| title = Byron, Units 1 and 2 - Full Action Request Report AR 1531420, No Actions Tracking Update to Calculation 3C8-0282-001, Redacted
| title = Full Action Request Report AR 1531420, No Actions Tracking Update to Calculation 3C8-0282-001, Redacted
| author name =  
| author name =  
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
Line 16: Line 16:
| page count = 5
| page count = 5
}}
}}
=Text=
{{#Wiki_filter:Go Back Print l New Search l Home AR Number: 01531420 Linked ARs Aff Fac:
Byron AR Type:
CR Status:
APPROVED Aff Unit:
00 Owed To:
A8852CAP Due Date:
12/29/2017 Aff System:
MS Event Date:
07/01/2013 CR Level/Class:
4/D Disc Date:
07/01/2013 How Discovered:
H02 Orig Date:
07/01/2013 Action Request Details
==Subject:==
NO ACTIONS TRACKING UPDATE TO CALCULATION 3C8-0282-001
==
Description:==
Originator:
Supv Contacted:
Condition
== Description:==
IR 1284054 had previously identified that calculation 3C8-0282-001 required update to strengthen inputs and assumptions. Actions generated from that IR tracked funding to update the calculation and have been closed out. An action to track the actual calculation revision was not created. Revision of this calculation is now part of the HELB effort and it is desired to have a tracking item in CAP for the update. This IR will generate a new action for tracking the update to the calculation.
This is a common By/Bw calculation.
Immediate actions taken:
Reviewed previous IRs 1284054, 789344, 653093, and 620080 and associated actions.
Recommended Actions:
Create an action for A8852NESDM to track revision of calculation 3C8-0282-001. Recommended due date is 08/16/2013 What activities, processes, or procedures were involved?
Review of documentation supporting HELB RAI response.
Why did the condition happen?
CAP actions to obtain funding were completed and new actions were not generated. The calculation update is being tracked outside of the CAP process.
What are the consequences?
No consequences since the calculation update is being worked on as part of the HELB project.
Were any procedural requirements impacted?
No Were there any adverse physical conditions?
None List of knowledgeable individuals:
Page 1 of 5 Full Action Request Report 8/31/2017 http://eamgenco.ceco.com/cap/servlet/ReportFullARServlet
Repeat or similar condition?
No Operable Basis:
This IR describes an admin issue, therefore no Operability Basis statement is required.
Reportable Basis:
Not reportable since no Reportability Manual threshold is exceeded.
Functional Basis:
This is not a Functionality issue so no Functionality Basis statement is required.
Reviewed by:
07/02/2013 02:27:15 CDT Reviewer Comments:
Shift review for operability, reportability, functionality complete.
SOC Reviewed by:
07/02/2013 09:23:45 CDT SOC Comments:
Close to actions created 7/2/13 SOC 070213 Page 2 of 5 Full Action Request Report 8/31/2017 http://eamgenco.ceco.com/cap/servlet/ReportFullARServlet
Assign #: 01 AR #: 01531420 Aff Fac:
Byron Assign Type:
TRKG Status:
COMPLETE Priority:
Assigned To:
Due Date:
07/06/2013 Schedule Ref:
Prim Grp:
ACAPALL Orig Due Date:
Unit Condition:
Sec Grp:
Assignment Details Subject/Description: NO ACTIONS TRACKING UPDATE TO CALCULATION 3C8-0282-001 Assignment Completion In Progress Notes:
Completion Notes:
Page 3 of 5 Full Action Request Report 8/31/2017 http://eamgenco.ceco.com/cap/servlet/ReportFullARServlet
Assign #: 02 AR #: 01531420 Aff Fac:
Byron Assign Type:
ACIT Status:
NTFY/ASG Priority:
1 Assigned To:
Due Date:
12/29/2017 Schedule Ref:
Prim Grp:
A8852NESDM Orig Due Date:
08/16/2013 Unit Condition:
Sec Grp:
Assignment Details Subject/Description: Track revision of calculation 3C8-0282-001 Assignment Completion In Progress Notes:
AT 01531420-02 07/28/2016 This AT is moved by one year (to 08/25/17), because the calculation OAR has not been completed yet.
OAR is being performed by Braidwood Engineering for both Byron and Braidwood stations.
was informed of this extension.
AT 01531420-02
, SMDE alternate, 2/23/16. Now information?.. Byron agrees with Bwd's methodology for pipe break modeling. So we are deferring completion by 6 months.
09/02/2015 Per discussion with this AT is moved to 02/26/2016.
AT 01531420-02 03/02/2015 This AT is moved by 6 months (to 9/03/15) because the OAR process has come to a halt as a result of disagreement between Byron & Braidwood. Byron Engineering believes that a double ended pipe break needs to be considered, which results in large pressure & extensive structural evaluation, versus Braidwood which believes a single ended break needs to be considered. This subject is scheduled for discussion in TIM (Technical Issues Meeting) the week of 3-2-15.
was informed of this extension.
AT 01531420-02 09/03/2014 This AT is moved by 6 months (to 3/03/15) because the OAR process has come to a halt as a result of disagreement between Byron & Braidwood. Byron Engineering believes that a double ended pipe break needs to be considered (results in large pressure & extensive structural evaluation) versus Braidwood which believes a single ended break needs to be considered.
were informed of this extension.
Page 4 of 5 Full Action Request Report 8/31/2017 http://eamgenco.ceco.com/cap/servlet/ReportFullARServlet
06/03/2014 S&L has not completed revision to calculation 3C8-0282-001 yet.
Therefore, this task is extended by 3 months to 9/03/14.
was informed of this extension.
03/03/2014 S&L has not completed revision to calculation 3C8-0282-001 yet.
Therefore, this task is extended by 3 months to 06/03/14.
was informed of this extension.
11/22/2013 S&L has not completed revision to calculation 3C8-0282-001 yet.
Therefore, this task is extended by 3 months to 03/03/14.
were informed of this extension.
08/14/2013 S&L has not completed revision to calculation 3C8-0282-001 yet.
Therefore, this task is extended to 10/01/13.
were informed of this extension.
Completion Notes:
See In-Progress Notes Page 5 of 5 Full Action Request Report 8/31/2017 http://eamgenco.ceco.com/cap/servlet/ReportFullARServlet}}

