| (One intermediate revision by the same user not shown) |
| Line 2: |
Line 2: |
| | number = ML18041A073 | | | number = ML18041A073 |
| | issue date = 07/27/1999 | | | issue date = 07/27/1999 |
| | title = Rev 1 to NMP2-ISI-006, Second Ten Year Interval Inservice Insp Program Plan for Nine Mile Point Nuclear Power Station Unit 2. | | | title = Rev 1 to NMP2-ISI-006, Second Ten Year Interval Inservice Insp Program Plan for Nine Mile Point Nuclear Power Station Unit 2 |
| | author name = Brombach T, Mcclain E, Perkins G | | | author name = Brombach T, Mcclain E, Perkins G |
| | author affiliation = NIAGARA MOHAWK POWER CORP. | | | author affiliation = NIAGARA MOHAWK POWER CORP. |
| Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:NIAGARA MOHAWK POWER CORPORATION SECOND TKN YEAR INTERVAL INSKRVICE INSPECTION PROGRAM PLAN FOR NINE MILKPOINT NUCLEA.R POWER STATION - UNIT 2 CONTROLLED DOCUMENT NO. | | {{#Wiki_filter:}} |
| NMP2-IS I-006 Revision I Effective JULY 31, 1999 Prepared by:
| |
| E. L. Clain, ASME Section XIPrograms Reviewed by:
| |
| l g z71)q T. W. Br bach, SME Section XIPrograms Approved by:
| |
| G. R. Perkins, Supervisor; ASME Section X Programs Approved by:
| |
| 7-P7- 0 W. R. Yaeger Manag, Engineering Services 9908050'106 990730 PDR ADQCK 050004i0 8 PDR
| |
| | |
| 1f 7!"
| |
| tk )
| |
| ~ +< e r
| |
| A+ .L~J .,g J>
| |
| ll N
| |
| I A
| |
| al l egglp r'Ld(' 'f 14 a
| |
| c'.'>'A
| |
| . r
| |
| '0
| |
| | |
| TABLE OF CONTENTS NMP2-ISI-006 Rev.1
| |
| | |
| ==1.0 INTRODUCTION==
| |
| | |
| 1.1 NONMANDATORYAPPENDIX F ...
| |
| 1.1.1 ARTICLE F-2000: INSPECTION PLAN CONTENTS l.l.l.l SUBARTICLE F-2100; BACKGROUND AND INTRODUCTION 1.1.1.1.1 CONSTRUCTION CODES USED..
| |
| 1.1.1.1.2 DATES OF INSPECTION PERIODS AND INTERVALS.....
| |
| 1.1.1.1.3 SECTION XI EDITION AND ADDENDA 1.1.1.1.4 CODE CLASSIFICATIONOF COMPONENTS AND SYSTEM BOUNDARIES 1.1.1.1.4.1 SPECIHC RULES FOR CLASSIFICATION 1.1.1.1.4.2 LIST OF SYSTEMS AND IDENTIFICATIONOF ACRONYMS....
| |
| 1.1.1.1.4.3 PIPING AND INSTRUMENTATIONDIAGRAMS (P&IDs) SHOWING CLASSIHCATIONBOUNDARIES .....
| |
| 1.1.1.1.5
| |
| | |
| ==SUMMARY==
| |
| TABLES .............
| |
| 1.1.1.1.6 NAMES. SIGNATURES, AND COMPANY AFFILIATIONSOF PREPARERS AND APPROVERS ..
| |
| 1.1.1.2 SUBARTICLE F-2200:
| |
| | |
| ==SUMMARY==
| |
| OF CHANGES IN UPDATED INSPECTION PLANS 1.1.1.2.1 LISTING OF NEW OR REVISED PROCEDURES...,
| |
| 1 1 1 2 " CHANGES IN EXEMPTIONS, SAMPLES. EXAMNATlONS.OR TESTS 1.1.1,2.3 SUCCESSIVE, INSPECTIONS REQUIRED BY IWB-2420. IWC-2420, IWE-2420, OR IWF-2420 1.1.1.2A CHANGES IN SUBSTITUTE EXAMINATIONSOR TESTS OF F-3000.
| |
| 1.1.1.3 SUBARTICLE F-2300, APPLICABLEDOCUMENTS 11,1.4 SUBARTICLE F-2400, CODE SUBSECTIONS 1.1.1.4.1 SUBSECTION IWAGENERAL REQUIREMENTS 1.1.1.4.2 SUBSECTION IWB REQUIREMENTS FOR CLASS 1 COMPONENTS OF LIGHT WATER COOLED POWER PLANTS I.l.lA.3 SUBSECTION IWC REQUIREMENTS FOR CLASS 2 COMPONENTS OF LIGHT WATER COOLED POWER PLANTS 1.1.1.4.4 SUBSECTION IWD REQUIREMENTS FOR CLASS 3 COMPONENTS OF LIGHT WATER COOLED POWER PLANTS 1.1.1.4.5 SUBSECTION IWE REQUIREMENTS FOR CLASS MC AND METALLIC ~~ OF CLASS CC COMPONENTS OF LIGHT WATER COOLED POWER PLANTS....
| |
| 1.1.1.4.6 SUBSECTION IWF REQUIREMENTS FOR CLASS l.2. 3, and MC COMPONENT SUPPORTS OF LIGHT WATER COOLED POWER PLANTS 1.1.1.4.7 SUBSECTION IWP INSERVICE TESTING OF PUMPS IN NUCLEAR POWER PLANTS 1.1.1 A.8 SUBSECTION IWVINSERVICE TESTING OF VALVES lN NUCI.EAR POWER PLANTS 1.1.1.5 SUBARTICLE F-2500. DETAILEDCONTENTS 1.1.1.5.1 DRAWINGS SHOWING COMPONENTS TO BE EXAMINED.
| |
| 1.1.1.5.2 SPECIFIC EXEMPTIONS APPLIED TO EACH S YSTEM.
| |
| ' 1.1.1.5.3 1.1.1.5.4 1.1.1.5.5 LINE LISTS FOR EACH SYSTEM.
| |
| TABLES THAT PROVIDE DETAILS OF EXAMINATIONS LIST OF CALIBRATIONBLOCKS NMP2-ISI406 Rev.1 i ofiv
| |
| | |
| 1.1.1.5,6 LIST OF EQUATION AND TEST PROCEDURES 1.1.2 ARTICLE F-3000; SUBSTITUTE EXAMINATIONSOR TESTS 1,1.3 APPENDIX F SUPPLEMENTS 1.1.3.1 SUPPLEMENT 1
| |
| - CONTENTS OF IWB. IWC. IWD. IWE. AND IWL TABLES.
| |
| 1.1.3,1.1 IDENTIFICATIONOF SYSTEMS IN SYSTEM-BY-SYSTEM ORDER.
| |
| 1.1.3.1.2 CODE CLASSIFICATION 1.1.3.1.3 EXAMINATIONCATEGORY AND ITEM NUMBER.
| |
| 1.1.3. L4 INDIVIDUALCOMPONENTS AND WELDS SELECTED FOR EXAMINATIONSOR TESTS...,,, ..
| |
| 1.1.3.
| |
| | |
| ==1.5 REFERENCES==
| |
| TO DRAWINGS LOCATING WELDS AND COMPONENTS ...
| |
| 1.1.3.1,6 TEST OR EXAMINATIONMETHODS .,
| |
| 1.1,3.1.7 CAI.IBRATIONBLOCKS ..
| |
| 1.1.3.
| |
| | |
| ==1.8 REFERENCES==
| |
| TO PROCEDURES USED..
| |
| 1.1.3.1.9 EXAMINATIONOR TEST SCHEDULES .
| |
| 1.1.3.1.10 REFERENCES TO SECTION XI REQUIREMENTS THAT ARE NOT BEING SATISFIED, AND IDENTIFICATIONOF SUBSTITUTE EXAMINATIONSOR TESTS .................
| |
| 2.0 ASME BOILER AND PRESSURE VESSEL CODE REQUIREMENTS 2.1 SECTION XI OF THE ASME BOILER AND PRESSURE VESSEL CODE 2.1.1 ASME CODE CLASS 1 PIPE WELDS ..
| |
| ASME CODE CLASS 2 PIPE WELDS 2.1.3 ASME CODE CLASS 3 INTEGRAL ATTACHMENTSAND PRESSURE RETAINING BOUNDARY.......
| |
| 2,1.4 DEFERRED INCLUSION OF SUBSECTIONS IWE AND IWL ..
| |
| 2.1.5 EXCLUSION OF SUBSECTION IWF.
| |
| 2.1.6 ASME SECTION XI CODE CASES 3.0 AUGMENTED EXAMINATIONS t.
| |
| 3.1 COMMITMENTS MADE TO THE REGULATORS IN THE FSAR AND AS UPDATED IN THE USAR.......
| |
| 3.1.1 BREAK EXCLUSION REGIONS 3.1.2 ~ NUREG4313 Rcv. 2 3.1.3 NUREG4619.
| |
| 3.2 REGULATORY GUIDES 3.2.1 REGULATORYGUIDE 126.
| |
| 3.2.2 REGULATORYGUIDE 1.147.
| |
| 3.2.3'.3 REGULATORY GUIDE 1.150.
| |
| RECOMMI..NDATIONSOF THE NSSS SUPPLIER 3,4 COMMITMENTSMADE TO NRC PURSUANT TO BWR VESSEL & INTERNALS PROJECT 3.5 INSTITUTE FOR NUCLEAR POWER OPERATIONS RECOMMENDATIONS...
| |
| 3.6 USNRC OFFICE OF INSPECTION AND ENFORCEMENT BULLETINS 3.7 USNRC INFORMATIONNOTICES 4.0 INSERVICE INSPECTION BOUNDARIES 4.1 PIPING & INSTRUMENTATIONDRAWINGS (P&IDs) ..
| |
| NMP24SI406 Rev.1 ii ofiv
| |
| | |
| EXEMPTIONS, CLASS 1 VOLUMETRICAND SURFACE EXAMINATIONREQUIREMENT EXEMPTIONS CLASS 2 VOLUMETRICOR SURFACE EXAMINATIONREQUIREMENT EXEMPTIONS 4'>21 STANDBY GAS TREATMENT SYSTEM (GTS) 4.2.3 CLASS 3 EXEMPTIONS 4.2.4 APPLICABILITYOF CLASS 2 PRESSURE/TEMPERATURE EXEMPTIONS (Table 4.2-4) Class 2 System Portions Exempt Due to Operating Temperature and Pressure.
| |
| 5.0 BASES OF SAMPLE SELECTION AND FREQUENCIES OF EXAMINATION 5.1 FREQUENCY OF EXAMINATIONS, FREQUENCY CODES 5.3 INTERVALDISTRIBUTION, 5.4 MULTIPLECOMPONENT CONCEPT 5.5 CLASS 1 EXAMINATIONBASES 5.5.1 EXAMINATIONCATEGORY B-A. PRESSURE RETAINING WELDS IN REACTOR VESSEL 5.5.2 EXAMINATIONCATEGORY B-B - PRESSURE-RETAINING WELDS IN VESSELS OTHER THAN REACTOR VESSELS 5.5,3 EXAMINATIONCATEGORY B-D, FULL PENETRATION WELDS OF NOZZLES IN VESSELS - INSPECTION PROGRAM B............
| |
| 5.5.4 CATEGORY B-E, PRESSURE RETAININGPARTIAL PENETRATION WELDS IN VESSELS 5.5.5 CATEGORY B-F, PRESSURE RETAININGDISSIMILARMETALWELDS IN VESSEL NOZZLES .......
| |
| 5.5.6 CATEGORY B&-1, PRESSURE RETAININGBOLTING, GREATER THAN 2 in. IN DIAMETER.
| |
| 5.5.7 CATEGORY B&-2, PRESSURE RETAININGBOLTING, 2 in. AND LESS IN DIAMETER 5.5.8 CATEGORY B-H, INTEGRALATTACHMENTSFOR VESSELS..
| |
| 5.5.9 CATEGORY B-J, PRESSURE RETAISG WELDS IN PIPING.
| |
| 5.5.10 CATEGORY B-K-1, INTEGRALATTACHMENTFOR PIPING, PUMPS AND VALVES 5.5,1 1 CATEGORY B-L-1. PRESSURE RETAINING WELDS IN PUMP CASINGS 5,5.12 CATEGORY B-L-2. PUMP CASINGS 5,5.13 CATEGORY B-M-I, PRESSURE RE1 AINING WELDS Ihl VALVl BODIIrS 5.5,14 CATEGORY B-M-2, VALVEBODIES 5.5.15 CATEGORY B-N-I, INTERIOR OF REACTOR VESSEL, 5.5.16 CATEGORY B-N-2. INTEGRALLYWELDED CORE SUPPORT STRUCTURES AND INTERIOR ATTACHMENTSTO REACTOR VESSELS 5.5.17 CATEGORY B-N-3, REMOVABLECORE SUPPORT STRUCTURES 5.5.18 CATEGORY BW, PRESSURE RETAINING WELDS IN CONTROL ROD DRIVE HOUSINGS 5.5.19 CATEGORY B-P, ALLPRESSURE RETAININGCOMPONENTS 5.6 CLASS 2 EXAMINATIONBASIS .
| |
| 5.6.1 CATEGORY C-A, PRESSURE RETAINING WELDS IN PRESSURE VESSELS 5.6.2 CATEGORY C-B, PRESSURE RETAININGNOZZLE WELDS IN VESSELS ..
| |
| 5.6.3 CATEGORY C<, INTEGRALATTACHMENTSFOR VESSELS. PIPING, AND VALVES..
| |
| 5.6.4 CATEGORY C-D, PRESSURE RETAININGBOLTING GREATER THAN 2 in.
| |
| 5.6.5 CATEGORY C-F-I, PRESSURE RETAININGWELDS IN AUSTENITIC STAINLESS STEEL OR HIGH ALLOYPIPING ..
| |
| NMP2-ISI406 Rev.t iii of iv
| |
| | |
| CATEGORY C-F-2. PRESSURE RETAINING WELDS IN CARBON OR LOW ALLOYSTEEL PIPING CATEGORY C.G. PRESSURE-RETAiNING WELDS IN PUMPS AND VALVES 5.6.8 CATEGORY C-H. ALL PRESSURE RETAINING COMPONENTS 5.6.9 CLASS 2 AUGMENTED INSPECTION REQUIREMENTS 5,7 CLASS 3 EXAMINATIONBASES .....
| |
| 5.7.1 CATEGORY D-A, SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION 5.7.2 CATEGORY D-B. SYSTEMS IN SUPPORT OF EMERGENCY CORE COOLING, CONTAINlvG=.NTHEAT REMOVAL, ATMOSPHERE CLEANUP. AND REACTOR RESIDUAL HEAT REMOVAL 5.7.3 CATEGORY DK. SYSTEMS IN SUPPORT OF RESIDUAL HEAT REMOVALFROM SPENT FUEL STORAGE POOL....
| |
| 6.0 EXAMINATIONPROGRAM PLAN TABLE FIELDS DESCRIPTION .
| |
| 7.0 EXCEPTIONS TO ASME CODE REQUIREMENTS
| |
| : 7. I REQUESTING RELIEF UNDER IOCFR50.55a.
| |
| 7.l. I DETERMINATIONOF IMPRACTICALITY, 7.1.2 NOTIHCATIONOF REGULATORS 7,2 CYCLIC REVIEW.
| |
| 8.0 NONDESTRUCTIVE EXAMINATIONPROCEDURES LIST ...
| |
| ULTRASONIC CALIBRATIONSTANDARDS LIST 10.0 ASME Xl REPAIR/REPLACEMENT PROGRAM APPENDICES A Class I, Category 1W, Pipe Weld Count Summary.
| |
| B. Class 2, Categoty C-F-1 and C-F-2 Pipe Weld Count Summary.
| |
| C Class 1, 2 &, 3, Multiple Vessel, Pump & Valve Tables.
| |
| D Class 1, 2 & 3, IWF Component Su p ports (Code Case N-t91-1) ..
| |
| E. ~ Class 1, 2 & 3, Integral Attachments (Code Case N-509) ........
| |
| F. ISI Rellel'equests ..
| |
| G Class I & 2 NDE Requirements.,
| |
| H IWF Class 1,2 & 3 Component Support..
| |
| L IWF- Class 1,2 & 3 Snubbers.....
| |
| J. Change History..
| |
| NMP2-ISI406 Rev.1 iv of iv
| |
| | |
| 0
| |
| | |
| ==1.0 INTRODUCTION==
| |
| | |
| Pursuant to 10 CFR 50.55a(g)(2), Niagara Mohawk Power Corporation (NMPC), the holder of the operating license (NPF-69) for Nine Mile Point - Unit 2 (NMP2), a General Electric BWR-5 boiling (light) water~ooled nuclear power facility whose construction peimit was issued on or after January 1, 1971, but before July 1, 1974 (i.e., June 24, 1974) is committed to inservice inspection and examination of pressure retaining nuclear safety related components (including supports) in accordance with the American Society of Mechanical Engineers'ASME) Boiler Pressure k Vessel Code's Section XI, 1989 Edition with no Addenda. In that collection of publications, (herein referred to'as "the Code" ) NMPC is defined as the Owner of NMP2.
| |
| Revision 1 to this ISI Program Plan constitutes a major re-write of all sections and appendices. In addition, the Component Support Program Plan (Document Number NMP2-IWF-007) has been deleted and its contents have been incorporated into this document. This action provides better continuity and control of the examinations that are required to be performed during this Second Ten Year and subsequent Intervals.
| |
| V The Second Ten Year Interval Inservice Inspection Program Plan for pressure-retaining components and their supports for the Nine Mile Point Nuclear Station Unit 2 (NMP2) details the technical basis and provides the overall description of the activities planned to fulfillthe ISI requirements defined in the Code. The ISI Examination Program Plan, included herein, identifies the Class 1, 2 and 3 components (i.e., piping, pumps, valves, vessels, and their associated integral attachments)and their supports required to be examined in accordance with Subsections IWB, IWC, IWD and IWF of the Code. Pressure testing is addressed in a separate document (the NMP2 Pressure Testing Program Plan, Document No. NMP2-PT-008.) Items selected for examination are identified in the respective programs and on separate work lists. These work lists are issued by the NMP2 ISI Program Manager to the NMPC Quality Inspection Group in order to facilitate outage planning and conduct of examinations.
| |
| 1.1 NONMANDATORYAPPENDIX F Appendix F to the 1989 Edition of Section XI of the ASME Boiler and Pressure Vessel Code provides guidance for preparation of inspection plans to provide adequate information for submittal to reviewing agencies. As such, NMP2 has elected to incorporate its 'attributes below as a checklist to assure compliance with the 1989 Edition of Section XI of the ASME Boiler and Pressure Vessel Code.
| |
| 1.1.1 ARTICLE F-2000; INSPECTION PLAN CONTENTS This is the title of the article. It is subdivided into four (4) subarticles: F-2100 through F-2400 inclusive. Each is addressed below.
| |
| 1.1.1.1 SUBARTICLE F-2100; BACKGROUND AND INTRODUCTION This is the title of the subarticle. Each of its numerous topics is addressed below.
| |
| 1.1.1,1.1 CONSTRUCTION CODES USED The N-3 Data Report for the unit identifies 54 N-5 certified piping systems. Fifty (50) of those systems were constructed to the 1974 Edition of Division 1 of Section III of the ASME Boiler and Pressure Vessel Code the remaining four (Manufacturer's Serial Nos. RPV-8, RCI-NMP-01, RCI-NMP-02, RCI-NMP-03) were constructed to the 1977 Edition with Summer of 1978 Addenda of that same Code.
| |
| NMP2 recognizes that the application of ASME XI begins when the requirements of the various Construction Codes have been satisfied. Satisfaction of those Codes is evidenced by the Code certification (Data Reports) referenced above.
| |
| NMP2-IS1406 Rev.i Seeiion 1 Page 1 of 16
| |
| | |
| 1.1.1.1.2 DATES OF THE FIRST and SECOND TEN YEAR INTERVALSand INSPECTION PERIODS INTERVAL 'PERIOD FROM TO A ril5,1988 Au ust4,1991 Au ust 5, 1991 December 4, 1994 First December 5, 1994 A ril4,1998 A iii 5, 1998 A ril4,2001 A ril5,2001 A ril4,2005 Second April 5, 2005 April 4, 2008 1.1.1.1.3 SECTION XI EDITION AND ADDENDA This plan is written to the 1989 Edition with no Addenda of Section XI of the American Society of Mechanical Engineers'oiler & Pressure Vessel Code, Division 1.
| |
| 1.1.1.1.4 CODE CLASSIFICATIONOF COMPONENTS AND SYSTEM BOUNDARIES NMP2 was constructed and certified to Section IIIof the ASME KkPV Code. As such, systems have been classified as either Clas's 1, 2, or 3 in accordance with the Code's criteria for the same.
| |
| These classifications and system boundaries are also used to evaluate Code applicability for repair/replacement (includes modifications) activities, regardless of whether or not the item is included in this program plan for inspection.
| |
| '.1.1.1.4.1 SPECIFIC RULES FOR CLASSIFICATION General Design Criterion 1 of 10CFR50, Appendix A, requires that nuclear power plant systems and components important to safety be designed, fabricated, erected, and tested to quality standards commensurate with the importance of the safety function to be performed. These pressure retaining components of fluid systems are part of the reactor coolant pressure boundary (RCPB), and other fluid systems important to safety, where reliance is placed on these systems to:
| |
| (1) prevent or mitigate the consequences of accidents and malfunctions originating within the RCPB, (2) permit shutdown of the reactor and maintain it in a safe shutdown condition, and; (3) retain radioactive material.
| |
| At NMP2, Quality Group A components have been classified as ASME HI, Division 1, Class 1 in accordance with 10CFR50.2(v). Quality Group B components have been classified as ASME III, Division 1, Class 2. Quality Group C components have been classified as ASME III, Division 1, Class 3. (Both in accordance with Regulatory Guide 1.26 guidelines.) There are two notable exceptions:
| |
| (1) The main steam lines &om the outermost containment isolation valves to the turbine stop valves were neither classified nor constructed to ASME III, Division 1, Class 2 criteria. Rather, they were constructed to the ANSI B31.1 Code, with augmented quality requirements. They have been classified as ASME XI Class 2 in this program, and are inspected accordingly..
| |
| (2) The Reactor Water Cleanup System piping in the reactor building, beyond the outermost isolation valve, although classified as "not important to safety," was nevertheless classified as ASME III, Division 1, Class 3, and NMP2.IS1406 Rev. i Section i Page 2 of 16
| |
| | |
| constructed accordingly. It retains that classification (most notably for repair & replacement activities) in this program.
| |
| Quality Group D components are not categorically addressed in this plan. However, singular quality Group D items have been included to satisfy related quality inspection concerns.
| |
| USNRC has found (in NUREG-1047, the safety evaluation report related to the operation of NMP2) that these specific rules for classification are in conformance with the ASME Code and industry standards, the Commission's regulations, and the guidance found in RG 1.26. These classifications of ASME III Class 1, 2, or 3 have been associated with items classified as a "component" in the plant's Masfer Equipment List (MEL) thus allowing for the rapid acquisition of Code classification by plant personnel.
| |
| 1.1.1.1.4.2 LIST OF SYSTEMS AND IDENTIFICATIONOF ACRONYMS I~
| |
| This information is contained in Section 6 of this Second Ten- Year Interval Inservice Inspection Program Plan.
| |
| 1.1.1.1.4.3 PIPING AND INSTRUMENTATIONDIAGRAMS (PEcIDs) SHOWING CLASSIFICATION BOUNDARIES Are described in Section 4 of this Second Ten-Year Interval Inservice Inspection Program Plan.
| |
| 1.1.1.1.5
| |
| | |
| ==SUMMARY==
| |
| TABLES Summaiy tables for each system showing Code classification, Code examination category and item number, types of components, examinations or tests to be performed, and number of components for each item number are contained in the approproiate Appendices of this Program Plan.
| |
| 1.1.1.1.6 NAMES, SIGNATURES, AND COMPANY AFFILIATIONS OF PREPARE RS AND APPROVERS OF THE INSPECTION PLAN This information is included on the cover page of this Second Ten- Year Interval Inservice Inspection Program Plan.
| |
| The reader is referred to that cover page for NMPC personnel names and signatures. Arkwright Mutual Insurance Company (NMPC's Authorized Inservice Inspection Agency) document their review and concurrence via separate correspondence with NMPC.
| |
| 1.1.1.2 SUBARTICLE F-2200;
| |
| | |
| ==SUMMARY==
| |
| OF CHANGES IN UPDATED INSPECTION PLANS This is the title of the subarticle. Each of its numerous topics is addressed below.
| |
| 1.1.1.2.1 LISTING OF NEW OR REVISED PROCEDURES I
| |
| Section 8 of this plan lists the Nondestructive Testing procedures used to implement this program.
| |
| 1.1.1.22 CHANGES IN EXEMPTIONS, SAMPLES, EXAMINATIONS,OR TESTS There have been no changes between the First and Second Interval Programs other than to reflect any changes as a direct result of updating this Second Ten Year Interval Program to the 1989 Edition of ASME Section XI.
| |
| 1.1.1.2.3 SUCCESSIVE INSPECHONS REQUIRED BY IWB-2420, IWC-2420, IWE-2420, OR IWF-'2420 Successive inspections required by IWB-2420 from the first interval was limited to 2Rpvwo32, a 10 inch, stainless steel High Pressure Core Spray nozzle safe end-to-safe end extension weld. This weld is examined pursuant to two sets of examination criteria, as it receives augmented volumetric examinations on an increased frequency resultant NMP2-ISI406 Rcv. i Seciion i Page 3 of 16
| |
| | |
| to NMP2's commitment to the guidance provided by NRC in NUREG-0313 and Generic Letter 88-01. The associated ASME XI criteria states that "ifflaw indications are evaluated in accordance with IWB-3122.4 and the component qualifies as acceptable for continued service, the areas containing such flaw indications shall be reexamined during the next three inspection periods listed in the schedules of the inspection programs of IWB-2410." This weldment was accepted by evaluation.
| |
| The examinations conducted during the first interval under the guidance provided by Subsections IWC, IWD and IWF resulted in no acceptances by evaluation and therefore no successive inspection carryovers are required.
| |
| As stated in paragraph 2.1.4 of this document, a program plan for Subsection IWE/IWL(Class MC/CC) of ASME Section XI is under development.
| |
| 1.1.1.2.4 CIIANGES IN SUBSTITUTE EXAMINATIONSOR TESTS OF F-3000 Appendix F of this program Plan provides technical details of any substitute examinations that NMP2 is intending to perform. These requests are documented in the form of Relief Requests. Refer to the Inservice Testing Program Plan, and the Pressure Testing Program Plan for changes fiom the testing required/performed in the second interval for rhose specific items..
| |
| 1.1.1,3 SUBARTICLE F-2300, APPLICABLE DOCUMENTS This subarticle recommends that inspection plans include a reference list of applicable documents. Therefore, NMP2 reports that the following documents, in whole or in part, are applicable to this Second Interval Program Plan:
| |
| NOTE: Augmented examination reference documents are listed in Section 3.0.
| |
| (a) Part 50 of Title 10 of the Code of Federal Regulations, entitled, Domestic Licensing of Production and Urilizarion Faci lines (b) The American Society of Mechanical Engineers Boiler & Pressure Vessel Code; Sections II, III, V, IX, and XI, 1989 Edition (no Addenda); Section XI, 1992 Edition, 1992 Summer Addenda for IWE/IWL Repairs and Replacements.
| |
| (c) ASME XI Code Cases:
| |
| N-416-1 Alternative Pressure Test Requirement for Welded Repairs or Installation ofReplacement Items by Welding, Class 1, 2, and 3 N-460 Alternative Examination Coverage for Class 1 and Class 2 Welds N-461 Alternative Rules for Piping Calibration Block Thickness N-496 Helical-Coil Threaded Inserts N-491-1 Alternarive Rules for Examination ofClass l.2.3 and MC Component Supports ofLight Water Cooled Power Plants, Section Xf, Division 1.
| |
| N-498-1 Alternative Rules for 10-Year Hydrostaric Pressure Testing for Class 1 and 2 Systems N-504 Alternative Rules for Repair ofClass 1, 2, and 3 Austenitic Stainless Steel Piping N-504-1 Alternative Rules for Repair of Class 1, 2, and 3 Austeniric Stainless Steel Piping N-509 Alternarive Rules for the Selection and Examinanon of Class 1, 2, and 3 Integrally Welded Attachments. Section XE, Division 1 N-524 Alternate Examinanon Requirements for Longitudinal Welds in Class 1 dc 2 Piping NMP2-ISI406 Rcv. i Section i Page 4 of i6
| |
| | |
| (d) Regulatory Guides:
| |
| 1.26 Quality Group Classification and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components ofNuclear Power Plants (Revision 3 February 1978) 1.65 Materials and Inspecrions For Reactor Vessel Closure Studs (October 1973) 1.84 Design and Fabricarion Code Case Acceptability, ASME IllDivision I (Revision 29 July 1993) 1.85 Materials Code Case Acceptability ASME Section lllDivision l 1.147 Inservice Inspection Code Case Acceptability ASME Section XlDivision l (Revision 12 May 1999 1.150 Ultrasonic Testing of Reactor Vessel Welds During Preservice and Inservice Examinations (Revision 1 February, 1983)
| |
| (e) NUREGs 0313 Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping, Final Repon (Revision 2, January 1988) 0619 BWRFeedwater Nozzle and CRD Return Line Nozzle Cracking (November, 1980) 0800 "Standard Review Plan for the Review ofSafety Analysis Report for Nuclear Power Plants" 1047 Safety Evaluation Report related to the operation ofNine Mile Point Nuclear Station, Unit No.
| |
| 2, Docket No. 50-410 (Februaiy 1985)
| |
| (f) Generic Letters 88-01, &.Supp. 1 Intergranular Stress Corrosion Cracking in BWR Austenitic Stainless Steel Piping 1.1.1,4 SUBARTICLE F-2400, CODE SUBSECTIONS This subarticle recommends that inspection plans address the following Subsections of the Code:
| |
| 1.1.1.4.1 SUBSECTION IWAGENERAL REQUIREMENTS This subsection is divided into eight (8) Articles, each of which is further subdivided by Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. This plan will only number these items to the level of Subsections. Below that level, items are grouped, and Code designators are used. As a result, NMPC feels that no comment is required on the majority of Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. Rather than list each, and state "no comment," this plan willlist only those for which NMPC feels that some achtowledgment, explanation, or disclaimer is required due to the unique nature of its application to the NMP2 site.
| |
| IWA-1000 SCOPE AND RESPONSIBILITY This is the title of the article. Pertinent comments on subarticles follow.
| |
| IWA-1100 SCOPE - Inservice testing is outside the scope of this plan. The reader is referenced to the separate 1ST Program Plan document, NMP2-IST-005.
| |
| IWA-1400 OWNERS RESPONSIBILITIES - NMPC specifically acknowledges its responsibilities as listed in this subarticle, and will take all authorized actions necessary to meet them throughout the Second Ten Year Interval.
| |
| IWA-2000 EXAMINATIONAND INSPECI'ION This is the title of the article. Pertinent comments on subarticles follow.
| |
| IWA-2130 ACCESS FOR INSPECTOR - NMPC shall arranged for the Authorized Nuclear Inservice Inspector (ANII)to have access to all parts of the plant as necessary to make the required inspections.
| |
| IWA-2211 Visual Examination VT NMP2 has substituted remote VT-.1 visual examination for direct examination in the firstinterval and anticipates doing the same in the second interval.
| |
| NMP2-ISI406 Rev. I Section I Page 5 of 16
| |
| | |
| IWA-2212 Visual Examination VT VT-2 examinations are performed under the guidance of the NMP2 Pressure Testing Program Plan, Document No. NMP2-PT-008.
| |
| IWA-2212 Visual Examination VT NMP2 may perform visual examinations remotely as allowed by minor subparagraph (c) when applicable.
| |
| IWA-2311 NDE Methods listed in SNT-TC-1A - Training, qualification, and certification of ultrasonic examination personnel complies with the requirements specified in mandatory Appendix VII.
| |
| IWA-2313 Certification and Recertification - Nondestructive examination personnel at NMP2 are qualified by examination and so certified, in accordance with SNT-TC-lA, per ASME Section Xl. Level I and Level II personnel are recertified by qualification examinations every 3 years. Level III personnel are recertified by qualification examinations once every 5 years.
| |
| IWA-2321 Visual Acuity - The visual examinations required by this paragraph are conducted annually by personnel qualified to conduct them.
| |
| IWA-2322 Level IIIPersonnel - The technical qualifications of Level IIINDE personnel are determined using written examinations. These examinations cover the Basic, Method, and Specific areas of knowledge as defined in SNT-TC-IA.
| |
| IWA-2323 Level I and Level IIPersonnel - The technical qualifications of Level I and Level IINDE personnel are determined using written General and Specific Examinations and a Practical hands-on examination. The Practical Examination is administered by a level III.
| |
| IWA-2420 INSPECTION PLANS AND SCHEDULES - Code requirements (by category and item number for each component) that are not being satisfied by examinations, and the justiflcation for substitute examinations are found in the associated request for relief.
| |
| IWA-2430 INSPECTION INTERVALS - NMP2 did not utilize the extension allowed by IWA-2400(c) in the first interval.
| |
| IWA-2432 Inspection Program B - NMPC implemented Inspection Program B at NMP2 in the first iri terval, and continues to use it in the second interval.
| |
| IWA-3000 STANDARDS FOR EXAMINATIONEVALUATION This is the title of the article. Pertinent comments on subarticles follow.
| |
| IWA-3200 SIGNIFICANT DIGITS FOR LIMITINGVALUES - (a) All observed or calculated values of dimensions or component thickness and of flaws detected by nondestructive examinations used for comparison with the evaluation standards of IWX-3000 are expressed to the nearest 0.1 inches for values 1 inch and greater, and to the nearest 0.05 inches for values less than I inch. Rounding-off of values is performed in accordance with the Rounding-off Method of ASTM Recommended Practice E 29. (b) Interpolation of percentage values for acceptance standards, as required for intermediate flaw aspect ratios in the tables of allowable flaw standards, are rounded to the nearest 0.1%. (c) Interpolation of decimal or &actional dimensions specified in the tables of allowable flaw standards are rounded to the nearest 0.1 inches or '/t6 of an inch, respectively.
| |
| NMP2-ISI.006 Rev.i Section I Page 6 of 16
| |
| | |
| IWA-4000 REPAIR PROCEDURES Relevant information is contained in Section 10 of this Second Ten- Year Interval Inservice Inspection Program Plan.
| |
| IWA-5000 SYSTEM PRESSURE TESTS VT-2 examinations are addressed in a separate document; the NMP2 Pressure Testing Program Plan, Document No.
| |
| NMP2-PT-008.
| |
| IWA-6000 RECORDS AND REPORTS This is the title of the article. Pertinent comments on subarticles follow IWA-6310 MAINTENANCEOF RECORDS - At a minimum, NMP2 retains the records and reports identified in IWA-6330 (construction records) and IWA-6340 (lnservice Inspection records.) The records and reports are filed and maintained in a manner that allows access as required. NMPC provides suitable protection &om deterioration and damage in accordance with the NMPC Quality Assurance program for the service lifetime of the plant. The QA program allows for the use of microfilming.
| |
| IWA-7000 REPLACEMENT Relevant information is contained in Section 10 of this Second Ten- Year Interval Inservice Inspection Program Plan.
| |
| IWA-9000 GLOSSARY The following definitions apply to this Program Plan:
| |
| component - an item in a nuclear power plant such as a vessel, pump, valve, or piping system" constant load type support - spring type support that produces a relatively constant supporting force throughout a specified deflection.
| |
| component standard support - a support consisting of one or more generally mass-produced units usually referred to as catalog items.
| |
| component support - a metal support designed to transmit loads &om a component to the loadwanying building or foundation structure. Component supports include piping supports and encompass those structural elements relied upon to either support the weight or provide structural stability to components.
| |
| core support structures - those structures or parts of structures that are designed to provide direct support or restraint of the core (fuel and blanket assemblies) within the reactor pressure vessel.
| |
| defect - a flaw (imperfection or unintentional discontinuity) of such size, shape, orientation, location or properties as to be rejectable.
| |
| discontinuity - an interruption in the normal physical structure of material or a product.
| |
| engineering evaluation - an evaluation of indications that exceed allowable acceptance standards to determine ifthe margins required by the Design Specifications and Construction Code are maintained.
| |
| NMP2-ISI406 Rcv. 1 Scaion i Paac 7 of 16
| |
| | |
| evaluation - the process of determining the significance of examination or test results, including the comparison of examination or test results with applicable acceptance criteria or previous results.
| |
| flaw - an imperfection or unintentional discontinuity that is detectable by nondestructive examination.
| |
| hanger- a item that carries the weight of components or piping &om above with the supporting members being mainly in tension.
| |
| indication - the response or evidence &om the application of a nondestructive examination.
| |
| inservice inspecnon - methods and actions for assuring the structural and pressure - retaining integrity of safety related nuclear power plant components in accordance with the rules of ASME Section XI.
| |
| inservi ce examination - the process of visual, surface or volumetric examination performed in accordance with the rules of ASME Section XI, Division I inspection - verification of the performance of examinations and tests by an ANII item - a material, part, appurtenance, piping subassembly, component or component support.
| |
| relevant condition - a condition observed during a visual examination that requires supplemental examination, corrective measure, repair, replacement, or analytic'al evaluation.
| |
| support - (I) an item used to position components, resist gravity, resist dynamic loading, or maintain equilibrium of components; (2) an item that carries the weight of a component or piping &om below with the supporting members being mainly in compression.
| |
| support part- a part of subassembly of a component support or piping support.
| |
| terminal ends - the extremities of piping'runs that connect to structures, components, or pipe anchors, each of which acts as a rigid restraint or provides at least 2 degrees of restraint to piping thermal expansion.
| |
| test - a procedure to obtain information through measurement or observation to determine the operational readiness of a component or system while under controlled conditions.
| |
| variable spring type support-a spring type support providing a variable supporting force throughout a specified deflection.
| |
| vibration control and sway brace - a spring type support providing a variable restraining force along its axis.
| |
| 1.1.1.4.2 SUBSECHON IWB REQUIREMENTS FOR CLASS 1 COMPONENTS OF LIGHTWATER COOLED POWER PLANTS This subsection is divided into six (6) Articles, each of which is further subdivided by Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. This plan willonly number these items to the level of Subsections. Below that level, items are grouped, and Code designators are used. NMPC finds the Code to be well written and clear in its direction.
| |
| As a result, NMPC feels that no comment is required on the majority of Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. Rather than list each, and state "no comment," this plan will list only those for which NMPC feels that some acknowledgment, explanation, or disclaimer is required due to the unique nature of its application to the NMP2 site. Components with alternative examination, as in Code Cases, the rules of that document shall apply.
| |
| NMP2.ISI406 Rcv. i section i Page 8 of l6
| |
| | |
| IWB-1220 COMPONENTS EXEMPT FROM EXAMINATION- NMPC has utilized all three (3) of the exemptions identified in this subsubarticle, and wishes to draw special attention to paragraph (c), "reactor vessel head connections and associated piping, NPS 2 and smaller, made inaccessible by control rod drive penetrations." Examination item 2RpvklF, the weld of the reactor vessel shell to the N-15 nozzle for the bottom head drain is exempt per IWB-1220(c), and no relief lrom Code requirements is necessary for the Second Interval Program Plan.
| |
| IWB-2200 PRESERVICE EXAMINATION- NMPC performs appropriate preservice examinations per the requirements of subarticle IWB-2200 whenever a component is replaced, added, or altered during the service lifetime of NMP2. The results of those examinations are documented on a NIS-2 Form.
| |
| IWB-2412 Inspection Program B - The interpretation of Table IWB-2412-1 correlates the first, second, and third periods of the second interval with the 13, 17, and 20 calendar years of plant service. NMPC's second interval will comply with this schedule to the extent practical. The current refueling outage schedule, upon which this Program Plan is based, includes 6 refuel outages or 2 per period. Some variations to the length of Inspection Periods may be required based on actual versus scheduled outage dates.
| |
| IWB-2420 SUCCESSIVE INSPECTIONS -The sequence of component examinations established during the first ins pection interval is, to the extent practical, being repeated during this second inspection interval. NMPC has changed the sequence of several piping weld examinations in order to reduce support work duplication and radiation exposure (ALARA).Most of these changes were made to examine RPV welds and adjacent piping welds during the same refueling outage to reduce the need for duplication of the required support work (i.e. Scaffolding, insulation removal, etc.) in different outages. NMPC will continue to reschedule examinatioins where possible to optimize the ISI Program implementation with the primary goal of reducing duplicate support requirements and thereby reducing radiation exposure.
| |
| Any additional scheduling changes that are made will be documented in the controlled ISI Program Plan. First interval flaws accepted by analytical evaluation have resulted in reexaminations (or the future scheduling thereof) at three successive inspection periods, one of which overlaps into this'second interval.(Reference paragraph 1.1.1.2.3)
| |
| IWB-2430 ADDITIONALEXAMINATIONS- (a) Examinations of Class 1 items performed during an outage, in accordance with Table IWB-2500-1, that reveal indications exceeding the acceptance standards of Table IWB-3410-1, are extended to include additional examinations during that outage. NMPC will further define the scope of additional examinations to those welds, items, parts etc. that are of similar materials, design, size and service conditions. Those additional examinations include (a) the remaining welds, areas, or parts contained in the Table IWB-2500-1 inspection item listing and scheduled for inspection. (b) Ifany of those additional examinations reveal indications exceeding the acceptance standards of Table IWB-3410-1, the examinations are further extended to include all the welds, areas, or parts of similar design, size, and function. (c) The performance of these additional examinations in the current period shall have no impact upon the original schedule of examinations in the period immediately following.
| |
| IWB-3132 - Acceptance by Volumetric or Surface Examination -. Second interval NIS-1 Forms and Summary Reports will contain "Acceptance by Volumetric and/or Surface Examination" verbiage.
| |
| IWB-3132.4- Acceptance by Analytical Evaluation - For items whose volumetric or surface examination reveals flaws that exceed the acceptance standards listed in Table IWB-3410-1, and that have been analyzed as acceptable to return to service without benefit of either: flaw removal, repair, or replacement, NMPC will: (1) submit the analytical evaluation to NRC for review (and approval), and (2) schedule the item for examination during the next three periods.
| |
| IWB-3134 - Review by Authorities-Class 1 examinations performed during an outage, in accordance with Table IWB-2500-1, that reveal indications exceeding the acceptance standards of Table IWB-3410-1, and that require flaw removal by mechanical methods, or the component to be repaired (welded upon) to the extent necessaiy to meet the acceptance standards of IWB-3000, shall possess an ASME XI repair plan.
| |
| NMP2.lsl406 Rcv.i Section I Page 9 of l6
| |
| | |
| IWB-3142.1 - Acceptance by Visual Examination - Second interval NIS-1, or Form, and Summary Reports will contain "Acceptance by Visual Examination" verbiage.
| |
| IWB-3142.2 - Acceptance by Supplemental Examination - Visual examinations that reveal unacceptable relevant conditions may be supplemented by surface or volumetric examinations. These items may be considered acceptable for continued service ifthe results of the supplemental examinations meet the applicable acceptance criteria.
| |
| IWB-3142,3 - Acceptance by Corrective Measures or Repairs - Second interval NIS-1 Form and Summary Reports will contain "Acceptance by Corrective Measures or Repairs" verbiage (i.e., the acceptance may be by "Corrective Measures," or the acceptance may be by "Repairs," or a combination of the two.)
| |
| ARTICLE IWB-4000 REPAIR PROCEDURES The reader is referred to Section 10 of this Second Ten- Year Interval Inserv ice Inspection Program Plan for generic repair procedures commentary.
| |
| ARTICLE IWB-5000 SYSTEM PRESSURE TESTS VT-2 examinations are addressed in a separate document; the NMP2 Pressure Testing Program Plan, Document No.
| |
| NMP2-PT-008.
| |
| ARTICLE IWB-7000 REPLACEMENTS The reader is referred to Section 10 of this Second Ten- Year Interval Inservice Inspection Program Plan for generic repair procedures commentary 1.1.1.4.3 SUBSECTION IWC REQUIREMENTS FOR CLASS 2 COMPONENTS OF LIGHTWATER COOLED POWER PLANTS This subsection is divided into six (6) Articles, some of which are further subdivided by Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. This plan willonly number these items to the level of Subsections. Below that level, items are grouped, and Code designators are used. NMPC finds the Code to be well written and clear in its direction.
| |
| As a result, NMPC feels that no comment is required on the majority of Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. Rather than list each, and state "no comment," this plan will list only those for which NMPC feels that some acknowledgment, explanation, or disclaimer is required due to the unique nature of its application to the NMP2 site. Components with alternative examination, as in Code Cases, the rules o(that document shall apply.
| |
| IWC-1220 COMPONENTS EXEMPT FROM EXAMINATION- NMPC had been using the exemptions allowed by Code Case NAOS-2 during the first interval. With only minor editorial alterations, those exemptions have been into the 1989 Edition of ASME XI, and have had no impact upon the non-exempt population for the 'ncorporated second interval.
| |
| IWC-2200 PRESERVICE EXAMINATION- NMPC performs appropriate preservice examinations per the requirements of subarticle IWB-2200 whenever a component is replaced, added, or altered during the service lifetime of NMP2. The results of those examinations are documented on an NIS-2 Form.
| |
| IWC-2412 Inspection Program B - Table IWC-2412-1 correlates the first, second, and third periods of the second interval with the 13, 17, and 20 calendar years of plant service. NMPC's second interval willcomply with this schedule to the extent practical. The current refueling outage schedule, upon which this Program Plan is based, NMP2-ISI406 Rev. i Section i Page 10 of 16
| |
| | |
| C7 includes 6 refuel outages or 2 per period. Some variations to the length of Inspection Periods may be required based on actual versus scheduled outage dates.
| |
| IWC-2420 SUCCESSIVE INSPECTIONS - The sequence of component examinations established during the first inspection interval. is, to the extent practical, being repeated during this second inspection interval. NMPC has changed the sequence of several piping weld examinations in order to reduce support work duplication and radiation exposure (ALARA).These changes were made to examine adjacent piping welds during the same refueling outage to reduce the need for duplication of the required support work (i.e. scaffolding, insulation removal, etc.) in different outages. NMPC willcontinue to reschedule examinatioins where possible to optimize the ISI Program implementation with the primary goal of reducing duplicate support requirements and thereby reducing radiation exposure. Any additional scheduling changes that are made willbe documented in the controlled ISI Program Plan.
| |
| IWC-2430 ADDITIONALEXAMINATIONS- (a) Examinations of Class 2 items, performed in accordance with Table IWC-2500-1, that detect indications exceeding the allowable standards of Table IWC-3410-1, are extended to include an additional number of examinations within the same examination category, approximately equal to the number of examinations initially performed. NMPC will further limit the scope of additional examinations to those welds, items, parts etc. that are of similar materials, design, size and service conditions. (5) Ifany of those additional examinations detect further indications exceeding the allowable standards of Table IWC-3410-1, the remaining number of similar items within the same examination category willbe examined.
| |
| IWC-3000 ACCEPTANCE STANDARDS The requirements of IWC - 3000 shall be implemented as detailed below.
| |
| IWC-3132.1 - Acceptance by Supplemental Examination - Visual'examinations that reveal unacceptable relevant conditions may be supplemented by surface or volumetric examinations. These items may be considered acceptable for continued service ifthe results of the supplemental examinations meet the applicable acceptance criteria.
| |
| IWC-3132,2 - Acceptance by Corrective Measures or Repairs - Second interval NIS-1 Form, and Summary Reports will contain "Acceptance by Corrective Measures or Repairs" verbiage (i.e., the acceptance may be by "Corrective Measures," or the acceptance may be by "Repairs," or a combination of the two.)
| |
| IWC-3200 SUPPLEMENTAL EXAMINATIONS- For the second interval, visual examinations that reveal relevant conditions will be supplemented by either surface examinations, volumetric examinations or alternative examinations in order to determine the need for correcrive measures, repairs, evaluation, or replacement.
| |
| IWC-4000 REPAIR PROCEDURES, The reader is referted to Section 10 of this Second Ten-Year Interval Inservice Inspection Program Plan for generic repair/replacement procedures commentary.
| |
| A'RTICLE IWC-5000 SYSTEM PRESSURE TESTS VT-2 examinations are addressed in a separate document; the NMP2 Pressure Testing Program Plan, Document No.
| |
| NMP2-PT-008.
| |
| ARTICLE IWC-7000 REPLACEMENTS The reader is referred to Section 10 of this Second Ten- Year Interval Inserv ice Inspection Program Plan for generic repair/replacement procedures commentary.
| |
| NMP2.1SI406 Rev.1 Section 1 Page 11 of 16
| |
| | |
| 1.1.1.4A SUBSECTION IWD REQUIREMENTS FOR CLASS 3 COMPONENTS OF LIGHTWATER COOLED POWER PLANTS The IWD Articles of the Code require a VT-3 examination of integral attachments to the pressure boundary. This portion includes the weld to the pressure boundary. The Second Interval ISI Program Plan identifies and controls the Class 3 integral attachments, in their entirety, that are subject to VT-3 examination. Pursuant to ASME Code Case N-509, NMPC has elected to perform the required visual examinations on 10/o of the integral attachments. These VT-3 examinations shall be coordinated with the corresponding support 'examinations.
| |
| IWD-3000 ACCEPTANCE STANDARDS This article continues to authorize NMPC to use the rules of IWB-3000. Since Article IWB-.3000 has been updated, IWD-3000 is electively updated also. However, as indicated above, these updates are limited to their effect on repairzreplacemenf activities.
| |
| IWD-4000 REPAIR PROCEDURES This article no longer contains a set of rules specifically tailored to Class 3 components and their supports. Instead, it now references the generic rules of IWA4000. NMP2 addresses this in Section 10 of ttiis Second Ten- Year Interval Component Support Program Plan.
| |
| ARTICLE IWD-5000 SYSTEM PRESSURE TESTS VT-2 examinations are addressed in a separate document; the NMP2 Pressure Testing Program Plan, Document No.
| |
| NMP2-PT-008.
| |
| I ARTICLE IWD-7000 REPLACEMENTS j
| |
| The reader is referred to Section 10 of this Second Ten- Year Interval Inservice Inspection Program Plan for generic repair/replacement procedures commentary.
| |
| 1.1.1.4.5 SUBSECTIONS IWE/IWLREQUIREMENTS FOR CLASS MC AND METALLICLINERS OF CLASS CC COMPONENTS OF LIGHT WATER.COOLED POWER PLANTS AND CLASS CC REQUIREMENTS FOR CONCRETE COMPONENTS OF LIGHT WATER COOLED POWER PLANTS The Inspection Program Plans for IWE (Class MC) and IWL (Class CC) Components are under development. These programs will be completed and implemented prior to September, 2001.
| |
| Repair and replacement activities within the scope of Subsections IWE and IWL of the Code conducted after September 9, 1996, are conducted in accordance with these subsections.
| |
| 1.1.1.4.6 SUBSECHON IWFREQUIREMENTS FOR CLASS 1, 2,3, and MC COMPONENT SUPPORTS OF LIGHTWATER COOLED POWER PLANTS This subsection is divided into six (6) Articles, some of which are further subdivided by Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. This plan will only number these items to the level of Subsection. Below that level, items are grouped, and Code designators are used. As a result, NMPC feels that no comment is required on the majority of Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. Rather than list each, and state "no comment," this plan will list only those for which NMPC feels that some acknowledgment, explanation, or disclaimer is required due to the unique nature of its application to the NMP2 site.
| |
| NMP2.ISI406 Rev. i Section t Page r2of16
| |
| | |
| IWF-1000 SCOPE AND RESPONSIBILITY This is the title of the article. Pertinent comments on subarticles follow.
| |
| IWF-1220 SNUBBER INSPECI ION REQUIREMENTS This subsubarticle requires the inservice inspection requirements for snubbers to be in accordance with Article IWF-5000.
| |
| That article requires visual examination VT-3 and performance testing both pursuant to the first Addenda to ASME/ANSI OM-1987, Part 4 (published in 1988.) However, NMP2 has proposed an alternative to these requirements.
| |
| The reader is referred to the paragraph on Article IWF-5000 below and Relief Req. 4 RR-IWF-4.
| |
| IWF-1300 SUPPORT EXAMINATIONBOUNDARIES
| |
| 'MP2 notes no changes to the examination boundaries utilized during the first interval as a result of this update to the 1989 Edition of ASME XI.
| |
| IWF-2000 EXAMINATIONAND INSPECTION This is the title of the article. Pertinent comments on subaiticles follow.
| |
| IWF-2410 INSPECI'ION PROGRAM This subsubarticle continues to allow for inservice examinations to be performed during normal system operation as well as at plant outages. NMP2 has performed many inservice inspections of component supports during normal system operation in the first interval, and plans to continue that practice during the second ten year interval.
| |
| IWF-2420 SUCCESSIVE INSPECI'ION INTERVALS NMP2 has, to the extent practical, scheduled the component support examinations of the second interval to repeat the sequence of component support examinations established in the first interval. This criterion has been factored into our reduced scope of examinations as a result of implementing ASME Code Case N491-1.
| |
| IWF-2430 ADDITIONALEXAMINATIONS NMP2 willcomply with the requirements for additional examinations when corrective measures are required as the result of examinations performed, per the requirements of Code Case N-491-1.
| |
| IWF-2510 SUPPORTS SELECTED FOR EXAMINATION 1.) For multiple components other than piping, within a system of similar design, function and service, the supports of only one of the multiple components are required to be examined 2.) Exam Category F-A, Table IWF-2500-1 shall be utilized in it's entirety for categorizing and selecting supports for examination based on Code Case N-491-1 selection criteria.
| |
| TABLE IWF-2500-1 EXAMINATIONCATEGORIES NMP2 will categorize supports in the Appendix H exam tables in accordance with Code Case NA91-I and Table IWF-2500-1, Note l.
| |
| IWF-3000 STANDARDS FOR EXAMINATIONEVALUATIONS This is the title of the article. Pertinent comments on subarticles follow.
| |
| NMP2-ISI406 Rev. 1 Section I Page 13 of16
| |
| | |
| IWF-3122 Acceptance NMP2 has noted the change to the authorized acceptance methodology for supports found unacceptable for continued service to include (non repair/replacement) adj usrmenr to the authorized remediation methods, and to introduce the term correcrion to capture all three methods. These concepts have been incorporated into the applicable NDE examination procedures.
| |
| IWF-3410 ACCEPTANCE STANDARDS COMPONENT SUPPORT STRUCTURAL INTEGRITY NMP2 has noted the deletion of references to "snubbers" and "fluid loss" &om, as well as the addition of "misalignment of supports" to this subsubarticle, and has amended our visual examination VT-3 attributes accordingly.
| |
| IWF-4000 REPAIR PROCEDURES NMP2 has altered its first inrerval methodology and to process Second Interval ASME XI Component Support Repair Plans in accordance with this Article, Section 10 of this document has been updated accordingly.
| |
| IWF-5000 INSERVICE INSPECTION REQUIREMENTS FOR SNUBBERS As previously indicated, all snubber testing and visual examination requirements shall be performed per the NMP2 Technical Specification requirements of Section 3/4.7.5.
| |
| IWF-7000 REPLACEMENTS This article is fundamentally unchanged from the iteration contained in the Code of record for the first interval.
| |
| 1.1.1.4.7 SUBSECTION IWP INSERVICE TESTING OF PUMPS IN NUCLEAR POWER PLANTS The Inservice Testing Program Plan for pumps is found in NMPC's Controlled Document No. NMP2-IST-005.
| |
| 1.1.1.4,8 SUBSECTION IWVINSERVICE TESTING OF VALVES IN NUCLEAR POWER PLANTS The Inservice Testing Program Plan for valves is found in NMPC's Controlled Document No. NMP2-IST-005.
| |
| 1.1.1.5 SUBARTICLE F-2500, DETAILEDCONTENTS This subarticle addresses six (6) items:
| |
| 1.1.1.5.1 DRAWINGS SHOWING COMPONENTS TO BE EXAMINED 1
| |
| The components to be examined are depicted and labeled with their associated examination identifiers on two sets of drawings that are controlled in accordance with the procedures governing NMPC's Controlled Document System (CDS).
| |
| They represent the as-built condition of the plant and are updated as NIS-2 Forms are signed, which document repairs or replacements (includes modifications) to the physical plant.
| |
| A full set of these drawings was delivered to the NRC with the Second Ten Year Interval Program Plan submittal of July 31, 1998.
| |
| 1.1.1.5.2
| |
| ~ ~ ~ SPECIFIC EXEMPTIONS APPLIED TO EACH SYSTEM NMP2 has reported this information in Section 4 of this Second Ten- Year Interval Inservice Inspection Program Plan.
| |
| NMP2-ISI406 Rev. i Section i Page 14 or 16
| |
| | |
| 1.1.1.5.3 LINE LISTS FOR EACH SYSTEM This nonmandatory recommendation did not exist in the Code of record for the first interval. As a result, NMPC did not provide line lists for each system in the First Ten-Year Inservice Inspection Program Plan. Therefore, NMPC has decided to again exclude such line lists in this, The Second Ten- Year Inservice Inspection Program Plan. However; Appendix G contains the following relevant information, line number, system identifier, Code Classification, pipe size, and material description.
| |
| 1.1.1.5.4 TABLES THAT PROVIDE DETAILS OF EXAMINATIONS This information is contained in Appendices G & H of this Second Ten- Year Interval Inservice Inspection Program Plan.
| |
| 1.1.1.5.5 LIST OF CALIBRATIONBLOCKS This information is contained in Section 9 of the Second Ten- Year Interval Inservice Inspection Program Plan.
| |
| 1.1.1.5,6 LIST OF EXAMINATIONAND TEST PROCEDURES NDE Procedures applicable to this Second Ten- Year Interval Inservice Inspection Program Plan are contained in Section 8 of this document.
| |
| 1.1.2 ARTICLE F-3000; SUBSTITUTE EXAMINATIONSOR TESTS Section 7 of the Second Ten- Year Interval Inservice Inspection Program Plan addresses substitute examinations in the form of Relief Requests.
| |
| 1.1.3 APPENDIX F- SUPPLEMENTS There are four supplements listed in this Appendix. Supplement l & 2 are applicable to this program plan.
| |
| 1.1.3.1 SUPPLEMENT 1 -CONTENTS OF IWB, IWC, IWD, IWE, AND IWLTABLES, SUPPLEMENT 2 -CONTENTS OF IWF TABLES The following attributes are applicable to IWB, IWC, IWD and IWF Tables only. As previously stated the IWE/IWL Program Plans are currently under development and will be addressed in a separate document.
| |
| 1,1.3.1.1 IDENTIFICATIONOF SYSTEMS IN SYSTEM-BY-SYSTEM ORDER The referenced system-by-system format is contained in Appendices G & H of this Second Ten-Year Interval Inservice Inspection Program Plan.
| |
| 1.1.3:1.2 CODE CLASSIFICATION NMP2 has previously reported this information in the cLAss field of Appendix G of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten-Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
| |
| 1.1.3.1.3 EXAMINATIONCATEGORY AND ITEM NUMBER NMP2 has previously reported this information in the cATGRY and ITEM ¹ fields of Appendices G & H of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten-Year NMP2-ISI406 Rev. I Section I Page 15 of 16
| |
| | |
| IJ lnservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
| |
| 1.1.3.1.4 INDIVIDUALCOMPONENTS AND WELDS SELECTED FOR EXAMINATIONSOR TESTS NMP2 has previously reported this information in the ExAMINATIQNIDENTIFIER field of Appendices G & H of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G and new Appendix H of this Second Ten- Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
| |
| 1.1.3.
| |
| | |
| ==1.5 REFERENCES==
| |
| TO DRAWINGS LOCATINGWELDS AND COMPONENTS NMP2 has previously reported this information in the coMPoNENT DRAwlNG field of Appendix G of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten-Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
| |
| 1.1.3.1,6 TEST OR EXAMINATIONMETHODS NMP2 has previously reported this information in the Ex1, Ex2, Ex3 field of Appendix G of the First Ten- Year Inservice Inspection Program Plan and continues to do so in'the analogous Appendix G of this Second Ten- Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
| |
| 1.1.3.1.7 CALIBRATIONBLOCKS NMP2 has previously reported this information in the UT cAUBRATIN BLK field of Appendix G of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten-Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix. h 1,1.3.
| |
| | |
| ==1.8 REFERENCES==
| |
| TO PROCEDURES USED NMP2 has previously reported this information in the NDE RocEDuRE field of Appendix G of the First Ten- Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten-Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
| |
| 1.1,3.1.9 EXAMINATIONOR TEST SCHEDULES NMP2 has previously reported this information in the PERIDD1,2,3 field of Appendix G of the First Ten- Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten- Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
| |
| 1.1.3.1.10 REFERENCES TO SECTION XI REQUIREMENTS THAT ARE NOT BEING SATISFIED, AND IDENTIFICATIONOF SUBSTITUTE EXAMINATIONSOR TESTS ll NMP2 has previously reported this information in the REL REQ ¹ field of Appendix G of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten- Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
| |
| NMP2.ISI406 Rev. l Section l Page l6of 16
| |
| | |
| 2.0 ASME BOILER AND PRESSURE VESSEL CODE REQUIREMENTS The 1989 Edition (with no addenda) of the ASME Boiler and Pressure Vessel Code, Section XI was utilized to determine the examination requirements for this Second Ten Year Interval Inservice Inspection Program Plan.
| |
| However, the requirements of the Code have been modified as noted below by incorporating the following ASME Section XI Code Cases:
| |
| N-416-1 Alternative Pressure Test Requirement for 8'elded Repairs or Installation ofReplacement Items by 8'elding, Class I, 2, and 3 N-460 Alternarive Examinarion Coverage for Class I and Class 2 8'elds N-461 Alternative Rules for Piping Calibranon Block Thickness N-491-1 Alternative Rules for Examinarion ofClass l,2,3 and MC Component Supports ofLight 8'ater Cooled Power Plants, Section XT, Division I, N-496 Helical-Coil Threaded Inserts N-498-1 Alternative Rules for IO-Year Hydrostatic Pressure Testing for Class I and 2 Systems N-504 Alternative Rules for Repair ofClass I, 2, and 3 Austenitic Stainless Steel Piping N-504-1 Alternan've Rules for Repair of Class l, 2, and 3 Austenitic Stainless Steel Piping N-509 Alternarive Rules for the Selecnon and Examination of Class l. 2, and 3 Integrally fVelded Attachments. Section Xl, Division l N-524 Alternate Examination Requirements for Longitudinal Welds in Class 1 & 2 Piping This second interval is determined by the number of calendar years following the date of initial commercial operation. Unless altered, as described below, it shall run &om April 5, 1998 through April 4, 2008. The following historical information has been considered in the development of this Program Plan:
| |
| ~ Issuance of Construction Permit June 24, 1974
| |
| ~ Issuance of Low Power Operating License (NPF-54)
| |
| - = October 31, 1986
| |
| ~ Issuance of Full Power Operating License (NPF-69) = July 2, 1987
| |
| ~ Commercial Operation Date April 4, 1988
| |
| ~ First Ten- Year Interval Begins April 5, 1988
| |
| ~ First Ten- Year Interval Ends April 4, 1998 Inspection Progra'm B has been used as described by Section XI, subsubarticles IWB-2400. This interval, being the second 10-year inspection interval, may be decreased or extended by as much as one year to coincide with a plant outage. It may also be extended to compensate for an extended outage (i.e., > 6 months.) The inspection interval during which the outage occurred may be extended for a length of time equivalent to the outage, and the original pattern ofintervals extended accordingly for successive intervals. NMPC may elect, for certain components, to meet supplemental requirements, as set forth in the editions and addenda of the Code, which become effective subsequent to the 1989 Edition with no Addenda. Where utilized, they are referenced in this document and the use of proposed alternatives are documented on Relief Requests per Section 7 of this Program Plan.
| |
| 2.1 SECTION XI OF THE ASME BOILER AND PRESSURE VESSEL CODE The 1983 Edition with Summer of 1983 Addenda of Section XI of the ASME B&PV Code was used to develop the First 10-Year Interval ISI Program Plan. The 1989 Edition of ASME Section XI is utilized for the development of this Second Ten Year Interval ISI Program Plan.
| |
| 2.1.1 AS ME CODE CLASS 1 PIPE WELDS Code Class 1 pip'e welds requiring examination during the second interval include:
| |
| NMP2-ISI406 Rev.1 Section 2 Page1of3
| |
| | |
| ~ terminal ends in pipe or branch runs connected to vessels;
| |
| ~ weldments whose stress levels exceed.
| |
| either:
| |
| a) a primary, plus secondary stress intensity range of 2.4S or, b) a cumulative usage factor Uof 0.4;
| |
| ~ dissimilar metal welds between combinations of:
| |
| a) carbon or low alloy steels to low alloy steels b) carbon or low alloy steels to high nickel alloys c) high alloy steels to high nickel alloys
| |
| ~ commitments to NUREG-0313 (GL88-01) for non-resistant austenitic materials;
| |
| ~ commitments to the NUREG-0800 Branch Technical Position MEB 3-1 for the break exclusion region;
| |
| ~ additional welds as required to meet the 25% Code requirement for non-exempt welds per interval.
| |
| A comparison of the 1989 Edition of ASME XI to the originally utilized 1983 Edition with Summer 1983 Addenda required no alteration to the original weld selection from the First Interval.
| |
| 2,1.2 ASME CODE CLASS 2 PIPE WELDS
| |
| ~ the Code required minimum of 28 austenitic stainless steel welds;
| |
| ~ 7.5% of all carbon and low alloy steel welds not exempted by subsubarticle IWC-1220;
| |
| ~ commitments to the NUREG-0800 Branch Technical Position MEB 3-1 for the break exclusion region.
| |
| A comparison of the 1989 Edition of ASME XI to the originally utilized 1983 Edition with Summer 1983 Addenda required no alteration to the original weld selection &om the First Interval.
| |
| 2.1.3
| |
| ~ ~ ASME CODE CLASS 3 INTEGRALATTACHMENTSAND PRESSURE RETAINING BOUNDARY These requirements for pressure testing are addressed in a separate program plan document, the NMP2 Pressure Testing Program Plan, Document No. NMP2-PT-008.
| |
| Subsection IWD of the Code requires a VT-3 examination of integral attachments to the pressure boundary. This portion includes the weld to the pressure boundary. This plan identifies and controls the Class 3 integral attachments, that are subject to VT-3 examination.
| |
| ASME Section XI Code Case N-509 (Alternative Rules for the Selection and Examination of Class 1, 2 and 3 Integrally Welded Attachments of Light Water Cooled Power Plants, Section XI, Division 1) has been implemented per the additional requirements documented in RG1. 147 Rev. 12 for determining the scope of examinations to be performed on Class 3 Integral Attachments that are contained in this Program Plan.
| |
| 2.1A DEFERRED INCLUSION OF SUBSECTIONS IWE AND IWL The Inspection Program Plans for IWE (Class MC) and IWL (Class CC) Components are under development. These programs will be completed and implemented prior to September, 2001.
| |
| Repair and replacement activities within the scope of Subsections IWE and IWL of the Code conducted after September 9, 1996, are conducted in accordance with these subsections.
| |
| NMP2-ISI406 Rev.1 Section 2 Page 2 of 3
| |
| | |
| 2.1.5 SUBSECTION IWF Component supports, per IWF-1100, are considered to be "...those metal supports designed to transmit loads &om the component and piping to the load-carrying building or structure. 'This shall include the attachment portion of intervening element(s) to pressure-retaining components." NMP2 utilizes this definition to identify component supports.
| |
| ASME Section XI Code Case N-491-1 (Alternative Rules for Examination of Class 1, 2,3 and MC Component Supports of Light Water Cooled Power Plants, Section XI, Division 1) has been implemented to determine the scope of examinations to be performed on Class 1, 2 and 3 supports.
| |
| 2.1.5.1 INSPECTION PURSUANT TO THE CODE OF RECORD Visual (VT-3) examinations of all supports selected for examination (per Code Case N-491-1) shall be conducted in accordance with the requirements of the 1989 Edition of ASME Section XI.
| |
| Testing of all snubbers shall be performed per the requirements of NMP2 Technical Specifications 3/4.7.5.
| |
| Visual (VT-3) examination of the attachment portions of the snubbers shall not be performed as part of this programs requirements as it represents essentially a duplication of the Tech Spec visual examinations. The Tech Spec visual examinations are also completed on a more &equent basis than the Section XI required visual exam. Reference Relief Request ¹ RR-IWF-4.
| |
| Qualified VT-3 examiners shall be utilized to perform the VT-3 examinations and the results will be reported in conjuntion with the Tech Spec testing activities. The ISI Program Plan willcontinue to track all ASME Class 1, 2 and 3 snubbers in Appendix I and refer to the Tech Spec exam requirements.
| |
| 2.1.6 ASME SECTION XI CODE CASES The use of Code Cases as alternatives to those rules contained in the Code of record for this second Ten-Year Plan is permitted ifthey have been endorsed for use by the regulators, either per Regulatory Guide 1.147, or in a separate and unique correspondence with NMPC. ASME XI Code Cases applicable to this plan are listed in paragraph 2.0 above. Code Cases N-416-1 and N-498-1,have been specifically approved for use by NMPC via NRC letters dated October 18, 1994 and January 13, 1995, respectively.
| |
| NMP2-ISI406 Rev.1 Section 2 Page 3 of 3
| |
| | |
| 3.0 AUGMENTED EXAMINATIONS For purposes of this Program Plan, augm ented examinations are defined as those scheduled examinations which are outside the scope of the core mspections provided for in the 1989 Edition with no Addenda of Section XI of the ASME Boiler & Pressure Vessel Code, as altered by NMPC invoked, regulator approved Code Cases as well as NMPC requested, regulator approved, relief from the requirements of that Code, all as invoked and sanctioned by 10 CFR 50.55a. These augmented examinations are the result of:
| |
| ~ Commitments made to the regulators in the FSAR and as updated in the UFSAR
| |
| ~ Commitments made to regulatory guidance documents (Reg. Guides)
| |
| ~ Commitments made to the regulators in responses to NRC Generic Letters
| |
| ~ NSSS supplier recommendations (RICSILs and SILs);
| |
| ~ Commitments made to NRC via BWR Vessel & Internals Project
| |
| ~ Voluntary actions in response to INPO recommendations
| |
| ~ Commitments made to USNRC Inspection d'c Enforcement Bulletins
| |
| ~ Voluntary actions taken pursuant to knowledge gained from NRC Information Notices.
| |
| 3.1 COMMITMENTSMADETO THE REGULATORS IN THE FSAR AND AS UPDATED IN THE USAR 3.1.1 BREAK EXCLUSION REGIONS Pipe rupture has been addressed in the design for NMP2 by postulating ruptures and their effects. Empirical evidence suggests that ruptures generally occur at high stress and fatigue locations, such as at the terminal ends of a piping system at its connection to the nozzles'of a component. As such, the postulation of pipe rupture events at such locations is intended to comply with the requirements of General Design Criteria 4 of Appendix A to 10 CFR 50 for the design of nuclear power plant structures and components.
| |
| USNRC Branch Technical Position MEB 3-1 (BTP MEB 3-1) of the Standard Review Plan Section 3.6.2 of NUREG-0800, has been utilized by NMP2 as noted in USAR Section 3.6, entitled, Protection Against Dynamic Effects Associated II'ith The Postulated Rupture ofPiping.
| |
| In addition to requiring the postulation of pipe ruptures, BTP MEB 3-1 also allows for the non-postulation of ruptures in those portions of piping from the containment wall to and including the inboard or outboard isolation valves, provided they meet several requirements, one of which is that a 100% volumetric inservice examination of all (circumferential and longitudinal) pipe welds within the break exclusion region be conducted during each inspection interval.
| |
| NMP2 has utilized (and expanded the boundaries of) that allowance, as reflected in the USAR (Revisions 7 & 9) paragraph 3.6A.2.1.5, entitled Postulated Pipe Break Locations, wherein it is currently stated, "Breaks are not postulated in the portions of highwnergy piping between the containment isolation valves, outside and inside containment. Breaks are not postulated in the portions of high-energy piping between the isolation valve and the first restraint or groups of restraints designed to protect these portions of piping.
| |
| Containment isolation valve pipe whip restraints are capable of resisting bending and torsional moments produced by a postulated piping failure outboard of the first restraint or group of restraints beyond the containment isolation valves.
| |
| Restraints are designed to withstand the loadings resulting from a postulated piping failure, so that neither the isolation valve operability nor the leak-tight integrity of the associated containment penetration will be impaired. These portions of piping are designed to meet the requirements of ASME Section III, Subarticle NE-1120, and the following additional design requirements, which are in conformance with Revision 1 (July 1981) of SRP 3.6.2 and BTP MEB 3-1, the documents applicable at the time the analysis was performed: ...
| |
| NMP2-ISI406 Rev.1 Section 3 Pege1of13
| |
| | |
| I For these portions of high-energy fluid system piping, preservice and subsequent in-service examinations are performed in accordance with the requirements specified in ASME Section XL During each inspection interval, as defined in IWA-2400, an ISI is performed on all non-exempt ASME Code Section XI cir-cumferential and longitudinal welds within the break exclusion region for high-energy fluid system piping.
| |
| These inspections consist of augmented volumetric examinations (nominal pipe size greater than or equal to 4 inches) and augmented surface examinations (nominal pipe size less'than 4 inches) such that 100 percent of the previously defined welds are inspected at each interval. The break exclusion zone consists of those portions of high-energy fluid system piping between the moment limiting restraint(s) outside the outboard containment isolation valve and the moment limiting restraint(s) beyond the inboard containment isolation valve. The choice of the restraint(s) that define the limits of the break exclusion zone is based upon those restraints which are necessary to ensure the operability of the primary containment isolation valves."
| |
| These break exclusion regions are found in four (4) systems:
| |
| ~ Main Steam (MSS)
| |
| ~ Reactor Core Isolation Cooling (steam supply) (ICS)
| |
| ~ Feedwater (FWS)
| |
| ~ Reactor Water Clean-up (WCS)
| |
| NMPC has elected to perform both volumetric and surface examinations so that the circumferential and welds found in the break exclusion regions may be included in the 25% sample to satisfy Category B-J requirements.
| |
| The USAR commitment for examining break exclusion region welds results in the examination of four (4) Class 3 (2wcs4946AI022; 2wcs49-14'; 2wcs49-14RN07; 2wcs49-14Av009) and two (2) Class 4 (2Fws47-13AI002 aild 2RNSA7-19~002) welds.
| |
| 3.1.2 NUREG-0313 Rev. 2 (as required by Generic Letter 88-01 & GL88-01 Supp 1, "Intergranular Stress Corrosion Cracking in BWR Austenitic Stainless Steel Piping.")
| |
| Generic Letter 88-01 applies to all BWR piping made of austenitic stainless steel that is four (4) inches or larger in nominal diameter and contains reactor coolant at a temperature above 200'ahrenheit during power operation, regardless of Code classification. It also applies to reactor vessel attachments and appurtenances such as jet instrumentation penetration assemblies and head spray and vent components. The Generic Letter divides these welds into seven (7) categories, lettered A through G, of which only four (4) are currently applicable to NMP2: A, D, E, and F. A summary of these categories, as well as their current applicability to NMP2 may be found in Section 6 of this plan under the IGSCC Field Description. Examinations performed under the scope of GL88-01 (and this Program Plan) are in compliance with the applicable Edition and Addenda of the ASME Code, Section XI, as specified in paragraph (g), Inservice Inspection Requirements of 10 CFR 50.55a, Codes and Standards, as stipulated in Generic Letter 88-01. As noted in Amendment No. 8 to NMP2 Technical Specifications, issued June 14, 1989, paragraph 4.0.5f., Niagara Mohawk is committed to, and has incorporated, the examinations defined in Generic Letter 88-01 into this document:
| |
| Materials NUREG-0313, Revision 2, as implemented by Generic Letter 88-01, is the current version of this NUREG, and is addressed in the NMP2 USAR Section 5.2.3.4.1. This NUREG addresses intergranular stress corrosion cracking of stainless steel piping material at BWR's. The following excerpts &om this USAR section are evidence of NMP2 com-pliance.
| |
| ~ Since these materials have all been demonstrated to be highly resistant to oxygen-assisted stress corrosion in the as-installed condition, the reactor coolant pressure boundaiy is in complete compliance with NUREG-0313, Rev. 2.
| |
| ~ In addition to the RCPB, the balance-of plant ASMEIIIClass I, 2, and 3 piping and components 4-inch nominal pipe diameter and larger comply wi th NUREG-0313, Revision 2, except as noted below:
| |
| NMP2-ISI-006 Rev.1 Section 3 Page 2 of 13
| |
| | |
| pd
| |
| (. Where the normal operating temperature is 200 7 or less. the line has not necessarily been revised to comply with NUREG-03l3, Rev. 2. Test data and analysis ofactualin-service failures demonstrate that there is an insignificant risk ofIGSCC in systems which normally operate at temperatures of 200 'F or less in normal BWR environments.
| |
| : 2. Where the normal operaring temperature exceeds 200 'Ffor an extremely short period oftime Pess than 1% ofthe total design life ofthe plant), the line has not necessarily been revised to comply with NUREG-0313, Revision 2. In these cases, the total length oftime in which these lines are exposed to temperatures greater than 200 'is insignificant with respect to the service conditions that cover IGSCC ...
| |
| Examination Method NMPC considers the intersecting longitudinal seam welds of those circumferential welds which are not resistant, to be themselves resistant, and excludes them from the augmented examination. For example, ifa non-selected, Code Examination Category B-J circumferential weld is being ultrasonically examined, solely pursuant to Generic Letter 88-01, then, not only will that circumferential weld not receive the Code required surface examination, but both the surface and volumetric examinations normally performed on the appropriate length of the associated intersecting longitudinal seam weld would likewise not be performed. Furthermore, NMPC understands Generic Letter 88-01 to require augmented volumetric examinations only. Generic Letter 88-01 categoiy A through G weldments not coincidentally selected per Code requirements receive volumetric (UT) examination only no surface examination is performed.
| |
| The NDE procedures used for all stainless steel components at NMP2 include special techniques and trained personnel for detection of IGSCC.
| |
| Schedule Augmented piping examinations required by Generic Letter 88-01 are identified in the examination tables of Appendix G by IGSCC categoiy.
| |
| ~ ~Core o A - Wetds of resistant material, ICrSCC Category A, are examined according to an extent and t'requency in excess of that specified in applicable provisions of Section XI of the ASME Boiler and Pressure Vessel Code. This also exceeds the requirement reflected in Table 1, Summary ofInspection Schedules for BWR Piping Weldments, of the Generic Letter. That table identifies the extent and schedule of Category A welds to be (the same) "25%
| |
| (sample) every 10 years." There are currently 113 Category A weldments at NMP2.
| |
| It should be noted that the Category A portion of the NMP2 commitment to NRC is contained in a letter dated November 20, 1990 (NMP2L-1263.) That letter contains a list of welds categorized as A pursuant to the Generic Letter. Further, 24 of those Category A welds were arbitrarily annotated to reflect the 25% sample required by Table 1 referenced above. However, the arbitrary nature of that annotation failed to address the overlap created by the implementation of the mandatory selection criteria described by categorization in accordance with Category B-J of that Code. As a result, although NMP2 examined more than the minimum number of Category A welds in the first interval, they were not precisely the ones annotated in NMP2L-1263. Some of the originally selected welds were exchanged for other Category A welds, and others were not. Since the total of ASME XI mandatory examinations was always equal to or greater than the 25% of population required by the NMP2 commitment to the Generic Letter, the total number of first interval examinations of Category A welds exceeded the minimum 25% of population required. The Second Ten Year Program Plan took into consideration those welds examined in the First Interval and of those chose 34 (30%) for examination in the Second Interval. This exceeds the required minimum of GL-88-01.
| |
| ~ ~Cate o D There are curre-ntly 47 Category D weldments at NMP2. All of these welds are specifically identified in the Apendix G examination Tables with the &equency of examination clearly specified.
| |
| 18 welds are. located in the WCS System, all are examined every even numbered refueling outage. (RFO-6,8,10) 1 weld is in the RCS System and is examined every odd numbered refuelinf outage (RFO- 7,9,11)
| |
| NMP2-IS I406 Rev.1 Section 3 Page3of13
| |
| | |
| 29 welds are associated with the reactor vessel nozzle to safe ends and safe end extension welds. These examinations are performed approximately one half each refueling outage during the Second Interval such that all are examined every two refueling outages.
| |
| ~ ~Care o g T-his GL88 01 Category was not utilized in the First Ten-Year Program Plan prior to February 12, 1996. At that time, the High Pressure Core Spray nozzle safe-end to safe-end extension weld (2RPA(c32) was upgr'aded &om a GL88-01 Category F weldment pursuant to NRC approval contained in a letter of that date(2RP v-KG32 that was re-categorized to Category E and approved by the NRC on Feb. 12,1998.) Weld 2RPv-Kc32 was examined during RFO-6 with no detectable growth indicated from the previous examination.
| |
| ~ Cate o F- Cycle-6(May5,1998- July5,1998)
| |
| Examinations conducted on GL-88-01 Cat. D weld 2RPvm2o revealed unacceptable indications in excess of ASME Section XI acceptance criteria. DER 2-98-1713 was generated to document this deficiency. Fracture Mechanics Analysis was performed (File 8 NMPC-12Q-401) and approval for operation for one fuel cycle was granted by an NRC SER dated 6/25/98. Expanded sample requirements of GL-88-01 were implemented and the three remaining Feedwater Nozzle to Safe-end welds (not scheduled for examination in RFO-6) were examined by ultrasonic techniques, all with acceptable results. Weld 2RPY-K820 has been re-classified as Category F and is scheduled for examination every refueling outage.
| |
| Sample Expansion Cate o ASam leEx ansion Category A lends itself directly to sample expansion at NMP2. Ifone or more cracked welds are found by a sample inspection during a given Refueling Outage, an additional sample of Category A welds will be examined. Per the guidance contained in Generic Letter 88-01 the sample expansion shall be sized approximately equal to the original scope for that outage. The sample expansion will be determined based on size, system, location and operating environment most similar to the cracked weld. Ifany additional cracked welds are found in the expanded sample, all Category A weldments shall then be examined prior to a return to service of the unit.
| |
| Cate orv D Sam le Ex ansion GL 88-01 requested Category D welds to be 100% inspected every two refueling cycles, thus negating the need for sample expansion. However as written, GL 88-01 would have required sampleexpansion had~Cate o D wehh been examined on a sampling basis during each inspection with cracking identified during examination. With adequate justification, GL 88-01, Supplement 1 now provides for the sample expansion of Category D welds to be limited to the piping system where cracking is found. NMP2 has opted to examine approximately 50% of Category D (RPV Nozzle to safe-end and safe-end to safe-end extension welds) welds each cycle, and will use this sample expansion criteria should cracking be found.
| |
| All 18 welds in the WCS System and 1 weld in the RCS System are examined every other outage, therefore, based on the above definition there willbe no sainple expansion required for Category D welds in the WCS or RCS Systems in the event that cracking is found.
| |
| Cate o E&FSam leEx ansion Not applicable to NMP2 at this time as each of these categories are currently populated with one weld apiece. Sample expansion is therefore not required.
| |
| Reporting Requirements Ifany cracks are identified that do not meet the criteria for continued operation without evaluation given in ASME XI, USNRC approval of flaw evaluations and/or repairs in accordance with IWB-3640 and IWA-4130 is required before resumption of operation.
| |
| NMP2-ISI406 Rev.1 Section 3 Page 4of13
| |
| | |
| USNRC approval was sought and acquired for the aforementioned 2RPv4c$ 2 weld indication's acceptance-by-evaluation, prior to resumption of operation.
| |
| Despite the fact that the indications found in 2RPvwB04 alld 2RPv+B10 durlllg the RFOA inspection were not IGSCC, NMP2 sought and acquired the approval of NRC prior to the resumption of operation.
| |
| USNRC approval was sought and acquired for the Category D weld 2RPV-KB20 as identified above.
| |
| 3.1.3 NUREG-0619 This NUREG is covered in the FSAR as Licensing Issue 36. The subject is cracking of the feedwater nozzles and con-trol rod drive return lines at BWR's. However, neither of these are problems at NMP2 since:
| |
| ~ The feedwater nozzles have been redesigned by GE and a topical report issued covering this redesign has been accepted by NRC.
| |
| ~ The potential CRD return line problem has been solved at NMP2 by removing the CRD return line, thus elimi-nating temperature transients that caused cracking in other BWR facilities.
| |
| 3.2 REGULATORY GUIDES Regulatory Guides are issued by NRC to describe and make available to the public those methods of implementing specific parts of the Commission's regulations which are acceptable to the Regulatory StaK They are meant to provide guidance or delineate techniques used by the staK They are not substitutes for regulations, and compliance with them is not required by NRC. However, NMP2 understands that those implementation methods which differ substantially from the associated Regulatory Guide are subject to scrutiny by the Commission prior to acceptance by them. In such cases, those methods/solutions (di6'erent from those set out in the guides) are understood to be accept-able to the Commission ifthey provide a basis for the findings requisite to the continuance of NMP2's license by the Commission. NMP2 will always comply with the pre-approved methodology described in those Regulatory Guides which are applicable to this Program, or provide the appropriate basis for findings requisite to the continuance of our license.
| |
| Three Regulatory Guides have been determined to be applicable to NMP2 for purposes of this ISI Program Plan:
| |
| 3.2.1 REGULATORY GUIDE 1.26 This Regulatory Guide is titled, Quality Group Classificanons for Nuclear Piping and Components. Although the existing design ASME Class boundaries were used in development of this Program Plan, Regulatory Guide 1.26 was used as a reference document throughout the course of ISI Program Plan development. For example, although designed to Class 4 requirements, the Main Steam piping outboard of the containment isolation valves, up to but not including the stop valves, has been upgraded to Class 2 for ISI purposes. This upgrade is resultant to a commitment made by NMPC in the Final Safety Analysis Report.
| |
| 3.2.2 REGULATORY GUIDE 1.147 This Regulatory Guide is titled, ASMZ Code Case Applicability. It lists the ASME Section XI Code Cases which are accepted by NRC. Code cases listed in this Regulatory Guide, and which are applicable to NMP2, are tabulated in Section 2 of this plan.
| |
| 3.2.3 REGULATORY GUIDE 1.150 This Regulatory Guide is titled, UT ofRP V Welds During 1SI. It is addressed in NQAO-NDE Procedure NDEP 1.08
| |
| - Implementarion ofRegulatory Guide I. I50 for RPV Examinations.
| |
| L NMP2-ISI~ Rev.1 Section 3 Pege5of13
| |
| | |
| t NOTE: The requirements of this Reg. Guide have been modified based upon the utilization of General Electrics PDI enhanced inspection techniques for all Reactor Pressure Vessel Examinations.
| |
| 3.3 RECOMMENDATIONS OF THE NSSS SUPPLIER General Electric Nuclear Energy (GENE) implemented the Service Information Letter (SIL) program as a service to owners of GE BWRs in July of 1973. The purpose of the program is to promote plant performance improvements and to alert owners to conditions which can degrade plant performance. SILs usually convey specific recommenda-tions regarding GE BWR plant equipment or procedures. They also furnish information about unique operating conditions and experiences at GE BWRs. Because SILs only communicate GENEs recommendations, it is inappropriate for GENE to identify schedules for implementing those recommendations. Where no associated mandate from USNRC exists, implementation and scheduling are at the discretion of NMPC.
| |
| On April 1, 1986, GENE added Rapid Information Communication Services Information Letters (RICSILs) to the SIL program. The purpose of RICSILs is to communicate technical information concerning develo in situations which GENE believes may interest owners.
| |
| The following referenced documents are currently being implemented for this Second Ten Year Inservice Inspection Program Plan.
| |
| RICSIL-065 Jet Pum Beam Crackin This RICSIL is dated December 3, 1993 and was received by NMP2 shortly aAer entry into the fourth fuel cycle. In it, GENE provided an update to SIL-330 Supplement 2 which revealed that, "Ultrasonic testing (UT) procedures currently (i.e., 1993) in use do not address cracking in beam end locations, (and that) it is not possible currently to determine by in-vessel examinations whether installed beams are crack &ee and suitable for continued service." As a result, NMP2 implemented EDC 2M10802A at RFOQ to replace all 20 jet pump hold-down beam assemblies.
| |
| (This action also addressed concerns raised in USNRC Information Notice No. 93-101.) The inspection requirements of EDC 2M10802A supersede those of DER 2-93-2702 and SIL-330 Supp.2. They are:
| |
| ~ IVVIinspection of the as-left configuration of the beams and the keeper welds
| |
| ~ baseline (PSI) UT
| |
| ~ ISI UT examinations of the beam center sections aAer 10 years of hot reactor service (since these new beams have been installed, which precludes these specific bulleted examinations during the span of this first interval Plan)
| |
| ~ visual inspection at RFO-5 and RFO-6 of the sole jet pump beam retainer (¹16) that was bent instead of removed (as allowed by Option 2) and at each ISI (IVVI)of the jet pump beams thereafter.
| |
| SIL-330 Su . 2 GEBFR/6 Jet Pum InletMixer Eection This SIL is dated October 27, 1993, and was received by NMP2 during its third refueling outage. General Electric Nuclear Energy's (GENE) stated purpose for the promulgation of this SIL is to alert owners of GE BWRs with jet pumps, that a BWR/6 has recently been added to the list of two (2) BWR/3s that have experienced the loss of a jet pump inlet mixer due to IGSCC fomented beam failures. NMPC has evaluated this concern in Deviation/Event Report
| |
| ¹ 2-93-2702 which reveals that:
| |
| ~ crack initiation is not anticipated, on average, before October, 1996 (8.5 calendar years aAer commercial operation,)
| |
| ~ jet pumps are monitored daily for operability per Technical Specification 3.4.1.2,
| |
| ~ jet pump failure is more of a reliability/operability issue than a safety-related issue,
| |
| ~ root cause, and final assessment are yet to be determined/rendered,
| |
| ~ UT examinations are to be performed each RFO commencing with RFO-4.
| |
| SIL-409 Rev. I -Incore D Tube Cracks General Electric Nuclear Energy's (GENE) stated purpose for the promulgation of a first revision to this Services Informarion Letter is ".to provide new information and recommendations on the cracks found in Intermediate Range Monitor (IRM) and Source Range Monitor (SRM) dry tubes." NMPC has evaluated this concern in Deviation/Event NMP2-ISI~ Rev.1 Section 3 Pege6of13 f
| |
| | |
| ¹ Report C-93-0105, which reveals that GENE's original notification to the industry appeared in Revision 0 of SIL-409, which had been issued 6-19-84. The DER disposition is all-inclusive, as Rev. 1 of the SIL supersedes the original issue, and NMP2 had already taken action on Rev. 0.
| |
| All twelve SRM/IRM's were examined during RFO-6 in May'of 1998, during the IVVIexaminations. Allwere acceptable with the exception of dry tubes designated as 16-21 and 32-37 that were rejected and documented on DER 2-98-1584. These two are required to be inspected in RFO-7and are so scheduled in Appendix G.
| |
| SIL-420-Ins ecrion o JetPum Sensin Lines This SIL is dated March 28, 1985, and was received by NMP2 three (3) years prior to commercial operation. It was addressed three (3) years later, on the first day of the First Ten- Year Interval, April 5, 1988, by Internal Memorandum NMP-17671.
| |
| The SIL relates the results of visual inspections conducted in 1982 and 1984 at two (2} separate BWR/4s, where it was noted that the low pressure sensing line was fractured in the vertical section and separated from its middle support bracket at the attaching weld. GENE recommended a visual inspection suQicient to determine "that the weld between the support brackets and the vertical run on the sensing line is intact."
| |
| NMPC implemented no special exaininations to address this concern. Rather, credit was taken for the mandatory ASME XI Category B-N-1 VT-3 examinations anticipated to be performed " at the first refueling outage and subsequent refueling outages at approximately three year intervals" per coritractor (Nuclear Engineering Services) procedure number NES 83A2681. It specifically referenced the subject lines in its Section 1.2 as Item 21, "Jet Pump Sensing Lines." However, that procedure was not used to perform the B-N-1 VT-3s performed during the jirst interval. Instead, B-N-1 examinations were performed by GENE personnel to GENE procedures, the latest being at RFOA, to GE-VT-203, as documented on pages 9, and 11 through 15, inclusive, of examination report no. 2-2.01-95-0239.
| |
| SIL-455 Rev. I Su . I - ISI o Addirional Allo l82 0'eldments This SIL recommends additional ISI examination of safe end-to-nozzle weldments made with alloy 182, The purpose of these examinations is to assure that alloy 182 butter cracking has not occurred and extended into the low alloy nozzle material. These examinations can be performed during inservice inspection. The recommendations of SIL-455 Rev. I, Supp. 1 are being implemented as part of a Niagara Mohawk internal commitment and are not considered an NRC requirement.
| |
| SILP55 A//o 182 Ex anded Area Examinations RPV NOZZLES WELD ID¹ N1A, B (2) RPV-KB01, 02 N2A,B,G,D,E,F,G,H,J,K (10) RPV-KB03, 04, 05, 06, 07, 08, 09, 10, 11, 12 N4A, B, C, D, E, F (6) RPV-KB17, 18, 19, 20, 21, 22 N5 (1) RPV-KB23 N6A, B, C (3) RPV-KB24, 25, 26 N9A, B (2) RPV-KB29, 30 (1) RPV-KB32 SIL-462 Su . 3 - Radial Crackin in Creviced Inconel 600 Access Hole Cover Weldments This supplement is dated June 8, 1992. NMPC has evaluated this concern in Deviation/Event Report ¹ 2-92-2684, which reveals that this supplement does not discuss any adverse conditions found that are associated with a creviced 316L configuration, nor does it give any revised guidelines for the 316L material over those previously addressed in supplement 1. The commitment found in internal correspondence NMP-72187 requires a visual inspection (IVVI)
| |
| NMP2-ISI406 Rev.1 Section 3 Page7of13
| |
| | |
| will be performed on both cover plates once per 10-year inspection interval. The third period contained RFOA and RFO-5. An IVVIwas performed during RFO-4. That examination detected no cracking.
| |
| SIL-474 Steam D er Drain Channel Crackin This SIL is dated October 26, 1988, and was received by NMP2 during the mid-cycle outage (which had been conducted prior to RFO-I.) General Electric Nuclear Energy's (GENE) stated purpose for the promulgation of this SIL is to inform BWR owners of the significance of cracks which had been discovered at several BWR-4, 5, and 6 plants. Those cracks were in the welds that attached the drain channels to the steam dtyer shrt. Although the steam dryer is not a safety related component, and drain channel crachng is not a safety concern, GENE recommends further inspection and repair in the event such cracks are discovered at NMP2. No inspection was performed at the mid-cycle outage.
| |
| NMP2 examined all four steam dryer drain channels via remote, underwater, visual examination (RUVE) in October of 1990, during RFO-1. Drain channels I, 2 and 3 displayed no relevant indications and, although the weld that attaches drain channel ¹4 to the steam dryer skirt likewise displayed no relevant indications, the base metal of
| |
| . the skirt, from the toe of the weld outward, did. This heat affected zone at the left side vertical weld was found to contain 27 crack-like indications, ranging from.125" to 1.1" in length. The condition was found to be acceptable for continued use via NCR¹ 2-90-0054, which also required an additional remote, underwater, visual examination at RF0-2.
| |
| NMP2 re-examined drain channel ¹4 via RUVE in April of 1992, during RFO-2. The indications in the base metal were found to have grown, now ranging in size Irom 0.25" to 1.5 inches. GENE characterized this 36% crack growth as "small," with, "no fundamental change in the observed indications." The condition continued to be accept-able for use via DER 2-92-1381, which also required yet another RUVE at RFO-3 the largest indication to be mea-sured for growth, with a remote visual on the inside of the skirt (to determine if the indications continue behind the drain channel) in the event crack growth was detected, i.e: greater than 36%.
| |
| NMP2 reexamined drain channel ¹4 via RUVE in October of 1993, during RFO-3. The longest indication was verified to be 1.6" in length. Consistent with the initial evaluation of growth, this 6% increase was considered incon-sequential. Therefore, no inspection was performed on the inside of the skirt. The condition continued to be acceptable for use via Revision ¹3 to DER 2-92-1381, which required yet another RUVE this one at RFO-6, and intended to be coincidental with the first IVVIof the second interval, as mandated by ASME XI Code Category B-N-1.
| |
| NMP2 re-examined drain channel ¹4 via RUVE in May of 1995, during RFO-4. The longest indication was verified to be 1.8" in length. This represents growth of 0.2" in a span of one cycle (approximately 1.5 years) for a calculated growth rate of 0. 13 "/year, or '6 the allowable growth rate of 0.4"/year.
| |
| Acceptance Criteria.
| |
| Ifinspection results indicate crack growth to be limited to 0.4"/year, then further inspections shall be performed at every fourth RFO (so as to coincide with the IVVIexaminations.) t Ifinspection results indicate crack growth to exceed 0.4 "/year, or additional cracks are discovered, they shall be reported (to the design engineering department) via the governing procedure.
| |
| SIL-551 -Jet Pum Riser Brace Crackin This SIL is dated February 26, 1993, and was received by NMP2 on March 15, 1993, during its third operating cycle.
| |
| This SIL is safety related because jet pump integrity is required to maintain water level in the core following a design basis accident. It is important to note that although the title implies a concern regarding cracking of the brace, the text of the SIL relates a concern regarding'cracking on the weld that attaches the brace leaf to reactor vessel pads.
| |
| This SIL is addressed by NMP2 on April 1, 1993 via DER 2-93-0824, which concluded that the jet pump riser welds at NMP2 were (coincidental with ASME XI mandates) already being examined to the extent (VT-1 as opposed to VT-3) and frequency (every refueling outage, as opposed to every other refueling outage) recommended by this SIL. This conclusion is incorrect. The ASME XI criteria actually stipulates; that the less stringent VT-3 type visual examination be performed at a similar &equency (i.e., 100% every other refueling outage) on the braces, and that the more stringent (i.e., the appropriate visual examination) VT- I type visual examination be performed at a lesser frequency (i.e., 100% every 10 years) on the welds connecting the braces to the pads on the interior of the vessel wall.
| |
| Specifically, NMP2 does not perform a VT-1 type visual examination of the jet pump riser brace welds at a frequency of 50% every refueling outage, as recommended by this SIL. Rather, NMP2 routinely performs a VT-1 examination NMP2-ISI406 Rev.1 Section 3 Page Bof13
| |
| | |
| of acce sible jet pump riser bracket welds once evety ten years in accordance with ASME XI Examination Category B-N-2, Item No. B13.20, entitled "Interior Attachments Within Beltline Region," (JETNUMPs-233) and a VT-3 examination of accessible areas of the vessel interior (read jet pump brackets, i.e., braces) every even-numbered refueling outage in accordance with ASME XI Examination Category B-N-1, Item No. B13.10, entitled "Vessel Interior" (JET+UMr -291.) NMP2 will continue this alternate examination type and &equency until the disposition to DER 2-93-0824 is superseded.
| |
| SIL-554 -To Guide Crackin The top guide in a GE BRW maintains alignment and spacing at the top of fuel assemblies. (i.e., the top guide is part of the core support structure.) NMP2 routinely examines the top guide pursuant to ASME XI Examination Category B-N-2, Item No. B13.40, entitled "Core Support Structure." The top guide examination is specifically identified as coRENTRUGT-1 in Appendix G of this document. It is limited to those areas "made accessible for examination by removal of components during normal refueling outages.
| |
| SIL-571 - Instrument Nozzle Sa e Fnd Crack This SIL is dated September 15, 1993, and was received by NMP2 during its third refueling outage. General Electric Nuclear Energy's (GENE) stated purpose for the promulgation of this SIL is to locate any cracking in water-level-instrument-nozzle safe ends, so that they may be repaired on a timely basis. Although there is no safety concern associated with a failure of these safe ends, and a leak in one is unlikely to damage any drywell equipment, not performing the recommended actions only increases the length of time that a crack may go undetected, and commensurately, the chance that a leaking crack may be discovered at an inopportune time at which to perform mandatory repairs. NMPC has evaluated this concern in Deviation/Event Report ¹ 2-93-2388 which reveals that:
| |
| ~ NMP2 possesses eleven (11) such nozzles:
| |
| (1) Nozzle N11 1.953" dia., 0.251" thick, SA-336 Class F8 austenitic stainless steel, (4) Nozzles N12 2.406" dia., 0.485" thick, SA-508 Class 1 carbon steel, (2) Nozzles N13 - 2.406" dia., 0.485" thick, SA-508 Class 1 carbon steel, and, (4) Nozzles N14 2.406" dia., 0.360" thick, SA-508 Class I carbon steel.
| |
| ~ Only one (1) nozzle (N11) utilizes a stainless steel safe end.
| |
| ~ That nozzle contains a weld which is included in this Plan: 2N vc834-a Category B-F nozzle-to-safe-end,
| |
| ¹ dissimilar metal weld, (ref. Dwg. ISI-COM-035.)
| |
| ~ Only that weld was scheduled for examination (via the liquid penetrant method in the third Period of each Interval)-the entire length of the safe end was not.
| |
| Accordingly, this Program Plan was revised at RFO-3 to include the ultrasonic examination of the entire length of the stainless steel nozzle safe end base material at nozzle N11 that is accessible by that method, dependent upon the feasibility of acquiring a suitable calibration block. Accessibility was to be assured via field walk-down prior to acquisition of a standard.
| |
| During RFO-4, a GENE UT technician performed a walk-down of the N11 nozzle to determine access con-figuration and potential examination requirements, finding that:
| |
| ~ the nozzle safe end area is accessible for UT examination
| |
| ~ a calibration standard (block) should (now) be fabricated to develop a meaningful examination technique
| |
| ~ curved transducer wedges may be required due to the small diameter of the safe end (with confirmation upon acquisition of the above mentioned calibration standard.)
| |
| As a result of that walk-down (and the fact that the examinations need not commence prior to 15 years of plant opera-tion) the disposition to DER 2-93-2388 was revised to tentatively schedule an initial UT in or about the year 2001, during RFO-8. Thereafter, examinations will be planned based on the results of previous examinations.
| |
| Ifa linear indication is located, then ultrasonic examination should be used to determine crack depth, with the results reported to the Design Engineering department, in writing, via the appropriate vehicle.
| |
| NMP2-ISI406 Rev.1 Section 3 Page 9 of 13
| |
| | |
| SIL-574- Jet pum Ad ustin Screw Tack Weld Failures This SIL is dated October 5, 1993, and was received by NMP2 during its third refueling outage. General Electric Nu-clear Energy's (GENE) stated purpose for the promulgation of this SIL is to alert owners of GE BWRs with jet pumps, that cracking has occurred in the tack welds that lock the adjusting screws that are threaded into jet pump re-strainer brackets at four (4) (other, not NMP2) GE BWRs. There are: 20 jet pumps in the NMP2 vessel; two (2) set screws per jet pump (orie on the shroud side, and one on the vessel side); and two (2) tack welds per set screw, for a total of 80 tack welds. The vessel side screws (and therefore, their tack welds) are far more accessible to an underwater camera than the shroud side screws. NMPC has evaluated this concern in Deviation/Event Report ii 2 2295 which reveals that:
| |
| ~ Plants with observed cracking, and the subsequent loss of screw positioning, had operated for approximately six years or more (seven or more calendar years). A historical review of the events following weld cracking (i.e.,
| |
| failure of additional welds; back-out of screws; wearing of the pad/wedge areas) indicates a significant duration that may involve several operating cycles. As of RFO-3 (Autumn, 1993) NMP2 had completed 4.14 years of operation, through three (3) operating cycles-significantly less than plants which have experienced weld cracking. At RFO-4, NMP2 will have operated for a maximum of 5.64 years, through four (4) operating cycles.
| |
| ~ Of the four plants referenced, only Tokai 2 has the same jet pump design as NMP2. However, Tokai 2 also pos-sesses a higher vibration level. GENE believes that the cause of tack weld failure is high cycle fatigue &om jet pump vibration.
| |
| ~ NMP2 tack welds typically exceed the minimum size required by as much as 108%. GENE has reported that substantial tack welds greatly reduce the chances of finding fatigue cracks.
| |
| ~ NMP2 adjusting screws typically evince no gaps at the point of contact with the inlet-mixer "belly band," allowing the adjusting screws to transmit vibratory loads Irom the inlet-mixer to the restraint bracket directly through the screw threads, thus negating transmission to the welds.
| |
| ~ RFO-1 and RFO-2 IVVls addressed a large sample of adjusting screw tack welds; all of which exhibited no cracking.
| |
| 3.4 COMMITMENTS MADE TO NRC PURSUANT TO BWR VESSEL &, INTERNALS PROJECT The following information addressing BWRVIP Implementation addresses only those examinations'completed during RFO-06 and those currently scheduled for RFO-07 (Spring 2000). Development of the complete BWRVIP implementation for the entire second Ten Year Interval is under development. Upon completion that information will be added to the Program and implemented as specified.
| |
| BWRVIP-01 BFR Core Shroud Ins ection and Flaw Fvaluation Guideline Guidelines which are used for inspection of BWR Core Shrouds and for the evaluation of any Qaws. Flaws being cracks due to Intergranular Stress Corrosion Cracking (IGSCC) observed in the vicinity of the Core Shroud welds.
| |
| This document standardizes methodology which is accepted by regulators for performing Core Shroud inspections and for evaluating the results of any observed cracking.
| |
| During RFO-6 inspection of 4 of the 8 horizontal Reactor Pressure Vessel Core Shroud welds (H3, H4, H6 and H8) had been scheduled to be performed in order to determine ifevidence of cracking existed. These inspections were conducted in accordance with the BWR Vessel and Internals Project Shroud Inspections Guidelines (BWRVIP-01).
| |
| DER 2-98-1557 was generated on 5/27/98 to document this deficiency. An Engineering Analysis to support core re-load was completed on 6/8/98. Approval for operation for one fuel cycle was granted by an NRC SER dated 6/25/98.
| |
| BWRVIP-07 Guidelines or Reins ection o BH% Core Shrouds Provides a generic inspection criteria for the reinspection of BWR core shrouds. This document provides inspection criteria for both unrepaired and repaired core shrouds.
| |
| NMP2-ISI406 Rev.1 Section 3 Page10 of 13
| |
| | |
| BWRVIP Core S ra Internals Ins ecnon and Flaw Evaluation Guidelines Guidelines to provide information on weld location in core spray piping, spargers and brackets a "baseline" approach for the first inspection and an approach for subsequent reinspections.
| |
| . BWRVIP BFR Core Plate Ins ection and Flaw Evaluarion Guidelines Guidelines intended to present he appropriate inspection and evaluation of the core plate. The scope addresses all welds and bolted locations of the core plate stiffener beams, stabilizer beams, aligner pins, hold down bolts and wed ges.
| |
| BWRVIP BWR To Guide Ins ecrion and Flaw Evaluation Guidelines Guidelines for inspection of BWR top guides and presents an approach for evaluating flaws found during an inspection.
| |
| BWRVIP BWR Standb I.i uid Control S stem/Core Plate dP Inse ction and Flaw Evaluation Guidelines Guidelines to define the inspection requirements for BWR Standby Liquid Control (SLC) system piping &om the vessel nozzle safe-end inward.
| |
| BWRVIP BWR Shroud Su ort Ins ection and Flow Guidelines Guideline for the inspection of the BWR Shroud support structure and for the evaluation of any flaws found.
| |
| BWRVIP BFR Jet Pum Assembl Ins ection and Flaw Evaluation Guidelines NMP2 committed to the guidance contained in this document via disposition to NMP2 DER 2-97-0090. BWRVP-41 was submitted for approval to the regulators in October of 1997. NMP2 has not received a concluding Safety Evaluation Report as of August -1998. As a result, the guidance, and therefore, the commitment, remains tentative.
| |
| The following Jet Pump Riser welds were examined during RFO-06 with the remainder planned as noted.
| |
| A.) Riser Elbow -to- Thermal Sleeve Weld (RS-1):Performed enhanced VT-1 examination during RFO-06 of 100% of the accessible weld heat affected zone (HAZ) on one half (5) of the jet pumps (all with acceptable results).
| |
| B.) Riser Elbow -to- Riser Pipe Weld (RS-2): Performed enhanced VT-1 examination during RFO-06 of 100
| |
| % of the accessible weld heat affected zone (HAZ) on one half (5) of the jet pumps (all with acceptable results).
| |
| C.) Riser Pipe -to- Transition Piece Weld (RS-3): Performed enhanced VT-1 examination during RFO-06 of 100
| |
| % of the accessible weld heat affected zone (HAZ) on one half (5) of the jet pumps (all with acceptable results). (The cast side of the weld is not required to be inspected.)
| |
| NMP2-ISI406 Rev.1 Section 3 Page 11 ot13
| |
| | |
| BWRVIP - 41 Table 3.2-1 defines an inspection Cycle as six (6) years which is based on fuel cycles, ie. For a plant on a 24 month fuel cycle, the inspection cycle is 3 fuel cycles.
| |
| Future examinations for the remaining RS-1 & RS-2 welds are required to be completed within the next two inspection cycles (12 years), by RFO-12. ThereaAer, reinspection will be 25 % every 6 year inspection cycle.
| |
| The remaining RS-3 welds are required to be inspected within one inspection cycle (6years), by RFO-09. Thereafter, reinspection will be 50% every 6 year inspection cycle.
| |
| Scope Expansion:
| |
| Ifone or more flaws are found during either the baseline or re-inspection of a specific location, all of the remaining locations of the same type on all other jet pumps should be inspected during the same refueling outage unless the law can be correlated to a specific event. The purpose of this scope expansion recommendation is to assure that, for those degraded locations, inspections are completed so that any generic degredation can be identified. In addition, the e6ect that degredation of one location has on other locations should be considered when determining ifscope expansion is warranted. Flaw evaluation criteria is p'rovided in GE Report, GE-NE-01927, Rev. 0 (NMPC ii MISC017115028)
| |
| BWRVIP LPCI Cou lin Ins ection and Flaw Evaluation Guidelines These guideline provide design information on the types of LPCI coupling arid identify potential failure locations as welds, bolts, and other appurtenances.
| |
| BWRVIP Vessel ID Attachment Weld Ins ection and Evaluation de Guidelines Guidelines for vessel attachments which were determined to be safety-related (the core spray piping bracket and jet pump riser brace attachments).
| |
| BWRVIP Instrument Penetration Ins ection and Flaw Evaluation Guidelines Guidelines for the recommended approach of Instrument Penetrations which will assure the integrity of all safety functions.
| |
| 3.5 INSTITUTE FOR NUCLEAR POWER OPERATIONS RECOMMENDATIONS No recommendations applicable to pressure retaining components have been implemented at NMP2.
| |
| 3.6 USNRC OFFICE OF INSPECTION AND ENFORCEMENT BULLETINS NMPC routinely receives, reviews, and dispositions the information contained in USNRC, OQice of Inspection &
| |
| Enforcement bulletins in accordance with internal NMP C procedure no. NIP-ECA-01. Dispositions are documented in Deviation/Event Reports (DER). DER dispositions requiring periodic inspections to be incorporated into this plan are identified below under the heading of the originating Inspection & Enforcement bulletin.
| |
| 3.7 USNRC INFORMATIONNOTICES USNRC routinely issues Information Notices to alert addresses of industiy events; NRC expects that recipients will review the information for applicability to their facility and consider actions as appropriate to detect or avoid similar problems. However, suggestions contained in information notices are not NRC requirements; therefore, no specific action or written response is required by NRC. Nevertheless, NMPC routinely receives, reviews, and dispositions the information contained in Information Notices in accordance with internal NMPC procedure no. NIP-ECA-01.
| |
| NMP2-ISI406 Rev.1 Section 3 Page 12 of 13
| |
| | |
| Dispositions are documented in Deviation/Event Reports (DER). DER dispositions that require periodic inspections to be incorporated into this plan are identified below under the heading of the originating Information Notices.
| |
| ~ Information Notice 97-02 Cracks Found In Jet Pump Assembly Elbows at Boiling 8'arer Reactors NRC Information Notice 97-02 was issued February 6, 1997 to alert NMP2 that cracking had been detected in a jet pump riser assembly of a foreign BWR, at a location not previously known to have cracks. It was received by NMP2 in the ninth year of its First 10-Year ISI Plan, during its sixth fuel cycle. NMPC performed a preliminary assessment as documented in Quality Assurance Department memorandum no. QA97086, wherein it is stated that Information Notice 97-02 is applicable to NMP2 and is to be dispositioned in DER 2-97-0090.
| |
| That same DER addresses GE SIL-605, a document that preceded and, in part, fomented this Information Notice.
| |
| The reader is referred to that entry above.
| |
| ~ Information Notice 97-29 Containment Inspection Rule NMPC addressed this Information Notice in DER 2-97-2724, and references that document here (to facilitate auditability of this plan), despite the fact that its disposition does not require periodic inspections to be incorporated into this plan.
| |
| The Inspection Program Plans for IWE (Class MC) and IWL (Class CC) Components are under development. These programs will be completed and implemented prior to September, 2001.
| |
| Repair and replacement activities within the scope of Subsections IWE and IWL of the code conducted after September 9,,1996, are conducted in accordance with these subsections.
| |
| NMP2-ISI406 Rev.1 Section 3 Page 13 or 13
| |
| | |
| 4.0 INSERVICE INSPECTION BOUNDARIES For the sake of clarity, it is important to note that:
| |
| ~ The boundaries addressed below apply to inservice inspection only-this, as opposed to repair and replacement boundaries, which address all the components within these Class 1, 2 and 3 boundaries.
| |
| 4.1 PIPING 8c INSTRUMENTATIONDRAWINGS (PEcIDs)
| |
| The NMPC piping and instrumentation drawings covering all ASME Class 1, 2 and 3 systems were used to determine which piping lines and components were subject to the examinations required by Section XI of the ASME B&PV Code. The results of that analysis and application were submitted to the regulators in the First Ten-Year Inservice Inspection Program Plan, and were found to be in accordance with the Code of record as indicated in the approval letter and SER issued by the Commission.. All first interval inservice inspections were carried out in accordance with the 1983 Edition with Summer of 1983 Addenda to. Section XI of the Code. Plant configuration has been maintained throughout the interval via updates, in compliance with Criterion 6 of Appendix B to Part 50 of Title 10 of the Code of Federal Regulations, (i.e., the P&IDs have been updated to continue to reflect the as-built condition of the physical plant.) This ISI program document, by inclusion of those controlled P&IDs at their latest revision levels, together with posted, unincorporated change paper, updates the boundaries from those originally specified. As previously reported in the First Ten-Year Inservice Inspection Program Plan, the inservice inspection component classifications used continue to be determined by the class designations provided on the P&ID's.
| |
| A notable exception to the use of the classifications indicated on the P &ID's is the main steam piping from the outermost containment isolation valves up to the turbine stop valves, and branch lines 2-'/2 inches and larger (up to and including the first valve capable of automatic closure.) These lines are designed to ANSI B31.1 requirements and classified seismic Category I, Quality Group D. However; this piping is inspected to Section XI requirements for Class 2 piping. The examination classification upgrade of these runs of main steam piping is consistent with the USAR and Regulatory Guide 1.26.
| |
| I TABLE 4.1-1 P &ID'S IN SCOPE FOR ISI PROGRAM PLAN DOCUMENT NMP2-ISI-006 SYSTEM P Sc ID NUMBER NAME CODE 2-A. B C,D E S bols Main Steam MSS 1-A,B,C,D,E F,G H,J K Main Steam Safe Valves, Vents, and Drains SVV 6-B Feed water 13AB CDE Reactor Buildin Closed Loo Coolin Water CCP 25-A Auxili Steam ASS 25-F Turbine Gland Seal and Exhaust 28-A, B, C Reactor Vessel Instrument ISC 29-A B C Reactor Recirculation RCS 30-B, C Control Rod Drive H draulics RDS 31- BCDEFG Residual Heat Removal NMP2-ISI406 Rev.l Section 4 Page i of 4
| |
| | |
| Low Pressure Core rav CSL 32-A S 33-A, B Hj h Pressure. Core S ra CSH 35-AB CD Reactor Core Isolation Coolin ICS 36-A Standb Li uid Control SLS 37-A, B Reactor Water Cleanup WCS 4.2 EXEMPTIONS Class 1 and 2 exemptions applied in this ISI Program are given below.
| |
| 4.2.1 CLASS 1 VOLUMETRICAND SURFACE EXAMINATIONREQUIREMENT EXEMPTIONS As stated in subsubarticle IWB-1220, "The following components (or parts of components) are exempted from the volumetric and surface examination requirements of IWB-2500:
| |
| (a) Components'hat are connected to the reactor coolant system and part of the reactor coolant pressure boundmy,'nd that are of such a size and shape so that upon postulated rupture the resulting flow of coolant from the reactor coolant system under normal plant operating conditions is within the capacity of makeup systems which are operable from on-site emergency power; (b) (1) piping ofNPS-1 and smaller; ...
| |
| (2) components and their connections in piping'f NPS 1 and smaller; (c) reactor vessel head connections and associated piping, NPS 2 and smaller, made inaccessible by control rod drive penetrations."'.2.2 CLASS 2 VOLUMETRICOR SURFACE EXAMINATIONREQUIREMENT EXEMPTIONS As stated in subsubarticle IWC-1220, "The following components (or parts of components) are exempted from the volumetric and surface examination requirements of IWC-2500.
| |
| Components Within RHR, ECC, and CHR Systems (or Portions of Systems)'a)
| |
| Vessels, piping, pumps, valves, and other components NPS 4 and smaller in all systems ...
| |
| (b) ... (not applicable to NMP2)
| |
| (c) Component connections NPS 4 and smaller (including nozzles, socket fittings, and other connections) in vessels, piping, pumps, valves, and other components of any size in all systems ...
| |
| (d) ... (not applicable to NMP2)
| |
| (e) ... (not applicable to NMP2)
| |
| (f) Piping and other components of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal plant operating conditions.
| |
| 'efer to 10 CFR 50, Section 50.55a, (c)(2), revised March 15. 1984.
| |
| The exemptions from examination in IWC-1220 may bc applied to those components permined to be Class 2 in lieu of Class 1 by thc regulatory authority having jurisdiction at the plant site.
| |
| Reactor coolant pressure boundary is defined in 10 CFR 50, Section 50.2(v); revised January 1, 1975.
| |
| 'n piping is defined as having one inlet and one outlet pipe, each of which shall be NPS 1 or smaller.
| |
| NMP2 has used this allowance to exempt the RPV bonom head drain shell-to.nozzle exainination item number sttrv ttF.
| |
| RHR, ECC, and CHR systems are the Residual Heat Removal, Emergency Core Cooling, and Containment Heat Removal Systems, rcspectivcly.
| |
| NMP2.ISI406 Rcv. 1 Section 4 Page 2 of 4
| |
| | |
| Components Within Systems (or Portions of Systems) Other Than RHR, ECC, and CHR Systems (a) Vessels, piping, pumps, valves, and other components NPS 4 and smaller.
| |
| (b) Component connections NPS 4 and smaller (including nozzles, socket fittings, and other connections) in vessels, piping, pumps, valves, and other components of any size.
| |
| (c) Vessels, piping, pumps, valves, other components and component connections of any size in systems or portions of systems that operate (when the system function is required) at a pressure equal to or less than 275 psig and at a temperature equal to or less than 200'F.
| |
| (d) Piping and other components of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal plant operating conditions."
| |
| 4.2.2.1 STANDBY GAS TREATMENT SYSTEM (GTS)
| |
| As stated in the NMP2 FSAR Table 3.2-1, this piping, although designed to Class 2 requirements, is actually intended to fulfillthe function of duct work. Therefore, the safety class portions of this system are Class 2 exempt.
| |
| 4.2.3 CLASS 3 EXEMPTIONS As stated in major subparagraph IWD-1220.1, "Integral attachments of supports and restraints to components (and therefore the supports associated with those components) that are NPS 4 (4" nominal pipe size) and smaller within the system boundaries of Examination Categories D-A, D-B, and D-C of Table IWD-2500-1 shall be exempt from the visual examination VT-3."
| |
| As stated in major subparagraph IWD-1220.2, "Integral attachments of supports and restraints to components (and therefore the supports associated with those components) exceeding NPS 4 may be exempted from the visual examination VT-3 of Table IWD-2500-1 provided:
| |
| (a) the components are located in systems (or portions of systems) whose function is not required in support of residual heat removal, containment heat removal, and emergency core cooling; and (b) the components operate at a pressure of 275 psig or less and at a temperature of 200'F or less.
| |
| As authorized by NRC in their response to first ten-year request for relief RR-IWD-1, piping and other components of any size beyond the last shut off valve in openhanded portions of systems that do not contain water during normal operation may be exempted from the visual examination VT-3 of Table IWD-2500-1.
| |
| 4,2.4 APPLICABILITYOF CLASS 2 PRESSURE/TEMPERATURE EXEMPTIONS Most of the IWB and IWC exemptions are quite clear and not subject to interpretation, as they are based on the physical size of components. However, IWC (Class 2) provides exemptions for which the criteria are based on system functions and operating temperatures and pressures. These temperature and pressure exemptions were discussed in the previous section. Table 4.2-4,provides a listing of lines and system portions where these exemptions are used on Class 2 systems.
| |
| It is important to note that where the primary flow path provides the intended system function, as identified in the exemptions, any branching flow path which does not provide a system function, as identified in the exemptions, is included as part of the primary system to the nearest isolation valve.
| |
| ;4MP2.ISl406 Rev. i Section 4 Page 3 of 4
| |
| | |
| TABLE 4,2A
| |
| 'LASS 2 SYSTEM PORTIONS EXEMPT DUE TO OPERATING TEMPERATURE AND PRESSURE SYSTEM PRESS / TEMP* REFERENCE**.
| |
| ICS pump suction from 35A 150/ su ression 1 170'4.7 Reactor Core Iso- 35B / Ru ture disc to atmo here lation Cooling ICS 35D /
| |
| 160'ESCRIPTION 104'6.3 ICS um suction i in PDP 274 Rev. 6 100'.8/
| |
| Purge inlets to suppression chamber and veil 110'/
| |
| Containment Purge Purge outlet from suppression chamber and PDP 22-23 CPS 61A veil Rev. 3 135'.3 63C / Containment Drain Header Reactor Building 150'.3 Equipment 8c Floor Dlywell to Reactor Building PDP 26-3 Drains FR 63E / Drain Header Rev. 4 150'35 DBA Hydrogen PDP 27-13 Recombiner CS 62B / Outlet of water ra coolers Rev. 5
| |
| + Allpressures are in pounds per square inch absolute (psia); temperatures are in degrees Fahrenheit
| |
| + + The ASM E IIIN-5 Data Reports are predicated, in part, on Pipe Stress Data Packages (PDPs).
| |
| NMP2-ISI406 Rev.l Section 4 Page4of4
| |
| | |
| 5.0 BASES OF SAMPLE SELECTION AND FREQUENCIES OF EXAMINATION This Section identifies and applies the requirements of the 1989 Edition, Section XI of the ASME Boiler and Pressure Vessel Code (as well as requirements of Code Cases) that were used in identifying the representative samples (by Code Category and Item No.) and frequencies of examination for Class 1 & 2 welds, component surfaces, bolting and integral attachments, Class 1, 2 & 3 supports and integral attachments that require examination during the Second Ten Year Interval. NMPC is committed to maintaining the identity and sequence of examinations established during the first inspection interval to the extent practical during this second interval.
| |
| In essence, selection requires that the piping systems and components have been designated as safety related and, for ASME XI Class 1 s stems:
| |
| : 1) the pipe size will be greater than 1 NPS and,
| |
| : 2) if2 NPS or smaller, the piping, will not be rendered inaccessible due to its association with reactor vessel head connections and,
| |
| : 3) not have been documented as being of such a size and shape that, upon postulation of a rupture (during normal plant operating conditions) resulting in the flow of coolant fiom the reactor coolant system, that said flow is within the capacity of make-up systems that are operable &om on-site emergency power, for ASME XI Class 2 stems:
| |
| : 1) the pipe size will be greater than 4 NPS and,
| |
| : 2) the piping will not be part of an open-ended portion of the system beyond the last shut-off valve, and,
| |
| : 3) the system (or portions of it) willhave been designed to:
| |
| directly provide for residual heat removal (RHR) (regardless of operating pressure or temperature) or, directly provide for emergency core cooling (ECC) (regardless of operating pressure or temperature) or, directly provide for containment heat removal (CHR) (regardless of operating pressure or temperature) or, operate at a pressure greater than 275 psig (even ifnot designed for one of the above three purposes) or, operate at a temperature greater than 200' (even ifnot designed for one of the above three purposes),
| |
| for ASME XI Class 3 stems:
| |
| : 1) the pipe size willbe greater than 4 NPS, and,
| |
| : 2) the system (or portions of it) will have been designed to:
| |
| be ~in su ort of reactor residual heat removal.(RHR) (regardless of operating pressure or temperature) or, be ~in su ort of containment heat removal (CHR) (regardless of operating pressure or temperature) or, be ~in su ort of emergency core cooling (ECC) (regardless of operating pressure or temperature) or, operate at a pressure greater than 275 psig (even ifnot designed for one of the above three purposes) or, operate at a temperature greater than 200' (even ifnot designed for one of the above three purposes) and,
| |
| : 3) the design of supports for the system (or portions of it) will use integral attachments to the pressure boundaiy, 5.1 FREQUENCY OF EXAMINATIONS Frequencies of examination are routinely referenced within the itemization of Code Categories addressed below. In order to more easily follow those references, a brief discussion of the Code's semblance of order regarding the repetitive nature of examination of sampled items is in order.
| |
| First 10- Year Interval - NMP2 submitted its First Ten Year Interval Program Plan to NRC on July 30, 1987.
| |
| The First Ten Year Interval Program Plan was developed to the 1983 Edition, Summer 1983 Addenda of ASME Section XI. The First Interval covered the period from April 5, 1988 to April 4, 1998.
| |
| Second 10- Year Interval - The second 10-year interval commences immediately following the closure of the first 10-year interval covering the time periods of April 5, 1998 to April 4, 2008 and developed to the 1989 Edition of ASME Section XI.
| |
| NMP2-ISI406 Rev.1 Section 5 Page 1 of16
| |
| | |
| Inspection Periods -The interpretation of Table IWB-2412-1 correlates the first, second, and third periods of the second interval with the 13, 17, and 20 calendar years of plant service. NMPC's second interval willcomply with this schedule to the extent practical. The current refueling outage schedule, upon which this Program Plan is based, includes 6 refuel outages, or 2 per period. Some variations to the length of Inspection Periods may be required based on actual versus scheduled outage dates.
| |
| The current scheduled periods of the second interval are:
| |
| PERIOD START END April 5, 1998 April 4, 2001 April 5, 2001 April 4, 2005 April 5, 2005 April 4, 2008 Each period may be increased or decreased by as much as one year to allow the examination to correspond to plant outages, although the net increase over the 10-year interval cannot exceed one year.
| |
| ASME Section XI Subarticle IWA-2400 allows for additional flexibilityin the case where a plant is out of service
| |
| ~
| |
| continuously for six months or more; in this situation, the interval during which the outage occurred may be extended for a length of time equivalent to the outage duration and the original pattern of intervals extended accordingly for successive intervals.
| |
| Fuel Cycles - Defined as that period of time from the end of one refueling outage to the start of the next refueling outage. This is approximately 24 months for Unit 2.
| |
| Frequencies of examination are based on these concepts of intervals, periods, and fuel cycles, and the commentary below makes extensive use of them.
| |
| 5.2 FREQUENCY CODES As noted above, this plan specifies that certain items be examined, in full or in part, during a specific period, fuel cycle, or combination 'thereof. These are designated 1P, 2P, 3P, with or without suffixes of < or , as expanded upon in Section 6 of this plan. Other examinations can be performed anytime during the interval, provided they are performed by the end of the interval. These types of examinations are designated Eoi for "End of Interval."
| |
| When an examination must be performed each refueling outage, the inspection &equency reflects ERQ.
| |
| When an examination must be performed each period, the inspection &equency may reflect 123.
| |
| When an examination must be performed every other refueling outage, the inspection &equency is shown as either ENRO'(Even Numbered Refuel Outage) or ONRO (Odd Numbered Refuel Outage.)
| |
| Dis indicates that the examination &equency is contingent upon routine disassembly. It is to be performed in the event the item is disassembled for reasons other than performance of the ISI examination. (e.g., the fasteners in control rod drive housings.)
| |
| DisG indicates that the examination frequency is contingent upon the routine disassembly of the representative component of a group of components of similar design, size, function, and service within a system, in accordance with the multiple component concept described below. The Code's examination requirements for all of the examination items on all of the components within an entire group of components are satisfied ifthe examination items of only one component within a multiple component group are examined to the extent practical. Practicality dictates that NMP2-ISI406 Rev.1 Section 5 Page2of16
| |
| | |
| these examinations need only take place when and ifthe component is coincidentally disassembled for maintenance, repair or volumetric examination. The disassembly of more than one component within a multiple component group during the interval, will not be cause for additional ISI examinations to be performed within that group; examination is only required to be performed on one of the components.
| |
| Where the Code does not allow deferral until the end of the interval, the examinations must be distributed among the three periods in accordance with the schedule presented in the following paragraph.
| |
| 5.3 INTERVALDISTRIBUTION Class 1, 2 and 3 examinations within an examination category shall be performed among the three periods of the interval, in the percentages noted (unless specifically indicated otherwise) in Tables IWX-2412-1 of Section XI:
| |
| DISTRIBUTION OF EXAMINATIONS PERIOD RANGE OF EXAMINATIONS 1st 16% minimum, and not to exceed 34% of all re ulred examinations 50% minimum, and not to exceed 67% of all required examinations. This includes the examinations 2fld erformeddurin the1st eriod 3rd 100% of all required examinations (total for all three periods)
| |
| Most of the IWB, IWC, IWD and IWF examinations are scheduled by this method. This is indicated in the ISI Program Plan as interval distribution (io).
| |
| Interval distribution typically applies to a quantity of welds/items where the cumulative percent of the total number of welds/items examined by the end of each period must be in accordance with the ranges given in the preceding table.
| |
| However, interval distribution can also apply to a single-vessel weld where a percentage of the total weld length is examined each period. The cumulative percent of total weld length examined by the end of each period must be in accordance with the ranges given in the table above .
| |
| Period scheduling, per the Inspection Plan, is for guidance only-substitutions may be made as required as long as all scheduled examinations are completed by the end of the interval.
| |
| Examination substitutions for any Section XI scheduled weld/item may be made as long as the ISI Program Manager concurs with the requested substitution. Rescheduling of Augmented (GL 88%1) Category 'D', 'E'nd 'F'elds is not allowed untess prior NRC Approval Is obtained. A Licensing Document Change Request does not have to be written to cover selection changes; a revised selection change willsimply appear in the next regularly scheduled status update to the Program Plan Inspection Tables. Status updates were performed on a fuel cycle basis during the first interval, and may continue on that &equency in the second interval, or drop to a periodic frequency.
| |
| 5.4 MULTIPLECOMPONENT CONCEPT For Class I, 2 and 3 components (pumps, valves, and vessels only) of similar design, size, function, and service within a system, the Code allows for the grouping of those components, such that the examinations required to be performed on those components may be satisfied by the examination of only one of the components within a group (or divided among the components in a group, such that the total number of examinations performed is equivalent to the number that would be performed ifonly one of the components was required to be completely examined.) Those items qualify-ing as multiple components are identified in Appendix C.
| |
| NMP2-ISI406 Rev.1 Section 5 Page 3 of 16
| |
| | |
| 5.5 CLASS 1 EXAMINATIONBASES 5.5.1 EXAMINATIONCATEGORY B-A, PRESSURE RETAININGWELDS IN REACTOR VESSEL Item B1.11 Circumferential Shell Welds Extent of Examination - all welds, to at least the extent achieved in the first interval.
| |
| Frequency of Examination - end of interval (Eol), but repeat first interval to the extent practical.
| |
| NoTE: NMPC is considering a Request for Relief from performing examinations of RPV Circumferential welds based on USNRC - GENERIC LETTER 98-05.
| |
| Item B1.12 Longitudinal Shell Welds Extent of Examination - all welds, to at least the extent achieved in the first interval.
| |
| Frequency of Examination - end of interval (Eoi), but repeat first interval to the extent practical.
| |
| Item Bl.21- Circumferential Head Welds Extent of Examination - accessible lengths of all welds, to at least the extent achieved in the first interval.
| |
| Frequency of Examination - end of interval (Eoi), but repeat first interval to the extent practical.
| |
| Item B1.22 - Meridional Head Welds Extent of Examination - accessible lengths of all welds, to at least the extent achieved in the first interval.
| |
| Frequency of Examination - end of interval (Eoi), but repeat first interval to the extent practical.
| |
| Item B1.30- Shell-to-Flange Weld Extent of Examination - entire weld, to at least the extent achieved in the first interval.
| |
| Frequency of Examination - firstperiod (1P) and third period (3P) with a minimum of 50% of the total weld length completed in the firstperiod with the remainder to be performed in the third period, so that entire weld length has been examined by the end of the interval. (Ifpartial examinations are conducted &om the flange face, the remaining volumetric examinations required to be performed from the vessel wall may be deferred to the end of the interval.
| |
| The flange face is defined as the contact area between the shell flange and head flange.)
| |
| Item B1.40 - Head-to-Flange Weld Extent of Examination - entire weld, to at least the extent achieved in the firstinterval Frequency of Examination - interval distribution (io), repeating first interval to the extent practical. (If partial examinations are conducted &om the flange face, the remaining volumetric examinations required to be performed from the vessel wall may be deferred to the end of the interval. The flange face is defined as the contact area between the shell flange and head flange.)
| |
| Item B1.50- Repair Welds - Not applicable to the NMP2 Reactor Vessel.
| |
| H 5.5.2'XAMINATIONCATEGORY B-B - PRESSURE-RETAINING WELDS IN VESSELS OTHER THAN REACTOR VESSELS The only non-exempt Class 1 vessel is the reactor pressure vessel, at Nine Mile Point Unit 2.
| |
| 5.5.3 EXAMINATIONCATEGORY B-D, FULL PENETRATION WELDS OF NOZZLES IN VESSELS
| |
| - INSPECTION PROGRAM B Item B3.90- Nozzle-to-Vessel Welds Extent of Examination - all welds, to at least the extent achieved in the first interval.
| |
| Frequency of Examination: interval distribution (io), repeating first interval to the extent practical.
| |
| NMP2-ISI4I6 Rev.1 Section 5 Pege4of16
| |
| | |
| Item B3.100 Nozzle Inside Radius Section Extent of Examination - all radii, to at least the extent achieved in the first interval.
| |
| Frequency of Examination: interval distribution (io), repeating first interval to the extent practical.
| |
| Items B3.110 through B3.160 - not applicable at NMP2.
| |
| 5.5,4 CATEGORY B-E, PRESSURE RETAININGPARTIALPENETRATION WELDS IN VESSELS Item B4.11 - Vessel Nozzles - See NMP2 Inservice Inspection Pressure Testing Program Plan Document No.
| |
| NMP2-PT-008.
| |
| Item B4.12 - Control Rod Drive Nozzles - See NMP2 Inservice Inspection Pressure Testing Program Plan Docu-ment No. NMP2-PT-008.
| |
| Item B4.13 - Instrumentation Nozzles - See NMP2 Inservice Inspection Pressure Testing Program Plan Document No. NMP2-PT-008.
| |
| Item B4.20- Pressurizer Heater Penetration Welds - not applicable at NMP2 5.5,5 CATEGORY B-F, PRESSURE RETAININGDISSIMILARMETALWELDS Item B5.10- Reactor Vessel; NPS 4 or Larger Extent of Examination - all welds, to at least the extent achieved in the first interval.
| |
| Frequency of Examination: interval distribution (io), repeating first interval to the extent practical.
| |
| Item B5.20- Reactor Vessel; Less Than NPS 4 Extent of Examination - all welds, to at least the extent achieved in the first interval.
| |
| Frequency of Examination: interval distribution (io), repeating first interval to the extent practical.
| |
| Item B5.30- Reactor Vessel Nozzle-to-Safe End Socket Welds - not applicable at NMP2 Item B5.40 - Pressurizer Nozzle-to-Safe End Butt Welds NPS 4 or Larger - not applicable at NMP2 Item B5.50 - Pressurizer Nozzle-to-Safe End Butt Welds Less Than NPS 4 - not applicable at NMP2 Item B5.60 - Pressurizer Nozzle-to-Safe End Socket Welds - not applicable at NMP2 Item B5.70- Steam Generator Nozzle-to-Safe End Butt Welds NPS 4 or Larger - not applicable at NMP2 Item B5.80- Steam Generator Nozzle-to-Safe End Butt Welds Less Than NPS 4- not applicable at NMP2 Item B5.90- Steam Generator Nozzle-to-Safe End Socket Welds - not applicable at NMP2 Item B5.100 - Heat Exchanger Nozzle-to-Safe End Butt Welds NPS 4 or Larger - not applicable at NMP2 Item B5.110- Heat Exchanger Nozzle-to-Safe End Butt Welds Less Than NPS 4-not applicable at NMP2 Item B5.120- Heat Exchanger Nozzle-to-Safe End Socket Welds - not applicable at NMP2 NMP2-ISI406 Rev.1 Section 5 Page 5of16
| |
| | |
| Item B5.130- Dissimilar Metal Butt Welds in Piping NPS 4 or Larger Extent of Examination - all welds, to the extent achieved in the first interval. (Total of 5 welds, listed in Appendix A.)
| |
| Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
| |
| Item B5.140- Dissimilar Metal Butt Welds in Piping Less Than NPS 4 Extent of Examination - all welds, to the extent achieved in the first interval. (Total of 2 welds, listed in Appendix A.)
| |
| Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
| |
| Item B5.150 Dissimilar Metal Socket Welds in Piping- not applicable at NMP2 5.5.6 CATEGORY B-G-1, PRESSURE RETAININGBOLTING, GREATER THAN 2 in. IN DIAMETER Item B6.10- Reactor Vessel Closure Head Nuts NMPC proposes to perform a VT-1 visual examination of the reactor vessel closure head nuts in lieu of the surface examination required by the 1989 Edition of Section XI of the ASME B&PV Code. Refer to Appendix F for the proposed Relief Request to utilize an alternate method to the Code of record.
| |
| Extent of Examination - all nuts (via VT-1)
| |
| Frequency of Examination: interval distribution (ID), repeating the first interval to the extent practical Item B6,20- Reactor Vessel Closure Studs, in place NMP2 did no examinations to Item 6.20 in the first interval, and does not anticipate examining the closure studs in place during the second interval, However, as a contingency, NMPC provides the following:
| |
| Extent of Examination - all studs (volumetric only.)
| |
| Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
| |
| Item B6.30- Reactor Vessel Closure Studs, when removed Extent of Examination - all studs, surface and volumetric examination to the extent achieved in the first interval.
| |
| Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
| |
| Item B6.40- Reactor Vessel Threads in Flange Extent of Examination - all threads, to the extent achieved in the first interval.
| |
| Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
| |
| Item B6.50- Reactor Vessel Closure Washers, Bushings Extent of Examination - all washers and the singular bushing, to the extent achieved in the first interval.
| |
| Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
| |
| Item B6,60- Pressurizer Bolts and Studs - not applicable at NMP2 Item B6.70- Pressurizer Flange Surface, when connection disassembled - not applicable at NMP2 Item B6.SO- Pressurizer Nuts, Bushings, and Washers - not applicable at NMP2 Item B6,90- Steam Generator Bolts and Studs - not applicable at NMP2 Item B6.100- Steam Generator Flange Surface, when connection disassembled - not applicable at NMP2 NMP2-ISI406 Rev.1 Section 5 Page 6of16
| |
| | |
| 'Item B6.110 - Steam Generator Nuts, Bushings, and Washers - not applicable at NMP2 Item B6.120- Heat Exchangers Bolts and Studs - not applicable at NMP2 Item B6.130- Heat Exchangers Flange Surface, when connection disassembled - not applicable at NMP2 Item B6.140- Heat Exchangers Nuts, Bushings, and Washers - not applicable at NMP2 Item B6.150- Piping Bolts and Studs - not applicable at NMP2 Item B6.160- Piping Flange Surface, when connection disassembled - not applicable at NMP2 Item B6.170- Piping Nuts, Bushings, and Washers - not applicable at NMP2 Item B6.180- Pump Bolts and Studs Extent of Examination - bolts and/or studs of each pump selected for examination under B-L-2. A tabulation of pumps considered to qualify for the multiple component approach may be found in Appendix D to this document.
| |
| Frequency of Examination - interval distribution (Io)
| |
| Item B6.190- Pump Flange Surface, when connection disassembled Extent of Examination - Should the flanged connection of any pump in the representative group of pumps to be examined under Code Category B-L-2 be disassembled for maintenance, repair, or volumetric examination, the bushings and threads in flange stud holes and the 1" annular surface of flange surrounding the stud or bolt shall be examined. A tabulation of pumps considered to qualify for the multiple component approach may be found in Appendix C to this document.
| |
| Frequency of Examination - disassembly (Dis)
| |
| B6.200- Pump Nuts, Bushings, and Washers Extent of Examination - the 16 nuts on 2RCS*P1 (one of two pumps in the Recirculation System pump design does not utilize bushings or washers at the pressure retaining connection); examination item PPB103A on the pump selected for examination under B-L-2 in accordance with the tabulation of pumps considered to qualify for the multiple component approach (which may be found in Appendix C to this document.)
| |
| Frequency of Examination -interval distribution (Io)
| |
| Item B6.210- Valve Bolts and Studs Extent of Exaniination - One valve (2MSS*AOV7B) Multiple Component Group No. 14 valves (all of which were originally designed to utilize 2" bonnet-to-body fasteners) was modified in the first interval to use 2'/4" diameter bonnet-to-body connection step studs.
| |
| Frequency of Examination interval distribution (Io)
| |
| Item B6.220- Valve Flange Surface, when connection disassembled Extent of Examination - One valve (2MSS*AOV7B)Multiple Component Group No. 14 valves (all of which were originally designed to utilize 2" bonnet-to-body fasteners) was modified in the first interval to use 2'/4" diameter bonnet-to-body connection step studs.
| |
| Frequency of Examination when disassembled Item B6.230- Valve Nuts, Bushings, and Washers Extent of Examination - One valve (2MSS*AOV7B) Multiple Component Group No. 14 valves (all of which were originally designed to utilize 2" bonnet-to-body fasteners) was modified in the first interval to use 2'/4" diameter bonnet-to-body connection step studs.
| |
| Frequency of Examination when disassembled NMP2-ISI406 Rev.1 Section 5 Page7ot16
| |
| | |
| 5.5.7 CATEGORY B-G-2, PRESSURE RETAINING BOLTING, 2 in. AND LESS IN DIAMETER Item B7.10- Reactor Vessel Bolts, Studs, and Nuts Extent of Examination - limited to the 12 studs and 24 nuts found at the N-18 (spare) nozzle blind flange on the top of the reactor pressure vessel; examination item 2RPv+8164.
| |
| Frequency of Examination - interval distribution (ID)
| |
| Item B7.20- Pressurizer Bolts, Studs, and Nuts - not applicable at NMP2.
| |
| Item B7.30- Steam Generator Bolts, Studs, and Nuts - not applicable at NMP2.
| |
| Item B7.40- Heat Exchanger Bolts, Studs, and Nuts - not applicable at NMP2.
| |
| Item B7.50- Piping Bolts, Studs, and Nuts Extent of Examination - all bolts, studs, and nuts, on piping containing welds requiring examination under Category B-J.
| |
| Frequency of Examination - interval distribution (ID)
| |
| Item B7.60- Pump Bolts, Studs, and Nuts - not applicable at NMP2 Item B7.70- Valve Bolts, Studs, and Nuts Extent of Examination - all bolts, studs, and nuts on the valves selected for examination in the several groups of valves requiring examination under B-M-2. (Category B-M-2 pemtits the application of the multiple component concept for valves. A tabulation of valves considered to qualify for the multiple component approach may be found in Appendix B to this document.)
| |
| Frequency of Examination - inrerval distribution (ID)
| |
| Item B7.80- CRD Housing Bolts, Studs, and Nuts Extent of Examination - cap screws on CRD housings made accessible by coincidental disassembly Frequency of Examination - only examined when disassembled (Dis) 5.5,8 CATEGORY B-H, INTEGRAL'TTACHMENTSFOR VESSELS This category is now listed as B-K per Code Case N-509 Item B8.10- Integrally Welded Attachments to Reactor Vessel This item is now listed as B10.10 per Code Case N-509 Item B8,20- Integrally Welded Attachments to Pressurizer - not applicable at NMP2 Item B8.30- Integrally Welded Attachments to Steam Generators - not applicable at NMP2 Item B8.40 - Integrally Welded Attachments to Heat Exchangers - not applicable at NMP2 5.5.9 CATEGORY B-J, PRESSURE RETAINING WELDS IN PIPING Item B9.11- Circumferential Welds NPS 4 or Larger Extent of Examination - all dissimilar metal pipe welds, high stress welds, and terminal ends, plus an additional number of piping welds, so that 25% of all non-exempt circumferential welds are examined.
| |
| Frequency of Examination - interval distribution (ID)
| |
| NMP2-ISI406 Rev.1 Section 5 Page 6of16
| |
| | |
| Item B9.12- Longitudinal Welds NPS 4 or Larger Extent of Examination - all longitudinal pipe welds intersecting any of the selected circumferential welds.
| |
| Frequency of Examination - interval distribution (ID)
| |
| Code Case N-524 shall be utilized Item B9.21 - Circumferential Welds Less Than NPS 4 Extent of Examination - all dissimilar metal pipe welds, high stress welds, and terminal ends plus an additional number of piping welds, so that 25% of all non-exempt circumferential welds are examined Frequency of Examination - interval distribution (Io)
| |
| Item B9,22- Longitudinal Welds Less Than NPS 4- not applicable at NMP2 (There are no longitudinal pipe welds intersecting any of the selected B9.21 circumferential welds.)
| |
| Item B9.31- Branch Pipe Connection Welds NPS 4 or Larger Extent of Examination - 25% of all non-exempt branch pipe connection welds Frequency of Examination - interval distribution (io)
| |
| Item B9.32- Branch Pipe Connection Welds Less Than NPS 4 Extent of Examination - 25% of all non-exempt branch pipe connection welds Frequency of Examination - interval distribution (Io)
| |
| Item B9.40- Socket Welds Extent of Examination - 25% of all non-exempt socket welds Frequency of Examination - interval distribution (Io)
| |
| See Appendix Afor a complete listing, by system, of1velds in scope ofExamination Category BV 5.5.10 CATEGORY B-K-1, INTEGRAL ATTACHMENTFOR PIPING, PUMPS AND VALVES This category is now listed as B-K per Code Case N-509 Item B10.10- Integrally Welded Attachments to Reactor Vessel Extent of Examination 100% of the reactor vessel support skirt weld, and stablilizer bracket welds.
| |
| Frequency of Examination interval distribution (ID)
| |
| Item B10.20 - Integrally Welded Attachments to Piping Extent of Examination - Allintegrally welded attachments with a design thickness of /s inch and greater welded to piping required to be examined under Examination Category B-J. The multiple component concept is not applicable to this examination category. (It should be noted that integral attachments to piping include attachments at contain-ment penetrations. However, the Class 1 nonexempt piping containment penetrations at NMP2 are of a forged design as shown in Figure IWB-2500-14. The surface examinations required by B-K-1 need only be performed on welds that are within a region that is "t" inches &om the pressure-retaining component, where "t" is the wall thickness of the pressure-retaining component (the piping in this case). At NMP2, none of the Class l non-exempt piping containment penetrations have welds that are within this region.) I Frequency of Examination - interval distribution (Io)
| |
| Item B10.30- Integrally Welded Attachments to Pumps - not applicable at NMP2 Item B10.40 Integrally Welded Attachments to Valves - not applicable at NMP2 NMP2-ISI406 Rev.1 Section 5 Pagegot16
| |
| | |
| 5.5.11 CATEGORY B-L-1, PRESSURE RETAININGWELDS IN PUMP CASINGS Item B12.10- Pump Casing Welds - not applicable at NMP2 5.5.12 CATEGORY B-L-2, PUMP CASINGS Item B12,20- Pump Casing Extent of Examination - multiple component concept is applicable; i.e., only the interior surface of one recirculation pump requires examination. Examination shall be performed only ifa pump is disassembled for repair or mainte-nance.
| |
| Frequency of Examination - end of interval (Eoi) 5.5.13 CATEGORY B-M-1, PRESSURE RETAININGWELDS IN VALVEBODIES Item B12,30 - Valve Body Welds in Valves Less Than NPS 4 - not applicable at NMP2 Item B12.40- Valve Body Welds in Valves NPS 4 or Larger - not applicable at NMP2 4
| |
| 5.5.14 CATEGORY B-M-2, VALVEBODIES Item B12,50- Valve Body, Exceeding NPS 4 Extent of Examination - multiple component concept is applicable, and examinations are limited to one valve within a group of valves that are of the same constructional design (globe, gate, check), manufacturing method, and that if perform similar functions within the system. Examination shall be performed valves are disassembled for mainte-nance, repair or volumetric examination. A tabulation of valves considered to qualify for the multiple component ap-proach may be found in Appendix B to this document.
| |
| Frequency of Examination - end of interval (Eol) 5.5.15 CATEGORY B-N-1, INTERIOR OF REACTOR VESSEL Item B13.10 - Vessel Interior Extent of Examination - the spaces above and below the reactor core that are made accessible for examination by removal of items during normal refueling outages-most specifically, the core spray header and its brackets; the core spray spargers and their brackets; the fuel cells; the feedwater sparger and its brackets; the jet pumps and their brackets and supports; the moisture separator; the steam dryer; and interior wall of the vessel shell.
| |
| Frequency of Examination - once per period, at even numbered refueling outages (ENRO) 5.5.16 CATEGORY B-N-2, INTEGRALLYWELDED CORE SUPPORT STRUCTURES AND INTERIOR ATTACHMENTSTO REACTOR VESSELS B13.20- Interior Attachments Within Beltline Region of Boiling Water Reactors Extent of Examination - attachment welds made accessible by removal of items during a refueling outage most specifically, those associated with: jet pump brackets and supports; and surveillance specimen pad(s) and brackets Frequency of Examination - once per interval, in the first period, at an even numbered refueling outage (1PN)
| |
| B13.30- Interior Attachments Beyond Beltline Region of Boiling Water Reactors Extent of Examination - attachment welds made accessible by removal of items during a refueling outage most specifically, those associated with: core spray sparger brackets; feedwater sparger brackets; shroud support stubs; steam dryer support brackets; steam dryer guide rod brackets; steam dryer hold down brackets; and surveillance specimen pad(s) and brackets; Frequency of Examination - once per interval, in the first period, at an even numbered refueling outage (1P<)
| |
| F NMP2-ISI406 Rev.1 Section S Page 10 oI 16
| |
| | |
| B13.40- Core Support Structure of Boiling Water Reactors Extent of Examination - all surfaces of the core support structure made accessible by removal of components during a refueling outage most specifically, those associated with: the top guide; the core shroud; the shroud support stubs; and the core plate Frequency of Examination - once per interval, in the first period, at an even numbered refueling outage (1P<)
| |
| B1350- Interior Attachments Within Beltline Region of Pressurized Water Reactors - not applicable at NMP2.
| |
| B13.60- Interior Attachments Beyond Beltline Region of Pressurized Water Reactors - not applicable at NMP2.
| |
| 5.5.17 CATEGORY B-N-3, REMOVABLECORE SUPPORT STRUCTURES B13.70- Core Support Structure of Pressurized Water Reactors - not applicable at NMP2 5.5.18 CATEGORY B-O, PRESSURE RETAININGWELDS IN CONTROL ROD DRIVE HOUSINGS Item B14.10- Welds in CRD Housing Extent of Examination - in accordance with the subsfi rute examinarion proposed by NMPC in request for relief no.
| |
| RR-IWB-I, and as sanctioned by the regulators in the granting of that relief in the first interval plan; 5.5.19 CATEGORY B-P, ALLPRESSURE RETAINING COMPONENTS See NMP2-ISI Pressure Testing Program Plan Document ¹NMP2-PT-008.
| |
| 5.6 CLASS 2 EXAMINATIONBASIS 5.6.1 CATEGORY C-A, PRESSURE RETAININGWELDS IN PRESSURE VESSELS Note on Frequency of Examination - There are only two examinations required in this category for the whole of the interval. As such, it is impossible to comply with the percentages over three periods. Therefore, both examina-tions will be conducted at the same time, in the second period.
| |
| Item C1.10- Shell Circumferential Welds Extent of Examination - at least 78% of the length of Hw101A, on heat exchanger 2RHs'E1A (in the Residual Heat Removal System), the only weld at a gross structural discontinuity. Refer to Appendix C for a tabulation of the Class 2 vessels that are in the scope of this examination category, and are considered to qualify for the multi pie component approach.
| |
| Frequency of Examination - interval distribution (2P) (See note above)
| |
| Item C1.20- Head Circumferential Welds Extent of Examination - at least 95% of the length of HW1ooA, on heat exchanger 2RHs E1A (in the Residual Heat Removal System), the only vessel in this examination category that requires examination, as the multiple component concept is applicable. Refer to Appendix C for a tabulation of the vessels that are in the scope of this examination category and, are considered to qualify for the multiple component approach.
| |
| Frequency of Examination - interval distribution (2P) (See note above)
| |
| Item C1.30- Tubesheet-to-Shell Welds - not applicable at NMP2 5.6.2 CATEGORY C-B, PRESSURE RETAININGNOZZLE WELDS IN VESSELS Item C2.11 - Nozzle-to-Shell (or Head) Weld in Vessels c 'w in. Nominal Thickness - not applicable at NMP2 NMP2-ISI406 Rev.1 Section 5 Page 11 of 16
| |
| | |
| 0 Item C2.21 - Nozzle-to-Shell (or Head) Weld (Without Reinforcing Plate) in Vessels > v in. Nominal Thickness Extent of Examination - at least 96% of Hw10aA, the N3 nozzle weld, and 80% of Hw102A, Ole N4 nozzle weld (in accordance with the substitute examination proposed by NMPC in request for relief no. RR-IWC-5, on Residual Heat Removal System heat exchanger 2RHS'E1A. Refer to Appendix C for a tabulation of the vessels that are in the scope of this examination category, and are considered to qualify for the multiple component approach.
| |
| Frequency of Examination - interval distribution (ID)
| |
| Item C2.22 - Nozzle Inside Radius Section Extent of Examination - 100% each of Hw1o4A, the N3 nozzle, and Hw10sA, the N4 nozzle on Residual Heat Removal System heat exchanger 2RHS'E1A. Refer to Appendix C for a tabulation of the vessels that are, in the scope of this examination category, and are considered to qualify for the multiple component approach.
| |
| Frequency of Examination - interval distribution (Io)
| |
| C2.31 - Reinforcing Plate Welds to Nozzle and Vessel - not applicable at NMP2 C2.32- Nozzle-to-Shell (or Head) Weld (With Reinforcing Plate) in Vessels > v in. Nominal Thickness When Inside of Vessel Is Accessible - not applicable at NMP2 C2.33 - Nozzle-to-Shell (or Head) Weld (Without Reinforcing Plate) in Vessels > v in. Nominal Thickness When Inside of Vessel Is Accessible - not applicable to NMP2 5.6.3 CATEGORY C-C, INTEGRAL ATTACHMENTS FOR VESSELS, PIPING, AND VALVES Per Code Case N-509 Item C3.10- Integrally Welded Attachments to Pressure Vessels-Extent of Examination at least 90% of the required area subject to examination Frequency of Examination interval distribution (Io)
| |
| Item C3.20- Integrally Welded Attachments to Piping Extent of Examination - at least 90% of the required areas of the welded attachments to the piping subject to examina-tion.
| |
| Frequency of Examination - interval distribution (ID)
| |
| Item C3.30 - Integrally Welded Attachments to Pumps Extent of Examination - at least 90% of the required areas of the welded attachments subject to examination.
| |
| Frequency of Examination - interval distribution (ID)
| |
| Item C3.40- Integrally Welded Attachments to Valves - not applicable at NMP2 5.6.4 CATEGORY C-D, PRESSURE RETAININGBOLTING GREATER THAN 2 in. IN DIAMETER Item C4.10 - Bolts and Studs in Pressure Vessels - not applicable at NMP2 Item C4.20- Bolts and Studs in Piping - not applicable at NMP2 Item C4.30- Bolts and Studs in Pumps Extent of Examination - studs in low pressure core spray pump number 2CSL'P1 (the only pump at NMP2 examined under Category C-G that utilizes pressure retaining fasteners greater than 2" in diameter, i.e., the head-to-barrel connection studs.)
| |
| Frequency of Examination - interval distribution (ID)
| |
| Item C4.40- Bolts and Studs in Valves - not applicable at NMP2 NMP2-ISI406 Rev.1 Section 5 Pege12o116
| |
| | |
| 5.6.5 CATEGORY C-F-1, PRESSURE RETAININGWELDS IN AUSTENITIC STAINLESS STEEL OR HIGH ALLOYPIPING Pursuant to the Code of record, the welds selectedfor examination shall include 7.5%, but not less than 28 welds, ofall austenitic stainless steel ofhigh allow welds not exempted by BVC-1220. (Some welds not exempted by IH C-I 220 are not required to be nondestrucnvely examined per Examination Category C-F-I. These welds, however, shall be included in the total weld count to which the 7.5% sampling rate is applied) The examinations shall be distributed as follows:
| |
| a) rhe examinations shall be distributed among the sysrems prorated, to the degree practicable, on the number if ofnonexempt austenitic stainless steel or high allo~ welds in each system (i.e., a system contains 30% of the nonexempt welds, then 30% ofthe nondestrucnve examinations required by Examination Category C-F-I should be performed on that system):
| |
| b),within a system, the examinations shall be distributed among terminal ends and structural disconrinuities (Structural disconnnui rie include pipe weldjoints ro vessel nozzles, valve bodies, pump casings, pipe fittings (such as elbows, tees, reducers, flanges, etc conforming to ANSI BI6.9), and pipe branch connecrions and disconrinui fitrings.j prorated, to the degree practicable, on the number of nonexempt terminal ends and stnictural tie in that system; and c) wirhin each system, examinarions shall be disrributed between line sizes prorated to the degree pracn'cable.
| |
| That said, there are 88 welds at NMP2 that have been categorized as Category C-F-1 weldments; 49 are circumferen-tial and 39 are associated longitudinal seam welds. NMP2 examines 33 of those 88 weldments. Seventeen (17) of the 33 examined are circumferential welds, while 16 are longitudinal welds that intersect those 17 circumferential welds.
| |
| Table 2 in Appendix B to this document identifies which 17 circumferential welds and which 16 longitudinal welds.
| |
| It does so by first listing all 49 circumferential welds at NMP2 that have been categorized as Examination Category C-F-1 welds (for the purpose of calculating a representative sample) and then listing (in those cases where longitudi-nal welds intersect circumferential welds) the associated longitudinal weld numbers. Based on a population of 49 cir-cumferential welds, the Code mandates a minimum representative sample of 28 circumferential welds (plus their as-sociated intersecting longitudinal seam welds.) However, 12 of the 49 circumferential welds are included only for sample sizing, and are not themselves required to be nondestructively examined. This decreases the set of those that do require nondestructive examination from 49 circumferential welds down to 37 circumferential welds (&om which the 28 were to have been selected.) However, more than half (20) of those 37 circumferential welds were found to be in locations that were not readily accessible for the performance of nondestructive examinations. They (along with their 20 associated intersecting, longitudinal welds) are located in the suppression pool, under water. Therefore, pursuant to 10 CFR 50.55A(g)(5), NMPC has again determined that conformance with the examination requirements of the Code is not practical for those 20 circumferential welds (and their associated intersecting longitudinal welds.)
| |
| Those 20 circumferential welds have been identified in NMP2 relief request number RR-IWC-2, Revision 1. NRC granted that relief in the first interval, and NMPC anticipates a repetition of the granting of that relief in this second interval, as there has been no fundamental change in the factors affecting the impracticality of performing these examinations.
| |
| Item C5.11 - Circumferential Welds in Piping w'/6 in. Nominal Wall Thickness and > NPS 4 Extent of.Examination - at least 90% of the surface and volume of 16 of the 17 accessible welds noted above, and at least 50% of the surface and volume of the examination identified as 2RHscs-22~o1a (whose accessibility is limited due to a permanent interference) in accordance with the resubmittal of request for relief no. RR-IWC-5.
| |
| Frequency of Examination - interval distribution (Io)
| |
| Item C5.12- Longitudinal Welds in Piping a /s in. Nominal Wall Thickness and >NPS 4 (Per Code Case N-524)
| |
| Extent of Examination - at least 90% of the surface and volume of a length (equal to a minimum of 2.5 times the thickness of the piping) of the 16 intersecting welds noted above.
| |
| Frequency of Ex~ation - interval distribution (Io)
| |
| NMP2-ISI406 Rev.1 Section 5 Page 13 of 16
| |
| | |
| Item C5.21- Circumferential Welds in Piping > /s in. Nominal Wall Thickness and a NPS 2 and s NPS 4- this item is only applicable to pressurized water reactors, and is therefore not applicable at NMP2.
| |
| Item C5.22- Longitudinal Welds in Piping>'/5 in, Nominal Wall Thickness and a NPS 2 and 5 NPS 4- this item is only applicable to pressurized water reactors, and is therefore not applicable at NMP2.
| |
| Item C5.30- Socket Welds - not applicable at NMP2 Item C5.41- Circumferential Welds in Pipe Branch Connections of Branch Piping a NPS 2- not applicable at NMP2 Item C5.42- Longitudinal Welds in Pipe Branch Connections of Branch Piping z NPS 2 - not applicable at NMP2 5.6.6 CATEGORY C-F-2, PRESSURE RETAINING WELDS IN CARBON OR LOW ALLOY STEEL PIPING The welds selected for this examination category include 7.5% of all carbon and low allow steel welds not exempted by IWC-1220. (Some welds not exempted by IWC-1220 are not required to be nondestructively examined per Examination Category C-F-2. However, these welds have been included in the total weld count to which the 7.5%
| |
| sampling rate is applied.) The examinations have been distributed:
| |
| a) among the Class 2 systems prorated, to the degree practicable, on the number of nonexempt carbon and low allow steel welds in each system; b) within a system, among terminal ends and structural discontinuities prorated, to the degree practicable, on the number of nonexempt terminal ends and structural discontinuities in that system; and c) within each system, between line sizes prorated to the degree practicable; as indicated in Tables 3, 4, and 5 of Appendix B to this program document Item C5.51 - Circumferential Welds in Piping w /s in. Nominal Wall Thickness and > NPS 4 Extent of Examination - at least 90% of the surface and volume of the 98 welds examined in the first interval Frequency of Examination - interval distribution (Io)
| |
| U Item C5.52 - Longitudinal Welds in Piping z /s in. Nominal Wall Thickness and > NPS 4 (Per Code Case N-524)
| |
| Extent of Examination - at least 90% of the surface and volume of a length (equal to a minimum of 2.5 times the thickness of the piping) of the singular intersecting weld (2csH P1pw216) examined in the first interval Frequency of Examination - interval distribution (Io)
| |
| Item C5.61 - Circumferential Welds in Piping >'/5 in. Nominal Wall Thickness and 2 NPS 2 and 5 NPS 4 - this item is only applicable to pressurized water reactors, and is therefore not applicable at NMP2.
| |
| Item C5,62 - Longitudinal Welds in Piping >'/5 in. Nominal Wall Thickness and a NPS 2 and s NPS 4 - this item is only applicable to pressurized water reactors, and is therefore not applicable at NMP2.
| |
| t Item C5.70- Socket Welds Extent of Examination - at least 90% of the socket weld (2RHs Mov2A,vwMov2A-A)examined in the first interval Frequency of Examination - interval distribution (Io)
| |
| Item C5.81 - Circumferential Welds in Pipe Branch Connections of Branch Piping a NPS 2 Extent of Examination at least 90% of the three (3) branch connection welds (2csH'P1+w201; 2RHs'P1c,Pw103c; alld 2RHsws-24~sw026) examined in the first interval Frequency of Examination - interval distribution (Io)
| |
| NMP2-ISI406,Rev.1 Section 5 Page 14 ot16
| |
| | |
| Item C5.82- Longitudinal Welds in Pipe Branch Connections of Branch Piping a NPS 2 - not applicable at NMP2 5.6.7 CATEGORY C-G, PRESSURE-RETAINING WELDS IN PUMPS AND VALVES Item C6.10 Pump Casing Welds Extent of Examination - at least 90% of the surface areas of the pressure retaining welds in the casings of pumps that are themselves in piping runs that are examined under Examination Categories C-F-1 and C-F-2, that are not made inaccessible by the nature of their installation in concrete pits. (Request for Relief no. RR-IWC-1 is applicable to 21 of these selected welds.) The multiple component concept is applicable for pumps of similar design, function, size, and service within a system. Refer to Appendix D for a tabulation of the pumps that are in the scope of this examina-tion category and, are considered to qualify for the multiple component approach.
| |
| Frequency of Examination - interval distribution (io)
| |
| Item C6.20- Valve Body Welds Extent of Examination - at least 60% (per Request for Relief no. RR-IWC-5) of the surface areas of the pressure retaining welds in the bodies of valves that are in runs of pipe required to be examined by either Examination Category C-F-1 or Examination Category C-F-2. The multiple component concept is applicable for pumps of similar design, function, size, and service within a system. Its invocation has resulted in the selection of 25 of the 32 C6.20 weldments. Refer to Appendix D for a tabulation of the valves that are in the scope of this examination category and, are considered to qualify for the multiple component approach. Refer to Appendix F for a listing of the 20 weldments for which 90% or better examination coverage could not be achieved.
| |
| Frequency of Examination - interval distribution (io) 5.6.8 CATEGORY C-H, ALLPRESSURE RETAINING COMPONENTS See NMP2-ISI Pressure Testing Program Plan Document ¹NMP2-PT-008.
| |
| 5.6.9 CLASS 2 AUGMENTED INSPECTION REQUIREMENTS Extent of Examination - all welds on Class 2 portions of systems on highwnergy piping systems within the break exclusion region at the containment penetrations (of which there are only three; all in the Reactor Core Isolation Cooling (steam supply) System: 2icsw7<9~009, 2lcs4749cw016, and 21cs4749<w016.) The rationale for the inclusion of these examinations appears in paragraph 3.1.1 of Section 3 of this program plan document, It should be noted that the Class 2 break exclusion welds are also classified and examined as Category C-F-2 welds.
| |
| Frequency of Examination - interval distribution (io) 5.7 CLASS 3 EXAMINATIONBASES NMP2 addresses all Class 3 pressure retaining components in:
| |
| NMP2 Pressure Testing Program Plan, Document No. NMP2-PT-008.
| |
| A 10% sample of Class 3 supports are selected per Code Case N491-I and listed in the IWF Section of Appendix H.
| |
| Class 3 integral attachments associated with the IWF supports scheduled for examination during the second ten year interval are also examined to meet IWD criteria. Integral attachments shall be selected for examination per the requirements of Code Case N-509 and in conjunction with those Class 3 supports selected for examination.
| |
| NMP2.ISI406 Rev.1 Section 5 Pege15ot16
| |
| | |
| 5.8 ADDITIONALEXAMINATIONS When the results of examinations require Code Repair or Replacement (for their acceptance) the component supports immedtately adjacent to those reqtunng corrective action willbe examined. Also, the examinations will be extended to include additional supports equal in number and similar in type, design, and function to those initially examined during the inspection [Reference Code Case N-491-1.] When these additional examinations require corrective measures, the remaining component supports within the system of the same type, design, and function will be examined.
| |
| NMP2-ISI-006 Rev.1 Section 5 Page 16 of 16
| |
| | |
| 0 6.0 EXAMINATIONPROGRAM PLAN TABLE FIELDS DESCRIPTION The Examination Program Plan Tables are included as Appendix G. A description of each Program Plan Table field is given below. The reader should be so advised that not all of these codes appear m the current Appendix G. Rather, they are indicative of the several codes used over both interval's plans.
| |
| This column contains codes which represent the known restraints to access for inspection are:
| |
| HzoLEvEL Standard suppression pool water level covers support INSULATN NMPC Level Ill VT examiner has authorized the removal of insulation to facilitate the 1" interval examination Level IIIVT examiner has authorized/required the use
| |
| 'MPC of a ladder to facilitate the examination 1"'nterval NMPC Level III VT examiner has authorized the building of scaII'aiding to facilitate the 1" interval examination TIP ROOM Personnel radiation exposure concern associated with passage through transverse incore probe room ASSOC NONEX An asterisk in this column indicates the presence of associated non-exempt ASME Code INT ATT Class 1, 2, or 3 integral attachments. Their quantity may follow in parentheses. Identifiers'ay follow the quantity-if space permits.
| |
| SLOG This column contains codes which serve to identify the building in which the support will be found. Building abbreviations are defined as follows:
| |
| Auxiliary Bay North Auxiliary Bay South Control Building Standby Diesel Generator Building Main Steam Tunnel Primary Containment Secondary Containment SP Suppression Pool Screenwell Building Service Water Tunnel Turbine Building ELEV This column contains the approximate centerline elevation at the point of support.
| |
| ISO LOCATOR This column contains the inservice inspection isometric piping drawing/location number which is used to identify and locate a pipe support.
| |
| NMP2-ISI-006 Rev.1 Section 6 Page 1 of 7
| |
| | |
| LINE NUMBER Identifies the piping line designation, as defined in the ASME III certified Specificanon for Piping Engineering and Design, (for) ASME III Code Class I, 2, and 3, and ANSI B3I. I numbered NMP2-P301A.
| |
| RELREO¹ This field provides a reference to Section XI requirements that are not being satisfied, and identification, of substitute examinations, if any, via the uniquely numbered, 10 CFR 50.55a(g)(5)(iii) approved request for relief from the regulators. Summaries and statuses of the approved requests can be found in Appendix F to this Program Plan.
| |
| SUPPORT The alpha-numeric identifier for the support to be examined. Manufacturers'onstruction EXAMINATION identifiers, where applicable, have been utilized to provide traceability to construction records NO CATGRY ASME XI Code Table IWX-2500-1 Examination Category CLASS ASME XI Inservice Inspection Code Classification, COMPONENT References the planar drawn, ISI program item drawing (weld/mechanical connection map)
| |
| DRAWING which serves to locate the associated EXAM /Don an item, once the item has been located in the plant by other means.
| |
| Provides brief description of item to be examined, i.e.pipe/elbow weld, pipe/lug, valve OF ITEM TO BE EX-AMINED bolting, etc.
