ML18059A504: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML18059A504 | | number = ML18059A504 | ||
| issue date = 10/31/1993 | | issue date = 10/31/1993 | ||
| title = Monthly Operating Rept for Oct 1993 for Palisades Nuclear Plant | | title = Monthly Operating Rept for Oct 1993 for Palisades Nuclear Plant | ||
| author name = Handlovits S, Kluskowski P | | author name = Handlovits S, Kluskowski P | ||
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:consumers Power POWERINli lllllCHl&AN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 November 2, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month ~f October, 1993. | {{#Wiki_filter:consumers Power POWERINli lllllCHl&AN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 November 2, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month ~f October, 1993. | ||
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113 | If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113. | ||
Sincerely~_' | Sincerely~_' | ||
PJ Kl uskowski Reactor Engineer CC: | PJ Kl uskowski Reactor Engineer CC: | ||
DPHoffman, P26-117B JMartin, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades | |||
PDR' | : MPKnopp, Pali~ades SMMcintyre, Pl3-121 Region III Administrator, USNRC | ||
, Document Control, 950*22*35*10/L SMH93*21 9311150183*.931031: | |||
PDR' | |||
.R | * ADOCK 05000255 PDR *. | ||
. R | |||
) A CMS ENER(;Y COMPANY | |||
OPERATING STATUS: | |||
: 1. | |||
: 1. UNIT NAME | UNIT NAME | ||
: 2. REPORTING PERIOD: | : 2. | ||
: 3. LICENSED THERMAL POWER (MWt) | REPORTING PERIOD: | ||
: 4. NAMEPLATE RATING (GROSS MWe) | : 3. | ||
: 5. DESIGN ELECTRICAL RATING (NET MWe) | LICENSED THERMAL POWER (MWt) | ||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) | : 4. | ||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) | NAMEPLATE RATING (GROSS MWe) | ||
: 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT GIVE REASONS: | : 5. | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): | DESIGN ELECTRICAL RATING (NET MWe) | ||
OPERATING DATA REPORT Palisades 931001-931031 2530.0 811. 7 805.0 | |||
: 6. | |||
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) | |||
**770 | |||
: 7. | |||
MAXIMUM DEPENDABLE CAPACITY (NET MWe) | |||
**730 | |||
: 8. | |||
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT GIVE REASONS: | |||
: 9. | |||
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | : 10. REASONS FOR RESTRICTIONS, IF ANY: | ||
: 11. HOURS IN REPORTING PERIOD | |||
: 11. HOURS IN REPORTING PERIOD | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS | : 13. REACTOR RESERVE SHUTDOWN HOURS | ||
: 14. HOURS GENERATOR ON-LINE | : 14. HOURS GENERATOR ON-LINE | ||
: 15. UNIT RESERVE SHUTDOWN HOURS | : 15. UNIT RESERVE SHUTDOWN HOURS | ||
: 16. GROSS THERMAL ENERGY GENERATED CMWH) | : 16. GROSS THERMAL ENERGY GENERATED CMWH) | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED CMWH) | : 17. GROSS ELECTRICAL ENERGY GENERATED CMWH) | ||
: 18. NET ELECTRICAL ENERGY GENERATED CMWH) | : 18. NET ELECTRICAL ENERGY GENERATED CMWH) | ||
: 19. UNIT SERVICE FACTOR | : 19. UNIT SERVICE FACTOR | ||
: 20. UNIT AVAILABILITY FACTOR | : 20. UNIT AVAILABILITY FACTOR | ||
: 21. UNIT CAPACITY FACTOR (USING ~~C ~ET) | : 21. UNIT CAPACITY FACTOR (USING ~~C ~ET) | ||
: 22. UNIT CAPACITY FACTOR (USING DER NET) | : 22. UNIT CAPACITY FACTOR (USING DER NET) | ||
: 23. UNIT FORCED OUTAGE RATE This Month 745.0 0.0 0.0 0.0 0.0 0.0 0.0% | |||
0.0% | |||
0.0% | |||
0.0% | |||
0.0% | |||
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | : 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | ||
Refueling outage is currently in progress. | Refueling outage is currently in progress. | ||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
November 6, 1993 | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | ||
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL "OPERATION | |||
** Based on condenser backpressure | ** Based on condenser backpressure | ||
*Weighted* Average (635 MWe used as MDC Net prior to October 1985) | |||
Yr-to-Date 7296.0 3302.6 3293.0 8247903.0 2699400.0 2569273.0 45.1% | |||
45.1% | |||
48.2% | |||
43.7% | |||
11.4% | |||
Forecast DOCKET NO SD-255 DATE 1D-31-93 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 NOTES: | |||
Cumulative 191703.0 107035.2 102499.6 220543875.0 69589583.0 65606353.0 53.5% | |||
53.5% | |||
51.0%* | |||
42.5% | |||
29.9% | |||
Achieved | |||
AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1993 DAY AVERAGE DAILY.POWER LEVEL (MWe Net) | |||
AVERAGE DAILY UNIT POWER LEVEL | : 1. | ||
0 | |||
: 2. | |||
: 1. | 0 3.. | ||
: 2. | 0 | ||
: 4. | : 4. | ||
: 5. | 0 | ||
: 6. | : 5. | ||
: 7. | 0 | ||
: 8. | : 6. | ||
: 9. | 0 | ||
: 10. | : 7. | ||
: 11. | 0 | ||
: 12. | : 8. | ||
: 13. | 0 | ||
: 14. | : 9. | ||
: 15. | 0 | ||
: 16. | : 10. | ||
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt. | 0 | ||
: 11. | |||
0 | |||
: 12. | |||
0 | |||
: 13. | |||
0 | |||
: 14. | |||
0 | |||
: 15. | |||
0 | |||
: 16. | |||
