| number = ML17235B265
| number = ML17235B265
| issue date = 08/22/2017
| issue date = 08/22/2017
| title = Grand Gulf - NRC Radiation Protection Inspection Report 05000416/2017012 and Notice of Violation
| title = NRC Radiation Protection Inspection Report 05000416/2017012 and Notice of Violation
| author name = Gepford H J
| author name = Gepford H
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Larson E
| addressee name = Larson E
Line 14: Line 14:
| page count = 36
| page count = 36
}}
}}
See also: [[followed by::IR 05000416/2017012]]
See also: [[see also::IR 05000416/2017012]]


=Text=
=Text=
{{#Wiki_filter:August 22, 2017  
{{#Wiki_filter:August 22, 2017  
Mr. Eric Larson, Site Vice President  
Mr. Eric Larson, Site Vice President  
Entergy Operations, Inc.  
Entergy Operations, Inc.  
Grand Gulf Nuclear Station  
Grand Gulf Nuclear Station  
P.O. Box 756 Port Gibson, MS 39150   
P.O. Box 756  
SUBJECT: GRAND GULF NUCLEAR STATION - NRC RADIATION PROTECTION INSPECTION REPORT 05000416/2017012 AND NOTICE OF VIOLATION  Dear Mr. Larson:   
Port Gibson, MS 39150  
On July 14, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Grand Gulf Nuclear Station and discussed the results of this inspection with you and other  
   
SUBJECT: GRAND GULF NUCLEAR STATION - NRC RADIATION PROTECTION  
INSPECTION REPORT 05000416/2017012 AND NOTICE OF VIOLATION  
   
Dear Mr. Larson:  
   
On July 14, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at  
the Grand Gulf Nuclear Station and discussed the results of this inspection with you and other  
members of your staff.  The results of this inspection are documented in the enclosed report.  
members of your staff.  The results of this inspection are documented in the enclosed report.  
  Based on the results of this inspection, the NRC has identified two issues that were evaluated under the risk significance determination process as having very low safety significance (Green).  The NRC also determined that one violation is associated with these issues.  
   
This violation was evaluated in accordance with the NRC Enforcement Policy.  The current Enforcement Policy is included in the NRC's Web site at http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html.  The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surround it are described in detail in the subject inspection report.  The violation is being cited because this violation did not meet the criteria to  
Based on the results of this inspection, the NRC has identified two issues that were evaluated  
be treated as a non-cited violation because the licensee failed to restore compliance within a reasonable period of time after it was identified.   
under the risk significance determination process as having very low safety significance  
(Green).  The NRC also determined that one violation is associated with these issues.  
This violation was evaluated in accordance with the NRC Enforcement Policy.  The  
current Enforcement Policy is included in the NRCs Web site at http://www.nrc.gov/about-
nrc/regulatory/enforcement/enforce-pol.html.  The violation is cited in the enclosed Notice of  
Violation (Notice) and the circumstances surround it are described in detail in the subject  
inspection report.  The violation is being cited because this violation did not meet the criteria to  
be treated as a non-cited violation because the licensee failed to restore compliance within a  
reasonable period of time after it was identified.  
   
You are required to respond to this letter and should follow the instructions specified in the  
You are required to respond to this letter and should follow the instructions specified in the  
enclosed Notice when preparing your response.  If you have additional information that you believe the NRC should consider, you may provide it in your response to the Notice.  The NRC  
enclosed Notice when preparing your response.  If you have additional information that you  
review of your response will also determine whether further enforcement action is necessary to ensure your compliance with regulatory requirements.   
believe the NRC should consider, you may provide it in your response to the Notice.  The NRC  
review of your response will also determine whether further enforcement action is necessary to  
ensure your compliance with regulatory requirements.  
   
If you disagree with a cross-cutting aspect assignment or a finding not associated with a  
If you disagree with a cross-cutting aspect assignment or a finding not associated with a  
regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN:  Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Grand Gulf Nuclear  
regulatory requirement in this report, you should provide a response within 30 days of the date  
of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory  
Commission, ATTN:  Document Control Desk, Washington, DC 20555-0001; with copies to the  
Regional Administrator, Region IV; and the NRC resident inspector at the Grand Gulf Nuclear  
Station.  
Station.  
  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 
E. Larson 2  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available for public inspection in the NRC Public Document Room from the NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.  To the extent possible, your response should not include any personal, privacy, or proprietary information so that it can be made available to the public without redaction.  Sincerely,
   
   
/RA/  
Heather J. Gepford, Ph.D., CHP, Branch Chief Plant Support Branch 1  Division of Reactor Safety  
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
 
E. Larson
2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
made available for public inspection in the NRC Public Document Room from the NRCs Agency
wide Documents Access and Management System (ADAMS), accessible from the NRC Web
site at http://www.nrc.gov/reading-rm/adams.html.  To the extent possible, your response should
not include any personal, privacy, or proprietary information so that it can be made available to
the public without redaction.
Sincerely,
/RA/  
Heather J. Gepford, Ph.D., CHP, Branch Chief  
Plant Support Branch 1   
Division of Reactor Safety
Docket No. 50-416  
Docket No. 50-416  
License No. NPF-29  Enclosure: Inspection Report 05000416/2017012  w/Attachments:   
License No. NPF-29  
   
Enclosure:  
Inspection Report 05000416/2017012   
w/Attachments:   
1. Supplemental Information  
1. Supplemental Information  
2. Request for Information   
2. Request for Information   
   


  ML17235B265   SUNSI Review  ADAMS:   Non-Publicly Available  Non-Sensitive Keyword:  By:  HGepford  Yes    No  Publicly Available  Sensitive  NRC-002 OFFICE SHP:PSB2 HP:PSB2 HP:PSB2 SHP:RIII C:PSB2 C:PSB2 NAME LCarson NGreene JO'Donnell TGo HGepford JKozal SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 8/17/17 8/17/17 8/17/17 8/17/17 8/17/17 8/22/17 OFFICE ACES C:PSB2     NAME MHay HGepford     SIGNATURE /RA/ /RA/     DATE 8/22/17 8/22/17    
 
  Enclosure U.S. NUCLEAR REGULATORY COMMISSION  REGION IV  Docket: 05000416 Report: 05000416/2017012 Facility: Grand Gulf Nuclear Station  
  ML17235B265
Dates: July 10 through July 14, 2017  
SUNSI Review   
Inspectors: L. Carson II, Sr. Health Physicist N. Greene, PhD, Health Physicist  
ADAMS:  
J. O'Donnell, CHP, Health Physicist  
Non-Publicly Available  
  Non-Sensitive  
Keyword:   
By:  HGepford  
  Yes    No  
  Publicly Available  
  Sensitive   
NRC-002  
OFFICE  
SHP:PSB2  
HP:PSB2  
HP:PSB2  
SHP:RIII  
C:PSB2  
C:PSB2  
NAME  
LCarson  
NGreene  
JODonnell
TGo  
HGepford  
JKozal  
SIGNATURE  
/RA/  
/RA/  
/RA/  
/RA/  
/RA/  
/RA/  
DATE  
8/17/17  
8/17/17  
8/17/17  
8/17/17  
8/17/17  
8/22/17  
OFFICE  
ACES  
C:PSB2  
NAME  
MHay  
HGepford  
SIGNATURE  
/RA/  
/RA/  
DATE  
8/22/17  
8/22/17  
 
Enclosure  
U.S. NUCLEAR REGULATORY COMMISSION  
   
REGION IV  
   
Docket:  
05000416  
Report:  
05000416/2017012  
Facility:  
Grand Gulf Nuclear Station  
Dates:  
July 10 through July 14, 2017  
Inspectors:  
L. Carson II, Sr. Health Physicist  
N. Greene, PhD, Health Physicist  
J. ODonnell, CHP, Health Physicist  
T. Go, Health Physicist (RIII)  
T. Go, Health Physicist (RIII)  
Accompanied by S. Money, Health Physicist  Approved By: Heather Gepford, PhD, CHP Chief, Plant Support Branch 2
Division of Reactor Safety   
  2 NOTICE OF VIOLATION 
Entergy Operations, Inc. Docket No. 05000416  Grand Gulf Nuclear Station  License No. NPF-29 
   
   
During an NRC inspection conducted from July 10-14, 2017, a violation of NRC requirements was identified.  In accordance with the NRC Enforcement Policy, the violation is listed below:   
Accompanied by S. Money, Health Physicist
  10 CFR 20.1501(c) requires, in part, that the licensee shall ensure that instruments and equipment used for quantitative radiation measurements are calibrated periodically for  
Approved By:
Heather Gepford, PhD, CHP
Chief, Plant Support Branch 2
Division of Reactor Safety
 
2
NOTICE OF VIOLATION
Entergy Operations, Inc.
Docket No. 05000416 
Grand Gulf Nuclear Station 
License No. NPF-29
During an NRC inspection conducted from July 10-14, 2017, a violation of NRC requirements  
was identified.  In accordance with the NRC Enforcement Policy, the violation is listed below:   
   
10 CFR 20.1501(c) requires, in part, that the licensee shall ensure that instruments and  
equipment used for quantitative radiation measurements are calibrated periodically for  
the radiation measured.   
the radiation measured.   
   
   
Contrary to the above, since January 1, 2012, the licensee failed to ensure that instruments and equipment used for quantitative radiation measurements were calibrated periodically for the radiation measured.  Specifically, the licensee failed to  
Contrary to the above, since January 1, 2012, the licensee failed to ensure that  
properly calibrate the containment/drywell high range radiation monitors and the main steam line radiation monitors using industry accepted calibration methods and  
instruments and equipment used for quantitative radiation measurements were  
tolerances.   This violation is associated with a Green SDP finding.  
calibrated periodically for the radiation measured.  Specifically, the licensee failed to  
properly calibrate the containment/drywell high range radiation monitors and the main  
steam line radiation monitors using industry accepted calibration methods and  
tolerances.  
This violation is associated with a Green SDP finding.  
   
   
Pursuant to the provisions of 10 CFR 2.201, Entergy Operations, Inc., is hereby required to  
Pursuant to the provisions of 10 CFR 2.201, Entergy Operations, Inc., is hereby required to  
submit a written statement or explanation to the U.S. Nuclear Regulatory Commission,  
submit a written statement or explanation to the U.S. Nuclear Regulatory Commission,  
ATTN:  Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, Region IV, 1600 E. Lamar Blvd., Arlington, TX 76011, and a copy to the NRC Resident Inspector at the Grand Gulf Nuclear Station, within 30 days of the date of the letter  
ATTN:  Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional  
Administrator, Region IV, 1600 E. Lamar Blvd., Arlington, TX 76011, and a copy to the NRC  
Resident Inspector at the Grand Gulf Nuclear Station, within 30 days of the date of the letter  
transmitting this Notice of Violation (Notice).  This reply should be clearly marked as a "Reply to  
transmitting this Notice of Violation (Notice).  This reply should be clearly marked as a "Reply to  
a Notice of Violation" and should include for the violation:  (1) the reason for the violation or, if  
a Notice of Violation" and should include for the violation:  (1) the reason for the violation or, if  
contested, the basis for disputing the violation or severity level, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken, and  (4) the date when full compliance will be achieved.  Your response may reference or include  
contested, the basis for disputing the violation or severity level, (2) the corrective steps that  
have been taken and the results achieved, (3) the corrective steps that will be taken, and   
(4) the date when full compliance will be achieved.  Your response may reference or include  
previous docketed correspondence if the correspondence adequately addresses the required  
previous docketed correspondence if the correspondence adequately addresses the required  
response.  If an adequate reply is not received within the time specified in this Notice, an order  
response.  If an adequate reply is not received within the time specified in this Notice, an order  
or a Demand for Information may be issued as to why the license should not be modified,  
or a Demand for Information may be issued as to why the license should not be modified,  
suspended, or revoked, or why such other action as may be proper should not be taken.  Where good cause is shown, consideration will be given to extending the response time.  
suspended, or revoked, or why such other action as may be proper should not be taken.  Where  
If you contest this enforcement action, you should also provide a copy of your response with the basis for your denial, to the Director, Office of Enforcement, United States Nuclear Regulatory  
good cause is shown, consideration will be given to extending the response time.
Commission, Washington, DC 20555-0001.   Because your response will be made available electronically for public inspection in the  
NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction.  If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your  
If you contest this enforcement action, you should also provide a copy of your response with the  
basis for your denial, to the Director, Office of Enforcement, United States Nuclear Regulatory  
Commission, Washington, DC 20555-0001.
Because your response will be made available electronically for public inspection in the  
NRC Public Document Room or from the NRCs document system (ADAMS), accessible from  
the NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should  
not include any personal privacy, proprietary, or safeguards information so that it can be made  
available to the public without redaction.  If personal privacy or proprietary information is  
necessary to provide an acceptable response, then please provide a bracketed copy of your  
response that identifies the information that should be protected and a redacted copy of your  
response that deletes such information.  If you request withholding of such material, you must  
response that deletes such information.  If you request withholding of such material, you must  
specifically identify the portions of your response that you seek to have withheld and provide in   
specifically identify the portions of your response that you seek to have withheld and provide in  
  3 detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by  
 
10 CFR 2.390(b) to support a request for withholding confidential commercial or financial information).  If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.   
   
3  
detail the bases for your claim of withholding (e.g., explain why the disclosure of information will  
create an unwarranted invasion of personal privacy or provide the information required by  
10 CFR 2.390(b) to support a request for withholding confidential commercial or financial  
information).  If Safeguards Information is necessary to provide an acceptable response, please  
provide the level of protection described in 10 CFR 73.21.   
   
   
In accordance with 10 CFR 19.11, you may be required to post this Notice within two working  
In accordance with 10 CFR 19.11, you may be required to post this Notice within two working  
days of receipt.   
days of receipt.   
Dated this 22nd day of August 2017 
   
   
   
Dated this 22nd day of August 2017
  4  SUMMARY  IR 05000416/2017012; 07/10/2017 - 07/14/2017; Grand Gulf Nuclear Station; Radiation Monitoring Instrumentation (71124.05), Radioactive Gaseous and Liquid Effluent Treatment  
 
4  
   
SUMMARY  
   
IR 05000416/2017012; 07/10/2017 - 07/14/2017; Grand Gulf Nuclear Station; Radiation  
Monitoring Instrumentation (71124.05), Radioactive Gaseous and Liquid Effluent Treatment  
(71124.06)  
(71124.06)  
  Cornerstone:  Public Radiation Safety  * Green.  The inspectors identified a violation of 10 CFR 20.1501(c) for the failure to properly calibrate installed radiation monitors using industry accepted calibration methods and tolerances.  Specifically, since January 2012, the licensee failed to properly calibrate the following radiation monitors:  main steam line, containment high range, and the drywell high range.  This violation was originally entered into  
   
the licensee's corrective action program in March 2015 as Condition   
Cornerstone:  Public Radiation Safety  
Report CR-GGNS-2015-01832.  However, in 2017, inspectors determined that subsequent to 2015, the licensee failed to implement corrective actions to properly calibrate the instruments.  The licensee entered this repetitive issue into their corrective  
   
*  
Green.  The inspectors identified a violation of 10 CFR 20.1501(c) for the failure  
to properly calibrate installed radiation monitors using industry accepted calibration  
methods and tolerances.  Specifically, since January 2012, the licensee failed to  
properly calibrate the following radiation monitors:  main steam line, containment  
high range, and the drywell high range.  This violation was originally entered into  
the licensees corrective action program in March 2015 as Condition   
Report CR-GGNS-2015-01832.  However, in 2017, inspectors determined that  
subsequent to 2015, the licensee failed to implement corrective actions to properly  
calibrate the instruments.  The licensee entered this repetitive issue into their corrective  
action process as Condition Report CR-GGN-2017-06826.  
action process as Condition Report CR-GGN-2017-06826.  
   
   
The failure to properly calibrate radiation monitors is a performance deficiency.  The performance deficiency is more than minor because it is associated with the cornerstone attribute of plant instrumentation and adversely affects the cornerstone objective to ensure adequate protection of employee health and safety during routine civilian nuclear reactor operation and is therefore a finding.  Specifically, the failure to properly calibrate  
The failure to properly calibrate radiation monitors is a performance deficiency.  The  
radiation monitors impacts the licensee's ability to assess dose rates.  Using Inspection Manual Chapter 0609, Appendix C, "Occupational Radiation Safety Significance Determination Process," dated August 19, 2008, the inspectors determined the finding to be of very low safety significance because it was not an as low as reasonably achievable (ALARA) issue, there was no overexposure or substantial potential for overexposure,  
performance deficiency is more than minor because it is associated with the cornerstone  
and the licensee's ability to assess dose was not compromised.  This finding has a  
attribute of plant instrumentation and adversely affects the cornerstone objective to  
cross-cutting aspect in the resources component of the Problem Identification and Resolution area because the licensee did not ensure that effective corrective actions were implemented to address issues in a timely manner commensurate with the safety significance [P.3].  (Section 2RS5)  
ensure adequate protection of employee health and safety during routine civilian nuclear  
  * Green.  The inspectors identified a finding associated with the licensee's failure to operate the gaseous radwaste system within design specifications.  These deficiencies in design specifications were associated with the off gas charcoal adsorber and vault  
reactor operation and is therefore a finding.  Specifically, the failure to properly calibrate  
refrigeration components of the gaseous radwaste system, which has impacted the system's reliability and efficiency since at least 2007.  The design parameters for offgas flow rate into the charcoal adsorbers and vault refrigeration temperature were  
radiation monitors impacts the licensees ability to assess dose rates.  Using Inspection  
Manual Chapter 0609, Appendix C, Occupational Radiation Safety Significance  
Determination Process, dated August 19, 2008, the inspectors determined the finding to  
be of very low safety significance because it was not an as low as reasonably achievable  
(ALARA) issue, there was no overexposure or substantial potential for overexposure,  
and the licensees ability to assess dose was not compromised.  This finding has a  
cross-cutting aspect in the resources component of the Problem Identification and  
Resolution area because the licensee did not ensure that effective corrective actions  
were implemented to address issues in a timely manner commensurate with the safety  
significance [P.3].  (Section 2RS5)  
   
*  
Green.  The inspectors identified a finding associated with the licensees failure to  
operate the gaseous radwaste system within design specifications.  These deficiencies  
in design specifications were associated with the off gas charcoal adsorber and vault  
refrigeration components of the gaseous radwaste system, which has impacted the  
systems reliability and efficiency since at least 2007.  The design parameters for  
offgas flow rate into the charcoal adsorbers and vault refrigeration temperature were  
30 scfm and 0 degrees Fahrenheit, respectively.  In contrast, the gaseous radwaste  
30 scfm and 0 degrees Fahrenheit, respectively.  In contrast, the gaseous radwaste  
system is being operated with an approximate flow rate is 80 scfm and vault refrigeration temperature is 15 degrees Fahrenheit.  The licensee has developed a system improvement plan to address resolution of these issues during the next scheduled outages.  This performance deficiency was entered into the licensee's corrective action program as  Condition Report CR-GGN-2017-06875.  
system is being operated with an approximate flow rate is 80 scfm and vault refrigeration  
 
temperature is 15 degrees Fahrenheit.  The licensee has developed a system  
  5 The failure to operate the offgas gaseous radwaste system within design specifications, resulting in elevated radiological effluent releases, is a performance deficiency.  The  
improvement plan to address resolution of these issues during the next scheduled  
finding is more than minor because it is associated with the plant equipment attribute of the Public Radiation Safety cornerstone and adversely affected the cornerstone objective to ensure adequate protection of public health and safety from exposure of  
outages.  This performance deficiency was entered into the licensees corrective action  
program as  Condition Report CR-GGN-2017-06875.  
 
