ML17277B037: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 2: Line 2:
| number = ML17277B037
| number = ML17277B037
| issue date = 06/30/1983
| issue date = 06/30/1983
| title = Rev 2 to Administrative Procedure 1.3.4, Operating Data Logs.
| title = Rev 2 to Administrative Procedure 1.3.4, Operating Data Logs
| author name = Martin J
| author name = Martin J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:'IttASHINGTON PUBLIC POPOVER SUPPLY SYSTKM-PLA.'IT PRO(:EDI RE IIA'ALAI.
{{#Wiki_filter:'IttASHINGTON PUBLIC POPOVER SUPPLY SYSTKM-gggQO(g RQ(QQDO QQp p PLA.'IT PRO(:EDI RE IIA'ALAI.
gggQO(g        RQ(QQDO        QQp p Irx p.
Irxp.
PROCEOURE NUMBER               APPR   0                     DATE eel ~ 3                                                            6/30/83 VOLUME e4AME 1           ADMINISTRATIVE PROCEDURES SECTlON 1.3         CONDUCT OF OPERATIONS TITLE
PROCEOURE NUMBER eel ~ 3 VOLUMEe4AME APPR 0
                        +1.3.4       OPERATING DATA AND LOGS l.3.4.1   P~ur oee This procedure provides instructions to assure that plant operations are adequately recorded and the records are prepared, reviewed, and main-tained in a meaningful manner.
DATE 6/30/83 1
The records are assembled on the graveyard shift daily and forwarded to the day   shift manager for proper distribution and storage.
ADMINISTRATIVEPROCEDURES SECTlON 1.3 CONDUCT OF OPERATIONS TITLE
The minimum     records included are:
+1.3.4 OPERATING DATA AND LOGS l.3.4.1 P~ur oee This procedure provides instructions to assure that plant operations are adequately recorded and the records are prepared,
A. Shift   Manager's Log Book B. Control     Room Log Book C. Radwaste Log Book D. Fuel Handling Log Book E. Daily and Shift Operating Records F. Periodic Surveillance Records G. Operating Data Log Sheets H. Computer Logs I. Recorder Charts The Log Books       will be duplicate logs.       Each book will be a bound book having two     identical sheets per       page number.       Each set of pages will be sequentially numbered. The set           of pages will have a carbonless copy.
: reviewed, and main-tained in a meaningful manner.
The copy   will be perforated so it       can be removed for routing to Plant Management.
The records are assembled on the graveyard shift daily and forwarded to the day shift manager for proper distribution and storage.
1.3.4.2   General   Instructions for Record Partici ation A. The logs will be the means by which operating information important to the following shifts and plant management is recorded. It is, therefore, essential that log entries be legible, accurate and com-plete.
The minimum records included are:
B. A new   page   shall be started at the beginning of         each graveyard   shift.
A.
PROCEOURE NUMBER       REVISION NUMBER      PAGE NUMBER 1.3.4                                   1.3.4-1 of 10 331111 8311310343 05000397 PDDR ADOCII p,
Shift Manager's Log Book B.
PDR
Control Room Log Book C.
Radwaste Log Book D.
Fuel Handling Log Book E.
Daily and Shift Operating Records F.
Periodic Surveillance Records G.
Operating Data Log Sheets H.
Computer Logs I.
Recorder Charts The Log Books will be duplicate logs.
Each book will be a bound book having two identical sheets per page number.
Each set of pages will be sequentially numbered.
The set of pages will have a carbonless copy.
The copy will be perforated so it can be removed for routing to Plant Management.
1.3.4.2 General Instructions for Record Partici ation A.
The logs will be the means by which operating information important to the following shifts and plant management is recorded.
It is, therefore, essential that log entries be legible, accurate and com-plete.
B.
A new page shall be started at the beginning of each graveyard shift.
8311310343 331111 PDDR ADOCII 05000397 p,
PDR PROCEOURE NUMBER REVISION NUMBER 1.3.4 PAGE NUMBER 1.3.4-1 of 10


