{{#Wiki_filter:REGULATOR         NFORMATION DISTRIBUTION P           TEM (RIOS) i,"p ACCEAION NBR$ 8008250413'OC ~ OATEB 80/08/21 "NOTARIZED'O DO
{{#Wiki_filter:REGULATOR NFORMATION DISTRIBUTION P TEM (RIOS) i,"p ACCEAION NBR$ 8008250413'OC
. FACIL:50 387 Susquehanna Steam Electric Stationr Unit lr Pennsylva
~ OATEB 80/08/21 "NOTARIZED'O
  "
 
50 388 Susquehanna Steam Electric Stationr Unit 2P Pennsylva                           05000388 AUTH'AME                 AUTHOR AFFILIATION
DO
  '". CURTISPN H
. " FACIL:50 387 Susquehanna Steam Electric Stationr Unit lr Pennsylva 50 388 Susquehanna Steam Electric Stationr Unit 2P Pennsylva 05000388 AUTH'AME AUTHOR AFFILIATION
                  ~   ~       Pennsylvania Power 8 l.ight Co, RKGIP ~ NAME              RECIPIENT AFFILIATION                                       PcPP/g YOUNGBLOODEB ~ J    ~      I.'.i censing     Br anch
'". CURTISPN ~ H ~
RKGIP ~ NAME YOUNGBLOODEB ~ J ~
Pennsylvania Power 8 l.ight Co, RECIPIENT AFFILIATION I.'.i censing Br anch PcPP/g


==SUBJECT:==
==SUBJECT:==
Forwards         Revision       3   to. design assessment     reptrincluding updated pagesrfigurcs             L tables for Vol     iinonproprietary version   8 proprietary suppl,Proprietary suppl withheld (ref 10CFR2 ~ 790) ~
Forwards Revision 3 to. design assessment reptrincluding updated pagesrfigurcs L tables for Vol iinonproprietary version 8 proprietary suppl,Proprietary suppl withheld (ref 10CFR2
DISTRIBUTION CODE: PBOIS TITLE: Proprietary CDPIES RECEIVEDALTR Info Re PSAR/FSAR J   ENCL: fg SIZE:lt NOTES:Send       IBK 3 copies     FSAR L     all amends.                                   05000387 05000388 RECIPIENT               COPIES                RECIPIENT          COPIES ID CODE/NAME"           L'TTR ENCL         ID COOK/NAME         LTTR ENCL:
~ 790) ~
ACTIONP          YOUNGBLOODPB                    1      0      STARKERS        02 INTERNALi DIRECTOR NRR                          1      0      ISE              21      2       2 CA~3 MPA                            1     0     NR                      1       0 OELD                            1      0                      01 EXTERNAL: ACRS brest If          0 24        16      16      LPOR                    1      0 NSIC                                  0
DISTRIBUTION CODE:
( J(11 FETE:.
PBOIS CDPIES RECEIVEDALTR J ENCL: fg SIZE:lt TITLE: Proprietary Info Re PSAR/FSAR NOTES:Send IBK 3 copies FSAR L all amends.
P&#xc3; t(oK llfS(<
05000387 05000388 RECIPIENT ID CODE/NAME" ACTIONP YOUNGBLOODPB INTERNALi DIRECTOR NRR MPA OELD 0
                                                                          ~O         SP+aWA       QK AUG   26 $ 80 So             2>
EXTERNAL: ACRS If 24 NSIC COPIES L'TTR ENCL 1
TOTAL NUMBER OF COPIES               REQUIRED: I.TTR
0 1
                                                              ~      ENCL
0 1
0 1
0 16 16 0
ISE NR 21 01 LPOR RECIPIENT ID COOK/NAME STARKERS 02 COPIES LTTR ENCL:
2 2 CA~3 1
0 1
0
( J(11FETE:.
brest P&#xc3; t(oK llfS(<
~O SP+aWA QK AUG 26 $80 So 2>
TOTAL NUMBER OF COPIES REQUIRED:
I.TTR ~
ENCL


