{{#Wiki_filter:Public Service Electric and Gas Company Steven E. Miltenberger                   Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4199 Vice President and Chief Nuclear Officer APR 1 8 1009 NLR-N89079 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
{{#Wiki_filter:Public Service Electric and Gas Company Steven E. Miltenberger Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4199 Vice President and Chief Nuclear Officer APR 1 8 1009 NLR-N89079 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
STATUS OF IMPLEMENTATION OF TMI ACTION PLAN ITEMS SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and Gas Company (PSE&G) hereby submits its response to your letter, dated April 14, 1989, which requested us to promptly review and report the status of the implementation of the TMI Action Plan Items for each of the Salem Units.             The enclosure to this letter contains Enclosure 1 of your letter with the status of each item updated as per your instructions.
STATUS OF IMPLEMENTATION OF TMI ACTION PLAN ITEMS SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and Gas Company (PSE&G) hereby submits its response to your letter, dated April 14, 1989, which requested us to promptly review and report the status of the implementation of the TMI Action Plan Items for each of the Salem Units.
Completion of the items in Enclosure 1 has been verified using our records on the TMI event. In some cases, the item numbers in the enclosure did not correlate directly with NUREG 0737, NUREG 0737 Supplement 1, or the other related documents we reviewed.
The enclosure to this letter contains Enclosure 1 of your letter with the status of each item updated as per your instructions.
Completion of the items in Enclosure 1 has been verified using our records on the TMI event.
In some cases, the item numbers in the enclosure did not correlate directly with NUREG 0737, NUREG 0737 Supplement 1, or the other related documents we reviewed.
In these cases we statused the item using the descriptive text of the TMI associated NUREGs (i.e., NUREG-0737, -0660, -0645, etc.),
In these cases we statused the item using the descriptive text of the TMI associated NUREGs (i.e., NUREG-0737, -0660, -0645, etc.),
as indicated in our response.
as indicated in our response.
In addition, a verification of actual implementation of item responses was conducted to the fullest extent possible considering the time constraints imposed by your letter. This verification compared our original response with the current plant configuration. Verifications were performed to assure that this correspondence is as accurate as possible.
In addition, a verification of actual implementation of item responses was conducted to the fullest extent possible considering the time constraints imposed by your letter.
:390426C> 166--;*==-9-u4re ___
This verification compared our original response with the current plant configuration.
PDR         ADOCK 05000272 J        .
Verifications were performed to assure that this correspondence is as accurate as possible.
p                            F'DC           .
:390426C> 166--;*==-9-u4re ___ J PDR ADOCK 05000272 p
F'DC  


Document Control Desk                             APR 18 1900 NLR-N89079 PSE&Gs responses to the TMI Action Plan Items are being controlled within the Station Procedure and Design Control Processes. Should you have any questions or comments concerning this response, please do not hesitate to contact us.
Document Control Desk NLR-N89079 2 -
Sincerely, Enclosure c   Mr. J. c. Stone Licensing Project Manager Ms. K. Halvey Gibson Senior Resident Inspector Mr. w. T. Russell, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625
APR 18 1900 PSE&Gs responses to the TMI Action Plan Items are being controlled within the Station Procedure and Design Control Processes.
Should you have any questions or comments concerning this response, please do not hesitate to contact us.
Enclosure c
Mr. J. c. Stone Licensing Project Manager Ms. K. Halvey Gibson Senior Resident Inspector Sincerely, Mr. w. T. Russell, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625  


SALEM GENERATING STATION - UNITS 1 & 2
l'l
    ..        l'l                     MUlTI-PLAMT
()
  "'....      ()
[I, If*
[I, I ',Sul NUMBER      ACTION NO.      ISSUE TITLE                                                                                                              LICENSEE IMPLEMEHTATIOM STATUS
  .,.,,.,
If*
  .,.,
r*)
r*)
C*
C*  
  <(*
<(*
I.A. l.1.1 "I.A.1.1.2
0
                                                      =~~ ~~~lltlc:t ADVISOR -
<D N
SHI      T HNIC ON DUTY ****** ,*.*.**.*..............*....*****. ; **.*** ~ *********************..*************..**
0 m
ADVISOR - TEa! SPECS ******....**...........*...******.*.*******G*************************************.**
:l:
                  "I . A. L. 1. 3    FOOi                  FT ECllUCAL ADVISGa - TRAllED t'Ell LL CAT 8................*.*..*.**.*.**..*G*****.*.*....**...**....*.**.*********...
