENS.ACB-G-A  4KV EMERGENCY         AC/DC           51VX     Switchgear CNTL 4'-6"   3.643 1.452 GE 12HGA111J2G     EPRI NP-7147-SLR1,   7.040   Capacity BUS 34C BREAKER     POWER AND                             BLDG                             (DC)         GERS-RLY-ARH.5               meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGA           SYSTEMS                                                                                                           demand 153 3ENS.ACB-G-A  4KV EMERGENCY         AC/DC       51X-3ENSA02 Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA151A2P     EPRI 3002002997     5.769   Capacity BUS 34C BREAKER     POWER AND                             BLDG                         CD42 (DC)                                     meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGA           SYSTEMS                                                                                                           demand 154 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC           62M     Switchgear CNTL 4'-6"   3.643 1.452     AGASTAT         EPRI NP-7147-SLR1,   10.000   Capacity BUS 34C BREAKER     POWER AND                             BLDG                         E7012PA002       GERS-RLY-PNT. 7             meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGA           SYSTEMS                                                                                                           demand
[1]
[1]
Capacity BUS 34C BREAKER POWER AND BLDG CAT TRIP IND.
meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDGA SYSTEMS demand [1]
4KV EMERGENCY AC/DC 51N Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC51AD1A
[1]
[1]
Capacity BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]
4KV EMERGENCY AC/DC 51NX-3ENSA07 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34C BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 51V-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12JJCV51B21A
[1]
[1]
Capacity BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]
4KV EMERGENCY AC/DC 51VX Switchgear CNTL 4'-6" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity BUS 34C BREAKER POWER AND BLDG (DC)
GERS-RLY-ARH.5 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 51X-3ENSA02 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34C BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 62M Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C BREAKER POWER AND BLDG E7012PA002 GERS-RL Y-PNT. 7 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 42 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                             Demand                   Seismic Capacity Item                  Equipment       Key Safety                 Cabinet                                                   Seismic Capacity Evaluation No. Equipment JD    Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,H JCRS,v Relay Mfg. & Model   Source Document     TRS     Result 155 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC     81 (3EGSA05)   Control   EMER 24'-6"   3.132 1.936 GE 12SFF31A1A             [1]           [1]   Capacity BUS 34C BREAKER     POWER AND                   Cabinet   GEN                                                                         meets or CONNECTING TO       SUPPORT                               ENCL                                                                         exceeds EDGA           SYSTEMS                                                                                                           demand [1]
Item No.
156 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC       86HAED4-   Switchgear CNTL   4'-6"   3.643 1.452       GE           EPRI NP-7147-SLR1,   8.000   Capacity BUS 34C BREAKER     POWER AND       3ENSA02               BLDG                         12HEA61 C239X2     GERS-RLY-AL0.2               meets or CONNECTING TO       SUPPORT                                                                                                             exceeds EDGA           SYSTEMS                                                                                                             demand 157 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC     86HBU-3ENSA07 Switchgear CNTL   4'-6"   3.643 1.452       GE           EPRI NP-7147-SLR1,   8.000   Capacity BUS 34C BREAKER     POWER AND                             BLDG                         12HEA61C239X2       GERS-RLY-AL0.2               meets or CONNECTING TO       SUPPORT                                                                                                             exceeds EDGA           SYSTEMS                                                                                                             demand 158 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC           86HP     Switchgear CNTL   4'-6"   3.643 1.452       GE           EPRI NP-7147-SLR1,   8.000   Capacity BUS 34C BREAKER     POWER AND                             BLDG                         12HEA61 C239X2     GERS-RLY-AL0.2               meets or CONNECTING TO       SUPPORT                                                                                                             exceeds EDGA           SYSTEMS                                                                                                             demand 159 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC     87AE-A, B & C Switchgear CNTL   4'-6"   3.643 1.452 GE 12PVD99AB1A             [1]           [1]   Capacity BUS 34C BREAKER     POWER AND       (3ENSA02)             BLDG                                                                         meets or CONNECTING TO       SUPPORT                                                                                                             exceeds EDGA           SYSTEMS                                                                                                           demand [1]
Equipment JD 155 3ENS*ACB-G-A 156 3ENS*ACB-G-A 157 3ENS*ACB-G-A 158 3ENS*ACB-G-A 159 3ENS*ACB-G-A 160 3ENS*ACB-G-A 161 3ENS*ACB-G-A Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 42 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
160 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC       87G-A, B&C   Switchgear CNTL   4'-6"   3.643 1.452 GE 12PVD99AB1A             [1]           [1]   Capacity BUS 34C BREAKER     POWER AND   (3ENS*ACB-G-A)           BLDG                                                                         meets or CONNECTING TO       SUPPORT                                                                                                             exceeds EDGA           SYSTEMS                                                                                                           demand [1]
Type Bldg Elev ICRS,H JCRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 81 (3EGSA05)
161 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC       87G-A. B & C Switchgear CNTL   4'-6"   3.643 1.452 GE 12PVD99AB1A             [1]           [1]   Capacity BUS 34C BREAKER     POWER AND   (3ENS*ACB-G-A)           BLDG                                                                         meets or CONNECTING TO       SUPPORT                                                                                                             exceeds EDGA           SYSTEMS                                                                                                           demand [1]
Control EMER 24'-6" 3.132 1.936 GE 12SFF31A1A
[1]
[1]
Capacity BUS 34C BREAKER POWER AND Cabinet GEN meets or CONNECTING TO SUPPORT ENCL exceeds EDGA SYSTEMS demand [1]
4KV EMERGENCY AC/DC 86HAED4-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C BREAKER POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 86HBU-3ENSA07 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C BREAKER POWER AND BLDG 12HEA61C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 86HP Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C BREAKER POWER AND BLDG 12HEA61 C239X2 GERS-RL Y-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34C BREAKER POWER AND (3ENSA02)
BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]
4KV EMERGENCY AC/DC 87G-A, B&C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34C BREAKER POWER AND (3ENS*ACB-G-A)
BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]
4KV EMERGENCY AC/DC 87G-A. B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34C BREAKER POWER AND (3ENS*ACB-G-A)
BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 43 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                               Demand                   Seismic Capacity Item                  Equipment       Key Safety                     Cabinet                                                     Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)     Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document       TRS     Result 162 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC         DGNSDR         Control   EMER 24'-6"   3.132 1.936   GOULD/ITE         EPRI TR-105988-V2     9.467   Capacity BUS 34C BREAKER     POWER AND                       Cabinet   GEN                           J13P2012       (SQURTS), Table 3-1             meets or CONNECTING TO       SUPPORT                                 ENCL                                                                           exceeds EDGA           SYSTEMS                                                                                                                 demand 163 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC       ESCNXK96       Control   CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity BUS 34C BREAKER     POWER AND                       Cabinet   BLDG                                             GERS-RLY-ARS.4               meets or CONNECTING TO       SUPPORT                                                                                   (increased by EPRI             exceeds EDGA           SYSTEMS                                                                                       TR-105988                 demand
Item No.
[SQURTS], Table 3-1) 164 3ENS*ACB-G-A  4KV EMERGENCY         AC/DC       Unit Substation Switchgear CNTL   4'-6"   3.643 1.452 GE 121FC53AD1A             [1]             [1]   Capacity BUS 34C BREAKER     POWER AND     FDR QC 1A, 2A,             BLDG                                                                           meets or CONNECTING TO       SUPPORT     3A, 4A: 51-A, B &                                                                                           exceeds EDGA           SYSTEMS             c                                                                                                 demand [1]
Equipment ID 162 3ENS*ACB-G-A 163 3ENS*ACB-G-A 164 3ENS*ACB-G-A 165 3ENS*ACB-G-B 166 3ENS*ACB-G-B 167 3ENS*ACB-G-B Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 43 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
165 3ENS*ACB-G-B  4KV EMERGENCY         AC/DC             32       Switchgear CNTL   4'-6"   3.643 1.452 GE 121CW51A2A               [1]             [1]   Capacity BUS 34D BREAKER     POWER AND                                 BLDG                                                                           meets or CONNECTING TO       SUPPORT                                                                                                                 exceeds EDGB           SYSTEMS                                                                                                                 demand [1]
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC DGNSDR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity BUS 34C BREAKER POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or CONNECTING TO SUPPORT ENCL exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC ESCNXK96 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C BREAKER POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or CONNECTING TO SUPPORT (increased by EPRI exceeds EDGA SYSTEMS TR-105988 demand
166 3ENS*ACB-G-B  4KV EMERGENCY         AC/DC             40       Switchgear CNTL   4'-6"   3.643 1.452 GE 12CEH51A1A               (1]             [1]   Capacity BUS 34D BREAKER     POWER AND                                 BLDG                                                                           meets or CONNECTING TO       SUPPORT                                                                                                                 exceeds EDG B         SYSTEMS                                                                                                                 demand [1]
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC Unit Substation Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53AD1A
167 3ENS*ACB-G-B  4KV EMERGENCY         AC/DC             32X       Switchgear CNTL   4'-6"   3.643 1.452   ELECTROMAX                 [1]           [1]   Capacity BUS 34D BREAKER     POWER AND                                 BLDG                         CAT TRIP IND.                                     meets or CONNECTING TO       SUPPORT                                                               RELAY 6319234                                     exceeds EDG B         SYSTEMS                                                                                                                 demand [1]
[1]
[1]
Capacity BUS 34C BREAKER POWER AND FDR QC 1A, 2A, BLDG meets or CONNECTING TO SUPPORT 3A, 4A: 51-A, B &
exceeds EDGA SYSTEMS c
demand [1]
4KV EMERGENCY AC/DC 32 Switchgear CNTL 4'-6" 3.643 1.452 GE 121CW51A2A
[1]
[1]
Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1]
4KV EMERGENCY AC/DC 40 Switchgear CNTL 4'-6" 3.643 1.452 GE 12CEH51A1A (1]
[1]
Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand [1]
4KV EMERGENCY AC/DC 32X Switchgear CNTL 4'-6" 3.643 1.452 ELECTROMAX
[1]
[1]
Capacity BUS 34D BREAKER POWER AND BLDG CAT TRIP IND.
meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDG B SYSTEMS demand [1]  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 44 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment         Key Safety                 Cabinet                                                 Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document     TRS     Result 168 3ENS.ACB-G-B  4KV EMERGENCY         AC/DC           40X     Switchgear CNTL 4'-6"   3.643 1.452   ELECTROMAX               [1]           [1]   Capacity BUS 34D BREAKER     POWER AND                             BLDG                       CAT TRIP IND.                                   meets or CONNECTING TO       SUPPORT                                                           RELAY 6319234                                   exceeds EDGB           SYSTEMS                                                                                                         demand [1]
Item No.
169 3ENS.ACB-G-B  4KV EMERGENCY         AC/DC           51N     Switchgear CNTL 4'-6"   3.643 1.452 GE 121FC51AD1A             [1]           [1]   Capacity BUS 34D BREAKER     POWER AND                             BLDG                                                                       meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGB           SYSTEMS                                                                                                         demand [1]
Equipment ID 168 3ENS.ACB-G-B 169 3ENS.ACB-G-B 170 3ENS.ACB-G-B 171 3ENS.ACB-G-B 172 3ENS*ACB-G-B 173 3ENS.ACB-G-B 174 3ENS.ACB-G-B Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 44 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
170 3ENS.ACB-G-B  4KV EMERGENCY         AC/DC     51 NX-3ENSB07 Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA151A2P     EPRI 3002002997     5.769   Capacity BUS 34D BREAKER     POWER AND                             BLDG                         CD42 (DC)                                     meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDG B           SYSTEMS                                                                                                           demand 171 3ENS.ACB-G-B  4KV EMERGENCY         AC/DC       51V-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 121JCV51 B21A           [1]           [1]   Capacity BUS 34D BREAKER     POWER AND                             BLDG                                                                       meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGB           SYSTEMS                                                                                                         demand [1]
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 40X Switchgear CNTL 4'-6" 3.643 1.452 ELECTROMAX
172 3ENS*ACB-G-B  4KV EMERGENCY         AC/DC           51VX     Switchgear CNTL 4'-6"   3.643 1.452 GE 12HGA111J2G     EPRI NP-7147-SLR1,   7.040   Capacity BUS 34D BREAKER     POWER AND                             BLDG                             (DC)         GERS-RLY-ARH.5               meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGB           SYSTEMS                                                                                                           demand 173 3ENS.ACB-G-B  4KV EMERGENCY         AC/DC       51X-3ENSB02 Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA151A2P     EPRI 3002002997     5.769   Capacity BUS 34D BREAKER     POWER AND                             BLDG                         CD42 (DC)                                     meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGB           SYSTEMS                                                                                                           demand 174 3ENS.ACB-G-B  4KV EMERGENCY         AC/DC           62M     Switchgear CNTL 4'-6"   3.643 1.452     AGASTAT         EPRI NP-7147-SLR1,   10.000   Capacity BUS 34D BREAKER     POWER AND                             BLDG                         E7012PA002       GERS-RLY-PNT.7               meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGB           SYSTEMS                                                                                                           demand
[1]
[1]
Capacity BUS 34D BREAKER POWER AND BLDG CAT TRIP IND.
meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDGB SYSTEMS demand [1]
4KV EMERGENCY AC/DC 51N Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC51AD1A
[1]
[1]
Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1]
4KV EMERGENCY AC/DC 51 NX-3ENSB07 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34D BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand 4KV EMERGENCY AC/DC 51V-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121JCV51 B21A
[1]
[1]
Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1]
4KV EMERGENCY AC/DC 51VX Switchgear CNTL 4'-6" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity BUS 34D BREAKER POWER AND BLDG (DC)
GERS-RL Y-ARH.5 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 4KV EMERGENCY AC/DC 51X-3ENSB02 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34D BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 4KV EMERGENCY AC/DC 62M Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D BREAKER POWER AND BLDG E7012PA002 GERS-RLY-PNT.7 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 45 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                  Equipment       Key Safety                 Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     RelaylD(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document     TRS     Result 175 3ENS"ACB-G-B  4KV EMERGENCY         AC/DC     81 (3EGSB05)   Control   EMER 24'-6"   3.132 1.936 GE 12SFF31A1A             [1]           [1]   Capacity BUS 34D BREAKER     POWER AND                   Cabinet   GEN                                                                         meets or CONNECTING TO       SUPPORT                               ENCL                                                                         exceeds EDGB           SYSTEMS                                                                                                           demand [1]
Item No.
176 3ENS"ACB-G-B  4KV EMERGENCY         AC/DC       86HBED4-   Switchgear CNTL 4'-6"   3.643 1.452       GE           EPRI NP-7147-SLR1,   8.000   Capacity BUS 34D BREAKER     POWER AND       3ENSB02               BLDG                       12HEA61 C239X2     GERS-RLY-AL0.2               meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDG B         SYSTEMS                                                                                                           demand 177 3ENS"ACB-G-B  4KV EMERGENCY         AC/DC     86HBU-3ENSB07 Switchgear CNTL 4'-6"   3.643 1.452       GE           EPRI NP-7147-SLR1,   8.000   Capacity BUS 34D BREAKER     POWER AND                             BLDG                       12HEA61 C239X2     GERS-RLY-AL0.2               meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGB           SYSTEMS                                                                                                           demand 178 3ENS"ACB-G-B  4KV EMERGENCY         AC/DC           86HP     Switchgear CNTL 4'-6"   3.643 1.452       GE           EPRI NP-7147-SLR1,   8.000   Capacity BUS 34D BREAKER     POWER AND                             BLDG                       12HEA61 C239X2     GERS-RLY-AL0.2               meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGB           SYSTEMS                                                                                                           demand 179 3ENS"ACB-G-B  4KV EMERGENCY         AC/DC     87BE-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12PVD99AB1A             [1]           [1]   Capacity BUS 34D BREAKER     POWER AND       (3ENSB02)             BLDG                                                                         meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDGB           SYSTEMS                                                                                                           demand [1]
Equipment ID 175 3ENS"ACB-G-B 176 3ENS"ACB-G-B 177 3ENS"ACB-G-B 178 3ENS"ACB-G-B 179 3ENS"ACB-G-B 180 3ENS"ACB-G-B 181 3ENS"ACB-G-B Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 45 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function RelaylD(s)
180 3ENS"ACB-G-B  4KV EMERGENCY         AC/DC       87G-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12PVD99AB1A             [1]           [1]   Capacity BUS 34D BREAKER     POWER AND   (3ENS"ACB-G-B)           BLDG                                                                         meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDG B         SYSTEMS                                                                                                           demand [1]
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 81 (3EGSB05)
181 3ENS"ACB-G-B  4KV EMERGENCY         AC/DC       87G-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12PVD99AB1A             [1]           [1]   Capacity BUS 34D BREAKER     POWER AND   (3ENS"ACB-G-B)           BLDG                                                                         meets or CONNECTING TO       SUPPORT                                                                                                           exceeds EDG B         SYSTEMS                                                                                                           demand [1]
Control EMER 24'-6" 3.132 1.936 GE 12SFF31A1A
[1]
[1]
Capacity BUS 34D BREAKER POWER AND Cabinet GEN meets or CONNECTING TO SUPPORT ENCL exceeds EDGB SYSTEMS demand [1]
4KV EMERGENCY AC/DC 86HBED4-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D BREAKER POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand 4KV EMERGENCY AC/DC 86HBU-3ENSB07 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D BREAKER POWER AND BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 4KV EMERGENCY AC/DC 86HP Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D BREAKER POWER AND BLDG 12HEA61 C239X2 GERS-RL Y-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34D BREAKER POWER AND (3ENSB02)
BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1]
4KV EMERGENCY AC/DC 87G-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34D BREAKER POWER AND (3ENS"ACB-G-B)
BLDG meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand [1]
4KV EMERGENCY AC/DC 87G-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34D BREAKER POWER AND (3ENS"ACB-G-B)
BLDG meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand [1]  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 46 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                               Demand                   Seismic Capacity Cabinet                                                    Seismic Capacity Evaluation Item                  Equipment         Key Safety No. Equipment ID    Description       Function       Relay ID(s)     Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document       TRS     Result 182 3ENS*ACB-G-B  4KV EMERGENCY           AC/DC         DGNSDR       Control   EMER 24'-6"   3.132 1.936   GOULD/ ITE       EPRI TR-105988-V2     9.467   Capacity BUS 34D BREAKER     POWER AND                       Cabinet   GEN                           J13P2012       (SQURTS), Table 3-1             meets or CONNECTING TO       SUPPORT                                 ENCL                                                                             exceeds EOG B           SYSTEMS                                                                                                                   demand 183 3ENS*ACB-G-B  4KV EMERGENCY           AC/DC       ESCB/XK96       Control   CNTL 47'-6"   3.987 2.491 AGASTAT GPCNR       EPRI NP-7147-SLR1,     9.333   Capacity BUS 34D BREAKER     POWER AND                       Cabinet   BLDG                                             GERS-RLY-ARS.4                 meets or CONNECTING TO       SUPPORT                                                                                   (increased by EPRI             exceeds EDGB           SYSTEMS                                                                                       TR-105988                 demand
Item No.
[SQURTS], Table 3-1) 184 3ENS*ACB-G-B  4KV EMERGENCY           AC/DC       Unit Substation Switchgear CNTL   4'-6"   3.643 1.452 GE 121FC53AD1A               [1]             [1]   Capacity BUS 34D BREAKER     POWER AND     FDR QC 1A, 2A,             BLDG                                                                             meets or CONNECTING TO       SUPPORT     3A, 4A 51-A, B &                                                                                             exceeds EDGB           SYSTEMS             c                                                                                                   demand [1]
Equipment ID 182 3ENS*ACB-G-B 183 3ENS*ACB-G-B 184 3ENS*ACB-G-B 185 3ENS*ACB-GNA (15G-14U-2N) 186 3ENS*ACB-GNA (15G-14U-2N) 187 3ENS*ACB-GNA (15G-14U-2N)
185 3ENS*ACB-GNA  4KV EMERGENCY         AC/DC     51NX-3ENSA07     Switchgear CNTL   4'-6"   3.643 1.452       N/A             EPRI 3002002997     16.385   Capacity (15G-14U-2N) BUS 34C (SWGR A)     POWER AND                                 BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                   exceeds 3ENS*RES-GNA       SYSTEMS                                                                                                                   demand 186 3ENS*ACB-GNA  4KV EMERGENCY         AC/DC       87AE-A, B & C   Switchgear CNTL   4'-6"   3.643 1.452 GE 12PVD99AB1A               (1]             [1]   Capacity (15G-14U-2N) BUS 34C (SWGR A)     POWER AND       (3ENSA02)               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                   exceeds 3ENS*RES-GNA       SYSTEMS                                                                                                                 demand [1]
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 46 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
187 3ENS*ACB-GNA  4KV EMERGENCY         AC/DC       87G-A, B&C     Switchgear CNTL   4'-6"   3.643 1.452 GE 12PVD99AB1A               [1]           [1]   Capacity (15G-14U-2N) BUS 34C (SWGR A)     POWER AND   (3ENS*ACB-G-A)               BLDG                                                                             meets or BREAKER TO         SUPPORT                                                                                                                   exceeds 3ENS*RES-GNA       SYSTEMS                                                                                                                 demand [1]
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC DGNSDR Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity BUS 34D BREAKER POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or CONNECTING TO SUPPORT ENCL exceeds EOG B SYSTEMS demand 4KV EMERGENCY AC/DC ESCB/XK96 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D BREAKER POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or CONNECTING TO SUPPORT (increased by EPRI exceeds EDGB SYSTEMS TR-105988 demand
[SQURTS], Table 3-1) 4KV EMERGENCY AC/DC Unit Substation Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53AD1A
[1]
[1]
Capacity BUS 34D BREAKER POWER AND FDR QC 1A, 2A, BLDG meets or CONNECTING TO SUPPORT 3A, 4A 51-A, B &
exceeds EDGB SYSTEMS c
demand [1]
4KV EMERGENCY AC/DC 51NX-3ENSA07 Switchgear CNTL 4'-6" 3.643 1.452 N/A EPRI 3002002997 16.385 Capacity BUS 34C (SWGR A)
POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A (1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND (3ENSA02)
BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand [1]
4KV EMERGENCY AC/DC 87G-A, B&C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34C (SWGR A)
POWER AND (3ENS*ACB-G-A)
BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand [1]  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 47 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Cabinet                                                  Seismic Capacity Evaluation Item                  Equipment         Key Safety No. Equipment ID    Description       Function       Relay ID(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document     TRS     Result 188 3ENS*ACB-GNA  4KV EMERGENCY           AC/DC     94EAE-3ENSA02   Switchgear CNTL 4'-6"   3.643 1.452 WESTINGHOUSE       EPRI NP-7147-SLR1,   8.000   Capacity (15G-14U-2N) BUS 34C (SWGR A)     POWER AND                               BLDG                         774B470A12         GERS-RLY-Al1.4             meets or BREAKER TO         SUPPORT                                                                                                           exceeds 3ENS*RES-GNA       SYSTEMS                                                                                                           demand 189 3ENS*ACB-GNA  4KV EMERGENCY           AC/DC     94G-3ENS*ACB-   Switchgear CNTL 4'-6"   3.643 1.452 WESTINGHOUSE       EPRI NP-7147-SLR1,   8.000   Capacity (15G-14U-2N) BUS 34C (SWGR A)     POWER AND           G-A                 BLDG                         774B470A12         GERS-RLY-A11.4             meets or BREAKER TO         SUPPORT                                                                                                           exceeds 3ENS*RES-GNA       SYSTEMS                                                                                                           demand 190 3ENS*ACB-GNB  4KV EMERGENCY           AC/DC     51 NX-3ENSB07 Switchgear CNTL 4'-6"   3.643 1.452 GE 12HFA151A2P     EPRI 3002002997     16.385   Capacity (15G-15U-2N) BUS 34D (SWGR B)     POWER AND                               BLDG                         CD42 (DC)                                     meets or BREAKER TO         SUPPORT                                                                                                           exceeds 3ENS*RES-GNB       SYSTEMS                                                                                                           demand 191 3ENS*ACB-GNB  4KV EMERGENCY         AC/DC       87BE-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12PVD99AB1A             [1]           [1]   Capacity (15G-15U-2N) BUS 34D (SWGR B)     POWER AND       (3ENSB02)             BLDG                                                                       meets or BREAKER TO         SUPPORT                                                                                                           exceeds 3ENS*RES-GNB       SYSTEMS                                                                                                           demand [1]
Item No.
192 3ENS*ACB-GNB  4KV EMERGENCY         AC/DC       87G-A, B & C Switchgear CNTL 4'-6"   3.643 1.452 GE 12PVD99AB1A             [1]           [1]   Capacity (15G-15U-2N) BUS 34D (SWGR B)     POWER AND   (3ENS.ACB-G-B)             BLDG                                                                       meets or BREAKER TO         SUPPORT                                                                                                           exceeds 3ENS*RES-GNB       SYSTEMS                                                                                                           demand [1]
Equipment ID 188 3ENS*ACB-GNA (15G-14U-2N) 189 3ENS*ACB-GNA (15G-14U-2N) 190 3ENS*ACB-GNB (15G-15U-2N) 191 3ENS*ACB-GNB (15G-15U-2N) 192 3ENS*ACB-GNB (15G-15U-2N) 193 3ENS*ACB-GNB (15G-15U-2N)
193 3ENS*ACB-GNB  4KV EMERGENCY         AC/DC     94EBE-3ENSB02 Switchgear CNTL 4'-6"   3.643 1.452 WESTINGHOUSE       EPRI NP-7147-SLR1,   8.000   Capacity (15G-15U-2N) BUS 34D (SWGR B)     POWER AND                               BLDG                         774B470A12         GERS-RLY-Al1.4             meets or BREAKER TO         SUPPORT                                                                                                           exceeds 3ENS*RES-GNB       SYSTEMS                                                                                                           demand
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 47 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 94EAE-3ENSA02 Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A)
POWER AND BLDG 774B470A12 GERS-RL Y-Al1.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand 4KV EMERGENCY AC/DC 94G-3ENS*ACB-Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A)
POWER AND G-A BLDG 774B470A12 GERS-RL Y-A11.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand 4KV EMERGENCY AC/DC 51 NX-3ENSB07 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 16.385 Capacity BUS 34D (SWGR B)
POWER AND BLDG CD42 (DC) meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34D (SWGR B)
POWER AND (3ENSB02)
BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand [1]
4KV EMERGENCY AC/DC 87G-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A
[1]
[1]
Capacity BUS 34D (SWGR B)
POWER AND (3ENS.ACB-G-B)
BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand [1]
4KV EMERGENCY AC/DC 94EBE-3ENSB02 Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B)
POWER AND BLDG 774B470A12 GERS-RL Y-Al1.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand  