5  
The failure to operate the offgas gaseous radwaste system within design specifications,  
resulting in elevated radiological effluent releases, is a performance deficiency.  The  
finding is more than minor because it is associated with the plant equipment attribute of  
the Public Radiation Safety cornerstone and adversely affected the cornerstone  
objective to ensure adequate protection of public health and safety from exposure of  
radioactive materials released into the public domain as a result of routine civilian  
radioactive materials released into the public domain as a result of routine civilian  
nuclear plant operation.  Using Inspection Manual Chapter 0609, Appendix D, "Public  
nuclear plant operation.  Using Inspection Manual Chapter 0609, Appendix D, Public  
Radiation Safety Significance Determination Process," the finding was determined to be  
Radiation Safety Significance Determination Process, the finding was determined to be  
of very low safety significance (Green) because it involved the Effluent Release Program, it did not impair the ability to assess dose, and did not exceed the  10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits.  The finding has a   
of very low safety significance (Green) because it involved the Effluent Release  
cross-cutting aspect in the area of problem identification and resolution, associated with the resolution component, because the licensee failed to take effective corrective actions  
Program, it did not impair the ability to assess dose, and did not exceed the   
in a timely manner to minimize the unreliability and inefficiency of the gaseous radwaste system [P.3].  (Section 2RS6)  
10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits.  The finding has a   
 
cross-cutting aspect in the area of problem identification and resolution, associated with  
  6 REPORT DETAILS  2. RADIATION SAFETY  Cornerstones:  Public Radiation Safety and Occupational Radiation Safety   
the resolution component, because the licensee failed to take effective corrective actions  
in a timely manner to minimize the unreliability and inefficiency of the gaseous radwaste  
system [P.3].  (Section 2RS6)
 
6  
REPORT DETAILS  
   
2.  
RADIATION SAFETY  
   
Cornerstones:  Public Radiation Safety and Occupational Radiation Safety  
   
2RS5 Radiation Monitoring Instrumentation (71124.05)  
2RS5 Radiation Monitoring Instrumentation (71124.05)  
  a. Inspection Scope  The inspectors evaluated the accuracy and operability of the radiation monitoring  
   
a.  
Inspection Scope  
   
The inspectors evaluated the accuracy and operability of the radiation monitoring  
equipment used by the licensee to monitor areas, materials, and workers to ensure a  
equipment used by the licensee to monitor areas, materials, and workers to ensure a  
radiologically safe work environment.  This evaluation included equipment used to monitor radiological conditions related to normal plant operations, anticipated operational occurrences, and conditions resulting from postulated accidents.  The inspectors interviewed licensee personnel, walked down various portions of the plant, and reviewed  
radiologically safe work environment.  This evaluation included equipment used to  
monitor radiological conditions related to normal plant operations, anticipated operational  
occurrences, and conditions resulting from postulated accidents.  The inspectors  
interviewed licensee personnel, walked down various portions of the plant, and reviewed  
licensee performance associated with radiation monitoring instrumentation, as described  
licensee performance associated with radiation monitoring instrumentation, as described  
below:   
below:   
  * The inspectors performed walk downs and observations of selected plant radiation monitoring equipment and instrumentation, including portable survey instruments, area radiation monitors, continuous air monitors, personnel contamination monitors, portal monitors, and small article monitors.  The inspectors assessed material condition and operability, evaluated positioning of  
   
*  
The inspectors performed walk downs and observations of selected plant  
radiation monitoring equipment and instrumentation, including portable survey  
instruments, area radiation monitors, continuous air monitors, personnel  
contamination monitors, portal monitors, and small article monitors.  The  
inspectors assessed material condition and operability, evaluated positioning of  
instruments relative to the radiation sources or areas they were intended to  
instruments relative to the radiation sources or areas they were intended to  
monitor, and verified performance of source checks and calibrations.  * The inspectors evaluated the calibration and testing program, including laboratory instrumentation, whole body counters, post-accident monitoring instrumentation, portal monitors, personnel contamination monitors, small article monitors, portable survey instruments, area radiation monitors, electronic dosimetry, air samplers, and continuous air monitors.  * The inspectors assessed problem identification and resolution for radiation monitoring instrumentation.  The inspectors reviewed audits, self-assessments, and corrective action program documents to verify problems were being identified and properly addressed for resolution.   
monitor, and verified performance of source checks and calibrations.  
   
*  
The inspectors evaluated the calibration and testing program, including  
laboratory instrumentation, whole body counters, post-accident monitoring  
instrumentation, portal monitors, personnel contamination monitors, small article  
monitors, portable survey instruments, area radiation monitors, electronic  
dosimetry, air samplers, and continuous air monitors.  
   
*  
The inspectors assessed problem identification and resolution for radiation  
monitoring instrumentation.  The inspectors reviewed audits, self-assessments,  
and corrective action program documents to verify problems were being  
identified and properly addressed for resolution.  
   
These activities constitute completion of the three required samples of radiation  
These activities constitute completion of the three required samples of radiation  
monitoring instrumentation, as defined in Inspection Procedure 71124.05.  
monitoring instrumentation, as defined in Inspection Procedure 71124.05.  
  b. Findings  Introduction.  The inspectors identified a violation of 10 CFR 20.1501(c) for the failure to properly calibrate installed radiation monitors using industry accepted calibration methods and tolerances.  Specifically, the main steam line, containment high range, and  
   
drywell high range radiation monitors have not been properly calibrated since at least January 2012.  This violation was originally entered into the licensee's corrective action program in March 2015 as Condition Report CR-GGNS-2015-01832.  However, in 2017,  
b.  
inspectors determined that the licensee failed to implement appropriate corrective   
Findings  
  7 actions to properly calibrate the instruments.  The licensee entered this repetitive issue into their corrective action process as Condition Report CR-GGN-2017-06826.  
   
  Description.  The failure to properly calibrate the main steam line and containment/drywell high range area radiation monitors was previously identified and documented as a non-cited violation during an inspection in March of 2015:   
Introduction.  The inspectors identified a violation of 10 CFR 20.1501(c) for the failure to  
properly calibrate installed radiation monitors using industry accepted calibration  
methods and tolerances.  Specifically, the main steam line, containment high range, and  
drywell high range radiation monitors have not been properly calibrated since at least  
January 2012.  This violation was originally entered into the licensees corrective action  
program in March 2015 as Condition Report CR-GGNS-2015-01832.  However, in 2017,  
inspectors determined that the licensee failed to implement appropriate corrective  
 
   
7  
actions to properly calibrate the instruments.  The licensee entered this repetitive issue  
into their corrective action process as Condition Report CR-GGN-2017-06826.  
   
Description.  The failure to properly calibrate the main steam line and  
containment/drywell high range area radiation monitors was previously identified  
and documented as a non-cited violation during an inspection in March of 2015:   
NCV 05000416/2015001-04, Failure to Properly Calibrate Main Steam Line Radiation  
NCV 05000416/2015001-04, Failure to Properly Calibrate Main Steam Line Radiation  
Monitors and Containment/Drywall High Range Radiation Monitors.   
Monitors and Containment/Drywall High Range Radiation Monitors.   
  During this inspection, the inspectors reviewed the revised calibration procedures and calibration data for main steam line, containment high range, and drywell high range  
   
During this inspection, the inspectors reviewed the revised calibration procedures and  
calibration data for main steam line, containment high range, and drywell high range  
radiation monitors.  The main steam line radiation monitors provide reactor operators  
radiation monitors.  The main steam line radiation monitors provide reactor operators  
with early indication of gross release of fission products from the fuel.  This monitor has an automatic response function that isolates the reactor water sample line to limit the release of radioactive materials.  The containment high range and drywell high radiation monitors provide reactor operators and emergency response organization members  
with early indication of gross release of fission products from the fuel.  This monitor has  
an automatic response function that isolates the reactor water sample line to limit the  
release of radioactive materials.  The containment high range and drywell high radiation  
monitors provide reactor operators and emergency response organization members  
information about the radiological conditions inside the containment building and the  
information about the radiological conditions inside the containment building and the  
drywell.  This information is used to make informed decisions about what actions to take  
drywell.  This information is used to make informed decisions about what actions to take  
during an accident as well as make emergency declarations.  As such, it is important that these radiation monitors be properly calibrated.  However, it was determined that the improper calibrations did not adversely affect the licensee's ability to implement the Emergency Plan.  
during an accident as well as make emergency declarations.  As such, it is important  
that these radiation monitors be properly calibrated.  However, it was determined that  
the improper calibrations did not adversely affect the licensees ability to implement the  
Emergency Plan.  
   
   
Based on their review of the current revisions of the applicable procedures, corrective  
Based on their review of the current revisions of the applicable procedures, corrective  
action documents, and calibration data, the inspectors determined that the licensee had not corrected the calibration method from the previous non-cited violation.  The licensee procedures did not address the required reproducible source-to-detector geometry or the  
action documents, and calibration data, the inspectors determined that the licensee had  
not corrected the calibration method from the previous non-cited violation.  The licensee  
procedures did not address the required reproducible source-to-detector geometry or the  
characterization of the calibration sources used.  Additionally, because the main steam  
characterization of the calibration sources used.  Additionally, because the main steam  
line monitor calibration requires two different sources in the procedure, each source  
line monitor calibration requires two different sources in the procedure, each source  
should have been characterized in a reproducible geometry.   The licensee revised Procedure 06-IC-1D17-R-1002, "Main Steam Line High Radiation  
should have been characterized in a reproducible geometry.  
Monitor (PCIS) Calibration," Revision 109, on April 3, 2017.  The previous revision (108)  
The licensee revised Procedure 06-IC-1D17-R-1002, Main Steam Line High Radiation  
Monitor (PCIS) Calibration, Revision 109, on April 3, 2017.  The previous revision (108)  
was dated December 13, 2011.  Section 5.37 of this procedure describes the radiation  
was dated December 13, 2011.  Section 5.37 of this procedure describes the radiation  
calibration method.  The calibration method, as described in this section, fails to employ  
calibration method.  The calibration method, as described in this section, fails to employ  
a reproducible geometry or calibrated radiation sources.  Further, the calibration method, as described in this section, only addresses calibration of two of the six decades of the logarithmic monitor.   The licensee also revised Procedure 06-IC-1D21-R-1002, "Containment/Drywell High Range Area Radiation Monitor Calibration," Revision 108, on April 3, 2017.  The previous revision (107) was dated September 12, 2011.  Section 5.87 describes the radiation functional test portion of this procedure.  The calibration method described in  
a reproducible geometry or calibrated radiation sources.  Further, the calibration method,  
this section fails to employ a reproducible geometry or a calibrated radiation source.  Further, the acceptance criteria in this section are twice that allowed in American  
as described in this section, only addresses calibration of two of the six decades of the  
National Standards Institute (ANSI) N323D-2002, "American National Standard for  
logarithmic monitor.  
Installed Radiation Protection Instrumentation," approved on September 3, 2002.  In addition, the electronic calibration method in this procedure as allowed by NUREG 0737, "Clarification of TMI Action Plan Requirements," dated November 1980, only addresses  
calibration of three of the seven decades of the logarithmic monitor.  
The licensee also revised Procedure 06-IC-1D21-R-1002, Containment/Drywell High  
  8 The inspectors concluded that the licensee had continued to improperly calibrate these process radiation monitors since the previous inspection in March 2015.   
Range Area Radiation Monitor Calibration, Revision 108, on April 3, 2017.  The  
Procedure 06-IC-1D17-R-1002 rocedure is used for all four channels of the main steam line monitors and Procedure 06-IC-1D21-R-1002 is used for both channels of the drywell and containment high range radiation monitors.  Because both procedures  
previous revision (107) was dated September 12, 2011.  Section 5.87 describes the  
radiation functional test portion of this procedure.  The calibration method described in  
this section fails to employ a reproducible geometry or a calibrated radiation source.   
Further, the acceptance criteria in this section are twice that allowed in American  
National Standards Institute (ANSI) N323D-2002, American National Standard for  
Installed Radiation Protection Instrumentation, approved on September 3, 2002.  In  
addition, the electronic calibration method in this procedure as allowed by NUREG 0737,  
Clarification of TMI Action Plan Requirements, dated November 1980, only addresses  
calibration of three of the seven decades of the logarithmic monitor.  
 
8  
The inspectors concluded that the licensee had continued to improperly calibrate  
these process radiation monitors since the previous inspection in March 2015.   
Procedure 06-IC-1D17-R-1002 rocedure is used for all four channels of the main  
steam line monitors and Procedure 06-IC-1D21-R-1002 is used for both channels of  
the drywell and containment high range radiation monitors.  Because both procedures  
failed to use appropriate calibration methodologies, the inspectors determined that  
failed to use appropriate calibration methodologies, the inspectors determined that  
none of the containment/drywell high range and main steam line radiation monitors  
none of the containment/drywell high range and main steam line radiation monitors  
had been properly calibrated since at least the date of the procedure revisions,  
had been properly calibrated since at least the date of the procedure revisions,  
September 12, 2011, and December 13, 2011, respectively.   In evaluating the underlying cause of the licensee's failure to correct the calibration  
September 12, 2011, and December 13, 2011, respectively.  
In evaluating the underlying cause of the licensees failure to correct the calibration  
issue, the inspectors noted the following.  On January 20, 2017, a corrective action  
issue, the inspectors noted the following.  On January 20, 2017, a corrective action  
document (CR-GGN-2017-00612) was initiated identifying a non-conforming condition of  
document (CR-GGN-2017-00612) was initiated identifying a non-conforming condition of  
a 'Condition Adverse to Quality' that the calibration procedure for the containment high range and drywell high radiation monitors does not control the source geometry to the monitor.  The CR further described the required calibration traceability not being  
a Condition Adverse to Quality that the calibration procedure for the containment high  
range and drywell high radiation monitors does not control the source geometry to the  
monitor.  The CR further described the required calibration traceability not being  
maintained.  In the self-assessment report of the radiation protection instrument program   
maintained.  In the self-assessment report of the radiation protection instrument program   
(OL-GLO-2017-21) completed on May 23, 2017, the assessment team rated Objective 2,  
(OL-GLO-2017-21) completed on May 23, 2017, the assessment team rated Objective 2,  
the review of the prior inspection report, as unsatisfactory.  This rating was given because actions related to this issue were not complete after a considerable amount of time, which included at least five due date extensions and an extended outage that  
the review of the prior inspection report, as unsatisfactory.  This rating was given  
should have allowed completion of the corrective action.   Analysis.  The failure to properly calibrate radiation monitors is a performance deficiency.  The performance deficiency is more than minor because it is associated with the cornerstone attribute of plant instrumentation and adversely affects the cornerstone objective to ensure adequate protection of employee health and safety during routine  
because actions related to this issue were not complete after a considerable amount of  
civilian nuclear reactor operation and is therefore a finding.  Specifically, the failure to properly calibrate radiation monitors impacts the licensee's ability to assess dose rates.   
time, which included at least five due date extensions and an extended outage that  
Using Inspection Manual Chapter 0609, Appendix C, "Occupational Radiation Safety Significance Determination Process," dated August 19, 2008, the inspectors determined the finding to be of very low safety significance because it was not an as low as  
should have allowed completion of the corrective action.  
Analysis.  The failure to properly calibrate radiation monitors is a performance  
deficiency.  The performance deficiency is more than minor because it is associated with  
the cornerstone attribute of plant instrumentation and adversely affects the cornerstone  
objective to ensure adequate protection of employee health and safety during routine  
civilian nuclear reactor operation and is therefore a finding.  Specifically, the failure to  
properly calibrate radiation monitors impacts the licensees ability to assess dose rates.   
Using Inspection Manual Chapter 0609, Appendix C, Occupational Radiation Safety  
Significance Determination Process, dated August 19, 2008, the inspectors determined  
the finding to be of very low safety significance because it was not an as low as  
reasonably achievable (ALARA) issue, there was no overexposure or substantial  
reasonably achievable (ALARA) issue, there was no overexposure or substantial  
potential for overexposure, and the licensee's ability to assess dose was not  
potential for overexposure, and the licensees ability to assess dose was not  
compromised.  This finding has a cross-cutting aspect in the area of problem  
compromised.  This finding has a cross-cutting aspect in the area of problem  
identification and resolution, associated with the resolution component, because the licensee did not ensure that effective corrective actions were implemented to address issues in a timely manner commensurate with the safety significance [P.3].  
identification and resolution, associated with the resolution component, because the  
licensee did not ensure that effective corrective actions were implemented to address  
issues in a timely manner commensurate with the safety significance [P.3].  
   
   
Enforcement.  Title 10 CFR 20.1501(c) requires, in part, that the licensee shall ensure that instruments and equipment used for quantitative radiation measurements are calibrated periodically for the radiation measured.  Contrary to the above, since at least January 1, 2012, the licensee failed to ensure that instruments and equipment  
Enforcement.  Title 10 CFR 20.1501(c) requires, in part, that the licensee shall  
ensure that instruments and equipment used for quantitative radiation measurements  
are calibrated periodically for the radiation measured.  Contrary to the above, since at  
least January 1, 2012, the licensee failed to ensure that instruments and equipment  
used for quantitative radiation measurements were calibrated periodically for the  
used for quantitative radiation measurements were calibrated periodically for the  
radiation measured.  Specifically, the licensee failed to properly calibrate the  
radiation measured.  Specifically, the licensee failed to properly calibrate the  
containment/drywell high range radiation monitors and the main steam line  
containment/drywell high range radiation monitors and the main steam line  
radiation monitors using industry accepted calibration methods and tolerances.  This issue was entered into the licensee's corrective action program as Condition Report CR-GGN-2017-06826.  
radiation monitors using industry accepted calibration methods and tolerances.   
 
This issue was entered into the licensees corrective action program as Condition  
  9 This issue was previously identified during an inspection in March of 2015, as NCV 05000416/2015001-04 and was treated as a non-cited violation, consistent with  
Report CR-GGN-2017-06826.  
Section 2.3.2.a of the Enforcement Policy.  Since the licensee did not restore compliance in a reasonable period of time, this violation is being cited, consistent with the NRC Enforcement Policy, Section 2.3.2, which states, in part, that the licensee must restore compliance within a reasonable period of time (i.e., in a timeframe  
 
9  
This issue was previously identified during an inspection in March of 2015, as  
NCV 05000416/2015001-04 and was treated as a non-cited violation, consistent with  
Section 2.3.2.a of the Enforcement Policy.  Since the licensee did not restore  
compliance in a reasonable period of time, this violation is being cited, consistent with  
the NRC Enforcement Policy, Section 2.3.2, which states, in part, that the licensee must  
restore compliance within a reasonable period of time (i.e., in a timeframe  
commensurate with the significance of the violation) after a violation is identified.  A  
commensurate with the significance of the violation) after a violation is identified.  A  
Notice of Violation is attached.  VIO 05000416/2017012-01, "Failure to Properly  
Notice of Violation is attached.  VIO 05000416/2017012-01, Failure to Properly  
Calibrate Installed Radiation Monitors Using Industry Accepted Calibration Methods and Tolerances." 2RS6 Radioactive Gaseous and Liquid Effluent Treatment (71124.06)  a. Inspection Scope  The inspectors evaluated whether the licensee maintained gaseous and liquid effluent  
Calibrate Installed Radiation Monitors Using Industry Accepted Calibration Methods and  
processing systems and properly mitigated, monitored, and evaluated radiological discharges with respect to public exposure.  The inspectors verified that abnormal  
Tolerances.  
radioactive gaseous or liquid discharges and conditions, when effluent radiation monitors are out-of-service, were controlled in accordance with the applicable regulatory requirements and licensee procedures.  The inspectors verified that the licensee's quality control program ensured radioactive effluent sampling and analysis adequately  
   
2RS6 Radioactive Gaseous and Liquid Effluent Treatment (71124.06)  
   
a.  
Inspection Scope  
   
The inspectors evaluated whether the licensee maintained gaseous and liquid effluent  
processing systems and properly mitigated, monitored, and evaluated radiological  
discharges with respect to public exposure.  The inspectors verified that abnormal  
radioactive gaseous or liquid discharges and conditions, when effluent radiation monitors  
are out-of-service, were controlled in accordance with the applicable regulatory  
requirements and licensee procedures.  The inspectors verified that the licensees
quality control program ensured radioactive effluent sampling and analysis adequately  
quantified and evaluated discharges of radioactive materials.  The inspectors verified the  
quantified and evaluated discharges of radioactive materials.  The inspectors verified the  
adequacy of public dose projections resulting from radioactive effluent discharges.  The  
adequacy of public dose projections resulting from radioactive effluent discharges.  The  
inspectors interviewed licensee personnel and reviewed licensee performance in the following areas:  * During walk downs and observations of selected portions of the radioactive gaseous and liquid effluent equipment, the inspectors evaluated routine processing and discharge of effluents, including sample collection and analysis.   
inspectors interviewed licensee personnel and reviewed licensee performance in the  
following areas:  
    
*  
During walk downs and observations of selected portions of the radioactive  
gaseous and liquid effluent equipment, the inspectors evaluated routine  
processing and discharge of effluents, including sample collection and analysis.   
The inspectors observed equipment configuration and flow paths of selected  
The inspectors observed equipment configuration and flow paths of selected  
gaseous and liquid discharge system components, effluent monitoring systems, filtered ventilation system material condition, and significant changes to effluent release points.  
gaseous and liquid discharge system components, effluent monitoring systems,  
  * Calibration and testing program for process and effluent monitors, including National Institute of Standards and Technology traceability of sources, primary and secondary calibration data, channel calibrations, set-point determination  
filtered ventilation system material condition, and significant changes to effluent  
bases, and surveillance test results.   * Sampling and analysis controls used to ensure representative sampling and appropriate compensatory sampling.  Reviews included results of the inter-laboratory comparison program,   * Instrumentation and equipment, including effluent flow measuring instruments, air cleaning systems, and post-accident effluent monitoring instruments.  * Dose calculations for effluent releases.  The inspectors reviewed a selection of radioactive liquid and gaseous waste discharge permits and abnormal gaseous or liquid tank discharges, and verified the projected doses were accurate.  The   
release points.  
  10 inspectors also reviewed 10 CFR Part 61 analyses and methods used to determine which isotopes were included in the source term.  The inspectors  
   
reviewed land use census results, offsite dose calculation manual changes, and significant changes in reported dose values from previous years.   * Problem identification and resolution for radioactive gaseous and liquid effluent treatment.  The inspectors reviewed audits, self-assessments, and corrective action program documents to verify problems were being identified and properly  
*  
addressed for resolution.   
Calibration and testing program for process and effluent monitors, including  
These activities constitute completion of the six required samples of radioactive gaseous and liquid effluent treatment program, as defined in Inspection Procedure 71124.06.   b. Findings  Introduction.  The inspectors identified a Green finding for the licensee's failure to operate their gaseous radwaste system within design specifications, resulting in elevated radiological effluent releases that were not as low as reasonably achievable.  These  
National Institute of Standards and Technology traceability of sources, primary  
deficiencies in meeting the design specifications/parameters are associated with the offgas charcoal adsorber and vault refrigeration components of the offgas system, which have impacted the system's reliability and efficiency since at least 2007.   Description.  When reviewing the licensee's annual effluent release reports, the inspectors identified that in calendar year 2013, the licensee had total airborne releases  
and secondary calibration data, channel calibrations, set-point determination  
bases, and surveillance test results.
*  
Sampling and analysis controls used to ensure representative sampling and  
appropriate compensatory sampling.  Reviews included results of the inter-
laboratory comparison program,
*  
Instrumentation and equipment, including effluent flow measuring instruments, air  
cleaning systems, and post-accident effluent monitoring instruments.  
   