                            ~
~ )
                              )
V'F93 6"-.'.3JG8"I'f49QV<Q
V'F93 6"-.'.3 JG8"I'f49QV<Q


~ )
~
      ~
)
U. . All log entries shall       be made in ink.,
~ U.
: 0. Erasures are not permitted.
. All log entries shall be made in ink.,
line If an error is made,     it shall be voided by a   single         drawn through the entry and initialed by the person voiding the entry.
0.
E. All entries in the       Log Books shall be proceeded by a time and entered in chronological order. Any late entries are to be made in the log by identifying the entry with L.E. in the left hand margin.
Erasures are not permitted.
If an error is made, it shall be voided by a single line drawn through the entry and initialed by the person voiding the entry.
E.
All entries in the Log Books shall be proceeded by a time and entered in chronological order.
Any late entries are to be made in the log by identifying the entry with L.E. in the left hand margin.
The time and date of when the entry should have been entered will be noted.
The time and date of when the entry should have been entered will be noted.
F. All log entries shall be entered in a timely manner.             It shall nor-mally be done immediately after the event occurred.
F.
G. The Log Books will be identified by         title,   date started and finished, and volume number on the outside of the front cover.
G.
H. The  perforated duplicate pages of the Log Books for the previous 24 hour time duration will be removed at the beginning of each grave-yard shift and routed =to the Operations Manager for his review, distribution,      and  storage.
All log entries shall be entered in a timely manner.
When   completely filled out each Log Book shall be retained for reference in the Shift Manager's office, except for the Radwaste Log Book which shall be retained in the Radwaste Control Room. When no longer needed for this purpose, the Log Books shall be routed to the Plant's Record Stora g e File and p rocessed per document guide in the Plant Administrative Procedure 1.6.4.
It shall nor-mally be done immediately after the event occurred.
1.3.4.3   S   ecific Information for       Record Pre aration A. Shift   Mana er's Lo The purpose     of the Shift Manager's Log is to provide operational information important to the following shifts as well as plant man-agement personnel.       Although the extent and detail of the informa-tion logged will be determined and normally logged by the Shift Manager, the following should be included as a minimm:
The Log Books will be identified by title, date started and
: 1. Completion of a predetermined stamp at the start of each shift. If the predetermined stamp is not available, write in the following information:
: finished, and volume number on the outside of the front cover.
: a. Shift and Oate
When completely filled out each Log Book shall be retained for reference in the Shift Manager's office, except for the Radwaste Log Book which shall be retained in the Radwaste Control Room.
: b.     Shift Manager's   Name ROCKOVRK NVMBKR     RKV ISION NVMBKR     PAQK NVMBKR x.3.4                   2           l.3.4-2 of 10
When no longer needed for this purpose, the Log Books shall be routed to the Plant's Record Stora e File and rocessed per document guide in the g
: c. Names    of all individuals    on  shift
p Plant Administrative Procedure 1.6.4.
: d. Designate Fire Srigade Member
1.3.4.3 S ecific Information for Record Pre aration H.
: 2. Any  reduction in power and reason for          same.
The perforated duplicate pages of the Log Books for the previous 24 hour time duration will be removed at the beginning of each grave-yard shift and routed =to the Operations Manager for his review, distribution, and storage.
: 3. Status and authorization permit number of radioactive releases to the environs.
A.
: 4. Timed  entries for the following:
Shift Mana er's Lo The purpose of the Shift Manager's Log is to provide operational information important to the following shifts as well as plant man-agement personnel.
: a. Change    of operating mode
Although the extent and detail of the informa-tion logged will be determined and normally logged by the Shift
: b. Start of control rod withdrawal for reactor startup
: Manager, the following should be included as a minimm:
: c. Reactor    criticality
1.
: d. Reactor    trip and cause for    same
Completion of a predetermined stamp at the start of each shift. If the predetermined stamp is not available, write in the following information:
: e. Any  technical specification limit exceeded or potential reportable occurrence including plant management notifica-tion.
a.
: 5. Initiation    and completion  of surveillance testing.
Shift and Oate b.
: 6. Red  arrow items
Shift Manager's Name ROCKOVRK NVMBKR RKVISION NVMBKR PAQK NVMBKR x.3.4 2
: a. The purpose    of this system is to provide a method of draw-ing attention to items where followup action is absolutely essential.
l.3.4-2 of 10
: b. Red  arrow procedure-
: 1)    When  the Shift Manager encounters a situation where he deems  followup action is mandatory, he shall note
              'his by placing    a red arrow in the margin to the left of the log entry.
: 2)  -
When a  red arrow item    is closed, the Shift Manager closing the item will make a "red arrow" entry stat-ing the reason or action for closing. He shall write the word "closed" above the red arrow and log the page number and date of the originating red arrow entry below    it. The word "closed" shall then be written above the originating red arrow and log the page number and date of the closing entry written below  it.
: 3)    Open  red arrow items are identified by the lack of cross referenced log and page number and date written below the red arrow.
PRQCKQVRK NVMBKR      RKVISIQN iVVMBKR  iPAQK NVMBKR 2    i  1.3.4-3 of
                                                                        '.3.4 10


v a The open red arrow    items shall be compiled and writ-ten in the Shift Manager's log each Monday on the graveyard shift. 'When compiling this list, the Shift Manager shall indicate the log and page number and date where each of the open red arrow items can be found.
c.
: 5)    The Operations    Manager    shall assist in expediting red arrow items requiring engineering,          maintenance,    or management    action.
Names of all individuals on shift d.
: 7. Any injury or sickness occurring        on  shift.
Designate Fire Srigade Member 2.
: 8. The names  of extra personnel required for plant operation.
Any reduction in power and reason for same.
: 9. Any deviation from approved procedures          as per  PPM  1.2.4.
3.
: 10. Any significant    maintenance  activity occurring      on  the  shift.
Status and authorization permit number of radioactive releases to the environs.
ll. Other information or events the Shift Manager feels              may have operational or historical value.
4.
The Shift Manager shall enter the name        of his relief    and    sign the log at the  end of each shift.
Timed entries for the following:
t~ll The purpose  of the control room log is to provide a complete and accurate account of plant operation to the following shifts as well as plant management personnel.       Entries shall be of sufficient detail that any previous plant condition can be reconstructed from them. The Reactor Operator will normally be the individual making the entries into th Control Room Log Book. The control room log shall be the OFFICIAL plant operating record. The following should be entered as a mrnimum
a.
: 1. Completion    of a predetermined    stamp  at the start of each shift. If the predetermined stamp      is not available write in the following information:
Change of operating mode b.
: a. Shift  and Date
Start of control rod withdrawal for reactor startup c.
: b. Control  Room Supervisor's    Name
Reactor criticality d.
: c. Name  of all individuals    on  shift
Reactor trip and cause for same e.
: 2. Plant startups and shutdowns.
Any technical specification limit exceeded or potential reportable occurrence including plant management notifica-tion.
PRACKDURK NUMBKR      JRKVIBIQN iiUMBKR      ~
5.
Paa K NUMBKR 2             1.3.4-4 of 10
Initiation and completion of surveillance testing.
6.
Red arrow items a.
The purpose of this system is to provide a method of draw-ing attention to items where followup action is absolutely essential.
b.
Red arrow procedure-1)
When the Shift Manager encounters a situation where he deems followup action is mandatory, he shall note
'his by placing a red arrow in the margin to the left of the log entry.
2)
When a red arrow item is closed, the Shift Manager closing the item will make a "red arrow" entry stat-ing the reason or action for closing.
He shall write the word "closed" above the red arrow and log the page number and date of the originating red arrow entry below it.
The word "closed" shall then be written above the originating red arrow and log the page number and date of the closing entry written below it.
3)
Open red arrow items are identified by the lack of cross referenced log and page number and date written below the red arrow.
PRQCKQVRK NVMBKR RKVISIQNiVVMBKR iPAQK NVMBKR
'.3.4 2
i 1.3.4-3 of 10


