ML18051A827: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (7 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML18051A827 | | number = ML18051A827 | ||
| issue date = 03/12/2018 | | issue date = 03/12/2018 | ||
| title = | | title = Attachment - Amendment 115 (LAR-17-029) | ||
| author name = | | author name = | ||
| author affiliation = NRC/NRO/DNRL | | author affiliation = NRC/NRO/DNRL | ||
| Line 14: | Line 14: | ||
| page count = 5 | | page count = 5 | ||
| project = EPID:L-2017-LLA-0094 | | project = EPID:L-2017-LLA-0094 | ||
| stage = Approval | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:ATTACHMENT TO LICENSE AMENDMENT NO. 115 | {{#Wiki_filter:ATTACHMENT TO LICENSE AMENDMENT NO. 115 TO FACILITY COMBINED LICENSE NO. NPF-91 DOCKET NO. 52-025 Replace the following pages of the Facility Combined License No. NPF-91 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. | ||
Facility Combined License No. NPF-91 REMOVE INSERT 7 | |||
7 Appendix A to Facility Combined License Nos. NPF-91 and NPF-92 REMOVE INSERT 3.4.9-1 3.4.9-1 3.4.9-2 3.4.9-2 3.4.9-3 3.4.9-3 | |||
}} | (7) Reporting Requirements (a) | ||
Within 30 days of a change to the initial test program described in FSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d). | |||
(b) | |||
SNC shall report any violation of a requirement in Section 2.D.(3), | |||
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73. | |||
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 115, are hereby incorporated into this license. | |||
(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g). | |||
(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones: | |||
(a) | |||
Environmental Qualification Program implemented before initial fuel load; (b) | |||
Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) | |||
Preservice Testing Program implemented before initial fuel load; (d) | |||
Containment Leakage Rate Testing Program implemented before initial fuel load; (e) | |||
Fire Protection Program | |||
: 1. | |||
The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7 | |||
Amendment No. 115 | |||
Technical Specifications RCS Leakage Detection Instrumentation 3.4.9 VEGP Units 3 and 4 3.4.9 - 1 Amendment No. 115 (Unit 3) | |||
Amendment No. 114 (Unit 4) 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 RCS Leakage Detection Instrumentation LCO 3.4.9 The following RCS leakage detection instrumentation shall be OPERABLE: | |||
: a. | |||
Two containment sump level channels; and | |||
: b. | |||
One containment atmosphere F18 particulate monitor. | |||
APPLICABILITY: | |||
MODES 1, 2, 3, and 4. | |||
- NOTES - | |||
: 1. | |||
The following RCS leakage detection instrumentation is not required to be OPERABLE provided SR 3.4.7.1 is performed once per 24 hours after 12 hours of steady state operation: | |||
: a. | |||
The required containment sump level channels when In-containment Refueling Water Storage Tank (IRWST) gutter drain isolation valves are closed and for 2 hours after reopening IRWST gutter drain isolation valves; and | |||
: b. | |||
The containment atmosphere F18 particulate monitor and required containment sump level channels when containment purge flow path is open and for 2 hours after containment purge flow path is closed. | |||
: 2. | |||
The containment atmosphere F18 particulate monitor is only required to be OPERABLE in MODE 1 with RTP > 20%. | |||
Technical Specifications RCS Leakage Detection Instrumentation 3.4.9 VEGP Units 3 and 4 3.4.9 - 2 Amendment No. 115 (Unit 3) | |||
Amendment No. 114 (Unit 4) | |||
ACTIONS | |||
- NOTE - | |||
LCO 3.0.4 is not applicable. | |||
CONDITION REQUIRED ACTION COMPLETION TIME A. | |||
One required containment sump channel inoperable. | |||
A.1 Restore two containment sump channels to OPERABLE status. | |||
14 days B. | |||
Two required containment sump channels inoperable. | |||
B.1 | |||
- NOTE - | |||
Not required until 12 hours after establishment of steady state operation. | |||
Perform SR 3.4.7.1. | |||
Once per 24 hours AND B.2 Restore one containment sump channel to OPERABLE status. | |||
72 hours C. | |||
Containment atmosphere F18 particulate monitor inoperable. | |||
C.1.1 Analyze grab samples of containment atmosphere. | |||
Once per 24 hours OR C.1.2 | |||
- NOTE - | |||
Not required until 12 hours after establishment of steady state operation. | |||
Perform SR 3.4.7.1. | |||
Once per 24 hours AND C.2 Restore containment atmosphere F18 particulate monitor to OPERABLE status. | |||
30 days | |||
Technical Specifications RCS Leakage Detection Instrumentation 3.4.9 VEGP Units 3 and 4 3.4.9 - 3 Amendment No. 115 (Unit 3) | |||
Amendment No. 114 (Unit 4) | |||
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. | |||
Required Action and associated Completion Time of Condition A, B, or C not met. | |||
D.1 AND D.2 Be in MODE 3. | |||
Be in MODE 5. | |||
6 hours 36 hours E. | |||
