| issue date = 02/28/1991
| issue date = 02/28/1991
| title = Monthly Operating Rept for Feb 1991 for DC Cook Unit 2.W/ 910305 Ltr
| title = Monthly Operating Rept for Feb 1991 for DC Cook Unit 2.W/
| author name = Blind A, Janisse J
| author name = Blind A, Janisse J
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9103180245
| document report number = NUDOCS 9103180245
| title reference date = 03-05-1991
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 9
| page count = 9
Line 17: Line 18:
=Text=
=Text=
{{#Wiki_filter:ACCELERATED DI, TRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
{{#Wiki_filter:ACCELERATED DI, TRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9103180245             DOC.DATE: 91/02/28     NOTARIZED: NO           DOCKET' FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana                 & 05000316 AUTH. NAME           AUTHOR AFFXLXATION JANISSE,J.D.         Xndiana Michigan Power Co. (formerly Xndiana           & Michigan Ele BLIND,A.A.           Indiana Michigan Power Co. (formerly Xndiana           & Michigan Ele RECIP.NAME           RECIPIENT AFFILIATION                                                 R
ACCESSION NBR:9103180245 DOC.DATE: 91/02/28 NOTARIZED:
NO DOCKET' FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana 05000316 AUTH.NAME AUTHOR AFFXLXATION JANISSE,J.D.
Xndiana Michigan Power Co.
(formerly Xndiana
& Michigan Ele BLIND,A.A.
Indiana Michigan Power Co.
(formerly Xndiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R


==SUBJECT:==
==SUBJECT:==
Monthly operating rept           for Feb 1991 for DC Cook Unit 2.N/
Monthly operating rept for Feb 1991 for DC Cook Unit 2.N/
910305   ltr.                                                                     D DISTRIBUTION CODE: IE24D           COPXES RECEIVED:LTR       ENCL     SIZE:
910305 ltr.
DISTRIBUTION CODE:
IE24D COPXES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly 'Operating Report (per Tech Specs NOTES:
TITLE: Monthly 'Operating Report (per Tech Specs NOTES:
RECIPXENT               COPIES          RECIPIENT          COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL PD3-1 LA                     3    3    PD3-1  PD              1    1 COLBURN,T.                   1    1 D
D RECIPXENT ID CODE/NAME PD3-1 LA COLBURN,T.
INTERNAL: AEOD/DOA                     1    1    AEOD/DS P/TPAB          1    1 P    PEB10         1    1    NRR/DOEA/OEAB          1    1            S REG "FI~L         01        1    1    RGN3                    1    1 EXTERNAL   EG&G BRYCE i J ~ H           1     1     NRC PDR NSIC                        1     1 I
INTERNAL: AEOD/DOA P
Q D
PEB10 REG "FI~L 0 1 EXTERNAL EG&G BRYCE iJ
NOTE TO ALL "RIDS" RECIPIENTS:
~ H NSIC COPIES LTTR ENCL 3
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 2%79) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
3 1
TOTAL NUMBER OF COPIES REQUIRED: LTTR             14   ENCL   14
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN3 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
S I
Q NOTE TO ALL"RIDS" RECIPIENTS:
D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 2%79) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14


~i' Indiana Michigan Power Company
~i'
                            ~
Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 IHENAlUA NlCHEGQM PQWM March 5, 1991 U.S. Nuclear Regulatory Commission ATTN:      Document    Control Desk Washington, D.C.          20555 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit    2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1991 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment C      NRC R egion D. R. Hahn III EPRI  Nuclear      Safety Analysis Center R.C. Callen S.L. Hall J.G. Keppler INPO R ecords Center ANI Nuclear Engineering Department D.H. Williams,      Jr.
M.P. Alexich J.F. Kurgan J.J. Markowsky D.A. T imber lake D.W. Paul T.O. Argenta S.H. Steinhart J.L. Leichner J.A. Isom W.T. G illett E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause E.C. Schimmel 9i03i30245 9i0223 PDR  ADOCK    05000316 R                      PDR