*  
Dose calculations for effluent releases.  The inspectors reviewed a selection of  
radioactive liquid and gaseous waste discharge permits and abnormal gaseous  
or liquid tank discharges, and verified the projected doses were accurate.  The  
 
   
10  
inspectors also reviewed 10 CFR Part 61 analyses and methods used to  
determine which isotopes were included in the source term.  The inspectors  
reviewed land use census results, offsite dose calculation manual changes, and  
significant changes in reported dose values from previous years.  
*  
Problem identification and resolution for radioactive gaseous and liquid effluent  
treatment.  The inspectors reviewed audits, self-assessments, and corrective  
action program documents to verify problems were being identified and properly  
addressed for resolution.  
   
These activities constitute completion of the six required samples of radioactive gaseous  
and liquid effluent treatment program, as defined in Inspection Procedure 71124.06.
b.  
Findings  
   
Introduction.  The inspectors identified a Green finding for the licensees failure to  
operate their gaseous radwaste system within design specifications, resulting in elevated  
radiological effluent releases that were not as low as reasonably achievable.  These  
deficiencies in meeting the design specifications/parameters are associated with the  
offgas charcoal adsorber and vault refrigeration components of the offgas system, which  
have impacted the systems reliability and efficiency since at least 2007.  
Description.  When reviewing the licensees annual effluent release reports, the  
inspectors identified that in calendar year 2013, the licensee had total airborne releases  
of fission and activation gases of 1920 curies (Ci), including a peak release of 1540 Ci  
of fission and activation gases of 1920 curies (Ci), including a peak release of 1540 Ci  
during the third quarter.  The inspectors noted that this annual gaseous release was  
during the third quarter.  The inspectors noted that this annual gaseous release was  
significantly higher than the previous annual releases of approximately 450 Ci in calendar years 2010 thru 2012.  The licensee stated the primary reason for the elevated activity of gaseous releases was associated with refrigeration equipment issues affecting  
significantly higher than the previous annual releases of approximately 450 Ci in  
calendar years 2010 thru 2012.  The licensee stated the primary reason for the elevated  
activity of gaseous releases was associated with refrigeration equipment issues affecting  
charcoal adsorption efficiency.  Upon further evaluation, NRC inspectors determined that  
charcoal adsorption efficiency.  Upon further evaluation, NRC inspectors determined that  
such issues with the charcoal adsorbers and vault refrigeration systems were long-term,  
such issues with the charcoal adsorbers and vault refrigeration systems were long-term,  
ongoing, unresolved deficiencies in the gaseous radwaste system primarily due to numerous condenser in-leakages that remain unrepaired.    
ongoing, unresolved deficiencies in the gaseous radwaste system primarily due to  
numerous condenser in-leakages that remain unrepaired.    
The Grand Gulf Nuclear Station System Description, Revision 2, for the gaseous  
The Grand Gulf Nuclear Station System Description, Revision 2, for the gaseous  
radwaste system notes that there are two sets of four charcoal adsorber vessels  
radwaste system notes that there are two sets of four charcoal adsorber vessels  
arranged in series, totaling eight charcoal adsorber beds.  As the offgas flows from the condenser system via the steam jet air ejectors into the charcoal adsorption system, the charcoal acts as a medium to delay the flow of krypton and xenon gases to allow them to decay to radiation levels acceptable for atmospheric release.  In addition, the activated charcoal adsorbs the radioactive isotopes of iodine removing them for decay.  The adsorption of xenon, krypton, and iodine offgas on charcoal depends on gas flowrate, holdup time, mass of charcoal, and the dynamic adsorption coefficient.  The  
arranged in series, totaling eight charcoal adsorber beds.  As the offgas flows from the  
inspectors determined the nominal flowrate for the licensee's charcoal system to operate efficiently is specified as 30 scfm, to achieve proper holdup times of offgases.  However,  
condenser system via the steam jet air ejectors into the charcoal adsorption system, the  
the licensee has been consistently running the system at 80 scfm. The Grand Gulf Nuclear Station System Description also states the charcoal adsorbers must be operated under controlled temperature and humidity conditions, maintaining a steady state temperature of about 0 degrees Fahrenheit (°F).  However, for optimal   
charcoal acts as a medium to delay the flow of krypton and xenon gases to allow them to  
  11 performance, a refrigeration temperature of 0 to -40°F is specified.  The inspectors reviewed Figure 10 of Section 4.1.7 of Grand Gulf Nuclear Station System Description, entitled "Comparative Curie Decontamination Factors for 8, 12, and 16 Bed Systems," which illustrated that the charcoal low temperature, eight bed system is designed to  
decay to radiation levels acceptable for atmospheric release.  In addition, the activated  
charcoal adsorbs the radioactive isotopes of iodine removing them for decay.   
The adsorption of xenon, krypton, and iodine offgas on charcoal depends on gas  
flowrate, holdup time, mass of charcoal, and the dynamic adsorption coefficient.  The  
inspectors determined the nominal flowrate for the licensees charcoal system to operate  
efficiently is specified as 30 scfm, to achieve proper holdup times of offgases.  However,  
the licensee has been consistently running the system at 80 scfm.  
The Grand Gulf Nuclear Station System Description also states the charcoal adsorbers  
must be operated under controlled temperature and humidity conditions, maintaining a  
steady state temperature of about 0 degrees Fahrenheit (°F).  However, for optimal  
 
   
11  
performance, a refrigeration temperature of 0 to -40°F is specified.  The inspectors  
reviewed Figure 10 of Section 4.1.7 of Grand Gulf Nuclear Station System Description,  
entitled Comparative Curie Decontamination Factors for 8, 12, and 16 Bed Systems,  
which illustrated that the charcoal low temperature, eight bed system is designed to  
operate at a decontamination factor of 1000 with the specified design parameters  
operate at a decontamination factor of 1000 with the specified design parameters  
(i.e., 30 scfm, 0ºF).  However, the inspectors determined licensee's current offgas flowrate of approximately 80 scfm and refrigeration temperature of approximately +15°F will achieve a decontamination factor of less than 50. The licensee performed evaluations, as documented in Apparent Cause Evaluation CR-GGN-2013-0450, and determined that corrective actions were needed to  
(i.e., 30 scfm, 0ºF).  However, the inspectors determined licensees current offgas  
flowrate of approximately 80 scfm and refrigeration temperature of approximately +15°F  
will achieve a decontamination factor of less than 50.  
The licensee performed evaluations, as documented in Apparent Cause  
Evaluation CR-GGN-2013-0450, and determined that corrective actions were needed to  
decrease the current elevated offgas flowrate into the charcoal adsorbers from  
decrease the current elevated offgas flowrate into the charcoal adsorbers from  
approximately 80 scfm, and to reduce the vault refrigeration temperature to within  
approximately 80 scfm, and to reduce the vault refrigeration temperature to within  
design specifications.  The licensee implemented some corrective actions to reduce  
design specifications.  The licensee implemented some corrective actions to reduce  
condenser in-leakage, resulting in some improvement in the offgas flowrate (reduction from ~160 scfm to ~80 scfm).  However, the offgas flowrates, charcoal adsorber flowpath, and refrigeration vault operations still remain inconsistent with the design specifications.  Although these deficiencies were ongoing issues, the licensee provided no documented evaluation to demonstrate that the degraded performance of the offgas system was  
condenser in-leakage, resulting in some improvement in the offgas flowrate (reduction  
from ~160 scfm to ~80 scfm).  However, the offgas flowrates, charcoal adsorber  
flowpath, and refrigeration vault operations still remain inconsistent with the design  
specifications.   
Although these deficiencies were ongoing issues, the licensee provided no documented  
evaluation to demonstrate that the degraded performance of the offgas system was  
maintaining gaseous releases as low as reasonably achievable, which the Updated Final  
maintaining gaseous releases as low as reasonably achievable, which the Updated Final  
Safety Analysis Report states is the primary design objective of the gaseous radwaste management system.  The NRC inspectors discussed with the licensee that, although the airborne releases may meet the 10 CFR Part 20, Appendix I, limitations, the failure  
Safety Analysis Report states is the primary design objective of the gaseous radwaste  
to operate the system consistent with design parameters is significantly impacting the system's ability to maintain gaseous releases as low as reasonably achievable, as evidenced by the annual effluent reports.    The licensee has developed a system improvement plan entitled, "Offgas Long Range Plan and Concluding Actions," to address how the plant may resolve the issues within the next few scheduled outages.  This performance deficiency was entered into the licensee's CAP as Condition Report CR-GGN-2017-06875. Analysis.  The failure to operate the offgas gaseous radwaste system within design specifications, resulting in elevated radiological effluent releases, is a performance deficiency.  The finding is more than minor because it is associated with the plant  
management system.  The NRC inspectors discussed with the licensee that, although  
the airborne releases may meet the 10 CFR Part 20, Appendix I, limitations, the failure  
to operate the system consistent with design parameters is significantly impacting the  
systems ability to maintain gaseous releases as low as reasonably achievable, as  
evidenced by the annual effluent reports.     
The licensee has developed a system improvement plan entitled, Offgas Long Range  
Plan and Concluding Actions, to address how the plant may resolve the issues within  
the next few scheduled outages.  This performance deficiency was entered into the  
licensees CAP as Condition Report CR-GGN-2017-06875.  
Analysis.  The failure to operate the offgas gaseous radwaste system within design  
specifications, resulting in elevated radiological effluent releases, is a performance  
deficiency.  The finding is more than minor because it is associated with the plant  
equipment attribute of the Public Radiation Safety cornerstone and adversely affected  
equipment attribute of the Public Radiation Safety cornerstone and adversely affected  
the cornerstone objective to ensure adequate protection of public health and safety from exposure of radioactive materials released into the public domain as a result of routine civilian nuclear plant operation.  Using Inspection Manual Chapter 0609, Appendix D, "Public Radiation Safety Significance Determination Process," the finding was  
the cornerstone objective to ensure adequate protection of public health and safety from  
exposure of radioactive materials released into the public domain as a result of routine  
civilian nuclear plant operation.  Using Inspection Manual Chapter 0609, Appendix D,  
Public Radiation Safety Significance Determination Process, the finding was  
determined to be of very low safety significance (Green) because it involved the  
determined to be of very low safety significance (Green) because it involved the  
Effluent Release Program, it did not impair the ability to assess dose, and did not  
Effluent Release Program, it did not impair the ability to assess dose, and did not  
exceed the 10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits.  The finding has a cross-cutting aspect in the area of problem identification and resolution, associated with the resolution component, because the licensee did not ensure that effective corrective  
exceed the 10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits.  The finding has a  
actions were implemented to address issues in a timely manner commensurate with the safety significance [P.3].  
cross-cutting aspect in the area of problem identification and resolution, associated with  
  12 Enforcement.  The inspectors did not identify a violation of regulatory requirements.  Although the licensee failed to operate the system within the design specifications, as described in the Grand Gulf Nuclear Station System Description, the inspectors determined this was a self-imposed standard and did not constitute a regulatory requirement.  The issue was entered into the licensee's corrective action program as  
the resolution component, because the licensee did not ensure that effective corrective  
CR-GGN-2017-06875.  Finding (FIN) 05000416-2017012-02, "Failure to Operate the  
actions were implemented to address issues in a timely manner commensurate with the  
Gaseous Radwaste System Within Design Specifications."
safety significance [P.3].
  2RS7 Radiological Environmental Monitoring Program (71124.07)  a. Inspection Scope  The inspectors evaluated whether the licensee's radiological environmental monitoring program quantified the impact of radioactive effluent releases to the environment and sufficiently validated the integrity of the radioactive gaseous and liquid effluent release program.  The inspectors also verified that the licensee continued to implement the voluntary NEI/Industry Ground Water Protection Initiative.  The inspectors reviewed or  
 
observed the following items:  * The inspectors observed selected air sampling and dosimeter monitoring stations, sampler station modifications, and the collection and preparation of environmental samples.  The inspectors reviewed calibration and maintenance records for selected air samplers, composite water samplers, and environmental  
12  
Enforcement.  The inspectors did not identify a violation of regulatory requirements.   
Although the licensee failed to operate the system within the design specifications, as  
described in the Grand Gulf Nuclear Station System Description, the inspectors  
determined this was a self-imposed standard and did not constitute a regulatory  
requirement.  The issue was entered into the licensees corrective action program as  
CR-GGN-2017-06875.  Finding (FIN) 05000416-2017012-02, Failure to Operate the  
Gaseous Radwaste System Within Design Specifications.  
   
2RS7 Radiological Environmental Monitoring Program (71124.07)  
   
a.  
Inspection Scope  
   
The inspectors evaluated whether the licensees radiological environmental monitoring  
program quantified the impact of radioactive effluent releases to the environment and  
sufficiently validated the integrity of the radioactive gaseous and liquid effluent release  
program.  The inspectors also verified that the licensee continued to implement the  
voluntary NEI/Industry Ground Water Protection Initiative.  The inspectors reviewed or  
observed the following items:  
   
*  
The inspectors observed selected air sampling and dosimeter monitoring  
stations, sampler station modifications, and the collection and preparation of  
environmental samples.  The inspectors reviewed calibration and maintenance  
records for selected air samplers, composite water samplers, and environmental  
sample radiation measurement instrumentation, and inter-laboratory comparison  
sample radiation measurement instrumentation, and inter-laboratory comparison  
program results.  The inspectors reviewed selected events documented in the  
program results.  The inspectors reviewed selected events documented in the  
annual environmental monitoring report and significant changes made by the  
annual environmental monitoring report and significant changes made by the  
licensee to the offsite dose calculation manual as the result of changes to the land census.  The inspectors evaluated the operability, calibration, and maintenance of meteorological instruments and assessed the meteorological  
licensee to the offsite dose calculation manual as the result of changes to the  
land census.  The inspectors evaluated the operability, calibration, and  
maintenance of meteorological instruments and assessed the meteorological  
dispersion and deposition factors.  The inspectors verified the licensee had  
dispersion and deposition factors.  The inspectors verified the licensee had  
implemented sampling and monitoring program sufficient to detect leakage from  
implemented sampling and monitoring program sufficient to detect leakage from  
structures, systems, or components with credible mechanism for licensed material to reach ground water and reviewed changes to the licensee's written program for identifying and controlling contaminated spills/leaks to groundwater.   * Groundwater protection initiative (GPI) implementation, including assessment of groundwater monitoring results, identified leakage or spill events and entries made into 10 CFR 50.75 (g) records, licensee evaluations of the extent of the  
structures, systems, or components with credible mechanism for licensed  
contamination and the radiological source term, and reports of events associated with spills, leaks, and groundwater monitoring results.  * Problem identification and resolution for the radiological environmental monitoring program.  The inspectors reviewed audits, self-assessments, and corrective action program documents to verify problems were being identified  
material to reach ground water and reviewed changes to the licensees written  
and properly addressed for resolution.   
program for identifying and controlling contaminated spills/leaks to groundwater.
These activities constitute completion of the three required samples of radiological environmental monitoring program, as defined in Inspection Procedure 71124.07.  
  13 b. Findings  No findings were identified.  2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation (71124.08)  a. Inspection Scope  The inspectors evaluated the effectiveness of the licensee's programs for processing, handling, storage, and transportation of radioactive material.  The inspectors interviewed  
*  
Groundwater protection initiative (GPI) implementation, including assessment of  
groundwater monitoring results, identified leakage or spill events and entries  
made into 10 CFR 50.75 (g) records, licensee evaluations of the extent of the  
contamination and the radiological source term, and reports of events associated  
with spills, leaks, and groundwater monitoring results.  
   
*  
Problem identification and resolution for the radiological environmental  
monitoring program.  The inspectors reviewed audits, self-assessments, and  
corrective action program documents to verify problems were being identified  
and properly addressed for resolution.  
   
These activities constitute completion of the three required samples of radiological  
environmental monitoring program, as defined in Inspection Procedure 71124.07.  
 
13  
b.  
Findings  
   
No findings were identified.  
   
2RS8  
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,  
and Transportation (71124.08)  
   
a.  
Inspection Scope  
   
The inspectors evaluated the effectiveness of the licensees programs for processing,  
handling, storage, and transportation of radioactive material.  The inspectors interviewed  
licensee personnel and reviewed the following items:  
licensee personnel and reviewed the following items:  
  * Radioactive material storage, including waste storage areas including container labeling/marking and monitoring containers for deformation or signs of waste decomposition.  * Radioactive waste system, including walk-downs of the accessible portions of the radioactive waste processing systems and handling equipment.  The inspectors also reviewed or observed changes made to the radioactive waste processing  
   
*  
Radioactive material storage, including waste storage areas including container  
labeling/marking and monitoring containers for deformation or signs of waste  
decomposition.  
   
*  
Radioactive waste system, including walk-downs of the accessible portions of the  
radioactive waste processing systems and handling equipment.  The inspectors  
also reviewed or observed changes made to the radioactive waste processing  
systems, methods for dewatering and waste stabilization, waste stream mixing  
systems, methods for dewatering and waste stabilization, waste stream mixing  
methodology, and waste processing equipment that was not operational or  
methodology, and waste processing equipment that was not operational or  
abandoned in place.   * Waste characterization and classification, including radio-chemical sample analysis results for radioactive waste streams and use of scaling factors and calculations to account for difficult-to-measure radionuclides, and processes for  
abandoned in place.
*  
Waste characterization and classification, including radio-chemical sample  
analysis results for radioactive waste streams and use of scaling factors and  
calculations to account for difficult-to-measure radionuclides, and processes for  
waste classification including use of scaling factors and 10 CFR Part 61  
waste classification including use of scaling factors and 10 CFR Part 61  
analyses.  
analyses.  
  * Shipment preparation, including packaging, surveying, labeling, marking, placarding, vehicle checking, driver instructing, and preparation of the disposal manifests.  * Shipping records for LSA I, II, III, SCOI, II, Type A, or Type B radioactive material or radioactive waste shipments.   * Problem identification and resolution for radioactive solid waste processing and radioactive material handling, storage, and transportation.  The inspectors reviewed audits, self-assessments, and corrective action program documents to  
   
verify problems were being identified and properly addressed for resolution.  These activities constitute completion of the six required samples of radioactive solid waste processing, and radioactive material handling, storage, and transportation  
*  
Shipment preparation, including packaging, surveying, labeling, marking,  
placarding, vehicle checking, driver instructing, and preparation of the disposal  
manifests.  
   
*  
Shipping records for LSA I, II, III, SCOI, II, Type A, or Type B radioactive material  
or radioactive waste shipments.
*  
Problem identification and resolution for radioactive solid waste processing and  
radioactive material handling, storage, and transportation.  The inspectors  
reviewed audits, self-assessments, and corrective action program documents to  
verify problems were being identified and properly addressed for resolution.  
   
These activities constitute completion of the six required samples of radioactive solid  
waste processing, and radioactive material handling, storage, and transportation  
program, as defined in Inspection Procedure 71124.08.  
program, as defined in Inspection Procedure 71124.08.  
  b. Findings  No findings were identified.  
   
  14 4. OTHER ACTIVITIES   
b.  
4OA6 Meetings, Including Exit   Exit Meeting Summary   
Findings  
   
No findings were identified.
 
14  
4.  
OTHER ACTIVITIES  
   
4OA6 Meetings, Including Exit
Exit Meeting Summary  
   
On July 14, 2017, the inspectors presented the radiation safety inspection results to  
On July 14, 2017, the inspectors presented the radiation safety inspection results to  
Mr. E. Larson, Site Vice President, and other members of the licensee staff.  The licensee  
Mr. E. Larson, Site Vice President, and other members of the licensee staff.  The licensee  
acknowledged the issues presented.  The licensee confirmed that any proprietary information reviewed by the inspectors had been returned or destroyed.  
acknowledged the issues presented.  The licensee confirmed that any proprietary information  
  Attachment 1 SUPPLEMENTAL INFORMATION  KEY POINTS OF CONTACT   Licensee Personnel    
reviewed by the inspectors had been returned or destroyed.  
 
