ML17262A841: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML17262A841 | | number = ML17262A841 | ||
| issue date = 04/30/1992 | | issue date = 04/30/1992 | ||
| title = Monthly Operating Rept for Apr 1992 for Ginna Station | | title = Monthly Operating Rept for Apr 1992 for Ginna Station | ||
| author name = | | author name = Dodge R, Mecredy R | ||
| author affiliation = ROCHESTER GAS & ELECTRIC CORP. | | author affiliation = ROCHESTER GAS & ELECTRIC CORP. | ||
| addressee name = | | addressee name = | ||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:;., ACCELERATED DI UTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9205150037 DOC.DATE: 92/04/30 NOTARIZED: | {{#Wiki_filter:; | ||
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION DODGE,R.E. | ., ACCELERATED DI UTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
Rochester Gas&Electric Corp.MECREDY,R.C. | ACCESSION NBR:9205150037 DOC.DATE: 92/04/30 NOTARIZED: | ||
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 | NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G | ||
AUTH.NAME AUTHOR AFFILIATION DODGE,R.E. | |||
Rochester Gas | |||
& Electric Corp. | |||
MECREDY,R.C. | |||
Rochester Gas | |||
& Electric Corp. | |||
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating rept for Apr 1992 for Ginna Station.W/920515 ltr.DISTRIBUTION CODE: IE24D COPIES'RECEIVED:LTR | Monthly operating rept for Apr 1992 for Ginna Station. | ||
/ENCL/SIZE: X TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). | W/920515 ltr. | ||
O5OOO244 D RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA NRR/-DEPQ%EPEEg.o G=FPHE~EXTERNAL EG&G BRYCE | DISTRIBUTION CODE: IE24D COPIES'RECEIVED:LTR | ||
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO | / | ||
ENCL / | |||
SIZE: X TITLE: Monthly Operating Report (per Tech Specs) | |||
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). | |||
O5OOO244 D | |||
RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA NRR/-DEPQ%EPEEg.o G=FPHE~ | |||
EXTERNAL EG&G BRYCE IJ ~ H NSIC COPIES LTTR ENCL 3 | |||
3 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGNl NRC PDR COPIES LTTR ENCL 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 D | |||
D | |||
~ | |||
rVP (7yel '7 5 S <I R | |||
D NOTE TO ALL"RIDS" RECIPIENTS: | |||
D D | |||
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: | |||
LTTR 14 ENCL 14 | |||
0 0 | |||
,I | |||
r IIItIIIIIII/ | |||
IIrIIIIIIIII Arm zz]gm 'zvntzzz i zzz.l8 uizizz ROCHESTER GAS AND ELECTRIC CORPORATION ROBERT C. MECREDY Vice President Cinna Nudear Production ala ~ 4 I>4 r | |||
T vota state 4 | |||
89 EAST AVENUE, ROCHESTER N. Y. 1464g-0001 TELEPHONE AREACODETtB 546 2700 GINNA STATION May 15, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 | |||
==Subject:== | ==Subject:== | ||
Monthly Report for April, 1992 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244 | Monthly Report for April, 1992 Operating Status Information R. | ||
E. Ginna Nuclear Power Plant Docket No. 50-244 | |||
==Dear Sir:== | ==Dear Sir:== | ||
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1992.Very truly yours, Robert C.Me redy RCM/deb Attachments cc: Mr.Thomas T.Martin NRC (1)f@he 9205i5003 05000244 7'Ti20430 PDR ADOCK R | Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1992. | ||
~~1 y l' | Very truly yours, Robert C. | ||
~~OPERATING DATA REPORT DOCKET HO.50.244 DATE Ms 5 1992 COMPLETED BY Robert ED Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext.396 2.3.4.5.6.7.Unit Name: R.E.GINNA NUCLEAR POWER PLANT Reporting Period: A ril 1992 Licensed Thermal Power (M'Wt): Hsmeplate Rating (Gross MWe): Design Electrical Rating (Het MWe): Maxiaxm Dependable Capacity (Gross MWe): Maxiaxm Dependable Capacity (Net We): If Changes Occur in Capacity Ratings (Items Notes: The unit remained off the line for the entire report period, for the annual Refueling and Maintenance outage.1520 490 470 490 470 Nunber 3 Through 7)Since Last Report, Give Reasons: 9.Power Level to Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr.-to-Date Cunulative 11~12.13.14.15~16.17.18.19.20.21~22.23.Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (WN)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate 719 2903 2012.47 1983.75 2 756 352 931 728 883 027 68.33K 68.33K 64.72K 64.72K 4.41K 197 009.45 155 343.43 1 687.55 | Me redy RCM/deb Attachments cc: | ||
Forecast Achieved | Mr. Thomas T. Martin NRC (1) f @he 9205i5003 05000244 7 'Ti20430 PDR ADOCK R | ||
E l)OCKET NO.SO-244 | |||
~~rr~~~ | ~ | ||
~ | |||
1 y | |||
l' | |||
~ | |||
~ | |||
OPERATING DATA REPORT DOCKET HO. | |||