Serial No. 16-455   . "'
Item No.
Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 48 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                           Demand                   Seismic Capacity Item                    Equipment         Key Safety                 Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID      Description       Function     Relay ID(s)   Type     Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document     TRS   Result 194 3ENS*ACB-GNB    4KV EMERGENCY           AC/DC     94G-3ENS*ACB- Switchgear CNTL 4'-6"   3.643 1.452 WESTINGHOUSE       EPRI NP-7147-SLR1,   8.000   Capacity (15G-15U-2N)  BUS 34D (SWGR B)     POWER AND         G-B               BLDG                           774B470A12         GERS-RLY-Al1.4             meets or BREAKER TO         SUPPORT                                                                                                           exceeds 3ENS*RES-GNB       SYSTEMS                                                                                                           demand 195  3MSS*MOV17A      TDAFWSTEAM           CORE           42C       MCC       ESF 36'-6"   0.886 0.677         [2]         EPRI NP-5223-SLR1,   1.200   Capacity (V12)      SUPPLY VALVE       COOLING                             BLDG.                                             GERS-MCC.9               meets or FROM S/G A MOV                                                                                                                         exceeds demand 196  3MSS*MOV17B      TDAFWSTEAM           CORE           42C       MCC       ESF 36'-6"   0.886 0.677         [2]         EPRI NP-5223-SLR1,   1.200   Capacity (V37)      SUPPLY VALVE       COOLING                             BLDG.                                             GERS-MCC.9               meets or FROM S/G B MOV                                                                                                                         exceeds demand 197  3MSS*MOV17D      TDAFWSTEAM           CORE           42C       MCC       ESF 36'-6"   0.886 0.677         [2]         EPRI NP-5223-SLR1,   1.200   Capacity (V38)      SUPPLY VALVE       COOLING                             BLDG.                                             GERS-MCC.9               meets or FROM S/G D MOV                                                                                                                         exceeds demand 198    3MSS*MSV5    TURBINE DRIVEN         CORE           1CON     Control   ESF 21'-6"   3.987 2.820       N/A                 [1]           [1]   Capacity AUXILIARY         COOLING                   Cabinet   BLDG.                                                                       meets or FEEDWATER PUMP -                                                                                                                         exceeds TURBINE ISOLATION                                                                                                                       demand [1]
Equipment ID 194 3ENS*ACB-GNB (15G-15U-2N) 195 3MSS*MOV17A (V12) 196 3MSS*MOV17B (V37) 197 3MSS*MOV17D (V38) 198 3MSS*MSV5 L
VALVE (INCLUSIVE OF TURBINE OVERSPEED TRIP SOLENOID 3FWL *sov104 SOV)
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 48 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
L
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 94G-3ENS*ACB-Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B)
POWER AND G-B BLDG 774B470A12 GERS-RLY-Al1.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand TDAFWSTEAM CORE 42C MCC ESF 36'-6" 0.886 0.677
[2]
EPRI NP-5223-SLR1, 1.200 Capacity SUPPLY VALVE COOLING BLDG.
GERS-MCC.9 meets or FROM S/G A MOV exceeds demand TDAFWSTEAM CORE 42C MCC ESF 36'-6" 0.886 0.677
[2]
EPRI NP-5223-SLR1, 1.200 Capacity SUPPLY VALVE COOLING BLDG.
GERS-MCC.9 meets or FROM S/G B MOV exceeds demand TDAFWSTEAM CORE 42C MCC ESF 36'-6" 0.886 0.677
[2]
EPRI NP-5223-SLR1, 1.200 Capacity SUPPLY VALVE COOLING BLDG.
GERS-MCC.9 meets or FROM S/G D MOV exceeds demand TURBINE DRIVEN CORE 1CON Control ESF 21'-6" 3.987 2.820 N/A
[1]
[1]
Capacity AUXILIARY COOLING Cabinet BLDG.
meets or FEEDWATER PUMP -
exceeds TURBINE ISOLATION demand [1]
VALVE (INCLUSIVE OF TURBINE OVERSPEED TRIP SOLENOID 3FWL *sov104 SOV)  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 49 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                     Seismic Capacity Item                  Equipment       Key Safety                 Cabinet                                                     Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type   Bldg Elev   ICRS,tt ICRS,v Relay Mfg. & Model   Source Document       TRS     Result 199 3MSS*MSV5    TURBINE DRIVEN       CORE           3CR       Control ESF 21'-6"   3.987   2.820 GE CR 120B D03041     EPRI NP-7147-SL,     5.667   Capacity AUXILIARY       COOLING                   Cabinet BLDG.                                               GERS-RLY-Al1.4               meets or FEEDWATER PUMP -                                                                                           (increased by EPRI             exceeds TURBINE ISOLATION                                                                                             TR-105988-V2               demand VALVE (INCLUSIVE                                                                                        [SQURTS], Table 3-1)
Item No.
OF TURBINE OVERSPEED TRIP SOLENOID 3FWL*SOV104 SOV) 200 3MSS*MSV5      TURBINE DRIVEN      CORE            K2        Control  ESF  21'-6"  3.987  2.820        NIA                  [1]            [1]    Capacity AUXILIARY        COOLING                  Cabinet  BLDG.                                                                            meets or FEEDWATER PUMP -                                                                                                                          exceeds TURBINE ISOLATION                                                                                                                        demand [1]
Equipment ID 199 3MSS*MSV5 200 3MSS*MSV5 201 3MSS*PV20A (V48)
VALVE (INCLUSIVE OF TURBINE OVERSPEED TRIP SOLENOID 3FWL*SOV104 SOV) 201 3MSS*PV20A    S/G A MAIN STEAM      CORE      PSCB/K627 (SU)  Control CNTL  47'-6"  3.987  2.491    POTIER&          EPRI NP-7147-SL,      9.533    Capacity (V48)        PRESSURE        COOLING                  Cabinet  BLDG                        BRUMFIELD MDR-        GERS-RLY-ARR.3                meets or RELIEVING VALVE                                                                      4076 (LATCHING)      (increased by EPRI            exceeds TR-105988-V2                demand
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 49 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Type Bldg Elev ICRS,tt ICRS,v Relay Mfg. & Model Source Document TRS Result TURBINE DRIVEN CORE 3CR Control ESF 21'-6" 3.987 2.820 GE CR 120B D03041 EPRI NP-7147-SL, 5.667 Capacity AUXILIARY COOLING Cabinet BLDG.
GERS-RL Y-Al1.4 meets or FEEDWATER PUMP -
(increased by EPRI exceeds TURBINE ISOLATION TR-105988-V2 demand VALVE (INCLUSIVE
[SQURTS], Table 3-1)
[SQURTS], Table 3-1)
OF TURBINE OVERSPEED TRIP SOLENOID 3FWL*SOV104 SOV)
TURBINE DRIVEN CORE K2 Control ESF 21'-6" 3.987 2.820 NIA
[1]
[1]
Capacity AUXILIARY COOLING Cabinet BLDG.
meets or FEEDWATER PUMP -
exceeds TURBINE ISOLATION demand [1]
VALVE (INCLUSIVE OF TURBINE OVERSPEED TRIP SOLENOID 3FWL*SOV104 SOV)
S/G A MAIN STEAM CORE PSCB/K627 (SU)
Control CNTL 47'-6" 3.987 2.491 POTIER&
EPRI NP-7147-SL, 9.533 Capacity PRESSURE COOLING Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING)
(increased by EPRI exceeds TR-105988-V2 demand
[SQURTS], Table 3-1)


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 50 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                   Seismic Capacity Item                    Equipment         Key Safety                 Cabinet                                                 Seismic Capacity Evaluation No. Equipment ID      Description       Function     Relay ID(s)   Type   Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document       TRS     Result 202  3MSS*PV20B    SIG B MAIN STEAM       CORE     PSCA/K627 (SLI) Control CNTL 47'-6"   3.987 2.491     POTIER&           EPRI NP-7147-SL,     9.533   Capacity (V55}        PRESSURE         COOLING                     Cabinet BLDG                       BRUMFIELD MDR-       GERS-RLY-ARR.3                 meets or RELIEVING VALVE                                                                       4076 (LATCHING}     (increased by EPRI             exceeds TR-105988-V2               demand
Item No.
[SQURTS], Table 3-1) 203  3Mss*pv2oc    SIG C MAIN STEAM       CORE     PSCBIK627 (SLI} Control CNTL 47'-6"   3.987 2.491     POTIER&           EPRI NP-7147-SL,     9.533   Capacity (V62)        PRESSURE         COOLING                     Cabinet BLDG                       BRUMFIELD MDR-       GERS-RLY-ARR.3                 meets or RELIEVING VALVE                                                                       4076 (LATCHING}     (increased by EPRI             exceeds TR-105988-V2               demand
Equipment ID 202 3MSS*PV20B (V55}
[SQURTS], Table 3-1) 204  3MSS*PV20D    SIG D MAIN STEAM       CORE     PSCA/K627 (SLI) Control CNTL 47'-6"   3.987 2.491     POTIER&           EPRI NP-7147-SL,     9.533   Capacity (V69)        PRESSURE         COOLING                     Cabinet BLDG                       BRUMFIELD MOR-       GERS-RLY-ARR.3                 meets or RELIEVING VALVE                                                                       4076 (LATCHING)     (increased by EPRI             exceeds TR-105988-V2               demand
203 3Mss*pv2oc (V62) 204 3MSS*PV20D (V69) 205 3RCS*PCV455A (V168) 206 3RCS'PCV455A (V168) 207 3RCS 0 PCV456 (V170)
[SQURTS], Table 3-1) 205 3RCS*PCV455A      PRESSURE             RCS       PSCA11K628   Control CNTL 47'-6"   3.987 2.491     POTIER&           EPRI NP-7147-SL,     6.667   Capacity (V168)    OPERATED RELIEF     INVENTORY                   Cabinet BLDG                       BRUMFIELD MOR-       GERS-RLY-ARR.3                 meets or VALVESOV           CONTROL                                                           134-1 (NON-                                       exceeds LATCHING)                                       demand 206 3RCS'PCV455A      PRESSURE             RCS       PSCA2/K743   Control CNTL 47'-6"   3.987 2.491     POTIER&           EPRI NP-7147-SL,     6.667   Capacity (V168)    OPERATED RELIEF     INVENTORY                   Cabinet BLDG                       BRUMFIELD MOR-       GERS-RLY-ARR.3                 meets or VALVESOV           CONTROL                                                           134-1 (NON-                                       exceeds LATCHING)                                       demand 207  3RCS 0 PCV456    PRESSURE             RCS       PSCB11K628   Control CNTL 47'-6"   3.987 2.491     POTIER&           EPRI NP-7147-SL,     6.667   Capacity (V170)    OPERATED RELIEF     INVENTORY                   Cabinet BLDG                       BRUMFIELD MDR-       GERS-RLY-ARR.3                 meets or VALVE SOV         CONTROL                                                           134-1 (NON-                                       exceeds LATCHING}                                       demand
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 50 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result SIG B MAIN STEAM CORE PSCA/K627 (SLI)
Control CNTL 47'-6" 3.987 2.491 POTIER&
EPRI NP-7147-SL, 9.533 Capacity PRESSURE COOLING Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING}
(increased by EPRI exceeds TR-105988-V2 demand
[SQURTS], Table 3-1)
SIG C MAIN STEAM CORE PSCBIK627 (SLI}
Control CNTL 47'-6" 3.987 2.491 POTIER&
EPRI NP-7147-SL, 9.533 Capacity PRESSURE COOLING Cabinet BLDG BRUMFIELD MDR-GERS-RLY-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING}
(increased by EPRI exceeds TR-105988-V2 demand
[SQURTS], Table 3-1)
SIG D MAIN STEAM CORE PSCA/K627 (SLI)
Control CNTL 47'-6" 3.987 2.491 POTIER&
EPRI NP-7147-SL, 9.533 Capacity PRESSURE COOLING Cabinet BLDG BRUMFIELD MOR-GERS-RLY-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING)
(increased by EPRI exceeds TR-105988-V2 demand
[SQURTS], Table 3-1)
PRESSURE RCS PSCA11K628 Control CNTL 47'-6" 3.987 2.491 POTIER&
EPRI NP-7147-SL, 6.667 Capacity OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MOR-GERS-RL Y-ARR.3 meets or VALVESOV CONTROL 134-1 (NON-exceeds LATCHING) demand PRESSURE RCS PSCA2/K743 Control CNTL 47'-6" 3.987 2.491 POTIER&
EPRI NP-7147-SL, 6.667 Capacity OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MOR-GERS-RL Y-ARR.3 meets or VALVESOV CONTROL 134-1 (NON-exceeds LATCHING) demand PRESSURE RCS PSCB11K628 Control CNTL 47'-6" 3.987 2.491 POTIER&
EPRI NP-7147-SL, 6.667 Capacity OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or VALVE SOV CONTROL 134-1 (NON-exceeds LATCHING}
demand  


(_ '
Item No.
Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 51 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List                         Demand                     Seismic Capacity Item                  Equipment         Key Safety                 Cabinet                                                   Seismic Capacity Evaluation No. Equipment ID    Description       Function     Relay ID(s)   Type   Bldg Elev   ICRS,H ICRS,v Relay Mfg. & Model   Source Document     TRS     Result 208  3RCS*PCV456    PRESSURE             RCS       PSCB2/K743   Control CNTL 47'-<l"   3.987 2.491     POTTER&           EPRI NP-7147-SL,   6.667   Capacity (V170)    OPERATED RELIEF     INVENTORY                   Cabinet BLDG                       BRUMFIELD MDR-       GERS-RLY-ARR.3               meets or VALVESOV         CONTROL                                                           134-1 (NON-                                     exceeds LATCHING)                                     demand 209    3VBNINV1      120VAC VITAL         AC/DC     Static Switch Control CNTL 4'-<l"   0.506 0.309 AMETEK Solidstate           (1]           [1]   Capacity INVERTER INV-1     POWER AND       Relays     Cabinet BLDG                         Controls Model 85-                               meets or SUPPORT                                                           VC0250-29                                     exceeds SYSTEMS                                                                                                         demand [1]
Equipment ID 208 3RCS*PCV456 (V170) 209 3VBNINV1 210 3VBA*INV2 211 3VBA*INV3 212 3VBNINV4 Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 51 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s)
210    3VBA*INV2    120VAC VITAL         AC/DC     Static Switch Control CNTL 4"-13"   0.506 0.309 AMETEK Solidstate           [1]           [1]   Capacity INVERTER INV-2     POWER AND       Relays     Cabinet BLDG                         Controls Model 85-                               meets or SUPPORT                                                           VC0250-29                                     exceeds SYSTEMS                                                                                                         demand [1]
Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result PRESSURE RCS PSCB2/K743 Control CNTL 47'-<l" 3.987 2.491 POTTER&
211    3VBA*INV3    120VAC VITAL         AC/DC     Static Switch Control CNTL 4'-<l"   0.506 0.309 AMETEK Solidstate           [1]           [1]   Capacity INVERTER INV-3     POWER AND       Relays     Cabinet BLDG                         Controls Model 85-                               meets or SUPPORT                                                           VC0250-29                                     exceeds SYSTEMS                                                                                                         demand [1]
EPRI NP-7147-SL, 6.667 Capacity OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or VALVESOV CONTROL 134-1 (NON-exceeds LATCHING) demand 120VAC VITAL AC/DC Static Switch Control CNTL 4'-<l" 0.506 0.309 AMETEK Solidstate (1]
212    3VBNINV4      120VAC VITAL         AC/DC     Static Switch Control CNTL 4'-<l"   0.506 0.309 AMETEK Solidstate           [1]           [1]   Capacity INVERTER INV-4     POWER AND       Relays     Cabinet BLDG                         Controls Model 85-                               meets or SUPPORT                                                           VC0250-29                                     exceeds SYSTEMS                                                                                                         demand [1]
[1]
Capacity INVERTER INV-1 POWER AND Relays Cabinet BLDG Controls Model 85-meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1]
120VAC VITAL AC/DC Static Switch Control CNTL 4"-13" 0.506 0.309 AMETEK Solidstate
[1]
[1]
Capacity INVERTER INV-2 POWER AND Relays Cabinet BLDG Controls Model 85-meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1]
120VAC VITAL AC/DC Static Switch Control CNTL 4'-<l" 0.506 0.309 AMETEK Solidstate
[1]
[1]
Capacity INVERTER INV-3 POWER AND Relays Cabinet BLDG Controls Model 85-meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1]
120VAC VITAL AC/DC Static Switch Control CNTL 4'-<l" 0.506 0.309 AMETEK Solidstate
[1]
[1]
Capacity INVERTER INV-4 POWER AND Relays Cabinet BLDG Controls Model 85-meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1]
Notes:
Notes:
: 1. Acceptable margin to contact chatter is based on the MPS3 design basis seismic qualification of components as described in Section 4.1.
: 1. Acceptable margin to contact chatter is based on the MPS3 design basis seismic qualification of components as described in Section 4.1.
: 2. GERS capacity data for starter/contactors from EPRI NP-5223-SLR1, GERS-MCC.9 is not model-specific.
: 2. GERS capacity data for starter/contactors from EPRI NP-5223-SLR1, GERS-MCC.9 is not model-specific.
(_ '


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 52 of 54 Appendix 2 - Representative Sample Component Evaluations This appendix provides two (2) representative sample component evaluations for relays selected from the list in Appendix 1.
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 52 of 54 Appendix 2 - Representative Sample Component Evaluations This appendix provides two (2) representative sample component evaluations for relays selected from the list in Appendix 1.
1st Example- Equipment ID 3EGS*EGB [Line Item 20 from Appendix 1]
1st Example-Equipment ID 3EGS*EGB [Line Item 20 from Appendix 1]
Description of component:
Description of component:
Equipment ID 3EGS*EGB - EMERGENCY DIESEL GENERATOR EOG "B" - supporting the AC/DC POWER AND SUPPORT SYSTEMS function. Relay from seal-in I lockout circuit analysis - stopping relay 5E. Relay is an AGASTAT Model 7022PE.
Equipment ID 3EGS*EGB - EMERGENCY DIESEL GENERATOR EOG "B" - supporting the AC/DC POWER AND SUPPORT SYSTEMS function.
Relay from seal-in I lockout circuit analysis - stopping relay 5E. Relay is an AGASTAT Model 7022PE.
Plant Location:
Plant Location:
Mounted in panel 3EGS*TBEG1 B EOG "B" Control and Relay Box located in the Emergency Generator Enclosure Building, Elevation 24'6". Cabinet type: Control Cabinet.
Mounted in panel 3EGS*TBEG1 B EOG "B" Control and Relay Box located in the Emergency Generator Enclosure Building, Elevation 24'6". Cabinet type: Control Cabinet.
Description of Mounting Point Demand Estimate:
Description of Mounting Point Demand Estimate:
Horizontal Response Estimate - Emergency Generator Enclosure Building foundation elevation:
Horizontal Response Estimate - Emergency Generator Enclosure Building foundation elevation:
4'6". Panel 3EGS*TBEG1 B is 24'6" - 4'6"     = 20 feet above foundation. AFsH   = 1.650 (from
4'6". Panel 3EGS*TBEG1 B is 24'6" - 4'6" = 20 feet above foundation. AFsH = 1.650 (from Reference 8, Figure 4-3). SAGMRs = 0.422g (from Reference 4). Then, SAcH = 0.422
                                    =                                        =
* 1.650 =
Reference 8, Figure 4-3). SAGMRs 0.422g (from Reference 4). Then, SAcH 0.422
* 1.650         =
0.696g.
0.696g.
Vertical Response Estimate - As described in Section 3.1.2, SAvGMRs = 0.309g. AFsv = 1.333 (from Reference 8, Figure 4-4). Then, SAcv = 0.309
Vertical Response Estimate - As described in Section 3.1.2, SAvGMRs = 0.309g. AFsv = 1.333 (from Reference 8, Figure 4-4). Then, SAcv = 0.309
Line 773: Line 1,494:
For cabinet type Control Cabinet, AFcH = 4.5 and AFcv = 4.7 (from Reference 8, Section 4.4).
For cabinet type Control Cabinet, AFcH = 4.5 and AFcv = 4.7 (from Reference 8, Section 4.4).
Then, mounting point demand is:
Then, mounting point demand is:
ICRScH =0.696
ICRScH = 0.696
* 4.5 =3.132g ICRScv = 0.412
* 4.5 = 3.132g ICRScv = 0.412
* 4.7 = 1.936g Description of Relay Capacity The capacity of the relay is based on EPRI GERS - GERS- RLY-PNT. 7 (Reference 9 and 10).
* 4.7 = 1.936g Description of Relay Capacity The capacity of the relay is based on EPRI GERS - GERS-RL Y-PNT. 7 (Reference 9 and 10).
For this relay, GERS capacity for non-operating, normally closed contact is applicable - SAT =
For this relay, GERS capacity for non-operating, normally closed contact is applicable - SAT =
6g.
6g.  


