ML17277B039: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML17277B039
| number = ML17277B039
| issue date = 10/31/1983
| issue date = 10/31/1983
| title = Rev 4 to Administrative Procedure 1.3.7, Maint Work Request.
| title = Rev 4 to Administrative Procedure 1.3.7, Maint Work Request
| author name = Martin J
| author name = Martin J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:,~,
      ~, ~
~
                      '
WASKNGTONPUBUC POWER SUPPLY SYSTEM a
WASKNGTON PUBUC POWER SUPPLY SYSTEM a
NCGNI7lIIIO~fLtl.ES CQPV
NCGNI7lIIIO~fLtl.ES CQPV NUMSCR              APPROV C
'ROCCDURC NUMSCR
                                                        'ROCCDURC DATC
+1.3.7 OIUMCNAMC APPROV C DATC 3,0/31/83 ON 1.3 ADMINISTRATIVEPRO RES CONDUCT OF OPERATIONS 1.5.7.1
                          +1.3.7                                                                     3,0/31/83 OIUMCNAMC ADMINISTRATIVE PRO              RES ON 1.3         CONDUCT OF OPERATIONS 1.5.7.1     ~Pur     aee This procedure establishes a system                     for identifying, controlling, docQ.--'-..'"
~Pur aee This procedure establishes a system for identifying, controlling, docQ.--'-..'"
menting and determining requirements                     for work performed by the Mainten-ance Department within the plant.                     It establishes the method   for prepara-tion, review, approval, implementation and,dispo'sition of the Maintenance Work Request         (MWR).
menting and determining requirements for work performed by the Mainten-ance Department within the plant. It establishes the method for prepara-tion, review, approval, implementation and,dispo'sition of the Maintenance Work Request (MWR).
1.3.7. 2 Definitions A.     Maintenance Work Request                 (MWR) (Form MWR)
1.3.7. 2 Definitions A.
The Maintenance Work Request SHALL be used to 'control all corrective maintenance activities and the implementation of permanent plant modifications or additions which result from Plant Modification Re-quests (PMR's). The Maintenance Work Request has a unique serial number but need not necessarily be worked in sequential order. The MWR     has one   original   and         four copies:   yellow   Operations;   golden-rod Maintenance; green - Chemistry-Health Physics; pink - Computer input/scheduling (PPICS). The Maintenance Work, Request original and copies are similar to'hose exhibited in Attachments A through C, inclusive.
Maintenance Work Request (MWR) (Form MWR)
: 8. Continuation Sheet The     continuation sheet is to be used when additional information is needed on       MWR and there is not enough room provided.               The continua-tion sheet is similar to the exhibit in Attachment D.
The Maintenance Work Request SHALL be used to 'control all corrective maintenance activities and the implementation of permanent plant modifications or additions which result from Plant Modification Re-quests (PMR's).
C. Confined Work Permit         (CWP)
The Maintenance Work Request has a unique serial number but need not necessarily be worked in sequential order.
The     Confined Work Permit is a card that covers hazardous conditions in   a- confined space. Instructions on the card are to be, followed explicitly. This card must be posted at the job site and becomes a record document. The use of a CWP SHALL be indicated in the block on the MWR. The CWP is similar to the exhibit in Attachment D (see PPM     1.9.2).
The MWR has one original and four copies:
CCDURC NUMSCR                      RCVISION NUMSCR            AQC NUMSCR 1.3.7                                                                       1.3.7-1 of 23 W~$ 7 R2 ISW2'I 83ii2i02bb 05000397  83iiii PDR ADOCK A         .    .        . PDR
yellow Operations; golden-rod Maintenance; green - Chemistry-Health Physics; pink - Computer input/scheduling (PPICS).
The Maintenance Work, Request original and copies are similar to'hose exhibited in Attachments A through C, inclusive.
8.
Continuation Sheet The continuation sheet is to be used when additional information is needed on MWR and there is not enough room provided.
The continua-tion sheet is similar to the exhibit in Attachment D.
C.
Confined Work Permit (CWP)
The Confined Work Permit is a card that covers hazardous conditions in a-confined space.
Instructions on the card are to be, followed explicitly.
This card must be posted at the job site and becomes a
record document.
The use of a CWP SHALL be indicated in the block on the MWR.
The CWP is similar to the exhibit in Attachment D (see PPM 1.9.2).
CCDURC NUMSCR 1.3.7 RCVISION NUMSCR AQC NUMSCR 1.3.7-1 of 23 W~$7 R2 ISW2'I 83ii2i02bb 83iiii PDR ADOCK 05000397 A
PDR


I ~
I
i  0. ~WR LoQ The  MWR  Log  is  a record keeping document that contains information on open    MWRs.'his    Log may be kept on hard copy and/or on computer (PPICS).
~
E. ~BW              k Work  that is determined by the Shift Manager that must be completed immediately in order to minimize injury or damage -to the plant or to protect the health and safety of the public.'he following are codes to    be used    to determine the priority of the MWR:
Items in this category are to be expedited at the expense of items in all other categories.        Failure to complete, results in a Technical Specification violation, a reportable occurance, creates a safety .hazard or could damage critical plant equip-ment.
: 2. Failure to complete could affect power oeneration.
: 3. Affects the efficient operation of the system involved.
: 4. Routine work to be complet'ed as manpower                  is available.
NOTE: PRIORITY ONE MWR'S SHALL BE "HAND CARRIED" BY ALL RESPONSIBLE INDIVIDUALS THROUGHOUT THE MWR ROUTING PROCESS.
The Shift Manager, upon determining the MWR                  is Priority  One should annotate the upper      left  hand corner
                                                                            -
of the  title block in capitol letters    RPRIORITY ONE                HAND CARRY".
G. Clearance Order (CO)
A  procedure used for isolating.a piece of equipment or system in such a manner as to provide maximum safety to personnel and equip-ment prior to performing work (see PPM 1.3.8.).
H. Radiation Work Permit      (RWP)
Is the work permit that provides control over access to areas where radiological hazards exist. A regular RWP is issued for a specific job of non-repetitive nature and is valid only during the time re-quired to complete the job. An extended RWP is posted for jobs of repetitive nature and is active for an indefinite period of time (see PPM 11.2.8.1).
PRQCKDVRC NUINOCR            RCVISIQN NUMSCR    PAQC N VM8C R 1.3.7                                                                  1.3.7-2 of  23 WP 500 Rl IO&l)


~ ~ ~ E S     y
i 0.
                    '
~WR LoQ The MWR Log is a record keeping document that contains information on open MWRs.'his Log may be kept on hard copy and/or on computer (PPICS).
Any   individual   who can   identify   a problem or activity which requires him   to generate     a MWR.
E. ~BW k
: 3. Plant Conditions
Work that is determined by the Shift Manager that must be completed immediately in order to minimize injury or damage
: 1.     Power Operation     is when the mode switch is in the run position and the reactor     is at any temp rature.
-to the plant or to protect the health and safety of the public.'he following are codes to be used to determine the priority of the MWR:
: 2.     Startup is when the acde switch is in the startup/hot standby position and the reactor is at any temperature.
Items in this category are to be expedited at the expense of items in all other categories.
Failure to complete, results in a Technical Specification violation, a reportable occurance, creates a safety.hazard or could damage critical plant equip-ment.
2.
Failure to complete could affect power oeneration.
3.
Affects the efficient operation of the system involved.
4.
Routine work to be complet'ed as manpower is available.
NOTE:
PRIORITY ONE MWR'S SHALL BE "HAND CARRIED" BY ALL RESPONSIBLE INDIVIDUALSTHROUGHOUT THE MWR ROUTING PROCESS.
The Shift Manager, upon determining the MWR is Priority One should annotate the upper left hand corner of the title block in capitol letters RPRIORITY ONE - HAND CARRY".
G.
Clearance Order (CO)
A procedure used for isolating.a piece of equipment or system in such a manner as to provide maximum safety to personnel and equip-ment prior to performing work (see PPM 1.3.8.).
H.
Radiation Work Permit (RWP)
Is the work permit that provides control over access to areas where radiological hazards exist.
A regular RWP is issued for a specific job of non-repetitive nature and is valid only during the time re-quired to complete the job.
An extended RWP is posted for jobs of repetitive nature and is active for an indefinite period of time (see PPM 11.2.8.1).
PRQCKDVRC NUINOCR 1.3.7 WP 500 Rl IO&l)
RCVISIQN NUMSCR PAQC NVM8C R 1.3.7-2 of 23
 
~
~
~
E
 
S y
Any individual who can identify a problem or activity which requires him to generate a
MWR.
3.
Plant Conditions 1.
Power Operation is when the mode switch is in the run position and the reactor is at any temp rature.
2.
Startup is when the acde switch is in the startup/hot standby position and the reactor is at any temperature.
Hot Shutdown is when the mode switch is in the shutdown posi-tion and the reactor temperature is greater than 200'F.
Hot Shutdown is when the mode switch is in the shutdown posi-tion and the reactor temperature is greater than 200'F.
: 4.     Cold Shutdown is when the mode switch is in the shutdown posi-tion and the reactor temperature is less than or equal to 200'F.
4.
: 5.       Refuel is when the mode switch is in the shutdown or refuel position and the reactor temperature is less than 140'F.
Cold Shutdown is when the mode switch is in the shutdown posi-tion and the reactor temperature is less than or equal to 200'F.
: 6.       Reduced Power is when the reactor power is reduced to complete
5.
Refuel is when the mode switch is in the shutdown or refuel position and the reactor temperature is less than 140'F.
6.
Reduced Power is when the reactor power is reduced to complete
: a. MWR.
: a. MWR.
: 7.       Pre Refuel   is when any   MWR is required to   be completed prior to a refueling outage.
7.
: 8.       Post Refuel is when any       MWR is required to   be completed after a refueling outage.
Pre Refuel is when any MWR is required to be completed prior to a refueling outage.
II
8.
: 9.       Spare.
Post Refuel is when any MWR is required to be completed after a
K. S   stem/Component The   following identif'ies the required condition or status           of'he system/component       for work to be done:
refueling outage.
: l.       In Service
II 9.
: 2.       Out of'ervice Not Applicable L. Power     Plant Information Control       S stem (PPICS)
Spare.
The computer system used by the Supply System             to control, monitor and retain history oi'           MWR.
K.
PRQCCDURC NUMBCR                     RCVISION NUMBCR      PAQC NUMBCR 1.3.7                                                              1.3.7-3 of  23
S stem/Component The following identif'ies the required condition or status of'he system/component for work to be done:
,W P SS S R 'I (SWS)
l.
In Service 2.
Out of'ervice Not Applicable L.
Power Plant Information Control S stem (PPICS)
The computer system used by the Supply System to control, monitor and retain history oi' MWR.
PRQCCDURC NUMBCR 1.3.7
,WP SS S R 'I (SWS)
RCVISION NUMBCR PAQC NUMBCR 1.3.7-3 of 23


1 ~ I '\ < ~ E a 1 y
1
~
I
'\\
~
E a
1 y


              '.,     Initiatin     Document Any document such       as.a Plant Modification Request (FMR) or NRC Bulletin, Nonconformance Report, Plant Problem Report, et, al.
'., Initiatin Document Any document such as.a Plant Modification Request (FMR) or NRC Bulletin, Nonconformance Report, Plant Problem Report, et, al.
N. Fire Hazard Review A   review by   a designated person, of specific work to be performed within the   main   plant structure, which identifies 'gnition sources and combustible materials and defines those precautions to be taken. A fire hazard review SHALL be performed when required by and in accordance with PPM 1.3.10.
N.
NOTE: At WNP-2 the Fire Hazard review and Fire Protection Permit           is covered under the same procedure.
Fire Hazard Review A review by a designated
1.3.7.3     Discussion The Maintenance Work Request         (MWR) is the document used to initiate and record Maintenance       activities or plant modification implementation. The MWR may be initiated by anyone who recognize a problem in the plant or a need for work to be performed which is the responsibility of the Mainten-ance Department.       This procedure is to allow Maintenance to perform its responsibilities while keeping Operations informed of plant problems at all times.
: person, of specific work to be performed within the main plant structure, which identifies 'gnition sources and combustible materials and defines those precautions to be taken.
The MWR   does not release     equipment into the responsibility of Maintenance for the     performance of necessary work or to record operational require-ments. This process is covered in the Equipment Clearance and Tagging Procedure, PPM 1.3.8. In addition, the MWR does not allow any changes to the original de'sign of the plant. This process will be covered in the Plant Modification Procedure, however,           it (Plant Modifications Docu-ment(s) per PPM 1.4.1 may become the initiating document(s) for an MWR.
A fire hazard review SHALL be performed when required by and in accordance with PPM 1.3.10.
The plant quality organization performs surveillance on Maintenance acti-vities to verify compliance with plant procedures. In addition the plant quality organization may establish inspection points for specific safety related activities they wish to inspect including Fire Protection or Rad-waste. This may be as a result of regulatory bulletins or information received on specific problem areas. CAS/SAS security system operators shall be notified before and after any work is performed on the security system.
NOTE:
1.3.7.4     References A. PPM   1.3.8, Equipment Clearance       and Tagging B. PPM   1.3.10, Fire Protection Program C. PPtd   1.3.12, Plant Problems PRaCaauRa NuMeCR                 RKVISION NLIMSIIR    PAOC NUMSCR 1.3.7                                                             1.3.7-4 of 23 WP atO RT IOWQ)
At WNP-2 the Fire Hazard review and Fire Protection Permit is covered under the same procedure.
1.3.7.3 Discussion The Maintenance Work Request (MWR) is the document used to initiate and record Maintenance activities or plant modification implementation.
The MWR may be initiated by anyone who recognize a problem in the plant or a need for work to be performed which is the responsibility of the Mainten-ance Department.
This procedure is to allow Maintenance to perform its responsibilities while keeping Operations informed of plant problems at all times.
The MWR does not release equipment into the responsibility of Maintenance for the performance of necessary work or to record operational require-ments.
This process is covered in the Equipment Clearance and Tagging Procedure, PPM 1.3.8.
In addition, the MWR does not allow any changes to the original de'sign of the plant.
This process will be covered in the Plant Modification Procedure, however, it (Plant Modifications Docu-ment(s) per PPM 1.4.1 may become the initiating document(s) for an MWR.
The plant quality organization performs surveillance on Maintenance acti-vities to verify compliance with plant procedures.
In addition the plant quality organization may establish inspection points for specific safety related activities they wish to inspect including Fire Protection or Rad-waste.
This may be as a result of regulatory bulletins or information received on specific problem areas.
CAS/SAS security system operators shall be notified before and after any work is performed on the security system.
1.3.7.4 References A.
PPM 1.3.8, Equipment Clearance and Tagging B.
PPM 1.3.10, Fire Protection Program C.
PPtd 1.3.12, Plant Problems PRaCaauRa NuMeCR 1.3.7 WP atO RT IOWQ)
RKVISIONNLIMSIIR PAOC NUMSCR 1.3.7-4 of 23


