ML17332A567: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 12/31/1994 | | issue date = 12/31/1994 | ||
| title = Revised Unit Shutdowns & Power Reductions Rept for Dec 1994 for DCP Unit 2 | | title = Revised Unit Shutdowns & Power Reductions Rept for Dec 1994 for DCP Unit 2 | ||
| author name = | | author name = Bublick D | ||
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG | | author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG | ||
| addressee name = | | addressee name = | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 1994 REV 1: UNIT NAME: DATE: COMPLETED BY: TELEPHONE: | {{#Wiki_filter:UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 1994 REV 1: | ||
PAGE February 7,-1995<<D.C.COOK UNIT" 2 Van 5, 1995 D.L.Bublick (616)465-5901 Page 1 of 1 DURATION NO.DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.CODE CODE TO PREVENT RECURRENCE X UN UUI | UNIT NAME: | ||
The unit was paralleled to the grid at 1949 hours on 941213.1 F: Forced S: Scheduled 2 Reason: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 Method: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)Exhibit G | DATE: | ||
COMPLETED BY: | |||
TELEPHONE: | |||
PAGE February 7, -1995<< | |||
D. | |||
C. | |||
COOK UNIT"2 Van 5, 1995 D. L. Bublick (616) 465-5901 Page 1 of 1 DURATION NO. | |||
DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO. | |||
CODE CODE TO PREVENT RECURRENCE X UN UUI ZOM DUI UO OO nw RW ON UIUI OO OM UOO UWV XII 0'39 940906 S | |||
240 941211 F | |||
50.7 H | |||
255.2 B, C N/A 94-008 N/A IB N/A LS The unit was removed from servic on 940906 at 0318 hours EDT for the cycle 9 to 10 refueling/maintenance outage. | |||
All refueling and maintenance activities were completed and the main turbine generator was paralleled to the grid at 1514 hours on 941211. | |||
Total length of the outage was 2315.9 hours. | |||
During power escalation, with the reactor power at 19% | |||
: RTP, an MSR high level trip signal was generated followed by a reactor trip at 1705 hours on 941211. | |||
The cause of the trip signal could not be conclusively determined. | |||
The unit was paralleled to the grid at 1949 hours on 941213. | |||
1 F: | |||
Forced S: | |||
Scheduled 2 | |||
Reason: | |||
A: | |||
Equipment Failure (Explain) | |||
B: | |||
Maintenance or Test C: | |||
Refueling D: | |||
Regulatory Restriction E: | |||
Operator Training and License Examination F: | |||
Administrative G: | |||
Operational Error (Explain) | |||
H: | |||
Other (Explain) 3 Method: | |||
1: | |||
Manual 2: | |||
Manual Scram 3: | |||
Automatic Scram 4: | |||
Other (Explain) | |||
Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I: | |||
Same Source}} | |||
Latest revision as of 14:10, 7 January 2025
| ML17332A567 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/31/1994 |
| From: | Bublick D INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML17332A564 | List: |
| References | |
| NUDOCS 9502150093 | |
| Download: ML17332A567 (1) | |
Text
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 1994 REV 1:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGE February 7, -1995<<
D.
C.
COOK UNIT"2 Van 5, 1995 D. L. Bublick (616) 465-5901 Page 1 of 1 DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.
CODE CODE TO PREVENT RECURRENCE X UN UUI ZOM DUI UO OO nw RW ON UIUI OO OM UOO UWV XII 0'39 940906 S
240 941211 F
50.7 H
255.2 B, C N/A 94-008 N/A IB N/A LS The unit was removed from servic on 940906 at 0318 hours0.00368 days <br />0.0883 hours <br />5.257936e-4 weeks <br />1.20999e-4 months <br /> EDT for the cycle 9 to 10 refueling/maintenance outage.
All refueling and maintenance activities were completed and the main turbine generator was paralleled to the grid at 1514 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.76077e-4 months <br /> on 941211.
Total length of the outage was 2315.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />.
During power escalation, with the reactor power at 19%
- RTP, an MSR high level trip signal was generated followed by a reactor trip at 1705 hours0.0197 days <br />0.474 hours <br />0.00282 weeks <br />6.487525e-4 months <br /> on 941211.
The cause of the trip signal could not be conclusively determined.
The unit was paralleled to the grid at 1949 hours0.0226 days <br />0.541 hours <br />0.00322 weeks <br />7.415945e-4 months <br /> on 941213.
1 F:
Forced S:
Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain)
Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:
Same Source