,  3. Significant  power changes    and the mechanism used to  make  the change.
v a
: 4. Status changes in equipment, components, or structures that affect plant operation.
The open red arrow items shall be compiled and writ-ten in the Shift Manager's log each Monday on the graveyard shift.
: 5. Initiation  and completion    of all surveillance tests.
'When compiling this list, the Shift Manager shall indicate the log and page number and date where each of the open red arrow items can be found.
: 6. Initiation  and  completion of   all special tests.
5)
: 7. Status and authorization permit number of radioactive releases to the environs.
The Operations Manager shall assist in expediting red arrow items requiring engineering, maintenance, or management action.
: 8. All electrical switching.
7.
: 9. Maintenance activities that affect operations.
Any injury or sickness occurring on shift.
: 10. Other events, alarms, and actions that control room operator feels may have operational or historical value.
8.
The control room supervisor and the reactor operator shall enter the name   of his relief and sign the log at the end of each shift.
The names of extra personnel required for plant operation.
  ~5t The purpose   of the radwaste log is to provide the following shifts as well as   plant   management personnel an accurate record of all radioactive waste systems operation. Entries shall be made by shift operating personnel. The Radwaste Operator will normally be that individual making the entries into the Radwaste Log Book. Entries shall include, but are limited to, the following:
9.
: 1. Completion   of   a predetermined stamp at the start of each shift. If the   predetermined stamp is not available write in the following information:
Any deviation from approved procedures as per PPM 1.2.4.
: a. Shift and Date
10.
: b. Shift Support Supervisor's Name
Any significant maintenance activity occurring on the shift.
: c. Name of Radwaste Operator(s)
ll.
: 2. All transfers of      water from the radwaste system to the conden-sate storage or other plant systems.
Other information or events the Shift Manager feels may have operational or historical value.
: 3. Status changes in equipment or components that affect plant or radwaste system operation.
The Shift Manager shall enter the name of his relief and sign the log at the end of each shift.
ROCKDVRK NLlMBKR      RKVISION NVMBKR  iPACiK NVMBKR 1.3. 4                  2         1.3.4-5 of 10
t~ll The purpose of the control room log is to provide a complete and accurate account of plant operation to the following shifts as well as plant management personnel.
Entries shall be of sufficient detail that any previous plant condition can be reconstructed from them.
The Reactor Operator will normally be the individual making the entries into th Control Room Log Book.
The control room log shall be the OFFICIAL plant operating record.
The following should be entered as a mrnimum 1.
Completion of a predetermined stamp at the start of each shift. If the predetermined stamp is not available write in the following information:
a.
Shift and Date b.
Control Room Supervisor's Name c.
Name of all individuals on shift 2.
Plant startups and shutdowns.
PRACKDURK NUMBKR JRKVIBIQNiiUMBKR
~Paa K NUMBKR 2
1.3.4-4 of 10


I ~ I
, 3.
  , 4. Any unusual   increase in floor drain or equipment drain systems inventory.
Significant power changes and the mechanism used to make the change.
: 5. Status and authorization permit number or radioactive releases to the environs.
4.
: 6. Any other events or information the operator       may   feel to have operational significance.
Status changes in equipment, components, or structures that affect plant operation.
: 7. Any significant maintenance   activity   which occurred during the shift.
5.
: 8. The Shift Support Supervisor will use this log to identify         and relay to other shifts any information he determines to be important.
Initiation and completion of all surveillance tests.
: 9. Other information the Rad Waste Operator feels       may have   opera-tional or historical value.
6.
Initiation and completion of all special tests.
7.
Status and authorization permit number of radioactive releases to the environs.
8.
All electrical switching.
9.
Maintenance activities that affect operations.
10.
Other events,
: alarms, and actions that control room operator feels may have operational or historical value.
The control room supervisor and the reactor operator shall enter the name of his relief and sign the log at the end of each shift.
~5t The purpose of the radwaste log is to provide the following shifts as well as plant management personnel an accurate record of all radioactive waste systems operation.
Entries shall be made by shift operating personnel.
The Radwaste Operator will normally be that individual making the entries into the Radwaste Log Book.
Entries shall include, but are limited to, the following:
1.
Completion of a predetermined stamp at the start of each shift. If the predetermined stamp is not available write in the following information:
a.
Shift and Date b.
Shift Support Supervisor's Name c.
Name of Radwaste Operator(s) 2.
All transfers of water from the radwaste system to the conden-sate storage or other plant systems.
3.
Status changes in equipment or components that affect plant or radwaste system operation.
ROCKDVRK NLlMBKR RKVISIONNVMBKR iPACiKNVMBKR 1.3. 4 2
1.3.4-5 of 10
 