Latest revision as of 11:03, 8 January 2025

Full Action Request Report AR 1531420, No Actions Tracking Update to Calculation 3C8-0282-001, Redacted
ML17255A832
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/01/2013
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17255A838 List:
References
RS-17-119 AR 1531420
Download: ML17255A832 (5)


Text

Go Back Print l New Search l Home AR Number: 01531420 Linked ARs Aff Fac:

Byron AR Type:

CR Status:

APPROVED Aff Unit:

00 Owed To:

A8852CAP Due Date:

12/29/2017 Aff System:

MS Event Date:

07/01/2013 CR Level/Class:

4/D Disc Date:

07/01/2013 How Discovered:

H02 Orig Date:

07/01/2013 Action Request Details

Subject:

NO ACTIONS TRACKING UPDATE TO CALCULATION 3C8-0282-001

==

Description:==

Originator:

Supv Contacted:

Condition

Description:

IR 1284054 had previously identified that calculation 3C8-0282-001 required update to strengthen inputs and assumptions. Actions generated from that IR tracked funding to update the calculation and have been closed out. An action to track the actual calculation revision was not created. Revision of this calculation is now part of the HELB effort and it is desired to have a tracking item in CAP for the update. This IR will generate a new action for tracking the update to the calculation.

This is a common By/Bw calculation.

Immediate actions taken:

Reviewed previous IRs 1284054, 789344, 653093, and 620080 and associated actions.

Recommended Actions:

Create an action for A8852NESDM to track revision of calculation 3C8-0282-001. Recommended due date is 08/16/2013 What activities, processes, or procedures were involved?

Review of documentation supporting HELB RAI response.

Why did the condition happen?

CAP actions to obtain funding were completed and new actions were not generated. The calculation update is being tracked outside of the CAP process.

What are the consequences?

No consequences since the calculation update is being worked on as part of the HELB project.

Were any procedural requirements impacted?

No Were there any adverse physical conditions?