sD   ,PPM 1.4.1, Plant Modifications E. PPM 1.3.4, Operating Data     and Logs f                 F. PPM 1.3.6, Shift Turnover G. FPM 1.5.1, Technical Specification Surveillance Testing         Program H. PPM 1.5.6,   Leakage Surveillance   and Prevention Program I. FR) 1.9.2, Confined     Space Entry PPM 11.2.8.1, Radiation     Work Permits 1.3.7.5     Precautions/Limitations A. Any defective equipment discovered by the originator of an MWR should be evaluated in accordance with PPM 1.3.12, Plant Problems (PDR/NCR), either prior to or in conjunction with the preparation of the MWR. If a PDR/NCR Report is generated, the MWR number should be referenced on the PDR/NCR and vice-versa.
sD
The Shift PDR/NCR Manager Report (Security Lt., Security Systems only) shall, is referenced   on the MWR, verify that the PDR/NCR if a disposition is approved (PDR/NCR need not       be totally closed) prior to declaring the system operational.
,PPM 1.4.1, Plant Modifications E.
B. If during   the course of working an     MWR, it is determined the Work Instructions   must be revised   to give additional direction to as-signed personnel, those individuals authorized to prepare the Work Instructions shall be authorized to make on-the-spot changes to the Work   Instructions.
PPM 1.3.4, Operating Data and Logs f
HOWEVER,   changes'f'recting plant operational status, radiation ex-posure,   QC hold points or technical direction shall be subject to re-review equal to the original review of the MWR.
F.
As a minimum,     the person authorized to make changes to the MWR shall base   his determination of change re-review on the criteria esta-blished in Step 1.3.7.6.A.16 of this procedure.
PPM 1.3.6, Shift Turnover G.
C. DO NOT   hang problem identification tags on Security System equip-ment,   this is a violation of Security Procedures and a possible violation of Safeguards, Information.
FPM 1.5.1, Technical Specification Surveillance Testing Program H.
PRQCCDURC NUMCCR               RCVICION NUM8CR    PAQC NUM8CR 1.3.7                                                         1.3.7-5 of   23 WP 550 Rl (5%4)
PPM 1.5.6, Leakage Surveillance and Prevention Program I.
FR) 1.9.2, Confined Space Entry PPM 11.2.8.1, Radiation Work Permits 1.3.7.5 Precautions/Limitations A.
Any defective equipment discovered by the originator of an MWR should be evaluated in accordance with PPM 1.3.12, Plant Problems (PDR/NCR), either prior to or in conjunction with the preparation of the MWR. If a PDR/NCR Report is generated, the MWR number should be referenced on the PDR/NCR and vice-versa.
B.
The Shift Manager (Security Lt., Security Systems only) shall, if a PDR/NCR Report is referenced on the MWR, verify that the PDR/NCR disposition is approved (PDR/NCR need not be totally closed) prior to declaring the system operational.
If during the course of working an MWR, it is determined the Work Instructions must be revised to give additional direction to as-signed personnel, those individuals authorized to prepare the Work Instructions shall be authorized to make on-the-spot changes to the Work Instructions.
HOWEVER, changes'f'recting plant operational status, radiation ex-
: posure, QC hold points or technical direction shall be subject to re-review equal to the original review of the MWR.
C.
As a minimum, the person authorized to make changes to the MWR shall base his determination of change re-review on the criteria esta-blished in Step 1.3.7.6.A.16 of this procedure.
DO NOT hang problem identification tags on Security System equip-ment, this is a violation of Security Procedures and a possible violation of Safeguards, Information.
PRQCCDURC NUMCCR 1.3.7 WP 550 Rl (5%4)
RCVICION NUM8CR PAQC NUM8CR 1.3.7-5 of 23


I . ~ - 'I 1.3.'7.6 ~rccedure A. 'lant   Equi ment Requirin     A Clearance i                  Responsibilit                                              Acticn Originator                             Completes originators portion oi'he HWR (unit, equipment piece number (EPN), equip-ment description/location, problem/work requested, initiating document), hangs pro-blem ID Tag, signs, and dates the HWR.
I
~
'I
 
i 1.3.'7.6
~rccedure A. 'lant Equi ment Requirin Responsibilit A Clearance Acticn Originator Completes originators portion oi'he HWR (unit, equipment piece number (EPN), equip-ment description/location, problem/work requested, initiating document),
hangs pro-blem ID Tag, signs, and dates the HWR.
Routes MWR to Control Room.
Routes MWR to Control Room.
LIMITATION: 00         NOT   hang problem identii'i-cation tags on Security System equipment, this is a violation of Security Procedures and a possible violation of Safeguards Information.
LIMITATION: 00 NOT hang problem identii'i-cation tags on Security System equipment, this is a violation of Security Procedures and a possible violation of Safeguards Information.
Control   Room                     2. Ensures   that identii'ication tag with HWR serial   number and       brief description of pro-blem is attached to that piece of'quipment specified in the MWR. Routes HWR to the Shii't Manager or Designee.
Control Room Operations Manager/
NOTE:   The   type identii'ication tag     is optional (usually a white shipping tag) and is intended to avoid duplicate HWRs, and provide   i'r   problem identii'ication. The tag should be hung as close to the pxoblem/
Shift Manager 2.
damage   as   is possible.
4.
Operations Manager/                    Reviews   originator's portion of         HWR for Shift  Manager                        accuracy and completeness.
Ensures that identii'ication tag with HWR serial number and brief description of pro-blem is attached to that piece of'quipment specified in the MWR.
: 4. Identif'ies HWR     i'r   technical specii'icat on afi'ecting RWP required (if known), clear-ance order, dispatcher notification           and identii'y   any additional operational requirements.
Routes HWR to the Shii't Manager or Designee.
NOTE:     Ii'echnical Specification affected, describes the requirements and time             limita-tions in the Operations Section.
NOTE:
: 5. Makes   safety related determination based on, as   applicable:
The type identii'ication tag is optional (usually a white shipping tag) and is intended to avoid duplicate HWRs, and provide i'r problem identii'ication.
a)     EPN   -   HEL, and/or b)     guality Class, and/or c)     Tech Spec Related,         and/or d)     Safety-Related PPtd affected; and indi-cates in the Sai'ety Related Block as ffYES'll or ffNOff PRQCKOURC NUMSCR               RCVISION NUMSCR  PAQC NUMIICR 1.3.'7                                                         1.3.7-6 of   23 WP $ 00 Rl ISA')
The tag should be hung as close to the pxoblem/
damage as is possible.
Reviews originator's portion of HWR for accuracy and completeness.
Identif'ies HWR i'r technical specii'icat on afi'ecting RWP required (if known), clear-ance order, dispatcher notification and identii'y any additional operational requirements.
5.
NOTE:
Ii'echnical Specification affected, describes the requirements and time limita-tions in the Operations Section.
Makes safety related determination based on, as applicable:
a)
EPN - HEL, and/or b) guality Class, and/or c)
Tech Spec Related, and/or d)
Safety-Related PPtd affected; and indi-cates in the Sai'ety Related Block as ffYES'll or ffNOff PRQCKOURC NUMSCR 1.3.'7 WP $00 Rl ISA')
RCVISION NUMSCR PAQC NUMIICR 1.3.7-6 of 23


                '..Plant
'..Plant Equi ment Re uirin A Clearance (Cont'nued)
                  ~1'      Equi ment Operations Manager/
~1' Operations Manager/
Re uirin 6.
Shift Hanager 6.
A Clearance   (Cont'nued)
Action Write the words "Leakage Related" on the HWR, when it is concerned with a radio-active leak.
Action Write the words "Leakage Related" on the Shift  Hanager                                HWR, when   it is   concerned with a     radio-active leak.     (Refer to   PPM 1.5.6)
(Refer to PPM 1.5.6) 7.
: 7. Assigns a priority and indicates the plant, system/component condition required before the work can be done.
Assigns a priority and indicates the plant, system/component condition required before the work can be done.
: 8. Signs and dates     HWR. Places xerox copy in "Initiated   HWR" notebook and carries to the Maintenance Department Planner/Scheduler.
Maintenance Planner/
Maintenance Planner/                  9. Inputs tracking and scheduling information Scheduler                                    from HWR into PPICS. Carries HWR to appro-priate Maintenance Section Supervisor.
Scheduler 8.
NOTE:   IF THE SYSTEM/STRUCTURE/COMPONENT             IS NOT UNDER PLANT CONTROL (RELEASED FOR OPER-ATIONS)   - SEE ATTACHMENT G.
9.
Maintenance Section                     10. Receives MWR and determines       if it   has ade-Supervisor                                  ~
Signs and dates HWR.
quate information and is appropriate for the job. Enters   WBS (Work Breakdown Struc-
Places xerox copy in "Initiated HWR" notebook and carries to the Maintenance Department Planner/Scheduler.
'                                                       ture)
Inputs tracking and scheduling information from HWR into PPICS.
Carries HWR to appro-priate Maintenance Section Supervisor.
NOTE:
IF THE SYSTEM/STRUCTURE/COMPONENT IS NOT UNDER PLANT CONTROL (RELEASED FOR OPER-ATIONS) - SEE ATTACHMENT G.
Maintenance Section Supervisor Maintenance Section Supervisor/
Plant System Engineer 10.
Receives MWR and determines if it has ade-
~ quate information and is appropriate for the job.
Enters WBS (Work Breakdown Struc-ture)
Code in upper right hand corner of'WR above the MWR Serial Number.
NOTE:
All manhours and material expended on the MWR will be charged against the WBS Code assigned.
Fills out Quality Class and RWP blocks of the HWR.
When a RWP is required, in-itiates a Radiation Work Permit per PPH 11.2.8.1.
12.
NOTE:
NOTE:
Code above the in  upper MWR All manhours right  hand corner Serial Number.
All work peri'ormed in radiologically controlled areas requires an RWP.
and of'WR material expended on the  MWR  will be  charged against the          WBS Code  assigned.
Determine the work to be perf'ormed and des-cribe in the work instruction section.
Maintenance Section                          Fills  out Quality Class and RWP blocks of Supervisor/                                  the  HWR. When a RWP is required, in-Plant System Engineer                        itiates a Radiation Work Permit per PPH 11.2.8.1.
If a procedure is required state procedure number in the space provided.
NOTE:    All work   peri'ormed   in radiologically controlled areas requires         an RWP.
Determine if a Fire Hazard Review is re-quired and, if necessary, to prepare one for the job as per PPM 1.3.10.
: 12. Determine the work to be perf'ormed and des-cribe in the work instruction section.                 If a procedure is required state procedure number   in the   space provided.
Indicate in the space provided.
Determine   ififa Fire Hazard Review is re-quired and,         necessary, to prepare one for the job as per PPM 1.3.10. Indicate                 in the space provided.
PROCCOURC NUMBCR 1.3.7 WP Sfb R1 (0%3)
PROCCOURC NUMBCR           R CV I BI O N N UMBC R     PACC NUMBCR 1.3.7                                                              1.3.7-7 of   23 WP Sfb R1 (0%3)
R CVI BI ON NUMBC R PACC NUMBCR 1.3.7-7 of 23


                                                                          ~
~
I ~ k I't <<0 't 5' &#xc3; ~ 'E '
I
ll'<<<<Lt . ) ~ 'I I P ' t 'I l~ *'
~ k I't <<0 't 5'
                                                          )Qtt t 'I ~
&#xc3; ~
                                                        'I '           tt
'E
' ll'<<<<Lt.
)
~
'I I
P t
'I l ~
)Qtt t
'I
~
'I '
tt


              '.,   Plant Equi ment Requirin       A Clearance   (Continued)
'., Plant Equi ment Requirin A Clearance (Continued)
Responsibilit                                             Action
Responsibilit Action 14.
: 14. Determine   if a CW/HWP   is required (Attach-ment 0). Prepare and indicate     in the   space provided o
Determine if a CW/HWP is required (Attach-ment 0).
: 15. Carries (green) copy and       RWP to the Health Physics Supervisor.
Prepare and indicate in the space provided o 15.
NOTES:
Carries (green) copy and RWP to the Health Physics Supervisor.
: 1)    The HP Supervisor, in coordination with the ALARA Coordinator, will re-view the    RWP  and  MWR  for radiological and ALARA    concerns/requirements.
: 2)    The normal    processing time for RWP approval    is  48 hours. However, RWP's may be  processed more quickly on an emergency    basis, if'ecessary.
Maintenance Section Supervisor/
Maintenance Section Supervisor/
: 16. lf the   MWR   is f'r Safety   Related, Fire Pro-tection or Radwaste,reviews the         work to be Plant System Engineer                    performed using the f'ollowing criteria and routes MWR to Technical/QC, as required:
Plant System Engineer NOTES:
NOTE:   The purpose of the criteria below is to establish guidelines; however, Mainten-ance Supervisors may route any MWR in ques-tion to Technical and/or QC for input.
1)
: a. MWRs   that are used with an approved procedure require NO Technical review, but require Plant       QC Review for as-signment   of'old Points,       if applicable.
The HP Supervisor, in coordination with the ALARA Coordinator, will re-view the RWP and MWR for radiological and ALARA concerns/requirements.
: b. MWRs   that are used with or without an approved procedure but are normally within the     skill level of the person-nel perf'orming the work require NO Technical or Plant QC review. (Exam-ples are: valve packing/adjustment, alignment, troubleshooting, crimping, terminations, cleaning, painting, gas-ket replacement, electronic repair, and other tasks as is more fully dis-cussed in PPM 10.1.11, Maintenance Procedures.)
2)
PRQCCDURC NUM8CR             RKVl5IQN NUM8KR  PAQC NUMSCR 1.3.7                                                         1.3.7-8   of'3 WP.158 Rl (5%5)
The normal processing time for RWP approval is 48 hours.
: However, RWP's may be processed more quickly on an emergency basis, if'ecessary.
: 16. lf the MWR is f'r Safety Related, Fire Pro-tection or Radwaste,reviews the work to be performed using the f'ollowing criteria and routes MWR to Technical/QC, as required:
NOTE:
The purpose of the criteria below is to establish guidelines; however, Mainten-ance Supervisors may route any MWR in ques-tion to Technical and/or QC for input.
a.
MWRs that are used with an approved procedure require NO Technical review, but require Plant QC Review for as-signment of'old Points, if applicable.
b.
MWRs that are used with or without an approved procedure but are normally within the skill level of the person-nel perf'orming the work require NO Technical or Plant QC review.
(Exam-ples are:
valve packing/adjustment, alignment, troubleshooting,
: crimping, terminations, cleaning, painting, gas-ket replacement, electronic repair, and other tasks as is more fully dis-cussed in PPM 10.1.11, Maintenance Procedures.)
PRQCCDURC NUM8CR 1.3.7 WP.158 Rl (5%5)
RKVl5IQN NUM8KR PAQC NUMSCR 1.3.7-8 of'3


