ML18004A400: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:RECULAT     INFORMATION DISTR IBUTION     STEM (R IDS)
{{#Wiki_filter:RECULAT INFORMATION DISTR IBUTION STEM (R IDS)
ACCESSION NBR: 8608080113       DQC. DATE: 86/08/03   NOTARIZED: NQ         DOCKET 0 FACIL: 50-400 Shearon Harris Nuclear Poeer Planti Unit ii Carolina           05000400 AUTH. NAME           AUTHOR AFFILIATION CQRMACKi P           Affiliation Not Assigned RECIP. NAME           RECIPIENT AFFILIATION DENTONi H.           OFfice of Nuclear Reactor Regulationi Director (post 851125
ACCESSION NBR: 8608080113 DQC. DATE: 86/08/03 NOTARIZED:
NQ DOCKET 0 FACIL:50-400 Shearon Harris Nuclear Poeer Planti Unit ii Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CQRMACKi P AffiliationNot Assigned RECIP. NAME RECIPIENT AFFILIATION DENTONi H.
OFfice of Nuclear Reactor Regulationi Director (post 851125


==SUBJECT:==
==SUBJECT:==
Requests   Full participation emergency exercise of replacement plan beFore operation of plant authorized.
Requests Full participation emergency exercise of replacement plan beFore operation of plant authorized.
Concern expressed re safety of residents surrounding Faci lite.
Concern expressed re safety of residents surrounding Faci lite.
DISTRIBUTION CODE: YEOSD       COPIES RECEIVED: LTR I ENCL     ~ SIZE: C5 TITLE: Request     for NRR Action (e. g. 2. 206 Petitions) 8c Related Correspondenc NOTES:Application     for permit renewal +iled.                             05000400 RECIPIENT         COPIES            RECIPIENT        COPIES ID CODE/NAME       LTTR ENCL       ID CODE/NAME     LTTR ENCL PWR-A PD2  L*                      PWR-A PD2 PD BUCKLEY B      01 INTERNAl .                                     ELD/HDS1 ELD                                NRR DIR
DISTRIBUTION CODE:
                ~LE          04 EXTERNAL: LPDR             03                 NRC PDR       02 NSIC            05
YEOSD COPIES RECEIVED: LTR I
~~LlL= (L     QQ TOT*L NUNBER   OF COPIES REQUIRED:   LTTR   11   ENCL   +I
ENCL ~
SIZE:
C5 TITLE: Request for NRR Action (e. g.
: 2. 206 Petitions) 8c Related Correspondenc NOTES:Application for permit renewal +iled.
05000400 RECIPIENT ID CODE/NAME PWR-A PD2 L*
BUCKLEY B 01 COPIES LTTR ENCL RECIPIENT ID CODE/NAME PWR-A PD2 PD COPIES LTTR ENCL INTERNAl.
ELD~LE 04 ELD/HDS1 NRR DIR EXTERNAL: LPDR NSIC 03 05 NRC PDR 02
~~LlL= (L QQ TOT*L NUNBER OF COPIES REQUIRED:
LTTR 11 ENCL
+I


fl   Kt h
fl Kt h
lt "'<<<<
lt "'<<<<
K K<<t.
K K<<t.
I K
I K
                                                  <<'<<                                  ~    <<<<.ftl-ll,        <<
,',,)Ir<<<<K
                                                          '7,
'tt'7, r
                            ,',,)Ir<<<<K                 'tt     r f.t 9       ~ h KI <<<<<<I f fl f
f.t 9
tt 1,
~
            << ~       <<IK K     d'<<
", <<<<.ftl-
K,'r.
~
K<<r<< R ff                                             I K
h KI <<<<<<I f fl ll, tt 1,
              ",'ll )                                                                               K KI K
<< ~
K,t qt y                t l,<<h t
<<IK K
L'
d'<<
f K,'r.
K<<r<< R ff K
I
",'ll )
qt K KI y
t K
K,t t l,<<h L'