| |
| Identifies the type of nondestructive examination to be performed through the use of the EX1. EX2. EX3 following codes:
| |
| 455 Special SIL-455 Alloy l82 expanded area examination IVV Special SILs/RICSILs in-vessel visual examinations NA Er field is logically not applicable.
| |
| PT Special SIL-419 liquid penetrant examination RUV Special SIL-474 remote underwater visual examination SUR Code surface examination (e.g.- magnetic particle or liquid penetrant)
| |
| UT Special SIL-330 jet pump ultrasonic examination VOL Code volumetric examination (e.g.- ultrasonic or radiographic)
| |
| VT1 Code visual examination to determine condition of surface VT3 Code visual examination to determine structural integrity EXAMINATION The alpha-numeric identifier for the weld, bolt, or component surface to be examined. This IDENTIFIER identifier will usually be unique to the particular weld or part of a component. Manufac-turers'onstruction identifiers, where applicable, are utilized to provide traceability to con-struction records.
| |
| NMP2-ISI406 Rev.1 Section 6 Page2of7
| |
| | |
| This column contains abbreviated notations indicating the requirement for frequency of FREQY examination as noted below.
| |
| 123 Examinations are to be performed during all three periods (i.e., 1, 2, and 3.)
| |
| 1P Examinations are to be performed during 1st periods.
| |
| 2P Examinations are to be performed during 2nd periods.
| |
| 3P Examinations are to be performed during 3rd periods.
| |
| DisG Examination belongs to a group of examinations on a single component, all of which are intended to be performed at the same time. DlsG indicates that this is a grouped component and is selected to represent the group.
| |
| Dis Examination &equency is contingent upon disassembly. It is to be performed in the event the item is disassembled for reasons other than performance of the ISI examination.
| |
| ENRO Examination performed at even numbered refueling outages EOI This examination must be performed during the interval, but may be deferred to the end of the interval.
| |
| EDR Examinations are to be performed every other refueling outage ERO Examination performed each refueling outage EERO Examination performed only ifrequired pursuant to an evaluation conducted at the end of the previous refueling outage (evaluate every refuel outage per DER 2-93-2295)
| |
| ID Selected for examination, and may be performed any time during the interval, given consideration on its impact on percentage requirements (i.e., on an interval distribution.)
| |
| na Freq field is logically not applicable.
| |
| NS The item was not selected for examination.
| |
| ONRO Examination performed at odd numbered'refueling outages RFO4 Examination performed at refueling outage number 4 (only.)
| |
| RR A USNRC relief request (pending or granted) renders frequency moot.
| |
| IGSCC Ifa weldment falls within the scope of Generic Letter 88-01, then it must be categorized pursuant to GL88-Ol's "Table 1." The applicability of that table (as modified by GL88-01 Supplement 1) to NMP2 is summarized immediately following.
| |
| NMP2-IS I406 Rev.1 Section 6 Page3of7
| |
| | |
| I,I
| |
| .':GL'88;,01:::TABL'E,,'l-'s -'APPLICABIL'ITY'TONMP2 EXTENT& DESCRIPTION NMP2 SCHEDULE OF WELDMENT COMMENTS 25'/ every 10 years Resistant Materials There are currently 113 Category A A at least 12'/ In 6 rs. weidments at NMP2 50% every 10 years Non-resistant Materials; There are currently Stress Improvement (Sl) no Category 8 weldments viithln 2 ears of o eration at NMP2 All within the next 2 refueling Non-resistant Materials; There are currently cycles, then all every 10 years Stress Improvement (SI) no Category C weldments at least 50% in 6 s. after 2 earsofo eration at NMP2 All every 2 refueling cycles Non<esistant Materials; There are currently 47 D No Stress Im rovement Cat. D weldments at NMP2 50% next refueling outage, Cracked; There is currently one (1) Category E then all every 2 refueling Reinforced by weld weldment at NMP2, as NRC granted ap-outages overlay, or proval to upgrade weld KC32 from Cat.
| |
| mitl atedb Sl F b letter dated Februa 12, 1996 All every refueling outage Cracked; There are currently One Category F weld-Inad uate or no re air ments at NMP2 2RPV-KB20 AII next refueling outage Non-Resistant; There are currently no Category G weld-Not Inspected (by UT) ments at NMP2 ITS ISOMETRIC References the isometrically drawn, ISI program piping drawing (mapping of welds and mechanical connections) that serves to locate the associated EYAMIDon a run of pipe in the plant.
| |
| ITEM ff ASME XI Code Table IWX-2500-1 Examination Category Item No.
| |
| LINE NO. Identifies the piping line designation, as defined in the ASME III certified Specification for Piping 'Engineering and Design, (for) ASME Ill Code Class I. 2, and 3. and ANSI B3I. I numbered NMP2-P30 IA.
| |
| Identifies the procedure used to perform the required NDE examination NOTES Specific information relating to the examination item, such as examination item form/material, or special requirements PERIOD1, g3 This column contains abbreviations indicating both schodule and perfor.
| |
| mance of examinations. Slngi~haracter notations may be combined to produce a com-pound statement: examination scheduled for this period 6 associates examination with fuel cycle number 6 7 associates examination with fuel cycle number 7 a associates examination with fuel cycle number 8 g associates examination with fuel cycle number 9 10 associates examination with fuel cycle number 10 associates examination with fuel cycle number 11 NMP2-ISI406 Rev.t Section 6 Page4of7
| |
| | |
| ~
| |
| | |
| At (¹) These letters indicate that the scheduled examinations were attempted (but not completed) in the period. A variable (number) may follow these letters. If so, then that number identifies the fuel cycle in which the attempt occurred.
| |
| CN These letters indicate that examinations were NIS-I certified in the period, but not required (e.g., rendered superfluous via subsequent de-selection.)
| |
| 0 (¹) This (capital) letter indicates that all examinations were done for the period. A variable (number) may follow this letter. Ifso, then that number identifies the fuel cycle in which the completion (examinations) occurred. (A lower case "d" indicates that a portion (but not all) of the listed examinations were done that period.)
| |
| ES (¹) These letters indicate that erpanded sample examinations were performed (e.g., pursuant to IWX-2430 - ADDITIONALEXAMINATIONS.) A variable (number) may follow these letters. Ifso, then that number identifies the fuel cycle in which those examinations occutTed.
| |
| Ev (¹) These letters indicate that the examinations required by the referenced Code Category were performed and were accepted by NMPC Design Engineering Department's evaluation pursuant to IWB-3122.4 Acceptance by Evaluation. A variable (number) may follow these letters. Ifso, then that number identifies the fuel cycle in which those examinations occurred.
| |
| (A lower case "e" indicates that a portion (but not all) of the listed examinations were performed.)
| |
| Ex (¹) These letters indicate that the examinations required by the referenced Code Category were performed and were accepted by meeting the examination acceptance criteria provided to the NMPC Quality Inspection Department personnel pursuant to IWB-3122.1 Acceptance by Examination. A variable (number) may follow these letters. If so, then that number "e" indi-identifies the refueling cycle in which those examinations occurred. (A lower case cates that a portion (but not all) of the listed examinations were performed.)
| |
| This letter indicates that a special mid-cycle examination was performed and accepted.
| |
| Ps (¹) These letters indicate that Code preservice examinations required by the referenced Code Category were performed and were accepted by meeting the various acceptance, repair, and reexamination criteria provided to the NMPC Quality Inspection Department personnel pur-suant to IWB-3110 PRESERVICE EXAMINATIONS. A variable (number) may follow these letters. Ifso, then that number identifies the refueling cycle in which those examinations oc-
| |
| 'll culTed.
| |
| Rr (¹) These letters indicate that the examinations required by the referenced Code Category were performed, failed to meet acceptance criteria, could not be accepted by evaluation, but rather, required repair, and were subsequently reexamined and found to be acceptable pursuant to IWB-3122.2 Acceptance by Repair. A variable (number) may follow these letters. Ifso, then that number identifies the refueling cycle in which those examinations occurred.
| |
| Rt (¹) These letters indicate that the examinations required by the referenced Code Category were performed, failed to meet acceptance criteria, could not be accepted by evaluation, but rather, required replacement, and were subsequently reexamined and found to be acceptable pursuant to IWB-3122.3 Acceptance by Rcplacemiet. A variable (number) may follow these letters. If so, then that number identifies the refueling cycle in which those examinations occuITed.
| |
| NMP2-ISI-006 Rev. 1 Section 6 Page5o(7
| |
| | |
| Sc (¹) These letters indicate that examinations are scheduled. A variable (number) may follow these letters. Ifso, then that number identifies the refueling cycle in which those examinations are scheduled. (A lower case "s" indicates that a portion (but not all) of the listed examinations are to be performed.)
| |
| W This letter indicates that the Code required examination has been waived by the regulatory and enforcement authority having jurisdiction at the plant site (i.e., the United States Nuclear Regulatory Commission.)
| |
| This typographic symbol indicates a status which was under review at the time the table was promulgated.
| |
| REL REQ ¹ This field provides a reference to Section XI requirements that are not being satisfied, and identification of substitute examinations, if any, via the uniquely numbered, 10 CFR 50.55a(g)(5)(iii) approved request for relief from the regulators. Summaries and statuses of the approved requests can be found in Appendix F to this Program Plan.
| |
| REMARKS Although there is no special format to this column, it does fulfilla specific requirement. In general terms, that requirement is to assure continuity and auditability of the Program Plan by identifying changes and the motivation/rationale behind them. Specifically, this column satisfies the NMPC procedural requirements of NIP-LPP-01, 93.2.1, insofar as:
| |
| ~ it provides "a brief description that summarizes the change,"
| |
| ~ it identifies the page (of the Table) upon which it appears as "a retyped version which clearly indicates the change."
| |
| ECT ASME XI relies on the concept of representative sampling. Therefore, although the Code and this Plan require entire populations of categories of weldments and base materials be listed herein, in most cases, only subsets of those populations require examination. This column provides the rationale for those selections. (Some weldments may be chosen pursuant to more than one criteria and, as a result, more than one code may, at times, appear.)
| |
| 10%perl Modified (RR-IWB-1) B14.10 10% sample selected weldment 7.5%Min C-F-I, C5.11 minimum 7.5% sample selected weldment AL Associated Longitudinal weld of a selected circumferential weld ANC Anchor (welded to, or adjacent to)
| |
| AU Augmented examination as defined in Section 3 of this Program AW Additional Weld BER Break Exclusion Region weldment DER Dlspo Deviation Event Report disposition selection mandate OM Dissimilar Metals weldment Exempt Nonselected item due to meeting ASME XI exemption criteria Grp Rep Multi-component group representative HS High Stress weldment Mandate Mandatory ASME XI Code examination NMP2-ISI406 Rev.1 Section 6 Pege6of7
| |
| | |
| NA Not Applicable none Selection criteria not provided by ASME XI Code (currently limited to Category C-F-2)
| |
| NR Not Required NS Selectable, but not selected (due to the selection of other items within its group)
| |
| SD Structural Discontinuity TE Category C-F-2, C5.51 or C5.81 terminal end sub-sample selection group member TEV Terminal End to Vessel UponDis Selection incumbent upon routine disassembly for maintenance, repair, or volumetric exam SYSTEM This is a three letter code which is associated with a piping system or the master nuclear component, i.e.the reactor pressure vessel. (It appears only once per page, at the top, in the heading.) A piping system is an assembly of piping, piping supports, components, and, if applicable, component supports of one or more Code Classes, with a defined function as described in the Design Specification for the piping system. The master nuclear component is the reactor pressure vessel, in its "as-received" configuration at NMP2.'here are 13 such codes listed below, replete with system name.
| |
| Ass Auxiliary Steam High Pressure Core Spray Low Pressure Core Spray Reactor Building Equipment Drains Feedwater Reactor Core Isolation Cooling Main Steam Reactor Coolant (Recirculation)
| |
| Control Rod Drive Hydraulic System Residual Heat Removal Reactor Pressure Vessel sLs Standby Liquid Control Reactor Water Cleanup UT CALIBRATN Identifies the calibration standard that, under most conditions, will be best suited for the BLK required examination. If, for some technically justified reason, the use of a different calibration block becomes necessary, the QI supervisor will be responsible for notifying the ISI Program Manager in writing, and obtaining his concurrence.
| |
| 'n addition to being ASME III Form N.IA certified by CBI Nuclear Company (CBI). and beanng senal number T52, the vessel also appears on a Form N-5 ccnification resultant to the CBI shop installation of I85 CRD housings, 55 incorc housings, 370 CRD hydraulic linc piping subassemblies, one drain line piping subassembly, one diifcrential prcssure & liquid control line piping subassembly, and one jet pump penetration seal appurtenance.
| |
| NMP2-ISI406 Rev.t Section 6 Page 7of7
| |
| | |
| 7.0 EXCEPTIONS TO ASME CODE REQUIREMENTS 7.1 REQUESTING RELIEF UNDER 10 CFR 50.55a Relief from ASME Code requirements may be requested based on either of the two following criteria. The format presented in Paragraph 7.1.2 below shall be utilized for both requests for relief with the proper reference to the the applicable 10CFR50.55a section included in the request.
| |
| (1) Section 50.55a(g)(5)(iii) of Title 10 of the Code of Federal Regulations states, "Ifthe licensee has determined that conformance with certain code requirements is impractical for its facility, the licensee shall notify the Commission and submit, as specified in f50.4, information to support the determinations."
| |
| (2) Section 50.55a(3) of Title 10 of the Code of Federal Regulations states, "Proposed alternatives to the requirements of paragraphs (c), (d), (e), (f), (g), and (h) of this section or portions thereof may be used when authorized by the Director of the Office of Nuclear Reactor Regulation. The applicant shall demonstrate that:
| |
| (i) The proposed alternatives would provide an acceptable, level of quality and safety, or (ii) Compliance with the specified requirements of this section would result in hardship or unusual diKculty without a compensating increase in the level of quality and safety.
| |
| 7.1.1 DETERMINATIONOF IMPRACTICALITY if Conformance with a code requirement shall be considered to be impractical a successful, meaningful implementa-tion of the requirement could only be achieved by altering or otherwise reworking the existing design, geometry or materials ofconstruction of an item within the facility. This alteration or reworking shall be termed a burden on NMPC in documents and communications with the Commission, subsequent and resultant to, NMPC's conclusion that a code requirement is not credible at NMP2.
| |
| 7.1.2 NOTIFICATION,OF REGULATORS In those cases where NMPC submits information to the Commission to support a determination that conformance with certain Code requirements is impractical for NMP2:
| |
| ~ prepare an analysis in the form provided below; Identifier Relief Request Number Component the assigned plant identifier associated ASME component System Title the applicable plant designated system title Function a brief description of system function during:
| |
| (a) normal plant operations (b) shutdown (c) refueling conditions Code Class ASME Section XI Class, Examination Category, and Item Number NMP2-ISI406 Rev.1 Section 7 Page 1 of 2
| |
| | |
| Examination a description of the examination required by 10CFR50.55a(g) is to include a reference to the Requirements salient portions of the document from which the examination is required', including:
| |
| (a) interval for which relief is requested (b) ifthe examination is required by ASME XI, the table or section of the Code delineating same (c) &equency of examination (d) specific type of examination Burden if describe the burden on NMPC the Code requirements were imposed (e.g., a system would have to be redesigned or an item would have to be replaced), include:
| |
| (a) the rationale upon which the examination is deemed impractical, such as:
| |
| (1) geometric constraints; (2) metallurgical constraints; (3) inaccessibility; (4) ALARAconcerns (not to be the sole reason)
| |
| (a) radiation levels at the test area; (b) total estimated man-REM exposure involved in the examination; (c) flushing or shielding capabilities that might reduce radiation level; (d) considerations involving remote inspection; (b) past history/lessons learned from previous intervals Recommended &om the discussion above, a synopsis of any substitute examination, including its &equency, Substitute and ifpossible, a specific schedule for implementation.
| |
| Technical provide support information, including:
| |
| Justification (a) description of, and justification for, any changes expected in the overall level of plant and Data to quality and safety resultant to implementation of the recommended substitute in lieu of Supportthe the ASME XI requirement; Determination (b) identification and discussion of similar components (in redundant systems or in the same system) to be examined or tested as substitutes; (c) percentage of the required examinations that have been or willbe completed on each com-ponent for which substitute examinations are planned; (d) discussion of the consequences of failure of the component for which substitute examina-tions are planned.
| |
| ~ submit this information to the Commission as specified in g 50.4 Written Communications, of Title 10 of the Code of Federal Regulations, through the Nuclear Licensing Department.
| |
| 7.2 CYCLIC REVIEW The list of relief requests that is contained in this program as Appendix F shall be reviewed for continued applicability as well as potential withdrawal on a cyclic basis. The cycles shall correspond with the generation of the ASME XI required Summary Report, that is to say, on a refueling outage basis if Code Case N-532 is not utilized, or on a if periodic basis Code Case N-532 is utilized. The review will consider such factors as system safety classification changes and evolving nondestructive examination techniques. The results of each cycle's review willappear as updates to the status contained in Appendix F.
| |
| 'his may bc a part ofthe core requirements contained inthe ASME Boiler & Pressure Vessel Code, Section
| |
| ~ Xl, or may be an augmented inspection
| |
| ~
| |
| as al-lowed by 10CFR50.55a(gX6Xii).
| |
| 'is requirement is derived &om the disposition to NMPC Deviation/Event Report tt t-934308, dated 2-9 93, wherein it was reported that the Nhl Pl Second
| |
| ~ ~
| |
| Tcn Year Program Plan was ddicient in thc area of relief request submittal/review. In part, the disposition to that DER requires this program plan to bc revised to incorporate a requirement for a periodic review ofrelief requests.
| |
| NMP2-ISI406 Rev.t Section 7 Page2o(2
| |
| | |
| 8.0 NONDESTRUCTIVE EXAMINATIONPROCEDURES VT 2.01 ASME Section XI Visual Examination Procedure PT 3.00 Liquid Penetrant Examination Procedure MT 4.00 Magnetic Particle Examination Procedure RT 5.00 Radiographic Examination UT 6.01 Ultrasonic Linearity Verification UT 6.04 Ultrasonic Examination of Bolts, Studs, Nuts and Cylindrical Components UT 6.05 Ultrasonic Thickness Measurement UT 6.06 Manual Planar Flaw Sizing Procedure UT 6.07 Ultrasonic Examination of Nozzle Inner Radii UT 6.09 Ultrasonic Examination Procedure for RPV Flange Weld and Stud Hole Threads in the RPV Flange UT 6.10 System Performance Checks and Implementation of Regulatory Guide 1.150 for RPV Examinations UT 6.13 Ultrasonic Examination of Bi-Metallic Piping Welds UT 6.20 Ultrasonic Examination of Reactor CRD Housings UT6.21 Ultrasonic Examination Procedure For Vessel Welds 2" Thick or Less And Associated Nozzle Inner Radius Areas UT 6.23 Ultrasonic Examination of Ferritic Pipe Welds UT 6.24 Ultrasonic Examination of Austenitic Pipe Welds UT 6.25 Straight Beam, Ultrasonic Examination of Bolts and Studs See controlled copy of NDE Procedures for latest approved revision.
| |
| NOTE: NON-DESTRUCTIVE EXAMINATION(NDE) PROCEDURES REFERENCED FOR USE IN THE APPENDIX G k H TABLES MAY BE SUPERCEDED WITH UPDATED OR NEW PROCEDURES TO COMPLY WITH CURRENT ASME CODE REQUIREMENTS WITHOUT REQUIRING CHANGES TO THE TABLES TO REFLECT THE ACTUALPROCEDURES USED.
| |
| The following are three examples of identified procedure changes required to implement the requirements of the 1989 Editiori of ASME Section Xl.
| |
| Current procedure: New procedure:
| |
| NDEP-UT-6.02 NDEP-UT-6.23 NDEP-UT-6.03 NDEP-UT-6.24 NDEP-UT-6.11 NDEP-UT-6.25 NMP2-ISI406 Rev.1 Section 8 Page1 of1
| |
| | |
| 9.0 ULTRASONIC CALIBRATIONSTANDARDS At NMP2, basic calibration blocks are made from material of the same nominal diameter and nominal wall thickness or pipe schedule as the item to be examined. The calibration blocks for similar metal welds are fabricated from one of the materials specified for the piping being joined by the weld. Calibration blocks for dissimilar metal welds are fabricated from the material specified for the side of the weld Irom which the examination is conducted. In those cases where material of the same specification is not available, material of similar chemical analysis, tensile properties and metallurgical structure have been and will continue to be used. In those cases where the material to be examined has been clad, the block has been and will continue to be clad by the same welding procedure as the production part (except in those instances where the automatic method is impractical-there, deposition of the clad is by the manual method.) The finish on the surfaces of these blocks is representative of the surface finishes of the items being examined in this interval. The inside and outside diameters of these blocks contain circumferential and longitudinal notches, the sides of which are perpendicular to the surface of the block Each notch is at least one (I) inch in length.
| |
| The basic calibration blocks, as listed below, are retained by the Owner, NMPC. Throughout the first interval, they were supplemented by two borrowed blocks, one Irom General Electric Nuclear Power (Serial No. N2NZ001) and the other from Carolina Power & Light's Brunswick-2 facility (Serial No. 83-8.) NMP2 anticipates that additional supplemental blocks may be used in the second interval based on its implementation of the Performance Demonstra-tion Initiative (PDI) or its use of newly developed techniques.
| |
| NMPC ID IN USE MATERIAL COMMENTS This is a welded mock-up of quenched and tempered vacuum-treated carbon steel (P-1) forging material to forged or rolled austenitic alloy steel (P-8) material for use by the vendor of automated examinations on reactor pressure vessel nozzles. It may be supple-SA-508 Class 1a mented by General Electric Nuclear Energy's (welded to) SA-182 calibration block, Serial No. N2NZ001 or CP8L's ~
| |
| GE795E254G3 Yes Grade F 316L Brunswick-2 block Serial No. 83-B.
| |
| Block is carbon steel plate for pressure vessels intended for intermediate and higher temperature service, made from SA-516 Grade 70 material, certified to meet SA-515 Grade 70, and intended to SR-155 be representative of the Main Steam System header, KC70 made from A155 KC70 Class 1.1 plate, rolled and NMP-2-48-3.50-CS Yes Class 1 welded.
| |
| This is a wrought carbon steel piping fitting; starting" SAQ20 material was SA-350 Grade LF2 (Charpy V-notch NMP-2-30-2.90-CS Yes Grade WPL6 tou hness tested. Used for Feedwater S em tees.
| |
| .': This'Is'caibon steel foigIng requIring notch>>toughness~
| |
| ',testiiigIfor"'piping:comp'an'enta!'.Althoiigh. fabricated",,)
| |
| '4 "''" ':;:,,durin'g,.tI)e."pr'eseryic'e inspection 'pha's'e."a'rid'intended:,":
| |
| "foi'tise'In",the i,',':, ,': - .'",'-';
| |
| performance:of,.iiiariual'examinabons'at.,'>>NMP2,",this,block'Is'.not.'prese'ntiy:
| |
| -'SA-350,,' used;for'InseivIce':>
| |
| .NMP-'2-'28-'2.60~'>>:-''9.:;::i": Gra'de L'F2'i:::':.':,':", '...": ".examin'ations.'.";":-."~-':"-"i=":": ':",'>>~-";..':
| |
| '"" :I: 7:::::: .'..,"':.: ''"5.:':::::""I This is seamless carbon steel pipe used for main NMP-2-28-1.34-CS Yes SA-106 Grade B steam line examinations This is quenched and tempered vacuum-treated alloy SA-508 steel forging material for pressure vessels; used for NMP-2-27-1.57-CS Yes Class 2 main steam nozzle to safe end weld examinations Seamless carbon steel pipe for main steam line NMP-2-26-1.26-CS Yes SA-106 Grade B examinations NMP2-ISI-006 Rev.1 Section 9 Page10f8
| |
| | |
| NMPC ID IN USE MATERIAL COMMENTS Quenched and tempered vacuum-treated alloy steel SA-508 forging for pressure vessels is used for recirculation NMP-2-25-1.84-NOZ Yes Class 2 suction nozzle to safe end weld examinations This is a quenched and tempered vacuum-treated alloy steel forging intended for pressure vessels; at SA-508 NMP2 it is used for feedwater system penetration weld NMP-2-24-2.469-CS Yes Class 2 examinations NMP-2-24-2.06-CS Yes SA-106 Grade B Seamless carbon steel pipe in feedwater system This is an electric fusion welded austenitic chromium-SA-358 nickel alloy steel pipe, double welded with filler metal Grade 316 in all passes, then completely radiographed. It is used NMP-2-24-1.317-SS Yes Class 1 for recirculation tern i in examinations at NMP2.
| |
| This is a wrought austenitic stainless steel (18-8, Mo) pipe fitting, made from A-1 82, Grade F 316 material, SAA03 and used for recirculation system piping weld ex-NMP-2-24-1.234-SS Yes WP 316 aminations Seamless carbon steel pipe used for feedwater NMP-2-24-1.219-CS Yes SA-106 Grade B s tern i in weld examinations Electric fusion welded austenitic chromium-nickel alloy SA-358 steel pipe, double welded with filler metal in aF passes, Grade 316 then completely radiographed; used for recirculation NMP-2-24-1.002-SS Yes Class 1 s tern i in weld examinations SA-312 Austenitic stainless steel pipe used for residual heat Yes Grade TP 304 removals tern i in weldexaminations Seamless carbon steel pipe used for residual heat NMP-2-24-.500-CS Yes SA-106 Grade B removals tern i in weldexaminations Seamless carbon steel pipe used for low pressure NMP-2-24-.375-CS Yes SA-106 Grade B cores ra s tern i in weld examinations This is an electric fusion'welded austenitic chromium-,
| |
| nickel alloy steel:pipe; double welded with filler metal "
| |
| in.. all- passes, but not'adiographed.,'Although fabricated during the presenrice inspection phase SA'-358 for use- fn the performance of.manuaf and'ntended Grade 316L- e'xamfnations at NMP2, this block is not presently u-NMP-2-20-1.03-SS No. Class 2 sed for inservice examinations.
| |
| Seamless carbon steel pipe used for residual heat NMP-2-20-1.031-CS Yes SA-106 Grade B removals tern i in weldexaminations Electric fusion welded austenitic chromium-nickel alloy SA-358 steel pipe; double welded with fiFer metal in ail passes, Grade 316L but not radiographed; used for residual heat removal NMP-2-20-.84-SS Yes Class 2 s tern i in weld examinations Seamless carbon steel pipe used for residual heat NMP-2-20-.812-CS Yes SA-106 Grade B removal s tern i in weld examinations Seamless carbon steel pipe used for residual heat NMP-2-20-.594-CS Yes SA-106 Grade B removal s tern f in weld examinations Seamless carbon steel pipe used for residual heat Yes SA-106 Grade B removals tern i in weld examinations NMP2-ISI406 Rev.1 Section 9 Page 2of8
| |
| | |
| ,I NMPC ID IN USE MATERIAL COMMENTS Seamless Carbon Steel Pipe used for high and low NMP-2-20-.375-CS Yes SA-106 Grade B pressure core spray systems piping weld examinations Austenitic stainless steel pipe used for high and low NMP-2-20-.375-SS Yes SA-312 Grade TP 304 ressurecores ra s tems i 'n weldexaminations Seamless carbon steel pipe used for feedwater and NMP-2-18-.938-CS Yes SA-106 Grade B mainsteams tems i in weldexaminations Seamless carbon steel pipe used for residual heat NMP-2-18-.500-CS Yes SA-106 Grade B removals tern i in weld examinations Seamless carbon steel pipe used for high and low pressure core spray and residual heat removal NMP-2-18-.375-CS Yes SA-106 Grade B s tems i in weldexaminations Austenitic stainless steel pipe used for high pressure NMP-2-1 8-.375-SS Yes SA-312 Grade TP 304 cores ra s tern i in weldexaminations Seamless carbon steel pipe used for high and low pressure core spray and main steam system piping NMP-2-1 6-1.031-CS Yes SA-106 Grade B weld examinations Electric fusion welded austenitic chromium-nickel aloy SA-358 steel pipe, double welded with filler metal in all passes, Grade 316 then completely radiographed; used for recirculation NMP-2-16-.822-SS Yes Class 1 s tern i in weld examinations Seamless carbon steel pipe used for low pressure core spray and residual heat removal systems piping NMP-2-16-.500-CS Yes SA-106 Grade B weld examinations
| |
| ':Austenitic stainless. steel-pipe;---,although fabricated "during the preseivice Inspection'phase and intended
| |
| : . for use iri the performance of manual examinations at:
| |
| 'A-'312''o.'rade
| |
| :,:, NMP2, this.block'is,not piesently used. fo''.:inservice NMP-2-16-.375-SS TP.'304 . -.'.examinatioris Seamless carbon steel pipe used for low pressure NMP-2-16-.375-CS Yes SA-106 Grade B cores ra s tern i in weld examinations Seamless carbon steel pipe used for high pressure NMP-2-14-.375-CS Yes SA-106 Grade B cores ra s tern i in weldexaminations "RECIRC:.1NLET'.'SAF E END~ENSION"''GAL'.
| |
| BLOCK. MODIFICATION"..-:.This is: forged, or rolled::
| |
| austenitic alloy steel fo'r;high'-temperature.service.::AI-:.:;
| |
| tho'ugtI:fab'ric'ated,"duiiiig th''res'ervice:
| |
| in the perfo'rinance.of. j Iri's'pection':,>>'phase,''and,inteiide'd':for:;us'e',
| |
| 'A-',182 NMP-'2-12-'1'.004S'.':- :',":
| |
| "';:: .Grade F'316L manu'al';:examinations",at'MP2,',:this'';.'bio'ck:is''.:not"',
| |
| resen ''s'e'd'for'iri'se'i'vice examination's..
| |
| ,Thh Is:an''.electric'fusIori 'w'ekied au'st'enilic chromium-".
| |
| nickel alloy. steel pipe;, double welded with. filler metal
| |
| ,in "all'.passes "but 'not,radiographed, 'Although fabricated. during the presenrice inspection phase and
| |
| ".SA-358.. intended for use in the performance of manual
| |
| .'Grade 316 examinations at NMP2; this'lock is not presently.,u-.-
| |
| 'NMP-'2-'12-.844-SS" No ~ Class 2 -
| |
| sed for inservice examinations; Seamless carbon steel pipe used for high pressure core spray, control rod drive and residual heat removal NMP-2-1 2-.844-CS Yes SA-106 Grade B s tern i in weld examinations NMP2-ISI406 Rev.1 Section 9 Page 3 of 8
| |
| | |
| NMPC ID IN USE MATERIAL COMMENTS Seamless carbon steel pipe used for high and low pressure core spray, feedwater, and residual heat NMP-2-12-.688-CS Yes SA-106 Grade B removal system piping weld examinations SA-376 Seamless austenitic steel pipe used for residual heat NMP-2-12-.688-SS Yes Grade TP 304 removals tern i in weld examinations Electric fusion welded austenitic chromium-nickel alloy SA-358 steel pipe, double welded with filler metal in all passes, Grade 316 then completely radiographed; used for recirculation NMP-2-12-.657-SS Yes Class 1 s tern i in weld examinations Austenitic stainless steel pipe; although fabricated dur-ing the preservice inspection phase and intended for
| |
| 'use in the performance of manual examinations at
| |
| 'A-312 'NMP2, this;block is not presently used for inservice NMP-2-'12-.375-SS -
| |
| No Grade TP 304 -
| |
| examinations.
| |
| Seamless Carbon Steel Pipe; used for low pressure core spray, reactor core isolation cooling, and residual NMP-2-12-.375-CS Yes SA-106 Grade B heatremovals tems i in weldexaminations Quenched and tempered vacuum-treated alloy steel forging for pressure vessels used for reactor pressure vessel nozzle safe end to safe end extension weld ex-aminations associated with the high and low pressure NMP-2-11.625-1.125-CS Yes SA-508 Class 2 core s ra and residual heat removal s stems Carbon steel forging requiring notch toughness SA-350 testing for piping components; used for feedwater NMP-2-10-1.00-CS Yes Grade LF2 s tern i in weld examinations Seamless carbon steel pipe used for high pressure core spray and reactor core isolation system piping NMP-2-10-.719-CS Yes SA-106 Grade B weld examinations Seamless carbon steel pipe used for high and low pressure core spray and reactor core isolation system NMP-2-10-.594-CS Yes SA-106 Grade B i in weld examinations Seamless carbon steel pipe; although fabricated dur-ing the presenrice inspection phase and intended for use,in the perforrftance of manual examinations at.
| |
| NMP2, this block.h not presently used for inservice NMP-'.2-10-.365-CS. No: . SA-'106 Grade B examinations.
| |
| Quenched and tempered vacuum-treated alloy steel forging for pressure vessels used for nozzle to flange NMP-2-9.3-1.77-CS Yes SA-508 Class 2 welds on to head of reactor ressure vessel Seamless or welded steel pipe for low-temperature service used for reactor water cleanup system piping NMP-2-8-.906-CS Yes SA-333 Grade 6 weld examinations Seamless carbon steel pipe used for reactor water NMP-2-8-.718-CS Yes SA-106 Grade B cleanu s tern i in weld examinations Seamless carbon steel pipe used for control rod drive and residual heat removal systems piping weld NMP-2-8-.594-CS Yes SA-106 Grade B examinations Seamless carbon steel pipe used for residual heat removal and reactor water cleanup systems piping NMP-2-8-.500-CS Yes SA-106 Grade B weld examinations NMP2-ISI406 Rev.t Section 9 Page 4 of 8
| |
| | |
| NMPC ID IN USE MATERIAL COMMENTS Austenitic stainless steel pipe; although fabricated dur ." =
| |
| . -'ing the preseryice inspection phase and intended for,.
| |
| 'se in the performance, of m'anual examinations, at I '.SA-'312. 'MP2, this block is not presently used for insenrice
| |
| '- 304, exa'min ations.
| |
| NMP-2-8-.322S . No Grade TP Seamless carbon steel pipe; although fabricated dur<< -:
| |
| Ing the presenrice inspection:phase and intended for.-.
| |
| ,:: use, in the performance of,.m'anual examinations, at"
| |
| : 'NMP2;,thh:block ls not presently'used for inseivice:
| |
| examin'ations. '.
| |
| - NMP-2-8-'.322'-CS: No- 'SA'-106GradeB Quenched and tempered vacuum-treated alloy steel forging for pressure vessels; used for spare nozzle to NMP-2-6.3-1.24-CS Yes SA-508 Class 2 flan e weld on to head of reactor ressure vessel Seamless carbon steel pipe used for auxiliary steam and reactor core isolation systems piping weld ex-NMP-2-6-.562-CS Yes SA-106 Grade B aminations Seamless carbon steel pipe used for reactor core isolation, main steam, and residual heat removal NMP-2-6-.432-CS Yes SA-106 Grade B s tems i in weld examinations Seamless carbon ste'el pipe; although fabricated'dui-'
| |
| .ing the preseryIce'inspection phase and jritendef for::
| |
| use iii the performari'ce:'of, manual'examinations'at.':
| |
| = 1. -NMP2;, this'lock is not'presently us'ed for Ins'eivIce'. I NMP-2-6-.280-CS' No 'A'-'.106,Grade B exa min'ation s'.
| |
| ::Austenitic stainless steel pipe; although fabricated dur=
| |
| -:ing:the presenrice inspection phase and intended foi
| |
| :.use in:.th'; performance,:of 'manual'ex'aminations at;
| |
| "'SA-312 :
| |
| NMP2, this:block: ls not presently used. for insenrice =
| |
| NMP-2-5;8-.365-SS No Grade TP.'304. examinations; "
| |
| Alloy steel forging for pressure and high-temperature SA-336 parts used for jet pump instrumentation nozzle welds NMP-2-5.25-.69-NOZ Yes Class F304 on reactor ressure vessel Quenched and tempered vacuum-treated alloy steel SA-508 forging for pressure vessels; used for control rod drive NMP-2-5-.78-CS Yes Class 2 h draulic s tern return line nozzle to safe end weld Seamless carbon steel pipe used for main steam and reactor water cleanup systems piping weld ex-NMP-2<-.337-CS Yes SA-106 Grade B aminations SA-312 Austenitic stainless steel pipe used for reactor water NMP-2-4-.337-SS Yes Grade TP 316L cleanu s tern i in weld examinations Forged or rolled austenitic alloy steel for high-A-182 temperature service used for reactor water NMP-2-4-.337-SS182 Yes Grade F 316 recirculation s tern i in weld examinations
| |
| 'o:
| |
| Seamless,.'carbon althou'gh; fabricated during - the,.':
| |
| preservice'ins pectioii phase and intended for us'e.in.';
| |
| ..the:.performari'ce.of manual examinations at NMP2;.
| |
| this block: is .not'resently.'sed', for., inservice:
| |
| t NMP-2-4-.250-CS . SA-106:Grade B examinatioris.
| |
| NMP2-ISI406 Rev.1 Section 9 Page 5of8
| |
| | |
| t NMPC ID NMP-2W.250-SS-IN USE No MATERIAL SA-182 Grade F 316 COMMENTS Forged or roiled austenitic aHoy steel for high-temperature setvice; although fabricated during the preservice inspection phase and intended for use in the performance of manual examinations at NMP2, this 'block is not presently used for inservice ex-aminations.
| |
| RCS PUMP STUD CAL. BLOCK - Chromium-nickel-SA-540 molybdenum alloy steel bolting matedal used for Grade B23 reactor water recirculation system pump fastener ex-NMP-2-3.25-23.5-STUD Yes Class 5 aminations CORE SPRAY LOW PRESSURE PUMP STUD-SA-193 Chromium-molybdenum alloy steel bolting material NMP-2-2.25-1 0-STUD Yes Grade B7 usedforlow ressurecores ra um fasteners RPV NOZZLE INNER RADIUS - Quenched and tempered vacuum-treated alloy steel forging for pressure vessels; only used for N2 (Reactor Recirculation) and N3 (Main Steam) manual nozzle SA-508 examinations, othetwise, automated examinations use NMP-2-IR-9-CS Yes Class 2 NMP2-126-1-RP V RPV NOZZLE INNER RADIUS - Quenched and tempered vacuum-treated alloy steel forging for pressure vessels; only used for manual nozzle ex-aminations on the reactor pressure vessel, otherwise, SA-508 the preferred, automated examinations use NMP2-NMP-2-IR-7.5-CS Yes Class 2 124-1-RPV or NMP2-127-1-RPV RPV NOZZLE INNER RADIUS - Quenched and Tempered Vacuum-Treated Alloy Steel Forging for Pressure Vessels; used on reactor pressure vessel top head nozzles N7 and N18 for manual examinations conducted from the nozzle barrel.
| |
| (Automated methodology has not been utilized for top head nozzle examinations, and NMPC does not SA-508 anticipate its use on top head nozzles in the second NMP-2-IR-4-CS Yes Class 2 interval.
| |
| RHS HEAT EXCHANGER - Carbon steel plate for pressure vessels of moderate or Lower temperature setvice for high and low pressure core spray, and SA-516 residual heat removal systems vessel weld and piping NMP-2-RHS-.75-CS Yes Grade 70 weld examinations RHS NOZZLE INNER RADIUS - Carbon steel forging used for residual heat removal vessel (heat ex-NMP-2-RHS-IR-3.75-CS Yes SA-105 chan er nozzle inner radius section examinations RPV FLANGE - Manganese-molybdenum-nickel alloy steel plate, (Heat No. 860269) quenched, tempered SA-533 and used for reactor pressure vessel Itange-side shell-Type B to-flange weld examination as well as the base metal Class 1 examinations of the threads in the stud holes of the NMP-2-FLG-RPV Yes flan e RPV CLOSURE HEAD STUD - Chromium-nickel-SA-540 molybdenum alloy steel bolting material (Heat No.
| |
| Grade B23 6072871) used for the 76 reactor pressure vessel stud Yes Class 3 base material examinations NMP2-ISI406 Rev.1 Section 9 Page 6 ot 8
| |
| | |
| NMPC ID IN USE MATERIAL
| |
| 'OMMENTS ,',',;RPV! CLOSURE HEAD THREADJNUT;-':Chromium-;:,.
| |
| ';nlc)kel'r'n)oly)bdehum'a)llo)y,steel bomng materiai '(Heat;",I I:; No'.'2D388) although fabricated during,,the preservice fo'use in:the perfor-',
| |
| 'SA440':-'.;""",::,'
| |
| Giade'B23';.:.;;"'.,;;::;, :<:
| |
| ',: ': man'ce.of, manyal'examInations, volumetiic examine-.),
| |
| 'ion n'of iequiie'd;,and this'block is not presently.'used
| |
| ':inspectio)n"phase"and)intended
| |
| ':.'NMP-'2-RPV-NUT-'1."
| |
| ".: ':"': -' ',"Class':3'::)
| |
| 'or:inservlce'examinations. " '
| |
| TOP HEAD RADIAL PLATE - A 5.25" manganese-molybdenum-nickel alloy steel plate, quenched and SA-533 tempered (but not dad) and used for reactor pressure Type B vessel top head-to4lange weld and all top head NMP-2-128-1-RPV Yes Class 1 meridional welds 'oinin the radial Iates.
| |
| TOP HEAD DOLLAR - A 3.18" thick manganese-molybdenum-nickel alloy steel plate, quenched and tempered (but not clad) and used for the reactor pressure vessel top head circumferential weld examinations, nozzle-to-vessel weld examinations, SA-533 and nozzle inside radius section base metal examina-Type B tions when'he examination is conducted from the top NMP-2-127-1-RPV Yes Class 1 head late.
| |
| NO. 4 SHELL RING - A 7.9" thick manganese-molybdenum-nickel alloy steel plate, (Ht No. C3066-2) quenched, tempered, clad, and used for the reactor SA-533 pressure vessel shell ring ¹4 examinations, and as a Type B substitute for block NMP2-123-1-RPV as noted NMP-2-126-1-RPV Yes Class 1 below.
| |
| "::NO,: 1((2:and'3)"',SHEL'L!"RING(s) -".A"nominal'6- /4"-",",
| |
| .',thIckman)gariestHnolybdenummckel'alhy'teel phte,'::,'.;:.
| |
| (He'at No.'::.C3192-2):quenched;,temp'er'e'd and clad in'
| |
| ::s)up'po)it'of,the".Ie)actor press)ure.vessel 'shell rings'¹1,:
| |
| "¹2, an!'d ¹3''examination's. This block was'.used for. the
| |
| 'presetvce examinations.)However, it was.not used for:
| |
| 'everal. of the inservice examinations in the flrst inter.-
| |
| ;:vel,:as;basic'calibration.,block:.NMP2-124-"1-RPV is' "made of the same material; and Is'the same n'ominai,.
| |
| .,thickness,'As, such,'it meets tlie requirements foundin".
| |
| ASME;:V,';:A'ttide"'4, paragraph,:TM1';::-",:1;3;4,: Baslc'-
| |
| :Callb'ratio'n'Block) Coiifi'jpir'ation".and'isbn''a'cceptable':,
| |
| substitute. for it;:)Us'e'"of.this subsbtutIon:.saves NMP2"'
| |
| :;.S'A'-:533;,
| |
| "'TypeB 'n the admlnIstiatiy'e'"costs".ass'ociated:"with'cairyin'g.:;
| |
| 'ust on'e-NMP-2-125-1-RPV: Yes:: , Classi1. .two.blocks'he'calibre'tion area'instea)d'of BOTIOM HEAD RADIALPLATE - A6.68" thick man-ganese-molybdenum-nickel alloy steel plate, (Heat No.
| |
| C3073-2) quenched, tempered, clad, and used for SA-533 pressure vessel bottom head radial plate ex-Type B aminations, and, as a substitute for block NMP2-125-NMP-2-124-1-RPV Yes Class 1 1-RPV as noted immediate above.
| |
| NMP2-ISI406 Rev.t Section 9 Page 7 of 8
| |
| | |
| 14 NMPC ID IN USE MATERIAL COMMENTS BOTTOM HEAD DOLL'AR,ASSEMBLY -. A nominal
| |
| .," 6-sl16", m'anganesmolybdenum-nickel alloy steel
| |
| ', plate', (Heat No. B6603-1):quenched; tempered and--'.
| |
| cIadin support of examinabon of two'(2) internal welds ',
| |
| ..':: ofthe Bottom Head DollarPlate Assembly. (2RPVNG:
| |
| =
| |
| and'-2RPVNR.)'This block was used for the're-service'examinabons. However; it was hot used for the
| |
| .: inservice examinations in the firstinterval, as th'ey are the- only two examinations it services, and basic calibration block NMP2-126<<1-RPV is made of the same material, and isthe same nominal thickness. As
| |
| 'such; it meets the requirements',found in ASME V,
| |
| . Article'4-paragraph:TA41.'1.3;4 Basic Calibration.,
| |
| Block ConQguratton and is an acceptable sub stitutB:.
| |
| -: for it;":Use'of this substitution saves NMP2 on the ad-::
| |
| 5
| |
| "::::; -SA-'533 -:~. 'ministrative 'cosh;associated with"carryirig two blocks
| |
| ::.'o :: Type'8': -'.", Instead'of just one; 'o"the'c'alib'rabo'n,:a'res NMP.-'2-1 23-:,1-RPV, 'Class',1, NMP2-ISI406 Rev.1 Section 9 Page 8 or 8
| |
| | |
| 10.0 ASME XI REPAIR/REPLACEMENT PROGRAM The Code defined and mandated repair and replacement (includes modification) of items subject to examination and/or test pursuant to this Program Plan, shall be completed in accordance with the Code of record and NMP2's Repair/Replacement Program as identified herein.
| |
| The NMP2 Program is a set of documents that defines the managerial and administrative controls for the completion of repairs or the replacement of items. NMP2's Repair/Replacement Program consists of the latest versions, or supersedings, of the following NMPC documents (as well as the interface procedures referenced therein) as controlled by NMPC in accordance with Criterion VI of Appendix B to 10 CFR 50.'OL NUCLEAR DIVISIONPOLICY NDD-ASU AUDITS AND SURVEILLANCES NDD-CON CONFIGURATION MANAGEMENT NDD-DES DESIGN CONTROL NDD-DOC DOCUMENT CONTROL NDD-ECA EVALUATIONAND CORRECTIVE ACTION NDD-IIT INSERVICE INSPECTION AND TESTING NDD-INS INSPECTIONS NDD-INV INVENTORY, IDENTIFICATION,AND PHYSICAL CONTROL OF MATERIALS, PARTS AND SUPPLIES NDD-MAI MAINTENANCE NDD-MTE MEASURING AND TESTING EQUIPMENT NDD-PRO PROCEDURES AND ORDERS NDD-RMG RECORDS MANAGEMENT NDD-SAT SURVEILLANCEAND TES TING NDD-SEV SAFETY EVALUATIONS NDD-SPC SPECIAL PROCESSES CONTROL NDD-SRE SAFETY REVIEWS NDD-TQS TRAINING QUALIFICATIONAND SIMULATORS These procedures, in whole or in part, provide for:
| |
| (a) identification of the applicable Edition and Addenda of Section XI to be used for the repairlreplacement activity; (b) a description of the items to be repaired or replaced and the Codes and Code Cases to which they were con-structed; (c) a description of the work to be performed; (d) the Code Edition, Addenda, and Code Cases applicable to materials, design, manufacture, and installation; (e) any special requirements pertaining to materials, welding, heat treatment, and nondestructive examination requirements; g) the test and acceptance criteria to be used to verify the acceptability of the repairlreplacement; (g) for replacements, the documentation required by IWA-7500:
| |
| ~ all procedures for installation of items to be used for replacement shall be in accordance with IWA-4100;
| |
| ~ maintenance of the following reports and records, to the extent required by the Construction Code and Article IWA-7000, as applicable to the description of the work to be performed:
| |
| (I) Certified Design Specification (2) Certified Design Report
| |
| 'his listing need only bc updated with each sucoessive mrerval's submission to the regulators. It is a dated compilation intended to quantitatively depict NMPCs Code compliance at the beginning of an Interval. It is not the control mechanism, The reader is referred to thc NMPC (on line, computerized) Controlled Document System. currently resident on the VAN Cluster, P Building, Nine Mile Point Site. Lycoming, NY.
| |
| NMP2-ISI406 Rev.1 Section 10 Page 1 of 4
| |
| | |
| r (3) Design Report (4) Over pressure Protection Report (5) Manufacturer's Data Report (6) Material Certification (7) Evaluation Report required by IWA-7220 (8) completed Owner's Report for Repairs and Replacements, Form NIS-2
| |
| ~ preservice inspection (prior'to return of the system to service) in accordance with IWB, C, D, E, or F-2200 for the item to be used for replacement, as applicable, including the joints that connect the item to the system; (h) the application of the ASME Code Symbol Stamp (which is neither required nor prohibited, and is generally not applied at NMP2.)
| |
| NMP2 utilizes the services of an Authorized Inservice Inspection Agency'for all repairs or replacements by notifying the ANIIprior to starting either of these activities and by keeping the ANII informed of the progress of the work so that necessary inspections may be performed. These notifications are documented in the form of signatures, hold points, and initials in work plans unique to each Code repair or replacement.
| |
| NMP2's Repair/Replacement Program anticipates the generation of individual repairireplacement plans for each vessel, pump, valve, or piping system (including their supports) that include the essential requirements for completion
| |
| ,of the repair or replacement. Among those essential requirements is the invocation of alternate rules to the ASME Boiler and Pressure Vessel Code Sections III and XI, as promulgated in the ASME's Code Cases, as sanctioned for use by the regulatory and enforcement authority having jurisdiction at the plant site that is, USNRC.
| |
| Special IWE/IWL interpretation pursuant to IN 97-29 Despite the facts that:
| |
| (I) licensees do not have to submit to the NRC staff for approval of the containment inservice inspection program developed to satisfy the requirements of Subsection IWE and Subsection IWL, (2) the program elements and the required documentation may be maintained on site for audit, and, (3) the inclusion of those elements in this document is deferred, all repair and replacement activities within the scope of Subsections IWE and IWL of the code conducted after September 9, 1996, are conducted in accordance with these subsections.
| |
| Use of Code Cases The ASME Boiler and Pressure Vessel Committee publishes a document entitled Code Cases. Generally, the individual Code Cases that make up this document explain the intent of Code rules or provide for alternative requirements under special circumstances. Most Code Cases are eventually superseded by revision of the Code and then are annulled by action of the ASME. In such instances, the intent of the annulled Code Case becomes part of the revised Code, and therefore continued use of the Code Case intent is sanctioned under the rules of the Code. In other instances, the Code Case is annulled because it is no longer acceptable or there is no further requirement for it. A Code Case that was approved for a particular situation and not for a generic application willonly be used for the approved situation because annulment of such a Code Case could result in situations that would not meet Code requirements.
| |
| The following table lists the Code Cases invoked by NMP2's Repair/Replacement Program. It includes references to: the individual plan identifiers (as controlled and revised) which first invoked the alternate rule at NMP2, documented evidence of USNRC staff acceptance for that use, and a brief synopsis of the rule. In those instances where a Case has not yet been utilized, but its use is anticipated, it has been included in the list.
| |
| NMP2-ISI-006 Rev.1 Section 10 Page 2 of 4
| |
| | |
| ":::::"':."".-''": ..:"'-.''ALTERNATE REPAIR/REPLsACEMENT RULES:VIA':CODE.CASE CODE INVOKING R/R USNRC STAFF CASE PLAN S SYNOPSIS ACCEPTANCE System hydrostatic test required by IWA4400 for R/R of Class 2 piping that cannot be isolated by existing valves or that requires securing safety or relief valves for isolation may Reg. Guide N-416 RHS- /EDC2M10494A be deferred until the next regularly scheduled system 1.147, Rev.9 RHS- /EDC2M10495A h drostatic test. A rll 1992 May substitute a system leakage test for the system hydrostatic test normally required by IWA-4000 for repair/replacement of items by welding, provided; (a) NDE is performed IAWASME III 1992 Edition, and; (b) prior to, or immediately upon return to service, VT-2 is performed in conjunction with a system leakage test, using ASME XI, 1992 Edition's IWA-5000, at nominal Per10 CFR SWPQ/EDC2M10693A SWP-3/ED C2M10694 operating pressure and temperature, and; 50.55a(a)(3)(ii)
| |
| SWP4/E0C2M10695A (c) use of this Code Case is documented on Form NIS-2 via letter SWP-3/ED C2M10696 (or NIS-2A per N-532, if that alternative is approved by of 10-18-94, SWP-3/ED C2M10697A NRC.)
| |
| SWP-3/E 0 C2M10698A If the previous N-416 was used to defer a Class 2 LBMarsh, SWP-3/EDC2M10757 hydrostatic test, the deferred test may be eliminated when USNRC to N-416-1 a b and c abovearemet. BRS Ivia, NMPC May use helicalwoil threaded inserts in pressure retaining items provided; (a) installation performed in accordance with IWX-7000; (b) they meet loadings in the Construction Code (for materials not listed in the Construction Code, primary stress shall not exceed /3 of the minimum specified yield strength or '/i of the minimum specified tensile strength of the applicable material, whichever is lower);
| |
| (c) they are purchased in accordance with the Owner's Quality Assurance Program with the supplier being evaluated for compliance with NCA-3800 or 10CFR50, Appendix B; (d) they are supplied with a CMTR that provides trace-ability to the item, material specification, grade or class, mechanical properties, and heat treated condition; (e) they shall be installed in accordance with the manufac-turer's instructions; Reg. Guide 2MSS'P SV1 20- (f) use of this Code Case is documented in the ap- 1.147, Rev.10 N-496 137/2M 10660 propriate Owner's Report (NIS-2 or NIS-2A.) (July 1993)
| |
| Usc of Code Case NAI6-1 is authorized: provided additional surface examinations arc performed on the root pass layer ofbutt and socket welds on thc pressure retaining boundary of Class 3 components when the surface examination method is used in accordance with ASM E Section 111, and until such time as the Code Case is publislied in a future revision of Regulatory Guide 1.147. At that time, ifNMPC continues to implement the Code Case, NMPC will be bound by any limitations Issued In the Regulatory Guide, as well as continuing to be required to follow all provisions in the Code Case.
| |
| NMP2-ISI406 Rev.1 Section 10 Page3of4
| |
| | |
| ". ",: ', ~ . '. ",".':":- '''ALTERNATE,REPAIR/REPLACEMENT RULES VIA CODE, CASE:,
| |
| CODE INVOKING R/R SYNOPSIS USNRC STAFF CASE PLAN S ACCEPTANCE May establish the acceptability of a defect in austenitic stainless steel piping in accordance with IWB-3640 by deposition of weld reinforcement (weld overlay) on the outside surface of pipe, provided; (a) the repair is performed in accordance with a Repair Program satisfying the requirements of IWAA130; (b) reinforcing weld metal is low carbon (0.035% max.) SS applied 360'round the circumference of the pipe, and in accordance with a qualified welding procedure specification identified in the Repair Program; (c) prior to welding, surface to be repaired is LP examined with indications greater than /16 inch being prepared for weld reinforcement by either:
| |
| (1) excavating to the extent necessary to create a cavity that can be repaired using qualified welding procedures, or (2) applying one or more layers of weld overlay without excavation, provided these layers are in addition to the design reinforcement thickness; (d) post preparation LPS reveal no indications greater than f16 of an inch; (e) weld reinforcement consists of a minimum of two weld layers having as-deposited delta ferrite content of at least 7.5 FN (with exceptions);
| |
| (I) weld design assures access for PSI and ISI; (g) an evaluation of the rammcations of the repair is con-ducted; (h) the specified Code pressure test is performed; (I) preservice examination is performed per IWB-2200; (j) ISI will include the entire volume PSI'd in (I) above; (k) post repair support design tolerances are verified via VT-3; (I) all other applicable requirements of IWXA000 are met; (m) use of this Code Case is documented on an NIS-2 (or Reg. Guide NIS-2A per N-532, if that alternative is approved by 1.147, Rev.11 N-504 None at ublication NRC October 1994 The technical merits of this Code Case are essentially the same as those for N-504, the differences being. NRC approval via administrative insofar as they correct typographic errors acceptance of N-504-1 (None at publication) (inaccurate references) in the original. this plan Also, repairlreplacement plans are subject to review by USNRC at any time, upon request. The certified results of those plans (NIS-2 Data Reports) are compiled and submitted'o USNRC (replete with references to Evaluation Reports verifying acceptability) within 90 calendar days of the completion of each refueling outage. As such, this Repair/Replacement Program is subject to review by USNRC,
| |
| 'nly those NIS 2 Data Reports which eettify Code work on ASME Class I and 2 components are inel uded with the IWA4230 Summary Report Submittal.
| |
| NMP2-ISI406 Rev.1 Section 10 Page4of4
| |
| | |
| APPENDIX A CLASS 1 CATEGORY B-J PIPE WELD COUNT
| |
| | |
| ==SUMMARY==
| |
| | |
| Table A-1: ¹nexempt Class l Circumferential Pipe IYeld Count Summary This table shows the total number of nonexempt circumferential pipe welds in each Class 1 system, as well as the subset totals of those welds selected for volumetric and/or surface examinations pursuant to Category B-J criteria or Augmented examination criteria.
| |
| Table A-2: Nonexempt Class l Pipe 8'eld Count For each isometric within a system, this table identifies the number of welds for each of the Section XI Category B-J item numbers.
| |
| Table A-3: Class l Pipe 8'elds Selected for Examination This table lists Examination Category B-J welds which have been selected for examination. In each case, the reason for selecting a particular weld has been provided. In cases where longitudinal welds intersect circumferential welds, the longitudinal weld number has also been provided. In those instances, the examination willinclude at least a pipe-diameter length, but not more than 12n of each longitudinal weld intersecting the circumferential welds required to be examined by this Examination Category B-J. Should a circumferential weld be examined solely pursuant to NUREG-0313 Rev. 2, (USNRC Generic Letter 88-01) the associated longitudinal welds does not require ex-amination.'
| |
| Refcrencc Section 3 0, Augmented Examinations, subsection 3 7, Augmented Requirements Applicable To Tire hfMP2 Program Plan, NUREG 03 i 3 Rev.
| |
| 2, paragraph entitled, "Examuunion Method," for amplification of NMP2 stance.
| |
| NMP2-ISI406 Revn Appendix A Page1 of18
| |
| | |
| TABLE A-1 NONEXEMPT CLASS 1 CIRCUMFERENTIAL PIPE WELD COUNT
| |
| | |
| ==SUMMARY==
| |
| | |
| (Cat. B-J Items B9.11, B9.21, B9.31, B9.32, & B9.40)
| |
| System System Nonexempt ASME XI Augmented Name Abbreviation Weld Count Selection Selection Hi h-Pressure Core S ra CSH 21 Low-Pressure Core S ra CSL 19 D ell E ui ment Drains DER Feedwater 99 25 10 Reactor Core Isolation Coolin ICS 67 16 Reactor Vessel Instrumentation ISC Main Steam MSS 248 62 31 Break Exduska R Reactor Recirculation RCS 106 27 Control Rod Drive RDS Residual Heat Removal RHS 164 41 Reactor Pressure Vessel RPV Standb Li uid Control SLS 50 13 Reactor Water Cleanup WCS 157 39 32 (14 GL8801. 18 Break Exoi Region)
| |
| TOTALWELD COUNTS 946 237 73 NMP2-ISI~ Rev. 1 Appendix A Page2of18
| |
| | |
| TABLE A-2 NONEXEMPT ISI CLASS 1 PIPE WELD COUNT System :..: -'':. Dwg. Mo;'.: ':, Code: Item No.
| |
| B9.11 B9.12 B9.21 B9 22'.':: B9.'31 B9 32 B9AO 25-09 0 0 0 0 0 CSH 25-10 18 0 0 0 0 0 SUBTOTALS 20 0 0 0 0 0 SEL'ECTED ~ 5"'9 0 '0: 0 0 0 26-05 0 0 0 0 0 0 Cst SUBTOTALS 19 0 0 0 0 0 0 SELECTED m '- 0 0 0, 0 .0 07-A 0 0 0 0 0 0 DER SUBTOTALS 0 0 0 0 0 0 I:, 'ELECTED'~ 0 :::":0'; 0 0 '0
| |
| 'FWS:,.::,: 47-1 3 19 0 0 0 0 0 47-14 0 0 0 0 47-15 14 0 0 0 0 0 0 47-16 20 0 0 0 0 '0 47-17 0 0 0 0 0 47-18 18 0 0 0 0 0 0 SUBTOTALS 93 0 0 0 0 0
| |
| 'SELECTED ~ .
| |
| 33 0 0 0 0 57-07 49 0 0 0 0 0 0
| |
| !CS 57-09 17 0 0 0 0 0 SUBTOTALS 66 0 0 0 0 0 SELECTED ~ 15 0':
| |
| E
| |
| : 0. '.
| |
| 322-B 0 0 0 0 0 0 ISC SUBTOTALS 0 0 0 0 0 0
| |
| :;;SELECTED II'. ".;'",':,'. 0 0 0 '. '0 0 01-1 3 19 0 0 0 MSS NMP2-ISI406 Rev.1 Appendix A Page 3 of 18
| |
| | |
| TABLE A-2 NONEXEMPT ISI CLASS 1 PIPE WELD COUNT System Dwg.:No. Code Item No.
| |
| B9.10 B9.'12. B9.21 B9.:22,: '.B9.31 B9;32 B9AO:-:,-"
| |
| 01-14 0 0 0
| |
| '1-'15 20 0 0 0
| |
| , 01-"I6 19 0 0 0 01-20 0 0 0 0 0 0 01.-',21 15 0 0 0 0
| |
| . 0 0 31 0 0 0 47.-..'A;':..
| |
| 'f064 ~ '-: 0 16 '0 0 0 0
| |
| .';:107.'-:A'
| |
| , 0 0 12 0 0 0 110-A 0 0 18 0 0 0
| |
| .SUBTOTALS'1 110-B .
| |
| 0 0 18 0 0 0 98 0 97 0 19 25 SELECTED~ 58; 0 0 18'''
| |
| 64-00-1 0 0 0 RCS.
| |
| 64-00-2 0 0 0 64-00-3 25 22 0 0 0 0 64-00-4 10 0 0 0 0 64-00-5 0 0 0 64-00% 25 0 0 0 0 SUB TOTALS 92 81 0 0 14 0 0
| |
| " '-:: ',SELECTED ~ '-',:: '::26 :36 0 1",;..':::::: 0 0 ISI-COM-004 0 0 0 0 0 0 RDS.
| |
| ISI-COM-005 0 0 0 0 0 0 SUBTOTALS 0 0 0 0 0 0 SELECTED'cr 0 0 0 0 ISI-COM-033 0 0 0 0 0 0 RPV SUBTOTALS 0 0 0 0 0 0 SEL'ECTED ~ 0 ''0 NMP24SI406 Rev.1 Appendix A Page 4 of 18
| |
| | |
| 0 TABLE A-2 NONEXEMPT ISI CLASS 1 PIPE WELD COUNT System'' "':,",:'. '!;-': Dwg..No;: Code':Item'o.
| |
| ; B9.'11 B9."12: -:B9.21 B9 22 B9.3$ B9.32: - .. B9.40 RHS. 66-19 0 0 0 0 0 0 66-21 0 0 0 0 0 66-26 0 0 0 0 0 0 66-31 0 0 0 0 0 0 66-32 0 0 0 0 0 0 6647 16 0 0 0 0 0 0 66-50 25 0 0 0 0 0 0 66-51 20 0 0 0 0 0 0 66-52 19 0 0 0 0 0 0 66-53 14 0 0 0 0 66-54 16 0 0 0 0 66-55 18 0 0 0 0 0 177-A 0 0 12 0 0 0 SUBTOTALS 140 12 0 0 SELECTED:~, 39' 0 75-A 0 0 14 0 0 0 0 88-A 0 0 30 0 0 0 0 88-B 0 0 0 0 0 0 SUBTOTALS 0 0 50 0 0 0 0 I
| |
| .; i,',';
| |
| 'SELECTED'Iz'9-05 0 '13 ,0 ~
| |
| 0 .t 44 0 0 0
| |
| - NfcS 0 0 09-06 21 0 17 0 09-14 41 0 0 0 0 0 0 12-A 0 0 0 0 0 94-A 0 0 0 0 0 100-A 0 0 0 0 0 0 217-A 0 0 0 0 0 NMP2-ISI406 Rev.1 Appendix A Page 5 of 18
| |
| | |
| TABLE A-2 NONEXEMPT ISI CLASS 1 PIPE WELD COUNT System 'Dwg. No. Code Item No.
| |
| B9.'l0 B9.12 B9.2$ B9.22 B9.31 89.32 B9AO SUBTOTALS 0 42 0 SELECTED'06 0 0 0 0 NMP2-ISI406 Rev.1 Appendix A Page6oI18
| |
| | |
| 0 TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
| |
| '.V't, g.': .
| |
| P:".:"'..
| |
| Weld.""::::,,:-';::,':"" "... ,.:;,::;;:"'-:-.': Code'.:.;:;:. '.,".,::Reason :::::::::::--:::Associated:-::: .:
| |
| 'umber ',:.'::.:.;...::.-,,:::.:,. ',:::::.: ":,::-:'Item'No."':":,': -''":: Selected ". Longwelds ,',:::,:..::
| |
| 2RPV-KB31-A 89.21 DM none 2CSH-25-09-FW009 89.11 TEV none 2CSH-25-10-FW001 89.11 TEV none 2CSH-25-1 0-FW006 89.11 HS none 2CSH-25-10-FW007 89.11 HS none 2CSH-25-10-FW008 89.11 TEV none 2CSL-26-05-FW005 89.11 TEV none 2CSL-26-05-FW006 89.11 TEV none 2CSL-26-05-FW009 89.11 HS none 2CSL-26-05-FW010 89.11 HS none 2CSL-26-05-FW012 89.11 TEV none 2DER-07A-FW001 89.21 HS none 2FWS-47-1 3-FW003 89.11 BER none 2FWS-47-1 3-FW006 89.11 AW/ber none 2FWS-47-1 3-FW007 89.11 AW/ber none 2FWS-47-1 3-FW008 89.11 TEV/ber none 2FWS-47-13-FW009 89.11 AW/ber none 2FWSQ7-13-FW010 89.11 AW/ber none 2FWSQ7-1 3-FW012 89.11 HS none 2FWS-47-13-FW014 89.11 BER none 2FWS-47-1 3-FW017 89.11 BER none 2FWS-47-13-SW003 89.11 BER none 2FWS-47-1 3-SW011 89.11 BER none NMP2-ISI406 Rev.t Appendix A Page 7 of 18
| |
| | |
| TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes Weld::::::,.: '. ;;;,;.,;;-;:,',,:;::;:,,'.:;: Code:,::..';-,'- .=: Reason".; .... ":::::..:,:".:::: Associate'd.,.':",.::;:,,.:.:.:;:::.:;.::;:.:,i Number'.': ..: '':.:";::.:,'It'e"m'',No.':.'.. ".,... .'.=. Selecte'd-.. .'... L'ongwelds':,':." "",'one 2FWSQ7-1 3-VW001 89.11 AW/ber 2FWSQ7-1 3-VW002 89.11 AW/ber none 2FWSQ7-13-VW003 89.31 AW/ber none 2FWS47-13-VWZ4A-SWA 89.11 TEV/ber none 2FWS-47-1 4-FW005 89.11 TEV none 2FWS47-1 5-FW003 89.11 TEV none 2FWS47-15-FW007 89.11 TEV none 2FWSQ7-16-FW003 89.11 BER none 2FWS-47-16-FW006 89.11 AW/ber none 2FWSQ7-16-FW007 89.11 AW/ber none 2FWSQ7-16-FW008 89.11 TEV/ber none 2FWSQ7-1 6-FW009 89.11 TEV/ber none 2FWS-47-1 6-FW010 89.11 AW/ber none 2F WS-47-1 6-FW012 89.11 HS none 2FWS47-1 6-FW014 89.11 BER none 2FWSQ7-1 6-SW003 89.11 BER none 2FWS-47-1 6-SW010 89.11 BER none 2FWS47-16-SW011 89.11 BER none 2FWS-47-16-VW001 89.11 AW/ber none 2FWSQ7-16-VW002 89.11 AW/ber none 2F WS-47-'16-VW003 89.31 AW/ber none 2FWSQ7-1 7-FW004 89.11 TEV none 2FWS-47-18-FW003 89.11 TEV none 2FWS-47-18-FW007 89.11 TEV none 2ICS-57-07-FW005 89.11 TEV none 2ICS-57-07-FW012 89.11 HS none NMP2-ISI406 Rev.t Appendix A Page 8 of 18
| |
| | |
| TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
| |
| ;.Weld""...',:",.',: .".,:-'.:::: ':,''Code.'.-.'.,""...', .':".:.".: Reason":.::::::,,:,:,.:";:: ';::::,:.:::.':.:;: ':: A's'sociated :
| |
| 'Nvmb'er'.:..:. '''.:::.'":.:'.::::..'..! ',':::,'Item.':No". '.".:.-'." ;,;: '-';Selected.':::::.:',:::::::,',:: .:::::::.::,:::::;::::, Longwelds.:
| |
| 2ICS-57-07-FW021 89.11 TEV none 2ICS-57-07-FW024 89.11 HS none 2ICS-57-07-FW026 89.11 HS none 2ICS-57-07-FW027 89.11 HS none 2ICS-57-07-SW003 89.11 AW none 2ICS-57-09-FW001 89.11 HS none 2ICS-57-09-FW002 89.11 HS none 2ICS-57-09-FW005 89.11 AW/ber none 2ICS-57-09-FW006 89.11 AW/ber none 2ICS-57-09-FW007 89.11 TEV/ber none 2ICS-57-09-FW008 89.11 TEV/ber none 2ICS-57-09-FW027 89.32 HS/ber none 2ICS-57-09-SW009 89.11 HS none 2RPV-K827 89.11 TEV none 2ISC-3228-SW001 89.21 TEV none 2ISC-3228-SW005 89.21 HS none 2MSS-01-1 3-FW002 89.11 HS none 2MSS-01-1 3-FW005 89.11 HS/her none 2MSS-01-1 3-FW008 89.11 TEV/ber none 2MSS-01-1 3-FW009 89.11 TEV/ber none 2MSS-01-1 3-FW021 89.11 BER none 2MSS-01-1 3-FW022 89.11 BER none 2MSS-01-1 3-FW025 89.11 BER none 2MSS-01-13-FW026 89.11 BER none 2MSS I 3-SW004 89.31 HS none NMP2-ISI406 Rev.1 Appendix A Pagegof18
| |
| | |
| TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
| |
| '':::.::;-',",''::Re'asoii'.:..';:=:.:-.':,: ',.".",::,"-.::: Associated',::::;,-::".:,
| |
| .'; .","',~lt'em" No".:..:',::.-;!.::;; ::::;:.",;:/'::Selected'":-::::::-:";:;:::;:.",,":.:."; L''oi'g'welds':','.'::.:.,I: .-
| |
| 2MSS-01-1 3-SW005 89.31 HS none 2MSS-01-13-SW006 89.31 HS none 2MSS-01-13-SW007 89.31 HS none 2MSS-01-13-SW008 89.11 HS none 2MSS-01-1 3-SW010 89.11 BER none 2MSS-01-1 3-SW013 89.11 BER none 2MSS-01-1 3-SW015 89.11 BER none 2MSS-01-1 3-SW020 89.11 BER none 2MSS-01-1 4-FW001 89.11 AW none 2MSS-01-14-FW004 89.11 HS/ber none 2MSS-01-14-FW009 89.11 TEV/ber none 2MSS-01-14-FW014 89.11 HS no'ne 2MSS-01-14-FW021 89.11 BER none 2MSS-01-14-FW022 89.11 BER none 2MSS-01-14-FW025 89.11 TEV/ber none 2MSS-01-14-FW026 89.11 BER none 2MSS-01-14-FW027 89.11 BER none 2MSS-01-14-SW007 89.31 HS none 2MSS-01-14-SW008 89.31 HS none 2MSS-01-1 4-SW009 89.31 HS none 2MSS-01-1 4-SW010 89.31 HS none 2MSS-01-14-SW011 89.31 HS none 2MSS-01-14-SW015 89.11 BER none 2MSS-01-14-SW019 89.11 BER none 2MSS-01-14-SW022 89.11 BER none 2MSS-01-1 5-FW005 89.11 HS/ber none 2MSS-01-1 5-FW009 89.11 TEV/ber none NMP2-ISI406 Rev.t Appendix A Page 10 of 18
| |
| | |
| TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
| |
| >'-",':",",, Reason'":"':-:.::-:,.;. '';,':.;'.-.',::;;:; Associat'e'd,:::,-::;::,:i.:-:::;:-'::'",
| |
| ,.:::::::::: -;.;,".:..'::: Number':.": ".-'::':.',.':.;"""..'".',.".',. '"",';",::;Selected'.::::." ':;-;;:::,:::,'::;:;::.;":L''oiigwelds,:-';.".::-;:"..-":
| |
| 2MSS-01-15-FW021 B9.11 BER none 2MSS-01-15-FW022 B9.11 BER none 2MSS-01-15-FW025 B9.11 TEV/ber none 2MSS-01-1 5-FW026 B9.11 AW/her none 2MSS-01-1 5-FW027 B9.11 BER none 2MSS-01-15-SW003 B9.11 HS none 2MSS-01-1 5-SW006 B9.31 HS none 2MSS-01-1 5-SW007 B9.31 HS none 2MSS-01-1 5-SW008 B9.31 HS none 2MSS-01-1 5-SW009 B9.31 HS none 2MSS-01-15-SW010 B9.31 HS none 2MSS-01-1 5-SW013 B9.32 BER none 2MSS-01-15-SW014 B9.11 BER none 2MSS-01-15-SW018 B9.11 BER none 2MSS-01-1 5-SW020 B9.11 BER none 2MSS-01-1 6-FW003 B9.11 HS none 2MSS-01-1 6-FW005 B9.11 HS/ber none 2MSS-01-1 6-FW008 B9.11 TEV/ber none 2MSS-01-1 6-FW009 B9.11 TEV/ber none 2MSS-01-16-FW021 B9.11 BER none 2MSS-01-16-FW022 B9.11 BER none 2MSS-01-16-FW025 B9.11 BER none
| |
| 'one 2MSS-01-16-FW026 B9.11 BER 2MSS-01-1 6-SW004 B9.31 HS none 2MSS-01-16-SW005 B9.31 HS none 2MSS-01-16-SW006 B9.31 HS none 2MSS-01-'1 6-SW007 B9.31 HS none NMP2-ISI406 Rev.t Appendix A Page 11 of 18
| |
| | |
| TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes Weld Code Reason Associated Number Item No. Selected Longwelds 2MSS-01-16-SW008 89.11 HS none 2MSS-01-16-SW010 89.11 BER none 2MSS-01-16-SW013 89.11 BER none 2MSS-01-16-SW015 89.11 BER none 2MSS-01-1 6-SW020 89.11 BER none 2MSS-01-20-FW001 89.11 TEV none 2MSS-01-21-FW002 89.11 HS none 2MSS-01-21-FW006 89.11 TEV none 2MSS-047A-FW001A 89.40 HS none 2MSS-047A-FW023A 89.40 HS none 2MSS-047A-FW038 89.40 HS none 2MSS-047A-FW043 89.40 HS none 2MSS-1 06A-FW001A 89.11 HS none 2MSS-106A-FW002 89.21 HS none 2MSS-106A-FW004A 89.21 HS none 2MSS-106A-FW014 89.21 HS none 2MSS-106A-FW018A 89.21 HS none 2MSS-107A-FW001A 89.21 HS none 2MSS-107A-FW002A 89.21 HS none 2MSS-107A-FW006 89.21 HS none 2MSS-1 07A-FW007 89.40 HS none 2MSS-1 07A-FW011 89.21 HS none 2MSS-110A-FW001A 89.40 HS none 2MSS-110A-FW006A 89.21 HS none 2RPV-KB13 89.11 TEV none 2RPV-KB14 89.11 TEV none 2RPV-KB15 89.11 TEV none NMP2-ISI406 Rev.t Appendix A Page 12 of 18
| |
| | |
| TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes Weld Code Reason Associated Number Item No. Selected Long welds 2RPV-KB16 89.11 TEV none 2RPV-KB28 89.11 TEV none 2RCS-64-00-FWA01 89.11 TEV/au LW01 2RCS-64-00-FWA03 89.11 HS/au LW06A, LW068 2RCSW4-00-FWA05 89.11 HS/au LW08A, LW088 2RCS<4-00-FWA06 89.11 HS/au LW10 2RCS-64-00-FWA07 89.11 AW/au LW1 0 2RCSW4-00-FWA1 0 89.11 HS/au LW14A, LW148 2RCS-64-00-FWA1 7 89.11 TEV/au LW32 2RCS-64-00-FWA1 8 89.11 TEV/au LW29 2RCS-64-00-FWA1 9 89.11 TEV/au LW18 2RCS-64-00-FWA20 89.11 TEV/au LW26 2RCS4-00-FWA21 89.11 TEV/au LW23 2RCSW4-00-FWB01 89.11 TEV/au LW33 2RCS<4-00-FW803 89.11 HS/au LW37A, LW378 2RCS-64-00-FWB06 89.11 HS/au LW41 2RCS-64-00-FW810 89.11 HS/au LW45A, LW458 2RCS-64-00-FWB17 89.11 TEV/au LW62 2RCS-64-00-FWB18 89.11 TEV/au LW59 2RCS-64-00-FW819 89.11 TEV/au LW49 2RCS-64-00-FWB20 89.11 TEV/au LW56 2RCS-64-00-FWB21 89.11 TEV/au LW53 2RCS-64-00-SW04 89.11 HS/au LW11 LW12A LW128 2RCS-64-00-SW07 89.31 HS/au none 2RCS-64-00-SW35 89.11 HS/au LW07, LW08A, LW088 2RCS-64'-00-SW40 89.11 HS/au LW01 LW02A LW028 NMP2-ISI406 Rev.1 Appendix A Page 13 of 16
| |
| | |
| TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
| |
| ;:: ':.:-'"::::::".::::.:.".:,'..-::Weld:",.:':.-'";:::..,,:-;::9':-:::
| |
| :::-:: -''::::C'ode'"-:: -'::::i :;:",::"".:-'::::R'eason':=.I':::;-',.'; ::":::::;.,'.::,:Associated::..;,'.:;-':;:::.-.-:
| |
| Numbei'.:::":'-:;-:,'::;::"'->'::::::""..":-'::: :,":;.,::::;.: Ite'm'iNo'.":::,,";,:::, :-:4;-'-',:.:'Select'ed.':" ." :.':-';::,'-:::.,'L'o'ngw'elds -",.-.",::: '.:'';.
| |
| '.";;
| |
| 2RCS-64-00-SW59 B9.11 HS/au LW50 2RCS-64-00-SW67 B9.11 MS/au LW38, LW39A, LW39B 2RCS-64-00-SW70 B9.11 HS/au LW33, LW34A, LW34B 2RPV-KB31-A B9.21 DM none
| |
| '/
| |
| 2RHS-66-1 9-FW005 B9.11 TEV none 2RHS-66-19-FW011 B9.11 TEV none 2RHS46-21-FW002 B9.11 TEV none 2RHS-66-26-FW012 B9.11 TEV none 2RHSW6-31-FW013 B9.11 TEV none 2RHS46-32-FW007 B9.11 TEV none 2RHS-66-50-FW001 B9.11 TEV none 2RHSW6-50-FW005 B9.11 HS none 2RHS-66-50-FW006 B9.11 HS none 2RHS-66-50-FW008 B9.11 TEV none 2RHS-66-50-SW013 B9.11 HS none 2RHS-66-51-FW001 B9.11 TEV none 2RHS-66-51-FW005 B9.11 HS none 2RHS-66-51-FW008 B9.11 TEV none 2RHS46-51-FW010 B9.11 HS none 2RHS46-51-FW016 B9.11 HS none 2RHSW6-52-FW001 B9.11 TEV none 2RHS-66-52-FW004 B9.11 HS none 2RHSZ6-52-FW005 B9.11 HS none 2RHS-66-52-FW007 B9.11 TEV none 2RHS-66-52-SW010 B9.11 AW none NMP24SI406 Rev.t Appendix A Page 14 of 16
| |
| | |
| TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes Weld Code Reason-- Associated Number Item No. Selected Long welds 2RHSW6-52-SW013 B9.11 HS none 2RHSW6-53-FW001 B9.11 TEV none 2RHS-66-53-FW003 B9.11 HS none 2RHS-66-53-FW004 B9.11 HS none 2RHS46-53-FW007 B9.11 HS/au LW002 2RHS-66-53-SW010 B9.11 DM/au LW002 2RHSZ6-54-FW001 B9.11 TEV none 2RHSW6-54-FW003 B9.11 HS none 2RHS-66-54-FW004 B9.11 HS none 2RHSW6-54-FW006 B9.11 HS/au LW001 2RHSW6-54-SW007 B9.32 AW none 2RHS-66-54-SW012 B9.11 DM/au LW001 2RHS-66-55-FW001 B9.11 AW/au LW001 2RHS46-55-FW002 B9.11 HS none 2RHS-66-55-FW004 B9.11 HS none 2RHS-66-55-FW005 B9.11 AW none 2RHS-66-55-FW008 B9.11 TEV none 2RHS-66-55-FW012 B9.11 HS none 2RHS-66-55-SW001 B9.11 DM/au LW001 2RHS-177A-FW016 B9.40 HS none 2SLS-75A-FW001 B9.21 TEV none 2SLS-75A-FW014 B9.21 AW none 2SLS-75A-FW023A B9.21 AW none 2SLS-88A-FW006 B9.21 AW none 2SLS-88A-FW013A B9.21 HS none 2SLS-88A-FW014 B9.21 AW none NMP2-ISI406 Rev.t Appendix A Page 15 of 18
| |
| | |
| TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes Weld Code Reason Associated Number Item No. Selected Longwelds 2SLS-88A-F W016 B9.21 HS none 2SLS-88A-FW024 B9.21 AW none 2SLS-88A-FW039A B9.21 DM none 2SLS-88A-FW042A B9.21 HS none 2SLS-88A-FW049 B9.21 AW none 2SLS-88B-FW001 B9.21 TEV none 2SLS-88B-FW005A B9.21 AW none 2WCS-09-05-FW001 B9.11 HS none 2WCS-09-05-FW014 B9.11 HS/au none 2WCS-09-05-FW01 5 B9.11 HS/au none 2WCS-09-05-SW014 B9.11 HS none 2WCS-09-05-SW020 B9.11 DM/au none 2WCS-09-05-SW021 B9.11 AU none 2WCS-09-05-SW022 B9.11 AU none 2WCS-09-05-SW023 B9.11 AU none 2WCS-09-05-SW024 B9.11 AU none 2WCS-09-05-SW025 B9.11 AU none 2WCS-09-05-SW026 B9.11 AU none 2WCS-09-05-SW027 B9.11 AU none 2WCS-09-05-SW028 B9.11 DM/au none 2WCS-09-05-SW029 B9.11 AU none 2WCS-09-05-SW030 B9.11 AU none 2WCS-09-05-SW031 B9.11 AU none 2WCS-09-05-SW032 B9.11 AU none 2WCS-09-05-SW033 B9.11 AU none 2WCS-09-05-SW034 B9.11 AU none NMP2-ISI406 Rev.t Appendix A Page 16 of 18
| |
| | |
| TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
| |
| :::;.."."'.i.-'"'.Reason'.-,:;..;;:".;."':,',::: ';.'-..."-:.'.":- -:.Ass'ociated'.::.;:,;':,:::. '-'
| |
| ..".;Nu'mb'er i.:;:;:::,::::".':." '::,,::"-"':":Item":No':.:,',:,:"'.",",,:,:-:.'. .':::::~Select'e'd.-'::::-'::: ',."::Lon'gwelds',:: ",'"
| |
| 89.11 AU none '''WCS-09-05-SW035 2WCS-09-06-F W003 89.11 HS none 2WCS-09-06-FW004 89.11 AW/ber none 2WCS-09-06-FW005 89.11 AW/ber none 2WCS-09-06-FW006 89.11 TEV/ber none 2WCS-09-06-FW007 89.11 TEV/ber none 2WCS-09-06-FW008 89.11 AW/ber none 2WCS-09-06-FW029 89.11 HS none 2WCS-09-14-FW009 89.11 AW/ber none 2WCS-09-14-FW011 89.11 AW/ber none 2WCS-09-1 4-FW012 89.11 AW/ber none 2WCS-09-1 4-FW013 89.11 BER none 2WCS-09-14-FW014 89.11 BER none 2WCS-09-14-FW015 89.11 AW/ber none 2WCS-09-14-FW016 89.11 AW/ber none 2WCS-09-14-FW017 89.11 AW/ber none 2WCS-09-1 4-FW021 89.11 AW/ber none 2WCS-09-14-FW024 89.11 AW/ber none 2WCS-09-14-FW029 89.11 AW/ber none 2WCS-09-1 4-FW032 89.11 AW/ber none 2WCS-09-14-FW037 89.11 BER none 2WCS-09-14-FW038 89.11 BER none
| |
| 'WCS-09-1 4-FW039 89.11 BER none 2WCS-09-1 4-FW040 89.11 BER none 2WCS-09-1 4-FW041 89.11 BER none 2WCS-09-14-FW042 89.11 AW/her none 2WCS-09-'14-FW043 89.11 AW/ber none NMP2-ISI406 Rev.1 Appendix A Page 17 of 18
| |
| | |
| y E TABLE A-3 CLASS 1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes I"':".:-::",.':.'::': 'Associat'e'd;.;"::;:::"::::;".:, i~
| |
| ;.;:::-'::,::.:.-"Nomb'er",;:::.: ',,"..:'-': ':::.""-.::-,"- :.."-I-:".:".':;::.:::,,::,'-;,:.L"oHgwelds',"'":.;:,:.",
| |
| 2WCS-09-14-FW044 89.11 BER none 2WCS-09-14-SW017 89.11 BER none 2WCS-09-14-SW018 89.11 AW/ber none 2WCS-09-14-SW022 89.11 BER none 2WCS-09-1 4-SW023 89.11 AW/ber none 2WCS-09-1 4-SW025 89.11 BER none 2WCS-09-14-SW026 89.11 AW/ber none 2WCS-09-14-SW027 89.11 BER none 2WCS-09-14-SW028 89.11 AW/ber none 2WCS-09-14-SW029 89.11 BER none 2WCS-09-14-SW030 89.11 AW/ber none 2WCS-09-14-SW031 89.11 BER none 2WCS-09-1 4-SW032 89.11 AW/ber none 2WCS-09-14-SW033 89.11 BER none 2WCS-09-14-SW034 89.11 AW/ber none 2WCS-09-1 4-SW035 89.11 BER none 2WCS-09-14-SW036 89.11 BER none 2WCS-09-14-SW038 89.11 BER none 2WCS-09-1 4-SW039 89.11 AW/ber none 2WCS-09-1 4-SW040 89.11 AW/ber none 2WCS-09-1 4-SW041 89.11 AW/ber none 2WCS-09-14-SW043 89.11 AW/ber none 2WCS-012A-FW005 89.21 AW none 2WCS-094A-FW004 89.21 HS none 2WCS-1 00A-FW004 89.21 HS (none)
| |
| NMP2-ISI406 Rev.1 Appendix A Page 18 of 18
| |
| | |
| APPENDIX B CLASS 2 CATEGORIES C-F-1 & C-F-2 PIPE WELD COUNT
| |
| | |
| ==SUMMARY==
| |
| | |
| Table B-I: Class 2 Nonexempt Circumferential Pipe 8'eld Count Summary This table reports the total number of circumferential welds only (it excludes longitudinal welds) in each of the two ASME Code Examination Categories; C-F-1. and C-F-2, for the seven (7) systems found to contain such welds. Additionally, it provides sums, default percentages of those sums, and NMP2's final decision on the total number of (driving circumferential) welds chosen for the representative sample examination.
| |
| Table B-2: Class 2 Nonexempt Cat. C-F-I 8'elds Selected for Examination There are 88 welds at NMP2 that have been categorized as Category C-F-1 weldments; 49 are cir-cumferential and 39 are associated longitudinal seam welds. NMP2 examines 33 of those 88 weldments.
| |
| Seventeen (17) of the 33 examined are circumferential welds, while 16 are longitudinal welds that intersect those 17 circumferential welds. Table 2 identifies which 17 circumferential welds and which 16 longitudinal welds. It does so by first listing all 49 circumferential welds at NMP2 that have been categorized as Examination'Category C-F-1 welds (for the purpose of calculating a representative sample) and then listing (in those cases where longitudinal welds intersect circumferential welds) the associated longitudinal weld numbers. Based on a population of 49 circumferential welds, the Code Case mandates a minimum representative sample of 28 circumferential welds (plus their associated intersecting longitudinal seam welds.) However, 12 of the 49 circumferential welds are included only for sample sizing, and are not themselves required to be nondestructively examined. This decreases the set of those that do require nondestructive examination from 49 circumferential welds down to 37 circumferential welds (from which the 28 were to have been selected.) However, more than half (20) of those 37 circumferential welds were found to be in locations that were not readily accessible for the performance of nondestructive examinations. They (along with their 20 associated intersecting, longitudinal welds) are located in the suppression pool, under water. Therefore, pursuant to 10CFR50.55a(g)(5), NMPC has determined that conformance with the examination requirements of the Code is not practical for those 20 circumferential welds (and their associated intersecting longitudinal welds.) Those 20 circumferential welds have been identified in this table, as well as in NMP2 relief request number RR-IWC-2, Revision
| |
| : 1. Pursuant to 10CFR50.55a(g)(6)(i), the Commission granted that request for relief on November 1, 1990. Since there are only 37 circumferential, Category C-F-1 welds at NMP2 that possess nondestruc-tive examination criteria, it was practical to prepare only one Category C-F-1 table.
| |
| t Table B-3: Class 2 Nonexempt Category C-F-2 Circumferential Weld Count NMP2-ISI406 Rev.1 Appendix B Page 1 of 14
| |
| | |
| This Table provides the number of Category C-F-2 welds for each nominal pipe size on piping isometrics and component drawings on an overall system basis.
| |
| Table B-4: Distribution of Class 2 Nonexempt Category C-F-2 Circumferential fields For all of the nonexempt line sizes in each system, this table shows:
| |
| ~ the total number of terminal end welds;
| |
| ~ the number of terminal end welds selected for examination;
| |
| ~ the total number of structural discontinuity welds;
| |
| ~ the number of structural discontinuity welds selected for examination.
| |
| Table B-5: Class 2 Nonexempt Category C-F-2 fields Selected for Eramination This table provides a listing of the selected welds and their nominal pipe sizes. It also distinguishes between terminal end welds and structural discontinuity welds.
| |
| TABLE B-1 CLASS 2 NONEXEMPT CIRCUMFERENTIAL PIPE WELD COUNT
| |
| | |
| ==SUMMARY==
| |
| | |
| System System Cat. C+4 Cat. C-F-2 Name Abbreviation Circ Weld Count Circ Wefd Count Auxilia Steam ASS Hi h-Pressure Core S ra CSH 157 Low-Pressure Core S ra CSL Reactor Core Isolation Coolin ICS 203 Main Steam MSS 92 Control Rod Drive RDS 76 Residual Heat Removal RHS 30 796 TOTAL NONEXEMPT CIRCUMFERENTIALWELDS 49 1,439 aa'.5%
| |
| of total nonexem t circumferential weids er Cate o 108 NUMBER OF WELDS SELECTED.:-:'' 28 108 Footnotes 2 of Table IWC-2500-1 Examination Categories C-F-1 and C-F-2 require that the welds selected for examination include 7.5%, but not be less than 28, of the nonexempt welds of each category.
| |
| NMP2-ISI-006 Rev.t Appendix B Page 2 of 14
| |
| | |
| 0 TABLE B-2 CLASS 2 NONEXEMPT CAT. C-F-1 WELDS SELECTED FOR EXAMINATION (RG) ~ Relief Granted (Weld had actually been selected for examination per Code Case, but found to be impractical to per-form. NMP2 requested relief from the Code Case requirement to select; that request was granted by the regulators);
| |
| INot Req'd) ~ Included for 'h calculation only, not required to be examined per Code Case Weld Sefectedl Associated Number . NPS Item No. Reason Longwelds 2CSH-25-05-FW002 20" C5.11 YES LW002-1 2CSH-25-05-FW010 1 8II C5.11 YES LW002-2 2CSH-25-05-FW012 20" C5.11 NO Inacc RG LWC & LWD 2CSH-25-05-FW013 20" C5.11 NO Inacc RG LWA 2CSH-25-05-FW014 20" C5.11 NO Inacc RG LWC 8 LWD 2CSH-25-05-FW015 2PII C5.11 NO Inacc RG LWA8 LWB 2CSL-26-01-FW026 20" C5.11 NO Inacc RG LW02, LW03, LW04 2CSL-26-01-FW027 20" C5.11 NO Inacc RG LW01 2CSL-26-01-FW028 20" C5.11 NO Inacc RG LW03, LW04, LW05 2CSL-26-01-FW029 20" C5.11 YES LW05 8 LW06 2CSL-26-01-FW030 20" C5.11 YES LW06 II 2CSL-26-01-FW035 20 C5.11 NO Inacc RG LW01 8 LW02 2ICS'MOV136-VWMOV136A 6 II none NO notre 'd none 2ICS-57-01-FW011 6 II none NO notre 'd none 2ICS-57-04-FW010 6 II none NO notre 'd none 2ICS-57-04-FW018 6ll none NO notre 'd none 2ICS-57-04-FW019 6 II none NO notre 'd none 2ICS-57-04-FW020 6lt none NO notre 'd none 2ICS-57-04-SW031 6 II none NO notre 'd none 2RHS'MOV1C,VWMOV1C-A 24" C5.11 YES LW08 2RHS V309,VWV309-A 8" na NO notre 'd none 2RHS-66-13-FW002 24" C5.11 YES LW05 & LW06 2RHS-66-13-FW020 24" C5.11 YES LW09 2RHS46-1 3-FW021 24" C5.11 YES LW07 2RHSW6-13-FW023 24" C5.11 NO Inacc RG LW02, LW03, LW04 2RHSW6-1 3-FW024 24" C5.11 NO (Inacc) (RG) LW01 NMP2-ISI406 Rev.t Appendix B Page 3 of 14
| |
| | |
| TABLE B-2 CLASS 2 NONEXEMPT CAT. C-F-1 WELDS SELECTED FOR EXAMINATION
| |
| """'CI'"Relief Granted (Weld had actually been selected for examination per Code Case, but found to be impractical to per-(RG) ~
| |
| form. NMP2 requested relief from the Code Case requirement to select; that request was granted by the regulators);
| |
| (Not Req'd) ~ Included for % calculation only, not required to be examined per Code Case Weld Selectedl Associated Number :NPS- Item--No." Reason L'ongwelds 2RHS-66-13-FW025 24" C5.11 NO Inacc RG LW03, LW04, LW05 2RHS46-1 3-FW029 24" C5.11 NO Inacc RG LW01 & LW02 2RHS-66-1 3-FW030 24" C5.11 YES LW06 & LW07 2RHS-66-13-FW032 24" C5.11 YES LW09 2RHS-66-22-FW009 24" C5.11 YES LW06 2RHS-66-22-FW012 24" C5.11 YES LW07 & LW08 2RHS-66-22-FW019 24" C5.11 YES LW07 2RHS-66-22-FW021 24" C5.11 NO Inacc RG LW02, LW03, LW04 2RHS-66-22-FW022 24" C5.11 NO Inacc RG LW01 2RHS-66-22-FW023 24" C5.11 NO Inacc RG LW03, LW04, LW05 2RHSW6-22-FW027 24" C5.11 YES LW05 & LW06 2RHSW6-22-FW029 24" C5.11 NO Inacc RG LW01 & LW02 2RHS-66-23-FW002 24" C5.11 YES LW05 & LW06 2RHSW6-23-FW017 24" C5.11 YES LW07 2RHS-66-23-FW018 24" C5.11 NO Inacc RG LW01 2RHS-66-23-FW019 24" C5.11 NO Inacc RG LW02 LW03, LW04 2RHS-66-23-FW020 24lt C5.11 NO Inacc RG LW03 LW04 LW05 2RHS-66-23-FW022 24" C5.11 NO Inacc RG LW01 & LW02 2RHS-66-23-FW024 24" C5.11 YES LW06 & LW07 2RHS-66-57-FW002 10" na NO notre 'd LW01 2RHS-66-57-FW019 10" na NO notre 'd LW01 2RHS-66-58-FW013 8lt na NO notre 'd LW01-1 2RHS-66-58-SW014 8N na NO (not req'd) LW01-2 NMP2-ISI406 Rev.1 Appendix 8 Page 4 of 14
| |
| | |
| 0 TABLE B-3 CLASS 2 NONEXEMPT CATEGORY C-F-2 CIRCUMFERENTIALWELD COUNT Sys Drawing Pi 12" peDa 14" 18"'
| |
| meter 2011 2411 '8ll '8ll 61f 16",.
| |
| ~
| |
| 10M ISI-20-01 0 0 0 0 0 0 0 ASS ASS TOTALS 4 4 0 0 0- 0 0 0 0 0 ASS SELECTED 1 0 0 0 0 0 0 IS I-25-01 0 0 0 18 0 0 0 ISI-25-03 0 0 0 19 0 0 0 ISI-25-04 0 0 12 13 0 0 0 ISI-25-05 0 0 0 0 3 14 1 0 ISI-25-08 0 0 0 20 0 0 0 ISI-25-09 0 0 0 10 0 0 0 IS I-25-1 3 0 4 0 0 0 0 0 ISI-25-1 7 0 0 0 0 0 0 0 IS I-25-1 8 0 0 16 0 0 0 0 0 ISI-COM-027 2 0
| |
| 'P1 0 0 0 2 0 ISI-COM-030 0 0 CSH 2CSH'STRT1 0 0 0 0 0 CSH TOTALS'5 0 4 . 37 12 82 3 CSH SELECTED 12 0 1 2 5 0 0 I-26-01 0 0 0 0 0 13 0 0 CSL IS ISI-26-02 0 0 0 0 0 18 2 0 ISI-26-03 0 0 15 0 26 0 0 0 ISI-26-04 0 0 0 16 0 0 0 ISI-26-06 0 0 0 0 0 0 0 ISI-COM-001 0 CSLiPV 114 0 2 0 0 0 0 IS I-COM-019 (2CSL'HCV118)
| |
| 'HCV119 0 0 0 0 0 0 0 ISI-COM-020 0 0 SL'MOV11 0 0 0 0 0 ISI-COM-027 f2CSL'P1) 0 0 0 2 0 2 0 NMP2-ISI-006 Rev.) Appendix B Page 5 of 14
| |
| | |
| I. t TABLE B-3 CLASS 2 NONEXEMPT CATEGORY C-F-2 CIRCUMFERENTIALWELD COUNT Sys Drawing .'.
| |
| ;: .'...''P.-.i p e ....
| |
| '-'D. a-:m:.::e t e r 611 10" 14". 1 6lt 20tt 24I I 2 8rl 48ft,'SI-COM-030 L'STRT1 0 0 0 0 0 0 0 2 0 0 0 ISI-COM-057 0 0 0 L'V121 0 0 0 0 0 0 0 1 CSLTOTALS 111 ., 0 .0 2 '-
| |
| 21 0 47 0 37 4 0
| |
| " -'0: '0 0
| |
| ... CSL SEL'ECTED.. 8 0 2 0 0 3 0 ISI-57-01 12 0 0 0 0 0 0 0 0 0 0 ISI-57-02 16 0 0 0 0 0 0 0 0 0 0 ISI-57-03 17 0 0 0 0 0 0 0 0 0 0 ISI-57-04 35 0 0 0 0 0 0 0 0 0 0 ISI-57-05 27 0 0 0 0 0 0 0 0 0 0 IS I-57-06 30 0 0 0 0 0 0 0 0 0 0 ISI-57-07 0 0 0 0 0 0 0 0 0 0 ISI-57-08 0 7 6 32 0 0 0 0 0 0 0 IS I-57-09 0 0 16 0 0 0 0 0 0 0 0 ISI-COM-013 0 0 0 0 0 0 0 0 0 ICS P1 ICS TOTALS", 203 142 7:
| |
| 22::,:.'::32 0' 0 0.::::;:-',;:::0 0 0'..
| |
| ICS'SELECTED: 15 0 5 2 0 0 0 0 0 0 ISI-01-03 0 0 0 0 0 8 0 0 0 0 ISI-01-04 0 0 0 0 0 0 0 0 0 20 0 ISI-01-05 0 0 0 0 0 0 0 0 0 12 ISI-01-06 0 0 0 0 0 8 0 0 0 0 0 ISI-01-07 0 0 0 0 0 24 0 0 0 0 IS I-01-13 0 0 0 0 0 0 0 0 0 0 ISI-01-14 0 0 0 0 0 0 0 0 0 0 ISI-01-15 0 0 0 0 0 0 0 0 0 0 ISI-01-1 6 0 0 0 0 0 0 0 0 0 0 ISI-01-17 0 0 0 0 0 0 0 0 0 0 INSS ISI-01-1 9 0 0 0 0 0 0 0 0 0 0 NMP2-ISI406 Rev.1 Appendix B Page 6 ol 14
| |
| | |
| TABLE B-3 CLASS 2 NONEXEMPT CATEGORY C-F-2 CIRCUMFERENTIALWELD COUNT Sys ;.::,-: Drawing, P.i> p e -.D a:;i m:: 'e'f.'t:.. e,.r 7"
| |
| 6ll ''8l ~
| |
| 1 Qll': .l2".'4tt ';l6!'> 1 8lt 2QI I >>
| |
| 24"';.
| |
| 28,">.;::;-;::::-48" ':
| |
| '>"1 MSS TOTAL>S.'2,' 3 '>t 0; -16: I ;36
| |
| ' I:::::0::';I ".'"':0 I'
| |
| r"": p:>> '4:.:::::::":;::::;",.0 MSS,SELiECTED:.> & r Q
| |
| > tff 0 IS I-65-00-1 0 38 0 2 0 0 0 0 0 0 0 RDS ISI-65-00-2 0 34 0 2 0 0 0 0 0 0 0 RDS TOTAL>S 6 ".' .:72:; "' '4'..',:..'0 0 ":rp " 0 0,''.0 0
| |
| 'DS'SELECTED i'fi5 0 ' 0 ".".0""" ''QI
| |
| ;
| |
| t>p itp 0 ISI-66-05 0 20 0 0 0 0 0 0 0 0 0 RHS ISI-66-06 7 26 0 3 0 0 0 0 0 0 ISI-66-09 0 26 0 0 0 0 0 0 0 0 0 ISI-66-10 3 27 0 -
| |
| 2 0 0 0 0 0 0 ISI-66-13 0 0 0 0 0 0 2 21 0 0 ISI-66-14 1 0 0 0 0 0 36 0 0 0 IS I-66-15 0 0 0 0 0 0 16 0 0 0 ISI-66-1 6 0 0 0 0 0 13 15 0 0 0 0 IS 1-66-1 7 4 0 0 2 0 0 14 0 0 0 0 ISI-66-18 0 0 0 2 0 16 0 0 0 0 0 ISIW6-19 0 0 0 25 0 0 0 0 0 0 0 IS I-66-20 0 0 0 0 0 0 18 0 0 0 0 ISI-66-21 0 0 0 0 0 0 21 10 0 0 0 ISI-66-22 0 0 0 0 0 0 2 0 20 0 0 ISI<6-23 0 0 0 0 0 0 4 23 0 0 IS I-66-24 1 0 0 0 0 0 31 0 0 0 ISI-66-25 1 0 0 0 0 0 27 0 0 0 0 IS I-66-26 0 0 0 21 0 0 0 Q r 0 0 0 ISI-66-27 0 1 0 0 0 0 21 0 0 0 0 ISI-66-28 0 0 0 0 0 0 9 0 0 0 0 ISI-66-29 0 0 0 0 0 4 33 0 0 0 ISI-66-30 0 0 0 1 0 0 17 0 0 0 0 NMP2-ISI406 Rev.1 Appendix B Page7of14
| |
| | |
| TABLE B-3 CLASS 2 NONEXEMPT CATEGORY C-F-2 CIRCUMFERENTIALWELD COUNT Sys Drawing P i p e D a m e t e r
| |
| , 61 ~
| |
| 8" 1 Qss 1 2ll $ 4ll 1 6lt -2pis 24ss 28H 48 II ISI-66-31 0 8 0 26 0 0 0 ISI-66-32 0 15 0 0 0 0 ISI-66-34 23 0 0 0 0 0 0 ISI-66<2 32 16 0 0 0 0 0 0 ISI-66-47 16 0 0 0 0 0 0 ISI-66-57 26 0 0 0 0 0 ISI-66-58 18 0 0 0 0 0 0 ISI<6-60 13 0 0 0 0 0 0 ISI-COM-001 0 0 6 0 0 0 ISI-COM-019 r2RHS'MOV2A.8 2RHS'MOVSA 8 0 0 0 8 0 0 ISI-COM-020 HS'MOV1C 0 0 0 0 0 1 IS I-COM-026 RHS'P1A 8 0 0 0 6 0 6 ISI-COM-030 RHS'STRT1A 8 0 0 0 0 0 6 ISI-COM-045 HS'PV21A38 0 0 0 0 0 0 ISI-COM-057 r2RH~re.
| |
| V377 V378 0 0 0 0 0 3 RHS TOTALS 96 '9 153 26 79 6 280 24 80 RHS SELECTED 58 pe 7 0 23 3 6 No 10" welds had a T 2 'Is"', therefore, none were selected NMP2-t St@06 Rev.1 Appendix 8 Page 8 of 14
| |
| | |
| TABLE BQ DISTRIBUTION OF CLASS 2 NONEXEMPT CATEGORY C-F-2 CIRCUMFERENTIALWELDS Sy'tem',';. ":,'~:liNPS ',:,':;::.':;..-:,':.::::,: -:;,,:::;.';,;:::-,::,:, To(tal'PopulatIon.:';.':,::,:..":,".-.:,::-'=.'.;::;::..:",'=":,"."...;::::.:::."-:.!1;::
| |
| ~(::::-::: --'-':-::.:..:':. -TE Tiimlnal and s~trununt nicoiittrifi:,."r-'.-'.: ': "-: I!( ':: .':: SeIected: ."-:: ":-
| |
| '-;-. TE ':,':-::"..:::.':SD"'::; :: Othe(f';: >cO;376 .': ':: '..'>>'TE- ':-'. ::SD:
| |
| ASS 6ll 0 0 0 0 10" 0 0 12" 0 32 5 0 0 14" 0 12 0 0 0 16" 47 30 0 1 8tl 0 0 0 0 0 20" 0 16 0 0 0 24" 0 0
| |
| ,.'i(j(lf"~.'8',
| |
| 10" 0 0 0 g! AS'jl'
| |
| >i!;t((i'":. '(''AI 0
| |
| 12" 18 0 .Kijs(:.i'Ã"'
| |
| 16" 44 p 0 3 20" 28 0 0 CSL 24ll 0 0 0 0 6ll 52 81 8(l 0 0 0 0
| |
| " " .V
| |
| .'' (. ('(Iq
| |
| 'i j": .'":
| |
| 10" p 16 0 0 ICS 12" 30 0 0
| |
| 'hree of these 16 structural discontinu',wektments are ln the'Break Exclusion Bounda 6(l 0 13 0 0 0 16" p 12 0 ".::"<'".. ":::, 0 1
| |
| 8ll,;:(;...:,( (l p 24 0 p i '..::!:,!: ~1 p 28" ".':'::.:::;'' 0 324 0 ':'.'---:,':,:l'"-: 0 MSS 48" 0 0 0 0
| |
| ;".;;;;,Four(4)'of:the'se structu'ral d'scontfnuityyekfments are('bi thle, Br(e(ak Exctusfon Boundary.';.
| |
| NMP2.ISI406 Rev.t Appendix B Page 9 of 14
| |
| | |
| TABLE BQ DISTRIBUTION OF CLASS 2 NONEXEMPT CATEGORY C-F-2 CIRCUMFERENTIALWELDS System 'NPS";;, ":Total End so structural Dbcontlnu Population'E&arrnlnal ::.':, ':Selected SD ':t Other' <O.576:..:: TE:" SD 8tl 0 71 0 0 RDS 12" 0 0 6n 0 0 82 0 8tl 82 21 48 10" 0 0 0 26 0 1
| |
| 2ll 68 0 1
| |
| 4ll 0 0 0 0 0 16" 47 10 0 18" 236 38 0 21 20" 18 0 0 RHS 24" 76 0 0 TABLE B-5 CLASS 2 NONEXEMPT CATEGORY C-F-2 WELDS SELECTED FOR EXAMINATION Selection Key: TE ~ Terminal End; SD ~ Structural Oiscontinuity; BER ~ Break Exclusion Region; % ~ T.6'/ criteria WEL'D:."
| |
| NUMBER: ', NPS-'TEM'NO.
| |
| 'CODE .. 'REASON .-.
| |
| SEL'ECTED ASSOCIATED LONGWEL'D(S) .
| |
| 2ASS-02-01-SW001 6ll C5.51 SD none 2CSH-25-03-SW004 16" C5.51 SD none 2CSH-25-04-FW003 16" C5.51 SD none 2CSH-25-04-SW004 16" C5.51 SD none 2CSH-25-04-SW005 14" C5.51 SD none 2CSH-25-04-FW006 1 4II C5.51 SD (none)
| |
| NMP2-ISI~ Rev.t Appendix B Page 10 of 14
| |
| | |
| TABLE B-5 CLASS 2 NONEXEMPT CATEGORY C-F-2 WELDS SELECTED FOR EXAMINATION SelectionKey: TE= TerminalEnd; SD~StructuraIOiscontinuity; BER= Break ExclusionRegion; '/i~7.5/ criteria WEL'D CODE REASON, ASSOCIATED NUMBER- NPS- ITEM NO. SELECTED. LONGWELD(S) 2CSH-25-05-SW008 20n C5.51 SD none 2CSH-25-08-FW014 1 6ll C5.51 TE none 2CSH-25-09-FW006 1 2tl C5.51 SD none 2CSH-25-13-FW003 pic C5.51 none 1 SD 2CSH-25-1 3-SW003 12" C5.51 SD none 2CSH-25-18-SW007 1 2ll C5.51 SD none 2CSH*P1,PW201 16" C5.51 TE 2CSH'P1,PW215 2CSL-26-01-FW033 20'< C5.51 SD none 2CSL-26-01-SW007 20H C5.51 SD none 2CSL-26-02-FW003 C5.51 SD none 20'6" 2CSL-26-03-FW014 C5.51 SD none 2CSL-26-03-SW019 1 6tl C5.51 SD none 2CSL-26-04-FW002 1 6ll C5.51 SD none 2CSL-26-05-FW002 1 2lt C5.51 SD none 2CSL-26-05-SW004 1 2II C5.51 SD none 2ICS-57-'05-FW003 6' C5.81 SD none 2ICS-57-05-FW012 C5.51 SD none
| |
| 'H 2ICS-57-05-SW001 C5.51 SD none 2ICS-57-05-SW019 6 ' C5.51 TE none II 2ICS-57-06-FW007 C5.51 SD none 2ICS-57-06-FW009 C5.51 TE none 6'I 2ICS-57-06-SW016 ~
| |
| C5.51 SD none 2ICS-57-07-FW001 6 ' C5.51 SD none 2ICS-57-08-FW021 C5.51 SD none 2'2" 2ICS-57-08-SW048 C5.51 SD none NMP24SI406 Rev.t Appendix B Page11 of14
| |
| | |
| TABLE B-5 CLASS 2 NONEXEMPT CATEGORY C-F-2 WELDS SELECTED FOR EXAMINATION Selection Key: TE -" Terminal End; SD ~ Structural Discontinuity; BER ~ Break Exclusion Region; '/ ~ 7.5/. criteria Y r!i
| |
| ",WELD'..: "CODE -', "::;ASSOCIATED
| |
| '":::;":-'UMBER.': 'REASON"'ELECTED NPS .:. '.' 'ITEM NO." ; LONGWELD(S) 2ICS-57-09-FW009 10" C5.51 SD/ber none 2ICS-57-09-FW012 1 0n C5.51 SD none 21CS-57-09-FW020 10" C5.51 SD none 2ICS-57-09-SW015 10" C5.51 SD/ber none 2ICS-57-09-SW016 10" C5.51 SD/ber none 2MSS-01-03-FW002 16" C5.51 SD none 2MSS-01-07-FW002 18" C5.51 SD none 2MSS-01-07-SW013 18" C5.51 SD none tl none 2MSS-01-13-FW020 28 C5.51 SD/ber 2MSS-01-14-FW020 2 81I C5.51 SD/ber none 2MSS-01-1 5-FW020 28" C5.51 SD/ber none 2MSS-01-16-FW020 28" C5.51 SD/ber none II 2MSS-01-1 9-FW005 6 C5.51 SD none II 2RDS-65-00-FW003 8 C5.51 SD none 2RDS-65-00-FW009 8H C5.51 SD none 2RDS-65-00-FW015 8lt C5.51 SD none II 2RDS-65-00-SW040 8 C5.51 SD none 2RDS-65-00-SW044 8lt C5.51 SD none 2RDS-65-00-SW060 12" C5.51 SD none 2RHS-66-05-FW007 8ll C5.51 SD none II 2RHSW6-05-SW004 8 C5.51 SD none II 2RHS46-05-SW007 8 C5.51 SD none It 2RHS-66-06-FW011 8 C5.51 SD none 2RHS-66-06-FW014 8ll C5.51 SD (none)
| |
| NMP2-ISI~ Rev.t Appendix B Page 12 of 14
| |
| | |
| TABLE 8-5 CLASS 2 NONEXEMPT CATEGORY C-F-2 WELDS SELECTED FOR EXAMINATION SelectionKey: TE~ TerrnfnaiEnd; SD"-StructuraiDiscontinuity; BER= Break ExciusionRegion; '/t~7.St/icriteria
| |
| ..:INtEL'D ':.:.:,'.'CODE:. REASON, :'.'
| |
| ASSOCIATED.:
| |
| ,'" 'NUMBER': NPS.:..::: ':
| |
| ITEM-'NO; '":::SELECTED" ; ':: LONGWELD(S):::."
| |
| 'D 2RHSW6-06-SW013 8ll C5.51 flofle 2RHS-66-09-FW002 8ll C5.51 SD none 2RHS<6-09-FW008 8ll C5.51 TE none tl 2RHS-66-09-FW019 8 C5.51 SD none 2RHS46-10-SW001 C5.51 SD none tt 2RHSW6-10-SW019 8 C5.51 SD none 2RHS-66-13-FW004 24" C5.51 SD none 2RHSW6-13-FW012 24tl C5.51 SD none 2RHS-66-1 3-SW027 20" C5.51 SD none 2RHSW6-14-FW004 18" C5.51 SD none 2RHS46-14-FW020 18" C5.51 SD none 2RHS-66-14-SW012 1 8lt C5.51 SD flofle 2RHSW6-14-SW013 1 8ll C5.51 SD none 2RHS<6-1 6-FW002 18" C5.51 TE none 2RHS46-16-FW006 16" C5.51 SD none 2RHS-66-1 7-FW004 12" C5.51 SD none 2RHSW6-1 8-FW025 16" C5.51 SD none 2RHS-66-1 8-FW027 12" C5.51 SD none 2RHSW6-19-FW002 12" C5.51 SD none 2RHS<6-1 9-SW026 12" C5.51 SD none 2RHS-66-20-FW001 18" C5.51 SD none 2RHSW6-21-FW007 20" C5.51 SD none 2RHS<6-21-SW009 18" C5.51 SD none 2RHS46-21-SW016 18" C5.51 SD none 2RHS46-22-FW014 24" C5.51 SD none 2RHS46-22-SW017 24" C5.51 SD none 2RHS-66-23-FW007 24" C5.51 SD none NMP2-ISI406 Rev.t Appendix B Page 13 of 14
| |
| | |
| TABLE B-5 CLASS 2 NONEXEMPT CATEGORY C-F-2 WELDS SELECTED FOR EXAMINATION Selection Key: TE ~ Terminal End; SD ~ Structural Discontinuity; BER ~ Break Exclusion Region;
| |
| ~h ~ 7.5/ criteria WEL'D 'ODE REASON ..., ASSOCIATED
| |
| 'UMBER NPS ITEM NO.", SELECTED ": LONGWELD(S)
| |
| 'RHS-66-23-SW018 24" C5.51 SD none 2RHS-66-24-FW022 1 8ll C5.51 SD none 2RHS-66-24-FWSW026 6H C5.81 TE none II none 2RHS-66-24-SW003 20 C5.51 SD 2RHS-66-24-SW005 18" C5.51 SD none 2RHS-66-25-FW006 1 8ll C5.51 SD none 2RHS-66-25-FW007 18" C5.51 SD none 2RHS-66-26-FW010 12" C5.51 SD none 2RHS-66-27-FWSW015 18" C5.51 SD none 2RHS-66-27-SW002 18" C5.51 SD none 2RHS-66-27-SW005 18" C5.51 SD none 2RHS-66-27-SW016 18" C5.51 SD none 2RHS-66-28-FW001 18" C5.51 SD none 2RHS-66-29-FW002 1 8tl C5.51 SD none 2RHS-66-29-FW010 1 6II C5.51 SD none 2RHS-66-29-FW023 1 8II C5.51 SD none 2RHS-66-30-FW006 18" C5.51 SD none 2RHS-66-31-FW008 16" C5.51 TE none 2RHS46-31-FW011 1 2II C5.51 SD none 2RHS-66-31-SW004 16" C5.51 SD none 2RHSW6-31-SW006 16" C5.51 SD none 2RHS-66-32-SW005 12" C5.51 TE none 2RHS P1C,PW102C 18" C5.51 SD none 2RHS Pl C,PW103C 18" C5.81 TE none 2RHS'MOV2A,VWMOV2A-A 18" C5.70 SD none 2RHS'PV21A,VWPV21A-B 8tt C5.51 SD none NMP24SI-006 Rev.t Appendix B Page 14 of 14
| |
| | |
| APPENDIX C CLASS 1,2 &3 MULTIPLEVESSEL, PUMP AND VALVETABLES This Appendix shows the equivalency of the Class 1 pumps and valves subject to examination under ASME Section XI, Examination Categories; B-L-2, Pump Casings; and B-M-2, Valve Bodies.
| |
| Class 1 Pumps The two reactor water recirculation pumps 2Rcs'P1A and 2Rcs'P1 B are the only Class 1 pumps at NMP2. Section XI, Table IWB-2500, Examination Category B-L-2 permits the examination of only "...one pump in each group of pumps performing similar functions in the system..." The NMP2 recirculation pumps are equivalent.
| |
| The only other IWB-2500 examination category that applies to the NMP2 recirculation pumps is Examination Category B-G-1, Pressure-Retaining Bolting Greater Than 2 in. in Diameter. The Code allows for B-G-1 examinations to be limited to the pump selected for examination under Category B-L-2. Therefore, at NMP2, only the bolting of 2Rcs'P1A is scheduled for B-G-1 examination.
| |
| Class 1 Valves Examination Category B-M-2 allows the examination of only one valve within each group of valves of; the same design, the same 4" NPS requires a visual manufacturing method, and similar function. As a result, only one valve, per group of valves, exceeding examination (VT-3) of internal surfaces under Category B-M-2, and this one valve need only be examined ifit is disassembled for maintenance, repair, or volumetric examination; and even then, only to the extent deemed practical by the Owner, and never more than once in any interval.
| |
| Bolting examinations for the other two IWB-2500 examination categories that apply to Class I valves at NMP2 (B-G-l, Pressure-Retaining Bolting Greater than 2-Inch Diameter pfalve 2Mss'Aov7B 2-~/s" x 2" diameter step stud only] and B-G-2, Pressure-Retaining Bolting 2-Inch Diameter and Less) are limited to those valves selected for examination under Examination Category B-M-2.
| |
| Valves determined to meet this multi-component equivalency criteria are listed in Table B-I following.
| |
| NMP2-ISI406 Rev.1 Appendix C Page 1 of 14
| |
| | |
| 0 TABLE C-1 ISI CLASS 1 MULTIPLE VALVE EQUIVALENCYTABLE Group Valve Se- ISI Valve ISI-COM B-G-1. B-G-2 B-M-2 No.- Number lect lso-. Design Drawing 'ID No, ID:No. ID No.
| |
| 1Va01 2CSH'MOV107 Yes 25-09 Gate'12" 012 na VB100 7/8" VBY102 1Va02 2CSH'AOV108 Yes 25-10 Swin Check 12" 003 na VB500 VBY100 1Va03 2CSH'HCV120 Yes 25-10 Gate 12" 008 na VB501 1 1/8" VBY101 1Va04 2CSL'MOV104 Yes 26-05 Gate 12" 009 na VB101 7/8" VBY105 1Va05 2CSL'AOV101 Yes 26-05 Swin Check 12" 003 na VB502 VBY103 1Va06 2CSL'HCV117 Yes 26-05 Gate 12 008 na VB503 1 1/8" VBY104 2FWS'MOV21A No 47-13 Gate 24" 007 na VB504 1 1/8" VBY110 1Va07 2FWS'MOV21B No 47-16 Gate 24" 007 na VB505 1 1/8" VBY111 2FWS'AOV23A Yes 47-13 Swin Check 24" 002 na VB506 .625" VBY106 2FWS AOV23B No 47-16 Swin Check 002 na VB507 .625 VBY107 24'7-13 2FWS V12A No Swin Check 24" 003 na VB508 .625" VBY112 1Va08 2FWS'V12B No 47-16 Swing Check 24 003 na VB509 .625 VBY113 NMP2-ISI406 Rev.1 Appendix c Page 2 of 14
| |
| | |
| TABLE C-1 ISI CLASS 1 MULTIPLE VALVE EQUIVALENCYTABLE Group . . Valve Se- ISI, Valve 'SI-COM B-G-1 B-G-2 :.
| |
| No.. Number .:lect- Iso Design ';..Driwing ID No. ID No. '.'.ID'No;.-
| |
| B.-M-2':.::.,
| |
| 2FWS'HCV54A Yes 47-13 An le 24'11 na VB-510 1 1/8" VBY108 1Va09 2FWS HCV54B No 47-'16 An le 24" 011 na VB-511 1 1/8" VBY109 2ICS'MOV1 21 Yes 57-09 Gate 10" 008 na VB-512 '/i" VBY116 1Va10 2ICS'MOV128 No 57-09 Gate 10" 008 na VB-513 ~/i" VBY118 2ICS'AOV156 Yes 57-07 Swin Check6" 003 na VB514 .5" VBY114 1Va11 2ICS AOV157 No 57-07 Swin Check 6" 003 na VB515 .5" VBY115 1Va12 2ICS'MOV126 Yes 57-07 Gate 6" 015 na VB-102 5/8" VBY117 PB107 & VB123 1Va13 2MSS"PSV120 Yes 01-13 Safe -Relief 26" 054 na 1.625 8 1" VB130 PB110 & VB124 2MSS'PSV1 21 No 01-13 Safe -Relief 26" 054 na 1.625 8 1" VB131 PB113 & VB125 2MSS'PSV1 22 No 01-13 Safe -Relief 26" 054 na 1.625 8 1" VB132 PB116 & VB126 2MSS'PSV123 No 01-13 Safe -Relief 26 054 na 1.625 8 1 VB133 PB119 8 VB127 2MSS'PSV124 No 01-14 Safe -Relief 054 na 1.625 8 VB134 26'afe PB122 & VB128 2MSS'PSV125 No 01-14 -Relief 26" 054 na 1.625 8 1 VB135 PB125 8 VB129 2MSS'PSV1 26 No 01-14 Safety-Relief 26" 054 na 1.625 & 1" VB136 NMP2-ISI406 Rev.1 Appendix c Page 3 of 14
| |
| | |
| TABLE C-1 ISI CLASS 1 MULTIPLEVALVE EQUIVALENCYTABLE Group .: -,':,-Valv.e
| |
| -..''Numb'er:
| |
| .;. . ISI
| |
| .'so.
| |
| Valve Design
| |
| -', ISI-COM:-:.;:::.-:-,:.:
| |
| -'Drawing-:--:-:,
| |
| -::=.':,.;::--
| |
| .8-G-1 ID No.
| |
| - ',B-,G-2.
| |
| '. -ID No;
| |
| .:::;" 8-M-2-'D No..:,
| |
| No. .
| |
| PB128 & VB130 2MSS'PSV1 27 No 01-14 Safe -Relief 26" 054 na 1.625 & 1" VB137 PB131 & VB131 2MSS'PSV128 No 01-14 Safe -Relief 26" 054 na 1.625 & 1 VB138 PB134 & VB132 2MSS'PSV129 No 01-15 Safe -Relief 26" 055 na 1.625 & 1" VB139 PB137 8 VB133 2MSS'PSV1 30 No 01-15 Safe -Relief 26" 055 na 1.625 & 1" VB140 PB140 & VB134 2MSS'PSV1 31 No 01-15 Safe -Relief 26" 055 na 1.625 & 1" VB141 PB143 & VB135 2MSS'PSV1 32 No 01-15 Safe -Relief 26" 055 na 1.625 & VB142 PB146 & VB136 2MSS'PSV1 33 No 01-15 Safe -Relief 26" 055 na 1.625 & 1" VB143 PB149 & VB137 2MSS'PSV134 No 01-16 Safe -Relief 26" 055 na 1.625 & 1 VB144 PB152 & VB138 2MSS PSV135 No 01-16 Safe -Relief 26" 055 na 1.625 & 1" VB145 PB155 & VB139 2MSS'PSV1 36 No 01-16 Safe -Relief 26" 055 na 1.625 & 1" VB146 PB158 & VB140 2MSS'PSV1 37 No 01-16 Safe -Relief 26" 055 na 1.625 & 1" VB147 2MSS'AOV6A No 01-1 3 Y-Pattern Globe 26" 058 na VB546 2" VBY178 1Va14 2MSS'AOV6B No 01-14 Y-Pattern Globe 26" 058 na VB547 2" VBY179 2MSS'AOV6C No 01-15 Y-Pattern Globe 26" 058 na VB548 2 VBY180 2MSS'AOV6D No 01-16 Y-Pattern Globe 26" 058 na VB549 2 VBY181 2MSS'AOV7A Yes 01-13 Y-Pattern Globe 26" 058 na VB550 2" VBY182 VB551B & VB551C 2MSS'AOV7B No 01-14 Y-Pattern Globe 26" 058 2/i na VBY183 NMP2-ISI406 Rev.1 Appendix c Page 4 of 14
| |
| | |
| 0 TABLE C-1 IS) CLASS 1 MULTIPLEVALVE EQUIVALENCYTABLE Group -; Valve -=
| |
| Se- ISI Valve ISI-:COM B-G-1 B-G-2 B-M-2 No. '=. Number ..::lect.: Iso Design Drawiiig ,ID No.. . ID No. . IDNo.
| |
| 2MSS'AOV7C No 01-15 Y-Pattern Globe 26 058 na VB552 2 VBY184 2MSS AOV7D No 01-16 Y-Pattern Globe 26" 058 na VB553 2" VBY185 2MSS*MOV111 No 01-21 Globe 6" 009 na VB103 1" VBY127 1Va15 2MSS'MOV112 Yes 01-20 Globe 6" 009 na VB104 VBY128 1Va16 2MSS'MOV207 Yes 01-21 Globe 6" 018 na VB-524 7/8'BY129 2RCS'MOV1 OA Yes 64-00-1 Gate 24 016 na VB113 1~/i" VBY150 1Va17 2RCS'MOV10B No 64-00-4 Gate 24" 016 na VB114 1'/i VBY151 2RCS'MOV1 8A Yes 64-00-2 Gate 24" 016 na VB115 VBY152 1e/4'B116 64-00-5 Gate 24" 016 na 1%" VBY153 1Va18 2RCS'MOV1 8B No VB105, VB107 1 5/8" 8 1 3/8" VB109, VB111 2RCS'HYV1 7A Yes 64-00-2 Gate 24" 044 na 1%" 8 1 VBY148 VB108 5/8'B106, 1 5/8" 8 1 3/8" VB110, VB112 2RCS'HYV1 7B 64-00-5 Gate 24" 044 na 1%" & 1 5/8" VBY149 1Va19 No Appendix c Page 5 of 14 NMP2-ISI406 Rev.1
| |
| | |
| TABLE C-1 ISI CLASS 1 MULTIPLE VALVE EQUIVALENCYTABLE Group Valve Se- ISI Yalve ISI-COM -:B-G-1 . 8-G-2 . B-M-2 No.-- Number .: lect Iso Design , Drawing . ID No. ID No; ID No.
| |
| 2RHS'HCV54A Yes 66-53 Gate'12" 008 na VB525 1 1/8" VBY163 1Va20 2RHS"HCV54B No 66-54 Gate 12" 008 na VB526 1 1/8" VBY164 2RHS AOV39A Yes 66-53 Swin Check12 003 na VB527 .625" VBY157 1Va21 2RHS'AOV39B No 66-54 Swin Check12 003 na VB528 .625 VBY158 2RHS'MOV40A Yes 66-19 Globe 12 018 na VB529 7/8" VBY171 1Va22 2RHS'MOV40B No 66-32 Globe 12" 018 na VB530 7/8" VBY172 2RHS'MOV112 Yes 66-55 Gate 20" 007 na VB531 7/8" VBY166 1Va23 2RHS'MOV113 No 66-21 Gate 20" 007 na VB532 7/8" VBY167 2RHS'HCV53A Yes 66-50 Gate 12" 008 na VB533 1 1/8" VBY160 Gate 12" 008 na VB534 1/8" VBY161 1Va24 2RHS'HCV53B No 66-51 1 66-52 Gate 12" 008 na VB535 1/8" VBY162 1Va25 2RHS'HCV53C Yes 1 2RHS AOV16A Yes 66-50 Swin Check12" 003 na VB536 .625" VBY154 1Va26 2RHS'AOV16B No 66-51 Swin Check12" 003 na VB537 .625" VBY155 Appendix c Page 6 of 14 NMP2-ISI406 Rev.1
| |
| | |
| I" TABLE C-1 ISI CLASS 1 MULTIPLEVALVE EQUIVALENCYTABLE
| |
| -Group Valve=- -.=':-. --;,':--.:Se'-'-.:.:-:.--:: ISI. Valve . ISI-COM.':: '.:.;,-:- B'-'G-1 ..::-:::: .::. ': ,
| |
| - B-.M-'2'-.'.:.
| |
| -- -'No. Number-.-.'-..=:- -:-'--lect-:-::-:::=';.'Iso;. . Design -:::.'.:.-.:::.:,.--ID No.'..:..:.::::.:: .-.:', -::.::. ID No.
| |
| B-'G-2'rawing-'..'::.
| |
| '; ID.No..-":-',.'..;
| |
| 1Va27 2RHS AOV16C Yes 66-52 Swin Check 12" 003 na VB538 .625" VBY156 2RHS'MOV24A Yes 66-1 9 Gate 12" 008 na VB539 1" VBY168 1Va28 2RHS'MOV24B No 66-31 Gate 12" 008 na VB540 1" VBY169 1Va29 2RHS'MOV24C Yes 66-26 Gate 12" 008 VB541 1" VBY170 1Va30 2RHS'V143 Yes 66-47 Swin Check 6" 003 na VB542 5/8 VBY173 1Va31 2RHS'MOV104 Yes 66-47 Globe 6" 018 na VB543 7/8" VBY165 Gate 12" 017 na VB544 1/8" VBY159 1Va32 2RHS'HCV131 Yes 66-55, 1 09-06 Globe 8" 009 na VB118 1 3/8" VBY174 2WCS'MOV1 02 Yes Globe 8" 009 na VB122 3/8" VBY176 1Va33 2WCS'MOV112 No 09-06 1 IVa34 2WCS'MOV103 Yes 09-06 Globe 8" 009 na VB119 1 3/8 VBY175 Appendix c Page 7 of 14 NMP24SI406 Rev.1
| |
| | |
| TABLE C-1 ISI CLASS 1 MULTIPLEVALVE EQUIVALENCYTABLE Group .- Valve ISI Valve ISI-COM: B-G-1 . B-G -.'-::.'. 8-M-2
| |
| , No..: -
| |
| Number . lso "Design . DraIfvIng . ID No. -ID No; . .ID No.
| |
| 2WCS'MOV200 Yes 09-14 Globe 8" 018 na VB545 1 1/8" VBY-177 1Va35 Appendix c Page 8 of 14 NMP2-ISI406 Rev.1
| |
| | |
| APPENDIX C CLASS 2, MULTIPLEVESSEL EQUIVALENCY This Appendix shows the equivalency of the Class 2 vessels subject to examination under ASME Section XI, Examination categories C-A, Pressure Retaining Welds in Vessels; C-B, Pressure Retaining Nozzle Welds in Vessels; C-C, Integral Attachments for Vessels, Piping, Pumps, and Valves; and, C-D, Pressure Retaining Bolting Greater than 2 in. In Diameter.
| |
| Residual Heat Removal System (RHS) heat exchangers 2RHs'E1A and 2RHs'EIB are the only Class 2 nonexempt pressure vessels at NMP2. Section XI allows for the examination of only one vessel "...in the case of multiple vessels of similar design, size, and service..." for each of the examination categories which apply to Class 2 vessels. The RHS heat exchangers are considered to be equivalent and meet the multi-component equivalency criteria. 2RHS'E1A has been selected for the subject Class 2 examinations. The RHS heat exchangers possess no hardware which can be categorized under Examination Categories C-C and C-D.
| |
| Residual Heat Removal System heat exchanger examination requirements are summarized in Table C-I below.
| |
| TABLE C-2
| |
| | |
| ==SUMMARY==
| |
| OF CLASS 2 VESSEL EXAMINATIONS Group Vessel ISI-COM C-A C-B No. ID No. Selected Drawing ID Nos. ID Nos.
| |
| HW100A HW102A HW103A 2RHS E1A Yes 091 HW101A HW104A HW105A HW1 008 HW1028 HW1038 2Ve01 2RHS E18 No 092 HW1018 HW1048 HW1058 NMP2-ISI406 Rev.o Appendix C Page 9 of 14
| |
| | |
| APPENDIX C CLASS 2, MULTIPLEPUMP AND VALVEBREAKDOWN This Appendix identifies the Class 2 pumps and valves subject to Code Categories C-C, C-D, C-G via application of the multi-component concept.
| |
| Class 2 Pumps There are six nonexempt Class 2 pumps:
| |
| 2csH'PI - This pump is unique in its function and populates a group of one (I).
| |
| 2csL'P1 - This pump is unique in its function and populates a group of one (I).
| |
| 2Ics'PI - This pump is unique in its function and populates a group of one (1).
| |
| 2RHS'PI A - This pump meets the equivalency requirements of the multi-component concept.
| |
| 2RHS'P18 - This pump meets the equivalency requirements of the multi-component concept.
| |
| 2RHS'P1c - This pump is unique in its function and populates a group of one (1).
| |
| Since 2csH'P1, 2GSL'P1, 2lcs'P1, arid 2RHs'P1 c are unique in their function, the multi-component concept can not be applied to them. Each of these pumps is required to be examined under C-C, C-D, and C-G Table D-1 shows the identification numbers of the welds and bolting requiring examination on the Class 2 pumps.
| |
| TABLE C-3 CLASS 2 PUMPS REQUIRING INSERVICE INSPECTION Group Pump Se- ISI-COM Cat. C-C Cat. C-D Cat. C-G No. No. lect Drawln ID Nos. ID Nos. ID Nos.
| |
| PW203 PW206 PW207 PW208 PW209 PW210 PW212 PW217 2Pu01 2CSH*P1 Yes 027 na PW218 PW219 PW306 PW310 PW311 2P.,u02, 2CSL P1 Yes 027 PW319 PPB100 PW312 PW314 PW315 PW316 PW400 PW401
| |
| .,2Pu03 2ICS*P1 Yes 013 PW402 PW403 na na 2RHS*P1 PW110A PW111A PW112A A Yes 026 PW121A PW113A PW115A PW116A PW118A
| |
| :;:2RHS'P
| |
| '::.'.-'W108A
| |
| 'l:;;:.;"':::,;lI.;.i7',"~",'r'>>'~e,'PeW108B',PW110B PW111B;PW112Bi~
| |
| ":"-"~8~"'"P 5~""'Pu04 Si".':i:- PW121B ::-! ';;:;".'na s<N::: PW113B PW115B':PW116B PW118B ".
| |
| 2RHS*P1 PW108C PW110C PW111C PW112C 2Pu05 C Yes 026 PW121C na PW113C PW115C PW116C PW118C Class 2 Valves Section XI, Table IWC-2500-1, Examination Categories applicable'o Class 2 valves, are: C-C, Integral Attachments for Vessels, Piping, Pumps, and Valves; C-D, Pressure Retaining Bolting Greater Than 2 in. In Diameter; and C-G, Pressure Retaining Welds in Pumps and Valves. Research into the design of nonexempt Class 2 valves at NMP2
| |
| 'ther than pressure tests, Category C-H.
| |
| NMP2-ISI406 Rev. I Appendix C Page10or14
| |
| | |
| during the formulation of the preservice inspection plan revealed that: within the (nonexempt) boundaries of the piping systems examined under Categories C-F- I or C-F-2, there exist only 12 valves that possess pressure retaining body welds requiring their inclusion into, and examination pursuant to the rules of, Categoty C-G None of those valves utilize integral attachments of the type described in Examination Category C-C. Further, none of those valves utilize bolting greater than 2 inches in diameter. Therefore, all (non-VT-2) Code examinations conducted on Class 2 valves at NMP2 are pur'suant to the requirements of Examination Category C-G.
| |
| Examination Category C-G permits the examination of only one valve in a group of valves of similar design, function, and service. Table D-2 of this Appendix shows the nonexempt Class 2 valves for which Category C-G requires examination and the multi-component equivalency of these valves. In Table D-2, equivalent valves are identified by the same group number. It should be noted that valve-to-pipe welds are not considered in Category C-G or this Ap-pendix. Valve-to-pipe weld examinations are covered in the applicable pipe weld category (C-F- I or C-F-2.) One valve from each multi-component group has been selected for examination during the interval.
| |
| TABLE C-4 ISI CLASS 2 MULTIPLE VALVE EQUIVALENCYTABLE Group Valve Se- Associated Design ISI-COM C-G No. ID No. lect Pi in Iso T e Drawin ID Nos.
| |
| (3) VWMOV112-C, D 2Va01 2CSL'MOV112 Yes 26-01 Butte rfl 020 & LW (3) VWV121-C, D &
| |
| 2Va02 2CSL V121 Yes 26-01 Butterfl 057 LW (3) VWHCV118-C, D &
| |
| 2Va03 2CSL HCV118 Yes 26-02 Butterfl 019 LW (3) VWHCV119-C, D &
| |
| 2Va04 2CSL HCV119 Yes 26-02 Butterfl 019 LW 2RHS MOV8A Yes 66-14 Butterfl 019 2 VWMOV8A-C & D 2Va05 2RHS'MOV88. No 66-29 Butterfi 019 2 -VWMOV8B-G'&D (3) VWMOV1C-C, D &
| |
| 2Va06 2RHS MOV1 C Yes 66-22 Butterfi 020 LW (3) VWV376-C, D &
| |
| 2RHS V376 Yes 66-13 Butterfl 057 LW
| |
| '\
| |
| iI:tv"2 ;, . (3)';VWV377-;;C",:. D.,"&'i:;:.,
| |
| 2Va07;"::,',:;..'~2RHS,V377;.":: ",: '. "66-.23 ; .Butte'rfl:;:", ! .:057.:.:.::.'' .',:
| |
| "'''',;:.''LW::.':.'Va08 (3) VVW378-C, D &
| |
| 2RHS'V378 Yes 66-22 Butterfl 057 LW 2RHS MOV2A Yes 66-1 3 019 2 VWMOV2A-C& D 2Va09 4" '.
| |
| ;2RHS;MOV2B :,''. 'o "::::::.66-23'utterfl
| |
| . Butterfly;.'. ,"',O'I9 "; :;",.:,'(2);VWMOV2B-'G"&'
| |
| NMP2-ISI406 Rev. 1 Appendix C Page 11 of 14
| |
| | |
| APPENDIX C IWF-2510 MULTIPLE COMPONENT IMPLEMENTATION Table C-5 Class I Multiple Component Equivalency for IFF Support Examination Selection This tabulation of Class l pumps and vessels, within systems at NMP2, groups those components by similar design, function, and service, for the purpose of choosing a singular component to act as a representative for its group. The table then identifies the supports (requiring examination by this plan) of that one represehtative component.
| |
| The two reactor water recirculation pumps 2Rcs'P1A aild 2Rcs P1B are Ole only Class 1 pumps at NMP2. The reactor vessel is the only Class I, vessel at NMP2. Supports of Class l valves are not specific to those valves.
| |
| Valve support design is incorporated into the support of the piping system into which the valves are installed.
| |
| TABLE C-5
| |
| | |
| ==SUMMARY==
| |
| OF CLASS 1 MULTI-COMPONENTSUPPORT EXAMINATIONS Vendor Group Componerrt Support Fabrication Isometric No. ID No. Selected ID Drawing Locator 2RCS-PSSH009A1 BZ-70L 64-00-1-12 2RCS-PS SH010A1 BZ-70L 64-00-1-11 2RCS-PSSH011A1 BZ-70L 64-00-1-09 2RCS-PSSH012A1 BZ-70L 64-00-1-1 0 2RCS-PS SP042A1 BZ-70T 64-00-1-07 2RCS-PSSP044A1 'BZ-70V 64-00-1-06 2RCS-PSSP046A1 BZ-70X 64-00-1-08 2RCS-PSSP061A1 BZ-70X 64-00-1-13 2RCS-PSSP062A1 BZ-70X 64-00-1-15 2RCS-PSSP063A1 BZ-70X 64-00-1-1 4 I
| |
| 2RCS-PS ST059A1 BZ-70X 64-00-1-1 9 2RCS'P1A Yes 2RCS-RA2 767E722 64-00-1-20
| |
| .,",.';;:,,'2RCS-"PSSHQ13A'1,'. ';"': '.::'--::BZ-'70L': ", ..";.;;. .;".".::'": 64 'Olh'4; 15';;:I:;::;.:I::::':
| |
| ',";;:::..:2RCS-PSSH01'4A1..'.;.:: :;:, :'::<<BZ-,TOL':.'.;.;.:.;:. ;,:.:;-';,;64-00'1,:-.',1'4":;::<<''.::
| |
| :.'";:";.:;;;:;2RCS-PSSH015A1, "":: ":";:,";,"BZ-,70L'-':;;.';,;,'.;.;,' " - 6'4-'00-',1;,12 ';:,:':,::;:::":
| |
| '' ';:2RCSWSSH016A1 ',:;;:; BZ-'70L'".-'.",,::,:;,; '. ~"".S4=00;1"-,13,:.':.;::;~
| |
| :."i'I:."2RCS;PSSP041A1 'jt'I'! l: ',;:.,: 64'-',00-'.1';"11 .: ..."i
| |
| <<,':;.';:::,! 2RCS-',PSSP043A1:.':,,:.'i'" ": ':";,";."'BZ>>'";70Ull'",'."."',:.:3', .';;,:-;':;<:64-';00;1',09; ".'..:.'.
| |
| 'i:,-,I;2RCS-'PSSP045A1;::.!'
| |
| .;."",''64<0'-;1-,',10'~'."-;
| |
| .2RCS-;PSSP064A'1 ':-,',
| |
| ';"
| |
| ,:: .'= "'BZ-',70AJ;",: '-:. '.- -..;-.64-';00-,1-"18
| |
| ':;:,'.::";2RCS;-'PSSP065A1;::,:."' BZ-'70AK;",:.''';".";. :,.'"'j'''';6'440-'1"-16:. I'".'"':
| |
| "'," 2RCS-'PSSP066A1 .,,'.
| |
| '. -,. BZ-'.70AH:,'.,:l!:::;;.:'.""; ,";.,S4;00-'1;-'17! '",
| |
| -'.2RCS-'PSST060A1,.", '. ;:-:,::.:; ": BZ-;70AE,""..'';. ",:*
| |
| 64;,00'-'1=.19:::,''."':-:'.,:'.:=:.-,"64-",00-;,1'0',;:;
| |
| 1Pu01 -! .'2RCS;P1B;":;., '':.:"::; ':::.:,'::;::,.;",,:;2RCS-'RB2: :,:- i:;~767E722',;
| |
| NMP2-ISI406 Rev. 1 Appendix c Page12of14
| |
| | |
| 0' t Table C-6 Class 2 Multiple Component Equivalency for ISF Support Examinanon Selection This tabulation of Class 2 pumps and vessels, within systems at NMP2, groups those components by similar design, function, and service, for the purpose of choosing a singular component to act as a representative for its group. The table then identifies the supports (requiring examination by this plan) of that one representative component.
| |
| There are six nonexempt Class 2 pumps:
| |
| 2csH P1 - This pump is unique in its function and populates a group of one (I).
| |
| 2csL'P1 - This pump is unique in its function and populates a group of one (1).
| |
| 2lcs'P1 - This pump is unique in its function and populates a group of one (1).
| |
| 2RHs'P1A - This pump meets the equivalency requirements of the multiple component concept.
| |
| 2RHs'P1B - This pump meets the equivalency requirements of the multiple component concept.
| |
| 2RHS'P1 c - This pump is unique in its function and populates a group of one (1).
| |
| Since 2csH'P1, 2csL P1, 2lcs P1, and 2RHs P1c are unique in their function, the multiple component concept cannot be applied to them. Each of these pumps is required to be examined under C-C, C-D, and C-G Residual Heat Removal System (RHS) heat exchangers 2RHS'E1A and 2RHs E1B are the only Class 2 nonexempt pressure vessels at NMP2. Section XI allows for the examination of only one vessel
| |
| "... in the case of multiple
| |
| " for each of the examination categories that apply to Class 2 vessels.
| |
| vessels of similar design, size, and service...
| |
| The RHS heat exchangers are considered equivalent and thus, meet the multiple component equivalency criteria.
| |
| 2RHS'E1A has been selected for the subject Class 2 examinations in the ISI Program Plan. Therefore, the support mechanism of that component only, need be examined under this IWF Program Plan.
| |
| TABLE CW
| |
| | |
| ==SUMMARY==
| |
| OF CLASS 2 MULTI-COMPONENTSUPPORT EXAMINATIONS Vendor Group Component Support Fabrication Isometric No. ID No. Selected ID Drawing Locator 2Pu01 2CSH*P1 Yes 2CSH*P1-SUPPORT 2C-5270 25-series 2pu02 2CSL'P1 Yes 2CSL'P1-SUPPORT 2C-5576 26-series 2Pu03 2ICS*P1 Yes 2ICS*P1-SUPPORT FD230516 57-series 2RHS*P1A Yes 2RHS'P1A-SUPPORT 21A1913AD 66-series 2Pu04 2RHS*P1B No . 2RHS P1B-SUPPORT 21A1913AD'6-seiies 2Pu05 2RHS*P1C Yes 2RHS'P1C-SUPPORT 21A1913AD 66-series 2RHS E1A Yes 2RHS E1A-SUPPORT 762E909 66-series 2Ve01 2RHS*E1B No - 2RHS" E1B-SUPPORT 762E909 66-series NMP2-ISI406 Rev. 1 Appendix C Page 13 of 14
| |
| | |
| Table C-7 Class 3 Multiple Component Fquivalency for ISF Support Framination Selection This tabulation of Class 3 pumps and vessels, within systems at NMP2, groups those components by similar design, function, and service, for the purpose of choosing a singular component to act as a representative for its group. The table then identifies the supports (requiring examination by this plan) of that one representative component.
| |
| TABLE C-7
| |
| | |
| ==SUMMARY==
| |
| OF CLASS 3 MULTI-COMPONENT SUPPORT EXAMINATIONS Group Component Support Fabrication Isometric No. ID No. ID No. Drawing Locator 2SFC*P1A-2SFC*P1A Yes SUPPORT N239506¹1 07-series t,
| |
| 'll-:"'endor ,I ', 1
| |
| " '~ Vi"
| |
| ; ",:;.;;.:,:;-,,2SFC'.P1B-';:::;,',:.':
| |
| 3Pu01 2SFC'P1 ;::."'.,'!No;,,'::::i B .".'SWP...",P..1'A'elected "SUPPORT.::::-'-;:.:-:,:::i':.::: '.
| |
| .':,~':!N239506¹5'::::::t;: ';;:;-07;"series I".""
| |
| ';-"'"-"":'.21-'20:
| |
| ~"'",'i':!No'~'ll""''iiijx"": -'-,:.;SUPPORT:::".'.:. i!:":..;
| |
| 2SWP'P1B-2SWP*P1B Yes SUPPORT N239505¹1
| |
| :.'2SWP..'..P I '..;:" No:::.::-":
| |
| ',!I'",-'2RHS;P.:1C-.,
| |
| ~!I":::;:::,:..SUPPORT,',- '. ''. -" " ',N239505¹.1- "'1-17l9'' ."":::::: 21
| |
| \'l
| |
| "';:-', 2SWP.,'.P1D-",:: 4';
| |
| C:,'SWP'.P1D."-.:,
| |
| No'''"'lt '''
| |
| '::,,'SUP,P.ORT':
| |
| '-':- 'N239505¹1 ".':.::.": I.''::::: .: .::,21'-17
| |
| 'I
| |
| -:2SWP.::P'IE".. :"; '::",.No':..:':.'.; '. '': 2SWP ..P...,.1E-.
| |
| 'SUP.P.ORT:.. N239505¹1 I"a 'i' 21-21 2SWP P1F-No SUPPORT N2 3950 5¹.1 21-''18 3Pu02 2SWP P1F 2SFC E1A-2SFC'E1A Yes SUPPORT 5084312161 07-series
| |
| ',"-'':. 2SFC-.,E1 B- ".'L$ '-.',
| |
| 3Ve01 ;. '2SFC',E1B~, ',",';.'-:",::. No"','""-" ;:,'.:-'.:;::; SUP.PORT. t.,':~5084312;l61i:.'':.':": ':.';",:::-~07-'series:
| |
| NMP2-IS!406 Rev. 1 Appendix c Page 14 or 14
| |
| | |
| APPENDIX D CLASS 1, 2 Ec 3 IWF COMPONENT SUPPORTS (CODE CASE N-491)
| |
| F1.10 Class 1 Piping Support Cate orization And Distribution Class 1 SupportType 25% of Support Type Systems Within Each System Within Each System F1.10A F1.10B F1.10C F1.10A F1.10B F1.10C C
| |
| CSH 0 0 CSL 0 0 p4~$
| |
| DER 0 0 0 0 18 '';-'.30',:: ''94~<
| |
| '-',,:,?7'"
| |
| ICS 13 '".;,8,''SS 41 21 20 '"'22'-''
| |
| RCS 0 0 10 0 0 19 16 SLS WCS 20 14 e+7+w, Ve"i >i iw 25 % Selection per type and function in each System A designator is F1.10A (Supports-one directional)
| |
| B designator is F1.10B (Supports-multidirectional)
| |
| C designator is F1.10C (Supports that allow thermal movement, ie. Springs)
| |
| NMP2-ISI406 Rev. I Appendix D Page 1 Of 8
| |
| | |
| APPENDIX D CLASS 1, 2 43 IWF COMPONENT SUPPORTS (CODE CASE N-491)
| |
| F1.10 Class 1 Piping Supports Exam Distribution 8 System Period One Period Two Period Three ,.
| |
| TotaIs,','A/8/C S stem RF0-6 RFO-7 RFO-8 RFO-9 RFO-10 RF0-11 " '
| |
| CSH 0 IA 1C 0 IA 0 .2/0/1,.
| |
| CSL IC 0 0 0 1A 0 - 1/0/1:."
| |
| DER 0 0 0 0 0 IC, 0/0/1 ',,
| |
| FWS IB, IC IA IA,IC 1B 3C 0 '-"2/2/5;;
| |
| ICS 1A lc IB,IC 1A IA,1B 1A 4/2/2 1A,2B MSS IA,2C 3A 3A 2B,2C 3A,2B '11/6/5 lc 'CS IC 0 2C 0 0 0 , OI0/3:.i'"
| |
| 2A,lB IC IA,IC IA,IC 1A,IB 0 IC SLS 0 IA,IB IA IC IB 0 WCS 0 IA,IB 2A,2C IB IC 2A .-.;..'5/2/4 '."
| |
| IC A/8/C 2/1/6 8/2/3 '.
| |
| 8/I/8: 2/5/3 4/4/5 8/3/2, 32/16/27r
| |
| .EXAMS PER OUTAGE,
| |
| %.Compiete '29% " 100%
| |
| 25 % Selection per type and function in each System A/B/C A designator is F I. I OA (Supports-one directional)
| |
| B designator is F1.10B (Supports-multidirectional)
| |
| C designator is F1.10C (Supports that allow thermal movement, ie. Springs)
| |
| NMP2-ISI406 Rev. i Appendix D page 2 Of 8
| |
| | |
| 11 APPENDIX D CLASS 1, 2 8'c 3 IWF COMPONENT SUPPORTS (CODE CASE N-491)
| |
| F1.20 Class 2 Piping Supports Cate orization And Distribution Class 2 SupportType 15 % of Support Type Systems Within Each System Within Each System F1.20A F1.20B F1.20C F1.20A F1.20B F1.20C '~"i"YOtaI~'"
| |
| ASS 0 0 0 0 CSH 38 30 10 78 CSL 22 13 42, 7 ICS 17 58 12 14"::,
| |
| MSS 12 19 RDS 0 36 0 0 0 '36 .6 RHS 178 88 79 27 14 12 TOTAL .. 267 .',.'32 DS 42",', 38', 627-'01,.
| |
| 15 % Selection per type and function in "each System A/B/C A designator is F1.20A (Supports-one directional)
| |
| B designator is F1.20B (Supports-multidirectional)
| |
| C designator is F1.20C (Supports that allow thermal movement, ie. Springs)
| |
| NMP2-ISI406 Rcv. I Appendix D Page 3 of 8
| |
| | |
| APPENDIX D CLASS 1,2 IWF COMPONENT SUPPORTS (CODE CASE N-491)
| |
| F1.20 Class 2 Piping Supports Exam Distribution B S stem Period One Period Two Period Three '. Totals RFO-6 RF0-7 RF0-8 RFO-9 RF0-10 RFO-11
| |
| 'A/B/C, S stem ASS 0 1C 0 0 0 0 0/0/1 ;
| |
| CHS 18 18,1C lA,18 2A,18 2A,18 1A,1C",6/5/2';
| |
| CSL 1A 1A 18,1C 1A 1A;18 0 --4/2/1 ICS 0 0 2A,18 28,1C lA,28 48,1C '/9/2, MSS 1C 1C 1A,18 1A 18,1C 0 ~
| |
| 2/2/3,.;-i:
| |
| RDS 1B 28 0 28 0 18 0/6/0 1A,18 SA,38 6A,28 SA,28 SA,28 27/14/12 2C 2C 2C 2C 1C 3C 2/3/3 6/6/5".:10/6/3 9/7/3.:, '9/7/2: . 6/9/5'2/38/21 Exams Per ":-:1;8':. ."..;,, 20" '-',","-, ""<<"101 Outa e., "''
| |
| oio Com lete 25ol '' " '62%'' '"' '" " "'00 15 % Selection per type and function in each System A/B/C A designator is F1.20A (Supports-one directional)
| |
| B designator is F1.20B (Supports-multidirectional)
| |
| C designator is F1.20C (Supports that allow thermal movement, ie. Springs)
| |
| NMP2-ISI406 Rev. I Appendix D pege4 Of 8
| |
| | |
| APPENDIX D CLASS 1, 2 8'c 3 IWF COMPONENT SUPPORTS (CODE CASE N-491)
| |
| F1.30 Class.3 Piping Supports Cate orization And Distribution Class 3 SupportType 10% of Support Type Systems Within Each System Within Each System F1.30A F1.30B F1.30C F1.30A F1.30B F1.30C 3 0 EGA 25 0 SFC 71 84 "$ 64;, "'.18'"o.
| |
| ,gag eg',,
| |
| SWP 208 255 34 21 26 4 SWQ 32 SWR 12 0 0 .":-16'x RHS 0 0 0 0 WCS 8 (e(j.g
| |
| ; TOTAL";;.' ';j, ",333,';,*.ji:",,ij,'388'; .:-"=';.:,"-::47,;; ';"' '-768:: :,-;87;",
| |
| 10 % Selection per type and function in each System A/B/C A designator is F1.30A (Supports-one directional)
| |
| B designator is F1.30B (Supports-multidirectional)
| |
| C designator is F1.30C (Supports that allow thermal movement, ie. Springs)
| |
| NMP2-ISI406 Rcv. I Appendix D page 5 of 8
| |
| | |
| APPENDIX D CLASS 1, 2 43 IWF COMPONENT SUPPORTS (CODE CASE N-491)
| |
| F1.30 Class 3 Piping Supports Exam Distribution 8 S stem Period One Period Two Period Three ",, TotaIs' S stem RFO-6 RF0-7 RF0-8 RFO-9 RF0-10 RFO-11 A/SIC EGA 3A,1B 0 0 0 0 2A,3B '."',8/Q/I'.'-,
| |
| SFC 1A 1A lA,2B 2A,1B 1A,3B lc 4A,4B 4A,7B 1A, 2C lA,3B 3A,8B lc lc 8A,4B,21"/26/4.
| |
| SWQ 1B 0 0 2B, lc 1A,1B 2A;,,3'/4/I .
| |
| SWR 0 2B 0 0 0 0 0 0 0 1A 0 '',- I'/0/0 -':-;;
| |
| WCS 0 0 0 1B, lc 0 0 ';" -0/i/1 3/3/0'.,:;" 4/10/0
| |
| '8/9/1. 'iX/7iO::':::: '7/431/7';.
| |
| "'/B/C 5/9/3 Exams Per Outa e 14' .I8;: 87.
| |
| % Corri tete. 22% '.. 58% 100%
| |
| 10 % Selection per type and function in each System A/B/C A designator is F1.30A {Supports-one directional)
| |
| B designator is F1.30B (Supports-multidirectional)
| |
| C designator is Fl.30C (Supports that allow thermal movement, ie. Springs)
| |
| NMP2-ISI.006 Rev. I Appendix D page 6 of 8
| |
| | |
| APPENDIX D CLASS 1, 2 Ec 3 IWF COMPONENT SUPPORTS (CODE CASE N-491)
| |
| F1.40 Supports Other Than Piping (Class 1, 2, 3 and MC)
| |
| Cate orization And Distribution Class % of Support Type SupportType 100 1,243 Within Each System Within Each System Systems F1.40A F1.40B F1.40C F1.20A F1.40B F1.40C '-'Total.;
| |
| CSH 0 0 0 0:.".'."1-;.
| |
| CSL 0 0 0 0 ICS 0 0 0 0 RCS
| |
| * 0 0 RHS
| |
| * 0 0 0 0 2 RPV 0 0 0 0 SFC* 0 0 0 0 SWP* 0 0 0 0 a~%I.'1~g(;~,'~,
| |
| TOTAL"',
| |
| 100% of the Supports
| |
| * Supports of only one of the multiple components are required to be examined A/B/C A designator is F1.40A (Supports-one directional)
| |
| B designator is F1.40B (Supports-multidirectional)
| |
| C designator is F1.40C (Supports that allow thermal movement, ie. Springs)
| |
| NMP2-ISI406 Rcv. 1 Appendix D page 7 of 8
| |
| | |
| 0
| |
| *t
| |
| | |
| APPENDIX D CLASS 1, 2 Ec 3 IWF COMPONENT SUPPORTS (CODE CASE N-491)
| |
| F1.40 Supports Other Than Piping (Class 1, 2, 3 and MC)
| |
| Exam Distribution B S stem Period One Period Two Period Three ,",.
| |
| S stem RFO-6 RFO-7 RFO-8 RF0-9 RFO-10 RFO-11 Totals';."'"WB/C,;,'SL CHS 18 0 0 0 0 0 ", ';-'0/jl0','.
| |
| 0 0 0 18 0 0 '.'-0/IIO'.'CS 0 0 18 0 0 0 0/1/0 .
| |
| RCS* 0 4C 0 0 2A 0 2/0/4 0 0 0 0 28 0 0/2/0, RPV 28 0 38 0 28 0 ;>''0/7/0"4-'FC 18 0 0 0 18 0 '::;:.0/2/0'.
| |
| 0 0 0 18 0 0 ;,':0/il0"'".4~
| |
| A/B/C::.::::0/4/0 0/0/4 ': 0/4/0.:,-:0/2IO 2/5'/0 ':
| |
| 0/0/0: 2/IS/4 ExaIIls 'I' I'er ,2 Outa e Com lete. 38% @*i :-" '.'"66.6%::.
| |
| '. : -;:"100% h 100% of the Supports
| |
| " Supports of only one of the multiple components are required to be examined
| |
| ** Best % possible A/B/C A designator is F 1.40A (Supports-one directional)
| |
| B designator is F1.40B (Supports-multidirectional)
| |
| C designator is F1.40C (Supports that allow thermal movement, ie. Springs)
| |
| NhkP2-ISI406 Rev. I Appendix D Pege8 of 8
| |
| | |
| APPENDIX E Class 1,2 &3 Integral Attachments (Code Case N-509)
| |
| CL-1 CL-2 CL-3 B10.10 B10.20 C3.10 C3.20 C3.20 C3.30 D1.20 Pipe Piping Piping SYS Vessel Piping Vessel Pump IWF Pen.
| |
| Total 10%
| |
| CSH N/A N/A 13 N/A N/A N/A
| |
| 'CSL N/A N/A 14 N/A N/A EGA N/A N/A N/A N/A N/A N/A 16 FWS N/A 16 N/A N/A N/A N/A N/A N/A ICS N/A N/A 13 N/A N/A N/A MSS N/A 42 N/A 18 N/A N/A N/A N/A RCS N/A N/A N/A N/A N/A N/A N/A RDS N/A N/A N/A 16 N/A N/A N/A N/A N/A 130 SFC N/A N/A N/A N/A- N/A N/A SWP N/A N/A N/A N/A N/A N/A 156 16 SW N/A N/A N/A N/A N/A N/A 27 N/A N/A N/A N/A N/A N/A RPV N/A N/A N/A N/A N/A N/A N/A WCS N/A N/A N/A N/A N/A N/A N/A Total 204 C3.20 Total 209 215 25 76 I.A.
| |
| 'Re 100% 10% 100%* 10% 10%
| |
| Exams 21 Re .
| |
| Multiple Vessel selected NMP2.ISI-006 Rcv. I Appendix E page 1 of l
| |
| | |
| IP 0
| |
| | |
| APPENDIX F SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Eleven of the following Relief Requests are based upon the examination results obtained during the First Ten Year ISI Interval. Each of these relief request reliects those items/welds for which code requirements were not met during the first interval and which are also scheduled for examination during the Second Ten Year Interval. Relief Request RR-IWB-14 has been added and is applicable to the Second Ten Year Interval only.
| |
| (1) RR-IWB-1 (2) RR-IWB-2 (3) RR-IWB-3 (4) RR-IWB-6 (5) RR-IWB-7 (6) RR-IWB-1 3 (7) RR.IWB-14 (8) RR.IWC-1 (9) RR-IWC-2 (10) RR-IWC-3 (11) RR-IWC-5 (Parts 1 - 3)
| |
| (12) RR-IWFK NMP2-ISI406 Rev.1 Appendix F Page 1 of 17
| |
| | |
| SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-lWB-1 Component: Five (5) pressure retaining (Categ. B-0) welds in control rod housings: 2RPv-cRDH001 A through 2RPv-cRDH040A and 2RPv-cRDH0018 through 2RPv-cRDH0408 are the total population of peripheral welds, of which, 10% require examination.
| |
| System
| |
| | |
| ==Title:==
| |
| Reactor Pressure Vessel Function: Exact reactor coolant pressure boundary and provide core support Code Qass: ASME Section XI Class 1 Examination Requirements: Volumetric or surface examination of 100% of 10% of the peripheral CRD housing welds per Examination Category B-O, pressure Retaining fields in Control Rod Housings. There are 40 peripheral CRD housings. Each housing has two welds. Therefore, eight welds are required to be examined. Assuming a Code (Case) minimum coverage allowable of 90%, eight (8) full examinations equals a minimum requirement of 720 total percentage points.
| |
| Burden: Limited accessibility for all peripheral CRD housing welds due to inherent obstructioris caused by surrounding cables, tubing, and foundations which are not practical to remove or replace.
| |
| Recommended Substitute: Partial examinations of: 10% of the welds plus six (6) additional welds, such that the aggregate total is greater than or equal to eight full examinations (720 total percentage points.)
| |
| Technical Justification and Data to Support the Determination: Portions of 6 additional welds were examined to the extent possible, such that, fourteen (14) welds were actually examined. Examination coverages ranged from 27% to 100%. The total of examined percentage points summed to 953, thus exceeding the 720 required. Although the use of an inspection mirror achieved 100% coverage on three of the welds (thus reducing the original population for which relief is sought &om 8 to 5) this request is still required. It has been modified accordingly and submitted with this Second Interval Program.
| |
| Ori inalSeo e Additional welds 2RP V-CRD H007A 27% Coverage achieved 2RPV-CRDH001A 43% Coverage achieved 2RPV-CRDH0036A 54% Coverage achieved 2RPV-CRDH0018 80% Coverage achieved 2R P V-C R D H0037A 43% Coverage achieved 2RPV-CRDH004A 43% Coverage achieved 2RPV-CRDH0038A 84% Coverage achieved 2RPV-CRDH0048 75% Coverage achieved 2RPV-CRDH00388 76% Coverage achieved 2RPV-CRDHOOSA 64% Coverage achieved 2RPV-CRDH0058 64% Coverage achieved NMP2-ISI406 Rey.1 Appendix F Page 2 of 17
| |
| | |
| SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IwB-2 Component: Thirty -three (33) reactor pressure vessel nozzle-to-shell welds.
| |
| System
| |
| | |
| ==Title:==
| |
| Reactor Pressure Vessel Function: Exact reactor coolant pressure boundary and provide core support Code Class: ASME Section XI Class 1 Examination Requirements: 100% volumetric per Examination Categoiy B-D, Full Peneh ation fields ofNozzles in Vessels (90% per invoked Code Case N-460)
| |
| Burden: The automated examination of these RPV nozzle-to-shell welds is limited to'arying extents due to nozzle-to-shell blend, vessel scanner tracks, other nozzles, limited access from nozzle side of welds and mechanical limitations.
| |
| Recommended Substitute: Perform volumetric examinations to the maximum extent practical, utilizing the latest UT techniques and equipment.
| |
| Technical JustiTication and Data to Support the Determination: The following welds were examined to the maximum extent possible with the principal deterrent to achieving Code Compliance being the design configuration of the weld joints.
| |
| 2RPv-KA01 examined with 58% coverage achieved 2RPY.KA02 examined with 58% coverage achieved 2RPv-KA03 examined with 65% coverage achieved 2RPv-KA04 examined with 65% coverage achieved 2RPV-KA05 examined with 65% coverage achieved 2RPv-KAos examined with 65% coverage achieved 2RPv-KA07 examined with 65% coverage achieved 2RPv-KAos examined with 65% coverage achieved 2RPv-KAos examined with 65% coverage achieved 2RPV-KA10 examined with 65% coverage achieved 2RPv-KA11 examined with 65% coverage achieved 2RPv-KA12 examined with 65% coverage achieved 2RPv-KA13 examined with 63% coverage achieved 2RPY.KA14 examined with 63% coverage achieved 2RPv-KA15 examined with 65% coverage achieved 2RPv-KA16 examined with 65% coverage achieved 2RPv-KA17 examined with 56% coverage achieved 2RPv-KA1s examined with 56% coverage achieved 2RPv-KA19 examined with 58% coverage achieved 2RPV-KA20 examined with 63% coverage achieved NMP2-ISI~ Rev.1 Appendix F Page 3 of 17
| |
| | |
| SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS RR-IWS-2 Contlnuatlon:
| |
| 2RPv-KA21 examined with 58% coverage achieved 2RPv-KA22 examined with 63% coverage achieved 2RPY.KA23 examined with 56% coverage achieved 2RPv-KA24 examined with 61% coverage achieved 2RPv-KA25 examined with 69% coverage achieved 2RPv-KA26 examined with 65% coverage achieved 2RPv-KA27 examined with 63% coverage achieved 2RPv-KA2s examined with 63% coverage achieved 2RPv-KA29 examined with 64% coverage achieved 2RPv-KA30 examined with 64% coverage achieved 2RPv-KA31 examined with 64% coverage achieved 2RPv-KA32 examined with 67% coverage achieved 2RPv-KA33 examined with 63% coverage achieved NMP2-ISI406 Rev.1 Appendix F Page 4 of 17
| |
| | |
| SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IwB 3 Component: RPV Flange to Shell Weld System
| |
| | |
| ==Title:==
| |
| Reactor Pressure Vessel Function: Exact reactor coolant pressure boundary and provide core support Code Class: ASME XI Class 1 Examination Requirements: 100% volumetric examination per Examination Category B-A, Item No. B1.30, Pressure Retaining Welds in Reactor Vessel.
| |
| Burden: The configuration of the subject weld joint does not allow access &om both sides of the weld due to the ID taper from the flange forging to the thinner upper shell course.
| |
| Recommended Substitute: Perform volumetric examinations from the shell side to the maximum extent possible and supplement this with examinations &om the flange face as recommended in ASME Section 5 ~icle 4, Para.
| |
| T-441.3.2.2.
| |
| Technical Justification and Data to Support the Determination: Examination of the subject weld was performed to the maximum extent possible &om both the RPV shell course and from the flange face as recommended. Because of unparallel surfaces above the weld it is impossible to achieve further coverage without redesign of the flange.
| |
| Weld: 2RP V-AE - From the shell side - CRV= 52%
| |
| 2RPV-AE - From the flange face - CRY= 100%
| |
| NMP2-ISI406 Rev.1 Appendix F Page 5 of 17
| |
| | |
| 0 SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IWBW Component: One (1) pressure retaining weld, zRcs-64-oo-sw35, partially inaccessible for a complete surface exam due to interference by a pipe rupture restraint.
| |
| System
| |
| | |
| ==Title:==
| |
| Reactor water recirculation Function: Circulation of reactor coolant within the vessel during power operation to control reactivity and assure thermal mixing Code Class: ASME XI Class 1 Examination Requirements: 100% volumetric and surface (90% per invoked Code Case N-460) per Examination Category B-J, Pressure Retaining Welds in Piping, Item No. B9.11, Circumferential 8'elds NPS 4 or Larger.
| |
| Burden: Access for the surface exam is limited by a pipe rupture restraint.
| |
| Recommended Substitute: Surface examination is performed to the maximum extent possible. Without redesign of the affected rupture restraint additional coverage is not possible.