1
1
                            ~
~
.A4 E/ 0 W'\ A 0
A 0
* t F ~ ~
* t
.A4 E/
0 W'\\
F
~
~


              <
< A., Plant Equi ment Requirin A Clearance (Continued) f Responsibilit ffction c.
A., Plant Equi ment Requirin   A Clearance   (Continued)
MWRs that are used without an approved procedure (except as noted above)
Responsibilit                                         ffction f                                                c. MWRs that are used without an approved procedure (except as noted above) RE-QUIRE Technical and Plant QC review.
RE-QUIRE Technical and Plant QC review.
7Examples are: manufacturing of'pare parts or components, fabrication of special lifting rigs, special tests/
7Examples are:
manufacturing of'pare parts or components, fabrication of special lifting rigs, special tests/
inspections, etc.)
inspections, etc.)
NOTES:
NOTES:
: 1)   The Technical Manager or designee is to review or determine the work process to be used and sign the MWR in the work instruction section in the "REVIEWED BY" block. Technical, upon comple-tion of their review, is to carry the MWR on to Plant QC Super-visor/Designee unless the block on the MWR allocated   f'r QC is marked "NO   QC REQ'D", upon which Technical is to carry the MWR to the appropriate Maintenance Supervisor.
1)
: 2)   The   QC Supervisor/Designee   is to review the work process for esta-blishing any necessary QC hold points and sign/date the MWR in     .
The Technical Manager or designee is to review or determine the work process to be used and sign the MWR in the work instruction section in the "REVIEWED BY" block.
the blank, untitled blocks below the "Approval" block in the work instruction section.     QC is, upon completion of their review, to carry the MWR to the appropriate Maintenance Supervisor unless the work, as stipulated by the work instruction/procedure number re-quires "Authorized Nuclear In-spector (ANI(I)) involvement.
Technical, upon comple-tion of their review, is to carry the MWR on to Plant QC Super-visor/Designee unless the block on the MWR allocated f'r QC is marked "NO QC REQ'D", upon which Technical is to carry the MWR to the appropriate Maintenance Supervisor.
: 3)   If the MWR requires ANI(I) in-volvement, QC contacts the ANI(I) who reviews the MWR and/or adds hold points, as applicable.
2)
The QC Supervisor/Designee is to review the work process for esta-blishing any necessary QC hold points and sign/date the MWR in the blank, untitled blocks below the "Approval" block in the work instruction section.
QC is, upon completion of their review, to carry the MWR to the appropriate Maintenance Supervisor unless the work, as stipulated by the work instruction/procedure number re-quires "Authorized Nuclear In-spector (ANI(I)) involvement.
3)
If the MWR requires ANI(I) in-volvement, QC contacts the ANI(I) who reviews the MWR and/or adds hold points, as applicable.
After ANI(I) review, QC is to carry the MWR to the appropriate (in this case Mechanical) Main-tenance Supervisor.
After ANI(I) review, QC is to carry the MWR to the appropriate (in this case Mechanical) Main-tenance Supervisor.
PRDCCOURC NUMBCR              RCVIBIDN NUMBCR PAOC NUMBCR 1.3.7                                                     1.3.7-9 of 23 WP 55I Rl (t&5)
PRDCCOURC NUMBCR 1.3.7 WP 55I Rl (t&5)
RCVIBIDNNUMBCR PAOC NUMBCR 1.3.7-9 of 23


                                            ~
~
                                              ~
~
1 4
1 4
w-' ~ oq= l w'   ytl   'AA k'' V ~ OPf' I ~,                                   t~ L     I ~
w-' ~ oq=
l w'
ytl
'AA k''
V
~
OPf' I
~,
t ~
L I
~


~
~
o     ~
o
                '..         Plant Equipment Requirin     A Clearance   (Continued)
~ '.. Plant Equipment Requirin A Clearance (Continued)
Res onsibilit                                               Action Haintenance Section                     17. Signs the work   instruction section as pre-Supervisor/                                  pared hy.
Res onsibilit Action Haintenance Section Supervisor/
Plant System Engineer hiaintenance Section                    18. Approves the work instruction section and Supervisor                                    signs as approved by.
Plant System Engineer hiaintenance Section Supervisor Supervisor/Foreman/
Supervisor/Foreman/                    19. Requests   and obtains a clearance order,   if Assigned Person                              required, i'rom Operations as per PPH 1.3.8. Prepares and processes through Operations a Fire Protection Permit per PPM 1.3.10 or a Confined Workplace Permit per PPM 1.9.2. Requests and obtains,   if appli-cable, Health Physics support and equipment as required by the RWP and/or ALARA check-list. Interi'aces with QC if'ny hold prints are stipulated.
Assigned Person 17.
: 20. Assures that the     MWR Work Package is CAR-RIED   to Control Room (CAS/SAS Operator xf work is on a Security System) immediately prior to commencing work.
18.
NOTE:   (Applies to Shift Manager only)
19.
When a   Clearance Order   is required, writes C.O. number on the     HWR f'ront sheet in the "OPERATIONS REQUIREMENTS"     section before proceeding to the next step of this proce-dure.
20.
Shift   Manager/                       21   Reviews   MWR Package received from Main-Security Lieutenant                          tenance   in the previous step, signs MWR (Security Systems only)                      in lower right hand corner of'ork instruc-tion section, makes Xerox copy of MWR f'ront sheet for Control Room (CAS/SAS for Secur-ity Systems)   "Active HWR Notebook". Re-turns hNR to the appropriate Maintenance Section Supervisor/Foreman/assigned per-son. Additionally provides explicit noti-fication and documentation of'he aff'ected equipment per PPH 1.3.4t "Operating Data and Logs" and PPhi 1.3.6t "Shif't Turnover".
Signs the work instruction section as pre-pared hy.
Maintenance Section                    22. Assigns personnel to perf'orm the work.
Approves the work instruction section and signs as approved by.
Supervisor/Foreman                          Gives goldenrod copy to assigned personnel for information on the job.
Requests and obtains a clearance order, if
PROCKDURC NUMSCR                   RKVI5ION NUMSCR    PIC@ NUMItaR
: required, i'rom Operations as per PPH 1.3.8.
                      '.3.7 1.3.7-10 of 23 WP 550  Rt (5&5)
Prepares and processes through Operations a Fire Protection Permit per PPM 1.3.10 or a Confined Workplace Permit per PPM 1.9.2.
Requests and obtains, if appli-
: cable, Health Physics support and equipment as required by the RWP and/or ALARA check-list.
Interi'aces with QC if'ny hold prints are stipulated.
Assures that the MWR Work Package is CAR-RIED to Control Room (CAS/SAS Operator xf work is on a Security System) immediately prior to commencing work.
NOTE:
(Applies to Shift Manager only)
When a Clearance Order is required, writes C.O.
number on the HWR f'ront sheet in the "OPERATIONS REQUIREMENTS" section before proceeding to the next step of this proce-dure.
Shift Manager/
Security Lieutenant (Security Systems only)
Maintenance Section Supervisor/Foreman 21 22.
Reviews MWR Package received from Main-tenance in the previous step, signs MWR in lower right hand corner of'ork instruc-tion section, makes Xerox copy of MWR f'ront sheet for Control Room (CAS/SAS for Secur-ity Systems)
"Active HWR Notebook".
Re-turns hNR to the appropriate Maintenance Section Supervisor/Foreman/assigned per-son.
Additionally provides explicit noti-fication and documentation of'he aff'ected equipment per PPH 1.3.4t "Operating Data and Logs" and PPhi 1.3.6t "Shif't Turnover".
Assigns personnel to perf'orm the work.
Gives goldenrod copy to assigned personnel for information on the job.
PROCKDURC NUMSCR
'.3.7 WP 550 Rt (5&5)
RKVI5IONNUMSCR PIC@ NUMItaR 1.3.7-10 of 23


I A., Plant E'qui ment Re   uirin   A Clearance   (Continued)
I A., Plant E'qui ment Re uirin Responsibilit 23.
Responsibilit                                                Action
A Clearance (Continued)
: 23. Supervises and inspects all work being per-formed to ensure proper completion prior to return to service.
Action Supervises and inspects all work being per-formed to ensure proper completion prior to return to service.
Assigned Personnel                 24. Complete necessary maintenance       and notifies the Maintenance superv'sor for       release to operations. Remove the MWR ID         tag from component worked on and checks       block on MWR.
Assigned Personnel
        'Assigned Personnel                  25. NOTE: DETACH PINK SHEET FRQ3 MWR.PRIOR TO DIIOfG THIS STEP.       TO PRECLUDE THE BOTTOM PORTION OF THE PINK SHEET (COMPUTER INPUT)
'Assigned Personnel 24.
25.
Complete necessary maintenance and notifies the Maintenance superv'sor for release to operations.
Remove the MWR ID tag from component worked on and checks block on MWR.
NOTE:
DETACH PINK SHEET FRQ3 MWR.PRIOR TO DIIOfG THIS STEP.
TO PRECLUDE THE BOTTOM PORTION OF THE PINK SHEET (COMPUTER INPUT)
FROM BEING DEFACED WHILE RECORDING DATA ON THE WHITE ORIGINAL AND YELLOW SHEETS.
FROM BEING DEFACED WHILE RECORDING DATA ON THE WHITE ORIGINAL AND YELLOW SHEETS.
Describes     all work performed on ORIGINAL MWR   and MWR   continuation sheet   (ii'eces-sary) in enough detail for machinery his-tory, including total manhours required to perform the work. List materials and parts used on the work performed section and at-tach accept tags. If accept tags are not available, list the purchase requisition or store order number. Attach any other com-pleted supporting documentation to original MWR and sign as completed by.
Maintenance Section Supervisor Maintenance Section Supervisor/Foreman/
Maintenance Section                  26. Reviews and ensures that MWR and any sup-Supervisor                                porting documentation is completed correct-ly. Evaluates   MWR for possible necessary changes to the Preventive Maintenance Pro-gram. Signs and dates MWR as reviewed by.
Assigned Person Maintenance Section Supervisor/Foreman 26.
Maintenance Section                  27. Releases                 or system to Operations Supervisor/Foreman/                      f'r returncomponent to service. Carries yellow copy Assigned Person                          of the     MWR to the Control Room (to the CAS/
27.
28.
Describes all work performed on ORIGINAL MWR and MWR continuation sheet (ii'eces-sary) in enough detail for machinery his-tory, including total manhours required to perform the work.
List materials and parts used on the work performed section and at-tach accept tags.
If accept tags are not available, list the purchase requisition or store order number.
Attach any other com-pleted supporting documentation to original MWR and sign as completed by.
Reviews and ensures that MWR and any sup-porting documentation is completed correct-ly.
Evaluates MWR for possible necessary changes to the Preventive Maintenance Pro-gram.
Signs and dates MWR as reviewed by.
Releases component or system to Operations f'r return to service.
Carries yellow copy of the MWR to the Control Room (to the CAS/
SAS operator f'r Security Systems) and in-cludes any special checks or maintenance requirements.
SAS operator f'r Security Systems) and in-cludes any special checks or maintenance requirements.
Maintenance Section                  28. Completes pink copy of MWR as appropriate Supervisor/Foreman                        f"or maintenance history inf'ormation (PPICS-EQH) in computer input i'ormat, including:
Completes pink copy of MWR as appropriate f"or maintenance history inf'ormation (PPICS-EQH) in computer input i'ormat, including:
PRQCSDURS NUMSSR             RKVIBION NUMSIKR    PAGC NUMSCR 1.3.7                                                           1.3.7-11   of'3 WP StS Rl (0%3)
PRQCSDURS NUMSSR 1.3.7 WP StS Rl (0%3)
RKVIBIONNUMSIKR PAGC NUMSCR 1.3.7-11 of'3


