| issue date = 06/03/1986 | | issue date = 06/03/1986 | ||
| title = Urges Conversion or Shutdown of plant.Trade-offs of Benefits Vs Cost & Potential Harm Unacceptable | | title = Urges Conversion or Shutdown of plant.Trade-offs of Benefits Vs Cost & Potential Harm Unacceptable | ||
| author name = | | author name = Ferguson R | ||
| author affiliation = AFFILIATION NOT ASSIGNED | | author affiliation = AFFILIATION NOT ASSIGNED | ||
| addressee name = | | addressee name = Denton H | ||
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | | addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
| docket = 05000400 | | docket = 05000400 | ||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REQU TORY INFORNATION DISTRIBU'SYSTEN (RIDS)ACCESSION NBR: 8606090295 DOC.DATE: 86/06/03 NOTARIZED: | {{#Wiki_filter:REQU TORY INFORNATION DISTRIBU | ||
NO DOCKET 0 FAC IL: 50-400 Shearon Harris Nuclear Power Plant>Unit i>Car ol ina 05000400 AUTH.NAllE AUTHOR AFFILIATION FERGUSON>R.C. | 'SYSTEN (RIDS) | ||
Director (post 85ii25 SUB JECT: Urges conversion or shutdown of p lant.Trade-of | ACCESSION NBR: 8606090295 DOC. DATE: 86/06/03 NOTARIZED: | ||
DISTRIBUTION CODE: YECSD COPIES RECEIVED: LTR (ENCL Q SIZE: (TITLE: Request for NRR Action (e.g.2.206 Petitions) | NO DOCKET 0 FAC IL:50-400 Shearon Harris Nuclear Power Plant> | ||
Zc Related Correspondenc NOTES: Application for permit renetIjal | Unit i> Car ol ina 05000400 AUTH. NAllE AUTHOR AFFILIATION FERGUSON> R. C. | ||
Affiliation Not Assigned REC IP. NAl'lE REC IP IENT AFFILIATION DENTON> H. | |||
Office of Nuclear Reactor Regulation> | |||
Director (post 85ii25 SUB JECT: | |||
Urges conversion or shutdown of p lant. Trade-of fs of benef its vs cost 5 potential harm unacceptable. | |||
DISTRIBUTION CODE: | |||
YECSD COPIES RECEIVED: LTR | |||
( ENCL Q SIZE: | |||
( | |||
TITLE: Request for NRR Action (e. g. | |||
: 2. 206 Petitions) | |||
Zc Related Correspondenc NOTES: Application for permit renetIjal filed. | |||
05000400 REC IP 1'ENT ID CODE/NAl'lE PNR-A PD2 LA gUCKLEY 8 01 INTERNAL: EDO/ACB E} | |||
04 COPIES LTTR ENCL RECIPIENT ID CODE/NAi'lE PWR-A PD2 PD ELD/HDBi NRR DIR COPIES LTTR ENCL EXTERNAL: 24X NRC PDR LPDR NBIC 03 05 TOTAL NUNBER OF COPIEB REQUIRED LTTR iZ ENCL | |||
==Dear Mr.Denton:== | h h I It t | ||
re: Shearon Harris Nuclear Plant, New Hill, NC I have come to the conclusion that generation of electricity by nuclear power plants such as CP&L's Shearon Harris plant is unnecessarily costly and hazardous-The benefits are outweighed by the considerable cost and potential for long-term pollution of air, ground and water, with attendant loss of life and health.I am no longer willing to accept these trade-offs and I feel that more acceptable solutions can and should be found.I am writing to urge you to do whatever you can to prevent the Shearon Harris plant from going on line (as a nuclear facility), and to encourage exploration of less expensive and less hazardous alternatives. | t h | ||
h h | |||
't, | |||
3312 Cheswick Drive | |||
: Raleigh, NC 27609 June 3, | |||
1986 Harold Denton Director of Nuclear Reactor Regulations Nuclear Regulatory Commission Washington, DC 20/55 | |||
==Dear Mr. Denton:== | |||
re: Shearon Harris Nuclear Plant, New Hill, NC I have come to the conclusion that generation of electricity by nuclear power plants such as CP&L's Shearon Harris plant is unnecessarily costly and hazardous-The benefits are outweighed by the considerable cost and potential for long-term pollution of air, ground and water, with attendant loss of life and health. | |||