| |
| Technical Justification and Data to Support the Determination: The weld for which relief is requested has been examined to the maximum extent possible by the surface exam technique. The entire Code Required Volume has been examined volumetrically by UT and was acceptable thus ensuring the integrity of the more critical inner third of the weld volume &om where flaws detrimental to the weld integrity would be expected to originate.
| |
| NMP2 anticipates no changes in the overall level of plant quality and safety based on performing the subject exam to the maximum extent possible.
| |
| (1): 2Rcs-64-00-sw35 100% of the UT exam was completed, 66% of the required surface exam was completed.
| |
| NMP2-ISI~ Rev.1 Appendix F Page6of17
| |
| | |
| SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IWS-7 Component: Four (4) reactor vessel bottom head longitudinal welds:
| |
| 2RPv-DB (meridional bottom head radial plate-to-bottom head radial plate) 2Rt v-Dc (meridional bottom head radial plate-to-bottom head radial plate) 2RPv-DG (circumferential bottom head dollar plate-to-bottom head dollar plate) 2RPv-DR (circumferential bottom head dollar plate-to-bottom head dollar plate)
| |
| System
| |
| | |
| ==Title:==
| |
| Reactor Pressure Vessel Function: Exact reactor coolant pressure boundary and provide core support Code Class: ASME Section XI Class 1 Examination Requirements: 100% volumetric examination of the reactor vessel bottom head welds per Examination Category B-A, Pressure Retaining 8'elds in Reactor Vessel, Items No. B1.21, Circumferennal Head 8'elds, and B1.22, Meridional Head Welds.
| |
| Burden: Accessibility for the manual volumetric examinations on the bottom head welds is limited do to inter-ference with the CRD penetrations and the vessel support skirt. Only approximately 12" to 24" on each end of welds 2RPv-DG & 2RPv-DR can be examined due to interference with the CRD penetration housings.
| |
| Approximately one foot cannot be examined on each of the other bottom head welds due to interference with the RPV support skirt.
| |
| Recommended Substitute: Perform volumetric examinations to the maximum extent possible based on design limitations.
| |
| Technical Justification and Data to Support the Determination: The subject examinations have been completed to the maximum extent possible, additional coverage is not possible without redesign of the vessel.
| |
| 2RPv DB was examined with 82% coverage achieved 2RPY.Dc was examined with 82% coverage achieved 2RPv-DG was examined with 19% coverage achieved 2RPv-DR was examined with 21% coverage achieved NMP2-ISI-006 Rev.1 Appendix F Page 7 of 17
| |
| | |
| 0 SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-lWB-13 ComPonent: 2Mss'REv1 (2RPY-TF001 thru 2RPv-TFo76)
| |
| System
| |
| | |
| ==Title:==
| |
| Reactor Pressure Vessel Function: These threads, located in the reactor pressure vessel top flange, provide for pressure retention and closure of the RPV Head to the Reactor Pressure Vessel.
| |
| Code Class: ASME Section XI Class 1, Examination Category B-G-1, Pressure Retaining Bolnng Greater
| |
| 'rhan 2 in. In Diameter, Code Item B6.40, Threads in Reactor Vessel Flange Examination Requirements: Requires a volumetric examination of essentially 100% of the volume described by Figure IWB-2500-12 of 1989 Edition of ASME Section XI. This examination is required to be performed once per inspection interval.
| |
| Burden: The groove that the o-ring seal is placed in limits the accessibility of the transducers used to ultrasoni-cally interrogate this base material. As a result, 100% volumetric interrogation is deemed impractical.
| |
| Recommended Substitute: These examinations document interrogated volumes greater than 90%, but less than 100%, in all cases. There are no additional techniques that could be utilized to increase the volume examined for each of the ligament areas.
| |
| Technical Justification and Data to Support the Determination: NMP2 has considered the consequences of a failure of this system and finds that, due to the conservatism of design inherent to the reactor pressure vessel, catastrophic failure of this component is considered highly unlikely (as reflected in the FSAR choice of the design basis accident.) Therefore, further analysis of the consequences of failure of the reactor pressure vessel flange threads is not required. Examination of the flange ligament areas >vill be performed to the maximum extent possible for each of the 76 ligament areas, ie., CRV = 90.2 %.
| |
| Lastly, NMP2 anticipates no changes in the overall level of plant quality and safety based on performing the subject examinations to the maximum extent possible.
| |
| NMP2-ISI406 Rev.1 Appendix F Page 8 of 17
| |
| | |
| SECOND TEN-YEAR INTERNAL ISI RELIEF REQVESTS Identifier: RR-lWB-14 Component: Reactor Pressure Vessel Closure Head Nuts (2RPV-N001 through 2RPV-N076)
| |
| System
| |
| | |
| ==Title:==
| |
| Reactor Pressure Vessel Code Class: ASME Section XI Code Class 1 Examination Requirements: 100% surface examination of the Reactor Pressure Vessel Closure Head Nuts per Examination Category B-G-I,Pressure Retaining Bolting, Greater Than 21nchIn Diamefer, ItemNo. B6.10.
| |
| C Burden: Relief is requested from performing a 100% surface (magnetic particle) examination of the Reactor Pressure Vessel Closure Head Nuts as required by ASME Section XI.
| |
| Recommended Substitute:. NMPC proposes to perform a visual, VT-1 examination of the Reactor Pressure Vessel Closure Head Nuts to the criteria of ASME Section XI, 1989 Edition with 1989 Addenda in conjunction with the acceptance criteria as stated in Subsection IWB-3000.
| |
| Technical Justification and Data to Support the Determination: The 1989 Edition of Section XI does not provide acceptance criteria for the mandated surface examination of Table IWB-2500-1. Table IWB-2500-1 was subsequently changed in the 1989 Addenda requiring a VT-1 examination of the closure nuts, additionally providing acceptance criteria for VT-1 examination of bolting greater than 2 inches. This change to the Code by the Section XI Subcommittee recognized that a VT-I examination could supplant the surface examination requirement without diminishing the level of quality and safety.
| |
| It is NMPC's intention to use the requirements of the 1989 Edition with the 1989 Addenda of the Code for the proposed examination as an alternative permitted by paragraph (a)(3)(i) of 10CFR50.55a.
| |
| | |
| ==Reference:==
| |
| ASME Section XI, 1989 Edition with Addenda through 1989, Table IWB-2500-1.
| |
| NMP2-ISI406 Rev.1 Appendix F Page 9 of 17
| |
| | |
| V SECOND TEN-YEAR INTERVAL ISI RELIEF REQVESTS Identifier: RR-IWC-1 Component: Thirty-four (38) weldments, on six (6) separate pumps; twelve (12) integral attachment (Cat. C-C) welds, and 26 pressure retaining (Cat. C-G) welds:
| |
| 2CSH'P1,PW207, 208, 209, 212, 217, 218, and 219 2csI P1)Pw311) 312) 315) 316) Gnd 319 2RHS P1A)PW1 1 1A) 1 12A) 1 13A) 1 16A) 1 18A) GIld 121 A 2RHs'P1B)Pw111B) 112B) 113B) 116B) 118B) Gild 121B 2RHS P1C)PW111C) 112C) 113C) 116C) 118C) GIld 121C 2ICS '1, PW400, 401, 402, and 403 System Titles (4): High Pressure Core Spray; Low Pressure Core Spray; Residual Heat Removal, Reactor Core Isolation Cooling Functions: I) The High Pressure Core Spray System maintains reactor vessel coolant inventory (water level) in the event of a small break (less than 1 inch in diameter) which does not result in rapid reactor depressurization. 2)
| |
| The Low Pressure Core Spray System provides coolant inventory and spray cooling during large breaks in which the core is calculated to uncover. Also, following a small break with initiation of the Automatic Depressurization System, it provides coolant inventory makeup. 3) Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing. 4) Used to reestablish reactor pressure vessel water level when the vessel is isolated and feedwater is not available.
| |
| Code Class: ASME Section XI Class 2 Examination Requirements: 100% surface examination of integrally welded attachment on Class 2 pumps per Examination Category C-C, Integral Attachments for Vessels, Piping, Pumps and Valves, Item C3.30 Integrally 8'elded Attachments to Pumps, and 100% surface examination of Class 2 pump casing welds per Category C-G, Pressure Retaining fields in Pumps and Valves, Item C6.10, Pump Casing 8'elds.
| |
| Burden: The pumps are installed in a concrete pit, thereby making the exterior of the casing welds and entire integral attachment welds inaccessible for surface examination. Examination of the casing welds would require either disassembly or removal &om the pit. Examination of the integral attachment welds would require lifting the pump from the pit. The hardships associated with pump disassembly of lifting from the pit would far exceed any beneficial safety improvements that might be achieved by such an examination. For the integral attachments on pump Ics'P1, approximately 17% of each of the four welds is inaccessible. The pump design utilizes U shaped attachments that limit access to the entire weld surface.
| |
| Recommended Substitute: Perform surface examination on welds of pumps that become accessible when dis-assembled for routine maintenance. Perform surface exams on integral attachments to the maximum extent possible when accessible.
| |
| Technical Justification and Data to Support the Determination: Since these pumps are subject to testing per IWP of the ASME Code, loss of integrity of the pump casing welds would be detected during quarterly pressure, differential, and flow rate testing. Failure of integral attachments welds would be detected by quarterly vibration measurements. Furthermore, pump casing integrity is verified during system leakage testing.
| |
| NMP2-ISI406 Rev.1 Appendix F Page 10 of 17
| |
| | |
| SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IWC-2 Component: Twenty (20) pressure retaining welds in austenitic stainless steel piping:
| |
| 2CSH-25-05-FW01+ 013, 014 and 015 2CSL-26-01-FW026, 027, 028 and 035 2RHS 66 13 FW023t 024) 025 and 029 2RHS-66-22-FW021, 022, 023 and 029 2RHS 66 23 FW018t 019) 020 and 022 System Titles (3): High Pressure Core Spray; Low Pressure Core Spray; Residual Heat Removal Functions: 1) The High Pressure Core Spray System maintains reactor vessel coolant inventory (water level) in the event of a small break (less than 1 inch in diameter) which does not result in rapid reactor depressurization. 2)
| |
| The Low Pressure Core Spray System provides coolant inventory and spray cooling during large breaks in which the core is calculated to uncover. Also, following a small break with initiation of the Automatic Depressurization System, it provides coolant inventory makeup. 3) Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
| |
| Code Class: ASME Section XI Class 2 Examination Requirements: Surface and volumetric examination on a minimum of 28 welds (out of a nonexempt population of 37 welds) per Examination Category C-F-1, Pressure Retaining 8'elds in Austenitic Stainless Steel or High AlloyPiping, Item No. C5.11, Circumferential 8'elds in Piping z ~lain. Nominal Pall Thickness for Piping > NPS 4 Burden: Twenty (20) of the 37 welds are inaccessible for both surface and volumetric examination (by design, as they are submerged in the suppression pool.) Greater access would require these systems to be redesigned.
| |
| Recommended Substitute: Perform the full compliment of examinations on the 17 accessible welds Technical Justification and Data to Support the Determination: The subject welds are on pump suction piping, which is under water, postulated cracks in these welds are not detrimental to the safety function of their associated systems. There has been no change in the NMP2 design through the first interval. As such, the granted relief was used on all 20 weldments and is submitted for use with this Second Interval plan.
| |
| NMP2-ISI406 Rev.1 Appendix F Page11 of17
| |
| | |
| SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IWC Component: Thirteen (13) integral attachment welds on piping submerged in the suppression pool:
| |
| 2csH 25-O~w301 (previously called FW301; it is actually a shopweld in penetration assembly z-12, and is inaccessible behind a leak channel under approximately five feet of water in the suppression pool) 2csL-26-01-sw301 (previously called Fw315, it is actually a shopweld in penetration assembly z-15, and is inac-cessible behind a leak channel under approximately five feet of water in the suppression pool) 2RHs-66-13-Fw316 Under water in the suppression pool.
| |
| 2RH&46-13-Fw317 Under water in the suppression pool.
| |
| RHs-66-1~w301 (previously called Fw314; it is actually a shopweld in penetration assembly z-5A, and is inaccessible behind a leak channel under approximately five feet of water in the suppression pool) 2RHs-66-22-Fw-310 Under water in the suppression pool.
| |
| 2RH&66-22-Fw-311 Under water in the suppression pool.
| |
| 2RHae6-22-sw-301 (previously called FW312; it is actually a shopweld in penetration assembly z-sc, and is inaccessible behind a leak channel under approximately five feet of water in the suppression pool) 2RHs-66-23-Fw-313 Under water in the suppression pool.
| |
| 2RHs-66-23-Fw-314 Under water in the suppression pool.
| |
| 2RHs 23-sw-301 (previously called Fw315; it is actually a shopweld in penetration assembly z-5B, and is inaccessible behind a leak channel under approximately five feet of water in the suppression pool) 2csL- 26-01-Fw313 Under water in the suppression pooh 2csL- 26-01-Fw314 Under water in the suppression pool.
| |
| System Titles (3): High Pressure Core Spray; Low Pressure Core Spray; Residual Heat Removal Functions: I) The High Pressure Core Spray System maintains reactor vessel coolant inventory (water level) in the event of a small break (less than 1 inch in diameter) which does not result in rapid reactor depressurization 2)
| |
| The Low Pressure Core Spray System provides coolant inventoiy and spray cooling during large breaks in which the core is calculated to uncover. Also, following a small break with initiation of the Automatic Depressurization System, it provides coolant inventory makeup. 3) Using three (3) independent loops of piping, the Residual Heat
| |
| ,Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
| |
| Code Class: ASME Section XI Class 2 Examination Requirements: 100% surface examination of the areas depicted in Code Figure No. IWC-2500-5 per Examination Category C-C, Integral Attachments for Vessels. Piping, Pumps and Valves, Item C3.20, Integrally Welded Attachments to Piping.
| |
| Burden: These welds are inaccessible for surface examination because they are located under water in the suppression pool. Greater access would require the redesign of the NMP2 containment and suppression systems.
| |
| Recommended Substitute: None Technical Justification and Data to Support the Determination: Compliance with the specific requirements of ASME Section XI would result in hardship or unusual diQiculties without a compensating increase in the level of quality or safety.
| |
| NMP2-ISI406 Rev.1 Appendix F Page 12 of 17
| |
| | |
| lt SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-lWCW Component: Twenty-six (26) welds in six Code Categories, subdivided into 3 parts for clarity:
| |
| (1) Category C-A examinations (part 1)
| |
| (1) Category C-B examinations (part'1)
| |
| (3) Category C-C examinations (part 2)
| |
| (1) Category C-F-1 examinations (part 2)
| |
| (20) Category C-G examinations (part 3)
| |
| System Titles (3): High Pressure Core Spray; Low Pressure Core Spray; Residual Heat Removal Function: 1) The High Pressure Core Spray System maintains reactor vessel coolant inventory (water level) in the event of a small break (less than 1 inch) which does not result in rapid reactor depressurization. 2) The Low Pressure Core Spray System provides coolant inventory and spray cooling during large breaks in which the core is calculated to uncover. Also, following a small break with initiation of the Automatic Depressurization System, it provides coolant inventory makeup. 3) Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
| |
| Code Class: ASME Section XI, Class 2 Examination Requirements: Various; See Parts 1 through 3 following.
| |
| Burden: Accessibility is limited due to permanent interferences.
| |
| Recommended Substitute: Perform volumetric and/or surface examinations to maximum extent possible for each.
| |
| Technical Justification and Data to Support the Determination: See Parts 1 through 3 below for item-by-item status.
| |
| NMP2-ISI406 Rev.1 Appendix F Page 13 of 17
| |
| | |
| 1
| |
| 'J
| |
| | |
| SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-tWCW (Part I of 3)
| |
| Component: Two (2) examinations in two categories RHEAS'E1A,HW101A (C-A)
| |
| RHEAS'E1A,HW102A (C-B) t System
| |
| | |
| ==Title:==
| |
| Residual Heat Removal Function: Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (I) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
| |
| Code Class: ASME Section XI Class 2 Examination Requirements: 100% volumetric examination of the volume depicted in Code Figure IWC-2500-I per Examination Category C-A, Pressure Retaining Welds in Pressure Vessels, Item No. C1.10, Shell Circumferential fields, and, both 100% volumetric and surface examinations of the volumes and areas depicted in IWC-2500-4(a) or (b) per Examination Category C-B, Pressure Retaining Nozzle Helds in Vessels, Item No.
| |
| C2.21, Nozzle to shell (or head) 8'elds in Nozzles 8'i thout Reinforcing Plates in Vessels Y~ in. Nominal Thickness.
| |
| Burden: Accessibility is limited due to permanent interferences.
| |
| Recommended Substitute: Perform volumetric and/or surface examination to maximum extent possible for each.
| |
| Technical Justification and Data to Support the Determination: A significant portion of the required code coverage has been achieved, as noted below, for each of the two welds for which relief is requested. This coverage assures an acceptable level of inservice structural integrity. To increase the % of coverage, major redesign and modification would be required without a compensating increase in the level of quality or safety.
| |
| RHEAs'E1A,Hw1 01A 78% UT coverage achieved RHEAs'E1A,Hw102A 100% MT Ec 80% UT coverage achieved NMP2-IS 14m6 Rev.1 Appendix F Page 14 of 17
| |
| | |
| SECOND TEN-YEAR INTERVAL ISI RELIEF REQVESTS Identifier: RR-lWCN (Part 2 of 3)
| |
| Component: 2csH-amFIN300 (C-C) and RHEA&46-22-Fw019 (C-F-1).
| |
| System Titles (2): High Pressure Core Spray and Residual Heat Removal Functions (2): 1) The High Pressure Core Spray System maintains reactor vessel coolant inventory (water level) in the event of a small break (less than I inch) which does not result in rapid reactor depressurization. 2) Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
| |
| Code Class: ASME Section XI Class 2 Examination Requirements: 100% surface examination of the integrally welded attachments on piping as depicted in Code Figure No. IWC-2500-5 per Examination Category C-C, Integral Attachments for Vessels, Piping, Pumps, and Valves, Item No. C3.20, Integrally 0'elded Attachments to Piping, and 100% surface and volumetric examination of a weld neck flange to pipe weld, as depicted in Code Figure No. IWC-2500-7, per Examination Category C-F-I, Pressure Retaining fields in Austenitic Stainless Steel or High AlloyPiping, Item No. C5.11, Circumferential 0'elds in Piping 2~lnin. Nominal Hall Thickness for Piping > NPS 4.
| |
| Burden: Accessibility is limited due to permanent interferences.
| |
| ~
| |
| Recommended Substitute: Perform volumetric and/or surface examinations to maximum extent.
| |
| ~
| |
| Technical Justification and Data to Support the Determination: A significant portion of the required code coverage has been achieved, as noted below, for three of the four welds for which relief is requested. This coverage assures an acceptable level of inservice structural integrity. To increase the % of coverage, major redesign and modification would be required without a compensating increase in the level of quality or safety.
| |
| 2csH-25-09-Fw300; 55% MT coverage achieved RHEA6-66-22.Fw019; 50% UT 4 100% PT coverage achieved NMP2-IS I406 Rev.1 Appendix F Page 15 of 17
| |
| | |
| SECOND TEN-YEAR INTERVAL ISI RELIEF REQVESTS Identifier: RR-lWCN (Part 3 of 3)
| |
| Component: Twenty (20) surface examinations on eight (8) valves: 2cst. Hcv118; 2cst.'Hcv119; 2CSL MOV112; RHEASiMOV1C; RHEASiMOV2A;RHEAS'MOVBA; RHEAS'V376; RHEAS'V378 System Titles (2): Low Pressure Core Spray (LPCS); Residual Heat Removal Functions (2): 1) The LPCS System provides coolant inventory and spray cooling during large breaks in which the core is calculated to uncover. Also, following a small break with initiation of the Automatic Depressurization System, it provides coolant inventory makeup. 2) Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
| |
| Code Class: ASME Section XI Class 2 Examination Requirements: 100% surface (inside or outside) examination of valve body welds per Examination Category C-G,Pressure Retaining Welds in Pumps and Valves, Item C6.20, Valve Body 8'elds, as depicted in Fig. No. IWC-2500-8 for the representative in each group of valves of similar design.
| |
| Burden: Accessibility is limited due to permanent interferences.
| |
| Recommended Substitute: Perform surface examinations to maximum extent possible for each.
| |
| Technical Justification and Data to Support the Determination: A significant portion of the required code coverage has been achieved, as noted below, for the twenty welds for which relief is requested. This coverage assures an acceptable level of inservice structural integrity. To increase the % of coverage, major redesign and modification would be required without a compensating increase in the level of quality or safety.
| |
| 2csL'Hcv118,vwHcv118-c; 86% MT coverage RHEAs'v376, vwv376-Lw; 82% coverage 2csL'Hcv118,vwHcv118-D; 86% MT coverage RHEAs'v378, vwv378-Lw; 81% coverage 2csL'Hcv118,vwHcv118-Lw; 76% PT coverage RHEAs'MovBA,vwMovBA-D;80% PT coverage
| |
| 'CSL HCV1 19yWVHCV1 19 Ct 60% PT coverage 2csL'Hcv119,wvHcv119-D; 80% PT coverage 2csL'Hcv119,wvHcv119-Lw; 82% MT coverage 2csL Mov112,vwMov112-c; 80% MT coverage 2csL'Mov1 1+vwMov112-D; 60% PT coverage 2csL'Mov1 1+vwMov112-Lw; 87% MT coverage 2csL'v121,vwv121 w; 80% MT coverage 2csL'v121,YBw1214w; 87% MT coverage RHEAs'Mov1c,vwMov1c-c; 70% PT coverage RHEAs'Mov1c,vwMov1c-D; 84% PT coverage RHEAs'Mov1c,vwMov1c-Lw; 81% PT coverage RHEAs'Mov2A,vwMov2A-c; 60% PT coverage RHEAs'Mov2A,vwMov2A-D; 80% PT coverage RHEAs'MovBA,vwMovBA-c;60% PT coverage NMP2-ISI406 Rev.1 Appendix F Page16of17
| |
| | |
| SECOND TEN-YEAR INTERNAL ISI RELIEF REQUESTS Identifier: RR-IWFK Component: Inservice Inspection Requirements for Snubbers listed in Article IWF-5000 of the ASME B&PV Code, Section XI, 1989 Edition, Division 1 System Titles: All ASME Code Class 1, 2 &3 systems.
| |
| Functions: Sampling criteria requirements per ASME Section XI, IWF-5000.
| |
| Code Class: ASME Section XI Class 1, 2 & 3.
| |
| Examination Requirements: IWF-5000 invokes the snubber examination requirements of the first Addenda to ASME/ANSI OM-1987, Part 4 (published 1988).
| |
| Burden: Relief is requested from Article IWF-5000 "Inservice Inspection Requirements for Snubbers". The article provides rules and requirements for the inservice examination of snubbers in accordance with the first addenda to ASME/ANSI OM-1987, Part 4 (published 1988) titled "Operation and Maintenance ofNuclear Power Plants". Part 4 of the OMa-1988 requirements (specifically, the examinations to be conducted at 18-month intervals and the subsequent examination schedule adjustment) does not fit into Nine Mile Unit 2's 24 month refueling cycles.
| |
| Recommended Substitute: All inservice inspection of snubbers shall be performed per the requirements of section 3/4.7.5 of the Nine Mile Point Unit 2 Technical Specification (TS).
| |
| Technical Justification and Data to Support the Determination: In addition to the ASME Section XI requirements of IWF-5000, an augmented inservice inspection program for snubbers is required by TS 3/4.7.5.
| |
| The above-mentioned TS was amended (Amendment No. 29 dated May 6, 1991) to incorporate the recommendations on snubber visual inspection frequencies, as contained in Generic Letter 90-09, titled "Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions". The augmented snubber program provides the necessary assurance for snubber operability and visual examination requirements to fulfillthe ASME Section XI Code requirements without duplicating the inspections. This sampling program is practical and provides an acceptable level of quality and safety, as permitted by paragraph (a)(3)(i) of 10CFR So.ssa.
| |
| | |
| ==Reference:==
| |
| (1) First Ten- Year Interval Relief Request No. RR-IWF-4 (2) Generic Letter 90-09 "Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions" (3) SER dated 10/24/90 NMP2-ISI406 Rev.1 Appendix F Page 17 of 17
| |
| | |
| NIAGARA MONANK POHER CORPORATION - H ILE POINT NUCLEAR STATION - UNIT 2 NMP2-ISI-006( REV. 1( CN 000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - ASS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED )
| |
| DESCRIPTIOH OF ITEM TO BE EXAMINED)CATGRY (IGSCC) EX1/NDE PROCEDURE [PERIOD 1 REMARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR COMPONENT DllG ¹ I ITEM ¹ IFREOYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I i SHL/PIPE /C-F-2 / na / VOL/UT6.02 2ASS-20-01-FH001 i QISO 20-01 or DUG¹ na in /C5.51 /none / SUR/PT3.00/MT4.00 / I NMP2-6-.562-CS I LINE¹ 2ASS-006-125-4 HTS: 1,2 ISO I 2 I na /na I I I PIPE/*MOV148 /C-F-2 ( na )
| |
| VOL/UT6.02 I 2ASS-20-01-Fll002 i Ql SO 20-01 or DMG¹ na in JC5.51 (none f SUR/PT3.00/MT4.00 J HMP2-6-.562-CS (
| |
| LINE¹ 2ASS-006-125-4 NTS: 2(4 JSD ( 2 ( na /na I PIPE/ELB JC-F-2 f na ) VOL/UT6.02 I 2ASS-20-01-SHGDI I 9 ISO 20-01 or DUG¹ na in JC5.51 [ ID ] SUR/PT3.00/MT4.00 ]Sc8 NMP2-6-.562-CS f LINE¹ 2ASS-006.125-4 Nl'S: 2,3 JSD f 2 f na /na I I ELB/PIPE JC-F-2 f na / VOL/UT6.02 I 2ASS-20-01-SI502 i Ql SO 20-01 or DNG¹ na in [C5.51 ]none ( SUR/PT3 F 00/MT4.00 J NMP2-6-.562-CS f LINE¹ 2ASS-006-125-4 HTS: 3,2 JSD / 2 f na /na EHD OF SYSTEM ASS
| |
| | |
| NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH~
| |
| System: ASS General Notes
| |
| : 3. 6 Sch. 120 Elbow, A234 WP8
| |
| : 1. 16" X 6'ch. 80 Sweepolet, A105 4. 6 Valve, SA-105
| |
| : 2. 6 Sch.120Pipe,A106Gr. B
| |
| | |
| NIAGARA NOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 1 of 25 HHP2-ISI-006, REV. 1, CH.OOO SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - CSH SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED DESCRIPTION OF ITEH TO BE EXAHINEDJCATGRY IGSCC( EX1/NDE PROCEDURE [PERIOD 1 REMARKS
| |
| ( )
| |
| EXAHIHATION IDENTIFIER ) ITS ISO LOCATOR, COHPOHENT DMG ¹, [ITEN ¹ JFREOYJ EX2/HDE PROCEDURE ]PERIOD 2 f USE CAL BLK ¹ I LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I i <<AOV108 BLTG
| |
| /8-G-2 / na / VT1/VT2.01 Sc7 2CSH<<AOVIOB,VBNOO I QISO 25-10 or DMG¹ 003 in (87.70 )ID f na /na I
| |
| ) LINE¹ 2CSH-012-15-1 NTS: (none) JGrp Rep) 1 J na /na I
| |
| *AOV108 INI'UR JB.H-2 ] na J VT3/VT2.01 J>> Examine shen dissassemble for maintenance 2CSH<<AOV108,VBY100 I QISO 25-10 or DMG¹ 003 in JB12.50 [DlsG f na /na /<<
| |
| )
| |
| LINE¹ 2CSH-012-15-1 NTS: 5 (Grp Repf 'I J
| |
| na /na /<<
| |
| I
| |
| *HCV120 IHT SUR IB-H-2 I na I VT3/VT2.01 /<< (>> Examine when dissasseahie for maintenance 2CSH*HCV120,VBY101 I QISO 25-10 or DMG¹ 008 in JB12.50 )DisG (
| |
| na /na )<<
| |
| ( LINE¹ 2CSH.012-46-1 NTS: 6 /Grp Rep/ 1 f na /na i>>
| |
| I
| |
| *NOV107 BLTG IB-G-2 I na I VT1/VT2.01 I 2CSH>>NOV107, VB100 I QISO 25-09 or DWG¹ 012 in )B7.70 [ID ) na /na Sc9
| |
| [ LINE¹ 2CSH-012-4-1 HTS: (none) [Grp Rep) 1 ) na /na I I
| |
| *NOV107 INT SUR /B-H-2 / na / VT3/VT2.01 I [<<Examine when dissassemble for maintenance 2CSH>>HOV107, VBY102 I QISO 25-09 or DWG¹ 012 in )B12.50 (DisG )
| |
| na /na /<<
| |
| f LINE¹ 2CSH-012-4-1 NTS: 11 (Grp Rep) 1 f na /na /<<
| |
| I
| |
| *Pl PIPE/MNF /C-F-2 / na / VOL/RT5.00 [Deseiected 2CSH>>P1,PM200 J QISO 25-08 or DMG¹ 027. in /C5.51 /none / SUR/PT3.00/NT4.00 /
| |
| / LINE¹ 2CSH-016-na-2 NTS: 58,39 /SD / 2 / na /na I
| |
| <<P1 HD/PIPE (C-F-2 J na ) SUR/PT3.00/NT4.00 f Sc7 2CSH*P1, PM201 QISO 25-08 or DWG¹ 027 in (C5.81 )ID na /
| |
| )
| |
| I LINE¹ 2CSH 016 na 2 HT '7 58 ITE I 2
| |
| [
| |
| I na /na I
| |
| I I
| |
| *P1 HD COVER/HD SNL JC-G f na f SUR/PT3.00/HT4.00 f Sc7 2CSH<<P1,PM203 I QISO 25-08 or D'WG¹ 027 in [C6.10 ]ID [ na /na f LINE¹ 2CSH-na-na-2 NTS: 57,59 /Handate/ 2 / na /na I I
| |
| *P1 MNF/PIPE IC-F-2 I na I VOL/RT5.00/UT6.02 I 2CSH*P1,PM204 i QISO 25-05 or DMG¹ 027 in IC5-51 lnone I SUR/P'T3.00/HT4 F 00 I NHP2-RHS-.75-CS f LINE¹ 2CSH-024-na-2 NTS: 38,50 JSD / 2 / na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - NILE POINT HUCLEAR STATION - UNIT 2 2 of 25 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED (
| |
| DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1 REHARKS EXAHINATIOH IDENTIFIER (
| |
| ITS ISO LOCATOR, COHPONENT DWG ¹, (ITEN ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE HO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I I
| |
| *P1 PIPE/HO (C-F-2 (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2CSN~PI,PM205 (
| |
| aiso 2s-os or DMG¹ 027 in (C5.81 (none ( na /
| |
| na (
| |
| LIHE¹ 2CSH-024-na-2 NTS: 50,57 (TE (
| |
| 2 (
| |
| na /na I I
| |
| *P1 HD/FLG (C-G (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| Sc7 2CSH*P1,PM206 I QISO 25-08 or OMG¹ 027 in (C6.10 (ID (
| |
| na /na na (
| |
| LINE¹ 2CSH-na.na-2 NTS: 57,60 (Handate( 2 (
| |
| na /na I IMC-1 I
| |
| *P1 UPR BARREL FLG/SHL (C-G (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (* (* Examine When dissassembie for maintenance 2CSH*PI,PW207 I QISO 25- or DMG¹ 027 in (C6.10 (IO (
| |
| na /na I*
| |
| ( LINE¹ 2CSH-na-na-2 HTS: 61,62 (Handate( 2 (
| |
| na /na I IMC-1 (
| |
| *P1 UPR BARREL/LMR BARREL (C-G (
| |
| na SUR/PT3.00/HT4.00 (* (>> Examine When dissassemble for maintenance 2CSH*P1,PW208 (
| |
| QISO 25- or DWG¹ 027 in (C6.10 (ID na /na (*
| |
| ( LINE¹ 2CSH-na-na-2 NTS: 62 (Handate( 2 na /na (*
| |
| IMC-1 I
| |
| *P1 LWR BARREL SHL/HD (C-G (
| |
| na SUR/PT3.00/HT4.00 (* (* Examine Ken dissassemble for maintenance 2CSN*P1,PW209 QISO 25- or O'MG¹ 027 in (C6.10 (ID na /na (*
| |
| ( LINE¹ 2CSH-na-na-2 HTS: 62,63 (Handate( 2 na /na
| |
| (
| |
| *P1 LM (C-G (
| |
| na (
| |
| SUR/PT3.00/HT4.00 Sc7 2CSH~P1,PM210 ( QISO 25-08 or DMG¹ 027. in (C6.10 (ID (
| |
| na /na I
| |
| (
| |
| LINE¹ 2CSH-na-na-2 NTS: 57 (Handate( 2 ( na /na I IWC-1 (
| |
| ~Pl HID BARREL SHL/LMR BARREL SHL (C-G ( na SUR/PT3.00/HT4.00 (* (~ Examine When dissassemble for maintenance 2CSN*P1,PM212 (
| |
| also 25- or DWG¹ 027 in (C6.10 (IO na /na I
| |
| (
| |
| LINE¹ 2CSH-na-na-2 NTS: 62 (Handate( 2 na /na
| |
| (
| |
| <<P1 LM (C-F-2 (
| |
| na ( VOL/RT5.00 (Deselected 2CSH*PI,PW215 ( QISO 25-08 or OMG¹ 027 in (C5.52 (none (
| |
| SUR/PT3.00/HT4.00
| |
| (
| |
| LIHE¹ 2CSH-016-na.2 HTS: 58 (AL (
| |
| 2 ( na /na
| |
| (
| |
| *P1 LM (C-F-2 (
| |
| na (
| |
| VOL/RT5.00/UT6.02 (
| |
| 2CSH*P1,PM216 ( QISO 25- or DWG¹ 027 in (C5.52 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| HHP2-RHS-.75-CS ( LINE¹ 2CSH-024-na-2 NTS: 50 (AL (
| |
| 2 (
| |
| na /na
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 3 of 25 NMP2-ISI.006( REV. 1, CH.000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier)
| |
| ND IHTVL REL REQ I DESCRIPTION F ITEM TO BE EXAMINEDICATGRY lIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REMARKS EXAMINATION IDENTIFIER j ITS ISO LOCATOR, COMPONENT DMG ¹, LITEM ¹ ifREQYi EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ [ LINE NO. AND NOTES, AS APPLICABLE [SELECT iCLASSi EX3/NDE PROCEDURE iPERIOD 3 (
| |
| IMC- I I
| |
| <<P1 L'M UPR BARREL SHL IC-G I na I SUR/PT3.00/MT4.00 I>> i>> Examine when dissassemble for maintenance 2CSH<<P1,PM217 I QISO 25- or DMG¹ 027 in iC6.10 iID i na /na J>>
| |
| LINE¹ 2CSH-na-na-2 HTS: 62 iMandatei 2 i na /na I*
| |
| INC-1 I
| |
| *P1 L'M MID BARREL SHL IC G I na I SUR/PT 'MT i>> [>> Examine when dissassembie for maintenance 2CSH*P1, PM218 i QISO 25- or DMG¹ 027 in iC6.10 iID i na /na i>>
| |
| i LINE¹ 2CSH-na-na-2 HTS: 62 iMandatei 2 i na /na i>>
| |
| IMC-1 I
| |
| *Pl LM LMR BARREL SHL IC-G I na I SUR/PT3.00/MT4.00 I>> i>> Examine when dissassemble for maintenance 2CS H*P1, PM219 J QISO 25- or DMG¹ 027 in iC6.10 iID i na /na i>>
| |
| na / LINE¹ 2CSH-na-na-2 NTS: 62 iMandatei 2 )
| |
| na /na i>>
| |
| i LM IC-F-2 i na /
| |
| VOL/U'T6.02 2CSH*STRT1,S'IRT-L'M001 I QISO 25-05 or DMG¹ 030 in iC5.52 lnone i SUR/PT3.00/MT4.00 /
| |
| NHP2-20-.375.CS I LINE¹ 2CSH.020-2-2 NTS: 36 INS 2 i na /na i MNF/PIPE IC-F-2 j na i VOL/UT6.02 2CSH*STRT1,STRTMELD003Ai QISO 25-05 or DMG¹ 030 in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-20-.375-CS I LINE¹ 2CSH.020-2-2 NTS: 35,36 ISD 2 i na /na I I EXT RING/TEE IC-F-2 i na / VOL/UT6.02 2CSH<<STRTI,STRTMEL0003Bi QISO 25-05 or DMG¹ 030. in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-20-.375-CS I LINE¹ 2CSH-020-2-2 HTS: 34,36 I SD 2 i na /na I I PIPE / PIPE iC-F-2 i VOL/ iAdded NEM record/Exam Identerfier 2CSH-25-01-f M002 i QISO 25-01 or DMG¹ in iC5.51 i SUR/ I LINE¹ 2CSH.016.43-2 NTS: I I 2 I I I ELBOM / PIPE IC-F-2 / VOL/ iAdded NEM record/Exam ldenterfier 2CSH-25-01-FM003 i QISO 25-01 or DMG¹ in iC5.51 I I SUR/ I LINE¹ 2CSH.016-43-2 HTS: I I 2 I I i ELBOM / PIPE IC-F-2 i VOL/ iAdded NEM record/Exam Identerfier 2CSH-25-01-FM003 I QISO 25.01 or DMG¹ in JC5.51 I I SUR/ I I LINE¹ 2CSH.016.43-2 NTS I I 2 I I
| |
| | |
| NIAGARA KONAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 4 of 25 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) IHTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier)
| |
| HD IH'IVL REL REQ I DESCRIPTIOH OF ITEN To BE EXAHIHEDICATGRY llGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHIHATION IDENTIFIER i ITS ISO LOCATOR, COHPONEHl'MG ¹, )ITEN ¹ iFREOYJ EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ i LINE NO. AHD NOTES, AS APPLICABLE DESELECT iCLASSJ EX3/NDE PROCEDURE iPERIOD 3 PIPE / PIPE IC-F-2 vou iAdded NEM record/Exam Identerfier 2CSH-25-01-FM004 I
| |
| i QISO 25-O1 or DMG¹ in iC5 ~ 51 I' I i i SUR/ I I LINE¹ 2CSH-016-43-2 HTS: I I i ELBOW / PIPE IC-F-2 I ) vou iAdded NEM record/Exam Identerfier 2CSH-25-01-FM006 i QISO 25-OT or DMG¹ in )C5.51 I SUR/ I i LINE¹ 2CSH-16-43-2 HTS: I 2 I i PIPE / ELBOW IC-F-2 I i VOL/ iAdded NEM record/Exam Identerfier 2CSH-25-01-FMSM003 i Qisa 25-O1 or DWG¹ in iC5.51 I I SUR/ I i LINE¹ 2CSH.016-43-2 HTS: I 2 I I PIPE / ELBOW IC.F-2 I ( VOL/ I iAdded NEll record/Exam Identerfier 2CSH-25-01-SW001 i QISO 25-01 or DMG¹ in JC5.51 I I SUR/ I I LINE¹ 2CSH-016-43-2 NTS: I I 2 I I ELBOW / PIPE IC-F-2 I J VOL/ (Added NEM record/Exam Identerfier 2CSH-25-01-SM002 ( QISO 25-01 or DWG¹ in JC5.51 I I SUR/ I I LINE¹ 2CSH-016.43-2 NTS I 2 I i PIPE / ELBOW IC-F-2 I ) vou iAdded NEM record/Exam Identerfier 2CSH-25-01-SM004 I QISO 25-01 or DMG¹ . in iC5.51 I I SUR/ I I LINE¹ 2CSH-016-43-2 HTS: I 2 I I ELBOW / PIPE IC-F-2 I i vou iAdded HEM record/Exam Identerfier 2CSH-25-01-SM005 i QISO 25-O1 or DMG¹ in iC5.51 I I SUR/ I i LINE¹ 2CSH-016-43-2 HTS: I I 2 I I PIPE / ELBOM IC-F-2 I i vou iAdded HEM record/Exam Identerfier 2CSH-25-01-SM006 i QISO 25.01 or DMG¹ in )C5.51 I I SUR/ I L I HE¹ 2CSH-016-43-2 NTS: I I 2 I I ELBOW / PIPE IC-F-2 I [ VOL/ iAdded HEM record/Exam Identerfier 2CSH.25-01-SM007 I QISO 25-01 or DMG¹ in iC5.51 I I SUR/ I I LINE¹ 2CSH-016-43-2 NTS: I I 2 I
| |
| | |
| NIAGARA NOHAMK POWER CORPORATIOH - NILE POINT NUCLEAR STATION - UNIT 2 5 of 25 NHP2-ISI-006t REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 . APPENDIX G - CSH SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RED )
| |
| DESCRIPTION OF ITEN TO BE EXAHINED)CATGRY ) IGSCC) EX1/NDE PROCEDURE )PERIOD 1 ) REMARKS EXAHINATION IDENI'IFIER )
| |
| ITS ISO LOCATOR, COHPONENT DMG ¹, )ITEN ¹ )FREOY) EX2/NDE PROCEDURE )PERIOD 2 )
| |
| USE CAL BLK ¹ I LINE ko. AND NOTES, AS APPLICABLE )SELECT )CLASS) EX3/NDE PROCEDURE )PERIOD 3 I
| |
| ) PIPE / ELBOW IC-F-2 ) vou )Added HEM record/Exam Identerfier 2CSH-25-01-S'I$ 08 )
| |
| QISO 25-01 or DMG¹ in )C5.51 I SUR/
| |
| 'I
| |
| ) LINE¹ 2CSH-016-43-2 HTS: I 2 I PIPE / ELBOW IC-F-2 ) vou )Added NEM record/Exam Identerfier 2CSH-25-01-Sl$ 09 I QISO 25-01 or DMG¹ in )C5 ~ 51 ) suR/ I LINE¹ 2CSH-016-43-2 NTS: I 2 I I PIPE / PIPE IC-F-2 )
| |
| vou )Added NEM record/Exam Identerfier 2CSH-25-01-SM010 I QISO 25-01 or DWG¹ in )C5 ~ 51 )
| |
| suR/ I I LINE¹ 2CSH-016-43-2 NTS: I 2 I PIPE / PIPE IC-F-2 )
| |
| VOL/ )Added NEll record/Exam Identerfier 2CSH-25-01-SM011 QISO 25-01 or DMS¹ in )C5.51 SUR/
| |
| LINE¹ 2CSH.016-43-2 NTS: I 2 I PIPE / PIPE IC-F-2 )
| |
| VOL/ )Added HEll record/Exam Identerfier 2CSH-25-01-9513 )
| |
| QISO 25-01 or DMG¹ in )C5.51 )
| |
| suR/
| |
| I LINE¹ 2CSH-016.43-2 NTS: I 2
| |
| )
| |
| PIPE / PIPE IC-F-2 ) VOL/ )Added HEll record/Exam Identerfier 2CSH-25.01-SW014 I QISO 25-01 or DMG¹ . in )C5.51 ) SUR/
| |
| )
| |
| LINE¹ 2CSH.016-43-2 NTS: 2 )
| |
| ELBOW / PIPE IC-F-2 ) VOL/ )Added HEll record/Exam Identerfier 2CSH-25-03-Fl$ 02 )
| |
| QISO 25-03 or DMG¹ in )C5.51 I SUR/ I I LINE¹ 2CSH.016-43-2 NTS: I 2 I
| |
| )
| |
| ELBOM / PIPE IC-F-2 ) vou )Added NEM record/Exam Identerfier 2CSH-25-03-FW003 )
| |
| QISO 25-03 or DMG¹ in )C5.51 )
| |
| suR/ I I LINE¹ 2CSH-016-43-2 NTS: I 2 I
| |
| ) PIPE / PIPE IC-F-2 ) VOL/ I )Added NEll record/Exam Identerfier 2CSH-25.03-FI$ 04 ) QISO 25-03 or DMG¹ in )C5.51 ) suR/ I I I LINE¹ 2CSH-016-43-2 NTS: I 2 ) I I I
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 6 of 25 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEM (sorted by Examination Identifier) 2HO INTVL REL RED i OESCRIPTIOH OF ITEM TO BE EXAMINEDiCATGRY irGSCCi EX1/HDE PROCEDURE iPERIOO 1 ( REHARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG ¹, LITEM ¹ JFREQYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ i LINE HO. AND NOTES, AS APPLICABLE DESELECT /CLASSY EX3/NDE PROCEDURE iPERIOO 3 i PIPE / ELBOM IC-F-2 i VOL/ iAdded HEll record/Exam Identerfier 2CSH-25-03-FM009 ) QISO 25-03 or OMG¹ in iC5.51 SUR/
| |
| i LINE¹ 2CSH.016-43-2 HTS: I I 2 I I PIPE / PIPE IC-F-2 I VOL/ iAdded NE'M record/Exam Identerfier 2CSH-25-03-FM010 i QISO 25-03 or DMG¹ in iC5 ~ 51 i SUR/ I I LINE¹ 2CSH.016-43-2 NTS: I 2 i / I I PIPE / PIPE IC-F-2 i VOL/ iAdded HEM record/Exam Identerfier 2CSH-25-03-FM013 i QISO 25-03 or DMG¹ in )C5.51 I SUR/ I I LINE¹ 2CSH.016-43-2 HTS: I 2 I I i PIPE / PIPE IC-F-2 i VOL/ I iAdded NEM record/Exam Identerfier 2CSH-25-03-Fl$ 14 I QISO 25-03 or DMG¹ in iC5.51 I SUR/ I I
| |
| )
| |
| LINE¹ 2CSH-016.43.2 NTS: I 2 I I i ELBOM / PIPE IC-F.2 ( VOL/ iAdded HEM record/Exam Identerfier 2CSH-25-03-FM015 I QISO 25.03 or DMG¹ in iC5.51 SUR/ I LINE¹ 2CSH-016.43-2 NTS: I 2 I I PIPE / PIPE iC-F-2 i VOL/ iAdded HEM record/Exam Identerfier 2CSH-25-03-Fl$ 21 i QISO 25-03 or OMG¹ . in iC5.51 I SUR/ I I LIHE¹ 2CSH-016.43-2 NTS: I 2 I I PIPE / PIPE IC-F-2 i VOL/ iAdded HEM record/Exam Identerfier 2CSH.25-03-Fl$ 22 i QISO 25-03 or DMG¹ in iC5.51 I SUR/ I I LINE¹ 2CSH-016-43-2 NTS: I 2 i I PIPE / PIPE IC-F-2 / VOL/ iAdded NEll record/Exam Identerfier 2CSH-25-03-FM023 I QISO 25.03 or DMG¹ in iC5.51 I SUR/ I I LIHE¹ 2CSH-016-43-2 HTS: I 2 I I PIPE / PIPE IC-F-2 i VOL/ iAdded HEM record/Exam Identerfier 2CSH-25-03-FM028 I QISO 25 03 or DMG¹ in iC5.51 I SUR/ I I LINE¹ 2CSH.016-43-2 HTS: I 2 I
| |
| | |
| 0 NIAGARA HOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UHIT 2 7 of 25 NHP2-IS1-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 I REHARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR'OHPONEHT DMG ¹i I ITEN ¹ IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE No. AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE / ELBOM IC-F-2 i VOL/ iAdded NEM record/Exam Identerfier 2CSH-25-03-SM001 I QISO 25-03 or DMG¹ in iC5.51 I SUR/ I I LINE¹ 2CSH-016-43-2 NTS: I 2 I i PIPE / ELBOM IC-F-2 i VOL/ iAdded HEM record/Exam Identerfier 2CSH-25-03-SMD02 I QISO 25-03 or DMG¹ in JC5.51 I SUR/ I i LINE¹ 2CSH.016.43-2 NTS: I 2 I i PIPE / ELBOM IC-F-2 i VOL/UT6.24 H7 iAdded NEM record/Exam Identerfier. Hidcycie Exam PT/UT during Cycle 7.
| |
| 2CSH-25-03-SM004 I QISO 25-03 or DMG¹ in iC5.51 I SUR/PT3.00 NHP2-16-.375-SS I LINE¹ 2CSH.016.43-2 NTS: I PIPE / PIPE IC-F-2 i VOL/ I iAdded NEM record/Exam Identerfier 2CSH-25-03-SM005 I QISO 25-03 or DMG¹ in iC5 ~ 51 SUR/ I I I LINE¹ 2CSH-016-43-2 NTS: I 2 I I I PIPE / PIPE ic-F-2 i VOL/ iAdded NEM record/Exam Identerfier 2CSH-25-03-SM006 I QISO 25 03 or DMG¹ in iC5.51 I SUR/ I I LINE¹ 2CSH-016-43-2 HTS: I I I PIPE / PIPE IC-F-2 i VOL/ iAdded NEM record/Exam Identerfier 2CSH-25-03-SM007 (
| |
| QISO 25-O3 or O'MG¹ ,in JC5.51 I SUR/ I I LINE¹ 2CSH-016.43-2 NTS: 2 I I PIPE / PIPE IC-F-2 i VOL/ iAdded NEM record/Exam Identerfier 2CSH-25-03-SMDOB i QISO 25-O3 or DMG¹ in iC5.51 I SUR/
| |
| I LINE¹ 2CSH-016.43-2 HTS: I 2 I ELBOM / PIPE IC-F-2 i VOL/ iAdded HEll record/Exam Identerfier 2CSH-25-04-FM001 i QISO 25-04 or DMG¹ in /C5.51 I SUR/ I LINE¹ 2CSH-016-43-2 Nj'S: I 2 I I
| |
| ELBOM / PIPE IC-F-2 I VOL/UT6.24 H7 iAdded HEll record/Exam Identerfier. Hidcycie Exam PT/UT during Cycle 7.
| |
| 2CSH-25.04-FM003 QISO 25-04 or DUG¹ in JC5.51 i SUR/PT3.00 NHP2-16-.375-SS LINE¹ 2CSH-016-43-2 NTS: I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 8of 25 NHP2-ISI-006( REV. 1I CH.OOO SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - CSH SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED ) DESCRIPTIOH OF ITEN TO BE EXAHINED)CATGRY [IGSCC[ EXl/NDE PROCEDURE ]PERIOD 1 REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG ¹, JITEH ¹ )FREGY( EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LINE NO AND NOTES ~ AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE / HOV101 /C-F-2 / VOL/ (Added HEll record/Exam Identerfier 2CSH-25-04-FM004 i QISO 25-04 or DMG¹ in /C5.51 I I SUR/
| |
| LINE¹ 2CSH-014-1-2 HTS: I I 2 I HOV101/P I PE IC-F-2 )
| |
| na ] VOL/UT6.02 2CSH-25 FM005 i QISO 25-04 or DMG¹ na in (C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-14-.375-CS I LIHE¹ 2CSH-014-1-2 HTS: 14,15 ISD 2 f na /na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 lEX6 2CSH-25.04-FM006 i QISO 25-04 or O'MG¹ na in JC5.51 IID I SUR/PT3.00/HT4.00 I NHP2-14-.375-CS I LINE¹ 2CSH-014-1-2 NTS: 15,16 ISD 2 / na/na I I PIPE/~V59 IC-F-2 J na J VOL/UT6.02 2CSH-25-04-FM007 i QISO 25-04 or OMG¹ na in JC5.5'l ]none f SUR/PT3.00/HT4.00 )
| |
| NHP2-14-.375-CS I LINE¹ 2CSH-014-1.2 NTS: 15I17 ISD 2 / na /na I I
| |
| *V59/PIPE IC-F-2 I na I VOL/UT6.02 I 2CSH-25-04-FM008 I QISO 25-04 or DMG¹ na in (C5.51 )none )
| |
| SUR/PT3.00/HT4.00 [
| |
| NNP2-14-.375-CS I LIHE¹ 2CSH 014 1 2 NTS'5i17 ISD 2 [ na/na I I PIPE/TEE IC-F-2 [ na [ VOL/UT6.02 2CSH-25-04-FM009 i QISO 25-04 or DMG¹ na . in JC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-14-.375-CS I LINE¹ 2CSH-014-1-2 NTS: 15,18 ISO 2 [ na /na I i PIPE / PIPE IC-F-2 ) VOL/ )Added NEM record/Exam Identerfier 2CSH-25-04-FM011 I QISO 25-04 or OMG¹ in (C5.51 I I SUR/ I LINN 2CSH.016-43-2 NTS: I I 2 I I i PIPE / ELBOM IC-F-2 i VOL/ ]Added NEM record/Exam Identerfier 2CSH-25-04-FM012 QISO 25-04 or OMG¹ in (C5.51 / SUR/ I I LINE¹ 2CSH-016-43-2 HTS: I I 21 I I ELBOM / PIPE IC-F-2 i VOL/ (Added NEll record/Exam Identerf ier 2CSH-25-04-FM013 I QISO 25-04 or DMG¹ in [C5.51 / SUR/ I i LINE¹ 2CSH-016-43-2 NTS: I I 2 I I
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UHIT 2 9 of 25 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOD 1 REHARKS EXAHIHATIOH IDENTIFIER i ITS ISO LOCATOR, COHPONEHT DMG ¹, i ITEN ¹ iFREQYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSi EX3/NDE PROCEDURE iPERIOD 3
| |
| I PIPE / PIPE IC-F-2 i VOL/ iAdded NEll record/Exam Identerf ier 2CSH-25-04-FW016 i QISO 25-04 or DMG¹ in /C5.51 SUR/
| |
| I LINE¹ 2CSH.016-43-2 HTS: I I 2 I I PIPE / PIPE IC-F-2 J VOL/ iAdded NEW record/Exam Identerfier 2CSH-25-04-FM029 I QISO 25-04 or DUG¹ in JC5.51 SUR/ I
| |
| (
| |
| LINE¹ 2CSH-016-43-2 NTS: I I 2 I I I PIPE / PIPE IC-F-2 i VOL/ iAdded NEW record/Exam Identerfier 2CSH-25-04-FM030 i QISO 25-04 or DWG¹ in iC5.51 I I SUR/ I I LINE¹ 2CSH-016.43-2 NTS: I I 2 I I REDUCER / PIPE IC-F-2 J VOL/UT6.23 iAdded NEW record/Exam Identerfier. Hidcycie Exam HT/O'I during Cycle 7.
| |
| 2CSH.25.04-FMSW005 QISO 25-04 or DWG¹ in iC5.51 I I SUR/HT4.00/PT3.00 I NHP2-14-.375-CS LINE¹ 2CSH-014-1-2 NTS: I I 2 I I i PIPE / ELBOM IC-F-2 i VOL/ iAdded HEll record/Exam Identerfier 2CSH-25-04-SW002 i QISO 25-04 or DMG¹ in iC5.5'I I I SUR/ I I LINE¹ 2CSH-016.43-2 NTS: I 12 I I i PIPE / ELBOW IC-F-2 ) VOL/ iAdded HEW record/Exam Identerfier 2CSH-25-04-SW003 i QISO 25-04 or DWG¹ , in iC5.51 I I SUR/ I I LINE¹ 2CSH.016.43-2 NTS: I I 2 I I I ELBOW / REDUCER IC-F-2 i VOL/UT6.24 H7 iAdded HEll record/Exam Identerfier. Hidcycie Exam PT/UT during Cycle 7.
| |
| 2CSH-25-04-SW004 i QISO 25-04 or DUG¹ in (C5.51 I I SUR/PIC 00 I I NHP2 ~ 375-SS I LINE¹ 2CSH-O'I6-43-2 NTS: I I 2 I I I I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2CSH-25-04-SW007 i QISO 25-04 or D'WG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-14-.375-CS LINE¹ 2CSH-014-1-2 NTS 15,16 LSD I 2 I na/na I I ELB/PIPE IC-F-2 ) na i VOL/UT6.02 2CSH-25-04-SW008 I QISO 25-04 or DWG¹ na in [C5.51 [none i SUR/PT3.00/HT4.00 i NHP2.14-.375-CS LINE¹ 2CSH-014-1-2 NTS: 15,16 LSD 2 i na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 10 of 25 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED ) DESCRIPTION OF ITEN To BE EXAHINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOO 1 REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, CDHPONEHT DMG ¹, i ITEH ¹ iFREOYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE Ho AND NOTES AS APPLICABLE ISELECT ICLASSI EX3/KDE PROCEDURE IPERIOO 3 I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2CSH-25-04-SW009 I QISO 25-04 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i KHP2-14-.375-CS I LINE¹ csH-014-1-2 NTs: 1 16 Iso 2 i na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2CSH-25-04-S'M011 I QISO 25-04 or DMG¹ na in JC5.51 /none i SUR/PT3.00/MT4.00 i NHP2-14-.375-CS I LINE¹ 2CSH-014-1.2 HTS:,15( 16 ISD 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2CSH-25-04-SM012 I oilSO 25 04 or D'MG¹ na in iC5.51 )none J SUR/PT3.00/HT4.00 i NHP2-14-.375-CS I LINE¹ 2CSH-014.1-2 NTS: 15,16 Iso 2 / na/na I I PIPE / PIPE IC-F-2 i VOL/ iAdded NEM record/Exam Identerfier 2CSH-25-04-SM013 i QISO 25-04 or DWG¹ in iC5.51 I I SUR/ I I LINE¹ 2CSH-016.43-2 NTS: I I 2 I I PIPE / PIPE IC-F-2 i VOL/ )Added NEM record/Exam Identerfier 2CSH-25-04-SW014 i QISO 25.04 or DWG¹ in iC5.51 i SUR/ I LINE¹ 2CSH.016-43-2 NTS I I 2 I I PENET 212/RED iC-F-1 J na ( VOL/UT6.03 I 2CSH-25-05-FM002 I QISO 25-05 or DMG¹ na . in iC5.11 iID / SUR/PT3.00 JSc8 NHP2-20-.375-SS i LINE¹ 2CSH.020-13-2 HTS: 23,26 )7.5XHIn) 2 i na / I i *HOVI18/r IPE IC-F-2 i na i VOL/UT6.O2 2CSH-25-05-FW003 i QISO 25.05 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 [
| |
| NHP2-18-.375-CS LIHE¹ 2CSH-018 45-2 NTS: 27,28 iSO 2 i na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2CSH.25-05-FW004 I QISO 25.05 or DMG¹ na in iC5.51 inone i SUR/PT3.00/H'I4.00 i NHP2-20-.375-CS I LINE¹ 2CSH.020.2-2 NTS 30,31 ISD 2 / na /na I ELB/sv16 IC-F-2 ) na ) VOL/UT6.02 2CSH-25-05-FW005 i QISO 25-05 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 NHP2-20-.375-CS I LINE¹ 2CSH-020-2-2 NTS: 30(32 ISO 2 ) na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 11 of 25 NHP2-ISI-006, REV. 1I CH-000 SECOND TEN YEAR INSERVICE IHSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - CSH SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ i DESCRIPTION OF ITEN TO BE EXAHINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOD 1 REHARKS EXAHINATIOH IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DMG ¹, iITEH ¹ iFREQYi EX2/HDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE NO AND NOTEsi AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I *V16/PIPE IC-F-2 I na I VOL/UT6.02 I 2CSH-25 FWOI16 ( QISO 25-05 or DWG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 J NHP2-20-.375-CS I LINE¹ 2CSH-020-2-2 HTS: 29,32 ISD 2 i na /na I i PIPE/*STRT-1 IC-F-2 i na i VOL/UT6.02 2CSH-25-05-Fl$ 07 i QISO 25-O5 or DMG¹ na in iC5.51 inone J SUR/PT3.00/NT4.00 i NHP2-20-.375-CS i LINE¹ 2CSH-020-2-2 NTS: 29(34 iso 2 ) na /na I I STRT-1/RED IC-F-2 i na i VOL/UT6.O2 2CSH-25-05-FM008 I QISO 25-05 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-20-.375-CS I LINE¹ 2CSH-020-2-2 NTS: 34,37 ISD 2 i na/na I i PIPE/*HOV118 IC-F-2 i na i VOL/UT6.02 2CSH.25-05-Fl$ 09 I QISO 25-05 or DMG¹ na in iC5.51 Inone I SUR/PT3.00/HT4 F 00 I HHP2-18-.375-CS i LINE¹ 2CSH-018-44.2 NTS: 27,28 iso 2 i na/na I I RED/PIPE
| |
| )C-F-1 i na J VOL/UT6.13 I 2CSH.25-05-FW010 i QISO 25-05 or O'MG¹ na in iC5.11 iio i SUR/PT3.00 JSc8 NHP2-18-.375-SS i LINE¹ 2CSH-018-44-2 HTS: 26,27 i7.5XNini 2 i na / I IWC-2r1 I PIPE/ELB IC-F-1 i na i VOL/UT6.03 ] Inacc 2CSH-25-05-FM012 I QISO 25-05 or DMG¹ na. in iC5.11 )RR i SUR/PT3.00 I NHP2-20-.375-SS i LINE¹ 2CSH-020-13-2 NTS: 21,22 iNS 2 dna/ I IMC-2r1 I WNF/PIPE iC-F-I i na i VOL/UT6.03 ilnacc 2CSH-25-05-FM013 I QISO 25-05 or DMG¹ na in iC5.11 IRR I SUR/PT I NHP2-20-.375-SS I LIHE¹ 2CSH-020-13-2 NTS: 19,20 INS i 2 ina/ I I'MC-2r'I I ELB/PEHET 212 IC-F-1 [ na i VOL/UT6.03 iinacc 2CSH-25-05-FM014 i QISO 25-05 or DMG¹ na in [C5.11 IRR I SUR/PT3 00 I NHP2-20-.375-SS i LINE¹ 2CSH-020-13-2 NTS: 22,23 iNS 2 dna/ I IWC-2r1 I PIPE/PIPE IC-F-1 I na I VOL/UT6.03 i inacc 2CSH-25-05-Fl$ 15 i QISO 25-05 or DMG¹ na in iC5.11 IRR I SUR/PT3.00 I NHP2-20-.375-SS I LINE¹ 2CSH 020 13 2 NTS'0 21 IHS 2 dna/ I
| |
| | |
| NIAGARA MOHAWK POMER CORPORATIOH - NILE POINT NUCLEAR STATION - UNIT 2 12 of 25 NHP2-ISI-006, REV. 1( CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - CSH SYSTEN (sorted by Examination Identifier)
| |
| HD INTVL REL RED DESCRIPTION OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REMARKS I
| |
| EXAHINATION IDENTIFIER [ ITS ISO LOCATOR, COMPONENT DMG ¹, iITEH ¹ iFREOYi EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ i LIHE NO. AND NOTES, AS APPLICABLE [SELECT iCLASSi EX3/NDE PROCEDURE iPERIOO 3 i Lu assoc M/FW002 IC-F-I ) na i VOL/UT6.03 I 2CSH-25-05-LM002-1 i QISO 25-05 or DMG¹ na in )C5.12 iID J SUR/PT3.00 isc8 HHP2-20-.375-SS I LINE¹ 2CSH-020.13-2 NTS: 26 IAL 2 dna/ I
| |
| ) Lu assoc v/FW010 IC-F-1 i na i VOL/UT6.03 I 2CSH-25-05-LM002-2 i QISO 25-05 or DMG¹ na in iC5.12 iiD i SUR/PT3.00 isc8 NHP2-18-.375-SS I LINE¹ 2CSH 020-13-2 HTS: 26 )AL 2 )na/ I
| |
| [ Lu IC-F-1 i na i'OL/UT6.03 iInacc 2CSH.25-05-LWA I QISO 25-05 or DMG¹ na in iC5.12 IRR I SUR/PT3.00 I NHP2-20-.375-SS I LINE¹ 2CSH-020-13-2 NTS: 20 INS 2 I i Lu IC-F-1 i na ) VOL/UT6.03 [Inacc 2CSH-25-05-LMB i QISO 25-05 or DMG¹ na in iC5.12 ERR i SUR/PT3.00 I HHP2-20-.375-SS I LINE¹ 2CSH-020-13-2 N'IS'1 INS ( 2 dna/ I I LW IR IC-F-1 i na i VOL/UT6.03 iInacc 2CSH.25.05-LMC i QISO 2S-DS or D'MG¹ na in iC5.12 IRR I SUR/PT3.00 I NHP2-20-.375-SS LINE¹ 2CSH-020-13-2 NTS: 22 FANS 2 dna/ I I LM OR IC-F-1 i na i VOL/UT6.03 iinacc 2CSH-25-05-LMD i QISO 25-05 or DMG¹ na . in )C5.12 IRR I SUR/PT3.00 I NHP2-20-.375-SS I LINE¹ 2CSH-020-13-2 NTS: 22 INS 2 (na/ I i Lu assoc v/FW002 L f414 JC-F-1 i na i VOL/UT6.03 I 2CSH-25.05-LME I QISO 25-05 or DMG¹ na in iC5.12 I ID I SUR/PT3.00 isc8 NHP2-20-.375-SS I LINE¹ 2CSH-020-13-2 HTS: 23 IAL 2 )na/ I I PIPE/RED IC-F-2 J na i VOL/UT6.02 2CSH-25-05-SM007 I QISO 25-05 or DWG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 i NHP2-18-.375.CS I LINE¹ 2CSH-018.45-2 NTS: 27,29 ISD 2 J na /na I I RED/PIPE IC-F-2 I na I VOL/UT6.02 I 2CSH.25.05.SM008 I QISO 25-05 or DMG¹ na in iC5.51 iID i SUR/PT3.00/NT4.00 JSc8 NHP2-20-.375.CS LINE¹ 2CSH-020-2.2 HTS 29 30 LSD 2 [ na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 13 of 25 NHP2-ISI-006, REV. 1, CH-OOO SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHINATIOH IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG ¹, ]ITEN ¹ JFREOY( EX2/NDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ f LINE NO. AND NOTES, AS APPLICABLE ]SELECT )CLASS) EX3/NDE PROCEDURE )PERIOD 3 I ELB/PIPE IC-F-2 J na (
| |
| VOL/UT6.02 2CSH-25-05-SW009 (
| |
| QISO 25-05 or DMG¹ na in (C5.51 ]none f SUR/PT3.00/HT4.00 )
| |
| NHP2-20-.375-CS I LINE¹ 2CSH-020-2-2 NTS: 30,31 ISO 2 J na /na I PIPE/ELB IC-F-2 (
| |
| na ] VOL/UT6.02 2CSH-25-05-SM010 i QISO 25-05 or DMG¹ na in (C5.51 [none J SUR/PT3.00/HT4.00 J NHP2-20-.375-CS I LINE¹ 2CSH-020-2.2 NTS: 30,31 I SD 2 J na /na I I PIPE/ELB IC-F-2 [ na [ VOL/UT6.02 2CSH-25-05-SM014 I QISO 25-05 or DMG¹ na in [C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-20-.375-CS I LINE¹ 2CSH-020-2-2 NTS: 29,30 I 2 f na /na I I ELB/PIPE IC-F-2 ) VOL/UT6.02 2CSH-25-05-SW015 I QISO 25-05 or DWG¹ na in (C5.51 ]none f SUR/PT3.00/MT4.00 f NHP2-20-.375-CS LINE¹ 2CSH-020-2-2 NTS: 29,30 LSD 2 / na /na I PIPE/ELB IC-F-2 (
| |
| na [ VOL/UT6.02 2CSH-25-05-SM016 i QISO 25-05 or DMG¹ na in IC5.51 ]none f SUR/PT3.00/NT4.00 f NHP2-20-.375-CS LINE¹ 2CSH-020-2-2 NTS: 29,30 /SD 2 ]
| |
| 'na /na i
| |
| ELB/PIPE IC-F-2 f na J VOL/UT6.02 2CSH-25.05-SM017 QISO 25-05 or DMG¹ na in [C5.51 (none J SUR/PT3.00/HT4.00 [
| |
| NHP2-20..375-CS LINE¹ 2CSH.020-2-2 N'IS: 29,30 ISD 2 [ na/na I I PIPE/TEE IC-F-2 f na J VOL/UT6.02 2CSH-25-05-SM019 I QISO 25-05 or DMG¹ na in )C5.51 ]none J SUR/PT3.00/HT4.00 J NHP2-20-.375-CS i LINE¹ 2CSH-020.2-2 NTS: 29,33 LSD 2 J na /na I I TEE/PIPE IC-F-2 [ na [ VOL/UT6.02 2CSH-25-05-SM020 I QISO 25-05 or DWG¹ na in JC5.51 [none [ SUR/PT3.00/HT4.00 [
| |
| NHP2-20-.375-CS I LINE¹ 2CSH-020-2-2 NTS: 29,33 ISD 2 f na /na RED/WNF IC-F-2 [ na [ VOL/UT6.02 2CSH-25-05-SM026 QISO 25-05 or DMG¹ na in JC5.51 )none [ SUR/PT3.00/HT4.00 ]
| |
| NHP2-20-.375-CS LINE¹ 2CSH-024-2-2 NTS: 37,38 )SD 2 ( na/na
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - . NILE POINT NUCLEAR STATION - UNIT 2 14 of 25 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED (
| |
| DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC[ EX1/HDE PROCEDURE (PERIOD 1 REHARKS EXAHIHATIOH IDENl'IFIER i ITS ISO LOCATOR, COHPOHEHT DMG ¹, LITEM ¹ )FREQY) EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I IMC 3 INTEG ATT PENET Z12 SHOPMELD (C-C ),na )
| |
| SUR/(inaccessibie) (
| |
| Inacc 2CSH-25-05-SM301 / QISO 25-05 or OMG¹ na in /C3.20 [RR J na /na I
| |
| / LINE¹ 2CSH-020-13-2 HTS: (none) /HS 2 / na/na I I INTEG ATT PEHET Z12 SHOPMELO IC-C I na I SUR/PT3.00 I 2CSH-25-05.SM302 I QISO 25-05 or DMG¹ na in /C3.20 ]ID na /na /Sc8 f LINE¹ 2CSH-020-13-2 NTS: (none) [Handate) 2 na /na I I PIPE/ELB IC-F-2 [ na (
| |
| VOL/UT6.02 I 2CSH-25-08-FM003 i QISO 25.08 or DMG¹ na in JC5.51 (none )
| |
| SUR/PT3.00/HT4.00 f NHP2-16-1.031-CS I LINE¹ 2CSH-016.3-2 NTS: 40,41 ISD 2 / na /na I ELB/PIPE IC-F-2 / na )
| |
| VOL/UT6.02 2CSH-25-08.FM004 (
| |
| QISO 25-08 or DMG¹ na in JC5.51 /none / SUR/PT3.00/HT4.00 /
| |
| NHP2-16-1.031.CS I LINE¹ 2CSH-016-3-2 HTS: 40,41 I TE 2 / na/na I I ELB/PIPE IC-F-2 [ na (
| |
| VOL/UT6.02 2CSH.25-08-FM005 i QISO 25-08 or DMG¹ na in JC5.51 ]none J SUR/PT3.00/HT4.00 (
| |
| NHP2-16-1.031-CS I LINE¹ 2CSH-016-3-2 HTS 40 41 I 2 / na /na I ~FE105/PIPE IC-F-2 I na I VOL/UT6.02 I 2CSH-25 FM006 I QISO 25-08 or DUG¹ na .in JC5.51 /none / SUR/PT3.00/HT4.00 )
| |
| NKP2-16-1.031-CS I LINE¹ 2CSH-016-3-2 HTS'0 ISO 2 / na /na I I
| |
| PIPE/AFE-105 IC-F-2 I na I VOL/UT6.02 I 2CSH-25-08.FM007 I QISO 25-08 or DMG¹ na in /C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-16-1.031-CS I LIHE¹ CSH 016 3 NTS " ISD I 2 I na/na I I PIPE/PIPE IC-F-2 [ na [ VOL/UT6.02 2CSH-25-08-FM008 I QISO 25-08 or DMG¹ na in JC5.51 ]none J SUR/PT3.00/HT4.00 J NHP2-16-1.031-CS / LINE¹ 2CSH-016-3-2 NTS: 40 ]none 2 / na /na I MNF/PIPE IC-F-2 [ na ) VOL/UT6.02 ] ScT 2CSH-25-08-FM014 [ QISO 25-08 or DMG¹ na in [C5.51 I ID I SUR/PT3.00/HT4.00 I NHP2-16-1.031-CS I LINE¹ 2CSH-016-3-2 HTS: 39,40 ITE 2 ] na /na
| |
| | |
| NIAGARA HONAWK POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 15 of 25 NHP2-ISI-006I REV. I( CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED J DESCRIPTION OF ITEN TO BE EXAMINED)CATGRY [ IGSCC) EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENTIFIER I ITS ISO LOCATORi COHPONENT DMG i IITEH ¹ IFREQYI EX2/HDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I
| |
| / ELB/MHF IC-F-2 f na f VOL/UT6.02 2CSH-25-08-FM015 (
| |
| QISO 25-08 or DMG¹ na in [C5.51 ]none / SUR/PT3.00/HT4.00 f NHP2-16-1.031-CS I LINE¹ 2CSH-016-3-2 NTS: 39,41 LSD 2 / na /na I I WNF/PIPE IC-F-2 i VOL/UT6.02 2CSH-25-08-FM016 I QISO 25-08 or DMG¹ na in [C5 ~ 51 [none I SUR/PT3.00/HT4.00 I NHP2-16-1.031-CS i LINE¹ 2CSH-016-3-2 NTS: 39,40 LSD 2 / na /na I
| |
| ] PIPE/*V9 IC-F-2 f na / VOL/UT6.02 2CSH-25-08-FW018 I QISO 25.08 or DMG¹ na in )C5.51 /none f SUR/PT3.00/HT4.00 f NHP2-16-1.031-CS LINE¹ 2CSH-016-3.2 NTS: 40,42 LSD 2 J na /na I
| |
| [ *V9/ELB IC-F-2 ] na [ VOL/UT6.02 2CSH.25-08-FW019 i QISO 25-08 or DMG¹ na in /C5.51 )none [ SUR/PT3.00/HT4.00 )
| |
| NHP2-16.1.031-CS I LINE¹ 2CSH-016-3.2 NTS: 41,42 ISD ( 2 f na /na I I IHTEG ATT )C-C [ na (
| |
| SUR/PT3.00/HT4.00 Sc7 2CSH-25-08.FW301 [ QISO 25-08-7 or DWG¹ na in JC3.20 (ID / na /na I f LINE¹ 2CSN-016-3-2 NTS: 40,43 JHandatef 2 [ na /na I I PIPE/ELB IC-F-2 / na / VOL/UT6.02 2CSH-25-08-SM006 i QISO 25-08 or DWG¹ na .in /C5.51 )none / SUR/PT3.00/HT4.00 /
| |
| NHP2-16-1.031-CS i LINE¹ 2CSH-016-3-2 HTS: 40,41 LSD I 2 I I I ELB/PIPE IC-F-2 )
| |
| na ( VDL/UT6.02 2CSH-25 SW010 I QISO 25-08 or DMG¹ na in )C5.51 [none J SUR/PT3.00/HT4.00 [
| |
| NHP2-16-1.031-CS i LIHE¹ 2CSH.016.3-2 HTS: 40,41 LSD 2 f na /na I I ELB/PIPE IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 2CSH-25.08-SM012 i QISO 25-08 or DWG¹ na in /C5.51 )none f SUR/PT3.00/HT4.00 )
| |
| NHP2-16-1.031-CS (
| |
| LINE¹ 2CSH-016-3-2 NTS: 40,41 [SD 2 / na /na
| |
| (
| |
| PIPE/PIPE IC-F-2 [ na [ VOL/UT6.02 2CSH-25-08-SW016 ) QISO 25-08 or DMG¹ na in [C5.51 Inone I SUR/PT3.00/HT4.00 NHP2-16-1.031-CS I LINE¹ 2CSH-016-3-2 NTS: 40 Inone 2 I na /na I
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 16 of 25 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REMARKS EXANINATION IDENTIFIER f ITS ISO LOCATOR, COHPONEHT DWG ¹, ( ITEN ¹ [FREOY) EX2/HDE PROCEDURE (PERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/ELB IC-F-2 ] na [ VOL/UT6.02 2CSH-25-08-SW017 )
| |
| QISO 25-08 or DMG¹ na in JC5.51 [none f SUR/PT3.00/HID 00 )
| |
| NHP2-16.1.031.CS I LINE¹ 2CSH-016-3-2 NTS: 40,41 ISD 2 f na /na I PIPE/ELB IC-F-2 [ na [ VOL/UT6.02 2CSH-25-08-SW018 )
| |
| QISO 25-08 or DMG¹ na in /C5.51 ]none J SUR/PT3.00/HT4.00 )
| |
| NHP2-16-1.031-CS I LINE¹ 2CSH-016-3-2 NTS: 40,41 ITE 2 / na /na I PIPE/TEE IC-F-2 ) na )
| |
| VOL/UT6.02 2CSH-25-08-SW019 I QISO 25-08 or DMG¹ na in /C5.51 [none J SUR/PT3.00/HT4.00 J NHP2-16-1.031.CS I LINE¹ 2CSH-016-3-2 NTS: 40,44 ISD 2 / na /na TEE/PIPE IC-F-2 [ na J VOL/UT6.02 2CSH.25-08-SW020 QISO 25-08 or DWG¹ na in [C5.51 lno" I SUR/PT3.00/HT4 00 I NHP2-16.1. 031- CS LINE¹ 2CSH-016-3-2 NTS: 40,44 i SD 2 f na /na I PIPE/ELB IC-F-2 )
| |
| na ) VOL/UT6.02 2CSH.25-08.SW021 I QISO 25.08 or DMG¹ na in [C5.51 )none ) SUR/PT3.00/HT4 F 00 J NHP2-16-'1.031-CS I LINE¹ 2CSH-016-3-2 NTS: 40,41 ISD 2 f na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2CSH-25-09. FM001 / QISO 25-09 or DMG¹ na .in /C5.51 ]none J SUR/PT3.00/HT4.00 /
| |
| NHP2-16-1.031.CS I LINE¹ 2CSH-016-3-2 NTS: 41,40 ISD I 2 I na /na I I TEE/PIPE IC-F-2 [ na. [ VOL/UT6.02 2CSH-25-09 FW002 i QISO 25-09 or DMG¹ na in [C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-16.1.031-CS I LINE¹ 2CSH-016-3-2 HTS: 40,44 ISD 2 / na /na I PIPE/PIPE IC-F-2 I na I VOL/UT6.02 I 2CSH-25-09-FW003 (
| |
| QISO 25-09 or DMG¹ na in )C5.51 ]none (
| |
| SUR/PT3.00/HT4.00 J HHP2-16-1.031-CS (
| |
| LINE¹ 2CSH-016-3-2 N'IS: 40 ]none 2 f na/na I PIPE/ELB IC-F-2 (
| |
| na ( VOL/UT6.02 2CSH-25-09 FW004 i QISO 25-09 or DWG¹ na in [C5.51 /none / SUR/PT3.00/HT4.00 /
| |
| NHP2-16-1.031.CS LINE¹ 2CSH-016-3-2 NTS: 41,40 i SD 2 / na /na
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 17 of 25 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEM (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEOICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOD 1 REHARKS EXAHINATION IDEHI'IFIER I ITS ISO LOCATOR, COHPONENT DMG ¹, IITEH ¹ IFREOYI EX2/NDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ I LINE NO. AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2CSH-25-09-FM006 I QISO 25-09 or DMG¹ na in IC5.51 IID I SUR/PT3.00/HT4.00 I Sc9 NHP2-12-.844-CS I LINE¹ 2CSH-012-42-2 HTS: 1,50 ISD I 2 I na /na I
| |
| PIPE/*HOVIO IC-F-2 I na I VOL/UT6.02 2CSH-25-09-FM007 I QISO 25-09 or DWG¹ na in IC5.51 Inone I SUR/PT3 F 00/HT4.00 I HHP2-12-.844-CS I LINE¹ 2CSH-012-42-2 HTS: 1,51 ISD 2 I na /na I I *HOV107/PIPE IB-J I na I VOL/UT6.02 I 2CSH-25-09.F'W008 I QISO 25-09 or DMG¹ na in IB9.11 Inone I SUR/PT3.00/HT4.00 I NHP2.12-.844.CS I LINE¹ 2CSH-012-4-1 NTS: 1,11 INS 1 I na /na I PIPE/PENET 214 IB-J I na I VOL/UT6.02 I Sc7 2CSH-25-09-FM009 I QISO 25-09 or DMG¹ na in IB9.11 IID I SUR/PT3.00/HT4.00 I NHP2-12-.844-CS I LINE¹ 2CSH.012-4-1 NTS: 1(7 ITEV 1 Ina/
| |
| I PIPE/PIPE IC-F-2 I na I VOL/UT6.02 2CSH-25-09-FW013 I QISO 25-09 or DWG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-16-1 '31-CS I LINE¹ 2CSH 016-3.2 NTS: 40 Inone 2 I na /na I I'MC-5 I INTEG ATT OUTSIDE EDGES 1" PLATE IC-C I na SUR/PT3.00/HT4.00 I 2CSH-25-¹FW300 I QISO 25-¹6 or DMG¹ na. in IC3.20 IID na /na Sc8 I LINE¹ 2CSH-016-3-2 NTS: 40,45 IHandateI 2 na /na I I INTEG ATT IC-C I na I SUR/PT3.00/HT4.00 I 2CSH-25-09-FM306 I QISO 25-09-8 or DMG¹ na in IC3.20 IID I na /na I I LINE¹ 2CSN-016-3-2 HTS: 40,47 IHandateI 2 I na /na I I PIPE/WNF IC-F-2 I na I VOL/UT6.02 2CSH-25-09-FMSM005 I QISO 25-09 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-12-.844-CS I LINE¹ 2CSH-012-42-2 HTS: 1,49 ISD 2 I na /na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2CSH-25-09.SM002 I QISO 25-09 or DWG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2. 16-1. 031- CS I LINE¹ 2CSH.016-3-2 NTS: 41,40 ISD 2 I na /na I
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - NILE POINI'UCLEAR Sl'ATION - UNIT 2 18 of 25 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY )IGSCC( EX1/NDE PROCEDURE [PERIOD 1 REHARKS
| |
| (
| |
| EXAHINATIOH IDENTIFIER I ITS IS LOCATOR'OMPONENT DWG ¹i IITEH IFREQYI EX2/NDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ I LIHE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I PIPE/RED IC-F-2 I na I VOL/UT6.02 2CSH-25-09-SW003 [ QISO 25-09 or DWG¹ na in /C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-16-1.031-CS I LINE¹ 2CSH-016-3-2 NTS: 40,48 ITE 2 I na /na I I RED/PIPE IC-F-2 ( na (
| |
| VOL/UT6.02 2CSH-25-09-SW004 i QISO 25.09 or DWG¹ na in JC5.51 Inon I SUR/Pl'3'00/HT4 00 I NHP2-12-.844-CS I LINE¹ 2CSH-012-42-2 HTS: 48,1 ISD 2 / na /na I
| |
| / WHF/PIPE IC-F-2 (
| |
| na )
| |
| VOL/UT6.02 2CSH-25-09-SW008 ] QISO 25-09 or DMG¹ na in JC5.51 (none f SUR/PT3.00/HT4.00 J NHP2.12-.844-CS I LINE¹ 2CSH.012.42-2 NTS: 1,49 ISD 2 f na /na I I PIPE/ELB IC-F-2 ] na J VOL/UT6.02 2CSH-25-09-SM009 I QISO 25-09 or DWG¹ na in [C5 ~ 51 [none )
| |
| SUR/PT3.00/HT4.00 J NHP2-12-.844-CS I LINE¹ 2CSH.012-42-2 NTS: 1 '0 ISD 2 / na /na I ELB/PIPE IC-F-2 [ na J VOL/UT6.02 2CSH-25-09.SW010 I QISO 25.09 or DWG¹ na in (C5.51 [none [ SUR/PT3.00/HT4.00 )
| |
| NHP2-12-.844-CS i LINE¹ 2CSH-012-42-2 NTS: 1,50 LSD 2 / na /na I ELB/PIPE IC-F-2 ] na [ VOL/UT6.02 2CSH-25.09.S'W011 ] QISO 25-09 or DWG¹ na . in ]C5.51 Inone I SUR/PT3.00/HT4 00 I NHP2-12-.844-CS LINE¹ 2CSH-012-42-2 NTS: 1,50 LSD 2 / na /na
| |
| (
| |
| PIPE/PIPE IC-F-2 [ VOL/UT6.02 2CSH-25-09-SW016 i QISO 25-09 or DWG¹ na in (C5.51 )none )
| |
| SUR/PT3.00/Hl'4.00 (
| |
| NHP2-16-1.031-CS )
| |
| LINE¹ 2CSH-016-3-2 NTS: 40 (none I 2 I na/na I I PIPE/TEE IC-F-2 [ na )
| |
| VDL/UT6.02 2CSH-25-09-SWOIT I QISO 25-09 or DWG¹ na in JC5.51 [none (
| |
| SUR/PT3.00/HT4.00 )
| |
| NHP2-16.1.031-CS I LINE¹ 2CSH.016-3-2 NTS: 40,44 ISD 2 / na /na I PIPE/PIPE IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 2CSH-25-09-SW018 I QISO 25-09 or DWG¹ na in JC5.51 ]none / SUR/PT3.00/MT4.00 (
| |
| NHP2-16-1.031-CS J LIHE¹ 2CSH-016-3-2 NTS: 40 ]none 2 f na /na
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 19 of 25 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTIOH OF ITEM TO BE EXAMIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 REMARKS EXAMINATION IDENTIFIER f ITS ISO LOCATOR, COMPONENT DWG ¹, [ITEM ¹ JFREOY[ EX2/NDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ [ LINE NO. AND NOTES, AS APPLICABLE ]SELECT (CLASS] EX3/NDE PROCEDURE (PERIOD 3 I PENET 214/PIPE IB-J J na J VOL/UT6.02 J Sc7 2CSH-25-10-FW001 i QISO 25-10 or DWG¹ na in )89.11 IID' SUR/PT3.00/MT4.00 I NMP2-12-.844-CS I LINE¹ 2CSH.012-15-1 NTS: 1,7 ITEV 1 (na/
| |
| I PIPE/ELB iB-J I na I VOL/UT6.02 2CSH-25-10-FW002 i QISO 25-10 or DWG¹ na in /89.1'l ]none f SUR/PT3.00/Ml'4.00 f HMP2-12-.844-CS i LINE¹ 2CSH-012-15-1 HTS: 1,4 iNS I 1 I na/na I I PIPE/ELB )B-J I na I VOL/UT6.02 2CSH-25-10-FW003 I QISO 25-10 or DWG¹ na in /B9.11 [none ] SUR/PT3.00/HT4.00 f NHP2-12-.844-CS I LINE¹ 2CSH-012-15-1 NTS: 1,4 INS 1 / na /na I I PIPE/*AOV108 IB-J (
| |
| na )
| |
| VOL/UT6.02 2CSH-25-10-FW004 I QISO 25-10 or DWG¹ na in )89.11 [none ] SUR/PT3.00/MT4.00 ]
| |
| NHP2-12-.844.CS I LINE¹ 2CSH-012-15-1 NTS: 1,5 iNS ] na /na I
| |
| / *AOV108/PIPE IB-J [ na [ VOL/UT6.02 (Deselected 2CSH-25-10-FW005 i QISO 25-10 or DWG¹ na in /B9.11 [none (
| |
| SUR/PT3.00/HT4.00 [
| |
| HMP2 12-.844-CS i LINE¹ 2CSH-012-15-1 NTS: 1,5 iNS 1 /na/ I=
| |
| I PIPE/*HCV120 IB-J (
| |
| na )
| |
| VOL/UT6.02 (
| |
| Sc7 2CSH-25-10-FW006 I QISO 25-10 or DWG¹ na ,in )89.11 IID I SUR/PT3.00/HT4.00 I NMP2-12-.844-CS I LIHE¹ 2CSH.012-15-1 NTS: 1,6 IHS 1 (na/
| |
| I *HCV120/PIPE IB-J ] na (
| |
| VOL/UT6.02 ( Sc7 2CSH-25-10-FW007 i QISO 25-10 or O'WG¹ na in IB9.11 IID I SUR/PT3.00/MT4.00 I HMP2-12-.688-CS (
| |
| LINE¹ 2CSH-012-46-1 NTS: 2,6 IHS 1 /na/
| |
| I PIPE/SEEX Q N16 Az240 HI PRESS CS /B-J I na I VOL/UT6.02 I Sc7 2CSH-25-10-FW008 I QISO 25-10 or DWG¹ na in ]B9.11 IID-E I SUR/PT3.00/MT4.00 I NMP2-10-.594-CS i LINE¹ 2CSH-010-27-1 NTS: 3,9 ]TEV 1 ina/
| |
| I ELB/PIPE IB-J I na I VOL/UT6.02 2CSH-25-10-FW010 i QISO 25-10 or DWG¹ na in /89.11 (none ( SUR/PT3.00/MT4.00 f NMP2-12-.844-CS I LINE¹ 2CSH-012-15-1 NTS: 1,4 ]NS 1 / na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UHIT 2 20 of 25 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG ¹, ]ITEN ¹ (FREQYJ EX2/NDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSJ EX3/NDE PROCEDURE )PERIOD 3 I MOL/PIPE IB-J I na I SUR/PT3.00/HT4.00 I 2CSH.25-10-FM013 I QISO 25-10 or DMG¹ na in (89.32 /none f na /na
| |
| ( LINE¹ 2CSH-012-46-1 NTS: 2,12 iNS / na /na I I INTEG ATT JB-K J na f SUR/PT3.00/HT4.00 f 2CSH-25-10-FM300 f QISO 25-'IO-12 or DMG¹ na in [810.20 [ID ( na /na I J
| |
| LINE¹ 2CSH-012-46-1 NTS: 2,10 (Handate) 1 J na /na I I
| |
| INTEG ATT (8-K [ na ] SUR/PT3.00/HT4.00 2CSH-25-10-FM301 f QISO 25-10-12 or DMG¹ na in )810.20 ]ID )
| |
| na /na I f LINE¹ 2CSH-012-46-1 NTS: 2,10 /Handatef 1 / na /na I I ELB/PIPE IB-J I na I VOL/UT6.02 I 2CSH-25-10-SM001 i QISO 25-10 or DMG¹ na in /89.11 ]none f SUR/PT3.00/HT4.00 f NHP2-12-.844-CS ( LINE¹ 2CSH-012-15-1 NTS: 1,4 /NS I ELB/PIPE IB-J I na I VOL/UT6.02 I 2CSH-25-10-SM002 I QISO 25-10 or DMG¹ na in /89.11 ]none / SUR/PT3 F 00/HT4.00 (
| |
| NHP2-12-.844 CS LINE¹ 2CSH-012-15-1 NTS: I(4 /NS / 1 [ na /na I PIPE/ELB IB-J ( na (
| |
| VOL/UT6.02 2CSH-25-10-SM003 i QISO 25-10 or DMG¹ na . in /89.11 I SUR/PT /HT4 F 00
| |
| 'none I
| |
| NHP2-12-.844-CS I LINE¹ 2CSH-012-15-1 NTS: 1,4 INS I I PIPE/ELB IB-J / na / VOL/UT6.02 2CSH-25 SM006 i QISO 25-10 or DMG¹ na in /89.11 /none )
| |
| SUR/PT3.00/Hl'4.00 /
| |
| NHP2-12-.844-CS i LINE¹ 2CSH-012-15-1 NTS: 1,4 /NS 1
| |
| / na /na I PIPE/ELB IB-J f na / VOL/UT6.02 I 2CSH.25-10-SM008 I QISO 25-10 or DMG¹ na in /89.11 [none J SUR/PT3.00/HT4.00 / I NHP2-12-.688-CS I LINE¹ 2CSH-012-46-1 NTS: 2,8 JNS 1 J na/na I I I ELB/PIPE IB-J / na / VOL/UT6.02 2CSH-25-10-SM009 i QISO 25-10 or DMG¹ na in /89.11 (none ) SUR/PT3.00/HT4.00 (
| |
| NHP2 12-.688-CS LINE¹ 2CSH-012-46-1 NTS: 2,8 /NS [ na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 21 of 25 NHP2-ISI-006( REV. 'I, CH-000 SECOND TEN YEAR INSERVICE IHSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ f DESCRIPTIOH OF ITEH TO BE EXAHIHED(CATGRY [IGSCC) EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATIOH IDENTIFIER ) ITS ISO LOCATOR, COHPONENT DMG ¹, [ITEN ¹ JFREOY) EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LINE NO AND NOTES AS APPLICABLE ISELECT ]CLASS] EX3/NDE PROCEDURE ]PERIOD 3 )
| |
| I PIPE/RED IB-J [ na f VOL/UT6.02 2CSH-25-10.9810 / QISO 25-10 or DMG¹ na in /89.11 /none / SUR/PT3.00/HT4.00 /
| |
| NHP2-12-.688-CS i LINE¹ 2CSH.012-46-1 NTS: 2,8 iNS 1 / na /na I RED/PIPE IB-J [ na (
| |
| VOL/UT6.02 2CSH-25-10-Sl$ 11 i QISO 25-10 or DMG¹ na in [89.'ll [none J SUR/PT3.00/HT4.00 J NHP2-10. ~ 594-CS ] LINE¹ 2CSH.010-27-1 HTS: 8,3 [NS 1 / na /na I ELB/PIPE IB-J / na / VOL/UT6.02 I' 2CSH-25-10-9012 I QISO 25-10 or DMG¹ na in )89.11 )none (
| |
| SUR/PT3.00/HI'4.00 (
| |
| NHP2-12-.844-CS (
| |
| LINE¹ 2CSH-012-15-1 NTS: 1 4 INS / na /na I I TEE/PIPE IC-F-2 J na f VOL/UT6.02 2CSH-25-13-FM002 )
| |
| QISO 25-13 or DMG¹ na in JC5.51 ]none [ SUR/PT3.00/HT4.00 f NHP2.12-.844-CS i LINE¹ 2CSH.012-20-2 NTS: 44,1 [SD- 2 [ na /na I i PIPE/~HOV110 IC-F-2 ) na [ VOL/UT6.02 2CSH-25-13.FM003 i QISO 25-13 or DIIG¹ na in [C5.51 ilD i SUR/PT3.00/HT4.00 igc8 NHP2-10-.719-CS I LINE¹ 2CSH 010 19 2 N'IS'3 54 ISD 2 / na /na I I *HOV110/PIPE (C-F-2 I na I VOL/UT6.02 I 2CSH-25-13-FM004 i QISO 25-13 or DMG¹ na .in [C5.51 [none f SUR/PT3.00/HT4.00 [
| |
| NHP2-10-.719-CS i LINE¹ 2CSH.010-19-2 HTS: 53,54 LSD 2 / na /na I I PIPE/*HOV112 IC-F-2 J na. [ VOL/UT6.02 2CSH-25-13-FM005 i QISO 25-13 or DMG¹ na in (C5.51 )none f SUR/PT3.00/HT4.00 J NHP2-10-.719-CS LINE¹ 2CSH-010-19-2 NTS: 53'4 I SD I 2 I na/ I I PIPE/PIPE IC-F-2 [ na )
| |
| VOL/UT6.02 2CSH-25 Fl$ 16 I QISO 25-13 or DMG¹ na in )C5.51 Inone )
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-12-.844-CS [ LINE¹ 2CSH-012-20-2 NTS: 1 )none I 2 I na /na I I INTEG ATT JC-C [ na ( SUR/PT3.00/HT4.00 J 2CSH-25-13-FM306 / QISO 25-13-7 or DMG¹ na in JC3.20 )ID f na /na f LINE¹ 2CSH-010-19-2 NTS: 53,45 [Mandate/ 2 f na /na I
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 22 of 25 KNP2-ISI-006( REV. '1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAH Change date: 07/29/1999 APPEKDIX G - CSH SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAMIHEDICATGRY l IGSCCI EX1/KDE PROCEDURE IPERIOO 1 I RENARKS EXAMIHATION IDENTIFIER ITS ISO LOCATOR, COMPONENT DIIG ¹, LITEM ¹ tFREOYi EX2/HDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I INTEG ATT iC-C i na I SUR/PT3 00/MT4 F 00 I 2CSH-25-13-FM30W i QISO 25-'13-7 or DMG¹ na in iC3.20 )IO i na /na na i LINE¹ 2CSH-010-19-2 NTS: 53,45 /Mandated' J na /na I
| |
| ( PIPE/ELB ic-F-2 i na ] VOL/UT6.02 2CSH-25-13-SM001 i QISO 25-13 or DUG¹ na in iC5.51 inone i SUR/PT3.00/MTC.OO i NNP2-12-.844.CS I LINE¹ 2CSH-012-20-2 HTS: 1,50 ISD 2 i na /na I I ELB/PIPE IC-F-2 t na i VOL/UT6.02 2CSH.25-13.SN002 i QISO 25-13 or DIJG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 L HNP2-12..844-CS I LINE¹ 2CSH-012-20.2 NTS: 1,50 ISO 2 ) na /na I i PIPE/ELB IC-F-2 i na i VOL/UT6.02 2CSH-25-13.SM003 I QISO 25-13 or DUG¹ na in iC5.51 LID i SUR/PT3.00/MT4.00 igc8, NNP2-12-.844-CS I LINE¹ 2CSH-012-20-2 NTS: 1,50 ISD 2 i na /na I REO/PIPE IC-F-2 i na ) VOL/UT6.02 2CSH-25-13-SN006 I QISO 25-13 or D'IIG¹ na in iC5.51 inone (
| |
| SUR/PT3.00/MT4.00 i NNP2-10-.719-CS I LINE¹ 2CSH-010.19-2 NTS: 52,53 ISD 2 i na/na I I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2CSH-25-13-SU017 i QISO 25-13 or DUG¹ na . in iC5.51 inone i SUR/PT3.00/MT4.00 i KNP2-12-.844-CS I LINE¹ 2CSH-012-20.2 NTS: 1,50 I 2 J na /na I PIPE/RED IC-F-2 I na i VOL/UT6.02 I 2CSH-25-13-SN018 I QISO 25-13 or DIIG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 t NNP2-12-.844-CS i LINE¹ 2CSH-012-20-2 NTS: 1,52 LSD 2 i na /na I I TEE/PIPE IC-F-2 t na i VOL/UT6.02 2CSH-25-17-FN001 t QISO 25-17 or DUG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i HNP2-12-.84C-CS I LINE¹ CSH 012 5 2 NTS 48i1 I 2 / na /na I PIPE/PIPE IC-F-2 i na i VOL/UT6.02 2CSH-25-17-FM002 I QISO 25-17 or DlJG¹ na in iC5.51 inone i SUR/PT3.00/MTC.OO i KNP2-12-.844-CS I LIKE¹ 2CSH 012-5-2 HTS: 1 Inone 2 i na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 23 of 25 NHP2-ISI-006, REV. 1( CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTIOH OF ITEH To BE EXAHIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 REHARKS EXAHINATION IDENTIFIER I ITS ISO LOCATOR, COHPONENT D'MG ¹, IITEH ¹ IFREOYI EX2/NDE PROCEDURE IPERIOO 2 USE CAL BLK ¹ I LINE No'ND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/ELB IC-F-2 I na I VOL'/UT6.02 2CSH-25-17-FMOI53 I QISO 25-17 or DMG¹ na in IC5 ~ 51 Inone I SUR/PT3.00/HT4.00 I NHP2-12-.844-CS I LINE¹ 2CSH 012 5 2 NT ' 50 I 2 I na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2CSH.25-17.SM001 I QISO 25-17 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-12-.844-CS I LINE¹ 2CSH-012-5-2 NTS: 1,50 ISD 2 I na /na I I PIPE/ELB IC-F-2 I na I VOL/uT6.02 2CSH-25-17.SM002 I QISO 25-17 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NMP2 12-.844-CS LINE¹ 2CSH-012-5-2 NTS: 1,50 ISD 2 I na /na I I PIPE/PIPE IC-F-2 I na I voL/ul'6.02 2CSH-25-17-SM003 I QISO 2S-17 or DMG¹ na in ICS.S1 Inone I SUR/PT3.00/HT4.00 I NMP2-12-.844.CS I LINE¹ 2CSH.012.5-2 NTS: 'I Inone 2 I na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2CSH-25-18-FM001 I QISO 25-18 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2.12-.844-CS I LINE¹ 2CSH.012-5-2 NTS: 50(1 Iso 2 I na /na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2CSH-25-18-FM002 I QISO 25-18 or DMG¹ na . in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-12-.844-CS I LINE¹ 2CSH-012-5-2 NTS: 50,1 ISD 2 I na/na I I PIPE/PIPE IC-F-2 I na I VOL/uT6.O2 2CSH-25-18-FM003 I QISO 25-18 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/Hl'4.00 I NHP2-12-.84C-CS I LINE¹ 2CSH.012-5-2 NTS: 1 Inone I 2 I na/na I I PIPE/PIPE IC-F-2 I na I VOL/UT6.02 2CSH-25-18-FM004 I QISO 25-18 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 NHP2-12-.84C-CS I LINE¹ 2CSH-012.5.2 NTS: 1 Inone 2 I na /na I I ELB/PIPE IC-F-2 I na I voL/UT6.o2 2CSH-25-18-FM005 I QISO 25-18 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I HHP2-12-.844-CS I LINE¹ 2CSH-012-5-2 NTS: 50,1 ISD 2 I na /na
| |
| | |
| NIAGARA NOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 24 of 25 NHP2-ISI-006, REV. 1( CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ i DESCRIPTION OF ITEN TO BE EXAHIHEOiCATGRY i IGSCCi EX1/HDE PROCEDURE iPERIOD 1 REMARKS EXANINATION IDENI'IFIER J ITS ISO LOCATOR, COHPONENT DMG ¹, ]ITEN ¹ JFREQYJ EX2/HDE PROCEDURE ]PERIOD 2 J USE CAL BLK ¹ I LINE NO AHD NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I PIPE/ELB IC-F-2 / VOL/UT6.O2 2CSH-25-18-FM006 [ QISO 25-18 or DMG¹ na in /C5.51 /none / SUR/PT3.00/HT4.00 /
| |
| NHP2-12-.844-CS i LINE¹ 2CSH-012-5-2 NTS: 50,1 /SO 2 / na /na I PIPE/ELB IC-F-2 / na )
| |
| VOL/UT6.O2 2CSH-25-18-FM007 [ QISO 25-18 or DWG¹ na in [C5.51 /none / SUR/PT3.00/NT4.00 /
| |
| NHP2-12-.844-CS I LIHE¹ 2CSH 012 5 2 HTS'0 1 ISD 2 / na /na I I PIPE/~NOV111 IC-F-2 I na I VOL/UT6 02 I 2CSH-25-18-FM008 I QISO 25-18 or DMG¹ na in )C5.51 )none (
| |
| SUR/PT3.00/HT4.00 NHP2-12-.844-CS I LINE 2CSH 012 5 ? HTS'i55 ISD ~
| |
| 2 J na /na I I INTEG ATT IC-C I na I SUR/PT3.00/HT4.00 I 2CSH-25-18-FW300 [ QISO 25-18-8 or DWG¹ na in /C3.20 /ID / na /na ( Sc10
| |
| / LINE¹ 2CSH-012-5-2 NTS: 1,45 JHandate) 2 / na /na I I INTEG ATT [C-C ] na f SUR/PT3.00/HT4.00 I 2CSH-25-18-FW301 / QISO 25-18-8 or DWG¹ na in JC3.20 ]ID / na /na i Sci0 f LINE¹ 2CSH-012-5-2 NTS: 1,45 JHandate) 2 f na /na I I ELB/PIPE IC-F-2 J na J VOL/UT6.O2 2CSH-25-18-FMSM010 i QISO 25-18 or DMG¹ na. in [C5.51 ]none f SUR/PT3.00/NT4.00 J HHP2-12-.844-CS I LINE¹ 2CSH 012 5 2 H'IS' 1 ISD 2 f na /na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2CSH-25-18-SM001 I QI 2518 or DMG¹ na in /C5.51 )none f SUR/PT3.00/HT4.00 /
| |
| HHP2-12-.844-CS I LINE¹ 2CSH-012-5-2 HTS: 50(1 ISD 2 f na /na I I PIPE/ELB IC-F-2 / na / VOL/UT6.O2 2CSH-25-18-S'M003 i QISO 25-18 or DMG¹ na in /C5.51 /none / SUR/PT3.00/NT4.00 /
| |
| NHP2-12-.844-CS I LINE 2CSH 01 2 HTS )SD 2 / na /na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2CSH-25-18-SM004 [ QISO 25-18 or DMG¹ na in /C5.51 )none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-12-.844-CS I LINE¹ 2CSH-012-5-2 NTS: 50,1 ISD 2 / na /na
| |
| | |
| NIAGARA HOHAMK PONER CORPORATIOH - NILE POINT NUCLEAR STATION - UNIT 2 25 of 25 NHP2-ISI-006( REV. 1I CH-OOO SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED DESCRIPTION OF ITEN TO BE EXANINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS
| |
| (
| |
| EXAHINATION IDENTIFIER I ITS ISO LOCATOR'OHPOHENT DllG ¹i I ITEN ¹ IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I ELB/PIPE /C-F-2 / na / VOL/UT6.02 I 2CSH-25-18-SM005 / QISO 25-18 or DWG¹ na in /C5.51 /none / SUR/PT3.00/HT4.00 / I NHP2-12-.844-CS / LINE¹ 2CSH-012-5-2 HTS: 50,1 /SD ) 2 ) na /na I I ELB/PIPE /C-F-2 / na / VOL/UT6.02 I 2CSH-25-18-SM007 i Ql SO 25-18 or DllG¹ na in (C5.51 (
| |
| ID (
| |
| SUR/PT3.00/HT4.00 (Sc8 NHP2-12-.844-CS f LIHE¹ 2CSH-012-5-2 HTS: 50,1 /SD f 2 ) na /na I I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I I 2CSH-25-18-SN008 [ QI SO 25-18 or DllG¹ na in )C5.51 /none f SUR/PT3.00/HT4.00 J I NHP2-12-.844-CS [ LIHE¹ 2CSH.012-5-2 NTS: 50,1 JSD f 2 f na /na I I I ELB/PIPE [C-F-2 / na / VOL/UT6.02 I 2CSH-25-18.SW009 I QISO 25-18 or DNG¹ na in /C5.51 /none J SUR/Pl'3.00/HT4.00 /
| |
| NHP2-12-.844-CS I LINE¹ 2CSH-012-5-2 NTS: 50,1 ISD I 2 I na /na I I END OF SYSTEH CSH
| |
| | |
| NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System: CSH General Notes
| |
| : 1. 12" SCH 100 PIPE, SA-1 06B 33. 20" X14" STD REDTEE,SA-234WPB 12 SCH 80 PIPE MATERIAL,SA-108B 34. 20" STD TEE, SA-234 WPB
| |
| : 3. 10" SCH 80 PIPE MATERIAL,SA-106B 35. 20 15% WNF, SA-105
| |
| : 4. 12 SCH 100 PIPE FITTINGS, SA-234 WPB 36. 20" EXT RING, SA-516 GR 70
| |
| : 5. 'AOV108- BODY, SA-216 WCB 37. 24 X 20" STD ECC REDUCER, SA-234 WPB
| |
| : 6. 'HCV120- BODY, SA-105 38. 24" 19% WN FLANGE, SA-105
| |
| : 7. PENETRATION Z-14, SA408 CL 1 39. 16" 90% WNF, SA-105
| |
| : 8. 12" SCH 80 PIPE FITTINGS, SA-234 WPB 40. 16 SCH 100 PIPE, SA-106 GRB
| |
| : 9. N-16 NOZ SEE, SA-508 CL2 41. 16 SCH 100 ELBOW, SA-234 WPB
| |
| : 10. PLATE MATERIAL,SA416 GR 70 42. 16" CHECKVALVE,SA-216WCB
| |
| : 11. MOV107- BODY, SA-216 WCB 43. 1-1/2" PLATE, SA416 GR65
| |
| : 12. 12" X2 SCH 160 WELDOLET, SA-105 44. 16" X 17 SCH 100 RED TEE, SA-234 WPB
| |
| : 13. 20,1 DIAMETER STUDS AND NUTS 45. 1" PlATE, SA415 GR 65
| |
| : 14. 14" GATE VALVE,SA-216 WCB 46. 12 SCH160PIPE
| |
| : 15. 14" STD PIPE, SA-106 GRB 47. 12" SCH 120 PIPE
| |
| : 16. 14" STD ELBOW. SA-234 WPB 48. 16 X12 SCH100CONC RED,SA-234WPB
| |
| : 17. 14" CHECK VALVE,SA-105 49. 12 90& WNF, SA-105
| |
| : 18. 20" X 14" STD REDUCING TEE, SA-234 WPB 50. 12 SCH 100 ELBOW, SA-234 WPB
| |
| : 19. 20 15'N FLANGE, SA-182 F304 51. 17 GATE VALVE,SA-216 WCB 20" SCH 100 PIPE, SA412TP 304W 52. 17 X 10" SCH 100 CONC RED, SA-234 WPB
| |
| : 21. 20" STD PIPE, SAD12 WP 304 W 53. 10" SCH 100 PIPE, SA-106 GRB 20" STD ELBOW, SA~ WP 304 W 54. 10 GLOBE VALVE,SA-216 WCB 20 STD PIPE (PENETRATION) SA412TP 304 W 55. 12" GLOBE VALVE,SA-216 WCB
| |
| : 24. 3/4 PLATE, SA-240 TP 304 56. 24" X 3/4" WALLPIPE, SA416 GR 70 3/4" PLATE, SA437 CL 2 57. HEAD SHELL 1-1/2" PLATE, SA416 GR 70 20" X 18" STD CONC REDUCER, SA 403 WP 304 W 58. 16" X 1-1/2" WALLPIPE, SA416 GR 70
| |
| : 27. 18 STD PIPE SA-106 GRB 59. HEAD COVER, SA-105
| |
| : 28. 18" GATE VALVE,SA-216 WCB 60. HEAD FLANGE, SA-105 20 X 18" CONC RED, SA-234WPB 61. BARREL FLANGE, SA-105 20" STD PIPE, SA-106 GRB 62. BARREL SHELL 1/2" PLATE, SA416 GR70
| |
| : 31. 20" STD ELBOW, SA-234 WPB 63. DISHED HEAD 4-7/16" MIN PLT, SA416 GR 70
| |
| : 32. 20 STD CHECK VALVE,SA-105 64. SUPPORT RING 1-1/Z PLT, SAN16 GR 70
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 1 of 20 HHP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REO ) DESCRIPTION OF ITEN TO BE EXAHIHED]CATGRY J IGSCC) EX1/NDE PROCEDURE [PERIOD 1 REMARKS EXAHIHATION IDENI'IFIER ( ITS ISO LOCATOR, COHPONEHT DllG ¹, ]ITEN ¹ [FREQYJ EX2/NDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ I LINE NO AHD NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I
| |
| <<AOV101 BLTG IB G 2 I na I VT1/VT2.01 Sc7 2CSL*AOV101, VB502 t QISO 26-05 or DWG¹ 003 in (87.70 ]ID ] na /na I
| |
| / LINE¹ 2CSL-012-4-1 HTS: (none) /Grp Rep/ 1 / na /na I I
| |
| *AOV101 INT SUR ]8-H-2 f na ] VT3/VT2.01 /<< [<< Examine shen dissassemble for maintenance 2CSL<<AOV101, VBY103 ] QISO 26-05 or DMG¹ 003 in (812.50 (DisG [ na /na
| |
| / LINE¹ 2CSL-012-4-1 NTS: 5 (Grp Rept 1 f na /na I RED/*FV114 /C-F-2 / na / na /na 2CSL*FV114, VWFV114-A I QISO 26-03 or DWG¹ 001 in [C5.51 (none )
| |
| na /na f LINE¹ 2CSL-010-8-2 NTS: 42,43 (SD J 2 J na /na I
| |
| *Fv'I14/RED /C-F-2 / na na /na 2CSL<<FV114,VWFV114-8 .i QISO 26-03 or DWG¹ 001 in JC5.51 [none f na /na na I LIHE¹ 2CSL-010-8-2 NTS: 42,43 ISD I 2 I na /na
| |
| *HCV117 INT SUR IB.H-2 I na I VT3/VT2.01 IEX6 2CSL*HCV117, VBY104 [ QISO 26-05 or DWG¹ 008 in [812.50 (OisG [ na /na I J
| |
| LINE¹ 2CSL-012-4-1 NTS: 4 JGrp Rep) 1 ( na /na I
| |
| (
| |
| *HCV118 BODY(pipe)/SOF Ic-F-2 I na I SUR/PT3.00/NT4.00 I 2CSL HCVIIB,VWHCVI18 8 (
| |
| QISO 26-02 or DWG¹ 019. in )none (none (
| |
| na / I na J LINE¹ 2CSL-020-32-2 NTS: 19 [na J 2 J na /na I IMC-5 / *HCV118 BODY/BEARING NECK fc-G / na SUR/PT3.00/HT4 F 00 IEX6 2CSL<<HCV118,VWKCV118.C ( QISO 26-02 or DWG¹ 019 in JC6.20 )ID na /na I na / LIHE¹ 2CSL-020-32-2 NTS: 18,20 /Grp Rep( 2 na /na I IMC-5 J
| |
| <<HCV118 BODY/BEARIHG HECK /C-G f na f SUR/PT3.00/NT4.00 JEX6 2CSL*HCV118,VWHCV118.D i QISO 26-02 or D'WG¹ 019 in )C6.20 )ID (
| |
| na /na na f LINE¹ 2CSL-020-32-2 NTS: 18,20 JGrp Rep) 2 f na /na I IWC-5 J
| |
| <<HCV118 BODY LW Jc-G ] na SUR/PT3.00/HT4.00 IEX6 2CSL'HCV118,VWHCV118-LW( QISO 26-02 or DWG¹ 019 in ]C6.20 (
| |
| ID na /na I na [ LINE¹ 2CSL-020-32-2 NTS: 18 [Grp Rep[ 2 na /na I
| |
| | |
| HIAGARA HOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 2 of 20 NNP2-ISI-006, REV. 1, CH-000 SECOND TEN 'YEAR IHSERVICE INSPECTION (ISI) INI'ERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REQ DESCRIPTION OF ITEN TO BE EXANIHED(CATGRY )IGSCC) EX1/HOE PROCEDURE (PERIOD 1 REHARKS
| |
| )
| |
| EXANINATIOH IDENTIFIER I ITS ISO LOCATOR, CONPOHEHT DMG ¹, I ITEN ¹ IFREQYI EX2/HDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE NO'ND HOTEL AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
| |
| (
| |
| 'HCV119 BODY(pipe)/SOF ]C-F-2 [ na ] SUR/PT3.00/HT4.00 [
| |
| 2CSI.*HCV119,VWHCV119-A [ QISO 26-02 or DMG¹ 019 in [none (none J na /
| |
| na f LINE¹ 2CSL-020-34-2 HTS: 18,27 )na f 2 I na /na I IWC I *HCV119 BODY/BEARING NECK JC-G )
| |
| na f SUR/PT3.00/HT4.00 f 2CSL<<HCVI19(VWHCV119-C (
| |
| QISO 26.02 or DWG¹ 019 in JC6.20 (ID f na /na I AS f LIHE¹ 2CSL-020-34-2 HTS: 18,20 /Grp Repf 2 f na /na Sc11 IWC-5 (
| |
| *HCV1'19 BODY/BEARING HECK JC-G / na f SUR/PT3 ~ 00/HT4.00 f 2CSL*HCV119,VWHCVI19.D f QISO 26-02 or DMG¹ 019 in /C6.20 /ID f na /na I f LINE¹ 2CSL-020-34-2 NTS: 18,20 /Grp Rep/ 2 / na /na Sc11 IMC-5 i <<HCV119 LW JC.G J na )
| |
| SUR/PT3.00/HT4.00 J 2CSL<<HCV119,VWHCV119 LWL QISO 26-02 or DMS¹ 019 in (C6.20 JIO (
| |
| na /na I na / LINE¹ 2CSL-020-34-2 NTS: 18 JGrp Rep) 2 f na /na I Sc11 I *NOV104 BLTG
| |
| )B-G-2 J na J VT1/VT2.01 I 2CSL<<HOV104, VB101 J QISO 26-05 or DWG¹ 009 in (87.70 ]ID ( na /na I f LINE¹ 2CSL-012-17-1 NTS: 8 JGrp Rep) 1 f na /na iSc10
| |
| <<NOV104 INT SUR /B.N-2 / na f VT3/VT2.01 /<< )<< Examine Ken dissassemble for maintenance 2CSL<<NOVI 04, VBY105 f QISO 26-05 or DWG¹ 009.in /812.50 (DisG f na /na
| |
| ) LINE¹ 2CSL-012-17-1 NTS: 4 ]Grp Rep[ 1 (
| |
| na /na
| |
| )
| |
| <<NOV112 BODY(pipe)/SOF fC-F-2 [ na ( SUR/PT3.00/HT4.00 f 2CSL<<HOVI12,VWNOV112-B i QISO 26.01 or DUG¹ 020 in [none [none f na /
| |
| f LINE¹ 2CSL-020-1-2 NTS: 18,19 )na ) 2 f na /na I IMC-5 f <<HOV112 BODY/BEARING HECK )C-G ] na J SUR/PT3.00/NT4.00 J 2CSL<<HOV112,VWNOVI12-C ] QISO 26.01 or DWG¹ 020 in [C6.20 [ID [ na /na Sc9 AS J LINE¹ 2CSL-020-1-2 NTS: 18,20 JGrp Rep) 2 f na /na I IWC-5 I *HOV112 BODY/BEARIHG HECK IC G I na I SUR/PT3 00/NT I 2CSL*HOV112, VWNOV112. D I QISO 26.01 or DMG¹ 020 in JC6.20 [ID ] na /na ] Sc9
| |
| / LINE¹ 2CSL-020-1-2 NTS: 18,20 /Grp Rep/ 2 / na /na j
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 E 3of 20 NHP2-ISI-006I REV. 1, CN.OOO SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEH (sorted by Examination Identifier) 2NO INTVL REL RED )
| |
| DESCRIPTION OF ITEM TO BE EXAHINEDJCATGRY (IGSCC) EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENTIFIER J ITS ISO LOCATOR, COHPONENT DMG ¹, [ITEH ¹ [FREOY( EX2/NDE PROCEDURE (PERIOD 2 USE CAL BLK ¹ f LINE NO. AND NOTES, AS APPLICABLE ]SELECT ]CLASS( EX3/NDE PROCEDURE ]PERIOD 3 [
| |
| luc 5 I <<HOV112 BODY LM Ic-G I na I SUR/PT3.00/HT4 F 00 I 2CSL<<HOvi12,vuHOv112-LM) Qlso 26-01 or DMG¹ 020 in IC6.20 IID I na /na I Sc9 na I LINE¹ 2CSL-020-1-2 NTS: 18 IGrp Repl 2 I na /na I I
| |
| *P1 BLTG Jc-D na VOL/UT6.04
| |
| / f I 2CSL*P1, PPB100 I QISO 26- or DMG¹ 027 in JC4 ~ 30 /10 f / Sc9 NHP2-2.25-10.STUD / LINE¹ 2CSL-020-na-2 NTS: (none) /Handate/ 2 [ / I
| |
| (
| |
| *Pl PIPE/MNF Ic-F-2 I na I VOL/RT5.00/UT6.02 I 2CSL*P1,PM300 I QISO 26.03 or DMG¹ 027 in (C5.51 [none )
| |
| SUR/PT3.00/Hl'4.00 )
| |
| NHP2-16..375-CS J LINE¹ 2CSL-016-na-2 NTS: 47,33 JSD [ 2 J na /na I I
| |
| *P1 ND/PIPE Jc-F-2 f na ( SUR/PT3.00/HT4.00 (
| |
| 2CSL*P1,PM301 i QISO 26-03 or DUG¹ 027 in )C5.81 (none ( na / I na f LINE¹ 2CSL-016-na-2 NTS: 46,47 /TE f 2 t na /na I I
| |
| *Pl HD COVER/SNL Ic G I na I SUR/PT3.00/HT4.00 I 2CSL<<P1,PM306 i QISONA or DMG¹ 027 in [C6.10 ]ID (
| |
| na /na Sc9
| |
| ( LINN 2CSL-020-1-2 NTS: 46,48 JHandate[ 2 f na /na I
| |
| (
| |
| <<Pl MNF/PIPE Ic-F-2 I na I VOL/RT5 F 00/UT6.02 I 2CSL*P1,PM308 / QISO 26-02 or DMG¹ 027. in /C5.51 /none / SUR/PT3.00/Hl'4.00 /
| |
| NHP2-RNS-.75-CS / LINE¹ 2CSL-024-na-2 NTS: 32 45 /SD / 2 / na /na I *P1 PIPE/ND Ic-F-2 I na I SUR/PT3.00/HT4.00 I 2csL*P1,Pu309 I QISO 26-02 or DMG¹ 027 in (C5.81 (none J na / I
| |
| ( LINE¹ 2CSL-024-na-2 NTS: 45,46 JTE f 2 f na /na I I
| |
| <<P1 HD/FLG fc-G [ na ] SUR/PT3.00/HT4.00 J 2CSL*P1, PM310 [ cilISONA or DUG¹ 027 in JC6.10 ]ID ( na /na (
| |
| Sc9 J
| |
| LINE¹ 2CSL-020-1-2 NTS: 46,50 JHandate) 2 [ na /na I IMC-1 I
| |
| *P1 UPR BARREL SHL/FLG fc G ( na f SUR/P'T3.00/H'T4.00 (<< (<< Examine Ken dissassemble for maintenance 2CSL*P1, PM31'I I QISO 26- or DMG¹ 027 in /C6.10 ]ID f na /na /<<
| |
| f LINE¹ 2CSL-020-1-2 NTS: 50,51 JHandatef 2 ] na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 E 4 of 20 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REO ) DESCRIPTION OF ITEM TO BE EXAHINED(CATGRY )IGSCC( EX1/NDE PROCEDURE iPERIOD 1 REHARKS EXAHINATION IDENTIFIER ] ITS ISO LOCATOR, COHPONEN'I D'MG ¹, ]ITEN ¹ JFREQYJ EX2/NDE PROCEDURE /PERIOD 2 i USE CAL BLK ¹ J LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSi EX3/NDE PROCEDURE /PERIOD 3 IMC-1 I
| |
| <<P1 LMR BARREL SHL/ND [C-G ( na SUR/PT3.00/HT4.00 J>> Examine when dissassemble for maintenance 2CSL<<P1, Pl612 / QISO 26- or DMG¹ 027 in /C6.10 /ID na /na />> I i LINE¹ 2CSL-016-3-2 NTS: 51,52 (Handate( 2 na /na J>> I
| |
| <<P1 HD LM na /HT4 00
| |
| [ IC G I I SUR/PT3 I 2CS L*P1, PM314 / QISONA or DMG¹ 027 in /C6.10 /ID / na /na Sc9
| |
| [ LINE¹ 2CSL-020.1-2 Hl'S: 46 (Handate( 2 (
| |
| na /na I IMC-1 I
| |
| *P1 UPR BARREL SNL LM /C-G / na SUR/PT3.00/HT4.00 (>> Examine when dissassemble for maintenance 2CSL*P1, PM315 I QISO 26- or DMG¹ 027 in /C6.10 /ID na /na /<< I
| |
| / LINE¹ 2CSL-020-1-2 NTS: 5'I /Handate/ 2 na /na I IMC-1 <<P1 UPR BARREL SHL/LMR SHL /C-G f na SUR/PT3.00/HI'4.00 />> )>> Examine when dissassemble for maintenance 2CSL*P1, PM316 QISO 26- or DMG¹ 027 in (C6.10 (ID na /na />> I LINE¹ 2CSL-020.na-2 NTS: 51 JHandate( 2 na /na />> I
| |
| *P1 LM (C-F-2 na VOL/UI'6.02
| |
| / f 2CSL*P1, PM317 I QISO 26- or DMG¹ 027 in /C5.52 /none J SUR/PT3.00/HT4.00 /
| |
| NHP2-RHS-.75-CS / LINE¹ 2CSL-020.1-2 NTS: 45 /AL J 2 / na /na I IMC-1 *P1 BARREL SHL PIN/HD fC-C J na SUR/PT3.00/HT4.00 />> J>> Examine when dissassemb(e for maintenance 2CSL<<P1,PM319 / QISO 26- or DMG¹ 027. in /C3.30 /ID na /na />> I
| |
| / LIHE¹ 2CSL-020-na-2 NTS: 52,53 /Handate/ 2 na /na /<< I i MNF/EXT RING (C-F-2 / na [ VOL/UT6.02 2CSL<<STRT1,STRTMELD004Ai QISO 26-02 or DMG¹ 030 in [C5.51 ]none f SUR/PT3.00/HT4.00 NHP2-20-.375-CS I LINE¹ 2CSL-020 1-2 NTS: 21,30 ISD I 2 I na /na I EXT RING/TEE IC-F-2 I na I VOL/UT6.02 2CSL<<STRTI,STRTMELD004Bi QISO 26-02 or O'MG¹ 030 in (C5.51 )none ) SUR/PT3.00/HT4.00 NHP2-18-.375-CS f LINE¹ 2CSL-020-1-2 NTS: 28,29 JSD f 2 / na /na
| |
| (
| |
| *V121 BODY(pipe)/SOF JC-F-2 / na SUR/PT3.00/HT4.00 /
| |
| 2CSL<<V121, VMV121-B i QISO 26.01 or DMG¹ 057 in (none ]none ( na / I
| |
| ( LINE¹ 2CSI.-020-1-2 NTS: 18,19 dna f 2 na /na I
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 5 of 20 NMP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEM (sorted by Examination Identifier) 2HD INTVL REL RED (
| |
| DESCRIPTIOH OF ITEM TO BE EXAMINEDJCATGRY (IGSCC[ EX1/NDE PROCEDURE [PERIOD 1 REMARKS EXAMINATION IDENTIFIER J ITS ISO LOCATOR, COMPONENT D'WG ¹, ]ITEM ¹ JFREOYJ EX2/HDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ / LIHE HO. AHD NOTES, AS APPLICABLE ]SELECT )CLASS] EX3/HDE PROCEDURE [PERIOD 3 I WC-5 f
| |
| *V121 BODY/BEARING NECK JC-G ] na f SUR/PT3.00/MT4.00 ]
| |
| 2CSL*V121, VWV121-C i QISO 26.01 or DWG¹ 057 in JC6.20 )ID ] na /na J
| |
| LINE¹ 2CSL-020-1-2 NTS: 18,20 IGrp Repl 2 I na /na Sc11
| |
| [ *V121 BODY/BEARING NECK [C-G J na (
| |
| SUR/PT3.00/Ml'4.00 (
| |
| 2CSL*V121, VllV121-D I QISO 26-01 or DWG¹ 057 in (C6.20 ]ID J na /na na [ LINE¹ 2CSL-020-1-2 NTS: 18,20 JGrp Rep) 2 J na /na Sc11 IllC-5 f
| |
| *V121 BODY L'W JC-G ] na f SUR/PT3.00/MT4.00 J
| |
| [NOTE NAME CHANGE: Called VBW121-LW in 1st Interval Plan 2CSL*V121, VWV121. LW i QISO 26.01 or DWG¹ 057 in JC6.20 [ID / na /na I I J
| |
| LINE¹ 2CSL-020-1-2 NTS: 18 ]Grp Repf 2 / na /na I Sc11 I
| |
| ]
| |
| PIPE/*MOV112 /C-F-2 / na / VOL/UT6.02 2CSL-26-01-FW004 [ QISO 26-01 or DWG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/MT4.00 (
| |
| NMP2-20-.375-CS / LINE¹ 2CSL-020-1-2 HTS: 18,22 /SD / 2 / na /na I PIPE/ELB [C-F-2 ) na J VOL/Ul'6.02 2CSL-26.01-FW008 i QISO 26-01 or DWG¹ na in )C5.51 (none ] SUR/PT3.00/MT4.00 )
| |
| HMP2-20-.375-CS )
| |
| LINE¹ 2CSL-020-1-2 NTS: 22,23 )SD ( 2 ] na /na I
| |
| (
| |
| WHF/PIPE JC-F-2 f na f VOL/UT6.02 2CSL-26-01-FW009 I QISO 26-01 or DWG¹ na in JC5.51 ]none [ SUR/PT3.00/MT4.00 (
| |
| HMP2-20-.375-CS LINE¹ 2CSL-020-1-2 HTS: 21,22 JSD f 2 [ na /na I ELB/PIPE JC-F-2 J na f VOL/UT6.02 2CSL-26-01-Fl$ 15 i QISO 26.01 or DWG¹ na in ]C5.51 ]none )
| |
| SUR/PT3.00/MT4.00 (
| |
| NMP2-20-.375-CS / LINE¹ 2CSL-020-1-2 NTS: 22,23 /SD / 2 / na /na I PIPE/PIPE IC-F-2 I na I VOL/UT6.02 I 2CSL-26-01-FW016 I QISO 26-01 or DWG¹ na in (C5.51 [none )
| |
| SUR/PT3.00/MT4.00 )
| |
| NMP2-20-.375-CS f LIHE¹ 2CSL-020-'1-2 NTS: 22 ]none f 2 f na /na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2CSL-26-01-FW022 I QISO 26.01 or DWG¹ na in JC5.51 [none [ SUR/PT3.00/MT4.00 HMP2-20-.375-CS J LINE¹ 2CSL-020-'l-2 HTS: 22,23 ]SD J 2 [ na /na
| |
| | |
| NIAGARA NOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 6of 20 HHP2-ISI-006, REV. 1, CH-000 SECOHD TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEM (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 I REMARKS EXANIHATIOH IDENTIFIER J ITS ISO LOCATOR, COHPOHEHT DMG ¹, ]ITEN ¹ JFREQYJ EX2/HDE PROCEDURE ]PERIOD 2 )
| |
| USE CAL BLK ¹ f LIHE HO. AND NOTES, AS APPLICABLE ]SELECT )CLASS] EX3/HDE PROCEDURE ]PERIOD 3 IMC-2r1 I PIPE/ELB IC-F-1 / na / VOL/UT6.03 [ Inacc 2CSL-26 01-FW026 I QISO 26-01 or DWG¹ na in (C5.11 ERR / SUR/PT3.00 I NHP2-20-.375-SS I LINE¹ 2CSL-020-2-2 HTS'4 15 INS 2 /na/ I IWC-2r1 I WNF/PIPE IC-F-1 (
| |
| na )
| |
| VOL/UT6.03 ]Inacc 2CSL-26.01-FM027 I QISO 26 01 or DWG¹ na in (C5.11 IRR I SUR/PT3.00 I NMP2-20-.375-SS I LIHE¹ 2CSL-020-2-2 HTS: 11,12 INS ~
| |
| 2 ina/ I IWC-2rl I ELB/PENET Z15 IC-F-1 ] na [ VOL/UT6.03 finacc 2CSL-26.01-FI$ 28 i QISO 26-01 or DWG¹ na in )C5.11 ERR )
| |
| SUR/PT3.00 I HHP2-20..375-SS I LINE¹ 2CSL-020-2-2 NTS: 15(14 INS 2 /na/ I I 215/PIPE (C-F-I J na J VOL/UT6.03 I 2CSL-26-01-FW029 I QI 26 01 or DWG¹ na in JC5.11 ]ID f SUR/PT3.00 I HNP2.20-.375-SS f LINE¹ 2CSL-020-64-2 NTS: 12,14 (7.5XNin) 2 f na / iSc10 PIPE/~VI21 IC F-1 [ na )
| |
| VOL/UT6.13 I 2CSL-26-01-FW030 I Ql 26 01 or DWG¹ na in (C5.11 (ID (
| |
| SUR/PT3.00 I HNP2-20..375-SS f LINE¹ 2CSL-020-64-2 HTS: 12,18 )7.5XHIn) 2 J na / )Solo I PIPE/PIPE IC-F-2 J na J VOL/UT6.02 2CSL-26.01-FW032 i QISO 26-01 or DWG¹ na . in [C5.51 ]none f SUR/PT3 F 00/HT4.00 ]
| |
| HNP2-20-.375-CS )
| |
| LINE¹ 2CSL-020-1-2 HTS: 22 )none [ 2 ~
| |
| na /na
| |
| [ WNF/PIPE IC-F-2 f na ] VOL/UT6.02 2CSL-26-01-FW033 i QISO 26-01 or DMG¹ na in (C5.51 ]ID f SUR/PT3.00/HT4.00 JSc8 NHP2-20-.375-CS I LINE¹ 2CSL-020-1-2 NTS: 21(22 I SD 2 / na /na I'WC-2r1 I PIPE/PIPE IC-F-1 I na I VOL/UT6.03 (Inacc 2CSL-26-01-FW035 i QISO 26-01 or DMG¹ na in [C5.11 IRR I SUR/PT3.00 I HHP2-20-.375-SS i LINE¹ 2CSL-020.2-2 HTS: 12,14 iHS 2 /na/ I I PIPE/PIPE IC-F-2 )
| |
| na (
| |
| VOL/UT6.02 2CSL-26.01-FM036 i QISO 26-01 or DWG¹ na in )C5.51 ]none J SUR/PT3.00/NT4.00 )
| |
| NNP2-20-.375-CS J LINE¹ 2CSL-020-1-2 HTS: 22 )none 2 / na /na I
| |
| | |
| /
| |
| NIAGARA NOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 7 of 20 NNP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEN (sorted by Examination Identifier) 2HD IHTVL REL RED DESCRIPTIOH OF ITEN TO BE EXAMINED)CATGRY )IGSCC) EX1/NDE PROCEDURE )PERIOD 1 RENARKS
| |
| )
| |
| EXANIHATIOH IDENIIFIER I ITS ISO LOCATOR'ONPONEHT DMG ¹i )ITEN ¹ IFREQYI EX2/NDE PROCEDURE )PERIOD 2 I USE CAL BLK ¹ ) LINE NO. AND NOTES, AS APPLICABLE )SELECT )CLASS) EX3/HDE PROCEDURE )PERIOD 3 )
| |
| IWC-3 I INTEG ATT )C-C )
| |
| na )
| |
| SUR/(inaccessible))lnacc 2CSL-26.01-FM313 )
| |
| QISO 26-01-12 or DWG¹ na in )C3.20 IRR na /na I
| |
| )
| |
| LINE¹ 2CSL-020-2-2 NTS: 12,13 )HS 2 )
| |
| na /na I IMC-3 I IHTEG ATT )C-C )
| |
| na SUR/(inaccessible)) Inacc 2CSL-26.01-FM314 I QISO 26-01-12 or DMG¹ na in IC3.20 IRR ) na /na I
| |
| ) LINE¹ 2CSL-020-2-2 NTS: 12,13 )HS 2 ) na /na I
| |
| )
| |
| LM Ic-F-1 ) na )
| |
| VOL/UT6.03 )Inacc 2CSL-26-01-LW01 )
| |
| QISO 26-01 or DMG¹ na in )C5.12 )RR I SUR/PT3.00 I HNP2-20..375-SS I LINE¹ 2CSL-020-2-2 NTS: 12 INS 2 ) na/ I
| |
| )
| |
| LW Ic-F-1 )
| |
| na )
| |
| VOL/UT6.03 ) Inacc 2CSL-26-01-LM02 )
| |
| QISO 26-01 or DWG¹ na in )C5.12 )RR I SUR/PT3.00 I HNP2-20-.375-SS LINE¹ 2CSL-020-2-2 HTS: 14 )NS 2 )
| |
| na/ I L'M IR - -1 na VOL/UT6.03 )lnacc I IC F ) )
| |
| 2CSL-26-01-LM03 I QI 26 01 or DWG¹ na in )C5 ~ 12 IRR I SUR/PT3.00 I HNP2-20-.375-SS )
| |
| LINE¹ 2CSL-020-2-2 N'IS: 15 )HS 2 )
| |
| na/ I
| |
| )
| |
| LM OR Ic-F-1 )
| |
| na ) VOL/UT6.03 )lnacc 2CSL-26-01-LW04 )
| |
| QISO 26-01 or DMG¹ na in )C5.12 IRR I SUR/PT3.00 I HNP2-20-.375-SS I LINE¹ CSL 020 2 2 NTS' INS I 2 )
| |
| na /na I
| |
| )
| |
| LM assoc w/fr@28 B, FM029 )C-F-1 )
| |
| na I VOL/UT6.03 ) I 2CSL-26-01-LM05 )
| |
| QISO 26-01 or DMG¹ na in )C5.12 )ID I SUR/PT3.00 I I NNP2-20-.375-SS I LINE¹ 2CSL-020.2-2 NTS: 14 IAL 2 )
| |
| na /na )
| |
| Sc10
| |
| )
| |
| LM assoc w/FW029 8, FW030 )C-F-1 )
| |
| na I VOL/UT6.03 I 2CSL-26-01-LW06 I QI 2601 or DMG¹ na in )C5.12 )ID I SUR/PT3.00 I NNP2-20-.375-SS I LINE¹ 2CSL-020-64-2 NTS: 12 IAL 2 )
| |
| na /na )
| |
| Sc10 I ELB/PIPE Ic-F-2 )
| |
| na ) VOL/UT6.02 2CSL-26-01-SM006 ) QISO 26-01 or DMG¹ na in )C5.51 )none ) SUR/PT3 F 00/NT4.00 )
| |
| NNP2-20-.375-CS I LINE¹ 2CSL-020-1-2 NTS: 22,23 ISD 2 ) na /na
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 8 of 20 NHP2-ISI-006, REV. 1( CH.OOO SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REO J DESCRIPTION OF ITEN TO BE EXAHINED[CATGRY JIGSCC] EX1/NDE PROCEDURE ]PERIOD 1 J REHARKS EXAHIHATION IDENl'IFIER f ITS ISO LOCATOR, COHPONEHT DMG ¹, ]ITEN ¹ (FREQYJ EX2/HDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I
| |
| [ PIPE/ELB IC-F-2 ] na J VOL/UT6.02 2CSL-26-01-SM007 i QISO 26-01 or DMG¹ na in [C5.51 iID i SUR/PT3.00/HT4.00 igc8 NHP2-20..375-CS i LINE¹ 2CSL-020-1-2 NTS: 22,23 iSO 2 / na /na I I ELB/PIPE IC-F-2 / na / VOL/UT6.02 2CSL-26-01-SM011 i QISO 26-01 or DMG¹ na in (C5.51 [none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-20-.375-CS I LINE¹ 2CSL-020-1-2 HTS: 22,23 ISD I 2 I na /na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2CSL-26.01-SM013 i QISO 26-01 or OMG¹ na in )C5.51 ]none f SUR/PT3.00/HT4.00 (
| |
| NHP2-20..375-CS LINE¹ 2CSL-020-1-2 NTS: 22,23 [SD I 2 I I IMC-3 I INTEG ATT PENET 215 SKOPIIELD IC-C )
| |
| na [ SUR/(inaccessible)[lnacc 2CSL-26-01-SM301 i QISO 26-01 or DMG¹ na in [C3.20 IRR I na /na I i LIHE¹ 2CSL-020-2-2 NTS: 14,16 iNS 2 f na/na I I INTEG ATT PENET Z15 SHOPMELO IC-C I na I SUR/PT3.00/HT4.00 I 2CSL-26.01-SM302 i QISO 26.01 or DMG¹ NA in (C3.20 ]ID f na /na f LINE¹ 2CSL-020.2-2 NTS: 14,17 JHandatef 2 J na /na i Sc10 I ELB/PIPE )C-F-2 [ na ] VOL/UT6.02 2CSL-26-02-FM001 (
| |
| QISO 26-02 or DMG¹ na ~ in [C5.51 [none ) SUR/PT3.00/HT4.00 (
| |
| NHP2-20-.375-SS I LINE¹ 2CSL 20 1 2 HTS'3 2 ITE 2 f na /na I ELB/PIPE IC-F-2 ] na (
| |
| VOL/UT6.02 2CSL-26-02-FII002 I QISO 26-02 or DMG¹ na in (C5.51 ]none J SUR/PT3.00/H'I4.00 J NHP2 ~ 375-CS I LINE¹ 2CSL 020.1-2 HTS: 23,24 ISO 2 ) na /na I PIPE/TEE IC-F-2 ] na [ VOL/UT6.02 2CSL-26.02-FM003 I QISO 26-02 or DMG¹ na in [C5.51 IID I SUR/PT3.00/HT4.00 ISc8 NHP2 ~ 375-CS I LINE¹ 2CSL-020-1-2 HTS: 24,26 ISO 2 [ na /na I ELB/PIPE IC-F-2 J na [ VOL/UT6.02 2CSL-26-02.FM008 I QISO 26.02 or OMG¹ na in JC5.51 (none ( SUR/PT3.00/HT4 F 00 J NHP2-20..375-CS I LIHE¹ 2CSL-020-1-2 NTS: 23,24 ISD 2 f na /na
| |
| | |
| HIAGARA HONAWK POMER CORPORATION - NILE POINT NUCLEAR STATIOH - UNIT 2 9 of 20 HHP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - CSL SYSTEH (sorted by Examination Identifier) 2ND IN'IVL REL RED ( DESCRIPTIOH OF ITEN TO BE EXANINED(CATGRY ( IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REMARKS EXAHIHATION IDENT'IFIER ( ITS ISO LOCATOR, COHPONEHT DWG ¹, (ITEM ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO AND NOTES AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I I ELB/ELB IC-F-2 (
| |
| n (
| |
| VOL/UT6.02 2CSL-26.02-FW009 (
| |
| QISO 26-02 or DWG¹ na in (C5.51 (none ( SUR/PT3.00/NT4.00 (
| |
| NHP2-20-.375-CS I LINE¹ 2CSL-020-1-2 NTS: 23 ISD 2 ( na /na I
| |
| *STRT 1/RED IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2CSL-26-02-FW011 I QISO 26-02 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| HHP2-20-.375-CS (
| |
| LINE¹ 2CSL-020-1-2 HTS: 28,30 (SD 2 (
| |
| na /na
| |
| (
| |
| PIPE/*STRT-1 IC-F-2 ( na (
| |
| VOL/UT6.02 2CSL-26.02-FM012 I QISO 26-02 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/NT4.00 (
| |
| NHP2-20-.375-CS ( LINE¹ 2CSL-020-1-2 NTS: 24,28 (SD ( 2 (
| |
| na /na
| |
| (
| |
| WNF/PIPE IC-F-2 I na I VOL/UT6.02 I 2CSL-26-02-FM013 ( QISO 26.02 or DWG¹ na in (C5.5'I (none ( SUR/PT3.00/HT4.00 (
| |
| NHP2-20-.375.CS ( LINE¹ 2CSL.020-32-2 NTS: 24,2'I (SD 2 ( na /na I RED/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 I 2CSL-26-02-FW018 ( QISO 26.02 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 ( I NHP2-24-.375-CS (
| |
| LINE¹ 2CSL-024-1.2 HTS: 30,31 ISD 2 (
| |
| na /na ( I P I PE/WNF IC-F-2 ( na ( VOL/UT6.02 I 2CSL-26.02-FM019 I QISO 26-02 or DWG¹ na ~ in (C5.51 (none ( SUR/PT3.00/HT4.00 ( I HHP2-24-.375.CS I LINE¹ 2CSL-024-1-2 HTS: 31,32 ISD 2 ( na /na I
| |
| ( ELB/PIPE IC-F-2 ( na ( VOL/UT6.02 2CSL-26-02-FW020 I QISO 26-02 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/Nl'4.00 (
| |
| NHP2.20-.375-CS LINE¹ 2CSL-020-1-2 HTS: 23,24 (SD 2 (
| |
| na /na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2CSL-26.02.SW009 ( QISO 26-02 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-20-.375-CS I LINE¹ 2CSL-020.1-2 NTS: 23,24 ISD 2 ( na /na I PIPE/ELB IC-F-2 ( na (
| |
| VOL/UT6.02 2CSL-26-02-SW010 I QISO 26.02 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/NT4.00 (
| |
| NHP2-20-.375-CS I LINE¹ 2CSL-020-1-2 HTS: 23,24 ISD 2 ( na /na
| |
| | |
| NIAGARA NOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 10 of 20 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN change date: 07/29/1999 APPENDIX G - CSL SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHIHATION IDENTIFIER ) ITS ISO LOCATOR, COHPONEHT DWG ¹, ]ITEN ¹ JFREOYJ EX2/HDE PROCEDURE ]PERIOD 2 USE CAL BLK I LINE NO AND HOTESi AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I TEE/PIPE IC-F-2 ] na )
| |
| VOL/UT6.02 2CSL-26-02-SI$ 11 ] QISO 26-02 or DWG¹ na in )C5.51 )none ] SUR/PT3.00/HT4.00 )
| |
| HHP2 ~ 375-CS (
| |
| LINE¹ 2CSL-020-1-2 NTS: 24,26 )SD 2 J na /na I I PIPE/TEE IC-F-2 f na [
| |
| VOL/UT6.02 2CSL-26-02-SW012 i QISO 26-02 or DMG¹ na in /C5.51 ]none f SUR/PT3.00/MT4.00 /
| |
| NNP2.20-.375.CS I LINE¹ 2CSL-020-32-2 NTS: 24I26 ISD 2, / na /na I I ELB/PIPE IC-F-2 [ na ] VOL/UT6.02 2CSL-26-02-SW013 ) QISO 26-02 or DWG¹ na in /C5.51 [none f SUR/PT3.00/NT4.00 f HNP2-20-.375.CS / LINE¹ 2CSL-020-32-2 HTS: 23,24 /SD 2 / na /na I I PIPE/ELB IC-F-2 ) na [ VOL/UT6.02 2CSL-26.02-SW014 i QISO 26-02 or DWG¹ na in [C5.51 [none [ SUR/PT3.00/HT4.00 (
| |
| NHP2-20-.375-CS I LINE¹ 2CSL-020-32-2 HTS: 23,24 ISD 2 ) na /na I I ELB/PIPE IC-F-2 ] na [ VOL/UT6.02 2CSL-26-02-SW015 ] QISO 26-02 or DWG¹ na in ]C5.51 Inone I SUR/PT3.00/HT4 00 I HNP2-20-.375-CS i LINE¹ 2CSL-020-1-2 HTS: 23,24 LSD 2 / na /na I I PIPE/ELB IC-F-2 I na I " L/UT6 02 I 2CSL-26.02-Sl$ 16 i QISO 26-02 or DMG¹ na ~ in )C5.51 ]none f SUR/PT3.00/Hl'4.00 /
| |
| HNP2-20-.375-CS LINE¹ 2CSL-020 1-2 NTS: 23,24 (SD 2 f na /na I
| |
| ] PIPE/ELB IC.F-2 [ na J VOL/UT6.02 2CSL-26-02-SW017 I QISO 26-02 or DWG¹ na in JC5.51 (none f SUR/PT3.00/HT4.00 J HHP2-20-.375-CS I LINE¹ 2CSL-020-1-2 HTS: 23,24 ITE 2 [ na /na I
| |
| )
| |
| PIPE/*V4 IC-F-2 [ na [ VOL/UT6.02 2CSL-26-03-FM003 ( QISO 26-03 or DWG¹ na in [C5.51 (none I SUR/PT3.00/HT4.00 I NHP2-16-.500-CS (
| |
| LINE¹ 2CSL-016-3-2 NTS: 34,35 )SD 2 f na /na I I *V4/PIPE IC-F-2 (
| |
| na ( VOL/UT6.02 2CSL-26-03-FW004 ] QISO 26-03 or DWG¹ na in [C5.51 )none ) SUR/PT3.00/HT4.00 (
| |
| NHP2-16-.500-CS I LINE¹ 2CSL-016-3-2 NTS: 34,35 ISD 2 ] na /na
| |
| | |
| NIAGARA NOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 11 of 20 NNP2-ISI-006, REV. 1, CN.OOO SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - CSL SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTIOH OF ITEN TO BE EXANINEDiCATGRY iIGSCCi EX1/HDE PROCEDURE iPERIOD 1 RENARKS EXANINATION IDENTIFIER i ITS ISO LOCATOR, CONPONEHT DWG ¹, (
| |
| ITEN ¹ iFREOYi EX2/HDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE No. AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I ELB/PIPE IC-F-2 i na i VOL/ur6.O2 2CSL-26-03-Fl$ 05 I QISO 26.03 or DWG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 i NNP2-16-.500.CS i LINE¹ 2csL-016-3-2 Nrs: 34,36 iso 2 i na /na i ELB/PIPE IC-F-2 i na t VOL/UT6.02 2CSL-26-03-FW006 I QISO 26.03 or DMG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 i NNI2-16-.500-CS I LINE¹ 2CSL-016-3-2 NTS: 34,36 ISO 2 i na /na I PIPE/ELB IC-F-2 J na i VOL/ur6.O2 2CSL-26-03-FM007 I Qlso 26.03 or DMG¹ na in iC5.51 )none J SUR/PT3.00/NT4.00 i HNP2-16-.500-CS i LINE¹ 2CSL-016-3-2 NTS: 34,36 iSD 2 i na /na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2CSL-26.03-Fl$ 08 / QISO 26-03 or DMG¹ na in /C5.51 inone i SUR/PT3.00/NT4.00 i NNP2-16-.500-CS t LINE¹ 2CSL-016-3-2 NTS: 34,36 LSD 2 i na /na I TEE/PIPE IC-F-2 i na J VOL/UT6.02 2CSL-26.03-FW009 I QISO 26-03 or DWG¹ na in iC5.51 inone / SUR/PT3.00/NT4.00 i NNP2-16-.500.CS I LINE¹ 2CSL-016-3-2 NTS: 34,39 ISO 2 i na /na I TEE/PIPE IC-F-2 i na i vol./ur6.02 2CSL-26 Fl$ 10 I QISO 26.03 or DWG¹ na in iC5.51 )none i SUR/PT3.00/NT4.00 i NNP2-12-.375-CS I LINE¹ CSL 012 8 2 HT '9i40 ISD 2 i na /na I I ELB/PIPE IC-F-2 i na i VOL/ur6.O2 2CSL-26-03-Fl$ 11 i QISO 26.03 or DWG¹ na in iC5.51 [none i SUR/PT3 F 00/NT4.00 i HNP2-12-.375-CS LINE¹ 2CSL-012-8-2 HTS: 40,41 LSD 2 i na /na I I PIPE/RED IC-F-2 i na i VOL/ur6.02 2CSL-26-03-Fl$ 12 I QISO 26-03 or DWG¹ na in iC5.51 Inone I SUR/PT3.00/NT4.00 I NNP2-12-.375-CS I LINE¹ 2CSL-012-8-2 NTS: 40i42 ISO 2 i na /na I I PIPE/~FEI IC-F-2 I na I VOL/UT6 02 I 2CSL-26-03-Fl$ 13 I QISO 26.03 or DWG¹ na in (C5.51 inone i SUR/PT3.00/NT4.00 i NNP2-16 .500-Cs i LIHE¹ 2CSL-016-3-2 NTS: 34,37 iso 2 i na /na
| |
| | |
| NIAGARA MOHAWK POWER (X)RPORATION - MILE POINT NUCLEAR STATION - UHIT 2 12 of 20 NMP2-ISI-0061 REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEM (sorted by Exenination Identifier) 2ND INTVL REL RED ) DESCRIPTIOH OF ITEM To BE EXAMINED)CATGRY )IGSCC) EX1/HDE PROCEDURE )PERIOD 1 REMARKS EXAMINATION IDENTIFIER )
| |
| ITS ISO LOCATOR, COMPONENT DWG ¹, )ITEM ¹ )FREOY) EX2/NDE PROCEDURE )PERIOD 2 )
| |
| USE CAL BLK ¹ )
| |
| LINE Ho. AND No'IES, AS APPLICABLE )SELECT )CLASS) EX3/HDE PROCEDURE )PERIOD 3 I PIPE/*FE107 IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 ) Sc7 2CSL-26.03-FW014 )
| |
| QISO 26-03 "or DWG¹ na in )C5.51 IID I SUR/PT3.00/MT4.00 I NMP2-16-1.031-Cs ) LINE¹ 2CSL-016-3-2 NTS: 34,37 )SD 2 ) na/na
| |
| ) PIPE/PIPE IC-F-2 ) na )
| |
| VOL/UT6.02 2CSL-26-03-FW017 )
| |
| QISO 26-O3 or DWG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/MT4.00 )
| |
| NMP2-12-.375-CS I LINE¹ 2CSL 012 8 2 HTS'0 )none 2 )
| |
| na /na )
| |
| I PIPE/ELB IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 2CSL-26.03-FW018 )
| |
| QISO 26-03 or DWG¹ na in )C5.51 )none ) SUR/PT3 F 00/MT4.00 )
| |
| NMP2-12-.375-CS ) LINE¹ 2CSL-012-8-2 NTS: 40,41 )SD 2 ) na/na I ELB/PIPE IC-F-2 ) na ) VOL/UT6.02 2CSL-26-03-FW019 I also 26-03 or DWG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/MT4.00 )
| |
| HMP2-12-.375-CS I LIHE¹ 2CSL-012-8-2 HTS: 40,41 ISD 2 )
| |
| na /na I
| |
| )
| |
| PIPE/ELB IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 2CSL-26-03-FW020 )
| |
| Qrso 26-o3 or DWG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/MT4.00 )
| |
| HMP2-12-.375-CS ) LINE¹ 2CSL-012-8.2 HTS 40,41 )SD 2 )
| |
| na /na I
| |
| )
| |
| PIPE/ELB IC-F-2 )
| |
| na ) VOL/UT6.02 2CSL-26-03-FW023 )
| |
| QISO 26-03 or DWG¹ na .in )C5.51 )none ) SUR/PT3.00/MT4.00 )
| |
| NMP2-16-.500-CS )
| |
| LINE¹ 2CSL-016-3-2 HTS: 34,36 )SD )
| |
| 2 )
| |
| na /na
| |
| ) WNF/PIPE IC-F-2 ) na I VOL/UT6.02 I 2CSL-26-03-FW025 )
| |
| also 26-03 or DWG¹ na in )C5.51 )none )
| |
| SUR/PT3 F 00/Ml'4.00 )
| |
| NMP2-16-.500-CS I LINE¹ 2CSL-016-3-2 NTS: 33 '4 ISD 2 )
| |
| na /na
| |
| ) INTEG ATT IC-C I na I SUR/PT3.00/MT4.00 I 2CSL-26-03-FW300 )
| |
| arSO 26-03-13 or DWG¹ na in )C3.20 )ID ) na /na )
| |
| Sc9
| |
| )
| |
| LINE¹ 2CSL-016-3-2 HTS: 34,38 )Mandate) 2 )
| |
| na /na I I PIPE/ELB IC-F.2 )
| |
| na )
| |
| VOL/UT6.02 2CSL-26.03-S'W008 I also 26-03 or DWG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/MT4.00 )
| |
| NMP2-16-.500 CS I LINE¹ 2CSL-016-3-2 NTS: 34,36 )SD 2 ) na /na
| |
| | |
| NIAGARA NOHAWK POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 13 of 20 HNP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEN (sorted by Examination Identifier) 2HD INTVL REL RED )
| |
| DESCRIPTION OF ITEN TO BE EXANIHED)CATGRY ) IGSCC) EX1/HDE PROCEDURE )PERIOD 1 REHARKS EXANIHATION IDENTIFIER I ITS ISO LOCATOR ~ CONPOHEHT DMG ¹i )ITEN ¹ IFREQYI EX2/NDE PROCEDURE )PERIOD 2 I USE CAL BLK ¹ I LINE NO. AHD NOTES, AS APPLICABLE )SELECT )CLASS) EX3/NDE PROCEDURE )PERIOD 3 )
| |
| ELB/PIPE IC-F-2 ) na )
| |
| VOL/UT6.02 2CSL-26-03-SM009 I QISO 26-03 or OMG¹ na in )C5.51 )none )
| |
| SUR/PT3 F 00/HT4 F 00 )
| |
| HNP2-16-.500.CS I LINE¹ 2CSL-016-3-2 HTS: 34,36 ISD -2 )
| |
| na /na I I PIPE/ELB )C-F-2 )
| |
| na )
| |
| VOL/UT6.02 2CSL-26-03-SM010 I QISO 26-03 or DMG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/NT4.00 )
| |
| NNP2-16-.500-CS )
| |
| LINE¹ 2CSL-016-3-2 NTS: 34,36 )SD 2 )
| |
| na /na I PIPE/ELB IC-F-2 ) na )
| |
| VOL/UT6.02 2CSL-26-03-SM011 I QISO 26-03 or DMG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/NT4.00 )
| |
| HNP2-16..500.CS ) LINE¹ 2CSL-016.3-2 HTS: 34,36 )SO 2 )
| |
| na /na I I ELB/PIPE IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 2CSL-26.03-SW014 )
| |
| QISO 26-03 or DMG¹ na in )C5.51 )none ) SUR/PT3.00/HT4.00 )
| |
| HHP2-16-.500-CS ) LINE¹ 2CSL-016-3.2 NTS 34,36 )SD 2 )
| |
| na /na I
| |
| ) PIPE/ELB )C-F-2 )
| |
| na )
| |
| VOL/UT6.02 2CSL-26.03-SM015 ) QISO 26-03 or DMG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/NT4.00 )
| |
| HNP2 F 500-CS LINE¹ 2CSL-016-3-2 NTS: 34,36 )SD 2 )
| |
| na /na I ELB/PIPE )C-F-2 )
| |
| na )
| |
| VOL/UT6.02 2CSL-26-03-SM016 I Q 26 03 or DMG¹ na . in )C5.5'I )none ) SUR/PT3.00/NT4.00 )
| |
| NNP2-16-.500-CS LINE¹ 2CSL-016-3-2 NTS: 34,36 )SD 2 ) na /na I PIPE/ELB IC-F-2 ) na )
| |
| VOL/UT6.02 2CSL-26-03.SW018 ) QISO 26.03 or DMG¹ na in )C5.51 )none I SUR/PT3.00/MT4.00 I HNP2-16-.500.CS I LINE¹ 2CSL-016-3-2 NTS: 34 36 I o 2 ) na /na I ELB/PIPE IC-F-2 na )
| |
| VOL/UT6.02 )
| |
| Sc7 2CSL-26-03-SM019 )
| |
| QISO 26-03 or DMG¹ na in )C5.51 IID I SUR/PT3.00/NT4.00 I NNP2-16-.500.CS LIHE¹ 2CSL-016-3-2 NTS: 34,36 )SD 2 ) na /na I PIPE/ELB IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 2CSL-26-03-SM020 I QISO 26-03 or DMG¹ na in )C5.51 )none I SUR/PT3 F 00/NT4.00 I NNP2-16-.500.CS I LINE¹ 2CSL-016-3-2 NTS: 34,36 ISD 2 )
| |
| na /na
| |
| | |
| NIAGARA. NOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 14 of 20 HNP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED ) DESCRIPTIOH OF ITEI4 TO BE EXANIHED(CATGRY )IGSCC) EX1/HDE PROCEDURE (PERIOD 1 REHARKS EXANIHATION IDENTIFIER I ITS ISO LOCATOR, COMPONENT DMG ¹, IITEH ¹ IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LIHE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I ELB/PIPE IC-F-2 [ na [ VOL/UT6.02 2CSL-26-03-SM021 i QISO 26-03 or DMG¹ na in /C5 ~ 51 )none f SUR/PT3.00/MT4.00 f NNP2-16-.500-CS i LINE¹ 2CSL-016-3-2 HTS'4i36 ISD 2 )
| |
| na /na I PIPE/TEE IC-F-2 J na J VOL/UT6.02 2CSL-26-03-SW022 I QISO 26-03 or DMG¹ na in ]C5.51 ]none f SUR/PT3.00/HT4.00 f NNP2-16-.500-CS I LINE¹ 2CSL-016-3-2 HTS: 34,39 ISD 2 ) na /na I i PIPE/ELB IC-F-2 [ na ] VOL/UT6.02 2CSL-26.03-SM023 [ QISO 26-03 or DMG¹ na in ]C5.51 )none )
| |
| SUR/PT3.00/H'l4.00 )
| |
| NHP2-16-.500-CS i LINE¹ 2CSL-016-3-2 NTS: 34,36 LSD 2 J na /na I ELB/PIPE IC-F-2 f na [ VOL/UT6.02 2CSL-26-03-SW024 I QISO 26-03 or DMG¹ na in [C5.51 ]none f SUR/PT3.00/HT4.00 /
| |
| HNP2-16-.500-CS I LIHE¹ 2CSL-016-3-2 NTS: 34,36 ISD 2 / na /na I PIPE/MNF IC-F-2 [ na ) VOL/UT6.02 2CSL-26-03-SM025 I QISO 26.03 or DMG¹ na in )C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-16-.500-CS I LINE¹ 2CSL-016-3-2 HTS: 33,34 ISO 2 / na /na I I PIPE/ELB IC-F-2 f na f VOL/UT6.02 2CSL-26-03-SW029 I QISO 26-03 or DMG¹ na - in (C5.51 /none f SUR/PT3.00/NT4.00 f NHP2-12-.375-CS ( LINE¹ 2CSL-012-B-2 HTS: 40,41 )SO 2 / na/na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2CSL-26-03-SM031 (
| |
| QISO 26-03 or DWG¹ na in JC5.51 [none f SUR/PT3.00/HT4.00 [
| |
| HHP2-12-.375-CS i LINE¹ 2CSL-012.8.2 HTS: 40,41 LSD 2 / na /na I ELB/PIPE IC-F-2 [ na [ VOL/UT6.02 2CSL-26-03-SW032 [ QISO 26-03 or DMG¹ na in ]C5.5'l [none J SUR/PT3.00/HT4.00 J HHP2-12-.375-CS I LINE¹ 2CSL-012-8-2 NTS: 40,41 ITE 2 ) na /na I PIPE/ELB IC-F-2 I na [ VOL/UT6.02 I 2CSL-26-03-SM033 I QISO 26.03 or DWG¹ na in ]C5.51 ]none J SUR/PT3.00/NT4.00 J HHP2-12-.375-CS i LINE¹ 2CSL-012-8-2 NTS: 40,41 ATE 2 / na /na
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATIOH - UNIT 2 15 of 20 NHP2-ISI-006, REV. 1) CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - CSL SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED ) DESCRIPTION OF ITEN TO BE EXANINEDJCATGRY )IGSCC( EX1/HDE PROCEDURE (PERIOD 1 RENARKS EXAHIHATION IDENTIFIER ) ITS ISO LOCATOR, COHPOHENT DMG ¹, ]ITEN ¹ )FREOYJ EX2/HDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I ELB/PIPE IC-F-2 [ na ) VOL/UT6.02 2CSL-26-03-SM034 f QISO 26-03 or DMG¹ na in [C5.51 [none ] SUR/PT3.00/HT4.00 (
| |
| NNP2-12-.375-CS I LINE¹ 2CSL;012-8-2 NTS: 40,41 ISD 2 J na /na I I PIPE/ELB IC-F-2 [ na [ VOL/UT6.02 2CSL-26-03-SM038 i QISO 26-03 or DMG¹ na in )C5.51 [none J SUR/PT3.00/NT4.00 )
| |
| HNP2-12-.375-CS LIHE¹ 2CSL-012-8-2 NTS: 40,41 LSD 2 / na /na I ELB/PIPE IC-F-2 [ na ] VOL/UT6.02 2CSL-26.03-SM039 I QISO 26-03 or DMG¹ na in [C5.51 ]none I SUR/PT3.00/NT4.00 I NHP2-12-.375-CS LIHE¹ 2CSL-012-8-2 NTS: 40,41 (SD 2 J na /na I I ELB/PIPE IC-F-2 ( na (
| |
| VOL/UT6.02 2CSL-26-03-SM040 I QISO 26-03 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/NT4.00 (
| |
| HHP2-12-.375-CS I LINE¹ 2CSL-012-8-2 NTS: 40,41 LSD 2 / na /na I I ELB/PIPE IC-F-2 [ na ] VOL/UT6.02 2CSL-26-04-FM001 i QISO 26-04 or DMG¹ na in [C5.51 [none ] SUR/PT3.00/MT4.00 (
| |
| NHP2-16-.500-CS (
| |
| LINE¹ 2CSL-016-3-2 HTS: 34,36 )SD 2 / na /na I ELB/PIPE IC-F-2 ] na f VOL/UI'6.02 2CSL-26-04-FM002 [ QISO .26-04 or DMG¹ na ~ in )C5.51 )ID i SUR/PT3.00/HT4.00 i Sc9 NHP2-16-.500.CS [ LIHE¹ 2CSL-016-3-2 NTS: 34,36 (SD 2 f na /na I
| |
| (
| |
| PIPE/PIPE IC.F-2 [ na f VOL/UT6.02 I 2CSL-26-04-FM003 ] QISO 26-04 or DMG¹ na in [C5.51 [none f SUR/PT3.00/HT4.00 J I-NHP2-16-.500-CS [ LINE¹ 2CSL-016-3-2 NTS: 34 ]none 2 / na /na I I PIPE/ELB IC-F-2 [ na [ VOL/UT6.02 2CSL-26-04-FM004 QISO 26.04 or DMG¹ na in [C5.51 )none f SUR/PT3.00/NT4.00 J HHP2-16-.500-CS I LINE¹ 2CSL-016-3-2 NTS: 34,36 ISD 2 / na /na PIPE/PIPE IC-F-2 I na i VOL/UT6 02 I 2CSL-26.04-FM005 QISO 26.04 or DMG¹ na in (C5.51 (none )
| |
| SUR/PT3.00/NT4.00 )
| |
| HHP2-16-.500.CS LINE¹ 2CSL-016-3-2 NTS: 34 [none 2 / na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - NILE POINT HUCLEAR STATION - UNIT 2 16 of 20 NNP2-ISI-006, REV. 1( CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEN (sorted by Examination Identifier)
| |
| HD INTVL REL RED DESCRIPTION OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 RENARKS I
| |
| EXAHINATIOH IDEHI'IFIER J ITS ISO LOCATOR, COHPONENT DWG ¹, iITEN ¹ )FREOYi EX2/HDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE Ho AHD NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I ELB/PIPE iC-F-2 i na i voL/UT6.02 2CSL-26.04-FW006 i QISO 26-04 or DMG¹ na in iC5.51 inane / SUR/PT3.00/NT4.00 i NHP2 F 500-CS I LIHE¹ 2CSL-016-3-2 HTS: 34,36 ISD 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.O2 2CSL-26.04-FM007 i QISO 26.04 or DMG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 i HMP2-16-.500-CS i LINE¹ 2CSL-016-3-2 HTS: 34,36 LSD 2 i na /na P I PE/WHF IC-F-2 i na i VOL/UT6.02 2CSL-26.04-SM001 i QISO 26-04 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-16-.500.CS i LINE¹ 2CSL-016-3-2 HTS: 33,34 LSD 2 i na /na I I PIPE/ELB IC-F-2 [ na i voL/uT6.02 2CSL-26.04-SW003 i QISO 26.04 or DWG¹ na in iC5.51 (none i SUR/PT3.00/HT4.00 i HHP2-16-.500-CS I LINE¹ 2CSL-016-3-2 NTS: 34,36 ISD 2 J na /na I PIPE/ELB IC-F-2 i na (
| |
| voL/UT6.O2 2CSL-26-04-SW004 i QISO 26.04 or DWG¹ na in iC5.51 (none i SUR/PT3.00/NT4.00 i HHP2-16-.500-CS i LINE¹ 2CSL-016-3-2 NTS: 34,36 LSD 2 i na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2CSL-26.04-SW005 i QISO 26-04 or DWG¹ na ~ in iC5.51 )none ) SUR/PT3.00/NT4.00 i HHP2-16-.500.CS I LINE¹ 2CSL-016-3-2 HTS: 34,36 ISD 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2CSL-26-04-SW006 i QISO 26-04 or DWG¹ na in iC5.51 inone J SuR/PT3.00/HT4.00 i HHP2 F 500.CS i LIHE¹ 2CSL-016-3-2 NTS: 34,36 LSD 2 J na /na I I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2CSL-26-04-SW007 i QISO 26.04 or DMG¹ na in iC5.51 inone i SUR/PT3.00/Hl'4.00 i HHP2-16-.500-CS I LINE¹ 2CSL-016-3-2 NTS'4 36 ISD 2 i na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2CSL-26-04-SM008 i QISO 26-04 or DWG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 HHP2-16-.500-CS LINE¹ 2CSL-016-3-2 HTS: 34,36 LSD i 2 I
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 17 of 20 HMP2-ISI-006, REV. I( CH.ODO SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTIOH OF ITEM TO BE EXAMIHEDiCATGRY iIGSCC) EX1/HDE PROCEDURE iPERIOD 1 REMARKS EXAMINATION IDENTIFIER L ITS ISO LOCATOR, COMPONENT DWG ¹, )ITEM ¹ iFREOY( EX2/HDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/ELB IC-F-2 (
| |
| na i VOL/u'l6.02 2CSL-26-04-SWD09 i QISO 26-04 or DMG¹ na in iC5 ~ 51 inone J SUR/PT3.00/MT4.00 i NHP2-16-.500-CS J LINE¹ 2CSL-016-3-2 NTS: 34,36 LSD 2 J na /na I PIPE/ELB IC-F-2 i na J voL/uT6.02 2CSL-26-04-SW010 i QISO 26-04 or DWG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-16-.500-CS i LIHE¹ 2CSL-016-3.2 HTS: 34,36 LSD 2 i na /na I ELB/PIPE IC-F-2 i na i vol./uT6.02 2CSL-26-05-FW001 i QISO 26-05 or DMG¹ na in )C5.51 inone i SUR/P'I3.00/MT4.00 i NMP2-16-.500-CS i LINE¹ 2CSL-016-3-2 NTS: 34,36 LSD 2 i na /na I PIPE/<<MOV104 IC-F-2 J na i VOL/uT6.02 2CSL-26-05-FW002 I QISO 26-05 or DWG¹ na in iC5.51 [ID i SUR/PT3.00/MT4.00 i $ c9 NHP2.12-.375-CS i LIHE¹ 2CSL-012-42-2 HTS: (none) LSD 2 i na /na I I <<MOV104/PIPE iB-J i na i vOL/UT6.02 2CSL-26-05-FW004 I QISO 26.05 or DWG¹ na in i89.11 [none i SUR/PT3.00/MT4.00 i NMP2-12-.688-CS i LINE¹ 2CSL-012-17-1 NTS: 1,7 )HS i na /na I PIPE/PENET 216 IB J i na i VOL/UT6.02 2CSL-26-05-FW005 i QISO 26-05 or DWG¹ na in i89.11 IID I SURIPT3.00/MT4.00 I NMP2-12-.688. CS I LINE¹ 2CSL-012.17-1 NTS: 1,6 ITEV 1 i na I i Sc11 I PENET 216/PIPE IB-J i na i voL/uT6.02 i sc7 2CSL-26-05-FW006 i QISO 26.05 or DWG¹ na in /89.11 iID i SUR/PT3.00/MT4.00 NMP2-12-.688-CS i LINE¹ 2CSL-012-4-1 HTS: 1,6 iTEV 1 dna/