Cl If>
                  "'I.A.l.1.4                        SHIFT TECtlUCAL ADVISOR - DESCR111E* LONG TERM PROGRAM .*.*.....*.****************G*.***************.***********
(')
* n<<;,*** ....
m ID I "
I. A. l. 2                          SH~FT SUPERVISOR RESPONSIBILITIES******.*.**.............*...***..*********.** -~ ***********.******.********* ~. ,~~.. ~- ***.*.
I "
Ill l. A. 1. 3. l      F002            SH FT MANNING - LIMIT OVERTIMES **********...**.............*.**..******...*************.****.*.*.******.****** ~ ******...
U) m N
SHIFT MNMIMG - MIN SHIFT CREW*********.*...*........*...* ........****.***.**** -~ *.********.*********.***************....
Cl'. w a:
  ..        (')
0 u w
I J.A.1.3.2 l.A.2.L.l F002 IMMEDIATE UPGRADING Of RO & SRO TRAINING AND QUAL. - SRO EXPER ........................................................ ..
_J w
              ,.,
I-x 0
llllEDIATE UPGRADING OF RO &SRO TRAINING AND QUAL. - SRO'S BE R0 1 S lYR *********G....................................... .
Cl'. w x
0
Ill
  <D              1.1\.2.l.2 IMMEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - 3 MO. TRAIHING ****.*******G.................................. ~.
(')
N 0          fl, IA.2.l.3
I fl, I,_
  '"
~.
m          ,_I  J.A.?.1.4            F003            IfltEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - MODIFY TRAINING *******... .G*..***.** ******** **: *.**.*..***.*** **.*
  "          ~.
i~
i~
I. A. 2. 1. 5                        DllEDIATE UPGRADING OF RO & SllO TRAINING AND QUAL. - fACIUTY CERTIF ******.***                                              *&sect; ........... *............................ .
(!
:.>  I. f\. 2. 3                          AllllNISTRATION OF TRAINIMG PROGRAMS *****.......*...........**.**..********************.**.************.*******.*********
I p;
            "(!   I .A. 3. L 1                        REVISE SCOPE & CRITERIA FOR LICENSING EXAMS - INCREASE SCOPE. ....**..*.***.***.C*******.**.**..****.*..*****.***.******..
h  
I  1.A.3.l.2                            REVISE SCOPE & CRITERIA FOR LICENSllG EXAMS - INCREASE PASSING GRADE .**..***.**~ .**.*********.***.*******************..*
~.
I. A. 1. l. 3.A                      REVISE SCOPE &. CRIT. FOR UC. EXAMS - SUIJLATOR PLANTS WITH SIMULATORS *****.*. -~ *.*****..*.**..**.**.***.**.**.****.**<.
{ii
          'p;*'                                        REVISE SCOPE & CRIT. FOR UC. EXAMS - SltlllATOR :. OTHER PLANTS ....****.*****.* -~ **....***.******..***.*******.***...*.**
:J  
1.1\.J.l.3.B h
)
          ~.      ~1.B.1.2                            EVALUATION OF ORGANIZATION & MANAGEMENT *..*.*....*......*....**..*..*.*.***..*.C.. ..*...*..*.. * .*..* ** * ... ** * * * * .** * * * * * * *
i~
:l:      {ii l.C.1.1                              SHORT-TERM ACCIDENT & PROCEDURES REVIEW - SB LOCA ....*.*............*..********C.. *************************** : * ***********
d U1
Cl
:J       I. C. L 2. A        F004            SHORT-TEllt ACCID. & PROCEDURES REV. - INADEQ. CORE COOL. REANAL. GUIOELINES **.*G.....*..................................
"
If>
J.C. L.7.B          F004            SHORT-TERM ACCID. & PROCEDURES REV. - INMJEQ. CORE COOL. REVISE PROCEDURES*****C.. *********************************..**..*
(')        )
i.C.1.3.A          F005            SHORT-TERM ACCID. & PROCEDURES REV - TRANSIENTS & ACCDTS. REA.MAL GUIDELINES (PROC. GEH. PKG.) ** %***********************
m        .,... l.C.1.3.B          FOD5            SHORT-TElltl ACCID. & PROCEDURES REV. - TRANSIENTS & ACCORS. REVISE PROCEDURES (UCPGRADED EOP'S) *********.***.****.**.*...*
ID I                I. c.?                              SHIFT & RELIEF TURNOVER PROCEDURES **.*.*.... *.*.******************************                                              *c * * *** * ** *** * ******* **** ** *** ** *** *** * * *
* I" i~
d       I.[. 3                              SHIFT-SUPERVISOR RESPONSIBILITY *******. * .*..... * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *              *c ** ** * *** * * * ** **** **** ** * *** * ***** ** * ** *
* I. c. 4                            CONTROL-ROOM ACCESS ********* * *** * * . * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * "c" * * * * * * * * * * * ** * *********************....*
"        U1 FEEDBACK Of OPERATING EXPERIENCE ****.*..** *.* .. *******************************                                            *c * **** * **** ****** ******** ** ***. *****. * *..