50.244 DATE Ms 5 1992 COMPLETED BY Robert ED Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext. 396 2. | |||
3. | |||
4. | |||
5. | |||
6. | |||
7. | |||
Unit Name: | |||
R.E. | |||
GINNA NUCLEAR POWER PLANT Reporting Period: | |||
A ril 1992 Licensed Thermal Power (M'Wt): | |||
Hsmeplate Rating (Gross MWe): | |||
Design Electrical Rating (Het MWe): | |||
Maxiaxm Dependable Capacity (Gross MWe): | |||
Maxiaxm Dependable Capacity (Net We): | |||
If Changes Occur in Capacity Ratings (Items Notes: | |||
The unit remained off the line for the entire report period, for the annual Refueling and Maintenance outage. | |||
1520 490 470 490 470 Nunber 3 Through 7) Since Last Report, Give Reasons: | |||
9. | |||
Power Level to Which Restricted, If Any (Net MWe): | |||
10. | |||
Reasons For Restrictions, If Any: | |||
This Month Yr.-to-Date Cunulative 11 ~ | |||
12. | |||
13. | |||
14. | |||
15 ~ | |||
16. | |||
17. | |||
18. | |||
19. | |||
20. | |||
21 ~ | |||
22. | |||
23. | |||
Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH) | |||
Gross Electrical Energy Generated (WN) | |||
Net Electrical Energy Generated (MWH) | |||
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net) | |||
Unit Capacity Factor (Using DER Net) | |||
Unit Forced Outage Rate 719 2903 2012.47 1983.75 2 756 352 931 728 883 027 68.33K 68.33K 64.72K 64.72K 4.41K 197 009.45 155 343.43 1 687.55 152 689.13 1687.55 2 756 352 931 728 883 027 74.41K 74.41K 6.03K 24. | |||
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): | |||
Annual Refuelin snd Maintenance Outs e: | |||
Startin March 27 1992 Duration: 43 ds s 25. | |||
If Shut Down At End Of Report Period, Estimated Date of Startup: | |||
05-09-92 26. | |||
Units In Test Status (Prior to Conmerciai Operation): | |||
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION "CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975 | |||
<<*ClÃULATIVETOTAL COMMENCING NOVEMBER 8, 1969 | |||
0 1 | |||
)t E | |||
A | |||
AVERAGE DAILY UNIT POWER LEVEL MONTH A ril 1992 DOCKET NO. | |||
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Ma 15 92 COMPLETED BY Robert E. | |||
Dodge TELEPHONE 1 | |||
315 524-4446 ext. | |||
396 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | |||
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 ' | |||
~ | |||
18. | |||
3 ~ | |||
19 ' | |||
~ | |||
20 ~ | |||
5. | |||
21. | |||
6. | |||
22 ' | |||
~ | |||
23 24 ' | |||
~ | |||
25 | |||
'0. | |||
26. | |||
27. | |||
12 ~ | |||
28. | |||
13'9. | |||
14. | |||
30. | |||
15'1. | |||
16 | |||
'NSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
E l)OCKET NO. | |||
SO-244 UNITNAMf. R.E. GINNA NUCLEAR POWER PLAN'f UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETED I3Y REPORT MONTH 11'.LEPllONE 1 -524-4446 Ext 396 Ho. | |||
Date | |||
.0 0 0 0X O~ | |||
r0 0o IIl 0I >>0 r 0 0>> | |||
O | |||
> cc 0 I/l r 0Q I icensee Event Report N | |||
Ew o | |||
I/I 0 cn ~ | |||
r0 Ml r00 0 | |||
E O U | |||
Cause gI Corrective Action to Prevent Recurrence 4-92 S | |||
719 The unit remained Shutdown for the entire Report Period, for the Annual Refueling and Maintenance outage. | |||
1 F: | |||
Forced S: | |||
Scheduled REV. 4/SS 4949 Reason: | |||
A-EIIuipment Failure (Explain) | |||
B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training gt License Examination F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain) 3 Method: | |||
14fanual 2-Manual Scram. | |||
3-Automatic Scram. | |||
4-Other (Explain) | |||
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) | |||
Exhibit 1 - Same Source | |||
~ | |||
~ | |||
rr | |||
~ | |||
~ | |||
~ | |||
NARRATIVE | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE Ma 199 COMPLETED BY obert E.Dodge TELEPHONE 1 315 524-4446 ext.396 MONTH A ril 1992 The unit was Shutdown for the Annual Refueling and Maintenance outage.The unit remained Shutdown at the end of the Report Period. | OF OPERATING EXPERIENCE DOCKET NO. | ||
~A~~}} | 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Ma 199 COMPLETED BY obert E. | ||
Dodge TELEPHONE 1 | |||
315 524-4446 ext. | |||
396 MONTH A ril 1992 The unit was Shutdown for the Annual Refueling and Maintenance outage. | |||
The unit remained Shutdown at the end of the Report Period. | |||
~ | |||
A | |||
~ | |||
~}} | |||
Latest revision as of 10:20, 8 January 2025
| ML17262A841 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 04/30/1992 |
| From: | Dodge R, Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9205150037 | |
| Download: ML17262A841 (10) | |
Text
., ACCELERATED DI UTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9205150037 DOC.DATE: 92/04/30 NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.