| |
| i ELB/PIPE IB-J I na I VOL/UT6.02 I 2CSL-26-05-FM007 I QISO 26.05 or DWG¹ na in i89.11 inone i SUR/PT3.00/MT4.00 i NMP2-12-.688.CS I LINE¹ 2CSL-012.4-1 HTS: 1,2 IHS / na /na I PIPE/*AOV101 IB-J i na i VOL/UT6.02 2CSL-26-05-FW008 I QISO 26-05 or DMG¹ na in i89.11 Inone I SUR/PT3 F 00/MT4.00 I NMP2-12-.688-CS LINE¹ 2CSL-012-4-1 NTS: 1,5 iHS 1 [ na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 18 of 20 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1 REHARKS
| |
| (
| |
| EXAHINATION IDENI'IFIER I ITS ISO LOCATOR, COHPONEHT DMG ¹i I ITEN ¹ IFREOYI EX2/NDE PROCEDURE ]PERIOD 2 J USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSi EX3/NDE PROCEDURE iPERIOO 3 )
| |
| I *AOV101/PIPE IB-J [ na [ VOL/UT6.02 [ Sc7 2CSL-26-05-FM009 i QISO 26-05 or DMG¹ na in /89.11 IID I SUR/PT3.00/HT4.00 I NHP2-12-.688-CS i LINE¹ 2CSL-012-4-1 NTS: 1,5 IHS 1 /na/ I I PIPE/*HCV117 IB-J I na I VOL/UT6 02 I Sc7 2CSL-26-05-FM010 i QISO 26-05 or DMG¹ na in /89.11 IID I SUR/PT3.00/HT4.00 I NHP2-12-.688-CS [ LINE¹ 2CSL-012-4-1 NTS: 1,4 IHS 1 /na/ I
| |
| (
| |
| *HCV117/PIPE IB-J [ na [ VOL/UT6.02 2CSL-26-05-FM011 i QISO 26.05 or DMG¹ na in IB9.11 [none f SUR/PT3.00/HT4.00 /
| |
| NHP2-12-.688-CS I LINE¹ 2CSL-012-4-1 NTS: 1,4 INS 1
| |
| / na/na I I PIPE/SEEK Q N5 A7120 LOM PRES CS IB-J [ na [ Vol./UT6.02 [ Sc7 2CSL-26.05-FM012 i QISO 26-05 or DMG¹ na in (89.11 IID I SUR/PT3.00/HT4.00 I NHP2-10-.594-CS i LINE¹ 2CSL-010-13-1 NTS: 10,9 iTEV j 1 lna/ I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2CSL-26-05-FIQOO (
| |
| QISO 26-05-8 or DMG¹ na in (810.20 ]ID f na /na i LINE¹ 2CSL-012-4-1 NTS: 1,3 JNS f 1 f na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2CSL-26-05-FI601 f QISO 26-05-8 or DMG¹ na .in /810.20 /ID [ na /na I LINE¹ 2CSL-012-4-1 NTS: 1,3 INS I 1 I na /na I I INTEG ATT IB K I na I SUR/PT3.00/HT4 F 00 J 2CSL-26-05-FI602 (
| |
| QISO 26-05-8 or DMG¹ na in /810.20 )IO / na /na I I LINE¹ 2CSL 012 4 1 HT ' 3 /NS / 1
| |
| / na /na I I INTEG ATT JB-K J na J SUR/PT3.00/HT4.00 f 2CSL-26-05-FI603 (
| |
| QISO 26-05-8 or DMG¹ na in ]810.20 ]ID J na /na I LINE¹ 2CSL-012.4-1 NTS: 1,3 [NS f 1
| |
| ] na/na I I PIPE/PIPE IB-J [ na / VOL/UT6.02 2CSL-26-05-FMSM023 I QISO 26-05 or DMG¹ na in /B9.11 /none / SUR/PT3.00/HT4.00 /
| |
| NHP2-12-.688-CS I LINE¹ 2CSL-012.4-1 NTS: 1 iNS 1 [ na /na
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 19 of 20 NHP2-ISI-006, REV. 1, CH.OOO SECOND TEN YEAR IHSERVICE INSPECTION (ISI) IN'IERVAL PLAN Change date: 07/29/1999 APPEHDIX G - CSL SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RED J DESCRIPTIOH OF ITEM TO BE EXAHINED[CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1 RENARKS EXAHIHATION IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DMG ¹, iITEN ¹ iFREQYJ EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LIHE NO. AHD HOlES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I PIPE/ELB IC-F-2 I na I VOL/UT6 02 I 2CSL-26-05-SM001 I QISO 26-05 or DMG¹ na in JC5.51 )none [ SUR/PT3.00/NT4.00 J NHP2-16-.500-CS I LINE¹ 2CSL-016-3-2 NTS: 34,36 ISD 2 f na /na I I ELB/RED IC-F-2 [ na [ VOL/UT6.02 2CSL-26-05-SW003 I QISO 26-05 or DWG¹ na in [C5.51 [none / SUR/PT3 F 00/MT4.00 /
| |
| HHP2-16-.500.CS I LINE¹ 2CSL-016-3-2 HTS: 36 ISD 2 / na /na I RED/PIPE IC-F-2 f na f VOL/UT6.02
| |
| - or in (C5.51 2CSL-26-05-SW004 / QISO 26-05 OWG¹ na IID I SUR/PT3.00/NT4.00 I Sc9 HNP2-12-.375.CS f LINE¹ 2CSL-012-42-2 NTS: (none) /SO 2 J na /na
| |
| ] PIPE/ELB JB-J (
| |
| na )
| |
| VOI./UT6.02 2CSL-26.05-SW011 I QISO 26.05 or OWG¹ na in (89.11 ]none J SUR/PT3.00/NT4.00 [
| |
| HHP2-12..688.CS LINE¹ 2CSL-012-4-1 NTS: 1,2 iHS 1 J
| |
| na /na I I ELB/PIPE IB-J (
| |
| na J VOL/UT6.02 2CSL-26-05-SW012 I QISO 26.05 or DWG¹ na in (89.11 )none f SUR/PT3.00/NT4.00 f NHP2-12-.688.CS i LINE¹ 2CSL-012-4-1 'NTS: 1,2 iHS 1 [ na /na I PIPE/ELB IB-J f na [ VOL/UT6.02 2CSL-26.05-SW013 i QISO 26-05 or DMG¹ na . in )89.11 /none f SUR/PT3.00/NT4.00 f NHP2-12-.688.CS i LINE¹ 2CSL-012-4-1 HTS: 1,2 iHS 1 / na /na I I PIPE/ELB IB J ) na [ VOL/UT6.02 2CSL-26-05-SM014 i QISO 26.05 or DMG¹ na in [89.11 (none f SUR/PT3.00/NT4.00 f NHP2-12-.688-CS I LINE¹ 2CSL-012.4-1 NTS: 1,2 INS 1 f na /na I ELB/PIPE IB-J I na I VOL/UT6.02 I 2CSL-26.05-SW015 I QISO 26.05 or DMG¹ na in (89.11 ]none J SUR/PT3.00/HT4.00 J HNP2-12-.688-CS I LINE¹ 2CSL 012 4 1 NTS' ' INS 1 / na /na I PIPE/ELB IB- J I na [ VOL/UT6 02 I 2CSL-26-05-SW016 i QISO 26-05 or DWG¹ na in (89.11 ]none J SUR/PT3.00/NT4.00 J HNP2-12..688-CS i LINE¹ 2CSL-012-4-1 NTS: 1,2 iHS 1 f na /na
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 20 of 20 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - CSL SYSTEH (sorted by Examination Identifier)
| |
| ND IHTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE iPERIOO 1 I REHARKS EXANINATION IDENTIFIER [ ITS ISO LOCATOR, CONPONENT DWG ¹, )ITEN ¹ JFREOV) EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I ELB/PIPE IB-J [ na [ VOL/UT6.02 2CSL-26-05-SM017 )
| |
| QISO 26.05 or DMG¹ na in (89.11 [none J SUR/PT3.00/NT4.00 J NNP2-12-.688.CS ) LINE¹ 2CSL-012-4-1 NTS: 'I 2 INS 1 / na /na I PIPE/RED IB-J ] na )
| |
| VOL/UT6.02 2CSL-26.05-SM019 i QISO 26-05 or DWG¹ na in )89.11 ]none ) SUR/PT3.00/HT4.00 J HNP2-12-.688.CS i LINE¹ 2CSL-012-4-1 NTS: 1,2 iNS ~
| |
| na /na I RED/PIPE IB-J [ na [ VOL/UT6.02 2CSL-26-05-SW020 i QISO 26-05 or DWG¹ na in JB9.1'I )none J SUR/PT3 F 00/NT4.00 J NMP2-10-.594.CS I LIHE¹ 2CSL.010.13-1 NTS: 10,2 IHS 1 J na/na I I RED/PIPE IC-F-2 f na f VOL/UT6.02 2CSL-26-06.FW005 i QISO 26-06 or DMG¹ na in [C5 ~ 51 ]none [ SUR/PT3.00/MT4.00 J NHP2-12-.375-CS i LINE¹ 2CSL-012-9-2 NTS: 40,42 LSD 2 J na /na
| |
| (
| |
| PIPE/*V9 IC-F-2 [ na [ VOL/UT6.02 2CSL-26-06-FW006 I QISO 26-06 or D'WG¹ na in )C5.51 [none f SUR/PT3.00/NT4.00 f HNP2-12-.375-CS [ LINE¹ 2CSI.-012-9-2 HTS: 40,44 (SD 2 / na /na I PIPE/ELB IC-F-2 [ na )
| |
| VOL/UT6.02 2CSL-26.06-SM005 i QISO 26-06 or DMG¹ na in )C5.51
| |
| ~ ]none ) SUR/PT3.00/HT4.00 J HNP2-12-.375-CS i LINE¹ 2CSL-012-9-2 HTS: 40,41 LSD 2 / na /na i ELB/PIPE IC-F-2 f na f VOL/UT6.02 2CSL-26.06-SW006 i QISO 26.06 or DMG¹ na in ]C5.51 ]none [ SUR/PT3.00/NT4.00 [
| |
| NHP2-12-.375-CS I LIHE¹ 2CSL-012-9-2 NTS: 40,41 ISD I 2 I na /na I EHD OF SYSTEH CSL
| |
| | |
| NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System: CSL General Notes
| |
| : 1. 12" SCH PIPE MATERIAL,SA-106B 28. 20" STD TEE, SA-234 WPB
| |
| : 2. 12" SCH 80 PIPE FITTINGS, SA-234 WPB 29. 20" EXTENSION RING, SAC16GR70
| |
| : 3. PLATE MATERIAL,SA416 GR 70 30. 24" X20 STD ECC REDUCER, SA-234WPB
| |
| : 4. 'HCV117 VALVEBODY, SA-105 31. 24" STD PIPE, SA-106 GR B
| |
| : 5. 'AOV101 VALVEBODY, SA-216 WCB 32. 24 150¹ WNF, SA-105
| |
| : 6. Z-16 PENETRATION MATERIAL,SA408 CL1 33. 16" 300¹ WN FLANGE, SA-105
| |
| : 7. 'MOV104 VALVEBODY, SA450 LF 2 34. 16" XS PIPE, SA-106 GR B
| |
| : 8. BOLTING MATERIAL,SA-193 GR B7: SA-194 GR 2H 35. 16" CHECK VALVE, SA-105
| |
| : 9. SAFE END EXT. MATERIAL,SA408 CL1 36. 16 XS ELBOW, SA-234 WPB
| |
| : 10. 10" PIPE MAT'L. - SA 106B SCH 80 37. 16" SCH. 100 PIPE, SA-106 GR B 20" 150¹ WNF, SA-182 F304 38. 3/4" PLATE, SA415 GR 65
| |
| : 12. 20" SCH 100 PIPE, SA412 TP 304 W 39. 16" XS X 12" STD RED. TEE, SA-234 WPB
| |
| : 13. 1-1/2 PLATE, SA-240 TP 304 40. 12" STD PIPE, SA-106 GR B
| |
| : 14. 20" STD PIPE, SA412TP304W 41. 12" STD ELBOW, SA-234 WPB
| |
| : 15. 20" STD ELBOW, SAM3 WP 304 W 42. 12" X 10" STD. CONC. REDUCER, SA-234 WPB
| |
| : 16. 3/4" PLATE SA-240 43. 10" CONTROL VALVE, SA-217 GR C5
| |
| : 17. 3/4" PLATE SA-537 CL2 44.'2" CHECK VALVE, SA-105
| |
| : 18. 20" BUTTERFLY VALVE(BODY) SA-516 GR 70/SA-515 BR 70 45. 24" 3/4" WALLPIPE SA416 GR 70
| |
| : 19. 20" 150¹ SOF, SA-105 46. HEAD SHELL 1-1/4" PLATE, SA416 GR 70
| |
| : 20. 20" BUTTERFLY VALVE(BEARING NEClq SA-105 47. 16" SCH,40PIPE, SA-106GR B
| |
| : 21. 20 150¹ WNF, SA-105 48. HEAD COVER, SA-105
| |
| : 22. 20" STD PIPE, SA-106 GR B 49. HEAD FLANGE, SA-105
| |
| : 23. 20" STD ELBOW, SA-234 WPB 50. BARREL FLANGE, SA-105
| |
| : 24. 14" SCH 120 PIPE, SA-106 GR B 51. BARREL SHELL, 1/2" PLATE, SA416 GR 70 18" SCH 120 PIPE, SA-106 GR B 52. DISHED HEAD, SAW16 GR 70
| |
| : 26. 20 STD STR TEE, SA-234 WPB 53. BARREL SHELL PIN, SA-105
| |
| : 27. 20 300¹ SOF, SA-105
| |
| | |
| NIAGARA MOHAHK PSIER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 E 1of1 NMP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - DER SYSTEM (sorted by Examination Identifier) 2HD INTVL REL RED ( DESCRIPTIOH OF ITEM TO BE EXAMINED(CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1 REMARKS EXAMINATION IDENTIFIER (
| |
| ITS ISO LOCATOR, COMPONENT DWG ¹, (ITEM ¹ (FREOY( EX2/HDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I I PIPE/<<MOV128 (B-J (
| |
| na ( SUR/PT3.00/MT4.00 (
| |
| 20ER-07A-FW001 I QISO 07-A or DIIG¹ na in (B9.21 (ID (
| |
| na /na I na (
| |
| LINE¹ 2DER-002-7-1 HTS: 1,2 (HS (
| |
| 1
| |
| (
| |
| na /na Scil (
| |
| (
| |
| <<MOV128/P IPE (B-J (
| |
| na (
| |
| SUR/PT3.00/MT'0 ( I 20ER-07A-FN002 ( QISO 07-A or DllG¹ na in (89.21 (none (
| |
| na /na I I
| |
| (
| |
| LINE¹ 2DER-002-7-1 HTS: 1,2 (HS (
| |
| 1
| |
| (
| |
| na /na I I I P IPE/<<MOV129 IB-J I na I SUR/PT3.00/MT4.00 I I 2DER-07A-FH003 (
| |
| QISO 07-A or DMG¹ na in (B9.21 (none (
| |
| na /na ( I
| |
| (
| |
| LINE¹ 2DER-002-7-1 NTS: 1,2 (NS (
| |
| 1 (
| |
| na /na I I EHD OF SYSTEM DER
| |
| | |
| NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System: DER General Notes
| |
| : 1. Z SCH 80 SMLS PIPE, SA-106B 2. 2'LOBE VALVE, SA-105
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION NILE POINT NUCLEAR STATION - UNIT 2 1 of 19 NHP2-ISI-006, REV. 1( CH.OOO SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FMS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEOICATGRY IIGSCCI EX1/HDE PROCEDURE (PERIOD 1 REHARKS EXAHIHATION IDENTIFIER ITS ISO LOCATOR, COHPOHEH'T DMG ¹, (ITEN ¹ (FREOY( EX2/HDE PROCEDURE (PERIOD 2 USE CAL BLK ¹ I LINE NO. AHD NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 (
| |
| I
| |
| <<AOV23A BLTG IB-G-2 I na I VT1/VT2.01 I 2FMS<<AOV23A,V8506 I QISO 47-13 or DMG¹ 002 in (87.70 (ID ( na /na I na (
| |
| LINE¹ 2FMS-024-50-1 HTS: (none) (Grp Rep( 1 (
| |
| na /na (Sc10
| |
| (
| |
| *AOV23A IHI'UR (8-H-2 ( na (
| |
| VT3/VT2.01 J<< (* Examine shen dissassemble for maintenance 2FMS<<AOV23A,VBY106 ( QISO 47-13 or DMG¹ 002 in (812.50 (DisG ( /
| |
| (
| |
| LINE¹ 2FMS-024-50-1 HTS: 7 (Grp Rep( 1 ( / I*
| |
| I <<AOV238 BLTG (8-G-2 ( na (
| |
| VT1/VT2.01 2FMS<<AOV23B,V8507 ( QISO 47-16 or DMG¹ 002 in (87.70 (none (
| |
| na /na
| |
| ( LINE¹ 2FMS-024-51-1 NTS: (none) (HS ( 1 (-na /na
| |
| (
| |
| *AOV238 IHT SUR (8-H-2 ( na (
| |
| VT3/VT2.01 2FMS<<AOV23B,VBY107 (
| |
| QISO 47-16 or DMG¹ 002 in (812.50 (none ( /
| |
| I LINE¹ 2FMS 024 1 1 NTS'8 IHS I 1 I /
| |
| I *NCV54A IHT SUR (8-H-2 (
| |
| na (
| |
| VT3/VT2.01 (<< (* Examine Mhen dissassemble for maintenance 2FMS*KCV54A,VBY108 I QISO 47-13 or DMG¹ 011 in (812.50 (DisG ( / I*
| |
| (
| |
| LINE¹ 2FMS-024-31-1 N'TS: '12 (Grp Rep( 1 ( / (*
| |
| I
| |
| <<HCV548 INT SUR (8-H-2 ( na ( VT3/VT2.01 2FMS*HCV548, VBY109 (
| |
| QISO 47-16 or DMG¹ 011 in (812.50 (none ( /
| |
| na (
| |
| LINE¹ 2FMS-024-32-1 NTS: 14 (HS (
| |
| 1
| |
| ( /
| |
| I
| |
| >>NOV2IA INT SUR (8-H-2 (
| |
| na (
| |
| VT3/VT2.01 I (>> Examine Mhen dissassemble for maintenance 2FMS<<NOV21A,VBY110 I QISO 47-13 or DMG¹ 007 in (812.50 (DisG ( / (*
| |
| ( LIHE¹ 2FMS-024-50-'I HTS: 2 (Grp Rep( 1 ( / (*
| |
| (
| |
| <<NOV218 INT SUR (8-N-2 ( na (
| |
| VT3/VT2.01 2FMS*MOV21B,VBY111 I QISO 47-16 or DMG¹ 007 in (812.50 (none ( /
| |
| I LINE¹ 2FMS-024-51-1 NTS 2 IHS I 1 I /
| |
| I <<V12A BLTG IB-G-2 I na I VT1/VT2.01 2FMS<<V12A,VB508 I QISO 47-13 or DMG¹ 003 in (87.70 (none ( na /na
| |
| ( LINE¹ 2FMS-024-31-1 NTS: (none) (HS ( 1 ( na /na
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 2of 19 HHP2-ISI-006, REV. 1, CN-OOO SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FMS SYSTEII (sorted by Examination Identifier) 2ND IHTVL REL RED [ DESCRIPI'ION OF ITEM TO BE EXAHINED[CATGRY ]IGSCC[ EX1/HDE PROCEDURE ]PERIOD 1 RENARKS EXAHINATION IDENTIFIER J ITS ISO LOCATOR, COHPOHEHT DMG ¹, ]ITEN ¹ JFREOY( EX2/NDE PROCEDURE (PERIOD 2 J USE CAL BLK ¹ I LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I
| |
| *V12A IH'I SUR (8-H-2 f na / VT3/VT2.01 2FMS*V12A,VBY112 i QISO 47-13 or DMG¹ 003 in )812.50 ]none ) /
| |
| I LINE¹ 2FMS-024-31-1 HTS: 7 INS I 1 I I
| |
| *V128 BLTG IB-G-2 I na I T1/VT2 01 2FMS~V128,VB509 I QISO 47-16 or DMG¹ 003 in )87.70 /none / na /na
| |
| (
| |
| LINE¹ 2FMS-024-32-1 HTS: (none) (HS /n /n I *V128 IHT SUR IB-M-2 i na i VT3/VT2.01 2FMS*V12B,VBY113 / QISO 47-16 or DWG¹ 003 in /812.50 /none ) /
| |
| I LINE¹ 2FWS-024-32-1 HTS: 28 INS I I I
| |
| / PIPE/*MOV2IA (AUGHENTED VOL ONLY) /na f na [ VOL/UT6.02 I 2FMS-47-13-FW002 4713 or DWG¹ na in )na ID * /n/a I QI J ) I NMP2-24-2.06;CS I LINE¹ 2FWS-024-27-4 HTS: 1,2 IBER I 4 I i Sc10
| |
| *HOV21A/PIPE IB-J I na I VOL/UT6.02 iEX6 2F'MS-47-13-FM003 I QISO 47-13 or DWG¹ na in /89.11 [ID [ SUR/PT3.00/MT4.00 ]
| |
| NHP2-24-2.06-CS i LINE¹ 2FMS-024-50-1 NTS: 1,2 IBER I
| |
| )
| |
| PIPE/*AOV23A JB-J ] na f VOL/UT6.02 2FMS-47-13-FM006 I QISO 47-13 or DWG¹ na . in )89.11 )ID (
| |
| SUR/PT3.00/HT4.00 [
| |
| HHP2-24-2.06-CS / LINE¹ 2FWS-024-50-1 HTS: 1,7 /AM/ber f 1 / na / / Sc10
| |
| )
| |
| *AOV23A/PIPE )8-J f na f VOL/UT6.02 I 2F MS.47 F'M007 I QI 4713 or DMG¹ na in [89.11 ]ID f SUR/PT3.00/HT4.00 f I NHP2-24-2.06-CS I LINE¹ 2FMS-024-50-1 NI'S: 1(7 (AM/ber J 1
| |
| f na / )Sc10 ~ I I PIPE/PEHET 24A JB-J [ na (
| |
| VOL/UT6.02 (EX6 2FMS-47-13-FM008 I QISO 47-13 or DWG¹ na in JB9.11 ]ID f SUR/PT3.00/HT4.00 f NHP2-24-2.06-CS )
| |
| LINE¹ 2FMS-024-50-1 HTS: 1,8 /TEV/berf 1 f na / I f PEHET Z4A/*V12A IB-J I na I VOL/UT6.02 I 2FMS-47-13-FM009 I QISO 47-13 or DWG¹ na in (89.11 )ID [ SUR/PT3.00/HT4 F 00 f NHP2-24-2.469-CS ) LINE¹ 2FMS-024-31-1 HTS: 7,9 fAW/ber f 1 f na / JSc10
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 3of 19 NHP2-ISI-006, REV. 1( CH-000 SECOND TEN YEAR IHSERVICE IHSPECTION (ISI) INTERVAL PLAN APPENDIX - FMS SYSTEH Change date: 07/29/1999 G (sorted by Examination Identifier) 2ND IHTVL REL RED DESCRIPTIOH OF ITEN TO BE EXAHINED)CATGRY (IGSCC) EX1/HDE PROCEDURE (PERIOD 1 REHARKS
| |
| (
| |
| EXAHINATION IDENTIFIER I ITS ISO LOCATOR'OMPONENT DWG ¹i IITEH ¹ IFREOYl EX2/HDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ I LIHE HO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I
| |
| *V12A/PIPE JB-J f na J VOL/UT6.02
| |
| ]
| |
| 2FWS-47-13. F MOTO I QISO 47-13 or DWG¹ na in )89.11 /ID [
| |
| SUR/PT3.00/HT4.00 f NHP2-24-2.06-CS I LINE¹ 2FWS-024-31-1 HTS: 1,7 /AW/ber / 1 / na / /Scio I
| |
| PIPE/*HCV54A IB-J f na f VOL/UT6.02 2FWS-47 Fl$ 11 i QISO 47-13 or DWG¹ na in )89.11 ]none f SUR/PT3.00/HT4.00 /
| |
| NNP2-24-2.06.CS i LINE¹ 2FWS-024-31-1 NTS: 1,12 JHS 1 / na/na I I
| |
| *NCV54A/PIPE IB-J J na (
| |
| VOL/UT6.02 2FWS-47-13 Fl$ 12 I QISO 47-13 or DWG¹ na in (89.11 ]ID f SUR/PT3.00/HT4.00 /
| |
| HHP2-24-1.219-CS I LINE¹ 2FWS.024-61-1 NTS: 12,13 IHS 1 )na/ J Sc10 I ELB/PIPE IB- J )
| |
| na (
| |
| VOL/UT6.02 2FWS-47 Fl$ 14 (
| |
| QISO 47-13 or DWG¹ na in [89.11 I ID I SUR/PT3.00/MT4.00 I NNP2.24-2.06.CS I LIHE¹ 2FMS-024-31-1 HTS: 1,10 I DER 1 (na/ i Sc10
| |
| *FTG18/P I PE IB-J f na )
| |
| VOL/UT6.02 [EX6 2FWS-47-13-FW017 I QISO 47-13 or DWG¹ na in (89. 11 ] ID ]
| |
| SUR/PT3.00/HT4.00 [
| |
| NNP2.24-2.06.CS LINE¹ 2FWS-024-50-1 HTS: 1,5 IBER [ na/ I I INTEG ATT JB-K f na [ SUR/PT3.00/HT4.00 )
| |
| 2FWS-47-13-FM308 / QISO 47-13-07 . or D'WG¹ . in /810.20 ]ID / /
| |
| NA I LINE¹ 2FWS.024-31-1 NTS: 1,11 INS I 1 I / I INTEG ATT IB K I na I SUR/PT3.00/MT'0 I 2FWS.47-13-FW309 )
| |
| QISO 47-13-07 or DWG¹ in (810.20 /ID / /
| |
| NA I LINE¹ 2FMS-024-31-1 HTS: II11 JNS / 1 / / I IN'IEG ATT [8-K f na [ SUR/PT3.00/HT4.00 f 2FWS-47-13. F W310 J QISO 47-13-07 or DMG¹ in /810.20 /ID / /
| |
| HA I LINE¹ 2FWS-024-31-1 NTS: 1,11 IHS I 1 I / I IHTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I /0-I 2FWS.47-13-FW3'l1 J QISO 47-13-07 or DWG¹ in /810.20 /ID I NA I LINE¹ 2FWS.024-31-1 NTS: 1,11 /NS / 1 / / I I
| |
| | |
| NIAGARA HOHAWK POWER CORPORATIOH - NILE POIHT NUCLEAR'STATION - UNIT 2 4of 19 NHP2-ISI-006I REV. II CH-OOO SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FWS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTION OF ITEM TO BE EXANIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REHARKS EXAHIHATION IDENTIFIER [ ITS ISO LOCATOR, CONPOHEHT DMG ¹, )ITEN ¹ (FREOY( EX2/HDE PROCEDURE (PERIOD 2 USE CAL BLK ¹ I LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/ELB IB-J f na f VOL/UT6.02 2FMS-47-13-SW003 I QISO 47-13 or DWG¹ na in [89.11 )ID ( SUR/PT3.00/NT4.00 i NNP2-24-2.06-CS i LINE¹ 2FMS-024-31-1 NTS: 1,10 ABER 1 /na/ [Sc10
| |
| [ PIPE/ELB IB-J i na J VOL/UT6.02 2FWS-47-13-SM006 I QISO 47-13 or DWG¹ na in [89.11 /none [ SUR/PT3.00/NT4.00 f NNP2-24-1.219-CS I LIHE¹ 2FMS-024-61-1 NTS: 13,14 INS / na /na I ELB/PIPE IB-J [ na [ VOL/uT6.O2 2FWS-47-13-SM007 i QISO 47-13 or DMG¹ na in [89.11 ]none ) SUR/PT3.00/NT4.00 J NHP2-24-1.219-CS LINE¹ 2FWS-024.61-1 HTS: 14,15 (NS I I PIPE/SWL /8-J [ voL/uT6.O2 2FWS-47-13-SM008 i QISO 47-13 or DWG¹ na in )89.31 ]none f SUR/PT3.00/NT4.00 [
| |
| HHP2-24-1.219-CS LINE¹ 2FMS.024-61-1 NTS: 15,16 iNS 1 / na /na I I PIPE/RED IB-J (
| |
| na ) VOL/uT6.O2 2F WS-47-13-SM009 I QISO 47 13 or DWG¹ na in (89.11 [none ] SuR/PT3.00/NT4 F 00 )
| |
| NHP2-24-1. 219- CS I LINE¹ 2FMS-024-61-1 NTS: 15(17 IHS / na /na I I PIPE/0FTG18 IB-J I na I VOL/UT6.02 I 2FMS-47-13-SM011 I QISO 47 13 or DWG¹ na. in )89.11 IID I SUR/PT3.00/HT4.00 I HNP2-24-2.06-CS I LINE¹ 2FMS-024-50-1 NTS: 1,3 IBER 1 dna/ iSc10 I PIPE/PIPE IB-J [ na (
| |
| VOL/uT6.O2 2FWS-47-13-SW012 i QISO 47-13 or DWG¹ na in [89.11 (none J SUR/PT3.00/NT4.00 J HNP2-24-2.06-CS i LINE¹ 2FMS-024-31-1 NTS: 1 iNS 1 / na /na I FLUED KD/TEE ( FTG18) ]8-J (
| |
| na f VOL/UT6.02 2FMS.47-13-VMOOI )
| |
| QISO 47-13 or DWG¹ 048 in (89.11 )ID J SUR/PT3.00/NT4.00 J NHP2-30-2.90-CS f LINE¹ 2FMS-024-50-1 NTS: 3,4 JAM/ber / 1 f na / JSc10 I TEE/RED(*FTG18) /8-J f na f VOL/UT6.02 2FMS-47-13-VM002 I QISO 47-13 or DMG¹ 048 in [89.11 (ID (
| |
| SUR/PT3.00/NT4.00 [
| |
| NHP2-30-2.90-CS / LINE¹ 2FMS-024-50-1 NTS: 4,5 /AW/ber / 1 / na / I Sc10
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - MILE POIN'I NUCLEAR STATION - UNIT 2 5of 19 NHP2-ISI-006( REV. 1, CH-000 SECOHD TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FMS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED DESCRIPTION OF ITEN TO BE EXANIHED(CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1 REHARKS
| |
| (
| |
| EXAHIHATIOH IDEHTIFIER f ITS ISO LOCATOR, COMPONENT DMG ¹, )ITEN ¹ )FREOV) EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ f LINE NO. AND NOTES, AS APPLICABLE [SELECT (CLASS( EX3/HDE PROCEDURE ]PERIOD 3 I
| |
| TEE/THERNAL SLEEVE(*FTG1B) IB-J I na I VOL/UT6.02 I 2FMS-47-13-VM003 f QISO 47-13 or DMG¹ 048 in (89.31 /ID f SUR/PT3.00/NT4.00 /
| |
| HNP2-10-1.00-CS / LINE¹ 2FMS.024-50-1 NTS: 4,6 /AM/ber / 1 / na / /Sc10 f FLUED HD FORGING/PIPE Z4A )B-J ] na f VOL/UT6.02 I 2FMS-47-13-VMZ4A-SMA I Q 4713 or DMG¹ na in )89.11 )
| |
| ID )
| |
| SUR/PT3.00/HT4.00 I HNP2-24-2.469.CS f LINE¹ 2FMS-024-31-1 NTS: 8,9 JTEV/ber( 1 J
| |
| na / )
| |
| Sc10 I RED/PIPE IB-J [ na )
| |
| VOL/UT6.02 2FMS-47-14-FM001 I QISO 47-14 or DMG¹ na in (89.11 ]none f SUR/PT3.00/MT4.00 f HNP2-18-.938.CS J LINE¹ 2FMS-018-36-1 NTS: 19,2 iHS 1 f na/na I I PIPE/ELB IB-J [ na J VOL/UT6.02 2FMS-47-14-FM002 i QISO 47-14 or DMG¹ na in (B9.11 ]none I SUR/PT3.00/NT4.00 I HHP2-18-.938-CS I LINE¹ 2FMS-018-36-1 HTS: 20,22 INS 1 / na /na I I ELB/PIPE /8-J J na [ VOL/UT6.02 2FMS-47 FM004 I QISO 47-14 or DMG¹ na in [89.11 (none [ SUR/PT3.00/NT4.00 J HNP2-12-.688 CS i LINE¹ 2FMS-012-53-1 HTS: 24,25 (HS 1 / na /na I PIPE/SE Q N4A Az030 FEEDMATER IB-J [ na ] VOL/UT6.02 ] Sc7 2FMS-47-14-FM005 / QISO 47-14 or DMG¹ na. in /89.11 [ID 0 ] SUR/PT3.00/NT4.00 ]
| |
| NNP2-12-.688-CS I LINE¹ 2FMS-012-53-1 NTS: 24,26 I TEV I 1 lna/ I I PIPE/PIPE IB-J (
| |
| na )
| |
| VOL/UT6.02 2FMS-47-14-FM013 I QISO 47-14 or DUG¹ na in )89.'l1 ]none f SUR/PT3.00/NT4.00 J HNP2-12-.688-CS I LINE¹ 2FMS-012-53-1 NTS: 24 IHS 1 [ na /na I IHTEG ATT IB-K I na I SUR/PT3.00/NT4.00 I 2FMS-47-14-FM300 / QISO 47-14-13 or DMG¹ na in /810.20 /ID f na /na na I LINE¹ 2FMS-012-53-1 NTS: 24,26 INS I 1 I na /na I I IHTEG ATT JB-K [ na / SUR/PT3 F 00/NT4.00 J 2FMS-47-14-FM301 f QISO 47-14-13 or DMG¹ na in /810.20 /ID [ na /na
| |
| [ LIHE¹ 2FMS-012-53-1 NTS: 24,26 [HS I 1 I na /na I
| |
| | |
| NIAGARA HONAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 6 of 19 NNP2-ISI-006( REV. TI CN-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FMS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED DESCRIPTION OF ITEN TO BE EXANINED(CATGRY JIGSCC) EX1/HDE PROCEDURE )PERIOD 1 RENARKS
| |
| )
| |
| EXAHINATIOH IDENTIFIER J ITS ISO LOCATOR, COMPONENT DWG ¹, )ITEH ¹ (FREOYJ EX2/HDE PROCEDURE ]PERIOD 2 J USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSJ EX3/HDE PROCEDURE iPERIOO 3 i I INTEG ATT IB-K I na I SUR/PT3.00/NT4.00 I 2FMS-47 FM302 / QISO 47-14-13 or DMG¹ na in (810.20 /ID / na /na
| |
| / LIHE¹ 2FWS-012-53-1 NTS: 24,26 /HS / 1 / na /na I I IHTEG ATT (8-K (
| |
| na )
| |
| SUR/PT3.00/Hl'4.00 )
| |
| 2FWS-47-14-FM303 / QISO 47-14-13 or DWG¹ na in [810.20 )ID ] na /na I f LINE¹ 2FMS-012-53-1 NTS: 24,26 /HS / 1 f na /na I I IHTEG ATT JB-K I na I SUR/PT3.00/NT4.00 I 2FWS-47-14-FW304 f QISO 47-14-13 or DUG¹ na in (8'l0.20 )ID f na /na I I LINE¹ 2FWS-012-53-1 HTS: 24,26 IHS I 1 I na /na I I IHTEG ATT IB-K I na I SUR/PT3.00/NT4.00 I 2FMS-47 F W305 )
| |
| QISO 47-14-13 or DMG¹ na in JB10.20 ]ID ) na /na I f LINE¹ 2FMS-012-53-1 HTS: 24,26 FANS f 1 / na /na I I INTEG ATT (8-K f na )
| |
| SUR/PT3.00/NT4 F 00 (
| |
| 2FMS-47 FM306 ) QISO 47-14-13 or DMG¹ na in ]810.20 (ID J na /na I
| |
| (
| |
| LINE¹ 2FMS-012-53-1 NTS: 24,26 /HS f 1 [ na /na I IHTEG ATT )8-K [ na ( SUR/PT3.00/HT4.00 f 2FWS-47-14-FM307 f QISO 47-14-13 or DMG¹ na . in IB10.20 IID I na /na I
| |
| / LIHE¹ 2FWS-012-53-1 NTS: 24,26 (HS )
| |
| 1 f na /na I
| |
| / PIPE/SWL IB-J [ na [ VOL/UT6.02 2FWS-47-14-SM001 i QISO 47-14 or DMG¹ na in [89.31 [none J SUR/PT3.00/NT4.00 J HHP2-18-.938-CS LINE¹ 2FWS-018-36-1 HTS: 20,21 )HS 1 f na /na I ELB/PIPE IB-J [ na J VOL/UT6.02 2FMS-47-14-SM002 [ QISO 47-14 or DMG¹ na in )89.11 (none J SUR/PT3.00/NT4.00 J NNP2-18-.938.CS I LINE¹ 2FMS-018-36-1 HTS: 20 '2 INS / na /na I PIPE/RED IB-J I na I VOL/UT6.02 I 2FMS-47-14-SW003 i QISO 47-14 or DMG¹ na in )89.11 ]none ) SUR/PT3.00/HT4.00 (
| |
| NNP2-18-.938-CS [ LINE¹ 2FWS-018-36-1 NTS: 20,23 (NS 1 [ na /na
| |
| | |
| r NIAGARA MOHAWK POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 7 of 19 HNP2-ISI-006, REV. 1, CH.OOO SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN APPENDIX - FWS SYSTEH Change date: 07/29/1999 G (sorted by Examination Identifier)
| |
| (PERIOD RENARKS 2HD INTVL REL RED I DESCRIPTIOH OF ITEN To BE EXANINEDICATGRY I IGSCCI EX1/HDE PROCEDURE 1 EXAHIHATIOH IDENTIFIER ( ITS ISO LOCATOR, COMPONENT DMG ¹, (ITEN ¹ (FREQY( EX2/HDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE Ho. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 (
| |
| RED/PIPE IB-J (
| |
| na (
| |
| VOL/UT6.02 I
| |
| 2FMS-47-14-SM004 (
| |
| QISO 47-14 or DMG¹ na in (B9.11 (none (
| |
| SUR/PT3.00/NIL 00 (
| |
| HHP2-12-.688.CS I LINE¹ 2FWS 012 53 1 NTS'3 '4 IHS 1 (
| |
| na /na I PIPE/ELB IB-J I na I VOL/UT6.02 I 2FMS-47-14-SM005 (
| |
| QISO 47-14 or DMG¹ na in (89.11 (none (
| |
| SUR/PT3.00/NT4.00 (
| |
| HNP2-12-.688-CS ( LINE¹ 2FWS-012-53-1 HTS: 24,25 (HS I PIPE/ELB IB J (
| |
| na (
| |
| voL/uT6.O2 I
| |
| 2FMS-47-14-SM007 (
| |
| QISO 47-14 or DMG¹ na in (89.11 (none (
| |
| SUR/PT3.00/NI'F 00 (
| |
| HNP2-12-.688 CS (
| |
| LINE¹ 2FWS-012-53-1 NTS: 24,25 (NS 1 (
| |
| na /na
| |
| ( ELB/PIIE IB-J (
| |
| na (
| |
| VOL/uT6.O2 2FMS-47-14-SM008 I QISO 47-14 or DWG¹ na in (B9.11 (none (
| |
| SUR/PT3.00/NT4.00 (
| |
| NHP2-12-.688-CS (
| |
| LINE¹ 2FWS-012-53-1 NTS: 24,25 (NS ( na /na I SWL/PIPE (8-J (
| |
| na ( VOL/uT6.02 2F WS-47 FM001 I QISO 47-15 or DMG¹ na in (B9.11 (none (
| |
| SUR/P'13.00/HT4.00 (
| |
| HNP2-12-.688-CS LINE¹ 2FWS-012-52-1 NTS: 18(24 INS 1 (
| |
| na /na
| |
| (
| |
| ELB/PIPE IB-J (
| |
| na (
| |
| VOL/UT6.02 I
| |
| 2FWS-47-15-FM002 I QISO 47-15 or DMG¹ na .in (89.11 (none (
| |
| SUR/PT3.00/NT4 F 00 (
| |
| NHP2-12-.688-CS LINE¹ 2FWS-012-52-1 HTS: 24 25 IHS 1 (
| |
| na /na I
| |
| PIPE/SE Q N4B Az090 FEEDWATER (B.J I na I VOL/UT6.02 I
| |
| (
| |
| 2FWS-47-15-FM003 QISO 47-15 or DMG¹ na in (89.11 I ID-0 I SUR/PT3.00/NT4.00 (
| |
| Sc9
| |
| (
| |
| NNP2-12-.688.CS (
| |
| LINE¹ 2FWS-012-52-1 NI'S: 24,27 (TEV 1 (na/
| |
| I SWL/PIPE IB-J (
| |
| na (
| |
| VOL/UT6.02 2FMS-47-15-FW004 (
| |
| QISO 47-15 or DWG¹ na in (89.'ll (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NNP2-12-.688.CS LIHE¹ 2FMS-012-34-1 HTS: 18,24 (HS (
| |
| na /na
| |
| (
| |
| ELB/PIPE IB-J (
| |
| na ( VOL/UT6.02 I
| |
| 2FWS-47-15-FW005 I QISO 47-15 or DMG¹ na in (89.11 (none (
| |
| SUR/PT3.00/Hl'4.00 (
| |
| NNP2-12-.688-CS LINE¹ 2FWS-012-34-1 Hl'S: 24,25 (NS 1 (
| |
| na /na
| |
| | |
| NIAGARA NOHAMK POWER CORPORATION - IIILE POINT NUCLEAR STATION - UNIT 2 8 of 19 NNP2-ISI-006) REV. 1I CH-OOO SECOHD TEH TEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FMS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REO ] DESCRIPTIOH OF ITEN TO BE EXANIHED)CATGRY [IGSCC( EX1/NDE PROCEDURE (PERIOD 1 RENARKS EXANINATION IDENTIFIER f ITS ISO LOCATOR, COHPOHEHT OMG ¹, ]ITEN ¹ )FREQYJ EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ I LINE NO. AHD NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I ELB/PIPE IB-J )
| |
| na [ VOL/UT6.02 2FMS-47 FM006 I QISO 47-15 or D'MG¹ na in (89.11 ]none f SUR/PT3.00/NT4.00 f HNP2-12-.688-CS I LINE¹ 2FMS 012 34 1 NTS'4i25 IHS ( na /na I I PIPE/SE Q N4C A2150 FEEDMATER IB-J (
| |
| na )
| |
| VOL/UT6.02 2FMS-47 F W007 I QISO 47-15 or DMG¹ na in JB9.11 IID 0 I SUR/PT3.00/MT4.00 I HKP2-12-.688-CS I LINE¹ 2FMS-012-34-1 HTS:.24,27 ITEV 1 dna/ I Sc11 I PIPE/ELB IB-J )
| |
| na )
| |
| VOL/UT6.02 2FMS-47-15-FM008 I QISO 47-15 or DMG¹ na in JB9.11 )none ) SUR/PT3.00/NT4.00 J NHP2-12-.688-CS I LINE¹ 2FMS-012-34-1 NTS: 24(25 IHS [ na /na I IHTEG ATT IB-K I na I SUR/PT3.00/NT4.00 2FMS-47 FM300 / QISO 47-15-13 or DMG¹ HA in /B10.20 [IO / na /na na / LINE¹ 2FMS-012-34-1 NTS: 24,13 [NS / 1 / na /na INTEG ATT ]B-K ] na [ SUR/PT3.00/NT4.00 ]
| |
| 2FMS-47 FM301 f QISO 47-15-13 or DWG¹ NA in JB10.20 JIO J na /na I na J LINE¹ 2FMS-012-34-1 NTS 24(13 JHS f 1
| |
| )
| |
| na /na I I IHTEG ATT IB K I na I SUR/PT3.00/NT4.00 I 2FMS-47-15-FM310 f QISO 47-15-10 or DMG¹ na . in (B10.20 /ID f na /na I na ) LINE¹ 2FMS-012-34-1 NTS: 24,28 fNS (
| |
| 1 f na /na I I IHTEG ATT IB K I na I SUR/PT3.00/NT4 F 00 2FMS-47 FM311 [ QISO 47-15-10 or DMG¹ na in (B10.20 ]ID f na /na
| |
| (
| |
| LINE¹ 2FMS.012-34-1 NTS: 24,28 fHS / 1 f na /na I INTEG ATT [B-K f na [ SUR/PT3.00/MT4.00 f 2FMS-47-15-FM314 f QISO 47-15-12 or OMG¹ na in /B10.20 ]ID / na /na I f LINE¹ 2FMS-012-34-1 NTS: 24,13 /Nandate) 1 f na /na Sc8 i I IHTEG ATT IB K I na I SUR/PT 00/NT4.00 I I 2FMS-47-15-FM3'l5 f QISO 47-15-12 or DWG¹ na in JB10.20 ]ID J na /na I I f LINE¹ 2FMS-012-34-1 NTS: 24,13 [Nandatef 1 ] na /na Sc8 i
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 9 of 19 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FMS SYSTEN (sorted by Examination Identifier) 2ND IN'IVL REL RED DESCRIPTIOH OF ITEN TO BE EXAHIHED)CATGRY )IGSCC) EX1/HDE PROCEDURE )PERICO 1 REHARKS
| |
| (
| |
| EXAMINATION IDENT'IFIER J ITS ISO LOCATOR, COHPONEHT DMG ¹, [ITEN ¹ JFREQV[ EX2/HDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE ]PERIOD 3 /
| |
| I INTEG ATT JB-K . ] na J SUR/PT3.00/NT4.00 [
| |
| 2FMS-47-15-FM3X2 QISO 47-15-15 or DMG¹ na in (810.20 )ID na /na f
| |
| I LINE" 2FMS 012 34 1 HT '4 13 IHS I 1 f
| |
| I na /na I I INTEG ATT (B-K f na f SUR/PT3.00/NT4.00 f 2FMS.47-15-FM3X3 f QISO 47-15-15 or DMG¹ na in (810.20 ]ID ) na /na I
| |
| [ LINE¹ 2FMS-012-34-1 NTS: 24,13 JNS f 1 / na /na I I IHTEG ATT /8-K ] na f SUR/PT3.00/HT4.00 f 2FMS-47-15-FM3X4 f QISO 47-15-14 or DMG¹ na in /810.20 /ID f na /na I J
| |
| LINE¹ 2FMS.012-34-1 NTS: 24,13 /NS f 1 f na /na I I IHTEG ATT JB-K J na f SUR/PT3.00/NT4.00 2FMS-47-15-FM3X5 J QISO 47-15-14 or DMG¹ na in JB10.20 [ID ] na /na f LINE¹ 2FMS-012-34-1 HTS: 24,13 /HS ) 1 f na /na I INTEG ATT IB-K I na I SUR/PT3.00/NT4.00 I 2FMS-47-15-FM3X6 / QISO 47-15-11 or DMG¹ na in (810.20 ]ID f na /na I f LINE¹ 2FMS-012-34-1 HTS: 24,13 /HS ) 1 f na /na I INTEG ATT [B-K f na f SUR/PT3.00/NT4.00 ]
| |
| 2FMS-47 FM3X7 f QISO 47-15-11 or DMG¹ na . in JB10.20 ]ID f na /na I LINE¹ 2FMS-012-34-1 NTS: 24,13 IHS I 1 I na /na I I INTEG ATT /B-K J na f SUR/PT3.00/HT4.00 2FMS-47 FM3XB f QISO 47-15-10 or DMG¹ na in /B10.20 /ID f na /na f LINE¹ 2FMS-012-34-1 HTS: 24,28 /HS I 1 f na /na I INTEG ATT JB-K f na / SUR/PT3.00/NT4.00 f 2FMS-47-15-FM3X9 f QISO 47-15-10 or DMG¹ na in )810.20 (10 / na /na J
| |
| LINE¹ 2FMS-012-34-1 NTS: 24,28 ]HS / 1 / na /na I I PIPE/ELB IB-J / na / VOL/UT6.02 2FMS-47-15-SM001 I QISO 47-15 or DMG¹ na in (89.11 /none J SUR/PT3.00/NT4.00 /
| |
| HKP2-12-.688.CS I LINE¹ 2FMS-012-52-1 HTS'4 25 INS 1 / na /na
| |
| | |
| NIAGARA NOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 10 of 19 HNP2-ISI-006, REV. 1( CH-000 SECOHD TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FMS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTION OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REMARKS EXAHIHATION IDENTIFIER J ITS ISO LOCATOR, COHPOHENT DMG ¹, [ITEN ¹ [FREQYJ EX2/NDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/ELB IB-J i na i VOL/UT6.02 2FMS-47-15-SWOON I QISO 47-15 or DMG¹ na in (B9.11 /none / SUR/PT3.00/HT4.00 )
| |
| HNP2-12-.688-CS I LINE¹ 2FWS-012-52-1 NTS: 24,25 iHS I ELB/PIPE IB-J J na J VOL/UT6.02 2FMS-47-15-SM004 I QISO 47-15 or DMG¹ na in )89.11 [none J SUR/PT3.00/HT4.00 J NHP2-12-.688.CS i LINE¹ 2FMS-012-52-1 HTS: 24,25 iHS 1 J na /na I I PIPE/ELB IB-J f na f VOL/UT6.02 2FWS.47-15-SM005 i QISO 47-15 or DMG¹ na in [B9.11 ]none f SUR/PT3.00/HT4.00 (
| |
| NHP2-12-.688.CS LINE¹ 2FMS-012-34-1 HTS: 24,25 [HS f na /na I I PIPE/ELB IB-J J na J VOL/UT6.02 2F WS-47-15. SW008 I QISO 47-15 or DMG¹ na in (89.11 Inone I SUR/PT3.00/HT4.00 i NHP2-12-.688 CS I LINE¹ 2FWS-012-34-1 HTS: 24,25 INS 1 / na /na I I ELB/PIPE IB-J f na f VOI./UT6.02 2FMS-47-15-SW009 I QISO 47-15 or DMG¹ na in )89.11 ]none f SUR/PT3.00/HT4.00 f NNP2-12-.688.CS I LINE¹ 2FMS-012-34-1 NTS: 24,25 IHS 1 / na /na I
| |
| )
| |
| PIPE/*NOV218 (AUGNENTED VOL ONLY) Ina )
| |
| na [ VOL/UT6.02 I or DMG¹ na .in * /n/a Sc9 2FMS-47 FM002 i QISO 47-16 [na )ID (
| |
| NNP2-24-2.06-CS I LINE¹ 2FWS-024-28-4 NTS: 1,2 IBER I 4 I I
| |
| / *KOV21B/PIPE IB-J I na I VOL/UT6.02 I 2FWS-47 FM003 I QISO 47-16 or DWG¹ na in (B9.11 ilD i SUR/PT3.00/HT4.00 ( Sc9 NHP2-24-2.06-CS LINE¹ 2FMS.024-51-1 HTS: 1,2 ABER I 1 lna/ I PIPE/*AOV23B ]B-J [ na ] VOL/UT6.02 2FMS-47 FM006 [ QISO 47-16 or DMG¹ na in [89.'l1 (ID f SUR/PT3.00/HT4.00 f Sc9 NHP2-24-2.06.CS / LINE¹ 2FWS-024-51-1 HTS: 1,28 [AW/ber / 1 / na /
| |
| I
| |
| *AOV23B/PIPE /8-J / na / VOL/UT6.02 2FMS-47 FM007 / QISO 47-16 or DWG¹ na in /89.11 /ID / SUR/PT3.00/HT4.00 (
| |
| Sc9 HHP2-24-2.06.CS / LINE¹ 2FWS-024-51-1 N'IS: 1,28 /AM/ber / 1 / na /
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 11 of 19 NHP2-ISI-006( REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - FMS SYSTEH (sorted by Examination Identifier)
| |
| ND IHTVL REL RED DESCRIPTIOH OF ITEM TO BE EXAHIHEDlCATGRY IIGSCCI EX1/NDE PROCEDURE )PERIOD 1 I REHARKS I
| |
| EXAHINATION IDENTIFIER [ ITS ISO LOCATOR, COHPOHENT DMG ¹, (ITEN ¹ [FREOYJ EX2/NDE PROCEDURE (PERIOD 2 USE CAL BLK ¹ i LINE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I i PIPE/PENET Z4B /8-J f na / VOL/UT6.02 2FMS-47-16-FM008 (
| |
| aiso 47-16 or DMG¹ na in /89.11 /IO / SUR/PT3.00/HT4.00 / Sc9 NHP2-24-2.06-CS )
| |
| LINE¹ 2FMS-024-51-1 HTS: 1,8 /TEV/ber/ 1 / na /
| |
| I PENET Z4B/*V12B IB-J I na I VOL/UT6.02 I 2FMS-47-16-FW009 [ arso 47-16 or DMG¹ na in JB9.11 ]ID (
| |
| SUR/PT3.00/MT4.00 Jsc8 NHP2-24-2.469-CS f LINE¹ 2FMS-024-32-1 NTS: 28,8 [TEV/berf 1 / na / I t *V12B/PIPE [B-J J na [ VOL/UT6.02 2Fl5-47 FM010 / QISO 47-16 or DMG¹ na in (89.11 ]ID / SUR/PT3.00/MI'4.00 Jsc8 NHP2-24-2.06-CS f LINE¹ 2FWS-024-32-1 NTS: 1,28 /AW/ber f 1 / na /
| |
| / PIPE/*HCV54B IB-J I na I VOL/UT6.02 I 2FMS-47-16-FW011 i QISO 47-16 or DMG¹ na in (89.11 ]none J SUR/PT3.00/HT4.00 [
| |
| NHP2.24-2.06-CS LINE¹ 2FI5-024-32-1 NTS 3 14 IHS 1 / na /na I
| |
| *HCV54B/PIPE IB-J [ na )
| |
| VOL/UT6.O2 2FMS-47-16-FW012 I QISO 47-16 or DMG¹ na in (B9.11 IID I SUR/PT3.00/HT4.00 Isc8 NHP2-24-1. 219. CS I LINE¹ 2FMS-024.60-1 NTS: 3,14 IHS 1 [na/ I I RED/PIPE IB-J I na I VOL/UT6.02 I 2FI5-47-16-FM013 I QISO 47-16 or DWG¹ na . in (89.11 Inone I SUR/PT3 F 00/HT4.00 I HHP2-24-1.219-CS I LINE¹ 2FMS-024-60-1 NTS'7 19 IHS 1 / na /na I I ELB/PIPE IB-J I na I VOL/UT6.02 I 2Fl5-47-16. FM014 f arSO 47-16 , or DMG¹ na in ]89.11 /ID f SUR/PT3.00/HT4.00 [Sc8 HHP2-24-2.06-CS i LIHE¹ 2FMS-024-32-1 NTS: 3, 12 ABER 1 /na/
| |
| I INTEG ATT (8-K SUR/PT3.00/MT4.00 I )Re-entered into program associated with 2FMS-PSSH233A1/BZ-17KU 2FMS-47 FM300 J QISO 47-'l6-07 or DMG¹ HA in /810.20 /Ns / I NA I LINE¹ 2Fl5-024-32-1 HTS: 3,13 [na / 1 / I I INTEG ATT /8-K / na SUR/PT3.00/HT4.00 I [Re-entered into program associated with 2FMS-PSSH233A1/BZ-17KU 2FIIS-47-16. FW301 J QISO 47-16-07 or DWG¹ NA in JB'l0.20 /Ns / I NA ] LINE¹ 2FMS-024-32-1 NTS: 3,'13 Jna / 1 / I
| |
| | |
| HIAGARA HONAMK POMER CORPORATIOH - NILE POINT NUCLEAR STATION - UNIT 2 12 of 19 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FMS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE )PERIOD 1 I REHARKS EXAHINATIOH IDENTIFIER ) ITS ISO LOCATOR, COHPONENT DMG ¹, ) ITEN ¹ )FREQY) EX2/NDE PROCEDURE )PERIOD 2 )
| |
| USE CAL BLK ¹ I LINE No. AND NOTES, AS APPLICABLE )SELECT )CLASS) EX3/NDE PROCEDURE )PERIOD 3 I I IHTEG ATT IB K I na I SUR/PT /HT I )Re-entered into program associated with 2FMS.PSSH233AI/BZ-17KU 2FMS-47-16.FM302 )
| |
| QISO 47-16-07 or DMG¹ NA in )810.20 )NS ) /
| |
| NA )
| |
| LINE¹ 2FMS-024-32-1 NTS: 3,13 )na ) 1 ) / I I IHTEG ATT )8-K )
| |
| na )
| |
| SUR/PT3.00/HT4 F 00 )Re-entered into program associated with 2FMS-PSSH233A1/BZ-17KU 2FMS-47-16-FM303 )
| |
| QISO 47-16-07 or DMG¹ NA in )810.20 )NS ) /
| |
| NA )
| |
| LINE¹ 2FMS-024-32-1 NTS: 3,13 )na )
| |
| 1 ) /
| |
| I PIPE/SML IB-J )
| |
| na )
| |
| VOL/UT6.02 2FMS.47 FMS'MOOB )
| |
| QISO 47-16 or DMG¹ na in )89.31 )none I SUR/PT3 00/HT4 0 I NHP2-24.1.219. CS LINE¹ 2FMS 024-60-1 NTS: 17,18 )NS 1
| |
| )
| |
| na /na I PIPE/ELB IB-J )
| |
| na )
| |
| VOL/UT6.02 2f MS-47-16-SM003 I QISO 47-16 or DMG¹ na in )89.11 )ID )
| |
| SUR/PT3.00/HT4.00 )Sc8 NHP2-24-2.06-CS I LINE¹ 2FMS-024-32-1 NTS: 3,12 IBER 1 )na/ I
| |
| ) PIPE/ELB IB-J )
| |
| na )
| |
| VOuuT6.O2 2FMS-47-16-SM006 I QISO 47-16 or DMG¹ na in )89.11 )none )
| |
| SUR/PT3.00/HT4 F 00 )
| |
| NHP2-24-1.219-CS )
| |
| LINE¹ 2FMS-024-60.1 N'IS: 3(4 )NS I I ELB/PIPE IB-J I na I VOL/UT6.02 I ZFMS-47-16-SM007 ) QISO 47-16 or DMG¹ na . in )89.11 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NHP2-24-1 ~ 219. CS LINE¹ 2FMS-024-60-1 NTS: 16,15 )NS 1 )
| |
| na /na I I PIPE/RED IB-J )
| |
| na )
| |
| VOL/UT6.02 2FMS-47-16.SM009 I QISO 47-16 or DMG¹ na in )89.11 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NHP2-24-1.219-CS I LINE¹ 2FMS-024-60.1 NTS: 17,19 INS 1
| |
| )
| |
| na /na
| |
| )
| |
| PIPE/*FTGIA IB-J )
| |
| na )
| |
| VOL/UT6.02 2FMS.47-16-SM010 I QISO 47-16 or DMG¹ na in )89.11 )IO )
| |
| SUR/PT3.00/MT4.00 )
| |
| Sc9 NHP2-24-2.06-CS )
| |
| LINE¹ 2FMS 024 51 1 NTS' 3 IBER )
| |
| na/
| |
| I
| |
| <<FTG1A/PIPE IB-J )
| |
| na ) vouUT6.o2 2FMS-47-16-SM011 )
| |
| QISO 47-16 or DMG¹ na in )89.11 )ID )
| |
| SUR/PT3 F 00/HT4.00 ) Sc9 NHP2-24-2.06-CS I LINE¹ 2FMS-024-51-1 NTS: 1,5 IBER 1 )na/
| |
| | |
| NIAGARA MOHAMK POMER CORPORATIOH - MILE POINT NUCLEAR STATION - UNIT 2 13 of 19 NMP2-1SI-006, REV. 1, CN-OOO SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FMS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED ( DESCRIPTION OF ITEH TO BE EXAMINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 'I REHARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR ~ COMPONENT DMG ¹i IITEH ¹ IFREQYI EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE No. AND NOTES'S APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I
| |
| ( PIPE/PIPE IB-J (
| |
| na (
| |
| VOL/UT6.02 2FMS-47-16. SM012 (
| |
| QISO 47-16 or OMG¹ na in (89.11 (none I SUR/PT3.00/MT'0 I NHP2-24-1.219. Cs I LINE¹ 2FMS-024-60-1 HTS: 15,17 INS 1 (
| |
| na /na I PIPE/PIPE IB-J I na I VOL/UT6.02 I 2FMS-47-16-SM013 (
| |
| QISO 47-16 or DMG¹ na in (89.11 (none (
| |
| SUR/PT3.00/Ml'4.00 (
| |
| NHP2-24-2.06-CS I LINE¹ 2FMS-024-32-1 NTS: 3 INS ( na /na I FLUEO ND/TEE (*FTG1A) IB-J I na I VOL/UT6.02 I 2FMS-47-16-VM001 (
| |
| QISO 47-16 or OMG¹ 048 in (89.11 (ID ( SUR/PT3.00/MT4.00 (
| |
| Sc9 NMP2-30-2.90-CS (
| |
| LINE¹ 2FMS-024-51-1 NTS: 3,4 (AM/ber ( 1 ( na /
| |
| I TEE/RED (*FTG1A) IB-J (
| |
| na (
| |
| VOL/UT6.02 2FMS-47-16-W002 I QISO 47-16 or DMG¹ 048 in (89.11 (ID (
| |
| SUR/PT3.00/MT4.00 (
| |
| Sc9 NMP2-30.2.90-CS (
| |
| LINE¹ 2FMS-024 I NTS: 4,5 (AM/ber (na/
| |
| I TEE/THERMAL SLEEVE (*FTG1A) IB J (
| |
| na (
| |
| voL/uT6.O2 2FMS-47-16-W003 I QISO 47-16 or DMG¹ 048 in (89.31 (ID (
| |
| SUR/PT3.00/HT4.00 (
| |
| Sc9 NHP2-10-1.00.CS ( LINE¹ 2FMS-024-51-1 NTS: 4,6 (AM/ber 1 (na/
| |
| I PIPE/ELB IB-J (
| |
| na (
| |
| VOL/UT6.02 2FMS-47 FM001 (
| |
| QISO 47-17 or DMG¹ na . in (89.11 (none (
| |
| SUR/P'T3.00/MT4.00 (
| |
| NMP2-18-.938.CS (
| |
| LINE¹ 2FMS-018-35-1 NTS: 29,22 (NS (
| |
| na /na I PIPE/PIPE IB-J ( na (
| |
| VOL/UT6.02 2FMS-47-17-FM002 (
| |
| QISO 47-17 or DMG¹ na in (89.11 (none (
| |
| SuR/PT3.00/MT4.00 (
| |
| NMP2-12-.688.CS ( LINE¹ 2FMS-012-54-1 NTS: 24 (NS 1 (
| |
| na /na I ELB/PIPE IB-J na (
| |
| VOL/UT6.02 2FMS-47-17-FM003 (
| |
| QISO 47-17 or DMG¹ na in (89.11 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NMP2-12-.688.CS (
| |
| LINE¹ 2FMS-012-54-1 NTS: 24,25 INS (
| |
| na /na
| |
| (
| |
| PIPE/SE Q N4D Az210 FEEDMATER (8-J I na I VOL/UT6.02 I 2FMS-47-17-FM004 ( QISO 47-17 or DMG¹ na in (89.11 (ID-E (
| |
| SUR/PT3.00/HT4.00 (Sc8 NHP2-12-.688.CS I LINE¹ 2FMS-012-54-1 NTS 24 27 I TEV (na/
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 14 of 19 HHP2-ISI-006, REV. 1, CH-000 SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - FMS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTION OF ITEN TO BE EXANIHEDiCATGRY iIGSCCi EX1/HDE PROCEDURE iPERIOO 1 RENARKS EXAHIHATIOH IDENTIFIER f ITS ISO LOCATOR, COHPONEHT DMG ¹, [ITEN ¹ JFREOY[ EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I INTEG ATT JB-K f na f SUR/PT3.00/HT4.00 /
| |
| 2FMS-47 FM306 (
| |
| QISO 47-17-16 or DMG¹ na in /B10.20 ]ID J na /na f LINE¹ 2FMS.012-54-1 NTS: 24,26 JNS / 1 [ na /na I I IHTEG ATT /8-K J na J SUR/PT3.00/NT4 F 00 (
| |
| 2FMS-47-17-FM307 ) QISO 47-17-16 or DMG¹ na in (810.20 /ID / na /na
| |
| )
| |
| LINE¹ 2FMS-012-54-1 NTS: 24,26 ]HS 1 / na/na I I IHTEG ATT IB K I na I SUR/PT3.00/Hl'4.00 I 2FMS-47-17-FM308 f QISO 47-17-16 or DUG¹ na in [B10.20 /ID / na /na I I LINE¹ 2FMS-012-54-1 HTS: 24,26 INS 1 / na/na I INTEG ATT )8-K f na f SUR/PT3.00/NT4.00 f 2FMS-47-17-FM309 I QISO 47-17-16 or DMG¹ NA in IB10.20 ]ID f na /na na I LINE¹ 2FMS.012-54-1 NTS: 24,26 INS I 1 I na /na I I IHTEG ATT IB K I na I SUR/PT3.00/MT4.00 2FMS-47-17-FM310 / QISO 47-17-16 or DMG¹ NA in /810.20 /ID / na /na I LINE¹ 2FMS 012 54 1 NTS'4 26 IHS I 1 I na /na I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2FMS-47-17-FM311 f QISO 47-17-16 or DMG¹ HA . in /810.20 /ID / na /na I LIHE¹ 2FMS-012-54-1 NTS: 24,26 IHS 1 / na/na I I INTEG ATT [B-K f na f SUR/PT3.00/Hl'4.00 f 2FMS-47 FM312 f QISO 47-17-16 or DMG¹ HA in /810.20 )ID f na /na
| |
| [ LIHE¹ 2FMS-012-54-1 NTS: 24,26 )NS )
| |
| 1 ) na /na I I INTEG ATT JB-K [ na ) SUR/PT3.00/NT4.00 f I 2FMS.47 FM313 / QISO 47-17-16 or DMG¹ HA in /B10.20 /ID / na /na I I LINE¹ 2FMS-012-54-1 NTS: 24,26 IHS I 1 f na /na I I I PIPE/S'ML IB- J (
| |
| na [ VOL/UT6.02 2FMS-47-17-SM001 i QISO 47-17 or DMG¹ na in (B9.31 [none J SUR/PT3.00/NT4.00 J NHP2-18-.938-CS LINE¹ 2FMS-018-35-'I HIS'9 18 IHS 1 / na /na
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - HILE POINT'UCLEAR STATION - UNIT 2 15 of 19 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FWS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY (IGSCCI EX1/NDE PROCEDURE IPERIOD 'I REHARKS I
| |
| EXAHINATION IDENTIFIER J ITS ISO LOCATOR, COHPONENT DWG ¹, ]ITEN ¹ )FREOYJ EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I ELB/PIPE IB-J I na I VOL/UT6.02 I 2FWS-47-17-SW002 I QISO 47-17 or DMG¹ na in JB9.11 ]none [ SUR/PT3.00/HT4.00 J NHP2-18-.938-CS i LINE¹ 2FMS-018-35-'I NTS: 22,20 iNS 1 / na /na I I PIPE/RED IB-J [ na )
| |
| VOL/UT6.02 2FWS-47-17-SI$ 03. I QISO 47-17 or DMG¹ na in )89.11 Inone f SUR/PT3.00/HT4.00 I NHP2-18-.938-CS I LINE¹ 2FWS-018-35-1 NTS: 22,19 INS 1 / na/na I I RED/PIPE IB-J [ na (
| |
| VOL/UT6.02 2FWS-47-17-SM004 I QISO 47-17 or DWG¹ na in )89.'ll (none ] SUR/PT3.00/HT4.00 (
| |
| NHP2-12-.688.CS I LINE¹ 2F'WS-012-54-1 NTS: 19,24 INS 1 f na/na PIPE/ELB IB-J )
| |
| na )
| |
| VOL/UI'6.02 2FWS.47-17-SM005 QISO 47-17 or DMG¹ na in [89.11 )none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-12-.688-CS LINE¹ 2FWS-012-54-1 NTS: 24,25 INS 1 J na /na I I PIPE/ELB IB-J [ na ] VOL/UT6.02 2FWS.47-17-S'W007 i QISO 47-17 or DWG¹ na in (89.11 Inone I SUR/PT3.00/HT4.00 I NHP2-12-.688-CS [ LINE¹ 2FMS-012-54-1 NTS: 24,25 (NS 1 J na /na I I ELB/PIPE IB-J na (
| |
| VOL/UT6.02 I 2FMS-47-17-SW008 I QISO 47-17 or DWG¹ na . in (89.11 Inone I SUR/PT3 00/HT4.00 I )
| |
| NHP2-12-.688-CS LINE¹ 2FWS-012-54-1 NTS: 24,25 iNS 1 / na/na I I I PIPE/PIPE IB-J ] na [ VOL/UT6.02 2FWS-47-17-Sl$ 09 i QISO 47-17 or DWG¹ na in ]B9.11 )none (
| |
| SUR/PT3.00/Hl'4.00 )
| |
| NHP2-18-.938-CS i LINE¹ 2FWS-018-35-1 NTS: 29 FANS f na /na I I SWL/PIPE IB-J I na I VOL/UT6.02 I 2FWS-47 Fl$ 01 I QISO 47-18 or DWG¹ na in ]89.'l1 [none )
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-12-.688.CS LINE¹ 2FWS-012-37-1 NTS: 18,24 iNS 1 [ na /na I I ELB/PIPE IB-J [ na [ VOL/UT6.02 2FWS-47-18-FI$ 02 i QISO 47-18 or DWG¹ na in JB9.11 ]none ( SUR/PT3.00/HT4.00 J NHP2-12-.688-CS [ LINE¹ 2FMS-012-37-1 NTS: 24,25 iNS 1 / na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 16 of 19 NNP2-ISI-006( REV. 1) CH-OOO SECOHD TEN YEAR INSERVICE IHSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - FMS SYSTEN (sorted by Examination Identifier) 2HD IHTVL REL RED DESCRIPTIOH OF ITEN TO BE EXAHINED[CATGRY ] IGSCC( EX1/NDE PROCEDURE (PERIOD 1 RENARKS
| |
| )
| |
| EXANINATIOH IDENTIFIER f ITS ISO LOCATOR, CONPONENT OMG ¹, )ITEN ¹ JFREOYJ EX2/NDE PROCEDURE ]PERIOD 2 J USE CAL BLK ¹ i LINE HO. AND NOTES, AS APPLICABLE DESELECT )CLASS) EX3/NDE PROCEDURE iPERIOO 3 I PIPE/SE Q N4E A2270 FEED'MATER IB-J f na f VOL/UT6.02 2FMS-47-18-FM003 i QISO 47-18 or DWG¹ na in /89.11 IID-E I SUR/PT3.00/NT4.00 I HNP2-12-.688-CS I LINE¹ 2FMS-012-37-1 HTS: 24,27 I TEV 1 /na/ / Sc10 I SML/PIPE IB- J ( na [ VOL/UT6.02 FANS 2FMS-47 FM004 i QISO 47-18 or DMG¹ na in (89.11 (none )
| |
| SUR/PT3.00/NT4.00 [
| |
| NNP2-12-.688.CS LINE¹ 2FMS-012-33-1 NTS: 18,24 iNS I ELB/PIPE IB-J (
| |
| na )
| |
| VOL/UT6.02 2FMS-47-18-FWDDS I QISO 47-18 or DMG¹ na in )89.11 [none J SUR/PT3.00/HT4.00 )
| |
| NNP2-12-.688-CS LINE¹ 2FWS-012-33-'I NTS: 24,25 1 / na/na I I ELB/PIPE IB-J [ na [ VOL/UT6.02 2FMS-47-18-FM006 I Q 4718 or DMG¹ na in )89.11 ]none J SUR/PT3.00/NT4.00 J HNP2-12-.688-CS LINE¹ 2Fl5-012-33-1 NTS: 24,25 (NS 1 f na /na I I PIPE/SE Q N4F A2330 FEEDWATER IB-J I na I VOL/UT6.02 I 2FMS-47-18-FW007 i QISO 47-18 or DMG¹ na in [89.11 IID-E I SUR/PT3.00/NT4.00 I HNP2-12-.688-CS i LINE¹ 2FMS-012-33-1 HTS: 24,27 iTEV 1 /na/ I Sc10 I PIPE/ELB IB J [ na [ VOL/UT6.02 2Fl5-47 FM008 i QISO 47-18 or DWG¹ na .in ]89.11 (none f SUR/PT3.00/HT4.00 J HNP2-12-. 688-CS I LINE¹ 2FMS 012-33-1 NTS: 24 ~ 23 IHS I I IHTEG ATT )8-K SUR/PT3.00/HT4.00 I 2FI5-47-18-FM300 QISO 47-18.13 or DMG¹ NA in [810.20 /ID na /na
| |
| /
| |
| I LINE¹ 2FMS 012 33 1 HT '4 13 IH I 1 I na /na I
| |
| I I IHTEG ATT JB-K ( na )
| |
| SUR/PT3.00/HT4.00 f ~
| |
| 2FMS-47 FM301 [ QISO 47-18-13 or DWG¹ HA in JB10.20 (ID ] na /na LINE¹ 2FMS 012-33-1 NTS: 24,13 /NS f 1 f na /na I I INTEG ATT IB-K I na I SUR/PT3.00/NT4.00 i 2FMS-47-18-FM302 / QISO 47-18-14 or DMG¹ na in (810.20 ]ID f na /na I LINE¹ 2FMS.012-33-1 NTS: 24,13 INS I 1 I na /na I
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 17 of 19 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/'1999 APPENDIX G - FWS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REQ ) DESCRIPTION OF ITEH TO BE EXANINED)CATGRY )IGSCC) EX1/HDE PROCEDURE )PERIOD 1 REHARKS EXAHIHATION IDENTIFIER I ITS ISO LOCATOR'OMPONENT DWG ¹, IITEM ¹ IFREQYI EX2/NDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I IHTEG ATT /8-K / na I SUR/PT3.00/HT4.00 I 2FMS-47-18-FM303 / QISO 47-18-14 or DWG¹ na in /810.20 /ID / na /na na I LINE¹ 2FWS-012-33-1 NTS: 24,13 INS I 1 / na /na I I INTEG ATT (8-K f na (
| |
| SUR/PT3.00/NT4.00 J 2Fl5-47 FM304 J QISO 47-18-15 or DWG¹ na in (B10.20 [ID [ na /na I LINE¹ 2FWS.012-33-1 NTS: 24,13 IHS I 1 I na /na I I IHTEG ATT JB-K / na I SUR/PT3.00/HT4.00 I 2FWS.47-18-FM305 f QISO 47-18-15 or DWG¹ na in JB10 ~ 20 /ID / na /na I LINE¹ 2FWS-012-33-1 HTS: 24,13 INS I 1 / na /na I I INTEG ATT IB-K I na I SUR/PT3.00/NT4.00 I 2FMS-47 F W316 / QISO 47-18-12 or DWG¹ na in /810.20 /ID / na /na I i LINE¹ 2FWS-012-33-1 HTS: 24,13 iHS i 1 / na /na I I INTEG ATT /8-K / na I SUR/PT3.00/NT 00 I 2FMS.47-18-FW317 )
| |
| QISO 47-18-12 or DWG¹ na in (810.20 (ID J na /na I I LINE¹ 2Fl5-012-33-1 NTS: 24,13 INS I 1 / na /na I I INTEG ATT /8-K / na / SUR/PT3.00/NT4.00 J 2FI5-47-18-FW326 / QISO 47-18-11 or DWG¹ na .in /810.20 /ID / na /na I LINE¹ 2FWS-012-33-1 HTS: 24,13 INS I 1 / na /na I INTEG ATT )8-K J na I SUR/PT3.00/NT4.00 I 2FWS.47-18. FW327 f QISO 47-18-11 or DWG¹ na in /810.20 /ID / na /na I i LINE¹ 2FMS-012-33-1 NTS: 24, 13 iHS i 1 ) na /na I I IH'IEG ATT /8-K / na I SUR/PT3 F 00/HT4.00 I 2FI5.47 FM328 / QISO 47-18-10 or DWG¹ na in /B10.20 /ID / na /na i LINE¹ 2FWS-012-33-1 NTS: 24,28 iNS i 1 / na /na I I INTEG ATT JB-K / na I SUR/PT3 00/HT4 00 I 2FMS-47-18-FM329 / QISO 47-18-10 or DMG¹ na in /810.20 /ID f na /na
| |
| (
| |
| LINE¹ 2Fl5-012-33-1 NTS: 24,28 [HS [ 1 f na /na I
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 18 of 19 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - Fl5 SYSTEN (sorted by Examination Identif ier) 2ND INTVL REL RED )
| |
| DESCRIPTION OF ITEN TO BE EXANIHED]CATGRY ] IGSCC( EX1/NDE PROCEDURE (PERIOD 1 RENARKS EXAHINATIOH IDENTIFIER J ITS ISO LOCATOR, COHPONEHT DMG ¹, )ITEM ¹ JFREOY( EX2/HDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ i LINE HO. AND NOTES, AS APPLICABLE DESELECT iCLASS( EX3/HDE PROCEDURE [PERIOD 3 INTEG ATT fB-K f na ) SUR/PT3.00/HT4.00 f 2FMS-47 FM330 )
| |
| QISO 47-18-10 or DMG¹ na in (810.20 [ID ] na /na LINE¹ 2Fl5-012-33-1 NTS: 24,28 fHS f 1 f na /na I I IHTEG ATT )8-K J na )
| |
| SUR/PT3.00/NT4.00 ]
| |
| 2FMS-47 FM331 J QISO 47-18-10 or DMG¹ na in )810.20 ]ID J na /na I f LINE¹ 2F'MS-012-33-1 HTS: 24,28 (NS J 1 / na /na I I PIPE/ELB IB-J I na I VOL/UT6.02 I 2FMS-47-18. SM001 i QISO 47-18 or DMG¹ na in [89.11 ]none f SUR/PT3.00/HT4.00 f HHP2-12-.688.CS I LINE¹ 2Fl5-012-37-1 NTS: 24,25 INS 1 / na /na I PIPE/ELB IB-J I na I VOL/UT6.02 I 2FMS.47-18-SM003 I QISO 47-18 or DMG¹ na in )89.11 ]none J SUR/PT3.00/NT4.00 f NHP2-12-.688-CS I LINE¹ 2FMS-012-37-1 NTS: 24,25 IHS 1 f na /na I ELB/PIPE IB-J [ na )
| |
| VOL/UT6.02 2FMS-47-18-SM004 [ QISO 47-18 or DMG¹ na in [89.11 Inone I SUR/PT3.00/HT4 F 00 )
| |
| HHP2-12-.688.CS i LINE¹ 2Fl5-012-37-1 NTS: 24,25 JHS I 1 I na /na I I PIPE/ELB IB-J ) na [ Vol./UT6.02 2Fl5-47-18-SM006 I QISO 47-18 or DMG¹ na . in iB9.11 ]none J SUR/PT3.00/NT4.00 J NNP2-12-.688-CS I LINE¹ 2FI5-012-33-1 HTS: 24,25 IHS J na /na I PIPE/ELB IB-J (
| |
| na [ VOL/UT6.02 2Fl5-47-18-SM008 i QISO 47-18 or DMG¹ na in (89.11 (none (
| |
| SUR/PT3.00/NT4.00 )
| |
| NHP2-12-.688 CS i LINE¹ 2Fl5-012-33-1 NTS: 24,25 iHS ) na /na I I ELB/PIPE IB-J (
| |
| na (
| |
| VOL/U'I6.02 2FMS-47-18-SM009 I QISO 47-18 or DMG¹ na in )89.11 )none (
| |
| SUR/PT3.00/HT4.00 (
| |
| HHP2-12-.688.CS I LIHE¹ 2FMS-012-33-1 NTS: 24,25 IHS 1 J na/na I PIPE/PIPE IB-J [ na ] VOL/UT6.02 2FMS-47-18-SM010 i QISO 47-18 or DMG¹ na in [B9.11 Inone I SUR/PT3.00/NT4.00 I HHP2-12-.688 CS I LINE¹ 2Fl5 012 33 1 HTS'4 INS J na /na
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 19 of 19 HNP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) IN'IERVAL PLAN Change date: 07/29/1999 APPENDIX G - FMS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED DESCRIPTION OF ITEN TO BE EXAMINED(CATGRY [IGSCC) EX1/HDE PROCEDURE )PERIOD 1 RENARKS
| |
| (
| |
| EXAMINATION IDENTIFIER ) ITS ISO LOCATOR, CONPONEHT DMG ¹, (ITEN ¹ )FREQY[ EX2/HDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ I LINE NO. AHD NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/PIPE fB-J (
| |
| na J VOL/UT6.02 2FMS-47-18.SM011 i QISO 47-18 or DMG¹ na in /89.11 [none J SUR/PT3.00/NT4.00 [ I HHP2-12-.688-CS / LINE¹ 2FMS-012-33-1 HTS: 24 (HS / 1 / na /na I
| |
| (
| |
| PIPE/PIPE /B-J / na / VOL/UT6.02 2FMS-47-18.SM012 / QISO 47-18 or DMG¹ na in JB9.11 /none / SUR/PT3.00/NT4.00 / I NNP2-12-.688-CS I LINE¹ 2FMS-012-33-1 NTS: 24 INS I 1 I na /na I I J
| |
| PIPE/PIPE JB-J f na f VOL/UT6.02 I 2FMS-47-18-SM013 (
| |
| QI SO 47-18 or DMG¹ na in (89.11 (none )
| |
| SUR/PT3.00/NT4.00 ) I NMP2-12-.688-CS [ LINE¹ 2FMS-012-33-1 NTS: 24 )HS )
| |
| 1 f na /na I EHD OF SYSTEN FMS
| |
| | |
| NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI-006, Rev. 1, CH400 System: FWS General Notes
| |
| : 1. CLASS 1 BER WELD 16. 24. SCH. 80 ELBOW, SA-234 WPB
| |
| : 2. CLASS 4 AUGMENTED BER WELD 17. 24" SCH. 80 SMLS PIPE, SA433 GR6
| |
| : 3. 24" SCH 140 SMLS PIPE, SA-106C 18. 24" X12" SCH.BOSWEEPOLET, SA-105
| |
| : 4. 24" GATE VALVE, SA-105 19. 24" X 18" SCH. 80 CONC. RED. SA-234 WPB
| |
| : 5. 30" X 24" 1.804" MIN. WALLFLUED HD SA450 LF2 20. 18" SCH. 80 SMLS PIPE, SA-106B
| |
| : 6. 30" X 10" 2.625" MIN. WALLTEE, SA<20 WPL6 21. 18" X 12 SCH. 80 SWEEPOLET SA-105
| |
| : 7. 30" X 24" 1.804" MIN. WALLRED. SA450 LF2 22. 18" SCH. 80 ELBOW, SA-234 WPB
| |
| : 8. 10" X 8" .793" MIN. WALLTHERM. SLV SA450 LF2 23. 18" X 12" SCH. 80 CONC. RED., SA-234 WPB
| |
| : 9. 24" CHECK VALVE,SA-216 WC 8 24. 12" SCH. 80 SMLS PIPE, SA-106B
| |
| : 10. 24" PENETRATION, SA-508 CL2 25. 1Z SCH. 80 ELBOW, SA-234 WP8
| |
| : 11. 24" SCH. 160 SMLS PIPE, SA-508 CL2 26. 1.25" PLATE, SA416 GR 70
| |
| : 12. 24" SCH. 140 ELBOW, SA-234 WPL 27. 12" SAFE END EXTENSION, SA408 CL1
| |
| : 13. 1.50" PLATE, SA-516 GR70 28. 1.00" PLATE, SA416 GR 70
| |
| : 14. 24" ANGLE VALVE, SA452 LCB 29. 18 SCH.80SMLS PIPE,SA433GR6
| |
| : 15. 24" SCH. 80 SMLS PIPE, SA-106B
| |
| | |
| NIAGARA MOHAHK POHER CORPORATION - n MILE POINT NUCLEAR STATION - UNIT 2 1 of 34 HMP2-ISI.006( REV. 1I CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL RED DESCRIPTION OF ITEM TO BE EXAMINED(CATGRY (IGSCC) EX1/NDE PROCEDURE (PERIOD 1 REMARKS
| |
| )
| |
| EXAMINATIOH IDEHI'IFIER [ ITS ISO LOCATOR, COMPONENT DUG ¹, ]ITEM ¹ ]FREOYJ EX2/HDE PROCEDURE ]PERIOD 2 [
| |
| USE CAL BLK ¹ I LINE NO AND HOTESi AS APPLICABLE ISELECT ICLASSi EX3/NDE PROCEDURE iPERIOD 3 i
| |
| (
| |
| <<AOV156 BLTG )8-G-2 ) na )
| |
| VT1/VT2.01 I 2 I CS<<AOV156, VB514 (
| |
| QISO 57-07 or DUG¹ 003 in (87.70 )ID J na /na Sc9 f LINE¹ 2ICS-006-60-1 NTS: (none) JGrp Rep] 1 J na /na I i <<AOV156 INT SUR /8-M-2 f na f VT3/VT2.01 /<< J<< Examine when dissassemble for maintenance 2 I CS<<AOV156, VBY114 (
| |
| QISO 57-07 or DUG¹ 003 in ]812.50 JDisG f / /<<
| |
| [ LINE¹ 2ICS-006-60-1 HTS: 4 JGrp Rep/ 1 / / /<<
| |
| I
| |
| <<AOV157 BLTG /B-G-2 / na VT1/VT2.01, 2I CS*AOV157, VB515 / QISO 57-07 or DHG¹ 003 in /87.70 /none / na /na
| |
| / LINE¹ 2ICS-006-33-1 HTS: (none) )HS / 1 na /na I
| |
| *AOV1 INT SUR /8-M-2 / na / VT3/VT2.01 I 2ICS<<AOV157,VBY115 ( QISO 57-07 or DWG¹ 003 in (812 '0 ]none ] / I i LINE¹ 2ICS-006-33-1 NTS: 4 iHS i 1 ) / I
| |
| )
| |
| *MOV121 INT SUR JB-M-2 ') na VT3/VT2.01 IEX6 2 I CS'MOV121, VBY116 I Q 57 09 or DUG¹ 008 in )812.50 )DisG J / I f LINE¹ 2ICS-010-70-1 NTS: 14 [Grp Repf 1 / I i <<MOV126 INT SUR
| |
| /8-M-2 / na VT3/VT2.01 IEX6 2I CS<<MOV126, VBY117 )
| |
| QISO 57-07 or DWG¹ 015. in )812.50 )DisG ) / I
| |
| ) LINE¹ 2ICS-006-60-1 NTS: 1 /Grp Rep/ 1 / I I *MOV128 INT SUR IB-M-2 I na I VT3/VT2.01 2 I CS*MOV128, VBY118 ( QISO 57-09 or DUG¹ 008 in (812.50 )none J
| |
| /
| |
| ] LINE¹ 2ICS-010-70-1 HTS: 14 )NS ) 1 ) /
| |
| I PIPE/*MOV136 JC-F-1 / na / na /na [PIPE llALL < 3/8"; Although it is not required to be examined (and has 2 1 CS<<MOV136-VHMOV136A QISO 57-04 or DUG¹ na in /none /none / na /na (no Code Item No.) this weld was included in the total C.F-1 weld count
| |
| (
| |
| LINE¹ 2ICS-006-19.2 NTS: 22,1 /HS ) 2 / na /na (to which the 7.5X sampling rate was applied.
| |
| i lllC-I I
| |
| *Pl MT FOOT/BARREL JC-C f na f SUR/PT3.00/MT4.00 f Sc7 IN20346 2ICS<<PI,PN400 )
| |
| QISO 57-05 or DUG¹ 013 in /C3.30 (ID f na /na I
| |
| / LINE¹ 2ICS-006-na-4 NTS: 54,55 iMandate/ 2 / na /na I I
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 2 of 34 NHP2-ISI-006, REV. 1, CH-000 SECOHD TEH TEAR IHSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEN (sorted by Examination Identifier) 2HD IHTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIDO 1 I REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG ¹, iITEH ¹ iFREOYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ i LINE NO. AHD NOTES, AS APPLICABLE ]SELECT iCLASS) EX3/HDE PROCEDURE iPERIDO 3 i I WC-1 )
| |
| *P1 HT FOOT/BARREL JC-C f na )
| |
| SUR/PT3.00/HT4.00 J Sc7 IN20346 2I CS*P1, PM401 (
| |
| QISO 57-05 or DMG¹ 013 in (C3.30 ]ID f na /na I f LINE¹ 2ICS-006-na-4 NTS: 54,55 (Handate) 2 J na /na I I IMC-1 i
| |
| <<P1 HT FOOT/BARREL /C-C J na / SUR/PT3.00/NT4.00 Sc7 (N20346 2 I CS*P1, PM402 / QISO 57-05 or DWG¹ 013 in /C3.30 )ID / na /na I I
| |
| / LINE¹ 2ICS-006-na-4 HTS: 54,55 /Handate/ 2 / na /na I I IWC-1 I
| |
| *P1 HT FOOT/BARREL /C-C / na / SUR/PT3.00/HT4.00 / Sc7 IH20346 2I CS*P1, PW403 I QISO 57-05 or DMG¹ 013 in JC3.30 ]ID J na /na I I J
| |
| LINE¹ 2ICS-006-na-4 HTS: 54,55 JHandate) 2 J na /na I I
| |
| [
| |
| *P1 (discharge) BARREL/HOZ JC-F-2 I na I SUR/PT3.00/HT4.00 I 2 I CS*P1, PW404 I QISO 57-05 or DMG¹ 013 in [C5.81 /none / na /
| |
| LINE¹ 2ICS-006-na-4 NTS: 53,7 ITE 2 / na /na I
| |
| /
| |
| *P1 (suction) NOZ/BARREL /C-F-2 I na I SUR/PT3.00/HT4.00 I 2 I CS*P1, PM405 / QISO 57-04 or DMG¹ 013 in [C5.81 /none / na / I I LIHE¹ 2ICS-006-na-4 HTS: 54,53 I TE 2 ) na/na I
| |
| <<P1 (suction) MHF/ELB IC-F-2 )
| |
| na [ VOL/UT6.02 (gingham-Wiliamette Dwg 8-29968 (16.350-001- 040A) infers 0.278" wall
| |
| (
| |
| 2I CS*P1, PW406 QISO 57-04 or DMG¹ 013 in [none )none SUR/PT3.00/NT4.00 (thickness, and therefore, not required to be examined; included in HNP2-10-.719.CS
| |
| (
| |
| I LINE¹ 2ICS 006 na 4 HT '1 ~ 52 Ina 2 ]
| |
| [
| |
| na /na
| |
| [
| |
| I (C-F-2 for 7.5X criteria
| |
| (
| |
| *Pl (suction) ELB/NOZ /C-F-2, / na / VOL/UT6.02 2I CS<<P1 PM407 / QISO 57-04 or DMG¹ 013 in /C5.51 /none / SUR/PT3.00/HT4.00 /
| |
| NHP2-10-.719-CS / LINE¹ 2ICS-006-na-4 HTS: 52,54 /SD / 2 J na /na I PIPE/PIPE IC-F-2 / na / na/na [PIPE 'WALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-01-FM002 i QISO 57-01 or DMG¹ na in )none /none ) na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-006-142 2 NTS'7 Ina I 2 I na/na [to which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 / na / na /na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-01-FW003 I QISO 57-01 or DMG¹ na in (none /none / na /na (no Code Item No.) this weld was included in the total C-F-2 weld count na I LINE¹ 2ICS 006 142 2 HTS'7 18 Ina 2 / na /na ]to which the 7.5X sampling rate was applied.
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 3 of 34 NKP2-ISI-006( REV. 'I, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ (
| |
| DESCRIPTIOH OF ITEN TO BE EXAMINED)CATGRY [IGSCC[ EXI/HDE PROCEDURE IPERIOO 1 I REHARKS EXAHIHATION IDENTIFIER ( ITS ISO LOCATOR, CONPONENT DMG ¹, [ITEN ¹ JFREQYJ EX2/NDE PROCEDURE ]PERIOD 2 J USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I PIPE/ELB IC-F-2 / na ( na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57-01-FM009 i QISO 57-01 or DMG¹ na in )none /none (
| |
| na /na )no Code Item Ho.) this weld was included in the total C-F-2 weld count
| |
| [ LINE¹ 2ICS-006-142-2 NTS: 17,18 )na ] 2 J na/na )to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC-F-2 / na / na/na (PIPE WALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57 FM010 I QISO 57-01 or DWG¹ na in ]none [none / na /na )no Code Item No.) this weld was included in the total C-F-2 weld count
| |
| (
| |
| LINE¹ 2ICS-006-142-2 NTS: 17 (na 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC-F-1 [ na / na/na )PIPE MALL < 3/8"; Cls2 CS to Cls4 SS; Although it is not required to 2ICS-57-01-FM011 I QISO 57-01 or DMG¹ na in / none (none / na /na )be examined (and has no Code Item Ho.) weld was included in the total LINE¹ 2ICS-006-142-2 NTS: 16, 17 iNS 2 / na /na )C-F-I weld count to which the 7.5X sampling rate was applied.
| |
| PIPE/ELB IC-F-2 [
| |
| na [ na /na I )PIPE WALL < 3/8"; Although it is not required to be examined (and has 21CS.57.01-SW001 QISO 57-01 or DMG¹ na in ]none ]none [ na /na I )no Code Item Ho.) this weld was included in the total C-F-2 weld count LINE¹ 2ICS-006-142-2 NTS: 17,18 /na 2 J na /na I )to which the 7.5X sampling rate was applied.
| |
| ELB/PIPE IC-F-2 ] na [ na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-01-SM002 QISO 57-01 or DMG¹ na in [none )none [ na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count LINE¹ 2ICS-006-142-2 NTS: 17,18 dna 2 / na /na (to which the 7.5X, sampling rate was applied.
| |
| PIPE/ELB IC-F-2 / na / na /na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2I CS-57-01-SM003 QISO 57-01 or DMG¹ na,in /none ]none (
| |
| na /na (no Code Item No.) this weld was included in the total C-F-2 weld cant LINE¹ 2ICS-006-142-2 NTS: 17,18 /na I 2 I na/ )to which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 J na ] na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 1 CS-57-01-SM004 I QISO 57-01 or DMG¹ na in )none Jn~ ) na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count
| |
| ) LINE¹ 2ICS-006-142-2 NTS: 17,18 )na 2 J na/na (to which the 7.5X sampling rate was applied.
| |
| PIPE/ELB IC-F-2 / na / na /na ]PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57-01-SM005 I QI 57 01 or DWG¹ na in ]none /none / na /na ]no Code Item No.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-006-142-2 NTS: 17,18 (na 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 / na / na /na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-01-SW007 I QISO 57-01 or DMG¹ na in ]none /none / na /na )no Code Item No.) this weld was included in the total C-F-2 weld cant na ( LINE¹ 2ICS-006-142-2 NTS: 17,18 (na 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT HUCLEAR STATION - UNIT 2 4 of 34 NHP2-ISI-006, REV. 1, CH.000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - ICS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED J DESCRIPTIOH OF ITEN TO BE EXANINED[CATGRY ( IGSCC[ EKl/NDE PROCEDURE [PERIOD 1 REHARKS EXAHINATIOH IDENTIFIER [ ITS ISO LOCATOR, COHPONEHI'MG ¹, [ITEN ¹ JFREQYJ EX2/HDE PROCEDURE (PERIOD 2 f USE CAL BLK ¹ f LINE NO. AND NOTES, AS APPLICABLE )SELECT ]CLASS( EX3/HDE PROCEDURE ]PERIOD 3 PIPE/ELB IC-F-2 / na / na /na (PIPE MALL < 3/84; Although it is not required to be examined (and has 2ICS-57-01-SM008 QISO 57-01 or DMG¹ na in /none /none J na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count LINE¹ 2ICS-006-142-2 NTS: 17,18 Jna 2 J na/na (to which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 / na [ na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 21 CS-57-01-SM009 I QISO 57-01 or DMG¹ na in (none /none / na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-006-142-2 NTS: 17,18 Ina 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC-F-2 / na / na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57 FM001 I QISO 57-02 or DMG¹ na in [none /none / na /na )no Code Item No.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS.006-142-2 HTS: 17 Ina 2 J na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC F 2 f na ) na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-02-FM003 I QISO 57-02 or DMG¹ na in [none ]none f na /na (no Code Item No.) this weld was included in the total C-F-2 weld cant LINE¹ 2I CS-006-1-2 HTS: 17 (na 2 f na/na )to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC-F-2 [ na / na/na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2I CS.57 FM004 J QISO 57-02 or DMG¹ na in )none /none / na /na )no Code Item Ho.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-006-1-2 HTS: 17 Ina 2 / na/na )to which the 7.5X serpling rate was applied.
| |
| PIPE/PIPE IC-F-2 / na / na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-02-FM005 QI SO 57-02 or DMG¹ na .in /none /none / na /na (no Code Item No.) this weld was included in the total C-F-2 weld cunt LINE¹ 2ICS-006-1-2 NTS: 17 )na 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC-F-2 f na / na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57 FM006 i QISO 57-02 or DMG¹ na in ]none /none / na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count
| |
| (
| |
| LINE¹ 2ICS-006-1-2 NTS: (none) (na 2 J na/na (to which the 7.5X sampling rate was applied.
| |
| [ PIPE/PIPE IC-F-2 / na f na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57 FM007 i QISO 57-02 or DMG¹ na in ]none (n~ ) na/na (no Code Item No.) this weld was included in the total C-F-2 weld cmnt I LINE¹ 2ICS-006-1-2 NTS: 17 Ina 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| I P I PE/ANOV129 IC-F-2 / na f na /na [PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-02-FM008 (
| |
| QISO 57-02 or DMG¹ na in )none /none f na /na (no Code Item No.) this weld was included in the total C-F-2 weld cant LINE¹ 2ICS-006-142-2 NTS: 17,1 (na I 2 I na/na (to which the 7.5X sampling rate was applied.
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR Sl'ATION - UHIT 2 5 of 34 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REO ( DESCRIPTION OF ITEN TO BE EXAHIHED(CATGRY (IGSCC( EK1/NDE PROCEDURE (PERIOD 1 RENARKS EXAMINATION IDENTIFIER ( ITS ISO LOCATOR, COHPOHEHT OMG ¹, ( ITEN ¹ (FREQY( EX2/HDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ (
| |
| LIHE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 (
| |
| (
| |
| *HOV129/PIPE IC-F-2 (
| |
| na (
| |
| na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS.57 FM009 (
| |
| QISO 57-02 or DMG¹ na in (none (none (
| |
| na /na (no Code Item No.) this weld was included ih the total C-F-2 weld count
| |
| (
| |
| LIHE¹ 2ICS-006-1 2 NTS: 17,1 (na 2 ( na/ns (to which the 7.5X sampling rate was applied.
| |
| (
| |
| PIPE/PIPE IC-F-2 (
| |
| na ( na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57 FM011 I QISO 57-02 or DMG¹ na in (none (none ( na /na (no Code Item No.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-006-1-2 NTS: 17 Ina 2 ( na /na (to which the 7.5X sampling rate was applied.
| |
| (
| |
| PIPE/PIPE IC-F-2 ( na ( na /na (PIPE MALL < 3/84; Although it is not required to be examined (snd has 2 I CS-57 FM012 ( QISO 57-02 or DMG¹ na in (none (none (
| |
| na /na (no Code Item No.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-006-1-2 HTS: (none) Ina 2 (
| |
| na /na (to which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 (ns (ns/na (PIPE MALL < 3/8"; Although it is not required to be examined (ard has 2ICS-57 FM014 I QISO 57-02 or DMG¹ na in (none (none (
| |
| na /na (no Code Item No.) this weld was included in the total C-F-2 weld count
| |
| (
| |
| LINE¹ 2ICS-006-142-2 NTS: 17,18 (na 2 ( na/na (to which the 7.5X sampling rate was applied.
| |
| (
| |
| PIPE/PIPE IC-F-2 (
| |
| na (
| |
| na /na (PIPE MALL < 3/8"; Although it is not required to be examined (snd has 2ICS-57.02- FM015 (
| |
| QISO 57-02 or OMG¹ na in (none (none ( na /na (no Code Item No.) this weld wss included in the total C-F-2 weld count
| |
| (
| |
| LINE¹ 2ICS-006-142-2 HTS: 17 (na 2 ( na/na (to which the 7.5X sampling rate was appl'led.
| |
| I PIPE/*V249 IC-F-2 (na (na/na (PIPE MALL < 3/8"; Although it is not required to be examined (snd has 2ICS-57-02-FM022 (
| |
| QISO 57-02 or DMG¹ na in (none (~e (
| |
| na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count
| |
| (
| |
| LIHE¹ 2ICS-006-1-2 NTS: 17,19 (na 2 ( na/na (to which the 7.5X sampling rate was applied.
| |
| (
| |
| *V249/PIPE IC-F-2 (na (na/na (PIPE MALL < 3/8"; Although it is not required to be examined (ard has 2ICS-57-02-FM023 I QISO 57-02 or DMG¹ na in (none (none ( na /na (no Code Item No.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-006-1-2 NTS: 17,19 lna 2 ( na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/ELB IC-F-2 ( na ( na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and hss 2I CS-57-02-SM002 (
| |
| QISO 57-02 or DMG¹ na in (none (none ( na /na (no Code Item No.) this weld was included in the total C-F-2 weld cant
| |
| ( LINE¹ 2ICS-006-142.2 NTS: 17,18 (na 2 ( na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC-F-2 ( na ( na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS.57-02-SM004 I QISO 57-02 or DMG¹ na in (none (none (
| |
| na /na (no Code Item No.) this weld wss included in the total C-F-2 weld count I LINE¹ 2ICS-006-1-2 H'TS: 17 Ina 2 ( ns/na (to which the 7.5X sampling rate was applied.
| |
| | |
| NIAGARA NOHAWK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 6of 34 NNP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier)
| |
| ND IHTVL REL REQ I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHINATIOH IDENTIFIER J ITS ISO LOCATOR, COHPOHEHT DWG ¹, [ITEM ¹ JFREQY[ EX2/HDE PROCEDURE (PERIOD 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE )SELECT )CLASSY EX3/NDE PROCEDURE iPERIOD 3 P I PE/P I PE IC-F-2 [ na f na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 21 CS-57 FW001 ) QISO 57-03 or DMG¹ na in (none /none / na /na )no Code Item No.) this weld was included in the total C-F-2 weld cant
| |
| [ LIHE¹ 2ICS-006-1-2 NTS: 17 ]na 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 / na / na /na )PIPE 'WALL < 3/8"; Although it is not required to be examined (and has 2I CS-57-03-FM002 I QISO 57-03 or DMS¹ na in [none /none / na /na (no Code Item No.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS 006 1 2 NTS: 17,18 Ina 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| ELB/PIPE IC-F-2 / na / na/na )PIPE MALL <<3/8"; Although it is not required to be examined (and has 2 I CS-57 FM003 QISO 57-03 or DMG¹ na in [none /none / na /na (no Code Item No.) this weld was included in the total C-F-2 weld count LINE¹ 2ICS-006-1-2 HTS: 17,18 (na 2 / na./na (to which the 7.5X sampling rate was applied.
| |
| PIPE/ELB IC-F-2 J na / na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-03-FM005 QISO 57-03 or DMG¹ na in /none /none J na /na (no Code Item No.) this weld was included in the total C-F-2 weld count na LINE¹ 2ICS-006-1-2 HTS: 17,18 /na 2 / na/na (to which the 7.5X sanpling rate was applied.
| |
| PIPE/PIPE IC-F-2 ) na f na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS.57.03.FM006 QISO 57-03 or DMG¹ na in )none (none f na /na (no Code Item No.) this weld was included in the total C-F-2 weld count LINE¹ 2ICS-006-1-2 HTS: 17 ina 2 / na /na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC-F-2 / na / na/na (PIPE WALL < 3/8"; Although it is not required to be examined (and has 2ICS-57.03-FM007 I QISO 57 03 or DMG¹ na .in )none /none / na /na [no Code Item Ho.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-006-1-2 NTS: 17 Ina 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC-F-2 / na f na /na (PIPE WALL < 3/8"; Although it is not required to be examined (and has 2I CS-57 FM009 [ QISO 57-03 or DMG¹ na in /none (none / na /na (no Code Item No.) this weld was included in the total C-F-2 weld count f LINE¹ 2ICS-006-1-2 HTS: 17 (na 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| PIPE/PIPE IC-F-2 / na f na /na )PIPE WALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-03-FM017 QISO 57-03 or DMG¹ na in [none /none / na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld coat LINE¹ 2ICS-006-1-2 HTS: 17,18 (na 2 J na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC-F-2 ] na (
| |
| na /na (PIPE MALL << 3/8"; Although it is not required to be examined (and has 21CS.57-03-FW018 ) QISO 57-03 or DMG¹ na in (none ]none )
| |
| na /na (no Code Item No.) this weld was included in the total C-F-2 weld coat
| |
| ( LINE¹ 2ICS-006-1-2 NTS: 17 (na 2 J na/na (to which the 7.5X sax@ling rate was applied.
| |
| | |
| NIAGARA NONAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 NHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR IHSERVICE IHSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RECI I DESCRIPTIOH OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE (PERIOD 1 I REHARKS EXAHINATION IDENTIFIER ( ITS ISO LOCATOR, CONPONEHT DMG ¹, ( ITEN ¹ (FREQY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ ( LINE NO. AHD NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I PIPE/ELB IC-F-2 (
| |
| na (
| |
| na/na (PIPE MALL <<3/8"; Although it is not required to be examined (and has 2ICS-57-03-SM001 QISO 57-03 or DMG¹ na in (none (none (
| |
| na /na (no Code Item No.) this weld was included in the total C-F-2 weld cgnt LINE¹ 2ICS.006-1-2 NTS: 17,18 (na 2 (
| |
| na/na (to which the 7.5X saapling rate was applied.
| |
| ELB/PIPE IC-F-2 (
| |
| na (
| |
| na /na (PIPE 'MALL < 3/8"; Although it is not required to be examined (and has 2I CS-57-03. SM002 QISO 57-03 or DMG¹ na in (none (none (
| |
| na /na (no Code Item No.) this weld was included in the total C-F-2 weld count LIHE¹ 2ICS-006-1-2 NTS: 17,18 (na 2 ( na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/ELB IC-F-2 ( na (
| |
| na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-03-SM003 I QISO 57-03 or DMG¹ na in (none (none (
| |
| na /na (no Code Item No.) this weld was included in the total C-F-2 weld eeet I LINE¹ 2ICS.006-1-2 NTS: 17(18 (na 2 (
| |
| na/na (to which the 7.5X saapling rate was applied.
| |
| PIPE/ELB IC-F-2 (
| |
| na ( na /na I (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS.57-03-SM004 QISO 57-03 or DMG¹ na in (none (none ( na /na I (no Code Item Ho.) this weld was included in the total C-F-2 weld cant LINE¹ 2ICS-006-1-2 NTS: 17,18 (na 2 (
| |
| na/na I (to which the 7.5X sampling rate was applied.
| |
| PIPE/ELB IC-F-2 ( na (
| |
| na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS.57-03-SM005 QISO 57-03 or DMG¹ na in (none (none (
| |
| na /na (no Code Item Ho.) this weld was included in the total C.F-2 weld count LINE¹ 2ICS-006-1-2 NTS: 17,18 (na 2 ( na /na (to which the 7.5X sampling rate was applied.
| |
| ELB/PIPE IC-F-2 (na (na/na ~
| |
| (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57.03-SM006 QISO 57-03 or DMG¹ na .in (none (none (
| |
| na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld cent LINE¹ 2ICS-006-1-2 NTS: 17,18 (na 2 (
| |
| na/na (to which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 (
| |
| na ( na /na (PIPE MALL < 3/8"; Although it is not required to be examined-(and has 2ICS-57-03-SM007 ( QISO 57-03 or DMG¹ na in (none (none ( na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count
| |
| (
| |
| LINE¹ 2ICS-006-1-2 HTSt 17,18 (na 2 (
| |
| na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/ELB IC-F-2 ( na (
| |
| na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2I CS-57-03-SM008 I QISO 57-03 or DMG¹ na in (none (none (
| |
| na /na (no Code Item No.) this weld was included in the total C-F-2 weld coat LIHE¹ 2ICS-006 1-2 HTS: 17,18 (na 2 (
| |
| na /na (to which the 7.5X sampling rate was applied.
| |
| ELB/PIPE (C-F-2 (
| |
| na (
| |
| na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57 FM001 QI SO 57-04 or DMG¹ na in (none (none (
| |
| na /na (no Code Item No.) this weld was included in the total C-F-2 weld cent LINE¹ 2ICS-006-1-2 NTS: 17,18 (na 2 ( na /na (to which the 7.5X sampling rate was applied.
| |
| | |
| 0 NIAGARA HONAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 8 of 34 NHP2-1S1-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REQ i DESCRIPTIOH OF ITEN TO BE EXANINEDiCATGRY i IGSCCi EX1/HDE PROCEDURE iPERIOO 1 i REHARKS EXANIHATION IDEHTIFIER I ITS ISO LOCATOR'OHPONEHT DMG ¹i IITEH ¹ IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE )SELECT iCLASSi EX3/NDE PROCEDURE IPERIOD 3 I I
| |
| PIPE/~V27 IC-F-2 / na (
| |
| na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 1 CS-57-04-FM002 i QISO 57-04 or DMG¹ na in [none /none / na /na [no Code Item Ho.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-006-1-2 NTS: 17,19 Ina 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| (
| |
| *V27/PIPE IC-F-2 / na / na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2I CS-57 FM003 (
| |
| QISO 57-04 or DWG¹ na in [none /none / na /na [no Code Item No.) this weld was included in the total C-F-2 weld cant I LINE¹ 2ICS 006 1 2 NTS'7 19 Ina 2 / na/na )to which the 7.5X sampling rate was appl'led.
| |
| J PIPE/'V83 IC-F-2 [ na ( na /na (PIPE 'MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-04-FM004 i QISO 57 04 or DMG¹ na in ]none (none [ na /na (no Code Item No.) this weld was included in the total C-F-2 weld count
| |
| (
| |
| LIHE¹ 2ICS-006-1-2 HTS: 1,17 Jna 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| *V83/PIPE IC-F-2 ] na )
| |
| na /na (PIPE WALL < 3/8"; Although it is not required to be examined (and has 21 CS-57 FW005 QISO 57.04 or DMG¹ na in [none [none ) na /na (no Code Item No.) this weld was included in the total C-F-2 weld count LINE¹ 2ICS-006-1-2 HTS: 1,17 (na 2 f na/na (to which the 7.5X sampling rate was applied.
| |
| I
| |
| *V28/PIPE IC-F-2 [ na (
| |
| na/na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 21 CS-57.04- FW006 or DMG¹ na in [none (none f na /na )no Code Item Ho.) this weld was included in the total C-F-2 weld count i QISO 57-04
| |
| )
| |
| LINE¹ 2ICS-006-35-2 NTS: 17.19 Ina 2 f na /na (to which the 7.5X sampling rate was applied.
| |
| I PENET 217/PIPE IC-F-1 J na f na /na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2I CS-57 FM010 QISO 57.04 or DMG¹ na, in (none )~e )
| |
| na/na )no Code Item No.) this weld was included in the total C-F-1 weld count
| |
| )
| |
| I LINE¹ 2ICS-006-19.2 HTS: 16,22 INS 2 / na/na [to which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 (
| |
| na (
| |
| na /na (PIPE MALL <<3/8"; Although it is not required to be examined (and has 2ICS-57-04-FW012 QISO 57-04 or DMG¹ na in )none )none [ na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld cent
| |
| (
| |
| LINE¹ 2ICS-006-35 2 HTS: 17,18 [na 2 / na /na [to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC-F-2 f na (
| |
| na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-04-FM014 QISO 57-04 or DMG¹ na in [none /none / na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld cent
| |
| (
| |
| I LINE¹ 2ICS-006-1-2 NTS: 17 Ina 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 / na [ na /na [PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57 FM015 I QISO 57-04 or DMG¹ na in /none /none / na /na [no Code Item No.) this weld was included in the total C-F-2 weld cent na (
| |
| LINE¹ 2ICS-006-1-2 HTS: 17,18 [na 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 9 of 34 NHP2-ISI-006, REV. 1( CH-000 SECOHD TEH YEAR IHSERVICE IHSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEN (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 I REHARKS EXAHINATION IDEHT IF IER [ ITS ISO LOCATOR, COHPOHEHT DMG ¹, ]ITEN ¹ [FREOY] EX2/HDE PROCEDURE ]PERIOD 2 f USE CAL BLK ¹ ) LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I i PIPE/~V28 IC-F-2 / na / na /na (PIPE WALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-04-FI$ 16 ( QISO 57-04 or DMG¹ na in [none /none / na /na (no Code Item No.) this weld was included in the total C-F-2 weld count I LIHE¹ 2ICS-006-35-2 HTS: 17,19 Ina 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| [ ~NOV136/PIPE
| |
| )C-F-2 / na f na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-04-FM017 i QISO 57-04 or DMG¹ na in /none /none / na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count
| |
| ] LINE¹ 2ICS.006-35-2 HTS: 1,17 )na 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| I FLG/PIPE IC-F-1 (
| |
| na ] na /na (PIPE WALL < 3/84; Although it is not required to be examined (and has 2ICS-57-04.fl$ 18 i QISO 57-04 or DMG¹ na in /none )none (
| |
| na /na )no Code Item Ho.) this weld was included in the total C-F-1 weld count i LINE¹ 2ICS-006-19-2 NTS: 20,16 iNS 2 ) na /na )to which the 7.5X sampling rate was applied.
| |
| PIPE/ELB IC-F-I / na / na /na I (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57 F WOI9 QISO 57-04 or DMG¹ na in )none )none )
| |
| na /na I (no Code Item Ho.) this weld was included in the total C-F-1 weld count LINE¹ 2ICS-006-19-2 NTS: 16,21 iHS 2 J na /na I (to which the 7.5X sampling rate was applied.
| |
| PIPE/PEHET 217 IC-F-1 ] na [ na /na ]PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS.57.04-Fl$ 20 QISO 57-04 or DMG¹ na in )none [none [ na /na )no Code Item No.) this weld was included in the total C-F-1 weld count LINE¹ 2ICS.006-76-2 NTS: 16,16 [NS 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| I TEE/PIPE IC-F-2 f na / na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57 FW024 QISO 57-04 or DMG¹ na .in /none [none f na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count
| |
| /
| |
| / LIHE¹ 2ICS.006-35-2 NTS: 17,23 /na 2 f na/na [to which the 7.5X sampling rate was applied.
| |
| I PIPE/TEE IC-F-2 / na / na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-04-FW025 i QISO 57-04 or DMG¹ na in [none /none / na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count LINE¹ 2ICS-006.35-2 NTS: 17,23 )na 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| I TEE/PIPE IC-F-2 f na ) na /na )PIPE MALL <<3/8"; Although not required to be examined (and has no 2ICS-57-04-FW026 QISO 57-04 or DMG¹ na in (none /none f na /na (Code Item No.) weld is included in the total C-F-2 weld count to which
| |
| )
| |
| I LINE¹ 2ICS-006-35-2 NTS 17,23 Ina 2 / na/na (7.5X sampling rate is applied. (HisID'd as FW020 in 1st Intvl)
| |
| PIPE/ELB IC-F-2 f na / na/na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-04-Sl$ 01 QISO 57-04 or DMG¹ na in [none /none / na /na )no Code Item No.) this weld was included in the total C-F-2 weld count LINE¹ 2ICS-006-1-2 HTS: 17,18 dna 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 10 of 34 NHP2-IS1-006, REV. 1, CN-000 SECOHD TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHIHEDICATGRY JIGSCCI EX'I/HDE PROCEDURE IPERIDO 1 I REMARKS EXAHINATION IDENTIFIER ITS ISO LOCATOR, COHPOHEHT DMG ¹, iITEH ¹ LFREQYi EX2/HDE PROCEDURE )PERIOD 2 i USE CAL BLK ¹ I LINE HO. AND HOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIDO 3 I I PIPE/ELB IC-F-2 i na i na /na iPIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-04-SW003 i QISO 57-04 or DMG¹ na in inone inone i na /na ino Code Item No.) this weld was included in the total C-F-2 weld count I LIHE¹ 2ICS-006-1-2 HTS: 17, 18 Ina 2 i na/na ito which the 7.5X sampling rate was applied.
| |
| ELB/PIPE IC-F-2 i na / na /na I iPIPE MALL < 3/8"; Although it is not required to be examined (and has 21 CS-57-04-SM004 QISO 57-04 or DMG¹ na in inone inone i na /na I ino Code Item No.) this weld was included in the total C-F-2 weld count LINE¹ 21CS 006 1 2 HTS'7i18 lna 2 / na/na I. ito which the 7.5X sanpiing rate was applied.
| |
| I PIPE/ELB IC-F-2 ( na i na/na iPIPE MALL < 3/8"; Although it is not required to be examined (and has 21CS-57-04-SM010 I QISO 57-04 or DMG¹ na in inone inone i na /na tno Code Item Ho.) this weld was included in the total C-F-2 weld count i LINE¹ 2ICS-006-1-2 NTS: 17,18 dna 2 i na/na ito which the 7.5X sampling rate was applied.
| |
| ELB/PIPE IC-F-2 i na J.na /na I iPIPE 'MALL < 3/8"; Although it is not required to be examined (and has 2ICS.57.04-SW011 QISO 57-04 or DMG¹ na in inone inone J na /na I ino Code Item No.) this weld was included in the total C-F-2 weld count na LINE¹ 2ICS-006-1-2 NTS: 17,18 dna 2 J na/na I ito which the 7.5X sampling rate was applied.
| |
| I PIPEIELB IC-F-2 i na J na/na iPIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS.57-04-SW012 I QISO 57-04 or DMG¹ na in inone inone i na /na ino Code Item No.) this weld was included in the total C-F-2 weld count i LINE¹ 2ICS-006-1-2 NTS: 17,18 dna 2 L na/na ito which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 i na / na/na iPIPE WALL < 3/8"; Although it is not required to be examined (and has 21CS-57-04-SW013 I QISO 57-04 or DMG¹ na .in inone l~e I na ino Code Item No.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-006-1-2 HTS: 17,18 Ina 2 i na/na ito which the 7.5X sampling rate was applied.
| |
| I PIPE/MNF IC-F-2 i na i na/na iPIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-04-SM015 i QISO 57.04 or DWG¹ na in inone i~e i na Ina ino Code Item No.) this weld was included in the total C-F-2 weld count
| |
| ) LINE¹ 21CS-006-1-2 HTS: 17,25 dna 2 i na/na ito which the 7.5X serpiing rate was applied.
| |
| I MNF/PIPE IC-F-2 / na i na/na iPIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-04-SM016 I QISO 57-04 or DMG¹ na in inone inone i na /na ino Code Item No.) this weld was included in the total C-F-2 weld count i LINE¹ 21CS-006-1-2 HTS: 17,25 dna 2 i na/na ito which the 7.5X sampling rate was applied.
| |
| PIPE/ELB IC-F-2 i na i na Ina iPIPE MALL < 3/8"; Although it is not required to be examined (and has 21 CS-57-04-SM017 QISO 57-04 or DMG¹ na in inone /none i na /na ino Code Item No.) this weld was included in the total C-F-2 weld cant LINE¹ 2ICS-006-1-2 NTS: 17,18 dna 2 i na/na ito which the 7.5X sea@ling rate was applied.
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 11 of 34 NHP2 ISI 006) REV 1 g CN 000 SECOND TEH YEAR INSERVICE IHSPECTIOH (ISI) INTERVAL PLAH Change date: 07/29/1999 APPENDIX G - ICS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REHARKS EXAHIHATIOH IDENTIFIER J ITS ISO LOCATOR, COHPONENI'MG ¹, ]ITEN ¹ )FREOYJ EX2/HDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ I LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I ELB/PIPE IC-F-2 / na / na/na )PIPE MALL < 3/84; Although it is not required to be examined (and has 21 CS-57-04-SM018 QISO 57-04 or DMG¹ na in [none /no'ne / na /na (no Code Item No.) this weld was included in the total C-F-2 weld count J
| |
| [ LIHE¹ 2ICS-006-1-2 NTS: 17,18 (na 2 ) na/na )to which the 7.5X sampling rate was applied.
| |
| I PIPE/MNF IC-F-2 / na / na /na )PIPE WALL < 3/8"; Although it is not required to be examined (and has 2I CS-57-04-SM019 [ QISO 57-04 or DMG¹ na in ]none /none J na /na )no Code Item.No.) this weld was included in the total C-F-2 weld count
| |
| [ LIHE¹ 2ICS.006-1-2 NTS: 17,25 (na 2 J na/na (to which the 7.5X saapiing rate was applied.
| |
| I ELB/PIPE IC-F-2 i na f na/na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 21CS-57-04-SW022 )
| |
| QISO 57-04 or DMS¹ na in [none /none f na /na (no Code Item No.) this weld was included in the total C-F-2 weld count i LINE¹ 2ICS-006.35-2 NTS: 17,18 ina 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/ELB IC-F-2 f na f na/na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2I CS.57-04-SM023 QISO 57-04 or DWG¹ na in [none ]none f na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count
| |
| )
| |
| LINE¹ 2ICS 006-35-2 NTS: 17,18 (na 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| I PIPE/ELB IC-F-2 )
| |
| na J na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has or in (none na /na (no Code Item No.) this weld was included in the total C-F-2 weld ccxat 2ICS-57-04-SM024 i QISO 57-04 DMG¹ na /none /
| |
| I LINE¹ 2ICS.006-35-2 NTS: 17 18 Ina 2 J na/na (to which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 (
| |
| na f na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has or .in na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count 2 I CS-57-04-SM025 i QISO 57-04 DMG¹ na )none /none f
| |
| )
| |
| LIHE¹ 2ICS-006-35-2 NTS: 17,18 Ina 2 / na/na (to which the 7.5X sanpling rate was applied.
| |
| ) PIPE/ELB IC-F-2 )
| |
| na / na/na )PIPE MALL <<3/8"; Although it is not required to be examined (and has 2I CS-57-04-SW026 i QISO 57-04 or DMG¹ na in /none ]none f na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld count I LIHE¹ 2ICS-006-35-2 HI'S: 17,18 Ina 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| I PIPE/RED
| |
| /C-F-2 f na / na /na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57-04-SM028 QISO 57-04 or DMS¹ na in ]none /none / na /na ]no Code Item Ho.) this weld was included in the total C-F-2 weld count I
| |
| LINE¹ 2ICS-006-35-2 NTS: 17,24 )na 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE /C-F-I / na / na /na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57-04-SM031 QISO 57-04 or DMG¹ na in [none /none J na /na (no Code Item No.) this weld was included in the total C-F-1 weld coat
| |
| (
| |
| I LINE¹ 2ICS-006-1-2 HTS: 16,21 IHS 2 [ na /na (to which the 7.5X sampling rate was applied.
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 12 of 34 NNP2-ISI-006, REV. 1, CH-OOO SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ DESCRIPTION OF ITEN TO BE EXAHINED)CATGRY JIGSCC( EX1/NDE PROCEDURE (PERICO 1 REMARKS
| |
| )
| |
| EXANINATIOH IDENTIFIER ) ITS ISO LOCATOR, COHPOHEHT DMG ¹, ) ITEN
| |
| ¹ ]FREOYJ EX2/NDE PROCEDURE )PERIOD 2 J USE CAL BLK ¹ I LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I PIPE/TEE IC-F-2 ) na f na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57-04-SM036 QISO 57-04 or DMG¹ na in [none /none / na /na (no Code Item No.) this weld was included in the total C-F-2 weld count
| |
| )
| |
| I LIHE¹.2ICS-006-1-2 HTS: 17(23 Ina 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| I TEE/PIPE IC-F-2 / na )
| |
| na /na )PIPE MALL < 3/84; Although it is not required to be examined (and has 2I CS-57-04-$ 837 QISD 57-04 or DMG¹ na in [none /none / na /na (no Code Item No.) this weld was included in the total C-F-2 weld count
| |
| )
| |
| ] LINE¹ 2ICS-006-1-2 HTS: 17,23 Ina 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/'IEE IC-F-2 )
| |
| na [ na /na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2I CS-57-04-$ 538 / QISO 57-04 or DMG¹ na in /none /none / na /na [no Code Item No.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-006-35-2 NTS: 17,23 Ina 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| / PIPE/~V9 IC-F-2 (
| |
| na ) VOL/UT6.02 2 I CS-57 FM001 I QISO 57-05 or DMG¹ na in )C5.51 ]none f SUR/PT3.00/HT4.00 f HHP2.6-.562-CS I LINE¹ 2ICS.006-41-2 HTS'iT ISD 2 ) na /na I <<V9/PIPE IC-F-2 I na I VOL/UT6.02 I 2I CS-57 FM002 i QISO 57-05 or DMG¹ na in JC5.51 (none f SUR/PT3.00/NT4.00 [
| |
| NHP2.6-.562-CS LINE¹ 2ICS-006-41 2 HTS 7/1 [SD 2 / na /na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2 I CS-57 FM003 i QISO 57-05 or DMG¹ na .in ]C5.51 iID J SUR/PT3.00/NT4.00 ]Sc8 NNP2-6-.562-CS I LINE¹ 2ICS-006-41-2 HTS: 26,27 I SD 2 / na /na I PIPE/PIPE (C-F-2 )
| |
| na ) VOL/UT6.02 2ICS-57-05-Fl$ 11 I QISO 57-05 or DMG¹ na in (C5.51 [none J SUR/PT3.00/NT4.00 J NHP2-6-.562-CS ) LINE¹ 2ICS-006.41-2 HTS: 26 (none 2 J na /na I PIPE/ELB IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2 I CS-57 FM012 I QISO 57-05 or DMG¹ na in JC5.51 [ID i SUR/PT3.00/HT4.00 iSc8 NHP2-6-.562.CS I LINE¹ 2ICS-006-41-2 NTS: 26,27 ISD 2 f na /na I ELB/PIPE IC-F-2 [ na ) VOL/UT6.02 2 I CS-57 FM017 i QISO 57-05 or DMG¹ na in )C5.51 ]none [ SUR/PT3.00/NT4.00 f NHP2-6-.562-CS i LINE¹ 2ICS-006-41-2 HTS: 26,27 LSD 2 / na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 13 of 34 NHP2 ISI 006~ REV 1 ~ CH 000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED DESCRIPTIOH OF ITEH TO BE EXAHINED)CATGRY (IGSCC) EX1/NDE PROCEDURE )PERIOD 1 REHARKS
| |
| )
| |
| EXAHINATION IDENTIFIER (
| |
| ITS ISO LOCATOR, COHPONENT DMG ¹, JITEH ¹ JFREOY) EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERI(X) 3 I I MNF/PIPE IC-F-2 ] na [ VOL/UT6.02 2ICS-57-05-FM018 / QISO 57-05 or DMG¹ na in /C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2 ~ 562-CS I LINE¹ 2ICS-006-41=2 NTS: 7(26 ISD 2 / na /na
| |
| ] PIPE/MNF IC-F-2 [ na ] VOL/UT6.02 2 I CS-57 FM019 ) QISO 57-05 or DMG¹ na in )C5.51 ]none (
| |
| SUR/PT3.00/HT4 F 00 J NHP2-6-.562-CS I LINE¹ 2ICS-006 41-2 HTS: 7,26 ISD 2 J na /na
| |
| / MNF/PIPE IC-F-2 [ na [ VOL/UT6.02 2 I CS-57-05-SM001 ) QISO 57-05 or DMG¹ na in [C5.51 (ID J SUR/PT3.00/HT4.00 (Sce NHP2-6-.562-CS I LINE¹ 2ICS.006-41-2 NTS: 7,26 ISD 2 )
| |
| na /na I PIPE/ELB IC-F-2 ) na )
| |
| VOL/UT6.02 2ICS-57-05-SM004 i QISO 57-05 or DMG¹ na in [C5.51 [none [ SUR/PT3.00/HT4.00 /
| |
| NHP2-6-.562-CS I LINE¹ 2ICS-006-41-2 NTS: 26,27 ISD 2 / na/na I I ELB/PIPE IC-F.-2 )
| |
| na )
| |
| VOL/UT6.02 2I CS-57-05-SM005 )
| |
| QISO 57-05 or DMG¹ na in )C5 ~ 51 ]none f SUR/PT3.00/HT4.00 f NHP2-6-.562-CS i LINE¹ 2ICS-006-41-2 NTS: 7,27 LSD 2 / na /na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2ICS-57-05-SM010 f QISO 57-05 or DMG¹ na ,in JC5.51 /none / SUR/PT3.00/HT4.00 /
| |
| NHP2.6-.562-CS I LINE¹ 2ICS-006-41-2 NTS: 26,27 ISD I 2 I na /na I I ELB/PIPE IC-F-2 (
| |
| na J VOL/UT6.02 2I CS-57.05-SM011 I QISO 57.05 or DMG¹ na in /C5.51 ]none )
| |
| SUR/PT3.00/HT4 F 00 f NHP2-6-.562-CS i LINE¹ 2ICS-006.41-2 NTS: 26,27 LSD 2 / na /na I PIPE/ELB IC-F-2 [ na J VOL/UT6.02 2I CS.57-05-SM012 (
| |
| QISO 57-05 or DMG¹ na in JC5.51 (none [ SUR/PT3.00/HT4.00 J na /na NHP2.6..562-CS i LINE¹ 2ICS-006-41-2 NTS: 26,27 [SD 2 /
| |
| I ELB/PIPE IC-F-2 J na )
| |
| VOL/UT6.02 2ICS-57.05-SM013 i QISO 57-05 or DMG¹ na in ]C5.51 ]none )
| |
| SUR/PT3.00/HT4.00 J NHP2-6-.562-CS I LINE¹ 2ICS-006-41-2 NTS: 26I27 ISD 2 [ na /na
| |
| | |
| NIAGARA NOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 14 of 34 HNP2 ISI 006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEM (sorted by Exeminat ion Identif ier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I RENARKS EXANI NATION IDEHT I F IER ITS ISO LOCATOR, CONPONENT DMG ¹, iITEN ¹ JFREOYi EX2/NDE PROCEDURE iPERIOD 2 J USE CAL BLK ¹ i LIHE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I PIPE/ELB IC-F-2 i na i VOL/UT6.O2 2ICS-57-05-SM014 i QISO 57.05 or DMG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 )
| |
| NHP2-6-.562-CS I LIHE¹ 2ICS-006-41-2 HTS: 26,27 ISD 2 i na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2 I CS-57-05-SM015 i QISO S7-OS or DMG¹ na in iC5.51 inone )
| |
| SUR/PT3.00/HT4.00 i NNP2.6-.562-CS i LINE¹ 2ICS-006-41-2 NTS: 26,27 LSD 2 [ na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2ICS-57-05.SM016 i QISO 57-05 or DWG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 i HNP2-6..562-CS [ LINE¹ 2ICS-006-41-2 NTS: 26,27 LSD 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2ICS-57.05-SMO17 QISO 57-05 or DMG¹ na in iC5.51 inone i SUR/P'I3.00/NT4.00 i HNP2-6..562-CS LINE¹ 2ICS 006 41 2 HIS'6i27 ISD 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2ICS-57-05-SM018 i QISO 57.05 or DMG¹ na in [C5.51 [none J SUR/PT3.00/NT4.00 i NNP2-6-.562 CS I LINE¹ 2ICS-006-41-2 HTS: 26I27 ISD 2 / na /na
| |
| ) PIPE/MHF IC-F-2 i na i VOL/Ul'6.02 2 I CS-57-05-SM019 i QISO 57-05 or DWG¹ na .in iC5.51 ilD i SUR/PT3.00/NT4.00 iSc8 NNP2.6-.562-CS i LINE¹ 2ICS-006.41-2 NTS: 7,26 ATE 2 i na /na I I MNF/PIPE IC-F-2 i na i VOL/UT6.02 2ICS.57-05.SM020 i QISO 57-05 or DMG¹ na in iC5.51 inone ] SUR/PT3.00/NT4.00 [
| |
| HNP2-6-.562.CS I LINE¹ 2ICS-006-41-2 HTS: 7(26 ISO 2 i na /na I i PIPE/ELB IC-F-2 i na i VOL/UT6.02 2 I CS-57-05-SM022 i QISO 57-05 or DMG¹ na in [C5.51 Inone I SUR/PT3.00/HT4.00 I NNP2-6-.562-CS LINE¹ 2ICS-006.41-2 N'IS: 26,27 LSD 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2 I CS-57-05-SM023 )
| |
| QISO 57-05 or DMG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 i NNP2.6..562-CS I LINE¹ 2ICS-006-41-2 NTS: 26 27 I 2 i na/na
| |
| | |
| NIAGARA MOHAMK PDMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 15 of 34 NMP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEM TO BE EXAMIHEDICATGRY IIGSCCI EX'I/HDE PROCEDURE IPERIDO 1 I REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPOHENT DMG ¹, LITEM ¹ iFREQYi EX2/HDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE NO. AND NO'IES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2ICS-57-05-SM024 i also sr-os or DMG¹ na in iC5.51 inane )
| |
| SUR/PT3.00/MT4.00 i NMP2-6-.562-CS I LIHE¹ 2ICS-006-41-2 NTS: 26(27 ISO 2 i na /na i ELB/PIPE IC-F-2 i na i VOL/UT6.02 2ICS-57-05-SM025 i also sr-os or OMG¹ na in iC5.51 inone J SUR/PT3.00/MT4.00 i NMP2-6-.562-CS I LINE¹ 21CS-006.41.2 NTS: 26,27 ISO 2 ) na /na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 21CS-57-05-SM027 I QISO 57-05 or DUG¹ na in iC5.51 Inone I SUR/PT3.00/MT4.00 I NMP2-6-.562-CS I LINE¹ 21CS 06 41 2 NTS'6 2 ISO 2 i na /na I I ELB/PIPE IC-F-2 ) na i VOL/UT6.02 21 CS-57 FM001 I QISO 57-06 or DMG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-6-.562-CS i LINE¹ 2ICS-006-41-2 NTS: 27,26 LSD 2 J na /na I I ELB/PIPE IC-F-2 i na i VOL/UT6.02 21CS-57-06-FM002 I QISO 57.06 or DMG¹ na in iC5.51 )none i SUR/PT3.00/MT4.00 i NMP2-6-.562-CS LINE¹ 2ICS-006-41-2 NTS: 27,26 LSD 2 i na /na I I PIPE/ELB IC-F-2 i na i VOL/UT6.02 21CS-57 FM003 I QISO 57-06 or DMG¹ na ,in [Cs.si )none i SUR/PT3.00/MT4.00 i NMP2-6-.562-CS I LINE¹ 2ICS 006 41 2 NTS'7 26 ISD 2 i n /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2 I CS. 57 FM004 i QISO 57-06 or DMG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 J NMP2-6-.562-CS ) LIHE¹ 2ICS-006-41 2 HTS: 27,26 /SO 2 i na /na I ELB/PIPE IC-F-2 ( na i VOL/UT6.02 2 1 CS-57 FM005 I QISO 57-06 or DMG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-6-.562.CS I LINE¹ 2ICS-006-41-2 NTS: 27,26 ISD 2 J na /na I I ELB/PIPE iC-F-2 . i na i VOL/UT6.02 21CS-57 FM006 i QISO 57-06 or DMG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 )
| |
| HMP2-6-.562-CS i LINE¹ 2ICS-006.41-2 HTS: 27,26 LSD 2 i na /na
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 16 of 34 NMP2-ISI-006, REV. 1, CH-000 SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEM To BE EXAMIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPOHEHT DWG ¹, LITEM ¹ iFREOY) EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I ELB/PIPE IC-F-2 i na i VOL/UT6.02 i Sc7 2ICS-57-06-FW007 ) QISO 57-06 or DWG¹ na in iC5 ~ 51 i ID i SUR/PT3.00/Ml'4.00 i NMP2-6-.562-CS i LINE¹ 2ICS-006-41-2 HTS: 27,26 iso 2 )
| |
| na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2 I CS-57 F W008 i QISO 57-06 or DWG¹ na in iC5.51 )none i SUR/PT3.00/MT4.00 [
| |
| NMP2-6..562-CS i LINE¹ 2ICS-006-4'I-2 NTS: 82(83 LSD 2 i na /na I I ELB/PIPE IC-F-2 i na i VOL/uT6.02 2ICS-57-06-FW009 i QISO 57-06 or DWG¹ na in iC5.51 iID )
| |
| SUR/PT3.00/MT4.00 JSc8 NMP2-6-.562-CS LINE¹ 2ICS-006-41-2 HTS: 27,26 ATE 2 )
| |
| na /na I I ELB/PIPE IC-F-2 i na i voL/UT6.02 2ICS-57-06.FW010 i QISO 57-06 or DWG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NHP2-6-.562.CS I LINE¹ 2ICS-006-41-2 NTS: 27,26 ISD 2 i na /na I I PIPE/PIPE IC-F-2 i na i VOL/UT6.02 2I CS-57 FW011 I QISO 57-06 or DWG¹ na in iC5.51 inone i SUR/PT3.00/MT'0 (
| |
| NMP2-6-.562-CS i LINE¹ 2ICS-006-41-2 NTS: 27 inone I 2 I na/na I i ELB/PIPE IC-F-2 (
| |
| na i voL/UT6.02 2ICS-57-06-FWD12 i QISO 57-06 or DWG¹ na .in iC5.51 Inone I SUR/PT3.00/MT4.00 I HMP2-6-.562.CS I LINE¹ 2ICS 006 41 2 HTS'7i26 ISD 2 i na /na I I INTEG ATT iC-C i na i SUR/PT3.00/MT4.00 I 2 I CS-57 F W320 / QISO 57-06-17 or DWG¹ na in iC3.20 iID i na /na igc9 i LINE¹ 2ICS-006-41.2 HTS: 27,28 iMandatei 2 i na /na I I PIPE/ELB ic-F-2 i na i VOL/UT6.02 2 I CS-57-06-SW001 i QISO 57.06 or DWG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-6-.562-CS I LINE¹ 2ICS-006-41-2 HTS: 27,26 ISO 2 i na /na I I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2ICS-57-06-SW002 I QISO 57-06 or DWG¹ na in iC5.51 inone i SUR/PT3.00/MT'0 i HMP2-6-.562-CS LINE¹ 2ICS.006.41-2 NTS: 27,26 i SD 2 / na /na
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 17 of 34 NNP2-ISI-006( REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN
| |
| - ICS SYSTEH Change date: 07/29/1999 APPENDIX G (sorted by Examination Identifier)
| |
| ND IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 RENARKS EXANIHATIOH IDENTIFIER I ITS ISO LOCATOR'ONPONEHT DMG ¹i IITEN ¹ IFREQYI EX /NDE PROCEDURE IPERIOD 2 USE CAL BLK ¹ )
| |
| LINE NO. AND NOTES, AS APPLICABLE ]SELECT [CLASS( EX3/HDE PROCEDURE ]PERIOD 3 I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 21 CS-57-06-9503 J QISO 57-06 or DllG¹ na in )C5.51 [none ] SUR/PT3.00/NT4.00 J NKP2-6-.562-CS LIHE¹ 2ICS 006.41-2 HTS: 27I26 ISD 2 na /na I J I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2ICS-57-06-9005 ( QISO 57-06 or DllG¹ na in )C5.51 [none J SUR/PT3.00/NT4.00 J NNP2 ~ 562-CS I LINE¹ 2ICS-006-41-2 H'IS: 27i26 I 2 / na /na I ELB/PIPE IC-F-2 [ na [ VOL/UT6.02 2ICS-57-06-SM006 I QISO 57-06 or DMG¹ na in )C5.51 (none (
| |
| SUR/PT3.00/NT4.00 )
| |
| HNP2-6-.562-CS I LINE¹ 2ICS-006-41-2 N'IS: 27,26 I D 2 / na /na I PIPE/ELB IC-F-2 f na ] VOL/UT6.02 21 CS-57-06-5'I$ 07 i QISO 57-06 or DMG¹ na in (C5.51 ]none J SUR/PT3.00/NT4.00 J NNP2-6..562.CS I LINE¹ 2ICS 006 41 2 NTS'7i26 ISD 2 [ na /na I PIPE/ELB IC-F-2 [ VOL/UT6.02 2ICS-57-06-SM009 ] QISO 57-06 or DMG¹ na in (C5.51 ]none J SUR/PT3.00/NT4.00 [
| |
| NNP2-6..562-CS [ LINE¹ 2ICS-006-41-2 HTS: 27,26 LSD 2 f na /na I PIPE/ELB IC-F-2 [ na [ VOL/UT6.02 2ICS-57-06.9810 (
| |
| QISO 57-06 or DMG¹ na .in )C5.51 ]none f SUR/PT3.00/NT4.00 f NNP2-6-.562-CS I LINE¹ 2ICS-006-41-2 HTS'7'6 ISO 2 / na /na I ELB/PIPE IC-F-2 [ na )
| |
| VOL/UT6.02 2I CS-57-06-9811 i QISO 57-06 or DMG¹ na in [C5.51 ]none (
| |
| SUR/PT3.00/NT4.00 [
| |
| NNP2-6-.562.CS (
| |
| LIHE¹ 2ICS-006-41-2 NTS: 27,26 ISD I 2 I na/na I I PIPE/ELB IC-F-2 [ na ) VOL/UT6.02 2ICS-57-06-SM012 )
| |
| QISO 57-06 or DMG¹ na in JC5.51 ]none f SUR/PT3.00/NT4.00 J NNP2-6-.562-CS 'i LINE¹ 2ICS-006.41-2 NTS: 27,26 LSD 2 J na /na I I PIPE/ELB IC-F-2 f na f VOL/UT6.02 2ICS-57-06-SM013 (
| |
| QISO 57-06 or DMG¹ na in ]C5.51 ]none / SUR/PT3.00/NT4.00 J NNP2-6-.562-CS I LINE¹ 2ICS-006-41-2 NTS: 27,26 ISD 2 / na /na
| |
| | |
| NIAGARA NONAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 18 of 34 NNP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED ) DESCRIPTION OF ITEN To BE EXANINEOiCATGRY ) IGSCCi EX1/HDE PROCEDURE iPERIOO 1 RENARKS EXANINATION IDENTIFIER I ITS ISO LOCATOR, CONPOHEHT DMG ¹, IITEN ¹ IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/ELB IC-F-2 i na ( VOL/UT6.02 21 CS-57-06-SM014 i QISO 57-06 or DMG¹ na in iC5.51 Inone I SUR/PT3.0 /NTC.OO I NNP2.6-.562-CS i LINE¹ 2ICS-006-C1-2 NTS: 27,26 ATE 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2 1 CS;,57.06-SM015 i also 57-OS or DMG¹ na in iC5.51 !none I SUR/PT3.00/NT4.00 I NNP2-6-.562.CS LINE¹ 21CS.006-41-2 HTS: 27,26 ISO 2 i na /na I
| |
| ( PIPE/ELB (C-F-2 i na i VOL/UT6.02 2ICS-57-06.SM016 i QISO 57-06 or DMG¹ na in iC5.51 ilo i SUR/PT3.00/NT4.00 iSc8 HNP2-6..562.CS LINE¹ 21CS-006-41 2 NTS: 27,26 LSD 2 i na /na PIPE/ELB IC-F-2 i na i VOL/uTS.O2 2ICS-57-06-SM017 QISO 57-06 or DMG¹ na in )C5.51 inone i SUR/PT3.00/NT4.00 i HNP2.6-.562.CS LINE¹ 21CS-006-41-2 NTS: 27,26 ISD 2 i na /na PIPE/ELB IC-F-2 i na i VOL/UT6.02 2ICS-57-06-SM021 QISO 57-06 or DMG¹ na in iC5.51 inone J SUR/PT3.00/NT4.00 J NNP2-6-.562-CS LINE¹ 2ICS-006-41-2 NTS: 27,26 LSD 2 i na /na PIPE/PIPE IC-F-2 I na I VOL/UT6'02 I 21CS-57-06-SM022 i QISO 57-06 or DMG¹ na .in )C5.51 inone i SUR/PT3.00/HT4.00 i NNP2-6-.562-CS LINE¹ 21CS-006-41-2 NTS: 27 inone 2 i na /na i PIPE/PIPE IC-F-2 i na i VOL/uT6.O2 21CS-57 SM023 (
| |
| also 57-oS or DMG¹ na in iC5.51 inone t SUR/PT3.00/NT4.00 i NNP2-6-.562-CS LINE¹ 21CS-006-41-2 NTS: 27 inone 2 / na /na P I PE/*NOV126 IC-F-2 i na i VOL/UT6.02 21 CS-57 FM001 i QISO 57-07 or DMG¹ na in (C5.51 iID i SUR/PT3.00/NT4.00 JSc8 NNP2-6..562.CS LINE¹ 21CS-006-41-2 NTS: 27,26 i So 2 i na /na I *NOV126/P IPE IB-J i na i VOL/UT6.02 21CS-57 FM002 i QISO 57-07 or DMG¹ na in i89.11 inone J SUR/PT3.00/NT4.00 i HMP2.6-.432-CS I LINE¹ 2ICS-006-60-1 NTS: I(2 IHS ) na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - HILE POINT NUCLEAR STATION - UHIT 2 19 of 34 NHP2-ISI-006) REV. 'I, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE iPERIOO 1 I REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONEH'I DMG ¹, )
| |
| ITEN ¹ iFREOYi EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ I LINE No AND NOTES) AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PENET 222/PIPE IB-J i na i VOL/UT6.O2 )
| |
| Scr 21CS-57-07-FM005 i QISO 57-07 or DMG¹ na in i89.11 IID I SUR/PT3.00/HT4 F 00 I NHP2-6-.432-CS I LINE¹ 2ICS.006.67-1 NTS: 2,5 ITEV 1 dna/
| |
| I ELB/PIPE IB-J i na i VOL/UT6.O2 21 CS-57 FM006 )
| |
| Qlso 5r-or or DWG¹ na in i89.11 inone i SUR/PT3.00/HT4.00 i NHP2-6-.432-CS I LINE¹ 2ICS-006-67-1 NTS: 2,6 INS 1 i na /na I ELB/PIPE IB-J i na i VOL/UT6.02 2ICS-57-07-FM007 I QISO 57-07 or DMG¹ na in i89.11 inone i SUR/PT3.00/HT4.00 i NHP2-6-.432-CS LINE¹ 21CS-006.67-1 NTS: 2)6 iNS 1 i na/na I I ELB/PIPE IB-J i na i VOL/UT6.02 2ICS-57-07-FMOOB i QISO 57-07 or DMG¹ na in [89.11 inone i SUR/PT3.00/MT4.00 NHP2-6-.432-CS LINE¹ 21CS-006.67-1 NTS: 2,6 iNS 1 i na /na I I ELB/PIPE IB-J i na i VOL/U'l6.02 ioeseiected 2 I Cs-57 FM009 i QISO 57-07 or DMG¹ na in i89.11 inone i SUR/PT3.00/HT4.00 i I NHP2-6-.432-CS LINE¹ 2ICS-006.67-1 NTS: 2,6 /NS 1 [na/ I I
| |
| ) PIPE/*AOV157 IB-J i na ) VOL/UT6.O2 21 Cs-57 FM011 i QISO 57-07 or DWG¹ na .in /89.11 Inone I SUR/PT3.00/HT4 F 00 I NHP2-6-.432-CS I LINE¹ 2ICS-006-33-1 NTS: 2,4 iNS 1 (
| |
| na /na I i *AOV157/P IPE IB-J i na i VOL/UT6.02 i Sc7 21 Cs-57 F M012 i QISO 57-07 or DMG¹ na in i89.11 IID I SUR/PT3.00/HT4.00 I NHP2-6-.432-CS I LINE>> 21CS-006-33-1 NT - 2.4 IHS 1 dna/
| |
| I PIPE/PIPE IB-J i na ( VOL/UT6.02 21CS-57 FM013 i QISO 57-07 or DMG¹ na in /89.'ll Inone I SUR/PT3.00/HT4 F 00 I NHP2-6-.432-CS I LINE¹ 2ICS-006-67-1 NTS: 2 iNS =
| |
| ( na /na I i PIPE/MNF /8-J i na i VOL/UT6.O2 21 CS.57-07-FM014 i QISO 57-07 or DMG¹ na in i89.11 )none I SUR/PT3 00/HT4 00 I NHP2-6-.432-CS i LINE¹ 21CS.006.67-1 NTS: 2,7 /NS 1 i na/na
| |
| | |
| NIAGARA HONA'WK POWER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 20 of 34 NHP2-ISI-006( REV. 1, CH-000 SECOHD TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - ICS SYSTEH (sorted by Exenination Identifier) 2HD IHTVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EXl/NDE PROCEDURE IPERIOO 1 REMARKS EXAHIHATIOH IDENTIFIER I ITS ISO LOCATOR, COHPONENT DMG ¹, IITEH ¹ IFREOYI EX2/HDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ I LINE No. AND HOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I ELB/PIPE IB-J I na I VOL/UT6.02 21 CS-57-07-FW017 I QISO 57-07 or DWG¹ na in I89.11 Inone I SUR/PT3.00/MT'0 I HHP2-6-.432-CS I LINE¹ 2ICS-006-33-1 NTS: 2,6 INS 1 I na /na I P IPE/<<AOV156 IB-J I na I VOL/UT6.02 I 21CS-57 FWOI8 I QISO 57-07 or DWG¹ na in IB9.11 Inone I SUR/PT3.00/HT4 F 00 I NHP2-6-.432-CS I LINE¹ 21CS-006-60-1 NTS: 2(4 IHS 1 I na /na I <<AOVI56/P IPE IB-J I na I voL/uT6.O2 21CS-57-07-FW019 I QISO 57-07 or DMG¹ na in I89.11 Inone I SUR/PT3.00/HT4.00 I HHP2-6-.432-CS LINE¹ 21CS.006-60-1 NTS: 2,4 INS 1 I na /na I I PIPE/PEHET 222 IB-J I na I VOL/UT6.02 IEX6 21 CS.57-07-FW021 I QISO 57-07 or DMG¹ na in I89.11 IID I SUR/PT3.00/HT4.00 I NHP2.6-.432.CS I LINE¹ 2ICS-006.60-1 NTS 2,5 ITEV I I ELB/PIPE IB-J I na I VOL/UT6.02 I 2ICS.57-07-FW023 I QISO 57-07 or DWG¹ na in IB9.11 Inone I SUR/PT3.00/HT4.00 I NMP2-6-.432.CS I LINE¹ 2ICS-006-33-1 NTS: 2,6 INS I 1 I na/na I I ELB/MNF Q Hl ALO RCIC TP ND SPRAY IB-J I na I voL/uT6.02 2 1 CS-57 FM024 I QISO 57-07 or OWG¹ na in IB9.11 IID I SUR/PT3.00/HT4.00 I NHP2-6-.432-CS I LINE¹ 2ICS-006-33-1 NTS: 6,8 IMS I 1 I na / ISc10 I PIPE/ELB IB-J I na I VOL/UT6.02 21CS-57-07.FM025 I QISO 57-07 or DMG¹ na in I89.11 Inone I SUR/PT3.00/HT4.00 I NHP2-6-.432-CS LINE¹ 21CS-006-33-1 NTS: 2,6 IHS 1 I na /na I PIPE/MNF IB-J I na I VOL/UT6.02 I Scl 21 CS-57 F W026 I QISO 57-07 or DMG¹ na in IB9.11 IID I SUR/PT3.00/HT4.00 I NHP2-6-.432-CS I LINE¹ 2ICS-006-33-1 NTS: 2,7 IHS 1 Ina/
| |
| I
| |
| 'MHF/ELB Q N7 ALO Rclc TP HD sPRAY IB-J I na I voL/uT6.O2 2ICS-57-07-FW027 I QISO 57-07 or DWG¹ na in I89.11 IID I SUR/PT3.00/MT4.00 I NMP2-6-.432-CS I LIHE¹ 21CS-006.33-1 HTS: 6,7 IMS 1 I na / ISc10
| |
| | |
| NIAGARA NOHAWK POWER CORPORATION - h. NILE POINT NUCLEAR STATION - UNIT 2 21 of 34 HHP2-181-006, REV. 1( CH-OOO SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHIHEOICATGRY IIGSCCI EX1/HDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDEHTIFIER i ITS ISO LOCATOR, COHPONEHT DWG ¹, i ITEN ¹ iFREQYi EX2/HDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LIHE No. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/ELB IB J i na [ VOL/UT6.02 21CS-57 FM031 )
| |
| QISO 57-07 or DWG¹ na in i89.11 inone i SUR/PT3.00/HT4.00 NHP2.6-.432-CS J LINE¹ 2ICS-006-33-1 HTS: 2,6 iHS 1 i na /na I I ELB/PIPE IB-J i na i VOL/UT6.02 21 CS-57 F W032 i Qiso 57-or or DMG¹ na in i89.11 [none ) SUR/PT3.00/HT4.00 'i NHP2-6-.432-CS I LINE¹ 21CS-006-33-1 NTS: 2,6 iHS 1 i na /na I I PIPE/PIPE IB-J i na i voL/uT6.02 21CS-57 FM033 i QISO 57.07 or DWG¹ na in i89.11 inone i SUR/PT3.00/HT4 F 00 i NHP2-6-.432-CS I LINE¹ 2ICS 006 33 1 HIS iHS I PIPE/PIPE IB J (
| |
| na i VOL/UT6.02 2 1 CS-57 FW034 )
| |
| Qiso 57-or or DWG¹ na in i89.11 inone i SUR/PT3.00/HT4.00 )
| |
| HHP2-6-.432-CS I LINE¹ 2ICS-006-67-1 NTS: 2 JNS 1 i na/na I i PIPE/PIPE IB-J i na J VOL/UT6.02 2ICS-57-07-FW035 QISO 57-07 or DWG¹ na in i89.11 /none SUR/PT3.00/NT4.00 HHP2-6-.432-CS I
| |
| I LINE¹ 2ICS-006-67-1 NTS: 2 iHS 1 i
| |
| [ na/na 'Ii I PIPE/ELB IB-J i na i VOL/UT6.02 21 CS-57 F WSW01'I I QISO 57-07 or D'MG¹ na ~ in )89.11 Inone I SUR/PT3.00/HT4.00 I NHP2.6-.432-CS i LINE¹ 2ICS-006-67-1 HTS: 2,6 )Ns 1 i na/na I i PIPE/ELB IB-J i na i VOL/uT6.O2 2 1 CS-57.07- FMSW012 i QISO 57-07 or DUG¹ na in i89.11 inone ( SUR/PT3.00/NT4.00 i NHP2.6-.432-CS LINE¹ 2ICS-006-67-1 NTS: 2,6 iNS i na /na I I ELB/PIPE IB-J I na I VOL/UT6.02 I 2 1 CS-57 F WSW013 i QISO 57-07 or DWG¹ na in i89.11 inone i SUR/PT3.00/HT4.00 i NHP2.6..432-CS I LINE¹ 2ICS-006-67-1 NTS: 2,6 iHS 1 i na /na I J
| |
| PIPE/WNF IB-J i na i voL/uT6.O2 21 CS-57 FMSW034 i QISO 57-07 or DWG¹ na in i89.11 )none i SUR/PT3.00/NT4.00 i NNP2-6-.432-CS LINE¹ 21CS-006-67-1 NTS: 2,7 JNS 1 i na /na
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT HUCLEAR STATION - UNIT 2 22 of 34 NHP2-1S1-006, REV. 1, CH-000 SECOHD TEH YEAR IHSERVICE INSPECTION (Isl) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ i DESCRIPTION OF ITEN TO BE EXAHINEDiCATGRY )IGSCCi EX1/HDE PROCEDURE iPERIOD 1 REHARKS EXAIIIHATIOH IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DMG ¹, i ITEH ¹ iFREQYi EX2/HDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I MNF/PIPE IB-J i na J VOL/UT6.02 21CS-57-07-FMS'I$ 35 I QISO 57-07 or DMG¹ na in i89.11 /none / SUR/PT3.00/HT4.00 i NHP2.6-.432-CS i LINE¹ 21CS-006.67-1 HTS: 2,7 iHS i na /na I PIPE/TEE IB-J i na i VOL/UT6.02 21 Cs-57-07-SM002 i QISO 57-07 or DUG¹ na in i89.11 inone i SUR/PT3.00/HT4.00 i NHP2-6-.432-CS i LINE¹ 2ICS-006-60.1 HTS: 2,3 iNS I TEE/PIPE IB-J i na i VOL/UT6.02 iEX6 21CS-57-07-SI$ 03 i QISO 57-07 or DMG¹ na in i89.11 IID I SUR/PT3.00/HT4.00 I NHP2-6-.432.CS i LINE¹ 21CS-006-60-1 NTS: 2(3 IAM I PIPE/ELB IB-J i na i VOL/UT6.02 21CS-57-07-SM004 i QISO 57-07 or DMG¹ na in i89.11 Inone I SUR/PT3.00/NT4 00 I NHP2-6-.432-CS I LINE¹ 2ICS-006-67-1 NTS: 2,6 iHS 1 i na /na I I ELB/PIPE iB-J i na i voL/uT6.02 21 CS-57-07-S'M005 i QISO 57-07 or DMG¹ na in (89.11 inone f SUR/PT3.00/NT4.00 i HHP2.6-.432-CS i LINE¹ 2ICS-006.67-1 NTS: 2,6 IHS i na /na I PIPE/ELB IB-J i na [ VOL/UT6.02 21 CS-57-07-SM006 i QISO 57-07 or DMG¹ na .in i89.11 (none i SUR/PT3.00/NT4.00 i HHP2-6-.432-CS i LINE¹ 2ICS.006-67-1 NTS: 2,6 iNS i na /na I I PIPE/ELB IB J i na i voL/UT6.02 iDeseiected 21 Cs-57-07-SM007 i QISO 57-07 or DMG¹ na in i89.11 inone i SUR/PT3.00/HT4.00 /
| |
| NHP2-6-.432-CS i LINE¹ 2ICS-006-67-1 HTS: 2(6 /NS I ELB/PIPE IB-J i na i voL/UT6.02 2ICS-57-07-9008 i QISO 57-07 or DMG¹ na in i89.11 inone i SUR/PT3.00/MT'0 )
| |
| NHP2-6-.432-CS LINE¹ 21 CS-006-67-1 NTS: 2(6 iHS 1 / na /na I PIPE/ELB IB-J ) na / VOL/UT6.02 2ICS-57-07-SM009 i QISO 57-07 or DUG¹ na in i89.11 Inone I SUR/PT3.00/NT4.00 I HHP2-6-.432-CS i LINE¹ 2ICS-006-67-1 NTS: 2,6 iNS
| |
| | |
| 0 NIAGARA NOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 23 of 34 NHP2-ISI-006, REV. 1, CH.OOO SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REa i DESCRIPTIOH OF ITEN To BE EXAHINED)CATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOD 1 REMARKS EXANIHATION IDENTIFIER J ITS ISO LOCATOR, CONPOHEHT DMG ¹, iITEH ¹ iFREOYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE No AND NOTEsi AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/ELB IB-J i na ) voL/UT6.02 2I CS-57-07-SM010 i also 5r-or or DMG¹ na in i89.11 Inone I SUR/PT3.00/NT4.00 I NNP2.6-.432-CS / LINE¹ 2ICS-006.67-1 NTS: 2,6 /HS ( na /na I I PIPE/ELB IB-J i na i VOL/UT6.02 2ICS-57-07-SM014 i QISO 57-07 or DMG¹ na in i89.11 Inone I SUR/PT3.00/NT4 00 I NNP2.6-.432.CS LINE¹ 2ICS-006-67-1 HTS: 2,6 iNS 1 i na /na I I ELB/PIPE IB-J i na i VOL/UT6.02 2 I CS-57.07-SM015 ) QISO 57-07 or DMG¹ na in )89.11 inone i SUR/PT3.00/NT4.00 i NNP2-6-.432-CS t LINE¹ 2ICS-006-67-1 NTS: 2,6 /HS / na /na .
| |
| I ELB/PIPE IB-J i na i VOL/UT6.O2 2 I CS-57-07-SM017 i QISO 57-07 or DMG¹ na in i89.11 Inone I SUR/PT3.00/NT4 F 00 I NNP2-6-.432-CS LINE¹ 2ICS-006-67-1 NTS: 2,6 iNS 1 i na /na I I PIPE/ELB I B.- J I na I VOL/UT6.02 I 2ICS-57-07-SM018 I also 57-07 or DMG¹ na in i89.11 )none i SUR/PT3.00/HT4.00 i HHP2-6-.432-CS I LINE¹ 2ICS-006-67-1 NTS: 2,6 IHS i na /na I i ELB/PIPE IB-J I na I VOL/UT6.02 I 21 Cs-57-07-SM019 i QISO 57-07 or DMG¹ na .in (89.'l1 inone i SUR/PT3.00/MT4.00 i HNP2.6-.432-CS i LINE¹ 2ICS-006.67-1 NTS: 2,6 iNS 1 i na /na I I
| |
| PIPE/MHF iB-J i na i VOL/UT6.02 2ICS-57-07-SM020 i QISO 57.07 or DMG¹ na in i89.11 /none i SUR/PT3.00/NT4.00 /
| |
| NNP2.6-.432.CS i LINE¹ 2ICS-006.67-1 HTS: 2(7 JHS 1 i na /na I i MHF/PIPE IB-J i na i VOL/UT6.02 2ICS-57-07-SMD21 ) QISO 57-07 or DMG¹ na in /89.11 inone ( SUR/PT3.00/NT4.00 i NHP2.6-.432-CS i LINE¹ 2ICS-006-33-1 HTS: 2,7 [HS i PIPE/ELB IB-J I na I VOL/UT6.02 I 2 I Cs-57-07-SM023 i also 5r-or or DMG¹ na in i89.11 Inone I SUR/PT /HT I NNP2-6-.432-CS LINE¹ 2ICS-006-67-1 HTS: 2,6 iHS 1 i na /na
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - MILE POINT NUCLEAR STATION - UHIT 2 24 of 34 NNP2-ISI-006, REV. Ii CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) iPERIOD REHARKS 2ND INTVL REL RED i DESCRIPTIOH OF ITEN TO BE EXANINEDiCATGRY iIGSCCi EX1/HDE PROCEDURE 1 EXANIHATIOH IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DMG ¹, iITEH ¹ iFREOYi EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ i LIHE No. AND NOTES, AS APPLICABLE )SELECT iCLASSi EX3/HDE PROCEDURE )PERIOD 3 I PIPE/ELB IB-J I na I VOL/UT6.02 I 21 CS-57-07-SM026 I QISO 57-07 or DMG¹ na in i89.11 inone ( SUR/PT3.00/IIT4.00 i NNP2.6..432-CS i LINE¹ 2ICS-006-33-1 Hl'S: 2,6 iNS 1 i na /na I I MHF/PIPE IB-J i na i VOL/UT6.02 2I CS-57-07-SM031 i also sr-or or DMG¹ na in i89.11 inone i SUR/PT3.00/NT4.00 i NNP2-6-.432-CS ) LINE¹ 2ICS-006-67-1 HTS: 2,7 iHS 1 i na /na I I PIPE/ELB IC-F-2 i n i VOL/UT6.O2 2ICS-57-08. FM001 I QISO 57-08 or DMG¹ na in JC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-12-.375.CS I LINE¹ 2ICS-012-25-2 HTS: 34,37 I SD 2 i na /na I I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2ICS-57-08-FM002 i QISO 57-08 or DMG¹ na in iC5.51 inone J SUR/PT3.00/HT4.00 i NNP2.12-.375-CS i LINE¹ 2ICS-012-25-2 NTS: 34(37 LSD 2 i na /na I I ELB/PIPE IC-F-2 ) na i VOL/UT6.02 2I CS-57 FM003 I QISO 57-08 or DMG¹ na in )C5.51 inone i SUR/PT3.00/NT4.00 i HNP2.12-.375-CS i LINE¹ 2ICS-012-25-2 NTS: 34,37 LSD 2 i na /na I i PIPE/~V29 IC-F-2 i na i VOL/UT6.O2 2I CS.57 FM004 I QISO 57-08 or DMG¹ na in iC5.51 Inone I SUR/PT3.00/NT4.00 I NHP2-12-.375-CS i LINE¹ 2ICS-012-25-2 NTS: 34,43 LSD 2 i na /na I I PIPE/~NOV122 IC-F-2 i na ( VOL/UT6.02 2 I CS-57 FM006 I QISO 57-08 or DMG¹ na in iC5.51 /none / SUR/PT3.00/HT4.00 i NNP2-12-.375.CS i LINE¹ 2ICS-012-25.2 HTS: 34,44 tSD 2 i na /na I I ELB/PIPE IC-F-2 i na J na/na iPIPE MALL < 3/8"; Although it is not required to be examined (end has 21 CS-57 FM010 I QISO 57-08 or DMG¹ na in inone [none i na /na ino Code Item Ho.) this weld was included in the total C-F-2 weld count LINE¹ 2ICS-008-38-2 HTS: 31,32 dna 2 i na/na ito which the 7.5X sampling rate was applied.
| |
| I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2 I CS.57-08. FM012 i also sr-o8 or DMG¹ na in iC5.51 )none i SUR/PT3.00/HT4.00 i NNP2-12-.375.CS I LINE¹ 2ICS 012 25 2 NTS'4i37 ISD 2 / na /na I
| |
| | |
| NIAGARA HONAMK POMER CORPORATIOH - IIILE POINT NUCLEAR STATION - UHIT 2 25 of 34 HHP2-ISI-006, REV. 1, CH 000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEM (sorted by Examination Identifier) 2HD IHTVL REL RED ) DESCRIPTIOH OF ITEN TO BE EXAHINEO)CATGRY )IGSCC) EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHIHATION IDENTIFIER i ITS lso LOCATOR, COHPOHENT DMG ¹, (ITEN ¹ iFREOYi EX2/NDE PROCEDURE iPERIOD 2 i US CAL BLK I LINE NO AHD HOTES AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE ]PERIOD 3 I ELB/PIPE IC-F-2 ) n [ VOL/UT6.02 2ICS-57-08-FM013 )
| |
| QISO 57-08 or DMG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NHP2-12-.375-CS ) LINE¹ 2ICS-012-25-2 NTS: 34,37 [SD ] 2 J na /na I I RED/PIPE IC-F-2 [ na ] VOL/UT6.02 [ Sc7 2 I CS-57-08-FM021 (
| |
| QISO 57-08 or OMG¹ na in ]C5.51 IID I SUR/PT3.00/NT4.00 I NHP2-12-.375 ~
| |
| CS i LINE¹ 2ICS-012-51-2 HTS: 33,34 LSD 2 f na /na I I PIPE/ELB IC-F-2 / na J na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-08-F'M022 i QISO 57-08 or DMG¹ na in [none /none )
| |
| na /na )no Code Item Ho.) this weld was included in the total C-F-2 weld cont I LINE¹ 2ICS-008-38-2 NTS: 30,31 Ina 2 / na/na (to which the 7.5X sarrpiing rate was applied.
| |
| I ELB/PIPE IC-F-2 f na / na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS.57-08. FM023 I QISO 57-08 or DMG¹ na in (none /none f na /na (no Code Item No.) this weld was included in the total C-F-2 weld count
| |
| ( LINE¹ 2ICS.008-38-2 NTS: 31,32 dna 2 / na/na (to which the 7.5X sampling rate was applied.
| |
| I AV29/PIPE IC-F-2 ) na [ VOL/UT6.02 2ICS-57.08.FM028 i QISO 57.08 or DMG¹ na in JC5.51 (none [ SUR/PT3.00/HT4.00 J HHP2-12-.375-CS I LINE¹ 2ICS 012 25 2 NTS'4i43 ISO 2 / na /na J
| |
| MHF/PIPE IC-F-2 f na / na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2 I CS-57 FM029 i QISO 57-08 or OMG¹ na in /none /none ( na /na (no Code Item No.) this weld was included in the total C-F-2 weld count na J LINE¹ 2ICS-008-38-2 HTS: 30,31 (na 2 / na/na )to which the 7.5X sampling rate was applied.
| |
| I PIPE/PIPE IC-F-2 / na / na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 21 CS-57 FM033 I QISO 57 08 or DMG¹ na in /none (none J na /na [no Code Item No.) this weld was included in the total C-F-2 weld count
| |
| [ LIHE¹ 2ICS-008-38-2 NTS: 31 /na I 2 I na/na (to which the 7.5X sampling rate was applied.
| |
| I PIPE/RED IC-F-2 )
| |
| na ] na /na )PIPE MALL < 3/8"; (included in C-F-2 count for 7.5K sampling only) 2 I CS.57 FM034 i QISO 57-08 or DMG¹ na in ]none ]none J na /na I LINE¹ 2ICS-008-38-2 HTS: 31,33 Ina 2 I na/
| |
| I INTEG ATT IC-C I na I SUR/PT3.00/HT4.00 I I 2ICS-57.08-FM302 f QISO 57-08-8 or DMG¹ NA in JC3.20 )ID / na /na I na f LINE¹ 2ICS-012-25-2 HTS: 34,42 JHandateJ 2 / na /na Sc10 /
| |
| | |
| NIAGARA NOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 26 of 34 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REO [ DESCRIPTION OF ITEN TO BE EXAHIHED]CATGRY )IGSCCJ EX1/HDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENI'IFIER f ITS ISO LOCATOR, CONPOHEHT DMG ¹, ]ITEN ¹ JFREOYJ EX2/HDE PROCEDURE ]PERIOD 2 f USE CAL BLK ¹ ( LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSi EX3/HDE PROCEDURE [PERIOD 3 I TEE/PIPE IC-F-2 / na / na /na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 21 CS-57 FMSM058 I QISO 57-08 or DMG¹ na in [none /none / na /na (no Code Item No.) this weld was included in the total C-F-2 weld count na [ LINE¹ 2ICS-010-56-2 HTS: 38,39 (na 2 ) na/na (to which the 7.5X sampling rate was applied.
| |
| [ PIPE/CAP (conforms to AHSI 816.9) )C-F-2 ( na [ VOL/UT6.02 21 CS-57-08-9002 i QISO 57-08 or DMG¹ na in ]C5.51 Inone I SUR/PT3.00/HT4.00 )
| |
| NHP2-12-.375.CS i LINE¹ 2ICS-012-51-2 NTS: 34,36 LSD 2 J na/na
| |
| ( TEE/PIPE IC-F-2 I na I VOL/UT6 02 I I 2ICS-57-08-SM005 I QISO 57-08 or DMG¹ na in JC5.51 )none [ SUR/PT3.00/HT4.00 J I HHP2-12-.375-CS I LINE¹ 2ICS-012-51-2 NTS: 34,35 ISO 2 / na /na I I I PIPE/TEE IC-F-2 [ na [ VOL/UT6.02 2 I CS-57-08. SM006 i QISO 57-08 or DMG¹ na in [C5.51 (none ] SUR/PT3.00/NT4.00 [
| |
| NHP2-12..375-CS LINE¹ 2ICS-012-51-2 HTS: 34,35 LSD 2 / na /na I PIPE/ELB IC-F-2 / na J na/na (PIPE MALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-08-SW013 i QISO 57-08 or DMG¹ na in (none /none / na /na [no Code Item No.) this weld was included in the total C-F-2 weld count I LINE¹ 2ICS-008-38-2 HTS: 31,32 Ina 2 / na /na (to which the 7.5X sampling rate was applied.