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 53 of 54 Appendix 2 - Representative Sample Component Evaluations The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.0 was selected based on the cabinet relay mounting (similar stiffness in three directions).
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 53 of 54 Appendix 2 - Representative Sample Component Evaluations The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.0 was selected based on the cabinet relay mounting (similar stiffness in three directions).
Then, TRS = (6/1.5)
Then, TRS = (6/1.5)
* 1.0 = 4g.
* 1.0 = 4g.
Capacity I Demand Ratio:
Capacity I Demand Ratio:
CI D   =TRS / ICRSc
C I D = TRS / ICRSc  
= 4g I 3.132g = 1.277 - Horizontal (governing) - acceptable*
= 4g I 3.132g = 1.277 - Horizontal (governing) - acceptable*
Capacity exceeds demand.
Capacity exceeds demand.
2"d Example - Equipment ID 3RCS*PCV455A (V168) [Line Item 206 from Appendix 1]
2"d Example - Equipment ID 3RCS*PCV455A (V168) [Line Item 206 from Appendix 1]
Description of component:
Description of component:
Equipment ID 3RCS*PCV455A (V168) - PRESSURIZER PRESSURE OPERATED RELIEF VALVE SOV - supporting the RCS Inventory Control function. Relay from seal-in I lockout circuit analysis - PSCA2/K743. Relay is a POTTER & BRUMFIELD MDR-134-1 (NON-LATCHING).
Equipment ID 3RCS*PCV455A (V168) -
PRESSURIZER PRESSURE OPERATED RELIEF VALVE SOV - supporting the RCS Inventory Control function. Relay from seal-in I lockout circuit analysis -
PSCA2/K743. Relay is a POTTER & BRUMFIELD MDR-134-1 (NON-LATCHING).
Plant Location:
Plant Location:
Mounted in panel PSCA2 Reactor Protection System Relay Cabinet in the Control Building, Main Control Room, Elevation 47'6". Cabinet type: Control Cabinet.
Mounted in panel PSCA2 Reactor Protection System Relay Cabinet in the Control Building, Main Control Room, Elevation 47'6". Cabinet type: Control Cabinet.
Description of Mounting Point Demand Estimate:
Description of Mounting Point Demand Estimate:
Horizontal Response Estimate - Control Building foundation elevation: 4' 6". Panel PSCA2 is
Horizontal Response Estimate - Control Building foundation elevation: 4' 6". Panel PSCA2 is 47'6" - 4'6" = 43 feet above foundation. AFsH = 2.1 (from Reference 8, Figure 4-3). SAGMRS =
            =                                  =
0.422g (from Reference 4). Then, SAcH = 0.422
47'6" - 4'6" 43 feet above foundation. AFsH 2.1 (from Reference 8, Figure 4-3). SAGMRS         =
* 2.1 = 0.886g.
                                      =              =
Vertical Response Estimate -As described in Section 3.1.2, SAvGMRS = 0.309g. AFsv = 1.717 (from Reference 8, Figure 4-4). Then, SAcv = 0.309
0.422g (from Reference 4). Then, SAcH 0.422
* 1.717 = 0.530g.
* 2.1 0.886g.
For cabinet type Control Cabinet, AFcH = 4.5 and AFcv = 4.7 (from Reference 8, Section 4.4).  
Vertical Response Estimate -As described in Section 3.1.2, SAvGMRS = 0.309g. AFsv = 1.717 (from Reference 8, Figure 4-4). Then, SAcv =0.309
* 1.717 =0.530g.
For cabinet type Control Cabinet, AFcH =4.5 and AFcv =4.7 (from Reference 8,       Section 4.4).


Serial No. 16-455 Docket Nos. 50-336/423 Attachment 2 MPS3 HF Sensitive Equipment Functional Confirmation Page 54 of 54 Appendix 2 - Representative Sample Component Evaluations Then, mounting point demand is:
Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 54 of 54 Appendix 2 - Representative Sample Component Evaluations Then, mounting point demand is:
ICRScH =0.886
ICRScH = 0.886
* 4.5 =3.987g ICRScv =0.530
* 4.5 = 3.987g ICRScv = 0.530
* 4.7 =2.491g Description of Relay Capacity:
* 4.7 = 2.491g Description of Relay Capacity:
The capacity of the relay is based on EPRI GERS - GERS- RLY-ARR.3 (Reference 9 and 10).
The capacity of the relay is based on EPRI GERS - GERS-RLY-ARR.3 (Reference 9 and 10).
For this relay, GERS capacity for non-operating, normally open contact is applicable - SAT =
For this relay, GERS capacity for non-operating, normally open contact is applicable - SAT =
10g.
10g.
The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.0 was selected based on the cabinet relay mounting (similar stiffness in three directions).
The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.0 was selected based on the cabinet relay mounting (similar stiffness in three directions).
Then, TRS   =(10/1.50)
Then, TRS = (10/1.50)
* 1.0 =6.667g.
* 1.0 = 6.667g.
Capacity I Demand Ratio:
Capacity I Demand Ratio:
CID  =TRS I ICRSc
C I D = TRS I ICRSc  
=6.667g I 3.987g =1.672   - Horizontal (governing) - acceptable Capacity exceeds demand.}}
= 6.667g I 3.987g = 1.672 - Horizontal (governing) - acceptable Capacity exceeds demand.}}

Latest revision as of 17:02, 9 January 2025

Response to March 12, 2012 Information Request High Frequency Sensitive Equipment Functional Confirmation for Recommendation 2.1
ML16365A036
Person / Time
Site: Millstone  
(DPR-065, NPF-049)
Issue date: 12/22/2016
From: Heacock D
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
16-455
Download: ML16365A036 (84)


Text

{{#Wiki_filter:.ir Dominion Nuclear Connecticut, Inc. 5000 Dominion Boulevard, Glen Allen, VA 23060 .Web Address: www.dom.com December 22, 2016 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 DOMINION NUCLEAR CONNECTICUT, INC. MILLSTONE POWER STATION UNITS 2 AND 3 Serial No. 16-455 NRNDEA RO Docket Nos. 50-336/423 License Nos. DPR-65 NPF-49 RESPONSE TO MARCH 12, 2012 INFORMATION REQUEST HIGH FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR RECOMMENDATION 2.1

References:

1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012 [ADAMS Accession Nos. ML12056A046 and ML12053A340].
2. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 "Seismic" of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,"

dated October 27, 2015 [ADAMS Accession No. ML15194A015].

3. EPRI Report 3002004396, Final Report, High Frequency Program Application Guidance for Functional Confirmation and Fragility Evaluation, July 2015 [ADAMS Accession No. ML15223A102].
4. EPRI Report 1025287, Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic, February 2013 [ADAMS Accession No. ML12333A170].

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status., Item (4), of Reference 1 requested addressees to provide information related to the functionality of high-frequency sensitive structures, systems, and components (SSCs) under certain circumstances. By letter dated October 27, 2015 (Reference 2), the NRC transmitted final seismic information request tables, which identified that Millstone Units 2 and 3 were to conduct a limited scope seismic evaluation that included a high-frequency (HF) sensitive equipment evaluation. Electric Power Research Institute (EPRI) Report 3002004396, High Frequency Program Application Guidance for Functional Confirmation and Fragility Evaluation (Reference 3), provides methods and criteria for evaluating the HF sensitive equipment to the reevaluated ground motion response spectrum (GMRS) hazard levels. This report supplements the guidance provided in the Seismic Evaluation Guidance, Screening,

1 o ID

~~R-.

Serial No. 16-455 Docket Nos. 50-336/423 Page 2 of 3 Prioritization and Implementation Details (SPID) (Reference 4), for plants where the GMRS exceeds the safe shutdown earthquake (SSE) spectrum in the frequency range greater than 10 Hz. Attachments 1 and 2 provide the information requested in response to Enclosure 1, Item (4) of Reference 1 for Millstone Units 2 and 3, respectively, based on the high-frequency sensitive equipment evaluation guidance from EPRI Report 3002004396. This letter completes the submittal of information requested by Reference 1, Enclosure 1, Recommendation 2.1: Seismic, for Millstone Units 2 and 3. If you have any questions regarding this information, please contact Diane E. Aitken at (804) 273-2694. Sincerely, David A. Heacock President Dominion Nuclear Dominion Nuclear Connecticut, Inc. COMMONWEAL TH OF VIRGINIA COUNTY OF HENRICO Notaublic Commitments made in this letter: No new regulatory commitments Attachments: CRAIG D SLY Notary Public Commonwealth of Virginia Reg.# 7518653 My Commission Expires December 31, 2~

1. High-Frequency Sensitive Equipment Functional Confirmation for Millstone Unit 2
2. High-Frequency Sensitive Equipment Functional Confirmation for Millstone Unit 3 J

cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station 50.54f_Seismic.Resource@nrc.gov Serial No. 16-455 Docket Nos. 50-336/423 Page 3 of 3

ATTACHMENT 1 Serial No. 16-455 Docket Nos. 50-336/423 HIGH-FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR MILLSTONE UNIT 2 MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC.

1.0 INTRODUCTION

1.1 PURPOSE Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 1 of 25 The purpose of this attachment is to provide information requested by the NRC in its March 12, 2012 10 CFR 50.54(f) letter issued to all power reactor licensees and holders of construction permits in active or deferred status (Reference 1 ). Specifically, this attachment provides the results of the High Frequency Confirmation required by Item (4), Enclosure 1, Recommendation 2.1: Seismic, of the letter. The High Frequency Confirmation evaluation undertaken for Millstone Power Station Unit 2 (MPS2) used the methodologies in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation" (Reference 8) as described herein. A summary of the High Frequency Confirmation evaluations and results are provided below.

1.2 BACKGROUND

Following the accident at the Fukushima Dai-ichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established a Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations and to determine if the agency should make additional improvements to its regulatory system. The NTTF developed a set of recommendations intended to clarify and strengthen the regulatory framework for protection against natural phenomena. Subsequently, the NRC issued a 10 CFR 50.54(f) letter on March 12, 2012 (Reference 1), requesting information to assure that these recommendations are addressed by all U.S. nuclear power plants. The 50.54(f) letter requests that licensees and holders of construction permits under 10 CFR Part 50 reevaluate the seismic hazards at their sites against present-day NRC requirements and guidance. Included in the 50.54(f) letter was a request that licensees perform a "confirmation, if necessary, that SSCs, which may be affected by high-frequency ground motion, will maintain their functions important to safety." EPRI Report

1025287, "Seismic Evaluation Guidance:

Screening, Prioritization and Implementation Details (SPID) for the resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic" (Reference 6) provided screening, prioritization, and implementation details to the U.S. nuclear utility industry for responding to the NRC 50.54(f) letter. This report was developed with NRC participation and is endorsed by the NRC. The SPID included guidance for determining which plants should perform a High Frequency Confirmation and identified the types of components that should be evaluated in the evaluation.

Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 2 of 25 Subsequent guidance for performing a High Frequency Confirmation was provided in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation," (Reference 8) and was endorsed by the NRC in a letter dated September 17, 2015 (Reference 3). Final screening identifying plants needing to perform a High Frequency Confirmation was provided by NRC in a letter dated October 27, 2015 (Reference 2). On March 31, 2014, Millstone Power Station submitted a reevaluated seismic hazard to the NRC as a part of the Seismic Hazard and Screening Report (Reference 4). By letter dated October 27, 2015 (Reference 2), the NRC transmitted the results of the screening and prioritization review of the seismic hazards reevaluation. The reevaluated seismic hazard was developed in order to provide the information requested by the NRC in Reference 1 and does not constitute a new or supplemental seismic design or licensing basis for MPS2. As such, the conclusions of the High Frequency Confirmation review do not result in a challenge to the design basis function of any plant structures, systems, or components important to safety. 1.3 APPROACH EPRI Report 3002004396 (Reference 8) is used for the MPS2 engineering evaluations described in this attachment. Section 4.1 of Reference 8 provided general steps to follow for the high-frequency confirmation component evaluation. Accordingly, the following topics are addressed in the subsequent sections of this attachment: MPS2 Safe Shutdown Earthquake (SSE) and Ground Motion Response Spectrum (GMRS) Information Selection of components and a list of specific components for high-frequency confirmation Estimation of seismic demand for subject components Estimation of seismic capacity for subject components Summary of high-frequency evaluations for subject components Summary of Results 1.4 PLANT SCREENING MPS2 submitted the reevaluated seismic hazard information, including the GMRS, to the NRC on March 31, 2014 (Reference 4). In letters dated December 15, 2015 and March 15, 2016 (References 12 and 13, respectively), the NRC staff concluded that the submitted GMRS adequately characterizes the reevaluated seismic hazard for the MPS site. The NRC final screening determination letter (Reference 2) concluded that the MPS2 GMRS to SSE comparison resulted in a need to perform a High Frequency Confirmation in accordance

Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 3 of 25 with the screening criteria in the SPID (Reference 6). 1.5 INITIAL CONDITIONS For the purposes of this High Frequency Confirmation review, the plant is assumed to be operating normally prior to the occurrence of the severe seismic event with offsite power sources available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip. 2.0 SELECTION OF COMPONENTS FOR HIGH-FREQUENCY SCREENING The fundamental objective of the high-frequency confirmation review was to determine whether the occurrence of a seismic event could cause critical equipment to fail to perform as necessary. An optimized evaluation process was applied that focused on achieving a safe and stable plant state following a seismic event. As described in Reference 8, this state is achieved by confirming that key plant safety functions critical to immediate plant safety are preserved (reactor trip, reactor coolant system inventory and pressure control, and core cooling) and that the plant operators have the necessary power available to achieve and maintain this state immediately following the seismic event (AC/DC power and support systems). Within the applicable functions, the components that would need a high-frequency confirmation are contact control devices subject to intermittent states (e.g., relay contact chatter) in seal-in or lockout circuits. Accordingly, the objective of the review, as stated in Section 4.2.1 of Reference 8, was to determine if seismic induced high-frequency relay chatter would prevent the completion of key plant safety functions. For each function, a review was performed to identify plant equipment supporting the function. The control circuit schematic diagrams for this equipment were then reviewed using the guidance from EPRI NP-7148 (Reference 11) and EPRI Report 3002004396 (Reference 8) to determine whether seismic-induced contact chatter could result in seal-in or lockout (SILO) conditions that could have an adverse impact on the equipment capability to support key plant safety functions. From this review, a list of contact control devices for which contact chatter could result in SILO conditions was identified. These devices (termed "relays" for the purposes of this evaluation) were further evaluated for seismic capacity margin, as described in Sections 3 and 4.

2.1 REACTOR TRIP/SCRAM Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 4 of 25 Consistent with the guidance in Reference 8, the design requirements for reactor trip systems preclude the application of seal-in or lockout circuits that prevent reactor trip/SCRAM functions and no high-frequency component chatter review is necessary for this function. 2.2 REACTOR COOLANT SYSTEM INVENTORY CONTROL The reactor coolant system inventory control systems were reviewed to identify components. that could be susceptible to adverse operation due to contact control devices in SILO circuits that could create loss of coolant-type events, such as inadvertent opening of a pressurizer power-operated relief valve (PORV). The following components were identified for control circuit review for SILO conditions: Pressurizer PORVs 2.3 REACTOR COOLANT SYSTEM PRESSURE CONTROL Consistent with the guidance in Reference 8, no specific high-frequency component chatter review is required for this function. 2.4 CORE COOLING The core cooling systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that would prevent accomplishment of the core cooling function. The intent of the review was to ensure at least a single train of non-AC power driven. decay heat removal capability was maintained (e.g., auxiliary feedwater flow from at least one pump to at least one steam generator). The following components were identified for control circuit review for SILO conditions: Auxiliary Feedwater (AFW) Flow Regulating Valves AFW Discharge Header Cross-tie Valve Atmospheric Steam Dump Valves Turbine-driven AFW Pump Steam Supply Valves Turbine-driven AFW Pump Trip-Throttle Valve Turbine-driven AFW Pump 2.5 AC/DC POWER SUPPORT SYSTEMS The AC and DC power support systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that prevent the availability of DC and/or AC power sources. The following AC and DC power support systems

were reviewed: Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 5 of 25 Emergency Diesel Generators (EOG), EOG Support Systems and associated Switchgear, Load Centers, and MCCs, Battery Chargers and Inverters, Vital 125vdc and 120vac Distribution The analysis considered the reactor operating normally at power with no equipment failures prior to the seismic event. The EDGs are not operating, but are available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip. In response to bus under-voltage relaying detecting the LOOP, the Class 1 E control systems must automatically shed loads, start the EDGs, and sequentially load the diesel generators as designed. Ancillary systems required for EOG operation, as well as Class 1 E battery chargers and inverters, must function as necessary. The following components were identified for control circuit review for SILO conditions: 4kV Emergency Bus Feeder and Bus Tie Breakers (Emergency and Offsite sources) 480v Emergency Bus Feeder and Tie Breakers 4kV I 480v Emergency Bus Transformers and 4kV Supply Breakers 4kV Emergency Bus Load Breakers to Service Water, AFW, High Pressure Safety Injection, Low Pressure Safety Injection, Containment Spray and Reactor Building Closed Cooling Water Pumps 480v Emergency Bus Load Breakers to 125vdc Battery Chargers, various MCCs, and Load Centers 125vdc Batteries, DC Susses, Battery Chargers, and Distribution System Components 120vac Vital Inverters and Distribution System Components EDGs EOG Air Start System Valves EOG Room Ventilation Fans and Dampers Service Water Pumps and Strainers Service Water System Valves (required for cooling water supply to EDGs)

Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 6 of 25 2.6

SUMMARY

OF SELECTED COMPONENTS A list of the contact devices requiring a high-frequency confirmation is provided in Appendix 1. 3.0 SEISMIC DEMAND ESTIMATE The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the mounting point seismic demand to be determined, which requires the development of in-structure seismic demand based on the GMRS input and the in-cabinet amplification of the in-structure floor motion at the location of the electrical cabinet housing the relay. The calculation of in-structure response typically requires the development of a foundation input response spectrum (FIRS) and dynamic analysis of the structure. MPS2 has not developed these inputs from the GMRS for plant structures. Therefore, consistent with the guidance in Reference 8, Section 4.3, the in-structure response for buildings and floor elevations where subject relays are located was estimated as described in subsection 3.1 below. The mounting point high-frequency seismic demand was determined consistent with the guidance in Reference 8, Sections 4.4 and 4.5, and is described in subsection 3.2 below. 3.1 ESTIMATE OF HIGH FREQUENCY IN-STRUCTURE RESPONSE Per Reference 8, Sect. 4.3, the basis for calculating high-frequency seismic demand in the horizontal direction is the horizontal control point GMRS, which was developed in response to Reference 1 and reported in the MPS Seismic Hazard and Screening Report (Reference 4). As noted in Reference 8, Section 3.3, The Control Point GMRS developed for these rock sites are typically appropriate for all rock founded structures and additional FIRS estimates are not deemed necessary for the high frequency confirmation effort. MPS is a rock site, and the MPS2 structures of interest for the high-frequency confirmation (Auxiliary Building and Turbine Building) are rock-founded. Therefore, the control point GMRS was the appropriate review level earthquake (RLE) input for the purposes of the high-frequency confirmation.

3.1.1 HORIZONTAL SEISMIC DEMAND Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 7 of 25 The horizontal response structural amplification factor to be applied for estimating the horizontal in-structure seismic demand is provided in Reference 8, Figure 4-3 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation. For the MPS2 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage. The horizontal seismic demand was calculated in accordance with Reference 8, Equation 4-1 a: SAcH = SAGMRS

  • AF SH SAcH is the Spectral Acceleration, Clipped Horizontal (i.e., in-structure [floor] horizontal acceleration).

SAGMRS is the peak GMRS between 15-40Hz. The SAGMRs value is 0.422g from Reference 4. The horizontal GMRS is plotted in Figure 3-1. AFsH is the Horizontal Response Structural Amplification Factor from Reference 8, Figure 4-3. 3.1.2 VERTICAL SEISMIC DEMAND The vertical response structural amplification factor to be applied for estimating the vertical in-structure seismic demand is provided in Reference 8, Figure 4-4 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation. For the MPS2 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage. The vertical seismic demand was calculated in accordance with Reference 8, Equation 4-1 b: SAcv = SAvGMRS

  • AF sv SAcv is the Spectral Acceleration, Clipped Vertical (in-structure [floor] vertical acceleration).

SAvGMRs is the peak estimated Spectral Acceleration, Vertical GMRS in the 15 to 40Hz frequency range. The peak SAvGMRs is the maximum product of the Vertical-to-Horizontal (V/H) function values and the corresponding horizontal GMRS values between 15 and 40Hz. The GMRS values are from Reference 4. The V/H function is derived from Reference 8, Tables 3-1 and 3-2, utilizing the GMRS peak ground acceleration (PGA) [0.190g] and the shear wave travel time from a depth of 30 meters to the ground surface (Vs30) from Reference 4. For MPS2, the V/H function values are between 0.680 @ 15 Hz and 0.860 @ 40Hz, and are based on the GMRS Horizontal PGA = 0.19g and Vs30 > 1,000 mps corresponding to a site class '8-Hard' per Reference 8, Table 3-2. The maximum product of the V/H function values and the corresponding GMRS is 0.31 g, which occurs at 40Hz (GMRS = 0.36g, V/H = 0.86). The GMRS, estimated vertical GMRS (VGMRS), and V/H Ratio values are plotted in Figure 3-1, along with the SSE spectrum.

Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 8 of 25 AFsv is the Vertical Response Structural Amplification Factor from Reference 8, Figure 4-4. 3.2 ESTIMATE OF HIGH FREQUENCY MOUNTING POINT SEISMIC DEMAND The mounting point seismic demand was determined by applying in-cabinet amplification factors to the in-structure demand, as described in Reference 8, Sections 4.4 and 4.5.1. The in-structure demand was determined as described in Section 3.1 above. The in-cabinet amplification factor is applied to account for the amplification of the structure seismic response at the cabinet anchor points. The in-structure demand (horizontal or vertical) was multiplied by the applicable in-cabinet amplification factor to obtain the mounting point demand. Horizontal cabinet amplification factors used were: Motor Control Centers Switchgear (flexible panels) AFc = 3.6 AFc = 7.2 Control Cabinets (e.g., Control Room electrical panels AFc = 4.5 and bench boards, etc.) Cabinet types were determined based on guidance in EPRI NP-7148, "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality" (Reference 11). The vertical cabinet amplification factor used was AFc = 4.7 for all three cabinet types. For electrical cabinets/enclosures that did not correspond to the listed cabinet types, in-cabinet amplification factors consistent with the cabinet configuration were used and justified on a case-by-case basis. The mounting point demand, ICRSc, used in the horizontal and vertical directions for evaluation of the relays, is equal to the product of the clipped in-structure demand and the applicable cabinet amplification factor within the 15 to 40 Hz frequency range, as described in Reference 8, Sections 4.4: ICRScH = AF cH

  • SAcH ICRScv = AFcv
  • SAcv The cabinet type classification and the mounting point seismic demand are tabulated for each evaluated relay in Appendix 1.