I
~
I
 
, 4.
5.
Any unusual increase in floor drain or equipment drain systems inventory.
Status and authorization permit number or radioactive releases to the environs.
6.
Any other events or information the operator may feel to have operational significance.
7.
Any significant maintenance activity which occurred during the shift.
8.
9.
The Shift Support Supervisor will use this log to identify and relay to other shifts any information he determines to be important.
Other information the Rad Waste Operator feels may have opera-tional or historical value.
Upon making the last entry for his shift, the Shift Support Super-visor and assicped radwaste equipment operator shall enter the name of their respective relief and sign the log at the end of each shift.
Upon making the last entry for his shift, the Shift Support Super-visor and assicped radwaste equipment operator shall enter the name of their respective relief and sign the log at the end of each shift.
~.   ~ill dli The purpose of the fuel handling log 'is to provide following shifts and plant management personnel with information concerning         all evolutions conducted on the refueling floor. The fuel handling log shall only be maintained during periods of refueling floor acti-vity. The Senior Reactor Operator in charge of fuel handling           will normally be the individual making entries into the Fuel Handling Log Book. At other times, office.
~. ~ill dli The purpose of the fuel handling log 'is to provide following shifts and plant management personnel with information concerning all evolutions conducted on the refueling floor.
it shall be stored in the Shift Manager'
The fuel handling log shall only be maintained during periods of refueling floor acti-vity.
: 1. Completion of a predetermined   stamp   at the start of each shift. If the predetermined stamp   is not available write in the following information:
The Senior Reactor Operator in charge of fuel handling will normally be the individual making entries into the Fuel Handling Log Book.
: a. Shift and Oate
At other times, it shall be stored in the Shift Manager' office.
: b. Fuel Handling Supervisor's     Name
1.
: c. Names of all individuals   on Refueling Crew
Completion of a predetermined stamp at the start of each shift. If the predetermined stamp is not available write in the following information:
: 2. Any discrepancies   found during the inspection   of new fuel.
a.
: 3. Any problem encountered     with the movement of new fuel.
Shift and Oate b.
PROCKQURK NUMBKR     RKVISIQN NUMBKR      PAGK NVMBKR 1.3.4                   2             1.3.4-6 of 10
Fuel Handling Supervisor's Name c.
Names of all individuals on Refueling Crew 2.
Any discrepancies found during the inspection of new fuel.
3.
Any problem encountered with the movement of new fuel.
PROCKQURK NUMBKR RKVISIQNNUMBKR PAGK NVMBKR 1.3.4 2
1.3.4-6 of 10


l ~ ~
l
        ~
~
~
~
d
d
: 4. The  installation or removal of any reactor component.
: 5. Identification of the number of fuel elements,* control rods, and neutron sources handled during the shift. The detailed accountability of these items will be controlled per instruc-tions in the Plant Procedures Manual, Volume 9.
: 6. Equipment  failure  and  corrective action taken.
: 7. Any  situation involving unusual radiation or contamination levels.
: 8. All evolutions involving the fuel      cask and the shipping      of fuel.
: 9. Other information the refueling supervisor feels          may have    oper-ational or historical value.
The  refueling supervisor shall enter the        name    of his relief    and  sign the log at the end of each shift.
E. Dail    and  Shift  0  eratin    Records The purpose of these records is to ensure that the daily and shift surveillance testing required by the technical specifications are accomplished and documented, and that the results are satisfactory or appropriate action taken.
The daily and shift      surveillance records shall contain the following column headings:
: 1. Technical specification reference
: 2. Monitored parameter
: 3.  'nstrument      number
: 4. Parameter units    of  measurement
: 5. Technical specification      limit
: 6. Normal value or range
: 7. Actual value
: 8. Comments When  filled -out,  the responsible operator shall        initial the  record below each "actual value" column.
  ~
Should any parameter fall outside the technical specification limit, the Shift Manager shall be immediately notified and that value circled in red with      an explanation given in the      Comments  section.
The  Shift  Manager shall review the daily and      shift  operating records and  sign them in the space provided.
RQCKQURK NUMBKR    RKVISIQN NUMBKR      iPACK NUMBKR 1.3.4                  2'            .1 3 '-7    of 10


        ~ ~
4.
1 n k. S I
5.
The installation or removal of any reactor component.
Identification of the number of fuel elements,* control rods, and neutron sources handled during the shift.
The detailed accountability of these items will be controlled per instruc-tions in the Plant Procedures
: Manual, Volume 9.
6.
Equipment failure and corrective action taken.
7.
Any situation involving unusual radiation or contamination levels.
8.
All evolutions involving the fuel cask and the shipping of fuel.
9.
Other information the refueling supervisor feels may have oper-ational or historical value.
The refueling supervisor shall enter the name of his relief and sign the log at the end of each shift.
E.
Dail and Shift 0 eratin Records The purpose of these records is to ensure that the daily and shift surveillance testing required by the technical specifications are accomplished and documented, and that the results are satisfactory or appropriate action taken.
The daily and shift surveillance records shall contain the following column headings:
1.
Technical specification reference 2.
Monitored parameter
: 3. 'nstrument number 4.
Parameter units of measurement 5.
Technical specification limit 6.
Normal value or range 7.
Actual value 8.
Comments When filled -out, the responsible operator shall initial the record below each "actual value" column.
~
Should any parameter fall outside the technical specification limit, the Shift Manager shall be immediately notified and that value circled in red with an explanation given in the Comments section.
The Shift Manager shall review the daily and shift operating records and sign them in the space provided.
RQCKQURK NUMBKR RKVISIQNNUMBKR iPACK NUMBKR 1.3.4 2'
.1 3'-7 of 10
 