| |
| I TEE/PIPE IC-F-2 [ na [ VOL/UT6.02 2ICS-57-08-Sl$ 15 [ QISO 57-08 or DMG¹ na .in [C5.51 ]none J SUR/PT3.00/NT4.00 J NHP2-12..375-CS i LINE¹ 2ICS-012-51-2 HTS: 34,35 LSD 2 / na/na I I ELB/PIPE IC-F-2 J na ) VOL/UT6.02 2 I CS-57-08.9816 ) QISO 57-08 or DWG¹ na in (C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-12..375.CS I LINE¹ 2ICS 012 25 2 NTS'4i37 ISD i 2 i na /na I I PIPE/TEE IC-F-2 I na I VOL/UT6.02 I 2ICS-57-08.SM024 i QISO 57-08 or DMG¹ na in JC5.51 Inone I SUR/Pl'3.00/NT4.00 I NHP2-12..375-CS I LINE¹ 2ICS 012 2 2 NTS'4 38 I 2 f na /na PIPE/ELB IC-F-2 / na / na /na )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2I CS-57-08. Sl$ 25 QISO 57-08 or DMG¹ na in /none [none / na /na (no Code Item Ho.) this weld was included in the total C-F-2 weld coat LINE¹ 2ICS-010-56-2 NTS: 39,40 /na 2 / na /na [to which the 7.5X sampling rate was applied.
| |
| | |
| . ~
| |
| NIAGARA MOHAlK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 27 of 34 NMP2-1SI-006, REV. 1, CH-OOD SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED DESCRIPTIOH OF ITEH TO BE EXAMINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REMARKS
| |
| (
| |
| EXAMINATION IDENTIFIER ( ITS ISO LOCATOR, COMPONENT DWG ¹, (ITEM ¹ (FREQY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ (
| |
| LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 (
| |
| ELB/PIPE Ic-F-2 na na /na (PIPE llALL < 3/8"; Although it is not required to be examined (and has 21CS-57-08-SN026
| |
| (
| |
| (
| |
| QISO 57-08 or DUG¹ na in (none LINE¹ 21CS-010-56-2 NTS: 39,40 (na I~
| |
| (
| |
| 2 I na /na na /na (no Code Item No.) this weld was included in'he total C-F-2 weld count (to which the 7.5X sampling rate was applied.
| |
| ( I I I PIPE/SOF IC-F-2 (
| |
| na (
| |
| na /na (Renamed from SN07 to SM026.5 to address a typographic error (skipped 2ICS-57-08.$ 026.5 (
| |
| QISO 57-08 or DllG¹ na in (none (none ( na /na (weld ID by ITT-G on the construction isometric)
| |
| (
| |
| LINE¹ 21CS-010-56-2 NTS: 39,41 (na 2 (
| |
| na/na I I SOF/PIPE IC-F-2 (na (na/na (There is no Code Item associated with this record, as the nominal wall 21 CS-57-08-SU027 I Q 57 08 or DUG¹ na in (none (none (
| |
| na /na (thickness of 0.365" is less than the 3/8" required to qualify as an
| |
| ( LINE¹ 21CS-010.57-2 NTS: 39,41 (na 2 ( na/na (Item no. It is EXEMPT (from examination only.)
| |
| PIPE/SOF IC-F-2 (na (na/na I (There is no Code Item associated with this record, as the nominal wall 2ICS-57-08-SN029 QISO 57-08 or DUG¹ na in (none (none ( na /na I (thickness of 0.365" is less than the 3/8" required to qualify as an LINE¹ 2ICS-010.57-2 NTS: 39,41 (na ( 2 I na/na I (Item no. It is EXEMPT (from examination only.) )
| |
| I ELB/PIPE IC-F-2 (
| |
| na ( VOL/uT6.02 21CS-57-08-SN031 (
| |
| QISO 57-08 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NHP2-12-.375-CS I LINE¹ 2ICS-012-25-2 HTS: 34,37 ISD I 2 I na I I PIPE/ELB IC-F-2 ( na (
| |
| VDL/uT6.02 21 CS-57-08. SN032 I QISO 57-08 or DUG¹ na .in (C5.51 Inone I SUR/PT3.00/MT4.00 I NMP2-12-.375.CS (
| |
| LIHE¹ 2ICS-012-25-2 NTS: 34,37 (SD I 2 I I I ELB/PIPE (C-F-2 ( na (
| |
| VOL/UT6.02 2ICS-57-08-SN033 I QISO 57-08 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NMP2-12-.375.CS I LINE¹ 2ICS-012-25-2 HTS: 34,37 ITE 2 (
| |
| na /na I PIPE/ELB IC-F-2 (
| |
| na (
| |
| VOL/uT6.02 (
| |
| 2ICS-57-08-SN034 I QISO 57-08 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NMP2.12-.375-CS (
| |
| LINE¹ 2ICS-012-25-2 NTS: 34,37 (TE 2 I I PIPE/ELB IC-F-2 (
| |
| na ( VOL/uT6.02 2ICS-57-08-SN035 I QISO 57-08 or DUG¹ na in (C5.51 Inone I SUR/PT3 00/MT'0 I NMP2.12-.375-CS I LINE¹ 21CS-012-25-2 NTS: 34,37 ISD 2 ( na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 28 of 34 NHP2-ISI-006, REV. 1( CH-000 SECOND TEN TEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRZ IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REMARKS EXAHIHATIOH IDEHTIFIER I ITS ISO LOCATOR, COHPOHENT DMG ¹, I ITEN ¹ IFREOYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2ICS-57-08-9036 I QISO 57.08 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4 F 00 I NHP2-12-.375-CS I LINE¹ 21CS-012-25-2 NTS: 34,37 ISD 2 I na /na I PIPE/ELB . Ic-F-2 I na I VOL/UT6.02 21 CS-57-08-SW037 I QiSO 57-08 or DWG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-12-.375.CS I LINE¹ 2ICS-012-25-2 HTS: 34 37 ISD 2 I na/na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2ICS-57-08-$ 039 I QISO 57-08 or DMG¹ na in IC5.51 Inone I SUR/Pl'3.00/HT4.00 I NHP2-12-.375-CS I LINE¹ 2ICS-012-25-2 NTS: 34,37 ISD 2 I na /na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2 CS-57-08-SW041 1 I QISO 57.08 or DMG¹ na in IC5.51 Inone I SUR/PT3 00/HT4 00 I NHP2-12-.375-CS I LINE¹ 21CS-012-25-2 NTS: 34,37 ISD 2 I na /na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 21CS-57-08-SW042 I QISO 57.08 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/H'T4.00 I NHP2-12-.375-CS I LINE¹ 2ICS-012-25-2 NTS: 34,37 ISD I 2 I na/na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2 1 CS-57-08-SW044 I aiso 57-08 or DMG¹ na in IC5.51 Inone I SUR/PT3 F 00/HT4.00 I NHP2-12-.375-CS I LINE¹ 21CS-012-25-2 NTS: 34,37 ISD 2 I na /na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2ICS-57-08-SM045 I QISO 57-08 or DMG¹ na in IC5 ~ 51 Inone I SUR/PT3.00/HT4.00 I NHP2-12-.375.CS I LINE¹ 2ICS.012-25.2 N'TS: 34,37 ISD 2 I na /na I PIPE/ELB IC-F-2 I na I VOL/UT6'02 I 2ICS-57-08-$ 046 I QISO 57-08 or DWG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-12-.375-CS I LINE¹ 2ICS-012-25-2 NTS: 34,37 ISD 2 I na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2ICS-57-08-$ 547 I also 57-08 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-12-.375-CS I LINE¹ 2ICS-012-25-2 NTS: 34,37 ISD 2 I na /na
| |
| | |
| NIAGARA HONAWK POWER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 29 of 34 NNP2-ISI-006, REV. 1( CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTION OF ITEH TO BE EXAHINEDiCATGRY i IGSCCi EX1/NDE PROCEDURE iPERIOO 1 RENARKS EXAHIHATIOH IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG ¹, LITEM ¹ iFREOYJ EX2/HDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ i LIHE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I PIPE/ELB IC-F-2 i na i VOL/UT6.02 ) Sc7 2 I CS-57 SW048 I QISO 57-08 or DMG¹ na in iC5.51 (ID I SUR/PT3.00/HT4.00 I NMP2-12-.375-CS i LINE¹ 21CS-012-25-2 NTS: 34,37 LSD 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 21CS-57-08-SW049 I QISO 57-08 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i HHP2 ~ 375-CS i LINE¹ 2ICS-012-25-2 NTS: 34,37 LSD 2 i na /na I TEE/PIPE IC-F-2 i na J VOL/UT6.02 21CS-57-08.SM057 I QISO 57-08 or DMG¹ na in JC5.51 [none J SUR/PT3.00/HT4.00 /
| |
| NHP2-12-.375-CS LINE¹ 21CS-012-51-2 NTS:-34,38 JSD 2 J na /na I SML/PIPE IB-J i na [ VOL/UT6.02 2ICS-57-09.FW001 I QISO 57-09 or DWG¹ na in i89.11 IID I SUR/PT3.00/HT4.00 I NHP2-10-.594 CS I LINE¹ 2ICS-010.70-1 NTS: 9,10 IMS I dna/ LSc10 I ELB/PIPE IB-J ) na i VOL/UT6.02 iEX6 2ICS-57-09-FM002 i QISO 57-09 or DUG¹ na in i89.11 I ID I SUR/PT3.00/HT4.00 I NMP2-10-.594-CS i LINE¹ 21CS-010-70-1 HTS: 10,11 iNS dna/
| |
| I ELB/PIPE IB-J i na i VOL/UT6.02 21 CS-57 FW003 ) QISO 57-09 or DUG¹ na -in i89.11 ]none i SUR/PT3.00/NT4 F 00 i NHP2-10-.594-CS I LINE¹ 2ICS 010 70 1 NTS' 11 INS 1 i na /na I ELB/PIPE IB J i na i VOL/UT6.02 2ICS-57.09.FM004 I QISO 57-09 or DMG¹ na in i89.11 inone i SUR/PT3.00/NT4.00 i NHP2-10-.594-CS i LINE¹ 2ICS-010-70-1 Hl'S: 10,11 )NS 1 i na /na i i PIPE/*HOV128 IB-J i na ) VOL/UT6.02 2ICS-57-09.FM005 i QISO 57-09 or DMG¹ na in i89.11 IID I SUR/PT3.00/HT4.00 I NMP2-10-.594-CS J LINE¹ 2ICS-010-70-1 HTS: 10, 14 JAW/ber 1 i na / igc10
| |
| *HOV128/PIPE iB-J i na i VOL/UT6.02 2ICS-57-09-FW006 i QISO 57-09 or DUG¹ na in i89.11 LID i SUR/PT3.00/HT4.00 J NHP2 10-.594-CS i LINE¹ 21CS-010-70-1 NTS: 10,14 iAW/ber i 1 i na / igc10
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 30 of 34 NHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ f DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY )IGSCC) EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENTIFIER ) ITS ISO LOCATOR, COHPONEHT OWG ¹, ]ITEN ¹ JFREOY[ EX2/NDE PROCEDURE )PERIOD 2 )
| |
| USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I i PIPE/PENET Z21A )8-J f na J VOL/UT6.02 2 I CS-57.09. FI$ 07 / QISO 57-09 or OMG¹ na in /89.11 /ID / SUR/PT3.00/HT4.00 [
| |
| NHP2-10-.594-CS / LINE¹ 2ICS-010-70-1 NTS: 10,15 /TEV/ber/ 1 / na / /SclO
| |
| )
| |
| PENET Z21A/*HOV121 IB-J I na I VOL/UT6.02 I 2ICS-57-09-FW008 )
| |
| QISO 57-09 or DMG¹ na in (89.11 JIO / SUR/PT3.00/HT4.00 /
| |
| NHP2-10-.594-CS / LINE¹ 2ICS-010-70-1 NTS: 14,15 )TEV/ber[ 1 / na / (Sc10
| |
| [ *HOVI21/PIPE JC-F-2 ) na J VOL/UT6.02 2I CS-57 FM009 ) QISO 57-09 or DMG¹ na in )C5.51 ]ID J SUR/PT3.00/HT4.00 f Sc9 NHP2. 10-. 719- CS / LINE¹ 2ICS-010-62-2 NTS: 14,45 [SD/ber f 2 ] na /na I PIPE/ELB IC-F-2 )
| |
| na [ VOL/UT6.02 2ICS-57-09-FI$ 10 J QISO 57-09 or DWG¹ na in (C5.51 [none (
| |
| SUR/PT3.00/HT4.00 ]
| |
| NNP2-10-.719-CS I LINE¹ 2ICS.010-62-2 NTS: 45 '6 ISD 2 / na /na I I ELB/PIPE IC-F-2 [ na J VOL/UT6.02 2 1 CS-57 F W011 ) QISO 57-09 or DMG¹ na in [C5.51 [none I SUR/PT3.00/HT4.00 I NHP2-10-.719-CS ) LINE¹ 2ICS-010.62-2 NTS: 45,46 [SD 2 f na /na I I ELB/PIPE /C-F-2 [ na [ VOL/UT6.02 2 I CS-57 Fl!012 i QISO 57-09 or DMG¹ na .in ]C5.51 )ID ) SUR/PT3.00/HT4.00 i Sc9 NHP2. 10-. 719- CS i LINE¹ 2ICS.010-62-2 NTS: 45,46 LSD I 2 Ina/na I I PIPE/ELB IC-F-2 [ na )
| |
| VOL/UT6.02 2 I CS.57 FW013 i QISO 57.09 or DWG¹ na in [C5.51 ]none J SUR/PT3.00/HT4.00 J KHP2-10-.719-CS I LINE¹ 2ICS.010.62-2 NTS: 45,46 ISD 2 / na /na I I PIPE/ELB IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2ICS.57-09-Fl$ 16 )
| |
| QISO 57-09 or OMG¹ na in )C5.51 (none J SUR/PT3.00/HT4.00 f NHP2-10-.719-CS I LINE¹ 2ICS.010-62-2 NTS: 45,46 ISD 2 f na/na I I ELB/PIPE IC-F-2 [ na ) VOL/UT6.02 2 I CS-57 FM017 I QISO 57-09 or DMG¹ na in JC5.51 [none f SUR/PT3.00/HT4.00 J NHP2. 10..719-CS i LINE¹ 2ICS.010-62-2 NTS: 45,46 LSD 2 f na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UHIT 2 31 of 34 NHP2-ISI-006, REV. 1, CH 000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED ) DESCRIPTION OF ITEN TO BE EXAHINED]CATGRY (IGSCC[ EX1/NDE PROCEDURE ]PERIOD 1 REHARKS EXAHIHATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG ¹, )ITEN ¹ JFREOYJ EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ f LINE NO. AND NOTES, AS APPLICABLE [SELECT )CLASS] EX3/NDE PROCEDURE ]PERIOD 3 I PIPE/TEE IC-F-2 )
| |
| na [ VOL/UT6.02 )
| |
| Sc7 2ICS-57-09-FM020 (
| |
| QISO 57-09 or DMG¹ na in JC5.51 IID I SUR/PT3.00/HT4.00 I NHP2-10-.719-CS I LINE¹ 2ICS-010-62-2 HTS: 45,47 ISD 2 ( na /na I PIPE/SOL (8-J f na ] SUR/PT3.00/HT4.00 f 2ICS-57-09-FM027 [ QISO 57-09 or DMG¹ na in I89.32 IID I na /na I na / LINE¹ 2HSS-002-110-1 NTS: 10,13 JHS/ber f 1 f na /na i Sc10 INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2I CS-57 FM300 J QISO 57-09-9 or DMG¹ na in (810.20 )ID J na /na na /na '
| |
| na I LINE¹ 2ICS-010-70-1 NTS: 10,12 INS I 1 I INTEG ATT JB-K f na [ SUR/PT3.00/HT4.00 /
| |
| 2 I CS-57 FM301 / QISO 57-09-9 or DMG¹ na in /810.20 ]ID f na /na I na / LINE¹ 2ICS.010.70-1 NTS: '10,12 /NS J 1 f na /na I I IHTEG ATT JB-K ) na SUR/PT3.00/HT4.00 I 2I CS-57 FM302 / QISO 57.09.9 or DMG¹ na in /810.20 [IO na /na I I LINE¹ 2ICS-010-70.1 NTS: 10,12 INS I 1 I na /na I IN'TEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2 I CS-57 FM303 f QISO 57-09-9 or DMG¹ na in (810.20 ]ID
| |
| ~
| |
| J na /na I LINE¹ 2ICS-010-70-1 NTS: 10, 12 INS I 1 I na /na I I INTEG ATT )8-K f na ( SUR/PT3.00/HT4.00 [
| |
| 2 I CS-57 FW304 f QISD 57-09-9 or DMG¹ na in /810.20 ]ID f na /na f LINE¹ 2ICS-010-70-1 NTS: 10,12 INS J 1 I na /na I INTEG ATT (B.K ) na ) SUR/PT3.00/HT4.00 f 2I CS-57 FM305 / QISO 57-09-9 or DMG¹ na in (810.20 /ID f na /na I I LINE¹ 2ICS.010-70-1 NTS: 10(12 INS I 1 I na /na I I IHTEG ATT IB-K I na I SUR/PT3.00/Hl'4.00 I 2I CS-57 FM306 J QISO 57-09-9 or DMG¹ na in (810.20 (ID f na /na I LINE¹ 2ICS-010-70-1 NTS: 10,12 INS I 1 I na /na I
| |
| | |
| HIAGARA MOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 32 of 34 NMP2-ISI-006( REV. 1I CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier)
| |
| ND IHTVL REL REQ I DESCRIPTIOH OF ITEH TO BE EXAHIHEDICATGRY IIGSCCI EX1/NDE.PROCEDURE (PERIOD 1 REMARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR, COHPONENT DMG ¹, I ITEH ¹ IFREQYI EX2/HDE PROCEDURE (PERIOD 2 I USE CAL BLK ¹ I LINE HO AND NOTES AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE I ERIOO 3 I I IHTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 21 CS-57-09 FM307 I QISO 57-09-9 or DMG¹ na in IB10.20 IID I na /na I LINE¹ 21CS-010-70-1 NTS: 10,12 INS ( 1 I na /na I I PIPE/ELB IB-J (
| |
| na I VOL/UT6.02 21CS-57-09. SMDOI I QISO 57-09 or DMG¹ na in (B9.11 (none I SUR/PT3.00/HT4.00 I NMP2-10-.594-CS I LINE¹ 2ICS-010-70-1 HTS: 10,11 IHS 1 I na /na I PIPE/ELB IB-J I na (
| |
| VOL/UT6.02 21 CS-57-09-SM004 (
| |
| QISO 57-09 or DMG¹ na in IB9.11 (none I SUR/PT3.00/HT4.00 I NMP2-10-.594-CS I LINE¹ 2ICS-010-70.1 HTS: 10,11 (NS I na /na I PIPE/ELB IB-J (
| |
| na I VOL/UT6.02 2 1 CS-57-09-SM005 I QISO 57-09 or DMG¹ na in (89.11 Inone I SUR/PT3.00/HT4.00 (
| |
| NMP2-10-.594-CS LINE¹ 21CS-010-70-1 HTS: 10,11 IHS I na /na I PIPE/ELB IB-J I na (
| |
| VOL/UT6.02 2ICS-57-09-SM006 I QISO 57-09 or DMG¹ na in IB9.11 Inone I SUR/PT3.00/HT4 F 00 I NMP2-10-.594-CS I LINE¹ 2ICS-010-70-1 HTS: 10,11 INS I ELB/PIPE IB-J I na I VOL/UT6.02 I'1CS-57-09-SM009 I QISO 57-09 or DMG¹ na . in (B9.11 IID I SUR/PT3.00/HT4.00 I NMP2-10-.594-CS I LINE¹ 2ICS-010-70-1 NTS: 10,11 IHS I na / ISc10 I PIPE/ELB IB-J I na I VOL/UT6 02 I 2 I CS-57-09. SM010 (
| |
| QISO 57-09 or DMG¹ na in (89.11 (none I SUR/PT3 F 00/H'14.00 I HHP2 ~ 594-CS (
| |
| LINE¹ 21CS-010-70-1 HTS: 10,11 (NS 1 I na /na I ELB/PIPE IB-J I na (
| |
| VOL/UT6.02 21 Cs-57-09-SM011 ( QISO 57-09 or DMG¹ na in (89.11 (none I SUR/PT3.00/HT4.00 I HMP2-10-.594-CS I LINE¹ 21CS-010-70-1 NTS: 10,11 INS I PIPE/ELB IC-F-2 I na I VOL/UT6.02 21 Cs-57-09-SM015 I QISO 57-09 or DMG¹ na in IC5.51 IID I SUR/PT3.00/HT4.00 I Sc9 NHP2-10-.719-CS I LINE¹ 21CS-010-62-2 HTS: 45,46 ISD/ber I 2 I na /na
| |
| | |
| NIAGARA NONAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 33 of 34 NHP2-ISI-006, REV. 1) CN-000 SECOND TEN YEAR IHSERVICE IHSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEN (sorted by Examination Identifier)
| |
| HD IHTVL REL RED I DESCRIPTION OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I RENARKS EXANINATIOH IDENTIFIER [ ITS ISO LOCATOR, CONPONEHT DWG ¹, )
| |
| ITEN ¹ )FREOY) EX2/HDE PROCEDURE (PERIOD 2 ]
| |
| USE CAL BLK ¹ I LINE HO AHD NOTES) AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2ICS-57-09.SW016 / QISO 57-09 or DWG¹ na in /C5.51 /ID / SUR/PT3.00/HT4.00 / Sc9 HNP2-10..719-CS LINE¹ 2ICS-010-62-2 NTS: 45,46 /SD/ber / 2 / na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2ICS-57-09-SM020 / QISO 57-09 or DMG¹ na in /C5.51 Inone I SUR/PT3.00/NT4.00 NNP2-10-.719-CS L I NE¹ 2 I CS-010-62-2 NTS: 45) 46 )
| |
| SD 2 / na /na
| |
| [ PIPE/ELB IC-F-2 )
| |
| na [ VOL/uT6.02 2 I CS-57-09-sl$ 21 )
| |
| QISO 57-09 or DWG¹ na in JC5.51 ]none ) SUR/PT3.00/NT4.00 )
| |
| NNP2-10-. 719- Cs ) LINE¹ 2ICS-010-62-2 HTS: 45,46 [SD 2 / na /na I I TEE/PIPE iC-F-2 ] na [ voL/uT6.02 2ICS-57-09-SM024 (
| |
| QISO 57-09 or DWG¹ na in [C5.51 ]none )
| |
| SuR/PT3.00/NT4.00 )
| |
| HNP2 . 719- CS I LINE¹ 2ICS-010-45-2 HTS: 45,47 ISD 2 J na/na I I PIPE/RED IC-F-2 na J VOL/uT6.02 2ICS-57-09.SW025 I Q 57 09 or DMG¹ na in JC5.51 [none (
| |
| SUR/PT3.00/NT4.00 f NNP2-10-.719-CS L I HE¹ 2 I CS-010-45-2 N TS 45,48 i SD 2 f na /na I I PIPE/RED IC-F-2 (
| |
| na )
| |
| VOL/UT6.02 2 I Cs-57-09. SW029 )
| |
| QISO 57-09 or DMG¹ na in JC5.51
| |
| ~ Inone I SUR/PT3.00/HT4.00 I NHP2-10-.719-CS ( LINE¹ 2ICS-010.45-2 HTS: 45,47 iSO 2 / na /na I PIPE/PIPE IB-J n ) voL/UT6.02 2ICS-57-09.SM030 I QISO 57-09 or DMG¹ na in [89.11 [none f SUR/PT3.00/HT4.00 )
| |
| HNP2-10-.594-CS ) LINE¹ 2 I CS. 010-70-1 N TS: 10 (
| |
| Hs 1 / na /na I
| |
| ( PIPE/PIPE IB-J [ na [ voL/UT6.02 2ICS-57-09-sl$ 31 )
| |
| QISO 57-09 or DMG¹ na in (89.11 ]none J SUR/PT3.00/NT4.00 NNP2-10-.594-CS I LINE¹ 2ICS-010-70-1 NTS: 1 INS 1 / na /na TEE/PIPE IC-F-2 [ na [ VOL/UT6.02 2ICS-57-09.SW033 I QISO 57-09 or DMG¹ na in (C5.51 lnone I SUR/PT3.00/HT4 F 00 I HNP2-10-.719-CS LINE¹ 2ICS-010-45-2 HTS: 45,4/ ]SD 2 ) na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 34 of 34 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED ] DESCRIPTION OF ITEN TO BE EXAHIHED)CATGRY ( IGSCC) EX1/NDE PROCEDURE )PERIOD 1 REHARKS EXAHINATION IDENTIFIER ) ITS ISO LOCATOR, COHPOHEHT DMG ¹, ]ITEN ¹ )FREOY] EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ i LINE NO. AHD NOTES, AS APPLICABLE DESELECT iCLASSi EX3/HDE PROCEDURE [PERI(X) 3 I FLG BLTG Q H7 Azo RCIC TP HD SPRA IB-G-2 I na i VT1/VT2.01 I 2ICS-PB100 f QISO 57-07 or DMG¹ na in /87.50 ]ID )
| |
| na /na I J
| |
| LIHE¹ 2ICS-006-33-1 NTS: (none) /Handate/ 1 )
| |
| na /na iSc10 I FLG BLTG /8-0-2 (
| |
| na (
| |
| VT1/VT2.01 Sc7 2ICS-PB101 / QISO 57-07 or DMG¹ na in /87.50 /ID ( na /na I
| |
| [ LINE¹ 2ICS-006-33-1 NTS: (none) [Handate( 1 (
| |
| na /na I FLG BLTG )8-0-2 [ na I VT1/VT2.01 I 2I CS-PB102 I QISO 57-07 or DMG¹ na in )87.70 (ID )
| |
| na /na (Sc8
| |
| )
| |
| LINE¹ 2ICS-006-67-1 NTS: (none) (Nandate) 1 ] na /na I FLG BLTG )B-G-2 f na I VT1/VT2.01 I 2ICS-PB103 QISO 57-07 or DMG¹ na in IB7.70 IID ] na /na isc8 na LIHE¹ 2ICS-006-67-1 NTS: (none) [Mandate/ 1 ] na /na I FLG BLTG I VT1/VT2.01 I 21 CS-PB104 i QISO 57-07 or DMG¹ na in JB7.70 ]ID (
| |
| na /na isc8
| |
| [ LINE¹ 21CS-006-67-1 NTS: (none) )Handate( )
| |
| na /na I
| |
| ) NOZ/FLG Q H7 AzO RCIC TP HD SPRAY (8-J ) na i VOL/UT6.13 I 2RPV-KB27 ( QISO 57-07 or DMG¹ 033 in (89.11 )ID I SUR/HT4.00 I NHP2-9.3-1.77-CS f LINE¹ 21CS-006-33-1 HTS: (none) [TEV [ 1 / na/ )Sc10 EHD OF SYSTEH ICS
| |
| | |
| NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System ICS: General Notes
| |
| : 1. 6 GATE VALVE, SA-105 29. 6 SCH. 160 PIPE, SA-106 B
| |
| : 2. 6" SCH. 80 SMLS PIPE, SA-106 B 30. 8" 30% WN FLANGE, SA-105
| |
| : 3. 6 SCH. 80 TEE, SA-234 WPB 31. 8" STD. PIPE, SA-106 GR B
| |
| : 4. 6" CHECK VALVE, SA-216 WCB 32. 8" STD. ELBOW, SA-234 WP8
| |
| : 5. 6" SCH. 80 PENETRATION, SA408 CL1 33. 12 X 8" STD. RED. ELBOW, SA-234 WPB
| |
| : 6. 6" SCH. 80 ELBOW, SA-234 WPB 34. 12" STD. PIPE, SA-106 GR B
| |
| : 7. 6" 90% WN FLANGE, SA-105 35. 12" STD. TEE, SA-234 WPB
| |
| : 8. 6" 900/I SPRAY NOZZLE FLANGE, SA-105 36. 17 STD. CAP, SA-234 WP8
| |
| : 9. 26'X10 SCH.160SWEEPOLET,SA-105 37. 12" STD. ELBOW, SA-234 WPB
| |
| : 10. 10" SCH. 80 SMLS PIPE, SA-106 B 38. 12'X10" STD. RED. TEE, SA-234 WPB
| |
| : 11. 10" SCH. 80 ELBOW, SA-234 WP8 39. 10" STD. PIPE, SA-106 GR B
| |
| : 12. 1-1/2 THICK PLATE, SA416 GR 70 40. 10" STD. ELBOW, SA-234 WPB
| |
| : 13. 2" 6000/I SOCKOLET, SA-105 41. 10 15% SO FLANGE, SA-105
| |
| : 14. 10" GATE VALVE, SA-105 42. 12" SCH. 120 PIPE, SA-106 GR B
| |
| : 15. 10" SCH. 80 PENETRATION, SA408 CL1 43. 12" LIFT CHECK GLOBE VALVE, SA-216 WCB
| |
| : 16. 6" STD. PIPE, SA412 TP 304W 44. 12" GATE VALVE, SA-105
| |
| : 17. 6" STD. PIPE, SA-106 GR B 45. 10 SCH.100 PIPE, SA-106 GR B
| |
| : 18. 6" STD. ELBOW, SA-234 WPB 46. 10" SCH. 100 ELBOW, SA-234 WPB
| |
| : 19. 6 CHECK VALVE,SA-105 47. 10" SCH. 100 TEE, SA-234 WPB
| |
| : 20. 6 15% WN FLANGE, SA-182 F304 48. 10" X8" SCH. 100 CONC. REDUCER, SA-234 WPB
| |
| : 21. 6 STD. ELBOW, SA~ WP304W 49. 16 X6" 15& SO FLANGE, SA0182 F304
| |
| : 22. 6" SCH. 80 PIPE, SA412 TP304 50. 6 19% SO FLANGE, SA-192 F304
| |
| : 23. 6" STD. TEE, SA-234 WPB 51. 6" 3KC WN FLANGE, SA-105
| |
| : 24. 6" X 4" STD. CONC. RED., SA-234 WP8 52. 6 SCH. 160 ELBOW, SA-234 WPB
| |
| : 25. 6" 150// WN FLANGE, SA-105 53. OUTER BARREL, SA-105
| |
| : 26. 6" SCH. 120 PIPE, SA-106 GR B 54. 6" NOZZLE, SA-105
| |
| : 27. 6 SCH. 120 ELBOW, SA-234 WPB 55. MOUNTING FOOT, SA-216 WCB
| |
| : 28. 7/8" PLATE, SA415 GR. 65
| |
| | |
| NIAGARA MONAMK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 NMP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - ISC SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTIOH OF ITEM TO BE EXAMIHEDiCATGRY i IGSCCi EX1/NDE PROCEDURE iPERIOO 1 REMARKS EXAMINATION IDENTIFIER ( ITS ISO LOCATOR, COMPONENT DMG ¹, LITEM ¹ iFREQY) EX2/NDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ i LINE No. AND NOTES, AS APPLICABLE DESELECT iCLASSi EX3/NDE PROCEDURE (PERIOD 3
| |
| J HOZ SOC MELD a N148 Az IHSTRUM ie-F J na I SUR/PT3.00 Sc7 2ISC-102CDA-FM001 I QISOHA or DMG¹ 034 in F85.150 i ID i na /na I
| |
| [ LINE¹ 2ISC-001-22-1 NTS: (none) iMandatei 1 J
| |
| na /na I i NOZ SOC MELD a N14C Az rNSTRUM iB-F Mandated' i na I SUR/PT3.00 Sc7 2 I SC-102CDA-FM005 i arsoHA or DMG¹ 034 in F85.150 iID l na /na I i LIHE¹ 2ISC-001-23-1 HTS: (none) i / na Ina I
| |
| )
| |
| NOZ SOC MELD Q H138 Az IHSTRUM iB-F i na I SUR/PT3.00 Sc7 21 SC-104CDA- FM001 I QISONA or DMG¹ 034 in (85.150 iro i na /na I i LINE¹ 2ISC-750-104-2 NTS: (none) (Mandated' i na /na I NOZ SOC MELD Q N14A Az IHSTRUM IB F I na i SUR/PT3.00 I 2I SC-105CDA- FM001 QISONA or DMG¹ 034 in F85.150 tID i na /na Sc9 na LINE¹ 2ISC-001-26-1 HTS: (none) iMandatei 1 i na /na I
| |
| ) HOZ SOC MELD a H14D Az IHSTRUM IB-F I na I SUR/PT3 F 00 I 2 I SC-105CDA-FM007 I QISOHA or DMG¹ 034 in )85.150 iID f na /na sc9
| |
| / LINE¹ 2ISC-001-25-1 HTS: (none) /Mandated' / na Ina I i NOZ SOC MELD Q H13A Az INSTRUM iB-F i na i SUR/PT3.00 I 2ISC-107COA-FM001 I QISONA or DUG¹ 034 in F85.150 iID (
| |
| na /na Sc9 i LINE¹ 2ISC-750-107-2 NTS: (none) iMandatei 1 i na /na I i NOZ SOC
| |
| 'MELD Q N128 Az170 INSTRUM iB-F ( na I SUR/PT3.00 I I 2I SC-208CDA- FM001 I QI BONA or DMG¹ 034 in F85.150 )ID i na /na I I i LINE¹ 2ISC-750-208-2 HTS: (none) iMandate/ 1 i na /na Sc11 i HOZ SOC MELD Q N12C Az190 IHSTRUM )8-F i na I SUR/PT3.00 I I 2I SC-210CDA-FM001 i arsoHA or DMG¹ 034 in F85.150 (ID i na Ina I I i LINE¹ 2ISC-750-210-2 NTS: (none) iMandatei 1 i na /na Sc11 i NOZ SOC MELD Q N12D Az351 IHSTRUM iB-F i na i SUR/PT3.00 I I 2 I SC-215CDA- FM001 arsoNA or DMG¹ 034 in F85.150 iID i na /na I I LINEN 2ISC-750-215-2 NTS: (none) (Mandated' i na /na Sc11 i
| |
| | |
| NIAGARA NOHAMK PDMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 NNP2-ISI-006, REV. 1, CH-000 SECOHD TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPEHDIX G - ISC SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 I RENARKS EXAHIHATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG ¹, i ITEN ¹ iFREOYi EX2/HDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ I LINE HO AND NOTES AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE iPERIDD 3 i NOZ SOC MELD Q N12A At009 INSTRUH Je-F i na J SUR/PT3.00 I I 2ISC-217CDA-FM001 I QISONA or DMG¹ 034 in JB5.150 iID i na /na I I i LINE¹ 2ISC-750-217-2 NTS: (none) iNandatei 1 i na /na Sc11 I PIPE/RED IB-J I na I SUR/PT 2ISC-3228-FM019 i also322-e or DMG¹ na in i89.21 inone ) na /na I LIHE¹ 2ISC-150-400-1 NTS: 7 9 IHS I 1 I na /na I ELB/PIPE IB-J J na i SUR/PT3.00 2ISC-3228-FM020 i QIS0322-8 or DMG¹ na in le9.21 inone i na /na i LINE¹ 2ISC-'150-400-1 NTS: 7,8 iHS 1 i na /na I PIPE/ELB IB J i na i SUR/PT3.00 I 2ISC-3228-FM021 I QI S0322.8 or DMG¹ na in /89.21 inone f na /na I I LINE¹ 2ISC-150-400-1 NTS: 7,8 iHS i na /na I I RED/PIPE (8-J i na i SUR/PT3.00 iDeselected 2I SC-3228- FM022 i QISO322-8 or DMG¹ na in ie9.21 (none i na /na I I LIHE¹ 2ISC-150-400-1 NTS: 6,7 IHS I 1 I na /na I i SE/ELB Q H11 IB-J I na I SUR/PT3.00 I I 2ISC-3228-9501 i also322-8 or DMG¹ na in i89.21 iID i na /na I I i LINE¹ 2ISC-002-RPV-1 NTS: 1,2 )TEV 1 i na/na Sc11 i I ELB/PIPE Q N11 IB-J i na i SUR/PT3.00 2ISC-3228-SM002 i also322-8 or DMG¹ na in i89.21 inone i na /na I LINE¹ 2ISC-002-RPV-1 HTS: 2 3 IHS 1 i na /na i PIPE/TEE Q N'l1 Ie-J i na i SUR/PI'3.00 2ISC-3228-SM003 i also322-e or DMG¹ na in /89.21 inone i na /na LINE¹ 2ISC 002 RPV 1 HTS 324 /HS 1 i na/na I TEE/RED Q N11 IB-J i na J SUR/PT3.00 2ISC-3228-SI$ 04 I QIS0322-8 or DMG¹ na in /89.21 inone J na /na LIHE¹ 2ISC-002-RPV-1 NTS: 4,5 INS i na /na
| |
| | |
| NIAGARA MOHAHK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 3 of 3 HMP2-ISI-0063 REV. 13 CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - ISC SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ i DESCRIPTION OF ITEM TO BE EXAMINEDiCATGRY iIGSCCi EXl/NDE PROCEDURE )PERIOD 1 REMARKS EXAMINATIOH IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG ¹, [ITEM ¹ iFREOYJ EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE )SELECT iCLASSi EX3/NDE PROCEDURE iPERIOO 3 TEE/RED Q H11 iB-J i na i SUR/PT3.00 I I 2ISC-3228-SN005 QIS0322-B or DllG¹ na in iB9.21 )ID i na /na I I J
| |
| LINE¹ 2ISC-002-RPV-1 HTS: 4,6 IHS I 1 I na /na So11 i END OF SYSTEM ISC
| |
| | |
| NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-1St~, Rev. 1, CH400 System ISC: General Notes
| |
| : 1. 2" N11 NOZ SAFE END SA436 CLF8 6. 2" X 1-1/2" PIPE FITT. SA-182 F304 RED/ADAPTER
| |
| : 2. 2" PIPE FTNG SA-182 F304 SCH. 80904 EL 7. 1-1/2 PIPE MA'7L SA412 TP316L CL1 (SCH. 805)
| |
| : 3. 2" PIPE MAT'LSA412 TP304 (SCH. 80) 8. 1-1/7 PIPE FITT. SA-182 F31 6L <<3000 CL1 90'L
| |
| : 4. 2" PIPE FITI'. SA-182 F3042" X7X 7 TEE (SCH. 80) 9. 1-1/2" X3/4" PIPE FITT. SA-182 F316L ¹3000 CL1 RED. CPLG.
| |
| : 5. 7 X 1" PIPE FITT. SA-182 F304 RED/ADAPTER
| |
| | |
| NIAGARA HONAC POHER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 E 1 of 65 HHP2-ISI-006, REV. 1( CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (Isl) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - Hss SYSTEM (sorted by Examination Identifier) 2HD IHTVL REL RED )
| |
| DESCRIPTIOH OF ITEH TO BE EXAMINED(CATGRY )IGSCC( EX1/HDE PROCEDURE (PERIOD 1 REHARKS EXAHIHATION IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DUG ¹, )ITEM ¹ iFREOYi EX2/HDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE lsELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
| |
| (
| |
| *AOV6A BLTG IB-G-2 I na I VT1/VT2.01 I 2HSS<<AOV6A,V8546 [ also 01-13 or DUG¹ 058 in )87.70 [none [ na /na I.
| |
| [ LINE¹ 2MSS-026-43-1 NTS: (none) (NS 1 J na /na I
| |
| )
| |
| *AOV6A INT SUR IB-H-2 I na I VT3/VT2.01 2HSS*AOV6A,VBY178 i QISO 01-13 or DUG¹ 058 in )812.50 )none J /
| |
| I LiNE¹ 2HSS-026-43-1 HTS: 11 IHS [ 1 ] /
| |
| I
| |
| *AOV68 BLTG IB-G-2 ( na [ VT1/VT2.01 2MSS<<AOV6B,V8547 I QISO 01-14 or DUG¹ 058 in )87.70 (none )
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-026-44-'I NTS: (none) (Ns 1 / na/na I
| |
| *AOV68 IHT SUR IB-M-2 [ na [ VT3/VT2.01 2HSS*AOV6B,VBY179 I QISO 01-14 or DUG¹ 058 in /812.50 /none / /
| |
| I LINE¹ 2MSS-026-44-1 NTS: 11 IHS I I I I *AOV6C BLTG IB-G-2 I na I VT1/VT2.01 2HSS*AOV6C,V8548 [ also 01-15 or DUG¹ 058 in )87.70 (none (
| |
| na /na I LINE¹ 2MSS-026-45-1 HTS: (none) IHS 1 / na/na
| |
| [ *AOV6C INT SUR IB-H-2 I na I VT3/VT2.01 2HSS*AOV6C,VBY180 f QISO 01-15 or DUG¹ 05& in )812.50 )none / /
| |
| i LINE¹ 2HSS-026-45-1 NTS: 1'I iNS i 1 ) /
| |
| I
| |
| <<AOV6D BLTG IB-G-2 I na I VT1/VT2.01 2HSS<<AOV6D,V8549 I QISO 01-16 or DWG¹ 058 in )87.70 (~e )
| |
| na/na I LINE¹ 2HSS 026-46-1 HTS: (none) INS I 1 I na /na I
| |
| <<AOV6D IHT SUR IB-H-2 I na I VT3/VT2.01 2MSS<<AOV6D,VBY181 (
| |
| also 01-16 or DWG¹ 058 in ]812.50 (none ( /
| |
| i LINE¹ 2HSS.026-46-1 HTS: 11 iNS ) 1 i /
| |
| (
| |
| *AOV7A BLTG IB-G-2 I na I VT1/VT2.01 sc7 2MSS*AOV7A,V8550 [ also 01-13 or DIJG¹ 058 in )87.70 )ID ) na /na I f I.IHE¹ 2HSS-026-152-1 NTS: (none) /Grp Rep/ 1
| |
| ) na /na I
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UHIT 2 E 2 of 65 NHP2- ISI-006, REV. 1 ~ CN-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPEHDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTIOH OF ITEH TO BE EXAHINEDiCATGRY )IGSCC[ EX1/NDE PROCEDURE iPERIOO 1 REHARKS EXAHINATIOH IDENTIFIER i ITS ISO LOCATOR, COHPOHENT DMG ¹, LITEM ¹ iFREGYi EX2/HDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ J LINE HO. AND NO'IES, AS APPLICABLE DESELECT iCLASSi EX3/HDE PROCEDURE iPERIOD 3 i <<AOV7A IHT SUR iB.H-2 i na ) VT3/VT2.01 i<< i>> Examine when disassembled for'maintenance.
| |
| 2MSS>>AOV7A,VBY182 i QISO 01-13 or DMG¹ 058 in i812.50 (DisG i / J<<
| |
| i LIHE¹ 2HSS-026-152-1 NTS: 11 iGrp Rep/ 1 i / J<<
| |
| I
| |
| *AOV78 BLTG (STEP STUDS) IB G i na i VOL/O'T6.04 Sc7 iCalBlock supports in situ ISI examination; Stud removal HOT required.
| |
| 2HSS>>AOV7B,VB5518 i QISO 01-14 or DMG¹ 058 in i86.210 inone ( na /na I iMultiple Component concept applies, however only vlv with step studs.
| |
| NHP2-2.24-15.88-STi LINE¹ 2HSS-026-151-1 HTS: (none) iNS i na /na I
| |
| *AOV78 FLG SUR (STEP STUD HOLES) IB-G-1 I na I VT1/VT2.01 /<< i<< Examine when disassembled for maintenance. Examine 1<< around each of 2HSS*AOV7B,VB551C I Q 0114 or DMG¹ 058 in iB6.220 inone i na /na i>> i(20) 2 '5<< step studs. Multiple Component concept applies, however J
| |
| LINE¹ 2HSS-026-151-1 NTS: 11 iNS i 1 i na /na i<< sonly vlv with step studs.
| |
| I
| |
| *AOV78 INT SUR IB-H-2 I na I VT3/VT2.01 I 2HSS*AOV7B,VBY183 I QISO 01-14 or DMG¹ 058 in i812.50 inone i / I I LIHE¹ 2HSS-026-151-1 HTS: 11 INS I 1 I / I I
| |
| *AOV7C BLTG IB-G-2 i na j VT1/VT2.01 2HSS*AOV7C,VB552 I QISO 01-15 or DMG¹ 058 in iB7.70 (none i na /na i LIHE¹ 2HSS-026-154-1 NTS: (none) )HS 1 i na /na
| |
| )
| |
| <<AOV7C INT SUR iB-H-2 I na I VT3/VT2.01 2MSS>>AOV7C,VBY184 i QISO 01-15 or DMG¹ 058. in i812.50 inone i /
| |
| I LINE¹ 2HSS-026-154-1 NTS: 11 INS I 1 I /
| |
| i <<AOV7D BLTG IB.G-2 i na ( VTl/VT2.01 2HSS>>AOV7D,VB553 i QISO 01-16 or DMG¹ 058 in F87.70 inone i na /na I LINE¹ 2HSS-026-153-1 HTS: (none) INS I
| |
| <<AOV7D INT SUR IB H 2 I na I VT3/VT2 01 2HSS<<AOV7D,VBY185 i QISO 01-16 or DMG¹ 058 in i812.50 inone J /
| |
| j LINE¹ 2HSS-026-153-1 HTS: ll iHS i 1 i /
| |
| I
| |
| <<HOV111 BLTG IB-G-2 i na i VT1/VT2.01 2HSS<<HOV111, VB103 I QISO 01-21 or DMG¹ 009 in )87.70 [none i na /na
| |
| ) LINE¹ 2HSS-006-150-1 NTS: (none) LHS 1 i na/na
| |
| | |
| NIAGARA HOHAllK PONER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 E 3 of 65 NHP2-IS1-006, REV. 'I, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - MSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEM TO BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENTIFIER ( ITS ISO LOCATOR, COHPONENT DUG ¹, ( ITEH ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ ( LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3
| |
| (
| |
| <<MOV111 INT SUR (8-H-2 (
| |
| na ( VT3/VT2.01 2HSS<<HOV111, VBY127 ( QISO 01-21 or DNG¹ 009 in (812 F 50 (none ( /
| |
| (
| |
| LINE¹ 2HSS-006-150-1 NTS: 24 (NS ( 1 ( /
| |
| (
| |
| <<HOV112 BLTG (8-G-2 ( na ( VT1/VT2.01 (Ex6 (VT-1 QRF0-6, ACCEPTED BY CORRECTION, Ref. DER 2-1998-1666.
| |
| 2HSS<<HOV112,V8104 (
| |
| QISO 01-20 or DUG¹ 009 in (87.70 (ID ( na /na
| |
| (
| |
| LINE¹ 2HSS-006-150-1 NTS: (none) (Grp Rep( 1 (
| |
| na /na I
| |
| *HOV112 INT SUR (8-H-2 (
| |
| na (
| |
| VT3/VT2.01 (* Examine when disassembled for maintenance.
| |
| " 2HSS*HOV112, VBY128
| |
| (
| |
| QISO 01-20 or DUG¹ 009 in (812.50 (DisG ( / (*
| |
| (
| |
| LINE¹ 2HSS-006-150-1 NTS: 19 IGrP ReP( 1
| |
| ( / (*
| |
| (
| |
| PIPE/<<HOV112 IB-J I na I VOL/UT6.02 2HSS<<MOV112, VNMOV112 (
| |
| QISO 01-20 or DUG¹ na in (89.11 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NMP2-6-.432-CS I LINE¹ 2HSS-006-150-1 NTS: 18, 19 INS I 1 I na /na I
| |
| <<HOV207 INT SUR (8-H-2 (
| |
| na (
| |
| VT3/VT2.01 (* (* Examine when disassembled for maintenance.
| |
| 2HSS*MOV207,VBY129 (
| |
| QISO 01-21 or DWG¹ 018 in (812.50 (DisG ( / (*
| |
| (
| |
| LINE¹ 2HSS-006-150-1 NTS: 24 IGrp Repl 1 I / (*
| |
| <<PSV120 FLG BLTG (8-G-2 (
| |
| na (
| |
| VT1/VT2.01 (Ex6 (VT-I QRF0-6.
| |
| 2HSS*PSV120, PB107 I QISO 01-13 or DUG¹ 054. in (87.50 (ID ( na /na I I
| |
| (
| |
| LINE¹ 2HSS-026-43-1 NTS: (none) (Grp Rep( 1 ( na /na I I I
| |
| *PSV120 VLV BLTG (8-G-2 ( na (
| |
| VT1/VT2.01 (Ex6 (VT-1 QRFO 6.
| |
| 2HSS<<PSV120,V8123 ( QISO 01-13 or DUG¹ 054 in (87.70 (ID ( na /na I I
| |
| ( LINE¹ 2HSS-026-43-1 NTS: (none) (Grp Rep( 1 (
| |
| na /na I I I
| |
| *PS 120 INT SUR (8-H-2 ( na (
| |
| VT3/VT2.01 (>> Examine Ken disassembled for maintenance.
| |
| 2HSS<<PSV120, VBY130 ( QISO 01-13 or DUG¹ 054 in (812.50 (DisG ( /
| |
| ( LINE¹ 2HSS-026-43-1 NTS: 7 (Grp Rep( I ( / (>>
| |
| (
| |
| *PSV121 FLG BLTG (8-G-2 (
| |
| na (
| |
| VT1/VT2.01 2HSS*PSV121,P8110 (
| |
| QISO 01-13 or DNG¹ 054 in (87.50 (none (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-026-43-1 NTS: (none) (NS (
| |
| 1 (
| |
| na /na
| |
| | |
| NIAGARA NOHAMK POWER CORPORATION - . NILE POINT NUCLEAR Sl'ATION - UNIT 2 4 of 65 NNP2-ISI-006, REV. 1, CH.OOO SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED ) DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY )IGSCC) EX1/NDE PROCEDURE (PERIOD 1 RENARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG ¹, )ITEN ¹ JFREOY[ EX2/NDE PROCEDURE )PERIOD 2 f USE CAL BLK ¹ I LINE NO. AND HOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I
| |
| *PSV121 VLV BLTG IB-G-2 I na I VT1/VT2.01 2HSS<<PSV121, VB124 [ QISO 01-13 or DWG¹ 054 in [B7.70 [none J na /na
| |
| )
| |
| LINE¹ 2HSS-026-43-1 NTS: (none) [NS 1 ) na/na
| |
| )
| |
| *PSV121 INT SUR fB-H-2 ] na (
| |
| VT3/VT2.01 2HSS*PSV121, VBY131 J QISO 01-13 or DWG¹ 054 in )B12.50 ]none J
| |
| /
| |
| I LINE¹ 2NSS-026-43-1 NTS: 7 INS I 1 I /
| |
| I
| |
| *PSV122 FLG BLTG IB-G-2 J na ) VT1/VT2.01 2NSS*PSV122, P 8113 I QISO 01-13 or DWG¹ 054 in JB7.50 )none f na /na na I LINE¹ 2HSS-026-43-1 NTS: (none) [NS 1 ) na /na I *PSV122 VLV BLTG IB-G-2 [ na [ VT1/VT2.01 I 2NSS*PSV122,VB125 i QISO 01-13 or DWG¹ 054 in IB7.70 /none / na /na I
| |
| (
| |
| LINE¹ 2HSS-026-43-1 NTS: (none) iNS 1 / na./na .I I
| |
| *PSV122 INT SUR IB H 2 I na I VT3/ 2'01 2NSS*PSV122,VBY132 [ QISO 01-13 or DMG¹ 054 in JB'l2.50 )none ( /
| |
| na I LINE¹ 2NSS-026-43-1 NTS: 7 INS I 1 I /
| |
| (
| |
| *PSV123 FLG BLTG IB-G-2 I na I VT1/VT2.01 2HSS<<PSV123, PB116 i QISO 01-13 or OMG¹ 054 in /B7.50 /none / na /na
| |
| / LINE¹ 2HSS-026-43-1 NTS: (none) /NS I
| |
| <<PSV123 VLV BLTG (B-G-2 [ na ( VT1/VT2.01 2HSS<<PSV123, VB126 i QISO 01-13 or DMG¹ 054 in )87.70 /none (
| |
| na /na I LINE¹ 2HSS-026-43-1 HTS: (none) I NS I na /
| |
| (
| |
| *PSV123 IN'I SUR (B-H-2 I na I VT3/VT2.01 2HSS*PSV123, VBY133 i QISO 01-13 or DMG¹ 054 in JB12.50 ]none f /
| |
| I LINE¹ 2HSS.026-43-1 NTS: 7 INS I 1 I /
| |
| )
| |
| *PSV124 FLG BLTG IB-G-2 [ na [ VT1/VT2.01 2HSS<<PSV124, PB119 f QISO 01-14 or DWG¹ 054 in IB7.50 )~e [ na /na
| |
| (
| |
| LINE¹ 2HSS-026-44-1 NTS: (none) /NS ( 1 / na/na
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 5 of 65 HNP2-ISI-006, REV. 1, CN.000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPEHDIX G - HSS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL RED [ DESCRIPTIOH OF ITEN TO BE EXAHINED)CATGRY (IGSCC( EX1/HDE PROCEDURE )PERIOD 1 REHARKS EXAMINATION IDENTIFIER ) ITS ISO LOCATOR, COHPOHENT DMG ¹, [ITEN ¹ JFREGY( EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ f LIHE HO. AND NOTES, AS APPLICABLE (SELECT [CLASS[ EX3/HDE PROCEDURE [PERIOD 3 f i ~PSV124 VLV BLTG IB-G-2 I na I VT1/VT2.01 2HSS*PSV124, VB127 J QISO 01-14 or DMG¹ 054 in (87.70 /none / na /na
| |
| )
| |
| LINE¹ 2HSS-026-44-1 NTS: (none) (HS 1 / na/na
| |
| )
| |
| *PSV124 INT SUR )8-N-2 J na J VT3/VT2.01 2HSS~PSV124, VBY134 I QISO 01-14 or DIIG¹ 054 in (812.50 (none ) /
| |
| I LINE¹ 2NSS-026-44-1 HTS: 7 INS I 1 I /
| |
| I 4PSV125 FLG BLTG IB-G-2 (
| |
| na f VT1/VT2.01 2NSS~PSV125,PB122 I QISO 01-14 or DMG¹ 054 in [87.50 /none f na /na J
| |
| LINE¹ 2MSS-026-44-1 NTS: (none) JNS 1 / na/na I
| |
| *PSV125 VLV BLTG IB-G-2 I na I VT1/VT2.01 I 2NSS*PSV125, V8128 I QISO 01-14 or DMG¹ 054 in (87.70 ]none J na /na I
| |
| )
| |
| LINE¹ 2NSS-026-44-1 HTS: (none) )NS 1 J
| |
| na/na I
| |
| (
| |
| *PSV125 INT SUR (8-N-2 J na ) VT3/VT2.01 2HSS*PSV125,VBY135 i QISO 01-14 or DMG¹ 054 in )812.50 ]none ) /
| |
| I LINE¹ 2NSS-026-44-1 NTS: 7 IHS I 1 I /
| |
| I 4PSV126 FLG BLTG iB-G-2 ) VT1/VT2.01 I 2HSS*PSV126, P8125 i QISO 01-14 or DMG¹ 054. in [87.50 [none f na /na I
| |
| [ LINE¹ 2HSS-026-44-1 NTS: (none) )HS 1 / na/na I I 0PSV126 VLV BLTG IB-G-2 [ VT1/VT2.01 2HSS~PSVI26,VB129 i QISO 01-14 or DWG¹ 054 in )87.70 [none [ na /na
| |
| (
| |
| LINE¹ 2HSS-026-44-1 HTS: (none) [HS 1 / na /na
| |
| )
| |
| ~PSV126 INT SUR (B.N-2 J na [ VT3/VT2.01 2HSS*PSV126,VBY'136 ) QISO 01-14 or DMG¹ 054 in (812.50 (none [ /
| |
| I LINE¹ 2HSS-026-44-1 NTS: 7 IHS I 1 I /
| |
| i iPSV127 FLG BLTG IB.G-2 [ na [ VT1/VT2.01 2NSS*PSV127,P8128 i QISO 01-14 or DMG¹ 054 in (87.50 ]none / na /na I LINE¹ 2HSS-026-44-1 HTS: (none) IHS 1 ( na/na
| |
| | |
| NIAGARA MOHAC POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 6 of 65 NMP2-ISI-006( REV. 'I, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPEHDIX G - MSS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ ( DESCRIPTION OF ITEM TO BE EXAMINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REMARKS EXAMINATION IDENTIFIER (
| |
| ITS ISO LOCATOR, COMPOHEHT DUG ¹, (ITEM ¹ (FREQY( EX2/HDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ ( LINE HO. AHD NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 (
| |
| I <<PSV127 VLV BLTG (8-0-2 I na I VTI/VT2.01 2MSS<<PSV127, V8130 (
| |
| QISO 01-14 or DIIG¹ 054 in (87.70 (none (
| |
| na /na I LINE¹ 2HSS-026-44-1 NTS: 10,14 IHS 1 ( na/na
| |
| (
| |
| *PSV127 INT SUR (B.M-2 ( na (
| |
| VT3/VT2.01 2MSS*PSV127,VBY137 ( QISO 01-14 or DUG¹ 054 in (812.50 (none ( /
| |
| ( LINE¹ 2MSS-026-44-1 NTS: 7 (NS ( 1 ( /
| |
| (
| |
| <<PSV128 FLG BLTG IB-G-2 (
| |
| na ( VT1/VT2.01 2MSS*PSV128,P8131 (
| |
| QISO 01-14 or DWG¹ 054 in (87.50 (none (
| |
| na /na na (
| |
| LINE¹ 2MSS-026-44-1 NTS: (none) (HS (. na /na I *PSV128 VLV BLTG IB.G-2 ( na (
| |
| VT1/VT2.01 I 2MSS*PSV128, VB131 ( QISO 01-14 or DUG¹ 054 in (87.70 (none (
| |
| na /na I
| |
| ( LINE¹ 2MSS-026-44-1 NTS: (none) (HS 1 (
| |
| na/na I
| |
| *PSV128 INT SUR IB-M-2 I na I VT3/VT2.01 2MSS*PSV128,VBY138 (
| |
| QISO 01-14 or DUG¹ 054 in (812 ~ 50 (none ( /
| |
| (
| |
| LINE¹ 2MSS-026-44-1 HTS: 7 (HS (
| |
| 1 ( /
| |
| (
| |
| <<PSV129 FLG BLTG IB G 2 ( na (
| |
| Vl'1/VT2.01 2MSS*PSV129, PB134 I QISO 01-15 or DUG¹ 055 in (87.50 (none ( na /na
| |
| ( LINE¹ 2MSS-026-45-1 NTS: (none) (NS 1
| |
| (
| |
| na /na I *PSV129 VLV BLTG IB-G-2 I na I VT1/VT2.01 2MSS<<PSV129,VB132 (
| |
| QISO 01-15 or DMG¹ 055 in (87.70 (none (
| |
| na /na
| |
| (
| |
| LINE¹ 2MSS-026-45-1 HTS: (none) (HS 1 ( na/na
| |
| (
| |
| <<PSVI29 INT SUR (B.M-2 (
| |
| na ( VT3/VT2.01 2MSS<<PSV129, VBY139 I QISO 01-1 or DMG¹ 055 in (812.50 (none ( /
| |
| (
| |
| LIHE¹ 2MSS-026-45-1 NTS: 7 (NS ( 1 ( /
| |
| I
| |
| *PSV130 FLG BLTG IB-G-2 ( na (
| |
| VT1/V'l2.01 2MSS<<P SV130, P 8137 (
| |
| QISO 01-15 or DMG¹ 055 in (87.50 (none (
| |
| na /na
| |
| ( LINE¹ 2MSS-026-45-1 HTS: (none) (HS (
| |
| na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 7 of 65 NHP2-1SI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED (
| |
| DESCRIPTIOH OF ITEN TO BE EXAMINED(CATGRY )IGSCC) EX1/HDE PROCEDURE (PERIOD 1 RENARKS EXAHIHATIOH IDENTIFIER J ITS ISO LOCATOR, COHPONENT DMG ¹, ]ITEN ¹ )FREQY( EX2/HDE PROCEDURE [PERIOD 2 f USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I f ~PSV130 VLV BLTG IB-G-2 [ VT1/VT2.01 2HSS*PSV130,VB133 I Ql 0115 or DMG¹ 055 in (87.70 /none / na /na
| |
| ] LINE¹ 2HSS-026-45-1 N'IS: (none) )NS 1 / na/na I
| |
| *PSV130 IHI SUR IB H 2 I na I VT3/VT2.01 2HSS~PSV130,VBY140 J QISO 01-15 or DMG¹ 055 in [B12.50 [none ) /
| |
| i LINE¹ 2NSS-026-45-1 NTS: 7 iHS i 1 i /
| |
| I
| |
| *PSV131 FLG BLTG IB-G-2 f na J VT1/VT2.01 2HSS*PSV131, PB140 I QISO 01-15 or DMG¹ 055 in /87.50 [none J na /na
| |
| (
| |
| LIHE¹ 2HSS-026-45-1 HTS: (none) (HS 1 / na/na
| |
| *PSV131 VLV BLTG /B-C-2 I na I VT1/VT2.01 I 2HSS*P SV131, VB134 QI SO 01-15 or DMG¹ 055 in (B7.70 [none J na /na I LINE¹ 2HSS-026-45-1 NTS: (none) [NS 1 / na /na I
| |
| (
| |
| ~PSV131 INT SUR IB-H-2 I na I VT3/VT2.01 2HSS~PSV131, VBY141 i QISO 01-15 or D'MG¹ 055 in )B12.50 ]none f /
| |
| i LINE¹ 2HSS-026-45-'I HTS: 7 iNS I I I
| |
| *PSV132 FLG BLTG IB-G-2 I na I VT1/VT2.01 2HSS~PSV132,PB143 QISO 01-15 or DMG¹ 055 in )B7.50 [none [ na /na LINE¹ 2NSS-026-45-1 NTS: (none) )
| |
| NS J na /na
| |
| / *PSV132 VLV BLTG IB-G-2 I na. I VT1/VT2.01 2HSS*PSV132,VB135 i QISO 01-15 or DMG¹ 055 in [87.70 /none / na /na I LINE¹ 2HSS-026-45-1 HTS: (none) (HS 1 / na /na
| |
| )
| |
| *PSV132 INI'UR /B.H-2 / na / VT3/VT2.01 2NSS~PSV132,VBY142 I QISO 01-15 or DMG¹ 055 in IB12.50 Inone I /
| |
| ( LINE¹ 2HSS-026-45-1 HTS: 7 iHS i 1 i /
| |
| *PSV133 FLG BLTG IB-G-2 I na I VT1/VT2 01 2NSS*PSV133,PB146 QISO 01-15 or DMG¹ 055 in (B7.50 /none / na /na LINE¹ 2HSS-026-45-1 NTS: (none) )HS / na /na
| |
| | |
| NIAGARA MOHANK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 Bof 65 HMP2-ISI-006, REV. 1, CH-000 SECOHD TEH YEAR INSERVICE INSPECTION (Isl) IHTERVAL PLAH Change date: 07/27/1999 APPENDIX G - MSS SYSTEM (sorted by Exemination Identifier) 2ND IHTVL REL REa I DESCRIPTION OF ITEM TO BE EXAMINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 REMARKS ExAMIHATIDN IDENTIFIER I ITs Iso LocAToR, coMPDNENT DNG ¹, IITEM ¹ IFREOYI Ex2/HDE PRocEDURE IPERIDD 2 I USE CAL BLK ¹ I LINE No. AND NO'IES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I
| |
| <<PSV133 VLV BLTG IB-G-2 na VT1/VT2.01 2MSS<<PSV133,VB136 I
| |
| I QISO 01-15 LINE¹ 2MSS-026-45-1 or DUG¹ 055 HTS: (none) in I87.70 IHS l~
| |
| I 1
| |
| I I na /na na/na I I I I *PSV133 IHT SUR IB.M-2 I na I VT3/VT2.01 2MSS<<PSV133, VBY143 I QISO 01-15 or DMG¹ 055 in I812.50 lnone I /
| |
| LINE¹ 2MSS.026.45-1 HTS: 7 IHS I 1 I /
| |
| I *PSV134 FLG BLTG IB-G-2 I na I VT1/VT2 01 2MSS*PSV134, PB149 I QISO 01-16 or DUG¹ 055 in I87.50 Inone I na /na I LINE¹ 2MSS-026-46-1 NTS: (none) INS 1 I na /na I *PSV134 VLV BLTG IB-G-2 I na I VT1/VT2.01 2HSS*PSV134,V8137 I QISO 01-16 or DMG¹ 055 in I87.70 lnone I na /na na I LINE¹ 2MSS-026-46-1 HTS: (none) IHS 1 I na /na I *PSV134 INT SUR IB.M-2 I na I VT3/VT2.01 2MSS*PSV134, VBY144 I QISO 01-16 or DWG¹ 055 in IB12.50 lnone I /
| |
| I LINE¹ 2MSS.026-46-1 NTS: 7 IHS I 1 I /
| |
| I
| |
| <<PSV135 FLG BLTG IB.G-2 I na I VT1/VT2.01 2MSS*PSV135, P8152 I alSO 01-16 or DUG¹ 055- in IB7.50 Inone I na /na I LINE¹ 2MSS-026-46-1 NTS: (none) IHS 1 I na/na I <<PSVI35 VLV BLTG IB-G-2 I na I VT1/VT2.01 2MSS*PSV135,VB138 I QISO 01-16 or DWG¹ 055 in I87.70 lnone I na /na I LINE¹ 2MSS-026-46-1 NTS: (none) INS 1 I na /na I
| |
| *PSV135 INT SUR IB-M-2 I na I VT3/VT2.01 2MSS*PSV135, VBY145 I QISO 01-16 or DMG¹ 055 in I812.50 Inone I /
| |
| I LINE¹ 2MSS-026-46-1 NTS: 7 IHS I 1 I /
| |
| I
| |
| *PSV136 FLG BLTG IB-G-2 I na I VTI/VT2.O1 2MSS*PSV136,PB155 I QISO 01-16 or DUG¹ 055 in I87.50 Inone I na /na I LINE¹ 2MSS-026-46-1 NTS: (none) IHS I na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - i HILE POINT NUCLEAR STATION - UNIT 2 9 of 65 NHP2-1S1-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ (
| |
| DESCRIPTION OF ITEN TO BE EXAHINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PER100 1 REHARKS EXAHINATION IDENTIFIER I ITS ISO LOCATOR'OHPONENT DMG ¹i I ITEN ¹ (FREQYI EX2/NDE PROCEDURE IPER100 2 I USE CAL BLK ¹ I LINE NO AND NOTESi AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
| |
| *PSV136 VLV BLTG IB-G-2 na VT1/VT2.01 2HSS*PSV136, VB139 I
| |
| (
| |
| QISO 01-16 LINE¹ 2HSS.026-46-1 or DMG¹ 055 NTS: (none) in (87.70 INS l~
| |
| (
| |
| 1
| |
| (
| |
| I na /na na/na I (
| |
| (
| |
| *PSV136 INT SUR (B-H-2 (
| |
| na (
| |
| VT3/VT2.01 2HSS*PSV136, VBY146 (
| |
| QISO 01-16 or DMG¹ 055 in (B12.50 (none ( /
| |
| ( LINE¹ 2HSS-026-46-1 NTS: 7 (NS ( 1 ( /
| |
| I
| |
| <<PSV137 FLG BLTG IB-G-2 ( na (
| |
| VT1/VT2.01 2HSS<<PSV137, PB158 (
| |
| QISO 01-16 or DMG¹ 055 in (B7.50 (none ( na /na
| |
| (
| |
| LINE¹ 2HSS-026-46-1 NTS: (none) (NS I 1 I na /na
| |
| (
| |
| <<PSV137 VLV BLTG (B-0-2 I na I VT1/VT2.01 2HSS*PSV137,VB140 ( QISO 01-16 or DMG¹ 055 in (87.70 (none (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-026-46-1 NTS: (none) (NS 1 (
| |
| na/na I
| |
| *PSV137 INT SUR IB H-2 I na I V 3/VT2 ~ 01 2HSS*PSV137, VBY147 (
| |
| QISO 01-16 or DMG¹ 055 in (B12.50 (none ( /
| |
| I LINE¹ 2HSS-026-46-1 NTS: 7 INS I 1 I /
| |
| I OTLT/PIPE IC-F-2 I na I VOL/UT6.02 I 2HSS-01-03-FM001 ( QISO 01-03 or DMG¹ na ~ in (C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-16-1.031-CS ( LINE¹ 2HSS-016-26-4 NTS: 36,37 (SD 2 ( na /na I ELB/PIPE . IC-F-2 ( na (
| |
| VOL/UT6.02 2HSS-01-03-FM002 I QISO 01-03 or DMG¹ na in (C5.51 (ID (
| |
| SUR/PT3.00/HT4.00 (
| |
| Sc9 NHP2-16-1 ~ 031-CS (
| |
| LINE¹ 2NSS.016.26-4 NTS: 37,38 (SD I 2 I na /na I
| |
| ( P IPE/<<AOV92A (C-F-2 I na I VOL/UT6.02 I 2HSS-01-03-FW003 I QISO 01-03 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-16-1.031-CS (
| |
| LINE¹ 2HSS.016-26-4 NTS: 37,39 (SD 2 (
| |
| na /na I PIPE/PIPE IC-F-2 I na I VOL/Ul'6.02 I 2HSS-01-03-SM001 I QISO 01-03 or DMG¹ na in (C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-16-1. 031- CS LINE¹ 2NSS.016-26-4 NTS: 37 (none 2 (
| |
| na /na
| |
| | |
| NIAGARA MOHAN PSIER CORPORATION - I HILE POINT NUCLEAR STATION - UNIT 2 10 of 65 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/'1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2NO INTVL REL RED ) DESCRIPTION OF ITEH To BE EXAMINED)CATGRY ) IGSCC) EX1/NDE PROCEDURE )PERIOD 1 REMARKS EXAMINATION IDENTIFIER )
| |
| ITS ISO LOCATOR, COHPONENT DNa ¹, )ITEH ¹ )FREOY) EX2/NDE PROCEDURE )PERIOD 2 )
| |
| USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/PIPE IC-F-2 )
| |
| na )
| |
| VOL/uT6.02 2HSS-01-03. SlJ002 )
| |
| QISO Ol-O3 or DUG¹ na in )C5 ~ 51 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NMP2-16-1.031-CS I LIHE¹ 2HSS.016-26-4 NTS: 37 )none 2 )
| |
| na /na I PIPE/ELB IC-F-2 )
| |
| na )
| |
| voL/UT6.O2 )
| |
| 2HSS-01-03-9503 I QISO 01-03 or DUG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NMP2-16-1.031-CS )
| |
| LINE¹ 2HSS-016-26-4 NTS: 37,38 )SD 2 )
| |
| na /na I PIPE/ELB IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 2MSS-01-03-SNO05 I QISO 01-03 or DUG¹ na in )C5.51 )none I SUR/PT3.00/HT4.00 I NHP2-16-1.031-CS )
| |
| LINE¹ 2MSS.016-26-4 HTS: 37,38 )SD 2 )
| |
| na /na I ELB/PIPE IC-F-2 I na ) VOL/UT6.02 I 2HSS-01-03-SN006 I QISO 01-03 or DNG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NHP2-16-1.031-CS )
| |
| LINE¹ 2MSS-016.26-4 NTS: 37,38 )SD 2 )
| |
| na /na I I PIPE/ELB IC-F-2 ) na )
| |
| VOL/uT6.O2 2HSS-01-04-FNO01 )
| |
| QISO 01-04 or Olio¹ na in )C5.51 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NHP2-28-1.34-CS )
| |
| LINE¹ 2HSS-028-3-4 NTS: 40,41 )SD 2 ) na /na I PIPE/ELB IC-F-2 na )
| |
| VOL/UT6.02 2HSS-01 FN002 )
| |
| also ol-o4 or DWG¹ na . in )C5 ~ 51 )none ) SUR/PT3.00/HT4.00 )
| |
| NMp2-28-1.34-cs )
| |
| LINE¹ 2HSS-028-3-4 NTS: 40,41 )
| |
| SD 2 ) na /na I PIPE/OTLT IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 2HSS-01 FlJ003 )
| |
| QISO 01-04 or DUG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/MT4.00 )
| |
| NHP2-28-1.34-CS I LINE¹ 2HSS-028-3-4 NTS: 40,45 I SD 2 ) na /na I PIPE/ELB IC-F-2 )
| |
| na )
| |
| voL/uT6.O2 )
| |
| Deseiected 2HSS-01-04-FN004 )
| |
| also ol-04 or DNG¹ na in )C5.51 )none ) SUR/PT3.00/HT4.00 )
| |
| NHP2-28-1.34-CS I LINE 2HSS 028 1 4 NTS 41 ISD 2 ) na /na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2HSS-01-04-Fl$ 05 )
| |
| QISO 01-04 or DUG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NMP2-2e-1.34-cs I LINE¹ 2HSS-028-1-4 NTS: 40,41 ISD 2 )
| |
| na /na
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 11 of 65 NHP2-1SI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) IHTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED ( DESCRIPTION OF ITEH TO BE EXAHINEO(CATGRY ( IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENTIFIER ( ITS ISO LOCATOR, COHPONENT DMG ¹, ( ITEH ¹ (FREQY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I I PIPE/OTLT Ic-F-2 (
| |
| na (
| |
| VOL/UT6.02 2HSS-01 FM006 (
| |
| QISO 01-04 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-28-1.34-CS (
| |
| LINE¹ 2HSS 028 1 4 NTS- 40r45 I 2 (
| |
| na /na I PIPE/ELB Ic-F-2 I na I VOL/UT6.02 I 2HSS-01-04-FMD07 (
| |
| QISO 01-04 or DMG¹ na in (C5.51 (none I SUR/PT3 00/HT4 00 I NHP2-28-1.34-CS I LINE¹ 2HSS-028-7-4 NTS: 40'1 ISD 2 (
| |
| na /na
| |
| (
| |
| PIPE/ELB Ic-F-2 (
| |
| na (
| |
| VOL/UT6.02 2HSS-01-04 FMODB I QISO 01-04 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-28-1.34-CS (
| |
| LINE¹ 2HSS-028-7.4 NTS: 40,41 (SD 2 ( na /na I PIPE/OTLT Ic-F-2 (
| |
| na (
| |
| VOL/UT6.02 2HSS-01-04-FM009 (
| |
| QISO 01-04 or DMG¹ na in (C5.51 (none I SUR/PT3.00/HT4.00 I NHP2-28-1.34-CS LINE¹ 2HSS-028-7-4 NTS: 40,45 (SD ( 2 (
| |
| na /na
| |
| ( PIPE/ELB Ic-F-2 (
| |
| na (
| |
| VOL/UT6.02 2HSS-01 F M010 I Q 01 04 or DMG¹ na in (C5.51 (none ( SUR/PT3.00/HT4.00 (
| |
| NHP2-28-1.34-CS LINE¹ 2HSS-028-5-4 NTS: 40,41 (SD 2 (
| |
| na /na I PIPE/ELB Ic-F-2 (
| |
| na ( VOL/UT6.02 2HSS-01-04-FM011 (
| |
| QISO 01-04 or DMG¹ na in (C5.51
| |
| ~ (none (
| |
| SUR/PT3.00/Hl'4.00 (
| |
| NHP2-28-1.34-CS LINE¹ 2HSS-028.5-4 NTS: 40,41 (SD 2 ( na/na I PIPE/OTLT Ic-F-2 (
| |
| na (
| |
| VOL/UT6.02 (Desel ected 2HSS.01-04-FM012 (
| |
| QISO 01-04 or DMG¹ na in (C5 ~ 51 (none (
| |
| SUR/PT3.00/HT4.00 (Sc8 I NHP2-28-1.34-CS (
| |
| LINE¹ 2HSS-028-5-4 NTS: 40,45 (SD 2 ( na /na I I INTEG ATT (C-C (
| |
| na ( SUR/PT3.00/HT4.00 (
| |
| 2HSS-01-04-FM300 (
| |
| QISO 01-04 ¹20 or DMG¹ na in (C3 ~ 20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-028-3.4 NTS: 40,44 (Handate( 2 ( na /na I I IHTEG ATT (C-C (
| |
| na ( SUR/PT3.00/HT4.00 (
| |
| 2HSS-01 FM301 (
| |
| QISO 01-04 ¹20 or DMG¹ na in (C3.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-028-3-4 NTS: 40,44 (Handate( 2 (
| |
| na /na I
| |
| | |
| NIAGARA MONAVK PSIER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 12 of 65 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED DESCRIPTION OF ITEN TO BE EXAHINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REMARKS
| |
| (
| |
| EXAMINATION IDENTIFIER I ITS ISO LOCATOR'OHPONENT DNG <<i IITEH IFREQYI EX /NDE PROCEDURE (PERIOD I USE CAL BLK ¹ I LINE NO AND NOTES AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I I INTEG ATT IC-C I na I SUR/PT3.00/HT4.00 (
| |
| 2HSS.01 FM302 (
| |
| QISO 01-04 ¹5 or DUG¹ na in (C3.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-028-5-4 NTS: 40,44 (Handate( 2 (
| |
| na /na I I INTEG ATT (C-C (
| |
| na ( SUR/PT3.00/HT4.00 (
| |
| 2HSS-01-04-FN303 (
| |
| QISO 01-04 ¹5 or DUG¹ na in (C3.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-028-5-4 NTS: 40,44 (Handate( 2 (
| |
| na /na I I INTEG ATT (C-C ( na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2HSS-OI-04-FN304 (
| |
| QISO 01-04 ¹18 or DUG¹ na in (C3.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-028-3-4 NTS: 40,43 (Handate( 2 (
| |
| na /na I I INTEG ATT (C-C (
| |
| na SUR/PT3.00/MT4.00 I 2MSS.01-04-FN305 ( QISO 01-04 ¹18 or DMG¹ na in (C3.20 (ID na /na I
| |
| (
| |
| LINE¹ 2HSS-028-3-4 NTS: 40,43 (Mandate( 2 na /na I I INTEG ATT (C-C (
| |
| na SUR/PT3.00/Hl'4.00 2MSS-OI-04-Fl606 (
| |
| QISO 01-04 ¹3 or DUG¹ na in (C3.20 (ID na /na I
| |
| ( LINE¹ 2MSS-028-5-4 N'TS: 40,43 (Handate( 2 na /na I I INTEG ATT IC C I na I SUR/PT /HT 00 I 2HSS-01 FM307 I QISO 01-04 ¹3 or DUG¹ na in (C3.20
| |
| . I ID I na /na (
| |
| ( LINE¹ 2HSS-028-5-4 NTS: 40,43 (Handate( 2 (
| |
| na /na I I INTEG ATT IC-C I na I SUR/PT3.00/HT4.00 I 2MSS-01-04-FN308 (
| |
| QISO 01-04 ¹13 or DUG¹ na in (C3.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2MSS-028-1-4 NTS: 40,46 (Mandate( 2 (
| |
| na /na I I INTEG ATT IC-C I na I SUR/PT3.00/HT4.00 I 2MSS.01-04-FN309 (
| |
| QISO 01-04 ¹13 or DUG¹ na in (C3.20 (ID ( na /na
| |
| ( LINE¹ 2HSS-028-1-4 NTS: 40,46 (Handate( 2 ( na /na I I INTEG ATT (C-C (
| |
| na SUR/PT3.00/HT4.00 I 2MSS-01-04-FM310 (
| |
| QISO 01-04 ¹8 or DUG¹ NA in (C3.20 (ID na /na I
| |
| (
| |
| LINE¹ 2HSS-028-7-4 NTS: 40,46 (Handate( 2 na /na I Sc10
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UHIT 2 13 of 65 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Exsnination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE iPERIOD 1 I REHARKS EXAHINATION IDENTIFIER ITS ISO LOCATOR, COHPONENT DMG ¹, ¹ ilTEH iFREOYi EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE NO. AND NO'IES, AS APPLICABLE (SELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I INTEG ATT IC C I na I SUR/PT3.00/HT4.00 I 2HSS-01-04-FM311 f QISO 01-04 ¹8 or DMG¹ NA in JC3.20 ']ID f na /na f LINE¹ 2HSS-028-7-4 NTS: 40,46 JHandatef 2 f na /na i Sc10 I ELB/PIPE IC-F-2 [ na [ VOL/UT6.02 2HSS-01-04-SM001 / QISO 01-04 or DMG¹ na in /C5.51 ]none J SUR/PT3.00/H'l4.00 J NHP2-28-1.34-CS [ LINE¹ 2HSS-028-3-4 NTS: 40,41 (SD 2 / na /na I I ELB/PIPE IC-F-2 I na I VOL/Ul'6.02 I 2HSS-01-04-SM002 (
| |
| QISO 01-04 or DMG¹ na in (C5.51 )none )
| |
| SUR/PT3.00/HT4.00 f NHP2-28-1.34-CS I LINE" 2HSS 028 3 4 NTS'0 41 ISD 2 i na /na I ELB/PIPE IC-F-2 f na f VOL/UT6.02 2HSS-01-04-SM003 I QISO 01-04 or DMG¹ na in [C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-28-1.34-CS I LINE¹ 2HSS-028-1-4 NTS: 40(41 ISD 2 f na /na I ELB/PIPE IC F 2 ] na ) VOL/UT6.02 2HSS.01.04-SM004 (
| |
| QISO 01-04 or DMG¹ na in JC5.51 ]none f SUR/PT3.00/HT4.00 J NHP2-28-1.34-CS i LINE¹ 2HSS-028-1-4 NTS: 40,41 LSD I 2 I na /na I I ELB/PIPE IC-F-2 J na f VOL/UT6.02 2HSS-01-04-SM005 [ QISO 01-04 or DMG¹ na .in ]C5.51 ]none f SUR/PT3.00/HT4.00 )
| |
| NHP2-28-1.34-CS I LINE¹ 2HSS 028-7-4 NTS'0i41 ISD 2 I ELB/PIPE IC-F-2 [ na ] VOL/UT6.02 2HSS-01-04-SM006 I QISO 01-04 or DMG¹ na in /C5.51 ]none ) SUR/PT3.00/HT4.00 f NHP2-28-1.34.CS I LINE¹ 2HSS-028-7-4 NTS: 40,41 ISD 2 / na /na I ELB/PIPE IC-F-2 [ VOL/UT6.02 2HSS-01-04-SM007 i QISO 01-04 or DMG¹ na in JC5.51 [none J SUR/PT3.00/H'T4.00 [
| |
| NHP2-28.1.34-CS I LINE¹2H 02854 NT '4041 I D 2 / na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 I 2HSS-01-04-SM008 / QISO 01-04 or DMG¹ na in (C5.51 ]none [ SUR/PT3.00/HT4.00 f NHP2-28-1.34-CS I LINE¹ 2HSS-028.5.4 NTS: 40(41 I SD 2 / na /na
| |
| | |
| NIAGARA NOHAMK POMER CORPORATIOH - . HILE POINT NUCLEAR STATION - UNIT 2 14 of 65 NMP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE [PERIOD 1 I REMARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPOHENT DMG ¹, LITEM ¹ iFREOYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ i LINE HO. AHD NOTES, AS APPLICABLE DESELECT iCLASSi EX3/NDE PROCEDURE iPERIOD 3 I OTLT/PIPE IC-F-2 I na I VOL/UT6.02 I 2HSS-01-05-FM001 i QISO 01-05 or DMG¹ na in iC5.51 inone L SUR/PT3.00/HT4.00 i NMP2-28-1.34-CS i LINE¹ 2MSS-028-4-4 HTS: 48,40 LSD 2 i na /na I
| |
| / PIPE/*HSIV-1B IC-F-2 i na i VOL/UT6.02 2HSS-01-05-FM002 I olISO 01-05 or DMG¹ na in iC5.51 inone ( SUR/PT3.00/HT4.00 i NMP2-28-1.34-CS i LINE¹ 2HSS-028-4-4 NTS: 40,48 LSD 2 i na /na I OTLT/PIPE IC-F-2 I na I VOL/UT6 02 I 2HSS-01-05-FM003 I QISO 01-05 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i HHP2-28-1.34-CS i LINE¹ 2HSS-028-2-4 NTS: 48,40 LSD 2 i na/na I i PIPE/*MS IV-1A IC-F-2 i na i VOL/UT6.02 iOesel ected 2HSS-01-05-FM004 i QISO 01-05 or DMG¹ na in iC5.51 inone J SUR/PT3.00/Ml'4.00 i NHP2-28.1.34-CS i LINE¹ 2HSS 028-2-4 NTS: 40,48 LSD 2 (
| |
| na /na I I OTLT/PIPE IC-F-2 [ na i VOL/UT6.02 2HSS-01 FM005 i QISO 01-05 or DMG¹ na in (C5.51 inone i SUR/PT3.00/MT4.00 )
| |
| HMP2-28-1.34-CS i LINE¹ 2HSS-028-8-4 NTS: 48,40 LSD 2 J na /na
| |
| [ PIPE/*NSI V-1D iC-F-2 i na i Vol./UT6.02 2HSS.01-05-FM006 I QISO 01-05 or DMG¹ na .in [C5.51 [none i SUR/PT3.00/HT4.00 J NHP2-28-1.34-CS I LINE¹ 2HSS 028 8 4 HTS: 40,48 ISD 2 i na /na i OTLT/PIPE IC-F-2 i na i VOL/UT6.02 2NSS-01-05-FM007 i also 01-0S or DMG¹ na in )C5.51 inone i SUR/PT3.00/NT4.00 i HHP2-28-1.34-CS i LIHE¹ 2HSS-028.6-4 NTS: 48,40 LSD 2 i na/na i PIPE/~MSI V-1C IC-F-2 i na t VOL/UT6.02 2HSS-01-05-FM008 i also 01-os or DMG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 (
| |
| NHP2-28-1.34-CS I LINE¹ 2HSS 028.6-4 NTS'0i48 I 2 i na /na I PIPE/PIPE IC-F-2 i na i VOL/UT6.02 2HSS-01-05-FM009 I QISO 01-05 or DMG¹ na in iC5.51 Inone i SUR/PT3 F 00/HT4 F 00 I HHP2-48-3.50-CS I LIHE¹ 2HSS-048-9-4 NTS: 47 (none 2 i na /na
| |
| | |
| NIAGARA HONAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 15 of 65 NHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED [ DESCRIPTION OF ITEN TO BE EXAHINED[CATGRY [IGSCC] EX1/NDE PROCEDURE [PERIOD 1 REHARKS EXAHINATION IDEHTIFIER f ITS ISO LOCATOR, COHPONENT DMG ¹, JITEH ¹ JFREOY[ EX2/NDE PROCEDURE ]PERIOD 2 f USE CAL BLK.¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/PIPE /C-F-2 / na / VOL/UT6.02 2HSS-01-05-FW014 f QISO 01-05 or DMG¹ na in JC5.51 ]none J SUR/PT3.00/HT4 F 00 /
| |
| NHP2-28-1.34-CS / LINE¹ 2HSS-028-4-4 NTS: 40 /none / 2 / na /na I PIPE/PIPE [C-F-2 f na f VOL/U'I6.02 2HSS-01 FW016 [ QISO 01-05 or DWG¹ na in [C5.51 [none f SUR/PT3.00/HT4.00 /
| |
| NHP2-28-1.34-CS / LINE¹ 2HSS-028-2-4 NTS: 40 /none / 2 f na /na I PIPE/PIPE /C-F-2 / na / VOL/UT6.02 2HSS-01-05-FW018 I QISO 01-05 or DWG¹ na in JC5.51 /none / SUR/PT3.00/HT4.00 NHP2-28-1.34-CS f LINE¹ 2HSS-028-8-4 NTS: 40 [none f 2 ) na /na i PIPE/PIPE IC-F-2 I na I VOL/UT6.02 2HSS-01-05-FW020 (
| |
| QISO 01-05 or DWG¹ na in (C5.51 (none )
| |
| SUR/PT3.00/HT4.00 NHP2-28-1.34-CS [ LINE¹ 2HSS-028-6-4 NTS: 40 [none [ 2 J na /na INTEG ATT; 2" thick plate (C-C (
| |
| na SUR/PT3.00/HT4.00 I 2HSS-01-05-FM300 QISO 01-05 ¹4 or DWG¹ na in JC3.20 ]ID na /na LINE¹ 2HSS-028-4-4 NTS: 40,44 (Handate) 2 na /na I
| |
| [ INTEG ATT; 2a thick plate )C-C ) na (
| |
| SUR/PT3.00/Hl'4.00 [
| |
| 2HSS.01-05-FW301 (
| |
| QISO 01-05 ¹4 or DWG¹ na .in IC3.20 IID I na /na I f LINE¹ 2HSS-028-4-4 NTS: 40,44 JHandatef 2 J na /na I f INTEG ATT; 10" diam. 1" waII pipe JC-C f na / SUR/PT3.00/HT4.00 /
| |
| 2HSS-Ol-05-FW304 / QISO 01-05 ¹1/2 or DMG¹ na in JC3.20 ]ID [ na /na I
| |
| / LINE¹ 2HSS-048-9-4 NTS: 47,50 JHandatef 2 f na /na I INTEG ATT; 10" diam. 1" wall pipe iC-C ) na / SUR/PT3.00/HT4.00 2HSS-01-05-FM305 I QISO 01-05 ¹1/2 or DWG¹ na in IC3.20 lID I na /na J
| |
| LINE¹ 2HSS-048-9-4 NTS: 47,50 /Handate/ 2 / na /na f INTEG ATT; 10" diam. 1" vaII pipe ]C-C ( na [ SUR/Pl'3.00/HT4.00 2HSS-01-05-FW308 J QISO 01-05 ¹19/20 or DWG¹ na in JC3.20 ]ID ) na /na J
| |
| LINE¹ 2HSS-048-9-4 NTS: 47,50 JHandate) 2 [ na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 16 of 65 NHP2-ISI-006, REV. 1, CN-OOO SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - Hss S'YSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED (
| |
| DESCRIPTION OF ITEH To BE EXAHINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENTIFIER (
| |
| ITS ISO LOCATOR, COHPONENT DMG ¹, (ITEN ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE No. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I
| |
| ( IHTEG ATT; 10" diem. 1" wall pipe (C-C (
| |
| na (
| |
| SUR/PT3.00/HT4.00 2HSS-01-05-FW309 (
| |
| QISO 01-05 ¹19/20 or DWG¹ na in (C3.20 (Io (
| |
| na /na
| |
| ( LINE¹ 2HSS-048-9-4 HTS: 47,50 (Handate( 2 (
| |
| na /na
| |
| ( LM IC-F-2 I na I VOL/UT6.02 I 2HSS-01-05-LM01-1 (
| |
| also O1-OS or DMG¹ na in (C5.52 (none I SUR/PT /HT I NHP2-48-3.50.CS I LINE¹ 2HSS-048-9-4 NTS'7 INS 2 (
| |
| na /na
| |
| (
| |
| LM (C-F-2 ( na (
| |
| VOL/UT6.02 2HSS-01-05-LM01-2 (
| |
| also ol-os or DMG¹ na in (C5.52 (none I SUR/PT3.00/HT4 F 00 I NHP2-48-3.50.CS I LINE¹ 2HSS.048.9-4 NTS: 47 IHS 2 (
| |
| na /na
| |
| ( LM IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2HSS-01-05-LM02-1 (
| |
| QISO 01-05 or DMG¹ na in (C5.52 (none ( SUR/PT3 F 00/HT4.00 (
| |
| NHP2-48-3.50.CS ( LINE¹ 2HSS-048-9-4 NTS 47 INS 2 (
| |
| na /na
| |
| (
| |
| LM IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2HSS-01-05-LM02-2 I QISO 01-05 or DMG¹ na in (C5.52 (none I SUR/PT /HT 00 I NHP2-48-3.50.CS I LINE¹ 2HSS-048-9.4 NTS: 47 (Ns 2 ( na /na
| |
| ( PIPE/CAP (conforms to ANSI B16.9) (C-F-2 (
| |
| na ( VOL/UT6.02 2HSS-01-05-SM001 (
| |
| QISO 01-05 or DMG¹ na ~ in (C5.51 (none I SUR/PT3.00/HT4.00 I NHP2-48-3.50-CS ( LINE¹ 2HSS-048-9-4 NTS: 47,49 (SD 2 ( na /na
| |
| (
| |
| PIPE/CAP (conforms to ANSI 816.9) (C-F-2 (
| |
| na ( VOL/UT6.02 2HSS-01-05-SM003 (
| |
| also ol-o5 or DWG¹ na in (C5.51 (none ( SUR/PT3.00/HT4.00 (
| |
| NHP2-48-3.50.CS (
| |
| LIHE¹ 2HSS-048-9-4 NTS: 47,49 (SD I 2 I na /na (
| |
| I OTLT/PIPE IC-F-2 ( na (
| |
| VOL/UT6.02 2HSS-01-06-FM001 ( also 01-06 or DWG¹ na in (C5.51 (none ( SUR/PT3.00/HT4.00 (
| |
| NHP2-16-1.031-CS I LINE¹ 2HSS-016-25-4 NTS: 36,37 ISD 2 ( na /na
| |
| ( P IPE/~AOV928 IC-F-2 (
| |
| na ( VOL/UT6.O2 2HSS-01-06-FM002 ( QISO 01-06 or DMG¹ na in (C5.51 (none ( SUR/PT3.00/HT4.00 (
| |
| NHP2-16-1.031-CS (
| |
| LINE¹ 2HSS-016-25-4 NTS: 52,54 (SD 2 ( na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 17 of 65 NHP2-ISI-006, REV. 1, CH-OOO SECOHD TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REO i DESCRIPTIOH OF ITEN TO BE EXAHIHEOiCATGRY iIGSCCi EX1/HDE PROCEDURE iPERIDO 1 REHARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR'OHPOHEHT DMG ¹i IITEH ¹ IFREQYI EX2/HDE PROCEDURE IPERIDD 2 I USE CAL BLK ¹ I LINE NO AND NOTES AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I PIPE/PIPE IC-F-2 J na i VOL/UT6.02 2HSS-01 FM014 i QISO 01-06 or DMG¹ na in iC5.51 Jnone I SUR/PT3.00/HT4.00 I HHP2-16-'I.031-CS i LINE¹ 2HSS-016-25-4 NTS: 37 inone I 2 I na /na I I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2HSS-01 FM015 i QISO 01-06 or DMG¹ na in iC5.51 Inone J SUR/PT3.00/HT4.00 I HHP2-16-1.031-CS I LINE¹ 2HSS 016 25 4 NTS'7 38 ISD 2 i na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2HSS-01-06-SM001 t QISO 01-06 or DMG¹ na in JC5.51 inone i SUR/PT3.00/HT4.00 i HHP2-16-1.031-CS i LINE¹ 2HSS-016-25-4 HTS: 37,38 /SD 2 )
| |
| na /na I PIPE/ELB IC-F-2 i na )
| |
| VOL/UT6.02 2HSS-01-06-SM002 i QISO 01.06 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i HHP2-16.1.031-CS I LINE¹ 2HSS-016-25-4 NTS: 37,38 I SD 2 i na/na I I ELB/PIPE IC-F-2 i na J VOL/UT6.02 2HSS-01-06-SM003 I QISO 01-06 or DMG¹ na in )C5 ~ 51 (none J SUR/PT3.00/HT4.00 i NHP2-16-1.031-CS i LINE¹ 2HSS-016-25-4 NTS: 37,38 ISO 2 i na /na
| |
| ) PIPE/PIPE IC-F-2 i na i VOL/UT6.02 2HSS-01-06-SM004 / QISO 01-06 or DMG¹ na .in iC5.51 /none i SUR/PT3.00/HT4.00 i HHP2-16-1.031-CS i LIHE¹ 2HSS-016-25-4 NTS: 37 inone 2 i na /na I 0'ILT/ELB IC-F-2 i na. i VOL/UT6.02 2HSS-01 FM001 ) Qlso 01-or or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i HHP2-18-.938-CS LINE¹ 2HSS 018-34-4 NTS: 51,52 LSD 2 i na /na I, PIPE/ELB IC-F-2 i na i VOL/UT6.02 2HSS-01-07-FM002 i Qlso 01-07 or OMG¹ na in iC5.51 ilD i SUR/PT3.00/HT4.00 i Sc9 NHP2-18-.938-CS i LINE¹ 2HSS-018-34-4 HTS: 52,53 ISO 2 i na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2HSS-01-07-FM003 i QISO 01-07 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4 F 00 i HHP2-18-.938-CS J LINE¹ 2HSS-018-34-4 NTS: 52,53 LSD 2 i na/na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 18 of 65 KHP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Exininat ion Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHINATION IDENT IF IER ITS ISO LOCATOR, COHPONENT DMG ¹, (ITEH ¹ (FREQY( EX2/KDE PROCEDURE (PERIOD 2 I USE CAL BLK ¹ I LIKE Ho AND KOTES AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/ELB IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2HSS-01 FM004 I QISO 01-07 or DMG¹ na in IC5.51 (none (
| |
| SUR/PT3.00/HT4 F 00 (
| |
| NHP2-18-.938-CS (
| |
| LINE¹ 2HSS-018-34-C HTS: 52,53 (SD 2 I na /na I I PIPE/BYPASS CHEST IC-F-2 ( n (
| |
| VOL/UT6.02 2HSS-01-07-FM005 I QISO 01-07 or DMG¹ na in (C5.51 I SUR/PT3.00/HT4.00-(
| |
| 'none NHP2-18-.938-CS I LINE¹ 2HSS-018-34-4 NTS: 53,54 ISD I 2 I na /na I I OTLT/ELB IC-F-2 I na I VOL/UT6.02 I 2HSS-01 FM006 I QISO 01-07 or DMG¹ na in (C5.51 (none I SUR/PT3.00/HT4.00 I NHP2-18-.938-CS I LINE¹ 2HSS 018 '10 4 Nl'S'i 2 ISO I 2 I na I I PIPE/ELB IC-F-2 ( na (
| |
| VOL/uT6.02 I 2HSS.01-07-FM007 (
| |
| QISO O1-O7 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 ( I NHP2-18-.938-CS I LINE¹ 2HSS-018-10.4 NTS: 52,53 ISO 2 I na /na I I.
| |
| I PIPE/ELB IC-F-2 I na I voL/uT6.o2 2HSS-01-07-FM008 I QISO 01-07 or DMG¹ na in (C5.51 (none I SUR/PT3.00/HT4.00 (
| |
| NHP2-18-.938.CS I LINE¹ 2HSS 018 10 4 N'IS'2i53 ISD 2 (
| |
| na /na I I PIPE/BYPASS CHEST IC-F-2 (
| |
| na (
| |
| voL/UT6.O2 2HSS-01-07-FM009 I QISO 01.07 or DMG¹ na .in (C5.51 (none I SUR/PT3.00/HTC.OO (
| |
| NHP2-18-.938-CS I LIHE¹ 2HSS-018-10-4 NTS: 53,54 (SD 2 I na /na I I ELB/PIPE IC-F-2 (
| |
| na (
| |
| VOL/uT6.O2 2HSS.01-07-SM001 I QISO 01-07 or DMG¹ na in (C5.51 (none (
| |
| SUR/P'T3.00/HT4 F 00 I KHP2-18-.938- CS I LINE¹ 2HSS-018-3C-4 NTS: 52,53 (SD I 2 I na /na I I PIPE/ELB IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2HSS-01-07-SM002 I QISO 01-07 or DMG¹ na in IC5 ~ 51 (none ( SUR/PT3.00/HT4.00 I KHP2-18-.938-CS I LINE¹ 2HSS-018-3C-4 HTS: 52,53 ISO 2 I na /na I I ELB/PIPE IC-F-2 (
| |
| na (
| |
| voL/uT6.O2 2HSS-01-07-SM003 I QISO 01-07 or DMG¹ na in (C5.51 (none ( SUR/PT3.00/HT4 F 00 (
| |
| NHP2-18-.938-CS I LINE¹ 2HSS-018-34-4 NTS: 52,53 ISD ( 2 I na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 19 of 65 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Exemination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REHARKS EXAHIHAT ION IDEN'I IF IER ITS ISO LOCATOR, COHPONEHT DMG ¹, ]ITEN ¹ JFREQY[ EX2/NDE PROCEDURE [PERIOD 2 [
| |
| USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I ELB/PIPE IC.F-2 [ na [ VOL/UT6.02 2HSS-01-07-SM004 ) QISO 01-07 or DMG¹ na in )C5.51 ]none J SUR/PT3.00/HT4.00 J NHP2.18-.938-CS I LINE¹ 2HSS 018 34 4 NTS' 3 ISO 2 f na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2HSS-01-07-Sl$ 05 I QISO 01-07 or DMG¹ na in )C5.51 (none J SUR/PT3.00/HT4.00 J NHP2.'18-.938-CS [ LIHE¹ 2HSS.018-34-4 NTS: 52,53 [SO 2 / na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2HSS-01-07-SM006 QISO 01-07 or DMG¹ na in [C5.51 [none SUR/PT3.00/HT4.00 NHP2-18-.938.CS I
| |
| I LINE¹ 2HSS 018 34 4 NT '2 53 ISD 2
| |
| )
| |
| / na /na f
| |
| (18") PIPE/SML (6") IC-F-2 I na I SUR/PT3.00/HT4.00 I 2HSS-01-07-SM007 QISO 01-07 or DMG¹ na in (C5.81 (none f na / I LINE¹ 2ASS-006-125-4 NTS: 53(55 LSD 2 / na/na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2HSS-01-07-SM008 I QISO 01-07 or DMG¹ na in (C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-18-.938-CS i LINE¹ 2HSS-018-34-4 HTS: 52,53 ISO I 2 I na/na I I ELB/PIPE IC-F-2 ) na ) VOL/UT6.02 2HSS-01-07-SM009 I QISO 01-07 or DMG¹ na .in )C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-18-.938-CS I LINE¹ 2HSS 018 34 4 NTS' 53 ISD I 2 I na /na I I ELB/PIPE IC-F-2 (
| |
| na [ VOL/UT6.02 2HSS-01-07-SI$ 12 i QISO 01-07 or DMG¹ na in (C5.51 ]none f SUR/PT3.00/HT4.00 ]
| |
| NHP2-18-.938-CS I LINE¹ 2HSS-018-10.4 NTS: 52,53 ISD 2 / na /na I PIPE/ELB (C-F-2 [ na ] VOL/UT6.02 2HSS-01-07-9813 [ QISO 01-07 or DMG¹ na in [C5.51 IID I SUR/PT3.00/HT4.00 I Sc9 NHP2-18-.938.CS ) LINE¹ 2HSS-018-10-4 NTS: 52,53 i SO i 2 )
| |
| na /na I ELB/PIPE IC-F-2 )
| |
| na J VOL/UT6.02 2HSS-01-07-9514 i QISO 01-07 or DMG¹ na in )CS ~ 51 )none ) SUR/PT3.00/HT4.00 J NHP2-18-.938.CS I LINE¹ 2HSS 018 10 4 NTS'2 53 ISD 2 f na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - .c HILE POINT NUCLEAR STATION - UNIT 2 20 of 65 NHP2-ISI-006, REV. 1( CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/'1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHINATION IDENI'IFIER ITS ISO LOCATOR, COHPONENT DMG ¹, i ITEN ¹ iFREQYi EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ I LINE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE !PERIOD 3 I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2HSS-01-07-SM015 I QISO 01-07 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-18-.938.CS I LINE¹ 2HSS-018-10.4 NTS: 52I53 I SD 2 i. na /na I i ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2HSS-01-07-SM017 i also o1-o7 or DIIG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-18-.938-CS i LINE¹ 2HSS-018-10-4 NTS: 52,53 [SD 2 J na /na I I PIPE/ELB IC-F-2 I na i VOL/UT6.02 I 2HSS-01-07-SM018 I QISO 01-07 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-18-.938-CS i LINE¹ 2HSS-018-10.4 NTS: 52,53 JSD 2 i na /na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2HSS-01-07-SM019 I QISO 01-07 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-18-.938-CS LINE¹ 2HSS-018-10.4 NTS: 52,53 i SD I 2 I na /na I SE/PIPE Q N3A Az072 HAIN STEAN iB-J i na i VOL/UT6.O2 ioeselected during 2nd 10-Year Update 2HSS.01-13-F'M001 i QISO 01-13 or D'MG¹ na in i89.11 /none i SUR/PT3.00/HT4.00 i I NHP2.26.1.26-CS LINE¹ 2HSS-026-43-1 NTS: 1,2 iNS 1 dna/ I I ELB/PIPE IB-J i na i VOL/UT6.02 /Ex6 iHT/UT QRF0-6.
| |
| 2HSS-01-13-FM002 i QISO 01-13 or DMG¹ na .in iB9.11 IID I SUR/PT3.00/HT4.00 I I NHP2-26-1.26-CS LINE¹ 2HSS-026-43-1 NTS: 2,3 iHS i na/ I I PIPE/ELB IB-J i na i VOL/UT6.02 2HSS-01 FM003 i QISO 01-13 or DMG¹ na in iB9.11 inone i SUR/PT3.00/HT4.00 i NHP2-26-1.26 CS I LINE¹ 2HSS 026 43 1 NTS' 3 IN 1 i na /na I ELB/PIPE IB-J i n i VOL/UT6.O2 2HSS.01-13-FM004 i also 01-13 or DMG¹ na in iB9.11 inone I SUR/PT3.00/HT4.00 I NHP2-26-1.26-CS LINE¹.2HSS-026-43-1 NTS: 2,3 iNS 1 [ na/na PIPE/ELB IB J i na i VOL/UT6.02 iEx6 iHT/UT QRF0-6.
| |
| 2HSS-01-13-FM005 QISO 01-13 or DMG¹ na in 189.11 iID i SUR/PT3.00/HT4.00 i I NHP2-26-1 '6.CS LINE¹ 2HSS-026-43-1 NTS: 2,3 i NS/ber dna/ I
| |
| | |
| NIAGARA MONAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 21 of 65 NMP2- IS I-006( REV. 1 ~ CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: OT/27/1999 APPENDIX G - Mss SYSTEH (sorted by Examination Identifier)
| |
| NO INTVL REL RE4 I DESCRIPIION OF ITEH To BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 REMARKS EXAHINATION IDENTIFIER I ITS ISO LOCATOR, COMPONENT DMG ¹, I ITEN ¹ IFRE4YI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE No AND NOTEsi AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/PENET 21A IB-J I na I VOL/UT6.02 IEx6 IHT/UT QRFO 6.
| |
| 2HSS-01-13-FM008 I QISO 01-13 or DMG¹ na in IB9.11 IID I SUR/PT3.00/NT4.00 I I NMP2-26-1.26-CS I LINE¹ 2HSS-026-43-1 Hl'S: 2,12 ITEV/berI 1 I na / I I PENET 21A/PIPE IB-J I na I VOL/UT6.02 I 2HSS-01 FM009 I QISO 01-13 or DMG¹ na in IB9.11 IID I SUR/PT3.00/NT4.00 I NMP2-26-1.26-CS I LINE¹ 2HSS-026-152-1 NTS: 2,12 ITEV/berI 1 I na / I Scil I EXPANDER/PIPE IC-F-2 I na I VOL/UT6.02 I I 2NSS.01-13-FM020 I QISO 01-13 or DMG¹ na in IC5.51 IID I SUR/PT3.00/HT4.00 I I NMP2-28-1.34-CS I LINE¹ 2HSS-028-1-4 NTS: 14,15 ISD/ber I 2 I na /na Scil I PIPE/<<ADYTA IB-J I na VOL/UT6.02 IEx6 INissed 1st Intrvl UFSAR Exam Cormltment, Ref DER2-1998-0090. MT/UT 2MSS-01 FM021 alSO 01-13 or DUG¹ na in IB9.11 I ID SUR/PT3.00/MT4.00 I IAutoUT QRFO-6 with no growth from prior Vol exam. USFAR coma't being NMP2-26-1.26-CS LINE¹ 2HSS-026-152-1 NTS: 2,11 IBER I 1 I na / Scil Ichanged to comply M/Code Req's. Exam QRF0.11, then revert to once /loy I PIPE/PIPE IB-J I na I VOL/UT6.O2 2MSS-01-13-FM022 I Qlso 01-13 or DMG¹ na in IB9.11 IID I SUR/PT3.00/MT4 F 00 I NNP2-26-1.26-CS I LINE¹ 2MSS-026-152-1 NTS: 2 IBER Scil I <<ADYTA/PLUG (2") IB-J I na I SUR/PT3.00/NT4.00 I 2MSS-01-13-FM023 I QISO 01-13 or DMG¹ na .in IB9.40 Inone I na /na I I LINE¹ 2HSS-002-152-1 NTS:.10 11 INS 1 I na/na I
| |
| *AOV6A/PIPE (OLD SM014 LOCUS) IB-J I na I VOL/UT6.02 IEx6 INT/UT QRF0-6.
| |
| 2HSS-01-13.FM025 I QISO O1-13 or DMG¹ na in IB9.11 IID I SUR/PT3 00/MT4 00 I I NMP2-26.1 ~ 26.CS I LINE¹ 2HSS.026-43-1 NTS: 2,11 IBER I I
| |
| PIPE/<<AOV6A IB-J I na I VOL/UT6.02 IEx6 IMT/UT QRF0.6.
| |
| 2MSS-01 FM026 I QISO 01-13 or DMG¹ na in IB9.11 IID I SUR/PT3.00/NT4.00 I I NHP2-26-1 ~ 26-CS I LINE¹ 2HSS-026-43-1 NTS: 2,11 IBER 1 Ina/ I I HSS LOOP A SOL/PLUG (2") IB-J I na I SUR/PT3 00/HT4 00 I 2MSS-01-13-FM027 I QISO 01-13 or DMG¹ na in IB9.40 Inone I na /na LINE¹ 2NSS-002-43-1 NTS: 9,10 INS 1 I na /na I
| |
| | |
| NIAGARA HOHAIC POWER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 22 of 65 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - NSS SYSTEN (sorted by Examination Identifier)
| |
| ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHINATION IDENTIFIER [ ITS ISO LOCATOR, COHPONENT DWG ¹, [ ITEH ¹ (FREQYJ EX2/NDE PROCEDURE (PERIOD 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE )SELECT iCLASSi EX3/NDE PROCEDURE (PERIOD 3 I ~AOV6A/PLUG (2") )8-J [ na f SUR/PT3.00/HT4.00 ]
| |
| 2MSS-01-13-FN028 i QISO 01-13 or DNG¹ na in (89 40 [none (
| |
| na /na I LINE¹ 2HSS-002-43-1 NTS: 10,11 INS I 1 I na /na I I INTEG ATT )8-K ] na I SUR/PT3.00/HT4.00 JEx6 iHT QRF0-6.
| |
| 2HSS-01 Fl600 (
| |
| QISO 01-13 ¹1 or DUG¹ na in (810.20 ]ID / na /na I LINE¹ 2HSS-026-43-1 NTS: 2,5 )Mandate] 1 / na /na I I INTEG ATT IB-K J na f SUR/PT3.00/HT4.00 JEx6 IHT QRF0-6.
| |
| 2MSS-01 FN301 [ QISO 01-13 ¹1 or DUG¹ na in )810.20 [ID f na /na I I na ( LINE¹ 2HSS-026-43-1 NTS: 2c5 /Mandatej 1 / na /na I I INTEG ATT (8-K [ na f SUR/PT3.00/HT4.00 JEx6 IHT QRFO 6 2MSS-01 FW302 J QISO 01-13 ¹1 or DUG¹ na in (810.20 (ID i na /na na I LINE¹ 2HSS-026-43.'I NTS: 2,5 ]Mandate] 1 ) na /na I I INTEG ATT [8 K J na ) SUR/PT3.00/HT4.00 )Ex6 IHT QRF0-6.
| |
| 2HSS-01 Fl603 I QISO 01-13 ¹1 or DUG¹ na in (810.20 ]ID f na /na na I LINE¹ 2HSS-026-43-1 NTS: 2(5 /Mandate) 1 J na /na I I INTEG ATT ]8-K )
| |
| na )
| |
| SUR/PT3.00/HT4.00 (Ex6 IHT QRF0.6.
| |
| 2MSS-01 Fl604 J QISO 01-13 ¹1 or DUG¹ na ~ in (810.20 JID f na /na I I na )
| |
| LINE¹ 2MSS-026-43-1 NTS: 2,5 ]Mandate( 1 / na /na I I I INTEG ATT )8-K f na f SUR/PT3.00/MT4.00 JEx6 IHT cilRF0.6.
| |
| 2MSS-01 Fl605 f QISO 01-13 ¹1 or DUG¹ na in JB10.20 ]ID f na /na na i LINE¹ 2HSS-026-43-1 NTS: 2,5 ]Mandate] 1 f na /na I I INTEG ATT [8-K f na f SUR/PT3.00/HT4.00 JEx6 iHT QRF0-6.
| |
| 2MSS-01 FM306 ) QISO 01-13 ¹1 or DNG¹ na in [810.20 / ID J na /na
| |
| ) LINE¹ 2MSS-026-43-1 NTS: 2,5 (Mandate/ 1 f na /na I I INTEG ATT [8-K f na [ SUR/PT3.00/NT4 F 00 (Ex6 iHT QRF0-6.
| |
| 2HSS-01-13-Fl607 ( QISO 01-13 ¹1 or DWG¹ na in (810.20 )ID f na /na LINE¹ 2HSS-026-43-1 NTS: 2,5 /Mandate/ 1 / na /na I
| |
| | |
| NIAGARA MOHAIIK PNER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 23 of 65 NHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTIOH (ISI) INTERVAL PLAH Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier)
| |
| ND INTVL REL REQ I DESCRIPTIOH OF ITEH TO BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE iPERIDD 1 RENARKS EXAHINATION IDENTIFIER ( ITS ISO LOCATOR, CONPOHENT DUG ¹, iITEH ¹ iFREOYi EX2/NDE PROCEDURE )PERIOD 2 i USE CAL BLK ¹ f LINE NO. AND NOTES, AS APPLICABLE ]SELECT [CLASS[ EX3/NDE PROCEDURE ]PERIOD 3 I INTEG ATT /B-X / na SUR/PT3.00/HT4.00 iEx6 iNT QRF0.6.
| |
| 2NSS-01-13-Fl608 )
| |
| QISO 01-13 ¹2 or DMG¹ na in /B10.20 /ID / na /na I na i LINE¹ 2NSS-026-43-1 NTS: 2,5 /Mandate/ 1 / na /na I I INTEG ATT tB-X / na SUR/PT3.00/HT4.00 iEx6 IMT QRFO 6.
| |
| 2MSS-01-13-Fl609 QISO 01-13 ¹2 or DHG¹ na in [810.20 )ID J na /na I I na LINE¹ 2NSS-026-43-1 NTS: 2(5 (Mandate) 1 J na /na I I I INTEG ATT /8-K / na [ SUR/PT3.00/HT4.00 iEx6 IMT QRFO 6 2MSS.01-13-Fl610 (
| |
| QISO 01-13 ¹2 or DUG¹ na in /810.20 /ID / na /na I I na I LINE¹ 2MSS-026-43-1 NTS: 2,5 /Mandate/ 1
| |
| / na /na I I I INTEG ATT /B-K / na SUR/PT3.00/MT4.00 iEx6 IMT QRF0.6 2MSS-01-13-FM311 (
| |
| QISO 01-13 ¹2 or DUG¹ na in /810.20 )ID / na /na I I na i LINE¹ 2MSS-026-43-1 NTS: 2(5 /Mandate) 1 ) na /na I I I INTEG ATT lB-K I na i SUR/PT3.00/HT4.00 iEx6 IMT QRFO 6 2NSS-01 F W312 (
| |
| QISO 01-13 ¹7/8 or DUG¹ na in /810.20 /ID )
| |
| na /na I I i LINE¹ 2MSS-026.43-1 HTS: 2,8 /Mandate/ 1 f na /na I I I IHTEG ATT JB-K ( na SUR/PT3.00/HT4.00 [Ex6 IMT ciIRFO 6.
| |
| 2MSS-01 FN313 [ QISO 01-13 ¹7/8 or DWG¹ na ~ in JB10.20 (
| |
| ID )
| |
| na /na I I na f LINE¹ 2MSS-026-43-1 NTS: 2,8 ]Mandate] 1 / na /na I I INTEG ATT /8-X na SUR/PT3.00/MT4.00 iEx6 )MT QRF0-6.
| |
| I J 2MSS.01 Fl614 )
| |
| QISO 01-13 ¹7/8 or DUG¹ na in /810.20 /ID (
| |
| na /na I I I LINE¹ 2NSS 026 43 1 NTS' 8 /Mandate[ 1 )
| |
| na /na I I I IHTEG ATT (B-X / na I SUR/PT3 00/NI4 00 IEx6 iMT QRF0-6.
| |
| 2MSS.01-13-FI615 [ QISO 01-13 ¹7/8 or,DNG¹ na in )810.20 (ID (
| |
| na /na I na I LINE¹ 2HSS 026 43 I NTS'(8 IMandatel f na /na I IHTEG ATT JB-X / na SUR/PT3.00/MT4.00 iEx6 iNT QRF0-6.
| |
| 2NSS.01 Fl616 ) QISO 01-13 ¹12/13 or DNG¹ na in /810.20 /ID f na /na I na I LINE¹ 2MSS-026-43-1 NTS: 2(5 )Mandate/ 1 J na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 24 of 65 NHP2 IS I 006g REV 1 CH 000
| |
| ~ SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCi EX1/NDE PROCEDURE I ERIOD 1 I REHARKS EXAHINATION IDENTIFIER ITS ISO LOCATOR, COHPONENT DMG ¹, iITEH ¹ iFREOYi EX2/NDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I INTEG ATT ie-K i na i SUR/PT3.00/HT4.00 iEx6 iHT QRF0.6.
| |
| 2HSS.01 FM317 i QISO 01-13 ¹12/13 or DMG¹ na in I810.20 IID I na /ns I I i LINE¹ 2HSS-026.43-1 NTS: 2(5 iHandatei 1 i na /na I I I IHTEG ATT IB-K I na I SUR/PT3.00/HT4.00 lEx6 iHI'RF0-6.
| |
| 2HSS-01-13-FM318 i QISO 01-13 ¹12/13 or DMG¹ na in ie10.20 ilD i na Ina I i LINE¹ 2HSS-026-43-1 NTS: 2 5 iHandatei 1 i na /na ~
| |
| I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 iEx6 iHT QRFO 6.
| |
| 2HSS-01-13-FM319 i QISO 01-13 ¹12/13 or DMG¹ na in i810.20 iID i na /na i LINE¹ 2HSS.026.43-1 NTS: 2,5 iHsndatei 1 i na /na I IN'TEG ATT ie-K i na i SUR/PT3.00/HT4.00 iEx6 IHT QRF0-6.
| |
| 2HSS.01-13-FM320 i QISO 01-13 ¹12/13 or DMG¹ na in i810.20 iID i na /na I I LINE¹ 2HSS.026.43-1 NTS 2 5 iHandatei 1 i ns /na I I I INTEG ATT iB-K i na i SUR/PT3.00/HT4.00 iEx6 IHT QRFO 6.
| |
| 2HSS-01-13.FM321 i QISO 01-13 ¹12/13 or DMG¹ na in ie10.20 ilD i na Ina I LINE¹ 2HSS-026-43-1 NTS: 2 iHsndatei 1 i na Ina I I INTEG ATT ie-K i na i SUR/PT3.00/HT4.00 iEx6 iHT QRF0-6.
| |
| 2HSS-01-13-FM322 i QISO 01-13 ¹12/13 or DMG¹ na ~ in i810.20 iID i na /na I i LINE¹ 2HSS-026-43-1 NTS: 2,5 iHandatei 1 i na /na I I I INTEG ATT ie-K i na i SUR/PT3.00/HT4.00 iEx6 IHT QRFO 6.
| |
| 2HSS-01=13.FM323 i QISO 01-13 ¹12/13 or DMG¹ na in i810.20 ilD i na /na na i LINE¹ 2HSS-026-43-1 N'IS: 2(5 .
| |
| iHsndatei 1 i na /na I I INTEG ATT ie-K i na i SUR/PT3.00/Hl'4.00 iEx6 iHT QRFO 6.
| |
| 2HSS.01 FM324 i QISO 01-13 ¹14 or DMG¹ na in ie10.20 ilD i na Ina I LINE¹ 2HSS-026-43-1 NTS: 2 5 iHandatei I I INTEG ATT iB-K i na i SUR/PT3.00/HT4.00 iEx6 iHT QRF0-6.
| |
| 2HSS-01 FM325 i QISO 01-13 ¹14 or DMG¹ na in i810.20 ilD i na Ins I I LINE¹ 2HSS 026 43 1 NTS' iHsndatei 1 i na /na I I
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATIOH - UNIT 2 25 of 65 NMP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - MSS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ ( DESCRIPTION OF ITEM TO BE EXAMINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIDO 1 REMARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR> COMPONENT DMG ¹i IITEM ¹ IFREQYI EX2/NDE PROCEDURE IPERIDO 2 I II USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIDO 3 I I IHTEG ATT IB K I na I SUR/PT3.00/MT4.00 lEx6 IMT QRF0-6.
| |
| 2MSS-01 F M326 i QISO 01-13 ¹14 or OMG¹ na in iB10.20 iID ) na /na I I LINE¹ 2HSS-026.43-1 HTS: 2(5 JMandatei 1 i na /na I I I INTEG ATT IB-K I na I SUR/PT3.00/MT4.00 lEx6 IMT QRF0-6.
| |
| 2MSS-01 FM327 i QISO 01-13 ¹14 or DMG¹ na in [BI0.20 )IO i na /na I I i LINE¹ 2HSS-026-43.1 NTS: 2,5 iMandate/ 1 i na /na I I I PIPE/ELB iB-J i na L VOL/UT6.02 2MSS-01 SM001 i QISO 01-13 or DMG¹ na in iB9.11 inone i SUR/Pt3.00/MT4.00 i NMP2-26-1.26-CS i LINE¹ 2HSS-026-43-1 NTS: 2,3 JNS 1 i na /na I ELB/PIPE IB-J i na i VOL/ut6.02 2MSS-01-13-SM002 i QISO 01-13 or DMG¹ na in (89.11 inone i SUR/PT3.00/Mt4.00 i NMP2-26-1.26-CS i LINE¹ 2MSS-026-43-1 NTS: 2(3 iNS 1 J na /na i PIPE/SOL (26" to 2") IB-J i na i SUR/PT3.00/Ml'4.00 [
| |
| 2MSS-01-13-SM003 I QISO 01-13 or OMG¹ na in iB9.32 iNS [ na /na I LINE¹ 2MSS-002-107-1 NTS: 2(4 iNS 1 i na /na I I PIPE/FLG NOZ IB-J J na i VOL/Ut6.02 iEx6 iMT/UT QRF0-6.
| |
| 2MSS-01-13-SM004 )
| |
| QISO 01-13 or DMG¹ na .in iB9.31 !ID I SUR/PT3 F 00/MT'0 I I NMP2-26-1.26-CS I LIHE¹ 2HSS-026.43-1 HTS: 2,6 INS 1 dna/ I i PIPE/FLG NOZ IB-J / na i VOL/UT6.02 iEx6 iMT/UT QRF0-6.
| |
| 2MSS-01-13-SM005 i QISO 01-13 or DMG¹ na in iB9.31 IID I SUR/PT3.00/MT4.00 I I NMP2-26-1.26-CS i LINE¹ 2HSS-026-43-1 NTS 2@6 IHS 1 )na/ I PIPE/FLG NOZ IB-J i na i VOL/UT6.02 JEx6 )MT/Ut QRFO 6.
| |
| 2HSS-01-13-SM006 I Ql 0113 or DMG¹ na in /89.31 IIO I SUR/PT3.00/MT4.00 I I NMP2-26-1.26.CS I LINE¹ 2HSS-026-43-1 NTS: 2,6 [NS dna/ I I PIPE/FLG NOZ IB-J i na i VOL/UT6.02 iEx6 iMT/Ut QRFO 6.
| |
| 2MSS-01-13-SM007 i QISO 01-13 or DMG¹ na in iB9.31 IID I SUR/PT3.00/MT4.00 I I NMP2-26-1.26-CS LINE¹ 2MSS-026-43-1 NTS: 2,6 INS 1 dna/ I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 26 of 65 NHP2-1S1-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - Hss SYSTEH (sorted by Examination Identifier)
| |
| REHARKS 2ND INTVL REL RED i DESCRIPTION OF ITEH TO BE EXAHINEDiCATGRY i IGSCCi EX1/NDE PROCEDURE iPERIOO 1 EXAIIINATION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DMG ¹, iITEH ¹ iFREOYi EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ I LINE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/ELB IB-J i na i VOL/UT6.02 iEx6 iHT/UT QRF0.6.
| |
| 2HSS.01-13-SM008 [ also ol-13 or DMG¹ na in i89.11 IID I SUR/PT3.00/HT4 F 00 I I NHP2-26.1 '6-CS I LINE¹ 2HSS-026-43-1 NTS: 2(3 IHS 1 dna/ I I I ELB/PIPE (8-J i na i VOL/Ul'6.02 [Ex6 IHT/UT QRFO 6 2HSS-01-13-SMOI0 )
| |
| also o1-13 or DMG¹ na in i89.11 )ID i SUR/PT3.00/HT4.00 i I NMP2-26-1.26-CS I LINE¹ 2HSS.026.43-1 NTS: 2,3 IBER i na/ I i PIPE/SOL (26" to 2") (PLUGGED) (8-J i na i SUR/PT3.00/HT4.00 i 2HSS-01-13-SM011 i also ol-13 or DMG¹ na in i89.32 inone J na /na I LINE¹ 2HSS-002-43-1 NTS: 2,9 INS i na /na I PIPE/PIPE (HITRE CUT) IB-J i na i VOL/UT6.02 iEx6 IHT/UT QRF0-6.
| |
| 2HSS-01-13-SM013 i also ol-13 or DMG¹ na in /89.11 IID I SUR/PT3 F 00/HT4.00 I I NHP2-26-1.26-CS I LINE¹ 2HSS-026-43-1 NTS: 2 IBER 1 dna/ I PIPE/PIPE (HITRE CUT) IB-J i na (
| |
| VOL/UT6.02 2HSS-O'I-13-SM015 I QISO 01-13 or DMG¹ na in i89.11 )ID i SUR/PT3.00/MT4.00 i NHP2-26.1.26.CS I LINE¹ 2HSS-026-152-1 NTS: 2 IBER 1 i na / J Sc11 i *AOV7A/EXPANDER (26" to 28") iB-J i na i VOL/UT6.02 2HSS-01-13-SM020 [ also 01-13 or DMG¹ na ~ in i89.11 IID I SUR/PT '0 /HT4 0 I NHP2-26-1.26-CS I LINE¹ 2HSS-026-152-1 NTS: 11,14 IBER dna/ Sc11 i SE/PIPE Q N38 Az108 HAIN STEAH iB-J i na i VOL/UT6.02 2HSS-01 FM001 (
| |
| QISO 01-14 or DMG¹ na in i89.11 i2P J SUR/PT3.00/Hl'4.00 isc8 NHP2-26-1.26-CS i LINE¹ 2HSS-026-44-1 NTS: 1,2 (AM 1 )na/
| |
| I ELB/PIPE IB-J i na / VOL/UT6.02 2HSS-01 FM002 )
| |
| also ol-14 or DMG¹ na in i89.11 (none i SUR/PT3.00/HT4.00 I NHP2-26-1.26-CS I LINE¹ 2HSS.026-44-'I NTS: 2,3 IHS I 1 I na /na I I ELB/PIPE IB-J I na I VOL/UT6.02 I 2HSS-01 FM003 i QISO 01-14 or DMG¹ na sn (89.11 Inone I SUR/PT3.00/HT4.00 I NHP2-26-1.26-CS i LINE¹ 2HSS-026-44-1 NTS: 2,3 INS 1 i na /na
| |
| | |
| NIAGARA HONAMK POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 27 of 65 NHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED [ DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY [ IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DllG ¹, )ITEN ¹ (FREOYJ EX2/NDE PROCEDURE [PERIOD 2 J USE CAL BLK ¹ I LINE NO AND NOTESi AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/ELB JB-J f na f VOL/UT6.02 2HSS-01 FM004 f QISO 01-14 or DMG¹ na in )89.11 ]ID (
| |
| SUR/PT3.00/HT4.00 f Sc9 NHP2-26-1.26-CS f LINE¹ 2HSS-026-44.1 NTS: 2,3 JNS/ber J 1 / na /
| |
| I PENET 218/PIPE (8-J (
| |
| na ] VOL/UT6.02 J Sc7 2HSS-01 FM009 f QISO 01-14 or DMG¹ na in (89.11 (10 f SUR/PT3.00/HT4.00 )
| |
| NHP2-26-1.26-CS f LINE¹ 2HSS-026-151-1 NTS: 2,12 /TEV/berf 1 f na / I I ELB/PIPE )8-J J na ] VOL/UT6.02 2HSS-01 FM013 I QISO 01-14 or DMG¹ na in /89.11 ]none f SUR/PT3.00/HT4.00 /
| |
| NHP2-26-1.26-CS i LINE¹ 2HSS-026-44-1 NTS: 2,3 iNS 1 / na /na
| |
| / PIPE/ELB IB-J I na I VOL/UT6 02 2HSS-01 FM014 i QISO 01-14 or DMG¹ na in )89.11 (
| |
| ID J SUR/PT3.00/HT4.00 J Sc9 NHP2-26.1.26.CS I LINE¹ 2HSS-026-44-1 NTS: 2,3 INS f na/
| |
| I EXPANDER/PIPE IC-F-2 [ na [ VOL/UT6.02 ] Sc7 2HSS-01 FM020 I QISO 01-14 or DMG¹ na in [C5.51 IID I SUR/PT3.00/HT4.00 I NHP2-28-1.34-CS [ LINE¹ 2HSS-028-3-4 NTS: 14,15 )SD/ber 2 f na /na I PIPE/*AOV78 IB-J J na (
| |
| VOL/UI'6.02 [ Sc7 2HSS-01-14-FM021 I Ql 01 14 or DMG¹ na . in (89.11 IID I SUR/PT3.00/HT4.00 I NHP2-26-1.26-CS i LINE¹ 2HSS.026-151-1 NTS: 2,11 ABER 1 /na/
| |
| I PIPE/PIPE IB-J ( na )
| |
| VOL/UT6.02 )
| |
| Sc7 2HSS-01-14-FM022 [ QISO 01-14 or DMG¹ na in (89.11 IID I SUR/PT3.00/HT4.00 I NHP2-26-1.26-CS I LINE¹ 2HSS-026-151-1 NTS: 2 IBER / na/
| |
| i ~AOV78/PLUG (2") IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-01 FM023 i QISO 01-14 or DMG¹ na in )89.40 /none / na /na
| |
| )
| |
| LINE¹ 2HSS-002-151-1 NTS: 10,11 )NS 1 / na /na I i iAOV68/PENET Z18 (8-J J na [ VOL/UT6.02 2HSS-01 FM025 f QISO 01-14 or DMG¹ na in (89.11 [ID i SUR/PT3.00/HT4.00 ( Sc9 NHP2-26-1.26-CS f LINE¹ 2HSS-026-44-1 NTS: 11,12 JTEV/ber/ 1 )
| |
| na /
| |
| | |
| NIAGARA HOHAHK POHER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 28 of 65 NMP2-ISI-006, REV. 1, CM-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEM (sorted by Examination Identifier)
| |
| HD INTVL REL REO I DESCRIPTION OF ITEH TO BE EXAHIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE (PERIOD 1 I REHARKS EXAHIHATIOH IDENTIFIER (
| |
| ITS ISO LOCATOR, COMPONENT DNG ¹, (ITEH ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 USE CAL BLK " I LINE NO AND NOTES'S APPLICABLE (SELECT (CLASS( EX /NDE PROCEDURE (PERIOD I
| |
| (
| |
| PIPE/*AOV68 IB-J I ns I VOL/UT6.02 I I 2NSS-01 FN026 (
| |
| QISO 01-14 or DMG¹ ns in (89.11 (ID (
| |
| SUR/PT3.00/HT4.00 (
| |
| Sc9 I NMP2-26-1.26.CS I LINE¹ 2HSS-026-44-1 HTS: 2,11 IBER I 1 I ns / I I I PIPE/PIPE IB J I na I VOL/UT6.02 2HSS-01 FH027 (
| |
| QISO 01-14 or DUG¹ na in (89.11 (ID (
| |
| SUR/PT3.00/NT4.00 (
| |
| Sc9 NNP2-26-1.26-CS I LIMES 2HSS.026-44-1 HTS: 2 IBER I 1 I na / I I *AOV68/PLUG (2s) IB-J I ns I SUR/PT3.00/MT'0 I 2MSS-01 FH028 (
| |
| QISO 01-14 or DMG¹ na in (89.40 (none ( na /na
| |
| ( LINE¹ 2HSS-002-44-1 NTS: 10,11 (NS ( 1 ( na /na I
| |
| (
| |
| *AOV68/PLUG (2s) IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-01 FW030 (
| |
| QISO 01-14 ~ or DHG¹ na in (89.40 (none (
| |
| na /na
| |
| (
| |
| LINE¹ 2NSS-002-44-1 NTS: 10,11 (HS (
| |
| 1 (
| |
| na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2MSS-01 FW300 (
| |
| QISO 01-14 ¹8/9 or OIIG¹ na in (810.20 (ID ( na /na I
| |
| (
| |
| LINE¹ 2NSS-026-44-1 NTS: 2,8 (Hsndate( 1 (
| |
| na /na I I IHTEG ATT (8-K (
| |
| na ( SUR/PT3.00/HT4.00 (
| |
| 2MSS.01 FI601 (
| |
| QISO 01-14 ¹8/9 or DIIG¹ na ~ in (810.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-026-44-1 NTS: 2,8 (Mandate( 1 (
| |
| na /na I I IHTEG ATT (8-K (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2MSS-01 FI602 (
| |
| QISO 01-14 ¹8/9 or DMG¹ na in (810.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-026-44-1 NTS: 2,8 (Hsndate( 1 ( na /na I I INTEG ATT IB K I na I SUR/PT3 00/HT4.00 I 2NSS-01-14-FI603 ( QISO 01-14 ¹8/9 or DMG¹ na in (810.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-026-44-1 NTS: 2,8 (Mandate( 1 (
| |
| na /na I IHTEG ATT (8-K (
| |
| na SUR/PT3.00/HT4.00 I 2MSS-01 FI604 (
| |
| QISO 01-14 ¹1 or DUG¹ na in (810.20 (ID na /na (
| |
| (
| |
| LINE¹ 2HSS-026.44-1 NTS: 2,5 (Hsndate( 1 na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 29 of 65 NHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED (
| |
| DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENTIFIER (
| |
| ITS ISO LOCATOR, COHPONENT DMG ¹, (ITEH ¹ (FREQY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ (
| |
| LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I INTEG ATT (8-K - ( na I SUR/PT3'00/HT 00 I 2HSS-01 FM305 (
| |
| QISO 01-14 ¹1 or DMG¹ na in (810.20 (ID (
| |
| na /na LINE¹ 2HSS-026-44-1 HTS: 2,5 (Handate( 1 (
| |
| na /na I I INTEG ATT (8-K (
| |
| na I SUR/PT3.00/HT4.00 I 2HSS.01-14-FM306 (
| |
| QISO 01-14 ¹1 or DMG¹ na in (810.20 (ID (
| |
| na /na I I LINE¹ 2HSS-026-44-1 NTS: 2(5 (Handate( 1 (
| |
| na /na I I INTEG ATT (8-K (
| |
| na ( SUR/PT3'00/HT4 00 I 2HSS-01 FM307 (
| |
| QISO 01-14 ¹1 or DMG¹ na in (810.20 ( ID (
| |
| na /na I
| |
| (
| |
| LINE¹ 2HSS-026-44-1 NTS: 2,5 (Handate( 1 (
| |
| na /na I INTEG ATT (8-K (
| |
| na I SUR/PT3.00/HT4.00 I 2HSS-01 FM308 (
| |
| QISO 01-14 ¹1 or DMG¹ na in (810.20 (ID (
| |
| na /na LINE¹ 2HSS-026-44-1 NTS: 2,5 (Handate( 1 ( na /na I I INTEG ATT (8-K (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2HSS.01 FM309 (
| |
| QISO 01-14 ¹1 or D'MG¹ na in (810.20 (ID ( na /na I LINE¹ 2HSS-026-44-1 NTS: 2,5 (Handate( 1 ( na /na I I INTEG ATT (8-K (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2HSS-01 FM310 (
| |
| QISO 01-14 ¹1 or DMG¹ na ~ in (810.20 (ID (
| |
| na /na I
| |
| (
| |
| LINE¹ 2HSS-026-44-1 NTS: 2,5 (Handate( 1 (
| |
| na /na I I INTEG ATT (8-K (
| |
| na I SUR/PT3 F 00/HT4.00 I 2HSS-01-14-FM311 (
| |
| QISO 01-14 ¹1 or DMG¹ na in (810.20 (ID ( na /na
| |
| (
| |
| LINE¹ 2HSS-026-44-1 HTS: 2(5 (Handate( 1 (
| |
| na /na I I INTEG ATT (8-K I SUR/PT3.00/HT4.00 I 2HSS.01 FM312 (
| |
| QISO 01-14 ¹2 or DMG¹ na in (810.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-026-44-1 NTS: 2,5 (Handate( 1 (
| |
| na /na I I INTEG ATT (8-K (
| |
| na I SUR/PT3.00/HT4.00 I 2HSS.01-14-FM313 (
| |
| QISO 01-14 ¹2 or DMG¹ na in (810.20 IID (
| |
| na /na I LINE¹ 2HSS-026-44-1 NTS: 2,5 (Handate( 1 (
| |
| na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 30 of 65 NHP2-1S1-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REa (
| |
| DESCRIPTIOH OF ITEH TO BE EXAHINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS ExAHIHATIDH IDENTIFIER I ITs Iso LocAT0R, coHPDHENT DMG ¹, (ITEN ¹ IFREaYI EX2/HDE PRocEDURE (PER100 2 (
| |
| USE CAL BLK ¹ (
| |
| LINE No. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I IHTEG ATT IB K I na I SUR/PT3 00/HT4 00 I 2HSS-01 FM31C (
| |
| QISO 01-14 ¹2 or DMG¹ na in (BIO 2O (10 I na /na LINE¹ 2HSS.026-44-1 NTS: 2(5 (Ha~tel 1 I na I I INTEG ATT (8-K (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2HSS-01-14-FM315 (
| |
| QISO 01-14 ¹2 or DMG¹ na in (810.20 (10 (
| |
| na /na I LINE¹ 2HSS.026-44-1 HTS: 2 (Handate( 1 (
| |
| na /na I I
| |
| IH'IEG ATT (8-K ( na ( SUR/I T3.00/HTC.OO (
| |
| 2HSS.01-14-FM316 (
| |
| QISO 01-14 ¹6/7 or DMG¹ na in (810.20 IID ( na /na LINE¹ 2HSS.026-44-1 NTS:,2,8 (Handate( 1
| |
| (
| |
| na /na I INTEG ATT IB K I na I SUR/PT 00/HT 'M I 2HSS-01 FIG17 ( QISO 01-14 ¹6/7 or DMG¹ na in (810.20 (ID ( na /na I na LINE¹ 2HSS-026-44-1 NTS: 2,8 (Handate( 1 I na /na I IN'IEG ATT IB K I na I SUR/PT3-00/HT4 F 00 I 2HSS-01 FM318 (
| |
| QISO 01-14 ¹6/7 or DMG¹ na in (B10.20 (ID (
| |
| na /na
| |
| ( LINE¹ 2HSS-026 44-1 NTS: 2,8 IHandate( 1 (
| |
| na /na I I IHTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I I 2HSS-01 FM319 I QISO 01-14 ¹6/7 or DMG¹ na ~ in (810.20 (ID (
| |
| na /na I
| |
| (
| |
| LINE¹ 2HSS-026-44-1 HTS: 2,8 (Handate( 1 ( na /na I I-I INTEG ATT (B-K ( na (
| |
| SUR/PT3.00/HTC F 00 (
| |
| 2HSS.01-14-FM320 ( QISO 01-14 ¹15 or DMG¹ na in (810 '0 (ID (
| |
| na /na I
| |
| (
| |
| LINE¹ 2HSS-026-44-1 NTS: 2,5 (Handate( 1
| |
| (
| |
| na /na I I INTEG ATT (B-K I na (
| |
| SUR/PT3.00/HT4.00 I 2HSS-O'I-14-FM321 ( QISO 01-14 ¹15 or DMG¹ na in (810.20 IID (
| |
| na /na LINE¹ 2HSS.026.44-1 NTS: 2,5 (Handate( 1 I na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2HSS-01 FM322 (
| |
| QISO 01-14 ¹15 or DMG¹ na in IB10.20 IID I na /na I I LINE¹ 2HSS-026.44-1 HTS: 2IS (Handate( 1 ( na /na I
| |
| | |
| NIAGARA MOHAN POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 31 of 65 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEII (sorted by Examination Identifier) 2ND IHTVL REL RED (
| |
| DESCRIPTION OF ITEH TO BE EXAMINED(CATGRY [IGSCC] EX1/HDE PROCEDURE )PERIOD 1 REMARKS EXAMINATION IDEHTIFIER f ITS ISO LOCATOR, COMPONENT DUG ¹, )ITEM ¹ JFREOYJ EX2/NDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASS) EX3/NDE PROCEDURE iPERIOD 3 I INTEG ATT iB-K i na i SUR/PT3.00/HT4.00 i 2MSS-01 FN323 / QISO 01-14 ¹15 or DUG¹ na in /810.20 /ID f na /na
| |
| ) LINE¹ 2MSS-026-44-1 NTS: 2,5 /Mandate/ 1' na /na I I INTEG ATT BOTTOM SOUTHEAST (8-K [ na )
| |
| SUR/PT3.00/MT4.00 [
| |
| 2MSS.01 FN324 (
| |
| QISO 01-14 ¹14 or DUG¹ na in (810.20 ]ID ) na /na i LINE¹ 2HSS-026-44-1 NTS: 2,5 [Mandate) 1 f na /na I INTEG ATT BOT'TOH NORTHEAST JB-K ] na f SUR/PT3.00/HT4.00 f 2MSS-01-14-FM325 [ QISO 01-14 ¹14 or DNG¹ na in /810.20 ]ID f na /na I I LINE¹ 2MSS 026 44 1 HTS'i5 /Mandate/ 1 )
| |
| na /na I I IHTEG ATT BOTTOM NORTHNEST IB-K I na I SUR/PT3.00/HT4.00 I 2MSS-01 FN326 )
| |
| QISO 01-14 ¹'l4 or DllG¹ na in (810.20 [ID J na /na
| |
| )
| |
| LINE¹ 2MSS-026-44-1 NTS: 2 5 /Mandate/ 1
| |
| / na /na I INTEG ATT BOTTOM SOUIKNEST [8-K (
| |
| na )
| |
| SUR/PT3.00/MT4.00 (
| |
| 2MSS.01-14-FM327 [ QISO 01-14 ¹14 or DUG¹ na in (810.20 ]ID J na /na-i LINE¹ 2MSS-026-44-1 NTS: 2(5 JMandatef 1 f na /na I IHTEG ATT TOP SOUTHEASt [8-K )
| |
| na [ SUR/PT3.00/HT4.00 ]
| |
| 2MSS-01-14-Fl628 ] QISO 01-14 ¹14 or DMG¹ na in [810.20 [ID f na /na f LINE¹ 2HSS-026-44-1 NTS: 2,5 )Mandate] 1 f na /na I I INTEG ATT TOP NORTHEAST IB K I na I SUR/PT /HT 00 I 2HSS-01 FN329 (
| |
| QISO 01-14 ¹14 or DUG¹ na in )810.20 ]ID / na /na I LINE¹ 2MSS-026-44-1 NTS: 2,5 /Mandate/ 1 / na /na I IHTEG ATT TOP NORTHlIEST IB-K I na I SUR/PT3.00/MT4.00 I 2MSS.01-14-Fl630 (
| |
| QISO 01-14 ¹14 or DNG¹ na in [810.20 /ID f na /na I LINE¹ 2HSS.026-44-1 HTS: 2,5 /Mandate/ 1 / na /na I I IHTEG ATT TOP SOUTHWEST 18 K I na I SUR/PT3.00/MT4.00 I 2MSS-01 F1631 )
| |
| QISO 01-14 ¹14 or DUG¹ na in (810.20 [ID ) na /na LINE¹ 2MSS-026-44-1 HTS: 2,5 ]Mandate( 1 ( na /na I
| |
| | |
| NIAGARA MONAMK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 32 of 65 NMP2-ISI-006, REV. 1, CN-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - Mss SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTIOH OF ITEH TO BE EXAMINEDiCATGRY i IGSCCi EX1/NDE PROCEDURE )PERIOD 1 REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DUG ¹, ilTEH ¹ iFREGYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASS) EX3/NDE PROCEDURE iPERIOO 3 I INTEG ATT IB K I na I SUR/PT 0/MT ~
| |
| I 2MSS-01-14-FN332 i QISO 01-14 ¹4/5 or DMG¹ na in F810.20 iID i na /na i LINE¹ 2HSS-026-44-1 HTS: 2,8 iMandateJ 1 i na /na I I INTEG ATT iB-K i na i SUR/PT3.00/MT4.00 i 2MSS-01-14-FN333 i QISO 01-14 ¹4/5 or DUG¹ na in F810.20 iID J na /na i LINE¹ 2HSS-026-44-1 NTS: 2,8 iMandatei 1 / na /na I I PIPE/ELB IB-J )
| |
| na i VOL/UT6.02 2MSS-01-14-FMSM012 I QISO 01 14 or DUG¹ na in )89.11 Inone I SUR/PT3.00/MT4.00 I NMP2-26-1.26.CS I LINE¹ 2MSS-026-44-1 HTS: 2(3 iNS 1 i na /na I I PIPE/ELB IB-J i na i VOL/UT6.02 2MSS-01-14-Sl$ 01 I QISO 01-14 or DUG¹ na in /89.11 inone i SUR/PT3.00/HT4.00 i NMP2-26-1.26-CS I LINE¹ 2HSS-026-44-1 NTS: 2(3 iNS i na./na I J
| |
| PIPE/SML IB-J i na i VOL/UT6.02 2MSS-01-14-SM003 I QISO 01-14 or DWG¹ na in i89.31 inone i SUR/PT3.00/MT'0 i NHP2-26-1.26-CS i LINE¹ 2MSS-026-44-1 NTS: 2(16 )Ns 1 i na /na I I ELB/PIPE IB-J I na I VOL/Ul'6.02 I 2MSS-01-14-SN005 ) QISO 01-14 or DHG¹ na .in F89.11 Inone I SUR/PT3.00/HT4.00 I NMP2-26-1.26-CS i LINE¹ 2HSS-026-44-1 NTS: 2,3 iNS 1 i na /na I i PIPE/ELB (8-J i na i VOL/Ul'6.02 2MSS-01-14-Sl$ 06 ) alSO 01-14 or DWG¹ na in IB9.11 Inone I SUR/PT3.00/MT4.00 I NMP2.26-1 '6-CS LINE¹ 2HSS-026-44-1 NTS: 2 3 iNS 1 )
| |
| na /na I I PIPE/FLG NOZ IB-J )
| |
| na i VOL/UT6.02 2MSS-01-14-SN007 i QISO 01-14 or DMG¹ na in i89.31 ( ID i SUR/PT3.00/HT4.00 i Sc9 NMP2-26-1.26-CS i LINE¹ 2MSS-026-44-'I NTS: 2,6 INS 1 dna/ I I PIPE/FLG NOZ IB-J I na I VOL/UT6.02 I 2MSS-01-14-SNDDB i QISO 01-14 or DMG¹ na in i89.31 IID I SUR/PT3.00/MT4 00 I Sc9 NMP2-26-1.26-CS i LINE¹ 2MSS-026-44-1 NTS: 2,6 INS 1 dna/
| |
| | |
| NIAGARA HOHAMX POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 33 of 65 KHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE IHSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - Hss SYSTEH (sorted by Examination Identifier) 2KD INTVL REL REQ DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY ) IGSCC) EX1/NDE PROCEDURE )PERIOD 1
| |
| )
| |
| REHARKS
| |
| )
| |
| EXAHINATION IDENTIFIER ) ITS ISO LOCATOR, COHPONENT D'MG ¹, )
| |
| ITEN ¹ )FREQY) EX2/KDE PROCEDURE )PERIOD 2 )
| |
| USE CAL BLK I LINE NO'ND NOTES'S APPLICABLE )SELECT )CLASS) EX3/KDE PROCEDURE )PERIOD 3 I I PIPE/FLG KOZ IB-J ) na )
| |
| VOL/UT6.02 2HSS-01 SM009 )
| |
| QISO 01-14 or DMG¹ na in )89.31 IID I SUR/PT3.00/HT4.00 I Sc9 NHP2-26-1.26.CS ) LINE¹ 2HSS.026-44-1 NTS: 2(6 IKS I PIPE/FLG NOZ IB-J )
| |
| na )
| |
| VOL/UT6.02 2HSS-OI-14-SMOI0 )
| |
| QISO 01-14 or DMG¹ na in )89.31 IID I SUR/PT3.00/HT4.00 I Sc9 KHP2-26-1.26-CS I LIHE¹ 2HSS.026-44-1 NTS: 2,6 IHS 1 )na/
| |
| I PIPE/FLG NOZ IB-J )
| |
| na )
| |
| VOL/UT6.02 )Added to Selected population (Ks) during 2nd 10-Year Update to match 2HSS.01-14.SM011 )
| |
| QISO 01-14 or DMG¹ na in )89.31 IID I SUR/PT3.00/HT4.00 I Sc9 )the other 17 analogous locations NHP2-26-1.26-CS LINE¹ 2HSS-026 44-1 NTS: 2)6 )KS 1 )na/ I
| |
| ) ELB/SOL (26" to 2") IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-01-14-SM014 ) QISO 01-14 or DMG¹ na in )89.32 IID ) na /na I Sc9 I LINE¹ 2HSS-002-48-1 NTS: 3,4 )BER I I ELB/PIPE IB-J ) na )
| |
| VOL/UT6.02 2HSS-01-14-SM015 I QISO 01-14 or DMG¹ na in )89.11 IID I SUR/PT3.00/HT4.00 I Sc9 NMP2-26-1.26.CS I LINE¹ 2HSS 026 44 1 NTS'i3 IBER 1 )na/
| |
| I PIPE/PIPE IB-J )
| |
| na ) VOL/UT6.02 )
| |
| Scl 2HSS-01-14-SM019 I QISO 01-14 or DMG¹ na ~ in )89.11 )ID ) SUR/PT3.00/HT4 F 00 KHP2-26-1.26-CS ) LINE¹ 2HSS.026-151-1 NTS: 2 )BER 1 )na/
| |
| I PIPE/PIPE IB J )
| |
| na )
| |
| VOL/UT6.02 2HSS-01-14-SM021 I QISO 01-14 or DMG¹ na in )89.11 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| HHP2-26-1.26.CS )
| |
| LIKE¹ 2HSS.026-44-1 .