il   I         II I ykb'I V
il I
(>>                 II f                                      t gk P'.,       )t.l   y   It                   f'     tb <<-   >>
II I
                                                                                                                            '
V f
                                                                                                            <<I<<         tX
t
                                                    << t             t                                               X>> ti
(>>
                                                                                                                                                          ~ I     >>I   Xl I  I                                                                                          It l                                  1 <<,'>>
gk P'.,
IX                       I a,                                  !
)t.l y It II f'
: t.      'll l      h      .  $      II
tb <<- >>
            '                                                                    'n'
<<I<< tX ykb'I
                  'll            ~
<< t t
                                  $   ,
I I l
                                        >>>> I'. >>
X>> ti 1 <<,'>>
f ti                                   1   II I'I WI     gC   f 1t     I N')
~ I
1 k,to
>>I Xl It IX
  ~                           II <<
'll I
a
~$
    -a                                                                                                                                                     il>>
I'. >>
II                                                                                  ti                                       XX
f ti a,
                                                                          >>>>                        I                                    ll I   'll                                           Ii f 1                                                  '1
'n' 1
                                                                                                                        )                                            ?
II I'I WI gC f 1t I
                                                              <<
1 t.
k,to
'll l h
II N')
~ a II <<
-a II I
ti XX il>>
ll I 'll 1
Ii f
'1 )
?
4(4 4',>>
rf
rf
                                                                >>I X
>>I s
4(4 4',>>                                            s  <<                                                                              Il                 I f   >>I i
X Il I
f
>>I i
g II
g II
                                                                                                                                            ~x"   ',P(
~x" ',P(
1I~->> 4 <<
1I~->>
        !5 <<<<r 1-<< ~       a
4 <<
                                                            'l' p$ +                         ge     X<<",,
!5
CW
<<<<r 1-<< ~
                                          <<
a
lf
'l' p$+
ge X<<",,
CW lf


PPIT     IL TWO NORTH NINTH STREET,   ALLENTOWN, PA. 18101   PHONE: (215) 821-5151 NORMAN W. CURTIS Vice President Engineering & Construction 821-5381 August       23,r 1980 Mr. B. J. Youngblood, Chief                                                       DOCKET NOS. 50-387 Light Water Reactors Branch No. 1                                                                 50-388 Division of Project Management U. S. Nuclear Regulatory Commission Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION DESIGN ASSESSMENT REPORT REVISION 3 ER 100450                       FILE 172-1, 840-2 PLA-530
PPIT IL TWO NORTH NINTH STREET, ALLENTOWN, PA.
18101 PHONE: (215) 821-5151 NORMAN W. CURTIS Vice President Engineering & Construction 821-5381 August 23,r 1980 Mr. B. J. Youngblood, Chief Light Water Reactors Branch No.
1 Division of Project Management U. S. Nuclear Regulatory Commission Washington, DC 20555 DOCKET NOS.
50-387 50-388 SUSQUEHANNA STEAM ELECTRIC STATION DESIGN ASSESSMENT REPORT REVISION 3 ER 100450 FILE 172-1, 840-2 PLA-530


==Dear Mr. Youngblood:==
==Dear Mr. Youngblood:==
Transmitted herewith are forty (40) copies of Revision 3 to the Susquehanna SES Design Assessment Report.
Both Volume 1 and the Proprietary Supplement have been revised.
Listed below are the major modifications.
h 2.
Revision of the non-proprietary and proprietary Section 9.0, nSSES LOCA Steam Condensation Test GKM-IIM", to include the GKM-IIMtest results.
Update of Appendix B, "Containment Mode Shapes and Response Spectra",
and Appendix C, "Reactor Building Response Spectra Due to SRV and LOCA Loads".
\\
3.
Revision of Section 7.0, "Design Assessment".
In addition, a small number of editorial changes have been made.
Pursuant to 10 CFR 2.790 and the affidavit submitted with our {{letter dated|date=August 13, 1980|text=August 13, 1980 letter}} (PLA-527), we request that. those pages marked proprietary be withheld from public disclosure.
Very truly yours, N. W. Curtis Vice President Engineering 6 Construction
~gpss SOOSSSO'/I'J,:
PENNSYLVANIA POWER IL LIGHT COMPANY