l.C.~              F006
(')
(')
F007            VERIFY CORIECT PUlFORMMCE OF OPERATING ACTIVITIES .*.....*.*.****** ***********                                                *c ***** **** **** ********** ******** ***** * **
0 m
* U) m 0 l.C.6 NSSS VENDOR REV. OF PIOC - LOW POWER TEST PROGRAM .....*...**.*.* * **. * * * * * * * * * *                                    *c ******** ************ ***************** * **
m  
N                  '"l.C.1.1
"<I'  
                    "'I. C. 7. 2                        NSSS VENDOR REV. OF PROC - POWER ASCENSION & EMER. PROCS .**. * *.** * ** * * * * * * * * * *                                  *c ** ***** *** ************************** ***
Cl'.      m                                             PILOT tlJll Of SELECTED EMEAGENCY PROC FOR NTOLS *..*... * * *. * * * * * * * * * * * *** * * * * * * * * "$ * * -~ T * * * * .. * * * * * * * * * * * * * * * * * * * * * * .. *.
* w m a:
                    "'!. C. B                      .... CONTROL-ROOM DESIGN REVIEWS (EllTER DATA FDR MPA FOOS &ttPA F-071) *.***********C~~--~-~~-*-**********************~***
I . ll. l  (See F008 & F071) 0 u                  1.0.2. 1            FOD9            PLANT-SAFETY PARMETER DISPLAY CONSOLE - DESCRIPTION **.*..**..****************** *************************************
w        "<I'
_J w .-<                                                                                                         I-x        ~
0 Cl'.
w 0 x
 
SALEM GENERATING STATION - UNITS 1 & 2 llJLTl-PLANT ISSUE NUMBER      ACTION NO.        ISSUE TITLE                                                                              LICENSEE IMPLEMENTATIOH STATUS I. ll. 2. 2
: 1. ll. 2. 3 F009 F009
                                            'PLANT-SAFETY PARAMETER DISPLAY CONSOLE ., INSTALLED ..**....*****.**..**..*.*** *G              *s ..  'N: .t ................................ .
PLANT-SAFETY PAAAMETER DISPLAY CONSOLE - FULL y IMPLEMENTED *..*..**.*********. .G. . ee . .0. -~~ *....*.*.....*.......*.*.........
          *I.G.1.1                            TRAINING DURING LOW-POWER TESTING - PROPOSE TESTS *....*...*.*..***.**.*******. c; ***************************** , *** *, ******
          "'I.G.1.2                            TRAINING DURING LOW-POWER TESTING - SlBIIT ANAL. & PROCS .*.***.******.***.***. G..*.*******.*****....**...******* : ***..*.
          "'I.G.1.3                            TRAINING DURING LOW-POWER TESTING - TRAINING & RESULTS ...*.....**..*.********* G*.*..******.**.**.**.******.*********....
If) 11.B.l.l                            REACTOR-COOLANT SYSTEM VENTS - DESIGN VEllTS ***.*.***..*.*..**.******.********* G***************************************.*
(')
Jl.B.1.2          FOlO                REACTOR-COOLANT SYSTEM VENTS - INSTALL VENTS (LL CAT B) **...**.*.***.**..***** G***.***************.********************.
"' I    11.B.Ll            FOlO        ..t' REACTOR-COOLANT SYSTEM VENTS - PROCEDURES ****.***...**.*****.**.***.**..***** *G. .**.******************..**************.*
0 U)    **I 11.B.2.1                            PLANT SHIELDING - REVIEW OESIGMS *.**.*******.*...**.*..*..**..*****.**.******* G*********.*.************* ; ..*.*.**                            a* ..
~
~
Ni    "*  "'II.B.2.2                          PLANT SHIELDING - CORRECTIVE ACTIONS TO ASSURE ACCESS *.**..*.*..******.******* G*******************.****************.*.