~
~
1 n
k.
S I


ihe completed daily and shift operating records shall be forwarded to Operations Shift Manager for distribution and storage. When no longer needed in the active storage file, it shall be routed to the Plant's Record Storage File and process per the Document Guide in the Plant's Administrative Procedure 1.6.4.
ihe completed daily and shift operating records shall be forwarded to Operations Shift Manager for distribution and storage.
Periodic Surveillance Records See PPM   1.5.1, Technical Specification Surveillance Testing Program 0 eratin   Data Lo sheets The purpose   of operating data log sheets is to provide Operations personnel with periodic readings of important plant operating data.
When no longer needed in the active storage file, it shall be routed to the Plant's Record Storage File and process per the Document Guide in the Plant's Administrative Procedure 1.6.4.
This data is important to Operations because         it may indicate trends'f developing equipment failures of improper operating practices.
Periodic Surveillance Records See PPM 1.5.1, Technical Specification Surveillance Testing Program 0 eratin Data Lo sheets The purpose of operating data log sheets is to provide Operations personnel with periodic readings of important plant operating data.
This data is important to Operations because it may indicate trends'f developing equipment failures of improper operating practices.
This data is also of value to the performance personnel in" assessing long range trends of equipment operation and operating practices.
This data is also of value to the performance personnel in" assessing long range trends of equipment operation and operating practices.
An   operating data log sheet shall     be maintained   for the following plant areas:
An operating data log sheet shall be maintained for the following plant areas:
: 1. Control   Room
1.
: 2. Reactor Building Turbine Building
Control Room 2.
: 4. Radwaste Building
Reactor Building Turbine Building 4.
: 5. Diesel Generator Building
Radwaste Building 5.
: 6. Service Building
Diesel Generator Building 6.
: 7. Makeup Water Pumphouse
Service Building 7.
: 8. Circulating Water     Pumphouse
Makeup Water Pumphouse 8.
: 9. Standby Service Water Pumphouses The   operating data logsheets shall contain the following column headings:
Circulating Water Pumphouse 9.
: l. Monitored parameter and/or instrument number
Standby Service Water Pumphouses The operating data logsheets shall contain the following column headings:
: 2. Parameter unit of measurement
l.
: 3. Low limit
2.
: 4. Normal value
3.
: 5. High limit
4.
: 6. Actual value
5.
: 7. Special information The   operating data logsheets shall be completed by Operations                 shift personnel.
6.
Should any value     fall outside the given high or low limits, the Shift   Manager   shall be notified and= the value shall be circled in red with an   explanation given in the Comments section.
7.
PRQCKQVRK N4M8KR     RKVISIQN NUM8KR      PAGK N4M8KR
Monitored parameter and/or instrument number Parameter unit of measurement Low limit Normal value High limit Actual value Special information The operating data logsheets shall be completed by Operations shift personnel.
                              ~.3.4                   2           1.3.4-8 of         10
Should any value fall outside the given high or low limits, the Shift Manager shall be notified and= the value shall be circled in red with an explanation given in the Comments section.
PRQCKQVRK N4M8KR RKVISIQNNUM8KR
~.3.4 2
PAGK N4M8KR 1.3.4-8 of 10


s 1 ~
s 1
~
1
1


          ,,   When filled out, the responsible operator shall     initial the     logsheet below the "actual value" column.
,, When filled out, the responsible operator shall initial the logsheet below the "actual value" column.
The completed operating data logsheet shall be forwarded to the day shift manager for review. He shall investigate and determine the .
, H.
cause of any abnormal trends.
The completed operating data logsheet shall be forwarded to the day shift manager for review.
    , H.
He shall investigate and determine the cause of any abnormal trends.
The purpose of computer logs is to provide Operation personnel, Plant management, and the Technical Department*with the necessary information to evaluate the performance of the reactor and balance of plant systems. All parameters logged       by the computer   shall   be checked periodically by shift personnel.
The purpose of computer logs is to provide Operation personnel, Plant management, and the Technical Department*with the necessary information to evaluate the performance of the reactor and balance of plant systems.
Selected plant operating parameters will be logged by the process computer and printed out on an hourly and monthly basis. Other logs are pr'inted out when required or on demand. During periods when the computer is out of service, selected plant parameters will be recorded by the operator.;
All parameters logged by the computer shall be checked periodically by shift personnel.
Each day the computer logs shall be routed by the Operations Manager to the Technical Department for evaluation. After evaluation, the computer logs will be routed to the Plant's Record Storage File and processed per the Document Guide in the Plant's Administrative Procedure 1.6.4.
Selected plant operating parameters will be logged by the process
Recorder Charts The purpose of recorder charts is to     provide Operations and Management personnel with a permanent     record of'rends exhibited by specific plant parameters.
- computer and printed out on an hourly and monthly basis.
All operating charts shall   be marked by the   shift personnel responsible for the equipment at the beginning of each shift with the time, date, recorder name, and other pertinent information that shall make the chart more useful. Charts should be checked for timing to ensure chart indicated time corresponds with actual time.
Other logs are pr'inted out when required or on demand.
When practicable, any unusual trends, or transients, should be identified on the appropriate recorder chart. This identification should intersect at the recorder pen and consist of the event, date, and time to the 'nearest minute.
During periods when the computer is out of service, selected plant parameters will be recorded by the operator.;
Chart paper will usually be replaced by the graveyard shift personnel when the end-of-chart indication is visible but can be done by any shift.
Each day the computer logs shall be routed by the Operations Manager to the Technical Department for evaluation.
ROCEOURK NUM8KR    iRKVISIQN NUM8KR      PAQK iVUMBKR W~9&                                     1'3 4       I 2       !
After evaluation, the computer logs will be routed to the Plant's Record Storage File and processed per the Document Guide in the Plant's Administrative Procedure 1.6.4.
1.3.4-9 of   10
Recorder Charts The purpose of recorder charts is to provide Operations and Management personnel with a permanent record of'rends exhibited by specific plant parameters.
All operating charts shall be marked by the shift personnel responsible for the equipment at the beginning of each shift with the time, date, recorder
: name, and other pertinent information that shall make the chart more useful.
Charts should be checked for timing to ensure chart indicated time corresponds with actual time.
When practicable, any unusual trends, or transients, should be identified on the appropriate recorder chart.
This identification should intersect at the recorder pen and consist of the event, date, and time to the 'nearest minute.
Chart paper will usually be replaced by the graveyard shift personnel when the end-of-chart indication is visible but can be done by any shift.
W~9&
ROCEOURK NUM8KR iRKVISIQNNUM8KR 1'3 4 I
2 PAQK iVUMBKR 1.3.4-9 of 10