Transmitted herewith are forty (40) copies of Revision 3 to the Susquehanna SES Design Assessment Report. Both Volume 1 and the Proprietary Supplement have been revised.
TQ 4RC MUiQR L.QCA-'""':3':
h Listed below are the major modifications.
3QC.K'.f...QQ&#xc3;S g.
Revision of the non-proprietary and proprietary Section 9.0, nSSES LOCA Steam Condensation Test GKM-IIM", to include the GKM-IIM test results.
> ~g4 aw '~ ~~~em
: 2.            Update of Appendix B, "Containment Mode Shapes and Response Spectra",
~ <Q c +~a>> 4~
and Appendix C, "Reactor Building Response Spectra Due to SRV and LOCA Loads".                          \
aA 4-L
: 3.             Revision of Section 7.0, "Design Assessment".                                        ~gpss In addition,            a small number of      editorial changes have been made.
's '-e.-'-g ~- ~e
Pursuant to 10 CFR 2.790 and                  the affidavit submitted with our August        13, 1980 letter (PLA-527), we request that. those pages marked proprietary be withheld from public disclosure.
~ ~
Very      truly yours, N. W.      Curtis Vice President              Engineering 6      Construction PENNSYLVANIA POWER    IL  LIGHT COMPANY SOOSSSO'/I'J,:
a "u'"''-
sc'cm m accc~~c w'~ Sec~- -; '.T~Q.
Qc~~4R r -V:-ORATE -.QV MSi Q~&c>> cc c~>>ce '
3~ LIc>>


TQ 4RC  MUiQR L.QCA-'""':3': 3QC  .K'.f...QQ&#xc3;S
To update your proprietary copy of the Susquehanna SES Design Assessment
: g. ~g4 aw
: Report, remove and insert the followin
          >        '~ ~~~em          ~ <Q  c +~a>> 4~ aA 4-L                                        's '-e.-'-g  ~- ~e  ~ ~  a "u'"''-
: pages, figures and tables:
sc'cm    m accc~~c        w'~  Sec~- -; '.T~Q.
MOVE INSN T Table 8.6 able 8.6 Table 8.8 (Page 5 of 5)
Qc~~4R r  -V:-ORATE -.QV MSi Q~&c>>        cc  c~>>ce '
Table 8.10 (Page 5 of 5)
3~ LIc>>
R move Chapter 9 tab entitled, "SSES LOCA:
St am Condensation Verification Test" and ins rt in ew three ring proprietary binder, Book 2.
'Pages 9P-1 thru 9 -6 New Chapter 9 pages 9P-1 thru 9P-36 in new three ring proprietary
: binder, Book 2
New Chapter 9 Figures 9-15 thru 9-151 in new three ring binder, Book 2, after page 9P-36 Chapter 9 Tables 9-6 thru 9-11 in new three ring binder, Book 2, after Figure 9-151


To update your    proprietary copy of the Susquehanna SES Design Assessment  Report, remove and insert the followin pages, figures and  tables:
1,
MOVE                                    INSN T Table 8.6                                  able 8.6 Table 8.8    (Page  5  of 5)
Table 8.10 (Page      5 of 5)
R move Chapter 9 tab  entitled, "SSES LOCA:
St am Condensation  Verification Test" and ins  rt  in ew three ring proprietary binder, Book 2.
'Pages  9P-1 thru  9  -6                  New  Chapter  9  pages  9P-1 thru 9P-36 in  new three ring proprietary binder,  Book  2 New  Chapter 9 Figures 9-15 thru 9-151 in new three ring binder, Book 2, after page 9P-36 Chapter 9 Tables 9-6 thru 9-11 in new three ring binder,      Book 2, after Figure 9-151