Attachment 1  
SUPPLEMENTAL INFORMATION  
   
KEY POINTS OF CONTACT
Licensee Personnel  
J. Ashley, Environmental Specialist, Chemistry  
J. Ashley, Environmental Specialist, Chemistry  
R. Benson, Acting Manager, Radiation Protection  
R. Benson, Acting Manager, Radiation Protection  
D. Byers, Manager, System Engineering R. Gaston, Director, Corporate Licensing M. Giacini, General Manager, Plant Operations  
D. Byers, Manager, System Engineering  
R. Gaston, Director, Corporate Licensing  
M. Giacini, General Manager, Plant Operations  
A. Hasanat, Licensing Engineer, Regulatory Assurance  
A. Hasanat, Licensing Engineer, Regulatory Assurance  
J. Hallanbeck, Design Manager, Engineering E. Larson, Site Vice President M. Larson, Supervisor, Radiation Protection K. Long, Shipper, Radwaste J. Reese, Specialist, Chemistry T. Reeves, Supervisor, Chemistry  
J. Hallanbeck, Design Manager, Engineering  
E. Larson, Site Vice President  
M. Larson, Supervisor, Radiation Protection  
K. Long, Shipper, Radwaste  
J. Reese, Specialist, Chemistry  
T. Reeves, Supervisor, Chemistry  
F. Rosser, Specialist, Radiation Protection  
F. Rosser, Specialist, Radiation Protection  
P. Stokes, Support Supervisor, Radiation Protection S. Sweet, Licensing Engineer, Regulatory Assurance E. Wright, Supervisor, Radiation Protection  
P. Stokes, Support Supervisor, Radiation Protection  
S. Sweet, Licensing Engineer, Regulatory Assurance  
E. Wright, Supervisor, Radiation Protection  
J. Underwood, Manager, Chemistry  
J. Underwood, Manager, Chemistry  
   
   
NRC Personnel   
NRC Personnel  
   
N. Day, Resident Inspector  
N. Day, Resident Inspector  
R. Smith, Acting Senior Resident Inspector  
R. Smith, Acting Senior Resident Inspector  
M. Young, Senior Resident Inspector  
M. Young, Senior Resident Inspector  
S. Hedger, Emergency Preparedness Inspector  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED   Opened 05000416-2017012-01 VIO Failure to Correct Instrument Calibration Process in a Timely Manner (Section 2RS5)  Opened and Closed 05000416-2017012-02 FIN Failure to Operate the Gaseous Radwaste System Within Design Specifications (Section 2RS6)  Closed None   Discussed None  
S. Hedger, Emergency Preparedness Inspector  
  A1-2 LIST OF DOCUMENTS REVIEWED  Section 2RS5:  Radiation Monitoring Instrumentation  Procedures Number Title Revision 06-IC-1D17-R-1002 Main Steam Line High Radiation Monitor (PCIS) Calibration 108, 109 06-IC-1D21-R-1002 Containment/Drywell High Range Area Radiation Monitor Calibration 107, 108,109 08-S-07-83 Radiation Protection Instruction Operation and Calibration of the ND-9000 Whole Body  
   
Counter  10 EN-CY-102 Laboratory Analytical Quality Control 9 EN-FAP-RP-007 Operation of the RP Central Calibration Facility 2 EN-MA-105 Control of Measuring and Test Equipment (M&TE) 13 EN-RP-122 Alpha Monitoring 9 EN-RP-301 Radiation Protection Instrument Control 10 EN-RP-305 Source Maintenance  0 EN-RP-317 Central Calibration Facility 0  
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
EN-RP-317-08 Calibration of Portable Scalers  1  
EN-RP-317-09 Calibration of Dosimeters 2  
Opened  
EN-RP-317-10 Calibration of Portable Dose Rate Instrument 0 ODCM Offsite Dose Calculation Manual 39  Audits and Self-Assessments Number Title Date OL-GLO-2017-21 Self-Assessment of RP Instrumentation Program May 23, 2017 QA-14/15-201 5-GGN-1 QA Audit: Combined Radiation Protection and Radwaste November 16, 2015    
05000416-2017012-01  
  A1-3 Condition Reports (CR-GGNS-)  2015-01775 2015-01773 2015-02807 2015-01831 2015-01832 2016-01796 2016-04647 2016-05297 2016-08308 2016-09537 2016-09889 2017-00612 2017-04141 2017-04697 2017-06865 2017-06876     Installed Radiation Instrument Calibration Records W/O Number Title Date 52628844 Main Steam Line High Radiation Monitor (PCIS) Calibration - Channel A February 22, 2017 52637367 Containment/Drywell High Range Area Radiation Monitor Calibration - Channel A March 16, 2016  Portable Radiation Instrument Calibration Records Number Title Date ASC-001 Calibration Data Sheet:  SAC-4 March 28, 2017 CHP-C-015 Calibration Data Sheet:  Model 2000(43-10) Alpha Scaler  July 10 2017 CHP-C-022 Calibration Data Sheet:  iSolo Alpha Scaler April 27, 2017 CHP-CS-020 Calibration Data Sheet:  iSolo Alpha Scaler March 23, 2017 CHP-DR-283 Calibration Data Sheet:  TelePole June 13, 2017  
VIO  
HP-11431 Calibration Data Sheet:  RO-2 June 6, 2017  
Failure to Correct Instrument Calibration Process in a Timely  
HP-CS-004 Calibration Data Sheet:  Model BC-4 July 6, 2017  
Manner (Section 2RS5)  
HP-DR-563 Calibration Data Sheet:  Model 9-3 December 12, 2016HP-DR-563 Calibration Data Sheet:  Ludlum Model-9-3 July 11, 2017 HP-DS-054 Calibration Data Sheet:  Model SAC-4 July 10, 2017  
   
RAM-001 Calibration Data Sheet:  AMP-100 March 12, 2017  Stationary Radiation Instrument Calibration Records Number Title Date 400-10-17-005 Germanium Detector No. 3 Calibration Package March 23, 2017 400-11-17-005 Germanium Detector No. 4 Calibration Package March 22, 2017 400-9-17-002 Germanium Detector No. 2 Calibration Package March 15, 2017   
Opened and Closed  
  A1-4 Stationary Radiation Instrument Calibration Records Number Title Date Apex-InVivo Analysis Report Calibration Check Count of People Mover Whole Body Monitor July 12, 2017 Canberra Calibration of the Canberra/Nuclear Data People Mover WBC System at Entergy Grand Gulf Nuclear  
05000416-2017012-02  
Station  August 8, 2015  Other Radiation Protection Instrument Records Number Title Date CHP-DR-326 Instrument Response Check Failure Review  January 13, 2017 CHP-TEL039 Instrument Response Check Failure Review  May 15, 2017  
FIN  
CHP-TEL044 Instrument Response Check Failure Review  March 1, 2017  
Failure to Operate the Gaseous Radwaste System Within Design  
HP-11431 Maintenance Data Sheet:  Failed Calibration Check April 10, 2017  Miscellaneous Documents Number Title Date 201512044 Central Radiation Protection Maintenance Data Sheet December 10, 2015201706-012 Entergy Operations, Inc., Portable Instruments to Waterford-3 RP June 19, 2017 3751 Laboratory Standard Calibration/Verification Data: V-570 Meter July 9, 2015 AO-987 Amersham Source Decay Data Sheet January 26, 2017 AO-988 Amersham Source Decay Data Sheet  January 26, 2017  
Specifications (Section 2RS6)  
ERIC Report Instrument Status Report Calibration Needed for GGNS July 11, 2017 JLS-8254 Source Verification of Source J.L. Shephard Calibrator S/N SRC-1993003 Model-89 (400) Cs-137 Sealed  
   
Sources at Set Positions October 13, 2015 MP-141 AEA Technology Source Decay Sheet January 26, 2017 MP-158 AEA Technology Source Decay Sheet January 26, 2017  
Closed  
  A1-5 Section 2RS6:  Radioactive Gaseous and Liquid Effluent Treatment  Procedures Number Title Revision 04-1-01-N65-1-SU System Operating Instruction Offgas Vault Refrigeration 033 06-CH-1000-M-0049 Effluent Dose Calculations 104 06-CH-1D17-M-0003 Building Ventilation Gaseous Tritium 109  
None  
06-CH-1D17-M-0005 Building Ventilation Exhaust Gaseous Isotopic 109  
06-CH-1D17-M-0018 Gaseous Release Points - Particulate Alpha Activity 108 06-CH-1D17-W-0017 Gaseous Release Points - Iodines, Tritium and Particulates 106 06-CH-1T48-M-0037 Standby Gas Treatment Exhaust Gaseous Isotopic 107 06-CH-SG17-O-0045 Radwaste Release Post-Release Calculations 105 06-CH-SG17-P-0041 Radwaste Release Pre-Release Analysis 109 06-CH-SG17-Q-0044 Radwaste Release Quarterly Composite 103  
08-S-03-10 Chemistry Sampling Program 052  
08-S-03-22 Installed Radiation Monitoring System Alarm Setpoint Determination and Control 114 1-S-08-11 Radioactive Discharge Controls 114 EN-CY-108 Monitoring of Nonradioactive Systems 006  Audits and Self-Assessments Number Title Date LO-GLO-2016-0122 Pre-NRC RETS/ODCM Radiological Effluent Occurrences Assessment December 4, 2016  Teledyne Brown Engineering Environmental Services April 19, 2017 QA-2-6-2015-GGNS-1 GGNS Combined Chemistry Effluent and Environmental Monitoring (including ODCM and REMP) Program Audit  October 9, 2015  Condition Reports (CR-GGNS-) 2013-00450 2015-06763 2015-06764 2015-06982 2016-02468 2016-02688 2016-07187 2016-08307 2016-08308 2017-00051  
Discussed  
2017-00193 2017-00204 2017-00264 2017-00290 2017-00336 2017-00529 2017-03101 2017-03745 2017-04525 2017-05659 2017-06821 2017-06875    
None  
  A1-6 10 CFR 50.75(g) Condition Reports (CR-GGNS-) 2015-06763 2015-06764 2016-07187 2017-00336   Release Permits Liquid Releases     2015051 2015094 2016011 2016017 2016022 2016040 2016042 2016044 2016045 2016051  
2016073 2017009 2017018   In-Place Filter Testing Records Number System Train Test Date WO 46551718 Standby Gas Treatment B DOP & HEPA June 3, 2017 WO 52482060 Standby Gas Treatment A DOP & HEPA March 16, 2015 WO 52618801 Control Room Air / Standby Fresh Air A DOP & HEPA October 27, 2016 WO 52655772 Control Room Air / Standby Fresh Air B DOP & HEPA December 1, 2016 Miscellaneous Documents Number Title Revision Date  2014 Annual Radioactive Effluent Release Report April 27, 2015  2015 Annual Radioactive Effluent Release Report April 14, 2016  
  2016 Annual Radioactive Effluent Release Report April 25, 2017  
 
  Cross Contamination of Service Air System / CR-GGN-2017-00193 February 27, 2017 Grand Gulf Service Air System I.E. Bulletin 80-10 Bounding Evaluation for Contamination of a  
Nonradioactive System March 29, 2017  Nuclear Independent Oversight Functional Area Performance Report: Group B May 31, 2016  Offsite Dose Calculation Manual 39 1000-1-17-002 2016 Radiochemistry INTRALAB Cross-Check Results January 23, 2017 GNRO-2016/00039 Supplement to Grand Gulf Nuclear Station 2015 Annual Radioactive Effluent Release Report (ARERR) July 20, 2016 SD N64/N65 Grand Gulf Nuclear Station System Description 2 UFSAR Chapter 11 GGN Updated Final Safety Analysis Report 2016-00  
  A1-7 Section 2RS7:  Radiological Environmental Monitoring Program  Procedures Number Title Revision 06-EN-S000-V-0001 Surveillance Procedure Radiological Environmental Sampling 111 06-IC-SC84-SA-1003 Primary Tower Wind Speed/Direction, Air Temperature (T/dT) and Relative Humidity 106 07-S-53-C84-7 Backup Tower Wind/Speed/Direction and Air Temperature Calibration 0 08-S-04-964 Met Data Processing  2 ODCM Offsite Dose Calculation Manual 39  Audits and Self-Assessments Number Title Date LO-GLO-2015-00042 Focused Self-Assessment: Chemistry Groundwater/Environmental  
Programs November 18, 2015 2015 Environmental Dosimetry Company Quality Assurance Status Report February 29, 2016 2015 Teledyne Brown Engineering:  Environmental Services  
A1-2  
Quality Assurance Report May 9, 2016 2016 Environmental Dosimetry Company Quality Assurance Status Report March 8, 2017 2016 Teledyne Brown Engineering:  Environmental Services  
LIST OF DOCUMENTS REVIEWED  
Quality Assurance Report April 19, 2017  Condition Reports (CR-GGNS-) 2015-04675 2015-05753 2015-06263 2015-06763 2016-03213 2016-03475 2016-03825 2016-05543 2016-07187 2016-07747  
   
2016-08364 2016-09067 2017-00813 2017-00993 2017-01731  
Section 2RS5:  Radiation Monitoring Instrumentation  
2017-02633 2017-05447    
   
  A1-8 REMP Air Sampler Calibration Data  Number Title Date CHEM-001 LV-1D - Air Sampler (LOVOL) July 21, 2016 CHEM-002 LV-1D - Air Sampler (LOVOL) October 20, 2016 CHEM-003 LV-1D - Air Sampler (LOVOL) July 19, 2016  Meteorological Instrument Calibration Records W/O Number Title Date 52652328 Backup Meteorological Tower Instrument Calibration 07-S-53-C84-7 August 29, 2016 52692658 Primary Meteorological Tower Instrument Calibrations  
Procedures  
06-IC-SC84-SA-1003  August 2, 2016  Meteorological Data Number Title Date 2016 ODCM Annual Average Relative Concentration (/Q) and Relative Deposition (D/Q) March 2017 2016 Review of Grand Gulf Meteorological Data  March 9, 2017  Groundwater Protection Documents Number Title Revision / Date L71506 Groundwater Monitoring Report - January 2017 February 3, 2017 L71974 Groundwater Monitoring Report - February 2017 March 31, 2017 L72140 Groundwater Monitoring Report - March 2017 March 31, 2017 L72521 Groundwater Monitoring Report - April 2017 May 5, 2017  
Number  
R06045-0032-002 Groundwater Monitoring Plan 6  Miscellaneous Documents Number Title Date 2015 Annual Environmental Operating Report April 19, 2016 2016 Annual Environmental Operating Report April 27, 2017  
Title  
2016 Land Use Census December 16, 2016  
Revision  
2017-044 Licensing Basis Document Change Request (LBDCR) April 27, 2017   
06-IC-1D17-R-1002  
  A1-9  Section 2RS8:  Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage, and Transportation  Procedures   Number Title Revision EN-RW-101 Radioactive Waste Management 3  
Main Steam Line High Radiation Monitor  
EN-RW-102 Radioactive Shipping Procedure 15  
(PCIS) Calibration  
EN-RW-103 Radioactive Waste Tracking Procedure 4 EN-RW-104 Scaling Factors 13 EN-RW-105 Process Control Program 5  
108, 109  
EN-RW-106 Integrated Transportation Security Plan 6  
06-IC-1D21-R-1002  
04-S-01-G17-3 Radwaste Filters and Demineralizer 47  
Containment/Drywell High Range Area  
08-S-06-50 Radwaste Instruction:  Loading Radioactive Material 9 08-S-06-71 Radwaste Instruction: Sampling Procedures for Waste Classification 7 07-S-14-428 Operation and Maintenance of the TRI-NUC Underwater Filtration System 0 08-S-02-075 Radiation Protection Instruction - Coverage and Control of Refueling Operations and Movement of Irradiated Materials 16  Audits and Self-Assessments Number Title Date QA-1 4/15-2015-GGN-1 Combined Radiation Protection and Radwaste September 14, 2015  LO-GLO-2017-00022 Pre-NRC Inspection Module 71124-08 May 24, 2017  
Radiation Monitor Calibration  
LO-GLO-2015-00139 10 CFR Part 37 Materials Security Review January 8, 2016  Condition Reports (CR-HQN-) 2015-00747 2017-00904   Condition Reports (CR-GGNS-) 2015-00231 2015-05082 2016-00319 2016-00320 2016-00801 2016-00804 2016-00805 2016-00809 2016-04376 2017-00101  
107, 108,109  
2017-00106 2017-01568 2017-01625 2017-01644 2017-04789 2017-05552 2017-06772 2017-06779    
08-S-07-83  
  A1-10 Radioactive Material and Waste Shipments Number Title Date GGN-2017-0101 CFFF Filters - LSA-II January 12, 2017 GGN-2017-0102 CRD-CRDM- LSA-II January 13, 2017 GGN-2017-0106 CPS Powdex Liner January 20, 2017  
Radiation Protection Instruction Operation  
GGN-2016-0319 WMG Sealands March 16, 2016  
and Calibration of the ND-9000 Whole Body  
GGN-2016-0320 Suppression Pool Filter Liners March 21, 2016  
Counter   
GGN-2016-0324 5 Type A GE Boxes March 23, 2016  
10  
GGN-2015-0801 RWCU-A Liner - Type B August  3, 2017 GGN-2015-0805 RWCU-A Liner - Type B August  3, 2017 GGN-2015-0809 RWCU-A Liner - Type B August 16, 2017  Miscellaneous Documents Number Title Date OE-NOE-2016-00 NRC-RIS-2016-11 November 30, 2016 2017 RW/RAM Shipping Log January 1, 2017  
EN-CY-102  
2016 RW/RAM Shipping Log January 1, 2016  
Laboratory Analytical Quality Control  
2015 RW/RAM Shipping Log January 1, 2015  
9  
UFSAR Chapter 11 GGN Updated Final Safety Analysis Report 2016  
EN-FAP-RP-007  
  Management Standard No. 36 April 25, 2017  Monitoring & Responding to Dose Rates on the Fuel Pools April 14, 2016  2015 Annual Radioactive Effluent Release Report April 25, 2017  2016 Annual Radioactive Effluent Release Report June 13, 2017  Radioactive Material Storage Container Tracking Sheets    
Operation of the RP Central Calibration  
  Attachment 2 The following items are requested for the Occupational/Public Radiation Safety Inspection at Grand Gulf Nuclear Station July 10 to 14, 2017 Integrated Report 2017007  Inspection areas are listed in the attachments below.  
Facility  
Please provide the requested information on or before June 14, 2017.  Please submit this information using the same lettering system as below.  For example, all  
2  
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled "1- A," applicable organization charts in file/folder "1- B," etc.  If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the inspectors will have access to the  
EN-MA-105  
information while writing the report.  In addition to the corrective action document lists provided for each inspection procedure listed  
Control of Measuring and Test Equipment  
below, please provide updated lists of corrective action documents at the entrance meeting.  The dates for these lists should range from the end dates of the original lists to the day of the  
(M&TE)  
13  
EN-RP-122  
Alpha Monitoring  
9  
EN-RP-301  
Radiation Protection Instrument Control  
10  
EN-RP-305  
Source Maintenance   
0  
EN-RP-317  
Central Calibration Facility  
0  
EN-RP-317-08  
Calibration of Portable Scalers   
1  
EN-RP-317-09  
Calibration of Dosimeters  
2  
EN-RP-317-10  
Calibration of Portable Dose Rate Instrument 0  
ODCM  
Offsite Dose Calculation Manual  
39  
   
Audits and Self-Assessments  
Number  
Title  
Date  
OL-GLO-2017-21  
Self-Assessment of RP Instrumentation  
Program  
May 23, 2017  
QA-14/15-201 5-GGN-1 QA Audit: Combined Radiation Protection and  
Radwaste  
November 16, 2015  
 
A1-3  
Condition Reports (CR-GGNS-)  
   
2015-01775  
2015-01773  
2015-02807  
2015-01831  
2015-01832  
2016-01796  
2016-04647  
2016-05297  
2016-08308  
2016-09537  
2016-09889  
2017-00612  
2017-04141  
2017-04697  
2017-06865  
2017-06876  
Installed Radiation Instrument Calibration Records  
W/O Number  
Title  
Date  
52628844  
Main Steam Line High Radiation Monitor (PCIS)  
Calibration - Channel A  
February 22, 2017  
52637367  
Containment/Drywell High Range Area Radiation  
Monitor Calibration - Channel A  
March 16, 2016  
   
Portable Radiation Instrument Calibration Records  
Number  
Title  
Date  
ASC-001  
Calibration Data Sheet:  SAC-4  
March 28, 2017  
CHP-C-015  
Calibration Data Sheet:  Model 2000(43-10) Alpha  
Scaler   
July 10 2017  
CHP-C-022  
Calibration Data Sheet:  iSolo Alpha Scaler  
April 27, 2017  
CHP-CS-020  
Calibration Data Sheet:  iSolo Alpha Scaler  
March 23, 2017  
CHP-DR-283  
Calibration Data Sheet:  TelePole  
June 13, 2017  
HP-11431  
Calibration Data Sheet:  RO-2  
June 6, 2017  
HP-CS-004  
Calibration Data Sheet:  Model BC-4  
July 6, 2017  
HP-DR-563  
Calibration Data Sheet:  Model 9-3  
December 12, 2016
HP-DR-563  
Calibration Data Sheet:  Ludlum Model-9-3  
July 11, 2017  
HP-DS-054  
Calibration Data Sheet:  Model SAC-4  
July 10, 2017  
RAM-001  
Calibration Data Sheet:  AMP-100  
March 12, 2017  
   
Stationary Radiation Instrument Calibration Records  
Number  
Title  
Date  
400-10-17-005  
Germanium Detector No. 3 Calibration Package  
March 23, 2017  
400-11-17-005  
Germanium Detector No. 4 Calibration Package  
March 22, 2017  
400-9-17-002  
Germanium Detector No. 2 Calibration Package  
March 15, 2017  
 
   
A1-4  
Stationary Radiation Instrument Calibration Records  
Number  
Title  
Date  
Apex-InVivo  
Analysis Report Calibration Check Count of People  
Mover Whole Body Monitor  
July 12, 2017  
Canberra  
Calibration of the Canberra/Nuclear Data People  
Mover WBC System at Entergy Grand Gulf Nuclear  
Station   
August 8, 2015  
   
Other Radiation Protection Instrument Records  
Number  
Title  
Date  
CHP-DR-326  
Instrument Response Check Failure Review   
January 13, 2017  
CHP-TEL039  
Instrument Response Check Failure Review   
May 15, 2017  
CHP-TEL044  
Instrument Response Check Failure Review   
March 1, 2017  
HP-11431  
Maintenance Data Sheet:  Failed Calibration Check  
April 10, 2017  
   