0 INSTRUCTIONS: | |||
DAY | |||
: 17. | |||
: 18. | |||
: 19. | |||
: 20. | |||
: 21. | |||
: 22. | |||
: 23. | |||
: 24. | |||
: 25. | |||
: 26. | |||
: 27. | |||
: 28. | |||
: 29. | |||
: 30. | |||
: 31. | |||
DOCKET NO 50-255 | |||
. UNIT Palisades | |||
. DATE 11/02/93 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 0 0 | |||
0 0 | |||
0 0 | |||
0 0 | |||
0 0 | |||
0 0 | |||
0 O* | |||
0 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
REPORT MONTH OCTOBER 1993 No. | |||
Date Type 1 02 930604 s | |||
: 1. | |||
: 1. | : 2. | ||
F: Forced | F: | ||
Forced S: | |||
Scheduled Duration Reason2 (Hours) 744.0 c | |||
Reason: | |||
A-Equipment Failure (Explain) | |||
B-Maintenance or Test C-Refue ling D-Regulatory Restriction | |||
[-Operator Training & License Examination F-Administrative G-Operational Error (Explain) | [-Operator Training & License Examination F-Administrative G-Operational Error (Explain) | ||
H-Other (Explain) | H-Other (Explain) | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report # | |||
1 | |||
: 3. | |||
Method: | |||
1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain) | |||
: 4. | |||
System Component Code4 Code6 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) | |||
Cause & Corrective Action to Prevent Recurrence | |||
: 5. | |||
DOCKET NO UNIT DATE COMPLETED BY TELEPHONE Exhibit I - Same Source 50-255 Palisades H/02/93 SMHandlovits (616)764-8913. | |||
r,..._," | |||
.;i | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR OCTOBER 1993 The unit was shutdown for the entire month.}} | OF OPERATING EXPERIENCE FOR OCTOBER 1993 The unit was shutdown for the entire month.}} | ||
Latest revision as of 07:47, 6 January 2025
| ML18059A504 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/31/1993 |
| From: | Handlovits S, Kluskowski P CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9311150183 | |
| Download: ML18059A504 (5) | |
Text
consumers Power POWERINli lllllCHl&AN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 November 2, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month ~f October, 1993.
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
Sincerely~_'
PJ Kl uskowski Reactor Engineer CC:
DPHoffman, P26-117B JMartin, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades
- MPKnopp, Pali~ades SMMcintyre, Pl3-121 Region III Administrator, USNRC
, Document Control, 950*22*35*10/L SMH93*21 9311150183*.931031:
PDR'
- ADOCK 05000255 PDR *.
. R
) A CMS ENER(;Y COMPANY
OPERATING STATUS:
- 1.
UNIT NAME
- 2.
REPORTING PERIOD:
- 3.
LICENSED THERMAL POWER (MWt)
- 4.
NAMEPLATE RATING (GROSS MWe)
- 5.
DESIGN ELECTRICAL RATING (NET MWe)
OPERATING DATA REPORT Palisades 931001-931031 2530.0 811. 7 805.0
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 770
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
- 730
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED CMWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED CMWH)
- 18. NET ELECTRICAL ENERGY GENERATED CMWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING ~~C ~ET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE This Month 745.0 0.0 0.0 0.0 0.0 0.0 0.0%
0.0%
0.0%
0.0%
0.0%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
Refueling outage is currently in progress.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
November 6, 1993
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL "OPERATION
- Based on condenser backpressure
- Weighted* Average (635 MWe used as MDC Net prior to October 1985)
Yr-to-Date 7296.0 3302.6 3293.0 8247903.0 2699400.0 2569273.0 45.1%
45.1%
48.2%
43.7%
11.4%
Forecast DOCKET NO SD-255 DATE 1D-31-93 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 NOTES:
Cumulative 191703.0 107035.2 102499.6 220543875.0 69589583.0 65606353.0 53.5%
53.5%
51.0%*
42.5%
29.9%
Achieved
AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1993 DAY AVERAGE DAILY.POWER LEVEL (MWe Net)
- 1.
0
- 2.
0 3..
0
- 4.
0
- 5.
0
- 6.
0
- 7.
0
- 8.
0
- 9.
0
- 10.
0
- 11.
0
- 12.
0
- 13.
0
- 14.
0
- 15.
0
- 16.
0 INSTRUCTIONS:
DAY
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
- 25.
- 26.
- 27.
- 28.
- 29.
- 30.
- 31.
DOCKET NO 50-255
. UNIT Palisades
. DATE 11/02/93 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 0 0
0 0
0 0
0 0
0 0
0 0
0 O*
0 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
REPORT MONTH OCTOBER 1993 No.
Date Type 1 02 930604 s
- 1.
- 2.
F:
Forced S:
Scheduled Duration Reason2 (Hours) 744.0 c
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refue ling D-Regulatory Restriction
[-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #
1
- 3.
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
- 4.
System Component Code4 Code6 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Cause & Corrective Action to Prevent Recurrence
- 5.
DOCKET NO UNIT DATE COMPLETED BY TELEPHONE Exhibit I - Same Source 50-255 Palisades H/02/93 SMHandlovits (616)764-8913.
r,..._,"
.;i
SUMMARY
OF OPERATING EXPERIENCE FOR OCTOBER 1993 The unit was shutdown for the entire month.