1, PRAPRI HTARY SECTIONS 9. 4, 9.5 A ND 9. 6 SSES LOCA STEAM CONDENSATION VERIFICATION TEST TABLE OF CONT ENTS 9.4 Test Results 9.5 Data Analysis and Load Specification
PRAPRI HTARY SECTIONS 9. 4, 9.5 A ND 9. 6 SSES LOCA STEAM CONDENSATION VERIFICATION TEST TABLE OF CONT ENTS 9.4 Test Results 9.5 Data Analysis and Load Specification
,
, 9.6 Verification of the Design Specification Rev.
9.6 Verification of the Design Specification Rev. 2, 5/80
2, 5/80


PROPRIETARY SECTIONS 9.4, 9.5 AND 9.6 I
PROPRIETARY SECTIONS 9.4, 9.5 AND 9.6 I
FIGURES Number                   Title At this time   no figures are available.
FIGURES Number Title At this time no figures are available.
Rev. 2, 5(80
Rev.
2, 5(80


PROPRIETARY SECTIONS 9.0 9.5 AND 9.6 TABLES Number At this time   no tables are available.
PROPRIETARY SECTIONS 9.0 9.5 AND 9.6 TABLES Number At this time no tables are available.
Rev. 2, 5/80                 9P-3
Rev.
2, 5/80 9P-3


PROPRIETARY 9 4   TEST RESULTS This section will provide a compilation of the test results for the LOCA steam condensation tests conducted in the GKH-IXN tests facility in Nannheim, West Germany by Kraftwerk Union. The test series began on October 22, 1979 and at the time of this writing eighteen of the twenty planned test runs had been completed. The schedule calls for the test results to be submitted to the NRC in Nay, 1980.
PROPRIETARY 9
Rev. 2, 5/80             9P-4
4 TEST RESULTS This section will provide a compilation of the test results for the LOCA steam condensation tests conducted in the GKH-IXN tests facility in Nannheim, West Germany by Kraftwerk Union.
The test series began on October 22, 1979 and at the time of this writing eighteen of the twenty planned test runs had been completed.
The schedule calls for the test results to be submitted to the NRC in
: Nay, 1980.
Rev.
2, 5/80 9P-4


PROVRIETARY
PROVRIETARY
    ~
~
      'ATA ANALYSIS AND LOAD SPECIFICATION This section will provide an analysis of the GKN-IIH test data and the development of a load specification for SSES based on this data. The schedule calls for this section to he submitted to the NRC in September, 1980.
'ATA ANALYSIS AND LOAD SPECIFICATION This section will provide an analysis of the GKN-IIH test data and the development of a load specification for SSES based on this data.
Rev. 2, 5/80
The schedule calls for this section to he submitted to the NRC in September, 1980.
Rev.
2, 5/80


PROPRIETARY 9.6   VERIFICATION OF THE DESIGN SPECIFICATION This section vill provide a comparison of the response spectra for the SSES containment based on the original design specification and the specification developed from the GKM-ITN test data.                                           M 9P-6 Rev. 2, 5/8O
PROPRIETARY 9.6 VERIFICATION OF THE DESIGN SPECIFICATION This section vill provide a comparison of the response spectra for the SSES containment based on the original design specification and the specification developed from the GKM-ITN test data.
M Rev.
2, 5/8O 9P-6