Miscellaneous Documents  
Number  
Title  
Date  
201512044  
Central Radiation Protection Maintenance Data Sheet December 10, 2015
201706-012  
Entergy Operations, Inc., Portable Instruments to  
Waterford-3 RP  
June 19, 2017  
3751  
Laboratory Standard Calibration/Verification Data:  
V-570 Meter  
July 9, 2015  
AO-987  
Amersham Source Decay Data Sheet  
January 26, 2017  
AO-988  
Amersham Source Decay Data Sheet   
January 26, 2017  
ERIC Report  
Instrument Status Report Calibration Needed for  
GGNS  
July 11, 2017  
JLS-8254  
Source Verification of Source J.L. Shephard Calibrator  
S/N SRC-1993003 Model-89 (400) Cs-137 Sealed  
Sources at Set Positions  
October 13, 2015  
MP-141  
AEA Technology Source Decay Sheet  
January 26, 2017  
MP-158  
AEA Technology Source Decay Sheet  
January 26, 2017  
 
A1-5  
Section 2RS6:  Radioactive Gaseous and Liquid Effluent Treatment  
   
Procedures  
Number  
Title  
Revision  
04-1-01-N65-1-SU  
System Operating Instruction Offgas Vault  
Refrigeration  
033  
06-CH-1000-M-0049  
Effluent Dose Calculations  
104  
06-CH-1D17-M-0003  
Building Ventilation Gaseous Tritium  
109  
06-CH-1D17-M-0005  
Building Ventilation Exhaust Gaseous Isotopic  
109  
06-CH-1D17-M-0018  
Gaseous Release Points - Particulate Alpha  
Activity  
108  
06-CH-1D17-W-0017  
Gaseous Release Points - Iodines, Tritium and  
Particulates  
106  
06-CH-1T48-M-0037  
Standby Gas Treatment Exhaust Gaseous Isotopic 107  
06-CH-SG17-O-0045  
Radwaste Release Post-Release Calculations  
105  
06-CH-SG17-P-0041  
Radwaste Release Pre-Release Analysis  
109  
06-CH-SG17-Q-0044  
Radwaste Release Quarterly Composite  
103  
08-S-03-10  
Chemistry Sampling Program  
052  
08-S-03-22  
Installed Radiation Monitoring System Alarm  
Setpoint Determination and Control  
114  
1-S-08-11  
Radioactive Discharge Controls  
114  
EN-CY-108  
Monitoring of Nonradioactive Systems  
006  
   
Audits and Self-Assessments  
Number  
Title  
Date  
LO-GLO-2016-0122  
Pre-NRC RETS/ODCM Radiological Effluent  
Occurrences Assessment  
December 4, 2016  
   
Teledyne Brown Engineering Environmental  
Services  
April 19, 2017  
QA-2-6-2015-GGNS-1 GGNS Combined Chemistry Effluent and  
Environmental Monitoring (including ODCM  
and REMP) Program Audit   
October 9, 2015  
   
Condition Reports (CR-GGNS-)  
2013-00450  
2015-06763  
2015-06764  
2015-06982  
2016-02468  
2016-02688  
2016-07187  
2016-08307  
2016-08308  
2017-00051  
2017-00193  
2017-00204  
2017-00264  
2017-00290  
2017-00336  
2017-00529  
2017-03101  
2017-03745  
2017-04525  
2017-05659  
2017-06821  
2017-06875  
 
A1-6
10 CFR 50.75(g) Condition Reports (CR-GGNS-)  
2015-06763  
2015-06764  
2016-07187  
2017-00336  
Release Permits  
Liquid Releases  
2015051  
2015094  
2016011  
2016017  
2016022  
2016040  
2016042  
2016044  
2016045  
2016051  
2016073  
2017009  
2017018  
In-Place Filter Testing Records  
Number  
System  
Train  
Test  
Date  
WO 46551718  
Standby Gas Treatment  
B  
DOP & HEPA  
June 3, 2017  
WO 52482060  
Standby Gas Treatment  
A  
DOP & HEPA  
March 16, 2015  
WO 52618801  
Control Room Air / Standby  
Fresh Air  
A  
DOP & HEPA  
October 27, 2016  
WO 52655772  
Control Room Air / Standby  
Fresh Air  
B  
DOP & HEPA  
December 1, 2016
Miscellaneous Documents  
Number  
Title  
Revision  
Date  
   
2014 Annual Radioactive Effluent Release Report  
April 27, 2015  
   
2015 Annual Radioactive Effluent Release Report  
April 14, 2016  
   
2016 Annual Radioactive Effluent Release Report  
April 25, 2017  
   
Cross Contamination of Service Air System / CR-
GGN-2017-00193  
February 27, 2017
Grand Gulf Service Air System I.E. Bulletin 80-10  
Bounding Evaluation for Contamination of a  
Nonradioactive System  
March 29, 2017  
   
Nuclear Independent Oversight Functional Area  
Performance Report: Group B  
May 31, 2016  
   
Offsite Dose Calculation Manual  
39  
1000-1-17-002  
2016 Radiochemistry INTRALAB Cross-Check  
Results  
January 23, 2017  
GNRO-2016/00039  
Supplement to Grand Gulf Nuclear Station 2015  
Annual Radioactive Effluent Release Report (ARERR)  
July 20, 2016  
SD N64/N65  
Grand Gulf Nuclear Station System Description  
2  
UFSAR Chapter 11  
GGN Updated Final Safety Analysis Report  
2016-00  
 
A1-7  
Section 2RS7:  Radiological Environmental Monitoring Program  
   
Procedures  
Number  
Title  
Revision  
06-EN-S000-V-0001  
Surveillance Procedure Radiological  
Environmental Sampling  
111  
06-IC-SC84-SA-1003 Primary Tower Wind Speed/Direction, Air  
Temperature (T/dT) and Relative Humidity  
106  
07-S-53-C84-7  
Backup Tower Wind/Speed/Direction and Air  
Temperature Calibration  
0  
08-S-04-964  
Met Data Processing  
   
2  
ODCM  
Offsite Dose Calculation Manual  
39  
   
Audits and Self-Assessments  
Number  
Title  
Date  
LO-GLO-2015-00042  
Focused Self-Assessment:  
Chemistry Groundwater/Environmental  
Programs  
November 18, 2015  
2015  
Environmental Dosimetry Company  
Quality Assurance Status Report  
February 29, 2016  
2015  
Teledyne Brown Engineering:   
Environmental Services  
Quality Assurance Report  
May 9, 2016  
2016  
Environmental Dosimetry Company  
Quality Assurance Status Report  
March 8, 2017  
2016  
Teledyne Brown Engineering:   
Environmental Services  
Quality Assurance Report  
April 19, 2017  
   
Condition Reports (CR-GGNS-)  
2015-04675  
2015-05753  
2015-06263  
2015-06763  
2016-03213  
2016-03475  
2016-03825  
2016-05543  
2016-07187  
2016-07747  
2016-08364  
2016-09067  
2017-00813  
2017-00993  
2017-01731  
2017-02633  
2017-05447  
 
A1-8  
REMP Air Sampler Calibration Data   
Number  
Title  
Date  
CHEM-001  
LV-1D - Air Sampler (LOVOL)  
July 21, 2016  
CHEM-002  
LV-1D - Air Sampler (LOVOL)  
October 20, 2016  
CHEM-003  
LV-1D - Air Sampler (LOVOL)  
July 19, 2016  
   
Meteorological Instrument Calibration Records  
W/O Number  
Title  
Date  
52652328  
Backup Meteorological Tower Instrument  
Calibration  
07-S-53-C84-7  
August 29, 2016  
52692658  
Primary Meteorological Tower Instrument  
Calibrations  
06-IC-SC84-SA-1003   
August 2, 2016  
   
Meteorological Data  
Number  
Title  
Date  
2016  
ODCM Annual Average Relative Concentration  
(/Q) and Relative Deposition (D/Q)  
March 2017  
2016  
Review of Grand Gulf Meteorological Data   
March 9, 2017  
   
Groundwater Protection Documents  
Number  
Title  
Revision / Date  
L71506  
Groundwater Monitoring Report - January 2017  
February 3, 2017  
L71974  
Groundwater Monitoring Report - February 2017  
March 31, 2017  
L72140  
Groundwater Monitoring Report - March 2017  
March 31, 2017  
L72521  
Groundwater Monitoring Report - April 2017  
May 5, 2017  
R06045-0032-002 Groundwater Monitoring Plan  
6  
   
Miscellaneous Documents  
Number  
Title  
Date  
2015  
Annual Environmental Operating Report  
April 19, 2016  
2016  
Annual Environmental Operating Report  
April 27, 2017  
2016  
Land Use Census  
December 16, 2016  
2017-044  
Licensing Basis Document Change Request  
(LBDCR)  
April 27, 2017  
 
   
A1-9  
   
Section 2RS8:  Radioactive Solid Waste Processing, and Radioactive Material Handling,  
Storage, and Transportation  
   
Procedures  
Number  
Title  
Revision  
EN-RW-101  
Radioactive Waste Management  
3  
EN-RW-102  
Radioactive Shipping Procedure  
15  
EN-RW-103  
Radioactive Waste Tracking Procedure  
4  
EN-RW-104  
Scaling Factors  
13  
EN-RW-105  
Process Control Program  
5  
EN-RW-106  
Integrated Transportation Security Plan  
6  
04-S-01-G17-3  
Radwaste Filters and Demineralizer  
47  
08-S-06-50  
Radwaste Instruction:  Loading Radioactive  
Material  
9  
08-S-06-71  
Radwaste Instruction: Sampling  
Procedures for Waste Classification  
7  
07-S-14-428  
Operation and Maintenance of the TRI-
NUC Underwater Filtration System  
0  
08-S-02-075  
Radiation Protection Instruction - Coverage  
and Control of Refueling Operations and  
Movement of Irradiated Materials  
16  
   
Audits and Self-Assessments  
Number  
Title  
Date  
QA-1 4/15-2015-GGN-1  
Combined Radiation Protection and  
Radwaste  
September 14, 2015  
   
LO-GLO-2017-00022  
Pre-NRC Inspection Module 71124-08  
May 24, 2017  
LO-GLO-2015-00139  
10 CFR Part 37 Materials Security Review  
January 8, 2016  
   
Condition Reports (CR-HQN-)  
2015-00747  
2017-00904  
Condition Reports (CR-GGNS-)  
2015-00231  
2015-05082  
2016-00319  
2016-00320  
2016-00801  
2016-00804  
2016-00805  
2016-00809  
2016-04376  
2017-00101  
2017-00106  
2017-01568  
2017-01625  
2017-01644  
2017-04789  
2017-05552  
2017-06772  
2017-06779  
 
A1-10  
Radioactive Material and Waste Shipments  
Number  
Title  
Date  
GGN-2017-0101  
CFFF Filters - LSA-II  
January 12, 2017  
GGN-2017-0102  
CRD-CRDM- LSA-II  
January 13, 2017  
GGN-2017-0106  
CPS Powdex Liner  
January 20, 2017  
GGN-2016-0319  
WMG Sealands  
March 16, 2016  
GGN-2016-0320  
Suppression Pool Filter Liners  
March 21, 2016  
GGN-2016-0324  
5 Type A GE Boxes  
March 23, 2016  
GGN-2015-0801  
RWCU-A Liner - Type B  
August  3, 2017  
GGN-2015-0805  
RWCU-A Liner - Type B  
August  3, 2017  
GGN-2015-0809  
RWCU-A Liner - Type B  
August 16, 2017  
   
Miscellaneous Documents  
Number  
Title  
Date  
OE-NOE-2016-00  
NRC-RIS-2016-11  
November 30, 2016  
2017  
RW/RAM Shipping Log  
January 1, 2017  
2016  
RW/RAM Shipping Log  
January 1, 2016  
2015  
RW/RAM Shipping Log  
January 1, 2015  
UFSAR Chapter 11  
GGN Updated Final Safety Analysis Report  
2016  
   
Management Standard No. 36  
April 25, 2017  
   
Monitoring & Responding to Dose Rates on the  
Fuel Pools  
April 14, 2016  
   
2015 Annual Radioactive Effluent Release  
Report  
April 25, 2017  
   
2016 Annual Radioactive Effluent Release  
Report  
June 13, 2017  
   
Radioactive Material Storage Container  
Tracking Sheets  
 
Attachment 2  
The following items are requested for the  
Occupational/Public Radiation Safety Inspection  
at Grand Gulf Nuclear Station  
July 10 to 14, 2017  
Integrated Report 2017007  
   
Inspection areas are listed in the attachments below.
Please provide the requested information on or before June 14, 2017.  
   
Please submit this information using the same lettering system as below.  For example, all  
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled  
1- A, applicable organization charts in file/folder 1- B, etc.  
   
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at  
least 30 days later than the onsite inspection dates, so the inspectors will have access to the  
information while writing the report.  
   
In addition to the corrective action document lists provided for each inspection procedure listed  
below, please provide updated lists of corrective action documents at the entrance meeting.   
The dates for these lists should range from the end dates of the original lists to the day of the  
entrance meeting.  
entrance meeting.  
   
   
If more than one inspection procedure is to be conducted and the information requests appear  
If more than one inspection procedure is to be conducted and the information requests appear  
to be redundant, there is no need to provide duplicate copies.  Enter a note explaining in which file the information can be found.   
to be redundant, there is no need to provide duplicate copies.  Enter a note explaining in which  
file the information can be found.  
   
If you have any questions or comments, please contact Martin Phalen at (817) 200-1158 or  
If you have any questions or comments, please contact Martin Phalen at (817) 200-1158 or  
martin.phalen@nrc.gov.     PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.   
martin.phalen@nrc.gov.
  A2-2 5. Radiation Monitoring Instrumentation (71124.05) Date of Last Inspection: March 27, 2015  A. List of contacts and telephone numbers for the following areas: 1. Effluent monitor calibration 2. Radiation protection instrument calibration  
PAPERWORK REDUCTION ACT STATEMENT  
This letter does not contain new or amended information collection requirements subject  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information  
collection requirements were approved by the Office of Management and Budget,  
control number 3150-0011.  
 
   
A2-2  
5.  
Radiation Monitoring Instrumentation (71124.05)  
Date of Last Inspection:  
March 27, 2015  
   
A.  
List of contacts and telephone numbers for the following areas:  
1. Effluent monitor calibration  
2. Radiation protection instrument calibration  
3. Installed instrument calibrations  
3. Installed instrument calibrations  
4. Count room and Laboratory instrument calibrations B. Applicable organization charts C. Copies of audits, self-assessments, vendor or NUPIC audits for contractor support and LERs, written since date of last inspection, related to:  1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey instruments, electronic dosimeters, teledosimetry, personnel contamination monitors, or whole body counters  2. Installed radiation monitors D. Procedure index for: 1. Calibration, use and operation of continuous air monitors, criticality monitors, portable survey instruments, temporary area radiation monitors, electronic  
4. Count room and Laboratory instrument calibrations  
dosimeters, teledosimetry, personnel contamination monitors, and whole body counters. 2. Calibration of installed radiation monitors E. Please provide specific procedures related to the following areas noted below.  Additional Specific Procedures will be requested by number after the inspector reviews  
B.  
the procedure indexes.  1. Calibration of portable radiation detection instruments (for portable ion chambers) 2. Whole body counter calibration 3. Laboratory instrumentation quality control F. A summary list of corrective action documents (including corporate and sub-tiered systems) written since date of last inspection, related to the following programs: 1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey instruments, electronic dosimeters, teledosimetry, personnel contamination monitors, whole body counters,  2. Installed radiation monitors,   
Applicable organization charts  
C.  
Copies of audits, self-assessments, vendor or NUPIC audits for contractor support and  
LERs, written since date of last inspection, related to:   
1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey  
instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,  
or whole body counters   
2. Installed radiation monitors  
D.  
Procedure index for:  
1. Calibration, use and operation of continuous air monitors, criticality monitors,  
portable survey instruments, temporary area radiation monitors, electronic  
dosimeters, teledosimetry, personnel contamination monitors, and whole body  
counters.  
2. Calibration of installed radiation monitors  
E.  
Please provide specific procedures related to the following areas noted below.   
Additional Specific Procedures will be requested by number after the inspector reviews  
the procedure indexes.   
1. Calibration of portable radiation detection instruments (for portable ion chambers)  
2. Whole body counter calibration  
3. Laboratory instrumentation quality control  
F.  
A summary list of corrective action documents (including corporate and sub-tiered  
systems) written since date of last inspection, related to the following programs:  
1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey  
instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,  
whole body counters,   
2. Installed radiation monitors,   
3. Effluent radiation monitors  
3. Effluent radiation monitors  
4. Count room radiation instruments NOTE: The lists should indicate the significance level of each issue and the search criteria used.  Please provide in document formats which are "searchable" so that the inspector can perform word searches. G. Offsite dose calculation manual, technical requirements manual, or licensee controlled specifications, which lists the effluent monitors and calibration requirements. H. Current calibration data for the whole body counters.   
4. Count room radiation instruments  
  A2-3 I. Primary to secondary source calibration correlation for effluent monitors. J. A list of the point of discharge effluent monitors with the two most recent calibration dates and the work order numbers associated with the calibrations. K. Radiation Monitoring System health report for the previous 12 months  
NOTE: The lists should indicate the significance level of each issue and the search  
  A2-4 6. Radioactive Gaseous and Liquid Effluent Treatment (71124.06)  Date of Last Inspection: March 27, 2015  A. List of contacts and telephone numbers for the following areas: 1. Radiological effluent control 2. Engineered safety feature air cleaning systems B. Applicable organization charts  
criteria used.  Please provide in document formats which are searchable so that  
C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs written since date of last inspection, related to: 1.  Radioactive effluents 2.  Engineered Safety Feature Air cleaning systems D. Procedure indexes for the following areas 1.  Radioactive effluents 2.  Engineered Safety Feature Air cleaning systems E. Please provide specific procedures related to the following areas noted below.  Additional Specific Procedures will be requested by number after the inspector reviews  
the inspector can perform word searches.  
the procedure indexes.  1. Sampling of radioactive effluents 2. Sample analysis 3. Generating radioactive effluent release permits 4. Laboratory instrumentation quality control  
G.  
Offsite dose calculation manual, technical requirements manual, or licensee controlled  
specifications, which lists the effluent monitors and calibration requirements.  
H.  
Current calibration data for the whole body counters.  
 
   
A2-3  
I.  
Primary to secondary source calibration correlation for effluent monitors.  
J.  
A list of the point of discharge effluent monitors with the two most recent calibration  
dates and the work order numbers associated with the calibrations.  
K.  
Radiation Monitoring System health report for the previous 12 months  
 
A2-4  
6.  
Radioactive Gaseous and Liquid Effluent Treatment (71124.06)   
Date of Last Inspection:  
March 27, 2015  
   
A.  
List of contacts and telephone numbers for the following areas:  
1. Radiological effluent control  
2. Engineered safety feature air cleaning systems  
B.  
Applicable organization charts  
C.  
Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs  
written since date of last inspection, related to:  
1.  Radioactive effluents  
2.  Engineered Safety Feature Air cleaning systems  
D.  
Procedure indexes for the following areas  
1.  Radioactive effluents  
2.  Engineered Safety Feature Air cleaning systems  
E.  
Please provide specific procedures related to the following areas noted below.   
Additional Specific Procedures will be requested by number after the inspector reviews  
the procedure indexes.   
1. Sampling of radioactive effluents  
2. Sample analysis  
3. Generating radioactive effluent release permits  
4. Laboratory instrumentation quality control  
5. In-place testing of HEPA filters and charcoal adsorbers  
5. In-place testing of HEPA filters and charcoal adsorbers  
6. New or applicable procedures for effluent programs (e.g., including ground water monitoring programs) F. List of corrective action documents (including corporate and sub-tiered systems) written since date of last inspection, associated with: 1.  Radioactive effluents 2.  Effluent radiation monitors  
6. New or applicable procedures for effluent programs (e.g., including ground water  
3.  Engineered Safety Feature Air cleaning systems NOTE: The lists should indicate the significance level of each issue and the search criteria used.  Please provide in document formats which are "searchable" so that the inspector can perform word searches. G. 2015 and 2016 Annual Radioactive Effluent Release Report, or the two most recent reports. H. Current Copy of the Offsite Dose Calculation Manual  
monitoring programs)  
I. Copy of the 2015 and 2016 inter-laboratory comparison results for laboratory quality control performance of effluent sample analysis, or the two most recent results.  J. Effluent sampling schedule for the week of the inspection  
F.  
K. New entries into 10 CFR 50.75(g) files since date of last inspection   
List of corrective action documents (including corporate and sub-tiered systems) written  
  A2-5 L. Operations department (or other responsible dept.) log records for effluent monitors removed from service or out of service M. Listing or log of liquid and gaseous release permits since date of last inspection N. A list of the technical specification-required air cleaning systems with the two most recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal  
since date of last inspection, associated with:  
1.  Radioactive effluents  
2.  Effluent radiation monitors  
3.  Engineered Safety Feature Air cleaning systems  
NOTE: The lists should indicate the significance level of each issue and the search  
criteria used.  Please provide in document formats which are searchable so that  
the inspector can perform word searches.  
G.  
2015 and 2016 Annual Radioactive Effluent Release Report, or the two most recent  
reports.  
H.  
Current Copy of the Offsite Dose Calculation Manual  
I.  
Copy of the 2015 and 2016 inter-laboratory comparison results for laboratory quality  
control performance of effluent sample analysis, or the two most recent results.   
J.  
Effluent sampling schedule for the week of the inspection  
K.  
New entries into 10 CFR 50.75(g) files since date of last inspection  
 
   
A2-5  
L.  
Operations department (or other responsible dept.) log records for effluent monitors  
removed from service or out of service  
M.  
Listing or log of liquid and gaseous release permits since date of last inspection  
N.  
A list of the technical specification-required air cleaning systems with the two most  
recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal  
adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers  
adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers  
associated with the surveillances O. System Health Report for radiation monitoring instrumentation.  Also, please provide a specific list of all effluent radiation monitors that were considered inoperable for 7 days or more since November 2011.  If applicable, please provide the relative Special Report and condition report(s).  P. A list of all radiation monitors that are considered § 50.65/Maintenance Rule equipment.  
associated with the surveillances  
Q. A list of all significant changes made to the Gaseous and Liquid Effluent Process Monitoring System since the last inspection.  If applicable, please provide the corresponding UFSAR section in which this change was documented.  R.  A list of any occurrences in which a non-radioactive system was contaminated by a radioactive system.  Please include any relative condition report(s).  
O.  
  A2-6 7. Radiological Environmental Monitoring Program (71124.07)  Date of Last Inspection: March 27, 2015  A. List of contacts and telephone numbers for the following areas: 1. Radiological environmental monitoring 2. Meteorological monitoring B. Applicable organization charts  
System Health Report for radiation monitoring instrumentation.  Also, please provide a  
C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs written since date of last inspection, related to: 1. Radiological environmental monitoring program (including contractor environmental laboratory audits, if used to perform environmental program functions) 2. Environmental TLD processing facility  
specific list of all effluent radiation monitors that were considered inoperable for 7 days  
3. Meteorological monitoring program D. Procedure index for the following areas: 1. Radiological environmental monitoring program 2. Meteorological monitoring program E. Please provide specific procedures related to the following areas noted below.  Additional Specific Procedures will be requested by number after the inspector reviews  
or more since November 2011.  If applicable, please provide the relative Special Report  
the procedure indexes.  1. Environmental Program Description 2. Sampling, collection and preparation of environmental samples  
and condition report(s).   
P.  
A list of all radiation monitors that are considered § 50.65/Maintenance Rule equipment.  
Q.  
A list of all significant changes made to the Gaseous and Liquid Effluent Process  
Monitoring System since the last inspection.  If applicable, please provide the  
corresponding UFSAR section in which this change was documented.   
R.   
A list of any occurrences in which a non-radioactive system was contaminated by a  
radioactive system.  Please include any relative condition report(s).  
 