N.R.C   OPERATING DATA REPORT DOCKET NO.         50-316 DATE 01-Mar-91 COMPLETED BY JD JANISSE TELEPHONE 616-465-5901 OPERATING STATUS
Indiana Michigan ~
: 1. Unit Name                     D. C. Cook Unit 2
Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 March 5, 1991 IHENAlUA NlCHEGQM PQWM U.S. Nuclear Regulatory Commission ATTN:
: 2. Reporting Period                         FEB.91       notes
Document Control Desk Washington, D.C.
: 3. Licensed Thermal Power (MWt)                 3411
20555 Gentlemen:
: 4. Name Plate Rating (Gross MWe)                 1133
Pursuant to the requirements of Donald C.
: 5. Design Electrical Rating (Net MWe)           1100
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1991 is submitted.
: 6. Maximum Dependable Capacity (GROSS MWe) 1100
Respectfully, A.A. Blind Plant Manager Attachment C
: 7. Maximum Dependable Capacity (Net MWe)         1060
NRC R D. R.
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
EPRI R.C.
: 9. Power Level To Which Restricted.
S.L.
: 10. Reasons For Restrictions.     If   If Any  (Net  MWe)
J.G.
Any:
K INPO R ANI N D.H.
This  Mo. Yr. to Date    Cumm.
W M.P.
: 11. Hours   in Reporting, Period                 672 '        1416.0    115368  '
A J.F.
: 12. No. of Has. Reactor Was Critical           672.0        1416.0    76550.9
K J.J.
: 13. Reactor Reserve Shutdown Hours                 0.0          0'          0.0
M D.A. T D.W.
: 14. Hours Generator on Line                     672.0        1416.0    75001.9
T.O.
: 15. Unit Reserve Shutdown Hours                     0.0          0.0          0.0
A S.H.
: 16. Gross Therm. Energy Gen. (MWH)           2110364      '643404    230810457
J.L.
: 17. Gross Elect. Energy Gen. (MWH)             693600        1533620    75320460
L J.A.
: 18. Net Elect. Energy Gen.     (MWH)           668517        1481084    82540051
W.T.
: 19. Unit Service Factor                         100.0          100.0        66.4
G E.A.
: 20. Unit Availability Factor                   100.0          100.0        66.4
J.C.
: 21. Unit Capacity Factor   (MDC Net)           93.9          98.7        60 '
K B.A.
: 22. Unit Capacity Factor   (DER Net)           90.4          95.1        58 '
D.F.
: 23. Unit Forced Outage Rate                       0.0           0.0 .       13.4
K E.C.
: 24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
egion III Hahn Nuclear Safety Analysis Center Callen Hall eppler ecords Center uclear Engineering Department illiams, Jr.
: 25. If Shut   Down At End of Report Period, Estimated Date of Startup:
lexich urgan arkowsky imber lake Paul rgenta Steinhart eichner Isom illett Smarrella rieger Svensson rause Schimmel 9i03i30245 9i0223 PDR ADOCK 05000316 R
PDR
 
N.R.C OPERATING DATA REPORT DOCKET NO.
50-316 DATE 01-Mar-91 COMPLETED BY JD JANISSE TELEPHONE 616-465-5901 OPERATING STATUS
: 1. Unit Name D.
C.
Cook Unit 2
: 2. Reporting Period FEB.91
: 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
: 5. Design Electrical Rating (Net MWe) 1100 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes
: 8. If Changes Occur in Capacity Ratings (Items no.
3 through
: 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
: 11. Hours in Reporting, Period 12.
No. of Has. Reactor Was Critical
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator on Line
: 15. Unit Reserve Shutdown Hours
: 16. Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
(MWH)
: 18. Net Elect. Energy Gen.
(MWH)
: 19. Unit Service Factor
: 20. Unit Availability Factor
: 21. Unit Capacity Factor (MDC Net)
: 22. Unit Capacity Factor (DER Net)
: 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six This Mo.
Yr. to Date Cumm.
672 '
1416.0 115368 '
672.0 1416.0 76550.9 0.0 0 '
0.0 672.0 1416.0 75001.9 0.0 0.0 0.0 2110364
'643404 230810457 693600 1533620 75320460 668517 1481084 82540051 100.0 100.0 66.4 100.0 100.0 66.4 93.9 98.7 60 '
90.4 95.1 58 '
0.0 0.0 13.4 Months (Type, Date,and Duration):
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forcast     Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved


AVERAGE DAILY POWER LEVEL (MWe-Net)
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.       50-316 UNIT                 TWO DATE         01-Mar-91 COMPLETED BY JD JANISSE TELEPHONE   616-465-5901 MONTH           FEB.91 AVERAGE DAILY                          AVERAGE DAILY.
DOCKET NO.
DAY POWER LEVEL              DAY          POWER LEVEL 1          1086            17                    594 2          1092            18                    596 3          1094            19                    606 4          1096            20                    609 5          1093            21                    683 6          1092            22                  1013 7          1092            23                  1063 8          1092            24                  1087 9          1092            25                  1084 10          1093            26                  1092 11          1090            27                  1086 12          1092            28                  1086 13          1091 14          1093 15          1089 16          878
50-316 UNIT TWO DATE 01-Mar-91 COMPLETED BY JD JANISSE TELEPHONE 616-465-5901 DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL 1086 1092 1094 1096 1093 1092 1092 1092 1092 1093 1090 1092 1091 1093 1089 878 FEB.91 DAY 17 18 19 20 21 22 23 24 25 26 27 28 AVERAGE DAILY.
POWER LEVEL 594 596 606 609 683 1013 1063 1087 1084 1092 1086 1086


DOCKET NO:      50-316 UNIT SHUIDOWNS AND POWER REDUCZIONS                             UNIT NAME:       D.C. COOK UNIT 2-DATE:            March 5, 1991 REPORZ MOTH:  February 1991                                COMIKZTED BY:    E.C. Schimmel TEEZPHONE        (616) 465-5901 METHOD OF SHVITING     LICENSEE DURATION           DOWN         EVEPZ         SYSZM  COMPONENTS  CAUSE AND CORRHCZIVE ACZION 'IO NO   DATE     TYPE     HOURS     REASON   REACTOR     REPORT NO. CODE   CODE5       PREVIWZ RIXXJBMKCE 212 910216                                                 N/A                             Unit power was reduced to 59% starting 1200 hours on 910216 to permit     cl of the east and west main feed pump turbine condensers. The time period the unit was at the   reduced pcver level was extended due to problems experi~     with the east main feeds~ turbine speed control during the pcarer reduction. unit pcarer was restored to 100% at 0144 hours on 910222.
UNIT SHUIDOWNS AND POWER REDUCZIONS REPORZ MOTH:
213  910222                                                N/A                              A forced power reduction to 70:
February 1991 DOCKET NO:
starting at 0750 hours on 912222 occurred due to Xenon buildup while     the primary water makeup supply for RCS dilution was isolated to perform forced maintenance repairs on primary water valve PW-269. Reactor poorer was restored to 100% at 0639 hours on 910223.
UNIT NAME:
1             2                                      3                      4                              5 F: Forced     Reason:                               Method                Exhibit G    Instructions    Exhibit  I:  Same  Source S  Scheduled   A: Hcpipment   Failure (Explain)     1: Manual            for preparation of data B: Maintenance or Test                 2: Manual Scram      entry sheets for Licensee C: Refueling                         3: Automatic Scram    Event Report (LER) File D: Regulatory Restriction             4: Other (Explain)  (NUREG  0161)
DATE:
E:  Operator Training and License E>amination F: Administrative G: Operational Error (Explain)
COMIKZTED BY:
H: Other (Explain)
TEEZPHONE 50-316 D.C.
COOK UNIT 2-March 5, 1991 E.C. Schimmel (616) 465-5901 METHOD OF SHVITING LICENSEE DURATION DOWN EVEPZ NO DATE TYPE HOURS REASON REACTOR REPORT NO.
SYSZM COMPONENTS CAUSE AND CORRHCZIVE ACZION 'IO CODE CODE5 PREVIWZ RIXXJBMKCE 212 910216 213 910222 N/A N/A Unit power was reduced to 59% starting 1200 hours on 910216 to permit cl of the east and west main feed pump turbine condensers.
The time period the unit was at the reduced pcver level was extended due to problems experi~ with the east main feeds~ turbine speed control during the pcarer reduction. unit pcarer was restored to 100% at 0144 hours on 910222.
A forced power reduction to 70:
starting at 0750 hours on 912222 occurred due to Xenon buildup while the primary water makeup supply for RCS dilution was isolated to perform forced maintenance repairs on primary water valve PW-269. Reactor poorer was restored to 100% at 0639 hours on 910223.
1 F:
S 2
Forced Reason:
Scheduled A:
Hcpipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License E>amination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method 1:
Manual 2:
Manual Scram 3:
Automatic Scram 4:
Other (Explain) 4 5
Exhibit G Instructions Exhibit I:
Same Source for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)