All required monitors inoperable. | |||
E.1 Enter LCO 3.0.3. | |||
Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 Perform a CHANNEL CHECK. | |||
12 hours SR 3.4.9.2 Perform a COT of containment atmosphere F18 particulate monitor. | |||
92 days SR 3.4.9.3 Perform a CHANNEL CALIBRATION. | |||
24 months}} | |||
Latest revision as of 09:55, 6 January 2025
| ML18051A827 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/12/2018 |
| From: | NRC/NRO/DNRL |
| To: | |
| References | |
| EPID L-2017-LLA-0094, LAR 17-029 | |
| Download: ML18051A827 (5) | |
Text
ATTACHMENT TO LICENSE AMENDMENT NO. 115 TO FACILITY COMBINED LICENSE NO. NPF-91 DOCKET NO.52-025 Replace the following pages of the Facility Combined License No. NPF-91 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Combined License No. NPF-91 REMOVE INSERT 7
7 Appendix A to Facility Combined License Nos. NPF-91 and NPF-92 REMOVE INSERT 3.4.9-1 3.4.9-1 3.4.9-2 3.4.9-2 3.4.9-3 3.4.9-3
(7) Reporting Requirements (a)
Within 30 days of a change to the initial test program described in FSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).
(b)
SNC shall report any violation of a requirement in Section 2.D.(3),
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 115, are hereby incorporated into this license.
(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).
(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:
(a)
Environmental Qualification Program implemented before initial fuel load; (b)
Reactor Vessel Material Surveillance Program implemented before initial criticality; (c)
Preservice Testing Program implemented before initial fuel load; (d)
Containment Leakage Rate Testing Program implemented before initial fuel load; (e)
- 1.
The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7
Amendment No. 115
Technical Specifications RCS Leakage Detection Instrumentation 3.4.9 VEGP Units 3 and 4 3.4.9 - 1 Amendment No. 115 (Unit 3)
Amendment No. 114 (Unit 4) 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 RCS Leakage Detection Instrumentation LCO 3.4.9 The following RCS leakage detection instrumentation shall be OPERABLE:
- a.
Two containment sump level channels; and
- b.
One containment atmosphere F18 particulate monitor.
APPLICABILITY:
MODES 1, 2, 3, and 4.
- NOTES -
- 1.
The following RCS leakage detection instrumentation is not required to be OPERABLE provided SR 3.4.7.1 is performed once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of steady state operation:
- a.
The required containment sump level channels when In-containment Refueling Water Storage Tank (IRWST) gutter drain isolation valves are closed and for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after reopening IRWST gutter drain isolation valves; and
- b.
The containment atmosphere F18 particulate monitor and required containment sump level channels when containment purge flow path is open and for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after containment purge flow path is closed.
- 2.
The containment atmosphere F18 particulate monitor is only required to be OPERABLE in MODE 1 with RTP > 20%.
Technical Specifications RCS Leakage Detection Instrumentation 3.4.9 VEGP Units 3 and 4 3.4.9 - 2 Amendment No. 115 (Unit 3)
Amendment No. 114 (Unit 4)
ACTIONS
- NOTE -
LCO 3.0.4 is not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One required containment sump channel inoperable.
A.1 Restore two containment sump channels to OPERABLE status.
14 days B.
Two required containment sump channels inoperable.
B.1
- NOTE -
Not required until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.
Perform SR 3.4.7.1.
Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND B.2 Restore one containment sump channel to OPERABLE status.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> C.
Containment atmosphere F18 particulate monitor inoperable.
C.1.1 Analyze grab samples of containment atmosphere.
Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OR C.1.2
- NOTE -
Not required until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.
Perform SR 3.4.7.1.
Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND C.2 Restore containment atmosphere F18 particulate monitor to OPERABLE status.
30 days
Technical Specifications RCS Leakage Detection Instrumentation 3.4.9 VEGP Units 3 and 4 3.4.9 - 3 Amendment No. 115 (Unit 3)
Amendment No. 114 (Unit 4)
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D.
Required Action and associated Completion Time of Condition A, B, or C not met.
D.1 AND D.2 Be in MODE 3.
Be in MODE 5.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours E.
All required monitors inoperable.
E.1 Enter LCO 3.0.3.
Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 Perform a CHANNEL CHECK.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.9.2 Perform a COT of containment atmosphere F18 particulate monitor.
92 days SR 3.4.9.3 Perform a CHANNEL CALIBRATION.
24 months