A2-6  
7.  
Radiological Environmental Monitoring Program (71124.07)   
Date of Last Inspection:  
March 27, 2015  
   
A.  
List of contacts and telephone numbers for the following areas:  
1. Radiological environmental monitoring  
2. Meteorological monitoring  
B.  
Applicable organization charts  
C.  
Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs  
written since date of last inspection, related to:  
1. Radiological environmental monitoring program (including contractor environmental  
laboratory audits, if used to perform environmental program functions)  
2. Environmental TLD processing facility  
3. Meteorological monitoring program  
D.  
Procedure index for the following areas:  
1. Radiological environmental monitoring program  
2. Meteorological monitoring program  
E.  
Please provide specific procedures related to the following areas noted below.   
Additional Specific Procedures will be requested by number after the inspector reviews  
the procedure indexes.   
1. Environmental Program Description  
2. Sampling, collection and preparation of environmental samples  
3. Sample analysis (if applicable)   
3. Sample analysis (if applicable)   
4. Laboratory instrumentation quality control  
4. Laboratory instrumentation quality control  
5. Procedures associated with the Offsite Dose Calculation Manual  
5. Procedures associated with the Offsite Dose Calculation Manual  
6. Appropriate QA Audit and program procedures, and/or sections of the station's QA manual (which pertain to the REMP) F. A summary list of corrective action documents (including corporate and sub-tiered systems) written since date of last inspection, related to the following programs: 1. Radiological environmental monitoring 2. Meteorological monitoring NOTE: The lists should indicate the significance level of each issue and the search criteria used.  Please provide in document formats which are "searchable" so that the inspector can perform word searches. G. Wind Rose data and evaluations used for establishing environmental sampling locations H. Copies of the 2 most recent calibration packages for the meteorological tower instruments  I. Copy of the 2015 and 2016 Annual Radiological Environmental Operating Report and Land Use Census, and current revision of the Offsite Dose Calculation Manual, or the two most recent reports.   
6. Appropriate QA Audit and program procedures, and/or sections of the stations QA  
  A2-7 J. Copy of the environmental laboratory's inter-laboratory comparison program results for 2015 and 2016, or the two most recent results, if not included in the annual radiological  
manual (which pertain to the REMP)  
environmental operating report K. Data from the environmental laboratory documenting the analytical detection sensitivities for the various environmental sample media (i.e., air, water, soil, vegetation, and milk) L. Quality Assurance audits (e.g., NUPIC) for contracted services   
F.  
M. Current NEI Groundwater Initiative Plan and status  
A summary list of corrective action documents (including corporate and sub-tiered  
N.  Technical requirements manual or licensee controlled specifications which lists the meteorological instruments calibration requirements O. A list of Regulatory Guides and/or NUREGs that you are currently committed to relative to the Radiological Environmental Monitoring Program.  Please include the revision  
systems) written since date of last inspection, related to the following programs:  
1. Radiological environmental monitoring  
2. Meteorological monitoring  
NOTE: The lists should indicate the significance level of each issue and the search  
criteria used.  Please provide in document formats which are searchable so that  
the inspector can perform word searches.  
G.  
Wind Rose data and evaluations used for establishing environmental sampling locations  
H.  
Copies of the 2 most recent calibration packages for the meteorological tower  
instruments   
I.  
Copy of the 2015 and 2016 Annual Radiological Environmental Operating Report and  
Land Use Census, and current revision of the Offsite Dose Calculation Manual, or the  
two most recent reports.  
 
   
A2-7  
J.  
Copy of the environmental laboratorys inter-laboratory comparison program results for  
2015 and 2016, or the two most recent results, if not included in the annual radiological  
environmental operating report  
K.  
Data from the environmental laboratory documenting the analytical detection sensitivities  
for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)  
L.  
Quality Assurance audits (e.g., NUPIC) for contracted services   
M.  
Current NEI Groundwater Initiative Plan and status  
N.   
Technical requirements manual or licensee controlled specifications which lists the  
meteorological instruments calibration requirements  
O.  
A list of Regulatory Guides and/or NUREGs that you are currently committed to relative  
to the Radiological Environmental Monitoring Program.  Please include the revision  
and/or date for the committed item and where this can be located in your current  
and/or date for the committed item and where this can be located in your current  
licensing basis/UFSAR.  P. If applicable, per NEI 07-07, provide any reports that document any spills/leaks to groundwater since the last inspection  
licensing basis/UFSAR.   
  A2-8 8. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage, and Transportation (71124.08)  Date of Last Inspection: March 27, 2015  A. List of contacts and telephone numbers for the following areas: 1. Solid Radioactive waste processing 2. Transportation of radioactive material/waste B. Applicable organization charts (and list of personnel involved in solid radwaste processing, transferring, and transportation of radioactive waste/materials) C. Copies of audits, department self-assessments, and LERs written since date of last inspection related to: 1. Solid radioactive waste management 2. Radioactive material/waste transportation program D. Procedure index for the following areas: 1. Solid radioactive waste management 2. Radioactive material/waste transportation  E. Please provide specific procedures related to the following areas noted below.  Additional Specific Procedures will be requested by number after the inspector reviews  
P.  
the procedure indexes.  1. Process control program 2. Solid and liquid radioactive waste processing   
If applicable, per NEI 07-07, provide any reports that document any spills/leaks to  
groundwater since the last inspection  
 
A2-8  
8.  
Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,  
and Transportation (71124.08)   
Date of Last Inspection:  
March 27, 2015  
   
A.  
List of contacts and telephone numbers for the following areas:  
1. Solid Radioactive waste processing  
2. Transportation of radioactive material/waste  
B.  
Applicable organization charts (and list of personnel involved in solid radwaste  
processing, transferring, and transportation of radioactive waste/materials)  
C.  
Copies of audits, department self-assessments, and LERs written since date of last  
inspection related to:  
1. Solid radioactive waste management  
2. Radioactive material/waste transportation program  
D.  
Procedure index for the following areas:  
1. Solid radioactive waste management  
2. Radioactive material/waste transportation   
E.  
Please provide specific procedures related to the following areas noted below.   
Additional Specific Procedures will be requested by number after the inspector reviews  
the procedure indexes.   
1. Process control program  
2. Solid and liquid radioactive waste processing   
3. Radioactive material/waste shipping   
3. Radioactive material/waste shipping   
4. Methodology used for waste concentration averaging, if applicable  
4. Methodology used for waste concentration averaging, if applicable  
5. Waste stream sampling and analysis F. A summary list of corrective action documents (including corporate and sub-tiered systems) written since date of last inspection related to: 1. Solid radioactive waste 2. Transportation of radioactive material/waste NOTE: The lists should indicate the significance level of each issue and the search criteria used.  Please provide in document formats which are "searchable" so that the inspector can perform word searches. G. Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing, packaging, and shipping. H. A summary of radioactive material and radioactive waste shipments made from date of last inspection to present I. Waste stream sample analyses results and resulting scaling factors for 2015 and 2016, or the two most recent results. J. Waste classification reports if performed by vendors (such as for irradiated hardware)   
5. Waste stream sampling and analysis  
  A2-9 K. A listing of all on-site radwaste storage facilities.  Please include a summary or listing of the items stored in each facility, including the total amount of radioactivity and the highest general area dose rate. Although it is not necessary to compile the following information, the inspector will also review: L. Training, and qualifications records of personnel responsible for the conduct of radioactive waste processing, package preparation, and shipping
F.  
A summary list of corrective action documents (including corporate and sub-tiered  
systems) written since date of last inspection related to:  
1. Solid radioactive waste  
2. Transportation of radioactive material/waste  
NOTE: The lists should indicate the significance level of each issue and the search  
criteria used.  Please provide in document formats which are searchable so that  
the inspector can perform word searches.  
G.  
Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing,  
packaging, and shipping.  
H.  
A summary of radioactive material and radioactive waste shipments made from date of  
last inspection to present  
I.  
Waste stream sample analyses results and resulting scaling factors for 2015 and 2016,  
or the two most recent results.  
J.  
Waste classification reports if performed by vendors (such as for irradiated hardware)  
 
   
A2-9  
K.  
A listing of all on-site radwaste storage facilities.  Please include a summary or listing of  
the items stored in each facility, including the total amount of radioactivity and the  
highest general area dose rate.  
Although it is not necessary to compile the following information, the inspector will also review:  
L.  
Training, and qualifications records of personnel responsible for the conduct of  
radioactive waste processing, package preparation, and shipping
}}
}}

Latest revision as of 12:51, 8 January 2025

NRC Radiation Protection Inspection Report 05000416/2017012 and Notice of Violation
ML17235B265
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/22/2017
From: Heather Gepford
Plant Support Branch-1
To: Emily Larson
Entergy Operations
References
IR 2017012
Download: ML17235B265 (36)


See also: IR 05000416/2017012

Text

August 22, 2017

Mr. Eric Larson, Site Vice President

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NRC RADIATION PROTECTION

INSPECTION REPORT 05000416/2017012 AND NOTICE OF VIOLATION

Dear Mr. Larson:

On July 14, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at

the Grand Gulf Nuclear Station and discussed the results of this inspection with you and other

members of your staff. The results of this inspection are documented in the enclosed report.

Based on the results of this inspection, the NRC has identified two issues that were evaluated

under the risk significance determination process as having very low safety significance

(Green). The NRC also determined that one violation is associated with these issues.

This violation was evaluated in accordance with the NRC Enforcement Policy. The

current Enforcement Policy is included in the NRCs Web site at http://www.nrc.gov/about-

nrc/regulatory/enforcement/enforce-pol.html. The violation is cited in the enclosed Notice of

Violation (Notice) and the circumstances surround it are described in detail in the subject

inspection report. The violation is being cited because this violation did not meet the criteria to

be treated as a non-cited violation because the licensee failed to restore compliance within a

reasonable period of time after it was identified.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. If you have additional information that you

believe the NRC should consider, you may provide it in your response to the Notice. The NRC

review of your response will also determine whether further enforcement action is necessary to

ensure your compliance with regulatory requirements.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a

regulatory requirement in this report, you should provide a response within 30 days of the date

of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory

Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the

Regional Administrator, Region IV; and the NRC resident inspector at the Grand Gulf Nuclear

Station.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

E. Larson

2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

made available for public inspection in the NRC Public Document Room from the NRCs Agency

wide Documents Access and Management System (ADAMS), accessible from the NRC Web

site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should

not include any personal, privacy, or proprietary information so that it can be made available to

the public without redaction.

Sincerely,

/RA/

Heather J. Gepford, Ph.D., CHP, Branch Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-416

License No. NPF-29

Enclosure:

Inspection Report 05000416/2017012

w/Attachments:

1. Supplemental Information

2. Request for Information

ML17235B265

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: HGepford

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

SHP:PSB2

HP:PSB2

HP:PSB2

SHP:RIII

C:PSB2

C:PSB2

NAME

LCarson

NGreene

JODonnell

TGo

HGepford

JKozal

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

8/17/17

8/17/17

8/17/17

8/17/17

8/17/17

8/22/17

OFFICE

ACES

C:PSB2

NAME

MHay

HGepford

SIGNATURE

/RA/

/RA/

DATE

8/22/17

8/22/17

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket:

05000416

Report:

05000416/2017012

Facility:

Grand Gulf Nuclear Station

Dates:

July 10 through July 14, 2017

Inspectors:

L. Carson II, Sr. Health Physicist

N. Greene, PhD, Health Physicist

J. ODonnell, CHP, Health Physicist

T. Go, Health Physicist (RIII)

Accompanied by S. Money, Health Physicist

Approved By:

Heather Gepford, PhD, CHP

Chief, Plant Support Branch 2

Division of Reactor Safety

2

NOTICE OF VIOLATION

Entergy Operations, Inc.

Docket No. 05000416

Grand Gulf Nuclear Station

License No. NPF-29

During an NRC inspection conducted from July 10-14, 2017, a violation of NRC requirements

was identified. In accordance with the NRC Enforcement Policy, the violation is listed below:

10 CFR 20.1501(c) requires, in part, that the licensee shall ensure that instruments and

equipment used for quantitative radiation measurements are calibrated periodically for

the radiation measured.

Contrary to the above, since January 1, 2012, the licensee failed to ensure that

instruments and equipment used for quantitative radiation measurements were

calibrated periodically for the radiation measured. Specifically, the licensee failed to

properly calibrate the containment/drywell high range radiation monitors and the main

steam line radiation monitors using industry accepted calibration methods and

tolerances.

This violation is associated with a Green SDP finding.

Pursuant to the provisions of 10 CFR 2.201, Entergy Operations, Inc., is hereby required to

submit a written statement or explanation to the U.S. Nuclear Regulatory Commission,

ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional

Administrator, Region IV, 1600 E. Lamar Blvd., Arlington, TX 76011, and a copy to the NRC

Resident Inspector at the Grand Gulf Nuclear Station, within 30 days of the date of the letter

transmitting this Notice of Violation (Notice). This reply should be clearly marked as a "Reply to

a Notice of Violation" and should include for the violation: (1) the reason for the violation or, if

contested, the basis for disputing the violation or severity level, (2) the corrective steps that

have been taken and the results achieved, (3) the corrective steps that will be taken, and

(4) the date when full compliance will be achieved. Your response may reference or include

previous docketed correspondence if the correspondence adequately addresses the required

response. If an adequate reply is not received within the time specified in this Notice, an order

or a Demand for Information may be issued as to why the license should not be modified,

suspended, or revoked, or why such other action as may be proper should not be taken. Where

good cause is shown, consideration will be given to extending the response time.

If you contest this enforcement action, you should also provide a copy of your response with the

basis for your denial, to the Director, Office of Enforcement, United States Nuclear Regulatory

Commission, Washington, DC 20555-0001.

Because your response will be made available electronically for public inspection in the

NRC Public Document Room or from the NRCs document system (ADAMS), accessible from

the NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should

not include any personal privacy, proprietary, or safeguards information so that it can be made

available to the public without redaction. If personal privacy or proprietary information is

necessary to provide an acceptable response, then please provide a bracketed copy of your

response that identifies the information that should be protected and a redacted copy of your

response that deletes such information. If you request withholding of such material, you must

specifically identify the portions of your response that you seek to have withheld and provide in

3

detail the bases for your claim of withholding (e.g., explain why the disclosure of information will

create an unwarranted invasion of personal privacy or provide the information required by

10 CFR 2.390(b) to support a request for withholding confidential commercial or financial

information). If Safeguards Information is necessary to provide an acceptable response, please

provide the level of protection described in 10 CFR 73.21.

In accordance with 10 CFR 19.11, you may be required to post this Notice within two working

days of receipt.

Dated this 22nd day of August 2017

4

SUMMARY

IR 05000416/2017012; 07/10/2017 - 07/14/2017; Grand Gulf Nuclear Station; Radiation

Monitoring Instrumentation (71124.05), Radioactive Gaseous and Liquid Effluent Treatment

(71124.06)

Cornerstone: Public Radiation Safety

Green. The inspectors identified a violation of 10 CFR 20.1501(c) for the failure

to properly calibrate installed radiation monitors using industry accepted calibration

methods and tolerances. Specifically, since January 2012, the licensee failed to

properly calibrate the following radiation monitors: main steam line, containment

high range, and the drywell high range. This violation was originally entered into

the licensees corrective action program in March 2015 as Condition

Report CR-GGNS-2015-01832. However, in 2017, inspectors determined that

subsequent to 2015, the licensee failed to implement corrective actions to properly

calibrate the instruments. The licensee entered this repetitive issue into their corrective

action process as Condition Report CR-GGN-2017-06826.

The failure to properly calibrate radiation monitors is a performance deficiency. The

performance deficiency is more than minor because it is associated with the cornerstone

attribute of plant instrumentation and adversely affects the cornerstone objective to

ensure adequate protection of employee health and safety during routine civilian nuclear

reactor operation and is therefore a finding. Specifically, the failure to properly calibrate

radiation monitors impacts the licensees ability to assess dose rates. Using Inspection

Manual Chapter 0609, Appendix C, Occupational Radiation Safety Significance

Determination Process, dated August 19, 2008, the inspectors determined the finding to

be of very low safety significance because it was not an as low as reasonably achievable

(ALARA) issue, there was no overexposure or substantial potential for overexposure,

and the licensees ability to assess dose was not compromised. This finding has a

cross-cutting aspect in the resources component of the Problem Identification and

Resolution area because the licensee did not ensure that effective corrective actions

were implemented to address issues in a timely manner commensurate with the safety

significance [P.3]. (Section 2RS5)

Green. The inspectors identified a finding associated with the licensees failure to

operate the gaseous radwaste system within design specifications. These deficiencies

in design specifications were associated with the off gas charcoal adsorber and vault

refrigeration components of the gaseous radwaste system, which has impacted the

systems reliability and efficiency since at least 2007. The design parameters for

offgas flow rate into the charcoal adsorbers and vault refrigeration temperature were

30 scfm and 0 degrees Fahrenheit, respectively. In contrast, the gaseous radwaste

system is being operated with an approximate flow rate is 80 scfm and vault refrigeration

temperature is 15 degrees Fahrenheit. The licensee has developed a system

improvement plan to address resolution of these issues during the next scheduled

outages. This performance deficiency was entered into the licensees corrective action

program as Condition Report CR-GGN-2017-06875.

5

The failure to operate the offgas gaseous radwaste system within design specifications,

resulting in elevated radiological effluent releases, is a performance deficiency. The

finding is more than minor because it is associated with the plant equipment attribute of

the Public Radiation Safety cornerstone and adversely affected the cornerstone

objective to ensure adequate protection of public health and safety from exposure of

radioactive materials released into the public domain as a result of routine civilian

nuclear plant operation. Using Inspection Manual Chapter 0609, Appendix D, Public

Radiation Safety Significance Determination Process, the finding was determined to be

of very low safety significance (Green) because it involved the Effluent Release

Program, it did not impair the ability to assess dose, and did not exceed the

10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits. The finding has a

cross-cutting aspect in the area of problem identification and resolution, associated with

the resolution component, because the licensee failed to take effective corrective actions

in a timely manner to minimize the unreliability and inefficiency of the gaseous radwaste

system [P.3]. (Section 2RS6)

6

REPORT DETAILS

2.

RADIATION SAFETY

Cornerstones: Public Radiation Safety and Occupational Radiation Safety

2RS5 Radiation Monitoring Instrumentation (71124.05)

a.

Inspection Scope

The inspectors evaluated the accuracy and operability of the radiation monitoring

equipment used by the licensee to monitor areas, materials, and workers to ensure a

radiologically safe work environment. This evaluation included equipment used to

monitor radiological conditions related to normal plant operations, anticipated operational

occurrences, and conditions resulting from postulated accidents. The inspectors

interviewed licensee personnel, walked down various portions of the plant, and reviewed

licensee performance associated with radiation monitoring instrumentation, as described

below:

The inspectors performed walk downs and observations of selected plant

radiation monitoring equipment and instrumentation, including portable survey

instruments, area radiation monitors, continuous air monitors, personnel

contamination monitors, portal monitors, and small article monitors. The

inspectors assessed material condition and operability, evaluated positioning of

instruments relative to the radiation sources or areas they were intended to

monitor, and verified performance of source checks and calibrations.