I' F ) ~
I' F
)
~
e'
e'


a A., Plant Equipment     Re uirin   A Clearance   (Continued)
a A., Plant Equipment Re uirin Res onsibilit A Clearance (Continued)
Res onsibilit                                            Action
Action o
'                                                    o o
Work Required Summary o
Work Required Summary Work Performed Summary o     Clearance Order No./RWP No.
Work Performed Summary o
o   'ork   Type (Failure, Non failure, planned,   etc.)
Clearance Order No./RWP No.
o     Lead Discipline Payroll No.
o 'ork Type (Failure, Non failure, planned, etc.)
o     Work Start and Stop
o Lead Discipline Payroll No.
                                                          -.(Month, day, year, hour) o     Actual Man-hours and crew size, each discipline o     Prepared by (Print name) and date Carries original     HWR to Administration   Man-ager (ENSURE ALL SUPPORTING DOCLNENTATION IS ATTACHED TO ORIGINAL MWR) and pink copy to Maintenance Planner/Scheduler.
o Work Start and Stop
NOTE:   Those items such as facility main-tenance only need to be indicated as com-pleted on pink copy and will not be entered in the PPICS maintenance history system (EqH).
-.(Month, day, year, hour) o Actual Man-hours and crew size, each discipline o
Maintenance Planner/               29. Updates'MWR   status in   PPICS, transfers   in-Scheduler                                formation to   PPICS maintenance history.
Prepared by (Print name) and date Carries original HWR to Administration Man-ager (ENSURE ALL SUPPORTING DOCLNENTATION IS ATTACHED TO ORIGINAL MWR) and pink copy to Maintenance Planner/Scheduler.
Adninistra tion Manager            30. Files the original MWR and all supporting documentation in the plant maintenance history files.
NOTE:
Shif't Manager/Security            31. Receives yellow copy of MWR directly from
Those items such as facility main-tenance only need to be indicated as com-pleted on pink copy and will not be entered in the PPICS maintenance history system (EqH).
        -
Maintenance Planner/
Lieutenant (Security                    Maintenance personnel and reviews the Work Systems Only)                            Performed section. Determines the opera-tional retest requirements including       any maintenance requested     testing and fills out the Operability Check Sheet       (OCS), Attach-ment E (Mandatory for Safety Related equip-ment). Signs the OCS as prepared by.
Scheduler Adninistra tion Manager Shif't Manager/Security
- Lieutenant (Security Systems Only) 29.
30.
31.
Updates'MWR status in PPICS, transfers in-formation to PPICS maintenance history.
Files the original MWR and all supporting documentation in the plant maintenance history files.
Receives yellow copy of MWR directly from Maintenance personnel and reviews the Work Performed section.
Determines the opera-tional retest requirements including any maintenance requested testing and fills out the Operability Check Sheet (OCS), Attach-ment E (Mandatory for Safety Related equip-ment).
Signs the OCS as prepared by.
Destroys xerox copy of MWR placed in the "Active MWR Notebook" in Step 21.
Destroys xerox copy of MWR placed in the "Active MWR Notebook" in Step 21.
NOTES:     a. Surveillance test procedures conducted   for operability tests SHAI L be documented   in accordance with   PPM 1.5.1.
NOTES:
PROCKDURC NUMSCR               REVISION NUMSCR    PAQK NUMICR 1.3.7                                                       1.3.7-12   of'3 WP %IS R'I (SWS)
a.
Surveillance test procedures conducted for operability tests SHAI L be documented in accordance with PPM 1.5.1.
PROCKDURC NUMSCR 1.3.7 WP %IS R'I (SWS)
REVISION NUMSCR PAQK NUMICR 1.3.7-12 of'3


I 7*1   iA - \, tl -- *I, tP ~ 1
I 7*1 iA
    ~   P
- \\,
tl
*I, tP
~ 1
~
P


i
i A.
                  ~1' A. Plant Equipment Reguirin     A Clearance   (Continued)
Plant Equipment Reguirin A Clearance (Continued)
Action
~1' Action b.
'                                                              b. If the retest requirements are questionable or unknown
If the retest requirements are questionable or unknown
                                                                    'he Technical Manager SHALL make the determination and sign the OCS as prepared by.
'he Technical Manager SHALL make the determination and sign the OCS as prepared by.
C ~   If the retest requirements cannot be perf'ormed at this time due to plant conditions the Shift Manager or Techni-cal Manager SHALL indicate when the test can be per-formed on the OCS.
C ~
: d.     In the case. of security sys-tem, Plant Security make the determination on the OCS.
If the retest requirements cannot be perf'ormed at this time due to plant conditions the Shift Manager or Techni-cal Manager SHALL indicate when the test can be per-formed on the OCS.
: 32. Checks   retest hold on the yellow copy MWR if   test cannot be performed at this time. Attaches yellow copy of'WR to the of'he OCS and places in "Hold" portion of'he "Active MWR Notebook".
d.
: 33. LIMITATION:     If a   Nonconformance Report       is referenced on the     MWR, ensure that the       NCR disposition is approved (NCR need not be totally closed) prior to declaring the system operational as per the OCS/yellow copy of the MWR.
In the case. of security sys-tem, Plant Security make the determination on the OCS.
Perf'orms   retest as per the OCS (if'e-quired). Notifies QC prior to retest on Safety Related Equipment. Signs, dates and enters time, on the OCS and/or the yellow copy of the MWR as applicable.
32.
Checks retest hold on the yellow copy of'he MWR if test cannot be performed at this time.
Attaches yellow copy of'WR to the OCS and places in "Hold" portion of'he "Active MWR Notebook".
Shift Manager/Security Lieutenant (Security System Only) 33.
LIMITATION: If a Nonconformance Report is referenced on the MWR, ensure that the NCR disposition is approved (NCR need not be totally closed) prior to declaring the system operational as per the OCS/yellow copy of the MWR.
Perf'orms retest as per the OCS (if'e-quired).
Notifies QC prior to retest on Safety Related Equipment.
: Signs, dates and enters
: time, on the OCS and/or the yellow copy of the MWR as applicable.
Additionally (the Shift Manager only), pro-vides explicit notif'ication and documenta-tion of the returned to operable status per PPM 1.3.4, "Operating Data and Logs" and PPM 1.3.6, "Shif't Turnover".
Additionally (the Shift Manager only), pro-vides explicit notif'ication and documenta-tion of the returned to operable status per PPM 1.3.4, "Operating Data and Logs" and PPM 1.3.6, "Shif't Turnover".
Shift Manager/Security          34. Attaches any supporting procedures and Lieutenant (Security                  carries OCS/yellow copy of'WR to the Ad-System Only)                          ministration Manager.
34.
PRQCCQURC NUMBCR            RCVISION NUMBCR    PAQC NUMBCR 1.3.7                                                       1.3.7-13 of'3 WP 4$ $ Rl (%%4)
Attaches any supporting procedures and carries OCS/yellow copy of'WR to the Ad-ministration Manager.
PRQCCQURC NUMBCR 1.3.7 WP 4$ $ Rl (%%4)
RCVISION NUMBCR PAQC NUMBCR 1.3.7-13 of'3


V.
V.
              <
                ~b'1'ction A., Plant  E Administration Manager ui  ment Re  uirin 35.
A  Clearance Files the any (Continued)
OCS', yellow copy of the MWR and supporting documentation in the plant machinery    history files.
B. 'lant    E  ui  ment Not  Requirin    Clearances All steps indicated in 1.3.7.6.A SHALL be followed except those that refer to clearances. These Maintenance activities SHALL be entered in the control room log.
Sho  Maintenance or Work Not Involvin Plant              E ui ment/S stems All steps indicated in 1.3.7.6.A          SHALL be    followed except the following:
: 1. No  clearance  is required    f'r this    type of'aintenance.
: 2. Notify control room only        when  working on any contaminated material needing a RWP.
: 3. The  MWR  is  NOT routed through Operations.
1.3.7.7    Emer enc    MWR  Processin A. When an  individual f'eels that      emergency work may be      involved, the Shift  Manager SHALL be      notified immediately.,
B. If the  Shif't Manager concurs that emergency work is required, he SHALL  establish the proper plant conditions, notify the management individuals on duty, notify QA/QC for safety-related work and should direct that the work be performed immediately.
C. Preparation of the MWR forms may be done while the work is in pro-gress or af'ter the work is completed. As soon as feasible, route the MWR forms to Maintenance Section Supervisor for input into PPICs.
D. The  Shif't  Manager SHALL return the system to normal and direct acti-vities  such as checkout, operational tests and reviews as may be required.
1.3.7.8    Attachments A. MWR  Form B. MWR  Computer Input Form C. MWR  Continuation Sheet PROCCOURC NUMBCR                REVISION NUMBCR    PAO C NUMBC  R 1.3.7                                                              1,3.7-14 of 23 WP SBB RI (SWS)


5 I*   'I     ,'
< A., Plant E ui ment Re uirin A Clearance (Continued)
all k
~b'1'ction Administration Manager 35.
Files the OCS', yellow copy of the MWR and any supporting documentation in the plant machinery history files.
B. 'lant E ui ment Not Requirin Clearances All steps indicated in 1.3.7.6.A SHALL be followed except those that refer to clearances.
These Maintenance activities SHALL be entered in the control room log.
Sho Maintenance or Work Not Involvin Plant E ui ment/S stems All steps indicated in 1.3.7.6.A SHALL be followed except the following:
1.
No clearance is required f'r this type of'aintenance.
2.
Notify control room only when working on any contaminated material needing a
RWP.
3.
The MWR is NOT routed through Operations.
1.3.7.7 Emer enc MWR Processin A.
B.
C.
D.
1.3.7.8 When an individual f'eels that emergency work may be involved, the Shift Manager SHALL be notified immediately.,
If the Shif't Manager concurs that emergency work is required, he SHALL establish the proper plant conditions, notify the management individuals on duty, notify QA/QC for safety-related work and should direct that the work be performed immediately.
Preparation of the MWR forms may be done while the work is in pro-gress or af'ter the work is completed.
As soon as feasible, route the MWR forms to Maintenance Section Supervisor for input into PPICs.
The Shif't Manager SHALL return the system to normal and direct acti-vities such as checkout, operational tests and reviews as may be required.
Attachments A.
MWR Form B.
MWR Computer Input Form C.
MWR Continuation Sheet PROCCOURC NUMBCR 1.3.7 WP SBB RI (SWS)
REVISION NUMBCR PAO C NUMBC R 1,3.7-14 of 23
 
5 I*
'I all k


                            '
i I D.
I D. CW/HWP Tag   (Special Work Permit - SWP)
CW/HWP Tag (Special Work Permit - SWP)
E. Operability   Check Sheet (OCS) i                F.
E.
G.
Operability Check Sheet (OCS)
Startup  Work Requests Additional Criteria to be used when Processing HWRs on systems/ com-ponents not yet under Plant Control, with Flow Chart PROCKDURK NUMBCR            RKVIBION NUMBCR  PA4K NUMBCR l.3.7                                                 1.3.7-15 of 23 WP IBB R'I {$~)
F.
Startup Work Requests G.
Additional Criteria to be used when Processing HWRs on systems/
com-ponents not yet under Plant Control, with Flow Chart PROCKDURK NUMBCR l.3.7 WP IBB R'I {$~)
RKVIBIONNUMBCR PA4K NUMBCR 1.3.7-15 of 23


I ~
I
R r P
~
R r
P
% ~
% ~


                                                      ~
~
~ ~
~
                                          %ASKN~I               KlCR SUFPt.Y SYSaal RAINTENAP4CE WORK REOUEST, I   C441t+lCIIT RCCC IIUIIACA                                                           AIZIA IIIC  44
%ASKN~I ~ KlCR SUFPt.Y SYSaal RAINTENAP4CE WORK REOUEST, I
          ~ ~   ~           ~   ~
C441t+lCIIT RCCC IIUIIACA
VIAUCII OCSCAIPFIOIIIUOCATIOH
~
    ~ LCIAlwOAK1(OU TCCIISPCC   Q ICS   QleO         OACNATIOICS ACOUINCJICIITSI C
~
0                      4 0ISPATC II    Cl     E3 '         $  A ~ ~ T ~ 1 0
~
4 Acuvco      C3T~ CI      ~l KI            10 P'A C   VII II     C                                                   10 KCVICIv I VCS VAI, IIC V I CW g  ~Y C I~           I 1 10 TAO ACIAOVCO 441~
~
Attachment             A PRQCEQURf HUhIBfR                 RfVISION NUIVIBfR          IIAQfNVSlf  fP 1.3.7                                                           1.3.7-16 of 3
~
VIAUCII OCSCAIPFIOIIIUOCATIOH AIZIA IIIC 44
~ LCIAlwOAK1(OU TCCIISPCC Q ICS QleO OACNATIOICS ACOUINCJICIITSI 0ISPATCII Cl E3 '
Acuvco C3T~ CI ~ l C0 A
~
~
T
~
1 4 04 K I 10 P'A C
VII II C
10 KCVICIv I VCS
: VAI, IICVICWg
~ Y CI~
I 1 10 TAO ACIAOVCO 441~
Attachment A
PRQCEQURf HUhIBfR 1.3.7 RfVISION NUIVIBfR IIAQfNVSlffP 1.3.7-16 of 3


        ~'
~
      ~
~ '
ShQCXCTCH PVlKKPOWER SUPPLY SYSM4 II
II Y COUIeeeceeY eltcc IIUeeo(A ShQCXCTCH PVlKKPOWER SUPPLY SYSM4
                                                                +WWVmaaCC mRX RCOuaSr                                             loCI.
+WWVmaaCC mRX RCOuaSr loCI.
Y COUIeeeceeY    eltcc IIUeeo(A w.A QU Iree cee   ocecr lrYIolelLocAYeoee OAIAee       A   A ARTCC 0 )Ti em. TAO IIUeee P   eeO OrcAATIOIYS ccoUIAceeceeecl c~sAeecs         QTcc @ceo awr         QTcs Q eeo       C 0            tSAeeT C                                    0 oeeAA'Tele       Cl       D           e     Y 4 $   I   e ~  s U
w.A QU Iree cee ocecr lrYIolelLocAYeoee OAIAee A
rc~vco          E3~      CI ~
A em. TAO IIUeee ARTCC P eeO OrcAATIOIYSccoUIAceeceeecl 0 )Ti c~sAeecs QTcc @ceo awr QTcs Q eeo oeeAA'Tele Cl D
Ale   IlecYAUcYIoleslrroc       Urc eeo         CLJLkk           ~ ceeleeeer                   Ir     ADA V A     V AC I       ~
rc~vco E3~ CI~
C0 C
tSAeeT e
Y 4
$ I e
~
s 0U Ale IlecYAUcYIoleslrroc Urc eeo CLJLkk
~ceeleeeer Ir ADA V A
VAC I
~
OUC OAYC
OUC OAYC
                                                                            ~e     4       T CREW RCS         0 C  E ATIOee
~e 4
                                                      ~   eoc   0       X eeee rcoUIAco     ~T         gTAAee ooceeeeoeee
T CREW RCS
                                                                              ~   ~
~
DA   To   eceU4     Ms   oA To         IIDUN       eeccee ~     IAc       ee c IA: 0 Attachment 8 PROCEDURE NUele8ER                 REVISIO I NUM8ER       PAGE NUIABER
eoc 0
'eTP 598                                                                    1.3.7                                               1.3.7-17 of 23
0C E ATIOee X
eeee rcoUIAco~T gTAAee ooceeeeoeee
~
~
DA To eceU4 Ms oA To IIDUN eeccee ~
IAc ee c
IA:
0 Attachment 8
'eTP 598 PROCEDURE NUele8ER REVISIO I NUM8ER 1.3.7 PAGE NUIABER 1.3.7-17 of 23
 
j


                            ,
t W
t W g fP
g f P
      'I
'I
                            ,I
,I
                              'L i
'L i
                            !
1 w
1 w
Ey k.
Ey k.
  ~ ~
~
~