0.50 0.45 0.40 tlO 0.35 c' 0 ~ 0.30 cu ] 0.25 u n:J ] 0.20 u cu Q. VI 0.15 0.10 0.05 0.00 0.1 I --- GMRS HF Range

  • *V/H Ratio I

I I Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 9 of 25 Millstone Unit 2 I I ,;f?i I'<: ~ ~ '",.Ill

  • * * * *
  • VG MRS
r.,.

I ~ -SSE . ~ 1.;. ii ll ....-~, ", I; ~.. I

  • ~

... -. -. -,1.'1. -. -. ;~ i* "'*. \\ ~m. **"lt II*... "* ,,_ I ,,~' .. ~ ":~ / ~

    • ~~
  • .~,
  • l I.'
  • ~xi: 1*.*,

/ ,f. ~;~:

    • I'
~' --

~/ , I. i* "'* 'I I 1 0.9 0.8 0.7 0.6 0... n:J 0.5 a::

c -

0.4 > I I 1' ..

  • 1

-~

  • ~

i *;:L P'! * ~ ~".** 0.3 I r f . :<er .";l -t ~.,,, ~ a ---.i.. 11~ :~al~~llt I ~-.-:****... ""*,***t I 0.2 0.1 0 1 10 100 Spectral frequency, Hz Figure 3-1: Plot of Horizontal and Vertical Ground Motion Response Spectra, Safe Shutdown Earthquake Spectrum, and V/H Ratio 4.0 CONTACT DEVICE EVALUATIONS The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the comparison of relay seismic capacity to the applicable seismic demand to determine whether the relay is predicted to experience contact chatter during a GMRS-level seismic event. Seismic demand was determined as described in Section 3.0. The deterministic high confidence of low probability of failure (HCLPF) capacity of the relay device was determined in accordance with the guidance of Reference 8, Section 4.5. 4.1 HCLPF COMPONENT CAPACITY The HCLPF capacities of the relays were developed based on the guidance in Reference 8, Section 4.5.2. The effective wide band capacity, TRS, is given by Reference 8, Equation 4-5: SAT is the Spectral Acceleration, Effective Spectral Test Capacity (Relay Seismic Capacity) for relays as obtained from one of the following sources:

Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 10 of 25 EPRI High Frequency Test Program (References 7 and 8) Generic Equipment Ruggedness Spectrum (GERS) (Reference 9 and 10) Seismic Qualification Reporting and Testing Standardization (Reference 14) Site-specific seismic qualification test data Certain relay model numbers identified on the relay list are not explicitly covered by the testing referenced in the list above and a comparison of the relay to other similar relay types having seismic qualification test data (e.g., same manufacturer & same family of relay, similar size, shape, features, construction, etc.) was made in those cases in order to provide a SAT value. FK is the Conservative Deterministic Failure Margin (CFDM) Knockdown Factor and its value depends on the source of the test value chosen to represent test capacity. FK was obtained from Reference 8, Table 4-2. FMs is the Multi-axis to Single-axis Correction Factor and is equal to either 1.0 or 1.2 depending on the expected seismic response of the relay enclosure cabinet. The value of FMs was chosen consistent with the guidance from Reference 8, Section 4.5.2. The effective wide band capacity, along with the source for the device capacity, is tabulated for each evaluated relay in Appendix 1. 4.2 SEISMIC MARGIN EVALUATION The seismic margin to the onset of contact chatter was determined by comparing the HCLPF capacity, TRS, to the mounting point seismic demand, ICRSc, to obtain the capacity/demand ratio: CID= TRS / ICRSc (C/D is determined for horizontal and vertical directions) The results of the relay chatter evaluation is tabulated for each evaluated relay in Appendix 1. Two representative sample relay evaluations are included in Appendix 2.

5.0 CONCLUSION

S 5.1

SUMMARY

OF RESULTS The high-frequency confirmation review was performed consistent with the guidance in EPRI Report 3002004396 (Reference 8). The following results were obtained: 132 essential plant components were selected for detailed review 103 components were selected for relay chatter evaluation (the remaining 29 components are non-electrical, and do not require relay chatter evaluation) 363 relays were identified for the 103 components evaluated for relay chatter

Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 11 of 25 104 relays were identified with the potential to cause SILO conditions and required seismic margin evaluation 101 relays were determined to have adequate seismic margin to chatter (C/D ratio>/= 1) The high-frequency confirmation review determined there are three relays associated with essential components for which, based on available high-frequency seismic capacity information and the conservatively estimated seismic demand, the seismic capacity is exceeded by the GMRS in-cabinet seismic demand. These relays are identified in the table below. The relays are associated with protection and/or metering for 4kV Emergency Diesel Generator output breakers. The relays are located within the 4kV Emergency Switchgear A3 and A4 cubicles. Appendix1 Component ID Associated Relay ID(s) Item No. (Breaker ID) (Switchgear Cubicle location) 6 15G-12U-2 (52-A312) 81 (A312) 15 15G-13U-2 (52-A401) 81 (A401) 18 15G-13U-2 (52-A401) 51V-A, B & C (A401) Chatter of the relays could cause trip and/or prevent closure of the emergency diesel generator (EOG) output breaker at a time when the EOG is required to provide emergency power to the associated 4kV emergency bus (i.e., LOOP). Further review of the consequences of potential contact chatter associated with these relays determined that operator action guided by existing emergency response procedures would resolve the condition. As part of the immediate actions, response to a reactor trip, as detailed in the Standard Post Trip Actions Emergency Operating Procedure, EOP-2525, the operator in the main control room is directed to check that vital electrical buses are energized. If the 4kV emergency bus(es) is(are) not energized, the procedure provides the immediate action to confirm that the EOG is running and ensure that the output breaker is closed. As part of this action, if the breaker had not closed, or had tripped open, as a result of 81 (frequency) or 51 (time overcurrent) relay device contact chatter, the operator would manually close the output breaker remotely from the panel in the main control room after confirming appropriate permissives are established (also from the main control room).. This action would resolve the adverse effect that could result from the relay contact chatter. Since this action would take place within the main control room and is guided by an existing procedure, the action to manually close the EOG output breaker to resolve the potential relay contact chatter consequence is not considered to be an excessive operational burden. In addition, the plant would initially reach safe and stable conditions without emergency AC power.

5.2 CONCLUSION

This attachment provides the information required by Enclosure 1, Recommendation 2.1:

Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 12 of 25 Seismic, Item (4) of the NRC's March 12, 2012 request for information letter (Reference 1 ). A high-frequency confirmation review has been performed for MPS2 to determine whether the occurrence of a severe seismic event could cause selected essential equipment to fail to perform as necessary. As a result of this review, it is concluded that accomplishment of the key plant safety functions defined in Reference 8 will not be adversely affected due to relay chatter during a severe seismic event equivalent to the level of the reevaluated seismic hazard for Millstone Power Station Unit 2.

6.0 REFERENCES

1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012.
2. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)

Regarding Recommendation 2.1 "Seismic" of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated October 27, 2015.

3. NRC Letter, "Endorsement of Electric Power Research Institute Final Draft Report 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility"," dated September 17, 2015.
4. Dominion Nuclear Connecticut, Inc. Letter, "Millstone Power Station Units 2 and 3, Response to March 12, 2012 Information Request - Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1," dated March 31, 2014.
5. EPRI Report 1015109, "Program on Technology Innovation: Seismic Screening of Components Sensitive to High-Frequency Vibratory Motions," October 2007.
6. EPRI Report 1025287, Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic, February 2013.
7. EPRI Report 3002002997, "High Frequency Program: High Frequency Testing Summary,"

September 2014.

8. EPRI Report 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility Evaluation," July 2015.
9. EPRI NP-7147-SL, "Seismic Ruggedness of Relays," August 1991.
10. EPRI NP-7147 SQUG Advisory 2004-02, "Relay GERS Corrections," September 10, 2004.
11. EPRI NP-7148 "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality,"

1990.

12. NRC Letter, "Millstone Power Station, Units 2 and 3 - Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f),

Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF3968 and MF3969),"

dated December 15, 2015. Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 13 of 25

13. NRC Letter, "Millstone Power Station, Units 2 and 3 - Supplement to Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (CAC Nos. MF3968 and MF3969)," dated March 15, 2016.
14. EPRI Report 1019309, "Seismic Qualification Reporting and Testing Standardization (SQURTS) Test Report Database v2.0," 2009.

Item Equipment No. ID 1 15G-12U-2 (52-A312} 2 15G-12U-2 (52-A312) 3 15G-12U-2 (52-A312) 4 15G-12U-2 (52-A312} 5 15G-12U-2 (52-A312) 15G-12U-2 6 (52-A312} 7 15G-12U-2 (52-A312) 8 15G-12U-2 (52-A312} 9 15G-12U-2 (52-A312) 15G-12U-2 10 (52-A312) 11 15G-12U-2 (52-A312) 12 15G-12U-2 (52-A312) 13 15G-13U-2 (52-A401) Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 14 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Eauioment Descriotion Function RelavlDfsl Tvoe Bid a Elev ICRS,M ICRS,v Relav Mfa. & Model Document TRS Result 4KV EMERGENCY BUS AC/DC 51-A, B & C (A302} Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53A101A SQURTS 7S015SE 8.747 Capacity meets or 24C (A3} FEEDER Power and exceeds demand BREAKER FROM EOG "A" Support CH7Al Svstems 4KV EMERGENCY BUS AC/DC 51GS (A302} Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53A3A SQURTS 7S015SE 8.747 Capacity meets or 24C (A3) FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support fH7Al Svstems 4KV EMERGENCY BUS AC/DC 51V-A, B & C (A312) Switchgear TURB 31'-6" 4.810 1.866 GE 121JCV52A9A SQURTS 50098. 7 5.463 Capacity meets or 24C(A3)FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support fH7Al Svstems 4KV EMERGENCY BUS AC/DC 59 (C38) Control AUX 14'-6" 3.987 2.905 GE 12NGV12A11A EPRl NP-7147-Sl, GERS-RLY-5.333 Capacity meets or 24C (A3) FEEDER Power and Cabinet PPM.4 exceeds demand BREAKER FROM EDG "A" Support CH7Al Svstems 4KV EMERGENCY BUS AC/DC 5X (reviewed for H-7 A) Control AUX 14'-6" 3.987 2.905 TELEMECHANlQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 24C (A3) FEEDER Power and (T040) Cabinet CLASS J13P3211 Table 3-1 exceeds demand BREAKER FROM EDG "A" Support fH7Al Svstems 4KV EMERGENCY BUS AC/DC 81 (A312} Switchgear TURB 31'-6" 4.810 1.866 GE 12CFF12A63A SQURTS 50098. 7 4.370 Close Breaker 24C (A3) FEEDER Power and from Control BREAKER FROM EDG "A" Support Room (COB} (H7A) Systems [2] 4KV EMERGENCY BUS AC/DC 86 (A312) Switchgear TURB 31'-6" 4.810 1.866 GE 12HEA61B235 EPRl NP-7147-SL, GERS-RL Y-8.000 Capacity meets or 24C (A3} FEEDER Power and AL0.2 exceeds demand BREAKER FROM EDG "A" Support (H7A) Svstems 4KV EMERGENCY BUS AC/DC 86-2/22S3-24C-2 (A302} Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC) EPRI 3002002997 16.385 Capacity meets or 24C (A3) FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support CH7Al Svstems 4KV EMERGENCY BUS AC/DC 87-A, B & C (A312X) Switchgear TURB 31'-6" 0.886 0.628 GE 121JD52A11A SQURTS 61267.2 1.717 Capacity meets or 24C (A3) FEEDER Power and exceeds demand BREAKER FROM EDG "A" Support (H7A) Systems 4KV EMERGENCY BUS AC/DC BUS A3 LOAD SHED Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or 24C (A3} FEEDER Power and (K534A) (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BREAKER FROM EDG "A" Support Millstone Unit 2 ESAS (H7A) Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC HSR(T040) Control AUX 14'-6" 3.987 2.905 GE CR120BD09041 EPRl NP-7147-SL, GERS-RLY-5.667 Capacity meets or 24C (A3} FEEDER Power and Cabinet Al1.4 (increased by SQURTS TR-exceeds demand BREAKER FROM EDG "A" Support 105988-V2, Table 3-1) (H7Al Systems 4KV EMERGENCY BUS AC/DC SDR (reviewed for H-7A) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRl TR-105988-V2 (SQURTS), 9.467 Capacity meets or 24C (A3) FEEDER Power and (T040} Cabinet CLASS J13P8111 Table 3-1 exceeds demand BREAKER FROM EDG "A" Support (H7A) Systems 4KV EMERGENCY BUS AC/DC 51-A, B & C (A411) Switchgear TURB 56'-6" 6.379 2.468 GE 121AC53A101A SQURTS 7S015SE 8.747 Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support CH7Bl Systems

Item Equipment No. ID 14 15G-13U-2 (52-A401) 15G-13U-2 15 (52-A401) 16 15G-13U-2 (52-A401) 15G-13U-2 17 (52-A401) 15G-13U-2 18 (52-A401) 19 15G-13U-2 (52-A401) 15G-13U-2 20 (52-A401) 21 15G-13U-2 (52-A401) 15G-13U-2 22 (52-A401) 23 15G-13U-2 (52-A401) 15G-13U-2 24 (52-A401) 24C1-2 (52-25 A303) Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 15 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Eouioment Description Function Relav ID{sl Tvoe BldQ Elev ICRS,H ICRS,v Relay Mfq. & Model Document TRS Result 4KV EMERGENCY BUS AC/DC 51GS (A411) Switchgear TURB 56'-6" 6.379 2.468 GE 121AC53A3A SQURTS 7S015SE 8.747 Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support {H7Bl Systems 4KV EMERGENCY BUS AC/DC 51V-A, B & C (A401) Switchgear TURB 56'-6" 6.379 2.468 GE 121JCV52A9A SQURTS 50098.7 5.463 Close Breaker 24D(A4)FEEDER Power and from Control BREAKER FROM EDG "B" Support Room (COB) (H7B) Systems [2] 4KV EMERGENCY BUS AC/DC 59 (C39) Control AUX 14'-6" 3.987 2.905 GE 12NGV12A11A EPRI NP-7147-SL, GERS-RLY-5.333 Capacity meets or 24D (A4) FEEDER Power and Cabinet PPM.4 exceeds demand BREAKER FROM EDG "B" Support <H7Bl Svstems 4KV EMERGENCY BUS AC/DC SX (reviewed for H-7B) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 24D (A4) FEEDER Power and (T041) Cabinet CLASS J13P3211 Table 3-1 exceeds demand BREAKER FROM EDG "B" Support {H7Bl Systems 4KV EMERGENCY BUS AC/DC 81 (A401) Switchgear TURB 56'-6" 6.379 2.468 GE 12CFF12A63A SQURTS 50098.7 4.370 Close Breaker 24D (A4) FEEDER Power and from Control BREAKER FROM EDG "B" Support Room (COB) (H7B) Systems [2] 4KV EMERGENCY BUS AC/DC 86 (A401) Switchgear TURB 56'-6" 6.379 2.468 GE 12HEA61B235 EPRI NP-7147-SL, GERS-RLY-8.000 Capacity meets or 24D (A4) FEEDER Power and AL0.2 exceeds demand BREAKER FROM EOG "B" Support {H7Bl Systems 4KV EMERGENCY BUS AC/DC 86-2/22S3-24D-2 (A411) Switchgear TURB 56'-6" 6.379 2.468 GE 12HFA151A2H (DC) EPRI 3002002997 16.385 Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support (H7B) Svstems 4KV EMERGENCY BUS AC/DC 87-A, B & C (A401X) Switchgear TURB 56'-6" 0.886 0.628 GE 121JD52A11A SQURTS 61267.2 1.717 Capacity meets or 24D(A4)FEEDER Power and exceeds demand BREAKER FROM EDG "B" Support fH7Bl Svstems 4KV EMERGENCY BUS AC/DC BUS A3 LOAD SHED Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or 24D (A4) FEEDER Power and (K634A) (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BREAKER FROM EDG "B" Support Millstone Unit 2 ESAS (H7B) Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC HSR (T041) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 24D (A4) FEEDER Power and Cabinet CLASS J13P6511 Table 3-1 exceeds demand BREAKER FROM EDG "B" Support fH7Bl Svstems 4KV EMERGENCY BUS AC/DC SDR (reviewed for H-7B) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or 24D (A4) FEEDER Power and (T041) Cabinet CLASS J13P8111 Table 3-1 exceeds demand BREAKER FROM EDG "B" Support (H7B) Systems 4KV EMERGENCY BUS AC/DC 3 (A303) Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC) EPRI 3002002997 16.385 Capacity meets or 24C (A3) FEEDER Power and exceeds demand BREAKER TO UBS Support Svstems

Item Equipment No. ID 24C1-2 (52-26 A303) 24C1-2 (52-27 A303) 28 24C-2T-2 (52-A305) 29 24C-2T-2 (52-A305) 30 24C-2T-2 (52-A305) 24C-2T-2 31 (52-A305) 32 24C-2T-2 (52-A30S) 24C-2T-2 33 (S2-A30S) 34 24C-2T-2 (S2-A30S) 24C-2T-2 35 (S2-A305) 24C3-2 (52-36 A307) 24C4-2 (52-37 A308) Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 16 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Equipment Description Function Relay ID{s) Type Bld!l Elev ICRS,tt ICRS,v Relay Mf!l. & Model Document TRS Result 4KV EMERGENCY BUS AC/DC 50/51-A, B & C (A303) Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53B104A for all SQURTS S1430SE 7.964 Capacity meets or 24C (A3) FEEDER Power and exceeds demand BREAKER TO UBS Support Svstems 4KV EMERGENCY BUS AC/DC 50GS (A303) Switchgear TURB 31'-6" 4.810 1.866 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or 24C(A3)FEEDER Power and exceeds demand BREAKER TO UBS Support Systems 4KV EMERGENCY BUS AC/DC S0/51-A, B & C (A505) Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53B810A SQURTS S1430SE 7.964 Capacity meets or 24C (A3) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (A5) Support Svstems 4KV EMERGENCY BUS AC/DC 51-A, B & C (A305) Switchgear TURB 31'-6" 4.810 1.866 GE 121AC53A101A SQURTS 7S01SSE 8.747 Capacity meets or 24C (A3) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (A5) Support Systems 4KV EMERGENCY BUS AC/DC 51GS (A305) Switchgear TURB 31'-6" 4.810 1.866 GE 121ACS3A3A SQURTS 7S015SE 8.747 Capacity meets or 24C (A3) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (A5) Support Svstems 4KV EMERGENCY BUS AC/DC 62GS (A505) Switchgear TURB 31'-6" 4.810 1.866 GE 12SAM11B22A EPRI NP-7147-SL, GERS-RLY-8.000 Capacity meets or 24C (A3) BREAKER - TIE Power and PPM.4 exceeds demand TO 4KV BUS 24E (A5) Support Svstems 4KV EMERGENCY BUS AC/DC 86 (A305) Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC) EPRI 3002004396 16.385 Capacity meets or 24C (A3) BREAKER - TIE Power and (12HFA1S1A2F), July 201S exceeds demand TO 4KV BUS 24E (AS) Support Svstems 4KV EMERGENCY BUS AC/DC 86-1/34B-24E-2 (ASOS) Switchgear TURB 31'-6" 4.810 1.866 GE HFAS1A (DC) EPRI NP-7147-SL, GERS-RLY-4.800 Capacity meets or 24C (A3) BREAKER - TIE Power and ARH.S exceeds demand TO 4KV BUS 24E (AS) Support Systems 4KV EMERGENCY BUS AC/DC 86-2 (ASOS) Switchgear TURB 31'-6" 4.810 1.866 GE HFAS1A (DC) EPRI NP-7147-SL, GERS-RLY-4.800 Capacity meets or 24C (A3) BREAKER - TIE Power and ARH.5 exceeds demand TO 4KV BUS 24E (A5) Support Systems 4KV EMERGENCY BUS AC/DC 86X (A305) Switchgear TURB 31'-6" 4.810 1.866 GE 12HGA11J52 (DC) EPRI NP-7147-SL, GERS-RLY-7.040 Capacity meets or 24C (A3) BREAKER - TIE Power and ARH.5 exceeds demand TO 4KV BUS 24E (AS) Support Systems 4KV EMERGENCY BUS AC/DC K5341/(SEQ 0) Control AUX 36'-6" 3.987 3.436 MPRASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or 24C (A3) BREAKER TO Power and (RC02B)K534U(SEQ 4) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P9A Support (RC02B) Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC SIAS-1/SEQ. 1 (K514A) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or 24C (A3) BREAKER TO Power and (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P41A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June2004

Item Equipment No. ID 24CS*2 (S2-38 A309) 24C6-2 (S2-39 A310) 24C7-2 (S2-40 A311) 24D1-2 (S2-41 A402) 24D2-2 (S2-42 A403) 24D-2T-2 43 (S2-A408) 24D-2T-2 44 (S2-A408) 4S 24D-2T-2 (S2-A408) 46 24D-2T-2 (S2-A408) 24D-2T-2 47 (S2-A408) 2403-2 (S2-48 A404) Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 17 of 25 Appendix 1 - Relay List and Evaluation Data Seismic Hi!:!h-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Eauioment Descriotion Function Relav IDlsl Tvoe Bid a Elev ICRS,H ICRS,v Relav Mfa. & Model Document TRS Result 4KV EMERGENCY BUS AC/DC SIAS SEQ. 3 (KS17A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24C (A3) BREAKER TO Power and (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P42A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC CSAS1 SEQ. 3 (KS09A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24C (A3) BREAKER TO Power and (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P43A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC SIAS 1/SEQ 2 (KS16A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24C (A3) BREAKER TO Power and (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P11A Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC SIAS 2/SEQ 2 (K616A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P11C Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC SIAS-2/SEQ. 1 (K614A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P41C Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC S1-A, B & C (A408) Switchgear TURB S6'..S" 6.379 2.468 GE 121ACS3A101A SQURTS 7S01SSE 8.747 Capacity meets or 24D (A4) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (AS) Support Systems 4KV EMERGENCY BUS AC/DC S1GS (A408) Switchgear TURB S6'..S" 6.379 2.468 GE 121ACS3A3A SQURTS 7S01SSE 8.747 Capacity meets or 24D (A4) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (AS) Support Systems 4KV EMERGENCY BUS AC/DC 86 (A408) Switchgear TURB S6'..S" 6.379 2.468 GE 12HFA1S1A2H (DC) EPRI 3002002997 16.38S Capacity meets or 24D (A4) BREAKER - TIE Power and exceeds demand TO 4KV BUS 24E (AS) Support Svstems 4KV EMERGENCY BUS AC/DC 86-1/34B-24E-2 (ASOS) Switchgear TURB 31'..S" 4.810 1.866 GE HFAS1A (DC) ( EPRI NP-7147-SL, GERS-RLY-4.800 Capacity meets or 24D (A4) BREAKER - TIE Power and ARH.S exceeds demand TO 4KV BUS 24E (AS) Support Svstems 4KV EMERGENCY BUS AC/DC 86X (A408) Switchgear TURB S6'..S" 6.379 2.468 GE 12HGA11JS2 (DC) EPRI NP-7147-SL, GERS-RLY-7.040 Capacity meets or 24D (A4) BREAKER - TIE Power and ARH.S exceeds demand TO 4KV BUS 24E (AS) Support Svstems 4KV EMERGENCY BUS AC/DC SIAS2 SEQ. 3 (K617A) Control AUX 36'..S" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P42B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004