The inspectors evaluated the calibration and testing program, including

laboratory instrumentation, whole body counters, post-accident monitoring

instrumentation, portal monitors, personnel contamination monitors, small article

monitors, portable survey instruments, area radiation monitors, electronic

dosimetry, air samplers, and continuous air monitors.

The inspectors assessed problem identification and resolution for radiation

monitoring instrumentation. The inspectors reviewed audits, self-assessments,

and corrective action program documents to verify problems were being

identified and properly addressed for resolution.

These activities constitute completion of the three required samples of radiation

monitoring instrumentation, as defined in Inspection Procedure 71124.05.

b.

Findings

Introduction. The inspectors identified a violation of 10 CFR 20.1501(c) for the failure to

properly calibrate installed radiation monitors using industry accepted calibration

methods and tolerances. Specifically, the main steam line, containment high range, and

drywell high range radiation monitors have not been properly calibrated since at least

January 2012. This violation was originally entered into the licensees corrective action

program in March 2015 as Condition Report CR-GGNS-2015-01832. However, in 2017,

inspectors determined that the licensee failed to implement appropriate corrective

7

actions to properly calibrate the instruments. The licensee entered this repetitive issue

into their corrective action process as Condition Report CR-GGN-2017-06826.

Description. The failure to properly calibrate the main steam line and

containment/drywell high range area radiation monitors was previously identified

and documented as a non-cited violation during an inspection in March of 2015:

NCV 05000416/2015001-04, Failure to Properly Calibrate Main Steam Line Radiation

Monitors and Containment/Drywall High Range Radiation Monitors.

During this inspection, the inspectors reviewed the revised calibration procedures and

calibration data for main steam line, containment high range, and drywell high range

radiation monitors. The main steam line radiation monitors provide reactor operators

with early indication of gross release of fission products from the fuel. This monitor has

an automatic response function that isolates the reactor water sample line to limit the

release of radioactive materials. The containment high range and drywell high radiation

monitors provide reactor operators and emergency response organization members

information about the radiological conditions inside the containment building and the

drywell. This information is used to make informed decisions about what actions to take

during an accident as well as make emergency declarations. As such, it is important

that these radiation monitors be properly calibrated. However, it was determined that

the improper calibrations did not adversely affect the licensees ability to implement the

Emergency Plan.

Based on their review of the current revisions of the applicable procedures, corrective

action documents, and calibration data, the inspectors determined that the licensee had

not corrected the calibration method from the previous non-cited violation. The licensee

procedures did not address the required reproducible source-to-detector geometry or the

characterization of the calibration sources used. Additionally, because the main steam

line monitor calibration requires two different sources in the procedure, each source

should have been characterized in a reproducible geometry.

The licensee revised Procedure 06-IC-1D17-R-1002, Main Steam Line High Radiation

Monitor (PCIS) Calibration, Revision 109, on April 3, 2017. The previous revision (108)

was dated December 13, 2011. Section 5.37 of this procedure describes the radiation

calibration method. The calibration method, as described in this section, fails to employ

a reproducible geometry or calibrated radiation sources. Further, the calibration method,

as described in this section, only addresses calibration of two of the six decades of the

logarithmic monitor.

The licensee also revised Procedure 06-IC-1D21-R-1002, Containment/Drywell High

Range Area Radiation Monitor Calibration, Revision 108, on April 3, 2017. The

previous revision (107) was dated September 12, 2011. Section 5.87 describes the

radiation functional test portion of this procedure. The calibration method described in

this section fails to employ a reproducible geometry or a calibrated radiation source.

Further, the acceptance criteria in this section are twice that allowed in American

National Standards Institute (ANSI) N323D-2002, American National Standard for

Installed Radiation Protection Instrumentation, approved on September 3, 2002. In

addition, the electronic calibration method in this procedure as allowed by NUREG 0737,

Clarification of TMI Action Plan Requirements, dated November 1980, only addresses

calibration of three of the seven decades of the logarithmic monitor.

8

The inspectors concluded that the licensee had continued to improperly calibrate

these process radiation monitors since the previous inspection in March 2015.

Procedure 06-IC-1D17-R-1002 rocedure is used for all four channels of the main

steam line monitors and Procedure 06-IC-1D21-R-1002 is used for both channels of

the drywell and containment high range radiation monitors. Because both procedures

failed to use appropriate calibration methodologies, the inspectors determined that

none of the containment/drywell high range and main steam line radiation monitors

had been properly calibrated since at least the date of the procedure revisions,

September 12, 2011, and December 13, 2011, respectively.

In evaluating the underlying cause of the licensees failure to correct the calibration

issue, the inspectors noted the following. On January 20, 2017, a corrective action

document (CR-GGN-2017-00612) was initiated identifying a non-conforming condition of

a Condition Adverse to Quality that the calibration procedure for the containment high

range and drywell high radiation monitors does not control the source geometry to the

monitor. The CR further described the required calibration traceability not being

maintained. In the self-assessment report of the radiation protection instrument program

(OL-GLO-2017-21) completed on May 23, 2017, the assessment team rated Objective 2,

the review of the prior inspection report, as unsatisfactory. This rating was given

because actions related to this issue were not complete after a considerable amount of

time, which included at least five due date extensions and an extended outage that

should have allowed completion of the corrective action.

Analysis. The failure to properly calibrate radiation monitors is a performance

deficiency. The performance deficiency is more than minor because it is associated with

the cornerstone attribute of plant instrumentation and adversely affects the cornerstone

objective to ensure adequate protection of employee health and safety during routine

civilian nuclear reactor operation and is therefore a finding. Specifically, the failure to

properly calibrate radiation monitors impacts the licensees ability to assess dose rates.

Using Inspection Manual Chapter 0609, Appendix C, Occupational Radiation Safety

Significance Determination Process, dated August 19, 2008, the inspectors determined

the finding to be of very low safety significance because it was not an as low as

reasonably achievable (ALARA) issue, there was no overexposure or substantial

potential for overexposure, and the licensees ability to assess dose was not

compromised. This finding has a cross-cutting aspect in the area of problem

identification and resolution, associated with the resolution component, because the

licensee did not ensure that effective corrective actions were implemented to address

issues in a timely manner commensurate with the safety significance [P.3].

Enforcement. Title 10 CFR 20.1501(c) requires, in part, that the licensee shall

ensure that instruments and equipment used for quantitative radiation measurements

are calibrated periodically for the radiation measured. Contrary to the above, since at

least January 1, 2012, the licensee failed to ensure that instruments and equipment

used for quantitative radiation measurements were calibrated periodically for the

radiation measured. Specifically, the licensee failed to properly calibrate the

containment/drywell high range radiation monitors and the main steam line

radiation monitors using industry accepted calibration methods and tolerances.

This issue was entered into the licensees corrective action program as Condition

Report CR-GGN-2017-06826.

9

This issue was previously identified during an inspection in March of 2015, as

NCV 05000416/2015001-04 and was treated as a non-cited violation, consistent with

Section 2.3.2.a of the Enforcement Policy. Since the licensee did not restore

compliance in a reasonable period of time, this violation is being cited, consistent with

the NRC Enforcement Policy, Section 2.3.2, which states, in part, that the licensee must

restore compliance within a reasonable period of time (i.e., in a timeframe

commensurate with the significance of the violation) after a violation is identified. A

Notice of Violation is attached. VIO 05000416/2017012-01, Failure to Properly

Calibrate Installed Radiation Monitors Using Industry Accepted Calibration Methods and

Tolerances.

2RS6 Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

a.

Inspection Scope

The inspectors evaluated whether the licensee maintained gaseous and liquid effluent

processing systems and properly mitigated, monitored, and evaluated radiological

discharges with respect to public exposure. The inspectors verified that abnormal

radioactive gaseous or liquid discharges and conditions, when effluent radiation monitors

are out-of-service, were controlled in accordance with the applicable regulatory

requirements and licensee procedures. The inspectors verified that the licensees

quality control program ensured radioactive effluent sampling and analysis adequately

quantified and evaluated discharges of radioactive materials. The inspectors verified the

adequacy of public dose projections resulting from radioactive effluent discharges. The

inspectors interviewed licensee personnel and reviewed licensee performance in the

following areas:

During walk downs and observations of selected portions of the radioactive

gaseous and liquid effluent equipment, the inspectors evaluated routine

processing and discharge of effluents, including sample collection and analysis.

The inspectors observed equipment configuration and flow paths of selected

gaseous and liquid discharge system components, effluent monitoring systems,

filtered ventilation system material condition, and significant changes to effluent

release points.

Calibration and testing program for process and effluent monitors, including

National Institute of Standards and Technology traceability of sources, primary

and secondary calibration data, channel calibrations, set-point determination

bases, and surveillance test results.

Sampling and analysis controls used to ensure representative sampling and

appropriate compensatory sampling. Reviews included results of the inter-

laboratory comparison program,

Instrumentation and equipment, including effluent flow measuring instruments, air

cleaning systems, and post-accident effluent monitoring instruments.

Dose calculations for effluent releases. The inspectors reviewed a selection of

radioactive liquid and gaseous waste discharge permits and abnormal gaseous

or liquid tank discharges, and verified the projected doses were accurate. The

10

inspectors also reviewed 10 CFR Part 61 analyses and methods used to

determine which isotopes were included in the source term. The inspectors

reviewed land use census results, offsite dose calculation manual changes, and

significant changes in reported dose values from previous years.

Problem identification and resolution for radioactive gaseous and liquid effluent

treatment. The inspectors reviewed audits, self-assessments, and corrective

action program documents to verify problems were being identified and properly

addressed for resolution.

These activities constitute completion of the six required samples of radioactive gaseous

and liquid effluent treatment program, as defined in Inspection Procedure 71124.06.

b.

Findings

Introduction. The inspectors identified a Green finding for the licensees failure to

operate their gaseous radwaste system within design specifications, resulting in elevated

radiological effluent releases that were not as low as reasonably achievable. These

deficiencies in meeting the design specifications/parameters are associated with the

offgas charcoal adsorber and vault refrigeration components of the offgas system, which

have impacted the systems reliability and efficiency since at least 2007.

Description. When reviewing the licensees annual effluent release reports, the

inspectors identified that in calendar year 2013, the licensee had total airborne releases

of fission and activation gases of 1920 curies (Ci), including a peak release of 1540 Ci

during the third quarter. The inspectors noted that this annual gaseous release was

significantly higher than the previous annual releases of approximately 450 Ci in

calendar years 2010 thru 2012. The licensee stated the primary reason for the elevated

activity of gaseous releases was associated with refrigeration equipment issues affecting

charcoal adsorption efficiency. Upon further evaluation, NRC inspectors determined that

such issues with the charcoal adsorbers and vault refrigeration systems were long-term,

ongoing, unresolved deficiencies in the gaseous radwaste system primarily due to

numerous condenser in-leakages that remain unrepaired.

The Grand Gulf Nuclear Station System Description, Revision 2, for the gaseous

radwaste system notes that there are two sets of four charcoal adsorber vessels

arranged in series, totaling eight charcoal adsorber beds. As the offgas flows from the

condenser system via the steam jet air ejectors into the charcoal adsorption system, the

charcoal acts as a medium to delay the flow of krypton and xenon gases to allow them to

decay to radiation levels acceptable for atmospheric release. In addition, the activated

charcoal adsorbs the radioactive isotopes of iodine removing them for decay.

The adsorption of xenon, krypton, and iodine offgas on charcoal depends on gas

flowrate, holdup time, mass of charcoal, and the dynamic adsorption coefficient. The

inspectors determined the nominal flowrate for the licensees charcoal system to operate

efficiently is specified as 30 scfm, to achieve proper holdup times of offgases. However,

the licensee has been consistently running the system at 80 scfm.

The Grand Gulf Nuclear Station System Description also states the charcoal adsorbers

must be operated under controlled temperature and humidity conditions, maintaining a

steady state temperature of about 0 degrees Fahrenheit (°F). However, for optimal

11

performance, a refrigeration temperature of 0 to -40°F is specified. The inspectors

reviewed Figure 10 of Section 4.1.7 of Grand Gulf Nuclear Station System Description,

entitled Comparative Curie Decontamination Factors for 8, 12, and 16 Bed Systems,

which illustrated that the charcoal low temperature, eight bed system is designed to

operate at a decontamination factor of 1000 with the specified design parameters

(i.e., 30 scfm, 0ºF). However, the inspectors determined licensees current offgas

flowrate of approximately 80 scfm and refrigeration temperature of approximately +15°F

will achieve a decontamination factor of less than 50.

The licensee performed evaluations, as documented in Apparent Cause

Evaluation CR-GGN-2013-0450, and determined that corrective actions were needed to

decrease the current elevated offgas flowrate into the charcoal adsorbers from

approximately 80 scfm, and to reduce the vault refrigeration temperature to within

design specifications. The licensee implemented some corrective actions to reduce

condenser in-leakage, resulting in some improvement in the offgas flowrate (reduction

from ~160 scfm to ~80 scfm). However, the offgas flowrates, charcoal adsorber

flowpath, and refrigeration vault operations still remain inconsistent with the design

specifications.

Although these deficiencies were ongoing issues, the licensee provided no documented

evaluation to demonstrate that the degraded performance of the offgas system was

maintaining gaseous releases as low as reasonably achievable, which the Updated Final

Safety Analysis Report states is the primary design objective of the gaseous radwaste

management system. The NRC inspectors discussed with the licensee that, although

the airborne releases may meet the 10 CFR Part 20, Appendix I, limitations, the failure

to operate the system consistent with design parameters is significantly impacting the

systems ability to maintain gaseous releases as low as reasonably achievable, as

evidenced by the annual effluent reports.

The licensee has developed a system improvement plan entitled, Offgas Long Range

Plan and Concluding Actions, to address how the plant may resolve the issues within

the next few scheduled outages. This performance deficiency was entered into the

licensees CAP as Condition Report CR-GGN-2017-06875.

Analysis. The failure to operate the offgas gaseous radwaste system within design

specifications, resulting in elevated radiological effluent releases, is a performance

deficiency. The finding is more than minor because it is associated with the plant

equipment attribute of the Public Radiation Safety cornerstone and adversely affected

the cornerstone objective to ensure adequate protection of public health and safety from

exposure of radioactive materials released into the public domain as a result of routine

civilian nuclear plant operation. Using Inspection Manual Chapter 0609, Appendix D,

Public Radiation Safety Significance Determination Process, the finding was

determined to be of very low safety significance (Green) because it involved the

Effluent Release Program, it did not impair the ability to assess dose, and did not

exceed the 10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits. The finding has a

cross-cutting aspect in the area of problem identification and resolution, associated with

the resolution component, because the licensee did not ensure that effective corrective

actions were implemented to address issues in a timely manner commensurate with the

safety significance [P.3].

12

Enforcement. The inspectors did not identify a violation of regulatory requirements.

Although the licensee failed to operate the system within the design specifications, as

described in the Grand Gulf Nuclear Station System Description, the inspectors

determined this was a self-imposed standard and did not constitute a regulatory

requirement. The issue was entered into the licensees corrective action program as

CR-GGN-2017-06875. Finding (FIN)05000416-2017012-02, Failure to Operate the

Gaseous Radwaste System Within Design Specifications.

2RS7 Radiological Environmental Monitoring Program (71124.07)

a.

Inspection Scope

The inspectors evaluated whether the licensees radiological environmental monitoring

program quantified the impact of radioactive effluent releases to the environment and

sufficiently validated the integrity of the radioactive gaseous and liquid effluent release

program. The inspectors also verified that the licensee continued to implement the

voluntary NEI/Industry Ground Water Protection Initiative. The inspectors reviewed or

observed the following items:

The inspectors observed selected air sampling and dosimeter monitoring

stations, sampler station modifications, and the collection and preparation of

environmental samples. The inspectors reviewed calibration and maintenance

records for selected air samplers, composite water samplers, and environmental

sample radiation measurement instrumentation, and inter-laboratory comparison

program results. The inspectors reviewed selected events documented in the

annual environmental monitoring report and significant changes made by the

licensee to the offsite dose calculation manual as the result of changes to the

land census. The inspectors evaluated the operability, calibration, and

maintenance of meteorological instruments and assessed the meteorological

dispersion and deposition factors. The inspectors verified the licensee had

implemented sampling and monitoring program sufficient to detect leakage from

structures, systems, or components with credible mechanism for licensed

material to reach ground water and reviewed changes to the licensees written

program for identifying and controlling contaminated spills/leaks to groundwater.

Groundwater protection initiative (GPI) implementation, including assessment of

groundwater monitoring results, identified leakage or spill events and entries

made into 10 CFR 50.75 (g) records, licensee evaluations of the extent of the

contamination and the radiological source term, and reports of events associated

with spills, leaks, and groundwater monitoring results.

Problem identification and resolution for the radiological environmental

monitoring program. The inspectors reviewed audits, self-assessments, and

corrective action program documents to verify problems were being identified

and properly addressed for resolution.

These activities constitute completion of the three required samples of radiological

environmental monitoring program, as defined in Inspection Procedure 71124.07.

13

b.

Findings

No findings were identified.

2RS8

Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,

and Transportation (71124.08)

a.

Inspection Scope

The inspectors evaluated the effectiveness of the licensees programs for processing,

handling, storage, and transportation of radioactive material. The inspectors interviewed

licensee personnel and reviewed the following items:

Radioactive material storage, including waste storage areas including container

labeling/marking and monitoring containers for deformation or signs of waste

decomposition.

Radioactive waste system, including walk-downs of the accessible portions of the

radioactive waste processing systems and handling equipment. The inspectors

also reviewed or observed changes made to the radioactive waste processing

systems, methods for dewatering and waste stabilization, waste stream mixing

methodology, and waste processing equipment that was not operational or

abandoned in place.

Waste characterization and classification, including radio-chemical sample

analysis results for radioactive waste streams and use of scaling factors and

calculations to account for difficult-to-measure radionuclides, and processes for

waste classification including use of scaling factors and 10 CFR Part 61

analyses.

Shipment preparation, including packaging, surveying, labeling, marking,

placarding, vehicle checking, driver instructing, and preparation of the disposal

manifests.

Shipping records for LSA I, II, III, SCOI, II, Type A, or Type B radioactive material

or radioactive waste shipments.

Problem identification and resolution for radioactive solid waste processing and

radioactive material handling, storage, and transportation. The inspectors

reviewed audits, self-assessments, and corrective action program documents to

verify problems were being identified and properly addressed for resolution.

These activities constitute completion of the six required samples of radioactive solid

waste processing, and radioactive material handling, storage, and transportation

program, as defined in Inspection Procedure 71124.08.

b.

Findings

No findings were identified.

14

4.

OTHER ACTIVITIES

4OA6 Meetings, Including Exit

Exit Meeting Summary

On July 14, 2017, the inspectors presented the radiation safety inspection results to

Mr. E. Larson, Site Vice President, and other members of the licensee staff. The licensee

acknowledged the issues presented. The licensee confirmed that any proprietary information

reviewed by the inspectors had been returned or destroyed.

