., ACCELERATED DI UTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9205150037 DOC.DATE: 92/04/30 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas & Electric Corp.

MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Apr 1992 for Ginna Station.

W/920515 ltr. D DISTRIBUTION CODE: IE24D COPIES'RECEIVED:LTR / ENCL / SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

X NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). O5OOO244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-3 LA 3 3 PD1-3 PD 1 1 JOHNSON,A 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/-DEPQ%EPEEg.o 1 1 NRR/DOEA/OEAB 1 1 G=FPHE~ 1 1 RGNl 1 1 EXTERNAL EG&G BRYCE I J ~ H 1 1 NRC PDR 1 1 NSIC 1 1

~ rVP (7yel '7 5 S 4 r

Arm /

IIItIIIIIII IIrIIIIIIIII

'zvntzzz r T vota zz]gm i zzz.l8 uizizz state ROCHESTER GAS AND ELECTRIC CORPORATION 4 89 EAST AVENUE, ROCHESTER N. Y. 1464g-0001 ROBERT C. MECREDY TELEPHONE Vice President AREA CODETtB 546 2700 Cinna Nudear Production GINNA STATION May 15, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for April, 1992 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1992.

Very truly yours, Robert C. Me redy RCM/deb Attachments cc: Mr. Thomas T. Martin NRC (1) f @he 9205i5003 7 'Ti20430 05000244 PDR ADOCK R

~ ~

1 y

l'

~ ~

OPERATING DATA REPORT DOCKET HO. 50.244 DATE Ms 5 1992 COMPLETED BY Robert ED Dodge TELEPHONE 315 524.4446 ext. 396 OPERATING STATUS Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes: The unit remained off the

2. Reporting Period: A ril 1992 line for the entire report
3. Licensed Thermal Power (M'Wt): 1520 period, for the annual
4. Hsmeplate Rating (Gross MWe): 490 Refueling and Maintenance
5. Design Electrical Rating (Het MWe): 470 outage.
6. Maxiaxm Dependable Capacity (Gross MWe): 490
7. Maxiaxm Dependable Capacity (Net We): 470 If Changes Occur in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cunulative 11 ~ Hours In Report Period 719 2903 197 009.45

12. Nunber of Hours Reactor Was Critical 2012.47 155 343.43
13. Reactor Reserve Shutdown Hours 1 687.55 *
14. Hours Generator On-Line 1983.75 152 689.13 15 ~ Unit Reserve Shutdown Hours 1687.55 *
16. Gross Thermal Energy Generated (MWH) 2 756 352 2 756 352
17. Gross Electrical Energy Generated (WN) 931 728 931 728
18. Net Electrical Energy Generated (MWH) 883 027 883 027
19. Unit Service Factor 68.33K
20. Unit Availability Factor 68.33K 21 ~ Unit Capacity Factor (Using MDC Net) 64.72K 74.41K
22. Unit Capacity Factor (Using DER Net) 64.72K 74.41K
23. Unit Forced Outage Rate 4.41K 6.03K
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Refuelin snd Maintenance Outs e: Startin March 27 1992 Duration: 43 ds s

25. If Shut Down At End Of Report Period, Estimated Date of Startup: 05-09-92
26. Units In Test Status (Prior to Conmerciai Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION "CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975

<<*ClÃULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

1 )t 0

E A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Ma 15 92 COMPLETED BY Robert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH A ril 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 17 '

~ 18.

3 ~ 19 '

~ 20 ~

5. 21.

'9.

6. 22 '

~ 23

'1.

24 '

~ 25 26.

'0.

27.

12 ~ 28.

13

14. 30.

15 16

'NSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

E l)OCKET NO. SO-244 UNIT NAMf. R.E. GINNA NUCLEAR POWER PLAN'f UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETED I3Y REPORT MONTH 11'.LEPllONE 1 -524-4446 Ext 396 IIl r0 0I >>

r0 0 r Ho. Date

.0 0 0 0>>> ccO I icensee Event Ew o

r00 Ml Cause gI Corrective 0 I/I 0 0 Action to 0X O~ o 0 I/l r Report N cn 0

~ E O Prevent Recurrence 0 U Q

4-92 S 719 The unit remained Shutdown for the entire Report Period, for the Annual Refueling and Maintenance outage.

1 3

F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-EIIuipment Failure (Explain) 14fanual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E&perator Training gt License Examination F-Administrative G-Operational Error (Explain)

REV. 4/SS 4949 H-Other (Explain) Exhibit 1 - Same Source

~

~ ~

~ ~

rr NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Ma 199 COMPLETED BY obert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH A ril 1992 The unit was Shutdown for the Annual Refueling and Maintenance outage. The unit remained Shutdown at the end of the Report Period.

~ A

~ ~