ISLE 8.6
ISLE 8.6 PARAMETERS AT TEST START CONDENSATION TEST SERIES Test Sc> ~
                                                                                                                                                                                        ,
VC CCC CC II IICC IICII HAT Discharge Linc.
PARAMETERS AT TEST START CONDENSATION TEST SERIES Discharge Linc. Accus>>>1ator               Suppress      Pool  Suppress. Pool Discharge Line Discharge Linc    Speci al Test                                                                      'Length        Prc.ssure                 Water Temp.          Water Level    Matrr Lcvcl    Air Temp.      Conditio>>s VC          CCC    CC I I IICC    IICII  HAT                        Pl 1A'>nr T5> ~ 1A           L5     1       L4 ~ 1''           T4. 5         l Sc> ~                                                                                                                                                                      cC 33 ~                                                                         35             79,1                         -'7               7 >2           6,2             90 3>>11                                                                                       39,8                                           '7 ~ 4         6,r(             85 35 ~ 1                                                                                       16>2'''5                                       7~3           6.0             90
'Length Accus>>>1ator Prc.ssure Pl 1A'>nr Suppress Pool Water Temp.
"
T5> ~ 1A Suppress.
36.1                                                                                                   re ~ ~             2>6                             6,3 37 ~                                                                                         79,6                                                                           9 38.1                                                                                         39,9                         72                                               90 39 '                                                                                         lr2 6' ~
Pool Discharge Line Water Level Matrr Lcvcl L5 1
a 83                               6,4             88 40 ~ 1                                                                                         7 GALS                                                       6,3             92 VCr     nt Clnnriuq                                         t IICC~ Ilc al Co>>cli inn>> Cold I'ool                                 1A is    mcnsurcd as pressuro differential Io thc atmospheric prcssure C ~
L4 ~ 1''
V<
Discharge Linc Air Temp.
C<>>>>lc nsatio>>                       BCII~ I<nal Condi tlons Ilot Pool                         ' P1   ~
T4. 5 cC Speci al Conditio>>s l
relntcd to       tho quencher ce>>ter CCC~  Clnan Cnndi tions Cold I'ool        HAT~ Hultiplr. Actuation Test                            ~ ~ ~ vnluc of       P2.5 since P1.1A out of rnugc CCII>c Clnnn C<uchitir>>>s Ilot I'nnl REV    1            3/79
33 ~
35 79,1
-'7 7 >2 6,2 90 3>>11 39,8
'7 ~ 4 6,r(
85 35 ~ 1 16>2'''5 7 ~ 3 6.0 90
" 36.1 re ~ ~
2>6 6,3 37 ~
79,6 9
38.1 39,9 72 90 39 '
lr 6' a
2 ~
83 6,4 88 40 ~ 1 7
GALS 6,3 92 VCr V< nt Clnnriuq C ~ C<>>>>lc nsatio>>
CCC~ Clnan Cnndi tions Cold I'ool CCII>c Clnnn C<uchitir>>>s Ilot I'nnl REV 1 3/79 IICC~ Ilc al Co>>cli t inn>> Cold I'ool BCII~ I<nal Condi tlons Ilot Pool HAT~ Hultiplr. Actuation Test P1 ~ 1A is mcnsurcd as pressuro differential Io thc atmospheric prcssure relntcd to tho quencher ce>>ter
~ ~ ~ vnluc of P2.5 since P1.1A out of rnugc


I~J}}
I~J}}

Latest revision as of 03:25, 7 January 2025

Forwards Revision 3 to Design Assessment Rept,Including Updated Pages,Figures & Tables for Vol 1,nonproprietary Version & Proprietary Suppl.Proprietary Suppl Withheld (Ref 10CFR2.790)
ML18030A008
Person / Time
Site: Susquehanna  
Issue date: 08/21/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML17138B441 List:
References
ER-100450, PLA-530, NUDOCS 8008250413
Download: ML18030A008 (14)


Text

REGULATOR NFORMATION DISTRIBUTION P TEM (RIOS) i,"p ACCEAION NBR$ 8008250413'OC

~ OATEB 80/08/21 "NOTARIZED'O

DO

. " FACIL:50 387 Susquehanna Steam Electric Stationr Unit lr Pennsylva 50 388 Susquehanna Steam Electric Stationr Unit 2P Pennsylva 05000388 AUTH'AME AUTHOR AFFILIATION

'". CURTISPN ~ H ~

RKGIP ~ NAME YOUNGBLOODEB ~ J ~

Pennsylvania Power 8 l.ight Co, RECIPIENT AFFILIATION I.'.i censing Br anch PcPP/g

SUBJECT:

Forwards Revision 3 to. design assessment reptrincluding updated pagesrfigurcs L tables for Vol iinonproprietary version 8 proprietary suppl,Proprietary suppl withheld (ref 10CFR2

~ 790) ~

DISTRIBUTION CODE:

PBOIS CDPIES RECEIVEDALTR J ENCL: fg SIZE:lt TITLE: Proprietary Info Re PSAR/FSAR NOTES:Send IBK 3 copies FSAR L all amends.