DOCKET NO:     50-316 UNIT NAME:      D.C. Cook Unit   2 COMPLETED BY:  E.C. Schimmel TELEPHONE:      (616) 465-5901 March 5, 1991 DATE'AGE0 1 of 1 MONTHLY OPERATING   ACTIVITIES Februar   1991 HIGHLIGHTS The unit entered the reporting period at 100% Rated Thermal Power.
DOCKET NO:
Unit power was reduced to 594 RTP on 910216 to allow for east and west main feedpump turbine condenser cleaning. The time period the unit was at the reduced power level was extended due to problems experienced with the east main feedpump turbine speed control during the power reduction. Unit power was restored to 100% RTP on 910221.
UNIT NAME:
A forced power reduction to 70% RTP occurred on 910222. The power reduction was caused by the negative reactivity effect of Xenon buildup following the power increase to 100~o RTP on 910221. The primary water system makeup to the RCS had to be isolated to perform maintenance on a failed primary water system valve which removed the ability to dilute the reactor coolant. Repairs were completed and power increased to 1004 RTP starting 2025 hours on 910222. The   unit reached 100% RTP at 0639 hours on 910223.     The unit exited the reporting period at 100% RTP.
COMPLETED BY:
Gross electrical generation for the month of February was       693600 MWH.
TELEPHONE:
DETAILS 02/16/91   1200 Commenced   unit power decrease to 594 RTP   for east and west main feedpump turbine condenser     cleaning.
DATE'AGE0 50-316 D.C.
1650 The unit is at 594 RTP.
Cook Unit 2 E.C.
02/21/91   1440 Commenced unit   power increase to 100% RTP.
Schimmel (616) 465-5901 March 5, 1991 1 of 1 MONTHLY OPERATING ACTIVITIES Februar 1991 HIGHLIGHTS The unit entered the reporting period at 100% Rated Thermal Power.
02/22/91   0144 The unit is at   1004 RTP.
Unit power was reduced to 594 RTP on 910216 to allow for east and west main feedpump turbine condenser cleaning.
02/22/91   0750 The boration flowpath LCO is entered. Reactor power drifts down to 70> RTP due to Xenon buildup while all dilution flowpaths are isolated for repair of the boration flowpath leak.
The time period the unit was at the reduced power level was extended due to problems experienced with the east main feedpump turbine speed control during the power reduction. Unit power was restored to 100%
2025 The unit is at 704 RTP. Commenced unit power increase to 1004 RTP.
RTP on 910221.
02/23/91   0639 The unit is at 100~ RTP.
A forced power reduction to 70% RTP occurred on 910222.
The power reduction was caused by the negative reactivity effect of Xenon buildup following the power increase to 100~o RTP on 910221.
The primary water system makeup to the RCS had to be isolated to perform maintenance on a failed primary water system valve which removed the ability to dilute the reactor coolant.
Repairs were completed and power increased to 1004 RTP starting 2025 hours on 910222.
The unit reached 100%
RTP at 0639 hours on 910223.
The unit exited the reporting period at 100%
RTP.
Gross electrical generation for the month of February was 693600 MWH.
DETAILS 02/16/91 1200 Commenced unit power decrease to 594 RTP for east and west main feedpump turbine condenser cleaning.
1650 The unit is at 594 RTP.
02/21/91 1440 Commenced unit power increase to 100% RTP.
02/22/91 0144 The unit is at 1004 RTP.
02/22/91 0750 The boration flowpath LCO is entered.
Reactor power drifts down to 70> RTP due to Xenon buildup while all dilution flowpaths are isolated for repair of the boration flowpath leak.
2025 The unit is at 704 RTP.
Commenced unit power increase to 1004 RTP.
02/23/91 0639 The unit is at 100~ RTP.