| |
| NTS: 2,2 )KS ) na /na
| |
| ) *AOV78/EXPANDER (26a to 28") )8-J )
| |
| na )
| |
| VOL/UT6.02 )
| |
| Scl ZHss-01-14-SM022 )
| |
| QISO 01-14 or DMG¹ na in )89.11 IID I SUR/PT3.00/HT4.00 I NNP2-26-1.26-CS )
| |
| LINE¹ 2HSS-026-151-1 NTS: 11,14 )BER 1 )na/
| |
| ) SE/PIPE Q N3C Az252 HAIN STEAH )8-J )
| |
| na )
| |
| VOL/UT6.02 2HSS-OI-15-FMODI ) QISO Oi-is or DMG¹ na in )89.11 )none I SUR/PT3.00/HT4.00 I NHP2-26-1.26-CS I LINE¹ 2HSS-026.45-1 NTS: 1,2 INS 1 )na/
| |
| | |
| NIAGARA NOHAMK POMER CORPORATIOH - . NILE POINT NUCLEAR STATION - UNIT 2 34 of 65 NNP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED ) DESCRIPTION OF ITEN TO BE EXAHINEDiCATGRY i IGSCCi EX1/HDE PROCEDURE iPERIOD 1 i RENARKS EXAHIHATIOH IDENTIFIER f ITS ISO LOCATOR, COIPOHENT DMG ¹, ]ITEN ¹ JFREOY) EX2/NDE PROCEDURE (PERIOD 2 )
| |
| USE CAL BLK ¹ I LIHE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I ELB/PIPE IB-J f na f VOL/UT6.02 2NSS-01 FM002 i QISO 01-15 or DMG¹ na in (89.11 Inone I SUR/PT3.00/NT4.00 I HNP2-26-1.26-CS i LINE¹ 2NSS-026-45-1 HTS: 2,3 iNS I PIPE/ELB IB-J J na J VOL/UT6.02 2HSS-01-15-FM003 I QISO 01-15 or DMG¹ na in (89.11 ]none f SUR/PT3.00/NT4.00 f NNP2-26-1.26-CS i LINE¹ 2NSS-026-45-1 HTS: 2 3 (NS 1 / na /na I ELB/PIPE IB-J )
| |
| na ) VDL/UT6.02 2HSS-01-15-FM004 I QISO 01-15 or DUG¹ na in (89.11 (none f SUR/PT3.00/NT4.00 f NNP2-26-1.26-CS i LINE¹ 2NSS.026-45-1 NTS 2,3 iHS f na /na I PIPE/ELB IB-J I .na I VOL/UT6.02 I Sc7 2NSS-01 FM005 I QISO 01-'l5 or DMG¹ na in [89.11 [ID )
| |
| SUR/PT3.00/HT4.00 [
| |
| NHP2-26-1.26-CS f LINE¹ 2HSS-026-45-1 NTS: 2,3 JHS/ber / 1 f na /
| |
| [ PENET 21C/PIPE IB J I na I VOL/UT6.02 I 2NSS-01-15-FM009 f QISO 01-15 or DMG¹ na in (89.11 ] ID J SUR/PT3.00/NT4.00 ]
| |
| HNP2-26-1.26-CS / LINE¹ 2NSS-026-154-1 HTS: 2,12 /TEV/ber/ 1 / na / / Sc11 I EXPANDER/PIPE IC-F-2 / na ( VOL/UT6.02 2NSS-01 FM020 I Q 0115 or DMG¹ na in [C5.51 IID I SUR/PT3.00/NT4.00 I NHP2-28-1.34-CS I LINE¹ 2NSS-028-5-4 NTS: 14,15 ISD/ber ~
| |
| 2 i na /na Sc11 I
| |
| PIPE/~AOV7C (8-J (
| |
| na ] VOL/UT6.02 (
| |
| Sc7 2NSS-O'I-15-FM021 I QISO 01-15 or DMG¹ na in )89.11 IID I SUR/PT3.00/NT4.00 I NNP2-26-1.26-CS ( LINE¹ 2NSS-026-154-1 NTS: 2,11 (BER 1 )na/ I I PIPE/PIPE IB-J f na f VOL/UT6.02 2NSS-01 FM022 I QISO 01-15 or DMG¹ na in (89.11 iID I SUR/PT3.00/HT4.00 I HNP2-26-1.26-CS f LINE¹ 2NSS-026-154-1 NTS: 2 (BER 1 f na / J Sc11 I *AOV7C/PLUG (2") IB-J I na I SUR/PT 'Ã/NT4 00 I 2HSS-01 FM023 I QISO 01-15 or DMG¹ na in (89.40 J~e (
| |
| na /na I LINE¹ 2NSS-002-154-1 H'TS: 11,10 INS 1 / na/na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POIN'I NUCLEAR STATION - UNIT 2 35 of 65 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED J DESCRIPTION OF ITEH TO BE EXAMINED]CATGRY (IGSCC) EX1/NDE PROCEDURE )PERIOD 1 REMARKS EXAHINATION IDENTIFIER ) ITS ISO LOCATOR, COHPONENT DUG ¹, JITEH ¹ [FREOY) EX2/NDE PROCEDURE [PERIOD 2 J USE CAL BLK ¹ f LINE NO. AND NOTES, AS APPLICABLE ]SELECT [CLASS] EX3/NDE PROCEDURE [PERIOD 3
| |
| [ *AOV6C/PENET 21C lB-J I na I VOL/UT6.02 I Sc7 2HSS-01 Fll025 f QISO 01-15 or DUG¹ na in (89.11 ]ID ( SUR/PT3.00/HT4.00 f NMP2-26-1.26-CS / LINE¹ 2MSS-026-45-1 NTS: 11,10 /TEV/ber/ 1 / na /
| |
| (
| |
| PIPE/*AOV6C IB J I na I VOL/UT6.02 I Sc7 2HSS-01-15-Fll026 f QISO 01-15 or DUG¹ na in (89.11 [ID f SUR/PT3 F 00/HT4.00 J NHP2-26-1.26.CS f LINE¹ 2HSS-026-45-1 NTS: 2,11 JAN/ber / 1 J na /
| |
| I PIPE/PIPE )B J (
| |
| na [ VOL/UT6.02 [ Sc7 2HSS.01-15-FN027 I QISO 01-'15 or DUG¹ na in JB9.11 )ID J SUR/PT3.00/MT4.00 f NHP2-26-1.26.CS ] LINE¹ 2HSS-026-45-1 NTS: 2 [BER J 1 [ na /
| |
| I *AOV6C/PLUG (2") (B-J J na f SUR/PT3.00/MT4.00 f 2MSS-01 FN028 i QISO 01-15 or DUG¹ na in (89.40 [none f na /na I LINE¹ 2HSS-002-45-1 NTS: 11,10 INS I 1 I na /na I I
| |
| *AOV6C/PLUG (2") (8-J [ na f SUR/PT3.00/HT4.00 )
| |
| 2HSS-01 FN030 I Q 0115 or DUG¹ na in [89.40 ]none f na /na
| |
| / LINE¹ 2HSS-002-45-1 NTS: 11,10 [NS f 1 f na /na I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2HSS-01 FN300 )
| |
| QISO 01-15 ¹06 or DlK¹ na .in /810.20 ]ID ] na /na
| |
| / LINE¹ 2HSS-026-45-1 NTS: 2,8 /Mandate/ 1 / na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2HSS-01 F l601 J QISO 01-15 ¹06 or DNG¹ na in JB10.20 ]ID f na /na
| |
| [ LINE¹ 2MSS-026-45-1 NTS: 2,8 )Mandate) 1 [ na /na I I INTEG ATT IB K I na I SUR/PT 00/MT I 2MSS-01 FN302 f QISO 01-15 ¹05 or DNG¹ na in [B10.20 /ID ) na /na I
| |
| (
| |
| LINE¹ 2HSS-026-45-1 NTS: 2,8 [Mandate( 1 ) na /na I I INTEG ATT (8-K - ( na J SUR/PT3.00/HT4.00 J 2HSS.01-15-FN303 [ QISO 01-15 ¹05 or DNG¹ na in )810.20 ]ID / na /na
| |
| ) LINE¹ 2HSS-026-45-1 NTS: 2,8 (Mandate] 1 f na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 36 of 65 NHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED ( DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENTIFIER ( ITS ISO LOCATOR, COHPONENT DMG ¹, (ITEH ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I I INTEG ATT (8-K (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2HSS-01 FM304 ( QISO 01-15 ¹10 or DMG¹ na in (810.20 (ID (
| |
| na /na (
| |
| I LINE¹ 2HSS-026-45-1 NTS: 2,8 (Handate( 1 (
| |
| na /na I I INTEG ATT (8-K (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2HSS-01-15-FM305 (
| |
| QISO 01-15 ¹10 or DMG¹ na in (810.20 (ID (
| |
| na /na I I LINE¹ 2HSS 026 45 1 NTS'i8 (Handate( 1 (
| |
| na /na I I INTEG ATT IB K (
| |
| na I SUR/PT3.00/HI'4.00 (
| |
| 2HSS-01-15-FM306 (
| |
| QISO 01-15 ¹9 or DUG¹ na in (810.20 (ID (
| |
| na /na LINE¹ 2HSS-026-45-1 NTS: 2,8 (Handate( 1
| |
| ( na /na I INTEG ATT (8-K (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2HSS-01 FM307 (
| |
| QISO 01-15 ¹9 or DMG¹ na in (810.20 (ID ( na /na I LINE¹ 2HSS.026.45-1 NTS: 2,8 IHandatel 1 ( na /na I INTEG ATT (8-K (
| |
| na (
| |
| SUR/P'I3.00/HT4.00 (
| |
| 2HSS-01 FM308 (
| |
| QISO 01-15 ¹14 or DMG¹ na in (810.20 (ID ( na /na I I LINE¹ 2HSS-026-45-1 NTS: 2,8 (Handate( 1 (
| |
| na /na I I INTEG ATT (8-K (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2HSS-01 FM309 (
| |
| QISO 01-15 ¹14 or DMG¹ na in (810.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-026-45-1 NTS: 2,8 (Handate( 1 (
| |
| na /na I I INTEG ATT IB K I na I SUR/PT ~ 0 /HT4 00 I 2HSS-01-15-FM310 ( QISO 01-15 ¹ 2/3 or DMG¹ na in (810.20 (ID (
| |
| na /na I I LINE¹ 2HSS-026-45-1 NTS: 2(5 (Handate( 1
| |
| (
| |
| na /na I I INTEG ATT IB-K I na I SUR/PT3.00/IlT4.00 I 2HSS-01-15-FM311 ( QISO 01-15 ¹ 2/3 or DMG¹ na in (810.20 (ID (
| |
| na /na I LINE¹ 2HSS 026 4 1 NTS (Handate( 1
| |
| (
| |
| na /na I I INTEG ATT IB-K I na I SUR/PT3.00/Hl'4.00 I 2HSS-01-15-FM312 (
| |
| QISO 01-15 ¹2/3 or DMG¹ na in (810.20 (ID ( na /na I LINE 2HSS 6 4 1 NTS (Handate( 1 ( na /na I
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 37 of 65 NHP2-ISI-006, REV. 1, CN-OOO SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REG [ DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY JIGSCC) EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENTIFIER ) ITS ISO LOCATOR, COHPONENT DMG ¹, JITEH ¹ JFREOY( EX2/NDE PROCEDURE )PERIOD 2 ]
| |
| USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE )SELECT iCLASSJ EX3/NDE PROCEDURE iPERIOO 3 i I INTEG ATT (8-K f na f SUR/PT3.00/HT4.00 J 2HSS-01-15-FM313 (
| |
| QISO 01-15 ¹ 2/3 or DMG¹ na in )810.20 ]ID f na /na i LINE¹ 2HSS-026-45.1 NTS: 2,5 )Handate) 1 / na /na I I INTEG ATT IB K I na I SUR/PT3.00/HT4.00 I 2HSS-01 FM314 ) QISO 01-15 ¹ 2/3 or DMG¹ na in (810.20 ]ID J na /na i LINE¹ 2HSS-026-45-1 NTS: 2,5 [Handatef 1 ) na /na I I INTEG ATT [8-K ) na [ SUR/PT3.00/HT4.00 ]
| |
| 2HSS-01 FM315 ) QISO 01-15 ¹ 2/3 or DMG¹ na in (810.20 [ID f na /na I LINE¹ 2HSS-026.45-1 NTS: 2,5 (Handate) I I INTEG ATT )B K [ na ) SUR/PT3.00/HT4.00 2HSS-01 FM316 -
| |
| [ QISO 01-15 ¹ 2/3 or DMG¹ na in /B10.20 /ID f na /na I LINE¹ 2HSS.026.45-1 NTS: 2,5 JHandatef 1 f na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2HSS-01 FM317 (
| |
| QISO 01-15 ¹ 2/3 or DMG¹ na in [810.20 ]ID ) na /na LINE¹ 2HSS-026-45-1 NTS: 2,5 JHandate( 1 / na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 (
| |
| 2HSS-01 FM318 ] QISO 01-15 ¹13 or DMG¹ na .in )810.20 [ID f na /na I LINE¹ 2HSS-026.45-1 NTS: 2,8 (Handate] 1 [ na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2HSS-01 FM319 (
| |
| QISO 01-15 ¹13 or DMG¹ na in [810.20 ]ID f na /na I i LINE¹ 2HSS-026.45-1 NTS: 2,8 )Handatef 1 / na /na I I INTEG ATT (B-K (
| |
| na (
| |
| SUR/PT3.00/HT4 F 00 2HSS-01-15-FM320 )
| |
| QISO 01-15 ¹ 17/18 or DMG¹ na in JBI0.20 )ID J na /na
| |
| )
| |
| LINE¹ 2HSS-026-45-1 NTS: 2,5 )Handate] 1 f na /na I I INTEG ATT IB K I na I SUR/PT3 00/HT I 2HSS.01-15-FM321 )
| |
| QISO 01-15 ¹ 17/18 or DMG¹ na in (810.20 )ID f na /na I LINE¹ 2HSS-026-45-1 NTS: 2,5 JHandate] 1 / na /na I
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 38 of 65 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEM (sorted by Examination 'Identifier) 2ND INTVL REL REO ( DESCRIPTION OF ITEH TO BE EXAMINED(CATGRY J IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATION IDENTIFIER ) ITS ISO LOCATOR, COHPONENT DWG ¹, [ITEM ¹ JFREGYJ EX2/NDE PROCEDURE ]PERIOD 2 )
| |
| USE CAL BLK ¹ f LINE NO. AND HOTES, AS APPLICABLE )SELECT ]CLASS] EX3/NDE PROCEDURE )PERIOD 3 )
| |
| I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2HSS-01-15-FM322 )
| |
| QISO 01-15 ¹ 17/18 or DWG¹ na in (810.20 ) ID f na /na I LINE¹ 2HSS-026-45.1 NTS: 2,5 ]Mandate] 1 f na /na I I INTEG ATT (8-K )
| |
| na )
| |
| SUR/PT3 F 00/HT4.00 (
| |
| 2HSS.01 FM323 j QISO 01-15 ¹ 17/18 or DWG¹ na in [810.20 )
| |
| ID f na /na na i LINE¹ 2HSS-026-45-1 NTS: 2(5 (Mandate[ 1 f na /na I I INTEG ATT IB-K I na I SUR/PT3.00/MT4.00 I 2HSS-01-15-FW324 [ QISO 01-15 ¹ 1 or DWG¹ na in (810.20 ]ID f na /na
| |
| ( LINE¹ 2HSS.026-45-1 NTS: 2(5 /Mandate/ 1 / na /na I I INTEG ATT JB-K f na / SUR/PT3.00/HT4.00 f 2HSS-01 FM325 J QISO 01-15 ¹ 1 or DWG¹ na in /810.20 /ID / na /na LINE¹ 2HSS-026.45-1 NTS: 2,5 /Mandate/ 1 / na /na I I INTEG ATT IB K I na I SUR/PT /HT 00 I 2HSS-01 FW326 [ QISO 01-15 ¹ 1 or DMG¹ na in [810.20 LID f na /na I na I LINE¹ 2HSS-026.45-1 NTS: 2I5 [Mandate/ 1 [ na /na I INTEG ATT IB K I na I SUR/PT3 F 00/HT4.00 I 2MSS-01-15-FM327 f alSO 01-15 ¹ 1 or DWG¹ na ~ in )810.20 ]ID f na /na I LINE¹ 2HSS 026 45 1 NTS' 5 IHandatej 1 I na /na I I INTEG ATT (8-K [ na f SUR/PT3.00/MT4.00 ]
| |
| 2HSS-01-15-FM328 / QISO 01-15 ¹ 15/16 or DMG¹ na in (810.20 (ID f na /na i LINE¹ 2HSS-026-45-1 NTS: 2,5 ]Mandate] 1 f na /na I I INTEG ATT IB.K I na I SUR/PT3.00/HT4.00 I 2HSS-01 FW329 )
| |
| QISO 01-15 ¹ 15/16 or DWG¹ na in )810.20 )ID f na /na na i LINE¹ 2MSS-026-45-1 NTS: 2,5 ]Mandate) 1 ( na /na I I INTEG ATT IB K I na I SUR/PT /HT4 I 2MSS-01-15-F W330 )
| |
| QISO 01-15 ¹ 15/16 or DWG¹ na in ]810.20 [ID ] na /na na i LINE¹ 2HSS-026-45-1 NTS: 2(5 ]Mandate] 1 J na /na
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 39 of 65 NHP2-IS1-006( REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC] EX1/NDE PROCEDURE (PERIOD 1 REHARKS
| |
| )
| |
| EXAHINATION IDENI'IFIER J ITS ISO LOCATOR, COHPONENT DMG ¹, ]ITEN ¹ JFREGY) EX2/NDE PROCEDURE ]PERIOD 2 J USE CAL BLK ¹ ( LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASS[ EX3/NDE PROCEDURE iPERIOO 3 )
| |
| I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2HSS-01-15-FM331 (
| |
| QISO 01-15 ¹ 15/16 or DMG¹ na in (810.20 (ID f na /na I LINE¹ 2HSS-026-45-1 NTS: 2(5 /Handate/ 1 J na /na I I INTEG ATT (8-K [ na [ SUR/PT3.00/HT4.00 )
| |
| 2HSS-01-15. FM332 f QISO 01-15 ¹ 15/16 or DMG¹ na in (810.20 [ID f na /na I i LINE¹ 2HSS-026-45.'I NTS: 2 5 )Handate] 1 [ na /na I I INTEG ATT IB K I na I SUR/PT /HT4 00 I 2HSS-01-15-FM333 ( QISO 01-15 ¹ 15/16 or DMG¹ na in (810.20 ]ID f na /na i LINE¹ 2HSS-026.45-1 NTS: 2,5 /Handate/ 1 / na /na I INTEG ATT IB-K I na I SUR/PT3 F 00/HT4 F 00 I 2HSS-01-15-FM334 )
| |
| QISO 01-15 ¹ 15/16 or Dl}G¹ na in (810.20 (10 / na /na I LINE¹ 2HSS-026.45-1 NTS: 2 5 )Ha~to( I I INTEG ATT IB K I na I SUR/PT3.00/HT4 F 00 I 2HSS-01-15-FM335 [ QISO 01-15 ¹ 15/16 or DMG¹ na in [810.20 ]ID ( na /na LINE¹ 2HSS-026-45-1 NTS: 2,5 JHandateJ 1 )
| |
| na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2HSS-01 FM336 / QISO 01-15 ¹ 7/8 or DMG¹ na ~ in (810.20 /ID f na /na
| |
| / LINE¹ 2HSS-026-45-1 NTS: 2,8 /Handate/ 1 / na /na I I INTEG ATT IB K I na I SUR/PT 00/HT I 2HSS-01 FM337 / QISO 01-15 ¹ 7/8 or DMG¹ na in /810.20 ]ID f na /na I I LINE¹ 2HSS-026-45-1 NTS: 2(8 /Handate/ 1 )
| |
| na /na I I PIPE/ELB IB-J I na I VOL/UT6.02 2HSS-01-15-SM001 ) QISO 01-15 or DMG¹ na in (89.11 ]none f SUR/PT3.00/HT4.00 [
| |
| NHP2-26-1.26-CS I LINE¹ 2HSS-026-45-1 NTS: 2,3 /NS / 1 / na /na I ELB/PIPE IB J I na I VOL/UT6'02 I 2HSS-01-15-SM002 i QISO 01-15 or DMG¹ na in /89.11 ]none f SUR/PI'3.00/HI'4.00 /
| |
| NHP2-26-1.26-CS I LINE¹ 2HSS-026-45-1 NTS: 2,3 INS I 1 I na/na I
| |
| | |
| NIAGARA HONAMK POMER CORPORATIOH - NILE POINT NUCLEAR STATION - UNIT 2 40 of 65 NHP2-ISI-006, REV. 1 ~ CN-000 SECOND TEN YEAR INSERVICE IHSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G HSS SYSTEH (sorted by Exemination Identifier) 2ND INTVL REL REQ ] DESCRIPTION OF ITEN TO BE EXAHINED)CATGRY (IGSCC( EX1/NDE PROCEDURE [PERIOD 1 REHARKS EXAHINATION IDEHTIFIER J ITS ISO LOCATOR, COHPONENT DMG ¹, JITEH ¹ [FREQYJ EX2/NDE PROCEDURE (PERIOD 2 f USE CAL BLK ¹ [ LINE NO. AND NOTES, AS APPLICABLE /SELECT )CLASSi EX3/NDE PROCEDURE iPERIOO 3 I PIPE/ELB IB-J ( na (
| |
| VOL/UT6.02 (
| |
| Sc7 2HSS-01-15-SM003 i QISO 01-15 or DMG¹ na in /89.11 IID I SUR/PT3.00/HT4.00 I NHP2-26-1.26-CS I LINE¹ 2HSS-026.45-1 NTS: 2,3 IHS 1 /na/
| |
| I ELB/PIPE /8-J ] na ) VOL/UT6.02 2HSS.01-15-SM004 I QISO 01-15 or DMG¹ na in /89.11 Inone I SUR/PT3.00/HT4.00 I NHP2-26-1.26-CS I LINE¹ 2llSS-026-45-1 NTS: 2,3 /NS 1 ] na/na I PIPE/FLG NOZ IB-J (
| |
| na )
| |
| VOL/UT6.02 (
| |
| Sc7 2HSS-01-15-SM006 I QISO 01-15 or DMG¹ na in /89.31 ] ID ] SUR/PT3.00/H'I4.00 ]
| |
| NHP2-26-1.26-CS LINE¹ 2HSS-026-45-1 NTS: 2,6 IHS 1 /na/
| |
| I PIPE/FLG NOZ IB-J ] na [ VOL/UT6.02 [ Sc7 2HSS-01-15-SM007 I QISO 01-15 or DMG¹ na in /89.31 )ID i SUR/PT3.00/HT4.00 i NHP2-26-1.26-CS ) LINE¹ 2HSS-026-45-1 NTS: 2(6 IHS J na/
| |
| I PIPE/FLG NOZ IB-J ) na )
| |
| VOL/Ul'6.02 ( Sc7 2HSS-01-15-SM008 i QISO 01-15 or DMG¹ na in /89.31 IID I SUR/PT3.00/HT4.00 I NHP2-26-1.26-CS i LINE¹ 2HSS-026-45-1 NTS: 2(6 INS 1 dna/
| |
| I PIPE/FLG NOZ IB-J ( na J VOL/UT6.02 (
| |
| Sc7 2HSS-01-15-SM009 i QISO 01-15 or DMG¹ na in (89.31 110 I SUR/PT3.00/HT4.00 I NHP2-26-1.26-CS [ LINE¹ 2HSS-026-45-1 NTS: 2(6 (NS 1 /na/
| |
| I PIPE/FLG NOZ IB J / na / VOL/UT6.02 / Sc7 2HSS-01-15-SM010 i QISO 01-15 or DMG¹ na in (89.31 110 I SUR/PT3.00/HT4.00 I NHP2-26-1.26.CS ( LIHE¹ 2HSS-026-45-1 NTS: 2,6 /HS I
| |
| ] PIPE/ELB IB-J [ na ) VOL/UT6.02 2HSS-01-15-SM011 i QISO 01-15 or DMG¹ na in /89.11 ]none ( SUR/PT3.00/HT4.00 f NHP2-26-1.26-CS i LINE¹ 2HSS-026-45-1 HTS: 2,3 INS / na /na
| |
| ) ELB/SOL (26" to 2") IB-J I na I SUR/PT .M/HT .N I Sc7 2HSS-01-15-SM013 ) QISO 01-15 or DMG¹ na in /89.32 (ID / na /na I LINE¹ 2HSS-002-49-'I NTS: 3,4 IBER 1
| |
| / na/na I
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - HILE POINT NUCLEAR STATION UNIT 2 41 of 65 NHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE [PERIOD 1 I REHARKS EXAHINATION IDENTIFIER J ITS ISO LOCATOR, COHPONENT DMG ¹, ]ITEN ¹ iFREQYi EX2/NDE PROCEDURE iPERIOO 2 J USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSl EX3/NDE PROCEDURE IPERIOD 3 I I ELB/PIPE IB-J f na f VOL/UT6.02 f Sc7 2HSS-01-15-SM014 i QISO 01-15 or DMG¹ na in /B9.11 IID I SUR/PT3.00/HT4.00 I NHP2-26-1.26.CS I LINE¹ 2HSS-026-45-1 NTS: 2,3 IBER I PIPE/PIPE IB-J [ na [ VOL/UT6.02 2HSS-01-15-Sl$ 18 i QISO 01-15 or DMG¹ na in JB9.11 IID I SUR/PT3 F 00/HT4.00 I NHP2-26-1 '6-CS ) LINE¹ 2HSS-026-154-1 NTS: 2 IBER I 1 I na / I Sc11
| |
| / *AOV7C/EXPANDER (26" to 28") /B-J f na ] VOL/UT6.02 2HSS-01-15. SM020 i QISO 01-15 or DMG¹ na in )B9.11 IID I SUR/PT3.00/HT4.00 I I NHP2-26-1.26-CS ] LINE¹ 2HSS-026-154-1 NTS: 11,14 [BER 1 / na / / Scil /
| |
| i SE/PIPE Q N3D Az288 HAIN STEAH iB-J [ na ] VOL/UT6.02 2HSS-01 FM001 [ QISO 01-16 or DMG¹ na in (89.11 ]none J SUR/PT3 F 00/HT4.00 J NHP2-26-1.26-CS i LINE¹ 2HSS-026-46-1 NTS: 1,2 iNS I ELB/PIPE IB-J [ na ] Vol./UT6.02 2HSS-01 FI$ 02 i QISO 01-16 or DMG¹ na in ]B9.11 )none J SUR/PT3 F 00/HT4 F 00 J NHP2-26-1.26-CS i LINE¹ 2HSS-026-46-1 NTS: 2,3 INS 1 / na /na I I PIPE/ELB IB-J ( na (
| |
| VOL/UT6.02 2HSS-01-16-FM003 i QISO 01-16 or DMG¹ na . in ( B9.11 IID I SUR/PT3.00/HT4 F 00 ISc8 NHP2-26-1.26-CS I LINE¹ 2HSS-026-46-1 NTS: 2 3 IHS I ELB/PIPE IB-J I na I VOL/UT6.02 I 2HSS-01 FI$ 04 I QISO 01-16 or DMG¹ na in /B9.11 [none f SUR/PT3.00/HT4.00 [
| |
| NHP2-26-1.26-CS i LINE¹ 2HSS-026-46-1 NTS: 2,3 INS 1 / na/na I I PIPE/ELB IB-J I na I VOL/UT6.02 I 2HSS-01 FM005 i QISO 01-16 or DMG¹ na in JB9.1'l [ID f SUR/PT3.00/HT4.00 [Sc8 NHP2-26-1.26-CS LINE¹ 2HSS-026-46-1 NTS: 2,3 JNS/ber / 1 f na / I I PIPE/PENET 210 IB-J I na I VOL/UT6.02 2HSS-01 Fl$ 08 [ QISO 01-16 or DMG¹ na in )B9.11 )ID (
| |
| SUR/PT3.00/HT4.00 ]Sc8 NHP2-26-1.26.CS f LINE¹ 2HSS-026-46-1 NTS: 2,12 JTEV/ber/ 1 f na /
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 42 of 65 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTION OF ITEM TO BE EXAHIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 REHARKS EXAHIHATIOH IDEN'TIFIER i ITS ISO LOCATOR, COHPOHENT DMG ¹, ) ITEN ¹ iFREQVi EX2/NDE PROCEDURE )PERIOD 2 i USE CAL BLK ¹ i LIHE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSi EX3/HDE PROCEDURE (PERIOD 3 I PENET 210/PIPE iB-J . i na i VOL/UT6.02 2HSS-01 FM009 i QISO 01-16 or DMG¹ na in iB9.11 iID i SUR/PT3.00/HT4.00 i NHP2-26-1 '6-CS i LINE¹ 2HSS-026-153-1 NTS: 2,12 /TEV/beri 1 i na / [ Sc11
| |
| )
| |
| EXPANDER/PIPE iC-F-2 J na i VOL/UT6.02 2HSS-01-16-FM020 t QISO 01-16 or DMG¹ na in iC5.5'l iID i SUR/PT3.00/HT4.00 i HHP2-28-1 '4-CS i LINE¹ 2HSS-028-7-4 H'TS: 14,15 LSD/ber i 2 i na /na Sc11 I PIPE/*AOV7D iB-J i na i VOL/UT6.02 I I 2HSS.01-16-FM021 i QISO 01-16 or DWG¹ na in i89.11 iID i SUR/PT3.00/HT4.00 I I NHP2-26-1.26-CS I LIHE¹ 2HSS-026-153-1 HTS: 2,11 IBER I
| |
| 'I I na / Sc11 i I PIPE/PIPE IB-J i na i VOL/UT6.02 2HSS-01 FW022 i QISO 01-16 or DMG¹ na in iB9.11 IID I SUR/PT 0 /HT I HHP2-26-1.26-CS i LINE¹ 2HSS-026-153-1 HTS: 2 [BER 1 dna/ I Sc11 i *AOV6D/PLUG (2") IB-J )
| |
| SUR/PT3.00/HT4.00 i 2HSS.01 FM023 i QISO 01-16 or DMG¹ na in i89.40 )none i na /na I I LINE¹ 2HSS-002-153-1 HTS: 10,11 IHS 1 i na/na I i *AOV60/PIPE (OLD SW014 LOCUS) iB-J i na i VOL/UT6.02 2HSS-01-16-FM025 )
| |
| QISO 01-16 or DMG¹ na - in i89.11 iiD i SUR/PT3.00/HT4.00 iSc8 HHP2-26-1.26-CS I LIHE¹ 2HSS.026.46-1 NTS: 2(11 I GER 1 /na/
| |
| I PIPE/*AOV6D IB-J [ na i VOL/UT6.02 2HSS-01 FW026 i QISO 01-16 or DMG¹ na in (B9.11 (ID J SUR/PT3.00/HT4.00 iSc8 NHP2-26-1.26-CS i LINE¹ 2HSS-026-46-1 HTS: 2,11 ABER 1 )na/
| |
| i HSS LOOP D SOL/PLUG (2") iB-J i na )
| |
| SUR/PT3.00/HT4.00 ) I 2HSS-01-16-FM027 i QISO 01-16 or DMG¹ na in iB9.40 /none i na /na I I LINE¹ 2HSS-002-46-1 HTS: 4,10 IHS i na /na I . I
| |
| / ~AOV60/PLUG (24) IB-J I na I SUR/PI3 00/HT4 00 I 2HSS-01-16-FM028 i QISO 01-16 or DMG¹ na in i89.40 inone i na /na I LINE¹ 2HSS-002-46-1 NTS: 10,'l1 INS 1 ) na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 43 of 65 NHP2-ISI-006( REV. 1( CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHINATION IDENTIFIER I ITS ISO LOCATOR( COHPONENT DMG ¹( I ITEH IFREQYI EX2/NDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ )
| |
| LINE NO. AND NOTES, AS APPLICABLE )SELECT )CLASS) EX3/NDE PROCEDURE )PERIOD 3 I INTEG ATT JB-K [ na J SUR/PT3.00/HT4.00 J 2HSS-01-16-FM300 [ QISO 01-16 ¹6 or DMG¹ na in )810.20 ]ID )
| |
| na /na i LINE¹ 2HSS-026-46.1 NTS: 2,8 (Handate/ 1 f na /na I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2HSS-01-16-FM301 (
| |
| QISO 01-16 ¹ 6 or DllG¹ na in JB10.20 ]ID ) na /na I
| |
| [ LINE¹ 2HSS-026-46-1 NTS: 2,8 /Handatef 1 ( na /na I I INTEG ATT JB-K f na f SUR/PT3.00/HT4.00 f 2HSS-01 FM302 [ QISO 01-16 ¹ 5 or DMG¹ na in IB10.20 IID I na / I LINE¹ 2HSS-026-46-1 NTS: 2,8 /Handate/ 1 / na /na I I INTEG ATT fB-K J na ] SUR/PT3.00/HT4.00 )
| |
| 2HSS-01 FM303 ] QISO 01-16 ¹ 5 or DMG¹ na in JB10.20 )ID f na /na I LINE¹ 2HSS-026-46-1 NTS: 2,8 )Handate] 1 J na /na I I INTEG ATT ]B-K [ na [
| |
| SUR/PT3.00/HT4.00 ]
| |
| 2HSS-01-16.F'M304 [ QISO 01-16 ¹ 9 or DMG¹ na in [810.20 (ID [ na /na I i LINE¹ 2HSS-026-46-1 NTS: 2,8 [Handatef 1 f na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2HSS-01 FM305 f QISO 01-16 ¹ 9 or DMG¹ na. in )810.20 /ID J na /na I
| |
| / LINE¹ 2HSS-026-46-1 NTS: 2,8 /Handate/ 1 / na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2HSS-01 FM306 ] QISO 01-16 ¹ 8 or DMG¹ na in (810.20 /ID f na /na I i LINE¹ 2HSS-026-46-1 NTS: 2,8 /Handate/ 1 f na /na I I INTEG ATT IB K I na I SUR/PT 00/HT4 I 2HSS.01-16-FM307 )
| |
| QISO 01-16 ¹ 8 or DMG¹ na in IB10.20 IID I na /na I i LINE¹ 2HSS.026-46-1 NTS: 2,8 )Handate) I I INTEG ATT IB K I na I SUR/PT3 00/HT4 I 2HSS-01-16-FM308 (
| |
| QISO 01-16 ¹ 3 or DMG¹ na in )810.20 [ID )
| |
| na /na I i LINE¹ 2HSS-026-46-1 NTS: 2,8 )Handate/ 1 ) na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 44 of 65 NHP2-1S1-006, REV. 1( CH-000 SECOND TEN TEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHIHEDICATGRY I IGSCCI EX1/HDE PROCEDURE (PERIOD 1 I REMARKS EXAHINATIOH IDENTIFIER ( ITS ISO LOCATOR, COHPOHENT DMG ¹, (ITEH ¹ (FREQY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ ( LINE NO AND NOTES'S APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I I IHTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2NSS-01 FIG09 (
| |
| QISO 01-16 ¹ 3 or DMG¹ na in (810.20 IID I na Ina I
| |
| (
| |
| LIHE¹ 2HSS-026-46-1 NTS: 2,8 (Handate( 1 ( na /na I IHTEG ATT IB-K I na I SUR/PT3.00/HT4 F 00 I 2HSS-01 FIG10 (
| |
| QISO 01-16 ¹ 3 or DMG¹ na in (810.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-026-46-1 NTS: 2,8 (Handate( 1 ( na /na I I INTEG ATT (B.K (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2NSS-01 FIG11 ( QISO 01-16 ¹ 3 or DMG¹ na in (B10.20 (ID (
| |
| na Ina
| |
| (
| |
| LINE¹ 2HSS.026-46-1 NTS: 2,8 (Handate( 1 (
| |
| na /na I I IHTEG ATI' IB-K I na I SUR/PT3.00/MT4.00 I 2HSS-01 FIG12 QISO 01-16 ¹ 3 or DMG¹ na in (810.20 (IO (
| |
| na Ina na (
| |
| LINE¹ 2HSS-026-46-1 HTS: 2,8 (Handate( 1 (
| |
| na Ina I I INTEG ATT (B-K (
| |
| na (
| |
| SUR/PT3.00/M'T4.00 (
| |
| 2HSS-01 FIG13 ( QISO 01-16 ¹ 3 or DMG¹ na in (810.20 IID (
| |
| na /na I
| |
| ( LINE¹ 2HSS-026-46-1 NTS: 2,8 (Handate( 1 (
| |
| na /na I
| |
| (
| |
| IHTEG ATT IB-K I na I SUR/PT3.00/NT4 F 00 I 2HSS.01-16-FIG14 ( QISO 01-16 ¹ 3 or DMG¹ na ,in (B10.20 (ID ( na /na
| |
| (
| |
| LINE¹ 2HSS-026-46-1 HTS: 2,8 (Handate( 1 (
| |
| na Ina I I IHTEG ATT (B-K (
| |
| na ( SUR/PT3.00/HT4.00 (
| |
| 2HSS.01-16-FIG15 ( QISO 01-16 ¹ 3 or DMG¹ na in (B10.20 (ID (
| |
| na /na I
| |
| ( LINE¹ 2NSS-026.46-1 NTS: 2,8 (Handate( 1 (
| |
| na /na I I IHTEG ATT IB-K I na I SUR/PT3.00/NT4.00 I 2HSS.01-16. FIG16 (
| |
| QISO 01-16 ¹ 13 or DMS¹ na in (810.20 (ID ( na /na
| |
| ( LINE¹ 2HSS-026.46-'I HTS: 2,5 (Mandate( 1 ( na /na I I INTEG ATT IB K I na I SUR/PT3.00/HT4.00 2NSS-01 FIG17 (
| |
| QISO 01-16 ¹ 13 or DMG¹ na in (B10.20 (IO (
| |
| na /na na ( LINE¹ 2MSS-026-46-1 HTS: 2,5 (Handate( 1 (
| |
| na /na I
| |
| | |
| NIAGARA HONANK PSIER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 45 of 65 NMP2 ISI 006'EV 1 g CH 000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND IN'TVL REL RED ) DESCRIPTION OF ITEN TO BE EXAMINED(CATGRY (IGSCCJ EXI/NDE PROCEDURE )PERIOD 1 REMARKS EXAMINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DIJG ¹, ]ITEM ¹ JFREOY( EX2/NDE PROCEDURE )PERIOD 2 J USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I INTEG ATT /8-K ( na I SUR/PT3.00/HT4.00 I 2HSS-01 FN318 (
| |
| QISO 01-16 ¹ 13 or DUG¹ na in /810.20 /ID / na /na I LINE¹ 2HSS 026 46 1 NTS'i5 /Mandate/ 1 / na /na I I INTEG ATT /8-K / na I SUR/PT3.00/HT4.00 I 2HSS.01-16. FN319 ) QISO 01-16 ¹ 13 or DllG¹ na in /810.20 )ID / na /na i LINE¹ 2HSS-026-46-1 NTS: 2,5 /Mandate( 1 / na /na I I INTEG ATT /8-K / na I SUR/PT 00/HT I 2HSS-01 FN320 [ QISO 01-16 ¹ 12 or DNG¹ na in /810.20 /ID ) na /na I LINE¹ 2HSS-026.46-1 NTS: 2,5 /Mandate/ 1 ( na /na I I INTEG ATT JB-K / na i SUR/PT3.00/HT4.00 i 2HSS-01-16. FN321 (
| |
| QISO 01-16 ¹ 12 or DMG¹ na in /810.20 /ID ) na /na I I LINE¹ 2HSS-026-46-1 NTS: 2,5 /Mandate) 1 J na /na I INTEG ATT [B-K f na I SUR/PT3.00/HT4.00 I 2MSS-01 FN322 (
| |
| QISO 01-16 ¹ 12 or DUG¹ na in (810.20 /ID J na /na I LINE¹ 2HSS.026-46-1 NTS: 2,5 (Mandate) 1 [ na /na I I INTEG ATT /B-K / na I SUR/PT3.00/HT4 F 00 I I 2HSS.01-16-FN323 / QISO 01-16 ¹ 12 or DUG¹ na . in /810.20 /ID / na /na I
| |
| / LINE¹ 2MSS-026.46-1 NTS: 2,5 ]Mandate/ 1 / na /na I .I I INTEG ATT /8-K [ na I SUR/PT3.00/HT4.00 I 2HSS-01 Fl624 (
| |
| QISO O'1-16 ¹ 12 or DUG¹ na in /810.20 ) ID J na /na
| |
| ) LINE¹ 2HSS-026-46.1 NTS: 2(8 /Mandate/ 1
| |
| )
| |
| na /na I I INTEG ATT /8-K / na I SUR/PT3.00/HT4.00 I 2HSS-01 FI625 (
| |
| QISO 01-16 ¹ 12 or DMG¹ na in /810.20 /ID / na /na LINE¹ 2HSS-026-46-1 NTS: 2,8 /Mandate/ 1 / na /na I I INTEG ATT ]B-K J na I SUR/PT3 00/HT4 00 I 2HSS-01 FN326 / QISO 01-16 ¹ 12 or DllG¹ na in JB10.20 ]ID / na /na I LINE¹ 2MSS-026-46-1 NTS: 2,8 [Mandate) 1 / na /na I
| |
| | |
| NIAGARA MOHAHK POHER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 46 of 65 NMP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - MSS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL REO J DESCRIPTIOH OF ITEM TO BE EXAMINED)CATGRY )IGSCC[ EX1/HDE PROCEDURE ]PERIOD 1 REMARKS EXAHIHATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DWG ¹, LITEM ¹ iFREQY) EX2/HDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ f LINE HO. AND NOTES, AS APPLICABLE [SELECT (CLASS[
| |
| EX3/NDE PROCEDURE ]PERIOD 3 INTEG ATT IB-K I na I SUR/PT3'00/MT4'00 I 2MSS-01-16-FN327 (
| |
| QISO 01-16 ¹ 12 or DNG¹ na in /810.20 ( ID f na /na I LINE¹ 2MSS-026-46-1 HTS: 2,8 [Mandate/ 1 f na /na I I IHTEG ATT (8-K ] na J SUR/PT3.00/MT4.00 f 2MSS-01 FN328 ) QISO 01-16 ¹ 12 or DHG¹ na in (810 '0 ]ID (
| |
| na /na I I LIHE¹ 2MSS-026.46-1 NTS: 2,5 ]Mandate] 1 [ na /na I I INTEG ATT (8-K )
| |
| na J SUR/PT3.00/MT4.00 J 2MSS-01-16-FN329 (
| |
| QISO 01-16 ¹ 12 or DNG¹ na in /810.20 /ID f na /na
| |
| [ LINE¹ 2MSS-026-46-1 NTS: 2,5 [Mandate/ 1 f na /na I I INTEG ATT (8-K f na f SUR/PT3.00/MT4.00 f 2MSS-01-16-FM330 [ QISO 01-16 ¹ 12 or DUG¹ na in )810.20 ]ID na /na
| |
| ) LINE¹ 2MSS-026-46-1 NTS: 2,5 /Mandate/ 1 f
| |
| J na /na 'I I IHTEG ATT IB K I na I SUR/PT3 00/MT4'00 2MSS-01 FN331 [ QISO 01-16 ¹ 12 or DNG¹ na in [810.20 ]ID )
| |
| na /na I LINES 2MSS 026 46 1 HT ' ~5 [Mandate] 1 ( na /na I I PIPE/ELB IB-J I na I VOL/UT6.02 I 2MSS-01-16-SN001 [ QISO 01-16 or DNG¹ na in /89.11 ]none f SUR/PT3.00/MT4.00 f HMP2-26-1.26-CS f LINE¹ 2MSS-026-46-1 NTS: 2,3 /HS / 1 f na /na I ELB/PIPE ]8-J [ na f VOL/UT6.02 2MSS-01.16-SN002 i QISO 01-16 or DWG¹ na in /89.11 /none / SUR/PT3 F 00/MT4.00 /
| |
| HMP2-26-1.26-CS i LINE¹ 2MSS-026-46-1 HTS: 2,3 /HS / 1 / na /na I PIPE/FLG HOZ IB J I na I VOL/UT6 02 I 2MSS. 01-16-SN004 I QISO 01-16 or DllG¹ na in JB9.31 ]ID ) SUR/PT3.00/Ml'4.00 JSc8 HMP2-26-1.26-CS I LINE¹ 2MSS-026-46-1 NTS: 2I6 JHS I 1 I na / I I PIPE/FLG HOZ [8-J (
| |
| na ) VOL/UT6.02 2MSS-01-16. SM005 I QI 0116 or DHG¹ na in [89.31 ]ID ( SUR/PT3.00/MT4.00 (ScB HMP2-26-1.26-CS LIHE¹ 2MSS-026-46-1 HTS: 2,6 JNS
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 47 of 65 NMP2-ISI-006( REV. 1, CN.000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEM TO BE EXAMINEDICATGRY IIGSCCI Exl/NDE PROCEDURE IPERIOO 1 I REHARKS EXAHIHATION IDENTIFIER i ITS ISO LOCATOR, COMPONENl'MG ¹, LITEM ¹ iFREOYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/FLG NOZ IB-J i na i VOL/UT6.02 2HSS-01-16-SM006 i QISO 01-16 or DMG¹ na in i89.31 )IO i SUR/PT3.00/HT4.00 iSc8 NMP2-26-1.26-CS i LINE¹ 2MSS.026-46-1 HTS: 2,6 INS 1 /na/
| |
| I PIPE/FLG NOZ IB-J I na I VOL/UT6.02 2MSS-01-16-SM007 I QISO 01-16 or DMG¹ na in iB9.31 iID i SUR/PT3.00/MT4.00 iSc8 NMP2-26-1.26-CS I LINE¹ 2MSS-026-46-1 NTS: 2,6 INS i na/
| |
| I PIPE/ELB IB-J I na I VOL/UT6.02 I 2MSS-01-16-SM008 I QISO 01-16 or DMG¹ na in l89.11 ilD / SUR/PT3.00/MT4.00 iSc8 NMP2-26-1.26-CS LINE¹ 2MSS-026.46-1 NTS: 2,3 IHS 1 /na/ I I ELB/PIPE IB-J i na i VOL/UT6.02 2MSS.01-16-SM010 i QISO 01-16 or OMG¹ na in i89.11 iiO i SUR/PT3.00/MT4.00 iSc8 NMP2-26.1.26-CS i LINE¹ 2MSS-026.46-1 NTS: 2,3 IBER ) 1 dna/
| |
| J PIPE/SOL (26" to 2") (PLUGGED) IB-J I na I SUR/PT3.00/HT4.00 I iNot examined in lstlPP 2MSS-01-16. SM011 I QISO 01-16 or DMG¹ na in iB9.32 inone ( na /na
| |
| ( LINE¹ 2MSS-002-46-1 NTS: 2,4 iNS 1 i na/na I I PIPE/PIPE (MITRE CUT) IB-J i na i VOL/UT6.02 2HSS-01-16-QI013 i QISO 01-16 or DMG¹ na in JB9.11 iID i SUR/PT3.00/MT4.00 (Sc8 NMP2-26-1.26.CS i LINE¹ 2MSS.026-46-1 NTS: 2 ABER I PIPE/PIPE (HITRE CUT) IB-J / na. i VOL/UT6.02 2MSS-01-16. QI015 I Q 0116 or DMG¹ na in i89.11 IID I SUR/PT /HT4 I I NMP2-26-1.26.CS I LINE¹ 2HSS.026-153-1 NTS: 2 IBER 1 dna/ Scil i i <<AOV7D/EXPANDER (26<< to 28") iB-J i na i VOL/UT6.02 2MSS-01-16-QI020 i QISO 01-16 or DMG¹ na in iB9.11 IID I SUR/PT3.00/MT4.00 I I NMP2-26-1.26-CS i LINE¹ 2MSS-026-153-1 NTS: 'll,'l4 ABER dna/ Scil (28") PIPE/SML (6") IC-F-2 I na I SUR/PT3 F 00/HT4.00 I 2MSS-01-17-SM002 I QISO 01-17 or DMG¹ na in iC5.81 inone ) na /
| |
| i LINE¹ 2MSS-006-117-4 NTS: 1,2 LSD 2 i na /na I
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - HILE POIHT NUCLEAR STATION - UNIT 2 48 of 65 NHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE IHSPECTIOH (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Exemination Identifier)
| |
| KD INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/KDE PROCEDURE IPERIOO 1 I REHARKS EXAHIKATION IDENTIFIER ] ITS ISO LOCATOR, COHPONENT DMG ¹, [ITEN ¹ (FREOY( EX2/NDE PROCEDURE [PERIOD 2 ]
| |
| USE CAL BLK ¹ I LINE NO. AKD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I (28") PIPE/SML (64) IC-F-2 i na i SUR/PT3.00/HT4.00 i 2HSS-01-17-SM004 (
| |
| Qrso 01-17 or DMG¹ na in (C5.81 /none / na /
| |
| (
| |
| LINE¹ 2HSS-006-12-4 HTS: 40,56 )SD 2 / na /na I I (28") PIPE/SML (64) IC-F-2 I na I SUR/PT3 F 00/HT4.00 I 2HSS-01-17-SW006 i QISO 01-17 or DMG¹ na in [C5.81 )none / na / I I LIHE¹ 2HSS-006-21-4 NTS: 40,56 ISO 2 ) na/na I I (284) PIPE/SWL (6") IC-F-2 I na I SUR/PT3.00/HT4.00 I 2HSS-01-17-SM008 I QISO 01-'l7 or DMG¹ na in JC5.81 /none / na / I J
| |
| LIKE¹ 2HSS-006-18 4 NTS: 40,56 JSD 2 / na /na I I SML/PIPE JC-F-2 / na )
| |
| VOL/U'I6.02 2HSS-01 FM001 I Q 0119 or DMG¹ na in JC5.51 /none / SUR/PT3.00/HT4.00 [
| |
| KHP2.6..432-CS (
| |
| LINE¹ 2HSS-006-18.4 N'IS: 56,23 JSD ( 2 ) na /na I S'WL/PIPE IC-F-2 f na ] VOL/UT6.02 2HSS-01-19.FW002 i QISO 01-19 or DMG¹ na in [C5.51 [none f SUR/PT3.00/Hl'4.00 [
| |
| NHP2.6..432-CS i LIKE¹ 2HSS-006-21-4 NTS: 56,23 LSD 2 J na /na I SWL/PIPE IC-F-2 [ na f VOL/UT6.02 2HSS-01-19-FM003 I QISO 01-19 or DMG¹ na ~ in ]C5.51 ]none (
| |
| SUR/PT3.00/HT4 F 00 )
| |
| NHP2-6-.432-CS i LIKE¹ 2HSS-006-12.4 NTS: 56,23 LSD 2 f na /na I I SWL/PIPE IC-F-2 I na I VOL/UT6.02 I 2HSS-01 FM004 [ QISO 01-19 or DMG¹ na in (C5.51 ]none f SUR/PT3.00/HT4.00 ]
| |
| KHP2-6-.432-CS i LIHE¹ 2HSS.006-117-4 NTS: 56,23 LSD 2 / na /na
| |
| )
| |
| PIPE/CAP (conforms to ANSI 816.9) iC-F-2 J na [ VOL/UT6.02 (
| |
| Sc7 2HSS-01 FM005 )
| |
| QISO 01-19 or DWG¹ na in [C5.51 IIO I SUR/PT3.00/HT4.00 I NHP2-6-.432-CS i LINE¹ 2HSS-006-18-4 NTS: 23,57 LSD 2 / na /na J
| |
| PIPE/CAP (conforas to ANSI $ 16.9) (C-F-2 [ na (
| |
| VOL/UT6.02 2HSS-01 FW006 [ QISO 01-19 or OMG¹ na in )C5.51 ]none J SUR/PT3.00/HT4 F 00 J KHP2.6-.432-CS I LINE¹ 2HSS 006 21 4 NTS'3~57 ISD 2 / na /na
| |
| | |
| NIAGARA MONAUK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 49 of 65 NMP2-ISI-006( REV. I( CH-000 SECOND TEH YEAR INSERVICE IHSPECI'ION (ISI) IHTERVAL PLAN Change date: 07/27/1999 APPENDIX G - MSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAMINEDICATGRY I IGSCCI EX1/NDE PROCEDURE IPERI(X) 1 I RENARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATORi CONPONEHT DUG ¹i I ITEM ¹ IFREOYI EX2/NDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ I LINE NO. AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I i PIPE/CAP (conforms to ANSI 816.9) iC-F-2 i na i VOL/UT6.02 2NSS-01-19-Fll007 [ also 01-19 or DUG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 i NNP2-6-.432-CS I LINE¹ 2MSS-006-117-4 HTS: 23 ~ 57 ISO 2 / na /na I i PIPE/CAP (conforms to AHSI 816.9) (C-F-2 i na i VOL/UT6.02 2HSS-01 FN008 i QISO 01-19 or DUG¹ na in iC5 ~ 51 !none I SUR/PT3.00/MT4.00 I NNP2-6-.432-CS i LINE¹ 2HSS-006-12-4 HTS: 23,57 LSD 2 J na /na I I PENET 22/PIPE IB-J i na i VOL/UT6.02 2MSS-01-20-FI$ 01 I QISO 01-20 or DllG¹ na in i89.'ll I ID I SUR/PT3.00/HT4.00 I NMP2-6-.432-CS i LINE¹ 2HSS-006-150-1 NTS: 17,18 iTEV i na /na iSc10
| |
| )
| |
| PIPE/*MOV207 IB-J i na )
| |
| voL/uT6.O2 2MSS-01 FN002 i QISO 01-21 or DNG¹ na in i89.11 I ID I SUR/PT3.00/HT4.00 I NMP2.6-.432-CS i LINE¹ 2MSS-006-150-1 N'IS: 23,24 iHS isc10
| |
| *MOV207/PIPE IB-J i na i VOL/uT6.OZ 2HSS.01-21.Fl$ 03 I QISO 01-21 or DNG¹ na in i89.11 Inone I SUR/PT3;00/HT4.00 I NMP2-6-.432-CS i LINE¹ 2MSS-006-150-1 NTS: 23,24 iNS 1 i na /na I i PIPE/*MOV111 IB-J i na (
| |
| VOL/UT6.02 2HSS-01 Fll004 i QISO 01-21 or DUG¹ na in i89.11 Inone I SUR/PT 'M/MT4 I NNP2.6-.432-CS i LINE¹ 2MSS-006-150-1 NTS: 23,24 iNS 1 i na /na I *MOV111/PIPE IB-J i na i VOL/uT6.O2 2HSS.01-21-Fl$ 05 i QISO 01-21 or DIIG¹ na in i89.11 )none J SUR/PT3.00/MT4.00 i NNP2-6-.432-CS i LINE¹ 2HSS.006-150-1 NTS: 23 24 iNS i na /na I I PIPE/PENET Z2 IB-J i na i VOL/uT6.OZ 2HSS-01 Fl$ 06 I also 01-21 or DWG¹ na in i89.11 I ID I SUR/PT3.00/HT4.00 I NMP2.6-.432-CS i LINE¹ 2HSS-006-150-1 NTS: 23(26 iTEV 1 i na /na ) Sc10 I RED/PIPE IB-J i na i VOL/UT6.02 2NSS-01 Fl$ 08 i also ol-21 or DNG¹ na in i89.11 inone i SUR/PT3.00/MT4.00 i NMP2-6-.432-CS I LINE¹ 2MSS 006 150 1 NTS'2i23 INS 1 i na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 50 of 65 NHP2-1S1-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPEHDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED ) DESCRIPTIOH OF ITEH TO BE EXAHIHEO)CATGRY [ IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHIHATIOH IDENTIFIER J ITS ISO LOCATOR, CDHPOHENT DMG ¹, ] ITEH ¹ [FREOY) EX2/NDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ I LINE Ho AHD NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIDO 3 I I PIPE/RED IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-01 FM009 i QISO 01-21 or DMG¹ na in )89.21 ]none f na /na f LIHE¹ 2HSS-003-298-1 NTS: 21,22 /Ns f 1 f na /na I i RED/PIPE IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-01 FM010 ( also 01-21 or DMG¹ na in (89.21 ]none f na /na I I LINE¹ 2HSS.003-298-1 HTS: 20,21 IHS I 1 I na /na I I INTEG ATT (8-K f na f SUR/PT3.00/HT4.00 f 2HSS-01 FM300 f QISO 01-21 ¹ 4 or DMG¹ na in JB10.20 ]ID f na /na I.
| |
| f LINE¹ 2HSS-006-150-1 NTS: 23,24 /Handatef 1 f na /na I I INTEG ATT IB K I na I SUR/PT /HT4 I 2HSS-01 FM301 f QISO 01-21 ¹ 4 or DMG¹ na in )810.20 ]ID f na /na I
| |
| [ LINE¹ 2HSS-006-150-1 NTS: 23,24 [Handate/ 1 / na /na I I IHTEG ATT (8-K J na f SUR/PT3.00/HT4.00 J 2HSS.01-21-FI602 J QISO 01-21 ¹ 4 or DMG¹ na in )810.20 [ID f na /na f LINE¹ 2HSS-006-150-1 NTS: 23,24 JHandate/ 1 / na /na I I IHTEG ATT (8-K (
| |
| na ] SUR/PT3.00/HT4.00 (
| |
| 2HSS-01 FI603 ) alSO Ol-21 ¹ 4 or DMG¹ na in [810.20 JIO J na /na f LINE¹ 2HSS-006-150-1 NTS: 23,24 /Handatef 1 f na /na I I INTEG ATT (8-K f na J SUR/PT3.00/HT4.00 (
| |
| 2HSS-01 FI604 / QISO 01-21 ¹ 4 or OMG¹ na in )810.20 ]ID / na /na
| |
| / LINE¹ 2HSS-006-150-1 NTS: 21,4 (Handate/ 1 f na /na I i IHTEG ATT IB-K, I na I SUR/PT3.00/HT4.00 I 2HSS-01-21-FI605 )
| |
| alSO 01-21 ¹ 4 or DMG¹ na in )810.20 /ID f na /na f LINE¹ 2HSS-006-150-1 HTS: 21,4 JHandatef 1 f na /na I INTEG Al'T /8-K ) na f SUR/PT3.00/HT4.00 2HSS-01-21-FI606 J QISO 01-21 ¹ 4 or DMG¹ na in )810.20 (ID f na /na f
| |
| LINE¹ 2HSS-006-150-1 NTS: 21,4 /Handate/ 1 f na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 51 of 65 NNP2-1S1-006, REV. I, CN.OOO SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - Hss SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I RENARKS EXAHINATION IDENI'IFIER J ITS ISO LOCATOR, COHPONENT DMG ¹, iITEH ¹ iFREQYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT JCLAssi EX3/NDE PROCEDURE )PERIOD 3 I INTEG ATT iB-K i na )
| |
| SUR/PT3.00/HT4.00 i 2HSS-01-21-FM307 i aISO 01-21 ¹ 4 or DMG¹ na in F810.20 ilo ) na /na i LINE¹ 2NSS-006-150-1 NTS: 21,4 iHandatei 1 )
| |
| na /na I I ELB/PIPE IB-J I na I VOL/UT6.02 I 2HSS-01 FMSM014 i also 01-21 or DMG¹ na in i89.11 inone i SUR/PT3.00/HT4.00 i NHP2-6-.432-CS ) LINE¹ 2HSS-006-150-1 NTS: 23,25 iNS 1 / na /na I=
| |
| I PIPE/PIPE (8-J J na i VOL/UT6.02 2HSS-01 FMSM017 i aiso o1-21 or DMG¹ na in i89.11 . inone i SUR/PT3.00/NT4.00 i NNP2-6-.432-CS i LINE¹ 2HSS-006-150-1 NTS: 23 iNS i 1 i na /na I I PIPE/SOL ig-J I na I SUR/PT3.00/HT4.00 I 2HSS-01-21-SI$ 04 i QISO 01-21 or DMG¹ na in ]89.32 inone i na /na I I LINE¹ 2NSS-006-150-1 NTS: 23,4 INS 1 i na/na I PIPE/SOL IB-J i na ( SUR/PT3.00/HT4.00 i i QISO 01-21 or DMG¹ na in i89.32 ino e i na /na I'NSS-01-21-SM005 I
| |
| i LINE¹ 2HSS-006-150-1 NTS: 23,4 [Ns 1 i na/na I I PIPE/SOL IB-J i na i SUR/PT3.00/HT4.00 i 2HSS-01-21-SM006 I QISO 01-21 or DMG¹ na . in i89.32 inone i na /na I I LINE¹ 2HSS-006-150-1 NTS: 23,4 INS 1 i na/na I i PIPE/SOL IB-J i na i SUR/PT3.00/NT4.00 J 2HSS-01-21-SI$ 07 I QISO 01-21 or DMG¹ na in i89.32 inone J na /na I I LINE¹ 2HSS.006-150-1 NTS: 23 4 INS i na /na I I PIPE/ELB IB-J i na i VOL/UT6.02 2HSS-01-21-SI$ 09 i aiso o1-21 or DMG¹ na in )89.11 inone J SUR/PT3.00/HT4.00 i NHP2 432-CS i LINE¹ 2HSS-006-150-1 NTS: 23,25 iNS 1 ) na /na I I ELB/PIPE IB-J i na i VOL/UT6.02 2HSS-01-21-9010 i aiso o1-21 or DMG¹ na in i89.11 Inone I SUR/PT3.00/HT4.00 I NHP2-6-.432-CS i LINE¹ 2HSS-006-150-1 NTS: 23,25 iNS 1 i na /na
| |
| | |
| NIAGARA MOHAMK POUER CORPORATION - HILE POINT NUCLEAR STATION - UNIT' 52 of 65 NMP2-ISI-006, REV. 1 ~ CH-000 SECOND TEN TEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - Mss SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ ) DESCRIPTION OF ITEH TO BE EXAMINED)CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REMARKS EXAHINATIOH IDENTIFIER J ITS ISO LOCATOR, COMPONENT DMG ¹, ]ITEM ¹ JFREQY( EX2/NDE PROCEDURE (PERIOD 2 [
| |
| USE CAL BLK ¹ I LINE No AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I PIPE/ELB IB-J I na I VOL/UT6.02 I 2HSS-01-21-Sli011 i arso ol-21 or DllG¹ na in l89.11 Inone I SUR/PT3 00/HT 00 I NHP2.6-.432-CS i LINE¹ 2HSS-006-150-1 NTS: 23,25 )Ns 1 [ na /na i ELB/PIPE IB-J [ na ] VOL/UT6.02 2MSS-01-21-SN012 I QISO 01 21 or DUG¹ na in (89.'ll ]none f SUR/PT3.00/MT4.00 [
| |
| NMP2-6-.432-CS LIHE¹ 2MSS-006-150-1 NTS: 23,25 JNS 1 / na /na I PIPE/ELB IB-J J na J VOL/UT6.O2 2MSS-01-21-Sl013 i QISO 01-21 or DMG¹ na in [89.11 Inone I SUR/PT3.00/HT4.00 I NMP2-6-.432-CS I LINE¹ 2HSS-006-150-1 NTS: 23,25 INS 1 f na /na I PIPE/ELB IB-J J na ( VOL/UT6.02 2NSS-01-21-SM015 i arso o1-21 or DllG¹ na in )89.11 [none f SUR/PT3.00/HT4.00 [
| |
| NMP2-6-.432-CS (
| |
| LIHE¹ 2HSS-006-150-1 NTS: 23,25 )Ns 1 / na /na I ELB/PIPE )8-J (
| |
| na )
| |
| VOL/UT6.02 2MSS-01-21-SU016 i QISO 01-21 or DUG¹ na in (89.11 Inone I SUR/PT /Ml' NMP2.6-.432-CS I LINE¹ 2HSS-006-150.1 NTS: 23,25 INS / na /na I
| |
| ) SOL/PIPE IB-J J na J SUR/PT3.00/MT4.00 (
| |
| Sc7 2MSS-047A-FN001A ( arso 47-A or DUG¹ na in [89.40 ]ID J na /na I I LINE¹ 2MSS-002-49-1 NTS: 27(4 IHS I 1 I na/na I I PIPE/ELB IB-J na J SUR/PT3.00/HT4.00 2NSS-047A-FII0028 I QISO 47-A or DUG¹ na in [89.21 /none J na /na I I LINE¹ 2HSS-002-49-1 NTS: 27,28 INS 1 ) na/na I I ELB/PIPE IB-J I na I SUR/PT3.00/NT4.00 I 2MSS-047A-FN003 J arso I7-A or DMG¹ na in (89.21 ]none / na /na i LINE¹ 2HSS-002-49-1 NTS: 27,28 iNS I 1 I na /na I I prpE/*v1c IB-J (
| |
| na )
| |
| SUR/PT3.00/NT4 F 00 (
| |
| 2HSS-047A- Fll004 i QISO 47-A or DUG¹ na in /89.21 /none ( na /na I LINE¹ 2HSS-002-49-1 NTS: 27(29 INS / na /na I
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 53 of 65 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - NSS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTIOH OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE (PERIOD 1 I RENARKS EXAHINATIOH IDENTIFIER ( ITS ISO LOCATOR, COHPOHEHT OMG ¹, (ITEN ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LIHE NO AHD NOTES'S APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I I
| |
| 4VIC/PIPE IB-J I na I SUR/PT3.00/NT4.00 I 2HSS-047A- FI$ 05 (
| |
| QISO 47-A or DMG¹ na in (89.21 (none (
| |
| na /na
| |
| (
| |
| LINE¹ 2NSS-002-49-1 NTS: 27,29 (NS 1 (
| |
| na/na I P I PE/ELB IB-J I na I SUR/PT3 /IIT I 2HSS-047A-FM006 (
| |
| QISO 47-A or DMG¹ na in (89.21 (none (
| |
| na /na I
| |
| (
| |
| LINE¹ 2HSS-002-49-1 NTS: 27,28 (NS 1 ( na/na I I ELB/PIPE IB-J ( na I SUR/PT3 F 00/NT4.00 I 2HSS-047A-FM007A ( QISO 47-A or DMG¹ na in (89.21 (none ( na /na I
| |
| (
| |
| LIHE¹ 2HSS-002-49-1 Nl'S: 27,28 (HS 1 ( na/na I I PIPE/RED IB-J I na I SUR/PT3.00/MT4.00 I 2NSS-047A-FM008 I QISO 47-A or DMG¹ na in (B9.21 (none (
| |
| na /na I na I LIHE¹ 2NSS.002-49-1 NTS: 27,4 INS 1 ( na/na I I PIPE/ELB IB-J I na I SUR/PT 00/NT 0 I 2HSS.047A-FM0128 I QISO 47-A or DMG¹ na in (B9.21 (none (
| |
| na /na I I LINE¹ 2NSS-002.82-1 NTS'7i28 IN 1 ( na/na I I ELB/PIPE IB-J ( na ( SUR/PT3.00/NT4.00 (
| |
| 2HSS-047A-Fl$ 13 I QISO 47-A or DMG¹ na ~ in (B9.21 (none (
| |
| na /na (
| |
| I LINE¹ 2HSS-002-82-1 HTS: 27(28 IHS 1 ( na /na I I PIPE/*V1D IB-J (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2HSS-047A- FM014 (
| |
| QISO 47-A or DMG¹ na in (89.21 (none (
| |
| na /na
| |
| (
| |
| LINE¹ 2HSS-002-82-1 N'IS: 27,29 (NS (
| |
| na /na I
| |
| (
| |
| *V1D/PIPE IB J I na I SUR/PT3 F 00/NT4.00 I 2HSS-047A-FM015 I QISO 47-A or DMG¹ na in (B9.21 (none (
| |
| na /na LINE¹ 2HSS.002-82-1 NTS: 27,29 (HS (
| |
| na /na I I PIPE/ELB IB-J I na I SUR/PT3.00/NT4.00 I 2HSS.047A-Fl$ 19A QISO 47-A or DMG¹ na in (B9.21 (none (
| |
| na /na na (
| |
| LINE¹ 2HSS-002-47-1 HTS: 27,28 (NS ( na /na I
| |
| | |
| NIAGARA MOHANK PONER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 54 of 65 HMP2-ISI-006, REV. 1, CN.ODD SECOND TEN YEAR INSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - MSS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REO ] DESCRIPTIOH OF ITEM TO BE EXAMINED)CATGRY )IGSCC) EX1/NDE PROCEDURE ]PERIOD 1 REMARKS EXAMINATION IDENTIFIER ) ITS ISO LOCATOR, COMPONENT DIIG ¹, )ITEM ¹ )FREOY) EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I ELB/PIPE IB-J I na I SUR/PT3.00/MT4.00 I 2MSS-047A-FN020A )
| |
| QISO 47-A or DNG¹ na in [B9.21 ]none f na /na i LINE¹ 2MSS-002-47-1 HTS: 27,28 iHS 1 / na /na I PIPE/~VIA IB-J na SUR/PT3.00/MT4.00 2MSS-047A-FN021 I
| |
| I QISO 47-A LIHE¹ 2MSS-002-47-1 or DNG¹ na NTS'7'9 in )89.21 IHS l~
| |
| I I I na /na na /na I
| |
| I I / I I *V1A/PIPE IB-J f na f SUR/PT3.00/MT4.00 [
| |
| 2MSS-047A-FN022 I QISO 47-A or DNG¹ na in (89.21 /none / na /na i LINE¹ 2MSS-002.47-1 NTS: 27,29 JHS ( na /na SOL/PIPE IB-J I na I SUR/PT3.00/MT4.00 I 2MSS-047A- FN023A i QISO 47-A or DNG¹ na in (89.40 /ID / na /na / Sc9 I LINE¹ 2MSS-002-48-1 NTS: 27,4 IMS 1 ) na /na I I PIPE/ELB IB-J I na I SUR/PT 00/MT4 I I 2MSS-047A-FN0248 i QISO 47-A or DWG¹ na in )89.21 [none J na /na I I LINE¹ 2MSS-002.48-1 NTS: 27I28 INS 1 / na /na I I I ELB/PIPE /B-J J na J SUR/PT3.00/MT'0 ]
| |
| 2MSS-047A- FN025B f QISO 47-A or DNG¹ na, in JB9.21 /none / na /na LINE¹ 2MSS-002-48-1 HTS: 27,28 JHS 1 ) na /na I I PIPE/ELB IB-J I na I SUR/PT3.00/MT4.00 I 2MSS-047A-FN026B i QISO 47-A or DIIG¹ na in )89.21 ]none f na /na i LINE¹ 2MSS-002-48-1 NTS: 27,28 iHS 1 )
| |
| na /na I I ELB/PIPE IB-J i na i SUR/PT3.00/MT'0 i 2MSS-047A-Fll027A i QISO 47-A or DUG¹ na in )89.21 /none / na /na LINE¹ 2MSS-002-48-'I NTS: 27(28 IHS 1 na /na I I J PIPE/*V18 /8-J I na I SUR/PT /MI'4 0 I I
| |
| 2MSS-047A- FN028 I QISO 47-A or DUG¹ na in ]89.21 /none / na /na I LINE¹ 2MSS 002 48 1 NTS'7i29 IHS / na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 55 of 65 NHP2-ISI-006, REV. 1( CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ ] DESCRIPTION OF ITEH TO BE EXAHINED[CATGRY [IGSCC[ EX1/NDE PROCEDURE [PERIOD 1 REHARKS EXAHINA'TION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DMG ¹, i ITEH ¹ iFREQYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I ov1B/PIPE IB J I na I SUR/PT3.00/HT4.00 I 2HSS-047A-FM029 ( QISO 47-A or DMG¹ na in )89.21 I LINE¹ 2HSS-002-48-1 NTS: 27,29 iNS 1 / na /na I I PIPE/SOL IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-047A-Fl$ 30 i QISO 47-A or DMG¹ na in /89.40 /none ) na /na LINE¹ 2HSS-002-82-1 NTS: 27 4 INS 1- ( n /na I I
| |
| PIPE/SOL IB-J f na f SUR/PT3.00/HT4.00 )
| |
| )Deselected 2HSS 047A-FM031 i QISO 47-A or DMG¹ na in (89.40 /none f na /na I LINE¹ 2HSS-002-47-1 NTS: 27,4 INS 1 / na /na I I PIPE/SOL IB-J J na J SUR/PT3.00/HT4 F 00 [Deseiected 2HSS-047A-FM032 I QISO 47-A or DMG¹ na in (89.21 ]none J na /na na I LINE¹ 2HSS-002.48-1 NTS: 27,4 INS J na /na I I ELB/ELB IB-J )
| |
| na [ SUR/PT3.00/HT4.00 ]
| |
| 2HSS-047A-FM0338 )
| |
| QISO 47-A or DMG¹ na in )89.21 [none [ na /na
| |
| )
| |
| LINE¹ 2HSS-002-48-1 NTS: 28 [NS 1 [ na /na I I ELB/PIPE IB-J I na I SUR/PT 0 /HT I 2HSS-047A- Fl$ 34 [ QISO 47-A or DMG¹ na in )89.21 /none / na /na I
| |
| )
| |
| LINE¹ 2HSS-002-82-1 NTS: 27,28 (NS 1 / na /na I I PIPE/ELB IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-047A- Fl$ 35 / QISO 47-A or DMG¹ na in /89.21 ]none ) na /na
| |
| / LINE¹ 2HSS-002-82-1 NTS: 27,28 /NS 1 / na /na I I ELB/PIPE IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-047A- FM036 i QISO 47-A or DMG¹ na in /89.21 [none / na /na I LINE¹ 2HSS-002-82-1 NTS: 27,28 INS I I PIPE/ELB IB-J I na I SUR/PT 'M/HT I 2HSS-047A-FM037 (
| |
| QISO 47-A or DMG¹ na in ]89.21 /none / na /na I LINE¹ 2NSS-002-82-1 NTS: 27,28 INS I 1 I na /na I
| |
| | |
| N IAGARA HOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 56 of 65 HHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - Hss SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REO I DESCRIPTION OF ITEN To BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHINATION IDENTIFIER [ ITS ISO LOCATOR, CDHPONENT DMG ¹, (
| |
| ITEN ¹ JFREQYJ EX2/NDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE isELECT JCLASsi EX3/NDE PROCEDURE [PERIOD 3
| |
| [ *AOV60/PIPE IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-047A- FM038 [ also 47-A or DMG¹ na in )89.40 /ID / na /na /Sc8 i LINE¹ 2HSS-002-82-1 NTS: 11,27 iNS 1 J na /na I I ELB/PIPE IB-J J na [ SUR/PT3.00/HT4.00 J 2HSS-047A-FM039 (
| |
| also 47-A or DMG¹ na in )B9.21 ]none f na /na J
| |
| LINE¹ 2HSS-O02-47-1 NTS: 27,28 JNS 1
| |
| / na /na I
| |
| ( PIPE/ELB IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-047A- FM040 [ also 47-A or DMG¹ na in )B9.21 /none / na /na I J
| |
| LINE¹ 2HSS-002-47-1 NTS: 27,28 JNS / na /na I I ELB/PIPE IB-J )
| |
| na (
| |
| SUR/PT3.00/HT4.00 )
| |
| 2HSS-047A-FW041 I QISO 47.A or DMG¹ na in JB9.21 )none [ na /na I na I LIHE¹ 2HSS-002-47-1 NTS: 27,28 INS I I PIPE/ELB IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-047A-Fi$ 42A i QISO 47-A or DWG¹ na in (89.21 )none (
| |
| na /na I LINE¹ 2HSS-002-47-1 NTS: 27,28 JNS I 1 I na /na I I <<AOV6A/P IPE IB-J I na I SUR/PT3.00/HT4 F 00 lEx6 iHT QRF0-6.
| |
| 2HSS 047A-FI$ 43 I QISO 47-A or DMG¹ na in (B9.40 /Io / na /na I I LINE¹ 2HSS-002-47-1 NTS: 11,27 INS 1 J na/na I I
| |
| [ MNF/RED IB-J f na J VOL/UT6.02 2HSS-106A- FMDOIA )
| |
| alsoIO6-A or DMG¹ na in JB9.11 ilo (
| |
| SUR/PT3.00/HT4.00 i Sc9 NNP2-4-.337-CS I LINE¹ 2HSS-002-107-1 NTS: 30,31 INS 1 / na /na I RED/PIPE IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-106A.FM002 (
| |
| alsoio6-A or D'MG¹ na in [89.21 /ID f na /na )
| |
| Sc9 I LINE¹ 2HSS.002-107-1 NTS: 31,27 IHS 1 / na/na I I PIPE/ELB IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-106A- FI$ 03 )
| |
| QIS0106-A or DMG¹ na in (89.21 ]none J na /na I LINE¹ 2HSS-002-107-1 NTS: 27,28 INS 1 / na /na I
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 57 of 65 NHP2-ISI 006, REV. 1 ~ CN 000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Exanination Identifier) 2ND INTVL REL RED (
| |
| DESCRIPTION OF ITEM TO BE EXAMINED)CATGRY (IGSCC) EX1/NDE PROCEDURE (PERIOD 1 REMARKS EXAMINATION IDENTIFIER )
| |
| ITS ISO LOCATOR, COHPONENT DWG ¹, JITEH ¹ [FREOYJ EX2/NDE PROCEDURE ]PERIOD 2 J USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I ELB/PIPE IB-J f na f SUR/PT3.00/MT4.00 /
| |
| 2HSS.106A-FW004A f QISO106-A or DWG¹ na in /B9.21 /ID / na /na (
| |
| Sc9 i LINES 2HSS-002-107-1 NTS: 27,28 iHS 1 / na /na I I PIPE/TEE IB-J (
| |
| na J SUR/PT3.00/HT4.00 J 2HSS-106A- FW0058 /
| |
| QISO106-A or DWG¹ na in /B9.21 ]none f na /na
| |
| )
| |
| LINE¹ 2HSS-002-107-1 NTS: 27,32 )NS 1 / na /na I I TEE/RED IB-J I na I SUR/PT3.00/MT'0 I 2MSS-106A- FW006 i QIS0106-A or DWG¹ na in (89.21 [none ) na /na I LINE¹ 2HSS-002-107-1 NTS'2i33 INS 1 / na /na I I TEE/PIPE IB-J f na J SUR/PT3.00/HT4.00 f 2HSS-106A-FW009A i QIS0106-A or DWG¹ na in (B9.21 ]none f na /na I I LINE¹ 2HSS-002-107-1 NTS: 27,32 INS 1 / na/na I I PIPE/PIPE IB-J i na [ SUR/PT3.00/HT4.00 i 2MSS-106A- FW010 )
| |
| QISO106-A or DWG¹ na in (B9.21 ]none f na /na I I LINE¹ 2HSS 002 107 1 Nl' 27 INS 1 f na/na I I PIPE/ELB IB J f na f SUR/PT3.00/HT4.00 J 2HSS-106A-FW011 i QIS0106-A or DWG¹ na ~ in (B9.21 [none J na /na i LINE¹ 2HSS-002-107-1 NTS: 27(28 iNS )
| |
| na /na I I ELB/PIPE IB-J I Aa I SUR/PT3.00/HT4.00 I 2HSS-106A-FW012 )
| |
| QIS0106-A or DWG¹ na in [89.21 /none / na /na
| |
| (
| |
| LINES 2MSS-002-107-1 NTS: 27,28 (NS 1 / na/na I PIPE/WNF IB-J f na f SUR/PT3.00/HT4.00 /
| |
| 2HSS-106A-FW013 [
| |
| QISO106-A or DUG¹ na in [89.21 tnone / na /na
| |
| [ LINE¹ 2MSS-002-107-1 NTS: 27,34 (NS 1 / na /na I
| |
| ] WNF/PIPE IB-J I na I SUR/PT3.00/MT4.00 I 2HSS-106A- FW014 i QISO106-A or DWG¹ na in (89.21 ]ID f na /na f Sc9 Aa LINE¹ 2HSS-002-107-1 NTS: 27,34 iNS 1 / na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 58 of 65 HHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REMARKS I
| |
| EXAHINATION IDEH IF IER ITS ISO LOCATOR, COHPONENT DMG ¹, (ITEN ¹ )FREOYJ EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/ELB IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-106A-FM018A I QI S0106-A or DMG¹ na in [89.21 [ID f na /na f Sc9
| |
| )
| |
| LIHE¹ 2HSS-002-107.1 HTS: 27,28 iHS 1
| |
| / na/na I I ELB/PIPE IB-J I na I SUR/PT 0 /HT4 I 2HSS-106A- FM019 'i QISO106-A or DMG¹ na in )89.21 )none / na /na I i LINE¹ 2HSS-002-107-1 NTS: 27,28 FANS 1 / na/na I PIPE/PIPE IB-J J na J SUR/PT3.00/HT4.00 (
| |
| 2HSS-106A-FM020 J QIS0106-A or DMG¹ na in ]89.21 [none [ na /na I na I LINE¹ 2MSS.002-107-1 HTS: 27 INS [ na /na I I INTEG ATT JB-K-1 f na f SUR/PT3.00/HT4.00 J 2HSS-106A-FM021 i QIS0106 A or DMG¹ NA in )810.10 )ID ) na /na qc9 na J LIHE¹ 2HSS-002-107-1 N'IS: 27,35 JHandate) 'I
| |
| ] na /na I I PIPE/PIPE IB-J [ na (
| |
| SUR/PT3.00/HT4.00 J 2HSS-106A-FM022 i QIS0106 A or DMG¹ na in /89.21 ]none f na /na I I LINE¹ 2HSS-002-107-1 NTS: 27 INS 1 / na /na I I PIPE/PIPE IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-106A-FM023 (
| |
| QIS0106-A or DMG¹ na ~ in )89.21 )~e ( na /na I I LINE¹ 2HSS-002-107-1 NTS: 27 INS 1 / na /na I I PIPE/TEE IB-J / na J SUR/PT3.00/HT4.00 J 2HSS-107A- FM001A i QISO107-A or DMG¹ na in [89.21 /ID / na /na I I LINE¹ 2HSS-002-107-1 HTS: 27,32 IHS 1 / na/na Sc11 I TEE/PIPE IB-J na i SUR/PT3.00/HT4.00 i 2HSS-107A.FM002A I QIS0107-A or DMG¹ na in /89.21 /ID / na /na I I LINE¹ 2HSS 002 107 1 HTS'7 32 IHS / na /na Sc11 f PIPE/*HOV108 IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-107A-FM003A / QISO107-A or DMG¹ na in /89.21 [none / na /na LINE¹ 2HSS-002-107-1 NTS: 27,29 iNS / na /na I
| |
| | |
| NIAGARA HONAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 59 of 65 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) IHTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCl EX1/NDE PROCEDURE iPERIOO 1 I REHARKS EXAHIHAT ION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DWG ¹, [ITEN ¹ JFREOY) EX2/NDE PROCEDURE ]PERIOD 2 f USE CAL BLK ¹ f LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I ~HOV108/PIPE IB-J )
| |
| na [ SUR/PT3.00/HT4.00 )
| |
| 2HSS-107A- FW004 I QIS0107-A or DMG¹ na in )89.21 I LINE¹ 2HSS.002-107-1 NTS: 27,29 INS I I PIPE/ELB IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-107A- FM005 i QIS0107-A or DWG¹ na in (89.21 (none [ na /na I I LINE¹ 2HSS-002-107-1 NTS: 27 28 IN 1 / na/na I I ELB/PIPE /8-J I na I SUR/PT3'00/HT4'00 I 2HSS-107A-FW006 i QIS0107-A or DWG¹ na in )89.21 /ID f na /na I LINE¹ 2HSS-002-107-1 NTS: 27I28 IHS 1 J
| |
| na /na Sc11 I PIPE/SOL /8-J I na I SUR/PT3 F 00/HT4.00 I 2HSS-107A-FW007 I QIS0107-A or DWG¹ na in (89.40 [ID / na /na LINE¹ 2HSS-002-107-1 NTS: 27,4 )HS 1 / na /na Sc11 I TEE/PIPE IB-J I na I SUR/PT3.00/HT4.00 I 2HSS.107A-FW008 (
| |
| QIS0107-A or DMG¹ na in (89.21 ]none J na /na I I LINE¹ 2HSS 002-54-1 NTS: 27,32 INS / na /na I I PIPE/ELB IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-107A- F W009 )
| |
| QIS0107-A or DWG¹ na in (89.21 )none [ na /na I I LINE¹ 2HSS-002-54-1 NTS: 27,28 INS 1 / na/na I I ELB/PIPE /8-J / na / SUR/PT3.00/HT4.00 /
| |
| 2HSS-107A-FW010A I QI S0107-A or DMG¹ na in [89.21 /none ( na /na I I LINE¹ 2HSS.002-54-1 NTS: 27,28 INS I 1 I na/na I
| |
| (
| |
| PIPE/*NOVI 18 IB-J I na I SUR/PT3 F 00/HT4.00 I I 2HSS-107A- FW011 i QISO107-A or DWG¹ na in /89.21 /ID / na /na I I i LINE¹ 2HSS-002-54-1 NTS: 27,29 iNS / na /na Sc11 /
| |
| I iHOVI18/P IPE IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-107A- FW012A QI S0107-A or DWG¹ na in (89.21 )~e I na /na I LINE¹ 2HSS-002-54-1 NTS: 27,29 INS 1 f na/na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 60 of 65 NHP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REO f DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC) EX1/NDE PROCEDURE [PERIOD 1 REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG ¹, ]ITEN ¹ JFREQYJ EX2/NDE PROCEDURE (PERIOD 2 f USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I P IPE/~HOV11 IB-J ] na f SUR/PT3 F 00/HT4 F 00 f 2HSS-107A-F M013A I QIS0107-A or DMG¹ na in (89.21 [none f na /na I LINE¹ 2HSS 002 54 1 NTS'7i29 INS 1 J na/na I I SOL/PIPE IB-J I na I SUR/PT /HT4'00 I I 2HSS-110A-FM001A i QIS0110-A or DMG¹ na in ]89.40 /ID / na /na
| |
| (
| |
| LINE¹ 2HSS-002-110-1 NTS: 4(27 )NS 1 / na/na Seri /
| |
| I PIPE/ELB IB-J I na I SUR/PT3.00/HT4 F 00 I 2HSS-110A-FM002 i QISO110-A or DMG¹ na in [89.21 ]none J na /na I I LINE¹ 2HSS-002-110-1 NTS: 27,28 INS J na /na I I ELB/PIPE IB J I na I SUR/PT3.00/HT4.00 I 2HSS-110A-FM003 I QIS0110-A or DMG¹ na in )89.21 )none [ na /na I LINE¹ 2HSS-002-110-1 NTS: 27 28 INS 1 / na /na I I PIPE/ELB IB-J I na I SUR/PT 0 /HT4 F 00 I 2HSS-110A-FM004 i QIS0110 A or DMG¹ na in (89.21 /none / na /na I LINE¹ 2HSS-002-110-1 NTS: 27,28 1NS 1 / na /na I I ELB/PIPE IB-J / na f SUR/PT3.00/HT4.00 )
| |
| 2HSS-IIOA-FM005 I QIS0110-A or DMG¹ na. in [89.21 /none / na /na I i LINE¹ 2HSS-002-110-1 NTS: 27,28 iNS 1 ( na/na I
| |
| )
| |
| PIPE/*HOV189 IB-J ] na J SUR/PT3.00/HT4.00 [
| |
| 2HSS-110A- FM006A I QIS0110.A or DMG¹ na in (89.21 /IO / na /na
| |
| ] LINE¹ 2HSS-002-110-1 NTS: 27 29 ]HS / na /na ) Sc11 i
| |
| (
| |
| *HOV189/PIPE IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-110A-FM007A [ QIS0110-A or DMG¹ na in [89.21 ]none J na /na i LINE¹ 2HSS-002-110-1 NTS: 27,29 iNS 1 J na /na I I PIPE/ELB IB-J (
| |
| na J SUR/PT3.00/Hl'4.00 [
| |
| 2HSS-110A-FM008 ] QIS0110-A or DMG¹ na in ]89.21 )n~ ) na /na
| |
| )
| |
| LINE¹ 2HSS-002-1'l0-1 NTS: 27(28 [NS 1 / na/na I
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 61 of 65 NHP2-ISI-006, REV. 1, Ck-ooo SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - Hss SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY I IGSCCI EX1/kDE PROCEDURE iPERIOD 1 I REHARKS EXAHlkATION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DMG ¹, iITEH ¹ iFREQYi EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE ko. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/kDE PROCEDURE IPERIOO 3 I I ELB/PIPE IB-J J na i SUR/PT3.00/HT4.00 i 2HSS->>OA-FM009 i also>>o-A or DllG¹ na in i89.21 )none i na /na I i LlkE¹ 2HSS-002->>0-1 NTS: 27,28 Jks I 1 Ina/na I I PIPE/ELB IB-J i na i SUR/PT3.00/HT4.00 i 2HSS->>OA-FM010 I QISO>>O.A or DMG¹ na in i89.21 inone i na /na i LINE¹ 2Hss-oo2->>o-1 NTs- 27 28 Iks i na /na I
| |
| / ELB/PIPE IB-J I na I SUR/PT3.00/HT4.00 I 2HSS->>OA-FMO>> i QISO>>0-A or DMG¹ na in i89.21 inone i na /na I na I LINE¹ 2HSS-002->>0-1 NTS: 2,3 Iks 1 i na/na I PIPE/ELB IB-J i na (
| |
| SUR/PT3.00/HT4.00 i 2HSS->>OA-FM012A i QISO>>O.A or OMG¹ na in i89.21 i~e i na /na LINE¹ 2HSS-002->>0-1 NTS: 27,28 [NS I I ELB/PIPE IB-J I na I SUR/PT /HT I I 2HSS->>OA- FM013 I QISO>>O.A or DMG¹ na in i89.21 inone i na /na I.
| |
| i LINE¹ 2HSS-002->>0-1 NTS: 27,28 iks i na /na I I I PIPE/PIPE IB-J I na I SUR/PT3.00/HT4.00 I 2HSS->>OA-FII015A i QISO>>0-A or DMG¹ na .in i89.21 in~ i na /na J
| |
| LINE¹ 2HSS-002->>0-1 NTS: 27 iks 1 J na/na I I PIPE/ELB IB-J i na i SUR/PT3.00/HT4.00 i 2HSS->>OA-FM016 i also>>o-A or DMG¹ na in i89.21 inone i na /na I i LINE¹ 2HSS-002->>0-1 NTS: 27,28 iks 1 / na/na I I ELB/PIPE IB-J I na I SUR/PT3.00/HT4.00 I 2HSS->>OA- Fll017A i also>>0-A or DMG¹ na in i89.21 inone i na /na I I LINE¹ 2HSS.002->>0.1 NTS: 27,28 Iks i na /na I I PIPE/ELB IB-J I na I SUR/PT3 00/HT4 00 I 2HSS->>OA-FM018 i also>>0-A or DMG¹ na in i89.21 /none i na /na i LINE¹ 2HSS-002-'>>0-1 NTS: 27,28 iks 1 i na /na I
| |
| | |
| NIAGARA HONAMK POMER CORPORATIOH - NILE POINT NUCLEAR STATION - UNIT 2. 62 of 65 NHP2-ISI-006( REV. 1( CH-000 SECOND TEH YEAR IHSERVICE INSPECI'IOH (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ J DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY [IGSCC) EX1/NDE PROCEDURE (PERIM 1 REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONEHT DMG ¹, [ITEH ¹ [FREOYJ EX2/NDE PROCEDURE ]PERIOD 2 f USE CAL BLK ¹ f LINE NO. AND NOTES, AS APPLICABLE )SELECT (CLASS]
| |
| EX3/NDE PROCEDURE [PERIM 3 )
| |
| ELB/PIPE IB-J na SUR/PT3.00/HT4.00 2HSS-110A- FM019 I
| |
| i QIS0110-A LINE¹ 2HSS 002 110 1 or DMG¹ na NTS'7(28 in (89.21 INS I~
| |
| f [
| |
| I na /na na /na f
| |
| I I ] I
| |
| ] PIPE/PIPE IB J I na I SUR/PT 0 /HT 0 I 2HSS-110A-FM028A [ QISO110-A or DMG¹ na in (89.21 /none J na /na I I LIHE¹ 2HSS-002-110-1 NTS: 27 INS 1
| |
| / na/na I I PIPE/ELB IB-J J na / SUR/PT3.00/HT4.00 I 2HSS.110B-FM004 i QISO110-8 or DMG¹ na in /89.21 /none / na /na I I LINE¹ 2HSS-002-110-1 NTS: 27,28 INS 1 / na /na I ELB/PIPE IB-J / na )
| |
| SUR/PT3.00/HT4.00 /
| |
| 2HSS-110B-FM005 I QIS0110.B or DMG¹ na in /89.21 /none ( na /na
| |
| (
| |
| LINE¹ 2HSS-002-110-1 NTS: 27,28 iNS ( na /na I I PIPE/ELB IB-J f na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2HSS-110B-FM006 / QISO110-8 or DMG¹ na in /89.21 )none / na /na i LINE¹ 2HSS-002-110-'I NTS: 27,28 iNS 1 / na /na I I ELB/PIPE IB-J f na / SUR/PT3.00/HT4.00 /
| |
| 2liSS-1108-FM007 i QISO110-8 or DMG¹ na . in (89.21 )none f na /na I LINE¹ 2HSS-002-110-1 NTS: 27(28 INS J na /na I I PIPE/ELB IB J I na I SUR/PT3.00/HT4.00 I 2HSS-110B-FM008 )
| |
| QISO110-8 or DMG¹ na in (89.21 /non'e / na /na I LINE¹ 2HSS-002-110-1 NTS: 27,28 INS 1 J
| |
| na /na I I ELB/PIPE IB-J I na I SUR/PT3 F 00/HT4.00 I 2HSS-1108- FM009 (
| |
| QIS0110-8 or DMG¹ na in (89.21 /none ) na /na I LINE¹ 2HSS-002-110-1 NTS: 27(28 INS / na /na I I PIPE/SOL IB-J I na I SUR/PT3.00/HT4.00 I 2HSS.110B-FM010A i QIS0110.8 or DMG¹ na in /89.40 /none f na /na LINE¹ 2MSS-002-110-1 NTS: 28,4 (NS / na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 63 of 65 NHP2-1S1-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ i DESCRIPTION OF ITEH TO BE EXAHINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOO 1 REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DMG ¹, iITEH ¹ iFREOY) EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/ELB IB-J i na i SUR/PT3.00/HT4.00 i 2HSS-1108-Fl$ 11 )
| |
| ais0110-8 or DMG¹ na in i89.21 /none i na /na
| |
| / LINE¹ 2HSS-002-110.1 NTS: 27,28 FANS 1 i na /na I I ELB/PIPE IB-J I na I SUR/PT3.00/HT4 F 00 I 2HSS-110B-Fl$ 12 i ais0110-8 or DMG¹ na in i89.21 inone i na /na i LINE¹ 2HSS-002-110-1 N'TS: 27,28 iNS 1 i na/na I
| |
| ( PIPE/ELB IB-J I na I SUR/PT3 F 00/HT4.00 i 2HSS-110B- Fl$ 13 i QIS0110-8 or DMG¹ na in i89.21 inone i na /na I i LINE¹ 2HSS-002-110-1 NTS: 27,28 iNS 1 i na/na I I ELB/PIPE IB-J I na I SUR/PT /HT4 00 I 2HSS-110B-Fl$ 14 i QISO'110-B or DMG¹ na in iB9.21 )none i na /na I LINE¹ 2HSS.002-110-1 N'IS: ?7,28 INS I I PIPE/ELB IB-J I na I SUR/PT3.00/HT4.00 I 2HSS-110B- FM015 i QIS0110-8 or DMG¹ na in /89.21 inone i na /na I LINE¹ 2HSS-002-110-1 NTS: 27,28 INS 1 i na /na I I ELB/PIPE IB-J J na i SUR/PT3.00/Hl'4.00 i 2HSS-110B- FI$ 16 i QIS0110-B or DMG¹ na ~ in i89.21 inone i na /na I i LINE¹ 2HSS-002-110.1 NTS: 27,28 iNS 1 ( na/na I I PIPE/ELB IB-J i na i SUR/PT3.00/Hl'4.00 i 2HSS-110B-Fl$ 17 i QIS0110-B or DUG¹ na in (B9.21 inone i na /na i LINE¹ 2HSS-002-110-1 NTS: 27(28 iNS 1 i na /na I I ELB/PIPE IB-J I na I SUR/PT3.00/HT4 F 00 I 2HSS-110B- FM018 i ais0110-8 or DMG¹ na in i89.21 inone i na /na I LINE¹ 2HSS 002 110 1 NTS 27i28 INS I I PIPE/ELB IB-J i na [ SUR/PT3.00/HT4.00 i 2HSS-110B-FM019 i QIS0110-8 or DMG¹ na in i89.21 inone i na /na I LINE¹ 2HSS-002-110-1 NTS: 27,28 INS 1 i na/na I
| |
| | |
| NIAGARA MOHAltK PONER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 64 of 65 NMP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - MSS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REO ) DESCRIPTIOH OF ITEH TO BE EXAMINED)CATGRY ) IGSCC) EX1/NDE PROCEDURE )PERI(X) 1 REMARKS EXAHINATION IDENTIFIER ( ITS ISO LOCATOR, COMPONENT DUG ¹, )
| |
| ITEM ¹ JFREOYJ EX2/NDE PROCEDURE (PERIOD 2 [
| |
| USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSJ EX3/NDE PROCEDURE iPERIOO 3
| |
| / ELB/PIPE IB-J I na I SUR/PT3 /MT' 2MSS-1108-FN020 i QIS0110 8 or DUG¹ na in [89.2'I /none / na /na I LINE¹ 2HSS-002-110-1 HTS: 27,28 INS 1 J na/na I I PIPE/ELB IB-J I na I SUR/PT3.00/MT4.00 I 2MSS-1108-FN021 i QIS0110-8 or DMG¹ na in )89.21 )none f na /na i LINE¹ 2HSS-002-110-1 NTS: 27,28 iNS 1 / na/na I I ELB/PIPE IB-J )
| |
| na )
| |
| SUR/PT3.00/MT4.00 J 2MSS-1108-FN022 i QISO110-8 or DMG¹ na in ]89.21 ]none f na /na I i LINE¹ 2HSS-002-110-1 NTS: 27(28 iNS J na /na
| |
| <<AOV7C/SM RED IHSERT (2" to 1") iB-J I M I SUR/PT3.00/MT4.00 I 2MSS. 175A- FMI12 I QISO 01-15 or DUG¹ na in [89.40 /none J na /na na i LINE¹ 2MSS.002-154-1 NTS: 11, 13 iNS 1 )
| |
| na /na I
| |
| (
| |
| <<AOV70/SW RED INSERT (2" to 1") )8-J [ na [ SUR/PT3.00/MT4.00 [
| |
| 2MSS-175A- F l!126 I QISO 01-16 or DUG¹ na in )89.40 ]none J na /na I
| |
| )
| |
| LINE¹ 2MSS-002-153-1 HTS: 11,14 )NS / na /na I
| |
| /
| |
| <<AOV7A/Ql RED INSERT (2" to 1") /8-J I na I SUR/PT3.00/MT4.00 I 2MSS-175A-FM142 i QISO 01-13 or DUG¹ na in (89.40 )none / na /na I na I LIHE¹ 2HSS-002-152-1 NTS: 11, 13 INS I 1 I na/na I
| |
| )
| |
| <<AOV78/SH RED INSERT (2" to 1") (8-J I na I SUR/PT3.00/MT4.00 I 2MSS-175A- FII154 i QISO 01-14 or DUG¹ na in (89.40 ]none f na /na I LINE¹ 2MSS-002-151-1 NTS: 11, 13 INS 1 f na /na I
| |
| / NOZ/FLG BLTG Q NB TOP HEAD VENT /B-G-2 / na VT1/VT2.01 I 2MSS-P8105 I QISO106-A or DUG¹ in /87.50 /ID na /na Sc9 na / LINE¹ 2MSS-002-107-1 NTS: (none) )Mandate/ 1 na /na I
| |
| )
| |
| NIF/WNF (8-G-2 / na VT1/VT2.01 I 2HSS-P8106 I QIS0106-A or DUG¹ in )87.50 )ID na /na Sc9 J
| |
| LINE¹ 2MSS-002-107-1 NTS: (none) ]Mandate] 1 na /na I
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 E 65 of 65 NHP2-ISI-006( REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/27/1999 APPENDIX G - Hss SYSTEH (sorted by Exemination Identifier)
| |
| ND INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DMG ¹, i ITEH ¹ iFREQY) EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ i LINE No AND NOTES, AS APPLICABLE I ELECT ICLASSI EX3/NDE PROCEDURE IPERIOO I i NOZ/SE Q N3A Az072 HAIN STEAH iB-J i na i VOL/UT6.02 )Ex6 iRecategorized during 2nd 10-Year Update. HT/UT Q RFO-6.
| |
| 2RPV-KB13 i QISO 01-13 or DMG¹ 031 in i89.11 /ID i SUR/HT4.00 I I NHP2-27-1 '7-CS I LINE¹ 2HSS-026-43-1 NTS: (none) ITEV I 1 I na / I I
| |
| / NOZ/SE Q N38 Az108 HAIN STEAH iB-J t na i VOL/UT6.02 I iRecategorized during 2nd 10-Year Update 2RPV-K814 i QISO O1-14 or DMG¹ 031 in i89.11 iID J SUR/HT4.00 igcB NHP2-27-1.57-CS i LINE¹ 2HSS-026-44-1 NTS: (none) )TEV i 1 J na / I I I NOZ/SE Q N3C Az252 HAIN STEAH IB-J I na I VOL/UT6.02 I iRecategorized during 2nd 10-Year Update 2RPV-K815 i QISO 01-15 or DMG¹ 031 in (89.11 iID i SUR/PT3.00 Sc9 NHP2-27-1.57-CS i LINE¹ 2HSS-026-45-1 NTS: (none) iTEV i 1 i na / I I
| |
| / NOZ/SE Q N3D Az288 HAIN STEAN iB-J i na / VOL/UT6.02 I iRecategorized during 2nd 10-Year Update 2RPV-K816 i QISO 01-16 or DMG¹ 031 in i89.11 iID i SUR/HT4.00 I . I NNP2-27-1.57-CS i LINE¹ 2HSS-026-46-1 NTS: (none) iTEV i 1 i na / iSc10 I NOZ/FLG Q NB TOP HEAD VENT IB-J I na I VOL/UT6.02 I iRecategorized during 2nd 10-Year Update 2RPV-K828 i QIS0106-A or DMG¹ 032 in i89.11 i2P i SUR/HT4.00 I Sc9 NHP2-6.3-1.24-CS J LINE¹ 2HSS-002-107-1 NTS: (none) )TEV ) 1 i na / I I END OF SYSTEH Hss
| |
| | |
| NIAGARAMOHAWKPOWER CORPORATION Nine MiIe Point Unit 2 NMP2-ISI406, Rev. 1 ~
| |
| CH400 System MSS: General Notes
| |
| : 1. 26" SAFE END, SA408 CL1 4" 90% WELD NECK FLANGE, SA-105
| |
| : 2. 26" X 1.177 MIN. WALLSMLS PIPE, SA-106C 31. 4" X2" SCH. 160 RED. ELBOW, SA-234 WPB
| |
| : 3. 26 X 1.177 MIN. WALLELBOW, SA-234 WPC 32. 2'CH. 160 STR. TEE, SA-234 WPB
| |
| : 4. 2" 600% SOCKOLET, SA-105 2 X1" SCH.160CONC. REDUCER, SA-234WPB
| |
| : 5. 1" PLATE, SA416, GR. 70 2" 1500// WELD NECK FLANGE, SA-105
| |
| : 6. 26" X8" 1500// FLANGE NOZZLE, SA-105 3/4" PLATE, SA41 6, GR. 70
| |
| : 7. 8" SAFETY RELIEF VALVE,SA-105 16" EXTRUDED OUTLET, A516 GR. 70
| |
| : 8. 1-1/2" PLATE, SA416, GR. 70 37. 16" SCH. 100 PIPE, SA-106 GR B
| |
| : 9. 2" 3$ XQ SOCKOLET, SA-125 16" SCH. 100 ELBOW, SA-234 WPB
| |
| : 10. 2" PLUG, SA416, GR. 79 16" GATE VALVE,A216 WCB
| |
| : 11. 26 Y GLOBE ISOLATION VALVE,SA-216 WCC 28" 1.245 MW, PIPE,A106CR. C
| |
| : 12. 26 X 1.156 MIN. WALLPENETRATION, SA408 CL1 41. 28" 1.245" MW ELBOW, A234 WPC
| |
| : 13. 2" X 1" 609% REDUCING INSERT, SA-105 42. 12 SCH. 120PIPE,A106GR. B BZ
| |
| : 14. 28 X1.339" NOMWALLX26 X1.266" NOM WALLREDUCER, SA-234WPC 14" SCH. 120 PIPE, A106 GR. B BZ
| |
| : 15. 28" X1.33 NOM WALLSMLS PIPE, SA-106 C 2" PLATE, A515 GR. 65
| |
| : 16. 26" X1.177" MIN WALLX10" SCH. 80 SWEEPOLET, SA-105 28" EXTRUDED OUTLET, A516 GR. 70
| |
| : 17. 16" SCH. 80 PENETRATION, SA-508 CL1 18" SCH. 160 PIPE, A106 GR. B '? BZ
| |
| : 18. 26" SCH. 80 SMLS PIPE, SA-106B 47. 48" EXTRUDED HEADER 48" (3 438" MW, (3-1/2" NW)) X 28" (1.245" MW) X 18"
| |
| : 19. 36" GLOBE VALVE,SA-182 F22 (.820" MW) X 16" (.738" MW) A516 GR. 70
| |
| : 20. 3" X 2 SCH. 80 CONC. REDUCER, SA-234 WPB 28" VALVE,A216 WCB
| |
| : 21. 3" SCH. 80 SMLS PIPE SA-106B 48" PIPE CAP 3.5" MW, A234 WPC
| |
| : 22. 6" X 3" SCH. 80 CONC. REDUCER, SA-234 WPB 10" SCH. 140 PIPE, A106 GR. B
| |
| : 23. 6 SCH.80SMLS PIPE SA-106 R 51. 18" EXTRUDED OUTLET, A516 GR 70
| |
| : 24. 6" GLOBE VALVE, SA-105 52. 18" SCH. 80 ELBOW, A234 WP8
| |
| : 25. 6" SCH. 80 ELBOW, SA-234 WPB 18" SCH. 80 PIPING, A106 GR B
| |
| : 26. 6 SCH. 80 PENETRATION, SA408 CL1 BYPASS CHEST
| |
| : 27. 2" SCH. 160 SMLS PIPE, SA-106B 18" X 6'CH. 80 SWEEPOLET, A105
| |
| : 28. 7 SCH. 160 ELBOW, SA-234 WP8 28" X 6" XS SWEEPOLET, A105
| |
| : 29. 2" GLOBE VALVE, SA-105 57. 6" SCH. 80 CAP, A234 WPB
| |
| | |
| 0 NIAGARA HOHAC POMER CORPORATION - H NILE POINT NUCLEAR STATION - UHIT 2 1 of 26 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEH (sorted by Examination identifier)
| |
| ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHIHEDICATGRY I IGSCCI EXl/NDE PROCEDURE IPERIOO 1 I REMARKS EXAMINATION IDENTIFIER ) ITS ISO LOCATOR, COHPONENT DNG ¹, )ITEN ¹ (FREOYJ EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ i LINE HO. AND NOTES, AS APPLICABLE ]SELECT iCLASSi EX3/NDE PROCEDURE iPERIOD 3 I
| |
| *HYV17A BLTG )B-G-2 f na f VT1/VT2.01 -I I 2RCSAHYV17A,V8105 J QISO 64-00-2 or DUG¹ 044 in )87.70 /ID / na /na I I
| |
| / LINE¹ 2RCS-024-2-1 NTS: (none) JGrp Rep) 1 / na /na Scil /
| |
| I
| |
| *HYV17A BLTG [B-G-2 / na / VTl/VT2.01 I I 2RCS*HYV17A,V8107 / QISO 64-00-2 or DllG¹ 044 in /87.70 /ID / na /na I I
| |
| / LINE¹ 2RCS-024-2-1 NTS: (none) /Grp Rep/ 1 / na /na Scil /
| |
| )
| |
| *HYV17A BLTG (B-G-2 )
| |
| na J VT1/VT2.01 I I 2RCS*HYV17A,V8109 f QISO 64-00-2 or DWG¹ 044 in /87.70 ]ID f na /na I I f LINE¹ 2RCS-024-2-1 NTS: (none) JGrp Repf 1 / na /na Sc11 I
| |
| *HYV17A BLTG JB-G-2 J na J VT1/VT2.01 I I 2RCS*HYV17A,VB111 J QISO 64-00-2 or DUG¹ 044 in [87.70 ]ID J na /na I ~ I J
| |
| LINE¹ 2RCS-024-2-1 HTS: (none) ]Grp Rep) 1 J na /na Sc11
| |
| (
| |
| *HYV17A INT SUR [8-H-2 J na J VT3/VT2.01 /* (* Examine Nhen dissassemble for maintenance 2RCS*HYV17A,VBY148 / QISO 64-00-2 or DHG¹ 044 in (812.50 )DisG f / /*
| |
| f I.INE¹ 2RCS-024-2-1 NTS: 13 JGrp Rep/ 1 / / Ja I
| |
| *HYV178 BLTG (8-G-2 J na J VT1/VT2.01 2RCS"HYV178,V8106 ] QISO 64-00-5 or DUG¹ 044 in )87.70 ]none f na /na
| |
| [ LINE¹ 2RCS-024-19-1 NTS: (none) JNS f 1 f na /na I
| |
| *HYV178 BLTG /B-G.2 f na f VT1/VT2.01 2RCS~HYV178,V8108 f QISO 64-00-5 or M¹ 044 in /87.70 ]none f na /na
| |
| / LINE¹ 2RCS-024-19-1 HTS: (none) [NS / 1 / na /na I
| |
| *HYV178 VLV BLTG (8-G-2 f na f VT1/VT2~ 01 2RCS*HYV178, V8110 J Qlso 64-00-5 or DMG¹ 044 in (87.70 (none f na /na f I.INE¹ 2RCS-024-19-1 NTS: (none) JNS / 1 / na /na I *HYV178 BLTG
| |
| /8-0-2 / na VT1/VT2.01 2RCS*HYV178, V8112 / QISO 64-00-5 or DMG¹ 044 in /87.70 /none / na /na
| |
| / LINE¹ 2RCS-024-19-1 NTS: (none) )NS / 1 na /na
| |
| | |
| NIAGARA MONAllK PONER CORPORATION - HILE POINI'UCLEAR STATION - UNIT 2 2 of 26 NMP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEH (sorted by Examination Identifier)
| |
| ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REMARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DUG ¹, )ITEM ¹ iFREOYi EX2/NDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE /SELECT iCLASSi EX3/NDE PROCEDURE [PERIOD 3 i <<HYV178 INT SUR [8-M-2 J na [ VT3/VT2.01 2RCS*HYV178,VBY149 f QISO 64-00-5 or DMG¹ 044 in )812.50 [none / /
| |
| I LINE¹ 2RCS-024-19-1 NTS: 54 INS I 1 I /
| |
| I *HOVIOA VLV BLTG )8-G-2 / na / VT1/VT2.01 I I 2RCS<<MOV10A, VB113 ( QISO 64-00-1 or DHG¹ 016 in /87.70 /ID / na /na I I
| |
| (
| |
| LIHE¹ 2RCS-024-1-1 NTS: (none) (Grp Rep/ 1 / na /na Scil J
| |
| <<MOV10A INT SUR IB-M-2 I na I VT3/VT2.01 )<< Examine when dissasseahle for maintenance 2RCS*MOV10A, VBY150 J QISO 64-00-1 or DNG¹ 016 in )812.50 /DisG / / /<<
| |
| / LINEN 2RCS-024-1-1 NTS: 7 /Grp Repl 1 I / f<<
| |
| i <<MOV108 BLTG
| |
| /8-G-2 f na f VT1/VT2.01 I 2RCS<<HOV10B, V8114 f QISO 64-00-4 or DUG¹ 016 in /87.70 ]none f na /na I f LINE¹ 2RCS-024-18-1 NTS: (none) /NS [ 1 J na /na I J
| |
| <<MOV108 INT SUR /8-M-2 / na / VT3/VT2.01 2RCS<<HOV108, VBY151 (
| |
| QISO 64-00-4 or DWG¹ 016 in /812.50 /none / /
| |
| na I LINE¹ 2RCS-024-18-1 NTS: 39 INS I 1 I /
| |
| I <<MOV18A BLTG IB G 2 I na I VT1/VT2.01 I I 2RCS<<MOV18A, V8115 f QISO 64-00-2 or DUG¹ 016.in [87.70 ]ID f na /na I I
| |
| / LINE¹ 2RCS-024-2-1 NTS: (none) [Grp Rep) 1 f na /na Sc11 I <<MOVIBA INT SUR JB-M-2 / na / VT3/VT2.01 IEX6 2RCS*MOV18A,VBY152 f QISO 64-00-2 or DUG¹ 016 in (812.50 /DisG / / I J
| |
| LINE¹ 2RCS-024-2-1 NTS: 24 )Grp Rep/ 1 / / I I *MOV188 VLV BLTG IB-G-2 I na I VT1/VT2.01 2RCS*MOV18B,VB116 ( QISO 64-00-5 or DUG¹ 016 in )87.70 ]none f na /na na f LINE¹ 2RCS-024-19-1 NTS: (none) /NS f 1 f na /na
| |
| )
| |
| *MOV188 INT SUR /B.M-2 / na / VT3/VT2.01 2RCS*HOV18B, VBY153 / QISO 64-00-5 or DWG¹ 016 in /812.50 /none / /
| |
| i LINE¹ 2RCS-024-19-1 NTS: 55 iNS i 1 i /
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 3 of 26 NHP2-ISI-006, REV. 1I CH.OOO SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 REHARKS EXAHINATIOH IDENTIFIER J ITS ISO LOCATOR, C(NPOHEHT DMG ¹, )ITEN ¹ [FREOV[ EX2/HDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ i LINE HO. AND NOTES, AS APPLICABLE DESELECT (CLASS( EX3/HDE PROCEDURE iPERIOO 3
| |
| )
| |
| <<P1A PUHP CASING )8-L-2 J na J VT3/VT2.01 /* )* Examine Ken dissassemble for maintenance 2RCS<<P1A, PC100A f QISO 64-00-1 or DMG¹ in (812.20 [DisG J
| |
| / /<< I
| |
| / LIHE¹ 2RCS-024-1-1 NTS: 8 /UponDis/ 1
| |
| / / I* I i
| |
| <<PIA STUDS JB-G-1 [ na ) VOL/UT6.04 Sc7 2RCS*P1A,PPB101A f QISO 64-00-1 or DMS¹ 010 in )86.180 /EOI / na /na I NNP2-3.25-23.5-STUJ LINE¹ 2RCS-024-1-1 NTS: 10 /Handatef 1 )
| |
| na /na I I
| |
| <<P1A FLG SUR /B-G-1 / na / VT1/VT2.01 Sc7 2RCS*P1A,PPB102A / QISO 64-00-1 or DMG¹ in /86.190 /Dis / na /na I
| |
| / LIHE¹ 2RCS-024-1-1 NTS: (none) /Handate/ 1 J na /na I I
| |
| <<P1A HUTS fB-G-'I J na ) VT1/VT2.01 Sc7 2RCS*P1A, PPB103A ] QISO 64-00-1 or DMG¹ 010 in /86.200 [EOI f na /na I
| |
| [ LINE¹ 2RCS-024-1-1 NTS: (none) /Handate/ 1 f na /na I
| |
| <<P18 PUHP CASING ]8-L-2 J na J VT3/VT2.01 (<< Examine Mhen dissassembie for maintenance 2RCS<<P1B, PC100B QISO 64-00-4 or DMG¹ in (812.20 JDisG f / /<<
| |
| LINE¹ 2RCS-024-18-1 HTS: 40 /Uponois/ 1 / / I*
| |
| [
| |
| <<IIB STUDS IB-G-I I na I VOL/UT6.04 2RCS*P1B,PPB1018 f QISO 64-00-4 or DMG¹ 010 in /86.180 /none / na /na NHP2-3.25-23.5-STUJ LINE¹ 2RCS-024-18-1 NTS: 41 [na f 1 / na /na I *P18 FLG SUR (B-G-1 [ na. f VT1/VT2.01 2RCS*P1B, PP 81028 / QISO 64-00-4 or DMG¹ in /86.190 /none / na /na
| |
| / LINE¹ 2RCS-024-18-1 HTS: (none) (na / 1 / na /na
| |
| ]
| |
| <<PIB HUTS IB-G-1 I na I VT1/VT2.01 2RCS*P1B, PPB103B )
| |
| QISO 64-00-4 or DMG¹ 010 in JB6.200 ]none [ na /na
| |
| / LINE¹ 2RCS-024-18-1 HTS: (none) /na / 1 f na /na I SE/PIPE Q N18 Az180 RECIRC OUTLET IB-J I A I VOL/UT6.03 I 2RCS-64-00-FMA01 J QISO 64-00-1 or DMS¹ na in [89.11 / ID-0 / SUR/PT3.00 Sc9 NHP2-24-1.002-SS I LINE¹ 2RCS-024-1-1 NTS: 1,11 ITEV/au / 1
| |
| / na / I
| |
| | |
| HIAGARA HOHAMK POWER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 4 of 26 HHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL RED DESCRIPTION OF ITEH TO BE EXAHIHED(CATGRY [IGSCC( EX1/HDE PROCEDURE )PERIOD 1 REHARKS J
| |
| EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR, COHPONENT DWG ¹, IITEH ¹ IFREQYI EX2/NDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ f LINE NO. AND HOTES, AS APPLICABLE ]SELECT ]CLASS) EX3/NDE PROCEDURE [PERIOD 3 i PIPE/PIPE IB-J I A I VOL/UT6.03 2RCS-64-00-FMA02 / QISO 64-00-1 or DWG¹ na in /89.11 [none / SUR/PT3.00 NHP2-24-1.002-SS I LINE¹ 2RCS-024-1-1 NTS: 1 INS 1 ) na /na I ELB/*HOV10A IB-J J A i VOL/UT6.03 I 2RCS-64-00-FWA03 / QISO 64-00.1 or DMG¹ na in /B9.11 IID I SUR/PT3.00 Sc9 NHP2-24-1.002-SS i LINE¹ 2RCS-024-1-1 NTS: 2,7 iHS/au / na/ I I
| |
| *HOV10A/PIPE IB-J I A I VOL/UT6.03 2RCS-64-00-FMA04 )
| |
| QISO 64-00-1 or DWG¹ na in /89.11 /none / SUR/PT3.00 NHP2-24-1.002-SS i LINE¹ 2RCS-024-1-1 NTS: 1(7 iNS J na /na IMB-6r1 I ELB/*P1A IB-J I A I VOL/UT6.03 Sc7 IGL88.01 CAT.A COHHITHENT 2RCS-64-00.FMA05 ( QISO 64-00-1 or DMG¹ na in )89.11 IID I SUR/PT3.00 NHP2.24-1.234-SS )
| |
| LINE¹ 2RCS-024-1-1 NTS: 3,8 )HS/au 1 / na /na I ~P1A/PIPE /B-J I A I VOL/UT6.03 I (GL88.01 CAT.A COHHITHENT 2RCS-64-00-FMA06 / QISO 64-00-2 or DMG¹ na in /B9.11 IID I SUR/PT3.00 I I NHP2-24-1.317.SS [ LINE¹ 2RCS.024-2-1 NTS: 12,22 )HS/au 1 (na/ I Sc11 I I PIPE/~HYV17A IB-J I D I VOL/UT6.03 sc7 2RCS-64-00 FWA07 / QISO 64-00-2 or DMG¹ na .in /89.11 iONRO J SUR/PT3.00 sc9 NHP2-24-1.317-SS / LIHE¹ 2RCS-024-2-1 NTS: 12,23 /AW/au 1 (na/ sc11 I *HYV17A/PIPE iB-J I A I VOL/UT6.03 2RCS-64-00-FMA08 )
| |
| QISO 64-00-2 or DMG¹ na in ]89.11 ]none J SUR/PT3.00 NHP2-24-1.317-SS I LINE¹ 2RCS-024-2-1 NTS: 12,13 INS 1 f na /na
| |
| )
| |
| PIPE/*HOVIBA IB-J ( VOL/UT6.03 2RCS-64-00.FMA09 [ QISO 64-00-2 or DMG¹ na in [B9.11 )none (
| |
| SUR/PT3.00 NHP2-24-1.317-SS I LINE¹ 2RCS-024-2-1 NTS: 12,24 iNS 1 f na /na I *HOVIBA/ELB IB-J i A i VOL/UT6.03 I I 2RCS.64-00.FWA10 f QISO 64-00-2 or DMG¹ na in /B9. 11 IID I SUR/PT3.00 I I
| |
| 'NHP2-24-1.234-SS LINEN 2RCS 024 3 1 NTS 15@24 [HS/au 1 f na /na Sc11 )
| |
| | |
| NIAGARA NOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 Sof 26 NHP2-1SI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEM (sorted by Examination Identifier) 2HD IHTVL REL REa ) DESCRIPTIOH OF ITEN TO BE EXAHINED[CATGRY JIGSCCJ EX1/HDE PROCEDURE ]PERIOD 1 REMARKS EXAHIHATION IDENTIFIER / I'IS ISO LOCATOR, CONPOHENT DWG ¹, /ITEN ¹ JFREOYJ EX2/HDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LIHE HO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I PIPE/RED IB-J I A I VOL/UT6.03 I 2RCS-64-00-FMA11 [ QISO 64-00-2 or DWG¹ na in (89.11 /none / SUR/PT3.00 I NHP2-24-1 '34-SS I LINE¹ 2RCS 024 3 1 NTS'3i21 IHS 1 / na /na I i SWPOL/PIPE Q H2E Az150 RECRC INLT iB-J [ A (
| |
| VOL/UT6.03 )Deseiected during 2nd 10-Year Update review 2RCS-64-00.FWA12 (
| |
| QISO 64-00-3 or DWG¹ na in (89.11 [none ) SUR/PT3.00 NNP2-12-.657-SS i LINE¹ 2RCS-012-7-1 NTS: 26,30 FANS 1 /na/
| |
| SWPOL/PIPE Q H20 Az120 RECRC IHLT iB-J I A I VOL/UT6.03 (Deselected during 2nd 10-Year Update review 2RCS-64-00-FMA13 (
| |
| QISO 64-00-3 or DWG¹ na in (89.11 [none [ SUR/PT3.00 HHP2-12-.657-SS I LINE¹ 2RCS.012-8.1 NTS: 26,30 INS 1 /na/
| |
| i RED/PIPE Q H2C Az090 RECIRC INLET iB-J I A I VOL/UT6.03 2RCS-64-00-FMA14 )
| |
| QISO 64-00-3 or DMG¹ na in )89.11 ]none )
| |
| SUR/Pl'3.00 NHP2-12-.657-SS )
| |
| LIHE¹ 2RCS-012-9-1 NTS: 29,30 )NS 1 ) na /na SWPOL/PIPE Q H28 Az060 RECRC IHLT )8-J I A I VOL/UT6.03 2RCS-64-00.FWA15 ) QISO 64-00-3 or DMG¹ na in )89.11 (none (
| |
| SUR/PT3.00 HNP2-12-.657-SS i LINE¹ 2RCS-012-10-1 NTS: 26,30 iNS 1
| |
| / na /na I SWPOL/PIPE Q N2A AZ030 RECRC IHLT IB-J I A I VOL/UT6.03 2RCS-64-00-FWA16 f QISO 64.00-3 or DMG¹ na .in )89.11 )none J SUR/PT3.00 HNP2-12-.657-SS I LIHE¹ 2RCS-012-11-1 NTS: 26,30 IHS 1 f na /na I PIPE/SE Q N2E Az150 RECIRC INLET IB-J, I A I VOL/UT6.03 IEX6 ]GL88.01 CAT.A CONHITNENT; Do with LW32 2RCS-64.00-FWA17 f Qlso 64-00-3 or DMG¹ na in )89.11 ]ID-E [ SUR/PT3.00 NNP2-12-.657-SS / LINE¹ 2RCS-012-7-1 H'IS: 30,32 /TEV/au / 1 / na /
| |
| I PIPE/SE Q N2D Az120 RECIRC INLET IB-J I A I VOL/UT6.03 Sc7 2RCS-64-00-FMA18 / QISO 64-00 or DMG¹ na in /89.11 ]ID-0 f SUR/PT3.00 I HHP2-12-.657-SS f LINE¹ 2RCS-012-8-1 NTS: 30,32 /TEV/au f 1 f na / I I PIPE/SE Q N2C A2090 RECIRC INLET IB-J I A I VOL/UT6.03 IEX6 2RCS-64 F'MA19 ) QISO 64-00-3 or DWG¹ na in (89.11 /ID-E f SUR/PT3.00 I HHP2-12-.657-SS f LINE¹ 2RCS-012-9-1 HTS: 30,32 JTEV/au / 1 [ na / I
| |
| | |
| NIAGARA MOHANK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 6 of 26 HMP2-ISI-006i REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPEHDIX G - RCS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ DESCRIPTIOH OF ITEM TO BE EXAMIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REMARKS I
| |
| EXAHINATION IDENTIFIER ITS ISO LOCATOR, COMPONENT DUG ¹, IITEM ¹ IFREOYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ i LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSJ EX3/HDE PROCEDURE iPERIOD 3 I PIPE/SE Q H28 A2060 RECIRC INLET IB-J I A I VOL/UT6.03 I 2RCS-64-00-FNA20 i QISO 64-00-3 or DNG¹ na in i89.11 KAID-0 i SUR/PT3.00 Sc9 NMP2-12-.657-SS i LINE¹ 2RCS-012-10-1 NTS: 30,32 JTEV/au i 1 )
| |
| na / I J
| |
| PIPE/SE Q N2A Az030 RECIRC INLET ig-J i A i VOL/UT6.03 I iGLBB-01 CAT.A COMMITMENT 2RCS-64-00-FNA21 i QISO 64-00-3 or DUG¹ na in i89.11 iID-E J SUR/PT3 F 00 I I NMP2-12-.657-SS i LINE¹ 2RCS-012-11-1 NTS: 30,32 iTEV/au i 1 i na / i Sc10 I i MOL/PIPE IB J i A i VOL/UT6.03 iThis was an original HMP2L-1263 GLBB-01 Cat.A comnitment, but was 2RCS-64-00-FNA24 (
| |
| QISO 64-00-1 or DUG¹ na in i89.31 [none i SUR/PT3.00 inever examined in the 1st Int in favor of another Cat.A Meld. <<There NMP2-24-1.002-SS LINE¹ 2RCS.024-1-1 HTS: 1,5 )HS i na /na ishaII be no branch outlet openings on Meld seam," 767E286.
| |
| SE/PIPE Q H1A Az000 RECIRC OUTLET [8-J i A i VOL/UT6.03 I iGL88-01 CAT.A COMMITMEHT 2RCS-64-00-FWB01 [ QISO 64-00-4 or DNG¹ na in i89.11 iID-0 i SUR/PT3.00 I I NMP2-24-1.002-SS i LIHE¹ 2RCS-024-18-1 NTS: 33 iTEV/au i 1 i na / Scil I I PIPE/PIPE IB- J i A ) VOL/UT6.03 2RCS-64-00-FNB02 i QISO 64-00-4 or DMG¹ na in i89.11 inone (
| |
| SUR/PT3.00 NMP2-24-1.002-SS I LINE¹ 2RCS-024-18-1 NTS: 33 IHS
| |
| )
| |
| ELB/<<MOV108 IB-J i A i VOL/UT6.03 I 2RCS-64-00-FMB03 i QISO 64-00-4 or DUG¹ na . in )89.11 IID I SUR/PT3.00 Sc9 NMP2-24-1 ~ 002-SS i LINE¹ 2RCS-024-18-1 NTS: 34,39 iHS/au 1 dna/ I i *MOV108/PIPE ig-J ) A i VOL/UT6.03 2RCS.64.00-FNB04 i QISO 64-00-4 or DUG¹ na in i89.11 inone J SUR/PT3.00 NMP2-24-1.002-SS J LINE¹ 2RCS-024-18-1 NTS: 33,39 iNS i na /na I ELB/*P18 IB-J I A I VOL/UT6.03 2RCS-64-00 FNB05 i QISO 64-00-4 or DUG¹ na in /89.11 inone i SUR/PT3.00 HMP2-24-1.234-SS LINE¹ 2RCS-024-18-1 NTS: 35,40 iHS 1 i na /na i <<PIB/PIPE IB-J i VOL/UT6.03 I 2RCS.64-00.FN06 ) QISO 64-00-5 or DNG¹ na in i89.11 IID I SUR/PT3.00 (Sc8 NMP2-24-1.317-SS I LINE¹ 2RCS 024 19 1 NTS'3 53 IHS/au I
| |
| | |
| NIAGARA NOHAMK POWER CORPORATION - HILE POINT NUCLEAR STATION - UNIT 2 7 of 26 HNP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REO I DESCRIPTION OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOD 1 RENARKS EXANINATIOH IDENTIFIER I ITS ISO LOCATOR, CONPONENT DWG ¹, IITEH ¹ IFREQYI EX2/HDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I PIPE/*HYV178 IB-J I A I VOL/UT6.03 2RCS-64-00-FWB07 QISO 64-00-5 or DMG¹ na in IB9.11 Inone I SUR/PT3.00 NHP2-24-1.317-SS LINE¹ 2RCS-024-19-1 HTS: 43,54 IHS I 1 I na /na I <<NYV178/PIPE IB-J I A I VOL/UT6.03 IThis was an original NHP2L-1263 GLBB-01 Cat.A conmitment, but was 2RCS-64-00-FWBDB I QISO 64-00-5 or DWG¹ na in I89.11 Inone I SUR/PT3.00 Inever examined in the 1st Interval in favor of another Cat.A weld NHP2-24-1.317-SS I LINE¹ 2RCS.024-19-1 NTS: 43,54 INS 1 I na /na Icoincidentally chosen pursuant to Cat B-J criteria.
| |
| I PIPE/<<NOV188 IB-J I A I VOL/UT6.03 2RCS-64-00-FWB09 I QISO 64-00-5 or DWG¹ na in I89.1'I Inone I SUR/PT3.00 NNP2-24-1.317-SS LINE¹ 2RCS-024-19-1 NTS: 43,55 INS I na /na I <<NOV188/ELB IB-J I A I VOL/UT6 03 I 2RCS-64-00-FWB10 I QISO 64-00-5 or DWG¹ na in I89.11 IID I SUR/PT ISc8>
| |
| NHP2-24-1.234-SS LINE¹ 2RCS-024-20-1 NTS: 46,55 r INS/au 1' na /na I I I PIPE/RED IB-J I A I VOL/UT6.03 2RCS-64-00-FWB11 I QISO 64-00-5 or DMG¹ na in IB9.11 Inone I SUR/PT3.00 NNP2-24-1 '34-SS I LINE¹ 2RCS-024-20-1 NTS: 44(52 IHS 1 I na /na I WOL/PIPE Q N2F Az210 RECIRC IHLET IB-J I A I VOL/UT6.03 IThis was an original HNP2L-1263 GLBB-01 Cat.A conmitment, but was 2RCS-64-00-FWB12 I QISO 64.00-6 or DMG¹ na . in IB9.11 Inone I SUR/PT3.00 Inever examined in the 1st Interval in favor of another Cat.A weld NNP2-12-.657-SS I LINE¹ 2RCS.012.25-1 HTS: 57(61 IHS 1 I na/na Icoincidentally chosen pursuant to Cat 8-J criteria.
| |
| I WOL/PIPE Q H2G Az240 RECIRC INLET IB-J I A I VOL/UT6.03 2RCS-64-00-FWB13 I QISO 64-00-6 or DIIG¹ na in IB9.11 Inone I SUR/PT3.00 NHP2-12-.657-SS LINE¹ 2RCS.012-26-1 NTS: 57,61 INS I na /na I RED/PIPE Q H2H A?270 RECIRC INLET IB-J I A I VOL/UT6.03 2RCS-64-00-FWB14 I QISO 64-00-6 or DWG¹ na in I89.11 Inone I SUR/PT3.00 NNP2-12-.657-SS I LINE¹ 2RCS-012-21-1 NTS: 60,61 INS 1 I na/na I SMPOL/PIPE Q N2J A?300 RECRC INLT IB-J I A I VOL/UT6.03 IDeselected during 2nd 10-Year Update revie~
| |
| 2RCS-64-00-FWB15 I QISO 64-00-6 or DMG¹ na in IB9.11 Inone I SUR/PT3.00 NNP2-12-.657-SS LINE¹ 2RCS-012-22-1 NTS: 56,61 INS 1 Ina/
| |
| | |
| NIAGARA HOHAMK POMER CORPORATIOH - NILE POINI'UCLEAR STATION - UNIT 2 8of 26 NHP2-1SI-006, REV. 1( CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED [ DESCRIPTION OF ITEN TO BE EXAHIHED)CATGRY (IGSCC) EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXANIHATIOH IDENTIFIER ) ITS ISO LOCATOR, COHPONEHT DMG ¹, ( ITEN ¹ [FREOY[ EX2/HDE PROCEDURE ]PERIOD 2 f USE CAL BLK ¹ I LINE HO AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I J
| |
| SMPOL/PIPE Q N2K Az330 RECRC INLT iB-J I A I VOL/UT6.03 )Deselected during 2nd 10-Year Update review 2RCS-64-00-FMB16 )
| |
| QISO 64-00-6 or DMG¹ na in (89.11 )none [ SUR/PT3.00 HHP2-12-.657-SS (
| |
| LINE¹ 2RCS-012-23-1 N'TS: 57,61 iNS 1 ]na/
| |
| I PIPE/SE Q H2F A2210 RECIRC INLET IB J I A I VOL/UT6.03 I 2RCS-64-00-FMB17 f QISO 64-00-6 or DMG¹ na in JB9.11 JIO-E / SUR/PT3.00 isc8 NHP2-12-.657-SS / LINE¹ 2RCS-012-25-1 NTS: 61,63 iTEV/au f 1 / na / I
| |
| [ PIPE/SE Q N2G Az240 RECIRC INLET IB-J I A I VOL/UT6.03 I I 2RCS-64-00-FMB18 (
| |
| QISO 64-00-6 or DMG¹ na in IB9.11 1ID-O I SUR/PT3.00 I I NHP2-12-.657-SS LINE¹ 2RCS-012-26-1 NTS: 61,63 /TEV/au / 1 / na / I Scil I I PIPE/SE Q N2H Az270 RECIRC INLET IB-J I A I VOL/UT6.03 I IGL88-01 CAT.A COHHITHENT 2RCS-64-00-FMB19 / QISO 64-00-6 or DUG¹ na in [89.11 )10-0 f SUR/PT3.00 Sc9 I NHP2-12-.657-SS (
| |
| LIHE¹ 2RCS-012-21-1 NTS: 61,63 )TEV/au ) 1 (
| |
| na / I I I PIPE/SE Q H2J Az300 RECIRC INLET IB-J I A I VOL/UT6.03 I 2RCS-64-00-FMB20 / QISO 64-00-6 or DMG¹ na in /B9.11 ]ID-0 [ SUR/PT3.00 Sc9 NHP2-12-.657-SS f LINE¹ 2RCS-012-22-1 NTS: 61,63 /TEV/au / 1 f na / I I PIPE/SE Q H2K Az330 RECIRC INLET IB J I A I VOL/UT6.03 I 2RCS-64-00-FMB21 ] QISO 64-00-6 or DUG¹ na .in )B9.11 IIO-E I SUR/PT3.00 I NHP2-12-.657-SS (
| |
| LINE¹ 2RCS-012-23-1 N'IS: 61,63 )TEV/au 1 /na/ i Sc10 i MOL/PIPE IB-J ] A . ] VOL/UT6.03 )"There shall be no branch outlet openings on veld seam," 767E286.
| |
| 2RCS-64-00-FMB24 / QISO 64-00-4 or DMG¹ na in )89.31 Inone I SUR/PT3.00 NHP2-24-1.002-SS I LINE¹ 2RCS-024-18-1 NTS: 33,36 IHS 1 J na /na i LM Q H1B assoc w/FMA01 8 SM40 iB-J (
| |
| na [
| |
| VOL/Ul'6.03 I (Do with FMA01 B SM040 2RCS-64-00-LM01 f QISO 64-00-1 or DMG¹ na in /89.12 IID-O I SUR/PT3.00 Sc9 I NHP2-24-1.002-SS I LINE¹ 2RCS.024-1-1 NTS: 1 IAL 1 (na/ I I
| |
| / LM Q H1B assoc w/SM40 only JB-J ( na J VOL/UT6.03 I [Do with SM40 2RCS-64-00-LM02A f QISO 64-00-1 or DMG¹ na in /B9.12 IID 0 I SUR/PT3.00 Sc9 I HHP2-24-1.002-SS I LINE¹ 2RCS-024-1-1 HI'S: 2 IAL / na/ I I
| |
| | |
| NIAGARA NOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 9 of 26 NNP2-IS1-006( REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL REO DESCRIPl'ION OF ITEN TO BE EXANINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 RENARKS
| |
| (
| |
| EXANIHATION IDENTIFIER (
| |
| ITS ISO LOCATOR, CONPOHENT DMG ¹, (ITEN ¹ (FREOY( EX2/HDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I
| |
| (
| |
| LM Q H18 assoc w/SM40 only IB-J (
| |
| na ( VOL/UT6.03 I (Do with SM40 2RCS-64-00-LW028 (
| |
| QISO 64-00-1 or DMG¹ na in (89.12 I I SUR/PT 00 Sc9 I NNP2-24-1.002-SS I LINE¹ 2RCS.024-1-1 NTS: 2 (na/ I I
| |
| (
| |
| LM IB-J (
| |
| na ( VOL/UT6.03 2RCS.64-00-LM03 (
| |
| QISO 64-00-1 or DMG¹ na in (89.12 (none (
| |
| SUR/PT3.00 NNP2-24-1.002-SS I LINE¹ 2RCS.024-1-1 NTS: 1 (NS I 1 (
| |
| na /na
| |
| ( LM assoc w/sw38 only IB-J (
| |
| na (
| |
| VOL/UT6.03 (Deselected during 2nd 10-Year update based on X's (as a result of the 2RCS.64-00-LM04 (
| |
| QISO 64-00-1 or DMG¹ na in (89.12 (none (
| |
| SUR/PT3.00 (deselection of sw38.)
| |
| HNP2-24-1.002-SS ( LINE¹ 2RCS.024-1-1 NTS: 1 (NS (na/
| |
| (
| |
| LM assoc w/sw36 & sw37 IB-J I na I VOL/UT6.03 2RCS-64-00-LM05 ( QISO 64-00-1 or DMG¹ na in (89.12 (none I SUR/PT3 00 NNP2-24-1.002.SS ( LINE¹ 2RCS.024-1-1 NTS: 1 (NS 1 (
| |
| na /na
| |
| (
| |
| LM assoc w/FMA03 only IB-J ( na ( VOL/UT6.03 I (Oo with FMA03 2RCS-64-00-LM06A (
| |
| QISO 64-00-1 or DWG¹ na in (89.12 (IO ( SUR/PT3.00 Sc9 I HNP2-24-1.002-SS I LINE 2RCS 024 1 1 NTS' (na/ I I
| |
| ( LM assoc w/FMA03 only IB-J (
| |
| na ( VOL/UT6.03 I (Do with FMA03 2RCS-64-00-LM068 (
| |
| QISO 64-00-1 or DWG¹ na . in (89.12 (ID (
| |
| SUR/PT3.00 Sc9 I HNP2-24-1.002-SS (
| |
| LINE¹ 2RCS-024-1-1 NTS: 2 (AL 1 (na/ I I
| |
| ( LM assoc w/SW35 only IB-J (
| |
| na ( VOL/UT6.03 Sc7 (Do with SM35 2RCS.64-00 LM07 (
| |
| QISO 64-00-1 or DMG¹ na in (89.12 IID I SUR/PT3.00 I I HNP2-24-1.002-SS ( LINE¹ 2RCS-024-1-1 HTS: I I LM assoc w/SM35 & FWA05 IB-J (
| |
| na (
| |
| VOL/UT6.03 sc7 (Do with SW35 & FMA05 2RCS 64-00-LWOBA (
| |
| QISO 64-00-1 or OMG¹ na in (89.12 IID I SUR/PT3.00 NNP2-24-1.002-SS I LINE¹ 2RCS-024-1-1 HTS: 3 (AL 1 (na/
| |
| LM assoc w/Q65 & FMA05 IB-J (
| |
| na (
| |
| VOL/UT6.03 Sc7 (Do with SW35 & FMA05 2RCS-64 LISSB (
| |
| QISO 64-00-1 or DWG¹ na in (89.12 (ID ( SUR/PT3.00 I I NNP2-24-1.002-SS I LINE¹ 2RCS 024 1 1 HTS' IAL I I
| |
| | |
| NIAGARA NOHAWK POMER CORPORATIOH - NILE POINT NUCLEAR STATION - UNIT 2 10 of 26 NNP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/'1999 APPEHDIX G - RCS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTION OF ITEN TO BE EXANIHEDICATGRY I IGSCCI EX'I/HDE PROCEDURE IPERIOO 1 REMARKS EXANINATIOH IDEHI'IFIER I ITS ISO LOCATOR'ONPOHEHT DMG ¹, I ITEN ¹ IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I LM assoc w/FMA06 only IB-J I na I VOL/UT6.03 I IDo with FMA06 2RCS-64-00-L'M10 I QISO 64-00-2 or DMG¹ na in I89.12 I ID I SUR/PT3.00 I I NNP2-24-1.317-SS LINE¹ 2RCS-024-2-1 NTS: 12 IAL Sc11 I I
| |
| I Lw assoc w/SM04 only IB-J I na I VOL/UT6.03 I IDo with SW04 2RCS-64-00-LWI1 I QISO 64-00-2 or DMG¹ na in I89.12 IID I SUR/PT3.00 I I HNP2-24-1.317-SS I LINE¹ 2RCS-024-2-1 NTS: 12 Ina/ Sc11 I I Lw assoc w/SM04 only IB-J I na I VOL/UT6.03 I IDo with SM04 2RCS-64-00-LM12A I QISO 64-00-2 or DMG¹ na in I89.12 IID I SUR/PT3.00 I I NNP2-24-1.317-SS I LINE¹ 2RCS-024-2-1 HTS: 14 IAL I na/ Sc11 I LM assoc w/SM04 only IB-J I na I VOL/UT6.03 I IDo with SM04 2RCS-64-00.L'M128 QISO 64-00-2 or DWG¹ na in I89.12 IID I SUR/PT3.00 I I NNP2-24-1.317-SS LINE¹ 2RCS-024-2-1 NTS: 14 IAL I na/ Sc11 I I Lw IB-J I na I VOL/UT6.03 2RCS-64-00-LM13 I QISO 64-00-2 or DMG¹ na in I89.12 Inone I SUR/PT3.00 NNP2-24-1.317-SS LINE¹ 2RCS-024-2-1 NTS: 12 INS 1 I na /na I Lw assoc w/FMA10 only IB-J I na I VOL/UT6.03 I IDo with FMA10 2RCS-64-00.LM14A I QISO 64-00-2 or DMG¹ na .in I89.12 IID I SUR/PT3.00 I I HNP2-24-1.234-SS I LIHE¹ 2RCS-024-3-1 NTS: 15 IAL I na /na I Sc11 I I Lw assoc w/FMA10 only IB-J I na I VOL/UT6.03 I IDo with FMA10 2RCS-64 LM148 I QISO 64-00-2 or DMG¹ na in I89.'12 IID I SUR/PT3.00 I I NNP2-24-1.234-SS LIHE¹ 2RCS-024-3-1 HTS: 15 IAL Sc11 I
| |
| j I Lw IB-J I na I VOL/UT6.03 2RCS-64-00.LM15 I QISO 64-00-2 or DMG¹ na in I89.12 Inone I SUR/PT3.00 NNP2-24-1.234-SS I LINE¹ 2RCS-024-3-1 NTS: 13 INS 1 I na /na I
| |
| LW Q H2C At090 RECIRC INLET IB J I na I VOL/UT6.03 2RCS-64-00-LM16 I QISO 64-00-3 or DMG¹ na - in IB9.12 Inone I SUR/PT3.00 HNP2-12-.657-SS I LINE¹ 2RCS-012-9-1 HTS: 30 INS I na /na
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 11 of 26 KMP2-ISI-006, REV. 1, CH-000 SECOHD TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL RED i DESCRIPTION OF ITEM TO BE EXAMIHEDiCATGRY iIGSCCi EX1/NDE PROCEDURE (PERIOD 1 REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG ¹, LITEM ¹ iFREQYi EX2/HDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ i LIKE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSJ EX3/HDE PROCEDURE iPERIOO 3 (
| |
| / LM Q H2C Az090 RECIRC INLET IB-J f na f VOL/UT6.03 2RCS.64-00-LW17A i QISO 64-00-3 or DWG¹ na in /89.12 inone [ SUR/PT3.00 NMP2-12-.657-SS I LINE¹ 2RCS-012-9-1 NTS: 31 IHS 1
| |
| / na /na LW Q N2C Az090 RECIRC INLET IB-J (
| |
| na i VOL/UT6.03 2RCS-64-00 LW178 QISO 64-00-3 or DMG¹ na in i89.12 /none i SUR/PT3 F 00 HMP2-12-.657-SS LINE¹ 2RCS-012-9-1 NTS: 31 INS i na /na
| |
| (
| |
| LM Q N2C Az090 assoc K/FMA19 only iB-J I na I VOL/UT6.03 IEX6 /Do with FMA19 2RCS.64-00-LW18 i QISO 64-00-3 or D'WG¹ na in i89.12 IID E I SUR/PT3.00 I I HMP2-12-.657-SS I LIHE¹ 2RCS-012-9-1 HTS: 30 IAL 1 dna/ I I L'M IB-J J na / VOL/UT6.03 I 2RCS-64-00.LW19 QISO 64-00-3 or DWG¹ na in i89.12 inone J SUR/PT3.00 I NMP2-16-.822-SS LINE¹ 2RCS-016-6-1 NTS: 25 IHS 1 f na /na I j LM IB-J ) na i VOL/UT6.03 2RCS-64-00-LM20 i QISO 64-00-3 or DMG¹ na in 189.12 inone [ SUR/PT3.00 NMP2-16-.822-SS I LINE¹ 2RCS-016-5-1 NTS: 25 IHS I 1 I na /na I LW Q H2A Az030 RECIRC INLET IB J i na i VOL/UT6.03 2RCS.64-00-LW21 i QISO 64-00-3 or DMG¹ na .in i89.12 inone i SUR/PT3.00 NMP2-12-.657.SS I LINE¹ 2RCS-012-11-1 NTS: 30 INS 1 i na /na LW Q K2A Az030 RECIRC INLET IB-J I na I VOL/UT6.03 2RCS.64-00-LIQ2A i QISO 64-00-3 or DWG¹ na in )89.12 /none i SUR/PT3.00 NMP2-12-.657-SS I LINE¹ 2RCS-012-11-1 NTS: 31 IHS 1 i na /na
| |
| / LM Q H2A Az030 RECIRC INLET IB-J I na I VOL/UT6 03 2RCS-64-00-LW228 [ QISO 64-00-3 or DWG¹ na in i89.12 Inone I SUR/PT3.00 HMP2-12-.657-SS I LINE¹ 2RCS-012-11-1 NTS: 31 INS i na /na LM Q N2A Az030 assoc v/FMA21 only iB-J i na i VOL/UT6.03 I iDo Kith FMA21 2RCS.64-00.LIQ3 QISO 64-00-3 or DWG¹ na in i89.12 IID E I SUR/PT3.00 I I NMP2-12-.657-SS LINE¹ 2RCS.012-11-1 NTS: 30 IAL 1 dna/ )
| |
| Sc10 I
| |
| | |
| NIAGARA NOHAMK POWER CORPORATION - NILE POIHl'UCLEAR STATION - UNIT 2 12 of 26 HNP2-ISI-006( REV. 1, CN-000 SECOND TEN YEAR IHSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/28/1999 APPEHDIX G - RCS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXANIHEDICATGRY I IGSCCI EX1/NDE PROCEDURE iPERIDO 1 REHARKS EXANIHATIOH IDENTIFIER I ITS ISO LOCATOR'ONPONENT DMG ¹i IITEN ¹ IFREOYI EX2/NDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ I LINE HO. AHD HOlES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I LW Q H28 Az060 RECIRC IHLET iB-J I na I VOL/UT6.03 2RCS-64-00.LM24 i QISO 64-00-3 or O'MG¹ na in /89.12 inone i SUR/PT3.00 HNP2-12-.657-SS I LINE¹ 2RCS.012-10-1 HTS: 30 INS J na /na LM Q N28 Az060 RECIRC INLET IB-J j na i VOL/UT6.03 2RCS-64-00-LM25A QISO 64-00-3 or DMG¹ na in L89.12 inone i SUR/PT3.00 HNP2-12-.657-SS LINE¹ 2RCS-012-10-1 NTS: 31 INS 1 i na /na LM Q H28 Az060 RECIRC INLET iB-J na i VOL/UT6.03 2RCS-64-00.LM258 i QISO 64-00-3 or DMG¹ na in i89.12 inone i SUR/PT3.00 NNP2-12-.657-SS i LINE¹ 2RCS-012-10-1 HTS: 31 iNS i na /na i LM Q N28 Az060 assoc w/FMA20 only /8-J i na i VOL/UT6.03 I iDo with FMA20 2RCS-64-00-LM26 i QISO 64.00-3 or DMG¹ na in i89.12 IID-O I SUR/PT3.00 Sc9 j HNP2-12-.657-SS I LINE¹ 2RCS-012-10-1 HTS: 30 IAL 1 dna/ I I i LM Q H2D Az120 assoc w/fwA13 only iB-J I na I VOL/UT6.03 iDeseiected during 2nd 10-Year update based on X's (as a result of the 2RCS-64-00-LW27 i QISO 64-00-3 or DMG¹ na in [89.12 inone i SUR/PT3.00 ideseiection of fwA13.)
| |
| HNP2-12-.657-SS i LINE¹ 2RCS-012-8-1 NTS: 30 iNS J na/
| |
| i LM Q N20 Az120 assoc w/fwA32 only iB-J )
| |
| na i VOL/UT6.03 iDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64 LM28A i QISO 64-00-3 or DMG¹ na .in l89.12 jnone i SUR/PT3.00 )deselection of fwA32.)
| |
| NNP2-12-.657-Ss I LINE¹ 2RCS-012-8-1 HTS: 31 INS I i LW Q N20 Az120 assoc w/fwA32 only iB-J I na I VOL/UT6.03 iOeseiected during 2nd 10.Year update based on X's (as a result of the 2RCS-64-00-LM288 i QISO 64-00-3 or DMG¹ na in i89.12 inone i SUR/PT3.00 ideseiection of fwA32.)
| |
| HNP2-12-.657-SS i LINE¹ 2RCS-012-8-1 HTS: 31 iNS 1 /na/ I i LM Q H20 Az120 assoc w/FMA18&SM32 iB-J I na I VOL/UT6.03 sc7 iDo with FWA18 2RCS-64-00-LM29 i QISO 64-00-3 or DMG¹ na in i89.12 IID-0 I SUR/PT3.00 NNP2-12-.657-SS I LINE¹ 2RCS-012-8-1 NTS: 30 IAL 1 dna/
| |
| J LM Q H2E Az150 assoc w/fwA12&sw33 LB-J i na i VOL/UT6.03 iDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS.64-00 LW30 i QISO 64-00-3 or DUG¹ na in )89. 12 Inone I SUR/PT3.00 ideselection of fwA12 & sw33.)
| |
| NNP2-12-.657-SS LIHE¹ 2RCS-012-7-1 HTS: 30 iNS dna/
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 13 of 26 NMP2-ISI-006( REV. 1, CM-000 SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/'l999 APPENDIX G - RCS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL RED I DESCRIPTIOH OF ITEM TO BE EXANIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 I RENARKS EXANIHATIOH IDEHI'IFIER i ITS ISO LOCATOR, COMPONENT DMG ¹, LITEM ¹ (FREOYi EX2/HDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ I LIHE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I
| |
| L'M Q N2E Azl50 assoc w/sw34&sw33 ig-J J na i VOL/UT6.03 iDeseiected during 2nd 10-Year update based on X(s (as a result, of the 2RCS-64-00.LIG1A QISO 64-00-3 or DMG¹ na in i 89.12 )none i SUR/PT3.00 ideselection of sw34 & sw33.)
| |
| LINE¹ 2RCS-012-7-1 NTS: 31 [HS 1 dna/ I'NP2-12-.657-SS i LM Q N2E Az150 assoc w/sw3C&sw33, IB-J i na i VOL/UT6.03 [Deselected during 2nd 10-Year update based on X(s (as a result of the 2RCS-64-00 LIG1B )
| |
| QISO 64-00-3 or DUG¹ na in F89.12 Inone I UR/PT3 00 ideseiection of sw34 & sw33.)
| |
| NMP2-12-.657.SS I LIHE¹ 2RCS-012-7-1 HTS: 31 JHS 1 dna/
| |
| i LM Q H2E Az150 assoc w/FMA17&sw34 /8-J i na i VOL/U'T6.03 IEX6 iDo with FMA17 & SM34 2RCS-64-00.LIG2 i QISO 64-00-3 or DMG¹ na in i89.12 IID-E I SUR/PT3.00 I I HMP2-12-.657-SS LINE¹ 2RCS-012-7-1 HTS: 30 iAL 1 dna/ I I LM Q H1A assoc w/SM70 & FMB01 IB-J i na i VOL/UT6.03 I iDo with SM70 & FMB01 2RCS-64.00-LIG3 QISO 64-00-4 or DMG¹ na in IB9.12 IID-0 I SUR/PT3.00 I I NMP2-24-1.002-SS LIHE¹ 2RCS-024-18-1 HTS: 33,42 IAL 1 dna/ Sc11 I i LM Q N1A assoc w/SM70 only ig-J J na i VOL/UT6.03 I iDo with SM70 2RCS-64.00-LIG4A i QISO 64-00-4 or DMG¹ na in i89.12 IID-O I SUR/PT3.00 I I HMP2-24-1.002-SS I LINE¹ 2RCS-024-18-1 NTS: 34 IAL 1 dna/ Sc11 i LM Q N1A assoc w/SM70 only iB-J i na i VOL/UT6.03 I iDo with SM70 2RCS-64-00-LIG4B t QISO 64-00-4 or DMG¹ na .in i89.12 IID-O I SUR/PT3.00 I I NMP2-24-1.002-SS i LIHE¹ 2RCS-02C-18-1 HTS: 34 iAL Sc11 I J
| |
| LM IB J i na. i VOL/UT6.03 I 2RCS-64-00-LM35 i QISO 64-00-4 or DMG¹ na in i89.12 Inone I SUR/PT3.00 I HMP2-24-1.002-SS I LINE¹ 2RCS-024-18-1 HTS: 33 INS i na /na I i LM iB-J I na I VOL/UT6.03 I 2RCS.64-00-LM36 i QISO 64-00-4 or DMG¹ na in IB9.12 inone i SUR/PT3.00 I NMP2-24-1.002-SS I LINE¹ 2RCS 18 1 HTS'3 iHS 1 ( na /na I.
| |
| i LM assoc w/FMB03 only IB-J ) na i VOL/UT6.03 I iDo with FMB03 2RCS-64-00-LIG7A i QISO 64-00-4 or DMG¹ na in /89.12 IID I SUR/PT3.00 Sc9 I HMP2-24-1.002-SS I LINE¹ 2RCS-024-18-1 NTS: 34 IAL dna/ I I
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - N IIILE POINT NUCLEAR STATION - UNIT 2 14 of 26 NHP2- ISI-006, REV. 1 ~ CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 REHARKS EXAHIHATIOH IDEHTIFIER I ITS ISO LOCATOR, COHPOHENT DMG ¹, I ITEN ¹ IFREOYI EX2/HDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ I LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I LM assoc w/FMB03 only IB-J I na I VOL/UT6.03 I IDo with FMB03 2RCS-64-00-LM378 I QISO 64-00-4 or DMG¹ na in IB9.12 IID I SUR/PT3.00 sc9 I HHP2-24-1.002-SS I LINE¹ 2RCS-024-18-1 HTS: 34 IAL 1 Ina/ I I I LM assoc w/SM67 only IB-J I na I VOL/UT6.03 I IDo with SM67 2RCS-64-00-LM38 I QISO 64-00-4 or DWG¹ na in IB9.12 I ID I SUR/PT3.00 I Sc9 I HHP2-24-1.002-SS I LINE¹ 2RCS 024 18 1 NT 33 1 Ina/ I I I LM assoc w/SW67 only IB-J I na I VOL/U'I6.03 I IDo with SM67 2RCS-64-00-LM39A I QISO 64-00-4 or DMG¹ na in IB9.12 IID I SUR/PT3.00 Sc9 I NHP2-24-1.234-SS I LINE¹ 2RCS.024-18-1 HTS: 35 IAL 1 I na /na I I I LW assoc w/SW67 only. IB-J I na I VOL/UT6.03 I IDo with SW67 2RCS-64-00-LW39B I QISO 64-00-4 or DWG¹ na in IB9.12 IID I SUR/PT3.00 sc9 I HNP2-24-1.234-SS I LIHE¹ 2RCS-024-18-1 N'IS: 35 IAL 1 I na /na I I I LM assoc w/FWB06 only IB-J I na I VOL/UT6.03 I IDo with FMB06 2RCS-64-00-LM41 I QISO 64-00-5 or DMG¹ na in IB9.12 IID I SUR/PT3.00 ISc8 I HHP2-24-1.317-SS I LINE¹ 2RCS-024-19-1 NTS: 43 IAL I 1 I na/ I I I LM IB-J I na I VOL/UT6.03 2RCS-64-00-LM42 I QISO 64-00-5 or DMG¹ na . in IB9.12 Inone I SUR/PT3.00 NHP2-24-1.317-SS I LINE¹ 2RCS-024-19-1 NTS. 43 IHS 1 I na /na I LM assoc w/sw45 only IB-J I na I VOL/UT6.03 IDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64-00-LM43A I QISO 64-00-5 or DMG¹ na in IB9.12 Inone I SUR/PT3.00 Ideselection of sw45.)
| |
| NHP2-24-1.317-SS I LINE¹ 2RCS-024-19-1 HTS: 45 IHs I LM assoc w/sw45 only IB-J I na I VOL/UT6.03 IDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64-00-LW43B I QISO 64-00-5 or D'MG¹ na in IB9.12 Inone I SUR/PT3.00 Ideselection of sw45 ~ )
| |
| NHP2-24-1.317-SS I LINE¹ 2RCS-024-19-1 HTS: 45 INs 1 Ina/
| |
| LM assoc w/sw45 only IB-J I na I VOL/UT6.03 IDeselected during 2nd 10-Year update based on Xis (as a result of the 2RCS-64-00-LM44 I QISO 64-00-5 or DMG¹ na in IB9.12 Inone I SUR/PT3.00 ldeselection of sw45 ~ )
| |
| NHP2-24-1.317-SS I LINE¹ 2RCS-024-19-1 NTS: 43 INS 1 Ina/
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 15 of 26 NHP2-ISI-006t REV- 1) CH-000 SECOND TEN YEAR INSERVICE IHSPECTION (ISI) IHTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEH (sorted by Examination Identifier)
| |
| HD INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 REHARKS EXAHIHATIOH IDENTIFIER i ITS ISO LOCATOR, CDHPOHEHT DMG ¹, i ITEH ¹ )FREOYi EX2/NDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ I LINE HO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I i LM assoc w/FMB10 only IB J J na J VOL/UT6.03 I iDo with FMB10 2RCS-64-00-LM45A i QISO 64-00-5 or DMG¹ na in i89.12 ]ID / SUR/PT3.00 Jsc8 I NHP2-24-1.234-SS I LINE¹ 2RCS-024-20-1 NTS: 46 IAL 1 i na /na I I i I.M assoc w/FMB10 only )8-J i na i VOL/UT6.03 I iDo with FM810 2RCS 64-00-LM458 (
| |
| QISO 64-00-5 or DMG¹ na in i89.12 iID i SUR/PT3.00 isc8 I NHP2-24-1.234-SS I LINE¹ 2RCS-024-20-1 NTS: 46 IAL 1 I na /na I I i LM IB J i na i VOL/UT6.03 2RCS.64-00-LM46 i QISO 64-00-5 or DMG¹ na in i89.12 inone J SUR/PT3.00 NHP2-24-1.234-SS i LINE¹ 2RCS 024-20-1 HTS: 44 /HS J na /na I
| |
| L'W Q N2H Az270 RECIRC INLET IB-J i na i VOL/UT6.03 I 2RCS-64-00-LM47 ) QISO 64-00-6 or DMG¹ na in i89.12 Inone I SUR/PT3.00 I HHP2-12-.657-SS i LINE¹ 2RCS.012-21-1 HTS: 61 iHS I I
| |
| L'W Q N2H A2270 RECIRC INLET IB-J I na I VOL/UT6.03 2RCS-64-00-L'M48A [ QISO 64-00-6 or DMG¹ na in i89.12 ]none i SUR/PT3.00 NHP2-12-.657-SS I LINE¹ 2RCS.012-21-1 NTS: 62 IHS 1 i na /na LM Q H2H Az270 RECIRC INLET iB-J i na i VOL/UT6.03 2RCS.64-00-LM488 i QISO 64-00-6 or DWG¹ na . in i89.12 Inone I SUR/PT3.00 HHP2-12-.657-SS I LINE¹ 2RCS.012-21-1 HTS: 62 INS i na /na i LM Q H2H Az270 assoc w/FM819 only iB-J / na i VOL/Ul'6.03 I iDo with FMB19 2RCS.64-00-LM49 i QISO 64-00-6 or DMG¹ na in i89.12 ilO.O i SUR/PT3.00 Sc9 I NHP2-12-.657-SS (
| |
| LINE¹ 2RCS-012-21-1 NTS: 61 iAL dna/ I I J
| |
| LW assoc w/SM59 IB-J I na I VOL/UT6.03 I [Do with SM59 2RCS.64-00-LM50 i QISO 64-00-6 or DWG¹ na in /89.12 IID I SUR/PT3.00 Sc9 I HHP2-16..822-SS I LINE¹ 2RCS-016-24-1 NTS: 56 IAL 1 dna/ I I
| |
| ) LM Q N2K Az330 assoc w/sw63&fw816 iB-J I na I VOL/UT6.03 iDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64-00-LM51 )
| |
| QISO 64-00-6 or DMG¹ na in i89.12 )none ) SUR/PT3.00 ideseiection of sw63 & fw816.)
| |
| HHP2-12-.657-SS I LINE¹ 2RCS-012-23-1 HTS: 61 IHS I 1 I na/ I
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - H E NILE POINT NUCLEAR STATION - UNIT 2 16 of 26 NHP2-1S1.006, REV. 1, CH-000 SECOHD TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ i DESCRIPTIOH OF ITEN TO BE EXAHIHEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOO 1 RENARKS EXAHIHATIOH IDENTIFIER i ITS ISO LOCATOR, CONPONENT DMG ¹, i ITEH ¹ iFREQYL EX2/NDE PROCEDURE )PERIOD 2 i USE CAL BLK ¹ I LINE HO AHD NOTESi AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I i LM Q H2K Az330 assoc w/sw64&sw63 iB-J I na I VOL/UT6.03 iOeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64 LI52A i QISO 64-00-6 or DMG¹ na in i89.12 inone i SUR/PT3 F 00 ideselection of sw63 8 sw64.)
| |
| NNP2-12-.657-SS LINE¹ 2RCS-012-23-1 NTS: 62 iHS 1 dna/ I LM Q H2K Az330 assoc w/sw64&sw63 iB-J I na I VOL/UT6.03 iDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64-00-LI528 i QISO 64-00-6 or DUG¹ na in i89.12 /none i SUR/PT3.00 ideselection of sw63 8 sw64.)
| |
| HHP2-12-.657-SS / LINE¹ 2RCS-012-?3-1 HTS: 62 iHS 1 dna/ I i LM Q H2K Az330 assoc w/FM821&sw64 LB-J i na i VOL/UT6.03 I iDo with FM821 & SM64 2RCS-64-00.LM53 / QISO 64-00-6 or DMG¹ na in (89.12 IID E I SUR/PT3.00 I I NHP2-12-.657-SS I LINE¹ 2RCS-012-23-1 NTS: 61 IAL 1 dna/ / Sc10 I i LM Q N2J Az300 assoc w/fw815&sw93 iB-J I na I VOL/UT6.03 iDeselected during 2nd 10.Year update based on X's (as a result of the 2RCS-64-00-LM54 L QISO 64-00-6 or DMG¹ na in i89.12 [none i SUR/PT3.00 )deselection of fw815.)
| |
| NHP2-12-.657-SS i LIHE¹ 2RCS-012-22-1 NTS: 61 iNS dna/
| |
| i LM Q N2J Az300 assoc w/sw938sw94 (8-J i na )
| |
| VOL/UT6.03 2RCS-64-00-LI55A i QISO 64-00-6 or DMG¹ na in (89.12 inone i SUR/PT3.00 NHP2-12-.657-SS i LINE¹ 2RCS-012-22-1 HTS: 62 iHS 1 / na /na
| |
| / LM Q H2J Az300 assoc w/sw93&sw94 JB-J i na i VOL/UT6.03 2RCS-64-00-LM558 i QISO 64-00-6 or DMG¹ na . in /89.12 inone i SUR/PT3.00 HHP2-12-.657-SS I LINE¹ 2RCS-012-22-1 HTS: 62 INS 1 i na /na
| |
| / LM Q H2J Az300 assoc w/FMB20 only [8-J i na i VOL/UT6.03 I iDo with FM820 2RCS-64-00-LI56 i QISO 64-00-6 or DMG¹ na in i89.12 IID-O I SUR/PT3.00 Sc9 I NNP2-12-.657-SS I LINE¹ 2RCS.012-22-1 HTS: 61 IAL dna/ I I I LM Q H2G Az240 RECIRC INLET IB-J I na I VOL/UT6.03 2RCS-64-00-LM57 i QISO 64-00-6 or DUG¹ na in i89.12 Inone I SUR/PT3.00 NHP2-12-.657-SS I LIHE¹ 2RCS 012 26 1 NTS'1 IHS 1 i na/na I LM Q H2G A2240 RECIRC INLET IB-J i na i VOL/UT6.03 2RCS-64-00-LI58A i QISO 64-00-6 or DMG¹ na in 189.12 inone i SUR/PT3.00 HHP2-12-.657-SS i LINE¹ 2RCS-012-26-1 NTS: 62 IHS 1 / na /na
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - N MILE POINT NUCLEAR S'IATION - UNIT 2 17 of 26 HMP2 IS I 006'EV 1 i CH 000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) IHTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEM (sorted by Examination Identifier)
| |
| EX1/NDE PROCEDURE iPERIOO REMARKS 2HD INTVL REL REO i DESCRIPTIOH OF ITEM TO BE EXAMINEDiCATGRY iIGSCCi 1
| |
| EXAMINATIOH IDENTIFIER i ITS ISO LOCATOR, COMPOHENT DMG ¹, LITEM ¹ iFREOYi EX2/HDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ i LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I i LM Q H2G Az240 RECIRC INLET iB-J )
| |
| na ) VOL/UT6.03 2RCS 64-00-LM588 i QISO 64-00-6 or DMG¹ na in [89.12 inone i SUR/PT3.00 HMP2- 12-.657-SS i LINE¹ 2RCS.012-26-1 NTS: 62 INS 1 i na /na i LM Q H2G Az240 assoc w/FM818 only IB-J I na I VOL/UT6.03 I )Do with FM818 2RCS-64-00.LM59 i QISO 64-00-6 or DWG¹ na in I89.12 !ID-O I SUR/PT3.00 I I NMP2-12-.657-SS i LIHE¹ 2RCS.012-26-1 HTS: 61 lAL 1 /na/ Sc11 I I LM Q N2F A2210 RECIRC INLET IB-J i na i VOL/UT6.03 2RCS-64-00 LM60 i QISO 64-00-6 or DMG¹ na in IB9.12 inone J SUR/PT3.00 HMP2-12-.657-SS I LINE¹ 2RCS.012-25-1 NTS: 61 iHS 1 [ na /na LM Q H2F Az210 RECIRC INLET iB-J i na i VOL/UT6.03 2RCS-64-00-LM61A QISO 64-00-6 or DWG¹ na in (89.12 inone i SUR/PT3.00 HMP2-12..657-SS LINE¹ 2RCS-012-25-1 NTS: 62 I Hs 1
| |
| )
| |
| na /na I LW Q H2F Az210 RECIRC INLET IB-J [ na i VOL/UT6.03 2RCS-64-00-LW618 i QISO 64-00-6 or DUG¹ na in i89.12 inone i SUR/PT3.00 HMP2-12-.657-SS I LINE¹ 2RCS-012-25-1 NTS: 62 IHS i na /na I LM Q N2F A2210 RECIRC INLET iB-J ) na i VOL/UT6.03 I 2RCS-64-00-LM62 i QISO 64-00-6 or DMG¹ na .in i89.12 LID.E i SUR/PT3.00 igc8 NMP2-12-.657-SS I LINE¹ 2RCS.012-25-1 NTS: 61 iAL i 1 i na / I i LM IB-J i na i VOL/UT6.03 2RCS-64.00-LM63 i QISO 64-00-6 or DMG¹ na in i89.12 Inone i SUR/PT3.00 HMP2.16-.822-SS i LIHE¹ 2RCS.016-27-1 NTS: 56 )Ns i PIPE/WOL IB J I A I VOL/UT6.03 i "There shall be no branch outlet openings on weld seam," 767E286.
| |
| 2RCS-64-00-SM01 i QISO 64-00-2 or DMG¹ na in I89.31 inone i SUR/PT3.00 HMP2-24-1.317-SS I LIHE¹ 2RCS.024-2-1 HTS: 12,18 iNS 1 i na /na I WOL/PIPE IB-J I A I VOL/UT6.03 2RCS-64-00-SW02 J QISO 64-00-2 or DUG¹ na in i89.11 [none i SUR/PT3.00 HMP2-4-.337-SS182 LIHE¹ 2RCS-004-1'12-1 HTS: 17, 18 iHS 1 i na /na
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - MILE POIHZ NUCLEAR STATIOH - UNIT 2 18 of 26 HHP2-ISI-006( REV. 1( CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEH (sorted by Examination Identifier) 2ND IHZVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 REMARKS EXAHIHATION IDENTIFIER I ITS ISO LOCATOR, COMPONENT DMG ¹, I ITEM ¹ IFREOYI EX2/HDE PROCEDURE IPERIDO 2 I USE CAL BLK ¹ I LINE NO AHD NOTES( AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I PIPE/FLG IB-J I VOL/UZ6.03 2RCS-64-00. SM03 I QISO 64-00-2 or DMG¹ na in IB9.11 Inone I SUR/PT3.00 NHP2-4-.337-SS182 I LINE¹ 2RCS-004-112-1 NTS: 17,19 INS 1 I na /na I PIPE/ELB IB-J I A I VOL/UT6.03 I I 2RCS-64-00-SM04 I QISO 64-00-2 or DMG¹ na in I89.11 II I SUR/PT3 00 I I NHP2-24-1.317-SS LINE¹ 2RCS.024-2-1 NZS: 12,14 IHS/au Ina/ Sc11 I I ELB/PIPE IB-J I A I VOL/UI'6.03 2RCS.64-00.Sl$ 5 I QISO 64-00-2 or DMG¹ na in I89.11 Inone I SUR/PT3.00 NHP2-24-1.317.SS I LINE¹ 2RCS-024-2-1 NTS: 12, 14 IHS 1 I na /na I'LB/PIPE IB-J I A I VOL/UZ6.03 I 2RCS.64-00-SM06 I QISO 64-00-2 or DMG¹ na in IB9.11 Inone I SUR/PT3.00 I NHP2.24-1.234-SS LIHE¹ 2RCS.024-3-1 NTS: 13,15 INS I na /na I P IPE/MOL IB-J I A I VOL/UT6.03 I I"There shall be no branch outlet openings on weld seam," 767E286.
| |
| 2RCS-64.00-SM07 QISO 64-00-2 or DMG¹ na in IB9.31 IID I SUR/PT3.00 I I NHP2-24-1.234-SS LINE¹ 2RCS-024-3-'I HTS: 13(16 IHS/au 1 I na /na Sc11 I IHTEG ATT IB-K I na I SUR/PT3.00/HT4 F 00 I 2RCS-64-00.SI$ 8 I QISO 64-00-2 or DMG¹ na . in I810.20 IID I na /na I LINE¹ 2RCS-024-3-1 NTS: 20 INS I 1 I na /na I I INTEG ATT IB-K I na I SUR/PT3.00/MT4.00 I 2RCS-64-00-SM09 I QISO 64-00-2 or DMG¹ na in IB10.20 IID I na /na I I LINE¹ 2RCS-024-3-1 NTS: 20 INS I 1 I na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2RCS.64-00.SM10 I QISO 64-00-2 or DMG¹ na in IB10.20 IID I na /na I LINE¹ 2RCS-024-3.1 HTS: 20 INS 1 na /na ATZ'B-K I I I I I INTEG I na I SUR/PT3.00/HT4.00 I 2RCS-64.00-SM11 I QISO 64-00-2 or DMG¹ na in I810.20 IID I na /na I I LINE¹ 2RCS-024-3-1 NTS: 20 INS I na /na I
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - MILE POIN'I HUCLEAR STATION - UNIT 2 19 of 26 NHP2-ISI-006( REV. 1I CN-000 SECOND TEN YEAR INSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REO (
| |
| DESCRIPTION OF ITEM TO BE EXAMINED(CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1
| |
| (
| |
| REMARKS EXAHIHATION IDENTIFIER (
| |
| ITS ISO LOCATOR, COMPONENT DMG ¹, (ITEH ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ (
| |
| LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 (
| |
| I RED/RED (8-J- (
| |
| A ( VOL/UT6.03 (Deselected during 2nd 10-Year update based on )('s.
| |
| 2RCS.64-00-SW12 (
| |
| QISO 64-00-3 or DWG¹ na in (89.11 (none (
| |
| SUR/PT3.00 NHP2-24-1.234-SS I LINE¹ 2RCS-024-3-1 NTS: 28,29 IHS 1 (
| |
| na /na I PIPE/ELB Q N2C A2090 RECIRC INLET IB J ( A (
| |
| VOL/UT6.03 2RCS-64-00-SW13 (
| |
| QISO 64-00-3 or DMG¹ na in (89.11 (none (
| |
| SUR/PT3.00 HHP2-12-.657-SS I LIHE¹ 2RCS.012.9-1 NTS: 30,31 INS 1 (
| |
| na /na I ELB/PIPE Q N2C A2090 RECIRC INLET IB.J (
| |
| A (
| |
| VOL/UT6.03 2RCS.64-00-SW14 (
| |
| QISO 64-00-3 or DWG¹ na in (89.11 (none (
| |
| SUR/PT3.00 NMP2-12-.657-SS I LINE¹ 2RCS-012-9-1 HTS: 30,31 INS (
| |
| na /na I RED/PIPE IB-J I A I VOL/UT6.03 2RCS-64-00-SM15 (
| |
| QISO 64-00-3 or DWG¹ na in (89.11 (none (
| |
| SUR/PT3.00 NHP2-16-.822-SS I LIHE¹ 2RCS-016.6-1 HTS 25,28 INS 1 ( na /na I PIPE/WOL IB-J ( A (
| |
| VOL/UT6.03 (aThere shall be no branch outlet openings on weld seem,<< 767E286.
| |
| 2RCS-64-00-SW16 (
| |
| QISO 64-00-3 or DWG¹ na in (89.31 (none (
| |
| SUR/PT3.00 NMP2-16-.822.SS I LINE¹ 2RCS-016-6-1 HTS: 25,26 INS 1 ( na /na PIPE/WOL IB-J I A I VOL/UT6.03 (This was an original NHP2L-1263 GLBB-01 Cat.A coamitment, but was 2RCS-64-00-SW17 (
| |
| QISO 64-00-3 or DMG¹ na .in (89.31 (none (
| |
| SUR/PT3 F 00 (never examined in the 1st Int in favor of another Cat.A weld. "There NMP2-16-.822-SS LINE¹ 2RCS-016-6-1 NTS: 25,26 (NS (
| |
| na /na (shall be no branch outlet openings on weld seam,w 767E286.
| |
| I PIPE/ELB Q N28 A?060 RECIRC IHLET IB-J I A I VOL/UT6.03 2RCS-64-00. SM18 (
| |
| QISO 64-00-3 or DWG¹ na in (89.11 (none (
| |
| SUR/PT3.00 NHP2-12-.657-SS I LINE¹ 2RCS 012 1 1 NTS'0 31 INS (
| |
| na /na I ELB/PIPE Q H 8 A 06 RECIRC INLET IB J I A I VOL/UT6.03 2RCS-64-00-SM19 (
| |
| QISO 64-00-3 or DWG¹ na in (89.11 (none I SUR/PT3.00 NMP2-12-.657-SS I LINE¹ 2RCS-012-10-1 HTS: 30,31 INS 1 (
| |
| na /na I PIPE/ELB Q N2A Az030 RECIRC IHLET IB-J (
| |
| A ( VOL/UT6.03 (This was an original NMP2L-1263 GL88-01 Cat.A comnitment, but was 2RCS-64-00-SM20 (
| |
| QISO 64-00-3 or DUG¹ na in (89.11 (none (
| |
| SUR/PT3.00 (never examined in the 1st Interval in favor of another Cat.A weld NMP2-12-.657-SS I LINE¹ 2RCS-012-11-1 HTS: 30,31 INS 1 ( na /na (coincidentally chosen pursuant to Cat 8-J criteria.