05000387 05000388 RECIPIENT ID CODE/NAME" ACTIONP YOUNGBLOODPB INTERNALi DIRECTOR NRR MPA OELD 0

EXTERNAL: ACRS If 24 NSIC COPIES L'TTR ENCL 1

0 1

0 1

0 1

0 16 16 0

ISE NR 21 01 LPOR RECIPIENT ID COOK/NAME STARKERS 02 COPIES LTTR ENCL:

2 2 CA~3 1

0 1

0

( J(11FETE:.

brest PÃ t(oK llfS(<

~O SP+aWA QK AUG 26 $80 So 2>

TOTAL NUMBER OF COPIES REQUIRED:

I.TTR ~

ENCL

il I

II I

V f

t

(>>

gk P'.,

)t.l y It II f'

tb <<- >>

<<I<< tX ykb'I

<< t t

I I l

X>> ti 1 <<,'>>

~ I

>>I Xl It IX

'll I

~$

I'. >>

f ti a,

'n' 1

II I'I WI gC f 1t I

1 t.

k,to

'll l h

II N')

~ a II <<

-a II I

ti XX il>>

ll I 'll 1

Ii f

'1 )

?

4(4 4',>>

rf

>>I s

X Il I

f

>>I i

g II

~x" ',P(

1I~->>

4 <<

!5

<<<<r 1-<< ~

a

'l' p$+

ge X<<",,

CW lf

PPIT IL TWO NORTH NINTH STREET, ALLENTOWN, PA.

18101 PHONE: (215) 821-5151 NORMAN W. CURTIS Vice President Engineering & Construction 821-5381 August 23,r 1980 Mr. B. J. Youngblood, Chief Light Water Reactors Branch No.

1 Division of Project Management U. S. Nuclear Regulatory Commission Washington, DC 20555 DOCKET NOS.

50-387 50-388 SUSQUEHANNA STEAM ELECTRIC STATION DESIGN ASSESSMENT REPORT REVISION 3 ER 100450 FILE 172-1, 840-2 PLA-530

Dear Mr. Youngblood:

Transmitted herewith are forty (40) copies of Revision 3 to the Susquehanna SES Design Assessment Report.

Both Volume 1 and the Proprietary Supplement have been revised.

Listed below are the major modifications.

h 2.

Revision of the non-proprietary and proprietary Section 9.0, nSSES LOCA Steam Condensation Test GKM-IIM", to include the GKM-IIMtest results.

Update of Appendix B, "Containment Mode Shapes and Response Spectra",

and Appendix C, "Reactor Building Response Spectra Due to SRV and LOCA Loads".

\\

3.

Revision of Section 7.0, "Design Assessment".

In addition, a small number of editorial changes have been made.

Pursuant to 10 CFR 2.790 and the affidavit submitted with our August 13, 1980 letter (PLA-527), we request that. those pages marked proprietary be withheld from public disclosure.

Very truly yours, N. W. Curtis Vice President Engineering 6 Construction

~gpss SOOSSSO'/I'J,:

PENNSYLVANIA POWER IL LIGHT COMPANY

TQ 4RC MUiQR L.QCA-'""':3':

3QC.K'.f...QQÃS g.

> ~g4 aw '~ ~~~em

~ > 4~

aA 4-L

's '-e.-'-g ~- ~e

~ ~

a "u'"-

sc'cm m accc~~c w'~ Sec~- -; '.T~Q.