Attachment 1

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

J. Ashley, Environmental Specialist, Chemistry

R. Benson, Acting Manager, Radiation Protection

D. Byers, Manager, System Engineering

R. Gaston, Director, Corporate Licensing

M. Giacini, General Manager, Plant Operations

A. Hasanat, Licensing Engineer, Regulatory Assurance

J. Hallanbeck, Design Manager, Engineering

E. Larson, Site Vice President

M. Larson, Supervisor, Radiation Protection

K. Long, Shipper, Radwaste

J. Reese, Specialist, Chemistry

T. Reeves, Supervisor, Chemistry

F. Rosser, Specialist, Radiation Protection

P. Stokes, Support Supervisor, Radiation Protection

S. Sweet, Licensing Engineer, Regulatory Assurance

E. Wright, Supervisor, Radiation Protection

J. Underwood, Manager, Chemistry

NRC Personnel

N. Day, Resident Inspector

R. Smith, Acting Senior Resident Inspector

M. Young, Senior Resident Inspector

S. Hedger, Emergency Preparedness Inspector

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened 05000416-2017012-01

VIO

Failure to Correct Instrument Calibration Process in a Timely

Manner (Section 2RS5)

Opened and Closed 05000416-2017012-02

FIN

Failure to Operate the Gaseous Radwaste System Within Design

Specifications (Section 2RS6)

Closed

None

Discussed

None

A1-2

LIST OF DOCUMENTS REVIEWED

Section 2RS5: Radiation Monitoring Instrumentation

Procedures

Number

Title

Revision

06-IC-1D17-R-1002

Main Steam Line High Radiation Monitor

(PCIS) Calibration

108, 109

06-IC-1D21-R-1002

Containment/Drywell High Range Area

Radiation Monitor Calibration

107, 108,109

08-S-07-83

Radiation Protection Instruction Operation

and Calibration of the ND-9000 Whole Body

Counter

10

EN-CY-102

Laboratory Analytical Quality Control

9

EN-FAP-RP-007

Operation of the RP Central Calibration

Facility

2

EN-MA-105

Control of Measuring and Test Equipment

(M&TE)

13

EN-RP-122

Alpha Monitoring

9

EN-RP-301

Radiation Protection Instrument Control

10

EN-RP-305

Source Maintenance

0

EN-RP-317

Central Calibration Facility

0

EN-RP-317-08

Calibration of Portable Scalers

1

EN-RP-317-09

Calibration of Dosimeters

2

EN-RP-317-10

Calibration of Portable Dose Rate Instrument 0

ODCM

Offsite Dose Calculation Manual

39

Audits and Self-Assessments

Number

Title

Date

OL-GLO-2017-21

Self-Assessment of RP Instrumentation

Program

May 23, 2017

QA-14/15-201 5-GGN-1 QA Audit: Combined Radiation Protection and

Radwaste

November 16, 2015

A1-3

Condition Reports (CR-GGNS-)

2015-01775

2015-01773

2015-02807

2015-01831

2015-01832

2016-01796

2016-04647

2016-05297

2016-08308

2016-09537

2016-09889

2017-00612

2017-04141

2017-04697

2017-06865

2017-06876

Installed Radiation Instrument Calibration Records

W/O Number

Title

Date

52628844

Main Steam Line High Radiation Monitor (PCIS)

Calibration - Channel A

February 22, 2017

52637367

Containment/Drywell High Range Area Radiation

Monitor Calibration - Channel A

March 16, 2016

Portable Radiation Instrument Calibration Records

Number

Title

Date

ASC-001

Calibration Data Sheet: SAC-4

March 28, 2017

CHP-C-015

Calibration Data Sheet: Model 2000(43-10) Alpha

Scaler

July 10 2017

CHP-C-022

Calibration Data Sheet: iSolo Alpha Scaler

April 27, 2017

CHP-CS-020

Calibration Data Sheet: iSolo Alpha Scaler

March 23, 2017

CHP-DR-283

Calibration Data Sheet: TelePole

June 13, 2017

HP-11431

Calibration Data Sheet: RO-2

June 6, 2017

HP-CS-004

Calibration Data Sheet: Model BC-4

July 6, 2017

HP-DR-563

Calibration Data Sheet: Model 9-3

December 12, 2016

HP-DR-563

Calibration Data Sheet: Ludlum Model-9-3

July 11, 2017

HP-DS-054

Calibration Data Sheet: Model SAC-4

July 10, 2017

RAM-001

Calibration Data Sheet: AMP-100

March 12, 2017

Stationary Radiation Instrument Calibration Records

Number

Title

Date

400-10-17-005

Germanium Detector No. 3 Calibration Package

March 23, 2017

400-11-17-005

Germanium Detector No. 4 Calibration Package

March 22, 2017

400-9-17-002

Germanium Detector No. 2 Calibration Package

March 15, 2017

A1-4

Stationary Radiation Instrument Calibration Records

Number

Title

Date

Apex-InVivo

Analysis Report Calibration Check Count of People

Mover Whole Body Monitor

July 12, 2017

Canberra

Calibration of the Canberra/Nuclear Data People

Mover WBC System at Entergy Grand Gulf Nuclear

Station

August 8, 2015

Other Radiation Protection Instrument Records

Number

Title

Date

CHP-DR-326

Instrument Response Check Failure Review

January 13, 2017

CHP-TEL039

Instrument Response Check Failure Review

May 15, 2017

CHP-TEL044

Instrument Response Check Failure Review

March 1, 2017

HP-11431

Maintenance Data Sheet: Failed Calibration Check

April 10, 2017

Miscellaneous Documents

Number

Title

Date

201512044

Central Radiation Protection Maintenance Data Sheet December 10, 2015

201706-012

Entergy Operations, Inc., Portable Instruments to

Waterford-3 RP

June 19, 2017

3751

Laboratory Standard Calibration/Verification Data:

V-570 Meter

July 9, 2015

AO-987

Amersham Source Decay Data Sheet

January 26, 2017

AO-988

Amersham Source Decay Data Sheet

January 26, 2017

ERIC Report

Instrument Status Report Calibration Needed for

GGNS

July 11, 2017

JLS-8254

Source Verification of Source J.L. Shephard Calibrator

S/N SRC-1993003 Model-89 (400) Cs-137 Sealed

Sources at Set Positions

October 13, 2015

MP-141

AEA Technology Source Decay Sheet

January 26, 2017

MP-158

AEA Technology Source Decay Sheet

January 26, 2017

A1-5

Section 2RS6: Radioactive Gaseous and Liquid Effluent Treatment

Procedures

Number

Title

Revision

04-1-01-N65-1-SU

System Operating Instruction Offgas Vault

Refrigeration

033

06-CH-1000-M-0049

Effluent Dose Calculations

104

06-CH-1D17-M-0003

Building Ventilation Gaseous Tritium

109

06-CH-1D17-M-0005

Building Ventilation Exhaust Gaseous Isotopic

109

06-CH-1D17-M-0018

Gaseous Release Points - Particulate Alpha

Activity

108

06-CH-1D17-W-0017

Gaseous Release Points - Iodines, Tritium and

Particulates

106

06-CH-1T48-M-0037

Standby Gas Treatment Exhaust Gaseous Isotopic 107

06-CH-SG17-O-0045

Radwaste Release Post-Release Calculations

105

06-CH-SG17-P-0041

Radwaste Release Pre-Release Analysis

109

06-CH-SG17-Q-0044

Radwaste Release Quarterly Composite

103

08-S-03-10

Chemistry Sampling Program

052

08-S-03-22

Installed Radiation Monitoring System Alarm

Setpoint Determination and Control

114

1-S-08-11

Radioactive Discharge Controls

114

EN-CY-108

Monitoring of Nonradioactive Systems

006

Audits and Self-Assessments

Number

Title

Date

LO-GLO-2016-0122

Pre-NRC RETS/ODCM Radiological Effluent

Occurrences Assessment

December 4, 2016

Teledyne Brown Engineering Environmental

Services

April 19, 2017

QA-2-6-2015-GGNS-1 GGNS Combined Chemistry Effluent and

Environmental Monitoring (including ODCM

and REMP) Program Audit

October 9, 2015

Condition Reports (CR-GGNS-)

2013-00450

2015-06763

2015-06764

2015-06982

2016-02468

2016-02688

2016-07187

2016-08307

2016-08308

2017-00051

2017-00193

2017-00204

2017-00264

2017-00290

2017-00336

2017-00529

2017-03101

2017-03745

2017-04525

2017-05659

2017-06821

2017-06875

A1-6

10 CFR 50.75(g) Condition Reports (CR-GGNS-)

2015-06763

2015-06764

2016-07187

2017-00336

Release Permits

Liquid Releases

2015051

2015094

2016011

2016017

2016022

2016040

2016042

2016044

2016045

2016051

2016073

2017009

2017018

In-Place Filter Testing Records

Number

System

Train

Test

Date

WO 46551718

Standby Gas Treatment

B

DOP & HEPA

June 3, 2017

WO 52482060

Standby Gas Treatment

A

DOP & HEPA

March 16, 2015

WO 52618801

Control Room Air / Standby

Fresh Air

A

DOP & HEPA

October 27, 2016

WO 52655772

Control Room Air / Standby

Fresh Air

B

DOP & HEPA

December 1, 2016

Miscellaneous Documents

Number

Title

Revision

Date

2014 Annual Radioactive Effluent Release Report

April 27, 2015

2015 Annual Radioactive Effluent Release Report

April 14, 2016

2016 Annual Radioactive Effluent Release Report

April 25, 2017

Cross Contamination of Service Air System / CR-

GGN-2017-00193

February 27, 2017

Grand Gulf Service Air System I.E.Bulletin 80-10

Bounding Evaluation for Contamination of a

Nonradioactive System

March 29, 2017

Nuclear Independent Oversight Functional Area

Performance Report: Group B

May 31, 2016

Offsite Dose Calculation Manual

39

1000-1-17-002

2016 Radiochemistry INTRALAB Cross-Check

Results

January 23, 2017

GNRO-2016/00039

Supplement to Grand Gulf Nuclear Station 2015

Annual Radioactive Effluent Release Report (ARERR)

July 20, 2016

SD N64/N65

Grand Gulf Nuclear Station System Description

2

UFSAR Chapter 11

GGN Updated Final Safety Analysis Report

2016-00

A1-7

Section 2RS7: Radiological Environmental Monitoring Program

Procedures

Number

Title

Revision

06-EN-S000-V-0001

Surveillance Procedure Radiological

Environmental Sampling

111

06-IC-SC84-SA-1003 Primary Tower Wind Speed/Direction, Air

Temperature (T/dT) and Relative Humidity

106

07-S-53-C84-7

Backup Tower Wind/Speed/Direction and Air

Temperature Calibration

0

08-S-04-964

Met Data Processing

2

ODCM

Offsite Dose Calculation Manual

39

Audits and Self-Assessments

Number

Title

Date

LO-GLO-2015-00042

Focused Self-Assessment:

Chemistry Groundwater/Environmental

Programs

November 18, 2015

2015

Environmental Dosimetry Company

Quality Assurance Status Report

February 29, 2016

2015

Teledyne Brown Engineering:

Environmental Services

Quality Assurance Report

May 9, 2016

2016

Environmental Dosimetry Company

Quality Assurance Status Report

March 8, 2017

2016

Teledyne Brown Engineering:

Environmental Services

Quality Assurance Report

April 19, 2017

Condition Reports (CR-GGNS-)

2015-04675

2015-05753

2015-06263

2015-06763

2016-03213

2016-03475

2016-03825

2016-05543

2016-07187

2016-07747

2016-08364

2016-09067

2017-00813

2017-00993

2017-01731

2017-02633

2017-05447

A1-8

REMP Air Sampler Calibration Data

Number

Title

Date

CHEM-001

LV-1D - Air Sampler (LOVOL)

July 21, 2016

CHEM-002

LV-1D - Air Sampler (LOVOL)

October 20, 2016

CHEM-003

LV-1D - Air Sampler (LOVOL)

July 19, 2016

Meteorological Instrument Calibration Records

W/O Number

Title

Date

52652328

Backup Meteorological Tower Instrument

Calibration

07-S-53-C84-7

August 29, 2016

52692658

Primary Meteorological Tower Instrument

Calibrations

06-IC-SC84-SA-1003

August 2, 2016

Meteorological Data

Number

Title

Date

2016

ODCM Annual Average Relative Concentration

(/Q) and Relative Deposition (D/Q)

March 2017

2016

Review of Grand Gulf Meteorological Data

March 9, 2017

Groundwater Protection Documents

Number

Title

Revision / Date

L71506

Groundwater Monitoring Report - January 2017

February 3, 2017

L71974

Groundwater Monitoring Report - February 2017

March 31, 2017

L72140

Groundwater Monitoring Report - March 2017

March 31, 2017

L72521

Groundwater Monitoring Report - April 2017

May 5, 2017

R06045-0032-002 Groundwater Monitoring Plan

6

Miscellaneous Documents

Number

Title

Date

2015

Annual Environmental Operating Report

April 19, 2016

2016

Annual Environmental Operating Report

April 27, 2017

2016

Land Use Census

December 16, 2016

2017-044

Licensing Basis Document Change Request

(LBDCR)

April 27, 2017

A1-9

Section 2RS8: Radioactive Solid Waste Processing, and Radioactive Material Handling,

Storage, and Transportation

Procedures

Number

Title

Revision

EN-RW-101

Radioactive Waste Management

3

EN-RW-102

Radioactive Shipping Procedure

15

EN-RW-103

Radioactive Waste Tracking Procedure

4

EN-RW-104

Scaling Factors

13

EN-RW-105

Process Control Program

5

EN-RW-106

Integrated Transportation Security Plan

6

04-S-01-G17-3

Radwaste Filters and Demineralizer

47

08-S-06-50

Radwaste Instruction: Loading Radioactive

Material

9

08-S-06-71

Radwaste Instruction: Sampling

Procedures for Waste Classification

7

07-S-14-428

Operation and Maintenance of the TRI-

NUC Underwater Filtration System

0

08-S-02-075

Radiation Protection Instruction - Coverage

and Control of Refueling Operations and

Movement of Irradiated Materials

16

Audits and Self-Assessments

Number

Title

Date

QA-1 4/15-2015-GGN-1

Combined Radiation Protection and

Radwaste

September 14, 2015

LO-GLO-2017-00022

Pre-NRC Inspection Module 71124-08

May 24, 2017

LO-GLO-2015-00139

10 CFR Part 37 Materials Security Review

January 8, 2016

Condition Reports (CR-HQN-)

2015-00747

2017-00904

Condition Reports (CR-GGNS-)

2015-00231

2015-05082

2016-00319

2016-00320

2016-00801

2016-00804

2016-00805

2016-00809

2016-04376

2017-00101

2017-00106

2017-01568

2017-01625

2017-01644

2017-04789

2017-05552

2017-06772

2017-06779

A1-10

Radioactive Material and Waste Shipments

Number

Title

Date

GGN-2017-0101

CFFF Filters - LSA-II

January 12, 2017

GGN-2017-0102

CRD-CRDM- LSA-II

January 13, 2017

GGN-2017-0106

CPS Powdex Liner

January 20, 2017

GGN-2016-0319

WMG Sealands

March 16, 2016

GGN-2016-0320

Suppression Pool Filter Liners

March 21, 2016

GGN-2016-0324

5 Type A GE Boxes

March 23, 2016

GGN-2015-0801

RWCU-A Liner - Type B

August 3, 2017

GGN-2015-0805

RWCU-A Liner - Type B

August 3, 2017

GGN-2015-0809

RWCU-A Liner - Type B

August 16, 2017

Miscellaneous Documents

Number

Title

Date

OE-NOE-2016-00

NRC-RIS-2016-11

November 30, 2016

2017

RW/RAM Shipping Log

January 1, 2017

2016

RW/RAM Shipping Log

January 1, 2016

2015

RW/RAM Shipping Log

January 1, 2015

UFSAR Chapter 11

GGN Updated Final Safety Analysis Report

2016

Management Standard No. 36

April 25, 2017

Monitoring & Responding to Dose Rates on the

Fuel Pools

April 14, 2016

2015 Annual Radioactive Effluent Release

Report

April 25, 2017

2016 Annual Radioactive Effluent Release

Report

June 13, 2017

Radioactive Material Storage Container

Tracking Sheets

Attachment 2

The following items are requested for the

Occupational/Public Radiation Safety Inspection

at Grand Gulf Nuclear Station

July 10 to 14, 2017

Integrated Report 2017007

Inspection areas are listed in the attachments below.

Please provide the requested information on or before June 14, 2017.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1- A, applicable organization charts in file/folder 1- B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Martin Phalen at (817) 200-1158 or

martin.phalen@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

A2-2

5.

Radiation Monitoring Instrumentation (71124.05)

Date of Last Inspection:

March 27, 2015

A.

List of contacts and telephone numbers for the following areas:

1. Effluent monitor calibration

2. Radiation protection instrument calibration

3. Installed instrument calibrations

4. Count room and Laboratory instrument calibrations

B.

Applicable organization charts

C.

Copies of audits, self-assessments, vendor or NUPIC audits for contractor support and

LERs, written since date of last inspection, related to:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

or whole body counters

2. Installed radiation monitors

D.

Procedure index for:

1. Calibration, use and operation of continuous air monitors, criticality monitors,

portable survey instruments, temporary area radiation monitors, electronic

dosimeters, teledosimetry, personnel contamination monitors, and whole body

counters.

2. Calibration of installed radiation monitors

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Calibration of portable radiation detection instruments (for portable ion chambers)

2. Whole body counter calibration

3. Laboratory instrumentation quality control

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the following programs:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

whole body counters,

2. Installed radiation monitors,

3. Effluent radiation monitors

4. Count room radiation instruments

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

Offsite dose calculation manual, technical requirements manual, or licensee controlled

specifications, which lists the effluent monitors and calibration requirements.

H.

Current calibration data for the whole body counters.

A2-3

I.

Primary to secondary source calibration correlation for effluent monitors.

J.

A list of the point of discharge effluent monitors with the two most recent calibration

dates and the work order numbers associated with the calibrations.

K.

Radiation Monitoring System health report for the previous 12 months

A2-4

6.

Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

Date of Last Inspection:

March 27, 2015

A.

List of contacts and telephone numbers for the following areas:

1. Radiological effluent control

2. Engineered safety feature air cleaning systems

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

D.

Procedure indexes for the following areas

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Sampling of radioactive effluents

2. Sample analysis

3. Generating radioactive effluent release permits

4. Laboratory instrumentation quality control

5. In-place testing of HEPA filters and charcoal adsorbers

6. New or applicable procedures for effluent programs (e.g., including ground water

monitoring programs)

F.

List of corrective action documents (including corporate and sub-tiered systems) written

since date of last inspection, associated with:

1. Radioactive effluents

2. Effluent radiation monitors

3. Engineered Safety Feature Air cleaning systems

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

2015 and 2016 Annual Radioactive Effluent Release Report, or the two most recent

reports.

H.

Current Copy of the Offsite Dose Calculation Manual

I.

Copy of the 2015 and 2016 inter-laboratory comparison results for laboratory quality

control performance of effluent sample analysis, or the two most recent results.

J.

Effluent sampling schedule for the week of the inspection

K.

New entries into 10 CFR 50.75(g) files since date of last inspection

A2-5

L.

Operations department (or other responsible dept.) log records for effluent monitors

removed from service or out of service

M.

Listing or log of liquid and gaseous release permits since date of last inspection

N.

A list of the technical specification-required air cleaning systems with the two most

recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal

adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers

associated with the surveillances

O.

System Health Report for radiation monitoring instrumentation. Also, please provide a

specific list of all effluent radiation monitors that were considered inoperable for 7 days

or more since November 2011. If applicable, please provide the relative Special Report

and condition report(s).

P.

A list of all radiation monitors that are considered § 50.65/Maintenance Rule equipment.

Q.

A list of all significant changes made to the Gaseous and Liquid Effluent Process

Monitoring System since the last inspection. If applicable, please provide the

corresponding UFSAR section in which this change was documented.

R.

A list of any occurrences in which a non-radioactive system was contaminated by a

radioactive system. Please include any relative condition report(s).

A2-6

7.

Radiological Environmental Monitoring Program (71124.07)

Date of Last Inspection:

March 27, 2015

A.

List of contacts and telephone numbers for the following areas:

1. Radiological environmental monitoring

2. Meteorological monitoring

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Radiological environmental monitoring program (including contractor environmental

laboratory audits, if used to perform environmental program functions)

2. Environmental TLD processing facility

3. Meteorological monitoring program

D.

Procedure index for the following areas:

1. Radiological environmental monitoring program

2. Meteorological monitoring program

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Environmental Program Description

2. Sampling, collection and preparation of environmental samples

3. Sample analysis (if applicable)

4. Laboratory instrumentation quality control

5. Procedures associated with the Offsite Dose Calculation Manual

6. Appropriate QA Audit and program procedures, and/or sections of the stations QA

manual (which pertain to the REMP)

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the following programs:

1. Radiological environmental monitoring

2. Meteorological monitoring

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

Wind Rose data and evaluations used for establishing environmental sampling locations

H.

Copies of the 2 most recent calibration packages for the meteorological tower

instruments

I.

Copy of the 2015 and 2016 Annual Radiological Environmental Operating Report and

Land Use Census, and current revision of the Offsite Dose Calculation Manual, or the

two most recent reports.

A2-7

J.

Copy of the environmental laboratorys inter-laboratory comparison program results for

2015 and 2016, or the two most recent results, if not included in the annual radiological

environmental operating report

K.

Data from the environmental laboratory documenting the analytical detection sensitivities

for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)

L.

Quality Assurance audits (e.g., NUPIC) for contracted services

M.

Current NEI Groundwater Initiative Plan and status

N.

Technical requirements manual or licensee controlled specifications which lists the

meteorological instruments calibration requirements

O.

A list of Regulatory Guides and/or NUREGs that you are currently committed to relative

to the Radiological Environmental Monitoring Program. Please include the revision

and/or date for the committed item and where this can be located in your current

licensing basis/UFSAR.

P.

If applicable, per NEI 07-07, provide any reports that document any spills/leaks to

groundwater since the last inspection

A2-8

8.

Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation (71124.08)

Date of Last Inspection:

March 27, 2015

A.

List of contacts and telephone numbers for the following areas:

1. Solid Radioactive waste processing

2. Transportation of radioactive material/waste

B.

Applicable organization charts (and list of personnel involved in solid radwaste

processing, transferring, and transportation of radioactive waste/materials)

C.

Copies of audits, department self-assessments, and LERs written since date of last

inspection related to:

1. Solid radioactive waste management

2. Radioactive material/waste transportation program

D.

Procedure index for the following areas:

1. Solid radioactive waste management

2. Radioactive material/waste transportation

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Process control program

2. Solid and liquid radioactive waste processing

3. Radioactive material/waste shipping

4. Methodology used for waste concentration averaging, if applicable

5. Waste stream sampling and analysis

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection related to:

1. Solid radioactive waste

2. Transportation of radioactive material/waste

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing,

packaging, and shipping.

H.

A summary of radioactive material and radioactive waste shipments made from date of

last inspection to present

I.

Waste stream sample analyses results and resulting scaling factors for 2015 and 2016,

or the two most recent results.

J.

Waste classification reports if performed by vendors (such as for irradiated hardware)

A2-9

K.

A listing of all on-site radwaste storage facilities. Please include a summary or listing of

the items stored in each facility, including the total amount of radioactivity and the

highest general area dose rate.

Although it is not necessary to compile the following information, the inspector will also review:

L.

Training, and qualifications records of personnel responsible for the conduct of

radioactive waste processing, package preparation, and shipping