DOCKET NO:     50-316 UNIT NAME:      D.C. Cook Unit 2 COMPLETED BY:  E.C. Schimmel TELEPHONE:      (616) 465-5901
DOCKET NO:
                          ~
UNIT NAME:
March 5, 1991 DATE'AGE:
COMPLETED BY:
1 of 1 MAJOR SAFETY-RELATED MAINTENANCE     Februar   1991 The AB train emergency diesel generator fuel oil transfer pump, QT-106-AB2 was unable to meet its required flow. The defective pump was replaced with a new pump.
TELEPHONE:
~
DATE'AGE:
50-316 D.C.
Cook Unit 2 E.C.
Schimmel (616) 465-5901 March 5, 1991 1 of 1
MAJOR SAFETY-RELATED MAINTENANCE Februar 1991 The AB train emergency diesel generator fuel oil transfer
: pump, QT-106-AB2 was unable to meet its required flow. The defective pump was replaced with a new pump.


g ~ ~ t A}}
g
~
~
t A}}

Latest revision as of 14:45, 7 January 2025

Monthly Operating Rept for Feb 1991 for DC Cook Unit 2.W/
ML17328A914
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/28/1991
From: Blind A, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9103180245
Download: ML17328A914 (9)


Text

ACCELERATED DI, TRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9103180245 DOC.DATE: 91/02/28 NOTARIZED:

NO DOCKET' FACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana 05000316 AUTH.NAME AUTHOR AFFXLXATION JANISSE,J.D.

Xndiana Michigan Power Co.

(formerly Xndiana

& Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.

(formerly Xndiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Feb 1991 for DC Cook Unit 2.N/

910305 ltr.

DISTRIBUTION CODE:

IE24D COPXES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly 'Operating Report (per Tech Specs NOTES:

D RECIPXENT ID CODE/NAME PD3-1 LA COLBURN,T.

INTERNAL: AEOD/DOA P

PEB10 REG "FI~L 0 1 EXTERNAL EG&G BRYCE iJ

~ H NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN3 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

S I

Q NOTE TO ALL"RIDS" RECIPIENTS:

D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 2%79) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

~i'

Indiana Michigan ~

Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 March 5, 1991 IHENAlUA NlCHEGQM PQWM U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1991 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment C

NRC R D. R.

EPRI R.C.

S.L.

J.G.

K INPO R ANI N D.H.

W M.P.

A J.F.

K J.J.

M D.A. T D.W.

T.O.

A S.H.

J.L.

L J.A.

W.T.

G E.A.

J.C.

K B.A.

D.F.

K E.C.

egion III Hahn Nuclear Safety Analysis Center Callen Hall eppler ecords Center uclear Engineering Department illiams, Jr.

lexich urgan arkowsky imber lake Paul rgenta Steinhart eichner Isom illett Smarrella rieger Svensson rause Schimmel 9i03i30245 9i0223 PDR ADOCK 05000316 R

PDR

N.R.C OPERATING DATA REPORT DOCKET NO.

50-316 DATE 01-Mar-91 COMPLETED BY JD JANISSE TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period FEB.91
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1100 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060 notes

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11. Hours in Reporting, Period 12.

No. of Has. Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect.

Energy Gen.

(MWH)

18. Net Elect. Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six This Mo.

Yr. to Date Cumm.

672 '

1416.0 115368 '

672.0 1416.0 76550.9 0.0 0 '

0.0 672.0 1416.0 75001.9 0.0 0.0 0.0 2110364

'643404 230810457 693600 1533620 75320460 668517 1481084 82540051 100.0 100.0 66.4 100.0 100.0 66.4 93.9 98.7 60 '

90.4 95.1 58 '

0.0 0.0 13.4 Months (Type, Date,and Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-316 UNIT TWO DATE 01-Mar-91 COMPLETED BY JD JANISSE TELEPHONE 616-465-5901 DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL 1086 1092 1094 1096 1093 1092 1092 1092 1092 1093 1090 1092 1091 1093 1089 878 FEB.91 DAY 17 18 19 20 21 22 23 24 25 26 27 28 AVERAGE DAILY.