U. S. Nuclear p'z                  (data), +~4 ha QW~~ +ca& ~~
(data),
Regulatory Commission 1717 H Street,   N.W.
+~4 p'z ha QW~~ +ca& ~~
Washington, D.C. 20555
U. S. Nuclear Regulatory Commission 1717 H Street, N.W.
Washington, D.C.
20555


==Dear                 :==
==Dear
:==
~A ~i I believe the SHEARON HARRIS EMERGENCY RESPONSE PLAN is of critical importance to public health and safety, particularly to North Carolina residents who would be affected by the evacuation provisions of that Plan.
~A ~i I believe the SHEARON HARRIS EMERGENCY RESPONSE PLAN is of critical importance to public health and safety, particularly to North Carolina residents who would be affected by the evacuation provisions of that Plan.
On May 27, 1986, the Chatham County Commissioners responded to the con-cerns of thousands of concerned citizens, who had questioned the adequacy of the Plan's evacuation provisions, by withdrawing Chatham County's approval of the previous Plan. As a result of promises to improve the Plan made by Carolina Power and Light Company (the "Company" ) and the North Carolina Department of Crime Control and Public Safety, the Chatham County Commis-sioners agreed to rejoin the effort to arrive at a satisfactory and adequate .
On May 27,
Plan.
: 1986, the Chatham County Commissioners responded to the con-cerns of thousands of concerned citizens, who had questioned the adequacy of the Plan's evacuation provisions, by withdrawing Chatham County's approval of the previous Plan.
As a result of promises to improve the Plan made by Carolina Power and Light Company (the "Company" ) and the North Carolina Department of Crime Control and Public Safety, the Chatham County Commis-sioners agreed to rejoin the effort to arrive at a satisfactory and adequate Plan.
Other counties in the ingestion area are considering requ sts for expan-sion and/or revision of the Plan.
Other counties in the ingestion area are considering requ sts for expan-sion and/or revision of the Plan.
Please note that the plant's emergency siren system has never been fully tested and that the system has already experienced failures during May 1985 and June-July 1986. Particular attention should be paid to the functioning of this critical evacuation safety system, through a full emergency test.
Please note that the plant's emergency siren system has never been fully tested and that the system has already experienced failures during May 1985 and June-July 1986.
In view of the changes proposed and presumably to be effected in the Plan previously agreed by the Company, County and State to be inadequate, become all the more critical that the provisions of 10 CFR 50, Appendix E, it has Section IV.Fal be fully enforced. The Company should be required to demon-strate the effectiveness and adequacy of such Plan as may be designed to replace the previous Plan, by conducting a Full Participation Emergency Exer-cise prior to final licensing of the Shearon Harris Plant before its commercial operation is permitted.
Particular attention should be paid to the functioning of this critical evacuation safety system, through a full emergency test.
Therefore I request that the NRC compel the Company to conduct a Full Participation   Emergency Exercise of the Replacement Plan before operation of the Shearon Harris Plant is authorized.
In view of the changes proposed and presumably to be effected in the Plan previously agreed by the Company, County and State to be inadequate, it has become all the more critical that the provisions of 10 CFR 50, Appendix E, Section IV.Fal be fully enforced.
Sincerely,
The Company should be required to demon-strate the effectiveness and adequacy of such Plan as may be designed to replace the previous Plan, by conducting a Full Participation Emergency Exer-cise prior to final licensing of the Shearon Harris Plant before its commercial operation is permitted.
                                                                      ~o~AA C k (name) 86080801i3 860803                              (address)   V~o PDR    ADOCK  05000000                                    )
Therefore I request that the NRC compel the Company to conduct a Full Participation Emergency Exercise of the Replacement Plan before operation of the Shearon Harris Plant is authorized.
PDR H                                                        ~~gelt-+ gi'O p7
Sincerely, 86080801i3 860803 PDR ADOCK 05000000 H
PDR
~o~AAC k (name)
(address)
V~o
)~~gelt-+p7 gi'O


i ~
i
~
h}}
h}}

Latest revision as of 07:27, 7 January 2025

Requests Full Participation Emergency Exercise of Replacement Plan Before Operation of Plant Authorized. Concern Expressed Re Safety of Residents Surrounding Facility
ML18004A400
Person / Time
Site: Harris 
Issue date: 08/03/1986
From: Cormack P
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8608080113
Download: ML18004A400 (4)