None List of knowledgeable individuals:

Page 1 of 5 Full Action Request Report 8/31/2017 http://eamgenco.ceco.com/cap/servlet/ReportFullARServlet

Repeat or similar condition?

No Operable Basis:

This IR describes an admin issue, therefore no Operability Basis statement is required.

Reportable Basis:

Not reportable since no Reportability Manual threshold is exceeded.

Functional Basis:

This is not a Functionality issue so no Functionality Basis statement is required.

Reviewed by:

07/02/2013 02:27:15 CDT Reviewer Comments:

Shift review for operability, reportability, functionality complete.

SOC Reviewed by:

07/02/2013 09:23:45 CDT SOC Comments:

Close to actions created 7/2/13 SOC 070213 Page 2 of 5 Full Action Request Report 8/31/2017 http://eamgenco.ceco.com/cap/servlet/ReportFullARServlet

Assign #: 01 AR #: 01531420 Aff Fac:

Byron Assign Type:

TRKG Status:

COMPLETE Priority:

Assigned To:

Due Date:

07/06/2013 Schedule Ref:

Prim Grp:

ACAPALL Orig Due Date:

Unit Condition:

Sec Grp:

Assignment Details Subject/Description: NO ACTIONS TRACKING UPDATE TO CALCULATION 3C8-0282-001 Assignment Completion In Progress Notes:

Completion Notes:

Page 3 of 5 Full Action Request Report 8/31/2017 http://eamgenco.ceco.com/cap/servlet/ReportFullARServlet

Assign #: 02 AR #: 01531420 Aff Fac:

Byron Assign Type:

ACIT Status:

NTFY/ASG Priority:

1 Assigned To:

Due Date:

12/29/2017 Schedule Ref:

Prim Grp:

A8852NESDM Orig Due Date:

08/16/2013 Unit Condition:

Sec Grp:

Assignment Details Subject/Description: Track revision of calculation 3C8-0282-001 Assignment Completion In Progress Notes:

AT 01531420-02 07/28/2016 This AT is moved by one year (to 08/25/17), because the calculation OAR has not been completed yet.

OAR is being performed by Braidwood Engineering for both Byron and Braidwood stations.

was informed of this extension.

AT 01531420-02

, SMDE alternate, 2/23/16. Now information?.. Byron agrees with Bwd's methodology for pipe break modeling. So we are deferring completion by 6 months.

09/02/2015 Per discussion with this AT is moved to 02/26/2016.

AT 01531420-02 03/02/2015 This AT is moved by 6 months (to 9/03/15) because the OAR process has come to a halt as a result of disagreement between Byron & Braidwood. Byron Engineering believes that a double ended pipe break needs to be considered, which results in large pressure & extensive structural evaluation, versus Braidwood which believes a single ended break needs to be considered. This subject is scheduled for discussion in TIM (Technical Issues Meeting) the week of 3-2-15.

was informed of this extension.

AT 01531420-02 09/03/2014 This AT is moved by 6 months (to 3/03/15) because the OAR process has come to a halt as a result of disagreement between Byron & Braidwood. Byron Engineering believes that a double ended pipe break needs to be considered (results in large pressure & extensive structural evaluation) versus Braidwood which believes a single ended break needs to be considered.

were informed of this extension.

Page 4 of 5 Full Action Request Report 8/31/2017 http://eamgenco.ceco.com/cap/servlet/ReportFullARServlet

06/03/2014 S&L has not completed revision to calculation 3C8-0282-001 yet.

Therefore, this task is extended by 3 months to 9/03/14.

was informed of this extension.

03/03/2014 S&L has not completed revision to calculation 3C8-0282-001 yet.

Therefore, this task is extended by 3 months to 06/03/14.

was informed of this extension.

11/22/2013 S&L has not completed revision to calculation 3C8-0282-001 yet.

Therefore, this task is extended by 3 months to 03/03/14.

were informed of this extension.

08/14/2013 S&L has not completed revision to calculation 3C8-0282-001 yet.

Therefore, this task is extended to 10/01/13.

were informed of this extension.

Completion Notes:

See In-Progress Notes Page 5 of 5 Full Action Request Report 8/31/2017 http://eamgenco.ceco.com/cap/servlet/ReportFullARServlet