                                            %'AS) ItXGTQY PUBIC t01CER SL PtLY SYSTEM i1AIiiVD,A.'ICZll 1) la R liE1,1(   t' (CONTINVAT1ON SIIKgT)
%'AS)ItXGTQYPUBIC t01CER SL PtLYSYSTEM
      . WII IIO, 5PA$ lK iAATSISsATKRtAL, ao. IIsto       ssanaIaI. coot                         IIaTta lais coot         wa. IIsco )
. WII IIO, i1AIiiVD,A.'ICZll1) la R liE1,1( t' (CONTINVAT1ONSIIKgT) ao. IIsto
)
ssanaIaI. coot 5PA$lKiAATSISsATKRtAL, IIaTtalais coot wa. IIsco
)
seaweed. coot
seaweed. coot
                          )
~
                                                                    ~   ~                 ~ ~
~
                                                                        ~ ~
~
                        ~~       ~   ~                                       ~     ~
~
                            ~           ~
~
                                                                              ~   ~ ~   ~ ~
~
                            ~   ~   ~ ~ ~ ~                           ~       ~ ~
~ ~
Mols1\s Attachment           C PROCKQVRK NUMBER               REVISION NUMSKR       PAGE NUMBER WP 59K                                                  l. 7                                               1.3.7-18 of 23
~
~
~
~
~
~
~
~
~
~
~
Mols1\\s
~
~
~
~
~
~
~
~
~
Attachment C
WP 59K PROCKQVRK NUMBER REVISION NUMSKR l.
7 PAGE NUMBER 1.3.7-18 of 23


CATE FIRE PROTECTION PERt/IIT, CoiNFINED SPACE                . ORKPLACE PERMIT REQUESTOA                          Si/PeAV;SQR o SQUESTQA                                 SUPEAVISOA IOSAI y/QRK LQCATIOnl WORK TO BE PEAFQRMEQ OR MWR No.
CATE CoiNFINED SPACE. ORKPLACE PERMIT FIRE PROTECTION PERt/IIT, o SQUESTQA SUPEAVISOA IOSAI REQUESTOA y/QRK LQCATIOnl Si/PeAV;SQR WCR': WCATIQN WOAKTO SE PSAFQRMEQ OR MWA No.
WCR': WCATIQN PIRE PAOTKCTION IN AASA:
REsuLTs oF hTuc"PuEAIC *NALvsls/TESTEA Si OTTER EQUIPMEiNT REQUIRED
YYORK REQUIREMENTS:        (Geact WOAK TO SE PSAFQRMEQ OR MWA No.
No TRANSiENT PIRE LCAO oEQUIREO REsuLTs oF hTuc"PuEAIC *NALvsls/TESTEA                                                       COMBUSTIBLKSREMOVEOiPAOTeC. eo BLANKS'ii/FLOWNCUATAINS AEQUIRSO ELK~ICALEQUIP'/IENT PIIQTKCTSO Si OTTER FIRE SARRIEAISI SREACHEO FIAE PROTECTION SYSTEhi IMPAIREO.
EQUIPMEiNT REQUIRED ZONK!S I AOJACENT FIRE PROTECTION SYSTEhl IMPAIREO. ZONE(SI
: l. VENTILATICN:
: l. VENTILATICN:
PIRE WATCH AEQUIREO Soess/y lyoe li.e.i lenil QTHEA ECIAL SQUIPMENTi Soeeify sype (Le.: Se/ely Hunesh eIC,I APPROVALS WORK SUPSAVISORIQ*TE                SiiiFT "IA.'4ACER/CATE COMMUN   I CA ~ I 0/4S:
Soess/y lyoe li.e.i lenil ECIALSQUIPMENTi Soeeify sype (Le.: Se/ely Hunesh eIC,I WORK TO BE PEAFQRMEQ OR MWR No.
PIRE PAOTKCTION IN AASA:
YYORK REQUIREMENTS: (Geact No TRANSiENT PIRE LCAO oEQUIREO COMBUSTIBLKSREMOVEOiPAOTeC.eo BLANKS'ii/FLOWNCUATAINSAEQUIRSO ELK~ICALEQUIP'/IENT PIIQTKCTSO FIRE SARRIEAISI SREACHEO FIAE PROTECTION SYSTEhi IMPAIREO.
ZONK!S I AOJACENT FIRE PROTECTION SYSTEhl IMPAIREO. ZONE(SI PIRE WATCHAEQUIREO QTHEA APPROVALS COMMUN I CA
~ I0/4S:
Soesi/y I, ae ihe.. Heaiol
Soesi/y I, ae ihe.. Heaiol
                                                                                                'YORK AREA/FIRE SYSTciYI RETURNED TO NORMAL
: 4. 'CHT/NQI Soecru iIlnune nriwisot Tvoe WORK SUPSAVISORIQ*TE SiiiFT "IA.'4ACER/CATE
: 4. 'CHT/NQI Soecru iIlnune nriwisot Tvoe WORK SUPERVISOR/OATS                SHIFT 'lANAueR/QATK S. LIFEiUNKTENQER ASQUIREOt Yes i .'4o                                   TehlE                             ~ I ME S. PEA!COIC ATMOSPHERIC!8ONITQAINQ REQUIREot Yes/ Vo                 PERSON IN CHARQEOFWORKOPERATICNWiL'CKNCWI.SQQKREVIEyy
'YORK AREA/FIRE SYSTciYI RETURNED TO NORMAL S. LIFEiUNKTENQER ASQUIREOt Yes i.'4o WORK SUPERVISOR/OATS TehlE SHIFT 'lANAueR/QATK
                                                                                          'NO COMI'VANCE WITH THIS PeRMIT AT THE START OP eKACH SHIFT P/sauency hhnusee    / Houis                                                          INITIAL     TIME     OATS       INITIAL         TIME   OATS QSR Sieneluie PERSONNEL KNTPRINC CONFINED SPACE TIME           TIME                       TIME     T! ME NAME            IN           QUT           NAME           IN       OUT ILK THIS COPYWITH CONTROL RQCM BSFQIIS S,ARTINQ WORK.
~ I ME S. PEA!COIC ATMOSPHERIC!8ONITQAINQREQUIREot Yes/ Vo P/sauency hhnusee / Houis PERSON IN CHARQEOFWORKOPERATICNWiL'CKNCWI.SQQKREVIEyy
PILE THIS COPY IN CCNTAOL <QOM LOQ WHEN WCAK is COMPI eTE, Attachment D PROCEDURE NUMBER        REVISION NUMBER                  PAGE NUMBER 1.3.7                                               1.3.7-19 of 23 WP 598
'NO COMI'VANCEWITH THIS PeRMIT AT THE START OP eKACH SHIFT INITIAL TIME OATS INITIAL TIME OATS QSR Sieneluie NAME PERSONNEL KNTPRINC CONFINED SPACE TIME TIME TIME T!ME IN QUT NAME IN OUT PILE THIS COPY IN CCNTAOL<QOM LOQ WHEN WCAKis COMPI eTE, ILKTHIS COPYWITH CONTROL RQCM BSFQIIS S,ARTINQ WORK.
Attachment D
WP 598 PROCEDURE NUMBER 1.3.7 REVISION NUMBER PAGE NUMBER 1.3.7-19 of 23


      . ~ '
V 4 IP
V 4 IP
. ~ '


      ~
~
I OPERABILITY CHECK SHEET EPN 8 Time/Date Performed Initial Tests Required:
I OPERABILITY CHECK SHEET EPN 8 Time/Date Performed Initial Tests Required:
l.
l.
20 Special Checks/Tests   (if required):
20 Special Checks/Tests (if required):
l.
l.
2.
2.
3.
3.
                  ~ ~
(Continuation/Remarks)
(Continuation/Remarks)
If'n hold - conditions     when check must be   complete:
~
~
If'n hold - conditions when check must be complete:
Prepared By:
Prepared By:
Shift Manager                           Date System Operable:
Shift Manager Date System Operable:
Shif't Manager                         Date     Time Attachment E PROCCOURC NUMBCR             RCVISION NUMSCR   PAOC NUMSCR l.3.7 O'lI Rl ($ %$ )
Shif't Manager Date Time Attachment E
1.3.7-20 of'3 WP
PROCCOURC NUMBCR RCVISION NUMSCR PAOC NUMSCR l.3.7 WP O'lI Rl ($%$)
1.3.7-20 of'3


STARTUP WORK REQUESTS Res onsibilit                                             Action Maintenance Planner/               .1   Receives approved Startup Work Request from Schedule r                              Test and Startup.
STARTUP WORK REQUESTS Res onsibilit Action Maintenance Planner/
                                            .2   Logs in SWR   into computer Tracking System.
Schedule r
                                            .3   Issues SWR to appropriate shop (e.g.;
.1 Receives approved Startup Work Request from Test and Startup.
.2 Logs in SWR into computer Tracking System.
.3 Issues SWR to appropriate shop (e.g.;
Mechanical, Electrical, etc.).
Mechanical, Electrical, etc.).
Appropriate Shop                   .4   Calls   QC, if requirementto is   so indicated on Block 12 of     SWR, prior     starting work.
Appropriate Shop
                                            .5   Implements work on     SWR as per   PPM Volume 10 procedures,     and/or SWR instructions,   as applicable.
.4 Calls QC, if requirement is so indicated on Block 12 of SWR, prior to starting work.
                                            .6   Attaches any quality documents to completed SWR, as applicable.
.5 Implements work on SWR as per PPM Volume 10 procedures, and/or SWR instructions, as applicable.
                                            .7,Signs   Block 20 of the     SWR.
.6 Attaches any quality documents to completed
                                            .8   Returns SWR to Haintenance Planner/
: SWR, as applicable.
.7,Signs Block 20 of the SWR.
.8 Returns SWR to Haintenance Planner/
Scheduler.
Scheduler.
Haintenance Planner/               .9  Logs  SWR  out of'omputer Tracking System.
Haintenance Planner/
Scheduler,
Scheduler,
                                            .10 Returns   SWR to Test   and Startup.
.9 Logs SWR out of'omputer Tracking System.
NOTES
.10 Returns SWR to Test and Startup.
: a. Startup     Work Requests are applicable for   use on systems/components/
NOTES a.
Startup Work Requests are applicable for use on systems/components/
structures prior to "Release For Operations" only.
structures prior to "Release For Operations" only.
: b. In the case of high priority or emergency work, Steps 1, 2, 3, 9, and 10 may be bypassed or deleted, as applicable.
b.
Attachment F PRQCCDURC NVMSCR             RCVISION NVMSCR    PAQC NUMSCR l.3.7                                                         1.3.7-21   of'3 WP.StS Rl (SWS)
In the case of high priority or emergency work, Steps 1, 2, 3, 9, and 10 may be bypassed or deleted, as applicable.
Attachment F
PRQCCDURC NVMSCR l.3.7 WP.StS Rl (SWS)
RCVISION NVMSCR PAQC NUMSCR 1.3.7-21 of'3


I y
I y
  ' die + Ay   a='     ~ ~ 4 ~ 0           f'
die
            }     -c ar   xww   c> =' f 1
+
Ay a='
~
~
4 ~ 0 f'
}
-c ar xww c>
='
f 1


Additional Criteria     To Be Used .
Additional Criteria To Be Used When Processing HWRs On Systems/Components Not Yet Under Plant Control NOTE:
When Processing   HWRs On   Systems/Components Not Yet Under Plant Control NOTE:   Use this criteria in conjunction with the attached         Flow Chart Maintenance                             If'ystem/Component/Structure is in Test and Planner Scheduler                        Startup custody, annotates the remarks field in   PPICS as "SU CUSTODY". Routes     the HWR to Test   and Startup rather than to Maintenance Section Supervisor.
Use this criteria in conjunction with the attached Flow Chart Maintenance Planner Scheduler If'ystem/Component/Structure is in Test and Startup custody, annotates the remarks field in PPICS as "SU CUSTODY".
Test and Startup                   2. Reviews MWR   as per TSI 12.1.
Routes the HWR to Test and Startup rather than to Maintenance Section Supervisor.
Maintenance Planner/Scheduler 3.'f'lant       is to do work, receives approved HWR   from Test and Startup.
Test and Startup 2.
NOTE:   If'hS/U   has determined the Mainten-ance Department is not to do the work, ThS/U shall return at least a copy of the MWR   to the Maintenance Planner/Scheduler delineating the disposition of'he HWR (e.g.: corrected under SLT program; corrected by SDR (List 8); sent to Con-struction to correct; etc.)
Reviews MWR as per TSI 12.1.
: 4. Annotates PPICS remarks     f'ield "Received from SU to work (date)".
Maintenance Planner/Scheduler 3.'f'lant is to do work, receives approved HWR from Test and Startup.
: 5. Issues MWR to appropriate       shop (e.g.; Mech-anical, Electrical, etc.).
Appropriate Shop 4.
Appropriate Shop                  6. Implements work, as applicable, per steps 1.3.7.6.A.10 through 1.3.7.6.A.26 including QC review criteria of Step 1.3.7.6.A.16 of PPM 1.3.7.
5.
: 7. Completes pink copy of'WR         as per step 1.3.7.6.A.28 of PPM 1.3.7.
6.
: 8. Returns MWR to Maintenance Planner/
NOTE:
Scheduler.     (ENSURE ALL SUPPORTING DOCUMEN-TATION IS ATTACHED TO ORIGINAL MWR.)
If'hS/U has determined the Mainten-ance Department is not to do the work, ThS/U shall return at least a copy of the MWR to the Maintenance Planner/Scheduler delineating the disposition of'he HWR (e.g.: corrected under SLT program; corrected by SDR (List 8); sent to Con-struction to correct; etc.)
Maintenance                       9. Logs   HWR closure data into PPIC-EQH from Planner/Scheduler                      MWR  pink copy as per step 1.3.7.6.A.29 of PPM  1.3.7.
Annotates PPICS remarks f'ield "Received from SU to work (date)".
: 10. Returns original MWR and supporting docu-mentaton to Test and Startup for filing as per TSI 12.1.
Issues MWR to appropriate shop (e.g.;
Attachment   G Page 1 of' PROCKDURK NUMSCR            RCVISION NUMSCR    PAQC NUMSCR 1.3.7                                                       1.3.7-22   of'3 WP $ 80 RI ($ &l)
Mech-anical, Electrical, etc.).
Implements work, as applicable, per steps 1.3.7.6.A.10 through 1.3.7.6.A.26 including QC review criteria of Step 1.3.7.6.A.16 of PPM 1.3.7.
7.
Completes pink copy of'WR as per step 1.3.7.6.A.28 of PPM 1.3.7.
8.
Returns MWR to Maintenance Planner/
Scheduler.
(ENSURE ALL SUPPORTING DOCUMEN-TATION IS ATTACHED TO ORIGINAL MWR.)
Maintenance Planner/Scheduler 9.
Logs HWR closure MWR pink copy as PPM 1.3.7.
data into PPIC-EQH from per step 1.3.7.6.A.29 of 10.
Returns original mentaton to Test per TSI 12.1.
Attachment G
Page 1 of' MWR and supporting docu-and Startup for filing as PROCKDURK NUMSCR 1.3.7 WP $80 RI ($&l)
RCVISION NUMSCR PAQC NUMSCR 1.3.7-22 of'3