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 20 of 26 NHP2-ISI-006, REV. 1 ~ CH 000 SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/'1999 APPENDIX G - RCS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REO ) DESCRIPTIOH OF ITEN TO BE EXANINED(CATGRY )IGSCC] EX1/HDE PROCEDURE )PERIOD 1 REHARKS EXAMINATION IDENTIFIER f ITS ISO LOCATOR, CONPOHENI''MG ¹, ]ITEN ¹ JFREOYJ EX2/HDE PROCEDURE ]PERIOD 2 J USE CAL BLK ¹ I LINE HO AHD NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I i ELB/PIPE Q N2A Az030 RECIRC INLET ig-J I A I VOL/UT6.03 2RCS-64-00-SM21 )
| |
| QISO 64-00-3 or DMG¹ na in ]89.'l1 (none [ SUR/PT3 F 00 HHP2-12-.657-SS I LINE¹ 2RCS-012-11-1 NTS: 30,31 INS / na /na I INTEG ATT IB K I na I SUR/PT3.00/MT4. 0 I 2RCS-64-00-SM22 f QISO 64-00-1 or DMG¹ na in (810.20 )ID f na /na f LIHE¹ 2RCS-024-1-1 NTS: 1,9 [HS I 1 I na /na I I INTEG ATT IB-K I na I SUR/PT3.00/HT4.00 I 2RCS-64-00-SM23 / QISO 64-00-1 or DMG¹ na in /BI0.20 /ID / na /na
| |
| / LINE¹ 2RCS.024-1-1 HTS: 1,9 JHS / 1 / na /na I INTEG ATT IB-K I na I SUR/PT3.00/NT4.00 I 2RCS-64-00-SM24 f QISO 64-00-1 or DMG¹ na in [810.20 /ID / na /na I I LINE¹ 2RCS-024-1-1 NTS: 1,9 INS I 1 I na /na I INTEG ATT [B-K [ na ] SUR/PT3.00/HT4.00 2RCS-64-00.SM25 f QISO 64-00-1 or DMG¹ na in /810.20 ]ID f na /na f LINE¹ 2RCS-024-1-1 NTS: 1,9 /HS J 1 J na /na I PIPE/CAP IB-J I A I VOL/UT6.03 (This was an original HHP2L-1263 GL88-01 Cat.A comnitment, but was 2RCS.64-00-SM26 [ QISO 64-00-3 or DMG¹ na .in JB9.11 [none )
| |
| SUR/PT3.00 )never examined in the 1st Interval in favor of another Cat.A Meld HHP2-16-.822-SS I LIHE¹ 2RCS-016.6-1 HTS: 25(27 INS 1
| |
| [ na /na (coincidentally chosen pursuant to Cat B-J criteria.
| |
| I RED/PIPE /B-J i A i VOL/UT6.03 2RCS-64-00-SM27 / QISO 64-00-3 or DMG¹ na in /B9.11 [none J SUR/PT3.00 NNP2-16-.822-SS I LINE¹ 2RCS.016.5-1 HTS: 25,28 IHS 1 f na /na i PIPE/MOL IB-J IA I VOL/UT6.03 (aThere shall be no branch outlet openings on Meld seam," 767E286.
| |
| 2RCS-64-00.SM28 )
| |
| QISO 64-00-3 or DMG¹ na in (B9.31 /none ) SUR/PT3.00 I HMP2-16-.822-SS LINE¹ 2RCS-016-5-1 NTS: 25,26 )HS I 1 I na /na I J
| |
| PIPE/MOL IB-J I A I VOL/UT6.03 ("There shall be no branch outlet openings on Meld seam,a 767E286.
| |
| 2RCS-64-00-SM29 / QISO 64-00-3 or DMG¹ na in /89.31 ]none f SUR/PT3.00 I HNP2-16-.822-SS I LINE¹ 2RCS-016-5-1 HTS: 25,26 INS / na /na I
| |
| | |
| NIAGARA MOHAC POMER CORPORATION - MILE POINT NUCLEAR STATIOH - UNIT 2 21 of 26 HMP2-ISI-006, REV. 1( CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL RE4 i DESCRIPTIOH OF ITEM TO BE EXAMIHEDiCATGRY i IGSCCi EX1/HOE PROCEDURE iPERIOO 1 REMARKS EXAMINATION IDEHTIFIER I ITS ISO LOCATOR'OMPONENT DUG ¹i I ITEM ¹ IFREOYI EX2/HDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LIHE NO AHD NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I PIPE/CAP IB-J I A I VOL/UT6.03 2RCS-64-00. QQO i QISO 64-00-3 or DUG¹ na in i89.11 inone i SUR/PT3.00 HMP2-16-.822-SS I LINE¹ 2RCS-016-5-1 NTS: 25,27 INS 1 i na /na i PIPE/ELB Q H2D Az120 RECIRC IHLET iB-J i A i VOL/UT6.03 2RCS-64-00-SIQ1 i QISO 64-00-3 or DUG¹ na in i89.11 inone ) SUR/PT3.00 NMP2-12-.657-SS I LINE¹ 2RCS-012-8-1 HTS: 30,31 INS 1 i na /na I ELB/PIPE Q N2D Az120 RECIRC IHLET IB-J I A I VOL/UI'6.0 iThis was an original HMP2L-1263 GLBB-01 Cat.A coanitment; 2RCS-64-00-SM32 i QISO 64-00-3 or DNG¹ na in )89.11 inone i SUR/PT3.00 iNevertheiess, it was deselected during 2nd 10-Year update based on Xs.
| |
| NMP2-12-.657-SS I LIHE¹ 2RCS-012-8-1 NTS: 30,31 (HS in /
| |
| I PIPE/ELB Q N2E Az150 RECIRC INLET IB-J i A i VOL/UT6.03 I iDeselected during 2nd 10-Year Update revie~
| |
| 2RCS-64-00-SIQ3 i QISO 64-00-3 or DUG¹ na in JB9.'ll inone I SUR/PT3.00 I I NMP2-12-.657-SS i LINE¹ 2RCS-012-7-1 NTS: 30,31 JHS i na/ I j I ELB/PIPE Q H2E Az150 RECIRC INLET IB-J i A i VOL/UT6.03 iDeseiected during 2nd 10-Year Update review 2RCS-64-00-SIQ4 i QISO 64-00-3 or DUG¹ na in i89.11 inone )
| |
| SUR/PT3.00 I HMP2-12-.657-SS I LINE¹ 2RCS-012-7-1 NTS: 30,31 IHS 1 dna/ I IN-14 t PIPE/ELB IB-J I A I VOL/UT6.0 Sc7 2RCS-64-00-SU35 i QISO 64-00-1 or DUG¹ na . in )89.11 IID I SUR/PT3.00 I HMP2-24-1.002-SS i LINE¹ 2RCS-024-1-1 NTS: 1,3 lHS/au I I PIPE/ELB IB-J I A ~
| |
| I VOL/UT6.03 2RCS-64-00.SIQ6 i QISO 64-00-1 or DNG¹ na in i89.11 inone i SUR/PT3.00 NMP2-24-1.002-SS I LINE¹ 2RCS-024-1-1 HTS: 1,2 INS 1 i na /na I TEE/PIPE IB-J i VOL/UT6.03 2RCS-64-00-SM37 i QISO 64-00-1 or DUG¹ na in i89.11 Inone I SUR/PT3.00 NMP2-24-1.002-SS .I LINE¹ 2RCS-024-1-1 HTS: 1,4 IHS 1 / na/na I PIPE/TEE IB-J I A I VOL/UT6.03 iDeselected during 2nd 10-Year update based on X's.
| |
| 2RCS-64-00.SIQB i QISO 64-00-1 or O'IK¹ na in i89.11 /none i SUR/PT3.00 HMP2-24-1.002-SS I LINE¹ 2RCS-024-1-1 NTS: 1,4 IHS 1 dna/
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 22 of 26 HNP2-ISI-006( REV. 1I CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RE4 I DESCRIPTIOH OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 I REHARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR'OHPONENT DMG ¹, IITEH ¹ IFREQYI EX2/HDE PROCEDURE IPERIOD 2 J USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSi EX3/HDE PROCEDURE iPERIOD 3 i
| |
| [ ELB/PIPE Q H18 Az000 RECIRC OUTLT [8-J I A I VOL/UT6.03 2RCS-64-00-SM39 )
| |
| QISO 64-00-1 or DMG¹ na in )89.11 /none f SUR/PT3.00 NHP2-24-1 '02-SS I LINE¹ 2RCS-024-1-1 HTS: 1(2 IHS 1
| |
| / na/na
| |
| / PIPE/ELB Q N1B A7000 RECIRC OUTLT /8-J / A / VOL/UT6.03 I JGL88-01 CAT.A COHNITNENT 2RCS-64-00.SM40 / QISO 64-00-1 or DMG¹ na in /89.11 IID-0 I SUR/PT3.00 Sc9 I HNP2-24-1.002-SS i LINE¹ 2RCS-024-1-1 NTS: 1,2 iHS/au 1 /na/ I I J
| |
| PIPE/MOL IB-J I A I VOL/UT6.03 )>>There shall be no branch outlet openings on weld seam,>> 767E286.
| |
| 2RCS-64-00;SM41 / QISO 64-00-5 or DMG¹ na in /89.31 Inone I SUR/PT3.00 NNP2-24-1.317-SS I LINE¹ 2RCS-024-19-1 NTS: 43,49 IHS J na /na
| |
| ) MOL/PIPE IB-J I A I VOL/UT6.03 I 2RCS.64.00.SM42 / QISO 64-00-5 or DMG¹ na in /89.11 /none / SUR/PT3 F 00 I NNP2-4-.337-SS182 I LINE¹ 2RCS-004-39-1 NTS: 48(49 IHS 1 J na /na I I PIPE/FLG IB-J I A I VOL/UT6.03 2RCS-64-00-SM43 f QISO 64-00-5 or DMG¹ na in JB9.11 Inone I SUR/PT3.00 NHP2-4-.337.SS182 i LINE¹ 2RCS-004-39-1 NTS 48,50 iHS 1 J na /na I PIPE/ELB IB-J I A I VOL/UT6.03 2RCS.64-00.SM44 / QISO 64-00-5 or DMG¹ na .in JB9.11 (none ( SUR/PT3.00 NNP2-24-1.317-SS I LINE¹ 2RCS-024-19-1 HTS: 43,45 INS / na /na I ELB/PIPE IB.J I A I VOL/UT6.03 (This uas an original HNP2L-1263 GL88-01 Cat.A comnitmentl 2RCS-64-00-SM45 QISO 64-00-5 or DMG¹ na in /B9.11 /none SUR/PT3.00 (Nevertheless, it was deselected during 2nd 10-Year update based on Xs.
| |
| NNP2-24-1.317-SS
| |
| )
| |
| I LINE¹ 2RCS 024 19 1 NT '3 45 IHS J
| |
| / na/
| |
| I ELB/PIPE IB-J I A I VOL/UT6.03 2RCS-64-00.SM46 / QISO 64-00-5 or DMG¹ na in /89.11 Inone I SUR/PT3.00 NNP2-24-1.234-SS I LINE¹ 2RCS-024-20-1 NTS: 44,46 INS 1 f na /na I INTEG ATT IB.K I na I SUR/PT 00/NT I 2RCS-64-00-S'M47 / QISO 64-00-5 or DMG¹ na in /B10.20 ]ID / na /na i LIHE¹ 2RCS-024-20-1 HTS: 51 iHS 1 / na/na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 23 of 26 HHP2-ISI-006( REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED ( DESCRIPTION OF ITEH TO BE EXAHIHED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHIHATIOH IDENTIFIER ( ITS ISO LOCATOR, COHPOHEHT DMG ¹, (ITEH ¹ (FREOY( EX2/HDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ (
| |
| LIME NO. AND NO'IES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I IHTEG ATT IB-K I na I SUR/PT3.00/HT4 F 00 I I 2RCS-64-00-SM48 (
| |
| QISO 64-00-5 or DMG¹ na in (810.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2RCS-024-20-1 NTS: 51 (HS (
| |
| 1 (
| |
| na /na I I I IHTEG ATT (8 K I na I SUR/PT3 00/HT4 00 I 2RCS-64-00-SM49 (
| |
| QISO 64-00-5 or DMG¹ na in (810 '0 (ID (
| |
| na /na I LINE¹ 2RCS-024-20-1 NTS: 51 INS I 1 I na /na I I INTEG AT'I (B-K (
| |
| na (
| |
| SUR/PT3.00/MT4.00 (
| |
| 2RCS-64-00-SM50 (
| |
| QISO 64-00-5 or DMG¹ na in (810.20 (ID (
| |
| na /na I
| |
| (
| |
| LINE¹ 2RCS-024-20-1 NTS: 51 (HS (
| |
| 1 (
| |
| na /na I I PIPE/MOL IB-J I A I VOL/UT6.03 I (This was an original NHP2L-1263 GL88-01 Cat.A carmitment. Neverthless, 2RCS-64-00-SI51 (
| |
| QISO 64-00-5 or DMG¹ na in (89.31 (none I SUR/PT3.00 I iit was deselected during 2nd 10-Year update based on Xs. "There shall NHP2-24-1.234-SS I LINE¹ 2RCS-024-20-1 NTS: 44i47 IHS ( 1 (
| |
| na /na I (be no branch outlet openings on weld seam,>> 767E286.
| |
| I RED/RED IB-J I A I VOL/UT6.03 2RCS-64-00-SM52 (
| |
| QISO 64-00-6 or DMG¹ na in (89.11 (none (
| |
| SUR/PT3.00 HHP2-24-1.234-SS (
| |
| LINE¹ 2RCS-024-20-1 NTS: 59,60 (HS 1 (
| |
| na /na I PIPE/ELB Q N2H A2270 RECIRC INLET IB-J I A I VOL/UT6.03 2RCS-64-00-SM53 ( QISO 64-00-6 or DMG¹ na .in (89.11 (none (
| |
| SUR/PT3.00 NMP2-12-.657-SS LINE¹ 2RCS.012-21-1 NTS: 61 (HS 1 (
| |
| na /na I ELB/PIPE Q H2H A2270 RECIRC INLET IB-J ( A (
| |
| VOL/UT6.03 (This was an original NHP2L-1263 GL88-01 Cat.A comnitment, but was 2RCS-64-00.SM54 (
| |
| QISO 64-00.6 or DMG¹ na in (89.11 (none (
| |
| SUR/PT3.00 (never examined in the 1st Interval in favor of another Cat.A weld NMP2-12-.657-SS (
| |
| LINE¹ 2RCS-012-21-1 NTS: 61,62 (HS 1 (
| |
| na /na (coincidentally chosen pursuant to Cat 8-J criteria.
| |
| ( PIPE/MOL IB J (
| |
| A (
| |
| VOL/UT6.03 (>>There shall be no branch outlet openings on weld seam,>> 767E286.
| |
| 2RCS-64-00-SM55 (
| |
| QISO 64-00-6 or DMG¹ na in (89.31 (none I SUR/PT3.00 I NHP2-16-.822.SS I LINE¹ 2RCS-016-27-1 NTS: 56(57 IHS 1 ( na/na I P I PE/MOL IB-J I A I VOL/UT6.03 (>>There shall be no branch outlet openings on weld seam,>> 767E286.
| |
| 2RCS-64-00-SI56 ( QISO 64-00-6 or DMG¹ na in (89.31 (none (
| |
| SUR/PT3.00 I HHP2-16-.822-SS ( LIHE¹ 2RCS-016-27-1 HTS: 56,57 IHS 1 (
| |
| na /na I
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 24 of 26 NHP2-ISI-006( REV. 1, CH 000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REMARKS EXAHINATI OH IDENTIFIER ITS ISO LOCATOR, COHPONENT DWG ¹, ]ITEN ¹ [FREOY[ EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LINE HO AHD NOTES AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I i PIPE/CAP IB J ] A (
| |
| VOL/UT6.03 2RCS-64-00-SW57 f QISO 64-00-6 or DWG¹ na in /89.11 )none J SUR/PT3.00 NHP2-16-.822-SS I LIHE¹ 2RCS-016-27-1 NTS: 56,58 INS f na /na I RED/PIPE IB-J i A i VOL/UT6.03 2RCS-64-00-SM58 J QISO 64-00-6 or DWG¹ na in )89.11 Inone I SUR/PT3.00 NHP2-16-.822-SS I LINE¹ 2RCS-016-27-1 HTS: 56(59 INS / na /na I RED/PIPE IB-J [ A [ VOL/UT6.03 I 2RCS.64-00-SW59 / QISO 64-00-6 or DMG¹ na in /89.11 IID I SUR/PT3.00 Sc9 NHP2-16-.822-SS ( LINE¹ 2RCS-016-24-1 NTS: 56,59 (HS/au 1 /na/ I P I PE/MOL IB-J i A i VOL/UT6.03 I )"There shall be no branch outlet openings on weld sean," 767E286.
| |
| 2RCS-64-00-SW60 / QISO 64-00-6 or DMG¹ na in /89.31 (none ( SUR/PT3.00 I I NHP2-16-.822-SS I LINE¹ 2RCS-016-24-1 NTS: 56(57 INS 1
| |
| / na /na I I PIPE/MOL IB J I A I VOL/UT6.03 ("There shall be no branch outlet openings on weld seam," 767E286.
| |
| 2RCS-64-00-SM61 / QISO 64-00-6 or DMG¹ na in /89.31 /none / SUR/PT3.00 I NHP2-16-.822 SS I LINE¹ 2RCS-016-24-1 NTS: 56(57 INS / na /na I I PIPE/CAP IB-J I A I VOL/Ul'6.03 (This was an original NHP2L-1263 GLBB-01 Cat.A comnitment, but was 2RCS-64-00-S'W62 f QISO 64-00-6 or DWG¹ na . in /89.11 Inone I SUR/PT3.00 [never examined in the 1st Interval in favor of another Cat.A weld NHP2.16-.822-SS I LINE¹ 2RCS-016-24-1 HTS: 56,58 IHS 1
| |
| / na /na [coincidentally chosen pursuant to Cat 8-J criteria.
| |
| I PIPE/ELB Q H2K Az330 RECIRC INLET IB-J )
| |
| A [ VOL/UT6.03 (Deselected during 2nd 10-Year Update review 2RCS-64-00-SW63 f QISO 64-00-6 or DWG¹ na in ]89.11 )none )
| |
| SUR/PT3.00 HHP2-12-.657-SS i LINE¹ 2RCS-012-23-1 HTS: 61,62 iHS ( na/
| |
| I ELB/PIPE Q H2K A2330 RECIRC INLET IB-J I A I VOL/UT6.03 )Deselected during 2nd 10-Year Update review 2RCS-64.00-SM64 ] QISO 64-00-6 or DMG¹ na in JB9.11 [none (
| |
| SUR/PT3.00 NHP2-12-.657-SS i LINE¹ 2RCS-012-23-1 HTS: 61,62 iNS 1 dna/
| |
| I PIPE/ELB Q H2G Az240 RECIRC INLET IB-J I A I VOL/UT6.03 2RCS-64-00-SM65 f QISO 64-00-6 or DMG¹ na in (89.11 ]none f SUR/P'T3.00 NHP2-12-.657-SS l LINE¹ 2RCS-012-26-1 NTS: 61,62 IHS 1 / na /na
| |
| | |
| NIAGARA NOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 25 of 26 NHP2 ISI 006'EV 1 g CH 000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEN (sorted by Examination Identifier) 2ND INTVL REL REQ (
| |
| DESCRIPTION OF ITEN TO BE EXANIHED(CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1 REHARKS EXAHINATIOH IDEHTIFIER (
| |
| ITS ISO LOCATOR, COHPOHEHT DWG ¹, (ITEN ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ (
| |
| LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 (
| |
| I ELB/PIPE Q H2G A2240 RECIRC INLET IB-J ( A (
| |
| VOL/UT6.03 (This was an original HHP2L-1263 GL88-01 Cat.A comnitment, but was 2RCS-64-00-SM66 ( QISO 64-00-6 or DMG¹ na in (89.11 (none (
| |
| SUR/PT3.00 (never examined in the 1st Interval in favor of another Cat.A weld .
| |
| HHP2-12-.657-SS ( LINE¹ 2RCS.012-26-1 NTS: 61,62 (HS 1 (
| |
| na /na (coincidentally chosen pursuant to Cat B-J criteria.
| |
| ( PIPE/ELB IB-J ( A (
| |
| VOL/UT6.03 I 2RCS-64-00-SW67 ( QISO 64-00-4 or DMG¹ na in (89.11 IID I SUR/PT3.00 Sc9 NHP2-24-'1.002-SS ( I.INE¹ 2RCS-024-18-1 NTS: 33,35 (HS/au I I PIPE/ELB IB-J I A I VOL/UT6.03 2RCS-64-00-SM68 (
| |
| QISO 64-00-4 or DWG¹ na in (B9.11 (none (
| |
| SUR/PT3.00 HNP2-24-1.002-SS (
| |
| LINE¹ 2RCS-024.18-1 HTS: 33,34 IHS (
| |
| na /na I
| |
| ELB/PIPE IB-J I A I VOL/UT6.03 I 2RCS.64-00-S'W69 (
| |
| QISO 64-00-4 or DMG¹ na in (89.11 (none (
| |
| SUR/PT3.00 I NHP2-24-1.002-SS I LIHE¹ 2RCS-024.18-1 HTS: 33,34 (NS 1 (
| |
| na /na I
| |
| (
| |
| PIPE/ELB Q N1A Az000 RECIRC OUTLT (B-J ( A (
| |
| VOL/UT6.03 I I 2RCS-64-00-SW70 (
| |
| QISO 64-00-4 or DWG¹ na in (89.11 (ID-0 I SUR/PT3.00 I I NHP2-24-1.002-SS (
| |
| LINE¹ 2RCS-024-18-1 NTS: 33,34 (HS/au (na/ Sc11
| |
| (
| |
| PIPE/ELB Q N2F Az210 RECIRC INLET (B-J I A I VOL/UT6.03 2RCS-64-00-SW82 (
| |
| QISO 64-00-6 or DWG¹ na. in (B9.11 (none ( SUR/PT3.00 NNP2-12-.657-SS ( LIHE¹ 2RCS-012-25-1 NTS: 61,62 (NS 1 (
| |
| na /na I ELB/PIPE Q N2F A2210 RECIRC INLET IB-J I A I VOL/UT6.03 2RCS.64-00-SW83 (
| |
| QISO 64-00-6 or DWG¹ na in (89.11 (none I SUR/PT3 F 00 HHP2-12-.657-SS (
| |
| LINE¹ 2RCS-012-25-1 NTS: 61,62 (HS 1 ( na /na
| |
| ( PIPE/ELB Q H2J Az300 RECIRC INLET (B-J ( A (
| |
| VOL/UT6.03 2RCS-64-00. SW93 (
| |
| QISO 64-00-6 or DWG¹ na in (B9.11 (none (
| |
| SUR/PT3.00 HNP2.12-.657-SS LINE¹ 2RCS-012-22-1 NTS: 61,62 (HS 1 (
| |
| na /na ELB/PIPE Q N2J Az300 RECIRC INLET IB-J I A I VOL/UT6.03 (This was an original NHP2L-1263 GL88-01 Cat.A comnitment, but was 2RCS-64-00-SM94 QISO 64-00-6 or DMG¹ na in I 89.11 (none ( SUR/PT3.00 (never examined in the 1st Interval in favor of another Cat.A veld NMP2-12-.657-SS LINE¹ 2RCS-012-22-1 NTS: 61,62 (NS (
| |
| 1 (
| |
| na /na (coincidentally chosen pursuant to Cat 8-J criteria.
| |
| | |
| NIAGARA NONA'MK POMER CORPORATION - NILE POINT HUCLEAR STATION - UNIT 2 26 of 26 HHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RCS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTIOH OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 REHARKS EXANIHATION IDENTIFIER i ITS ISO LOCATOR, CONPONENT DMG ¹, iITEN ¹ iFREQYi EX2/HDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ I LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I INTEG ATT iB-K i na i SUR/PT3.00/NT4.00 i 2RCS-64-00-SM95 I QISO 64-00-4 or DMG¹ na in F810.20 ilD i na /na I I LINE¹ 2RCS-024-18-1 NTS: 33,38 IHS I
| |
| 'I I na /na I I I INTEG ATT IB-K I na I SUR/PT3.00/NT4.00 I I 2RCS-64-00-SM96 / QISO 64-00-4 or DMG¹ na in /810.20 /ID i na /na I I LINE¹ 2RCS-024-18-1 HTS: 33,38 iHS I 1 i na /na I I I INTEG ATT IB-K I na I SUR/PT3.00/NT4.00 I I 2RCS-64-00-SM97 J QISO 64-00-4 or DMG¹ na in F810.20 iID / na /na I
| |
| )
| |
| LINE¹ 2RCS-024-18-1 NTS: 33,38 /NS i 1 i na /na I I IHTEG ATT IB.K I na I SUR/PT3.00/NT4.00 I I 2RCS-64-00.SM98 i QISO 64-00-4 or DMG¹ na in iBI0.20 i IO J na /na i LINE¹ 2RCS-024-18-1 HTS: 33,38 iHS i 1 / na /na I I EHD OF SYSTEN RCS
| |
| | |
| NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System RCS: General Notes
| |
| : 1. 24" PIPE MATERIALSA358GR.316CL1 WELDED PIPE MIN. WALL.877/BASIC MAT'L 32 12" N2 NOZ SAFE END SA182 GR F 316 (1.00" THK)
| |
| SA240 33 24" PIPE MAT'LSA358 GR 316 CL1 (.877" MW) WELDED PIPE
| |
| : 2. 24" PIPE FITTINGS 90'L SA403 GR. WPW 316 MINWALL.877" 34 24" PIPE FTNG SA403 GR WPW 316 90'L (.877 MINWALL)
| |
| : 3. 24" PIPE FITTINGS 90'L SA403 GR. WPW 316 MINWALL1.053 35 24 PIPE FTNG SA403GR WPW 31690'L(1.053MW)
| |
| : 4. 24" PIPE FITTINGS 24" X 24" X 20" RED. TEE SA403 GR. F 316 24" X 24" MINWALL 36 24" x 4 PIPE FTNG SA182 GR F 316 CWO-WOL (24".877MW) (4".167" MW)
| |
| .877 20" MINWALL.732 37 1-1/4 PIPE FTNG SA182 GR F 316 S/W NOZ SOL
| |
| : 5. 24 X4" PIPE FITTINGS SA182GR F316CWD(WOL) 24".877MW4 .167MW 38 PLATE MATLSA182 GR F 316 2 THK.
| |
| : 6. 1-1/4" PIPE FITTINGS SA182 GR F 31 6 SOC WELD NOZZLE (SOL) 39 MOV10B-VALVEBODY SA351 GR CFBM
| |
| : 7. MOVIGA-BODYSA351 GR. CFBM WELD END 1.934" MIN COUNTERBORE TO 1.152 40 P1B PUMP BODY SA351 GR CFBM
| |
| : 8. PIA PUMP BODY SA 351 CF8M 41 P1B BODY STUDS 3.75" DIA SA540 GR B2 QTY 16 LENGTH 32"
| |
| : 9. PLATE/LUGS SA182 GR. F 316 2 THK. 42 N1 NOZ SAFE END SA336 CLBF THK 1.6P
| |
| : 10. PIA-STUDS 3.75 DIA. SA540 B23 C1. 532" LENGTH/QTY16 43 24 PIPE MAT'LSA358 GR 31 6 CL1 (1.153" MW)
| |
| : 11. N1 NOZ SAFE END SA336CL1 F8;T"-1.65" 44 24" PIPE MAT L SA358 GR 316 CL1 (1.080" MW)
| |
| : 12. 24" PIPE MALSA358 GR 316 CL 1 (1.153" MW) 45 24" PIPE FTNG SA403 GR WPW 3 16 90'L (1.384" MW)
| |
| : 13. 24" PIPE MAT'LSA358 GR 316 CL1 (1.080" MW) 46 24" PIPE FTNG SA403 GR WPW 316 90'L (1.080" MW)
| |
| : 14. 24 PIPE FITTING SA403GR WPW31690'L (1.384 MW) 47 24 X 12" PIPE FTNG SA182 GR F 316 CWO/WOL (24"-1.080/12" .575" MW)
| |
| : 15. 24" PIPE FITTING SA403 GR WPW 316 90'L (1.080" MW) 48 4" PIPE MAT'LSA182 GR F 316 SMLS (217." MNfj
| |
| : 16. 24 X 12" PIPE FTNG SA 182 GR F316 CWO/WOL (24" 1.080/12" .575" MW) 49 4" PIPE FTNG SA182 GR F 316 CWO/WOL (24" 1.153/4" .217" MW)
| |
| : 17. 4 APE MAT'LSA182 GR. F316 SMLS (217." MW) 50 4" PIPE FTNG SA182 GR F 316 90% RF W/N FLANGE
| |
| : 18. 24" X 4" PIPE FTNG SA182 GR F316 CWO/WOL (24" 1.153"/4" .217 MW) 51 PLATE MAT L SA182 GR F 316 2 THK (LUGS)
| |
| : 19. 4" PIPE FTNG SA182 GR F316 90% RF W/N FLANGE 52..24" PIPE MAT'LSA182 GR F 316 RED. CROSS (24-1.680" MW)
| |
| PLATE MAT'LSA182 GR F3162 THK(LUGS) 53 2RCSP1B BODY SA351 CFBM
| |
| : 21. 24" PIPE MAT'LSA182 GR F316 RED. CRS (24" 1.080" MW) 54 HYV 17B BODY SA351 CFBM (1.491" AT WELD ZONE) 2RCS'P1A BODY SA351 CF8M 55 MOV18B SA351 GR CFBM (1 405" AT WELD ZONE)
| |
| HYV17A BIDT SA351 CFBM (1.491" @ WELD ZONE) 56 16" PIPE MAT'LSA358 GR 316 CL1 (.720 MIN)
| |
| : 24. MOV18A SA351 CFBM (1 405" @ WELD ZONE) 57 16" X 12" PIPE FTNG SA182 GR F 316 CWO/WOL (16"-.720" MW/12".575" MW) 16" PIPE MAT'LSA358 GR 316 CL1 (.720" MW) 58 16 PIPE FTNG SA403GR WP316 CAP (.720 MW) 16" X 12" PIPE FTNG SA182 GR F316 CWO/WOL (16" .720" MW/12" .575" MW) 59 24" X 16" PIPE FTNG SA182 GR F 316 RED. CROSS (24" 1.080" MW/16".720" MW)
| |
| : 27. 16'IPE CAP SA403 WP316 (.720" MW) 60 24" X 12'IPE FTNG SA403 GR WP316 CONC RED (24" 1.080" MW/12".575" MW)
| |
| : 28. 24" X 16" PIPE FTNG SA182 GR F316 RED CROSS (24" 1.080" MW/1 6" .720" MW) 61 12 PIPE MALSA358 GR 316 CL1 (.575 MW) 24" X 12" PIPE FTNG SA403 GR WP 316 CONC. RED (24" 1.080 MW/12" .575" MW) 62 12" PIPE FTNG SA403 GR WPW 316 90'L (.575" MW) 12 PIPE MAT'LSA358 GR 316 CL1 (.575" MW) 63 NZ NOZ SAFE END SA182 GR F316 (1.00" THK)
| |
| : 31. 12 PIPE FTNG SA403 GR WPW 316 90'L
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - n ILE POINT NUCLEAR STATION - UNIT 2 1 of 23 NHP2-ISI-006, REV. 1I CH-000 SECOND TEN YEAR IHSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTIOH OF ITEN TO BE EXANIHEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOO 1 REHARKS EXANINATIOH IDEHTIFIER ) ITS ISO LOCATOR, COHPOHENT DMG ¹, ¹ iITEII iFREQYi EX2/HDE PROCEDURE [PERIOD 2 i USE CAL BLK ¹ J LINE NO. AHD NOTES, AS APPLICABLE DESELECT iCLAssi EX3/HDE PROCEDURE iPERIOO 3 I PIPE/ELB IC-F-2 J na i VOL/UT6.02 2RDS-65-00-FM001 i QISO 65-00-1 or DMG¹ na in iC5.51 )none i SUR/PT3.00/MT4.00 J NHP2-8-.594-CS I LINE¹ 2RDS-008-81-2 HTS: 2,4 /SO 2 i na /na I I PIPE/TEE IC-F-2 i na i VOL/UT6.O2 2RDS-65-00-FM002 i QISO 65-00-1 or DMG¹ na in /C5.51 inone )
| |
| SUR/PT3.00/HT4.00 /
| |
| NHP2-8-.594-CS I LINE 2RDS 08 75 NTS /so 2 i na /na I TEE/PIPE IC-F-2 I na I VOL/UT6.02 I 2RDS-65-00-FM003 i QISO 65-00-1 or DMG¹ na in /C5.51 irO i SUR/PT3.00/N'I4.00 i HHP2-8-.594-CS I LINE¹ 2RDS-008.81-2 NTS: 2,5 ISD 2 i na /na i Sc10 I PIPE/TEE iC-F-2 i na i VOL/UT6.O2 2RDS-65-00-FM004 i QISO 65.00-1 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NNP2-8-.594.CS I LINE¹ 2ROS-008-81-2 NTS: 2,5 ISD ( 2 / na/na I PIPE/TEE IC.F-2 I na I VOL/UT6.02 I 2RDS-65-00-FM005 (
| |
| QISO 65-00-1 or DMG¹ na in /C5.51 inone i SUR/PT3.00/NT4.00 i NMP2-8-.594-CS J LINE¹ 2RDS.008-76-2 NTS: 2,5 iSO 2 i na /na I I PIPE/TEE IC-F-2 / na i VOL/UT6.O2 2ROS-65.00-FM006 J QISO 65-00-1 or DMG¹ na . in /C5.51 (none i SUR/PT3.00/HT4.00 i NNP2-8-.594-CS LIHE¹ 2RDS-008-81-2 HTS: 2,5 (SD 2 i na /na I PIPE/TEE IC-F-2 I na I VOL/UT6.02 I 2RDS-65-00-FM007 i QISO 65-00-1 or DMG¹ na in iC5.51 Inone I SUR/PT3.00/NT4.00 I HHP2-8-.594-CS I LINE¹ 2RDS-008-81-2 HTS: 2(5 )SO 2 J na /na I PIPE/TEE IC-F-2 I na I VOL/UT6.02 I 2RDS-65 00-FM008 i QISO 65-00-1 or DMG¹ na in iC5.51 /none / SUR/Pl'3.00/HT4.00 i NNP2-8-.594.CS LIHE¹ 2RDS-008-78-2 NTS: 2,5 (SO 2 ( na /na I PIPE/TEE IC-F-2 J na i VOL/UT6.02 2RDS-65-00-FM009 i QISO 65.00-1 or DMG¹ na in tC5.51 IID I SUR/PT3.00/NT4.00 I NNP2-8-.594-CS I LIHE¹ 2RDS-008-79-2 NTS: 2,5 /SO 2 i na /na (Sclo
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 2 of 23 NHP2-ISI-006) REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTIOH OF ITEN TO BE EXAHINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIDO 1 REHARKS EXAHINATION IDEHI'IFIER i ITS ISO LOCATOR, COHPONENT DMG ¹, iITEH ¹ iFREQYi EX2/NDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ I LINE HO. AND HOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/TEE IC-F-2 i na i VOL/UT6.02 2RDS-65-00-FM010 i QISO 65-00-1 or DUG¹ na in /C5.51 inone i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS I LINE¹ 2RDS.008-81-2 NTS: 2)5 iSO 2 / na /na I PIPE/TEE IC-F-2 i VOL/UT6.O2 2RDS-65-00.FM011 i QISO 65-00-1 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i HHP2-8-.594-CS I LINE¹ 2RDS-008-80-2 NTS: 2,5 iSO 2 i na /na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2RDS-65-00-FM012 i QISO 65-00-1 or DMG¹ na in (C5.51 )none / SUR/PT3.00/HT4.00 (
| |
| HHP2-8-.594-CS I LINE¹ 2RDS-008-81-2 NTS: 2,4 iSO 2 [ na /na I I PIPE/ELB IC-F-2 / na i VOL/UT6.02 2RDS-65-00-FM013 i QISO 65-00-1 or DMG¹ na in JC5.51 /none i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS I LINE¹ 2RDS-008-81-2 NTS: 2,4 iSO 2 J na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2ROS-65-00-FM014 i QISO 65-00-1 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS LINE¹ 2RDS-008-81-2 HTS: 2,6 iSO 2 i na /na i PIPE/ELB IC-F-2 i na i voL/UT6.02 i sc7 2RDS-65-00-FM015 i QISO 65-00-2 or DUG¹ na .in iC5 51
| |
| ~ IIO I SUR/PT3.00/HT4.00 I NHP2 ~ 594.CS LINE¹ 2RDS-008-66-2 HTS: 2,4 JSD 2 i na /na I TEE/PIPE IC-F-2 i na i VOL/UT6.02 2RDS-65.00.FM016 i QISO 65-00-2 or DMG¹ na in iC5.51 )none ) SUR/PT3.00/HT4.00 i NHP2-8-.594-CS I LINE¹ 2RDS-008-66-2 HTS: 2,5 ISD 2 i na /na I PIPE/TEE IC-F-2 i na i VOL/UT6.02 2RDS-65-00-FM017 )
| |
| QISO 65-00-2 or DMG¹ na in iC5.51 Inone I SUR/PT3 00/MT4 00 I NHP2-8-.594-CS LINE¹ 2RDS-008-72-2 NTS: 2,5 [SO 2 i na/na I PIPE/TEE IC-F-2 i na i VOL/UT6.02 2RDS-65.00-FM018 i QISO 65-00-2 or DMG¹ na in (C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-8-.594-CS I LINE¹ 2ROS-008-71-2 NTS: 2,5 iSO 2 J na /na
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UHIT 2 3 of 23 HNP2-ISI-006, REV. 1, CN-000 SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REO i DESCRIPTION OF ITEN TO BE EXANIHEDiCATGRY iIGSCCi EX1/HDE PROCEDURE iPERIOO 1 RENARKS EXANIHATION IDENTIFIER I ITS ISO LOCATORi CONPONEHT DMG ¹i I ITEN ¹ IFREOYI EX2/HDE PROCEDURE IPERIOO 2 USE CAL BLK ¹ I LIHE HO AHD HOlES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I i TEE/PIPE IC-F-2 J na )
| |
| VOL/UT6.02 2RDS-65-00-FM019A i QISO 65-00-2 or DMG¹ na in iC5 ~ 51 inone i SUR/PT3.00/NT4.00 i NNP2-8-.594-CS i LINE¹ 2RDS.008.66.2 HTS: 2,5 iSO 2 i na /na I PIPE/TEE IC-F-2 i na i VOL/UT6.02 2RDS.65.00-FM020 i QISO 65-00-2 or DIIG¹ na in iC5.51 )none i SUR/PT3.00/HT4.00 i NNP2-8-.594-CS I LINE¹ 2RDS-008-70-2 HTS: 2,5 /SO 2 i na /na I I PIPE/TEE IC-F-2 i na i VOL/UT6.02 2RDS-65-00.FM021 i QISO 65-00-2 or DMG¹ na in iC5.51 inone [ SUR/PT3.00/NT4.00 i NNP2-8-.594-CS i LINE¹ 2RDS-008-69-2 HTS: 2,5 iso 2 / na/na I I TEE/PIPE IC-F-2 i na i VOL/UT6.02 2RDS-65.00-FM022 ) QISO 65-00-2 or DMG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 i HNP2-8..594-CS )
| |
| LINE¹ 2RDS-008-66-2 NI'S: 2,5 /SO 2 i na/na I I PIPE/TEE IC-F-2 i na i VOL/UT6.O2 2RDS-65-00-FM023 i QISO 65-00-2 or DMG¹ na in /C5.51 Inone I SUR/PT3.00/NT4.00 )
| |
| NNP2-8-.594-CS I LINE¹ 2RDS.008-68-2 NTS: 2,5 /so 2 f na /na I I PIPE/TEE IC-F-2 i na i VOL/UT6.O2 2RDS-65-00.FM024 i QISO 65-00-2 or OMG¹ na .in iC5.51 inone i SUR/PT3.00/NT4.00 i NNP2-8-.594-CS i LINE¹ 2RDS-008-67-2 HTS: 2,5 iSO 2 i na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2RDS-65-00-FM025 ) QISO 65-00-2 or DMG¹ na in iC5 ~ 51 inone i SUR/PT3.00/NT4.00 (
| |
| HNP2-8-.594.CS i LINE¹ 2RDS-008.66-2 NTS: 2,4 iSO 2 i na /na I PIPE/ELB IC-F-2 / na / VOL/UT6.02 2RDS-65-00-FM026 i QISO 65-00-2 or DMG¹ na in )C5.51 (none i SUR/PT3.00/NT4.00 i HNP2-8-.594-CS I LIHE¹ 2RDS-008-66-2 HTS: 2,4 iSO 2 i na /na I PIPE/PIPE (C-F-2 ( na ( VOL/UT6.02 2RDS-65-00-FM027 i QISO 65-00-2 or DMG¹ na in ic5.51 inone i SUR/PT3.00/NT4.00 i NNP2-8-.594-CS I LINE¹ 2RDS.008-66-2 HTS: 2 inone 2 ( na /na
| |
| | |
| NIAGARA NONA'MK POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 4 of 23 NKP2-IS1-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEN (sorted by Examination Identifier)
| |
| ND INTVL REL REQ DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I RENARKS I
| |
| EXANINATION IDENTIFIER )
| |
| ITS ISO LOCATOR, COHPONENT DWG ¹, iITEH ¹ iFREOYi EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ i LINE NO. AHD NOTES, AS APPLICABLE DESELECT JCLASSi EX3/NDE PROCEDURE iPERIOD 3 I ELB/ELB IC-F-2 i na i VOL/UT6.02 2RDS-65-00-FW028 i QISO 65-00-2 or DWG¹ na in iC5.51 inone )
| |
| SUR/PT3.00/NT4.00 )
| |
| NNP2-8-.594-CS )
| |
| LINE¹ 2RDS-008.66-2 NTS: 4,6 iSD 2 i na /na I IHTEG ATT )c-c I na I SUR/PT3.00/NT4.00 I 2RDS-65 IAll01B-12 i QISO 65-00-2 or DMG¹ na in iC3.20 iID i na /na I i LINE¹ 2RDS-008-66-2 NTS: 1,2 INS 2 / na/na I INTEG ATT ic-c I na I SUR/PT3.00/HT4.00 I 2RDS.65 IAM018-13 i QISO 65-00-2 or DMG¹ na in lC3.20 KAID i na /na I i LINE¹ 2RDS-008 66-2 HTS: 2,3 INS 2 i na/na I I IHTEG ATT ic-c i na J SUR/PT3.00/HT4.00 J 2RDS-65 IAM01B-14 / QISO 65-00-2 or DWG¹ na in iC3.20 iID [ na /na I I LINE¹ 2RDS-008-66-2 NTS: 2I3 JNS 2 i na /na I I IHTEG ATT ic-c i na i SUR/PT3.00/NT4.00 i 2RDS-65.00- IAM01B-15 J QISO 65-00-2 or DWG¹ na in iC3.20 [ID i na /na I I LINE¹ 2RDS-008-66-2 HTS: 2,3 iNS 2 J na/na I I IHTEG ATT ic-c i na i SUR/PT3 F 00/HT4.00 i 2RDS-65 IAM01B-16 i QISO 65-00-2 or DMG¹ na .in )C3.20 iID i na /na I I LINE¹ 2RDS-008-66.2 NTS: 2,3 INS 2 i na/na I I INTEG ATT ic-c I na I SUR/PT3.00/NT4.00 I 2RDS-65 IAM01B-17 i QISO 65-00-2 or DMG¹ na in iC3.20 ilD i na /na i LINE¹ 2RDS-008-66-2 HTS: 2,3 /HS 2 ( na/na I I IHTEG ATT ic-c I na I SUR/PT3.00/HT4.00 I 2RDS.65-00-IAM01B-18 i QISO 65-00-2 or DMG¹ na in iC3 ~ 20 iID i na /na i LINE¹ 2RDS-008-66-2 NTS: 2,3 /HS 2 i na/na I INTEG ATT ic-c I na i SUR/PT3.00/HT4.00 I 2RDS-65 IAM018-19 i QISO 65-00-2 or DMG¹ na in iC3.20 )ID ) na /na i LINE¹ 2RDS.008-66-2 HTS: 2,3 IHS 2 J na/na I
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 5 of 23 HMP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEM (sorted by Examination Identif ier) 2HD IHTVL REL REQ i DESCRIPTION OF ITEM TO BE EXAMIHEDiCATGRY iIGSCCi EX1/HDE PROCEDURE iPERIOD 1 REMARKS EXAMINATION IDENTIFIER J ITS ISO LOCATOR, COMPONENT OMG ¹, )ITEM ¹ iFREOY) EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I IHTEG ATT ic-C i na I SUR/PT3.00/MT4.00 I 2RDS-65 IAM03A-12 i QISO 65-00-1 or DMG¹ na in iC3.20 ilO i na /na na LINE¹ 2RDS-008-80-2 NTS: 2,3 iNS 2 t na /na I I INTEG ATT )c-c i na I SUR/PT3.00/MT4.00 I 2RDS-65-00-IAM03A-13 / QISO 65-00-1 or DMG¹ na in iC3.20 iiD i na /na I i LINE¹ 2RDS-008.80-2 HTS: 2,3 INS 2 i na /na I I INTEG ATT ic-c / na I SUR/PT3.00/MT4.00 I 2RDS-65.00- I AM03A-14 i QISO 65-00-1 or DMG¹ na in iC3.20 i ID i na /na I i LINE¹ 2RDS-008-80-2 NTS: 2,3 iNS I 2 i na /na I I INTEG ATT ic-c i na i SUR/PT3.00/MT4.00 i 2RDS-65-00-IAM03A-15 i QISO 65-00-1 or DMG¹ na in iC3.20 /ID i na /na I I LINE¹ 2RDS-008-80-2 NTS: 2,3 INS I 2 i na /na I I INTEG ATT ic-c j na I SUR/PT3.00/MT4.00 I 2RDS-65 IAM03A-16 i QISO 65-00-1 or DMG¹ na in JC3.20 (IO i na /na I na I LIHE¹ 2RDS-008-80-2 HTS: 2,3 JNS I 2 i na /na I I IHTEG ATT (c-c i na I SUR/PT3.00/MT4.00 I 2RDS-65 IAM03A-17 i QISO 65-00-1 or DMG¹ na . in [C3.20 iiD i na /na I I LINE¹ 2RDS-008-80-2 NTS: 2,3 INS 2 i na /na I I INTEG ATT ic-c (
| |
| na I SUR/PT3.00/MT4.00 I 2RDS-65-00.IAM03A-18 i QISO 65-00-1 or DMG¹ na in ic3.20 ( ID J na /na I LINE¹ 2RDS-008-80-2 NTS: 2,3 IHS I 2 i na /na I I IHTEG ATT [c-c J na I SUR/PT3.00/MT4.00 I 2RDS-65-00-IAM03A-19 i QISO 65-00-1 or DMG¹ na in iC3.20 I ID / na /na I LINE¹ 2RDS-008-80-2 HTS: 2,3 INS 2 i na /na I I INTEG ATT ic-c J na i SUR/PT3.00/MT4.00 i 2RDS-65-00.IAM048-12 i QISO 65-00-2 or DMG¹ na in iC3.20 ilO i na /na I LINE¹ 2RDS-008-72-2 HTS: 2,3 iNS I 2 i na /na I
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - MILE POINT NUCLEAR STATION - UHIT 2 6 of 23 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED DESCRIPTIOH OF ITEN TO BE EXAHINED)CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1 REHARKS
| |
| (
| |
| EXAHIHATIOH IDENTIFIER I ITS ISO LOCATOR, COHPONEHT DMG ¹, IITEH ¹ IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I INTEG ATT ic-c i na i SUR/PT3.00/NT4.00 i 2RDS-65.00- IAW048-13 (
| |
| QISO 65-00-2 or DllG¹ na in (C3.20 /ID / na /na i LIHE¹ 2RDS-008-72-2 HTS: 2,3 /HS 2 / na/na I INTEG ATT ic-c ( na f SUR/PT3.00/NT4.00 (
| |
| 2RDS-65 IAW048-14 J QISO 65-00-2 or DMG¹ na in /C3.20 ]ID (
| |
| na /na f LINE¹ 2RDS-008-72-2 NTS: 2,3 INS 2 / na/na I IHTEG ATT (c-c I na I SUR/PT /NT 00 I 2RDS-65-00.IAW048-15 / QISO 65-00-2 or DMG¹ na in IC3.20 I ID I na /na I I LINE¹ 2RDS-008-72-2 NTS: 2 3 /NS ~
| |
| 2 ~
| |
| na /na I INTEG ATT ic-c I na I SUR/PT3.00/NT4.00 I 2RDS-65 IAW04B-16 )
| |
| QISO 65-00-2 or DMG¹ na in IC3.20 /ID J na /na I I LINE¹ 2RDS-008-72-2 NTS: 2,3 IHS 2 / na/na I I
| |
| IHTEG ATT ic-c I na I SUR/PT3.00/NT4.00 I 2RDS-65 IAW04B-17 f QISO 65-00-2 or O'MG¹ na in /C3.20 /ID / na /na LINE¹ 2RDS-008-72-2 NTS: 2,3 IHS 2 / na/na I I INTEG ATT ic-c I na I SUR/PT /NT 00 I 2RDS-65 IAW04B-18 (
| |
| QISO 65-00-2 or DWG¹ na .in (C3.20 ]ID J na /na I LINE¹ 2RDS-008-72-2 NTS: 2,3 INS 2 / na/na I IHTEG ATT Jc-c I na I SUR/PT3.00/HT4.00 I 2RDS.65 IAW04B-19 / QISO 65-00-2 or DWG¹ na in [C3.20 /ID / na /na I i LINE¹ 2RDS.008-72-2 NTS: 2,3 IHS 2 [ na/na I I IHTEG ATT ic-c I na I SUR/PT /NT4 00 I 2RDS-65 I AM06A-12 J QISO 65-00-'I or DWG¹ na in /C3.20 /ID / na /na I I LINE¹ 2RDS 008 79 2 NTS' 3 INS 2 / na/na I I INTEG ATT ic-c I na I SUR/PT3.00/HT4.00 I 2RDS.65-00-IAW06A-13 / QISO 65-00-1 or DWG¹ na in /C3.20 [ID J na /na I na I LINE¹ 2RDS-008-79-2 HTS: 2 3 /NS 2 / na/na I
| |
| | |
| HIAGARA HOHAMK POWER CORPORATION - NILE POINT HUCLEAR STATION - UNIT 2 7 of 23 NHP2-ISI-006, REV. 1( CH-000 SECOND TEN YEAR IHSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REQ ( DESCRIPTIOH OF ITEN TO BE EXANIHED(CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1 REHARKS EXAHIHATIOH IDENTIFIER (
| |
| ITS ISO LOCATOR, CDHPONENT DMG ¹, (ITEN ¹ (FREQY( EX2/HOE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ (
| |
| LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 (
| |
| I INTEG ATT (C-C I na I SUR/PT3.00/HT4.00 I 2RD S-65 I AM06A-14 (
| |
| Qrso 65-00-1 or DMG¹ na in (C3.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2RDS-008-79-2 HTS: 2 3 (NS 2 (
| |
| na/na I IHTEG ATT (C-C (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2RDS 65-00-IAl$6A-15 (
| |
| QISO 65-00-1 or DMG¹ na in (C3.20 (IO (.na /na
| |
| ( LINE¹ 2RDS-008-79-2 HTS: 2,3 IHS 2 (
| |
| na /na I I IHTEG ATT (C-C (
| |
| na I SUR/PT3.00/HT4.00 I 2RDS-65 IAW06A-16 (
| |
| QISO 65-00-1 or DWG¹ na in (C3.20 (ro (
| |
| na /na I I LIHE¹ 2ROS-008-79-2 HTS: 2,3 (NS 2 (
| |
| na /na I INTEG ATT (C-C (
| |
| na (
| |
| SUR/PT3.00/NT4.00 (
| |
| 2RDS-65 IAM06A-17 ( QISO 65-00-1 or DMG¹ na in (C3.20 (IO ( na /na I na I LINE¹ 2RDS-008-79-2 NTS: 2,3 (HS 2 ( na /na I I INTEG ATT (C-C (
| |
| na I SUR/PT3.00/HT4 F 00 I 2RDS-65 IAM06A-18 (
| |
| QISO 65-00-1 or DMG¹ na in (C3.20 (ro ( na /na I na I LINE¹ 2RDS-008-79-2 NTS: 2,3 INS I 2 ( na /na I I INTEG ATT (C-C ( na I SUR/PT3 00/MT4 0 I 2RDS.65 I AM06A-19 ( QISO 65.00-1 or DMG¹ na .in (C3.20 (IO (
| |
| na /na I na I LINE¹ 2RDS-008-79-2 HTS: 2,3 IHS 2 (
| |
| na /na I I INTEG ATT (C-C (
| |
| na (
| |
| SUR/PT3.00/HT4.00 2RDS-65-00-IAW078-12 (
| |
| QISO 65-00-2 or DWG¹ na in (C3.20 (ro (
| |
| na /na I I LINE¹ 2RDS-008-71-2 N'TS: 2 INS 2 (
| |
| na /na I I INTEG ATT (C-C (
| |
| na I SUR/PT3.00/NT4.00 I 2RDS-65-00. IAW078-13 (
| |
| QISO 65-00-2 or DWG¹ na in (C3.20 (IO (
| |
| na /na I I LIHE¹ 2RDS 008 71 2 HT ' 3 (HS I 2 ( na /na I I IHTEG ATT (C-C (
| |
| na I SUR/PT3.00/HT4.00 I 2RDS.65-00 IAM078-14 (
| |
| QISO 65-00-2 or DMG¹ na in (C3.20 (ro ( na /na I I LINE¹ 2ROS-008-71-2 NTS: 2,3 IHS 2 ( na /na I
| |
| | |
| NIAGARA MOHAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 8 of 23 NNP2-ISI-006, REV. 1, CH.OOO SECOHD TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHINATION IDENT I F IER ITS ISO LOCATOR, CONPOHEHT DWG ¹, iITEH ¹ iFREOYi EX2/NDE PROCEDURE iPERIOO 2 i.
| |
| USE CAL BLK ¹ [ LINE HO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I INTEG ATT ic-c / na / SUR/PT3.00/NT4.00 /
| |
| 2RDS-65 IAW078-15 (
| |
| QISO 65-00-2 or DMG¹ na in /C3.20 /ID / na /na I LINE¹ 2RDS-008-71-2 HTS: 2,3 iHS 2 ) na /na I I INTEG ATT ic-c I na I SUR/PT3.00/NT4.00 I 2RDS-65-00-IAW07B-16 )
| |
| QISO 65-00-2 or DWG¹ na in )C3.20 ]ID J na /na i LINE¹ 2RDS-008-71-2 NTS: 2,3 )HS 2 / na/na I I INTEG ATT ic-c I na I SUR/PT3.00/HT4.00 I 2RDS-65 IAW078-17 / QISO 65-00-2 or DMG¹ na in /C3.20 /ID J na /na I I LINE¹ 2RDS-008-71-2 Nl'S: 2,3 /NS 2 / na/na I I INTEG ATT Jc-c I na I SUR/PI3.00/HI4 ~ 00 I 2RDS-65-00-IAl$ 7B-18 / QISO 65-00-2 or DMG¹ na in /C3.20 /10 / na /na
| |
| / LIHE¹ 2RDS-008-71-2 HTS: 2,3 iNS 2 / na /na I I INTEG ATT ic-c I na I SUR/PT3.00/NT4.00 I 2RDS-65. 00- I AM078-19 f QISO 65-00.2 or DMG¹ na in /C3.20 ]ID f na /na I LINE¹ 2RDS-008-71-2 NTS: 2I3 /NS 2 / na /na I I IHTEG ATT ic-c I na I SUR/PT3.00/HT4.00 I 2RDS-65 IAM09A-16 / QISO 65-00-1 or DMG¹ na . in /C3.20 ]ID J na /na I LINE¹ 2RDS-008-78.2 HTS: 2,3 INS 2 J na /na I I INTEG ATT Jc-c I na I SUR/PT3.00/HT4.00 I 2RDS-65 IAW09A-17 / QISO 65-00-1 or DWG¹ na in JC3.20 [ID [ na /na I
| |
| )
| |
| LINE¹ 2RDS-008-78-2 NTS: 2,3 /NS 2 / na/na I I INTEG ATT ic-c I na I SUR/PT3.00/NT4.00 I 2RDS-65-00-IAl$ 9A-18 (
| |
| QISO 65-00-1 or DMG¹ na in /C3.20 ]ID f na /na LINE¹ 2RDS-008-78-2 HTS: 2,3 INS 2 / na /na I I INTEG ATT ic-c I na I SUR/PT3.00/NT4 F 00 I 2RDS-65 IAM09A-19 )
| |
| QISO 65-00-1 or DWG¹ na in /C3.20 ]ID f na /na I LINE¹ 2RDS-008-78-2 HTS: 2,3 /NS 2 / na/na I
| |
| | |
| 0 NIAGARA NOHAMK PDMER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 9 of 23 HHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEH (sorted by Examination Identifier)
| |
| HD IHTVL REL REQ I DESCRIPTIOH OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOD 1 RENARKS EXANIHATIOH IDENTIFIER f ITS ISO LOCATOR, CONPOHEHT DMG ¹, ]ITEN ¹ JFREQY[ EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ I LINE HO AND NOTESi AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I IHTEG ATT iC-C I na I SUR/PT3 00/HT4 00 I 2RDS-65 IAM09A-20 (
| |
| QISO 65-00-1 or DMG¹ na in /C3 ~ 20 /ID / na /na I na I LINE¹ 2RDS-008-78-2 NTS: 2 3 /NS 2 / na/na I I
| |
| IN'TEG ATT Jc-c I na I SUR/PT3.00/HT4.00 I 2RDS-65 IAM09A-21 ) QISO 65-00-1 or DMG¹ na In /C3.20 ]ID / na /na I
| |
| )
| |
| LINE¹ 2RDS-008-78-2 NTS: 2(3 /NS 2 / na/na I I IHTEG ATT iC-C J na (
| |
| SUR/PT3.00/HT4.00 [
| |
| 2RDS.65-00-1AM09A-22 f QISO 65-00-1 or DMG¹ na in /C3.20 (ID J na /na I i LINE¹ 2RDS.008-78-2 HTS: 2,3 /HS 2 J na /na INTEG ATT iC-C J na [ SUR/PT3.00/NT4.00 J 2RDS-65.00. IAM09A-23 J QISO 65-00-1 or DMS¹ na in /C3.20 [ID f na /na I I LINE¹ 2RDS.008-78-2 NTS: 2,3 JNS 2 f na/na I I INTEG ATT iC-C f na f SUR/PT3.00/HT4.00 f 2RDS-65-00-IA'M09A-24 (
| |
| QISO 65-00-1 or DMS¹ na in /C3.20 [ID I I LINE¹ 2RDS-008-78-2 NTS: 2,3 INS 2 )
| |
| na/na I INTEG ATT (c-c I na I SUR/PT3.00/HT4.00 I 2RDS-65-00-IAM09A-25 / QISO 65-00-1 or DMG¹ na . in /C3.20 /ID f na /na I i LINE¹ 2RDS-008-78-2 NTS: 2,3 iNS 2 / na/na I INTEG ATT iC-C I na I SUR/PT3 00/HT4 00 I 2RDS-65-00-IAM10B-16 )
| |
| QISO 65-00-2 or DMG¹ na in /C3.20 ]ID ( na /na I I LIHE¹ 2RDS-008-70-2 HTS: 2,3 /HS 2 / na /na I I IHTEG ATT iC-C )
| |
| na J SUR/PT3.00/HT4.00 J 2RDS-65 IAM10B-17 / QISO 65-00-2 or DMG¹ na in JC3.20 /ID J na /na na I LINE¹ 2RDS-008-70-2 NTS: 2,3 INS 2 / na /na I I INTEG ATT iC-C J na [ SUR/PT3.00/NT4.00 f 2RDS-65 IAM10B-18 [ QISO 65-00-2 or DMG¹ na in [C3 ~ 20 )ID f na /na i LINE¹ 2RDS-008-70-2 NTS: 2,3 IHS I 2 I na /na I
| |
| | |
| N IAGARA HOHAMK POMER CORPORATION
| |
| - ILE POINT NUCLEAR STATION - UNIT 2 10 of 23 HHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEH (sorted by Exemination Identifier) 2HD IHTVL REL REQ [ DESCRIPTIOH OF ITEN TO BE EXAHINEO[CATGRY [ IGSCC[ EX1/NDE PROCEDURE )PERIOD 1 REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONEHT DMG ¹, i ITEH ¹ iFREGYi EX2/HDE PROCEDURE (PERIOD 2 i USE CAL BLK ¹ I LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I INTEG ATT IC C I na I SUR/PT3 00/HT I 2RDS-65-00-IAM108-19 )
| |
| QISO 65-00-2 or DMG¹ na in /C3.20 (ID' na /na na I LINE¹ 2RDS-008-70-2 NTS: 2(3 )HS J 2 [ na /na IHTEG ATT IC C I na I SUR/PT '00/HT4 I I
| |
| 2ROS-65. 00- I AMTOB-20 J QISO 65-00-2 or DMG¹ na in ]C3.20 )ID )
| |
| na /na
| |
| ) LINE¹ 2RDS-008.70.2 HTS: 2,3 [NS f 2 / na /na I I IHTEG ATT JC-C J na J SUR/PT3.00/HT4.00 J 2RDS-65 I A'M10B-21 J QISO 65-00-2 or DMG¹ na in JC3.20 [ID J na /na I I LINE¹ 2RDS-008-70-2 NTS: 2,3 )NS / 2 / na/na I I IHTEG ATT IC-C I na I SUR/PT3.00/NT4.00 I 2ROS-65-00. I A'MIOB-22 )
| |
| QISO 65-00-2 or DMG¹ na in [C3.20 [ID f na /na LINE¹ 2RDS-008-70-2 HTS: 2,3 /HS ) 2 / na/na I I INTEG ATT IC-C I na I SUR/PT3.00/HT4.00 I 2ROS-65-00-IA'M108-23 f QISO 65-00-2 or DMG¹ na in /C3.20 /ID / na /na
| |
| (
| |
| LINE¹ 2RDS-008-70-2 NTS: 2,3 /NS / 2 / na /na I I INTEG ATT fC-C J na )
| |
| SUR/PT3.00/HT4.00 JEX6 2RDS-65-00-IAM12A-20 [ QISO 65-00-1 or DMG¹ na .in [C3.20 [ID ] na /na I LINE¹ 2RDS-008-77-2 HTS: 2,3 JHandatef 2 f na /na I I INTEG ATT )C-C ) na ] SUR/PT3.00/HT4.00 JEX6 2RDS-65 IAM12A-21 (
| |
| QISO 65-00-1 or DMG¹ na in IC3 ~ 20 IID I na /na I LINE¹ 2RDS 008 77 2 NTS'i3 /Handatef 2 f na /na I I IHTEG ATT IC-C I na I SUR/PT3.00/HT4.00 IEX6 2RDS-65.00-IAM12A-22 f QISO 65.00-1 or DMG¹ na in (C3.20 ]ID [ na /na I I LIHE¹ 2RDS-008-77-2 NTS: 2,3 (Handate/ 2 / na /na I I
| |
| IN'TEG ATT IC C I na I SUR/PT3.00/HT4.00 IEX6 2RDS-65-00-IAM12A-23 ] QISO 65-00-1 or DMG¹ na in JC3.20 ]ID J na /na I na I LINE¹ 2RDS-008-77-2 NTS: 2,3 ]Handate[ 2 [ na /na I
| |
| | |
| NIAGARA NOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 11 of 23 HNP2-ISI-006( REV. 1, CH.000 SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEN (sorted by Examination Identifier) 2HD IHTVL REL REa DESCRIPTION OF ITEN TO BE EXANINEDiCATGRY ilGSCC) EX1/HDE PROCEDURE IPERIOO 1 I RENARKS I
| |
| EXANINATIOH IDENTIFIER I ITS ISO LOCATOR'OHPOHEHT OMG ~ IITEN ¹ IFREQYI EX /HDE PROCEDURE IPERIOD 2 USE CAL BLK ¹ ) LIHE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I INTEG ATT IC C I na I SUR/PT 00/HT4.00 IEX6 2ROS-65-00-IAM12A-24 )
| |
| QISO 65-00-1 or OMG¹ na in /C3.20 /ID / na /na I LINE¹ 2RDS-008-77-2 NTS: 2 3 /Nandate/ 2 / na /na I I INTEG ATT IC-C I na I SUR/PT3.00/NT4.00 IEX6 2RDS-65-00-IAM12A-25 ] QISO 65-00-1 or DMG¹ na in IC3.20 IID I na /na I
| |
| [ LINE¹ 2RDS-008-77-2 NTS: 2,3 (Nandate/ 2 / na /na I I IHTEG ATT IC-C I na I SUR/PT3.00/NT4.00 lEX6 2RDS.65-00.IAW12A-26 f QISO 65-00-1 or DMG¹ na in JC3.20 )ID f na /na I LINE¹ 2RDS-008-77-2 NTS: 2,3 /Nandate) 2 J na /na INTEG ATT /C-C f na f SUR/PT3.00/HT4.00 JEX6 2RDS-65-00-IAW12A-27 QISO 65-00-1 or DMG¹ na in /C3.20 /ID / na /na LINE¹ 2RDS-008-77-2 NTS: 2,3 /Nandate/ 2 / na /na I I INTEG ATT IC C I na I SUR/PT3.00/NT4.00 (EX6 2RDS-65-00-IAW12A-30 (
| |
| QISO 65-00-1 or DWG¹ na in (C3.20 JIO ( na /na I LIHE¹ 2RDS-008-77-2 NTS: 2,3 /Nandate/ 2 / na /na I I IHTEG ATT )C-C ] na )
| |
| SUR/PT3.00/NT4.00 JEX6 2RDS.65 I AW12A-31 [ QISO 65-00-1 or DMG¹ na .in /C3.20 [ID / na /na
| |
| / LINE¹ 2RDS 008-77-2 NTS: 2,3 /HAHDATE/ 2 / na /na I IHTEG ATT /C-C / na / SUR/PT3 F 00/NT4.00 /
| |
| 2RDS-65-00-IA'M13B-20 (
| |
| QISO 65-00-2 or DMG¹ na in /C3.20 /ID / na /na LINE¹ 2RDS-008-69 2 HTS: 2,3 (NS i 2 / na/na I I IHTEG ATT IC-C I na I SUR/PT3.00/NT4.00 I 2RDS-65 IAW13B-21 )
| |
| QISO 65-00-2 or DWG¹ na in /C3.20 /ID / na /na I na LINE¹ 2RDS-008.69-2 HTS: 2,3 JHS f 2 f na/na I I IHTEG ATT IC C I M I SUR/PT3 00/HT4 F 00 I 2RDS.65 IAW13B-22 )
| |
| QISO 65-00-2 or DMG¹ na in JC3.20 [ID / na /na I LINE¹ 2RDS-008-69-2 NTS: 2,3 JNS / 2 / na /na I
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - NILE POINl'UCLEAR STATION - UNIT 2 12 of 23 NHP2-ISI-006, REV. 1( CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL REO ( DESCRIPTION OF ITEN TO BE EXANINED)CATGRY ]IGSCC( EX1/HDE PROCEDURE (PERIOD 1 RENARKS EXAHINATIOH IDEHTIFIER J ITS ISO LOCATOR, COHPOHENT DMG ¹, )ITEN ¹ JFREOY) EX2/HDE PROCEDURE [PERIOD 2 [
| |
| USE CAL BLK ¹ I LINE NO. AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIDO 3 I I INTEG ATT ic-c I na I SUR/PT3.00/NT4.00 I 2RDS-65-00-IAM13B-23 [ QISO 65-00-2 or DMG¹ na in /C3.20 ]ID J na /na na I LINE¹ 2RDS-008-69-2 HTS: 2,3 iNS 2 / na/na I IHTEG ATT ic-c I na I SUR/PT3.00/HT4.00 I 2RDS-65 IAM13B-24 [ QISO 65-00-2 or DMG¹ na in JC3.20 /ID / na /na I LINE¹ 2RDS-008-69-2 HTS: 2 (NS 2 / na/na I I IHTEG ATT ic-C I na I SUR/PT3.00/NT4.00 I 2RDS.65 IAM138-25 J QISO 65-00-2 or DMG¹ na in /C3.20 /ID / na /na I LINE¹ 2RDS.008-69-2 NTS: 2,3 INS 2 / na /na I I IHTEG ATT Jc-c / na )
| |
| SUR/PT3.00/HT4.00 /
| |
| 2RDS-65 IAM13B-26 f QISO 65-00-2 or OMG¹ na in JC3.20 /ID / na /na I I LINE¹ 2RDS-008-69-2 NTS: 2,3 )NS 2 / na/na I I IHTEG ATT /c-c I na I SUR/PT3.00/NT4.00 I 2RDS-65 IAM13B-27 ) QISO 65-00-2 or DMG¹ na in [C3.20 /ID / na /na I I LINE¹ 2RDS.008-69-2 NTS: 2,3 iNS 2 / na/na I I INTEG ATT ic-c / na / SUR/PT3.00/NT4.00 /
| |
| 2RD S-65 I AM13B-32 / QISO 65-00-2 or DMG¹ na .in /C3.20 /ID / na /na I LIHE¹ 2RDS-008.69-2 HTS: 2,3 IHS 2 / na/na I I IHTEG ATT )C-C ) na f SUR/PT3.00/NT4.00 J 2RDS-65-00-IA'M13B-33 (
| |
| QISO 65-00-2 or DMG¹ na in /C3.20 (ID ( na /na I LINE¹ 2RDS.008.69-2 NTS: 2,3 /HS 2 / na/na I I IHTEG ATT [C-C / na / SUR/PT3.00/HT4.00 JEX6 2RDS-65 IAM15A-20A )
| |
| QISO 65-00-1 or DMG¹ na in /C3.20 /ID / na /na I LIHE¹ 2RDS-008-76-2 NTS: 2,3 /Mandate/ 2 / na /na I INTEG ATT IC-C I na I SUR/PT3.00/NT4.00 1EX6 2RDS-65 IAM15A-21A [ QISO 65-00-1 or DMG¹ na in /C3.20 /ID / na /na I LINE¹ 2RDS.008-76-2 HTS: 2,3 /Nandate/ 2 J na /na I
| |
| | |
| 0 NIAGARA MONANK POHER CORPORATION - h MILE POINT NUCLEAR STATION - UNIT 2 13 of 23 NMP2-IS1-006( REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL REO (
| |
| DESCRIPTION OF ITEM TO BE EXAMIHEDJCATGRY )IGSCC) EX1/HDE PROCEDURE )PERIOD 1 REMARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR'OMPONENT DUG ¹n I ITEM ¹ IFREQYI EX2/NDE PROCEDURE IPERIOD 2 I USE CAL BLK I LINE NO AND NOTESi AS APPLICABLE ISELECT ICLASSI EX /HDE PROCEDURE IPERIOO I I INTEG ATT /C-C / na I SUR/PT3.00/MT4.00 IEX6 2RDS-65 IAM15A-22A / QISO 65-00-1 or DUG¹ na in /C3.20 /ID / na /na I LINE¹ 2RDS-008-76-2 NTS: 2,3 /Mandate/ 2 / na /na I INTEG ATT )C-C J na I SUR/PT3.00/MT4.00 IEX6 2RDS-65-00-IALI15A-23A )
| |
| QISO 65-00-1 or DUG¹ na in /C3.20 /ID / na /na I I LINE¹ 2RDS-008-76-2 NTS: 2,3 (Mandate/ 2 / na /na I I INTEG ATT /C-C (
| |
| na I SUR/PT3.00/MT4.00 IEX6 2RDS-65 IAW15A-24 / QISO 65-00-1 or DUG¹ na in /C3.20 /ID [ na /na na I LINE¹ 2RDS-008-76-2 HTS: 2,3 /Mandate/ 2 / na /na I INTEG ATT JC-C / na I SUR/PT3.00/MT4.00 lEX6 2RDS-65 IAM15A-25A ) QISO 65-00-1 or DUG¹ na in )C3.20 (ID / na /na I LINE¹ 2RDS-008-76-2 NTS: 2,3 ]Mandate) 2 / na /na I I IHTEG ATT /C-C / na I SUR/PT /MT'0 IEX6 2RDS-65 IAHISA-26A )
| |
| QISO 65-00-1 or DUG¹ na in [C3.20 (ID ( na /na na ( LINE¹ 2RDS.008-76-2 HTS: 2,3 ]Mandate/ 2 )
| |
| na /na I I IHTEG ATT /C-C J na i SUR/PT3.00/MT4.00 [EX6 2RDS-65 IAW15A-27A / QISO 65-00-1 or DUG¹ na .in /C3.20 /IO / na /na na i LINE¹ 2RDS-008-76-2 NTS: 2,3 /Mandate/ 2 / na /na I I INTEG ATT )C-C / na I SUR/PT3.00/MT4.00 IEX6 2RDS-65 IAU15A-30 ) QISO 65-00-1 or DWG¹ na in /C3.20 / IO J na /na I I LINE¹ 2RDS-008-76-2 HTS: 2,3 /Mandate/ 2 / na /na I I INTEG ATT /C-C ( na I SUR/PT3.00/MT4.00 lEX6 2RDS-65 IAHI5A-31 [ QISO 65.00-1 or DUG¹ na in [C3.20 )ID / na /na na I LIHE¹ 2RDS-008-76.2 HTS 2,3 (Mandate[ 2 [ na /na I I I IHTEG ATT /C-C / na [ SUR/PT3.00/MT4.00 /
| |
| 2RDS 65-00-IAH168-20 f QISO 65-00-2 or DUG¹ na in /C3.20 /ID / na /na LINE¹ 2RDS-008-68-2 NTS: 2,3 /HS / 2 / na /na I
| |
| | |
| NIAGARA HONAMK POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 14 of 23 HHP2-ISI-006( REV. 1, CN-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED ) DESCRIPTION OF ITEH TO BE EXAHIKEDiCATGRY )IGSCCi EX1/HDE PROCEDURE iPERIOO 1 REHARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COHPONEHT DMG ¹, iITEH ¹ iFREOYi EX2/NDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ i LIHE NO. AKD NOTES, AS APPLICABLE DESELECT iCLASSi EX3/HDE PROCEDURE (PERIOD 3 I INTEG ATT ic-c I na I SUR/PT3.00/HT4 F 00 I 2RDS-65 IAM16B-21 i QISO 65-00-2 or DMG¹ na in JC3.20 iID i na /na I LIHE¹ 2RDS.008.68-2 NTS: 2,3 IHS 2 i na/M I I IHTEG ATT ic-c I M I SUR/PT3.00/HT4.00 I 2RDS-65 IA'W168-22 i QISO 65-00-2 or DMG¹ na in iC3.20 iID i na /na I i LIKE¹ 2RDS-008-68-2 NTS: 2,3 IHS 2 J na/na I I INTEG ATT ic-c I M I SUR/PT3.00/HT4.00 I 2RDS-65 I AM16B-23 i QISO 65-00-2 or DMG¹ na in iC3.20 )ID i na /na i LINE¹ 2RDS-008-68-2 NTS: 2,3 iHS 2 i na /na I INTEG ATT ic-c i na i SUR/PT3.00/HT4.00 i I 2RDS-65-00.IAW168-24 ) QISO 65-00.2 or DWG¹ na in iC3.20 (ID i na /na I I LINE¹ 2RDS-008-68.2 HTS: 2,3 iHS 2 i na /na I I I INTEG ATT [c-c i na [ SUR/PT3.00/HT4.00 i 2RDS-65 IAM16B-25 i QISO 65-00-2 or DMG¹ na in iC3.20 /ID i na /na I I LIKES 2RDS-008-68-2 NTS: 2,3 iHS 2 i na/na I I INTEG ATT ic-c I na I SUR/PT3 00/HT 0 I 2RDS-65 I AM16B-26 i QISO 65-00-2 or DMG¹ na .in )C3.20 iID / na /na i LINE¹ 2RDS.008.68-2 NTS: 2,3 iHS 2 i na/na I I INTEG ATT ic-c I M I SUR/PT3.00/HT4.00 I 2RDS-65 IAM16B-27 i QISO 65-00-2 or DMG¹ na in iC3.20 iID i na /na LINE¹ 2RDS.008-68-2 HTS: 2 3 iNS 2 i na/na I I IHTEG ATT ic-C i na i SUR/PT3.00/HT4.00 i 2RDS-65 I AM16B-32 i QISO 65-00-2 or DMG¹ na in JC3.20 iID J na /na I LIHE¹ 2RDS-008-68-2 HTS: 2,3 iHS 2 J na/na I INTEG ATT ic-c J na I SUR/PT3.00/HT4 00 I 2RDS-65-00-IAM16B-33 i QISO 65-00-2 or DMG¹ na in iC3.20 iID i na /na na LINE¹ 2RDS-008-68-2 NTS: 2,3 INS 2 / na /na I
| |
| | |
| NIAGARA NONAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 15 of 23 HNP2-ISI-006( REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) IHTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTION OF ITEN TO BE EXANIHEDiCATGRY iIGSCCi EX1/HDE PROCEDURE iPER100 1 RENARKS EXANINATIOH IDENTIFIER i ITS ISO LOCATOR, COHPONEHT DMG ¹, iITEN ¹ iFREGYi EX2/HDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ I LINE NO AHD NOTES( AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I IH'TEG ATT ic-c i na I SUR/PT3.00/NT4.00 i 2RD S-65-00. I A'W18A. 20 i QISO 65-00-1 or DMG¹ na in /C3.20 iiO i na /na i LIHE¹ 2RDS-008-75-2 HTS: 2,3 iNS 2 )
| |
| na /na I I IHTEG ATT JC-C J na I SUR/PT3.00/HT4.00 I 2RDS-65 I A'W18A-21 i QISO 65-00-1 or DWG¹ na in iC3.20 tiO i na /na I i LINE¹ 2RDS-008-75-2 NTS: 2,3 tNS 2 i na /na I I INTEG ATT ic-c i na I SUR/PT3.00/NT4.00 I 2ROS-65 I AMIBA-22 J QISO 65-00-1 or OMG¹ na in IC3.20 )IO i na /na i LINE¹ 2RDS-008-75-2 NTS: 2,3 )NS I 2 J na /na I I INTEG ATT ic-c i na I SUR/PT3.00/NT4.00 I 2RDS-65-00.IA'W18A.23 J QISO 65-00-1 or DMG¹ na in iC3.20 iiO i na /na I I LIHE¹ 2RDS-008-75-2 HTS: 2,3 INS 2 i na /na I I IHTEG ATT /c-c / na I SUR/PT3.00/NT4.00 I 2RDS-65-00 IAM18A-24 i QISO 65-00-1 or DWG¹ na in iC3.20 iiO .
| |
| i na /na I
| |
| )
| |
| LINE¹ 2RDS-008-75-2 NTS: 2 3 iNS 2 i na /na I I IHTEG ATT /c-c / na i SUR/PT3.00/NT4.00 i 2RDS-65-00-IAM18A-25 i QISO 65-00-1 or DMS¹ na .in iC3.20 i IO i na /na na i LINE¹ 2RDS-008-75-2 NTS: 2(3 iNS 2 ( na /na I I IHTEG ATT ic-c i na I SUR/PT 00/NT 00 I 2RD S-65 I AM18A-26 i QISO 65-00-1 or DWG¹ na in /C3.20 [ IO J na /na I I LINE¹ 2RDS-008-75-2 NTS: 2(3 iNS I 2 i na /na I I INTEG ATT ic-c i na I SUR/PT3.00/NT4.00 I 2ROS.65-00.IAW18A-27 ) QISO 65-00-1 or DWG¹ na in iC3.20 iIO i na /na LINE¹ 2RDS-008-75-2 HTS: 2,3 iHS 2 i na /na i I I IHTEG ATT ic-c / na J SUR/PT3 F 00/NT4.00 /
| |
| 2RDS-65 I AM18A-31 i QrSO 65-O0-1 or DMG¹ na in IC3.20 i io / na /na i LINE¹ 2RDS-OM-75-2 NTS: 2,3 iNS 2 i na /na I
| |
| | |
| HIAGARA HOHAWK POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 16 of 23 NHP2- ISI-006, REV. 'I, CH-000 SECOHD TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REG )
| |
| DESCRIPTION OF ITEN TO BE EXAHINED)CATGRY (IGSCC) EXl/HDE PROCEDURE )PERIOD 1 REHARKS EXAHIHATIOH IDEHI'IFIER )
| |
| ITS ISO LOCATOR, COMPONENT DWG ¹, )ITEN ¹ JFREGY] EX2/HDE PROCEDURE [PERIOD 2 )
| |
| USE CAL BLK ¹ i LINE NO. AHD NOTES, AS APPLICABLE ]SELECT iCLASS[ EX3/HDE PROCEDURE iPERIOO 3 I IHTEG ATT ic-c J na I SUR/PT3.00/HT4.00 I 2RDS-65-00 IAW18A-32 65-00-1 or DWG¹ na in /C3.20 ID' na /na
| |
| / QISO J J na i LINE¹ 2RDS-008-75-2 NTS: 2,3 JHS [ na /na I I IHTEG ATT , ic-c / na I SUR/PT3.00/HT4.00 I 2RDS-65.00.IAW198-20 (
| |
| QISO 65-00-2 or DWG¹ na in /C3.20 /ID J na /na I
| |
| )
| |
| LINE¹ 2RDS.008.67-2 NTS: 2,3 /HS I 2 / na /na I I IHTEG ATT ic-c / na I SUR/PT3.00/HT4.00 I 2RDS-65.00- IA'M198-21 / QISO 65-00-2 or DWG¹ na in /C3.20 /ID J na /na I LINE¹ 2RDS-008.67-2 NTS: 2,3 JHS 2 / na /na INTEG ATT ic-c / na I SUR/PT3.00/NT4.00 I 2RDS-65-00-IAM198-22 QISO 65-00-2 or DMG¹ na in /C3.20 /ID / na /na I na LINE¹ 2RDS-008.67-2 NTS: 2,3 iHS 2 / na /na I I INTEG ATT /c-c / na I SUR/PT3.00/HT4.00 I 2RDS-65-00.IAW198-23 / QISO 65-00-2 or DMG¹ na in /C3.20 /ID ( na /na I na I LIHE¹ 2RDS-008-67-2 HTS: 2,3 /NS I 2 f na /na I I INTEG ATT ic-c J na I SUR/PT3.00/HT4.00 I 2RDS.65.00-IAW198-24 [ QISO 65-00-2 or DWG¹ na .in )C3.20 I ID ] na /na I na I LINE¹ 2RDS-008-67.2 HTS: 2,3 /HS I 2 f na /na I I IHTEG ATT Jc-c / na I SUR/PT3.00/HT4.00 I 2RDS-65-00. IAW198-25 )
| |
| QISO 65-00-2 or DMG¹ na in /C3.20 (ID f na /na I I LINE¹ 2RDS-008.67-2 NTS 2 3 iHS 2 f na /na I I INTEG ATT Jc-c / na I SUR/PT3 00/HT4 00 I 2RDS.65-00-IAW198-26 (
| |
| QISO 65-00-2 or DWG¹ na in JC3.20 /ID J na /na
| |
| )
| |
| LINE¹ 2RDS-008.67-2 HTS: 2,3 IHS I 2 f na /na I I INTEG ATT ic-c / na SUR/PT3.00/M'I4.00 2RDS-65-00-IA'M19B 27 (
| |
| QISO 65-00-2 or DWG¹ na in /C3.20 /ID / na /na I I LIHE¹ 2RDS 008 67 2 HTS' 3 /HS I 2 / na /na I
| |
| | |
| NIAGARA NONAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 17 of 23 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REO ( DESCRIPTIOH OF ITEN TO BE EXANIHED(CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1 RENARKS EXANIHATIOH IDEHI'IFIER (
| |
| ITS ISO LOCATOR, COMPONENT DWG ¹, (ITEN ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO AHD NOTES AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE I ERIOD 3 I I INTEG ATT (C-C ( na (
| |
| SUR/PT3.00/NT4.00 (
| |
| 2RDS-65 IAM198-32 ( QISO 65-00-2 or DMG¹ na in (C3.20 I ID (
| |
| na /na
| |
| ( LINE¹ 2RDS-008.67-2 NTS: 2,3 (NS 2 (
| |
| na /na I I IHTEG ATT (C-C (
| |
| na I SUR/PT3.00/NT4.00 I 2RDS-65 IAW19B-33 (
| |
| QISO 65-00-2 or DMG¹ na in (C3.20 (ID (
| |
| na /na I LINE¹ 2RDS 008 67 2 NTS'i3 (NS I 2 (
| |
| na /na I I INTEG ATT (C-C (
| |
| na I SUR/PT3.00/NT4.00 I 2RDS-65 I AM22A-16 (
| |
| QISO 65-00-1 or DMG¹ na in (C3.20 I ID- (
| |
| na /na I I LINE¹ 2RDS.008.81-2 NTS: 2,3 INS 2 (
| |
| na /na I I IHTEG ATT (C-C (
| |
| na ( SUR/PT3.00/MT4.00 I 2RDS.65.00.IA'W22A-17 (
| |
| QISO 65-00-1 or DWG¹ na in (C3.20 (ID ( na /na na LINE¹ 2RDS.008-81-2 NTS: 2,3 (HS 2 (
| |
| na /na I I INTEG ATT (C-C (
| |
| na I SUR/PT3.00/NT4.00 I 2RDS-65 IAW22A-18 (
| |
| QISO 65-00-1 or DWG¹ na in (C3 ~ 20 (ID (
| |
| na /na I LINE¹ 2RDS.008.81-2 NTS: 2 (HS 2 (
| |
| na /na I I INTEG ATT (C-C (
| |
| na I SUR/PT3.00/NT4.00 I 2RDS-65 IAM22A-19 ( QISO 65-00-1 or DWG¹ na .in (C3.20 (ID ( na /na I
| |
| ( LINE¹ 2RDS-008.81-2 NTS: 2,3 (HS I 2 (
| |
| na /na I I IHTEG ATT (C-C (
| |
| na (
| |
| SUR/PT3.00/NT4.00 (
| |
| 2RDS-65-00-IAW22A-20 (
| |
| QISO 65-00-1 or DMG¹ na in (C3.20 (ID (
| |
| na /na (
| |
| I LINE¹ 2RDS-008-81-2 NTS: 2 3 (HS 2 (
| |
| na /na I I INTEG ATI' (C-C (
| |
| na I SUR/PT3.00/HT4.00 I 2RDS-65 I AW22A-21 QISO 65-00-1 or DMG¹ na in (C3.20 (ID ( na /na LINE¹ 2RDS.008-81-2 NTS: 2,3 (HS 2 ( na /na I I INTEG ATT (C-C (
| |
| na I SUR/PT3.00/HT4 00 I 2RDS-65-00-IAW22A-22 ( QISO 65-00-1 or DWG¹ na in (C3.20 (ID (
| |
| na /na I I LINE¹ 2RDS-008.81-2 HTS: 2,3 (NS 2 (
| |
| na /na I
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UHIT 2 18 of 23 NNP2-ISI-006, REV ~ 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL RED i DESCRIPTIOH OF ITEN To BE EXANIHEoiCATGRY iIGSCCi EX'I/NDE PROCEDURE iPERICO 1 REHARKS EXAHIHATIOH IDENTIFIER i ITS ISO LOCATOR, CONPONENT DMG ¹, iITEH ¹ iFREOYi EX2/HDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I IHTEG ATT ic-c I M I SUR/PT3.00/HT4.00 I 2RDS-65-00.IAM22A-23 i QISO 65-00-1 or DMG¹ na in iC3.20 iIO i na /na na I LINE¹ 2ROS-008.81-2 NTS: 2(3 iHS 2 i na/na I I INTEG ATT ic-c I na I SUR/PT3.00/NT4.00 I 2ROS-65-00-IAM22A-24 i QISO 65-00-1 or DMG¹ na in iC3.20 iio / na /na I LINE¹ 2RDS-008-81-2 NTS: 2,3 iNS 2 i na /na I INTEG ATT ic-c I na I SUR/PT3.00/HT4.00 I 2RDS-65 00-IAM22A-25 i QISO 65-00-1 or DMG¹ na in iC3 ~ 20 iio i na /na I na I LINE¹ 2RDS.008.81-2 NTS: 2,3 iNS 2 / na /na I I 'MHF/PIPE IC-F-2 i na i VOL/UT6.02 2RDS-65-00.SM001 i QISO 65-00-1 or DMG¹ na in iC5.51 [none i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS I LINE¹ 2RDS.008-81-2 NTS: 1,2 iso 2 i na /na I I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2RDS-65-00.SM002 i QISO 65-00-1 or DMG¹ na in iC5.51 inone i SUR/PT3.00/NT4.00 i NHP2.8..594-CS i LIHE¹ 2RDS-008.81-2 HTS: 2,4 iso 2 i na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2RDS.65-00.S'M003 i QISO 65-00-1 or DMG¹ na .in iC5.51 inone i SUR/PT3.00/NT4.00 i NHP2-8-.594.CS LINE¹ 2RDS-008-81-2 NTS: 2,4 iso i 2 ELB/PIPE IC-F-2 i na i VOL/UT6.O2 2RDS.65-00-SM004 i QISO 65-00-1 or DMG¹ na in iC5.51 Inone I SUR/PT3.00/NT4.00 I NHP2-8-.594-CS I LINE¹ 2RDS-008-81-2 NTS: 2,4 ISD 2 i na /na i MHF/PIPE IC-F-2 i na i VOL/UT6.02 2RDS-65-00.SM005 ) QISO 65-00-1 or DMG¹'na in iC5.51 Inone I SUR/PT3.00/NT4.00 I HNP2-8-.594-CS LINE¹ 2RDS-008-75-2 NTS: 1,2 iSO 2 i na /na PIPE/TEE IC-F-2 I na I VOL/UT6.02 I 2RDS-65-00-SM006 QISO 65-00-1 or DMG¹ na in [C5 ~ 51 inone i SUR/PT3.00/NT4.00 i NNP2-8-.594-CS LINE¹ 2RDS-008-81-2 NTS: 2,5 iso 2 i na /na
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - NILE POIN'I HUCLEAR STATION - UNIT 2 19 of 23 HNP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPEHDIX G - RDS SYSTEN (sorted by Examination Identif ier) 2HD INTVL REL REO I DESCRIPTIOH OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXANINATION IDENTIFIER ( ITS ISO LOCATOR, CONPOHEHT DMG ¹, (ITEN ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO. AHD NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I I PIPE/ELB IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 (
| |
| 2RDS-65-00-SM007 ( QISO 65-00-1 or DMG¹ na in (C5.51 (none ( SUR/PT3.00/NT4,00 (
| |
| HNP2-8-.594-CS (
| |
| LIHE¹ 2RDS.008-81-2 NTS: 2,4 (SO 2 (
| |
| na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RDS-65-00-SM008 (
| |
| QISO 65-00-1 or OMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NNP2.8-.594-CS LINE¹ 2RDS-008-81-2 HTS: 2,4 ISD 2 ( na /na I
| |
| ( MHF/PIPE IC-F-2 ( na (
| |
| VOL/UT6.02 2RDS-65.00.SM009 (
| |
| QISO 65-00-1 or DMG¹ na in (C5.51 (none I SUR/PT3.00/NT4 F 00 I HNP2-8-.594-CS LINE¹ 2RDS-008-76-2 NTS: 1,2 (SO I 2 I na /na (
| |
| I TEE/PIPE IC-F-2 I na I VOL/UT6.02 I 2RDS-65-00-SM010 (
| |
| QISO 65-00-1 or DMG¹ na in (C5 ~ 51 (none (
| |
| SUR/PT3.00/NT4.00 (
| |
| NHP2-8-.594.CS I LINE¹ 2RDS-008-81-2 NTS: 2,5 (SO 2 (
| |
| na /na
| |
| (
| |
| MHF/PIPE IC-F-2 (
| |
| na ( VOL/UT6.02 2RDS-65-00-SM011 (
| |
| QISO 65-00-1 or DMG¹ na in (C5.51 (none ( SUR/PT3.00/NT4.00 I HNP2-8-.594-CS I LINE¹ 2RDS-008-77-2 NTS: 1,2 (SO I 2 I I I PIPE/TEE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RDS.65-00.SM012 (
| |
| QISO 65-00-1 or DMG¹ na .in (C5.51 (none ( SUR/PT3.00/NT4.00 (
| |
| NHP2-8-.594-CS I LINE¹ 2RDS-008-81-2 NTS: 2,5 ISD 2 I TEE/PIPE IC-F-2 ( na (
| |
| VOL/UT6.02 2RDS-65-00-SM013 (
| |
| QISO 65-00-1 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/NT4.00 (
| |
| NHP2-8-.594-CS LINE¹ 2RDS.008.81-2 HTS: 2,5 (SO 2 ( na /na
| |
| ( MHF/TEE IC-F-2 (
| |
| na ( VOL/UT6.02 2RDS-65-00-SM014 ( QISO 65-00-1 or DMG¹ na in (C5.51 (none I SUR/PT3.00/NT4.00 I NNP2-8-.594-CS ( LIHE¹ 2RDS-008-78-2 HTS: 1,2 (So 2 ( na /na I TEE/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RDS-65-00 SM015 (
| |
| QISO 65-00-1 or DMG¹ na in (C5.51 (none ( SUR/PT3.00/NT4.00 (
| |
| HNP2-8-.594-CS I LINE¹ 2ROS.008-81-2 HTS: 2,5 ISD 2 ( na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - NILE POIHT NUCLEAR STATION - UNIT 2 20 of 23 HHP2-1S1-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY (IGSCCI EX1/NDE PROCEDURE IPER100 1 I RENARKS EXANIHATIOH IDEH'TIFIER ( ITS ISO LOCATOR, CONPONENT DMG ¹, (ITEH ¹ (FREQY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE Ho. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I
| |
| (
| |
| MNF/PIPE IC-F-2 ( na (
| |
| VOL/UT6.02 2RDS-65-00-Sl$ 16 (
| |
| QISO 65-00-1 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3 F 00/HT4.00 (
| |
| NNP2-8-.594-CS (
| |
| LINE¹ 2ROS-008-79-2 HTS: 1,2 (So 2 (
| |
| na /na I PIPE/TEE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RDS-65-00-9817 (
| |
| QISO 65-00-1 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| HNP2 ~ 594-CS (
| |
| LINE¹ 2RDS-008-81-2 HTS: 2,5 (SO 2 (
| |
| na /na I TEE/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RDS-65-00-$ 818 (
| |
| QISO 65-00-1 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/NT4.00 (
| |
| NHP2-8-.59C-CS I LINE¹ 2Ros-008-81-2 NTs: 2,5 ISD 2 (
| |
| na /na I
| |
| (
| |
| MNF/PIPE IC-F-2 ( na ( VOL/uT6.02 2RDS-65-00-SM019 (
| |
| QISO 65-00-1 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| HNP2.8-.594-CS (
| |
| LINE¹ 2RDS-008.80-2 NTS: 1,2 (SO 2 (
| |
| na /na I I TEE/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RDS-65.00-SM020 (
| |
| QISO 65.00-1 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| HNP2.8..594-CS ( LIHE¹ 2RDS-008-81-2 HTS: 2,5 (SO 2 ( na /na I ELB/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.O2 2RDS-65-00-SM021 QISO 65-00-1 or DMG¹ na . in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| HNP2 ~ 594-CS LINE¹ 2RDS-008-81-2 NTS: 2i4 ISD 2 (
| |
| na /na I I PIPE/ELB IC-F-2 (
| |
| na ( VOL/UT6.02 2RDS-65-00-Sl$ 22 (
| |
| QISO 65-00-1 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NNP2-8-.594.CS ( LINE¹ 2RDS-008-81-2 HTS: 2,4 (SO 2 (
| |
| na /na I I ELB/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RDS.65.00-SM023 (
| |
| QISO 65-00-1 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NNP2-8-.594-CS I LINE¹ 2RDS-008-81-2 NTS: 2,4 (SO 2 ( na /na I ELB/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RDS-65-00-9024 ( QISO 65-00-1 or DMG¹ na in (C5.51 (none (
| |
| SUR/P'T3.00/HT4.00 (
| |
| NHP2 ~ 594-CS ( LIHE¹ 2RDS-008-81-2 NTS: 2,4 (SO I 2 I na /na (
| |
| | |
| NIAGARA HONAWK POWER CORPORATION NILE POINT NUCLEAR STATION - UNIT 2 21 of 23 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTION OF ITEN TO BE EXAHIHEOiCATGRY iIGSCCi EX1/HDE PROCEDURE iPERIOO 1 REHARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR ~ COHPOHEHT DIIG ¹, I ITEN ¹ IFREQYI EX2/HDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ i LINE HO. AHD NOTES, AS APPLICABLE DESELECT iCLAssi EX3/HDE PROCEDURE iPERIOO 3 I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2RDS-65-00-QI027 i QISO 65-OO-1 or OWG¹ na in iC5.51 inone J SUR/PT3.00/HT4 F 00 i NHP2-12-.844-CS i LIHE¹ 2ROS-012-108-2 HTS: 6,7 )SO 2 J na /na i PIPE/CAP (conforms to ANSI B16.9) iC-F-2 i na / VOL/UT6.02 2RDS-65-00-SW028 i QISO 65-00-1 or DWG¹ na in JC5.51 inone / SUR/PT3.00/HT4.00 i NHP2-12-.844-CS i LINE¹ 2RDS.012-108-2 NTS: 7,8 iso 2 i na /na I WHF/PIPE IC-F-2 i na i VOL/UT6.02 2RDs-65-00-SM031 ) QISO 65-00-2 or DMG¹ na in [C5.51 inone i SUR/PT3.00/HT4.00 [
| |
| NHP2-8-.594.CS I LINE¹ 2RDS-008-66-2 NTS: 1,2 iSO 2 i na /na ELB/PIPE IC-F-2 i na i VOL/UT6.02 2ROS-65-00-SW032 QISO 65-00.2 or DWG¹ na in iC5.51 inone i SUR/PT3.00/Hl'4.00 i HNP2-8-.594-CS LINE¹ 2RDS.008-66-2 NTS: 2,4 iSO 2 i na /na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2RDS-65-00-9!033 i QISO 65-00-2 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS LINE¹ 2RDS-008.66-2 NTS: 2,4 /so 2 i na /na I ELB/PIPE IC-F-2 i na ) VOL/UT6.02 2RDS.65-00.QI034 i QISO 65-00-2 or OMG¹ na . in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS LINE¹ 2RDS.008.66-2 NTS: 2,4 iso 2 i na /na I PIPE/TEE IC-F-2 ) na i VOL/UT6.02 2RDS-65-00-QI035 )
| |
| QISO 65-00-2 or DWG¹ na in iC5.51 [none i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS I LINE¹ 2RDS-008-66-2 HTS: 2,5 iSO 2 i na /na i WHF/PIPE IC-F-2 i na i VOL/UT6.02 2RDS-65-00-S'W036 i QISO 65-00-2 or DWG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS i LINE¹ 2RDS-008-72-2 HTS: 1,2 iSO 2 J na /na I PIPE/TEE IC-F-2 i na i VOL/UT6.02 2RDS-65-00-QI037 i QISO 65-00-2 or DMG¹ na in (C5.51 inone i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS I LIHE¹ 2RDS 008 66 2 NTS' 5 iso 2 i na /na
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 22 of 23 NMP2-ISI-006, REV. 1, CN-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/28/1999 APPENDIX G - ROS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REa J DESCRIPTIOH OF ITEM TO BE EXAMINEDiCATGRY tIGSCCi EX1/HDE PROCEDURE iPERIOO 1 REMARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR'OMPONENT DWG ¹, IITEM ¹ IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE isELECT iCLAssi EX3/NDE PROCEDURE iPERIOO 3 I TEE/PIPE iC-F-2 I na I VOL/UT6.02 I 2RDS-65-00-9838 i QISO 65-00-2 or DWG¹ na in iC5.51 inone t SUR/PT3.00/MT4.00 /
| |
| NMP2-8-.594-CS i LINE¹ 2RDS-008-66-2 NTS: 2,5 iSO 2 i na /na I WHF/PIPE IC-F-2 J na i VOL/UT6.02 2RDS.65-00-Sl$ 39 i QISO 65-00-2 or DWG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2 ~ 594-CS t LINE¹ 2RDS-008-71-2 NTS: 1,2 ISD 2 i na /na I PIPE/TEE IC-F-2 i na / voL/UT6.02 2RDS-65-00.SW040 i QISO 65-OO-2 or OWG¹ na in [C5.51 [ID i SUR/PT3.00/MT4.00 (
| |
| NMP2-8-.594-CS I LINE¹ 2RDS-008-66-2 NTS: 2,5 iSO 2 i na /na ) Sc11 i WHF/PIPE IC.F-2 i na ( VOL/UT6.O2 2RDS 65-00-SW041 i QISO 65-00-2 or DWG¹ na in iC5.51 Inone I SUR/PT3 00/MT4 00 I HMP2 ~ 594-CS i LINE¹ 2RDS-008-70-2 HTS: 1,2 iSO 2 i na /na I I PIPE/TEE iC-F-2 i na i VOL/UT6.02 2RDS-65-00.SW042 i QISO 65-00-2 or DWG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i HMP2 ~ 594-CS LINE¹ 2RDS.008.66-2 HTS 2/5 iSO I 2 I na /na I I TEE/PIPE IC-F-2 / na J VOL/Ul'6.02 2RDS.65-00-Sl$ 43 / QISO 65-00-2 or DWG¹ na . in [C5.51 inone J SUR/PT3.00/MT4.00 J HMP2-8-.594-CS I LINE¹ 2RDS-008-66-2 NTS: 2,5 Iso 2 J na /na I WHF/PIPE IC-F-2 i na i VOL/UT6.02 2ROS-65-00-SW044 i QISO 65-00-2 or DWG¹ na in iC5.51 IID I SUR/PT3.00/MT4.00 I HMP2-8-.594-CS i LINE¹ 2RDS-008.69-2 H'TS: 1,2 iSO 2 J na /na )
| |
| Sc11 I PIPE/TEE IC-F-2 i na i VOL/UT6.02 2RDS-65-00-9845 i QISO 65-00-2 or DWG¹ na in iC5.51 [none i SUR/PT3.00/Ml'4.00 i NMP2-8-.594-CS I LINE¹ 2RDS-008-66-2 HTS: 2 5 iSO 2 / na /na
| |
| ) WNF/PIPE IC-F-2 I na I VOL/UT6.02 I 2RDS-65-00.SW046 i QISO 65-00-2 or DWG¹ na in /C5.51 inone I SUR/PT3.00/Ml'4.00 I HMP2-8-.594-CS i LIHE¹ 2RDS-008-68-2 NTS: 1,2 iSO 2 [ na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - NILE POIHT NUCLEAR STATION - UNIT 2 23 of 23 NNP2-ISI-006, REV. 1 ~ CH-000 SECOND TEH YEAR IHSERVICE IHSPECTIOH (ISI) INTERVAL PLAN Change date: 07/28/1999 APPEHDIX G - RDS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REO ) DESCRIPTION OF ITEN TO BE EXANIHED(CATGRY JIGSCC( EX1/HDE PROCEDURE )PERIOD 1 RENARKS EXANINATION IDEHTIFIER J ITS ISO LOCATOR, COHPOHENT DMG ¹, ]ITEN ¹ ]FREQY[ EX2/NDE PROCEDURE ]PERIOD 2 )
| |
| USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE iSELECT iCLASSi EX3/HDE PROCEDURE iPERIOO 3 (
| |
| I PIPE/TEE IC-F-2 (
| |
| na ) VOL/UT6.02 2RDS-65-00-Sl$ 47 f QISO 65-00-2 or DMG¹ na in /C5.51 [none )
| |
| SUR/PT3.00/NT4.00 J HHP2-8-.594-CS i LINE¹ 2RDS-008-66.2 HTS: 2,5 /SD 2 / na /na I TEE/PIPE IC-F-2 )
| |
| na [ VOL/UT6.02 2RDS-65-00-SM048 )
| |
| QISO 65-00-2 or DMG¹ na in (C5.51 [none J SUR/PT3.00/NT4.00 f HNP2-8-.594-CS i LINE¹ 2RDS-008-66-2 NTS: 2,5 LSD 2 J na/na I MHF/PIPE IC-F-2 [ na ] VOL/UT6.02 2RDS-65-00-SW049 / QISO 65-00-2 or DMG¹ na in /C5.51 [none )
| |
| SUR/PT3.00/NT4.00 )
| |
| NHP2-8-.594-CS J LINE¹ 2RDS-008-67-2 NTS: 1,2 LSD 2 ] na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RDS.65-00.SI$ 50 J QISO 65.00-2 or DMG¹ na in JC5.51 ]none f SUR/PT3.00/HT4 F 00 J HMP2-8..594-CS I LINE¹ 2RDS-008-66-2 NTS: 2,4 ISD 2 / na /na I ELB/PIPE IC-F-2 (
| |
| na [ VOL/UT6.02 2RDS-65-00-SM060 f QISO 65.00.2 or DIIG¹ na in /C5.51 IID I SUR/PT3.00/HT4.00 I Sc9 HNP2-12-.844-CS )
| |
| LINE¹ 2RDS-012-105-2 NTS: 6,7 )SD 2 f na /na I
| |
| (
| |
| PIPE/CAP (conforms to ANSI B16.9) )C-F-2 / na f VOL/UT6.02 2RDS-65-00-SM061 [ alSO 65-00-2 or DMG¹ na. in (C5.51 /none f SUR/PT3.00/NT4.00 f NNP2-12-.844-CS I LIHE¹ 2RDS-012-105-2 HTS: 7,8 ISD 2 / na /na I I HOZ/SE Q N10 Az180 CRDHS RETURN IB-J J na (
| |
| SUR/PT3.00 (Reclassified from 8-F during 2nd 10-Yr Update 2RPV-KB31 [ QISOna or DMG¹ 004 in (89.21 ]none )
| |
| na /na na J LINE¹ na NTS: (none) )NS 1 J na/na
| |
| / SE/CAP Q N10 Az180 CRDHS RETURN /8-J I na I SUR/PT3 00 I (Reclassified from 8-F during 2nd 10-Yr Update 2RPV-KB31-A / QISOna or DMG¹ 005 in /B9.21 )
| |
| na /na I I
| |
| / LINE¹ na H'IS: (none) (DH 1 J na /na I Sc11 I END OF SYSTEN RDS
| |
| | |
| NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System RDS: General Notes
| |
| : 1. 8" 900¹ WN FLANGE, SA-105 5. 8" SCH. 100 TEE, SA-234 WPB
| |
| : 2. 8" SCH. 100 PIPE, SA-106 GR B 6. 12" X 8" RED. ELBOW, SA-234 WPB
| |
| : 3. 1" PLATE, SA46/SA437 7. 12" SCH. 100 PIPE, SA-106 GR B
| |
| : 4. 8" SCH. 100 ELBOW, SA-234 WPB 8. 12" SCH. 100 CAP, SA-234 WPB
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - . HILE POINT NUCLEAR STATION - UHIT 2 1 of 135 HHP2-ISI-006, REV. 1( CH 000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED (
| |
| DESCRIPTION OF ITEH TO BE EXAHINED[CATGRY ) IGSCCJ EX1/NDE PROCEDURE [PERIOD 1 REMARKS EXAHINATIOH IDEHTIFIER J ITS ISO LOCATOR, COHPOHENT DMG ¹, i ITEH ¹ iFREQYi EX2/NDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ I LINE No. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I
| |
| *AOV16A BLTG (8-G-2 f na / VT1/VT2.01 I 2RHS<<AOV16A,V8536 / QISO 66-50 or DMG¹ 003 in /87.70 /ID ) na /na )Sc8
| |
| / LINE¹ 2RHS-012-8-1 NTS: (none) /Grp Rep/ 1 / na /na I
| |
| *AOV16A INT SUR IB-H-2 I na I VT3/VT2.01 /<< (>> Examine Mhen dissassemble for maintenance 2RHS*AOV16A,VBY154 ( QISO 66-5O or DMG¹ 003 in (812.50 )DisG J
| |
| / f<<
| |
| f I.IME¹ 2RHS-012-8-1 NTS: 13 JGrp Rep/ 1 / /
| |
| / <<AOV168 BLTG IB G 2 I na I VT1/VT2 01 2RHS<<AOV168,V8537 )
| |
| QISO 66-51 or DMG¹ 003 in )87.70 [none (
| |
| na /na
| |
| )
| |
| LINE¹ 2RHS-012-163-1 NTS: (none) (Ns f 1 f na /na
| |
| <<AOV168 INT SUR (8-H-2 ) na J VT3/VT2.01 2RHS AOV168,VBY155 QISO 66-51 or DMS¹ 003 in [812.50 [none f /
| |
| LINE¹ 2RHS-012-163-1 NTS: 5 INS I 1 I /
| |
| *AOV16C BLTG JB-G-2 J na J VT1/VT2.01 I 2RHS>>AOV16C,V8538 QISO 66-52 or DMG¹ 003 in ]87.70 )ID f na /na igc8 LINE¹ 2RHS-012-125-1 NTS: (none) JGrp Rep) 1 f na /na I I *AOV16C INT SUR JB-H-2 [ na [ VT3/VT2.01 (<< Examine Ken dissassembte for maintenance 2RHS*AOV16C, VBY156 ( QISO 66-52 or DMS¹ 003.in )812.50 [DisG f / /<<
| |
| f LINE¹ 2RHS-0'l2-125-1 NTS: 13 JGrp Repf 1 f / )<<
| |
| I <<AOV39A BLTG IB-G-2 I na . I VT1/VT2.01 I 2RHS*AOV39A,V8527 ( QISO 66-53 or DMS¹ 003 in /87.70 /ID / na /na isc8
| |
| ( LINE¹ 2RHS-012-10-1 NTS: (none) /Grp Rep/ 1 / na /na I
| |
| *AOV39A INT SUR IB-H-2 I na I VT3/VT2.01 /<< (<< Examine Mhen dissasserble for maintenance 2RHS*AOV39A,VBY157 I Q 66 53 or DMG¹ 003 in (812.50 [DisG J / /<<
| |
| na / LIHE¹ 2RHS-012-10-1 NTS: 6 /Grp Rep/ 1 f / J<<
| |
| I >>AOV398 BLTG /B-G-2 / na f VT1/VT2.01 2RHS*AOV39B,V8528 i QISO 66-54 or DMG¹ 003 in (87.70 ]none [ na /na J
| |
| LINE¹ 2RHS-012-30-1 NTS: (none) JNS f 1 [ na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - H ILE POINT NUCLEAR STATION - UNIT 2 2 of 135 NHP2-ISI-006, REV. I( CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ DESCRIPTION OF ITEH TO BE EXAHIHED)CATGRY (IGSCC) EX1/HDE PROCEDURE )PERIOD 1 REHARKS
| |
| )
| |
| EXAHIHATIOH IDENTIFIER J ITS ISO LOCATOR, COMPONENT DMG ¹, JITEH ¹ JFREGYJ EX2/NDE PROCEDURE ]PERIOD 2 f USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I i <<AOV398 INT SUR /8-H-2 / na / VT3/VT2.01 2RHS*AOV39B,VBY158 i QISO 66-54 or DMG¹ 003 in [812.50 )none [ /
| |
| / LINE¹ 2RHS-012-30-1 NTS: 13 iNS i 1 i /
| |
| I INTEGRAL ATTACHHEHT IC-C I na I SUR/ I 2RHS*E1A,FM300 J QISO 66- or DMG¹ 046 in /C3.10 / ID / /PT3.00/HT4.00 /
| |
| I LINE¹ VESSEL HTS: JGrp Repl 2 I / ISclo I 95K *E1A HD/SHL (CODE CASE H-460) IC-A I na I VOL/U'T6.02 I 2RHS*E1A,HMIDOA / QISO 66- or DMG¹ 046 in /C1.20 /2P / na /na Sc9 NHP2-RHS-.75-CS / LINE¹ 2RHS-020-185-2 NTS: 155,156 JGrp Rep/ 2 / na /na I INC-5 I 78K *E1A FLG/SHL (GRANTED RELIEF) IC-A I na J VOL/Ul'6.02 I 2R HS*E1A, HM101A i QISO 66- or DMG¹ 046 in /CI.IO /2P / na /na /Sc8 .
| |
| HHP2-RHS-.75-CS / LINE¹ 2RHS-020-185-2 NTS: 156,157 /Grp Rep/ 2 / na /na I IMC-5 ) BOX NOZ/SHL Q *E1A N4 (GRANTED R) IC-8 I na I VOL/UT6.02 I Sc7 2RHS*E1A,H'M102A i QISO 66- or DWG¹ 046 in /C2 ~ 21 /ID f SUR/PT3.00/HT4.00 f NHP2-RHS-.75-CS f LINE¹ 2RHS-018-4-2 HTS: 156,158 /GrP ReP[ 2 / na /na I *E1A H3 NOZ/HD (C-B (
| |
| na ] VOL/UT6.02 2RHS<<E1A, HM103A i QISO 66- or DMG¹ 046 .in JC2.21 ]ID ] SUR/PT3 F 00/HT4.00 (Sc8 NHP2-RHS-.75-CS f LIHE¹ 2RHS-020-185-2 NTS: 155,158 /Grp Rep) 2 f na /na I *E1A N3 NOZ IR IC B I na I VOL/UT6.07 I 2RHS<<E1A(HM104A I QISO 66 or D'MG¹ 046 in JC2.22 ]ID f na /na I NHP2-RHS-IR-3.75-CJ LINE¹ 2RHS-020-185-2 NTS: 158 /Grp Repf 2 f na /na )
| |
| Sc10 I <<E1A N4 NOZ IR [C-8 [ na (
| |
| VOL/UT6.07 I 2RHS*E1A,HM105A J QISO 66- or DMG¹ 046 in (C2.22 )ID J na /na I NHP2-RHS-IR-3.75-CJ LINE¹ 2RHS-018-4-2 NTS: 158 (Grp Rep/ 2 / na /na /Sc10 I INTEGRAL ATTACHMENT /C-C / na / SUR/ I 2RHS*E1B,FM300 i QISO 66- or DWG¹ 046 in /C3.10 /ID- / /PT3.00/NT4.00 /
| |
| I LINE¹ VESSEL NTS: INS I 2 I / I
| |
| | |
| NIAGARA MOHAHK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 3 of 135 HMP2-ISI-006, REV. 1( CH.OOD SECOHD TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED (
| |
| DESCRIPTION OF ITEM TO BE EXAMIHED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REMARKS EXAMINATIOH IDENTIFIER (
| |
| ITS ISO LOCATOR, COMPOHEHT DUG ¹, (ITEM ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I I
| |
| *E18 HD/SHL (C-A (
| |
| na (
| |
| VOL/UT6.02 2RHS*E1B,HH100B (
| |
| QISO 66- or DIIG¹ 046 in (C1.20 (none (
| |
| na /na NMP2-RHS-.75-CS (
| |
| LINE¹ 2RHS-020-208-2 NTS: 155(156 (NS 2 (
| |
| na /na
| |
| (
| |
| <<E18 FLG/SHL IC-A I na I VOL/UT6.02 2RHS<<E18, HN1018 ( QISO 66- or DIIG¹ 046 in (C1.10 (none (
| |
| na /na NMP2-RHS-.75-CS I LINE¹ 2RHS-020-208-2 NTS: 156(157 INS 2 ( na/na
| |
| (
| |
| NOZ/SHL Q <<E18 H4 IC-B ( na (
| |
| VOL/UT6.02 2RHS*E18, HW1028 (
| |
| QISO 66- . or DWG¹ 046 in (C2.21 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| HMP2-RHS-.75-CS (
| |
| LINE¹ 2RHS-018-24-2 HTS 156,158 INS 2 (
| |
| na /na I
| |
| (
| |
| *E18 N3 NOZ/HD (C-8 (
| |
| na (
| |
| VOL/UT6.02 2RHS<<E1B,HW103B (
| |
| QISO 66- or DUG¹ 046 in (C2.21 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NMP2-RHS-.75-CS I LINE¹ 2RHS-020-208.2 NTS: 155, 158 IHS 2 (
| |
| na /na I I *E1A N3 NOZ IR (C-8 ( na (
| |
| VOL/UT6.07 2RHS*E18 HH1 B I QISO 66- or DNG¹ 046 in (C2.22 (none (
| |
| na /na NMP2-RHS-IR-3.75-CI LINE¹ 2RHS-020-208.2 NTS: 158 IHS I 2 I na /na I
| |
| <<E18 H4 HOZ IR IC-8 ( na ( VOL/UT6.07 2RHS<<ETB,HM1058 (
| |
| QISO 66- or DUG¹ 046 .in (C2.22 (none ( na /na NMP2-RHS-IR-3.75-C( LINE¹ 2RHS-018-24-2 NTS: 158 (NS RED/<<FV38A (C-F-2 ( na VOL/UT6.02 Sc7 (Categorized as C-G when PSI'd in 1985, therefore, only a surface PSI 2RHS<<F V38A, VNF V38A-A QISO 66-16 or DUG¹ 001 in IC5.51 (none I .SUR/PT3.00/MT4.00 (was done; no UT was performed to backfit PSI when this weld was Unknown LINE¹ 2RHS-014-na-2 NTS: 90,91 (SD 2 (
| |
| na /na (recatagorized to C-F-2; Backfit UT PSI ASAP. (May use Vendor NDE)
| |
| (
| |
| <<FV38A/EXP IC-F-2 (
| |
| na VOL/UT6.02 Sc7 (Categorized as C-G when PSI'd in 1985, therefore, only a surface PSI 2RHS*FV38A,VNFV38A-B QISO 66-16 or DUG¹ 001 in IC5.51 (none SUR/PT3.00/MT4.00 (was done; no UT was performed to backfit PSI when this weld was Unknown
| |
| (
| |
| (
| |
| LINE¹ 2RHS-014-na-2 NTS: 91,92 (SD (2( (
| |
| na /na I
| |
| I (recatagorized to C-F-2; Backfit UT PSI ASAP. (May use Vendor NDE)
| |
| RED/*VF38B IC-F-2 (
| |
| na VOL/UT6.02 Sc7 (Categorized as C-G when PSI'd in 1985, therefore, only a surface PSI 2RHS<<FV38B,VWFV38B-A QISO 66-27 or DHG¹ 001 in ICS ~ 51 (none SUR/PT3.00/MT4.00 (was done; no UT was performed to backfit PSI when this weld was Unknown LINE¹ 2RHS-014-na-2 NTS: 90,91 (SD (2( (
| |
| na /na I
| |
| I (recatagorized to C-F-2; Backfit UT PSI ASAP. (May use Vendor NDE)
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 4 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECI'ION (Isl) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED DESCRIPTION OF ITEM TO BE EXAHINED(CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1 REMARKS
| |
| ( (
| |
| EXAHINATION IDENTIFIER (
| |
| ITS ISO LOCATOR, COHPONENT DUG ¹, (ITEM ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LIHE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I
| |
| <<FV388/EXP (C-F-2 ( na VOL/UT6.02 sc7 (Categorized as C-G when PSI'd in 1985, therefore, only a surface PSI 2RHS<<FV388, VNFV388-8 QISO 66-27 or DLIG¹ 001 in (C5.51 (none (
| |
| SUR/PT3.00/Ml'4.00 I (was done; no UT was performed to backfit PSI when this weld was Unknown LINE¹ 2RHS-014-na-2 NTS: 91,92 (SD ( 2 na /na I (recatagorized to C-F-2; Backfit UT PSI ASAP. (May use Vendor NDE)
| |
| RED/*FV38C (C-F-2 (
| |
| na VOL/UT6.02 Sc7 (Categorized as C-G when PSI'd in 1985, therefore, only a surface PSI 2RHS*FV38C,WFV38C-A QISO 66-27 or DllG¹ 001 in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 I (was done; no UT was performed to backfit PSI when this weld was Unknown LINE¹ 2RHS-014-na-2 NTS: 90,91 IsD I 2 na /na I (recatagorized to C-F-2; Backfit UT PSI ASAP. (Hay use Vendor NDE)
| |
| <<FV38C/EXP (C-F-2 ( na ( VOL/UT6.02 sc7 (Categorized as C-G when PSI'd in 1985, therefore, only a surface PSI 2RHS*F V38C, VIIFV38C- 8 QISO 66.27 or DMG¹ 001 in (C5.51 (none ( SUR/PT3.00/HT4.00 I (was done; no UT was performed to backfit PSI when this weld was Unknown LIHE¹ 2RHS-014-na-2 NTS: 91 92 ISD I 2 I na /na I (recatagorized to C-F-2; Backfit UT PSI ASAP'May use Vendor NDE)
| |
| (
| |
| *HCV131 INT SUR (8-M-2 (
| |
| na ( VT3/VT2.01 (* (* Examine when dissassemble for maintenance 2RHS*HCV131,VBY159 (
| |
| QISO 66-55 or DNG¹ 017 in (812.50 (DisG ( / (*
| |
| (
| |
| LINE¹ 2RHS-020-159-1 NTS: 27 (Grp Rep( 1 ( / (<<
| |
| I *NCV53A INT SUR (B-M.2 ( na (
| |
| VT3/VT2.01 (* (* Examine when dissassemble for maintenance 2RHS*HCV53A,VBY160 (
| |
| QISO 66-50 or DIIG¹ 008 in (812.50 (DisG ( / (*
| |
| ( LINE¹ 2RHS-012-8-1 NTS: 9 (Grp Rep( 1 ( /
| |
| I <<HCV538 INT SUR (B.M-2 (
| |
| na (
| |
| VT3/VT2.01 2RHS*HCV538, VBY161 ( QISO 66.51 or DWG¹ 008.in (812.50 (none ( /
| |
| ( LINE¹ 2RHS-012-163-1 NTS: 9 (NS (
| |
| 1 ( /
| |
| (
| |
| <<HCV53C IHT SUR (8-M 2 ( na (
| |
| VT3/VT2.01 (* (* Examine when dissassemble for maintenance 2RHS*HCV53C,VBY162 (
| |
| QISO 66.52 or DUG¹ 008 in (812.50 (DisG ( / (*
| |
| (
| |
| LINN 2RHS-012-125-1 HTS: 9 (Grp Rep( 1
| |
| ( / (*
| |
| I
| |
| <<HCV54A INT SUR (8-M-2 ( na ( VT3/VT2.01 (* (* Examine when dissassemble for maintenance 2RHS*HCV54A,VBY163 (
| |
| QISO 66-53 or DIIG¹ 008 in (812.50 (DisG ( / (*
| |
| (
| |
| LiNE¹ 2RHS-012-10-1 NTS: 9 (GrP ReP( 1 ( / (*
| |
| I <<HCV548 INT SUR (8-H-2 (
| |
| na ( VT3/VT2.01 2RHS*HCV54B,VBY164 (
| |
| QISO 66-54 or DUG¹ 008 in (812.50 (none ( /
| |
| LINE¹ 2RHS-012-30-1 NTS: 9 (NS (
| |
| 1 ( /
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - MILE POINT NUCLEAR STATION - UNIT 2 5 of 135 NMP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTIOH OF ITEM TO BE EXAMINEDiCATGRY iIGSCCi EX1/HDE PROCEDURE )PERIOD 1 REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONEHI'MG ¹, LITEM ¹ iFREOYi EX2/NDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ I LIHE HO AHD NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
| |
| (
| |
| *HOV104 IHT SUR IB M 2 I na I VT3/VT2.01 i<< i<<Examine Ken dissassemble for maintenance 2RHS<<MOV 104, VBY165 i QISO 66-47 or DMG¹ 018 in i812.50 iDisG i / i<<
| |
| J LINE¹ 2RHS-006-142-1 NTS: 5 iGrp Repi 1 i / i<<
| |
| i <<MOV112 INT SUR IB.M.2 I na I VT3/VT2.01 i<< Examine Mhen dissassemble for maintenance 2RHS*MOV112, VBY166 i QISO 66-55 or DMG¹ 007 in i812.50 iDisG i / I t LINE¹ 2RHS-020-159-1 NTS: 27 )GrP RePi 1 i / I I
| |
| *MOV113 INT SUR IB M-2 I na I VT3/VT2.01 IEX6 2RHS<<MOV113, VBY167 i QISO 66-21 or DMG¹ 007 in i812.50 inone i / I LINE¹ 2RHS.020.114-1 NTS: 27 iHS i 1 i / I i PIPE/<<MOV1C IC-F-I I na I VOL/UT6.13 IEX6 2RHS*MOV1C, VMMOVIC-A / QISO 66-22 or DMG¹ 020 in iC5.11 iID i SUR/PT3.00 I NMP2-24-.500-SS / LINE¹ 2RHS-024-334-2 HTS: 108,58 i7.5XMin) 2 i na / I
| |
| <<MOV1C BODY/SOF iC-F-2 i na i SUR/PT3.00/MT4.00 i 2RHS<<MOV1C, VMMOV1C-8 i QISO 66-22 or DMG¹ 020 in iC5.70 inone i na / I i LINE¹ 2RHS-024-334-2 NTS: 58,59 LSD i 2 i na /na I IMC-5 I <<MOVIC BODY/BEARING HECK IC G I na I SUR/PT3.00/MT4.00 IEX6 2RHS*MOV1C,VMMOV1C-C i QISO 66-22 or DMG¹ 020 in iC6.20 [ID i na /na i LIHE¹ 2RHS-024-334-2 NTS: 58,60 iGrp Repi 2 i na /na I IMC-5 I <<MOVIC BODY/BEARING HECK IC G I na I SUR/PT3.00/MT4.00 IEX6 2RHS*MOV1C,VMMOVIC D I QISO 66-22 or DMG¹ 020 in iC6.20 iID ) na /na I i LINE¹ 2RHS-024-334-2 NTS: 58,60 iGrp Repi 2 i na /na I IMC-5 I
| |
| *MOV1C BODY LM IC-G I na I SUR/PT3.00/MT4.00 lEX6 2RHS<<MOV1C,VNVIC.LM QISO 66-22 or DMG¹ 020 in JC6.20 iID i na /na J
| |
| LINE¹ 2RHS-024-334-2 NTS: 58 iGrp Repi 2 i na /na I I
| |
| <<MOV24A IHT SUR IB-M-2 I na I VT3/VT2.01 i<< i<< Examine <ken dissassemble for maintenance 2RHS<<MOV24A,VBY168 i QISO 66-19 or DMG¹ 008 in i812.50 iDIsG i / /<<
| |
| i LINE¹ 2RHS-012-75-1 NTS: 9 iGrp Rep/ 1 i / I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 6 of 135 NHP2-ISI-006, REV. I( CH-000 SECOND TEN YEAR INSERVICE INSPECTIOH (Isl) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier)
| |
| To BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD REMARKS 2ND INTVL REL RE I DESCRIPTION OF ITEH 1
| |
| I EXAHINATION IDEHTIFIER f ITS ISO LOCATOR, COMPONENT DMG ¹, ]ITEM ¹ )FREOY[ EX2/NDE PROCEDURE )PERIOD 2 )
| |
| USE CAL BLK ¹ I LINE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I
| |
| *HOV24B INT SUR /8-M-2 / na / VT3/Vt2.01 2RHS<<MOV24B,VBY169 / QISO 66-31 or DMG¹ 008 in /012.50 )none f /
| |
| I LINE¹ 2RHS-012-28-1 HTS: 9 INS I 1 I /
| |
| i <<HOV24C INt SUR IB H 2 I na I VT3/VT2 01 I'<< )<< Examine shen dissassemble for maintenance 2RHS*HOV24C,VBY170 i QISO 66-26 or DMG>> 008 in (812.50 [DisG f /
| |
| f LINE¹ 2RHS-012-44-1 NTS: 16 JGrp Repf 1 f /
| |
| I <<HOV2A BODY/SOF
| |
| /C-F-2 / na / SUR/PT3.00/HT4.00 /
| |
| 2R HS*MOV2A,VNOV2A-A ) QISO 66-13 or DMG¹ 019 in (C5.70 ]ID f na / Sc9 t LINE¹ 2RHS-018-203-2 HtS: 68,69 ]SO ) 2 f na /na I
| |
| *HOV2A BODY/SOF JC-F-2 [ na SUR/PT3.00/MT4.00 I 2RHS*HOV2A,VNOV2A-B i QISO 66-13 or DMG¹ 019 in ]C5.70 [none [ na / I na ) LINE¹ 2RHS-018-203-2 NTS: 68,69 iso i 2 na /na I IMC-5 ] *MOV2A BOOT/BEARING NECK [C-G f na f SUR/PT3.00/Ht4.00 sc7 2RHS*HOV2A,VNOV2A-C i QISO 66-13 or OMG>> 019 in IC6.20 110 I na /na I J
| |
| LINE¹ 2RHS-018-203-2 NTS: 68,70 JGrp Rep) 2 J na /na I IMC-5 J
| |
| *MOV2A BODY/BEARING NECK IC G I na I SUR/PT3.00/Mt4.00 I Sc7 2R H S<<HOV2A, VNOV2A.D i QISO 66-13 or DMG¹ 019.in [C6.20 )ID ( na /na f LINE¹ 2RHS-018-203-2 NTS: 68,70 (Grp Rep] 2 ) na /na I
| |
| / *HOV20 BODY/SOF IC-F-2 I na . I SUR/PT3.00/HT4.00 I I 2RHS*HOV2B, VNOV2B-A . )
| |
| QISO 66-23 or DMG¹ 019 in /C5.70 [none f na / I I, I LINE¹ 2RHS-018-65-2 Hts: 68,116 ISD I 2 I na /na I I f
| |
| <<HOV2B BODY/SOF JC-F-2 I na I SUR/PT3.00/HT4.00 I 2RHS*MOV28, VNOV2B-B / QISO 66-23 or DMG¹ 019 in JC5.70 /none J na /
| |
| ) LINE¹ 2RHS-018-65-2 NTS: 68,116 JSD [ 2 J na /na I f
| |
| *HOV20 BODY/BEARING NECK /C-G f na / SUR/Pt3.00/IIT4.00 f 2RHS*MOV2B,VMHOV2B-C )
| |
| QISO 66-23 or DMG¹ 019 in [C6.20 [none ] na /na I LINE¹ 2RNS-018.65-2 NTS: 68(70 INS I 2 I na /na I
| |
| | |
| NIAGARA MOHAMK P(HIER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 7 of 135 NMP2-ISI-006( REV. 1( CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND IN'IVL REL REQ i DESCRIPTION OF ITEM TO BE EXAMINEDiCATGRY iIGSCC) EX1/NDE PROCEDURE iPERIOO 1 REMARKS EXAMINATION IDENTIFIER f ITS ISO LOCATOR, COMPONENT DIIG ¹, [ITEM ¹ JFREOY( EX2/NDE PROCEDURE (PERIOD 2 f USE CAL BLK ¹ I LINE HO AHD NOTES AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I f
| |
| *MOV28 BODY/BEARIHG NECK [C-G f na [ SUR/PT3.00/MT4.00 [
| |
| 2RHS<<MOV28, WMOV28-0 i QISO 66-23 or DUG¹ 019 in (C6.20 )none [ na /na
| |
| / LINE¹ 2RHS-018-65-2 NTS: 68,70 /NS f 2 / na /na I
| |
| *MOV40A INT SUR [8-M-2 [ na / VT3/VT2~ 01 (* Examine shen dissassemble for maintenance 2RHS*MOV40A,VBY171 f QISO 66-19 or DUG¹ 018 in )812.50 (DisG J / /<<
| |
| f LINE¹ 2RHS-012-119-1 NTS: 9 JGrp Repf 1 f /
| |
| I *MOV4 8 INT SUR
| |
| /8-M-2 / na / VT3/VT2.01 I 2RHS<<MOV40B,VBY172 (
| |
| QISO 66-32 or DNG¹ 018 in (812.50 [none ) / I I LINE¹ 2RHS-012-219-1 HTS: 22 INS I 1 I / I J
| |
| *MOVBA BODY/SOF JC-F-2 ] na J SUR/PT3.00/MT4.00 J I 2RHS*MOVBA,WHOVBA.A i QISO 66-14 or DUG¹ 019 in JC5.70 )none f na / I I na LINE¹ 2RHS-018-20-2 N'IS: 68,69 JSD f 2 I na /na I I
| |
| <<MOVBA BODY/SOF (C-F-2 f na f SUR/PT3.00/M'I4.00 f 2RHS*MOVBA,WMOVBA 8 i QISO 66-14 or DUG¹ 019 in (C5.70 ]none (
| |
| na / I f LINE¹ 2RHS-018-20-2 NTS: 68,69 JSD f 2 / na /na I INC-5 I
| |
| *MOVBA BODY/BEARING NECK IC G I na I SUR/PT 00/MT I 2RHS*MOVBA,WMOVBA-C I QISO 66-14 or DUG¹ 019 .in IC6.20 I ID I na /na Sc9 na / LINE¹ 2RHS-018-20-2 NTS: 68,70 [Grp Rep/ 2 / na /na I INC-5 I *MOVBA BODY/BEARING NECK IC G I na I SUR/PT3.00/MT'0 I 2RHS*MOVBA WMOVBA-0 i QISO 66-14 or DUG¹ 019 in JC6.20 ]ID J na /na f Sc9 f LINE¹ 2RHS-018-20-2 HTS: 68,70 /Grp Repf 2 f na /na I I *MOVBB BODY/SOF
| |
| )C-F-2 f na f SUR/P'l3.00/MT4.00 (
| |
| 2RHS*MOVBB,WHOVBB-A J QISO 66-29 or DNG¹ 019 in )C5.70 ]none f na / I LINE¹ 2RHS-018-40-2 NTS: 68,116 /SD / 2 [ na /na I
| |
| *MOVBB BODY/SOF JC-F-2 f na f SUR/PT3.00/MT4.00 f 2RHS<<MOVBB,WMOVBB-B [ QISO 66-29 or DUG¹ 019 in JC5.70 /none f na /
| |
| na f LINE¹ 2RHS-018-40-2 NTS: 68,116 JSD / 2 f na /na I
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 8 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH 'YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - RHS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL REO ( DESCRIPTIOH OF ITEN TO BE EXANIHEO(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 'I RENARKS EXANIHATIOH IDENTIFIER (
| |
| ITS ISO LOCATOR, COMPONENT DMG ¹, (ITEN ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3
| |
| (
| |
| <<NOVBB BODY/BEARING NECK (C-G (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2RHS<<HOVBB,VWNOVBB-C (
| |
| QISO 66-29 or DMG¹ 019 in (C6.20 (none ( na /na
| |
| (
| |
| LINE¹ 2RHS 018 40 2 HTS: 68i70 (HS ( 2 (
| |
| na /na I
| |
| (
| |
| <<HOVBB BODY/BEARING HECK (C-G ( na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2RHS<<HOVBB,VWNOVBB.D ( QISO 66-29 or DMG¹ 019 in (C6.20 (none (
| |
| na /na
| |
| ( LINE¹ 2RHS-018-40-2 NTS: 68,70 (NS (
| |
| 2 (
| |
| na /na I
| |
| (
| |
| *P1A MNF/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS<<P1A, PM100A (
| |
| QISORef66-13 or DWG¹ 026 in (C5.51 (none (
| |
| SUR/PT3.00/NT4.00 (
| |
| HHP2-RHS-.75-CS ( LINE¹ 2RHS.024-na-2 NTS: 61, 145 (SD (
| |
| 2 (
| |
| na /na I
| |
| <<P1A PIPE/HD SHL (C-F-2 (
| |
| na ( SUR/PT3.00/NT4.00 (
| |
| 2RHS<<P1A,PW101A (
| |
| QISORef66-13 or DWG¹ 026 in (C5.81 (none (
| |
| na / I
| |
| (
| |
| LIHE¹ 2RHS-024-na-2 HTS: 145,146 (TE (
| |
| 2 (
| |
| na /na I
| |
| (
| |
| *P1A PIPE/MNF IC-F-2 ( na I VOL/UT6.02 I 2RHS<<P1A,PM102A (
| |
| QISO 66-14 or DMG¹ 026 in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| HHP2-18..500-CS (
| |
| LINE¹ 2RHS-018-na-2 NTS: 147,69 (SD (
| |
| 2 (
| |
| na /na
| |
| (
| |
| <<P1A HD SHL/PIPE (C-F-2 (
| |
| na ( SUR/PT3.00/NT4.00 (
| |
| 2RHS*P1A, PM103A ( QISO 66-14 or DMG¹ 026 in (C5.81 (none (
| |
| na /
| |
| (
| |
| LINE¹ 2RHS-018-na-2 NTS: 146,147 (TE ( 2 ( na /na I I <<P1A HD COVER/SHL (C-G ( na (
| |
| SUR/PT3.00/MT4.00 (
| |
| 2RHS*P1A,PMIOBA (
| |
| QISO 66- or DWG¹ 026 in (C6.10 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2RHS-024-2-2 HTS: 146,148 (Grp Rep( 2 (
| |
| na /na (Sc10 I
| |
| <<P1A HD/FLG (C G (
| |
| na (
| |
| SUR/PT3 00/NT4 F 00 2RHS*P1A, PM110A (
| |
| QISO 66- or DMG¹ 026 in (C6.10 (ID ( na /na
| |
| (
| |
| LINE¹ 2RHS-024-2-2 NTS: 146,149 (Grp Rep( 2 (
| |
| na /na (Sc10 I WC-1 (
| |
| *P1A UPR BARREL SHL/FLG (C-G (
| |
| na SUR/PT3.00/NT4.00 (* (* Examine when dissassemble for maintenance 2RHS*P1A,PM111A (
| |
| QISO 66- or DMG¹ 026 in (C6.10 (ID na /na (<<
| |
| (
| |
| LINE¹ 2RHS-024-2-2 NTS: 150,151 (Grp Rep( 2 na /na (*
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 9 of 135 NHP2 IS I 006'EV 1 CH ~ 000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHIHATIOH IDEHTIFIER f ITS ISO LOCATOR, COHPONEHT D'MG ¹, ]ITEN ¹ JFREQY] EX2/NDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASS[ EX3/HDE PROCEDURE [PERIOD 3 IMC-1 J
| |
| *P1A UPR/LMR BARREL SHL /C-G / na / SUR/PT3.00/HT4 F 00 /* (* Examine when dissasseahle for maintenance 2RHS*PlA,PM112A J QISO 66- or DMG¹ 026 in /C6.10 /ID / na /na I*
| |
| J LINE¹ 2RHS-024-2-2 HTS: 151 )Grp Rep) 2 / na /na /*
| |
| IMC-1 I
| |
| *P1A LMR BARREL SHL/HD /C-G / na SUR/PT3.00/HT4.00 /* )* Examine when dissassembie for maintenance 2RHS*P1A, PM113A / QISO 66- or DMG¹ 026 in (C6.10 /ID na /na
| |
| / LIHE¹ 2RHS-024-2-2 HTS: 151,152 )Grp Rep/ 2 na /na /*
| |
| I
| |
| *P1A LM HD/SHL /C-G f na f SUR/PT3.00/HT4.00 f 2RHS*P1A,PM115A / QISO 66- or DMG¹ 026 in /C6.10 /ID / na /na
| |
| / LINE¹ 2RHS-024-2-2 HTS: 146 /Grp Rep/ 2 / na /na isc10 IMC-1 I
| |
| *P1A LM UPR BARREL SHL /C-G / na / SUR/P'T3.00/HT4.00 /* Examine when dissassemble for maintenance 2RHS<<P1A, PM116A i QISO 66 or OMG¹ 026 in JC6.10 /ID / na /na /<<
| |
| / LINE¹ 2RHS-024-2-2 NTS: 151 /Grp Rep/ 2 / na /na /<<
| |
| I'MC-1 I *P1A LM LMR BARREL SHL JC-G J na f SUR/PT3.00/Hl'4.00 /<< )* Examine when dissassemble for maintenance 2RHS<<P1A, PM118A i QISO 66- or DMG¹ 026 in JC6.10 ]ID f na /na /<<
| |
| / LIHE¹ 2RHS-024-2-2 HTS: 151 JGrp Rep/ 2 f na /na )*
| |
| IMC- I I <<P1A BARREL SHL PIN/HD IC-C I na I SUR/PT3.00/HT4.00 I 2RHS*P1A, PM121A i QISO 66- or DMG¹ 026 in /C3.30 (ID f na /na I f LINE¹ 2RHS-024-2-2 NTS: 152,153 IGrp Repl 2 I na / iSc10 i <<PIA LM IC-F-2 I na I VOL/UT6.02 I 2RHS*P1A, PM122A / QISO 66-14 or DMG¹ 026 in JC5.52 ]none / SUR/PT3.00/HT4.00 (
| |
| NHP2-RHS-.75-CS LINE¹ 2RHS-024-2-2 NTS: 145 /AL / 2 f na /na I
| |
| *P1B MNF/PIPE [C-F-2 f na / VOL/UT6.02 2RHS*P1B,PM100B f QISO 66-23 or DMG¹ 026 in JC5.51 ]none / SUR/PT3.00/HT4.00 NHP2-RHS-.75-CS I LINE¹ 2RHS-024-na-2 NTS: 61,154 ISD I 2 I na /na I
| |
| <<P18 PIPE/HD SHL IC-F-2 I na I SUR/PT3.00/HT4.00 I 2RHS*P18, PM101B f QISO 66-23 or DMG¹ 026 in (C5.81 ]none ( na /
| |
| I LIHE¹ 2RHS.024-na-2 NTS: 154,146 ITE I 2 I na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 10 of 135 NHP2-ISI-006( REV. 'I, CH-000 SECOHD TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS S'YSTEH (sorted by Examination Identifier) 2ND INTVL REL REO DESCRIPTIOH OF ITEH TO BE EXAHINED[CATGRY (IGSCC) EX1/NDE PROCEDURE (PERIOD 1 REHARKS
| |
| )
| |
| EXAHINATION IDENTIFIER I ITS ISO LOCATOR'OHPONENT DMG ¹u IITEH ¹ IFREQYI EX2/HDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
| |
| ] *P1B PIPE/MNF /C-F-2 ] na )
| |
| VOL/UT6.02 2RHS*P18, PM1028 (
| |
| QISO 66-24 or DUG¹ 026 in )C5.51 ]none [
| |
| SUR/PT3.00/HT4.00 J NHP2-18-.500-CS LINE¹ 2RHS-018-na-2 NTS: 147,69 JSD 2 f na/na I
| |
| *PIB HD SHL/PIPE IC-F-2 I na I SUR/PT3 00/HT I 2RHS*P1B, PM103B ) QISO 66-24 or DMG¹ 026 in (C5.81 [none J na / I I LINE¹ 2RHS.018-na-2 NTS: 146 147 ITE 2 J na/na I
| |
| *P18 HD COVER/HD SHL IC-G I na I SUR/PT3.00/HT4.00 I 2RHS*P1B, PM108B I QISONA or DMG¹ 026 in /C6.10 /none / na /na I LINE¹ 2RHS-024-22-2 HTS: 146,148 iNS 2 / na/na I I *P1B HD SHL/HD FLG IC-G I na I SUR/PT3.00/HT4.00 I 2RHS*P1B,PM1108 i QISONA or DMG¹ 026 in /C6.10 ]none ) na /na I I LINE¹ 2RHS-024-22-2 NTS: 146(149 INS 2 )
| |
| na/na I IMC-1 (
| |
| *P1B UPR BARREL SHL/FLG )C-G I na I SUR/PT3.00/HT4.00 I 2RHS*P18, PM111B i QISO 66- or DMG¹ 026 in [C6.10 (none (
| |
| na /na I LINE¹ 2RHS-024-22-2 NTS: 150,151 [NS 2 / na/na I IMC.1 I *P18 UPR/LMR BARREL SHL IC G ( na J SUR/P'I3.00/HT4.00 (
| |
| 2RHS*P1B, PM1128 QISO 66- or DMG¹ 026 in /C6.10 /none ) na /na I I LINE¹ 2RHS-024-22-2 HTS: 151 INS 2 / na/na I IMC-I [
| |
| *P18 LMR BARREL SHL/HD IC-G J na J SUR/PT3.00/HT4.00 ]
| |
| 2RHS'P1B,PM1138 i QISO 66- or DMG¹ 026 in /C6.10 [none f na /na i LINE¹ 2RHS-024-22-2 HTS: 151,152 (HS 2 / na /na I I
| |
| *P1B L'M HD/SHL IC-G f na (
| |
| SUR/PT3.00/HT4.00 f 2RHSAPTB,PM115B / QISONA or DMG¹ 026 in /C6.10 /none f na /na I LINE¹ 2RHS-024-22-2 HTS: 146 INS 2 J na /na I IMC-1 I
| |
| *P1B LM UPR BARREL SHL IC-G f na J SUR/PT3.00/HT4.00 f 2RHS*PTB, PM116B QISO 66- or DUG¹ 026 in /C6.10 /none ) na /na
| |
| ) LINE¹ 2RHS-024-22-2 NTS: 151 )NS 2 / na/na I
| |
| | |
| 0 NIAGARA HOHAWK POWER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 11 of 135 NNP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED DESCRIPTION OF ITEN TO BE EXAHIHED(CATGRY ) IGSCC[ EX1/NDE PROCEDURE )PERIOD 1 REHARKS
| |
| )
| |
| EXAHIHATION IDENTIFIER I ITS ISO LOCATOR'ONPOHENT DWG ¹ I ITEN ¹ IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ i LIHE NO. AND HOTES, AS APPLICABLE DESELECT iCLASSi EX3/NDE PROCEDURE iPERIOO 3 IWC-1 I
| |
| *P18 L'W LWR BARREL SHL IC-G I na I SUR/PT3.00/HT4.00 I 2RHS*P1B,PM1188 i QISO 66- or DWG¹ 026 in /C6.10 ]none f na /na I LINE¹ 2RHS-024-22-2 NTS: 151 INS 2 [ na /na I IMC-1 I
| |
| *P1B BARREL SHL PIH/HD /c-c f na f SUR/PT3.00/NT4.00 J 2RHS~P I 8, PM121B f QISO 66- or DMG¹ 026 in /C3.30 /none / na /na I na I LINE¹ 2RHS-024-22-2 NTS: 152,153 IHS 2 / na/na I
| |
| /
| |
| *P1B LW IC-F-2 [ na f VOL/UI'6.02 2RHS*PlB,PM1228 i QISO 66-24 or DMG¹ 026 in )C5.52 )none f SUR/P'T3.00/Ml'4.00 f HHP2-RHS-.75-CS I LINE¹ 2RHS-024-22-2 NTS: 154 IAL 2 [ na /na I I
| |
| ~PIC WNF/PIPE IC-F-2 [ na [ VOL/UT6.02 2R RSVP I C, PMI DOC i QISO 66.22 or DMG¹ 026 in (C5.51 ]none f SUR/PT3.00/HT4.00 /
| |
| NHP2-RHS-.75-CS LINE¹ 2RHS-024-na-2 NTS: 61(154 (SD 2 f na/na P1C PIPE/HD SHL IC-F-2 I na I SUR/PT3 00/HT 0 I 2RHS~P IC, PW101C ( QISO 66-22 or DMG¹ 026 in )C5.81 /none ) na / I
| |
| ] LINE¹ 2RHS-024-na-2 NTS: 154,146 (TE 2 ( na/na I i ~PIC PIPE/MNF IC-F-2 I na I VOL/UT6.02 IEX6 2RHS*P1C, PW102C ) QISO 66-25 or DWG¹ 026 in (C5.51 IID I SUR/PT3.00/HT4.00 I NHP2-18-.500.CS I LINE¹ 2RHS-018-na-2 NTS: 147,69 ISD 2 / na /na I
| |
| ~PIC HD SHL/PIPE IC-F-2 I na I SUR/PT3.00/HT4.00 IEX6 2RHS*P1C, PW103C i QISO 66-25 or DWG¹ 026 in (C5.81 /ID f na/ I
| |
| ] LINE¹ 2RHS-018-na-2 NTS: 146,147 [TE 2 ) na /na I
| |
| *P1C HD COVER/HD JC-G f na ( SUR/PT3.00/NT4.00 JEX6 2RHS*P1C, PW108C QISO 66- or DWG¹ 026 in JC6.10 /ID / na /na
| |
| / LIHE¹ 2RHS-024-334-2 NTS: 146,148 JNandate/ 2 / na /na I I ~PIC HD SHL/FLG JC-G J na J SUR/PT3.00/HT4.00 )EX6 2RHSAP I C, PMI IOC )
| |
| QISO 66- or DWG¹ 026 in JC6.10 [ID f na /na f LINE¹ 2RHS-024-334-2 NTS: 146,149 (Handate/ 2 f na /na I
| |
| | |
| NIAGARA HOHAMK PDMER CORPORATIOH - ILE POINT NUCLEAR STATION - UNIT 2 12 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REHARKS EXAHINATIOH IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG ¹, ] ITEN ¹ JFREOYJ EX2/HDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSJ EX3/HDE PROCEDURE )PERIOD 3 i IMC-1 )
| |
| *P1C UPR BARREL FLG/SHL ]C-G / na f SUR/PT3.00/HT4.00 f>> )<<Examine when dissassemble for maintenance 2RHS<<P1C, PM111C ) QISO 66- or DMG¹ 026 in IC6.10 IID I na /na I<<
| |
| )
| |
| LINE¹ 2RHS-024-334-2 NTS: 150,151 [Handate( 2 J na /na I WC-1 /
| |
| *P1C UPR/LMR BARREL SHL /C-G / na SUR/PT3.00/HT4.00 /<< (>> Examine when dissassembie for maintenance 2RHS<<P1C, PM112C / QISO 66- or DMG¹ 026 in /C6.10 /ID na /na />>
| |
| / LINE¹ 2RHS-024-334-2 NTS: 151 JHandate) 2 na /na />>
| |
| f<< )>> Examine when dissassemble for maintenance IMC-1 I *P1C LMR BARREL SHL/HD [C-G [ na f SUR/PT3.00/HT4.00 2RHS<<P1C,P'M113C i QISO 66- or DMG¹ 026 in /C6.10 /ID / na /na J
| |
| LINE¹ 2RHS-024.334-2 NTS: 151,152 /Handate/ 2 / na /na
| |
| <<P1C HD L'M JC-G / na )
| |
| SUR/PT3.00/HT4.00 IEX6 2R H S<<P1C, PM 115 C i QISO 66- or DWG¹ 026 in /C6.10 /ID / na /na I
| |
| [ LINE¹ 2RHS-024-334-2 HTS: 146 /Handate/ 2 / na /na I I WC-1 I
| |
| <<P1C LM UPR BARREL SHL JC.G f na J SUR/PT3.00/MT4.00 I* (<< Examine when dissassemble for maintenance 2RH S<<P I C, PM116C / QISO 66- or DWG¹ 026 in JC6.10 ]ID J na /na I* I
| |
| )
| |
| LIHE¹ 2RHS-024-334-2 NTS: 151 [Mandate] 2 f na /na I I IMC-1 i <<P1C LM LMR BARREL SHL ic-G SUR/PT3.00/HT4.00 /<< )<< Examine when dissassembie for maintenance 2RHS*P1C,PM118C / QISO 66- or DMG¹ 026 in /C6.10 /ID na /na /<<
| |
| )
| |
| LIMES 2RHS-024-334-2 NTS: 151 /Handate/ 2 na /na /<<
| |
| IMC-1 I
| |
| <<P1C BARREL SHL PIN/HD /C-C / na SUR/PT3.00/HT4.00 J>> [>> Examine when dissassembie for maintenance 2RHS*P1C, PM121C J QISO 66- or DMG¹ 026 in /C3.30 /ID na /na )<<
| |
| / LINE¹ 2RHS-024-334-2 NTS: 152,153 )Handate/ 2 na /na />>
| |
| i <<P1C LM (C-F-2 ) na / VOL/UT6.02 2RHS<<P1C, PW122C f QISO 66-25 or DMG¹ 026 in (C5.52 /none / SUR/PT3 F 00/HT4.00 f NHP2-RHS-.75-CS / LINE¹ 2RHS-024.na-2 N'IS: 154 JAL / 2 f na /na P I PE/*P V21A IC-F-2 I-na I VOL/UT6.02 2R H S<<P V21A, VWP V21A-A J QISO 66-09 or DMG¹ 045 in JC5.51 ]none J SUR/PT3.00/HT4.00 NHP2-8-.594-CS I LINE¹ 2RHS-008-na-2 HTS: 31,36 ISD I 2 I na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 13 of 135 NHP2-ISI-006, REV. 1( CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED (
| |
| DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY )IGSCC) EX1/NDE PROCEDURE )PERIOD 1 REHARKS EXAHINATION IDEHI'IFIER J ITS ISO LOCATOR, COMPONENT DMG ¹, ]ITEN ¹ JFREOY] EX2/NDE PROCEDURE ]PERIOD 2 )
| |
| USE CAL BLK ¹ J LINE NO. AND NOTES, AS APPLICABLE )SELECT iCLASSi EX3/NDE PROCEDURE iPERIOD 3
| |
| (
| |
| *PV21A/PIPE IC-F-2 I na I VOL/UT6 02 IEX6 2RHS PV21A,VMPV21A-B / QISO 66.09 or DMG¹ 045 in /C5.51 IID I SUR/PT3 F 00/HT4.00 I NHP2-8-.594-CS / LINE¹ 2RNS.008.na-2 NTS: 31,38 /SD 2 (
| |
| na/na I PIPE/4PV218 IC-F-2 I na I VOL/UT6.02 I 2RHS~PV21B, VMPV21B-A QISO 66.05 or DMG¹ 045 in )C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2.8-.594.CS I LINE¹ 2RHS-008-na-2 NTS: 31,37 )SD 2 / na /na I
| |
| 4PV218/PIPE IC-F-2 f na / VOL/UT6.02 2RHS~PV21B VMPV2IB 8 I QISO 66 05 or DMG¹ 045 in [C5.51 ]none [ SUR/PT3.00/HT4.00 f NHP2.8-.500-CS I LINE¹ 2RNS-008.na-2 NTS: 37,38 ISD 2 / na /na I
| |
| / LM IC-F-2 / na / VOL/UT6.02 2RHS*STRT1A,STRT-LMODIA( QISO 66-13 or DMG¹ 030 in [C5.52 /none / SUR/PT3.00/HT4.00 /
| |
| NHP2-24-.500-CS I LINE¹ 2RHS 024-2.2 NTS: 74 INS 2 / na /na f WNF/PIPE (C-F-2 J na f VOL/UT6.02 2RHS*STRTIA,STRTMLOOOIAJ QISO 66-13 or DMG¹ 030 in JC5.51 [none ] SUR/PT3.00/HT4.00 J NHP2-24-.500.CS I LINE¹ 2RHS-024-2-2 NTS: 61(74 I SD 2 ] na /na I I PIPE/TEE IC-F-2 / na f VOL/UT6.02 2RHS~STRTIA,STRTMLD002AI QISO 66.13 or DMG¹ 030 in )C5.51 Inone I SUR/PT 00/HT I NHP2-24-.500.CS I LINE¹ 2RHS.024-2-2 HTS: 73,74 ISD J 2 ~
| |
| na /na I *STRT18 LW IC-F-2 i VOL/UT6.02 I 2RHS~STRTIB,STRT-LM001$ i QISO 66-23 or DMG¹ 030 in (C5.52 ]none f SUR/PT3.00/HT4.00 / I NHP2-24-.500-CS i LINE¹ 2RHS-024-22-2 HTS: 74 iNS I 2 I na/na I I WNF/PIPE IC-F-2 f na J VOL/UT6.02 2RHS~STRT1B,STRTMLD001BI QISO 66 23 or DMG¹ 030 in JC5.51 ]none J SUR/PT3.00/HT4.00 J NHP2-24-.500-CS i LINE¹ 2RHS-024-22.2 NTS: 61,74 (SD 2 f na /na I PIPE/TEE IC-F-2 I na I VOL/UT6.02 I 2RHS*STRTIB,STRTMLD002B( QISO 66-23 or DWG¹ 030 in )C5.51 /none J SUR/PT3.00/HT4.00 )
| |
| NHP2-24-.500.CS I LINE¹ 2RHS 024 22 2 NTS'3 74 ISD 2 f na /na
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - H.. MILE POINT NUCLEAR STATION - UNIT 2 14 of 135 HHP2-ISI-006( REV. 1, CH-000 SECOHD TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTIOH OF ITEH TO BE EXAMINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOO 1 REMARKS EXAHINATION IDEHTIFIER i ITS ISO LOCATOR, COMPONENT OWG ¹, LITEM ¹ iFREQYi EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT JCLASSi EX3/NDE PROCEDURE iPERIOO 3 i LW IC-F-2 I na I VOL/UT6.02 I 2RHS<<STRTIC,STRT-LWOOICi QISO 66.22 or OMG¹ 030 in iC5.52 inone i SUR/PT3 F 00/MT4.00 /
| |
| NMP2-24-.500-CS i LINE¹ 2RHS-024-42-2 NTS: 73 JHS i 2 i na /na i WNF/PIPE JC-F-2 i na i VOL/UT6.02 2RHS<<STRT1C,STRTMLD001Ci QISO 66-22 or DWG¹ 030 in /C5.51 )none i SUR/PT3.00/HT4.00 NHP2-24-.500.CS I LINE¹ 2RHS.024-42-2 NTS: 61,73 ISD I 2 I na /
| |
| i PIPE/TEE iC-F-2 i na i VOL/UT6.02 2RHS*STRT1C,STRTWLD002CI QISO 66-22 or DMG¹ 030 in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-24-.500-CS i LINE¹ 2RHS-024-42-2 NTS: 73,73 iSO J 2 J na /na
| |
| *V143 INT SUR IB M 2 I na I VT3/VT2.01 J<< i<< Examine when dissassemble for maintenance 2RNS*V143,VBY173 i QISO 66-47 or DMG¹ 003 in i812.50 [DisG i / I i LINE¹ 2RHS-006-142-1 NTS: 5 /Grp Repi 1 i / i<<
| |
| I PIPE/*V309 iC-F-1 i na na /na 2RHS<<V309,VWV309-A J QISO 66-60 ,
| |
| or DWG¹ na in inone inone i na /na na I LIHE¹ 2RHS.008-297-2 NTS: 128,143 INS I 2 I na /na I
| |
| *V376 BODY/SOF iC-F-2 i na i SUR/PT3.00/MT4.00 i 2RNS<<V376,VNG76-A i QISO 66-13 or DMG¹ 057 in iC5.70 inone i na /
| |
| i LINE¹ 2RHS-024-1-2 NTS: 58,59 LSD i 2 i na /na I i *V376 BODY/BEARING NECK iC-G i na SUR/PT3.00/MT4.00 I iNOTE NAHE CHANGE: Called VM376-C in 1st Interval Plan (only) 2RHS<<V376(VMV376-C i QISO 66-13 or DMG¹ 057 in iC6.20 iID na /na I I i LINE¹ 2RHS-024-'1-2 HTS: 58,60 iGrp Rep) 2 na /na iSc10 I I *V376 BODY/BEARING NECK IC-G I na I SUR/PT3.00/MT4.00 I iNOTE NAME CHANGE: Called VM376-0 in 1st Interval Plan (only) 2RHS<<V376(VMV376.0 i QISO 66-13 or DMG¹ 057 in iC6.20 iID i na /na i LINE¹ 2RHS 024-1-2 NTS: 58,60 iGrp Repi 2 i na /na i Sc10 IMC-5 i <<V376 BODY LW iC G i na i SUR/PT3.00/MT4.00 I iHOTE NAME CHANGE: Called VM376-LM001 in 1st Ten-Year Plan (only);
| |
| 2RHS<<V376,VNG76.LM ) QISO 66-13 or DMG¹ 057 in iC6.20 iIO i na /na I na i LINE¹ 2RHS-024-1-2 NTS: 58 iGrp Rep) 2 i na /na i Sc10
| |
| | |
| NIAGARA NOHAWK POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 15 of 135 HHP2-ISI-006, REV. 1, CH.OOO SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL RED ( DESCRIPTION OF ITEN To BE EXANIHEO(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 RENARKS EXAHINATION IDEHTIFIER ( ITS ISO LOCATOR, COHPOHEHT DWG ¹, ( ITEN ¹ (FREOY( EX2/HDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ (
| |
| LIHE Ho. AHD NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 (
| |
| I
| |
| *V377 BODY/SOF IC F I na I SUR/PT 0/NT I 2RHS*V377 N/377-A (
| |
| QISO 66-23 or DWG¹ 057 in (C5.70 (none (
| |
| na /
| |
| I LINE¹ 2RHS-024-332-2 HTS: 58,59 ISD I 2 I na /na I I 'V377 BODY/BEARING HECK IC-G I na I SUR/PT3.00/NT4 F 00 I 2RHS<<V377,VWV377-C (
| |
| QISO 66-23 or DUG¹ 057 in (C6.20 (none ( na /na I
| |
| ( LINE¹ 2RHS-024-332-2 NTS: 58,60 (NS (
| |
| 2 (
| |
| na /na I
| |
| (
| |
| <<V377 BODY/BEARING NECK IC-G I na I SUR/PT3.00/MT4.00 I 2RHS*V377, VWV377-0 (
| |
| QISO 66-23 or DMG¹ 057 in (C6.20 (none (
| |
| na /na
| |
| (
| |
| LINE¹ 2RHS-024-332-2 NTS: 58,60 (NS ( 2 (
| |
| na /na (
| |
| (
| |
| *V377 BODY LM (C-G (
| |
| na ( SUR/PT3.00 I 2RHS<<V377,VMV377-LW I QISO 66-23 or DWG¹ 057 in (C6.20 (none (
| |
| na /na I I LINE¹ 2RHS.024-332-2 NTS: 58 IHS I 2 I na /na I
| |
| (
| |
| *V378 BODY/SOF (C-F-2 ( na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2RHS<<V378, VWV378-A (
| |
| QISO 66-22 or DUG¹ 057 in (C5.70 (none (
| |
| na / I I LINE¹ 2RHS-024-169-2 HTS: 58,59 ISO I 2 I na /na I
| |
| (
| |
| <<V378 BODY/BEARING NECK (C-G (
| |
| na ( SUR/PT3.00/NT4.00 (
| |
| 2RHS<<V378, VWV378. C (
| |
| QISO 66-22 or DWG¹ 057 in IC6 20 IID I na /na ISc8
| |
| (
| |
| LINE¹ 2RHS-024-169-2 HTS: 58,60 (Grp Rep( 2 ( na /na I
| |
| (
| |
| 'V378 BODY/BEARING NECK (C-G (
| |
| na (
| |
| SUR/PT3.00/NT4.00 I 2R HS<<V378( VWV378. 0 (
| |
| QISO 66-22 or DWG¹ 057 in (C6.20 (IO (
| |
| na /na (Sc8
| |
| (
| |
| LINE¹ 2RHS-024-169-2 NTS: 58,60 (Grp Rep( 2 (
| |
| na /na I IWC-5 I
| |
| <<V378 BODY LW (C-G (
| |
| na (
| |
| SUR/P'T3.00/HT4 F 00 (
| |
| 2RHS<<V378, VWV378. LW (
| |
| QISO 66-22 or DMG¹ 057 in (C6.20 (ID ( na /na (Sc8
| |
| (
| |
| LINE¹ 2RHS-024-169-2 HTS: 58 (Grp Rep( 2 (
| |
| na /na I
| |
| ( SOL/PIPE (8-J ( na (
| |
| SUR/PT3 F 00/NT4.00 2RHS-177A-FW001 (
| |
| QIS0177-A or DWG¹ na in (89.40 (none (
| |
| na /na
| |
| (
| |
| LINE¹ 2RHS-002-177-1 NTS: 1,2 (NS ( 1 (
| |
| na /na
| |
| | |
| NIAGARA HOHAWK POWER CORPORA'TION - NILE POINT NUCLEAR STATION - UNIT 2 16 of 135 KHP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEKDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED ( DESCRIPTION OF ITEH TO BE EXAHINED[CATGRY ( IGSCC( EX1/KDE PROCEDURE (PERIOD 1 REHARKS EXAHIKATION IDEN'TIFIER i ITS ISO LOCATOR, COHPONEHT DMG ¹, i ITEH ¹ iFREOYi EX2/KDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/KDE PROCEDURE IPERIOO 3 I I PIPE/ELB IB-J f na ] SUR/PT3.00/HT4.00 ]
| |
| 2RHS-177A-FW002 [ arso177-A or DMG¹ na in i89.21 /none / na /na I LINE¹ 2RHS-002-177-1 NTS: 2,3 IHS 1 / na/na I I ELB/PIPE IB-J f na J SUR/PT3.00/HT4.00 J 2RHS-177A-FW003 (
| |
| aisoTTT-A or DIIG¹ na in /89.21 )none f na /na I LINE¹ 2RHS-002-177-1 NTS: 2,3 iKS / na /na I I P I PE/*HOV67A IB-J f na f SUR/PT3.00/HT4.00 f 2RHS-177A-FM004 I QI S0177-A or DWG¹ na in (89.21 ]none f na /na na i LINE¹ 2RHS-002-177-1 NTS: 2,4 iNS 1 / na/na I
| |
| <<HOV67A/PIPE IB-J )
| |
| na [ SUR/PT3.00/HT4.00 [
| |
| 2RHS-'I77A-FW005 [ QIS0177-A or DWG¹ na in /89.21 ]none (-na /na na I LINE¹ 2RHS-002-177-1 NTS: 2,4 JNS J na /na I I *V224/PIPE IB-J I na [ SUR/PT3.00/HT4 00 I 2RHS-177A-FM006 )
| |
| QIS0177-A or DWG¹ na in /89.40 ]none / na /na I LINE¹ 2RHS-002-177-1 NTS: 2,4 INS 1 / na/na I I P IPE/<<V224 IB-J f na ) SUR/PT3.00/HT4.00 f 2RHS-177A-FM007 I QIS0177-A or OMG¹ na .in /89.40 )none ] na /na I LINE¹ 2RHS-002-177-1 NTS 2 4 /NS I 1 f na/na I I PIPE/ELB IB-J I na I UR/ T3 00/HT4 F 00 I 2RHS-177A-FM008 I Ql S0177.A or DWG¹ na in /89.21 )none )
| |
| na /na na I LINE¹ 2RHS-002-177-1 NTS: 2,3 /KS [ na /na I I ELB/PIPE IB J I na I SUR/PT 00/HT4 00 I 2RHS-177A-FW009 Ql S0177-A or DMG¹ na In (89.21 /none f na /na LINE¹ 2RHS-002-177-1 NTS: 2,3 /NS 1 / na/na I I PIPE/SOL /8-J I na I SUR/PT3.00/HT4.00 I 2RHS-177A-FM010 i QIS017T-A or DMG¹ na in /89.40 ]none )
| |
| na /na na I LINE¹ 2RHS-002-177-1 NTS: 1,2 INS 1 J na/na I
| |
| | |
| NIAGARA NOHAMX POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 17 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 REHARKS EXANINATION IDENTIFIER f ITS ISO LOCATOR, CONPONENT DMG ¹, )ITEN ¹ [FREOY] EX2/HDE PROCEDURE ]PERIOD 2 f USE CAL BLK ¹ I LINE KO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
| |
| [ SOL/PIPE IB-J I na I SUR/PT3.00/NT4.00 I 2RHS-177A-FM011 i QISO177-A or DMG¹ na in /89.40 /none [ na /na i LINE¹ 2RHS-002-188-'I NTS: 1,2 INS 1 / na /na I I PIPE/ELB IB J I na I SUR/PT3.00/NT4.00 I 2RHS-177A-FM012 I QIS0177-A or DMG¹ na in JB9.21 /none / na /na I LINE¹ 2RHS-002-188-1 NTS: 2,3 iNS 1 / na /na I I ELB/PIPE IB-J I na I SUR/PT 00/HT I 2RHS-177A- FM013 i QIS0177-A or DMG¹ na in f89.21 /none f na /na I J
| |
| LINE¹ 2RHS-002-188-1 NTS: 2,3 [NS 1 f na/na I I
| |
| PIPE/0HOV678 IB-J / na / SUR/PT3.00/NT4.00 /
| |
| 2RHS-177A- FM014 i QIS0177-A or DMG¹ na in /89.21 )none [ na /na I LINE¹ 2RHS-002.188-1 NTS: 2,4 IHS 1 / na /na I
| |
| *HOV67B/PIPE IB-J [ na (
| |
| SUR/PT3.00/HT4.00 J .I 2RHS-177A-FM015 i QIS0177-A or DMG¹ na in l89.21 )none f na /na I I i LINE¹ 2RHS 002-188-1 NTS: 2,4 INS 1
| |
| / na/na I I I PIPE/*V227 IB-J / na J SUR/PT3.00/NT4 F 00 / Sc7 2RHS-177A-FM016 i QIS0177-A or DMG¹ na in /89.40 /ID f na /na i LINE¹ 2RHS-002-188-1 NTS: 2(4 IHS / na /na I
| |
| *V227/P I PE IB-J I na I SUR/PT3.00/HT4.00 I 2RHS. 177A- FM017 i QIS0177-A or DMG¹ na in /89.40 ]none f na /na I I LINE¹ 2RHS-002-188-1 NTS: 2,4 IHS 1 / na /na I I PIPE/ELB IB-J I na I SUR/PT3.00/NT4.00 I 2RHS-'l77A-FM018 I QIS0177-A or DMG¹ na in /89.21 ]none J na /na i LINE¹ 2RHS.002-188-1 Nl'S 2 3 INS ] na /n I I ELB/PIPE IB-J f na / SUR/PI3.00/HT4.00 f 2RHS-177A-FM019 I QIS0177-A or DMG¹ na in /89.21 [none / na /na I LIHE¹ 2RHS-002-188-1 NTS: 2,3 INS I
| |
| | |
| NIAGARA NOHAWK POWER CORPORATION - H NILE POINT NUCLEAR STATION - WHIT 2 18 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOHD TEN YEAR IHSERVICE IHSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RED ( DESCRIPTIOH OF ITEN TO BE EXAHIHED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS EXAHINATIOH IDENTIFIER ( ITS ISO LOCATOR, COHPONEHT DWG ¹, ( ITEN ¹ (FREQY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ (
| |
| LINE HO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 (
| |
| I PIPE/SOL IB-J ( na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2RHS-177A-FW020 (
| |
| QIS0177-A or DMG¹ na in (89.40 (none (
| |
| na /na I I LINE¹ 2RHS 002 188 1 NTS' 2 IN 1 (
| |
| na/na I I INTEG ATT (C-C (
| |
| na (
| |
| SUR/PT3.00/N'I4.00 (
| |
| 2RHS-5-CD-C-FW001 ( QISO 66-16-17 or DWG¹ na in (C3.20 (ID (
| |
| na /na na I LINE¹ 2RHS-016-5-2 NTS: 93,17 INS 2 ( na /na I I INTEG ATT (c-c (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2RHS-5-CD-C-FW002 (
| |
| QISO 66-16.17 or DWG¹ na in (C3.20 (ID (
| |
| na /na na I LINE¹ 2RHS-016.5-2 NTS: 93,17 INS 2 (
| |
| na /na I I PIPE/*NOV228 IC-F-2 ( na (
| |
| VOL/UT6.02 2RHS-66-05-FW002 (
| |
| QISO 66.05 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| HHP2-8-.594-CS I LINE¹ 2RHS-008.50-2 NTS: 31,32 ISD 2 (
| |
| na/na
| |
| (
| |
| *HOV228/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS.66-05-FM003 (
| |
| QISO 66-05 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/NI'4.00 (
| |
| NHP2-8-.594-CS I LIHE¹ 2RHS 008 50 2 NTS 31 32 ISD 2 ( na /na I PIPE/PIPE IC-F-2 ( na (
| |
| VOL/UT6.02 2RHS-66-05-FW004 (
| |
| QISO 66-05 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-8-.594-CS (
| |
| LINE¹ 2RHS-008-50-2 NTS: 31 (none 2 (
| |
| na /na I ELB/PIPE IC-F-2 (
| |
| na ( VOL/UT6.02 2RHS.66-05-FW005 (
| |
| QISO 66-05 or DWG¹ na in (C5.51 (none ( SUR/PT3.00/HT4.00 (
| |
| NHP2-8..594-CS I LINE¹ 2RHS.008-50-2 HTS: 31,33 ISD 2 (
| |
| na/na
| |
| ( ELB/PIPE IC-F-2 ( na (
| |
| VOL/UT6.02 'I 2RHS-66.05.FW006 (
| |
| QISO 66.05 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/NT4.00 ( I NHP2-8-.594-CS I LINE¹ 2RHS-008-50-2 Nl'S: 31,33 ISD 2 ( na /na I I ELB/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RHS-66-05-FM007 (
| |
| QISO 66-05 or DWG¹ na in (C5.51 (ID ( SUR/PT3.00/NT4.00 (Sc8 NHP2-8-.594.CS I LINE¹ 2RHS-008-50-2 NTS: 31,33 I 2 (
| |
| na /na
| |
| | |
| 0 NIAGARA HOHAWK POWER CORPORATION - ILE POINT NUCLEAR STATIOII - UNIT 2 19 of 135 NHP2-ISI-006) REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOD 1 REHARKS EXAHINATION IDEHT IF IER ITS ISO LOCATOR, COHPONENT DWG ¹, LITEM ¹ iFREQYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I ELB/PIPE IC-F-2 i na )
| |
| VOL/uT6.O2 2RHS-66.05-FW008 i QISO 66-05 or DWG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS I LINE¹ 2RHS-008-50-2 NTS: 31,33 ISD 2 / na /na I PIPE/PIPE ic-F-2 i na i VOL/UT6.02 2RNS-66-05-FW009 i QISO 66-05 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 J NHP2 8 .594-CS i LINE¹ 2RHS-008-50-2 NTS: 31 inone 2 i na /na
| |
| [ PIPE/*HOV238 IC-F-2 i na i VOL/UT6.02 2RHS-66-05-FW010 i QISO 66-05 or DWG¹ na in iC5.51 /none i SUR/PT3 F 00/HT4.00 NHP2.8-.594-CS I LINE¹ 2RHS-008-295-2 HTS: 31,32 ISD 2 i na /na I PIPE/PIPE IC-F-2 i na i voL/uT6.O2 2RHS-66.05-FW011 QISO 66-05 or DWG¹ na in iC5.51 inone i SUR/PT3.00/HI'4.00 i NHP2-8-.594-CS LINE¹ 2RHS-008-50-2 NTS: 31 inone 2 / na /na I RED/PIPE IC-F-2 i na ( VOL/UT6.02 2RHS-66.05-FM014 i QISO 66-05 or DWG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS I LIHE¹ 2RHS-008-50-2 HTS'59 31 ISD 2 / na/na I I TEE/PIPE IC-F-2 i na J VOL/UT6.02 2RHS-66-05-FW015 i QISO 66.05 or DUG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 J NHP2-8-.594-CS I LINE 2RHS 0 8 295 HTS'1 ~ 160 ISD I 2 I I I PIPE/TEE IC-F-2 i na i VOL/UT6.02 2RHS-66-05-FW018 i QISO 66.05 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 J NHP2-8-.594-CS I LINE¹ 2RHS-008-50.2 NTS: 31, 160 ISD 2 i na /na I I TEE/PIPE IC-F-2 (
| |
| na I VOL/UT6.02 I 2RHS-66.05-FW019 QISO 66-05 or DWG¹ na in JC5.51 (none J SUR/PT3.00/HT4.00 i NHP2.8-.594-CS i LINE¹ 2RHS-008.50.2 HTS: 31,160 LSD 2 i na/na I I PIPE/ELB IC-F-2 i na i VOI./uT6.O2 2RHS.66.05-FW026 (
| |
| QISO 66-05 or DMG¹ na in iC5.51 (none i SUR/PT3.00/HT4.00 )
| |
| NHP2-8-.594-CS LINE¹ 2RHS-008-50-2 NTS: 31,33 ]TE 2 i na /na
| |
| | |
| 0 NIAGARA NOHAMK POMER CORPORATION - NI NILE POINT NUCLEAR STATION - UNIT 2 20 of 135 HNP2-ISI-006( REV. 1, CH-000 SECOND TEH TEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS STSTEN (sorted by Examination Identifier) 2ND INTVL REL RED [ DESCRIPTIOH OF ITEN TO BE EXANINED[CATGRY J IGSCCJ EX1/HDE PROCEDURE [PERIOD 1 RENARKS EXAHINATION IDEHl'IFIER i ITS ISO LOCATOR, COHPOHEHT DMG ¹, iITEH ¹ iFREQYi EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE HO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I INTEG ATT IC-C I na I SUR/PT3.00/NT4.00 2RHS-66.05-FM301 / QISO 66-05-20 or DMG¹ na in /C3.20 /ID )
| |
| na /na J
| |
| LINE¹ 2RHS-008-50-2 HTS: 31,36 /Nandate/ 2 / na /na I INTEG ATT [C-C ] na [ SUR/PT3.00/NT4.00 2RHS-66-05-FM302 f QISO 66-05-20 or DMG¹ na in JC3.20 ] ID f na /na
| |
| )
| |
| LINE¹ 2RHS-008-50-2 NTS: 31,36 /Nandatef 2 f na /na I I IHTEG ATT (C.C J na / SUR/PT3.00/NT4.00 )
| |
| 2RHS-66-05-FM303 f QISO 66-05-20 or DMG¹ na in JC3.20 )ID / na /na f LINE¹ 2RHS-008-50-2 NTS: 31,36 ]Mandate[ 2 ( na /na I I INTEG ATT fC-C [ na ] SUR/PT3.00/MT4.00 J 2RHS-66-05-FM304 f QISO 66-05-20 or D'MG¹ na in JC3.20 (ID ] na /na f LINE¹ 2RHS-008-50-2 NTS: 31,36 JNandatef 2 J na /na I I
| |
| IN'IEG ATT IC-C I na I SUR/PT3.00/NT4 F 00 I 2RHS-66-05-FM313 f QISO 66-05-15 or DMG¹ na in (C3.20 )ID / na /na f LINE¹ 2RHS-008-50-2 HTS: 31,36 (Nandate/ 2 / na /na I I INTEG ATT IC C I na I SUR/PT3 00/HT4 0 I 2RHS 66 FM314 / QISO 66-05-15 or DMG¹ na in /C3.20 /ID / na /na
| |
| / LINE¹ 2RHS-008-50-2 NTS: 31,36 /Handate/ 2 / na /na I I INTEG ATT IC C I na I SUR/PT /HT4' 2RHS-66.05-FM315 J QISO 66-05-15 or DMG¹ na in /C3.20 ]ID J na /na f LINE¹ 2RHS-008-50-2 HTS: 31,36 (Nandatef 2 J na /na I I IHTEG ATT JC-C ) na ) SUR/PT3.00/NT4.00 (
| |
| 2RHS-66.05-FM316 f QISO 66-05-15 or DMS¹ na in JC3.20 (ID J
| |
| LIHE¹ 2RHS-008-50-2 NTS: 31,36 JHandate/ 2 / na /na I I INTEG ATT JC-C / na SUR/PT3.00/NT4.00 I 2RHS-66-05-FM321 / QISO 66-05-14 or DMG¹ na in /C3.20 /ID na /na isc7
| |
| (
| |
| LINE¹ 2RHS-008-50.2 NTS: 31,34 [Nandate] 2 na /na I
| |
| | |