I am no longer willing to accept these trade-offs and I feel that more acceptable solutions can and should be found. | |||
I am writing to urge you to do whatever you can to prevent the Shearon Harris plant from going on line (as a nuclear facility), | |||
and to encourage exploration of less expensive and less hazardous alternatives. | |||
Stopping or converting the Shearon Harris plant to non-nuclear energy is of the utmost importance. | Stopping or converting the Shearon Harris plant to non-nuclear energy is of the utmost importance. | ||
Thank you for the opportunity to make my feelings known, I hope that you will take some action on this matter.Sincerely, I Richard C.Ferguson 86'9QP9~DR+DOC~86QQQ3 H CH'gQQ (" | Thank you for the opportunity to make my feelings | ||
P~)S~~}} | : known, I hope that you will take some action on this matter. | ||
Sincerely, I | |||
Richard C. Ferguson 86'9QP9 | |||
~DR | |||
+DOC ~ 86QQQ3 H | |||
CH'gQQ | |||
(" | |||
PDR j&' | |||
P | |||
~ ) | |||
S | |||
~ | |||
~}} | |||
Latest revision as of 05:01, 7 January 2025
| ML18019A891 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/03/1986 |
| From: | Ferguson R AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8606090295 | |
| Download: ML18019A891 (4) | |
Text
REQU TORY INFORNATION DISTRIBU
'SYSTEN (RIDS)
ACCESSION NBR: 8606090295 DOC. DATE: 86/06/03 NOTARIZED:
NO DOCKET 0 FAC IL:50-400 Shearon Harris Nuclear Power Plant>
Unit i> Car ol ina 05000400 AUTH. NAllE AUTHOR AFFILIATION FERGUSON> R. C.
Affiliation Not Assigned REC IP. NAl'lE REC IP IENT AFFILIATION DENTON> H.
Office of Nuclear Reactor Regulation>
Director (post 85ii25 SUB JECT:
Urges conversion or shutdown of p lant. Trade-of fs of benef its vs cost 5 potential harm unacceptable.
DISTRIBUTION CODE:
YECSD COPIES RECEIVED: LTR
( ENCL Q SIZE:
(
TITLE: Request for NRR Action (e. g.
- 2. 206 Petitions)
Zc Related Correspondenc NOTES: Application for permit renetIjal filed.
05000400 REC IP 1'ENT ID CODE/NAl'lE PNR-A PD2 LA gUCKLEY 8 01 INTERNAL: EDO/ACB E}
04 COPIES LTTR ENCL RECIPIENT ID CODE/NAi'lE PWR-A PD2 PD ELD/HDBi NRR DIR COPIES LTTR ENCL EXTERNAL: 24X NRC PDR LPDR NBIC 03 05 TOTAL NUNBER OF COPIEB REQUIRED LTTR iZ ENCL
h h I It t
t h
h h
't,
3312 Cheswick Drive
- Raleigh, NC 27609 June 3,
1986 Harold Denton Director of Nuclear Reactor Regulations Nuclear Regulatory Commission Washington, DC 20/55
Dear Mr. Denton:
re: Shearon Harris Nuclear Plant, New Hill, NC I have come to the conclusion that generation of electricity by nuclear power plants such as CP&L's Shearon Harris plant is unnecessarily costly and hazardous-The benefits are outweighed by the considerable cost and potential for long-term pollution of air, ground and water, with attendant loss of life and health.
I am no longer willing to accept these trade-offs and I feel that more acceptable solutions can and should be found.
I am writing to urge you to do whatever you can to prevent the Shearon Harris plant from going on line (as a nuclear facility),
and to encourage exploration of less expensive and less hazardous alternatives.
Stopping or converting the Shearon Harris plant to non-nuclear energy is of the utmost importance.
Thank you for the opportunity to make my feelings
- known, I hope that you will take some action on this matter.
Sincerely, I
Richard C. Ferguson 86'9QP9