MWR's                                                                                                                                                                                           'ev If'hift Generate Manager review and cosplete ap-plicable Maintenance P'lanner Log Syst~     R leased for Ops.
MWR's GenerateIf'hift Manager review and cosplete ap-plicable section Maintenance P'lanner Log Syst~
                                                                            - ""      Maintenance Supervisor review/give work direction echnl eel Review Required Yes Plant System Engineer.
R - ""
review/add additional QC Re-quired I
leased for Ops.
Yes cw and establish hold oints section Ho
.Ho Maintenance Supervisor review/give work direction echnl eel Yes Plant System Engineer.
                                                                      .Ho SU Log                                                                                             Haint. Su vr.
Review review/add additional Required Yes QC Re-quired I
System Engr.                  .
Ho
Plant                                      TGS  Approved          Haint. armer ys em ogre Review Prepare               Iiaintenance        Give Mork SOR if required             To Ccmplete           Iree lo System Engr.
'ev cw and establish hold oints SU Log Haint.
Reference     SDR     SU on.ahtR Attach       Log original   tstR               B to   SDR or re-ference why no deficiency exists Haint. Supvr./Foreman get clearance order,                 Shift Hgr./SAS Operator                                                 Craftsmen Perform                        Haint. Supvr/Fore-Hair,t. Supvr.
Su vr.
4 review - keeps Haint. Supvr./Foreman                                                         man Revl'cw RMP. Conf ined Morkspace                                              Assign Mork                           Mork Approve                Permit, Fire Protection              copy Permit as required                                                                Roti fy                              In Process ~
System Engr.
Inspection         I QC     After Ccmpletion Inspection-System   Ycs Pelease for Gps.
Review Prepare SOR if required
I                                                                                                                                     Pink Copy Mhite Maintenance       armer       Pink Copy                                                                            Copy
. Plant Iiaintenance To Ccmplete ys em ogre Give Mork Iree lo TGS Approved System Engr.
        >eddic   lu           To EQ History Haint. armer SU  Log                                            Shift Hgr. SAS Operator                                                         L Yellow                                                        n' Sys tern File Copy                 Complete Opcrabili ty/                                                                                Pink Copy Surveillance Tests Mhi te SU            Copy Systetc Engr. Review and Retest Equip.                   TGS   Reviat               TGH Approve Lop                                                                          Attachment     G Page 2   of   2 PROCKDURK NUMQKR                            RKVISION NUMKKR              PAOK NUaaKKR 1.3.7                                                                                         1.3.7-23 of 23 wP.se4 R'I f043)
Reference SDR on.ahtR Attach original tstR to SDR or re-ference why no deficiency exists Haint.
armer SU Log B
Hair,t. Supvr.
4 Approve Haint. Supvr./Foreman get clearance
: order, RMP. Confined Morkspace Permit, Fire Protection Permit as required Shift Hgr./SAS Operator review - keeps copy Haint. Supvr./Foreman Assign Mork Rotify Craftsmen Perform Mork In Process
~
Inspection I
QC After Ccmpletion Inspection-Haint. Supvr/Fore-man Revl'cw System Ycs Pelease for Gps.
I Maintenance armer
>eddic lu SU Log Pink Copy To EQ History Yellow Copy Shift Hgr.
SAS Operator Complete Opcrabili ty/
Surveillance Tests Mhite Copy n'
Sys tern File Pink Copy Haint.
armer L
Pink Copy Systetc Engr. Review and Retest Equip.
TGS Reviat PROCKDURK NUMQKR Mhite Copy SU Lop TGH Approve RKVISIONNUMKKR PAOK NUaaKKR Attachment G
Page 2 of 2 1.3.7 wP.se4 R'I f043) 1.3.7-23 of 23


  '
I}}
I}}

Latest revision as of 07:27, 8 January 2025

Rev 4 to Administrative Procedure 1.3.7, Maint Work Request
ML17277B039
Person / Time
Site: Columbia 
Issue date: 10/31/1983
From: Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17277B035 List:
References
1.3.7, NUDOCS 8311210266
Download: ML17277B039 (40)


Text

,~,

~

WASKNGTONPUBUC POWER SUPPLY SYSTEM a

NCGNI7lIIIO~fLtl.ES CQPV

'ROCCDURC NUMSCR

+1.3.7 OIUMCNAMC APPROV C DATC 3,0/31/83 ON 1.3 ADMINISTRATIVEPRO RES CONDUCT OF OPERATIONS 1.5.7.1

~Pur aee This procedure establishes a system for identifying, controlling, docQ.--'-..'"

menting and determining requirements for work performed by the Mainten-ance Department within the plant. It establishes the method for prepara-tion, review, approval, implementation and,dispo'sition of the Maintenance Work Request (MWR).

1.3.7. 2 Definitions A.

Maintenance Work Request (MWR) (Form MWR)

The Maintenance Work Request SHALL be used to 'control all corrective maintenance activities and the implementation of permanent plant modifications or additions which result from Plant Modification Re-quests (PMR's).

The Maintenance Work Request has a unique serial number but need not necessarily be worked in sequential order.

The MWR has one original and four copies:

yellow Operations; golden-rod Maintenance; green - Chemistry-Health Physics; pink - Computer input/scheduling (PPICS).

The Maintenance Work, Request original and copies are similar to'hose exhibited in Attachments A through C, inclusive.

8.

Continuation Sheet The continuation sheet is to be used when additional information is needed on MWR and there is not enough room provided.

The continua-tion sheet is similar to the exhibit in Attachment D.

C.

Confined Work Permit (CWP)

The Confined Work Permit is a card that covers hazardous conditions in a-confined space.

Instructions on the card are to be, followed explicitly.

This card must be posted at the job site and becomes a

record document.

The use of a CWP SHALL be indicated in the block on the MWR.

The CWP is similar to the exhibit in Attachment D (see PPM 1.9.2).

CCDURC NUMSCR 1.3.7 RCVISION NUMSCR AQC NUMSCR 1.3.7-1 of 23 W~$7 R2 ISW2'I 83ii2i02bb 83iiii PDR ADOCK 05000397 A

PDR

I

~

i 0.

~WR LoQ The MWR Log is a record keeping document that contains information on open MWRs.'his Log may be kept on hard copy and/or on computer (PPICS).

E. ~BW k

Work that is determined by the Shift Manager that must be completed immediately in order to minimize injury or damage

-to the plant or to protect the health and safety of the public.'he following are codes to be used to determine the priority of the MWR:

Items in this category are to be expedited at the expense of items in all other categories.

Failure to complete, results in a Technical Specification violation, a reportable occurance, creates a safety.hazard or could damage critical plant equip-ment.

2.

Failure to complete could affect power oeneration.

3.

Affects the efficient operation of the system involved.

4.

Routine work to be complet'ed as manpower is available.

NOTE:

PRIORITY ONE MWR'S SHALL BE "HAND CARRIED" BY ALL RESPONSIBLE INDIVIDUALSTHROUGHOUT THE MWR ROUTING PROCESS.

The Shift Manager, upon determining the MWR is Priority One should annotate the upper left hand corner of the title block in capitol letters RPRIORITY ONE - HAND CARRY".

G.

Clearance Order (CO)

A procedure used for isolating.a piece of equipment or system in such a manner as to provide maximum safety to personnel and equip-ment prior to performing work (see PPM 1.3.8.).

H.

Radiation Work Permit (RWP)

Is the work permit that provides control over access to areas where radiological hazards exist.

A regular RWP is issued for a specific job of non-repetitive nature and is valid only during the time re-quired to complete the job.

An extended RWP is posted for jobs of repetitive nature and is active for an indefinite period of time (see PPM 11.2.8.1).

PRQCKDVRC NUINOCR 1.3.7 WP 500 Rl IO&l)

RCVISIQN NUMSCR PAQC NVM8C R 1.3.7-2 of 23

~

~

~

E

S y

Any individual who can identify a problem or activity which requires him to generate a

MWR.

3.

Plant Conditions 1.

Power Operation is when the mode switch is in the run position and the reactor is at any temp rature.

2.

Startup is when the acde switch is in the startup/hot standby position and the reactor is at any temperature.

Hot Shutdown is when the mode switch is in the shutdown posi-tion and the reactor temperature is greater than 200'F.

4.

Cold Shutdown is when the mode switch is in the shutdown posi-tion and the reactor temperature is less than or equal to 200'F.

5.

Refuel is when the mode switch is in the shutdown or refuel position and the reactor temperature is less than 140'F.

6.

Reduced Power is when the reactor power is reduced to complete

a. MWR.

7.

Pre Refuel is when any MWR is required to be completed prior to a refueling outage.

8.

Post Refuel is when any MWR is required to be completed after a

refueling outage.

II 9.

Spare.

K.

S stem/Component The following identif'ies the required condition or status of'he system/component for work to be done:

l.

In Service 2.

Out of'ervice Not Applicable L.

Power Plant Information Control S stem (PPICS)

The computer system used by the Supply System to control, monitor and retain history oi' MWR.

PRQCCDURC NUMBCR 1.3.7

,WP SS S R 'I (SWS)

RCVISION NUMBCR PAQC NUMBCR 1.3.7-3 of 23

1

~

I

'\\

~

E a

1 y

'., Initiatin Document Any document such as.a Plant Modification Request (FMR) or NRC Bulletin, Nonconformance Report, Plant Problem Report, et, al.

N.

Fire Hazard Review A review by a designated

person, of specific work to be performed within the main plant structure, which identifies 'gnition sources and combustible materials and defines those precautions to be taken.

A fire hazard review SHALL be performed when required by and in accordance with PPM 1.3.10.

NOTE:

At WNP-2 the Fire Hazard review and Fire Protection Permit is covered under the same procedure.

1.3.7.3 Discussion The Maintenance Work Request (MWR) is the document used to initiate and record Maintenance activities or plant modification implementation.

The MWR may be initiated by anyone who recognize a problem in the plant or a need for work to be performed which is the responsibility of the Mainten-ance Department.

This procedure is to allow Maintenance to perform its responsibilities while keeping Operations informed of plant problems at all times.

The MWR does not release equipment into the responsibility of Maintenance for the performance of necessary work or to record operational require-ments.

This process is covered in the Equipment Clearance and Tagging Procedure, PPM 1.3.8.

In addition, the MWR does not allow any changes to the original de'sign of the plant.

This process will be covered in the Plant Modification Procedure, however, it (Plant Modifications Docu-ment(s) per PPM 1.4.1 may become the initiating document(s) for an MWR.

The plant quality organization performs surveillance on Maintenance acti-vities to verify compliance with plant procedures.

In addition the plant quality organization may establish inspection points for specific safety related activities they wish to inspect including Fire Protection or Rad-waste.

This may be as a result of regulatory bulletins or information received on specific problem areas.

CAS/SAS security system operators shall be notified before and after any work is performed on the security system.

1.3.7.4 References A.

PPM 1.3.8, Equipment Clearance and Tagging B.

PPM 1.3.10, Fire Protection Program C.

PPtd 1.3.12, Plant Problems PRaCaauRa NuMeCR 1.3.7 WP atO RT IOWQ)

RKVISIONNLIMSIIR PAOC NUMSCR 1.3.7-4 of 23

sD

,PPM 1.4.1, Plant Modifications E.

PPM 1.3.4, Operating Data and Logs f

F.

PPM 1.3.6, Shift Turnover G.

FPM 1.5.1, Technical Specification Surveillance Testing Program H.

PPM 1.5.6, Leakage Surveillance and Prevention Program I.

FR) 1.9.2, Confined Space Entry PPM 11.2.8.1, Radiation Work Permits 1.3.7.5 Precautions/Limitations A.

Any defective equipment discovered by the originator of an MWR should be evaluated in accordance with PPM 1.3.12, Plant Problems (PDR/NCR), either prior to or in conjunction with the preparation of the MWR. If a PDR/NCR Report is generated, the MWR number should be referenced on the PDR/NCR and vice-versa.

B.

The Shift Manager (Security Lt., Security Systems only) shall, if a PDR/NCR Report is referenced on the MWR, verify that the PDR/NCR disposition is approved (PDR/NCR need not be totally closed) prior to declaring the system operational.

If during the course of working an MWR, it is determined the Work Instructions must be revised to give additional direction to as-signed personnel, those individuals authorized to prepare the Work Instructions shall be authorized to make on-the-spot changes to the Work Instructions.