                , The date, time, recorder name, and parameters shall be marked on each new   chart when installed or removed from it's recorder. In addition, when installing a new chart the following chart box label shall be filled out with Date/Time that the chart is put on and the recorders name.
, The date, time, recorder
Date/Time Off Date/Time On I Recorder Name I
: name, and parameters shall be marked on each new chart when installed or removed from it's recorder.
Upon removal of the chart,       it shall be placed in   its original   box and the label   filled   out previously   will be completed   with time date off and placed on the outside of the box.
In
The chart will then     be stored- in the Control   Room on the "This Week" shelf., Charts     from the week before   will be on the "Last Week" shelf. At the       end of each week, Friday, the clerk will pick up all of "Last Week" charts and take them,to Document Control.
: addition, when installing a new chart the following chart box label shall be filled out with Date/Time that the chart is put on and the recorders name.
The clerk will then place "This Week" placard on the empty shelf and place the "Last Week" placard on the shelf with the previous weeks charts in   it.
Date/Time Off Date/Time On I Recorder Name I
J. The  following records will be sent to Records Management to become          a part of the plant file. The forms will be controlled per the
Upon removal of the chart, it shall be placed in its original box and the label filled out previously will be completed with time date off and placed on the outside of the box.
'                  Document Guide identified in PPM 1.6.4.
The chart will then be stored-in the Control Room on the "This Week" shelf.,
: l. Shift Manager's Log 20    Control   Room Log 3~    Radwaste Log
Charts from the week before will be on the "Last Week" shelf.
: 4. Fuel Handling Log
At the end of each week, Friday, the clerk will pick up all of "Last Week" charts and take them,to Document Control.
: 5. Daily & Shift Operating Records
The clerk will then place "This Week" placard on the empty shelf and place the "Last Week" placard on the shelf with the previous weeks charts in it.
: 6. Periodic Surveillance Records
l.
: 7.  -Operating Data Log Sheets
20 3 ~
: 8. Computer Logs
4.
: 9. Recorder Charts 1.3.4.5   Attachments None PROCKOVRK NVMBKR   JRKVISION NVMBKR     iPAGK NVMBKR W~QB                                          1.3 4     I 2             1.3.4-10 of 10}}
5.
6.
7.
8.
9.
Shift Manager's Log Control Room Log Radwaste Log Fuel Handling Log Daily & Shift Operating Records Periodic Surveillance Records
-Operating Data Log Sheets Computer Logs Recorder Charts J.
The following records will be sent to Records Management to become a
part of the plant file.
The forms will be controlled per the Document Guide identified in PPM 1.6.4.
1.3.4.5 Attachments None W~QB PROCKOVRK NVMBKR JRKVISION NVMBKR iPAGK NVMBKR 1.3 4 I
2 1.3.4-10 of 10}}

Latest revision as of 07:27, 8 January 2025

Rev 2 to Administrative Procedure 1.3.4, Operating Data Logs
ML17277B037
Person / Time
Site: Columbia 
Issue date: 06/30/1983
From: Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17277B035 List:
References
1.3.4, NUDOCS 8311210262
Download: ML17277B037 (15)


Text

'IttASHINGTON PUBLIC POPOVER SUPPLY SYSTKM-gggQO(g RQ(QQDO QQp p PLA.'IT PRO(:EDI RE IIA'ALAI.

Irxp.

PROCEOURE NUMBER eel ~ 3 VOLUMEe4AME APPR 0

DATE 6/30/83 1

ADMINISTRATIVEPROCEDURES SECTlON 1.3 CONDUCT OF OPERATIONS TITLE

+1.3.4 OPERATING DATA AND LOGS l.3.4.1 P~ur oee This procedure provides instructions to assure that plant operations are adequately recorded and the records are prepared,

reviewed, and main-tained in a meaningful manner.

The records are assembled on the graveyard shift daily and forwarded to the day shift manager for proper distribution and storage.

The minimum records included are:

A.

Shift Manager's Log Book B.

Control Room Log Book C.

Radwaste Log Book D.

Fuel Handling Log Book E.

Daily and Shift Operating Records F.

Periodic Surveillance Records G.

Operating Data Log Sheets H.

Computer Logs I.

Recorder Charts The Log Books will be duplicate logs.

Each book will be a bound book having two identical sheets per page number.

Each set of pages will be sequentially numbered.

The set of pages will have a carbonless copy.

The copy will be perforated so it can be removed for routing to Plant Management.

1.3.4.2 General Instructions for Record Partici ation A.

The logs will be the means by which operating information important to the following shifts and plant management is recorded.

It is, therefore, essential that log entries be legible, accurate and com-plete.

B.

A new page shall be started at the beginning of each graveyard shift.

8311310343 331111 PDDR ADOCII 05000397 p,

PDR PROCEOURE NUMBER REVISION NUMBER 1.3.4 PAGE NUMBER 1.3.4-1 of 10

~ )

V'F93 6"-.'.3JG8"I'f49QV<Q

~

)

~ U.

. All log entries shall be made in ink.,

0.

Erasures are not permitted.

If an error is made, it shall be voided by a single line drawn through the entry and initialed by the person voiding the entry.

E.

All entries in the Log Books shall be proceeded by a time and entered in chronological order.

Any late entries are to be made in the log by identifying the entry with L.E. in the left hand margin.

The time and date of when the entry should have been entered will be noted.

F.

G.

All log entries shall be entered in a timely manner.

It shall nor-mally be done immediately after the event occurred.

The Log Books will be identified by title, date started and

finished, and volume number on the outside of the front cover.

When completely filled out each Log Book shall be retained for reference in the Shift Manager's office, except for the Radwaste Log Book which shall be retained in the Radwaste Control Room.

When no longer needed for this purpose, the Log Books shall be routed to the Plant's Record Stora e File and rocessed per document guide in the g

p Plant Administrative Procedure 1.6.4.

1.3.4.3 S ecific Information for Record Pre aration H.

The perforated duplicate pages of the Log Books for the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> time duration will be removed at the beginning of each grave-yard shift and routed =to the Operations Manager for his review, distribution, and storage.

A.

Shift Mana er's Lo The purpose of the Shift Manager's Log is to provide operational information important to the following shifts as well as plant man-agement personnel.

Although the extent and detail of the informa-tion logged will be determined and normally logged by the Shift

Manager, the following should be included as a minimm:

1.

Completion of a predetermined stamp at the start of each shift. If the predetermined stamp is not available, write in the following information:

a.

Shift and Oate b.