POWER LEVEL 594 596 606 609 683 1013 1063 1087 1084 1092 1086 1086

UNIT SHUIDOWNS AND POWER REDUCZIONS REPORZ MOTH:

February 1991 DOCKET NO:

UNIT NAME:

DATE:

COMIKZTED BY:

TEEZPHONE 50-316 D.C.

COOK UNIT 2-March 5, 1991 E.C. Schimmel (616) 465-5901 METHOD OF SHVITING LICENSEE DURATION DOWN EVEPZ NO DATE TYPE HOURS REASON REACTOR REPORT NO.

SYSZM COMPONENTS CAUSE AND CORRHCZIVE ACZION 'IO CODE CODE5 PREVIWZ RIXXJBMKCE 212 910216 213 910222 N/A N/A Unit power was reduced to 59% starting 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> on 910216 to permit cl of the east and west main feed pump turbine condensers.

The time period the unit was at the reduced pcver level was extended due to problems experi~ with the east main feeds~ turbine speed control during the pcarer reduction. unit pcarer was restored to 100% at 0144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br /> on 910222.

A forced power reduction to 70:

starting at 0750 hours0.00868 days <br />0.208 hours <br />0.00124 weeks <br />2.85375e-4 months <br /> on 912222 occurred due to Xenon buildup while the primary water makeup supply for RCS dilution was isolated to perform forced maintenance repairs on primary water valve PW-269. Reactor poorer was restored to 100% at 0639 hours0.0074 days <br />0.178 hours <br />0.00106 weeks <br />2.431395e-4 months <br /> on 910223.

1 F:

S 2

Forced Reason:

Scheduled A:

Hcpipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License E>amination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method 1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4 5

Exhibit G Instructions Exhibit I:

Same Source for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE'AGE0 50-316 D.C.

Cook Unit 2 E.C.

Schimmel (616) 465-5901 March 5, 1991 1 of 1 MONTHLY OPERATING ACTIVITIES Februar 1991 HIGHLIGHTS The unit entered the reporting period at 100% Rated Thermal Power.

Unit power was reduced to 594 RTP on 910216 to allow for east and west main feedpump turbine condenser cleaning.

The time period the unit was at the reduced power level was extended due to problems experienced with the east main feedpump turbine speed control during the power reduction. Unit power was restored to 100%

RTP on 910221.

A forced power reduction to 70% RTP occurred on 910222.

The power reduction was caused by the negative reactivity effect of Xenon buildup following the power increase to 100~o RTP on 910221.

The primary water system makeup to the RCS had to be isolated to perform maintenance on a failed primary water system valve which removed the ability to dilute the reactor coolant.

Repairs were completed and power increased to 1004 RTP starting 2025 hours0.0234 days <br />0.563 hours <br />0.00335 weeks <br />7.705125e-4 months <br /> on 910222.

The unit reached 100%

RTP at 0639 hours0.0074 days <br />0.178 hours <br />0.00106 weeks <br />2.431395e-4 months <br /> on 910223.

The unit exited the reporting period at 100%

RTP.

Gross electrical generation for the month of February was 693600 MWH.

DETAILS 02/16/91 1200 Commenced unit power decrease to 594 RTP for east and west main feedpump turbine condenser cleaning.

1650 The unit is at 594 RTP.

02/21/91 1440 Commenced unit power increase to 100% RTP.

02/22/91 0144 The unit is at 1004 RTP.

02/22/91 0750 The boration flowpath LCO is entered.

Reactor power drifts down to 70> RTP due to Xenon buildup while all dilution flowpaths are isolated for repair of the boration flowpath leak.

2025 The unit is at 704 RTP.

Commenced unit power increase to 1004 RTP.

02/23/91 0639 The unit is at 100~ RTP.

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

~

DATE'AGE:

50-316 D.C.

Cook Unit 2 E.C.

Schimmel (616) 465-5901 March 5, 1991 1 of 1

MAJOR SAFETY-RELATED MAINTENANCE Februar 1991 The AB train emergency diesel generator fuel oil transfer

pump, QT-106-AB2 was unable to meet its required flow. The defective pump was replaced with a new pump.

g

~

~

t A