HOWEVER, changes'f'recting plant operational status, radiation ex-

posure, QC hold points or technical direction shall be subject to re-review equal to the original review of the MWR.

C.

As a minimum, the person authorized to make changes to the MWR shall base his determination of change re-review on the criteria esta-blished in Step 1.3.7.6.A.16 of this procedure.

DO NOT hang problem identification tags on Security System equip-ment, this is a violation of Security Procedures and a possible violation of Safeguards, Information.

PRQCCDURC NUMCCR 1.3.7 WP 550 Rl (5%4)

RCVICION NUM8CR PAQC NUM8CR 1.3.7-5 of 23

I

~

'I

i 1.3.'7.6

~rccedure A. 'lant Equi ment Requirin Responsibilit A Clearance Acticn Originator Completes originators portion oi'he HWR (unit, equipment piece number (EPN), equip-ment description/location, problem/work requested, initiating document),

hangs pro-blem ID Tag, signs, and dates the HWR.

Routes MWR to Control Room.

LIMITATION: 00 NOT hang problem identii'i-cation tags on Security System equipment, this is a violation of Security Procedures and a possible violation of Safeguards Information.

Control Room Operations Manager/

Shift Manager 2.

4.

Ensures that identii'ication tag with HWR serial number and brief description of pro-blem is attached to that piece of'quipment specified in the MWR.

Routes HWR to the Shii't Manager or Designee.

NOTE:

The type identii'ication tag is optional (usually a white shipping tag) and is intended to avoid duplicate HWRs, and provide i'r problem identii'ication.

The tag should be hung as close to the pxoblem/

damage as is possible.

Reviews originator's portion of HWR for accuracy and completeness.

Identif'ies HWR i'r technical specii'icat on afi'ecting RWP required (if known), clear-ance order, dispatcher notification and identii'y any additional operational requirements.

5.

NOTE:

Ii'echnical Specification affected, describes the requirements and time limita-tions in the Operations Section.

Makes safety related determination based on, as applicable:

a)

EPN - HEL, and/or b) guality Class, and/or c)

Tech Spec Related, and/or d)

Safety-Related PPtd affected; and indi-cates in the Sai'ety Related Block as ffYES'll or ffNOff PRQCKOURC NUMSCR 1.3.'7 WP $00 Rl ISA')

RCVISION NUMSCR PAQC NUMIICR 1.3.7-6 of 23

'..Plant Equi ment Re uirin A Clearance (Cont'nued)

~1' Operations Manager/

Shift Hanager 6.

Action Write the words "Leakage Related" on the HWR, when it is concerned with a radio-active leak.

(Refer to PPM 1.5.6) 7.

Assigns a priority and indicates the plant, system/component condition required before the work can be done.

Maintenance Planner/

Scheduler 8.

9.

Signs and dates HWR.

Places xerox copy in "Initiated HWR" notebook and carries to the Maintenance Department Planner/Scheduler.

Inputs tracking and scheduling information from HWR into PPICS.

Carries HWR to appro-priate Maintenance Section Supervisor.

NOTE:

IF THE SYSTEM/STRUCTURE/COMPONENT IS NOT UNDER PLANT CONTROL (RELEASED FOR OPER-ATIONS) - SEE ATTACHMENT G.

Maintenance Section Supervisor Maintenance Section Supervisor/

Plant System Engineer 10.

Receives MWR and determines if it has ade-

~ quate information and is appropriate for the job.

Enters WBS (Work Breakdown Struc-ture)

Code in upper right hand corner of'WR above the MWR Serial Number.

NOTE:

All manhours and material expended on the MWR will be charged against the WBS Code assigned.

Fills out Quality Class and RWP blocks of the HWR.

When a RWP is required, in-itiates a Radiation Work Permit per PPH 11.2.8.1.

12.

NOTE:

All work peri'ormed in radiologically controlled areas requires an RWP.

Determine the work to be perf'ormed and des-cribe in the work instruction section.

If a procedure is required state procedure number in the space provided.

Determine if a Fire Hazard Review is re-quired and, if necessary, to prepare one for the job as per PPM 1.3.10.

Indicate in the space provided.

PROCCOURC NUMBCR 1.3.7 WP Sfb R1 (0%3)

R CVI BI ON NUMBC R PACC NUMBCR 1.3.7-7 of 23

~

I

~ k I't <<0 't 5'

à ~

'E

' ll'<<<<Lt.

)

~

'I I

P t

'I l ~

)Qtt t

'I

~

'I '

tt

'., Plant Equi ment Requirin A Clearance (Continued)

Responsibilit Action 14.

Determine if a CW/HWP is required (Attach-ment 0).

Prepare and indicate in the space provided o 15.

Carries (green) copy and RWP to the Health Physics Supervisor.

Maintenance Section Supervisor/

Plant System Engineer NOTES:

1)

The HP Supervisor, in coordination with the ALARA Coordinator, will re-view the RWP and MWR for radiological and ALARA concerns/requirements.

2)

The normal processing time for RWP approval is 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

However, RWP's may be processed more quickly on an emergency basis, if'ecessary.
16. lf the MWR is f'r Safety Related, Fire Pro-tection or Radwaste,reviews the work to be performed using the f'ollowing criteria and routes MWR to Technical/QC, as required:

NOTE:

The purpose of the criteria below is to establish guidelines; however, Mainten-ance Supervisors may route any MWR in ques-tion to Technical and/or QC for input.

a.

MWRs that are used with an approved procedure require NO Technical review, but require Plant QC Review for as-signment of'old Points, if applicable.

b.

MWRs that are used with or without an approved procedure but are normally within the skill level of the person-nel perf'orming the work require NO Technical or Plant QC review.

(Exam-ples are:

valve packing/adjustment, alignment, troubleshooting,

crimping, terminations, cleaning, painting, gas-ket replacement, electronic repair, and other tasks as is more fully dis-cussed in PPM 10.1.11, Maintenance Procedures.)

PRQCCDURC NUM8CR 1.3.7 WP.158 Rl (5%5)

RKVl5IQN NUM8KR PAQC NUMSCR 1.3.7-8 of'3

1

~

A 0

  • t

.A4 E/

0 W'\\

F

~

~

< A., Plant Equi ment Requirin A Clearance (Continued) f Responsibilit ffction c.

MWRs that are used without an approved procedure (except as noted above)

RE-QUIRE Technical and Plant QC review.

7Examples are:

manufacturing of'pare parts or components, fabrication of special lifting rigs, special tests/

inspections, etc.)

NOTES:

1)

The Technical Manager or designee is to review or determine the work process to be used and sign the MWR in the work instruction section in the "REVIEWED BY" block.

Technical, upon comple-tion of their review, is to carry the MWR on to Plant QC Super-visor/Designee unless the block on the MWR allocated f'r QC is marked "NO QC REQ'D", upon which Technical is to carry the MWR to the appropriate Maintenance Supervisor.

2)

The QC Supervisor/Designee is to review the work process for esta-blishing any necessary QC hold points and sign/date the MWR in the blank, untitled blocks below the "Approval" block in the work instruction section.

QC is, upon completion of their review, to carry the MWR to the appropriate Maintenance Supervisor unless the work, as stipulated by the work instruction/procedure number re-quires "Authorized Nuclear In-spector (ANI(I)) involvement.

3)

If the MWR requires ANI(I) in-volvement, QC contacts the ANI(I) who reviews the MWR and/or adds hold points, as applicable.

After ANI(I) review, QC is to carry the MWR to the appropriate (in this case Mechanical) Main-tenance Supervisor.

PRDCCOURC NUMBCR 1.3.7 WP 55I Rl (t&5)

RCVIBIDNNUMBCR PAOC NUMBCR 1.3.7-9 of 23

~

~

1 4

w-' ~ oq=

l w'

ytl

'AA k

V

~

OPf' I

~,

t ~

L I

~

~

o

~ '.. Plant Equipment Requirin A Clearance (Continued)

Res onsibilit Action Haintenance Section Supervisor/

Plant System Engineer hiaintenance Section Supervisor Supervisor/Foreman/

Assigned Person 17.

18.

19.

20.

Signs the work instruction section as pre-pared hy.

Approves the work instruction section and signs as approved by.

Requests and obtains a clearance order, if

required, i'rom Operations as per PPH 1.3.8.

Prepares and processes through Operations a Fire Protection Permit per PPM 1.3.10 or a Confined Workplace Permit per PPM 1.9.2.

Requests and obtains, if appli-

cable, Health Physics support and equipment as required by the RWP and/or ALARA check-list.

Interi'aces with QC if'ny hold prints are stipulated.

Assures that the MWR Work Package is CAR-RIED to Control Room (CAS/SAS Operator xf work is on a Security System) immediately prior to commencing work.

NOTE:

(Applies to Shift Manager only)

When a Clearance Order is required, writes C.O.

number on the HWR f'ront sheet in the "OPERATIONS REQUIREMENTS" section before proceeding to the next step of this proce-dure.

Shift Manager/

Security Lieutenant (Security Systems only)

Maintenance Section Supervisor/Foreman 21 22.

Reviews MWR Package received from Main-tenance in the previous step, signs MWR in lower right hand corner of'ork instruc-tion section, makes Xerox copy of MWR f'ront sheet for Control Room (CAS/SAS for Secur-ity Systems)

"Active HWR Notebook".

Re-turns hNR to the appropriate Maintenance Section Supervisor/Foreman/assigned per-son.

Additionally provides explicit noti-fication and documentation of'he aff'ected equipment per PPH 1.3.4t "Operating Data and Logs" and PPhi 1.3.6t "Shif't Turnover".

Assigns personnel to perf'orm the work.

Gives goldenrod copy to assigned personnel for information on the job.

PROCKDURC NUMSCR

'.3.7 WP 550 Rt (5&5)

RKVI5IONNUMSCR PIC@ NUMItaR 1.3.7-10 of 23

I A., Plant E'qui ment Re uirin Responsibilit 23.

A Clearance (Continued)

Action Supervises and inspects all work being per-formed to ensure proper completion prior to return to service.

Assigned Personnel

'Assigned Personnel 24.

25.

Complete necessary maintenance and notifies the Maintenance superv'sor for release to operations.

Remove the MWR ID tag from component worked on and checks block on MWR.

NOTE:

DETACH PINK SHEET FRQ3 MWR.PRIOR TO DIIOfG THIS STEP.

TO PRECLUDE THE BOTTOM PORTION OF THE PINK SHEET (COMPUTER INPUT)

FROM BEING DEFACED WHILE RECORDING DATA ON THE WHITE ORIGINAL AND YELLOW SHEETS.

Maintenance Section Supervisor Maintenance Section Supervisor/Foreman/

Assigned Person Maintenance Section Supervisor/Foreman 26.

27.

28.

Describes all work performed on ORIGINAL MWR and MWR continuation sheet (ii'eces-sary) in enough detail for machinery his-tory, including total manhours required to perform the work.

List materials and parts used on the work performed section and at-tach accept tags.

If accept tags are not available, list the purchase requisition or store order number.

Attach any other com-pleted supporting documentation to original MWR and sign as completed by.

Reviews and ensures that MWR and any sup-porting documentation is completed correct-ly.

Evaluates MWR for possible necessary changes to the Preventive Maintenance Pro-gram.

Signs and dates MWR as reviewed by.

Releases component or system to Operations f'r return to service.

Carries yellow copy of the MWR to the Control Room (to the CAS/

SAS operator f'r Security Systems) and in-cludes any special checks or maintenance requirements.

Completes pink copy of MWR as appropriate f"or maintenance history inf'ormation (PPICS-EQH) in computer input i'ormat, including:

PRQCSDURS NUMSSR 1.3.7 WP StS Rl (0%3)

RKVIBIONNUMSIKR PAGC NUMSCR 1.3.7-11 of'3

I' F

)

~

e'

a A., Plant Equipment Re uirin Res onsibilit A Clearance (Continued)

Action o

Work Required Summary o

Work Performed Summary o

Clearance Order No./RWP No.

o 'ork Type (Failure, Non failure, planned, etc.)

o Lead Discipline Payroll No.

o Work Start and Stop

-.(Month, day, year, hour) o Actual Man-hours and crew size, each discipline o

Prepared by (Print name) and date Carries original HWR to Administration Man-ager (ENSURE ALL SUPPORTING DOCLNENTATION IS ATTACHED TO ORIGINAL MWR) and pink copy to Maintenance Planner/Scheduler.

NOTE:

Those items such as facility main-tenance only need to be indicated as com-pleted on pink copy and will not be entered in the PPICS maintenance history system (EqH).

Maintenance Planner/

Scheduler Adninistra tion Manager Shif't Manager/Security

- Lieutenant (Security Systems Only) 29.

30.

31.

Updates'MWR status in PPICS, transfers in-formation to PPICS maintenance history.

Files the original MWR and all supporting documentation in the plant maintenance history files.

Receives yellow copy of MWR directly from Maintenance personnel and reviews the Work Performed section.

Determines the opera-tional retest requirements including any maintenance requested testing and fills out the Operability Check Sheet (OCS), Attach-ment E (Mandatory for Safety Related equip-ment).

Signs the OCS as prepared by.

Destroys xerox copy of MWR placed in the "Active MWR Notebook" in Step 21.

NOTES:

a.

Surveillance test procedures conducted for operability tests SHAI L be documented in accordance with PPM 1.5.1.

PROCKDURC NUMSCR 1.3.7 WP %IS R'I (SWS)

REVISION NUMSCR PAQK NUMICR 1.3.7-12 of'3

I 7*1 iA

- \\,

tl

  • I, tP

~ 1

~

P

i A.

Plant Equipment Reguirin A Clearance (Continued)

~1' Action b.

If the retest requirements are questionable or unknown

'he Technical Manager SHALL make the determination and sign the OCS as prepared by.

C ~

If the retest requirements cannot be perf'ormed at this time due to plant conditions the Shift Manager or Techni-cal Manager SHALL indicate when the test can be per-formed on the OCS.

d.

In the case. of security sys-tem, Plant Security make the determination on the OCS.

32.

Checks retest hold on the yellow copy of'he MWR if test cannot be performed at this time.

Attaches yellow copy of'WR to the OCS and places in "Hold" portion of'he "Active MWR Notebook".