Shift Manager's Name ROCKOVRK NVMBKR RKVISION NVMBKR PAQK NVMBKR x.3.4 2

l.3.4-2 of 10

c.

Names of all individuals on shift d.

Designate Fire Srigade Member 2.

Any reduction in power and reason for same.

3.

Status and authorization permit number of radioactive releases to the environs.

4.

Timed entries for the following:

a.

Change of operating mode b.

Start of control rod withdrawal for reactor startup c.

Reactor criticality d.

Reactor trip and cause for same e.

Any technical specification limit exceeded or potential reportable occurrence including plant management notifica-tion.

5.

Initiation and completion of surveillance testing.

6.

Red arrow items a.

The purpose of this system is to provide a method of draw-ing attention to items where followup action is absolutely essential.

b.

Red arrow procedure-1)

When the Shift Manager encounters a situation where he deems followup action is mandatory, he shall note

'his by placing a red arrow in the margin to the left of the log entry.

2)

When a red arrow item is closed, the Shift Manager closing the item will make a "red arrow" entry stat-ing the reason or action for closing.

He shall write the word "closed" above the red arrow and log the page number and date of the originating red arrow entry below it.

The word "closed" shall then be written above the originating red arrow and log the page number and date of the closing entry written below it.

3)

Open red arrow items are identified by the lack of cross referenced log and page number and date written below the red arrow.

PRQCKQVRK NVMBKR RKVISIQNiVVMBKR iPAQK NVMBKR

'.3.4 2

i 1.3.4-3 of 10

v a

The open red arrow items shall be compiled and writ-ten in the Shift Manager's log each Monday on the graveyard shift.

'When compiling this list, the Shift Manager shall indicate the log and page number and date where each of the open red arrow items can be found.

5)

The Operations Manager shall assist in expediting red arrow items requiring engineering, maintenance, or management action.

7.

Any injury or sickness occurring on shift.

8.

The names of extra personnel required for plant operation.

9.

Any deviation from approved procedures as per PPM 1.2.4.

10.

Any significant maintenance activity occurring on the shift.

ll.

Other information or events the Shift Manager feels may have operational or historical value.

The Shift Manager shall enter the name of his relief and sign the log at the end of each shift.

t~ll The purpose of the control room log is to provide a complete and accurate account of plant operation to the following shifts as well as plant management personnel.

Entries shall be of sufficient detail that any previous plant condition can be reconstructed from them.

The Reactor Operator will normally be the individual making the entries into th Control Room Log Book.

The control room log shall be the OFFICIAL plant operating record.

The following should be entered as a mrnimum 1.

Completion of a predetermined stamp at the start of each shift. If the predetermined stamp is not available write in the following information:

a.

Shift and Date b.

Control Room Supervisor's Name c.

Name of all individuals on shift 2.

Plant startups and shutdowns.

PRACKDURK NUMBKR JRKVIBIQNiiUMBKR

~Paa K NUMBKR 2

1.3.4-4 of 10

, 3.

Significant power changes and the mechanism used to make the change.

4.

Status changes in equipment, components, or structures that affect plant operation.

5.

Initiation and completion of all surveillance tests.

6.

Initiation and completion of all special tests.

7.

Status and authorization permit number of radioactive releases to the environs.

8.

All electrical switching.

9.

Maintenance activities that affect operations.

10.

Other events,

alarms, and actions that control room operator feels may have operational or historical value.

The control room supervisor and the reactor operator shall enter the name of his relief and sign the log at the end of each shift.

~5t The purpose of the radwaste log is to provide the following shifts as well as plant management personnel an accurate record of all radioactive waste systems operation.

Entries shall be made by shift operating personnel.

The Radwaste Operator will normally be that individual making the entries into the Radwaste Log Book.

Entries shall include, but are limited to, the following:

1.

Completion of a predetermined stamp at the start of each shift. If the predetermined stamp is not available write in the following information:

a.

Shift and Date b.

Shift Support Supervisor's Name c.

Name of Radwaste Operator(s) 2.

All transfers of water from the radwaste system to the conden-sate storage or other plant systems.

3.

Status changes in equipment or components that affect plant or radwaste system operation.

ROCKDVRK NLlMBKR RKVISIONNVMBKR iPACiKNVMBKR 1.3. 4 2

1.3.4-5 of 10

I

~

I

, 4.

5.

Any unusual increase in floor drain or equipment drain systems inventory.

Status and authorization permit number or radioactive releases to the environs.

6.

Any other events or information the operator may feel to have operational significance.

7.

Any significant maintenance activity which occurred during the shift.

8.

9.

The Shift Support Supervisor will use this log to identify and relay to other shifts any information he determines to be important.

Other information the Rad Waste Operator feels may have opera-tional or historical value.

Upon making the last entry for his shift, the Shift Support Super-visor and assicped radwaste equipment operator shall enter the name of their respective relief and sign the log at the end of each shift.

~. ~ill dli The purpose of the fuel handling log 'is to provide following shifts and plant management personnel with information concerning all evolutions conducted on the refueling floor.

The fuel handling log shall only be maintained during periods of refueling floor acti-vity.

The Senior Reactor Operator in charge of fuel handling will normally be the individual making entries into the Fuel Handling Log Book.

At other times, it shall be stored in the Shift Manager' office.

1.

Completion of a predetermined stamp at the start of each shift. If the predetermined stamp is not available write in the following information:

a.

Shift and Oate b.

Fuel Handling Supervisor's Name c.

Names of all individuals on Refueling Crew 2.

Any discrepancies found during the inspection of new fuel.

3.

Any problem encountered with the movement of new fuel.

PROCKQURK NUMBKR RKVISIQNNUMBKR PAGK NVMBKR 1.3.4 2

1.3.4-6 of 10

l

~

~

~

d

4.

5.

The installation or removal of any reactor component.

Identification of the number of fuel elements,* control rods, and neutron sources handled during the shift.