Rochester Gas
& Electric Corp.
MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244
SUBJECT:
Monthly operating rept for Apr 1992 for Ginna Station.
W/920515 ltr.
DISTRIBUTION CODE: IE24D COPIES'RECEIVED:LTR
/
ENCL /
SIZE: X TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
O5OOO244 D
RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA NRR/-DEPQ%EPEEg.o G=FPHE~
EXTERNAL EG&G BRYCE IJ ~ H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGNl NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D
~
rVP (7yel '7 5 S 4 r
T vota state 4
89 EAST AVENUE, ROCHESTER N. Y. 1464g-0001 TELEPHONE AREACODETtB 546 2700 GINNA STATION May 15, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for April, 1992 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1992.
Very truly yours, Robert C.
Me redy RCM/deb Attachments cc:
Mr. Thomas T. Martin NRC (1) f @he 9205i5003 05000244 7 'Ti20430 PDR ADOCK R
~
~
1 y
l'
~
~
OPERATING DATA REPORT DOCKET HO.
50.244 DATE Ms 5 1992 COMPLETED BY Robert ED Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext. 396 2.
3.
4.
5.
6.
7.
Unit Name:
R.E.
GINNA NUCLEAR POWER PLANT Reporting Period:
A ril 1992 Licensed Thermal Power (M'Wt):
Hsmeplate Rating (Gross MWe):
Design Electrical Rating (Het MWe):
Maxiaxm Dependable Capacity (Gross MWe):
Maxiaxm Dependable Capacity (Net We):
If Changes Occur in Capacity Ratings (Items Notes:
The unit remained off the line for the entire report period, for the annual Refueling and Maintenance outage.
1520 490 470 490 470 Nunber 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cunulative 11 ~
12.
13.
14.
15 ~
16.
17.
18.
19.
20.
21 ~
22.
23.
Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (WN)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate 719 2903 2012.47 1983.75 2 756 352 931 728 883 027 68.33K 68.33K 64.72K 64.72K 4.41K 197 009.45 155 343.43 1 687.55 152 689.13 1687.55 2 756 352 931 728 883 027 74.41K 74.41K 6.03K 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Annual Refuelin snd Maintenance Outs e:
Startin March 27 1992 Duration: 43 ds s 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
05-09-92 26.
Units In Test Status (Prior to Conmerciai Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION "CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
<<*ClÃULATIVETOTAL COMMENCING NOVEMBER 8, 1969
0 1
)t E
A
AVERAGE DAILY UNIT POWER LEVEL MONTH A ril 1992 DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Ma 15 92 COMPLETED BY Robert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 '
~
18.
3 ~
19 '
~
20 ~
5.
21.
6.
22 '
~
23 24 '
~
25
'0.
26.
27.
12 ~
28.
13'9.
14.
30.
15'1.
16
'NSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
E l)OCKET NO.
SO-244 UNITNAMf. R.E. GINNA NUCLEAR POWER PLAN'f UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETED I3Y REPORT MONTH 11'.LEPllONE 1 -524-4446 Ext 396 Ho.
Date
.0 0 0 0X O~
r0 0o IIl 0I >>0 r 0 0>>
O
> cc 0 I/l r 0Q I icensee Event Report N
Ew o
I/I 0 cn ~
r0 Ml r00 0
E O U
Cause gI Corrective Action to Prevent Recurrence 4-92 S
719 The unit remained Shutdown for the entire Report Period, for the Annual Refueling and Maintenance outage.
1 F:
Forced S:
Scheduled REV. 4/SS 4949 Reason:
A-EIIuipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training gt License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
14fanual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
~
~
rr
~
~
~
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Ma 199 COMPLETED BY obert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH A ril 1992 The unit was Shutdown for the Annual Refueling and Maintenance outage.
The unit remained Shutdown at the end of the Report Period.
~
A
~
~