Text

RECULAT INFORMATION DISTR IBUTION STEM (R IDS)

ACCESSION NBR: 8608080113 DQC. DATE: 86/08/03 NOTARIZED:

NQ DOCKET 0 FACIL:50-400 Shearon Harris Nuclear Poeer Planti Unit ii Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CQRMACKi P AffiliationNot Assigned RECIP. NAME RECIPIENT AFFILIATION DENTONi H.

OFfice of Nuclear Reactor Regulationi Director (post 851125

SUBJECT:

Requests Full participation emergency exercise of replacement plan beFore operation of plant authorized.

Concern expressed re safety of residents surrounding Faci lite.

DISTRIBUTION CODE:

YEOSD COPIES RECEIVED: LTR I

ENCL ~

SIZE:

C5 TITLE: Request for NRR Action (e. g.

2. 206 Petitions) 8c Related Correspondenc NOTES:Application for permit renewal +iled.

05000400 RECIPIENT ID CODE/NAME PWR-A PD2 L*

BUCKLEY B 01 COPIES LTTR ENCL RECIPIENT ID CODE/NAME PWR-A PD2 PD COPIES LTTR ENCL INTERNAl.

ELD~LE 04 ELD/HDS1 NRR DIR EXTERNAL: LPDR NSIC 03 05 NRC PDR 02

~~LlL= (L QQ TOT*L NUNBER OF COPIES REQUIRED:

LTTR 11 ENCL

+I

fl Kt h

lt "'<<<<

K K<<t.

I K

,',,)Ir<<<<K

'tt'7, r

f.t 9

~

", <<<<.ftl-

~

h KI <<<<<<I f fl ll, tt 1,

<< ~

<<IK K

d'<<

f K,'r.

K<<r<< R ff K

I

",'ll )

qt K KI y

t K

K,t t l,<<h L'

(data),

+~4 p'z ha QW~~ +ca& ~~

U. S. Nuclear Regulatory Commission 1717 H Street, N.W.

Washington, D.C.

20555

==Dear

==

~A ~i I believe the SHEARON HARRIS EMERGENCY RESPONSE PLAN is of critical importance to public health and safety, particularly to North Carolina residents who would be affected by the evacuation provisions of that Plan.

On May 27,

1986, the Chatham County Commissioners responded to the con-cerns of thousands of concerned citizens, who had questioned the adequacy of the Plan's evacuation provisions, by withdrawing Chatham County's approval of the previous Plan.

As a result of promises to improve the Plan made by Carolina Power and Light Company (the "Company" ) and the North Carolina Department of Crime Control and Public Safety, the Chatham County Commis-sioners agreed to rejoin the effort to arrive at a satisfactory and adequate Plan.

Other counties in the ingestion area are considering requ sts for expan-sion and/or revision of the Plan.

Please note that the plant's emergency siren system has never been fully tested and that the system has already experienced failures during May 1985 and June-July 1986.

Particular attention should be paid to the functioning of this critical evacuation safety system, through a full emergency test.

In view of the changes proposed and presumably to be effected in the Plan previously agreed by the Company, County and State to be inadequate, it has become all the more critical that the provisions of 10 CFR 50, Appendix E, Section IV.Fal be fully enforced.

The Company should be required to demon-strate the effectiveness and adequacy of such Plan as may be designed to replace the previous Plan, by conducting a Full Participation Emergency Exer-cise prior to final licensing of the Shearon Harris Plant before its commercial operation is permitted.

Therefore I request that the NRC compel the Company to conduct a Full Participation Emergency Exercise of the Replacement Plan before operation of the Shearon Harris Plant is authorized.

Sincerely, 86080801i3 860803 PDR ADOCK 05000000 H

PDR

~o~AAC k (name)

(address)

V~o

)~~gelt-+p7 gi'O

i

~

h