The detailed accountability of these items will be controlled per instruc-tions in the Plant Procedures

Manual, Volume 9.

6.

Equipment failure and corrective action taken.

7.

Any situation involving unusual radiation or contamination levels.

8.

All evolutions involving the fuel cask and the shipping of fuel.

9.

Other information the refueling supervisor feels may have oper-ational or historical value.

The refueling supervisor shall enter the name of his relief and sign the log at the end of each shift.

E.

Dail and Shift 0 eratin Records The purpose of these records is to ensure that the daily and shift surveillance testing required by the technical specifications are accomplished and documented, and that the results are satisfactory or appropriate action taken.

The daily and shift surveillance records shall contain the following column headings:

1.

Technical specification reference 2.

Monitored parameter

3. 'nstrument number 4.

Parameter units of measurement 5.

Technical specification limit 6.

Normal value or range 7.

Actual value 8.

Comments When filled -out, the responsible operator shall initial the record below each "actual value" column.

~

Should any parameter fall outside the technical specification limit, the Shift Manager shall be immediately notified and that value circled in red with an explanation given in the Comments section.

The Shift Manager shall review the daily and shift operating records and sign them in the space provided.

RQCKQURK NUMBKR RKVISIQNNUMBKR iPACK NUMBKR 1.3.4 2'

.1 3'-7 of 10

~

~

1 n

k.

S I

ihe completed daily and shift operating records shall be forwarded to Operations Shift Manager for distribution and storage.

When no longer needed in the active storage file, it shall be routed to the Plant's Record Storage File and process per the Document Guide in the Plant's Administrative Procedure 1.6.4.

Periodic Surveillance Records See PPM 1.5.1, Technical Specification Surveillance Testing Program 0 eratin Data Lo sheets The purpose of operating data log sheets is to provide Operations personnel with periodic readings of important plant operating data.

This data is important to Operations because it may indicate trends'f developing equipment failures of improper operating practices.

This data is also of value to the performance personnel in" assessing long range trends of equipment operation and operating practices.

An operating data log sheet shall be maintained for the following plant areas:

1.

Control Room 2.

Reactor Building Turbine Building 4.

Radwaste Building 5.

Diesel Generator Building 6.

Service Building 7.

Makeup Water Pumphouse 8.

Circulating Water Pumphouse 9.

Standby Service Water Pumphouses The operating data logsheets shall contain the following column headings:

l.

2.

3.

4.

5.

6.

7.

Monitored parameter and/or instrument number Parameter unit of measurement Low limit Normal value High limit Actual value Special information The operating data logsheets shall be completed by Operations shift personnel.

Should any value fall outside the given high or low limits, the Shift Manager shall be notified and= the value shall be circled in red with an explanation given in the Comments section.

PRQCKQVRK N4M8KR RKVISIQNNUM8KR

~.3.4 2

PAGK N4M8KR 1.3.4-8 of 10

s 1

~

1

,, When filled out, the responsible operator shall initial the logsheet below the "actual value" column.

, H.

The completed operating data logsheet shall be forwarded to the day shift manager for review.

He shall investigate and determine the cause of any abnormal trends.

The purpose of computer logs is to provide Operation personnel, Plant management, and the Technical Department*with the necessary information to evaluate the performance of the reactor and balance of plant systems.

All parameters logged by the computer shall be checked periodically by shift personnel.

Selected plant operating parameters will be logged by the process

- computer and printed out on an hourly and monthly basis.

Other logs are pr'inted out when required or on demand.

During periods when the computer is out of service, selected plant parameters will be recorded by the operator.;

Each day the computer logs shall be routed by the Operations Manager to the Technical Department for evaluation.

After evaluation, the computer logs will be routed to the Plant's Record Storage File and processed per the Document Guide in the Plant's Administrative Procedure 1.6.4.

Recorder Charts The purpose of recorder charts is to provide Operations and Management personnel with a permanent record of'rends exhibited by specific plant parameters.

All operating charts shall be marked by the shift personnel responsible for the equipment at the beginning of each shift with the time, date, recorder

name, and other pertinent information that shall make the chart more useful.

Charts should be checked for timing to ensure chart indicated time corresponds with actual time.

When practicable, any unusual trends, or transients, should be identified on the appropriate recorder chart.

This identification should intersect at the recorder pen and consist of the event, date, and time to the 'nearest minute.

Chart paper will usually be replaced by the graveyard shift personnel when the end-of-chart indication is visible but can be done by any shift.

W~9&

ROCEOURK NUM8KR iRKVISIQNNUM8KR 1'3 4 I

2 PAQK iVUMBKR 1.3.4-9 of 10

, The date, time, recorder

name, and parameters shall be marked on each new chart when installed or removed from it's recorder.

In

addition, when installing a new chart the following chart box label shall be filled out with Date/Time that the chart is put on and the recorders name.

Date/Time Off Date/Time On I Recorder Name I

Upon removal of the chart, it shall be placed in its original box and the label filled out previously will be completed with time date off and placed on the outside of the box.

The chart will then be stored-in the Control Room on the "This Week" shelf.,

Charts from the week before will be on the "Last Week" shelf.

At the end of each week, Friday, the clerk will pick up all of "Last Week" charts and take them,to Document Control.

The clerk will then place "This Week" placard on the empty shelf and place the "Last Week" placard on the shelf with the previous weeks charts in it.

l.

20 3 ~

4.

5.

6.

7.

8.

9.

Shift Manager's Log Control Room Log Radwaste Log Fuel Handling Log Daily & Shift Operating Records Periodic Surveillance Records

-Operating Data Log Sheets Computer Logs Recorder Charts J.

The following records will be sent to Records Management to become a

part of the plant file.

The forms will be controlled per the Document Guide identified in PPM 1.6.4.

1.3.4.5 Attachments None W~QB PROCKOVRK NVMBKR JRKVISION NVMBKR iPAGK NVMBKR 1.3 4 I

2 1.3.4-10 of 10