Item Equipment No. ID 24D4-2 (S2-49 A40S) 24DS-2 (S2-so A406) 24D5-2 (S2-S1 A406) 24D7-2 (S2-S2 A409) 24D7-2 (S2-S3 A409) 24D7-2 (S2-54 A409) 24E2-2 (S2-SS AS03) 24E3-2 (S2-S6 AS04) 2-FW-43A S7 2-FW-43B S8 S9 2-FW-44 Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 18 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacitv Evaluation Key Safety Cabinet Seismic Capacity Source Eauioment Descriotion Function Relav ID{sl Tvoe Bid a Elev ICRS,H ICRS,v Relav Mfa. & Model Document TRS Result 4KV EMERGENCY BUS AC/DC CSAS2 SEQ. 3 (K609A) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P43B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC K634U(SEQ 0) (RC02C) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P9B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June2004 4KV EMERGENCY BUS AC/DC K634M/(SEQ 4) (RC02C) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24D (A4) BREAKER TO Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P9B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC 3 (A409) Switchgear TURB S6'-6" 6.379 2.468 GE 12HFA1S1A2H (DC) EPRI 3002002997 16.38S Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER TO UB6 Support Svstems 4KV EMERGENCY BUS AC/DC SO/S 1-A. B & C (A409) Switchgear TURB S6'-6" 6.379 2.468 GE 121ACS3B101A SQURTS S1430SE 7.964 Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER TO UB6 Support Svstems 4KV EMERGENCY BUS AC/DC SOGS (A409) Switchgear TURB S6'-6" 6.379 2.468 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or 24D (A4) FEEDER Power and exceeds demand BREAKER TO UB6 Support Systems 4KV EMERGENCY BUS AC/DC KSS14B (RC02E) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24E (AS) BREAKER TO Power and KS614B (RC02E) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P41B Support Millstone Unit 2 ESAS Systems Replacement Relays, Revision 0, June 2004 4KV EMERGENCY BUS AC/DC SIAS S/SEQ 2 (KSS16B) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-266S, Design Verification of 8.200 Capacity meets or 24E (AS) BREAKER TO Power and (RC02E) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand P11B Support SIAS S/SEQ 2 (KS616B) Millstone Unit 2 ESAS Systems (RC02E) Replacement Relays, Revision 0, June 2004 SIG NO. 1 STEAM Core Cooling .20XIZ1-S276 (COS) Control AUX 36'-6" 3.987 3.436 GE 12HFA1S1A2H (DC) EPRI 3002002997 13.654 Capacity meets or GENERATOR AUX Cabinet exceeds demand FEEDWATER REGULATING VALVE - AVAILABLE TO THROTILE SIG NO. 2 STEAM Core Cooling 20X/Z2-S279 (COS) Control AUX 36'-6" 3.987 3.436 GE 12HFA1S1A2H (DC) EPRI 3002002997 13.654 Capacity meets or GENERATOR AUX Cabinet exceeds demand FEEDWATER REGULATING VALVE - AVAILABLE TO THROTILE AFW PUMP DISCHARGE Core Cooling 42-C/a (B6203) MCC AUX 36'-6" 0.886 0.731 STARTER/CONTACTOR EPRI NP-S223-SLR1, GERS-1.200 Capacity meets or HEADER CROSSTIE [1] MCC.9 exceeds demand VALVE

Item Equipment No. ID 60 2-MS-201 61 H-7A 62 H-7A 63 H-7A 64 H-7A 65 H-7A 66 H-7A H-7A 67 H-7A 68 69 H-7A 70 H-7A 71 H-7A Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 19 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Eauipment Description Function Relay ID(sl Type Bid a Elev ICRS,H ICRS,v Relav Mfa. & Model Document TRS Result TDAFW STEAM SUPPLY Core Cooling 42-C/a (B5202) MCC AUX 38'.Q" 0.886 0.731 STARTER/CONTACTOR EPRI NP-5223-SLR1, GERS-1.200 Capacity meets or VALVE FROM S/G NO. 1 [1] MCC.9 exceeds demand EMERGENCY DIESEL AC/DC 5/DG02 (T040) Control AUX 14'.Q" 3.987 2.905 AGASTAT E7022PE002 EPRI NP-7147-SL, GERS-RLY-6.667 Capacity meets or GENERATOR H-7A-DC Power and Cabinet PNT.7 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC 5X (T040) Control AUX 14'.Q" 3.987 2.905 TELEMECHANIOUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or GENERA TOR H-7 A - DC Power and Cabinet CLASS J13P3211 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC 86 (A312) Switchgear TURB 31'.Q" 4.810 1.866 GE 12HEA618235 EPRI NP-7147-SL, GERS-RLY-8.000 Capacity meets or GENERATOR H-7A-DC Power and AL0.2 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC EOR(T040) Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SOURTS), 9.467 Capacity meets or GENERATOR H-7A-DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC ESS Control AUX 14'.Q" 3.987 2.905 TELEMECHANIOUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or GENERATOR H-7A-DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC K4 (C38) Control AUX 14'.Q" 3.987 2.905 ALLEN BRADLEY 700DC-EPRI 3002002997 12.821 Capacity meets or GENERATOR H-7A-DC Power and Cabinet P800Z1 exceeds demand CONTROL POWER FROM Support DV10 Systems EMERGENCY DIESEL AC/DC K524C (SIAS1) Control AUX 36'.Q" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or GENERA TOR H-7 A - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV10 Systems Replacement Relays, Revision 0, June 2004 EMERGENCY DIESEL AC/DC K530A (LP1) Control AUX 36'.Q" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or GENERA TOR H-7 A - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV10 Systems Replacement Relays, Revision 0, June 2004 EMERGENCY DIESEL AC/DC OP1 (T040) Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or GENERATOR H-7A-DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Systems EMERGENCY DIESEL AC/DC OP2 (T040) Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or GENERATOR H-7 A-DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Svstems EMERGENCY DIESEL AC/DC OP3 (T040) Control AUX 14'.Q" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-VZ (SQURTS), 9.467 Capacity meets or GENERATOR H-7A-DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Systems

Item Equipment No. ID 72 H-7A H-7A 73 74 H-7A 75 H-7A 76 H-7A 77 H-7B 78 H-7B 79 H-7B H-7B 80 81 H-7B 82 H-7B H-7B 83 Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 20of25 Appendix 1 - Relay List and Evaluation Data Seismic Hicth-frequencv Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source Eauioment Descriotion Function Relay ID(s) Tvoe Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Document TRS Result EMERGENCY DIESEL AC/DC OPL 1 (T040) Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERATOR H-7 A - DC Power and Cabinet 222-10/COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV10 Systems 729 EMERGENCY DIESEL AC/DC OPL2 (T040) Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERATOR H-7A-DC Power and Cabinet 222-10/ COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV10 Systems 729 EMERGENCY DIESEL AC/DC OPL3 (T040) Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERA TOR H-7 A-DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV10 Svstems 729 EMERGENCY DIESEL AC/DC Relay 4 (T040) Control AUX 14'-6" 3.987 2.905 GE CR120BD05041 EPRI NP-7147-SL, GERS-RLY-5.667 Capacity meets or GENERATOR H-7A-DC Power and Cabinet Al1.4 (increased by SOURTS TR-exceeds demand CONTROL POWER FROM Support 105988-V2, Table 3-1) DV10 Svstems EMERGENCY DIESEL AC/DC SDR (T040) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or GENERATOR H-7A-DC Power and Cabinet CLASS J13P8111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV10 Systems EMERGENCY DIESEL AC/DC 5/DG02 (T041) Control AUX 14'-6" 3.987 2.905 AGASTAT E7022PE002 EPRI NP-7147-SL, GERS-RLY-6.667 Capacity meets or GENERATOR H-7B - DC Power and Cabinet PNT.7 exceeds demand CONTROL POWER FROM Support DV20 Systems EMERGENCY DIESEL AC/DC 5X (T041) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P3211 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Systems EMERGENCY DIESEL AC/DC 86 (A401) Switchgear TURB 56'-6" 6.379 2.468 GE 12HEA61B235 EPRI NP-7147-SL, GERS-RLY-8.000 Capacity meets or GENERATOR H-7B - DC Power and AL0.2 exceeds demand CONTROL POWER FROM Support DV20 Systems EMERGENCY DIESEL AC/DC EOR (T041) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or GENERATOR H DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Svstems EMERGENCY DIESEL AC/DC ESS Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SOURTS), 9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P4111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Systems EMERGENCY DIESEL AC/DC K4 (C39) Control AUX 14'-6" 3.987 2.905 ALLEN BRADLEY 700DC-EPRI 3002002997 12.821 Capacity meets or GENERATOR H-7B - DC Power and Cabinet P800Z1 exceeds demand CONTROL POWER FROM Support DV20 Svstems EMERGENCY DIESEL AC/DC K624C (SIAS2) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or GENERATOR H-7B - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV20 Systems Replacement Relays, Revision 0, June 2004

Item Equipment No. ID H-7B 84 85 H-7B 86 H-7B 87 H-7B 88 H-7B 89 H-7B 90 H-7B 91 H-7B 92 H-7B 93 P-5A 94 P-5A 95 P-5A Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 21 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source EQuipment Description Function Relay ID(sl Type BldQ Elev ICRS,M ICRS,v Relay MfQ. & Model Document TRS Result EMERGENCY DIESEL AC/DC K630A (LP2) Control AUX 36'-6'.' 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or GENERATOR H-7B - DC Power and Cabinet PN01-M the Davis-Besse SFAS and exceeds demand CONTROL POWER FROM Support Millstone Unit 2 ESAS DV20 Systems Replacement Relays, Revision 0, June 2004 EMERGENCY DIESEL AC/DC OP1 (T041) Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS), 9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Svstems EMERGENCY DIESEL AC/DC OP2 (T041} Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS}, 9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Systems EMERGENCY DIESEL AC/DC OP3 (T041} Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS}, 9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P6111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Svstems EMERGENCY DIESEL AC/DC OPL1 (T041} Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERATOR H-7B - DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV20 Svstems 729 EMERGENCY DIESEL AC/DC OPL2 (T041} Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERATOR H-7B - DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV20 Systems 729 EMERGENCY DIESEL AC/DC OPL3 (T041} Control AUX 14'-6" 0.886 0.618 DETROIT SWITCH NO. EPRI NP-5223-SLR1, GERS-4.000 Capacity meets or GENERATOR H-7B - DC Power and Cabinet 222-10 I COLTEC PS.5 exceeds demand CONTROL POWER FROM Support INDUSTRIES INC. 11 906 DV20 Systems 729 EMERGENCY DIESEL AC/DC Relay 4 (T041 } Control AUX 14'-6" 3.987 2.905 GE CR120BD05041 EPRI NP-7147-SL, GERS-RLY-5.667 Capacity meets or GENERATOR H-7B - DC Power and Cabinet Al1.4 (increased by SOURTS TR-exceeds demand CONTROL POWER FROM Support 105988-V2, Table 3-1) DV20 Systems EMERGENCY DIESEL AC/DC SDR (T041} Control AUX 14'-6" 3.987 2.905 TELEMECHANIQUE EPRI TR-105988-V2 (SQURTS}, 9.467 Capacity meets or GENERATOR H-7B - DC Power and Cabinet CLASS J13P8111 Table 3-1 exceeds demand CONTROL POWER FROM Support DV20 Systems SERVICE WATER PUMP A AC/DC 3 (A306} Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA151A2H (DC} EPRI 3002002997 16.385 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24C IA3], 24C2-2 l52-Support A306ll Svstems SERVICE WATER PUMP A AC/DC 50/51-A, B & C (A306} Switchgear TURB 31'-6" 4.810 1.866 GE 121AC66K8A EPRI 3002002997 6.923 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24C [A3], 24C2-2 [52-Support A3061) Systems SERVICE WATER PUMP A AC/DC 50GS (A306} Switchgear TURB 31'-6" 4.810 1.866 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24C [A3], 24C2-2 [52-Support A3061) Systems

Item Equipment No. ID P-5A 96 97 P-5B 98 P-SB 99 P-SB P-5B 100 101 P-5C 102 P-5C 103 P-5C P-5C 104 Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 22 of 25 Appendix 1 - Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Key Safety Cabinet Seismic Capacity Source E<1uipment Description Function Relav IDCsl Tvpe Bld<1 Elev ICRS," ICRS,v Relav Mf<1. & Model Document TRS Result SERVICE WATER PUMP A AC/DC LOAD SHED (K529A) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or (AC POWER FROM 4KV Power and (RC02B) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BUS 24C [A3], 24C2-2 [52-Support Millstone Unit 2 ESAS A306]) Systems Replacement Relays, Revision 0, June2004 SERVICE WATER PUMP B AC/DC 3 (AS02) Switchgear TURB 31'-6" 4.810 1.866 GE 12HFA1S1A2H (DC) EPRI 3002002997 16.38S Capacity meets or (SWING) (AC POWER Power and exceeds demand FROM 4KV BUS 24E [AS], Support 24E1-2 IS2-AS02ll Svstems SERVICE WATER PUMP B AC/DC SO/S1-A, B & C (AS02) Switchgear TURB 31'-6" 4.810 1.866 GE 121AC66K8A EPRI 3002002997 6.923 Capacity meets or (SWING) (AC POWER Power and exceeds demand FROM 4KV BUS 24E [AS], Support 24E1-2 f52-A502ll Svstems SERVICE WATER PUMP B AC/DC SOGS (AS02) Switchgear TURB 31'-6" 4.810 1.866 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or (SWING) (AC POWER Power and exceeds demand FROM 4KV BUS 24E [A5]. Support 24E1-2 f52-A502ll Svstems SERVICE WATER PUMP B AC/DC LOAD SHED (KSS31A, Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665. Design Verification of 8.200 Capacity meets or (SWING) (AC POWER Power and KS631A) (RC02E) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand FROM 4KV BUS 24E [A5], Support Millstone Unit 2 ESAS 24E1-2 [52-AS02]) Systems Replacement Relays, Revision 0, June 2004 SERVICE WATER PUMP C AC/DC 3 (A407) Switchgear TURB S6'-6" 6.379 2.468 GE 12HFA1S1A2H (DC) EPRI 3002002997 16.385 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24D [A4], 24D6-2 [52-Support A4071) Systems SERVICE WATER PUMP C AC/DC SO/S1-A, B & C (A407) Switchgear TURB S6'-6" 6.379 2.468 GE 121AC66K8A EPRI 3002002997 6.923 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24D [A4], 24D6-2 [52-Support A407ll Svstems SERVICE WATER PUMP C AC/DC 50GS (A407) Switchgear TURB 56'-6" 6.379 2.468 GE 12PJC11AV1A EPRI 3002002997 7.027 Capacity meets or (AC POWER FROM 4KV Power and exceeds demand BUS 24D [A4], 24D6-2 [52-Support A407ll Svstems SERVICE WATER PUMP C AC/DC LOAD SHED (K629A) Control AUX 36'-6" 3.987 3.436 MPR ASSOC. 0200-0068-MPR-2665, Design Verification of 8.200 Capacity meets or (AC POWER FROM 4KV Power and (RC02C) Cabinet PN01-M the Davis-Besse SFAS and exceeds demand BUS 24D [A4], 24D6-2 [52-Support Millstone Unit 2 ESAS A407]) Systems Replacement Relays, Revision o, June 2004 Notes:

1. GERS capacity data for starter/contactors from EPRI NP-5223-SLR1, GERS-MCC.9 is not model-specific.
2. See Section 5.1.

Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 23 of 25 Appendix 2 - Representative Sample Component Evaluations This appendix provides two (2) representative sample component evaluations for relays selected from the list in Appendix 1. 1st Example - Equipment ID 15G-12U-2 (52-A312) [Line Item 7 from Appendix 1] Description of component: Equipment ID 15G-12U-2 (52-A312) - 4KV EMERGENCY BUS 24C (A3) FEEDER BREAKER FROM EOG "A" (H7 A) - supporting the AC/DC Power and Support Systems function. Relay from seal-in/ lockout circuit analysis - relay 86 (A312). Relay is a GE Model 12HEA61B235. Plant Location: Mounted in panel A312 in the Turbine Building, Vital 4kV Electrical Equipment Room, Elevation 31'6". Cabinet type: Switchgear. Description of Mounting Point Demand Estimate: Horizontal Response Estimate - Turbine Building foundation elevation: 14' 6". Panel A312 is 31'6" -14'6" = 17 feet above foundation. AFsH = 1.583 (from Reference 8, Figure 4-3). SAGMRs = 0.422g (from Reference 4). Then, SAcH = 0.422

  • 1.583 = 0.668g.

Vertical Response Estimate - As described in Section 3.1.2, SAvGMRs = 0.309g. AFsv = 1.283 (from Reference 8, Figure 4-4). Then, SAcv = 0.309

  • 1.283 = 0.397g.

For cabinet type Switchgear, AFcH = 7.2 and AFcv = 4.7 (from Reference 8, Section 4.4). Then, mounting point demand is: ICRScH = 0.668

  • 7.2 = 4.81 Og ICRScv = 0.397
  • 4. 7 = 1.866g Description of Relay Capacity:

The capacity of the relay is based on EPRI GERS - GERS-RLY-AL0.2 (Reference 9 and 10). For this relay, GERS capacity for non-operating, normally closed contact is applicable - SAT = 10g.

Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 24 of 25 Appendix 2 - Representative Sample Component Evaluations The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.2 was selected based on the base-mounted cantilever cabinet (switchgear) relay mounting. Then, TRS = (10/1.5)

  • 1.2 = 8g.

Capacity I Demand Ratio: C I D = TRS / ICRSc = 8g / 4.81 Og = 1.663 - Horizontal (governing) - acceptable Capacity exceeds demand. 2"d Example - Equipment ID 2-FW-43A [Line Item 57 from Appendix 1] Description of component: Equipment ID 2-FW-43A - SIG NO. 1 STEAM GENERATOR AUX FEEDWATER REGULATING VALVE -AVAILABLE TO THROTTLE - supporting the Core Cooling (turbine-driven AFW pump feedwater flow to steam generator) function. Relay from seal-in I lockout circuit analysis - 20X/Z1-5276 (C05). Relay is a GE Model 12HFA151A2H (DC). Plant Location: Mounted in panel C05 in the Auxiliary Building, Main Control Room, Elevation 36'6". Cabinet type: Control Cabinet (benchboard). Description of Mounting Point Demand Estimate: Horizontal Response Estimate - Auxiliary Building foundation elevation: (-)45' 6". Panel C05 is 36' 6" - ((-)45' 6") = 82 feet above foundation. AFsH = 2.1 (from Reference 8, Figure 4-3). SAGMRS = 0.422g (from Reference 4). Then, SAcH = 0.422

  • 2.1 = 0.886g.

Vertical Response Estimate - As described in Section 3.1.2, SAvGMRS = 0.309g. AFsv = 2.367 (from Reference 8, Figure 4-4). Then, SAcv = 0.309

  • 2.367 = 0.731g.

For cabinet type Control Cabinet, AFcH = 4.5 and AFcv = 4.7 (from Reference 8, Section 4.4).

Serial No. 16-455 Docket Nos. 50-336/423 MPS2 HF Sensitive Equipment Functional Confirmation Page 25 of 25 Appendix 2 - Representative Sample Component Evaluations Then, mounting point demand is: ICRScH = 0.886

  • 4.5 = 3.987g ICRScv = 0.731
  • 4.7 = 3.436g Description of Relay Capacity:

The capacity of the relay is based on EPRI Report 3002002997 (Reference 7) fragility threshold test results for GE 12HFA 151A2F: SAr = 21.3g. Test results for GE 12HFA 151A2F were used based on similarity with the installed GE 12HFA151A2H relay. The CDFM knockdown factor, FK, of 1.56 was selected based on Reference 8, Table 4-2 (HF Test Program, Fragility Threshold). The FMs factor value of 1.0 was selected based on the benchboard cabinet relay mounting (similar stiffness in three directions). Then, TRS = (21.3/1.56)

  • 1.0 = 13.654g.

Capacity I Demand Ratio: C I D = TRS / ICRSc = 13.654g / 3.987g = 3.425 - Horizontal (governing) - acceptable Capacity exceeds demand.

ATTACHMENT 2 Serial No. 16-455 Docket Nos. 50-336/423 HIGH-FREQUENCY SENSITIVE EQUIPMENT FUNCTIONAL CONFIRMATION FOR MILLSTONE UNIT 3 MILLSTONE POWER STATION UNIT 3 DOMINION NUCLEAR CONNECTICUT, INC.

1.0 INTRODUCTION

1.1 PURPOSE Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 1 of 54 The purpose of this attachment is to provide information requested by the NRC in its March 12, 2012 10 CFR 50.54(f) letter issued to all power reactor licensees and holders of construction permits in active or deferred status (Reference 1 ). Specifically, this attachment provides the results of the High Frequency Confirmation required by Item (4), Enclosure 1, Recommendation 2.1: Seismic, of the letter. The High Frequency Confirmation evaluation undertaken for MPS Unit 3 (MPS3) used the methodologies in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation" (Reference 8) as described herein. A summary of the High Frequency Confirmation evaluations and results are provided below.

1.2 BACKGROUND

Following the accident at the Fukushima Dai-ichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established a Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations and to determine if the agency should make additional improvements to its regulatory system. The NTIF developed a set of recommendations intended to clarify and strengthen the regulatory framework for protection against natural phenomena. Subsequently, the NRC issued a 10 CFR 50.54(f) letter on March 12, 2012 (Reference 1 ), requesting information to assure that these recommendations are addressed by all U.S. nuclear power plants. The 10 CFR 50.54(f) letter requests that licensees and holders of construction permits under 10 CFR Part 50 reevaluate the seismic hazards at their sites against present-day NRC requirements and guidance. Included in the 50.54(f) letter was a request that licensees perform a "confirmation, if necessary, that SSCs, which may be affected by high-frequency ground motion, will maintain their functions important to safety." EPRI Report

1025287, "Seismic Evaluation Guidan~e: Screening, Prioritization and Implementation Details (SPID) for the resolution of Fukushima Near-Term Task Force Recommendation 2.1:

Seismic" (Reference 6) provided screening, prioritization, and implementation details to the U.S. nuclear utility industry for responding to the NRC 50.54(f) letter. This report was developed with NRC participation and is endorsed by the NRC. The SPID included guiaance for determining which plants should perform a High Frequency Confirmation and identified the types of components that should be evaluated in the evaluation.