Qc~~4R r -V:-ORATE -.QV MSi Q~&c>> cc c~>>ce '

3~ LIc>>

To update your proprietary copy of the Susquehanna SES Design Assessment

Report, remove and insert the followin
pages, figures and tables:

MOVE INSN T Table 8.6 able 8.6 Table 8.8 (Page 5 of 5)

Table 8.10 (Page 5 of 5)

R move Chapter 9 tab entitled, "SSES LOCA:

St am Condensation Verification Test" and ins rt in ew three ring proprietary binder, Book 2.

'Pages 9P-1 thru 9 -6 New Chapter 9 pages 9P-1 thru 9P-36 in new three ring proprietary

binder, Book 2

New Chapter 9 Figures 9-15 thru 9-151 in new three ring binder, Book 2, after page 9P-36 Chapter 9 Tables 9-6 thru 9-11 in new three ring binder, Book 2, after Figure 9-151

1,

PRAPRI HTARY SECTIONS 9. 4, 9.5 A ND 9. 6 SSES LOCA STEAM CONDENSATION VERIFICATION TEST TABLE OF CONT ENTS 9.4 Test Results 9.5 Data Analysis and Load Specification

, 9.6 Verification of the Design Specification Rev.

2, 5/80

PROPRIETARY SECTIONS 9.4, 9.5 AND 9.6 I

FIGURES Number Title At this time no figures are available.

Rev.

2, 5(80

PROPRIETARY SECTIONS 9.0 9.5 AND 9.6 TABLES Number At this time no tables are available.

Rev.

2, 5/80 9P-3

PROPRIETARY 9

4 TEST RESULTS This section will provide a compilation of the test results for the LOCA steam condensation tests conducted in the GKH-IXN tests facility in Nannheim, West Germany by Kraftwerk Union.

The test series began on October 22, 1979 and at the time of this writing eighteen of the twenty planned test runs had been completed.

The schedule calls for the test results to be submitted to the NRC in

Nay, 1980.

Rev.

2, 5/80 9P-4

PROVRIETARY

~

'ATA ANALYSIS AND LOAD SPECIFICATION This section will provide an analysis of the GKN-IIH test data and the development of a load specification for SSES based on this data.

The schedule calls for this section to he submitted to the NRC in September, 1980.

Rev.

2, 5/80

PROPRIETARY 9.6 VERIFICATION OF THE DESIGN SPECIFICATION This section vill provide a comparison of the response spectra for the SSES containment based on the original design specification and the specification developed from the GKM-ITN test data.

M Rev.

2, 5/8O 9P-6

ISLE 8.6 PARAMETERS AT TEST START CONDENSATION TEST SERIES Test Sc> ~

VC CCC CC II IICC IICII HAT Discharge Linc.

'Length Accus>>>1ator Prc.ssure Pl 1A'>nr Suppress Pool Water Temp.

T5> ~ 1A Suppress.

Pool Discharge Line Water Level Matrr Lcvcl L5 1

L4 ~ 1

Discharge Linc Air Temp.

T4. 5 cC Speci al Conditio>>s l

33 ~

35 79,1

-'7 7 >2 6,2 90 3>>11 39,8

'7 ~ 4 6,r(

85 35 ~ 1 16>25 7 ~ 3 6.0 90

" 36.1 re ~ ~

2>6 6,3 37 ~

79,6 9

38.1 39,9 72 90 39 '

lr 6' a

2 ~

83 6,4 88 40 ~ 1 7

GALS 6,3 92 VCr V< nt Clnnriuq C ~ C<>>>>lc nsatio>>

CCC~ Clnan Cnndi tions Cold I'ool CCII>c Clnnn C<uchitir>>>s Ilot I'nnl REV 1 3/79 IICC~ Ilc al Co>>cli t inn>> Cold I'ool BCII~ I<nal Condi tlons Ilot Pool HAT~ Hultiplr. Actuation Test P1 ~ 1A is mcnsurcd as pressuro differential Io thc atmospheric prcssure relntcd to tho quencher ce>>ter

~ ~ ~ vnluc of P2.5 since P1.1A out of rnugc

I~J