Shift Manager/Security Lieutenant (Security System Only) 33.

LIMITATION: If a Nonconformance Report is referenced on the MWR, ensure that the NCR disposition is approved (NCR need not be totally closed) prior to declaring the system operational as per the OCS/yellow copy of the MWR.

Perf'orms retest as per the OCS (if'e-quired).

Notifies QC prior to retest on Safety Related Equipment.

Signs, dates and enters
time, on the OCS and/or the yellow copy of the MWR as applicable.

Additionally (the Shift Manager only), pro-vides explicit notif'ication and documenta-tion of the returned to operable status per PPM 1.3.4, "Operating Data and Logs" and PPM 1.3.6, "Shif't Turnover".

34.

Attaches any supporting procedures and carries OCS/yellow copy of'WR to the Ad-ministration Manager.

PRQCCQURC NUMBCR 1.3.7 WP 4$ $ Rl (%%4)

RCVISION NUMBCR PAQC NUMBCR 1.3.7-13 of'3

V.

< A., Plant E ui ment Re uirin A Clearance (Continued)

~b'1'ction Administration Manager 35.

Files the OCS', yellow copy of the MWR and any supporting documentation in the plant machinery history files.

B. 'lant E ui ment Not Requirin Clearances All steps indicated in 1.3.7.6.A SHALL be followed except those that refer to clearances.

These Maintenance activities SHALL be entered in the control room log.

Sho Maintenance or Work Not Involvin Plant E ui ment/S stems All steps indicated in 1.3.7.6.A SHALL be followed except the following:

1.

No clearance is required f'r this type of'aintenance.

2.

Notify control room only when working on any contaminated material needing a

RWP.

3.

The MWR is NOT routed through Operations.

1.3.7.7 Emer enc MWR Processin A.

B.

C.

D.

1.3.7.8 When an individual f'eels that emergency work may be involved, the Shift Manager SHALL be notified immediately.,

If the Shif't Manager concurs that emergency work is required, he SHALL establish the proper plant conditions, notify the management individuals on duty, notify QA/QC for safety-related work and should direct that the work be performed immediately.

Preparation of the MWR forms may be done while the work is in pro-gress or af'ter the work is completed.

As soon as feasible, route the MWR forms to Maintenance Section Supervisor for input into PPICs.

The Shif't Manager SHALL return the system to normal and direct acti-vities such as checkout, operational tests and reviews as may be required.

Attachments A.

MWR Form B.

MWR Computer Input Form C.

MWR Continuation Sheet PROCCOURC NUMBCR 1.3.7 WP SBB RI (SWS)

REVISION NUMBCR PAO C NUMBC R 1,3.7-14 of 23

5 I*

'I all k

i I D.

CW/HWP Tag (Special Work Permit - SWP)

E.

Operability Check Sheet (OCS)

F.

Startup Work Requests G.

Additional Criteria to be used when Processing HWRs on systems/

com-ponents not yet under Plant Control, with Flow Chart PROCKDURK NUMBCR l.3.7 WP IBB R'I {$~)

RKVIBIONNUMBCR PA4K NUMBCR 1.3.7-15 of 23

I

~

R r

P

% ~

~

~

%ASKN~I ~ KlCR SUFPt.Y SYSaal RAINTENAP4CE WORK REOUEST, I

C441t+lCIIT RCCC IIUIIACA

~

~

~

~

~

VIAUCII OCSCAIPFIOIIIUOCATIOH AIZIA IIIC 44

~ LCIAlwOAK1(OU TCCIISPCC Q ICS QleO OACNATIOICS ACOUINCJICIITSI 0ISPATCII Cl E3 '

Acuvco C3T~ CI ~ l C0 A

~

~

T

~

1 4 04 K I 10 P'A C

VII II C

10 KCVICIv I VCS

VAI, IICVICWg

~ Y CI~

I 1 10 TAO ACIAOVCO 441~

Attachment A

PRQCEQURf HUhIBfR 1.3.7 RfVISION NUIVIBfR IIAQfNVSlffP 1.3.7-16 of 3

~

~ '

II Y COUIeeeceeY eltcc IIUeeo(A ShQCXCTCH PVlKKPOWER SUPPLY SYSM4

+WWVmaaCC mRX RCOuaSr loCI.

w.A QU Iree cee ocecr lrYIolelLocAYeoee OAIAee A

A em. TAO IIUeee ARTCC P eeO OrcAATIOIYSccoUIAceeceeecl 0 )Ti c~sAeecs QTcc @ceo awr QTcs Q eeo oeeAA'Tele Cl D

rc~vco E3~ CI~

C0 C

tSAeeT e

Y 4

$ I e

~

s 0U Ale IlecYAUcYIoleslrroc Urc eeo CLJLkk

~ceeleeeer Ir ADA V A

VAC I

~

OUC OAYC

~e 4

T CREW RCS

~

eoc 0

0C E ATIOee X

eeee rcoUIAco~T gTAAee ooceeeeoeee

~

~

DA To eceU4 Ms oA To IIDUN eeccee ~

IAc ee c

IA:

0 Attachment 8

'eTP 598 PROCEDURE NUele8ER REVISIO I NUM8ER 1.3.7 PAGE NUIABER 1.3.7-17 of 23

j

t W

g f P

'I

,I

'L i

1 w

Ey k.

~

~

%'AS)ItXGTQYPUBIC t01CER SL PtLYSYSTEM

. WII IIO, i1AIiiVD,A.'ICZll1) la R liE1,1( t' (CONTINVAT1ONSIIKgT) ao. IIsto

)

ssanaIaI. coot 5PA$lKiAATSISsATKRtAL, IIaTtalais coot wa. IIsco

)

seaweed. coot

~

~

~

~

~

~

~ ~

~

~

~

~

~

~

~

~

~

~

~

Mols1\\s

~

~

~

~

~

~

~

~

~

Attachment C

WP 59K PROCKQVRK NUMBER REVISION NUMSKR l.

7 PAGE NUMBER 1.3.7-18 of 23

CATE CoiNFINED SPACE. ORKPLACE PERMIT FIRE PROTECTION PERt/IIT, o SQUESTQA SUPEAVISOA IOSAI REQUESTOA y/QRK LQCATIOnl Si/PeAV;SQR WCR': WCATIQN WOAKTO SE PSAFQRMEQ OR MWA No.

REsuLTs oF hTuc"PuEAIC *NALvsls/TESTEA Si OTTER EQUIPMEiNT REQUIRED

l. VENTILATICN:

Soess/y lyoe li.e.i lenil ECIALSQUIPMENTi Soeeify sype (Le.: Se/ely Hunesh eIC,I WORK TO BE PEAFQRMEQ OR MWR No.

PIRE PAOTKCTION IN AASA:

YYORK REQUIREMENTS: (Geact No TRANSiENT PIRE LCAO oEQUIREO COMBUSTIBLKSREMOVEOiPAOTeC.eo BLANKS'ii/FLOWNCUATAINSAEQUIRSO ELK~ICALEQUIP'/IENT PIIQTKCTSO FIRE SARRIEAISI SREACHEO FIAE PROTECTION SYSTEhi IMPAIREO.

ZONK!S I AOJACENT FIRE PROTECTION SYSTEhl IMPAIREO. ZONE(SI PIRE WATCHAEQUIREO QTHEA APPROVALS COMMUN I CA

~ I0/4S:

Soesi/y I, ae ihe.. Heaiol

4. 'CHT/NQI Soecru iIlnune nriwisot Tvoe WORK SUPSAVISORIQ*TE SiiiFT "IA.'4ACER/CATE

'YORK AREA/FIRE SYSTciYI RETURNED TO NORMAL S. LIFEiUNKTENQER ASQUIREOt Yes i.'4o WORK SUPERVISOR/OATS TehlE SHIFT 'lANAueR/QATK

~ I ME S. PEA!COIC ATMOSPHERIC!8ONITQAINQREQUIREot Yes/ Vo P/sauency hhnusee / Houis PERSON IN CHARQEOFWORKOPERATICNWiL'CKNCWI.SQQKREVIEyy

'NO COMI'VANCEWITH THIS PeRMIT AT THE START OP eKACH SHIFT INITIAL TIME OATS INITIAL TIME OATS QSR Sieneluie NAME PERSONNEL KNTPRINC CONFINED SPACE TIME TIME TIME T!ME IN QUT NAME IN OUT PILE THIS COPY IN CCNTAOL<QOM LOQ WHEN WCAKis COMPI eTE, ILKTHIS COPYWITH CONTROL RQCM BSFQIIS S,ARTINQ WORK.

Attachment D

WP 598 PROCEDURE NUMBER 1.3.7 REVISION NUMBER PAGE NUMBER 1.3.7-19 of 23

V 4 IP

. ~ '

~

I OPERABILITY CHECK SHEET EPN 8 Time/Date Performed Initial Tests Required:

l.

20 Special Checks/Tests (if required):

l.

2.

3.

(Continuation/Remarks)

~

~

If'n hold - conditions when check must be complete:

Prepared By:

Shift Manager Date System Operable:

Shif't Manager Date Time Attachment E

PROCCOURC NUMBCR RCVISION NUMSCR PAOC NUMSCR l.3.7 WP O'lI Rl ($%$)

1.3.7-20 of'3

STARTUP WORK REQUESTS Res onsibilit Action Maintenance Planner/

Schedule r

.1 Receives approved Startup Work Request from Test and Startup.

.2 Logs in SWR into computer Tracking System.

.3 Issues SWR to appropriate shop (e.g.;

Mechanical, Electrical, etc.).

Appropriate Shop

.4 Calls QC, if requirement is so indicated on Block 12 of SWR, prior to starting work.

.5 Implements work on SWR as per PPM Volume 10 procedures, and/or SWR instructions, as applicable.

.6 Attaches any quality documents to completed

SWR, as applicable.

.7,Signs Block 20 of the SWR.

.8 Returns SWR to Haintenance Planner/

Scheduler.

Haintenance Planner/

Scheduler,

.9 Logs SWR out of'omputer Tracking System.

.10 Returns SWR to Test and Startup.

NOTES a.

Startup Work Requests are applicable for use on systems/components/

structures prior to "Release For Operations" only.

b.

In the case of high priority or emergency work, Steps 1, 2, 3, 9, and 10 may be bypassed or deleted, as applicable.

Attachment F

PRQCCDURC NVMSCR l.3.7 WP.StS Rl (SWS)

RCVISION NVMSCR PAQC NUMSCR 1.3.7-21 of'3

I y

die

+

Ay a='

~

~

4 ~ 0 f'

}

-c ar xww c>

='

f 1

Additional Criteria To Be Used When Processing HWRs On Systems/Components Not Yet Under Plant Control NOTE:

Use this criteria in conjunction with the attached Flow Chart Maintenance Planner Scheduler If'ystem/Component/Structure is in Test and Startup custody, annotates the remarks field in PPICS as "SU CUSTODY".

Routes the HWR to Test and Startup rather than to Maintenance Section Supervisor.

Test and Startup 2.

Reviews MWR as per TSI 12.1.

Maintenance Planner/Scheduler 3.'f'lant is to do work, receives approved HWR from Test and Startup.

Appropriate Shop 4.

5.

6.

NOTE:

If'hS/U has determined the Mainten-ance Department is not to do the work, ThS/U shall return at least a copy of the MWR to the Maintenance Planner/Scheduler delineating the disposition of'he HWR (e.g.: corrected under SLT program; corrected by SDR (List 8); sent to Con-struction to correct; etc.)

Annotates PPICS remarks f'ield "Received from SU to work (date)".

Issues MWR to appropriate shop (e.g.;

Mech-anical, Electrical, etc.).

Implements work, as applicable, per steps 1.3.7.6.A.10 through 1.3.7.6.A.26 including QC review criteria of Step 1.3.7.6.A.16 of PPM 1.3.7.

7.

Completes pink copy of'WR as per step 1.3.7.6.A.28 of PPM 1.3.7.

8.

Returns MWR to Maintenance Planner/

Scheduler.

(ENSURE ALL SUPPORTING DOCUMEN-TATION IS ATTACHED TO ORIGINAL MWR.)

Maintenance Planner/Scheduler 9.

Logs HWR closure MWR pink copy as PPM 1.3.7.

data into PPIC-EQH from per step 1.3.7.6.A.29 of 10.

Returns original mentaton to Test per TSI 12.1.

Attachment G

Page 1 of' MWR and supporting docu-and Startup for filing as PROCKDURK NUMSCR 1.3.7 WP $80 RI ($&l)

RCVISION NUMSCR PAQC NUMSCR 1.3.7-22 of'3

MWR's GenerateIf'hift Manager review and cosplete ap-plicable section Maintenance P'lanner Log Syst~

R - ""

leased for Ops.

.Ho Maintenance Supervisor review/give work direction echnl eel Yes Plant System Engineer.

Review review/add additional Required Yes QC Re-quired I

Ho

'ev cw and establish hold oints SU Log Haint.

Su vr.

System Engr.

Review Prepare SOR if required

. Plant Iiaintenance To Ccmplete ys em ogre Give Mork Iree lo TGS Approved System Engr.

Reference SDR on.ahtR Attach original tstR to SDR or re-ference why no deficiency exists Haint.

armer SU Log B

Hair,t. Supvr.

4 Approve Haint. Supvr./Foreman get clearance

order, RMP. Confined Morkspace Permit, Fire Protection Permit as required Shift Hgr./SAS Operator review - keeps copy Haint. Supvr./Foreman Assign Mork Rotify Craftsmen Perform Mork In Process

~

Inspection I

QC After Ccmpletion Inspection-Haint. Supvr/Fore-man Revl'cw System Ycs Pelease for Gps.

I Maintenance armer

>eddic lu SU Log Pink Copy To EQ History Yellow Copy Shift Hgr.

SAS Operator Complete Opcrabili ty/

Surveillance Tests Mhite Copy n'

Sys tern File Pink Copy Haint.

armer L

Pink Copy Systetc Engr. Review and Retest Equip.

TGS Reviat PROCKDURK NUMQKR Mhite Copy SU Lop TGH Approve RKVISIONNUMKKR PAOK NUaaKKR Attachment G

Page 2 of 2 1.3.7 wP.se4 R'I f043) 1.3.7-23 of 23