| NIAGARA MORA'MK POMER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 21 of 135 NMP2-ISI-006, REV. 'I, CH.000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Exemination Identifier) 2ND INTVL REL REQ i DESCRIP'TION OF ITEH TO BE EXAMINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOD 1 REHARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG ¹, LITEM ¹ iFREOYi EX2/NDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ I LINE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I INTEG ATT IC-C I na I SUR/PT3.00/HT4.00 I 2RHS-66-05-FM330 i QISO 66-05-16 or DMG¹ na in iC3.20 iID / na /na isc7 i LINE¹ 2RHS-008-50-2 NTS: 31,36 iMandatei 2 i na /na I I INTEG ATT . iC-C i na i SUR/Pt3.00/HT4.00 i 2RHS 66 05-FM331 / QISO 66-05-16 or DMG¹ na in JC3.20 iID i na /na isc7 I i LINE¹ 2RHS-008-50-2 NTS: 31,36 JMandatei 2 / na /na I' I I INTEG ATT iC-C i na i SUR/PT3.00/MT4.00 i 2RHS-66-05-FM332 i QISO 66-05-16 or DMG¹ na in iC3.20 iio i na /na isc7 i LINE¹ 2RHS-008-50-2 NTS: 31,36 iMandatei 2 i na /na I INTEG ATT IC C I na I SUR/Pt3 00/MT4 00 I 2RHS-66-05-FM333 i QISO 66-05-16 or DMG¹ na in iC3.20 )ID i na /na isc7 i LINE¹ 2RHS-008-50-2 NTS: 31,36 iMandatei 2 J na /na I I PIPE/ELB IC-F-2 i na i VOL/ut6.O2 2RHS-66-05-SM003 i QISO 66.05 or DMG¹ na in [C5.51 inone i SUR/PT3.00/MT4.00 i NHP2-8-.594-CS I LINE¹ 2RHS.008.50-2 NTS: 31,33 ISO 2 i na /na I PIPE/ELB IC-F-2 i na i VOL/ut6.02 2R H S-66-05-SM004 i QISO 66-05 or DMG¹ na in iC5.51 iID J SUR/PT3.00/MT4.00 isc8 NHP2-8-.594-CS I LIHE¹ 2RHS-008-50 2 NTS: 31,33 ISD 2 / na /na I PIPE/ELB IC-F-2 i na i VOL/Ul'6.02 2RHS.66-05.SM006 (
| |
| QISO 66-05 or DMG¹ na in iC5 ~ 51 (none i SUR/PT3.00/Ht4.00 i NHP2-8-.594-CS I LINE¹ 2RHS.008.50-2 Hts: 31,33 ISD 2 i na /na I PIPE/ELB IC-F-2 i na i voL/ut6.O2 2RHS.66.05-SM007 i QISO 66-05 or DMG¹ na in iC5.51 [ID ( SUR/PT3.00/MT4.00 isc8 NHP2-8-.594-CS i LINE¹ 2RHS-008-50-2 N'IS: 31,33 (SO I 2 I na/na I I ELB/PIPE IC-F-2 i na J VOL/UT6.02 2RHS-66-05-SM008 i QISO 66-05 or DMG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-8-.594-CS i LINE¹ 2RHS-008-50-2 NTS: 31,33 iso 2 J na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATIOH - N ILE POIHI'UCLEAR STATION - UNIT 2 22 of 135 HHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ DESCRIPTIOH OF ITEN TO BE EXAHINED[CATGRY (IGSCCJ EX1/NDE PROCEDURE (PERIOD 1 REHARKS J
| |
| EXAHINATION IDENI'IFIER (
| |
| ITS ISO LOCATOR, COHPONEHT DMG ¹, JITEH ¹ [FREOYJ EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
| |
| (
| |
| PIPE/PIPE IC-F-2 )
| |
| na (
| |
| VOL/UT6.02 2RHS-66-06-FM001 / QISO 66.06 or DMG¹ na in /C5.51 [none f SUR/Pl'3.00/HT4.00 [
| |
| NHP2-8-.500.CS I LINE¹ 2RHS-008-57-2 HTS: 39 Inone 2 J na /na I PIPE/TEE IC-F-2 I na I VOL/UT6.02 I 2RHS.66-06-FM003 ) QISO 66-06 or DMG¹ na in )C5.51 )none J SUR/PT3.00/HT4.00 J HHP2-8 .500-CS I LINE¹ 2RHS-008-57-2 N'TS: 39,35 I SD 2 f na/na i ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-06-FM004 i QISO 66.06 or DMG¹ na in [C5.51 ]none / SUR/PT3.00/HT4.00 f NHP2-8-.500-CS I LINE¹ 2RHS-008-57.2 NTS: 39,40 I SD 2 f na /na I ELB/PIPE IC-F-2 ] na [ VOL/UT6.02 2RHS-66-06-FM005 ) QISO 66-06 or DMG¹ na in (C5.51 [none f SUR/PT3.00/MT4.00 J NHP2-8-.500-CS I LINE¹ 2RHS-008-57-2 NTS: 39,40 ISD 2 f na/na I ELB/PIPE IC-F-2 J na (
| |
| VOL/UT6.02 2RHS-66-06-FM006 ) QISO 66.06 or DMG¹ na in /C5.51 [none J SUR/Pl'3.00/HT4.00 f NHP2-8-.500-CS LINE¹ 2RHS-008-57-2 NTS: 39,40 i SD 2 / na /na I I PIPE/PIPE IC-F-2 I na I VOL/UT6.02 I 2RNS.66.06-FM007 i QISO 66-06 or DMG¹ na in )C5.51 /none / SUR/PT3.00/HT4.00 J NHP2-8-.500.CS f LINE¹ 2RHS-008-57-2 Hl'S: 39 /none 2 / na/na
| |
| / RED/TEE IC-F-2 f na J VOL/UT6.02 2RHS-66-06-FM008 i QISO 66-06 or DMG¹ na in [C5.51 /none [ SUR/PT3.00/H'I4.00 f NHP2-20-.812.CS I LINE¹ 2RHS-020-208-2 HTS: 48,49 ISD 2 f na/na I PIPE/TEE IC F 2 / na / VOL/UT6.02 2RHS-66-06. FM010 i QISO 66.06 or DMG¹ na in [C5.51 ]none / SUR/PT3.00/HT4.00 /
| |
| NHP2-8-.500-CS I LINE¹ 2RNS-008-336-2 HTS: 39,35 ISO I 2 I na /na I
| |
| *HOV23B/P I PE I C-F-2 ( na (
| |
| VOL/Ul'6.02 2RHS 66-06-FM011 / QISO 66.06 or DMG¹ na in /C5.51 IID I SUR/PT3.00/HT4 F 00 I NHP2-8-.500-CS I LINE¹ 2RHS-008.335-2 NTS: 39,41 ISD 2 J na /na JSc10
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - ILE POINI'UCLEAR STATIOH - UNIT 2 23 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INIVL REL RED I DESCRIPTION OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 REHARKS EXAHINATIOH IDENTIFIER f ITS ISO LOCATOR, COHPOHEHT DMG ¹, [ITEN ¹ (FREOY( EX2/NDE PROCEDURE ]PERIOD 2 f USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I TEE/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66 FM014 J QISO 66.06 or DMG¹ na in JC5.51 IID I SUR/PT3.00/HT4.00 I NHP2-8-.500-CS i LINE¹ 2RHS.008.57-2 NTS: 39,35 LSD 2 J na /na i Sc10
| |
| (
| |
| PIPE/PIPE IC-F-2 / na / VOL/UT6.02 2RHS-66-06-FM016 [ Qrso 66-06 or DMG¹ na in )C5.51 /none / SUR/PT3.00/HT4.00 /
| |
| NHP2-8-.500.CS I LINE¹ 2RHS-008-57-2 NTS: 39 Inone 2 / na /na I I ELB/PIPE (C-F-2 ] na [ VOL/UT6.02 , (
| |
| 2RHS-66-06. FI$ 19 f QISO 66.06 or DMG¹ na in JC5.51 )none (
| |
| SUR/PT3.00/HT4.00 [
| |
| HHP2-8-.500.CS L IHE¹ 2RHS-008.57-2 HTS: 39,40 i SD 2 J na /na I I PIPE/ELB IC-F.2 [ na ( VOL/UT6.02 2RHS-66-06-FM020 i QISO 66-06 or DUG¹ na in /C5.51 ]none / SUR/PT3.00/HT4.00 f NHP2.8-.500-CS / LINE¹ 2RHS-008-57-2 NTS: 39,40 (SD 2 [ na /na I (Ba) PIPE/SML (6") IC-F-2 I na I SUR/PT3 00/HT4 00 I 2RHS-66-06-FM021 i'ISO 66.06 or DMG¹ na in [C5.8'I )none [ na / I i LINE¹ 2RHS.006-138.2 HTS: 39,163 ATE 2 f na/na I SML/PIPE IC-F-2 ( na f na/na 2RHS-66-06-FM022 QISO 66.06 or DMG¹ na in /none /none / na /na LINE¹ 2RHS.006-138-2 NTS: 44,163 Jna 2 / na/na I PIPE/PIPE IC-F-2 (
| |
| na ( VOL/UT6.02 2RHS-66 FI$ 23 f QISO 66-06 or DMG¹ na in (C5.51 ]none f SUR/PT3.00/HT4.00 (
| |
| NHP2-8-.500-CS I LIHE¹ 2RHS-008.57-2 NTS: 39 Inone I 2 I na /na I I PIPE/PIPE IC-F-2 / na ( VOL/UT6.02 2RHS-66 FM024 / QISO 66-06 or DMG¹ na in /C5.51 Inane I SUR/PT3.00/H'I4.00 I NHP2.8-.500.CS / LINE¹ 2RHS-008-57-2 NTS: 39 /none 2 / na /na
| |
| [ PIPE/RED IC-F-2 / na / VOL/UT6.02 2RHS-66-06 Fl$ 25 / QISO 66-06 or DMG¹ na in )C5.51 /none / SUR/PT3.00/HT4.00 /
| |
| NHP2-8-.500-CS (
| |
| LINE¹ 2RHS-012-307-2 NTS: 164,48 (SD I 2 I na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - N NILE POINT NUCLEAR STATION - UNIT 2 24 of 135 NHP2-ISI-006( REV. I( CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOD 1 I REHARKS EXAHIHATION IDENTIFIER J ITS ISO LOCATOR, COHPONEHT DMG ¹, ( ITEN ¹ JFREQYJ EX2/HDE PROCEDURE (PERIOD 2 J USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/MHF IC-F-2 (
| |
| na )
| |
| na /na 2RHS-66.06-FM027 i QISO 66 06 or DMG¹ na in (none /none / na /na I LINE¹ 2RHS-006-138-2 NTS: 44,45 Ina 2 J na /na I V4328/PIPE Ic-F-2 [ na J VOL/UT6.02 /Non-exempt veld added by PH2Y91HX027 ASHE XI Replacement Plan ¹ 2RHS-66-06-FM033 i QISO 66-06 or DMG¹ na in ]C5.51 Inone I SUR/PT3.00/HT4.00 I /EDC2M104958 NIS-2 certification of 11-16-93 NHP2.8-.500-CS I LINE¹ 2RHS-OM-57-2 NTS: (none) ISD 2 / na /na
| |
| ] Pii E/V4328 Ic-F-2 ] na ) VOL/UT6.02 (Non-exempt Meld added by PN2Y91HX027 ASHE XI Replacement Plan ¹ 2RHS-66-06-FM034 i QISO 66-06 or DMG¹ na in /C5.51 /none / SUR/PI'3.00/MT4.00 f )EDC2H10495B NIS-2 certification of 11-16-93 NHP2-8-.500.CS / LIHE¹ 2RHS-008-57-2 NTS: (none) /SD 2 ] na /na I I INTEG ATT /C-C I " I SUR/PT 0 /HT4 F 00 I 2RHS-66-06-Fl600 )
| |
| QISO 66-06-10 or DMG¹ na in (C3.20 ]ID J na /na I LIHE¹ 2RHS-008-57-2 NTS: 39,162 INS 2 / na /na I IHTEG ATT )C-C I na I SUR/PT3.00/HT4.00 I 2RHS-66-06-FM301 f QISO 66-06-10 or DMG¹ na in (C3.20 ]ID f na /na I i LINE¹ 2RHS-008-57-2 NTS: 39,162 iNS 2 / na/na I I INTEG ATT iC-C f na ) SUR/PT3 F 00/HT4.00 (
| |
| 2RHS-66.06- FM302 ] QISO 66-06-10 or DMG¹ na in JC3.20 /ID / na /na I i LINE¹ 2RHS-008-57-2 NTS: 39,162 tNS 2 I na /na I IHTEG ATT iC-C I na I SUR/PT3.00/HT4.00 I 2RHS.66-06-Fl603 [ QISO 66-06-10 or DMG¹ na in JC3.20 ]ID [ na /na I I LINE¹ 2RHS-008-57-2 NTS: 39,162 IHS 2 / na/na I I IHTEG ATT iC-C [ na ] SUR/PT3.00/HT4.00 ]
| |
| 2RHS.66.06-Fl616 (
| |
| QISO 66-06-3 or DMG¹ na in (C3 ~ 20 [ID ( na /na I I LINE¹ 2RHS-008-57-2 HTS: 39,36 INS 2 / na/na I I INTEG ATT iC-C I na I SUR/PT3.00/HT4.00 I 2RHS-66-06-Fl617 / QISO 66-06-3 or DMG¹ na in [C3.20 [ID J na /na na LINE¹ 2RHS-008-57-2 NTS: 39,36 /NS 2 f na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 25 of 135 NHP2 IS I 006'EV 1 CH 000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED [ DESCRII TION OF ITEN TO BE EXAHINED(CATGRY [IGSCC) EX1/NDE PROCEDURE ]PERIOD 1 REHARKS EXAHINATION IDENTIFIER ) ITS ISO LOCATOR, COHPONEHT DMG ¹, )ITEN ¹ )FREOY) EX2/HDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I INTEG ATT /c-c f na f SUR/PT3.00/HT4.00 f 2RHS-66-06-FM318 / QISO 66-06-3 or DMG¹ na in /C3.20 /ID / na /na I LINE¹ 2RHS-008-57-2 NTS: 39,36 INS 2 / na /na I I INTEG ATT ic-c J na / SUR/PT3.00/HT4.00 [
| |
| 2RHS-66-06-FM319 / QISO 66-06-3 or DMG¹ na in /C3.20 (ID J na /na
| |
| / LINE¹ 2RHS.008-57-2 HTS: 39,36 /HS 2 / na /na I I PIPE/ELB IC-F-2 [ na [ VOL/UT6.02 2RHS-66-06-SM001 i QISO 66.06 or DMG¹ na in JC5.51 )none J SUR/PT3.00/HT4.00 f NHP2-8-.500-CS I LIHE¹ 2RHS 008 57 2 NTS'9i40 ISD 2 / na /na I ELB/PIPE /C-F-2 (
| |
| na )
| |
| VOL/UT6.02 2RHS-66-06-SM002 i QISO 66-06 or DMG¹ na in (C5.51 ]none (
| |
| SUR/PT3.00/HT4.00 [
| |
| NHP2-8-.500-CS i LINE¹ 2RHS-008-57-2 NTS 39 40 LSD 2 f na /na I I PIPE/ELB IC-F-2 f na [ na/na 2RHS-66-06-S'M003 i QISO 66-06 or DMG¹ na in ]none ]none / na /na
| |
| )
| |
| LINE¹ 2RHS-006-296-2 NTS: 44,96 Jna 2 / na/na I ELB/PIPE IC-F-2 / na f na /na 2RHS-66-06-SM008 / QISO 66-06 or DMG¹ na in (none /none / na /na
| |
| [ LIHE¹ 2RHS-006-296-2 Hl'S: 44,96 (na 2 / na/na i PIPE/ELB IC-F-2 [ na )
| |
| VOL/UT6.02 2RHS.66-06-SM011 i QISO 66-06 or DMG¹ na in /C5.51 ]none f SUR/PT3.00/HT4.00 J NHP2-8-.500-CS I LINE¹ 2RHS-008-57-2 HTS: 39,40 ISD 2 J na /na I I PIPE/ELB IC-F-2 / na )
| |
| VOL/UT6.02 2RHS-66-06-SM013 J QISO 66-06 or DMG¹ na in JC5.51 IID I SUR/PT3.00/HT4.00 I NHP2-8..500-CS LINE¹ 2RHS.008.57-2 NTS: 39,40 ISD I 2 I na /na ISc10 I
| |
| I PIPE/ELB (C-F-2 I na I VOL/UT6.02 I 2RHS-66-06-SM014 i QISO 66.06 or DMG¹ na in JC5.51 (none [ SUR/PT3.00/HT4.00 (
| |
| NHP2-8-.500-CS I LINE¹ 2RHS.008-57-2 HTS: 39,40 ISD 2 ) na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UHIT 2 26 of 135 NHP2-ISI-006, REV. I, CH-000 SECOND TEN YEAR IHSERVICE IHSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 REHARKS EXAHIHATION IDENTIFIER I ITS ISO LOCATOR, COHPOHENT DMG ¹, I ITEH ¹ IFREQYI EX2/HDE PROCEDURE IPERIOD 2 I USE CAL BLK ¹ I LINE NO AHD NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I PIPE/ELB IC-F-2 I na I VOL/UT6.O2 2RHS.66-06-SM024 I Qlso 66-06 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-8-.500-CS I LINE¹ 2RHS-008-57-2 NTS: 39,40 ISD 2 I na /na I ELB/PIPE . IC-F-2 I na I VOL/UT6.02 2R HS-66-06-SM025 I QISO 66-06 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-8-.5OO-CS I LINE¹ 2RHS 008 57 2 NTS'9 40 ISD 2 I na /na I I RED/ELB IC-F-2 I na I VOL/UT6.02 I 2RHS-66-06-9526 I QISO 66-06 or DMG¹ na in IC5.51 Inone I SUR/PT3 F 00/HT4.00 I NHP2-8..500.CS I LINE¹ 2RHS.012-307-2 Hl'S: 46,47 ISO 2 I na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.O2 2RHS-66-06-SM027 I QISO 66-06 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2.8..500-CS I LINE¹ 2RHS-012-307-2 NTS: 47;164 ISO 2 I na /na I PIPE/RED IC-F-2 I na I VOL/UT6.02 I 2RHS-66-06-SM029 I QISO 66-06 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-8-.500.CS I LINE¹ 2RHS-008-57-2 NTS: 39,46 ISD 2 I na /na I I RED/PIPE IC-F-2 I na I na /na 2RHS-66.06.9830 I QISO 66-06 or DMG¹ na in Inone Inone I na /na I LINE¹ 2RHS-006-296-2 HTS: 161,44 Ina 2 I na /na I PIPE/REO IC-F-2 I na I VOL/UT6.02 2RHS-66-06-SI$ 31 I QISO 66-06 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-8-.500-CS I LINE¹.2RHS-008-335-2 NTS: 39,161 ISD I 2 I na/na I I PIPE/RED IC-F-2 I na I na /na 2RHS-66-06-9532 I QISO 66-06 or DMG¹ na in Inone Inone I na /na I LINE¹ 2RHS-006-296-2 NTS: 161,44 Ina 2 I na /na I RED/PIPE IC-F-2 I na I VOL/UT6.02 2RHS-66-06-Sl$ 33 I QISO 66-06 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2 F 500-CS I LINE¹ 2RHS-008-336-2 NTS: 39,161 ISD 2 I na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - N ILE POINT NUCLEAR STATION - UHIT 2 27 of 'l35 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 I REHARKS EXAHINATIOH IDENTIFIER ITS ISO LOCATOR, COHPOHENT DWG ¹, )ITEN ¹ JFREOY) EX2/NDE PROCEDURE ]PERIOD 2 )
| |
| USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I RED/PIPE IC-F-2 (
| |
| na )
| |
| VOL/UT6.02 2RHS-66 09-FM001 i QISO 66-09 or DMG¹ na in )C5.51 Inone I SUR/PT 0/HT4 00 I NHP2-8-.594-CS I LINE¹ 2RHS-008-53-2 NTS: 30,31 ISD 2 / na /na I PIPE/*HOV22A IC-F-2 f na J VOL/UT6.02 2RHS.66.09-FW002 (
| |
| QISO 66-09 or DMG¹ na in JC5.51 iID J SUR/PT3.00/HT4.00 ( Sc9 NHP2-8-.594-CS LINE¹ 2RHS-008-53.2 NTS: 31,32 LSD 2 )
| |
| na /na
| |
| [ *HOV22A/PIPE ]C-F-2 [ na ] VOI./UT6.02 2RHS-66-09-FM003 (
| |
| QISO 66-09 or DWG¹ na in ]C5.51 [none J SUR/PT3.00/HT4.00 f NHP2-8-.594-CS i LINE¹ 2RHS-008.53-2 NTS: 31,32 LSD 2 f na /na I I PIPE/PIPE IC-F-2 (
| |
| na [ VOL/UT6.02 2RHS-66.09-FM004 I Q 66 09 or DMG¹ na in [C5.51 )none )
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-8..594-CS )
| |
| LINE¹ 2RHS-008-53-2 NTS: 31 (none 2 ] na /na I PIPE/PIPE IC-F-2 [ na ) VOL/UT6.02 2RHS.66-09-FM005 ) QISO 66-09 or DWG¹ na in /C5.51 (none J SUR/PT3.00/HT4.00 I NHP2-8-.594-CS I LINE¹ 2RHS-008-53-2 NTS: 31 Inone I 2 I na /na I
| |
| [ PIPE/PIPE IC-F-2 [ na [ VOL/UT6.02 2RHS.66-09-FW006 ) QISO 66.09 or DWG¹ na in [C5.51 )none J SUR/PT3.00/HT4.00 f NHP2-8-.594-CS LINE¹ 2RHS-008-53.2 NTS: 31 [none 2 I na/na I PIPE/PIPE IC-F-2 [ na ) VOL/UT6.02 2RHS-66-09-FM007 I Ql 66 09 or DWG¹ na in [C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-8-.594-CS (
| |
| LINE¹ 2RHS-008-53-2 NTS: 31 [none 2 / na /na I I ELB/PIPE IC-F-2 ) na [ VOL/UT6.02 2RHS-66 FM008 ) QISO 66.09 or DMG¹ na in [C5.51 iID i SUR/PT3.00/HT4.00 iSc8 NHP2-8-.594-CS LINE¹ 2RHS-008-53-2 NTS: 31,33 ATE ~
| |
| 2 ~
| |
| na /na I
| |
| (
| |
| PIPE/PIPE IC-F-2 [ na [ VOL/UT6.02 2RHS-66-09-FM009 i QISO 66-09 or DMG¹ na in JC5.51 Inone I SUR/PT3.00/MT4.00 I NHP2-8-.594-CS J LINE¹ 2RHS-008-53-2 NTS: 31 )none 2 / na /na
| |
| | |
| NIAGARA MOHAIIK POMER CORPORATION - H MILE POINT NUCLEAR STATION - UNIT 2 28 of 135 NMP2 ISI 006'EV Ii CH 000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - RHS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ i DESCRIPTIOH OF ITEM To BE EXAMINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOO 1 REMARKS EXAMINATION IOEHI'IFIER i ITS ISO LOCATOR, COMPONENT DNG ¹, LITEM ¹ JFREOYi EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK ¹ I LINE Ho. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I i PIPE/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66-09-FN011 i QISO 66-09 or DWG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 )
| |
| NMP2 ~ 594-CS i LINE¹ 2RHS-008.53-2 NTS: 31 inone 2 / na /na I I PIPE/PIPE iC-F-2 ) na i VOL/UT6.02 2RHS-66-09-FN012 i QISO 66-09 or DMG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2 ~ 594-CS i LINE¹ 2RHS-008-53-2 NTS: 31 (none 2 i na /na I TEE/PIPE IC-F-2 i na / VOL/uT6.O2 2RHS-66.09-FN013 i QISO 66-09 or DNG¹ na in iC5.51 inone i SUR/PT3 F 00/MT4.00 i NMP2-8-.594.CS I LINE¹ 2RHS-008-293-2 HTS: 31,35 ISO 2 i na /na I
| |
| )
| |
| PIPE/*MOV23A IC.F-2 i na J VOL/UT6.02 2RHS-66-09-FN014 i QISO 66-09 or DMG¹ na in iC5.51 inone J SUR/PT3.00/MT4.00 i NMP2-8-.594-CS I LINE¹ 2RHS-008-293-2 NTS: 31,32 ISD 2 / na/na I I TEE/PIPE IC-F-2 / na i VOL/uT6.O2 2RHS-66-09-FW016 J QISO 66.09 or DUG¹ na in JC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-8-.594.CS I LINE¹ 2RHS-008-53-2 NTS: 31,35 ISD 2 i na /na I I PIPE/TEE IC-F-2 i na ) VOL/UT6.02 I 2RHS-66 FM017 i QISO 66-09 or DNG¹ na in iC5.51 inone i SUR/PT3.00/Ml'4.00 i I NMP2.8-.594-CS J LINE¹ 2RHS-008-53-2 HTS: 31,35 LSD 2 i na /na I I PIPE/ELB IC-F-2 i na i VOL/UT6.02 i QISO 66.09 or DUG¹ na in )C5.51 inone i SUR/PT3.00/MT4.00 J I'RHS-66-09-FWDI8 NMP2.8-.594-CS i LINE¹ 2RHS-008-293-2 HTS: 31,33 )SD 2 i na /na I I ELB/PIPE IC-F-2 i na i VOL/UT6.02 )Ex6 2RHS-66 Fl!019 i QISO 66.09 or DMG¹ na in iC5.51 IID I SUR/PT3.00/MT4.00 I NMP2-8-.594-CS I LINE¹ 2RHS-008-293-2 NTS: 31 '3 ISD 2 ( na /na PIPE/ELB IC-F-2 i na ) VOL/UT6.02 2RHS-66-09-FN020 i QISO 66-09 or DNG¹ na in JC5.51 /none / SUR/PT3.00/MT4.00 (
| |
| NMP2-8-.594-CS I LINE¹ 2RHS.008-293-2 HTS: 31,33 ISD 2 i na /na
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - N HILE POINT HUCLEAR STATION - UNIT 2 29 of 135 NMP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RNS SYSTEH (sorted by Examination Identifier) 2NO INTVL REL REQ I D SCRIPTION OF ITEM To BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE (PERIOD 1 I REMARKS EXAHINATION IDENTIFIER ITS ISO LOCATOR, COMPOHEHT DIIG ¹, ( ITEH ¹ (FREOY( EX2/HDE PROCEDURE (PERIOD 2 USE CAL BLK ¹ (
| |
| LINE No. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-09.FW021 (
| |
| QISO 66.09 or DWG¹ na in (C5 ~ 51 (none (
| |
| SUR/PT3.00/HI'4.00 (
| |
| NMP2-8-.594-CS I LINE¹ 2RHS.008-293-2 NTS: 31,33 ISD 2 (
| |
| na /na I I PIPE/ELB IC-F-2 (
| |
| na ( VOL/UT6.02 2RHS.66.09.FW022 (
| |
| QISO 66-09 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NMP2-8-.594-CS (
| |
| LINE¹ 2RHS-008-293-2 NTS: 31,33 (SD 2 (
| |
| na /na I ELB/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RHS-66-09-FW023 (
| |
| QISO 66-09 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NHP2-8..594-CS I LINE¹ 2RHS-008-293-2 NTS: 31,33 (SD 2 (
| |
| na/na I I INTEG ATT (C-C ( na SUR/PT3.00/MT4.00 IEX6 2RHS-66.09.FW300 (
| |
| QISO 66-09-22 or DWG¹ na in (C3.20 (ID na /na I
| |
| (
| |
| LINE¹ 2RHS-008-53-2 NTS: 31,36 (Mandate( 2 na /na I INTEG ATT I C-C I na I SUR/PT3.00/MT4.00 IEX6 I
| |
| 2RHS.66-09.FW301 (
| |
| QISO 66-09-22 or DWG¹ na in (C3.20 (ID ( na /na I
| |
| (
| |
| LIHE¹ 2RHS-008-53-2 NTS: 31,36 (Handate( 2 (
| |
| na /na I PIPE/ELB IC-F-2'ISO
| |
| (
| |
| na (
| |
| VOL/UT6.02 2RHS.66-09.SW004 66.09 or DWG¹ na in (C5.51 (none I SUR/PT3.00/HT4.00 I NMP2-8-.594-CS LINE¹ 2RHS-008-53-2 NTS'1 33 ISD 2 ( na /na I I ELB/PIPE IC-F-2 I na I VOL/UT6 02 2RHS.66.09.SW005 ( QISO 66-O9 or DWG¹ na in (C5.51 (none ( SUR/PT3.00/MT4.00 (
| |
| NHP2-8-.594-CS I LIHE¹ 2RHS-008-53-2 NTS: 31,33 (SD 2 (
| |
| na/na I PIPE/ELB IC-F-2 (
| |
| na ( VOL/UT6.02 2RHS-66.09-SW006 ( QISO 66.09 or DWG¹ na in (C5 ~ 51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NMP2-8-.594.CS I LINE¹ 2RHS-008-53-2 NTS'1 33 ISO 2 (
| |
| na /na I PIPE/PIPE IC-F-2 ( na ( VOL/UT6.O2 2RHS.66-09-SW015 (
| |
| QISO 66-09 or DWG¹ na in (C5.51 (none ( SUR/PT3.00/MT4.00 (
| |
| NHP2-8-.594-CS (
| |
| LINE¹ 2RHS-008-53-2 NTS: 31 (none 2 ( na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 30 of 135 NMP2-ISI-006, REV. II CH.OOO SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier)
| |
| HD IHTVL REL REQ DESCRIPtloN OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE iPERIOO 1 REMARKS I
| |
| EXAHINATIOH IDENTIFIER )
| |
| ITS ISO LOCATOR, COHPONEHT DMG ¹, iITEH ¹ iFREQYJ EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ I LINE No'ND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/PIPE IC-F-2 i na i VOL/ut6.02 2RHS-66 09-SM016 i QISO 66.09 or DIIG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i HHP2-8-.594.CS i LIHE¹ 2RHS-008-53-2 NTS: 31 inone 2 i na /na I I PIPE/PIPE IC-F.2 i na i VOL/UT6.02 2RHS-66 FM001 i QISO 66.10 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-8-.500-CS i LINE¹ 2RHS-008-54-2 NtS: 39 inone 2 ) na /na I i *HOV23A/PIPE IC-F-2 i na i VOL/ut6.OZ 2RHS-66-10-FM002 i QISO 66.10 or DMG¹ na in iC5.51 ]none J SUR/PT3.00/HT4.00 i NHP2-8-.500-CS I LINE¹ 2RHS.008-294-2 NTS: 39,41 ISD 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/ut6.02 2RHS-66-10-FM003 i QISO 66-10 or DMG¹ na in iC5.51 ]none i SUR/PT3.00/HT4.00 i NHP2-8-.500-CS I LIHE¹ 2RHS-008.54-2 NTS: 39 40 ISD 2 J na /na I i PIPE/ELB IC-F.2 i na i VOL/uT6.02 2RHS-66-10-FM004 i QISO 66.10 or DMG¹ na in iC5.51 Inone i SUR/PT3.00/HT4.00 I NHP2-8-.500-CS I LINE¹ 2RHS.008-54-2 NTS: 39,40 ISO z I ELB/PIPE IC-F-2 i na ( VOL/UT6.02 2RHS-66-10-FM005 i QISO 66-10 or DMG¹ na in JC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-8-.500-CS i LINE¹ 2RHS.008.54-2 HTS: 39,40 )SO Z i na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66 10.FM006 i QISO 66-10 or OMG¹ na in iC5 ~ 51 inone [ SUR/PT3.00/HT4.00 i NHP2 ~ 500 CS I LIHE¹ 2RHS.008.54-2 NTS: 39,40 ISD 2 i na/na I PIPE/PIPE IC-F-2 ) na i voL/UT6.02 2RHS 10. FMOO/ i QISO 66-10 or DMG¹ na in iC5.51 inone J SUR/PT3.00/Hl'4.00 i NHP2-8-.500-CS I LIHE¹ 2RHS.008-54-2 NTS: 39 Inone 2 [ na /na I RED/TEE IC-F-2 i na i VOL/UT6.02 2RHS-66-10-FM008 i QISO 66-10 or DMG¹ na in ic5.51 inone i SUR/PT3.00/HT4.00 i NHP2-20-.812.CS i LINE¹ 2RHS-020-185-2 HTS: 48,49 iSO 2 i na /na
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 31 of 135 NMP2-1SI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - RHS SYSTEM (sorted by Examination Identifier) lIGSCCI EX1/NDE PROCEDURE iPERIOO REMARKS 2ND IHTVL REL RE I DESCRIPTION OF ITEH To BE EXAMINEDICATGRY 1 I EXAMINATIOH IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG ¹, [ITEM ¹ iFREOY) EX2/NDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE )SELECT iCLASSi EX3/NDE PROCEDURE iPERIOO 3 (
| |
| I PIPE/PIPE IC-F-2 i na i voL/uT6.O2 2RHS-66-'lo-FM011 i QISO 66-10 or DMG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NHP2-8-.500-CS i LINE¹ 2RHS-008-54-2 NTS: 39 inone 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/uT6.O2 2RHS-66-10-FI$ 15 i QISO 66-10 or DMG¹ na in iC5.51 inone i SuR/PT3.00/MT4.00 i NMP2 ~ 500-CS I LINE¹ 2RHS 008 54 2 NTS'9 40 ISD 2 i na /na I PIPE/TEE IC-F-2 na ( VOL/UT6.02 2RHS-66 FM018 i QISO 66-10 or DUG¹ na in [C5.51 inone i SUR/PT3.00/MT4.00 i NMP2-8-.500-CS I LINE¹ 2RHS-008-54-2 NTS'9i35 ISD 2 i na /na I I TEE/PIPE IC-F.2 J na i VOL/UT6.02 2R HS-66 F M019 i QISO 66-10 or DMG¹ na in )C5.51 inone i SUR/PT3.00/MT4.00 i NHP2-8-.500.CS I LINE¹ 2RHS-008-54-2 Nl'S: 39,35 ISO 2 i na /na I I PIPE/TEE IC-F-2 i voL/uT6.o2 2RHS-66-10-FM020 I Ql 6610 or DMG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 J NMP2-8-.500.CS ( LINE¹ 2RHS-008-294-2 HTS: 39,35 LSD 2 i na /na I PIPE/MNF IC-F-2 i na i na /na 2RHS-66.10-FI$ 23 )
| |
| QISO 66-10 or DMG¹ na in inone (~e M/M (
| |
| i LINE¹ 2RHS-006-87-2 NTS: 44,45 dna 2 i na/na I PIPE/RED IC-F-2 I na I VOL/UT6.02 I 2RHS-66-10-FI$ 25 )
| |
| QISO 66-10 or DMG¹ na in iC5.51 Inone I SuR/PT3.00/HT4.00 I NMP2-8-.500.CS I LINE¹ 2RHS-008-54-2 Nl'S: 39,46 I SD 2 / na /na i MOL/PIPE IC-F-2 i na i na /na 2RHS-66 FM041 i QISO 66-10 or DMG¹ na in inone inone i na /na I LINE¹ 2RHS-006-87-2 NTS: 43,44 Ina 2 i na /na PIPE/V432A IC-F-2 i na i VOL/UT6.02 iNon-exempt veld added by PN2Y91MX027 ASME XI Replacement Plan ¹ 2RHS-66 FI$43 QISO 66-10 or DUG¹ na in iC5.51 )none i SUR/PT3.00/MT4.00 i iEDC2M10494B HIS-2 certification of 11-16-93 HHP2-8-.500.CS LINE¹ 2RHS-008-54-2 NTS: (none) I SD I 2 I na /na I
| |
| | |
| NIAGARA MOHAHK POMER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 32 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier)
| |
| REMARKS 2ND INTVL REL RED i DESCRIPTION OF ITEM TO BE EXAMINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOO 1 EXAHINATION IDEHTIFIER i ITS ISO LOCATOR, COHPONENT DUG ¹, LITEM ¹ iFREQYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE Ho. AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I V4328/PIPE IC-F-2 i na i VOL/UT6.02 iNon.exempt weld added by PN2Y91MX027 ASME XI Replacement Plan ¹ or in iC5.51 iEDC2M10494B NIS-2 certification of 11-16-93 2RHS-66-10. FN044 i QISO 66-10 DUG¹ na inone i SUR/PT3.00/MT4.00 J NMP2-8..500-CS i LINE¹ 2RNS-008-54-2 HTS: (none) LSD I 2 I na/na I I INTEG ATT IC-C I na I SUR/PT3.00/MT4.00 I 2RNS-66 FN306 i QISO 66-10.6 or DMG¹ na in iC3.20 iio i na /na I i LINE¹ 2RHS-008-54-2 HTS: 39,42 iMandateJ 2 i na /na i Sc10 I INTEG ATT IC-C I na I SUR/PT3.00/MT4.00 i 2RNS.66-10-FM307 i QISO 66-10-6 or DUG¹ na in iC3.20 )ID i na /na J
| |
| LINE¹ 2RHS-008-54-2 NTS: 39,42 iMandatei 2 i na /na iSc10 Integral Att IC-C I na- I SUR/PT3.00/HT4.00 I 2RHS-66-10 FH308 QISO 66-10-5 or DUG¹ na in iC3.20 ilo i na /na igc8 ,
| |
| LINE¹ 2RNS-008-54-2 NTS: iMandatei 2 i na /na I I PIPE/ELB IC-F-2 i na i VOL/uT6.O2 2RHS-66-10-SM001 i QISO 66-10 or DUG¹ na in iC5.51 !ID I SUR/PT3.00/MT4.00 I HMP2-8-.500-CS LINE¹ 2RHS.008-54-2 Nl'S: 39,40 LSD 2 ( na /na iSc10 I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66-10-SN002 i QISO 66-10 or DNG¹ na in )C5.51 Inone I SUR/PT3 00/MT4 I NMP2.8-.500-CS I LINE¹ 2RHS 008 54 2 NTS'9 40 I 2 J na /na I I PIPE/ELB IC-F-2 ( na [ voL/UT6.O2 2RHS.66-10.SN009 i QISO 66-10 or DNG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 NMP2.8..500.CS I LINE¹ 2RHS-008-54-2 NTS: 39,40 ISD 2 i na/na I I PIPE/ELB IC-F-2 i voL/uT6.O2 2RHS.66.10.SN010 i QISO 66-10 or DUG¹ na in iC5.51 )none i SUR/PT3.00/MT4.00 i NMP2.8..500-CS f LINE¹ 2RHS.008-54-2 NTS 39 40 LSD 2 J na/na ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-10-SW011 Ql So 66-10 or DUG¹ na in IC5.51 inone / SUR/PT3.00/MT4.00 i NHP2-8-.500-CS L INE¹ 2RNS-008.54-2 NTS: 39,40 ISD 2 ( na /na
| |
| | |
| NIAGARA HONAWK POWER CORPORATION - H ILE POINT NUCLEAR STATION - UNIT 2 33 of 135 HHP2- IS1-006, REV. 1 ~ CH.OOO SECOHD TEH YEAR IHSERVICE IHSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOD 1 I REHARKS EXAHIHATIOH IDENTIFIER J ITS ISO LOCATOR, COHPOHENT DWG ¹, [ITEN ¹ JFREOY[ EX2/HDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT )CLASS) EX3/NDE PROCEDURE iPERIOO 3 I ELB/PIPE IC-F-2 ( na ] VDL/UT6.02 2RHS.66-10-SW012 [ QISO 66-10 or DWG¹ na in )C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-8-.500-CS I LINE¹ 2RHS 008 4 2 NTS' ISD 2 / na/na I
| |
| ] PIPE/ELB IC-F-2 ) na )
| |
| VOL/UT6.02 2RHS-66-10-SW014 i QISO 66-10 or DWG¹ na in )C5.51 ]none J SUR/PT3.00/HT4.00 (
| |
| NHP2-8-.500.CS LINE¹ 2RHS-008-54-2 NTS: 39,40 i SD 2 / na /na I PIPE/ELB IC-F-2 [ na [ VOL/UT6.02 2RHS 66-10-SW015 i QISO 66.10 or DMG¹ na in [C5.51 [none f SUR/PT3.00/HT4.00 [
| |
| NHP2-8-.500-CS I LIHE¹ 2RHS-008-54-2 NTS: 39,40 ISD 2 / na /na I PIPE/ELB IC-F-2 J na ) VOL/UT6.02 2RHS.66-10-SM019 i QISO 66-10 or DWG¹ na in JC5.51 IID I SUR/PT /HT I NHP2-8-.500.CS I LINE¹ 2RHS-008-54-2 NTS: 39,40 ISD 2 f na /na /Sc10 I PIPE/ELB IC-F-2 [ na I VOL/UT6.02 I 2RHS.66-10.SW025 i QISO 66-10 or DWG¹ na in JC5.51 ]none [ SUR/PT3.00/HT4.00 [
| |
| NHP2-8-.500-CS i LINE¹ 2RHS-008-54-2 NTS: 39,40 LSD I 2 I na/na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-10-SM026 i QISO 66-10 or DMG¹ na in )C5.51 ]none ) SUR/PT3.00/HT4.00 f NHP2-8-.500-CS I LINE¹ 2RHS-008-54-2 HTS: 39,40 ISD 2 ) na /na I ELB/RED IC-F-2 I na I VOL/UT6.02 2RHS.66-10-SW029 [ QISO 66-10 or DWG¹ na in (C5.51 (none J SUR/PT3.00/HT4.00 J NHP2-12-.844-CS I LINE¹ 2RHS.012-306-2 NTS: 47,48 ISD 2 / na /na I RED/ELB IC-F-2 J na f VOL/UT6.02 2RHS.66-10-SM030 i QISO 66-10 or DWG¹ na in (C5.51 )none )
| |
| SUR/PT3 F 00/HT4.00 J NHP2-12-.844-CS [ LINE¹ 2RHS-0'I2-306-2 NTS: 46,47 LSD 2 f na/na PIPE/PIPE IC-F-2 [ na ] VOL/UT6.02 2RHS-66-10-SW03'I QISO 66-10 or DWG¹ na in [C5.51 ]none ] SUR/PT3.00/HT4.00 [
| |
| NHP2-8-.500-CS LINE¹ 2RHS-008-54-2 NTS: 39 (none 2 f na/na
| |
| | |
| NIAGARA KOHAMK POMER CORPORATIOH - N ILE POINT NUCLEAR STATION - UNIT 2 34 of 135 NHP2-1SI-006, REV. 1, CH-000 SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTINI OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 I REHARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR, COMPONENT DMG ¹, IITEH ¹ IFREOYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECI'CLASSI EX3/NDE PROCEDURE IPERIOO 3 I I (84) PIPE/MOL (64) IC-F-2 I na I SUR/PT3.00/HT4.00 I 2RHS-66-10-SM032 I Q 6610 or DMG¹ na in IC5.81 Inone I na /
| |
| I LINE¹ 2RHS-006-87-2 NTS: 39,43 ITE 2 I na /na I I PEHET Z5A/PIPE IC-F-1 I na I VOL/UT6.03 Sc7 2RHS-66-13-FM002 I QISO 66-13 or DMG¹ na in IC5.11 I ID I SUR/PT3.00 I NHP2 ~ 500.SS I LINE¹ 2RHS-024-1-2 NTS: 53,55 I7.5XHInI 2 I na / I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2RHS-66 13-FM003 I QISO 66-13 or DMG¹ na in IC5.51 Inone I SUR/Pl'3.00/HT4.00 I HHP2-24-.500-CS I LIHE¹ 2RHS-024-2-2 NTS: 62,65 ISD 2 I na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2RHS-66-13-FM004 I QISO 66-13 or DMG¹ na in IC5.51 IID I SUR/PT3.00/HT4.00 I NHP2-24-.500-CS I LINE¹ 2RHS.024-2-2 NTS: 62,65 ISD 2 I na /na ISc10 I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2RHS-66-13.F'M005 I QISO 66-13 or OMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4 F 00 I NNP2 F 500-CS I LINE¹ 2RHS-024-2-2 NTS: 62,65 ISD 2 I na /na I PIPE/TEE IC-F-2 I na I VOL/UT6.02 2RHS-66 FM006 I aiso 66-13 or DMG¹ na in IC5.51 Inone I SUR/PT3 F 00/HT4.00 I NNP2-18-.375-CS I LINE¹ 2RHS-018-203-2 NTS: 67,72 ISD 2 I na /na I PIPE/4STRTIA IC-F-2 I na I VOL/UT6.02 2RHS-66-13-FM008 I QISO 66-13 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2.24-.500-CS I LINE¹ 2RHS.024-2-2 NTS: 62,73 ISD 2 I na /na I RED/PIPE IC-F-2 I na I VOL/UT6.02 2RHS-66 FM010 I QISO 66-13 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-20..500.CS I LINE¹ 2RHS.020.15-2 NTS 75,76 I SD 2 I na /na I
| |
| *STRT1A/P I PE IC-F-2 I na I VOL/UI'6.02 2RHS-66 FM012 I aiso 66-13 or DUG¹ na in IC5.51 IID I SUR/PT3.00/HT4.00 I NNP2-24-.500-CS I LINE¹ 2RHS-024-2-2 NTS'2 73 ISD 2 I na /na ISc10
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 35 of 135 NMP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL REQ ( DESCRIPTION OF ITEM TO BE EXAMIHEDiCATGRY iIGSCC) EX1/HDE PROCEDURE (PERIOD 1 REMARKS EXAMIHATION IDENTIFIER i ITS ISO LOCATOR, COMPONEH'I DMG ¹, LITEM ¹ iFREOYi EX2/HDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I P I PE/MNF ic-F-2 J na i VOL/UT6.02 2RHS-66 FM013 i QISO 66-13 or DMG¹ na in iC5.51 inone J SUR/PT3.00/MT4.00 i NHP2-20-.500.CS I LIHE¹ 2RMS-020-15-2 NTS: 76,79 I SD 2 i na/na I PIPE/ELB iC-F-2 i na i VOL/UT6.02 2RHS.66.13-FM015 i QISO 66-13 or OMG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i HMP2-20..500.CS i LINE¹ 2RHS-020-15-2 NTS: 76,77 LSD 2 i na/na I I MNF/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66-13 FM016 i QISO 66-13 or DMG¹ na in iC5.51 /none i SUR/PT3.00/MT4.00 i HMP2-24-.500-CS i LIHE¹ 2RHS.024-2-2 NTS: 61,62 LSD 2 / na/na I i MNF/PIPE iC-F-I i na VOL/UT6.03 Sc7 2RHS-66-13-FM020 i QISO 66-13 or DMG¹ na in JCS.I1 )ID SUR/PT3.00 I NMP2.24-.500-SS / LINE¹ 2RHS-024-331-2 NTS: 50,53 /7.5XMini 2 na / I I PIPE/*V376 iC-F-I ) na VOL/UT6.13 Sc7 2RHS.66.13-FM021 )
| |
| QISO 66-13 or D'MG¹ na in PCS.'ll iID SUR/PT3.00 I NMP2-24-.500.SS i LINE¹ 2RHS.024-1-2 HTS: 53,58 i7.SXMini 2 na / I IMC-2r1 I PIPE/ELB IC-F-1 i na i VOL/UT6.03 )Inacc 2RHS-66-13-FM023 i QISO 66-13 or DMG¹ na in iC5.11 IRR I SUR/PT3.00 I NMP2.24-.500-SS LINE¹ 2RHS-024-80-2 NTS: 53,54 iHS 2 dna/ I IMC-2r1 IC-F-1 i na VOL/UT6.03 lnacc i PIPE/MNF ) J 2RHS-66-13-FM024 QISO 66-13 or DMG¹ na in iC5.11 IRR I SUR/PT I NMP2-24-.500.SS LINE¹ 2RHS-024-80-2 NTS: 50,51 iHS 2 dna/ I IMC-2rl I ELB/PENET ZSA iC-F-I I na I VOL/UT6.03 i lnacc 2RHS-66-13-FM025 i QISO 66-13 or DMG¹ na in iC5.11 IRR I SUR/PT3 0 I NMP2.24-.500-SS I LINE¹ 2RHS-024-80-2 HTS: 54 55 INS 2 dna/ I IMC-2rl I PIPE/PIPE IC-F-1 i na i VOL/UT6.03 Ilnacc 2RHS-66-13-FM029 i QISO 66-13 or DMG¹ na in iC5.11 IRR I SUR/PT3.00 I NHP2 F 500-SS I LINE¹ 2RHS 024 80 2 HTS' 3 INS 2 dna/ I
| |
| | |
| NIAGARA HOHAMK PDMER CORPORATION - ILE POIHT NUCLEAR STATION - UNIT 2 36 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEKDIX G - RHS SYSTEM (sorted by Examination Identifier) 2KD INTVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/KDE PROCEDURE IPERIOO 1 REMARKS EXAHIKATION IDENTIFIER I ITS ISO LOCATOR, COHPOKENT DMG ¹, I ITEN ¹ IFREOYI EX2/NDE PROCEDURE IPERIOD 2 USE CAL BLK ¹ I LIKE NO AKD NOTESi AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD I I PIPE/PIPE IC-F-1 I na I VOL/UT6.03 Sc7 2RHS-66-13-FM030 I QISO 66-13 or DMG¹ na in IC5.11 IID I SUR/PT3.00 I NHP2-24'-.500-SS I LINE¹ 2RKS.024-1-2 NTS: 53 I7.5KHinI 2 I na / I I P IPE/*HOV1A IC-F-1 I na I VOL/UT6.13 Sc7 2RHS-66-13-FM032 I QISO 66-13 or DMG¹ na in IC5 11 II I SUR/ T3 00 I I NHP2-24-.500-SS I LINE¹ 2RHS-024-331-2 NTS: 53,58 I7.5XHinI 2 I na / I .I I INTEG ATT Ic-c I na I SUR/PT3.00/HT4.00 I 2RKS-66-13-FM309 I QISO 66-13-4 or DMG¹ na in IC3.20 IID I na /na I LINE¹ 2RHS.024-2.2 NTS: 62,63 INS 2 I na /na I INTEG ATT IC-c I na I SUR/PT3.00/HT4.00 I 2RHS-66-13-FM310 I QISO 66-13-4 or DMG¹ na in IC3.20 IID I na /na I LINE¹ 2RKS-024-2.2 NTS: 62,63 INS 2 I na /na I I INTEG ATT IC-c I na I SUR/PT3.00/H'14.00 I 2RHS-66-13-FM311 I QISO 66-13-4 or DMG¹ na in IC3.20 IID I na /na I LINE¹ 2RHS.024-2-2 N'IS: 62,64 INS 2 I na /na I I INTEG ATT Ic-c I na I SUR/PT3.00/HT4.00 I 2RHS-66-13-FM312 I QISO 66-13-4 or DMG¹ na in IC3.20 IID I na /na I I LINE¹ 2RHS-024-2-2 NTS: 62,64 INS 2 I na/na I INTEG ATT; 16a dia., 1.219" thick IC-C I na I SUR/PT3.00/HT4.00 I 2RHS-66 FM314 QISO 66-13-14 or DMG¹ na in IC3.20 IID I na /na Isc8 LINE¹ 2RHS-024-2-2 NTS: 62,166 IHandateI 2 I na /na I IMC 3 I INTEG ATT IC-c I na I SUR/(inaccessible)IInacc 2RHS-66-13-FM316 I QISO 66-13-16 or DMG¹ na in IC3.20 IRR I na /na I na I LINE¹ 2RHS.024-80-2 NTS: 51,52 IKS 2 I na/na I INC-3 I INTEG ATT IC-c I na I SUR/(inaccessible)IInacc 2RHS-66 FM317 I QISO 66-13-16 or DUG¹ na in IC3.20 IRR I na /na I LINE¹ 2RHS-024-80-2 NTS: 51,52 INS 2 I na/na I
| |
| | |
| NIAGARA KOHAMK POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 37 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOHD TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE iPERIOD 1 REMARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG ¹, JITEH ¹ JFREOYJ EX2/HDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ i LINE HO. AND NOTES, AS APPLICABLE DESELECT iCLASSi EX3/NDE PROCEDURE iPERIOD 3
| |
| / LM IC-F-1 [ na [ VOL/UT6.03 / Inacc 2RHS-66-13-LI$ 1 i QISO 66-13 or DMG¹ na in /C5.12 IRR I SUR/PT3.00 I NHP2-24-.500-SS I LINE¹ 2RHS-024-80.2 NTS: 51 IHS 2 /na/ I
| |
| / LM IC-F-I I na I VOL/UT6.03 / Inacc 2RHS-66-13-LM02 i QISO 66-13 or DMG¹ na in /C5.12 ERR f SUR/PT3.00 I NHP2-24-.500-SS I LINE¹ 2RNS-024-80-2 NTS: 53 /NS 2 /na/ I I LW IR IC-F-1 I na I VOL/UT6 03 J Inacc 2RHS-66-13-LW03 i QISO 66-13 or DMG¹ na in /C5.12 IRR I SUR/PT3.00 I NHP2-24-.500-SS I LINE¹ 2RHS.024-80-2 HTS: 54 JNS 2 /na/ I I LM OR IC-F-I ( na ( VOL/UT6.03 /Inacc 2RHS-66 LI$4 i QISO 66-13 or DMG¹ na in /C5.12 [RR ] SUR/PT3.00 I NHP2.24-.500-SS i LINE¹ 2RHS-024-80-2 Nl'S: 5C /NS 2 dna/ I J
| |
| LW assoc M/fM025 & FW002 IC-F-I na f VOL/UT6.03 Sc7 2RHS.66.13-LI$ 5 [ QISO 66-13 or DWG¹ na in /C5.12 1ID I SUR/PT3.00 I NHP2.24-.500-SS i LINE¹ 2RHS-02C-80-2 H'TS: 55 IAL 2 /na/ I
| |
| ) LM assoc w/FW002 & FM030 IC-F-I f na f VOL/UT6.03 Sc7 2RHS-66-13-LM06 i QISO 66-13 or DWG¹ na in IC5.12 (ID / SUR/PT3.00 I NHP2 F 500-SS i LINE¹ 2RHS-024-1-2 HTS: 53 1AL 2 /na/ I
| |
| / LM assoc M/FI$21 & FM030 IC-F-1 (
| |
| na [ VOL/UT6.03 sc7 2RHS-66-13. LI$7 i QISO 66-13 or DWG¹ na in JC5.12 (ID [ SUR/PT3.00 I NHP2-24-.500-SS I LIHE¹ 2RHS-024-1-2 HTS: 53 IAL 2 /na/ I J
| |
| LM assoc w/FW020 & FM032 IC-F-I na )
| |
| VOL/UT6.03 Sc7 2RHS-66-13.LM09 i QISO 66-13 or DMG¹ na in JC5.12 IID I SUR/PT3 F 00 I NHP2.24..500-SS I LINE¹ 2RHS-024-331-2 NTS: 53 JAL 2 [na/ I I ELB/PIPE IC-F-2 [ na [ VOL/UT6.02 2RHS-66 SM008 i QISO 66-13 or DUG¹ na in ]C5.51 Inone I SUR/PT3 00/HT4 00 I NHP2 ~ 500-CS i LINE¹ 2RHS-024-2-2 NTS: 62,65 LSD 2 f na /na
| |
| | |
| NIAGARA MOHANK POHER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 38 of 135 NMP2-ISI-006, REV. 1( CH.000 SECOND TEN YEAR INSERVICE IHSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEM TO BE EXAMINEDICATGRY I IGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REMARKS EXAMINATION IDENTIFIER J ITS ISO LOCATOR, COMPOHENT DNG ¹, ]ITEM ¹ )FREGVJ EX2/HDE PROCEDURE ]PERIOD 2 J USE CAL BLK ¹ I LINE NO AND NOTESr AS APPLICABLE ISELECT ICLASSI EX /NDE PROCEDURE IPERIOD I I PIPE/ELB IC-F-2 J na J VOL/UT6.02 I 2RHS-66-13-SN009 i QISO 66-'13 or DNG¹ na in ]C5.51 ]none ) SUR/PT3.00/MT4.00 f NMP2-24-.500-CS )
| |
| LINE¹ 2RHS-024-2-2 HTS: 62,65 LSD 2 / na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-13-SI010 (
| |
| QISO 66-13 or DUG¹ na in [C5.51 /none )
| |
| SUR/PT3.00/MT4.00 [
| |
| NMP2-24-.500.CS ) LINE¹ 2RHS-024-2-2 NTS'2 65 ISD I 2 I na /na I I PIPE/ELB IC-F-2 f na f VOL/UI'6.02 2RHS-66.13-Sl$ 11 i QISO 66-13 or DUG¹ na in (C5.51 ]none f SUR/PT3.00/MT4.00 J NHP2-24-.500.CS LINE¹ 2RHS-024-2-2 NTS: 62,65 (SD 2 / na /na I PIPE/ELB IC-F-2 ] na ] VOL/UT6.02 2RHS-66-13-SN012 I QISO 66 13 or DUG¹ na in [C5.51 ]none f SUR/PT3.00/MT4.00 f NMP2-24-.500-CS I LINE¹ RHS 024 2 HTS'2i6 ISD 2 J na /na I ELB/PIPE IC-F-2 [ na [ VOL/UT6.02 2RHS-66-13-Sl$ 13 )
| |
| QISO 66-13 or DUG¹ na in )C5.51 [none f SUR/PT3.00/MT4.00 /
| |
| HMP2-24-.500.CS i LINE¹ 2RHS-024-2-2 NTS: 62,65 LSD 2 / na /na I ELB/TEE IC-F-2 J na J VOL/UT6.02 2RHS-66 SW014 i QISO 66-13 or DllG¹ na in )C5.5'l )none ) SUR/PT3.00/MT4.00 J HMP2-24-.500.CS i LINE¹ 2RHS-024-2-2 HTS: 65,67 LSD I 2 I na/na I I TEE/PIPE IC-F-2 f na f VOL/UT6.02 2RHS.66.13-SN015 [ QISO 66.13 or DIIG¹ na in [C5.51 ]none f SUR/PT3.00/MT4.00 [
| |
| NHP2-24-.500-CS I LINE¹ 2RHS-024-2-2 HTS: 62,67 ISO 2 / na /na I PIPE/TEE IC-F-2 J na J VOL/UT6.02 2RHS-66-13-9817 i QISO 66-13 or DlIG¹ na in (C5.51 ]none J SUR/PT3.00/MT4.00 J HMP2-24-.500.CS I LINE¹ 2RHS-024-2-2 NTS: 62,73 ISO 2 / na /na I TEE/PIPE IC-F-2 ] na J VOL/UT6.02 2RHS-66-13-SN018 ) QISO 66-13 or DUG¹ na in JC5.51 ]none [ SUR/PT3.00/MT4.00 J NHP2-24-.500.CS I LINE¹ 2RHS 024 2 2 HTS'2(73 ISD 2 / na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATIOH - N ILE POINT NUCLEAR STATION - UNIT 2 39 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL RELREQ I DESCRIPTION OF ITEH To BE EXAHIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHIHATION IDENTIFIER I ITS ISO LOCATOR'OHPONEHT DMG ¹i I ITEN ¹ IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE iPERIOD 3 I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2RHS 13-9819 i also 66-13 or DMG¹ na in tC5 51~ inone i SUR/PT3.00/Hl'4.00 i NHP2-24-.500-CS i LINE¹ 2RHS.024-2-2 NTS: 62,65 LSD I 2 I na /na I I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66-13-$ 820 i also 66-13 or OMG¹ na in iC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-24-.500 CS LIHE¹ 2RHS-024-2-2 N'TS: 62,65 LSD 2 i na /na PIPE/MNF IC-F-2 J na i VOL/UT6.02 2RHS-66-13-SM021 I QISO 66-13 or DMG¹ na in iC5.51 Inone I SUR/PT3 00/HT I NHP2-24-.500-CS LINE¹ 2RHS-024-2-2 NTS: 61,62 i SD 2 i na/na I TEE/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66-13-SM023 I Ql 6613 or OMG¹ na in iC5.51 inone t SUR/PT3.00/HT4.00 i NHP2-24-.500.CS I LINE¹ 2RHS.024.2-2 NTS: 62,73 ISD 2 i na /na I PIPE/RED IC-F-2 i na i voL/uT6.02 2RHS-66-13. $ 024 I Ql 6613 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-24-.500-CS I LINE¹ 2RHS-024-2-2 NTS: 62,75 ISD 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/uT6.O2 2RHS-66-13-SM025 i QISO 66-13 or OMG¹ na in iC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2 ~ 500.CS LINE¹ 2RHS-020-15-2 NTS: 76,77 LSD 2 / na/na I PIPE/ELB IC-F-2 i na i VOL/UI'6.02 2RHS-66-13-SM026 I QISO 66-13 or DMG¹ na in JC5.51 (none i SUR/PT3.00/HT4.00 i NHP2-20-.500-CS LINE¹ 2RHS.020-15-2 HTS: 76(77 i SD 2 ) na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66-13-9527 i also 66-13 or DMG¹ na in iC5.51 IID I SUR/PT3.00/HT4.00 I NHP2 F 500-CS i LINE¹ 2RHS-020-15-2 NTS: 76,77 LSD 2 i na /na /Sc10 I MNF/PIPE IC-F-2 J na i VOL/uT6.O2 2RHS-66-13-SM028 i- QISO 66-13 or DMG¹ na in iC5.51 lnone I SUR/PT3.00/HT4.00 I NHP2-18-.375-CS LINE¹ 2RHS-018-203-2 NTS: 71,73 LSD 2 i na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - N i NILE POINT NUCLEAR STATION - UNIT 2 40 of 135 NHP2-ISI-006, REV. 1, CH.000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REO )
| |
| DESCRIPTION OF ITEN TO BE EXAHINED(CATGRY )IGSCC( EX1/NDE PROCEDURE )PERIOD 1 REHARKS EXAHINATION IDENTIFIER J ITS ISO LOCATOR, COHPOHENT DMG ¹, ]ITEN ¹ JFREOYJ EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ i LIHE NO. AND NOTES, AS APPLICABLE )SELECT ]CLASS) EX3/NDE PROCEDURE iPERIOD 3 IMC-3 INTEG ATT PENET Z5A SHOPMELD /C-C J na [ SUR/(inaccessib(e))lnacc 2RHS-66-13-SM301 I Q 66 13 or DMG¹ na in (C3.20 /RR / na /na I na I LINE¹ 2RHS-024-80 2 NTS: 55,57 INS 2 / na/na I I INTEG ATl PENET Z5A SHOPMELO IC C I na [ SUR/PT3.00/HT4.00 I Sc7 2RHS-66-13-SM302 i QISO 66-13 or DMG¹ na in [C3.20 (ID ) na /na I f LIHE¹ 2RHS-024-80-2 NTS: 55,57 /Handate/ 2 ) na /na I I PIPE/*V1 IC-F-2 f na f VOL/UT6.02 2RHS-66.14-FM001 (
| |
| QISO 66.14 or DMG¹ na in (C5.51 ]none f SUR/PT3.00/HT4.00 J NHP2 ~ 500-CS i LINE¹ 2RHS-018-3-2 NTS: 80,82 LSD 2 )
| |
| na /na I I ~V1/ELB IC-F-2 )
| |
| na f VOL/UT6.02 2RHS-66-14.FI$ 02 i QISO 66-14 or DMG¹ na in JC5.51 )none f SUR/PT3.00/HT4.00 [
| |
| NHP2-18-.500-CS I LINE¹ 2RHS-018-3-2 NTS: 82,83 ISO 2 [ na/na I I
| |
| PIPE/*V4 IC-F-2 [ na [ VOL/UT6.02 2RHS-66-14-FM003 i QISO 66-14 or DMG¹ na in [C5.51 (none J SUR/PT3.00/HT4.00 J NHP2-18-.500-CS ) LINE¹ 2RHS-018-3-2 NTS: 80,84 (SD 2 / na /na I I ~V4/PIPE IC-F-2 (
| |
| na ) VOL/UT6.02 2RHS-66 FM004 i QISO 66-14 or OMG¹ na .in iC5.51 IID I SUR/PT3.00/HT4.00 I NHP2-18-.500-CS [ LINE¹ 2RHS-018-3-2 NTS: 80,84 (SD 2 [ na /na ) Sc11
| |
| ( PIPE/ELB IC-F-2 [ na [ VOL/UT6.02 2RHS-66 FM006 i QISO 66-14 or D'MG¹ na in [C5.51 [none J SUR/PT3.00/HT4 F 00 (
| |
| NHP2 F 500-CS I LINE¹ 2RHS.018-3.2 NTS: 80 83 ISO 2 / na /na
| |
| ] PIPE/TEE IC-F-2 [ na [ VOL/UT6.02 I 2RHS.66-14-FM007 i QISO 66-14 or DMG¹ na in [C5.51 (none [ SUR/PT3.00/HT4.00 ) I.
| |
| NHP2-18-.500-CS I LINE¹ 2RHS-018-3.2 NTS: 80,85 ISO 2 (
| |
| na /na I I I ELB/PIPE IC-F-2 ( na ] VOL/UT6.02 2RHS-66 Fl$ 08 i QISO 66-14 or OMG¹ na in ]C5.51 ]none )
| |
| SUR/PT3.00/H'I4.00 f NHP2-18-.500-CS I LINE¹ 2RHS 018 3 2 NTS'0 83 ISD 2 / na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - N LE POIN'I NUCLEAR STATION - UNIT 2 41 of 135 HHP2 ISI 006'EV 1 ~ CH 000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) IHTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier)
| |
| REHARKS i DESCRIPTIOH OF ITEN TO BE EXAHINEDiCATGRY iIGSCCi EX1/NDE iPERIOO 2HD IHTVL REL REO PROCEDURE 1 EXAHIHATION IDENTIFIER J ITS ISO LOCATOR, COHPONEHT DMG ¹, i ITEH ¹ iFREOYi EX2/NDE PROCEDURE iPERIOO 2 J USE CAL BLK ¹ i LINE No. AND NOTES, AS APPLICABLE DESELECT iCLASSi EX3/NDE PROCEDURE iPERIOO 3 I PIPE/ELB IC-F-2 i na ( VOL/UT6.02 2RHS-66-14-FM009 i QISO 66-1C or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-18-.500-CS I LINE¹ 2RHS-018-3-2 NTS: 80(83 LSD 2 i na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2RHS-66-14-FM010 i QISO 66-1C or DUG¹ na in iC5.51 Inone I SUR/PT3.00/HT4-00 I NHP2-18-.500.CS i LINE¹ 2RHS-018-3-2 NTS: 80,83 )SD i 2 i na /na I TEE/HOZ IC-F-2 i na i VOL/uT6.O2 2RHS-66-14-FM011 i QISO 66-14 or DMG¹ na in iC5.51 inone J SUR/PT3.00/HT4.00 J NHP2-20-.594-CS I LINE¹ 2RHS-020-185-2 HTS: 49,87 ITE 2 J na/na I
| |
| PIPE/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66 FM012 i QISO 66-14 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-18-.500-CS i LINE¹ 2RHS-018-3-2 NTS: 80 inone 2 i na /na I I TEE/PIPE IC-F-2 i na i voL/uT6.O2 2RHS-66-14-FM013 i QISO 66-14 or DMG¹ na in iC5.51 inone / SUR/PT3.00/HT4.00 )
| |
| NHP2-18-.500-CS I LINE¹ 2RHS-018-3-2 NTS: 80,85 ISD 2 J na /na PIPE/MHF IC-F-2 J na i voL/UT6.02 2RHS-66-1C- FM018 i QISO 66-14 or DMG¹ na in iC5.51 lnone I SUR/PT3 00/HT4 00 I NHP2-18-.500-CS I LINE¹ 2RHS-018-3-2 HTS: 69,80 ISO 2 J na/na I
| |
| 'MNF/PIPE IC F 2 i na [ VOL/UT6.02 2RHS-66 FM020 i QISO 66-14 or OMG¹ na in iC5.51 IID I SUR/PT3.00/HT4.00 I NHP2-18-.500.CS I LINE¹ 2RHS-018-3-2 NTS: 69,80 I SD 2 i na /na J Sc11 I PIPE/PIPE IC-F-2 i na i VOL/uT6.02 2RHS-66-14-FM021 i QISO 66.14 or DMG¹ na in iC5.51 )none i SUR/PT3.00/HT4.00 i NHP2-18-.500-CS i LINE¹ 2RHS-018-3-2 HTS: 80 inone i 2 i na /na i MNF/PIPE IC-F-2 i na i VOL/uT6.O2 2RHS-66-14-FM022 i QISO 66-14 or DMG¹ na in iC5.51 inone ( SUR/PT3.00/HT4.00 i NHP2-18-.500-CS I LINE¹ 2RHS-018-3-2 NTS: 69,80 ISD 2 i na /na I
| |
| | |
| NIAGARA MONANK PNER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 42 of 135 NMP2-1SI-006, REV. 1, CH-000 SECOHD TEN YEAR IHSERVICE INSPECTION (ISI) IHTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTIOH OF ITEH TO BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REMARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR, COMPONENT OllG ¹, IITEM ¹ IFREQYI EX2/HDE PROCEDURE IPERIOD 2 USE CAL BLK ¹ I LIHE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I ( 18a) PIPE/NOL (6") IC-F-2 I M I SUR/PT3.00/MT4.00 I 2RHS-66-14-Si$ 02 I QISO 66-14 or DIJG¹ na in IC5.81 Inone I na /
| |
| I LINE¹ 2RHS-006-12-2 NTS: 80,81 ITE 2 I na /na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2RHS-66-14-Sll005 I QISO 66-14 or DllG¹ na in IC5 ~ 51 Inone I SUR/PT3.00/MT4.00 I NHP2-18-.500-CS I LINE¹ 2RHS-018-3-2 NTS: 80,83 ISO 2 I na /na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2RHS-66-14-Sll010 I QISO 66-14 or DllG¹ na in IC5.51 Inone I SUR/PT3.00/MT4.00 I NHP2-18-.500-CS I LINE¹ 2RHS.018-3-2 NTS: 80,83 ISO 2 I na/na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-14-SU011 I QISO 66-14 or DUG¹ na in IC5.51 Inone I SUR/PT3.00/MT4.00 I NHP2-18-.500-CS I LINE¹ 2RHS.018.3-2 NTS: 80,83 ISD 2 I na/na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2RHS-66. 14-SN012 I QISO 66-14 or DWG¹ na in IC5.51 IID I SUR/PT3.00/MT4.00 I NMP2-18-.500-CS I LINE¹ 2RHS.018-3-2 NTS: 80,83 ISD 2 I na /na I Sc11 I TEE/PIPE IC-F-2 I na I VOL/UT6.02 I Sc7 2RHS-66-14-SM013 I QISO 66-14 or DllG¹ na in IC5.51 IIO I SUR/PT3.00/MT4.00 I NMP2-18-.500-CS I LINE¹ 2RHS 018 20 2 NTS'0 8 ISO 2 I na /na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2RHS.66-14.SU014 I QISO 66-14 or DllG¹ na in IC5.51 Inone I SUR/PT3.00/MT4.00 I NMP2-18..500-CS I LINE¹ 2RHS.018-20-2 HTS: 80,83 ISD 2 I na/na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2RHS.66-14-SN015 I QISO 66-14 or DIJG¹ na in IC5.51 Inone SUR/PT3.00/MT4.00 NMP2-18-.500-CS I LINE¹ 2RHS 018 20 2 N '0 ~ 83 ISD 2 I
| |
| I na /na I
| |
| PIPE/llNF IC-F-2 I na I VOL/UT6.02 2RHS-66-14-SN016 I QISO 66-14 or DIIG¹ na in IC5.51 Inone I SUR/PT3.00/MT4.00 I NMP2-18-.500.CS LINE¹ 2RNS-018-20-2 NTS: 69,80 I SD 2 I na /na
| |
| | |
| NIAGARA MOHAIIK PSIER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 43 of 135 NMP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RMS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED (
| |
| OESCRIPTIOH OF ITEM TO BE EXAMINED(CATGRY ( IGSCC( EX1/HDE PROCEDURE (PERIOD 1 REMARKS EXAMINATION IDENTIFIER (
| |
| ITS ISO LOCATOR, COMPONENT DUG ¹, (ITEM ¹ (FREOY( EX2/HDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ ( LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3
| |
| ( PIPE/ELB IC-F-2 (
| |
| na ( VOL/UT6.02 2RMS-66-14-Sl$ 18 (
| |
| QISO 66-14 or DMG¹ na in (C5.51 (none ( SUR/PT3.00/MT'0 (
| |
| NMP2-18-.500-CS (
| |
| LINE¹ 2RHS-018-3-2 NTS: 80,83 (SD 2 na /na
| |
| (
| |
| I PIPE/ELB IC-F-2 ( na (
| |
| VOL/UT6.02 2RHS-66-14.SN022 ( QISO 66-14 or DIIG¹ na in (C5.51 (none ( SUR/PT3.00/HT4.00 (
| |
| NMP2-18-.500-CS (
| |
| LINE¹ 2RHS-018-3-2 NTS: 80,83 (SD 2 ( na /na I ELB/PIPE IC-F-2 I na I VOL/UT6'02 I 2RHS-66.14-SN023 (
| |
| QISO 66-14 or DUG¹ na in (C5.51 (none ( SUR/PT3.00/MT4.00 (
| |
| HMP2-18-.500.CS (
| |
| LIHE¹ 2RHS-018-3.2 Nl'S: 80,83 (SD 2 (
| |
| na/na I ELB/PIPE IC-F-2 (
| |
| na ( VOL/UT6.02 2RHS-66-14-SW024 ( QISO 66-14 or DIIG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NMP2-18-.500-CS LINE¹ 2RHS 018.3-2 NTS: 80,83 (SD 2 (
| |
| na /na I PIPE/ELB IC-F-2 ( na ( VOL/UT6.02 2RHS.66-14-SM025 ( QISO 66-14 or DWG¹ na in (C5.51 (none (
| |
| SUR/P'T3.00/MT4 F 00 (
| |
| NMP2-18-.500.CS (
| |
| LINE¹ 2RHS-018-3-2 NTS: 80,83 (SD 2 ( na /na I ELB/PIPE IC-F-2 (
| |
| na ( VOL/UT6.02 2RHS-66-14-SN026 ( QISO 66-14 or DUG¹ na in (CS ~ 51 (none ( SUR/PT3.00/MT4.00 (
| |
| NMP2-18-.500-CS I LINE¹ 2RHS-018-3-2 HTS: 80,83 ISD 2 ( na /na I PIPE/ELB IC-F-2 (
| |
| na ( VOL/UT6.02 2RMS-66-14-SN027 ( QISO 66-14 or DUG¹ na in (C5.51 (none ( SUR/PT3.00/MT4.00 (
| |
| NMP2-18-.500-CS I LINE¹ 2RHS-018-3-2 HTS: 80 83 ISD 2 (
| |
| na /na I ELB/PIPE IC-F-2 ( na ( VOL/UT6.02 2RMS-66-14-Sl$ 28 ( QISO 66-14 or DIIG¹ na in (C5.51 (none ( SUR/PT3.00/MT4.00 (
| |
| HMP2-18..500-CS (
| |
| LINE¹ 2RHS-018.3-2 NTS: 80,83 (SD 2 (
| |
| na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66. 14-SN29 QISO 66-14 or DUG¹ na in (C5.51 (none ( SUR/PT3.00/MT4.00 (
| |
| HMP2-18-.500.CS LINE¹ 2RHS-018-3-2 NTS'0 83 I 2 ( na /na
| |
| | |
| NIAGARA HOHANK POVER CORPORATION - Nl ILE POINT NUCLEAR STATION - UNIT 2 44 of 135 NHP2- ISI-006, REV. 1 ~ CH-000 SECOND TEH TEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED ) DESCRIPTIOH OF ITEH TO BE EXAHINED(CATGRY )IGSCC( EXI/NDE PROCEDURE ]PERIOD 1 REHARKS EXAHIHATIOH IDENTIFIER ( ITS ISO LOCATOR, COHPONENT DWG ¹, )ITEN ¹ )FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO'ND NOTES'S APPLICABLE ISELECT ICLASSJ EX3/NDE PROCEDURE iPERIOO 3 i I PIPE/RED IC-F-2 ( na J VOL/UT6.02 2RHS-66-14-Sl$ 30 i QISO 66-14 or DLIG¹ na in )C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-18-.500.CS [ LIHE¹ 2RHS-018-3-2 NTS: 80,86 LSD 2 / na /na I RED/TEE , IC-F-2 I na' VOL/UT6.02 I 2RHS-66-14-SW031 i QISO 66-14 or DUG¹ na in JC5.51 (none J SUR/PT3.00/HT4.00 ]
| |
| NHP2-20-.594.CS I LINE¹ 2RHS 020 185 2 NTS'6i49 ISD 2 ] na /na I PIPE/ELB IC-F-2 ) na [ VOL/UT6.02 2RHS-66-14-SN034 i QISO 66-14 or DMG¹ na in (C5.51 ]none J SUR/Pl'3.00/HT4.00 J NHP2-18..500.CS i LINE¹ 2RHS.018-3-2 NTS: 80,83 LSD )
| |
| na /na I PIPE/PIPE iC-F-2 ) na f VOL/UT6.02 2RHS-66-14-SM035 J QISO 66-14 or DNG¹ na in /C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-18-.500.CS [ LINE¹ 2RHS-018-3-2 NTS: 80 (none 2 / na /na I I ELB/PIPE IC-F-2 ) na ] VOL/UT6.02 2RHS-66-14-SN036 i QISO 66-14 or DMG¹ na in /C5.51 [none J SUR/PT3.00/HT4.00 f NHP2-18-.500-CS i LINE¹ 2RHS-018-3-2 NTS: 80,83 )SD 2 f na /na I I NOZ/RED IC-F-2 [ na ) VOL/UT6.02 2RHS-66 Fl$ 01 i QISO 66-15 or DNG¹ na in /C5.51 Inone I SUR/PT3 0/HT4 00 I NHP2-20-.594-CS I LINE¹ 2RHS.020.4-2 NTS: 87(86 ITE I 2 I na/na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-15-Fll003 I QISO 66 15 or DMG¹ na in [C5.51 (none [ SUR/PT3.00/HT4.00 J NHP2-18-.500.CS i LINE¹ 2RHS-018.4-2 NTS: 83,80 )SD 2 f na /na I I PIPE/ELB IC-F-2 J na J VOL/UT6.02 2RHS-66.15- Fl$ 15 i QISO 66-15 or DllG¹ na in [C5.51 ]none )
| |
| SUR/PT3.00/HT4.00 f NHP2-18-.500.CS LINE¹ 2RHS-018-4-2 NTS: 83,80 [SD 2 / na /na
| |
| / PIPE/ELB IC-F-2 / na / VOL/UT6.02 2RHS-66 FII017 i QISO 66-15 or DNG¹ na in )C5.51 /none J SUR/PT3.00/HT4.00 /
| |
| NHP2-18-.500-CS J LINE¹ 2RHS-018-4-2 NTS: 83,80 )SD 2 J na /na
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - N ILE POINT NUCLEAR STATION - UHIT 2 45 of 135 NHP2-ISI-006, REV. I( CH 000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAH Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY I IGSCCI EX1/HDE PROCEDURE IPERIOO 1 REHARKS EXAHINATION IDEHTIFIER I ITS ISO LOCATOR, COHPONENT DWG ¹, IITEH ¹ IFREQYI EX2/NDE PROCEDURE IPERIOO 2 USE CAL BLK ¹ I LINE No AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/PIPE Ic-F-2 I na I VOL/UT6.O2 2RHS-66-15-FW018 I QISO 66-15 or DUG¹ na in IC5.51 Inorie I SUR/PT3.00/HT4.00 I NHP2-18-.500.CS I LINE¹ 2RHS-018-4-2 NTS: 80 Inone 2 I na /na I PIPE/TEE IC-F-2 I na I VOL/UT6.02 2RHS.66-15-FI$ 24 I QISO 66-15 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.500-CS I LINE¹ 2RHS-018-4-2 HTS: 80,85 ISO 2 I na /na I I WNF/PIPE IC-F-2 I na I VOL/UT6.02 2RHS.66.15-Fl$ 25 I QISO 66-'15 or DUG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18..500.CS I LINE¹ 2RHS-018.4-2 NTS: 80,69 ISD 2 I na /na I PIPE/WNF IC-F-2 I na I VOL/UT6.02 2RHS-66-15-FMSM007 I QISO 66-1 or OMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NMP2-18-.500-CS LINE¹ 2RHS.018-4-2 NTS: 80,69 ISD 2 I na /na I P I PE/MNF IC-F-2 I na I VOL/UT6.02 2RHS-66-15-FWSl$ 11 I QISO 66-15
| |
| * or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.500-CS I LINE¹ 2RHS-018-4-2 NTS: 80,69 ISD I 2 I na/na I I WNF/PIPE IC-F-2 I na I VOL/UT6.02 2RHS-66-15-SM002 I QISO 66-15 or DWG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NKP2-18-.500-CS I LINE¹ 2RHS.018-4-2 NTS: 80,69 ISD 2 I na /na I PIPE/WNF IC-F-2 I na I VOL/UT6.02 2RHS-66-15-SW003 I QISO 66-15 or DWG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2.18-.500-CS I LINE¹ 2RHS-018.4-2 NTS: 80,69 ISO 2 I na /na I PIPE/ELB IC-F-2 I na I VOL/UT6.O2 2RHS-66-15-SW004 I aiso 66-15 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.500.CS I LINE¹ 2RHS-018.4-2 NTS: 83,80 ISD 2 I na /na I TEE/PIPE IC-F-2 I na I voL/UT6.O2 2RHS-66-15-Sl$ 06 I also 66-15 or DMG¹ na in IC5 ~ 51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.500-CS I LINE¹ 2RHS-018-4-2 N'TS: 80 85 ISD 2 I na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 46 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REO DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REHARKS I
| |
| EXAHINATIOH IDENTIFIER ITS ISO LOCATOR, COHPONENT DMG ¹, iITEH ¹ iFREOY( EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ i LINE NO. AND HOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I i TEE/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS.66-15-Sl$ 08 i QISO 66-15 or DMG¹ na in )C5.51 [none i SUR/PT3.00/HT4.00 i HHP2-18-.500-CS i LINE¹ 2RHS.018-4 2 NTS: 80,85 LSD 2 i na /na I I ELB/PIPE ,
| |
| IC-F-2 i na i VOL/uT6.02 2RHS-66-15-SM012 i QISO 66-15 or DMG¹ na in iC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.500 CS I LINE¹ 2RHS-018-4-2 NTS: 83,80 ISD 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/uT6.02 2RHS-66-15-9818 I QISO 66-15 or DMG¹ na in iC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.500-CS LINE¹ 2RHS-018-4-2 NTS: 83,80 LSD 2 i na /na I I RED/ELB IC-F-2 I na I VOL/UT6.02 I 2R HS 15- SM019 i QISO 66.15 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-18-.500-CS L INE¹ 2RNS.018-4-2 NTS 86 83 i SD 2 ( na /na I I ELB/PIPE IC-F-2 i na i VOL/uT6.02 2RHS-66 FM001 i QISO 66-16 or DMG¹ na in iC5.51 inone J SUR/PT3.00/HI'4.00 i NHP2-18-.500-CS i LINE¹ 2RNS-018-4-2 NTS: 83,80 LSD 2 i na /na I I ELB/PIPE IC-F-2 i na (
| |
| VOL/uT6.02 2RHS-66-16-FM002 i QISO 66-16 or DMG¹ na in )C5.51 IID I SUR/PT3.00/HT4 F 00 I NHP2-18-.500-CS I LINE¹ 2RNS-018-4-2 NTS: 83,80 ITE I 2 I na /na iSc10 I TEE/PIPE IC-F-2 i na )
| |
| VOL/UT6.02 2RHS-66-16-Fl$ 03 i QISO 66-16 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-16-.500-CS LIHE¹ 2RHS.016-5-2 HTS: 89,93 LSD 2 / na/na I I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66-16-FM004 i QISO 66-16 or DMG¹ na in iC5.51 inone I SUR/PT3.00/Hl'4.00 I NHP2-18 .500-CS I LINE¹ 2RHS.018.11-2 NTS: 83,80 ISD 2 i na /na I PIPE/RED IC-F-2 I na I VOL/UT6.02 I 2RHS-66-16-FM005 J QISO 66-16 or DMG¹ na in /C5.51 )none ) SUR/PT3.00/HT4 F 00 i NHP2-18-.500-CS / LINE¹ 2RHS 018-11-2 HTS: 80,90 LSD 2 i na/na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 47 of 135 NHP2-ISI-006, REV. 1, CH-OOO SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IN'IVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEOICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 I REHARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR'OHPONEHT DMG ¹i IITEH ¹ IFREQYI EX2/HDE PROCEDURE IPERIDD 2 I USE CAL BLK ¹ I LINE NO AND NOTES AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I PIPE/ELB IC-F-2 ) na ] VOL/UT6.02 2RHS-66-16. FM006 i QISO 66-16 or DMG¹ na in [C5.51 ]ID [ SUR/PT3.00/HT4.00 f NHP2-16-.500.CS i LINE¹ 2RHS-016-5-2 NTS: 93,94 ISO 2 / na /na iSc10 I PIPE/ELB IC-F-2 ] na f VOL/UT6.02 2RHS-66-16-FM007 i QISO 66-16 or DMG¹ na in [C5.51 [none J SUR/PT3.00/HT4.00 ]
| |
| NHP2-16-.500-CS [ LINE¹ 2RHS-016-5-2 HTS: 93,94 LSD 2 f na/na I I PIPE/PIPE IC-F-2 )
| |
| na ] VOL/UT6.02 2RHS-66-16-FM008 i QISO 66-16 or DMG¹ na in JC5.51 )none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-16-.500-CS ) LINE¹ 2RHS-016-5-2 HTS: 93 ]none 2 J na /na I RED/PIPE IC-F-2 [ na [ VOL/UT6.02 2RHS-66-16. FMD I 0 f QISO 66-16 or DMG¹ na in )C5.51 ]none J SUR/PT3.00/HT4.00 J NHP2-18-.375-CS LINE¹ 2RHS-018-14-2 NTS: 92,72 LSD 2 J na /na I PIPE/PIPE IC-F-2 ] na [ VOL/UT6.02 2RHS-66-16-FM011 J QISO 66-16 or DMS¹ na in )C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-16-.500-CS I LINE¹ 2RHS-016-5-2 NTS'3 I 2 / na /na INTEG ATT; 14" dia., 1.094a thick )C-C f na ( SUR/PT3.00/HT4.00 J 2RHS-66-16-FM304 QISO 66-16-11 . or DMG¹ na in (C3.20 [ID / na /na I LINE¹ 2RHS-016.5-2 NTS: 93,165 INS 2 / na/na I INTEG ATT; 3/4" thick plate (C-C J na ] SUR/PT3.00/HT4.00 f 2RHS-66-16-FM305 )
| |
| QISO 66.16.3 or DMG¹ na in (C3.20 )ID J na /na I LIHE¹ 2RHS.018-4-2 NTS: 80,63 iNS 2 / na/na I INTEG ATT; 10" dia., 1.125" thick )C-C i na i SUR/PT3.00/HT4.00 i 2RHS-66 FM306 DEL )
| |
| QISO 66-16 or DMG¹ na in (C3 ~ 20 ]ID f na /na
| |
| ) LINE¹ 2RHS-018-4-2 NTS: 80,88 (NR 2 / na/na I IHTEG ATT; 3/4" thick plate [C-C I na I SUR/PT3.00/HT4.00 I 2RHS-66-16-FM307 DEL i QISO 66-16 or DMG¹ na in )C3.20 ]IO f na /na I LIHE¹ 2RHS 018-4-2 NTS: 80,63 [NR 2 / na/na I
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 48 of 135 NMP2-ISI-006( REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEM TO BE EXAMINEDICATGRY IIGSCCI EXl/NDE PROCEDURE IPERIOO 1 I REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DWG ¹, LITEM ¹ iFREOYi EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK ¹ J LINE NO. AHD NOTES, AS APPLICABLE (SELECT iCLASSJ EX3/NDE PROCEDURE iPERIOO 3 i i INTEG ATT; 3/4" thick plate (C-C i na i SUR/PT3.00/MT4.00 i 2RHS-66-16-FW308 DEL i also 66-16 or DWG¹ na in (C3.20 iID' na /na i LINE¹ 2RHS-018-4-2 NTS: 80,63 (NR 2 / na /na I I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2RHS-66-16-SW001 ) also 66-16 or DWG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-18-.500-CS I LINE¹ 2RHS 018 4 2 HTS'3 80 ISD 2 / na /na I I ELB/PIPE IC-F-2 i na ( VOL/UT6.02 2RHS-66-16-SW002 i QISO 66-16 or DWG¹ na in /C5.51 inone / SUR/PT3.00/MT4.00 i NMP2-18-.500.CS I LINE¹ 2RHS.018.4-2 NTS: 83,80 ISD 2 t na /na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2RHS-66-16-SW003 i QISO 66-16 or DWG¹ na in iC5.51 inone ( SUR/PT3.00/MT4.00 i NMP2-18-.500-CS LINE¹ 2RHS-018-4-2 NTS: 83,80 i SD 2 / na /na I I ELB/PIPE IC-F-2 i na ) VOL/uT6.O2 2RHS-66-16-SW004 i QISO 66-16 or DWG¹ na in iC5.51 inone / SUR/PT3.00/MT4.00 /
| |
| NMP2-18-.500-CS I LIHE¹ 2RHS.018.4-2 NTS: 83,80 ISD 2 J na /na i PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2RHS-66-16-SW005 i QISO 66.'l6 or OWG¹ na in (C5.51 inone i SUR/PT3.00/MT4.00 [
| |
| NMP2-18-.500-CS i LIHE¹ 2RHS.018.4-2 NTS: 83,80 iso 2 i na /na I PIPE/TEE IC-F-2 i na i VOL/uT6.02 2RHS-66-16-SW006 i QISO 66-16 or DWG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 )
| |
| NMP2-18-.500-CS I LINE¹ 2RHS-018-4-2 NTS: 80,89 ISD 2 i na /na I TEE/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-16-SW007 i QISO 66-16 or DIIG¹ na in iC5.51 /none i SUR/PT3.00/MT4.00 i NHP2-18-.500.CS I LINE¹ 2RHS-018-11-2 NTS: 80,89 I SD 2 i na /na PIPE/ELB IC-F-2 I na i VOL/UT6.02 I 2RHS-66-16-SW008 Ql So 66-16 or DWG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-18-.500.CS LINE¹ 2RHS-018.11-2 NTS: 83,80 i SD 2 J na /na
| |
| | |
| NIAGARA HONAMK POMER CORPORATION - N ILE POINT NUCLEAR S'TATION - UNIT 2 49 of 135 NHP2 ISI 006'EV 1 i CH 000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REO )
| |
| DESCRIPTIOH OF ITEH TO BE EXAHINED)CATGRY ) IGSCC) EX1/NDE PROCEDURE )PERIOD 1 REHARKS EXAHINATION IDENTIFIER )
| |
| ITS ISO LOCATOR, COHPONEHT DMG ¹, )ITEH ¹ )FREQY) EX2/NDE PROCEDURE )PERIOD 2 )
| |
| USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE )SELECT )CLASS) EX3/HDE PROCEDURE )PERIOD 3 )
| |
| I PIPE/ELB IC-F-2 na ) VOL/UT6.02 )
| |
| Desetected 2RHS-66-16-SM009 )
| |
| QISO 66-16 or DMG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NHP2-18-.500-CS ) LINE¹ 2RHS-018-11-2 HTS: 83,80 ISD 2 )
| |
| na /na I
| |
| ) ELB/PIPE IC-F-2 )
| |
| na )
| |
| VOL/uT6.02 2R HS.66-16-SM010 )
| |
| QISO 66-16 or DMG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NHP2-18 .500-CS L INE¹ 2RHS-018-11-2 NTS: 83,80 ) SD 2 )
| |
| na /na I PIPE/ELB IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 2RHS-66-16-SM013 ) QISO 66-16 or DMG¹ na in )C5.51 )none I SUR/PT3 00/MT 0 I NHP2 ~ 500.CS I LINE¹ 2RHS-016-5-2 NTS: 93 94 ISD 2 )
| |
| na /na I I ELB/PIPE IC-F-2 ) na ) VOL/uT6.02 2RHS-66-16-S'M014 )
| |
| QISO 66-16 or DMG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NHP2.16-.500-CS I LINE¹ 2RHS-016-5-2 NTS'3i94 ISD 2 )
| |
| na /na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 )
| |
| 2RHS.66-16-SM016 )
| |
| QISO 66-16 or DMG¹ na in )C5.51 )none )
| |
| suR/PT3.00/HI'4.00 )
| |
| NHP2-16-.500-CS )
| |
| LINE¹ 2RHS-016-5-2 NTS: 93,94 )SD 2 )
| |
| na /na I I PIPE/ELB IC-F-2 )
| |
| na ) VOL/UT6.02 2RHS-66-16-SM017 )
| |
| QISO 66-16 or DMG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NHP2 ~ 500-CS ) LINE¹ 2RHS-016-5-2 NTS: 93,94 )SD 2 )
| |
| na /na I I ELB/PIPE IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 )
| |
| 2RHS-66-16-SM018 )
| |
| QISO 66-16 or DMG¹ na in )C5.51 )none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NHP2-16-.500-CS )
| |
| LINE¹ 2RHS-016-5-2 NTS: 93,94 )SD 2 )
| |
| na /na I I PIPE/ELB IC-F-2 )
| |
| na ) VOL/UT6.02 2RNS-66-16-SM019 )
| |
| QISO 66-16 or DMG¹ na in )C5 ~ 51 )none )
| |
| SUR/PT3.00/HI'4.00 )
| |
| NHP2-16-.500.CS I LINE¹ 2RHS-016-5-2 NTS: 93,94 ISD 2 ) na /na I
| |
| ) PIPE/PIPE IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 2RHS-66-16-SM022 ) QISO 66-16 or DMG¹ na in )C5 ~ 51 )none I SUR/PT3.00/HT4.00 I NHP2-16-.500.CS )
| |
| LIHE¹ 2RHS-016-5-2 NTS: 93 )none 2 ) na /na
| |
| | |
| NIAGARA MOHAWK POWER CORPORATION - N ILE POINT NUCLEAR STATIOH - UHIT 2 50 of 135 NHP2- ISI-006, REV. ~ CH-000
| |
| 'I SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REQ ( DESCRIPTION OF ITEM TO BE EXAHINED(CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD 1 (
| |
| REMARKS EXAMINATION IDENTIFIER ( ITS ISO LOCATOR, COMPONENT DWG ¹, (ITEM ¹ (FREQY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ (
| |
| LINE HO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I ELB/PIPE (C-F-2 (
| |
| na (
| |
| VOL/uT6.O2 2RHS-66-16-SW023 (
| |
| QISO 66-16 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| HMP2-16-.500-CS I LIHE¹ 2RHS-016-5-2 NTS: 93,94 ISD 2 (
| |
| na /na
| |
| (
| |
| 2CSL*V9/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UI'6.02 2RHS.66-17-FW004 (
| |
| QISO 66-17 or DWG¹ na in (C5.51 (ID (
| |
| SUR/PT3.00/MT4.00 (
| |
| NHP2-18-.375-CS (
| |
| LIHE¹ 2CSL.012-9-2 NTS: 99,100 (SD 2 ( na /na (Sc10 I ELB/PIPE IC-F-2 (
| |
| na (
| |
| VOL/uT6.O2 I 2RHS-66-17-FW005 (
| |
| QISO 66-17 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4 F 00 ( I NHP2-18-.375-CS I LIHE¹ 2RHS-018-14-2 NTS: 72,101 (TE 2 (
| |
| na/na I I I PIPE/PIPE IC.F-2 (
| |
| na (
| |
| VOL/UT6.02 2RHS-66-17-FW006 (
| |
| QISO 66-17 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NMP2-18-.375-CS (
| |
| LINE¹ 2RHS-018-14-2 NTS: 72 (none 2 (
| |
| na /na I I PIPE/PIPE IC-F-2 (
| |
| na ( VOL/UT6.02 2RHS-66-17-FW007 (
| |
| QISO 66-17 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NHP2-18..375-CS (
| |
| LINE¹ 2RHS-018-14-2 NTS: 72 (none 2 (
| |
| na /na I
| |
| ( ELB/PIPE IC-F-2 (
| |
| na (
| |
| VOL/uT6.O2 2RHS-66-17-FW008 (
| |
| QISO 66-17 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NHP2-18-.375-CS I LINE¹ 2RNS.018-14-2 NTS: 72(101 ISD 2 (
| |
| na/na I PIPE/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-17-FW011 ( QISO 66-17 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NMP2-18-.375-CS (
| |
| LINE¹ 2RHS-018-14-2 HTS: 72 (none 2 (
| |
| na /na
| |
| (
| |
| PIPE/WHF IC-F-2 (
| |
| na ( VOL/UT6.02 2RNS-66-17-FW016 (
| |
| QISO 66-17 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NMP2-18..375-CS I LINE¹ 2RHS-018.14-2 HTS: 72,71 ISO 2 (
| |
| na /na I ELB/PIPE IC-F-2 ( na (
| |
| na/na 2RHS-66-17-FW031 (
| |
| QISO 66-17 or DWG¹ na in (none (none (
| |
| na /na LINE¹ 2RHS-006-13-2 NTS: 96,97 (na 2 (
| |
| na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 5'I of 135 NHP2-ISI-006, REV. 1 ~ CH-000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Exemination Identifier) 2ND INTVL REL RED i DESCRIPTION OF ITEH TO BE EXAHINEDiCATGRY iIGSCCi EX1/HDE PROCEDURE iPERIOD 1 REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DMG ¹, i ITEH ¹ iFREOYt EX2/NDE PROCEDURE iPERIOO 2 i USE CAL 'BLK ¹ I LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I PIPE/PIPE IC.F.2 I na I VOL/UT6.02 I 2RHS-66-17-Fl$ 32 i QISO 66-17 or DMG¹ na in iC5.51 )none i SUR/PT3.00/HT4.00 i NHP2-18-.375-CS I LINE¹ 2RHS-018-14-? NTS: 72 Inone 2 i na /na (6") l$L/PIPE (18") iC-F-2 I na I SUR/PT3.00/HT4.00 I i6" veld reinforced to 1S" equivalent Mall thickness 2RHS-66 FMQ$ 04 i QISO 66-'17 or DMG¹ na in JC5.81 inone i na /
| |
| i LIHE¹ 2RHS-006-13-2 HTS: 97,72 lTE 2 i na /na I I PIPE/ELB IC-F-2 i na i na /na 2RHS-66-17-Sl$ 02 i QISO 66-17 or DWG¹ na in inone inone i na /na I LINE¹ 2RHS-006-13.2 NTS: 44(96 Ina 2 i na/na I PIPE/TEE IC.F-2 I na I VOL/UT6.02 I 2RHS-66-17-SW005 i QISO 66.17 or DWG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2.18-.375-CS i LINE¹ 2RHS-018-14-2 HTS: 72,98 LSD 2 i na/na I I TEE/ELB IC-F-2 i na i VOL/UT6.02 2RHS-66-17-SW006 i QISO 66.17 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-18-.375-CS I LIHE¹ 2RHS.018-14-2 NTS: 98,101 ISO 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66-17-QI007 I QISO 66-17 or DWG¹ na .in iC5.51 inone i SUR/PT3.00/HT4.00 (
| |
| NHP2-18-.375-CS j LINE¹ 2RHS-018-14-2 NTS: 72,101 LSD i 2 i na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2RHS-66-17-QI008 i QISO 66-17 or DMG¹ na in iC5.51 inone )
| |
| SUR/PT3.00/HT4.00 i NHP2-18 .375-CS I LINE¹ 2RHS-018-14-2 NTS: 72 ~ 101 ISD 2 i na /na I ELB/PIPE IC-F-2 ) na i VOL/UT6.02 2RHS-66-17-Sl$ 09 i Qrso 66-17 or DMG¹ na in (C5.51 inone i SUR/PT3.00/Hl'4.00 J NHP2-'I8-.375.CS I LINE¹ 2RHS-018-14-2 NTS: 72,101 ISO 2 J na /na I I PIPE/ELB LC-F-2 i na ( VOL/UT6.02 2RHS-66-17-SM010 / QISO 66-17 or DMG¹ na in (C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.375-CS I LINE¹ 2RHS-018-14-2 NTS: 72,101 ISD 2 i na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 52 of 135 NHP2-ISI-006, REV. 1, CH.000 SECOHD TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Exemination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOD 1 REHARKS EXAHINATIOH IDEN'TIF ER I ITS ISO LOCATOR'OHPONENT DMG i IITEH IFREQYI EX /NDE PROCEDURE IPERIOO I USE CAL BLK ¹ I LINE NO- AND NOTESs AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE iPERIOD 3 I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2RHS-66-17-SM011 i QISO 66-17 or DMG¹ na in [C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.375-CS I LINE¹ 2RHS 018-14-2 NTS: 72,101 ISO 2 / na /na I PIPE/TEE IC-F-2 [ na [ VOL/UT6.02 2RHS.66-17-SM018 i QISO 66-17 or DMG¹ na in [C5.51 ]none f SUR/PT3.00/HT4.00 J HHP2-18-.375-CS I LINE¹ 2CSL-012-9-2 NTS: 98,100 ISD 2 ( na/na i PIPE/MOL IC-F-2 / na / na/na 2RHS-66-17-SM019 [ QISO 66-17 or DMG¹ na in [none /none / na /na na I LINE¹ 2RHS-006-13-2 HTS: 97,72 Ina 2 / na/na i ELB/PIPE IC.F-2 [ na )
| |
| VOL/UT6.02 2RHS-66 FM001 i QISO 66-18 or DMG¹ na in [C5 ~ 51 [none J SUR/PT3.00/HT4.00 f NHP2-16-.500-CS i LIHE¹ 2RHS.016.5-2 NTS: 94,93 [SD 2 J na/na I PIPE/PIPE IC.F-2 (
| |
| na ) VOL/UT6.02 2RHS-66-18-FM002 I QISO 66 18 or DMG¹ na in JC5.51 ]none f SUR/PT3.00/HT4 F 00 )
| |
| NHP2-16-.500-CS I LINE¹ 2RHS-016-5-2 NTS: 93 Inone 2 / na /na I I ELB/PIPE IC-F-2 / na f VOL/UT6.02 2RHS-66 FM003 i QISO 66-18 or DMG¹ na in JC5 ~ 51 Inone I SUR/PT3.00/HT4 00 I NHP2-16-.500 CS I LINE¹ 2RHS-016-5-2 HTS: 94,93 ISD 2 / na /na I TEE/PIPE IC-F-2 f na f VOL/UT6.02 2RHS-66-18-FM004 i QISO 66-18 or DMG¹ na in JC5.51 ]none f SUR/PT3.00/HT4.00 f NHP2 ~ 500.CS I LINE¹ 2RHS.016-5-2 NTS: 93,103 ISD 2 f na /na I PIPE/TEE IC-F-2 ) na J VOL/UT6.02 2RHS-66-18-FM005 f QISO 66-18 - or DMG¹ na in /C5.51 ]none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2 F 500.CS f LINE¹ 2RHS-016-5-2 NTS: 93,103 (SD 2 J na/na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2RHS-66-18-FM006 i QISO 66-18 or DMG¹ na in (C5.51 ]none J SUR/PT3.00/HT4.00 J NHP2-16-.500-CS I LINE¹ 2RHS-016-5-2 NTS: 94,93 ISD 2 J na /na
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 53 of 135 NHP2-ISI-006, REV. 1, CH.OOO SECOND TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED [ DESCRIPTION OF ITEN TO BE EXAHINED(CATGRY )IGSCC( EX1/NDE PROCEDURE ]PERIOD 1 REHARKS EXAHINATION IDENTIFIER ) ITS ISO LOCATOR, COHPONEHT DMG ¹, (
| |
| ITEN ¹ )FREOY] EX2/NDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ I LIHE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I PIPE/*HOV15A IC-F-2 [ na )
| |
| VOL/UT6.02 2RHS-66-18-FM009 i QISO 66-18 or DMG¹ na in /C5.51 Inone I SUR/PT 0/HT I NHP2-16-.500-CS i LINE¹ 2RHS-016-5-2 NTS: 93,105 LSD 2 / na /na i <<HOV15A/PIPE IC-F-2 [ na (
| |
| VOL/UT6.02 2RHS-66-18-FM010 I QISO 66-18 or DMG¹ na in JC5.51 (none )
| |
| SUR/PT3.00/HT4.00 [
| |
| NHP2-16-.500-CS i LINE¹ 2RHS-016-5-2 NTS: 93,105 LSD 2 / na /na I PIPE/<<HOV25A IC-F-2 I na I VOL/UT6.02 I 2RHS-66-18-FM011 I QISO 66-18 or DMG¹ na in )C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-16-.500.CS i LINE¹ 2RHS 016-5-2 NTS: 93,105 LSD 2 J na /na I I ELB/PIPE IC-F-2 J na [ VOL/UT6.02 2RHS-66-18. FM014 i QISO 66-18 or DMG¹ na in (C5.51 )none [ SUR/PT3.00/HT4.00 )
| |
| NHP2-16-.500 CS I LIHE¹ 2RHS.016.5-2 NTS 94,93 ISD 2 f na /na I I PIPE/ELB IC-F-2 f na / VOL/UT6.02 2RHS-66-18-FM024 J QISO 66.18 or DMG¹ na in ]C5 ~ 5'I [none [ SUR/PT3.00/HT4.00 f NHP2-16-.500-CS i LINE¹ 2RHS-016-5-2 NTS: 94,93 LSD 2 / na /na I I PIPE/TEE IC-F-2 [ na [ VOL/UT6.02 ] Sc7 2RNS-66-18.FM025 i QISO 66-18 or DMG¹ na .in JC5.51 IID I SUR/PT3.00/HT4.00 I NHP2-16-.500-CS I LINE¹ 2RHS-016-5-2 NTS: 93,103 ISO 2 [ na /na I I TEE/PIPE IC-F-2 )
| |
| na (
| |
| VOL/UT6.02 2RHS-66-18-FM026 i QISO 66-18 or DMG¹ na in (C5.51 ]none J SUR/PT3.00/HT4.00 J NHP2-12-.375-CS I LINE¹ 2RHS.012-7-2 HTS: 103,100 ISD 2 J na /na I I PIPE/MNF IC-F-2 )
| |
| na (
| |
| VOL/UT6.02 (
| |
| Sc7 2RHS.66-18-FM027 i QISO 66-18 or OMG¹ na in JC5.51 )IO f SUR/PT3.00/HT4.00 )
| |
| NHP2-12-.375-CS ) LINE¹ 2RNS-012-7-2 NTS: 100(104 )SD 2 / na /na I INTEG ATT IC-C I na I SUR/PT3.00/HT4 F 00 I 2RHS-66-18-FM306 [ QISO 66-18-3 or DMG¹ na in JC3.20 [ID f na /na [Sc8
| |
| [ LINE¹ 2RHS-016-5-2 NTS: 93,63 )Handate( 2 ( na /na I
| |
| | |
| NIAGARA HOKAWK POWER CORPORATION - ILE POINT NUCLEAR STATIOH - UNIT 2 54 of 135 HHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED DESCRIPTIOH OF ITEH TO BE EXAHINED)CATGRY IGSCC) EX1/NDE PROCEDURE )PERIOD 1 REHARKS
| |
| ( )
| |
| EXAMINATION IDENTIFIER (
| |
| ITS ISO LOCATOR, COHPONENT DWG ¹, ]ITEN ¹ (FREOY) EX2/HDE PROCEDURE (PERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I INTEG ATT ic-c I na I SUR/PT3.00/HT4.00 I 2RHS-66-18-FW309 / QISO aS-18-4 or DMG¹ na in /C3.20 /ID / na /na I LINE¹ 2RHS-016-5-2 NTS: 93,63 INS 2 / na/na I I TEE/ELB IC-F-2 J na J VOL/UT6.02 2RHS-66-18-FWSW005 i QISO 66-18 or DWG¹ na in JC5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-16-.500-CS J LINE¹ 2RHS-016-5-2 HTS: 94,103 JSD 2 )
| |
| na /na I I PIPE/ELB IC-F-2 J na ( VOL/UT6.02 I 2RHS-66-18-SW001 i QISO 66-18 or DWG¹ na in [C5.51 Inone I SUR/PT3.00/Hj'4.00 I I NHP2-16-.500-CS I LINE¹ 2RHS-016-5-2 NTS: 94,93 I SD 2 f na /na I I I ELB/PIPE IC-F-2 J na )
| |
| VOL/UT6.02 2RHS-66.18.SW006 i QISO 66-18 or DWG¹ na in )C5.51 (none f SUR/PT3.00/HT4.00 )
| |
| NHP2-16-.500-CS ) LINE¹ 2RHS-016-5-2 NTS: 94,93 [SD 2 f na /na I I ELB/PIPE IC-F-2 f na f VOL/UT6.02 2RHS-66-18.SW007 i QISO 66-18 or DMG¹ na in /C5.51 /none / SUR/PT3.00/HT4.00 [
| |
| NHP2-16-.500-CS I LINE¹ 2RHS-016-5-2 NTS: 94,93 ISO 2 / na /na I I TEE/PIPE IC-F-2 [ na (
| |
| VOL/UT6.02 2RHS-66-19.FW001 i QISO 66-19 or DMG¹ na .in )C5.51 ]none J SUR/PT3.00/HT4.00 J NHP2-12-.375.CS I LINE¹ 2RHS-012-9-2. HTS: 100,103 ISO 2 / na/na I I PIPE/TEE IC-F-2 )
| |
| na J VOL/UT6.02 2RHS-66-19.FW002 i QISO 66-19 or OWG¹ na in )C5.51 IIO I SUR/PT3.00/HT4.00 I NHP2-12-.375.CS I LINE¹ 2RHS-012-9-2 NTS: 100,106 ISD 2 f na /na I Sc11 i PIPE/~HOV40A IC-F-2 [ na [ VOL/UT6.02 2RHS.66-19-FW003 I QISO 66-19 or DWG¹ na in )C5.51 Inone I SUR/P'T3 00/HT4.00 I NHP2-12-.375-CS I LINE¹ 2RHS-012-9-2 NTS: 100,9 ITE 2 f na /na I
| |
| )
| |
| *HOV40A/PIPE IB-J [ na ) VOL/UT6.02 2RHS-66 FW004 )
| |
| QISO 66-19 or DWG¹ na in )89.11 [none )
| |
| SUR/PT3.00/HT4.00 f NHP2-12-.844-CS I LINE¹ 2RHS-012-119-1 NTS: 9,17 INS 1 / na/na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 55 of 135 NHP2-1SI-006, REV. 1, CH.OOO SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REHARKS EXAHIHATION IDENT IF IER ITS ISO LOCATOR, COHPOHEHT DMG ¹, (ITEN ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/PEHET 210A IB-J I na I VOL/UT6.02 2RHS-66-19-FM005 I QISO 66-19 or DMG¹ na in (89.11 IID I SUR/PT3.00/HT4.00 ISc8 NHP2-12-.844-CS I LINE¹ 2RHS-012-119-1 NTS: 17,18 ITEV I 1(na/ I I ELB/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RHS-66-19-FM008 I QISO 66-19 or DMG¹ na in IC5.51 (none (
| |
| SUR/PT3.00/HT4.00 I NHP2-12-.375-CS ( LINE¹ 2RHS-012-7-2 NTS: 100,101 (SD ( 2 I na /na I PIPE/~HOV24A IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RHS-66-19-FMOO9 I QISO 66-19 or DMG¹ na in IC5.51 (none I SUR/PT3.00/HT4.00 I NHP2-12-.375-CS I LINE¹ 2RHS 12 7-2 NTS'00 9 ITE 2 I na/na I I 4HOV24A/PIPE IB-J I na I VOL/UT6.02 I 2RHS-66 FM010 I QISO 66-19 or DMG¹ na in (89.11 (none I SUR/PT3.00/HT4.00 I NHP2-12-.688-CS I LINE¹ 2RHS-012-75-1 NTS: 9,10 INS I na /na I I PIPE/PENET Z9A IB-J I na I VOL/UT6 02 I 2RHS.66-19-FM011 I QISO 66-19 or DMG¹ na in (89.11 IID I SUR/PT3.00/MT4.00 I Sc9 NHP2-12-.688-CS I LINE¹ 2RHS-012-75-1 NTS: 10,11 ITEV 1 Ina/
| |
| I PIPE/PIPE IC-F-2 (
| |
| na I voL/uT6.02 2RHS-66-19-FM016 I QISO 66-19 or DMG¹ na in (C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-12-.375-CS I LINE¹ 2RHS.012.9-2 HTS: 100 (none I 2 I na /na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2RHS-66.19- FM019 I QISO 66-19 or DMG¹ na in IC5.51 (none I SUR/PT3.00/HT4.00 I NHP2-12-.375-CS (
| |
| LINE¹ 2RHS.012-9.2 NTS: 100(101 ISD 2 I na /na I PIPE/PIPE IC-F-2 I na I VOL/UT6.02 2RHS.66-19. FM020 (
| |
| QISO 66-19 or DMG¹ na in IC5.51 Inone I suR/PT3.00/HT4-00 I NHP2-12-.375-CS (
| |
| LINE¹ 2RHS-012-9-2 NTS: 100 (none 2 I na/na I I INTEG ATT Ic-c (
| |
| na I SUR/PT3.00/HT4.00 (
| |
| 2RHS-66-19-FM303 <TKS I QISO 66-19 or DMG¹ na in IC3.20 (ID (
| |
| na /na I'LINE¹ 2RHS-012-9-2 NTS: 100,95 INR 2 I na /na I
| |
| | |
| NIAGARA HOHAMK POMER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 56 of 135 NHP2-ISI-006, REV. 1, CH.OOO SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED DESCRIPTIOH OF ITEN TO BE EXAHIHED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD 1 REHARKS
| |
| (
| |
| EXAHINATION IDENTIFIER (
| |
| ITS ISO LOCATOR, COHPOHENT DMG ¹, (ITEN ¹ (FREOY( EX2/NDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I I ELB/PIPE IC-F-2 (
| |
| na ( VOL/UT6.02 2RHS-66-19-FMSM015 (
| |
| QISO 66-19 or DUG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-12-.375-CS (
| |
| LINE¹ 2RHS.012.9-2 HTS: 100,101 (SD 2 ( na/na
| |
| (
| |
| MHF/PIPE (C-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RHS-66-19-SM001 I QISO 66-19 or DUG¹ na in (C5 ~ 51 (none I SUR/PT3.00/HT4.00 I NHP2-12-.375-CS LINE¹ 2RHS.012-7-2 NTS: 104,100 (SD 2 (
| |
| na /na I PIPE/ELB IC-F-2 (
| |
| na ( VOL/UT6.02 2RHS.66-19-SM002 (
| |
| QISO 66-19 or DMG¹ na in (C5 ~ 51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2 ~ 375-CS (
| |
| LINE¹ 2RHS.012-7-2 NTS: 100,101 (SD 2 (
| |
| na /na I I ELB/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RHS-66-19.SM003 (
| |
| QISO 66-19 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| -NHP2-12-.375-CS LINE¹ 2RHS.012-7-2 NTS: 100,101 (SD 2 (
| |
| na /na
| |
| (
| |
| (
| |
| PIPE/ELB IC-F-2 ( na ( VOL/UT6.02 2RHS-66-19-SM004 (
| |
| QISO 66-19 or DMG¹ na in (C5.51 (none I SUR/PT3.00/HT4.00 I NHP2.12..375-CS LINE¹ 2RHS-012-7-2 NTS: 100,101 ISD 2 (
| |
| na /na I
| |
| I ELB/PIPE IC-F-2 ( na ( VOL/UT6.02 2RHS-66-19-SM005 (
| |
| QISO 66-19 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/MT4.00 (
| |
| NHP2.12-.375-CS LINE¹ 2RHS-012-7-2 NTS: 100,101 ISD 2 (
| |
| na /na I I
| |
| I PIPE/ELB IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RHS-66-19-SM008 (
| |
| QISO 66-19 or DMG¹ na in (C5.51 (none I SUR/PT3.00/HT4.00 I NHP2-12-.375-CS LINE¹ 2RHS.012-7-2 NTS: 100,101 (SD 2 (
| |
| na /na I ELB/PIPE IC-F-2 ( na ( VOL/UT6.02 2RHS-66-19-SM009 (
| |
| QISO 66-19 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-12-.375-CS I LINE¹ 2RHS.012-7-2 NTS: 100,101 ISD 2 (
| |
| na /na I PIPE/ELB IC-F-2 (
| |
| na I VOL/UI6.02 I 2RHS-66-19-SM012 (
| |
| QISO 66-19 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NHP2-12-.375-CS I LINE¹ 2RHS-012-9-2 NTS 100 101 ISD 2 (
| |
| na /na
| |
| | |
| NIAGARA MONAMK POMER CORPORATION - h ILE POINT NUCLEAR STATION - UNIT 2 57 of 135 NHP2- ISI-006, REV. 1 ~ CH-000 SECOND TEN TEAR INSERVICE INSPECTION (ISI) IHTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REHARKS EXAHIHAT ION IDENT IF IER J ITS ISO LOCATOR, COHPONEHT DMG ¹, ]ITEN ¹ JFREOYJ EX2/NDE PROCEDURE ]PERIOD 2 J USE CAL BLK ¹ i LIHE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I ELB/PIPE IC-F-2 f na f VOL/UT6.02 2RHS-66.'I9-SM013 i QISO 66-19 or DMG¹ na in )C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-12-.375-CS I LINE¹ 2RHS-012.9-2 NTS: 100,101 ISD 2 / na /na I PIPE/ELB IC-F-2 f na [ VOL/UT6.02 2RHS-66-19-SM014 i QISO 66-19 or DMG¹ na in [C5.51 /none / SUR/PT3.00/HT4.00 f NHP2-12-.375.CS J LINE¹ 2RHS-012.9-2 HTS: 100,101 iSO 2 ) na /na I I TEE/PIPE IC-F-2 [ na ] VOL/UT6.02 2RHS-66-19-SM016 i QISO 66.19 or DMG¹ na in )C5.51 [none f SUR/PT3.00/HT4.00 J HHP2-12-.375-CS I LINE¹ 2RHS-012.9-2 HTS: 100,106 ISD 2 / na/na I I ELB/PIPE IC.F-2 [ na [ VOL/UT6.02 2RHS-66-19-SM018 f QISO 66-19 or DMG¹ na in /C5.51 ]none J SUR/PT3.00/HT4.00 [
| |
| NHP2-12..375-CS I LINE¹ 2RHS-012-9-2 NTS: 100(101 ISO 2 [ na/na I I ELB/PIPE IC.F-2 [ na [ VOL/UT6.02 2RHS-66-19-SM024 i QISO 66-19 or DMG¹ na in [C5.51 (none (
| |
| SUR/PT3.00/HT4.00 [
| |
| NHP2-12-.375.CS LINE¹ 2RHS-012-7-2 NTS: 100/101 ]SO 2 [ na /na I I PIPE/ELB IC-F-2 [ na ] VOL/UT6.02 2RHS-66-19-SM025 i QISO 66-19 or DUG¹ na in )C5.51 ]none )
| |
| SUR/PT3.00/HT4.00 [
| |
| NHP2-12-.375-CS (
| |
| LINE¹ 2RHS-012-7-2 NTS: 100,101 (SD I 2 I na/na I I TEE/REO IC-F-2 )
| |
| na )
| |
| VOL/UT6.02 2RHS-66-19-SM026 i QISO 66-19 or DMG¹ na in [C5.5'l [ID f SUR/PT3.00/HT4.00 f NHP2-12-.375-CS I LINE¹ 2RHS-012-9-2 NTS: 95,46 ISD 2 / na/na Sc11 I PIPE/ELB IC-F-2 [ na [
| |
| VOL/Ul'6.02 2RHS-66-19-SM028 i QISO 66-19 or DMG¹ na in [C5.51 ]none J SUR/PT3.00/HT4.00 f HHP2-12-.375-CS I LINE¹ 2RHS.012-7-2 HTS: 100,'101 ISD 2 J na /na I I TEE/PIPE IC-F-2 )
| |
| na (
| |
| VOL/UT6.02 J Sc7 2RHS-66-20-FM001 i QISO 66-20 or DUG¹ na in (C5.51 IID I SUR/PT3.00/HT4.00 I NHP2-18-.375.CS i LINE¹ 2RHS-018-203-2 HTS: 107,100 LSD 2 / na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATIOH - HI HILE POINT NUCLEAR STATION - UNIT 2 58 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEH YEAR IHSERVICE IHSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED ) DESCRIPTION OF ITEN TO BE EXANIHED(CATGRY (IGSCC) EX1/HDE PROCEDURE )PERIOD 1 REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COMPONENT DMG ¹, )ITEN ¹ JFREOY) EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ f LINE NO. AND NOTES, AS APPLICABLE ]SELECT ]CLASS] EX3/NDE PROCEDURE (PERIOD 3 f I PIPE/PIPE IC-F-2 ) na [ VOL/UT6.02 2RHS-66-20-FM002 )
| |
| QISO 66-20 or DMG¹ na in [C5.51 ]none ) SUR/PT3.00/HT4.00 J NHP2-18-.375-CS ] LINE¹ 2RHS-018-203-2 NTS: 100 )none 2 / na /na I PIPE/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-20-FM003 / QISO 66-20 or DMG¹ na in (C5.51 Inone I SUR/PT3.00/NT4.00 I NHP2.18-.375.CS (
| |
| LINE¹ 2RHS-018-203-2 NTS: 100 )none 2 ) na /na I PIPE/ELB IC-F-2 )
| |
| na [ VOL/UT6.02 2RHS-66-20.FW004 ( QISO 66-20 or DMG¹ na in [C5.51 ]none f SUR/PT3.00/NT4.00 f NHP2-18-.375-CS i LIHE¹ 2RHS-018-203-2 NTS: 100,101 LSD 2 f na/na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2RHS.66-20-FM005 (
| |
| QISO 66.20 or DWG¹ na in JC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.375-CS I LINE¹ 2RHS-018-203-2 HTS: 100,101 ISD 2 f na/na I PIPE/ELB IC-F-2 (
| |
| na )
| |
| VOL/UT6.02 2RHS.66-20-FM006 )
| |
| QISO 66-20 or DWG¹ na in )C5.51 ]none ( SUR/PT3.00/HT4.00 )
| |
| NHP2-18-.375-CS LINE¹ 2RHS.018.203-2 NTS 100,101 )SD I 2 I na /na I I PIPE/PIPE IC-F-2 i na i VOL/UT6.02 I 2RHS-66-20-FW009 i QISO 66-20 or DMG¹ na .in ]C5.51 [none J SUR/PT3.00/NT4.00 J NHP2-18..375-CS I LINE¹ 2RHS-018-203-2 HTS: 100 Inone 2 [ na/na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-20-FM010 i QISO 66-20 or DWG¹ na in [C5.51 Inone I SUR/PT3.00/HT4.00 (
| |
| NHP2-18-.375-CS i LIHE¹ 2RHS-018-203-2 NTS: 100,101 )SD 2 f na/na I PIPE/ELB IC-F.2 [ na ) VOL/UT6.02 2RHS-66-20-FW011 J QISO 66-20 or DMG¹ na in JC5.51 ]none f SUR/PT3.00/MT4.00 J NHP2-18-.375-CS / LINE¹ 2RHS-018-203-2 NTS: 100,101 JSD 2 / na /na I ELB/PIPE IC-F-2 ) na ) VOL/UT6.02 2RHS-66-20-FM012 f QISO 66-20 or DMG¹ na in )C5.51 Inone I SUR/PT3 F 00/NT4.00 I NHP2-18-.375-CS I LIHE¹ 2RHS.018-203-2 HTS: 100,101 ISD 2 f na/na
| |
| | |
| NIAGARA HOHAMK PDMER CORPORATIOH - ILE POINT NUCLEAR STATION - UNIT 2 59 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/'1999 APPEHDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED [ DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY )IGSCC) EX1/NDE PROCEDURE )PERIOD 1 REHARKS EXAHINATION IDENTIFIER )
| |
| ITS ISO LOCATOR, COHPOHEHT DMG ¹, [ITEN ¹ )FREOY) EX2/HDE PROCEDURE [PERIOD 2 [
| |
| USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I PIPE/PIPE JC-F-2 [ na [ VOL/UT6.02 2RNS-66-20.FM013 I QISO 66-20 or DMG¹ na in ]C5.51 [none f SUR/PT3.00/HI'4.00 J NHP2-18..375-CS (
| |
| LINE¹ 2RHS-018-203-2 HTS: 100 (none 2 / na /na i ELB/PIPE IC-F-2 [ VDL/UT6.02 2RNS-66-20-FM014 [ QISO 66-20 or DMG¹ na in (C5.51 ]none [ SUR/PT3.00/HT4.00 J NHP2 ~ 375-CS I LIHE¹ 2RHS-018-203-2 NTS: 100,101 ISD 2 (
| |
| na /na
| |
| [ INTEG ATT; 1" thick plate [C-C I na I SUR/PT3.00/HT4.00 I 2RNS-66-20.FM303 )
| |
| QISO 66-20-7 or DMG¹ na in )C3.20 [ID )
| |
| na /na I LINE¹ 2RHS.018.203-2 NTS'2 36 INS 2 / na /na INTEG ATT; 1" thick plate JC-C f na f SUR/PT3.00/HT4.00 f 2RHS-66-20-FM304 )
| |
| Qlso 66-20-7 or DMG¹ na in )C3.20 /ID J na /na I na I LINE¹ 2RHS-018-203-2 NTS 72,36 INS 2 / na/na I
| |
| [ INTEG ATT; 1" thick plate [C-C I na I SUR/PT3.00/HT4.00 I 2RNS-66-20.FM305 (
| |
| QISO 66-20-7 or DMG¹ na in )C3.20 ]ID f na /na i LINE¹ 2RHS.018-203-2 NTS: 72,36 INS 2 / na/na I
| |
| [ IHTEG ATT; 1" thick plate (C-C ] na (
| |
| SUR/PT3.00/HT4.00 (
| |
| 2RNS-66-20-FM306 f QISO 66-20-7 or DMG¹ na .in [C3.20 ]ID ) na /na
| |
| ] LIHE¹ 2RHS 018-203-2 NTS: 72,36 (NS 2 / na/na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS.66-20-SM001 i QISO 66-20 or DMG¹ na in /C5 51 ~ ]none J SUR/PT3.00/HT4.00 J NHP2-18-.375-CS LINE¹ 2RHS.018-203-2 NTS: 100,101 /SD 2 / na /na I PIPE/ELB /C-F-2 )
| |
| na ( VOL/UT6.02 2RHS.66-20-SM003 (
| |
| QISO 66-20 or DMG¹ na in (C5.51 ]none J SUR/PT3 F 00/HT4.00 )
| |
| NHP2-18-.375-CS I LINE¹ 2RHS-018-203-2 NTS: 100,101 ISD 2 / na /na i PIPE/ELB IC-F-2 ) na ( VOL/UT6.02 2RHS.66-20 SM005 / QISO 66-20 or DMG¹ na in /C5.51 )none )
| |
| SUR/PT3.00/HT4 F 00 (
| |
| NHP2-18-.375.CS LINE¹ 2RHS-018-203-2 NTS: 100,101 LSD 2 ] na /na
| |
| | |
| NIAGARA MONAMK POMER CORPORATION - N MILE POINl'UCLEAR STATION - UNIT 2 60 of 135 NMP2-ISI-006, REV. 1, CH.000 SECOND TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTIOH OF ITEM TO BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG ¹, LITEM ¹ )FREOY( EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK ¹ I LINE NO AND NOTES AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I ELB/PIPE IC-F-2 i na )
| |
| VOL/uT6.02 2RNS-66-20-SM006 [ QISO 66-20 or DMG¹ na in (C5.51 )none i SUR/PT3.00/MT4.00 i NHP2-18-.375-CS )
| |
| LINES 2RHS-018-203-2 NTS: 100,101 LSD 2 i na /na J
| |
| PIPE/MNF /C-F-2 i na i VOL/uT6.O2 2RHS.66-20. SM008 i QISO 66-20 or DUG¹ na in iC5.51 Inone I SUR/PT3.00/MT4.00 I NMP2-18-.375-CS i LINE¹ 2RHS-018-203-2 NTS: 100,69 LSD 2 ) na /na I ELB/PIPE IC-F-2 i na i VOL/uT6.O2 2RHS-66-20-SM011 i QISO 66-20 or DUG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-18-.375-CS I LINE¹ 2RHS-018-203-2 NTS: 100,101 ISD 2 i na /na I PENET 211/PIPE IB-J i na i VOL/UT6.02 2RHS-66-21-FM002 i QISO 66-21 or DUG¹ na in iB9.11 iID i SUR/PT3.00/MT4.00 (Sc8 ,
| |
| NMP2-20.1.031-CS LINE¹ 2RHS-020-114-1 NTS: 26,29 iTEV PIPE/*MOV113 IB-J i na t voL/UT6.02 2RHS-66-21-FM003 i QISO 66-21 or DMG¹ na in i89.11 inone i SUR/P'13.00/MT4.00 i NHP2-20-1.031-CS I LINE¹ 2RHS-020-114-1 NTS: 26,27 INS / na /na I I
| |
| *MOV113/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66 FM004 i QISO 66-21 or DMG¹ na in (C5.51 inone i SUR/PT3.00/Ml'4.00 i NMP2-20-.500.CS I LINE¹ 2RHS-020 64-2 NTS: 27,76 ISD 2 i na /na I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I I 2RHS-66-21-FM007 i QISO 66-21 or DMG¹ na in iC5.51 IID I SUR/PT3.00/MT4.00 I I I LINE¹ 2RHS-020-64-2 NTS: 76,77 NMP2-20..500.CS ISD 2 Sc11 I RED/PIPE )C-F-2 J na i VOL/uT6.O2 2RHS-66-21-FM008 I QISO 66 21 or DUG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-18-.375-CS i LINE¹ 2RHS-018-203-2 NTS: 109,72 LSD 2 i na /na I RED/PIPE ic-F-2 i na i VOL/uT6.O2 2RNS-66-21-FM009 i QISO 66-21 or DMG¹ na in iC5.51 inone i SUR/PT3.00/MT4.00 i NMP2-18-.375-CS LINE¹ 2RHS-018-65-2 HTS: 109,72 LSD 2 i na /na
| |
| | |
| NIAGARA NONAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 61 of 135 NHP2-ISI-006, REV. 1, CH.OOO SECOHD TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED DESCRIPTIOH OF ITEH TO BE EXAHIHED)CATGRY IGSCC) EX1/NDE PROCEDURE (PERIOD 1 REMARKS
| |
| ( (
| |
| EXAHINATION IDENTIFIER f Il'S ISO LOCATOR, COHPOHENI'MG ¹, )ITEN ¹ )FREOYJ EX2/NDE PROCEDURE )PERIOD 2 USE CAL BLK ¹ I LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I PIPE/PIPE IC-F-2 ( na [ VOL/UT6.02 2RHS-66 FM010 (
| |
| QISO 66-21 or DMG¹ na in )C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-18-.375-CS J LINE¹ 2RNS-018-65.2 NTS: 72 ]none 2 I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2RHS-66 FM012 i QISO 66-21 or DMG¹ na in [C5.51 ]none [ SUR/PT3.00/HT4.00 [
| |
| NHP2-18-.375.CS I LINE¹ 2RHS-018-65-2 NTS: 72(110 I TE 2 / na /na I PIPE/ELB IC-F-2 ) na )
| |
| VOL/UT6.02 2RHS-66 FM013 i QISO 66-21 or DMG¹ na in /C5.51 Inone I SUR/PT3 00/HT4 00 I NHP2-18-.375-CS ) LINE¹ 2RHS-018-65-2 HTS: 72,110 (SD I 2 I na/n I I
| |
| PIPE/*V57 IC-F-2 ] na [ VOL/UT6.02 2RHS-66-21-FM014 i QISO 66-21 or OMG¹ na in )C5.51 (none )
| |
| SUR/PT3.00/HT4.00 )
| |
| NMP2.18-.375-CS i LINE¹ 2RHS-018.67-2 HTS: 72,84 LSD 2 (
| |
| na /na I PIPE/PIPE IC-F-2 [ na I VOL/UT6.02 I 2RHS-66 FM015 i QISO 66-21 or DMG¹ na in [C5.51 ]none f SUR/PT3.00/HT4.00 f NKP2-18-.375-CS I LIHE¹ 2RHS-018-65-2 NTS: 72 Inone 2 )
| |
| na /na I ELB/PIPE IC-F-2 ] na ] VOL/UT6.02 2RHS-66 FM017 [ QISO 66-21 or DMG¹ na .in ]C5.51 Inone I SUR/PT3 00/HT4 0 I NHP2-18-.375-CS I LINE¹ 2RHS-018-65-2 HTS: 72,110 ISD 2 f na/na
| |
| [ PIPE/ELB IC-F-2 [ na f VOL/UT6.02 2RHS-66 FM018 i QISO 66-21 or DMG¹ na in JC5.51 ]none J SUR/PT3.00/HT4.00 /
| |
| NHP2-18-.375-CS i LIHE¹ 2RHS.018-65-2 HTS: 72, 110 LSD I 2 Ina/n I I ELB/PIPE iC-F-2 I na I VOL/UT6.02 I 2RHS-66-21-FM019 )
| |
| QISO 66-21 or DMG¹ na in [C5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18..375-CS I LINE¹ 2RHS-018-67-2 HTS: 72,110 ISD 2 f na /na I PIPE/PIPE IC-F-2 ( na (
| |
| VOL/UT6.02 2RHS-66-21-FM020 (
| |
| QISO 66-21 or D'MG¹ na in [C5.51 ]none J SUR/PT3.00/HT4.00 J NHP2-20-.500-CS LINE¹ 2RHS-020-64-2 NTS: 76 (none 2 ] na/na
| |
| | |
| NIAGARA NOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UHIT 2 62 of 135 NHP2-ISI-006( REV. 1, CH.OOO SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEN (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 REMARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR, CONPOHEHT DMG ¹, IITEN ¹ IFREOYI EX2/HDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LIHE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I PIPE/ELB Ic-F-2 I na I VOL/UT6.02 2RHS-66 FM022 I QISO 66-21 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/NT4.00 I NHP2 ~ 500-CS LINE¹ 2RHS-020.64.2 NTS'6i?7 I SD I 2 I na/na I I PIPE/PIPE IC-F-2 I na I VOL/UT6.02 2RHS-66-21-FM028 I QISO 66-21 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.375-CS I LINE¹ 2RHS-018-65-2 NTS: 72 lnone 2 I na /na I PIPE/MHF IC-F-2 I na I VOL/UT6.02 2RHS-66-21-FM029 I QISO 66-21 or DUG¹ na in IC5.51 lnone I SUR/PT3.00/NT4.00 I HHP2-18-.375-CS I LINE¹ 2RHS-018-65-2 HTS: 72,71 ISD 2 I na /na I I PIPE/PIPE IC-F.2 I na I VOL/UT6.02 2RHS-66 FM031 I QISO 66.21 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/NT4.00 I HHP2-20-.500-CS I LINE¹ 2RHS-020-64-2 NTS: 76 lnone 2 I na/na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66-21-SM004 I QISO 66-21 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/NT4.00 I NHP2-20-.500-CS LINE¹ 2RHS-020.64-2 NTS: 76,77 ISD I 2 I na /na I I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I I 2RHS-66-21-SM007 I QISO 66 21 or DUG¹ na ,in IC5.51 lnone I SUR/PT3.00/HT4.00 I I NHP2-20..500-CS LINE¹ 2RHS-020 64-2 NTS: 76,77 ISD 2 I na /na I I PIPE/TEE IC-F-2 I na I VOL/UT6.02 2RHS-66-21-SM008 I QISO 66-21 or DUG¹ na in IC5.51 lnone I SUR/PT3.00/Hl'4.00 I NHP2-20-.500-CS I LINE¹ 2RHS-020.64-2 NTS: 76,108 ISD I 2 I na /na I I PIPE/TEE IC-F-2 I na I VOL/UT6.02 2RHS-66-21-SM009 I QISO 66-21 or DMG¹ na in IC5.51 IID I SUR/PT3.00/HT4.00 I HHP2-18-.375-CS I LINE¹ 2RHS.018-203-2 NTS: 72,107 ISD 2 I na /na I Sc11 I TEE/RED IC-F-2 I na I VOL/UT6.02 2RHS-66-21-SM010 QISO 66-21 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/NT4.00 I NHP2 F 500-CS I LINE¹ 2RHS-020 234-2 NTS 108i109 I 2 I na /na
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - - NILE POINT NUCLEAR STATION - UNIT 2 63 of 135 HHP2-ISI-006, REV. 1, CH-OOO SECOHD TEH YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIDH OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I REMARKS EXAMINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG ¹, ) ITEN ¹ )FREOYJ EX2/HDE PROCEDURE )PERIOD 2 f USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE (SELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I TEE/RED IC-F-2 f na )
| |
| VOI./UT6.02 2RHS-66-21-SM011 i QISO 66-21 or DMG¹ na in (C5.51 Inone I SUR/PT3.00/NT4.00 I NHP2-20..500-CS )
| |
| LINE¹ 2RHS.020-234-2 NTS: 108 109 I 2 / na /na I I PIPE/ELB IC-F-2 f na f VOL/UT6.02 2R H S.66 SI$ 12 i QISO 66-21 or DMG¹ na in ]C5.51 ]none f SUR/PT3.00/NT4 F 00 f HHP2-18-.375-CS I LINE¹ 2RHS-018-65.2 HTS: 72,110 ISO 2 J na /na I ELB/PIPE IC-F'-2 ] na )
| |
| VOL/UT6.02 2RHS-66-21-SM014 / QISO 66-21 . or DMG¹ na in /C5.51 ]none (
| |
| SUR/PT3.00/HT4.00 J NHP2-18-.375-CS I LINE¹ 2RHS-018-65-2 HTS 72 110 ISD 2 f na /na I I ELB/PIPE IC-F-2 / na / VOL/UT6.02 2RHS-66-21-Sl$ 15 i QISO 66.21 or DMG¹ na in /C5.51 /none / SUR/PT3.00/HT4.00 [
| |
| NNP2-18-.375-CS I LINE¹ 2RHS-018-65-2 HTS: 72, 110 ISD I 2 I na /na I I ELB/TEE IC-F-2 I na I >>L/UT6.02 I Sc7 2RHS-66-21-SW016 [ QISO 66-21 or DWG¹ na in ]C5.51 IID I SUR/PT3.00/HT4.00 I NNP2-18..375-CS i LINE¹ 2RHS-018-65-2 NTS: 110,106 LSD 2 / na /na I I TEE/PIPE IC-F-2 (
| |
| na J VOL/UI'6.02 2RHS-66-21-SWOT 7 i QISO 66-21 or DMG¹ na .in /C5 ~ 51 [none ] SUR/PT3.00/NT4.00 J NHP2-'18-.375-CS I LINE¹ 2RHS-018-67-2 NTS: 72,106 ISO 2 f na /na I I PIPE/ELB IC-F-2 ] na (
| |
| VOL/UT6.02 2RHS-66-21-Sl$ 18 i QISO 66-21 or DMG¹ na in JC5.51 Inone I SUR/PT3.00/NT4.00 I NNP2-18-.375-CS )
| |
| LINE¹ 2RHS-018.67-2 NTS: 72,110 (SD i 2 i na /na I I TEE/PIPE IC-F-2 [ na [ VOL/UT6.02 2RHS-66-21-SW021 i QISO 66-21 or DUG¹ na in [C5.51 ]none J SUR/PT3.00/HT4.00 J NHP2-18-.375-CS I LINE¹ 2RHS-018.65-2 HTS: 72,106 ISD J 2 )
| |
| na /na i PIPE/PIPE IC-F-2 )
| |
| na [ VOL/UT6.02 2RHS-66.21-SM022 i QISO 66-21 or DMG¹ na in [C5.51 ]none [ SUR/PT3.00/NT4 F 00 f NHP2-18-.375-CS LINE¹ 2RHS-018-65-2 HTS: 72 )none 2 / na /na
| |
| | |
| HIAGARA MOHAWK POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 64 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHIHEDICATGRY I IGSCCI EXl/HDE PROCEDURE IPERIOO 1 REMARKS EXAMINATION IDEHTIFIER I ITS ISO LOCATORi COMPONEHT DMG ¹i IITEH ¹ IFREQYI EX2/NDE PROCEDURE IPERIOD 2 USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I ELB/PIPE IC-F-2 I na I VOL/UT6.02 I 2RHS-66 FM004 I QISO 66-22 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NMP2-24-.500-CS I LINE¹ 2RHS 024 42 NTS'2 65 I 2 I na /na I I
| |
| *V57/PIPE IC-F-2 I na I VOL/UT6.02 2RHS-66-22-FM005 QISO 66-22 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NMP2-18-.375-CS I LIHE¹ 2RHS-018-67-2 NTS: 84,72 ISD I 2 I na /na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2RHS-66-22-FM006 I QISO 66-22 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/MT4.00 I NMP2-24-.500-CS I LINE¹ 2RHS-024-42-2 NTS: 62,65 ISD 2 I na /na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2RHS-66-22-FW007 I QISO 66-22 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-24-.500-CS I LINE¹ 2RHS-024-42-2 NTS: 62,65 ISD 2 I na/na I PIPE/~V378 IC-F-1 I na VOL/UT6.13 I 2RHS-66-22-FM009 I QISO 66-22 or DMG¹ na in IC5.11 IID SUR/PT3.00 Sc9 NMP2-24-.500-SS I LINE¹ 2RHS-024-169-2 NTS: 112,58 I7.5XMinI 2 na / I I PIPE/TEE IC-F-2 I na I VOL/UT6.02 2RHS-66-22-FM010 I QISO 66-22 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/MT4.00 I NMP2-24-.500-CS I LINE¹ 2RHS-024-42-2 NTS: 62 ~ 73 ISD 2 I na /na I TEE/PIPE IC-F.2 I na I VOL/UT6.02 2RHS-66-22-FM011 I QISO 66-22 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/MT4.00 I NMP2-24-.500.CS I LINE¹ 2RHS-024-42-2 NTS: 62,73 ISD 2 I na /na I PIPE/PIPE Ic-F-1 I na I VOL/UT6.03 Sc7 2RMS-66 FM012 I QISO 66-22 or DMG¹ na in IC5.11 IID SUR/PT3.00 I NMP2-24-.500-SS I LINE¹ 2RHS-024-334-2 NTS: 108,112 I7.5XMInl 2 I na / I I PIPE/ELB Ic-F-2 I na I VOL/UT6.02 2RHS-66-22-FM013 I QISO 66-22 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/MT4.00 I NHP2-24-.500.CS LINE¹ 2RHS-024-42-2 NTS: 62,65 ISD 2 I na/na
| |
| | |
| NIAGARA HONAWK POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 65 oE 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD IH'IVL REL REQ ) DESCRIPTION OF ITEN TO BE EXAHINEDiCATGRY iIGSCCi EXI/HDE PROCEDURE lPERIOD 1 REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONEHT DMG ¹, )
| |
| ITEN ¹ iFREOYi EX2/HDE PROCEDURE iPERIOO 2 )
| |
| USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSi EX3/NDE PROCEDURE iPERIOO 3 j I ELB/PIPE iC-F-2 i na J VOL/UT6.02 iEX6 2RNS-66-22-FI$ 14 i QISO 66-22 or DWG¹ na in JC5.51 iID i SUR/PT3.00/HI'4.00 i NHP2-24-.500-CS i LINE¹ 2RHS-024-42.2 HTS: 62,65 LSD j 2 i na /na I WNF/PIPE iC-F-2 i na i VOL/UT6.02 2RHS-66-22-FI$ 15 i QISO 66-22 or DWG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i HHP2 ~ 500-CS i LINE¹ 2RHS-024-42-2 NTS: 61,62 ISD I 2 I na /na I I PIPE/TEE iC-F-2 i na i VOL/UT6.02 I 2RHS.66-22-FWOI7 QISO 66-22 or DWG¹ na in PCS.SI inone i SUR/PT3.00/HT4.00 i NHP2-18-.375-CS i LINE¹ 2RHS-018.67-2 NTS: 67,72 LSD i 2 i na /na INC-5 i MHF/PIPE ic-F-I i na i VOL/UT6.03 I 2RNS-66-22-FW019 QISO 66-22 or DWG¹ na in IC5.11 I ID I .SUR/PT3.00 [Sc8 NHP2-24..500-SS i LINE¹ 2RHS-024-334-2 NTS: 50,112 i7.5XHinJ 2 J na / I IWC-2r1 PIPE/ELB IC-F-I I na I VOL/UT6.03 i inacc 2RHS-66-22-FI$ 21 QISO 66-22 or DMG¹ na in LC5.11 ERR i SUR/PT3.00 j NHP2-24-.500-SS LINE¹ 2RHS-024-41-2 HTS: 112,54 )Handatei 2 i na / I IWC-2r1 i WHF/PIPE IC F 1 I na I VOL/UT6 03 i lnacc 2RHS-66-22.FI$ 22 i QISO 66-22 or DMG¹ na In iC5.11 ERR i SUR/PT3.00 I NHP2-24-.500-SS )
| |
| LINE¹ 2RHS-024-41-2 NTS: 50,108 iHandatei 2 i na / I IWC-2r1 I ELB/PENET ZSC iC-F-1 i na i VOL/UT6.03 ilnacc 2RHS-66-22-FI$ 23 ) QISO 66-22 or DWG¹ na in iC5.11 ERR ) SUR/PT3.00 I NHP2-24-.500-SS LINE¹ 2RHS-024-41-2 NTS: 54,55 )Handatei 2 i na / l I ELB/PIPE iC-F-2 i na J VOL/UT6.02 2RHS.66-22-FM025 ) QISO 66-22 or DMG¹ na in PCS.SI )none i SUR/PT3.00/HT4.00 J NHP2-24-.500-CS i LINE¹ 2RHS-024-42-2 NTS: 62,65 JSD i 2 J na /na I PENET ZSC/PIPE IC-F-1 I na I VOL/UT6.03 I.
| |
| 2RHS.66-22.FI$ 27 i QISO 66-22 or DWG¹ na in iC5.11 iID i SUR/PT3.00 Sc9 NHP2-24-.500-SS i LIHE¹ 2RHS-024-169-2 NTS: 112,55 i7.5XHini 2 i na / I
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 66 of 135 HHP2-ISI-006, REV. 1, CH-000 SECOHD TEN YEAR IHSERVICE INSPECTIOH (ISI) INTERVAL PLAN Change date: 07/29/1999 APPEHDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOD 1 REHARKS EXAHIHATION IDENTIFIER ITS ISO LOCATOR, CONPONEHT DMG ¹, (ITEN ¹ JFREOYJ EX2/HDE PROCEDURE [PERIOD 2 USE CAL BLK ¹ I LINE HO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I IWC-2r1 I PIPE/PIPE JC-F-I J na J VOL/UT6.03 flnacc 2RHS-66.22-FW029 (
| |
| QISO 66-22 or DMG¹ na in JC5.11 JRR J SUR/PT3.00 I HHP2-24-.500-SS J LINE¹ 2RHS-024-41-2 NTS: 108,112 JNandateJ 2 J na / I I IHTEG ATT ic-c ] na f SUR/PT3.00/NT4.00 f 2RHS-66-22-FW303 (
| |
| QISO 66-22-2/3 or DWG¹ na in (C3.20 [ID f na /na I na i LINE¹ 2RHS-024-334-2 NTS: 112,56 iNS 2 f na /na I I IHTEG ATT ic-c I na I SUR/PT3.00/MT4.00 I 2RHS.66.22-FM304 / QISO 66-22-2/3 or DWG¹ na in /C3.20 [ID J na /na na I LINE¹ 2RHS-024-334-2 NTS: 112,56 INS 2 J na/na I IMC-3 I IHTEG ATT )c-c (
| |
| na ) SUR/(inaccessible)(lnacc 2RHS-66-22-FW310 (
| |
| QISO 66-22-21 or DWG¹ na in (C3.20 ERR ) na /na I LINE¹ 2RHS-024-41-2 N'IS: 108,52 iNS 2 / na/na I I WC-3 I INTEG ATT (c-c [ na ( SUR/(inaccessible)[lnacc 2RHS-66-22-FW311 / QISO 66-22-21 or DMG¹ na in /C3.20 ERR J na /na I I LINE¹ 2RHS-024-41-2 HTS: 108,52 INS 2 / na/na I I INTEG ATT ic-c f na f SUR/PT3.00/NT4.00 [
| |
| 2RHS-66-22-FW3X7 / QISO 66-22-17 or DWG¹ na .in /C3.20 /ID / na /na i LINE¹ 2RHS-024-42-2 HTS: 62,114 FANS 2 / na/na I INTEG ATT ic-c I na I SUR/PT3.00/NT4.00 I 2RHS-66-22-FM3XB / QISO 66-22-17 or DWG¹ na in /C3.20 /ID / na /na
| |
| / LINE¹ 2RHS-024-42-2 HTS: 62,114 iHS 2 / na/na I
| |
| / LM IC-F-1 / na / VOL/UT6.03 flnacc 2RHS-66-22-LWOI [ QISO 66-22 or DMG¹ na in )C5.12 IRR I SUR/PT3.00 I NHP2-24-.500.SS i LINE¹ 2RHS.024-41-2 NTS: 108 JNS 2 /na/ I
| |
| / LW IC-F-1 )
| |
| na ( VOL/UT6.03 flnacc 2RHS.66-22-LW02 ] QISO 66-22 or DWG¹ na in (C5.12 IRR I SUR/PT3.00 I NHP2-24-.500-SS I LINE¹ 2RHS.024-41-2 NTS: 112 IHS 2 (na/ I
| |
| | |
| NIAGARA MOHAMK POMER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 67 of 135 NMP2-1SI-006, REV. 1, CH-000 SECOND TEN TEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEM (sorted by Examination Identifier)
| |
| ND IHTVL REL RE4 DESCRIPTION OF ITEM TO BE EXAMIHEDICATGRY I IGSCCI EX1/NDE PROCEDURE IPERIOD 1 REMARKS I
| |
| EXAMINATION IDENTIFIER I ITS ISO LOCATOR, COMPONENT DMG ¹, I ITEM ¹ IFREOYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I LM IR IC-F-1 I na I VOL/UT6.03 Ilnacc 2RHS-66-22-LM03 I QISO 66-22 or DMG¹ na in IC5.12 IRR I SUR/PT3.00 I NHP2-24-.500-SS I LINE¹ 2RHS-024-41-2 NTS: 54 INS 2 Ina/ I I LM OR IC-F-1 I na I VOL/UT6.03 I lnacc 2RHS.66-22-LM04 I QISO 66-22 or DMG¹ na in IC5.12 IRR I SUR/PT3.00 I HMP2-24-.500.SS I LIHE¹ 2RHS-024-41-2 NTS: 54 INS 2 Ina/ I I LM assoc v/f423 8 FI$ 27 IC-F-1 I na I VOL/UT6.03 I 2RHS-66-22-LM05 QISO 66-22 or DMG¹ na in IC5.12 IID SUR/PT3.00 Sc9 NMP2-24-.500-SS I
| |
| I LINE 2RHS 41 NTS'AL 2 I
| |
| Ina/ I I LM assoc w/FM027 8 Fl$ 09 IC-F-1 I na I VOL/UT6.03 I 2RHS-66-22 LM06 I QISO 66-22 or DMG¹ na in IC5.12 IID I SUR/PT3.00 Sc9 NMP2-24-.500-SS I LINE¹ 2RHS-024-169-2 NTS: 112 IAL 2 Ina/ I I LM assoc M/FM019 8 Fl$ 12 IC-F-1 I na I VOL/UT6.03 I 2RHS-66-22-LM07 I QISO 66-22 or DMG¹ na in IC5.12 IID I SUR/PT3.00 ISc8 NHP2-24-.500-SS I LIHE¹ 2RHS-024-334-2 HTS: 112 IAL 2 Ina/ I LM assoc w/FM012 IC-F-1 I na I VOL/UT6.03 Sc7 I
| |
| 2RHS.66-22 LM08 I QISO 66-22 or DMG¹ na jn IC5.12 I ID I SUR/PT3.00 I NMP2-24-.500-SS I LINE¹ 2RHS-024-334-2 HTS: 112 IAL I 2 I na/ I I
| |
| PIPE/ELB IC-F-2 I na I VOL/UT6.02 2RHS.66.22-SM003 I QISO 66-22 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/MT4.00 I NMP2-24-.500-CS I LIHE¹ 2RHS-024.42-2 NTS: 62,65 ISD 2 I na /na I I PIPE/TEE IC-F-2 I na I VOL/UT6.02 2RHS.66-22-Sl$ 08 I QISO 66-22 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/MT4.00 I NMP2-24-.500-CS I LINE¹ 2RHS-024-42-2 NTS: 62,67 ISD 2 I na /na I TEE/PIPE IC-F-2 I na I VOL/UT6.02 2RHS-66-22-SM009 I QISO 66-22 or OMG¹ na in IC5.51 Inone I SUR/PT3.00/MT4.00 I NMP2-24-.500-CS LINE¹ 2RHS-024-42-2 HTS: 62,67 ISD I 2 I na /na I
| |
| | |
| NIAGARA HOHAWK POWER CORPORATION - N ILE POINT NUCLEAR STATION - UNIT 2 68 of 135 NHP2-ISI-006, REV. 1 ~ CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 I REMARKS EXAHIHATION IDENTIFIER I ITS ISO LOCATOR'OHPONENT DWG ¹, IITEH ¹ IFREOYI EX2/NDE PROCEDURE IPERIOO 2 i USE CAL BLK ¹ i LIHE NO. AND NOTES, AS APPLICABLE [SELECT iCLASSi EX3/HDE PROCEDURE )PERIOD 3 i I ELB/PIPE IC-F-2 ] na [ VOL/UT6.02 2RHS.66-22-SW011 i QISO 66-22 or DWG¹ na in (C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-24-.500.CS LINE¹ 2RHS-024-42-2 NTS: 62,65 LSD I 2 I na /na I PIPE/ELB IC-F-2 / na / VOL/UT6.02 2RHS-66-22-Sl$ 12 i QISO 66-22 or OWG¹ na in [C5.51 /none / SUR/PT3.00/HT4.00 /
| |
| NHP2-24-.500-CS I LIHE¹ 2RHS-024-42-2 NTS: 62,65 ISO 2 ( na /na I ELB/PIPE IC-F-2 ( na f VOL/UT6.02 2RHS.66-22.$ 013 )
| |
| QISO 66-22 or OWG¹ na in JC5.51 (none f SUR/PT3.00/HT4.00 f NHP2-24-.500-CS I LINE¹ 2RHS-024-42-2 NTS: 62,65 ISO 2 / na /na I I ELB/PIPE IC-F-2 )
| |
| na [ VOL/UT6.02 2RHS-66-22-SM014 i QISO 66-22 or DWG¹ na in JC5.51 ]none f SUR/PT3.00/HT4.00 J NHP2.24-.500-CS i LINE¹ 2RHS.024.42-2 NTS: 62,65 LSD 2 ( na /na PIPE/ELB C- F-2 [ na VOL/UT6.02 I / [
| |
| 2RHS-66-22-SW017 I QISO 66 22 or DWG¹ na in ]C5.51 )ID i SUR/PT3.00/HT4.00 i Sc9 NHP2-24-.500-CS I LINE¹ 2RHS-024.42-2 NTS: 62,65 ISD 2 / na /na I ELB/PIPE IC-F-2 ) na ( VOL/UT6.02 2RHS-66-22-Sl$ 19 i QISO 66-22 or DWG¹ na in )C5.51 ]none f SUR/PT3.00/HT4.00 [
| |
| NHP2-24-.500-CS )
| |
| LINE¹ 2RHS.024-42-2 NTS: 62,65 (SD 2 / na /na I PIPE/WNF IC F 2 f na J VOL/UT6.02 2RHS.66.22-SW021 i QISO 66-22 or OWG¹ na in [C5.51 (none f SUR/PT3.00/HT4.00 /
| |
| NHP2.24-.500-CS I LINE¹ 2RHS-024.42.2 NTS: 61,62 ISO 2 / na /na I PIPE/ELB IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RHS-66-22-SM023 ) QISO 66-22 or DWG¹ na in [C5.5'l ]none f SUR/PT3.00/HT4.00 f NHP2-24-.500-CS i LIHE¹ 2RHS-024-42-2 Nl'S: 62,65 LSD 2 / na /na IMC-3 I IHTEG ATT PEHET ZSC SHOPWELD IC-C (
| |
| na f SUR/(inaccessible)(inacc 2RHS-66-22-SW301 i QISO 66-22 or DWG¹ na in JC3.20 ERR / na /na I LINE¹ 2RHS-024-41-2 NTS: 55,56 iNS I 2 I na /na I
| |
| | |
| NIAGARA NOHAMX POWER CORPORATION - ILE POINT NUCLEAR STATION - UNIT 2 69 of 135 KHP2-ISI-006, REV. 1, CH-000 SECOHD TEN YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REO DESCRIPTION OF ITEN TO BE EXANIKED(CATGRY (IGSCC( EXI/KDE PROCEDURE (PERIOD 1 REHARKS
| |
| (
| |
| EXAMINATION IDENTIFIER (
| |
| ITS ISO LOCATOR, COHPOHEHT DMG ¹, (ITEM ¹ (FREQY( EX2/HDE PROCEDURE (PERIOD 2 (
| |
| USE CAL BLK ¹ I LINE KO AKD NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I INTEG ATT PENET 25C SHOPMELD (C-C (
| |
| na (
| |
| SUR/PT3.00/HT4.00 (
| |
| Sc7
| |
| (
| |
| 2RNS-66-22-SW302 (
| |
| QISO 66-22 - or DMG¹ na in (C3.20 (ID (
| |
| na /na
| |
| (
| |
| LINE¹ 2RKS-024-41-2 NTS: 55,57 (Nandate( 2 ( na /na I I PEHET Z5B/PIPE (C-F-I ( na VOL/UT6.03 I I 2RHS-66-23-FW002 (
| |
| QISO 66-23 or DMG¹ na in (C5.11 (ID SUR/PT3.00 I I NNP2-24-.500-SS (
| |
| LIHE¹ 2RKS-024-167-2 NTS: 53,55 (7.5XHin( 2 na / Sc11 (
| |
| I PIPE/ELB IC-F-2 ( na (
| |
| VOL/UT6.02 2RKS-66-23-FM005 (
| |
| QISO 66-23 or DWG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| HKP2.24-.500-CS LINE¹ 2RKS-024-22-2 NTS: 62,65 ISO 2 (
| |
| na /na I I
| |
| I ELB/PIPE (C-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RHS-66 23-FW006 I QISO 66-2 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| HKP2-24-.500-CS LIKE¹ 2RNS-024-22 2 NTS: 62,65 (SD 2 ( na/na I I ELB/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 (
| |
| Sc7 2RHS-66-23-FW007 (
| |
| QISO 66-23 or D'MG¹ na in (C5.51 IID I SUR/PT3.00/MT4.00 I NHP2-24-.500-CS (
| |
| LINE¹ 2RHS-024-22-2 HTS: 62,65 (SD 2 (
| |
| na /na (
| |
| STR1B/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RKS-66.23-FM009 ( QISO 66-23 or DMG¹ na ,in (C5.51 (none I SUR/PT3-00/HT4 00 I NNP2-24-.500-CS I LINE¹ 2RKS-024-22-2 NTS: 62,73 (SD 2 ( na /na I PIPE/*STRTI 0 (C-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RKS-66 FM010 ( QISO 66-23 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NKP2-24-.500-CS (
| |
| LINE¹ 2RKS-024-22-2 HTS: 62,73 (SD 2 ( na /na I I PIPE/PIPE IC-F-2 (
| |
| na (
| |
| VOL/UT6.02 2RKS-66-23-FM011 I QISO 66 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/HT4.00 (
| |
| NKP2-24-.500-CS ( LINE¹ 2RKS-024-332-2 HTS: 62 (none (
| |
| 2 I na I I TEE/PIPE IC-F-2 ( na (
| |
| VOL/UT6.02 2RKS-66-23-FW012 (
| |
| QISO 66-23 or DMG¹ na in (C5.51 (none (
| |
| SUR/PT3.00/NT4.00 (
| |
| NMP2-24-.500-CS LINE¹ 2RKS-024-22-2 NTS: 62,67 (SD 2 (
| |
| na /na
| |
| | |
| NIAGARA HONAMK POWER CORPORATION - NILE POINT NUCLEAR STATION - UNIT 2 70 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE iPERIOO 1 REHARKS EXAMINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG ¹, [ ITEH ¹ )FREOYJ EX2/NDE PROCEDURE ]PERIOD 2 ]
| |
| USE CAL BLK ¹ i LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I MNF/PIPE JC-F-2 )
| |
| na ) VOL/UT6.02 2RHS.66-23-FM013 f QISO 66-23 or DUG¹ na in [C5.51 ]none f SUR/PT3.00/HT4.00 f NHP2-24-.500-CS I LINE¹ 2RNS-024-22-2 NTS: 61,62 ISD I 2 I na /na I I ELB/PIPE ]C-F-2 J na f VOL/UT6.02 2RHS-66-23-FM014 (
| |
| QISO 66-23 or DMG¹ na in JC5.51 /none f SUR/PT3.00/HT4.00 [
| |
| NHP2-24-.500.CS f LINE¹ 2RHS-024-332-2 NTS: 62,65 JSD f 2 f na /na PIPE/*V377 ]C-F-1 J na J VOL/UT6.13 I I 2RHS.66-23-FM017 QI SO 66.23 or DWG¹ na in IC5.11 IID I SUR/PT3.00 I I NHP2-24-.500-SS LINE¹ 2RHS-024-167-2 NTS: 53,58 (7.5XHinf 2 f na / Sc11 (
| |
| I'MC-2r1 I WNF/PIPE /C-F-I ] na / VOL/UT6.03 J Inacc 2RHS-66-23-FM018 QISO 66.23 or DMG¹ na in /C5.'ll /RR / SUR/PT3.00 I NHP2-24-.500-SS [ LINE¹ 2RHS.024-21-2 Nl'S: 50,115 /Handate) 2 / na / I IWC-2r1 I PIPE/ELB IC-F-1 I na I VOL/UT6.03 /Inacc 2RHS.66-23-FM019 i QISO 66-23 or DMG¹ na in JC5.11 [RR f SUR/P'T3.00 I NHP2-24-.500.SS / LINE¹ 2RHS-024-21-2 NTS: 53,54 /Handatef 2 J na / I IWC-2r1 I ELB/PENET 25B IC-F-1 I na I VOL/UT6.03 ) Inacc 2RHS-66-23-FM020 f QISO 66-23 or DUG¹ na .in JCS ~ 11 ERR f SUR/PT3.00 I NHP2-24-.500-SS / LINE¹ 2RNS-024-21-2 NTS: 54,55 JHandate/ 2 f na / I IMC-2r1 I PIPE/PIPE JC-F-1 (
| |
| na J VOL/UT6.03 flnacc 2RHS.66-23-FM022 i QISO 66-23 or DMG¹ na in [C5.11 JRR )
| |
| SUR/PT3 F 00 I NHP2 ~ 500-SS / LIHE¹ 2RHS-024-21-2 NTS: 115,53 (Mandate] 2 f na / I I PIPE/PIPE IC-F-I I na I VOL/UT6.03 I I 2RHS.66-23-FM024 f QISO 66-23 or DWG¹ na in JC5.11 ]ID f SUR/PT3.00 I I NHP2-24-.500-SS f LINE¹ 2RNS-024-167-2 NTS: 53 J7.5XHinf 2 f na / Sc11 P IPE/*HOV1B (C-F-2 f na / VOL/UT6.02 2RHS-66-23-FM025 I QISO 66 23 or DWG¹ na in (C5.51 ]none ) SUR/PT3.00/HT4.00 f NHP2-24-.500-CS LINE¹ 2RHS-024-332-2 NTS: 62,58 JSD J 2 ( na /na
| |
| | |
| 0 NIAGARA HOHAMX POMER CORPORATION - H ILE POINT NUCLEAR STATION - UNIT 2 71 of 135 NHP2-ISI-006, REV. 1, CH-000 SECOND TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE iPERIOD 1 I REHARKS EXAHIHATION IDENTIFIER J ITS ISO LOCATOR, COHPONENT O'MG ¹, J ITEM ¹ [FREOY[ EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK ¹ I LINE KO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERICO 3 I INTEG ATT: 1.781" thick trunnion ]C-C ] na )
| |
| SUR/PT3.00/NT4.00 f 2RHS-66-23-FM307 QISO 66-23-16 or DMG¹ na in JC3.20 )ID f na /na JSc8 LINE¹ 2RHS-024-22-2 NTS: 62,111 [Mandate] 2 J na /na I INTEG ATT: 1.781" thick trunnion (C-C )
| |
| na [ SUR/PT3.00/NT4.00 [
| |
| 2RHS-66-23-FM308 QISO 66-23-16 or DMG¹ na in JC3.20 ]ID / na /na /Sc8 LINE¹ 2RHS-024-22-2 NTS: 62,111 JHandate/ 2 / na /na I IMC-3 I IHTEG ATT )c-c [ na [ SUR/(inaccessib(e) ] lnacc 2RHS-66-23-FM313 f QISO 66-23-23 or DMG¹ na in (C3.20 (RR ] na /na I na I LINE¹ 2RHS.024-2'I-2 NTS: 115,52 INS 2 / na/na I I'MC-3 INTEG ATT )c-c ) na (
| |
| SUR/(inaccessible))lnacc 2RHS-66-23-FM314 QISO 66-23-23 or DMG¹ na in )C3.20 /RR f na /na I na LINE¹ 2RHS-024-21-2 HTS: 115,52 INS 2 / na /na I J
| |
| LM JC-F-I na J VOL/UT6.03 ( Inacc 2RHS-66-23-LM01 )
| |
| QISO 66-23 or DMG¹ na in ]CS.'l2 )RR [ SUR/PT3.00 I NHP2-24-.500-SS I LINE¹ 2RHS.024-21-2 NTS: 115 INS 2 /na/ I
| |
| / LM IC-F-1 I na I VOL/UT6.03 flnacc 2RHS-66-23-LM02 [ QISO 66-23 or DMG¹ na .in (C5.12 IRR I SUR/PT3.00 I NHP2-24-.500-SS I LINE¹ 2RHS-024-21-2 NTS: 53 INS 2 /na/ I I LM IR IC-F-1 I na I VOL/UT6.03 f inacc 2RHS-66.23-LM03 I Ql 6623 or DMG¹ na in JC5.12 IRR I SUR/PT3.00 I NHP2-24-.500-SS I LINE¹ 2RHS-024.21-2 HTS: 54 INS 2 /na/ I I LM OR IC-F-1 I na I VOL/UT6.03 Jlnacc 2RHS.66-23-LM04 Ql SO 66-23 or DMG¹ na in )C5.12 IRR I SUR/PT I NHP2-24-.500-SS LINE¹ 2RHS-024-21-2 NTS: 54 iNS 2 dna/ I LM assoc w/fw020 & FM002 iC-F-1 [ na [ VOL/UT6.03 Sc7 2RHS-66-23-LM05 QISO 66-23 or DMG¹ na in [C5.12 I ID SUR/PT3.00 NHP2-24-.500-SS LINE¹ 2RNS 024 21 2 NTS'AL 2 I
| |
| )na/
| |
| I I
| |
| | |
| NIAGARA HOHAWK POMER CORPORATION - HILE POINT HUCLEAR STATION - UNIT 2 72 of 135 NHP2-ISI-006( REV. 1, CH-000 SECOND TEH YEAR IHSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REO I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO 1 REHARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR, COHPOHEHT DMG ¹, IITEH ¹ IFREQYI EX2/HDE PROCEDURE IPERIOO 2 I USE CAL BLK ¹ I LINE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I LM assoc M/FM002 8 FM024 Ic-F-1 I na I VOL/UT6.03 I I 2RNS-66-23-LM06 I QISO 66-23 or DWG¹ na in IC5.12 IID I SUR/PT3.00 I I NHP2-24-.500-SS I LINE¹ 2RHS-024-167-2 HTS: 53 IAL 2 Ina/ Sc11 I LW assoc M/FW024 F. FM017 IC-F-1 I na I VOL/UT6.03 I I 2RHS-66-23-LM07 I QISO 66-23 or DMG¹ na in IC5.12 IID I SUR/PT3.00 I I NHP2-24-.500-SS I LINE¹ 2RNS.024-167-2 NTS: 53 IAL 2 Ina/ Sc11 I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2RHS-66-23-S'M006 I QISO 66.23 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-24-.500.CS I LINE¹ 2RHS-024-332.2 NTS: 62,65 ISD 2 I na /na I I ELB/PIPE IC-F-2 I na I voL/uT6.O2 2RHS.66.23-SM007 I QISO 66 or OMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-24-.500-CS I LINE¹ 2RHS-024-332.2 NTS: 62,65 ISD 2 I na /na I I PIPE/ELB IC-F-2 I na I voL/uT6.o2 2RHS-66-23-SM008 I QISO 66-23 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-24-.500-CS I LINE¹ 2RHS-024-332-2 NTS: 62,65 ISD 2 I na /na I PIPE/TEE IC-F-2 I na I voL/uT6.o2 2RHS.66-23-SM009 I QISO 66-23 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.OO I NHP2-24-.500-CS I LINE¹ 2RHS.024.22-2 NTS: 62,67 ISD 2 I na /na I PIPE/TEE IC-F-2 I na I VOL/U'I6.02 2RHS.66-23-SM010 I QISO 66-23 or DWG¹ na in IC5.5'I Inone I SUR/PT3.00/HT4.00 I NHP2-18-.375-CS I LINE¹ 2RHS.018.65-2 NTS: 67,72 ISD 2 I na /na I ELB/PIPE IC-F-2 I na I VOL/UT6.02 2RHS-66-23.SM011 I QISO 66-23 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.375-CS I LINE¹ 2RHS.018-65-2 NTS: 72,101 ISD 2 I na /na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 2RHS-66-23.SM012 I QISO 66-23 or DMG¹ na in IC5.51 Inone I SUR/PT3.00/HT4.00 I NHP2-18-.375-CS I LINE¹ 2RHS-018-65-2 NTS: 72,101 ISD 2 I na /na
| |
| | |
| V
| |
| ~
| |
| 'I <<4
| |
| >1g P I
| |
| sf<i /
| |
| | |
| NIAGARA HOHAMK POWER CORPORATION - ILE POIN'I NUCLEAR STATION - UNIT 2 73 of 135 NHP2-ISI-006( REV. 1, CH-000 SECOHD TEN YEAR INSERVICE INSPECTION (ISI) INTERVAL PLAN Change date: 07/29/1999 APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTION OF ITEH TO BE EXAHINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOO 1 REHARKS EXAHINATION IDENTIFIER I ITS ISO LOCATOR'OHPONENT DMG ¹( l ITEH ¹ IFREOYI EX2/HDE PROCEDURE iPERIOO 2 i USE CAL BLK ¹ I LINE No. AND NOTES, AS APPLICABLE ISELECT ICLAssl EX3/NDE PROCEDURE IPERIOD 3 I i MNF/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66-23-SW013 )
| |
| QISO 66-23 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 i NHP2-18-.375-CS i LINE¹ 2RHS-018-65-2 NTS: 69,72 LSD 2 i na /na I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2RHS-66-23-SW016 i aiso 66-23 or DMG¹ na in iC5.51 lnone I SUR/PT3.00/Hl'4.00 I NHP2-24-.500-CS i LIHE¹ 2RHS-024-22-2 NTS: 62(65 LSD I 2 I >>/na I I PIPE/ELB IC-F-2 I na I VOL/UT6.02 I 2RHS-66-23-SW017 i QISO 66-23 or DMG¹ na in iC5.51 lnone SUR/PT3 0 /HT4 00 I NHP2-24-.500-CS i LINE¹ 2RHS.024-22-2 NTS: 62,65 iso i 2 i>>/>>
| |
| I I PIPE/ELB IC-F-2 i na i VOL/UT6.02 i Sc7 2RHS-66-23-SM018 i QISO 66-23 or DMG¹ na in iC5.51 IID I SUR/PT3.00/HT4.00 I NHP2-24-.500-CS I LINE¹ 2RHS-024-22-2 NTS: 62,65 ISO 2 i na /na I PIPE/ELB IC-F-2 i na i VOL/UT6.02 2RHS-66.23-SW020 i QISO 66-23 or DMG¹ na in iC5.51 inone i SUR/PT3.00/MT4 F 00 )
| |
| NHP2-24-.500-CS i LINE¹ 2RHS-024-22-2 NTS: 62,65 iso 2 i-na /na I I ELB/PIPE IC-F-2 i na i VOL/UT6.02 2RHs-66-23-SM021 i QISO 66-23 or DMG¹ na .in iC5.51 inone i SUR/PT3.00/HT4.00 (
| |
| NHP2-24-.500.CS I LINE¹ 2RHS-024-22-2 NTS: 62,65 ISD 2 i na /na I ELB/PIPE IC-F.2 i na i VOL/UT6.02 2RHS.66-23-SM022 i QISO 66-23 or DMG¹ na in iC5.51 inone i SUR/PT3.00/HT4.00 [
| |
| NHP2-24-.500-CS I LINE¹ 2RHS-024-22-2 NTS: 62,65 ISD 2 J na /na I PIPE/ELB IC F 2 i na i VOL/UT6.02 2RHS-66-23-SM023 i also 66-23 or DMG¹ na in iC5.51 lnone i SUR/PT3.00/HT4.00 (
| |
| NHP2-24-.500-CS i LINE¹ 2RHS.024-22-2 NTS: 62,65 LSD 2 i na /na I PIPE/FLG IC-F-2 I na I VOL/UT6.02 I 2RHS-66-23-SM024 ( QISO 66-23 or DMG¹ na in JC5 ~ 51 inone i SUR/PT3.00/HT4.00 i NHP2.24-.500.CS I LINE¹ 2RHS-024-22-2 NTS: 61(62 I SD I 2 I >>/na I
| |
| | |
| 0 0}}
| |