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 2 of 54 Subsequent guidance for performing a High Frequency Confirmation was provided in EPRI Report 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation," (Reference 8) and was endorsed by the NRC in a letter dated September 17, 2015 (Reference 3). Final screening identifying plants needing to perform a High Frequency Confirmation was provided by NRC in a letter dated October 27, 2015 (Reference 2). On March 31, 2014, Millstone Power Station submitted a reevaluated seismic hazard to the NRC as a part of the Seismic Hazard and Screening Report (Reference 4). By letter dated October 27, 2015 (Reference 2), the NRC transmitted the results of. the screening and prioritization review of the seismic hazards reevaluation. The reevaluated seismic hazard was developed in order to provide the information requested by the NRC in Reference 1 and does not constitute a new or supplemental seismic design or licensing basis for MPS3. As such, the conclusions of the High Frequency Confirmation review do not result in a challenge to the design basis function of any plant structures, systems, or components important to safety. 1.3 APPROACH EPRI Report 3002004396 (Reference 8) was used for the MPS3 engineering evaluations described in this attachment. Section 4.1 of Reference 8 provided general steps to follow for the high-frequency confirmation component evaluation. Accordingly, the following topics are addressed in the subsequent sections of this attachment: MPS3 Safe Shutdown Earthquake (SSE) and Ground Motion Response Spectrum (GMRS) Information Selection of components and a list of specific components for high-frequency confirmation Estimation of seismic demand for subject components Estimation of seismic capacity for subject components Summary of high-frequency evaluations for subject components Summary of Results 1.4 PLANT SCREENING MPS3 submitted the reevaluated seismic hazard information, including the GMRS, to the NRC on March 31, 2014 (Reference 4). In letters dated December 15, 2015 and March 15, 2016 (References 12 and 13, respectively), the NRC staff concluded that the submitted GMRS adequately characterizes the reevaluated seismic hazard for the MPS site.

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 3 of 54 The NRC final screening determination letter (Reference 2) concluded that the MPS3 GMRS to SSE comparison resulted in a need to perform a High Frequency Confirmation in accordance with the screening criteria in the SPID (Reference 6). 1.5 INITIAL CONDITIONS For the purposes of this High Frequency Confirmation review, the plant is assumed to be operating normally prior to the occurrence of the severe seismic event with offsite power sources available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip. 2.0 SELECTION OF COMPONENTS FOR HIGH-FREQUENCY SCREENING The fundamental objective of the high-frequency confirmation review was to determine whether the occurrence of a seismic event could cause critical equipment to fail to perform as necessary. An optimized evaluation process was applied that focused on achieving a safe and stable plant state following a seismic event. As described in Reference 8, this state is achieved by confirming that key plant safety functions critical to immediate plant safety are preserved (reactor trip, reactor coolant system inventory and pressure control, and core cooling) and that the plant operators have the necessary power available to achieve and maintain this state immediately following the seismic event (AC/DC power and support systems). Within the applicable functions, the components that would need a high-frequency confirmation are contact control devices subject to intermittent states (e.g., relay contact chatter) in seal-in or lockout circuits. Accordingly, the objective of the review, as stated in Section 4.2.1 of Reference 8, was to determine if seismic induced high-frequency relay chatter would prevent the completion of key plant safety functions. For each function, a review was performed to identify plant equipment supporting the function. The control circuit schematic diagrams for this equipment were then reviewed using the guidance from EPRI NP-7148 (Reference 11) and EPRI Report 3002004396 (Reference 8) to determine whether seismic-induced contact chatter could result in seal-in or loc~out (SILO) conditions that could have an adverse impact on the equipment capability to support key plant safety functions. From this review, a list of contact control devices for which contact chatter could result in SILO conditions was identified. These devices (termed "relays" for the purposes of this evaluation) were further evaluated for seismic capacity margin, as described in Sections 3 and 4.

2.1 REACTOR TRIP/SCRAM Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 4 of 54 Consistent with the guidance in Reference 8, the design requirements for reactor trip systems preclude the application of seal-in or lockout circuits that prevent reactor trip/SCRAM functions and no high-frequency component chatter review is necessary for this function. 2.2 REACTOR COOLANT SYSTEM INVENTORY CONTROL The reactor coolant system inventory control systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that could create loss of coolant-type events, such as inadvertent opening of a pressurizer power-operated relief valve (PORV). The following components were identified for control circuit review for SILO conditions: Pressurizer PORVs 2.3 REACTOR COOLANT SYSTEM PRESSURE CONTROL Consistent with the guidance in Reference 8, no specific high-frequency component chatter review is required for this function. 2.4 CORE COOLING The core cooling systems were reviewed to identify components that could be susceptible to adverse operation due to contact control devices in SILO circuits that would prevent accomplishment of the core cooling function. The intent of the review was to ensure at least a single train of non-AC power driven decay heat removal capability was maintained (e.g., auxiliary feedwater flow from at least one pump to at least one steam generator). The following components were identified for control circuit review for SILO conditions: Auxiliary Feedwater (AFW) Flow Regulating Valves AFW Discharge Header Cross-tie Valve Atmospheric Steam Dump Valves Turbine-driven AFW Pump Steam Supply Valves Turbine-driven AFW Pump Trip-Throttle Valve Turbine-driven AFW Pump 2.5 AC/DC POWER SUPPORT SYSTEMS The AC and DC power support systems were reviewed to identify components that could be

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 5 of 54 susceptible to adverse operation due to contact control devices in SILO circuits that prevent the availability of DC and/or AC power sources. The following AC and DC power support systems were reviewed: Emergency Diesel Generators (EOG), EOG Support Systems and associated Switchgear, Load Centers, and MCCs, Battery Chargers and Inverters, Vital 125vdc and 120vac Distribution The analysis considered the reactor operating normally at power with no equipment failures prior to the seismic event. The EDGs are not operating, but are available. The seismic event was presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor trip. In response to bus under-voltage relaying detecting the LOOP, the Class 1 E control systems must automatically shed loads, start the EDGs, and sequentially load the diesel generators as designed. Ancillary systems required for EOG operation, as well as Class 1 E battery chargers and inverters, must function as necessary. The following components were identified for control circuit review for SILO conditions: 4kV Emergency Bus Feeder Breakers (Emergency and Offsite sources) 480v Emergency Bus Feeder Breakers 4kV I 480v Emergency Bus Transformers and 4kV Supply Breakers 4kV Emergency Bus Load Breakers to Service Water, AFW, Containment Recirculation, Charging, Safety Injection, Residual Heat Removal, Quench Spray, and Reactor Plant Component Cooling Water Pumps and Control Building Chiller Units 480v Emergency Bus Load Breakers to 125vdc Battery Chargers, various MCCs, and Load Centers 125vdc Batteries, DC Susses, Battery Chargers, and Distribution System Components 120vac Vital Inverters and Distribution System Components EDGs EOG Air Start, Lubricating Oil, and Fuel Oil Systems EOG Room Ventilation Fans and Dampers Service Water Pumps and Strainers Service Water System Valves (required for cooling water supply to EDGs) 2.6

SUMMARY

OF SELECTED COMPONENTS A list of the contact devices requiring a high-frequency confirmation is provided in Appendix 1.

3.0 SEISMIC DEMAND ESTIMATE Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 6 of 54 The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the mounting point seismic demand, which requires the development of in-structure seismic demand based on the GMRS input and the in-cabinet amplification of the in-structure floor motion at the location of the electrical cabinet housing the relay. The calculation of in-structure response typically requires the development of a foundation input response spectrum (FIRS) and dynamic analysis of the structure. MPS3 has not developed these inputs from the GMRS for plant structures. Therefore, consistent with the guidance in Reference 8, Section 4.3, the in-structure response. for buildings and floor elevations where subject relays are located was estimated as described in subsection 3.1 below. The mounting point high-frequency seismic demand was determined consistent with the guidance in Reference 8, Sections 4.4 and 4.5, and is described in subsection 3.2 below. 3.1 ESTIMATE OF HIGH FREQUENCY IN-STRUCTURE RESPONSE Per Reference 8, Sect. 4.3, the basis for calculating high-frequency seismic demand in the horizontal direction is the horizontal control point GMRS, which was developed in response to Reference 1 and reported in the MPS Seismic Hazard and Screening Report (Reference 4). As noted in Reference 8, Section 3.3, The Control Point GMRS developed for these rock sites are typically appropriate for all rock founded structures and additional FIRS estimates are not deemed necessary for the high frequency confirmation effort. The structures of interest for the high-frequency confirmation are the Control Building, the Emergency Generator Enclosure Building, the Auxiliary Building and the Engineered Safety Features (ESF) Building. MPS is a rock site, and the Auxiliary Building and ESF Building are founded on bedrock. The Control Building and. the Emergency Generator Enclosure Building are founded on shallow soil overburden over bedrock. The Control Building is founded on basal till, of thickness varying between 1 foot on the east side and 15 feet on the west, overlying bedrock. Isolated zones of softened till were excavated and replaced with fill concrete or compacted structural backfill. The Emergency Generator Enclosure Building wall footings are founded on basal till varying in thickness from less than 1 O feet to 30 feet overlying bedrock. Based on velocity measurements obtained during site subsurface explorations conducted for initial plant construction, a representative shear wave velocity 0fs) for the dense basal till overburden material is 2200 fps.

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 7 of 54 Section 3.3 of Reference 8 describes that, for buildings on shallow soil layers at rock sites, the soil layers typically shift the frequency range of seismic input towards the lower frequency range of the response spectrum. Given the guidance from Reference 8, for purposes of high-frequency sensitive equipment evaluations in this attachment, the GMRS is likely to be richer in high-frequency content than a FIRS for a shallow layer soil-founded structure at a rock site such as the Control Building and the Emergency Generator Enclosure Building. Therefore, the control point GMRS is an appropriate review level earthquake (RLE) input for the purposes of the high-frequency confirmation. . 3.1.1 HORIZONTAL SEISMIC DEMAND The horizontal response structural amplification factor to be applied for estimating the horizontal in-structure seismic demand is provided in Reference 8, Figure 4-3 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation. For the MPS3 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage. The horizontal seismic demand was calculated in accordance with Reference 8, Equation 4-1 a: SAcH = SAGMRS

  • AF SH SAcH is the Spectral Acceleration, Clipped Horizontal (i.e., in-structure [floor] horizontal acceleration).

SAGMRS is the peak GMRS between 15-40Hz. The SAGMRs value is 0.422g from Reference 4. The horizontal GMRS is plotted in Figure 3-1. AFsH is the Horizontal Response Structural Amplification Factor from Reference 8, Figure 4-3. 3.1.2 VERTICAL SEISMIC DEMAND The vertical response structural amplification factor to be applied for estimating the vertical in-structure seismic demand is provided in Reference 8, Figure 4-4 and is based upon the height of the electrical cabinet (that the relay is mounted within) above the building foundation. For the MPS3 high-frequency confirmation, this height was taken as the difference between the lowest floor elevation and the floor elevation of the cabinet anchorage. The vertical seismic demand was calculated in accordance with Reference 8, Equation 4-1 b: SAcv = SAvGMRS

  • AF sv SAcv is the Spectral Acceleration, Clipped Vertical (in-structure [floor] vertical acceleration).

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 8 of 54 SAvGMRs is the peak estimated Spectral Acceleration, Vertical GMRS in the 15 to 40Hz range.. The peak SAvGMRs is the maximum product of the Vertical-to-Horizontal (V/H) function values and the corresponding horizontal GMRS values between 15 and 40Hz. The GMRS values are from Reference 4. The V/H function is derived from Reference 8, Tables 3-1 and 3-2, utilizing the GMRS peak ground acceleration (PGA) (0.190g] and the shear wave travel time from a depth of 30 meters to the ground surface (Vs30) from Reference 4. For MPS3, the V/H function values are between 0.680 @ 15 Hz and 0.860 @ 40Hz, and are based on the GMRS Horizontal PGA = 0.19g and Vs30 > 1, 000 mps corresponding to a site class 'B-Hard' per Reference 8, Table 3-2. The maximum product of the V/H function values and the corresponding GMRS is 0.31g, which occurs at 40Hz (GMRS = 0.36g, V/H = 0.86). The GMRS, estimated vertical GMRS (VGMRS), and the V/H Ratio values are plotted in Figure 3-1, along with the SSE spectrum. AFsv is the Vertical Response Structural Amplification Factor from Reference 8, Figure 4-4. 3.2 ESTIMATE OF HIGH FREQUENCY MOUNTING POINT SEISMIC DEMAND The mounting point seismic demand was determined by applying in-cabinet amplification factors to the in-structure demand, as described in Reference 8, Sections 4.4 and 4.5.1. The in-structure demand was determined as described in Section 3.1 above. The in-cabinet amplification factor is applied to account for the amplification of the structure seismic response at the cabinet anchor points. The in-structure demand (horizontal or vertical) was multiplied by the applicable in-cabinet amplification factor to obtain the mounting point demand. Horizontal cabinet amplification factors used were: Motor Control Centers Switchgear (flexible panels) AFc = 3.6 AFc = 7.2 Control Cabinets (e.g., Control Room electrical panels AFc = 4.5 and bench boards, etc.) Cabinet types were determined based on guidance in EPRI NP-7148, "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality" (Reference 11). The vertical cabinet amplification factor used was AFc = 4.7 for all three cabinet types. For electrical cabinets/enclosures that did not correspond to the listed cabinet types, in-cabinet amplification factors consistent with the cabinet configuration were used and justified on a case-by-case basis.

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 9 of 54 The mounting point demand, ICRSc, used in the horizontal and vertical directions for evaluation of the relays was the product of the clipped in-structure demand and the applicable cabinet amplification factor within the 15 to 40 Hz frequency range, as described in Reference 8, Sections 4.4: ICRScH = AFcH

  • SAcH ICRScv = AFcv
  • SAcv The cabinet type classification and the mounting point seismic demand are tabulated for each evaluated relay in Appendix 1.

0.50 0.45 0.40 ":tl.35 c: 0 ~0. 30 QJ ]0.25 u 111 ~0.20 u QJ ~. 15 0.10 0.05 0.00 0.1 GMRS SSE

  • * * * *
  • VG MRS HF Range
  • *V/H 1

Millstone Unit 3 1 10 100 Spectral frequency, Hz Figure 3-1: Plot of Horizontal and Vertical Ground Motion Response Spectra, Safe Shutdown Earthquake Spectrum, and V/H Ratio

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 10 of 54 4.0 CONTACT DEVICE EVALUATIONS The high-frequency functional confirmation process for the relays subject to the potential for seismic-induced contact chatter requires the comparison of relay seismic capacity to the applicable seismic demand to determine whether the relay is predicted to experience contact chatter during a GMRS-level seismic event. Seismic demand was determined as described in Section 3.0. The deterministic high confidence of low probability of failure (HCLPF) capacity of the relay device was determined in accordance with the guidance of Reference 8, Section 4.5. 4.1 HCLPF Component Capacity The HCLPF capacities of the relays were developed based on the guidance in Reference 8, Section 4.5.2. The effective wide band capacity, TRS, is given by Reference 8, Equation 4-5: SAT is the Spectral Acceleration, Effective Spectral Test Capacity (Relay Seismic Capacity) for relays as obtained from one of the following sources: EPRI High Frequency Test Program (References 7 and 8) Generic Equipment Ruggedness Spectrum (GERS) (Reference 9 and 10) Seismic Qualification Reporting and Testing Standardization (SQURTS) (Reference 14) Site-specific seismic qualification test data Certain relay model numbers identified on the relay list are not explicitly covered by the testing referenced in the list above and a comparison of the relay to other similar relay types having seismic qualification test data (e.g., same manufacturer & same family of relay, similar size, shape, features, construction, etc.) was made in those cases in order to provide a SAT value. As an alternative to relay-specific seismic margin evaluations, the adequacy of relay seismic capacity (with respect to the GMRS) for selected relays not covered by EPRI High Frequency Test Program testing, GERS, or SQURTS has been evaluated through an assessment of the original site specific seismic qualification basis for electrical components. The MPS3 seismic licensing basis is IEEE-323 1974 (Reference 15) and IEEE-344 1975 (Reference 16), and safety related relays contained within plant control panels, motor control centers, switchgear, etc., were qualified to the MPS3 SSE per the requirements of IEEE-344 1975 (Reference 16). Seismic qualification was performed to design specifications which established, based on the SSE, the applicable mounting point seismic demand for each component (panels, motor control centers, switchgear, etc.) based on applicable structure and floor acceleration response spectra. Subsequent changes to the plant have maintained the original seismic qualification of electrical components through the MPS3 Design Control Program. Comparing the peak spectral acceleration from the MPS3 SSE (0.459g between 2 and 6 Hz from Reference 4) to the peak spectral acceleration from the GMRS (0.422g at 15 Hz from

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 11of54 Reference 4), the SSE peak exceeds the GMRS peak by approximately 9%. This exceedance would be expected to translate to a higher in-structure response and mounting point seismic demand with respect to the demand estimated for the GMRS (refer to Section 3.0), although the peak would occur at lower spectral frequencies. From the EPRI High Frequency Test Program (References 7 and 8), the capacity of relays (with respect to contact chatter) in the high-frequency range was shown to be equal to or greater than the capacity of the relay in the lower frequency range. It follows, then, that relays qualified to the MPS3 design basis SSE (to higher accelerations at lower frequencies) would be expected to function acceptably at the (lower acceleration, higher frequency) GMRS-level mounting point demand. Based on the relay-specific seismic margin evaluation performed for the majority (approximately 75%) of MPS3 relays (see Appendix 1) that concludes that there is considerable margin to contact chatter, this alternative approach to show margin to contact chatter for a portion of the relays (approximately 25%) is reasonable for MPS3. FK is the Conservative Deterministic Failure Margin (CFDM) Knockdown Factor and its value depends on the source of the test value chosen to represent test capacity. FK was obtained from Reference 8, Table 4-2. FMs is the Multi-axis to Single-axis Correction Factor and is equal to either 1.0 or 1.2 depending on the expected seismic response of the relay enclosure cabinet. The value of FMs was chosen consistent with the guidance from Reference 8, Section 4.5.2. The effective wide band capacity, along with the source for the device capacity, is tabulated for each evaluated relay in Appendix 1. 4.2 SEISMIC MARGIN EVALUATION The seismic margin to the onset of contact chatter was determined by comparing the HCLPF capacity, TRS, to the mounting point seismic demand, ICRSc, to obtain the capacity/demand ratio: CID= TRS I ICRSc (C/D is determined for horizontal and vertical directions). The results of the relay chatter evaluation is tabulated for each evaluated relay in Appendix 1. Two representative sample relay evaluations are included in Appendix 2.

5.0 CONCLUSION

S 5.1

SUMMARY

OF RESULTS Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 12 of 54 The high-frequency. confirmation review was performed consistent with the guidance in EPRI Report 3002004396 (Reference 8). The following results were obtained: 229 plant components supporting the key safety functions were selected for detailed review 192 components were selected for relay chatter evaluation (the remaining 37 components are non-electrical, and do not require relay chatter evaluation) 410 relays were identified for the 192 components evaluated for relay chatter 212 relays were identified with the potential to cause SILO conditions and required seismic margin evaluation 212 relays were determined to have adequate seismic margin to chatter (CID ratio >/= 1)

5.2 CONCLUSION

This attachment provides information required by Enclosure 1, Recommendation 2.1: Seismic, Item (4) of the NRC's March 12, 2012 request for information letter (Reference 1 ). A high-frequency confirmation review has been performed for MPS3 to determine whether the occurrence of a severe seismic event could cause selected essential equipment to fail to perform as necessary. As a result of the review, it is concluded that accomplishment of the key plant safety functions defined in Reference 8 will not be adversely affected due to relay chatter

  • during a severe seismic event equivalent to the level of the reevaluated seismic hazard for Millstone Power Station Unit 3.

6.0 REFERENCES

1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012.
2. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)

Regarding Recommendation 2.1 "Seismic" of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated October 27, 2015.

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 13 of 54

3. NRC Letter, "Endorsement of Electric Power Research Institute Final Draft Report 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility"," dated September 17, 2015.
4. Dominion Nuclear Connecticut, Inc. Letter, "Millstone Power Station Units 2 and 3, Response to March 12, 2012 Information Request - Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1," dated March 31, 2014.
5. EPRI Report 1015109, "Program on Technology Innovation: Seismic Screening of Components Sensitive to High-Frequency Vibratory Motions," October 2007.
6. EPRI Report 1025287, Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic, February 2013.
7. EPRI Report 3002002997, "High Frequency Program: High Frequency Testing Summary,"

September 2014.

8. EPRI Report 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility Evaluation," July 2015.
9. EPRI NP-7147-SL, "Seismic Ruggedness of Relays," August 1991.
10. EPRI NP-7147 SQUG Advisory 2004-02, "Relay GERS Corrections," September 10, 2004.
11. EPRI NP-7148, "Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality," 1990.
12. NRC Letter, "Millstone Power Station, Units 2 and 3 - Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f),

Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF3968 and MF3969)," dated December 15, 2015.

13. NRC Letter, "Millstone Power Station, Units 2 and 3 - Supplement to Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (CAC Nos. MF3968 and MF3969)," dated March 15, 2016.
14. EPRI Report 1019309, "Seismic Qualification Reporting and Testing Standardization (SQURTS) Test Report Database v2.0," 2009.
15. The Institute of Electrical and Electronics Engineers (IEEE) Standard IEEE-323 1974, IEEE Standard for Qualifying Class 1 E Equipment for Nuclear Power Generating Stations
16. IEEE-344 1975, IEEE Recommended Practices for Seismic Qualification of Class 1 E Equipment for Nuclear Power Generating Stations.

