ML17332A567

From kanterella
Jump to navigation Jump to search
Revised Unit Shutdowns & Power Reductions Rept for Dec 1994 for DCP Unit 2
ML17332A567
Person / Time
Site: Cook 
Issue date: 12/31/1994
From: Bublick D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17332A564 List:
References
NUDOCS 9502150093
Download: ML17332A567 (1)


Text

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 1994 REV 1:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

PAGE February 7, -1995<<

D.

C.

COOK UNIT"2 Van 5, 1995 D. L. Bublick (616) 465-5901 Page 1 of 1 DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.

CODE CODE TO PREVENT RECURRENCE X UN UUI ZOM DUI UO OO nw RW ON UIUI OO OM UOO UWV XII 0'39 940906 S

240 941211 F

50.7 H

255.2 B, C N/A 94-008 N/A IB N/A LS The unit was removed from servic on 940906 at 0318 hours0.00368 days <br />0.0883 hours <br />5.257936e-4 weeks <br />1.20999e-4 months <br /> EDT for the cycle 9 to 10 refueling/maintenance outage.

All refueling and maintenance activities were completed and the main turbine generator was paralleled to the grid at 1514 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.76077e-4 months <br /> on 941211.

Total length of the outage was 2315.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />.

During power escalation, with the reactor power at 19%

RTP, an MSR high level trip signal was generated followed by a reactor trip at 1705 hours0.0197 days <br />0.474 hours <br />0.00282 weeks <br />6.487525e-4 months <br /> on 941211.

The cause of the trip signal could not be conclusively determined.

The unit was paralleled to the grid at 1949 hours0.0226 days <br />0.541 hours <br />0.00322 weeks <br />7.415945e-4 months <br /> on 941213.

1 F:

Forced S:

Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain)

Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:

Same Source