Item No. Equipment ID 1 3EGS*EGA 2 3EGS*EGA 3 3EGS*EGA 4 3EGS*EGA 5 3EGS*EGA 6 3EGS*EGA 7 3EGS*EGA 8 3EGS*EGA Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 14 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result DIESEL AC/DC 5 Control EMER 24'-6" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 4A Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 48 Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 5E Control EMER 24'-6" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC ESCNXK90 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATOR A POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand [SQURTS], Table 3-1) DIESEL AC/DC ESCA/XK91 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATOR A POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand [SQURTS], Table 3-1) DIESEL AC/DC OP1 Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OP2 Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand

Item No. Equipment ID 9 3EGS*EGA 10 3EGS*EGA 11 3EGS*EGA 12 3EGS*EGA 13 3EGS*EGA 14 3EGS*EGA 15 3EGS*EGA 16 3EGS*EGA 17 3EGS*EGS 18 3EGS*EGS 19 3EGS*EGS Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 15 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result DIESEL AC/DC OP3 Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL1 Control EMER 24'-6" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL2 Control EMER 24'-6" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL3 Control EMER 24'-6" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR A POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC SDR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC SFR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR A POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC T2A Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RL Y-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC T2S Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATOR A POWER AND Cabinet GEN GERS-RL Y-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 5 Control EMER 24'-6" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATORS POWER AND Cabinet GEN GERS-RL Y-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 4A Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC 4S Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand

Item No. Equipment ID 20 3EGS*EGB 21 3EGS*EGB 22 3EGS*EGB 23 3EGS*EGB 24 3EGS*EGB 25 3EGS*EGB 26 3EGS*EGB 27 3EGS*EGB 28 3EGS*EGB Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 16 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result DIESEL AC/DC 5E Control EMER 24'-<3" 3.132 1.936 AGASTAT 7022PE EPRI NP-7147-SLR1, 4.000 Capacity GENERATORS POWER AND Cabinet GEN GERS-RLY-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC ESCB/XK90 Control CNTL 47'-<3" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATOR B POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand [SQURTS], Table 3-1) DIESEL AC/DC ESCB/XK91 Control CNTL 47'-<3" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity GENERATORB POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or SUPPORT (increased by EPRI exceeds SYSTEMS TR-105988 demand [SQURTS], Table 3-1) DIESEL AC/DC OP1 Control EMER 24'-<3" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR B POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OP2 Control EMER 24'-<3" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATOR B POWER AND Cabinet GEN J13P3012 (SQURTS}, Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OP3 Control EMER 24'-<3" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORB POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL1 Control EMER 24'-<3" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATORB POWER AND

  • Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL2 Control EMER 24'-<3" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR B POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC OPL3 Control EMER 24'-<3" 0.696 0.412 DETROIT SWITCH EPRI NP-5223-SLR1, 4.000 Capacity GENERATOR B POWER AND Cabinet GEN INC. 222-1024 GERS-PS.5 meets or SUPPORT ENCL exceeds SYSTEMS demand

Item No. Equipment ID 29 3EGS*EGB 30 3EGS*EGB 31 3EGS*EGB 32 3EGS*EGB 33 3ENS*ACB-10A (34C10-2) 34 3ENS*ACB-10A (34C10-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 17 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRScH ICRScv Relay Mfg. & Model Source Document TRS Result DIESEL AC/DC SDR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC SFR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity GENERATORS POWER AND Cabinet GEN J13P3012 (SQURTS), Table 3-1 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC T2A Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATORS POWER AND Cabinet GEN GERS-RL Y-PNT. 7 meets or SUPPORT ENCL exceeds SYSTEMS demand DIESEL AC/DC T28 Control EMER 24'-6" 3.132 1.936 AGASTAT 7012PC EPRI NP-7147-SLR1, 8.333 Capacity GENERATORS POWER AND Cabinet GEN GERS-RL Y-PNT.7 meets or SUPPORT ENCL exceeds SYSTEMS demand 4KV EMERGENCY AC/DC ESCNXK39 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A) POWER AND (Bypass) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1C SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK43 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1C SYSTEMS TR-105988 demand [SQURTS], Table 3-1)

Item No. Equipment ID 35 3ENS*ACB-15B (34D15-2) 36 3ENS*ACB-15B (34D15-2) 37 3ENS*ACB-15B (34D15-2) 38 3ENS*ACB-15B (34D15-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 18 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3FWA*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC AMSAC(B)/K104 Control CNTL 47'-6" 3.987 2.491 WESTINGHOUSE

[1] [1] Capacity BUS 34D (SWGR B) POWER AND Cabinet BLDG 405A10H01 meets or BREAKER TO SUPPORT exceeds 3FWA*P1B SYSTEMS demand [1] 4KV EMERGENCY AC/DC ESCB/XK47 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3FWA*P1B SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC PSCA1/K640 Control CNTL 47'-6" 3.987 2.491 POTTER & EPRI NP-7147-SLR1, 6.667 Capacity BUS 34D (SWGR B) POWER AND Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or BREAKER TO SUPPORT 134-1 (NON-exceeds 3FWA*P1B SYSTEMS LATCHING) demand

Item No. Equipment ID 39 3ENS.ACB-16A (34C16-2) 40 3ENS.ACB-16A (34C16-2) 41 3ENS.ACB-16A (34C16-2) 42 3ENS.ACB-16A (34C16-2) 43 3ENS.ACB-16B (34D16-2) L__ __ Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 19 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3FWNP1A SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC AMSAC(A)/K104 Control CNTL 47'-6" 3.967 2.491 WESTINGHOUSE

[1] [1] Capacity BUS 34C (SWGR A) POWER AND Cabinet BLDG 405A10H01 meets or BREAKER TO SUPPORT exceeds 3FWNP1A SYSTEMS demand [1] 4KV EMERGENCY AC/DC ESCNXK47 Control CNTL 47'-6" 3.967 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A) POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3FWNP1A SYSTEMS TR-105966 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC PSCA1/K640 Control CNTL 47'-6" 3.987 2.491 POTTER& EPRI NP-7147-SLR1, 6.667 Capacity BUS 34C (SWGR A) POWER AND Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or BREAKER TO SUPPORT 134-1 (NON-exceeds 3FWNP1A SYSTEMS LATCHING) demand 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D (SWGR B) POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand

Item No. Equipment ID 44 3ENS.ACB-16B (34D16-2) 45 3ENS*ACB-16B (34016-2) 46 3ENS*ACB-16B (34D16-2) 47 3ENS*ACB-16B (34D16-2} 48 3ENS*ACB-16B (34D16-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 20 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A [1] [1] Capacity BUS 34D (SWGR B) PDWERAND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand [1] 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity BUS 34D (SWGR B) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand [1] 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HBED3-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B}

POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D (SWGR B} POWER AND (3ENSB02} BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1B SYSTEMS demand [1]

Item No. Equipment ID 49 3ENS*ACB-16B (34D16-2) 50 3ENS*ACB-16B (34D16-2) 51 3ENS*ACB-17A (34C17-2) 52 3ENS*ACB-17A (34C17-2) 53 3ENS*ACB-17A (34C17-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 21 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC ESCB/XK18 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND (MSB) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1B SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK34 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND (LOP) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1B SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C (SWGR A) POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand 4KV EMERGENCY AC/DC 50/50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A [1] [1] Capacity BUS 34C (SWGR A) POWER AND BLDG GE 121FC66D1A meets or BREAKER TO SUPPORT GE 121FC66K1A exceeds 3SWP*P1A SYSTEMS demand [1] 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand [1]

Item No. Equipment ID 54 3ENS*ACB-17A (34C17-2) 55 3ENS*ACB-17A (34C17-2) 56 3ENS*ACB-17A (34C17-2) 57 3ENS*ACB-17A (34C17-2) 58 3ENS*ACB-17A (34C17-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 22 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HAED3-Switchgear CNTL 4'-B" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A)

POWER AND 3ENSA02 BLDG 12HEA61C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34C (SWGR A) POWER AND (3ENSA02) BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1A SYSTEMS demand [1] 4KV EMERGENCY AC/DC ESCNXK18 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A) POWER AND (MSB) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1A SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK34 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A) POWER AND (LOP) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1A SYSTEMS TR-105988 demand [SQURTS], Table 3-1)

Item No. Equipment ID 59 3ENS*ACB-17B (34D17-2) 60 3ENS*ACB-17B (34D17-2) 61 3ENS*ACB-17B (34D17-2) 62 3ENS*ACB-17B (34D17-2) 63 3ENS*ACB-17B (34D17-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 23 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D (SWGR B) POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand 4KV EMERGENCY AC/DC 50/51-A. B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A [1] [1] Capacity BUS 34D (SWGR B) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand [1] 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21 B1A [1] [1] Capacity BUS 34D (SWGR B} POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand [1] 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP*P1D SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HBED3-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B)

POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand

Item No. Equipment ID 64 3ENS*ACB-17B (34D17-2) 65 3ENS*ACB-17B (34D17-2) 66 3ENS*ACB-17B (34D17-2) 67 3ENS*ACB-18A (34C18-2) 68 3ENS*ACB-18A (34C18-2) 69 3ENS*ACB-18A (34C18-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 24 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List ~ Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D (SWGR B) POWER AND (3ENSB02) BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1D SYSTEMS demand [1] 4KV EMERGENCY AC/DC ESCB/XK18 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND (MSB) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1D SYSTEMS TR-105988 demand [SQURTS], Table3-1) 4KV EMERGENCY AC/DC ESCB/XK38 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND (LOP) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SWP*P1D SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 62 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C (SWGR A) POWER AND BLDG E7012PC001 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3SWP*P1C SYSTEMS demand 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC66K1A [1] [1] Capacity BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1C SYSTEMS demand [1] 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3SWP*P1C SYSTEMS demand [1]

Item No. Equipment ID 70 3ENS.ACB-18A (34C18-2) 71 3ENS*ACB-18A (34C18-2) 72 3ENS*ACB-18A (34C18-2} 73 3ENS.ACB-18A (34C18-2} 74 3ENS.ACB-18A (34C18-2} Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 25 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4"-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A} POWER AND BLDG (DC} Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3SWP.P1C SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HAED3-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A}

POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RL Y-AL0.2 meets or BREAKER TO SUPPORT exceeds 3swp*p1c SYSTEMS demand 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34C (SWGR A} POWER AND (3ENSA02} BLDG meets or BREAKER TO SUPPORT exceeds 3swp*p1c SYSTEMS demand [1] 4KV EMERGENCY AC/DC ESCNXK18 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A} POWER AND (MSB} Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3swp*p1c SYSTEMS TR-105988 demand [SQ U RTS], Table 3-1 } 4KV EMERGENCY AC/DC ESCNXK38 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A} POWER AND (LOP} Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3swp*p1c SYSTEMS TR-105988 demand [SQURTS], Table 3-1)

Item No. Equipment ID 75 3ENS*ACB-18B (34D18-2) 76 3ENS.ACB-18B (34D18-2) 77 3ENS*ACB-18B (34D18-2) 78 3ENS.ACB-18B (34D18-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 26 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 1X Switchgear CNTL 4'-6" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity BUS 34D (SWGR B) POWER AND BLDG GERS-RL Y-ARH.5 meets or BREAKER TO SUPPORT exceeds 3Rss*P1B SYSTEMS demand 4KV EMERGENCY AC/DC 3-3RHS*P1B Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3Rss*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 3QSS*LS54B Field ESF 16'-6" 0.886 0.574 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity BUS 34D (SWGR B)

POWER AND BLDG. (SWITCH INC. 12N6BB4-U8-GERS-PS.5 meets or BREAKER TO SUPPORT EL.) - 4'-6" C1A-JJTTNQ exceeds 3Rss*P1B SYSTEMS (FLOOR demand EL) 4KV EMERGENCY AC/DC 3QSS*LS54D Field ESF 16'-6" 0.886 0.574 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity BUS 34D (SWGR B) POWER AND BLDG. (SWITCH INC. 12N6BB4-U8-GERS-PS.5 meets or BREAKER TO SUPPORT EL) - 4'-6" C1A-JJTTNQ exceeds 3RSS*P1B SYSTEMS (FLOOR demand EL.)

Item No. Equipment JD 79 3ENS*ACB-18B (34D18-2) 80 3ENS*ACB-18B (34D18-2) 81 3ENS*ACB-19A (34C19-2) 82 3ENS*ACB-19A (34C19-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 27 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,tt ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 86E1-3RSSB01 Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B22F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3RSS*P1B SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC ESCB/XK60 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B)

POWER AND (SSS) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RSS*P1B SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 1X Switchgear CNTL 4'-B" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity BUS 34C (SWGR A) POWER AND BLDG GERS-RL Y-ARH.5 meets or BREAKER TO SUPPORT exceeds 3RSS*P1A SYSTEMS demand 4KV EMERGENCY AC/DC 3-3RHS*P1A Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3RSS*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997

Item No. Equipment ID 83 3ENS*ACB-19A (34C19-2) 84 3ENS.ACB-19A (34C19-2) 85 3ENS*ACB-19A (34C19-2) 86 3ENS*ACB-19A (34C19-2) 87 3ENS*ACB-19B (34D19-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 28 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity . Description Function Relay ID(s) Type Bldg Elev ICRScH ICRScv Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 3Qss*LS54A Field ESF 15'-4" 0.886 0.568 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity BUS 34C (SWGR A) POWER AND BLDG. (SWITCH INC. 12N6BB4-U8-GERS-PS.5 meets or BREAKER TO SUPPORT EL)-4'.Q" C1A-JJTTNQ exceeds 3Rss*P1A SYSTEMS (FLOOR demand EL) 4KV EMERGENCY AC/DC 3QSS*LS54C Field ESF 18'-4" 0.886 0.584 STATIC-0-RING, EPRI NP-5223-SLR1, 2.000 Capacity BUS 34C (SWGR A) POWER AND BLDG. (SWITCH INC. 12N6BB4-U8-GERS-PS.5 meets or BREAKER TO SUPPORT EL)-4'.Q" C1A-JJTTNQ exceeds 3Rss*P1A SYSTEMS (FLOOR demand EL) 4KV EMERGENCY AC/DC 86E-3RSSA01 Switchgear CNTL 4'.Q" 3.643 1.452 GE 12HFA154B22F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3Rss*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC ESCA/XK60 Control CNTL 47'.Q" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)

POWER AND (SSS) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3Rss*P1A SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'.Q" 3.643 1.452 GE 12HFA151A2H EPRI NP-7147-SLR1, 16.385 Capacity BUS 34D (SWGR B) POWER AND BLDG (DC) GERS-RLY-ARH.5 meets or BREAKER TO SUPPORT exceeds 3RSS'P1D SYSTEMS demand

Item No. Equipment ID 88 3ENS*ACB-19B (34D19-2) 89 3ENS*ACB-19B (34D19-2) 90 3ENS*ACB-1 B (34D1-2) 91 3ENS*AC B-20A (34C20-2) 92 3ENS*ACB-20A (34C20-2) 93 3ENS*ACB-2DA (34C20-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 29 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Equipment Key Safety Cabinet Seismic Capacity Evaluation Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 62A Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D (SWGR B) POWER AND BLDG E7012PC002 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3RSS*P1D SYSTEMS demand 4KV EMERGENCY AC/DC ESCB/XK-62 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND (SSS) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RSS*P1D SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK46 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3HVK*CHL1B SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2H EPRI 3002002997 16.385 Capacity BUS 34C (SWGR A) POWER AND BLDG (DC) meets or BREAKER TO SUPPORT exceeds 3RSS*P1C SYSTEMS demand 4KV EMERGENCY AC/DC 62A Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C (SWGR A) POWER AND BLDG E7012PC002 GERS-RLY-PNT.7 meets or BREAKER TO SUPPORT exceeds 3RSS*P1C SYSTEMS demand 4KV EMERGENCY AC/DC ESCA/XK-62 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A) POWER AND (SSS) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RSS*P1C SYSTEMS TR-105988 demand [SQURTS], Table 3-1)

Item No. Equipment ID 94 3ENS*ACB-20B (34D20-2) 95 3ENS*ACB-21A (34C21-2) 96 3ENS*ACB-21 B (34D21-2) 97 3ENS*ACB-22A (34C22-2) 98 3ENS*ACB-2A (34C2-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 30 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,tt ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC ESCB/XK21 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3B SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK21 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A) POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3A SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK23 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3C SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK23 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A) POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CHS*P3C SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK46 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A) POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3HVK*CHL1A SYSTEMS TR-105988 demand [SQURTS]. Table 3-1)

Item No. Equipment ID 99 3ENS*ACB-5B (34D5-2) 100 3ENS*ACB-BA (34C6-2) 101 3ENS*ACB-BA (34C6-2) 102 3ENS*ACB-BB (34D6-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 31 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC ESCB/XK-25 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3Qss*P3B SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 6.110 Capacity BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3QSS.P3A SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC ESCNXK-25 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)

POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3QSS.P3A SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK-29 Control CNTL 47'-B" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EP RI exceeds 3RHS.P1B SYSTEMS TR-105988 demand [SQURTS], Table 3-1)

Item No. Equipment ID 103 3ENS*ACB-7 A (34C7-2) 104 3ENS*ACB-7 A (34C7-2) 105 3ENS*ACB-7B (3407-2) 106 3ENS*ACB-8A (34C8-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 32 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 3 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 6.110 Capacity BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3RHS*P1A SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC ESCA/XK-29 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A)

POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3RHS*P1A SYSTEMS TR-105988 demand ISQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK27 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SIH*P1B SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK-27 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A) POWER AND Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3SIH*P1A SYSTEMS TR-105988 demand [SQURTS], Table 3-1)

Item No. Equipment ID 107 3ENS*ACB-8B (34D8-2) 108 3ENS*ACB-8B (34D8-2) 109 3ENS*ACB-9A (34C9-2) 110 3ENS*ACB-9A (34C9-2) 111 3ENS*ACB-9B (34D9-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 33 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC ESCB/XK40 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND (SSS) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1B SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK42 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND (Bypass) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1B SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK40 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C (SWGR A) POWER AND (SSS) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1A SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCA/XK42 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1. 9.333 Capacity BUS 34C (SWGR A) POWER AND (Bypass) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1A SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC ESCB/XK39 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND (Bypass) Cabinet BLDG GERS-RLY-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3CCP*P1C SYSTEMS TR-105988 demand [SQURTS], Table 3-1)

Item No. Equipment ID 112 3ENS.ACB-9B (34D9-2) 113 3ENS*ACB-AA (34C3-2) 114 3ENS*ACB-AA (34C3-2) 115 3ENS*ACB-AA (34C3-2) 116 3ENS*ACB-AA (34C3-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 34 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC ESCB/XK43 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D (SWGR B) POWER AND (SSS) Cabinet BLDG GERS-RL Y-ARS.4 meets or BREAKER TO SUPPORT (increased by EPRI exceeds 3ccp*p1c SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity BUS 34C (SWGR A) POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJs*uS-1A SYSTEMS demand 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-1A SYSTEMS demand [1] 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJs*uS-1A SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HAED1-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A)

POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJs*uS-1A SYSTEMS demand

Item No. Equipment ID 117 3ENS*ACB-AA (34C3-2) 118 3ENS*ACB-AC (34C5-2) 119 3ENS.ACB-AC (34C5-2) 120 3ENS.ACB-AC (34C5-2) 121 3ENS*ACB-AC (34C5-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 35 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34C (SWGR A) POWER AND (3ENSA02) BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-1A SYSTEMS demand [1] 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity BUS 34C (SWGR A) POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJs*uS-3A SYSTEMS demand 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-3A SYSTEMS demand [1] 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34C (SWGR A) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJs*us-3A SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997 4KV EMERGENCY AC/DC 86HAED1-Switchgear CNTL 4'-B" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A)

POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RL Y-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJS*US-3A SYSTEMS demand

Item No. Equipment ID 122 3ENS*ACB-AC (34C5-2) 123 3ENS*ACB-AR 124 3ENS*ACB-AR 125 3ENS*ACB-AR 126 3ENS*ACB-AR Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 36 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34C (SWGR A) POWER AND (3ENSA02) BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-3A SYSTEMS demand [1] 4KV EMERGENCY AC/DC 27A, B, C&D Switchgear CNTL 4'-6" 3.643 1.452 GE 12NGV13B21A [1] [1] Capacity BUS 34C BREAKER POWER AND (3ENSA02) BLDG meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand [1] POWER 4KV EMERGENCY AC/DC 27A,B-3NNSA02 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 12.000 Capacity BUS 34C BREAKER POWER AND BLDG 12NGV13A11A GERS-RL Y-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC 27R (3ENSA18} Control CNTL 47'-6" 3.987 2.491 ITE-27H EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C BREAKER POWER AND Cabinet BLDG GERS-RL Y-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC 27RX-3ENSA02 Control CNTL 47'-6" 3.987 2.491 POTTER& EPRI NP-7147-SLR1, 6.667 Capacity BUS 34C BREAKER POWER AND Cabinet BLDG BRUMFIELD MDR-GERS-Rl Y-ARR.3 meets or CONNECTING TO SUPPORT 137-8 exceeds RESERVE OFFSITE SYSTEMS demand POWER

Item No. Equipment ID 127 3ENS*ACB-AR 128 3ENS*ACB-AR 129 3ENS*ACB-BA (34D2-2) 130 3ENS*ACB-BA (34D2-2) 131 3ENS*ACB-BA (34D2-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 37 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 62V/3NNSA02 Switchgear CNTL 4'-B" 3.643 1.452 AGASTAT 7012PB EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C BREAKER POWER AND BLDG GERS-RL Y-PNT.7 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC BB (BG30) Control CNTL 4'-B" 2.277 1.452 NIA [1] [1] Capacity BUS 34C BREAKER POWER AND Cabinet BLDG meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand [1] POWER 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-B" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity BUS 34D (SWGR B) POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJS*US-1B SYSTEMS demand 4KV EMERGENCY AC/DC 50GS Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity BUS 34D (SWGR B) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJs*us-1B SYSTEMS demand [1] 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-B" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B} POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJS*US-1B SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997

Item No. Equipment ID 132 3ENS*ACB-BA (34D2-2) 133 3ENS*ACB-BA (34D2-2) 134 3ENS*ACB-BC (34D4-2) 135 3ENS*ACB-BC (34D4-2) 136 3ENS*ACB-BC (34D4-2) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 38 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 86HBED1-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B) POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJS*US-1B SYSTEMS demand 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D (SWGR B) POWER AND* (3ENSB02) BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-1B SYSTEMS demand [1] 4KV EMERGENCY AC/DC 50/51-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53BD1A EPRI NP-7147-SLR1, 6.000 Capacity BUS 34D (SWGR B) POWER AND BLDG GERS-RLY-PP1.5 meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand 4KV EMERGENCY AC/DC SOGS Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFC21B1A [1] [1] Capacity BUS 34D (SWGR B) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand [1] 4KV EMERGENCY AC/DC 86E Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA154B25F QTR97P1230, 4.916 Capacity BUS 34D (SWGR B) POWER AND BLDG (DC) Qualification Test meets or BREAKER TO SUPPORT Report for Qualified exceeds 3EJS*US-3B SYSTEMS General Electric demand Relays Northeast Utilities Systems - Millstone Nuclear Power Station, Order

  1. 02044599, REV. 001, REV. 0, November 5, 1997

Item No. Equipment ID 137 3ENS*ACB-BC (34D4-2) 138 3ENS*ACB-BC (34D4-2) 139 3ENS*ACB-BR 140 3ENS*ACB-BR 141 3ENS.ACB-BR Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 39 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 86HBED1-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B) POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RL Y-AL0.2 meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D (SWGR B) POWER AND (3ENSB02) BLDG meets or BREAKER TO SUPPORT exceeds 3EJS*US-3B SYSTEMS demand [1] 4KV EMERGENCY AC/DC 27A, B, C&D Switchgear CNTL 4'-6" 3.643 1.452 GE 12NGV13B21A [1] [1] Capacity BUS 34D BREAKER POWER AND (3ENSB02) BLDG meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand [1] POWER 4KV EMERGENCY AC/DC 27A,B-3NNSB02 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 12.000 Capacity BUS 34D BREAKER POWER AND BLDG 12NGV13A11A GERS-RLY-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC 27R (3ENSB18) Control CNTL 47'-6" 3.987 2.491 ITE-27H EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D BREAKER POWER AND Cabinet BLDG GERS-RL Y-PPM.4 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER

Item No. Equipment ID 142 3ENS*ACB-BR 143 3ENS*ACB-BR 144 3ENS*ACB-BR 145 3ENS*ACB-G-A 146 3ENS*ACB-G-A 147 3ENS*ACB-G-A Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 40 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 27RX-3ENSB02 Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SLR1, 6.667 Capacity BUS 34D BREAKER POWER AND Cabinet BLDG BRUMFIELD MOR-GERS-RL Y-ARR.3 meets or CONNECTING TO SUPPORT 137-8 exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC 62V/3NNSB02 Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT 7012PB EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D BREAKER POWER AND BLDG GERS-RL Y-PNT.7 meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand POWER 4KV EMERGENCY AC/DC BB (BG3P) Control CNTL 4'-6" 2.277 1.452 N/A [1] [1] Capacity BUS 34D BREAKER POWER AND Cabinet BLDG meets or CONNECTING TO SUPPORT exceeds RESERVE OFFSITE SYSTEMS demand [1] POWER 4KV EMERGENCY AC/DC 32 Switchgear CNTL 4'-6" 3.643 1.452 GE 121CW51A2A [1] [1] Capacity BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1] 4KV EMERGENCY AC/DC 40 Switchgear CNTL 4'-6" 3.643 1.452 GE 12CEH51A1A [1] [1] Capacily BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1] 4KV EMERGENCY AC/DC 32X Switchgear CNTL 4'-6" 3.643 1.452 ELECTRO MAX [1] [1] Capacity BUS 34C BREAKER POWER AND BLDG CAT TRIP IND. meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDGA SYSTEMS demand [1]

Item No. Equipment ID 148 3ENS*ACB-G-A 149 3ENS.ACB-G-A 150 3ENS.ACB-G-A 151 3ENS.ACB-G-A 152 3ENS.ACB-G-A 153 3ENS.ACB-G-A 154 3ENS*ACB-G-A Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 41 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 40X Switchgear CNTL 4'-6" 3.643 1.452 ELECTROMAX [1] [1] Capacity BUS 34C BREAKER POWER AND BLDG CAT TRIP IND. meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDGA SYSTEMS demand [1] 4KV EMERGENCY AC/DC 51N Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC51AD1A [1] [1] Capacity BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1] 4KV EMERGENCY AC/DC 51NX-3ENSA07 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34C BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 51V-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12JJCV51B21A [1] [1] Capacity BUS 34C BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1] 4KV EMERGENCY AC/DC 51VX Switchgear CNTL 4'-6" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity BUS 34C BREAKER POWER AND BLDG (DC) GERS-RLY-ARH.5 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 51X-3ENSA02 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34C BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 62M Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34C BREAKER POWER AND BLDG E7012PA002 GERS-RL Y-PNT. 7 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand

Item No. Equipment JD 155 3ENS*ACB-G-A 156 3ENS*ACB-G-A 157 3ENS*ACB-G-A 158 3ENS*ACB-G-A 159 3ENS*ACB-G-A 160 3ENS*ACB-G-A 161 3ENS*ACB-G-A Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 42 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H JCRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 81 (3EGSA05) Control EMER 24'-6" 3.132 1.936 GE 12SFF31A1A [1] [1] Capacity BUS 34C BREAKER POWER AND Cabinet GEN meets or CONNECTING TO SUPPORT ENCL exceeds EDGA SYSTEMS demand [1] 4KV EMERGENCY AC/DC 86HAED4-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C BREAKER POWER AND 3ENSA02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 86HBU-3ENSA07 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C BREAKER POWER AND BLDG 12HEA61C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 86HP Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C BREAKER POWER AND BLDG 12HEA61 C239X2 GERS-RL Y-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34C BREAKER POWER AND (3ENSA02) BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1] 4KV EMERGENCY AC/DC 87G-A, B&C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34C BREAKER POWER AND (3ENS*ACB-G-A) BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1] 4KV EMERGENCY AC/DC 87G-A. B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34C BREAKER POWER AND (3ENS*ACB-G-A) BLDG meets or CONNECTING TO SUPPORT exceeds EDGA SYSTEMS demand [1]

Item No. Equipment ID 162 3ENS*ACB-G-A 163 3ENS*ACB-G-A 164 3ENS*ACB-G-A 165 3ENS*ACB-G-B 166 3ENS*ACB-G-B 167 3ENS*ACB-G-B Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 43 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC DGNSDR Control EMER 24'-6" 3.132 1.936 GOULD/ITE EPRI TR-105988-V2 9.467 Capacity BUS 34C BREAKER POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or CONNECTING TO SUPPORT ENCL exceeds EDGA SYSTEMS demand 4KV EMERGENCY AC/DC ESCNXK96 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34C BREAKER POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or CONNECTING TO SUPPORT (increased by EPRI exceeds EDGA SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC Unit Substation Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53AD1A [1] [1] Capacity BUS 34C BREAKER POWER AND FDR QC 1A, 2A, BLDG meets or CONNECTING TO SUPPORT 3A, 4A: 51-A, B & exceeds EDGA SYSTEMS c demand [1] 4KV EMERGENCY AC/DC 32 Switchgear CNTL 4'-6" 3.643 1.452 GE 121CW51A2A [1] [1] Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1] 4KV EMERGENCY AC/DC 40 Switchgear CNTL 4'-6" 3.643 1.452 GE 12CEH51A1A (1] [1] Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand [1] 4KV EMERGENCY AC/DC 32X Switchgear CNTL 4'-6" 3.643 1.452 ELECTROMAX [1] [1] Capacity BUS 34D BREAKER POWER AND BLDG CAT TRIP IND. meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDG B SYSTEMS demand [1]

Item No. Equipment ID 168 3ENS.ACB-G-B 169 3ENS.ACB-G-B 170 3ENS.ACB-G-B 171 3ENS.ACB-G-B 172 3ENS*ACB-G-B 173 3ENS.ACB-G-B 174 3ENS.ACB-G-B Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 44 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 40X Switchgear CNTL 4'-6" 3.643 1.452 ELECTROMAX [1] [1] Capacity BUS 34D BREAKER POWER AND BLDG CAT TRIP IND. meets or CONNECTING TO SUPPORT RELAY 6319234 exceeds EDGB SYSTEMS demand [1] 4KV EMERGENCY AC/DC 51N Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC51AD1A [1] [1] Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1] 4KV EMERGENCY AC/DC 51 NX-3ENSB07 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34D BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand 4KV EMERGENCY AC/DC 51V-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 121JCV51 B21A [1] [1] Capacity BUS 34D BREAKER POWER AND BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1] 4KV EMERGENCY AC/DC 51VX Switchgear CNTL 4'-6" 3.643 1.452 GE 12HGA111J2G EPRI NP-7147-SLR1, 7.040 Capacity BUS 34D BREAKER POWER AND BLDG (DC) GERS-RL Y-ARH.5 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 4KV EMERGENCY AC/DC 51X-3ENSB02 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 5.769 Capacity BUS 34D BREAKER POWER AND BLDG CD42 (DC) meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 4KV EMERGENCY AC/DC 62M Switchgear CNTL 4'-6" 3.643 1.452 AGASTAT EPRI NP-7147-SLR1, 10.000 Capacity BUS 34D BREAKER POWER AND BLDG E7012PA002 GERS-RLY-PNT.7 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand

Item No. Equipment ID 175 3ENS"ACB-G-B 176 3ENS"ACB-G-B 177 3ENS"ACB-G-B 178 3ENS"ACB-G-B 179 3ENS"ACB-G-B 180 3ENS"ACB-G-B 181 3ENS"ACB-G-B Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 45 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function RelaylD(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 81 (3EGSB05) Control EMER 24'-6" 3.132 1.936 GE 12SFF31A1A [1] [1] Capacity BUS 34D BREAKER POWER AND Cabinet GEN meets or CONNECTING TO SUPPORT ENCL exceeds EDGB SYSTEMS demand [1] 4KV EMERGENCY AC/DC 86HBED4-Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D BREAKER POWER AND 3ENSB02 BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand 4KV EMERGENCY AC/DC 86HBU-3ENSB07 Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D BREAKER POWER AND BLDG 12HEA61 C239X2 GERS-RLY-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 4KV EMERGENCY AC/DC 86HP Switchgear CNTL 4'-6" 3.643 1.452 GE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D BREAKER POWER AND BLDG 12HEA61 C239X2 GERS-RL Y-AL0.2 meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D BREAKER POWER AND (3ENSB02) BLDG meets or CONNECTING TO SUPPORT exceeds EDGB SYSTEMS demand [1] 4KV EMERGENCY AC/DC 87G-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D BREAKER POWER AND (3ENS"ACB-G-B) BLDG meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand [1] 4KV EMERGENCY AC/DC 87G-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D BREAKER POWER AND (3ENS"ACB-G-B) BLDG meets or CONNECTING TO SUPPORT exceeds EDG B SYSTEMS demand [1]

Item No. Equipment ID 182 3ENS*ACB-G-B 183 3ENS*ACB-G-B 184 3ENS*ACB-G-B 185 3ENS*ACB-GNA (15G-14U-2N) 186 3ENS*ACB-GNA (15G-14U-2N) 187 3ENS*ACB-GNA (15G-14U-2N) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 46 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC DGNSDR Control EMER 24'-6" 3.132 1.936 GOULD/ ITE EPRI TR-105988-V2 9.467 Capacity BUS 34D BREAKER POWER AND Cabinet GEN J13P2012 (SQURTS), Table 3-1 meets or CONNECTING TO SUPPORT ENCL exceeds EOG B SYSTEMS demand 4KV EMERGENCY AC/DC ESCB/XK96 Control CNTL 47'-6" 3.987 2.491 AGASTAT GPCNR EPRI NP-7147-SLR1, 9.333 Capacity BUS 34D BREAKER POWER AND Cabinet BLDG GERS-RL Y-ARS.4 meets or CONNECTING TO SUPPORT (increased by EPRI exceeds EDGB SYSTEMS TR-105988 demand [SQURTS], Table 3-1) 4KV EMERGENCY AC/DC Unit Substation Switchgear CNTL 4'-6" 3.643 1.452 GE 121FC53AD1A [1] [1] Capacity BUS 34D BREAKER POWER AND FDR QC 1A, 2A, BLDG meets or CONNECTING TO SUPPORT 3A, 4A 51-A, B & exceeds EDGB SYSTEMS c demand [1] 4KV EMERGENCY AC/DC 51NX-3ENSA07 Switchgear CNTL 4'-6" 3.643 1.452 N/A EPRI 3002002997 16.385 Capacity BUS 34C (SWGR A) POWER AND BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand 4KV EMERGENCY AC/DC 87AE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A (1] [1] Capacity BUS 34C (SWGR A) POWER AND (3ENSA02) BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand [1] 4KV EMERGENCY AC/DC 87G-A, B&C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34C (SWGR A) POWER AND (3ENS*ACB-G-A) BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand [1]

Item No. Equipment ID 188 3ENS*ACB-GNA (15G-14U-2N) 189 3ENS*ACB-GNA (15G-14U-2N) 190 3ENS*ACB-GNB (15G-15U-2N) 191 3ENS*ACB-GNB (15G-15U-2N) 192 3ENS*ACB-GNB (15G-15U-2N) 193 3ENS*ACB-GNB (15G-15U-2N) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 47 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 94EAE-3ENSA02 Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A) POWER AND BLDG 774B470A12 GERS-RL Y-Al1.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand 4KV EMERGENCY AC/DC 94G-3ENS*ACB-Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34C (SWGR A) POWER AND G-A BLDG 774B470A12 GERS-RL Y-A11.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNA SYSTEMS demand 4KV EMERGENCY AC/DC 51 NX-3ENSB07 Switchgear CNTL 4'-6" 3.643 1.452 GE 12HFA151A2P EPRI 3002002997 16.385 Capacity BUS 34D (SWGR B) POWER AND BLDG CD42 (DC) meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand 4KV EMERGENCY AC/DC 87BE-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D (SWGR B) POWER AND (3ENSB02) BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand [1] 4KV EMERGENCY AC/DC 87G-A, B & C Switchgear CNTL 4'-6" 3.643 1.452 GE 12PVD99AB1A [1] [1] Capacity BUS 34D (SWGR B) POWER AND (3ENS.ACB-G-B) BLDG meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand [1] 4KV EMERGENCY AC/DC 94EBE-3ENSB02 Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B) POWER AND BLDG 774B470A12 GERS-RL Y-Al1.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand

Item No. Equipment ID 194 3ENS*ACB-GNB (15G-15U-2N) 195 3MSS*MOV17A (V12) 196 3MSS*MOV17B (V37) 197 3MSS*MOV17D (V38) 198 3MSS*MSV5 L Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 48 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result 4KV EMERGENCY AC/DC 94G-3ENS*ACB-Switchgear CNTL 4'-6" 3.643 1.452 WESTINGHOUSE EPRI NP-7147-SLR1, 8.000 Capacity BUS 34D (SWGR B) POWER AND G-B BLDG 774B470A12 GERS-RLY-Al1.4 meets or BREAKER TO SUPPORT exceeds 3ENS*RES-GNB SYSTEMS demand TDAFWSTEAM CORE 42C MCC ESF 36'-6" 0.886 0.677 [2] EPRI NP-5223-SLR1, 1.200 Capacity SUPPLY VALVE COOLING BLDG. GERS-MCC.9 meets or FROM S/G A MOV exceeds demand TDAFWSTEAM CORE 42C MCC ESF 36'-6" 0.886 0.677 [2] EPRI NP-5223-SLR1, 1.200 Capacity SUPPLY VALVE COOLING BLDG. GERS-MCC.9 meets or FROM S/G B MOV exceeds demand TDAFWSTEAM CORE 42C MCC ESF 36'-6" 0.886 0.677 [2] EPRI NP-5223-SLR1, 1.200 Capacity SUPPLY VALVE COOLING BLDG. GERS-MCC.9 meets or FROM S/G D MOV exceeds demand TURBINE DRIVEN CORE 1CON Control ESF 21'-6" 3.987 2.820 N/A [1] [1] Capacity AUXILIARY COOLING Cabinet BLDG. meets or FEEDWATER PUMP - exceeds TURBINE ISOLATION demand [1] VALVE (INCLUSIVE OF TURBINE OVERSPEED TRIP SOLENOID 3FWL *sov104 SOV)

Item No. Equipment ID 199 3MSS*MSV5 200 3MSS*MSV5 201 3MSS*PV20A (V48) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 49 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,tt ICRS,v Relay Mfg. & Model Source Document TRS Result TURBINE DRIVEN CORE 3CR Control ESF 21'-6" 3.987 2.820 GE CR 120B D03041 EPRI NP-7147-SL, 5.667 Capacity AUXILIARY COOLING Cabinet BLDG. GERS-RL Y-Al1.4 meets or FEEDWATER PUMP - (increased by EPRI exceeds TURBINE ISOLATION TR-105988-V2 demand VALVE (INCLUSIVE [SQURTS], Table 3-1) OF TURBINE OVERSPEED TRIP SOLENOID 3FWL*SOV104 SOV) TURBINE DRIVEN CORE K2 Control ESF 21'-6" 3.987 2.820 NIA [1] [1] Capacity AUXILIARY COOLING Cabinet BLDG. meets or FEEDWATER PUMP - exceeds TURBINE ISOLATION demand [1] VALVE (INCLUSIVE OF TURBINE OVERSPEED TRIP SOLENOID 3FWL*SOV104 SOV) S/G A MAIN STEAM CORE PSCB/K627 (SU) Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 9.533 Capacity PRESSURE COOLING Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING) (increased by EPRI exceeds TR-105988-V2 demand [SQURTS], Table 3-1)

Item No. Equipment ID 202 3MSS*PV20B (V55} 203 3Mss*pv2oc (V62) 204 3MSS*PV20D (V69) 205 3RCS*PCV455A (V168) 206 3RCS'PCV455A (V168) 207 3RCS 0 PCV456 (V170) Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 50 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result SIG B MAIN STEAM CORE PSCA/K627 (SLI) Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 9.533 Capacity PRESSURE COOLING Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING} (increased by EPRI exceeds TR-105988-V2 demand [SQURTS], Table 3-1) SIG C MAIN STEAM CORE PSCBIK627 (SLI} Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 9.533 Capacity PRESSURE COOLING Cabinet BLDG BRUMFIELD MDR-GERS-RLY-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING} (increased by EPRI exceeds TR-105988-V2 demand [SQURTS], Table 3-1) SIG D MAIN STEAM CORE PSCA/K627 (SLI) Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 9.533 Capacity PRESSURE COOLING Cabinet BLDG BRUMFIELD MOR-GERS-RLY-ARR.3 meets or RELIEVING VALVE 4076 (LATCHING) (increased by EPRI exceeds TR-105988-V2 demand [SQURTS], Table 3-1) PRESSURE RCS PSCA11K628 Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 6.667 Capacity OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MOR-GERS-RL Y-ARR.3 meets or VALVESOV CONTROL 134-1 (NON-exceeds LATCHING) demand PRESSURE RCS PSCA2/K743 Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 6.667 Capacity OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MOR-GERS-RL Y-ARR.3 meets or VALVESOV CONTROL 134-1 (NON-exceeds LATCHING) demand PRESSURE RCS PSCB11K628 Control CNTL 47'-6" 3.987 2.491 POTIER& EPRI NP-7147-SL, 6.667 Capacity OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or VALVE SOV CONTROL 134-1 (NON-exceeds LATCHING} demand

Item No. Equipment ID 208 3RCS*PCV456 (V170) 209 3VBNINV1 210 3VBA*INV2 211 3VBA*INV3 212 3VBNINV4 Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 51 of 54 Appendix 1 -Relay List and Evaluation Data Seismic High-frequency Review Equipment List Demand Seismic Capacity Evaluation Equipment Key Safety Cabinet Seismic Capacity Description Function Relay ID(s) Type Bldg Elev ICRS,H ICRS,v Relay Mfg. & Model Source Document TRS Result PRESSURE RCS PSCB2/K743 Control CNTL 47'-<l" 3.987 2.491 POTTER& EPRI NP-7147-SL, 6.667 Capacity OPERATED RELIEF INVENTORY Cabinet BLDG BRUMFIELD MDR-GERS-RL Y-ARR.3 meets or VALVESOV CONTROL 134-1 (NON-exceeds LATCHING) demand 120VAC VITAL AC/DC Static Switch Control CNTL 4'-<l" 0.506 0.309 AMETEK Solidstate (1] [1] Capacity INVERTER INV-1 POWER AND Relays Cabinet BLDG Controls Model 85-meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1] 120VAC VITAL AC/DC Static Switch Control CNTL 4"-13" 0.506 0.309 AMETEK Solidstate [1] [1] Capacity INVERTER INV-2 POWER AND Relays Cabinet BLDG Controls Model 85-meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1] 120VAC VITAL AC/DC Static Switch Control CNTL 4'-<l" 0.506 0.309 AMETEK Solidstate [1] [1] Capacity INVERTER INV-3 POWER AND Relays Cabinet BLDG Controls Model 85-meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1] 120VAC VITAL AC/DC Static Switch Control CNTL 4'-<l" 0.506 0.309 AMETEK Solidstate [1] [1] Capacity INVERTER INV-4 POWER AND Relays Cabinet BLDG Controls Model 85-meets or SUPPORT VC0250-29 exceeds SYSTEMS demand [1] Notes:

1. Acceptable margin to contact chatter is based on the MPS3 design basis seismic qualification of components as described in Section 4.1.
2. GERS capacity data for starter/contactors from EPRI NP-5223-SLR1, GERS-MCC.9 is not model-specific.

(_ '

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 52 of 54 Appendix 2 - Representative Sample Component Evaluations This appendix provides two (2) representative sample component evaluations for relays selected from the list in Appendix 1. 1st Example-Equipment ID 3EGS*EGB [Line Item 20 from Appendix 1] Description of component: Equipment ID 3EGS*EGB - EMERGENCY DIESEL GENERATOR EOG "B" - supporting the AC/DC POWER AND SUPPORT SYSTEMS function. Relay from seal-in I lockout circuit analysis - stopping relay 5E. Relay is an AGASTAT Model 7022PE. Plant Location: Mounted in panel 3EGS*TBEG1 B EOG "B" Control and Relay Box located in the Emergency Generator Enclosure Building, Elevation 24'6". Cabinet type: Control Cabinet. Description of Mounting Point Demand Estimate: Horizontal Response Estimate - Emergency Generator Enclosure Building foundation elevation: 4'6". Panel 3EGS*TBEG1 B is 24'6" - 4'6" = 20 feet above foundation. AFsH = 1.650 (from Reference 8, Figure 4-3). SAGMRs = 0.422g (from Reference 4). Then, SAcH = 0.422

  • 1.650 =

0.696g. Vertical Response Estimate - As described in Section 3.1.2, SAvGMRs = 0.309g. AFsv = 1.333 (from Reference 8, Figure 4-4). Then, SAcv = 0.309

  • 1.333 = 0.412g.

For cabinet type Control Cabinet, AFcH = 4.5 and AFcv = 4.7 (from Reference 8, Section 4.4). Then, mounting point demand is: ICRScH = 0.696

  • 4.5 = 3.132g ICRScv = 0.412
  • 4.7 = 1.936g Description of Relay Capacity The capacity of the relay is based on EPRI GERS - GERS-RL Y-PNT. 7 (Reference 9 and 10).

For this relay, GERS capacity for non-operating, normally closed contact is applicable - SAT = 6g.

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 53 of 54 Appendix 2 - Representative Sample Component Evaluations The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.0 was selected based on the cabinet relay mounting (similar stiffness in three directions). Then, TRS = (6/1.5)

  • 1.0 = 4g.

Capacity I Demand Ratio: C I D = TRS / ICRSc = 4g I 3.132g = 1.277 - Horizontal (governing) - acceptable* Capacity exceeds demand. 2"d Example - Equipment ID 3RCS*PCV455A (V168) [Line Item 206 from Appendix 1] Description of component: Equipment ID 3RCS*PCV455A (V168) - PRESSURIZER PRESSURE OPERATED RELIEF VALVE SOV - supporting the RCS Inventory Control function. Relay from seal-in I lockout circuit analysis - PSCA2/K743. Relay is a POTTER & BRUMFIELD MDR-134-1 (NON-LATCHING). Plant Location: Mounted in panel PSCA2 Reactor Protection System Relay Cabinet in the Control Building, Main Control Room, Elevation 47'6". Cabinet type: Control Cabinet. Description of Mounting Point Demand Estimate: Horizontal Response Estimate - Control Building foundation elevation: 4' 6". Panel PSCA2 is 47'6" - 4'6" = 43 feet above foundation. AFsH = 2.1 (from Reference 8, Figure 4-3). SAGMRS = 0.422g (from Reference 4). Then, SAcH = 0.422

  • 2.1 = 0.886g.

Vertical Response Estimate -As described in Section 3.1.2, SAvGMRS = 0.309g. AFsv = 1.717 (from Reference 8, Figure 4-4). Then, SAcv = 0.309

  • 1.717 = 0.530g.

For cabinet type Control Cabinet, AFcH = 4.5 and AFcv = 4.7 (from Reference 8, Section 4.4).

Serial No. 16-455 Docket Nos. 50-336/423 MPS3 HF Sensitive Equipment Functional Confirmation Page 54 of 54 Appendix 2 - Representative Sample Component Evaluations Then, mounting point demand is: ICRScH = 0.886

  • 4.5 = 3.987g ICRScv = 0.530
  • 4.7 = 2.491g Description of Relay Capacity:

The capacity of the relay is based on EPRI GERS - GERS-RLY-ARR.3 (Reference 9 and 10). For this relay, GERS capacity for non-operating, normally open contact is applicable - SAT = 10g. The CDFM knockdown factor, FK, of 1.5 was selected based on the GERS capacity that represented the lowest test level without chatter. The FMs factor value of 1.0 was selected based on the cabinet relay mounting (similar stiffness in three directions). Then, TRS = (10/1.50)

  • 1.0 = 6.667g.

Capacity I Demand Ratio: C I D = TRS I ICRSc = 6.667g I 3.987g = 1.672 - Horizontal (governing) - acceptable Capacity exceeds demand.}}