0 MUlTI-PLAMT I ',Sul NUMBER ACTION NO.
IJo ,_
I.A. l.1.1 "I.A.1.1.2 "I. A. L. 1. 3 FOOi
'ot ,,
"'I.A.l.1.4 I. A. l. 2
          "'Il.B.2.3       FOll              PLANT SHIELDING - PLANT MODIFICATIONS (ll CAT B) .........*.......***..*....*.* G*****************************************
: l. A. 1. 3. l F002 J.A.1.3.2 F002 l.A.2.L.l 1.1\\.2.l.2 IA.2.l.3 J.A.?.1.4 F003 I. A. 2. 1. 5 I. f\\. 2. 3 I.A. 3. L 1 1.A.3.l.2 I. A. 1. l. 3.A 1.1\\.J.l.3.B
I~
~1.B.1.2 l.C.1.1 I. C. L 2. A F004 J.C. L.7.B F004 i.C.1.3.A F005 l.C.1.3.B FOD5 I. c.?
          *I I. B. 2.4                          PL.Alfl SHIELDJllG - EQUIPMENT QUALIFICATION- NOT TRACKED AS A TMI ACTION ITEM *** G........................................ .
I.[. 3 I. c. 4 l.C.~
:.>  "Il.8.3.l                             POSTACCIDENT SAMPLING - INTERIM SYSTEM *.**..**.**...***..*.**************.**** G.**************.*.****.*****...*.......*.
F006 l.C.6 F007
    "    "'11.B.3.2                            PDSTACCIDENT SAMPLING - CORRECTIVE ACTIONS .***.*..*..**.**.**..*..******..****G************************************.*.*.
'"l.C.1.1
          "'II.B.3.3                            POST.ACCIDENT SAMPLING - PROCEDURES *****.**.**.******.*..**....***.**********. .G** -~ *.************************.****.***.**
"'I. C. 7. 2
          *ILB.3.4          FOU                POSTACCIDENT SAMPLING - PLANT fllJDIFICATIONS (LL CAT B) .....*.***.***.******.* Ji~~ .. <?~~~- *......***...**..**.............
"'!. C. B I. ll. l (See F008 & F071) 1.0.2. 1 FOD9 SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICENSEE IMPLEMEHTATIOM STATUS
ILB.4.1          F013                TRAINING FOR MITIGATING CORE DAMftGE - DEVELOP TRACNING PROGRAM **.***********.*G........................................ .
=~~ ~~~lltlc:t ADVISOR - ON DUTY ******, *.*.**.*..............*....*****. ; **.*** ~ *********************..*************..**
          *JI.B.4.2.A      F013                TRAINING FOR MITIGATING CORE DAHAGE - INIHAL. ..**..*..*..**.**.*.*********** *G**.....*..**.*.***.******.. *- ........... .
SHI T HNIC ADVISOR - TEa! SPECS ******....**...........*...******.*.******* G *************************************.**
          "'II.B.4."2.B      F013            , TRAINING FOR HJTIGATING CORE DAMAGE - COMPLETE *.*.....**.*..**..******.***..* -~ ********.*....****.****.*..*..**.........
FT ECllUCAL ADVISGa - TRAllED t'Ell LL CAT 8................*.*..*.**.*.**..* G *****.*.*....**...**....*.**.*********...
H.D.l.l                            /REUEF & SAFETY VALVE TEST REQUIREMENTS - SUBMIT PROGRAM .*.****..****..***.***.***********.**.*************..**.........
SHIFT TECtlUCAL ADVISOR - DESCR111E* LONG TERM PROGRAM.*.*.....*.**************** G *.***************.***********
          ""Il.D.1.2.A                      .'RELIEF & SAFETY VALVE TEST REqlllREMEllTS - COMPLETE TESTING .*.*.*****.****..***G***********.**********.*****.***.*****.**
* n<<;,* **....
          "'11.D.1.2.B      F014        ~RELIEF & SAFETY VALVE TEST REQUIREllENJS - PLANT SPECIFIC REPORT ******.****.***&ee.Nates .........*.......................
SH~FT SUPERVISOR RESPONSIBILITIES ******.*.**.............*...***..*********.** -~ ***********.******.********* ~.,~~.. ~-***.*.
11.11.l.3                            RELIEF & SAFETY VAVLE TEST REQUIREMENTS - BLOCK-VALVE TESTJNG *****.**********             *& ........................................ .
SH FT MANNING - LIMIT OVERTIMES **********...**.............*.**..******...*************.****.*.*.******.****** ~ ******...
          *11.D.3.1                            VALVE POSITION INDICATION - INSTALL DIRECT INDICATIONS Of VALVE POS .......... *c ....................................... .
SHIFT MNMIMG - MIN SHIFT CREW *********.*...*........*... *........****.***.**** -~ *.********.*********.***************....
          *I I. D. 3. 2                        VALVE POSTION INDICATION - TECH SPECS ***. _. .*******..*.***.***** * ***** * * * * * * ** *c * * * ** * *** * ** ** ***** ***** * *** *** * ** * ** ** * *
IMMEDIATE UPGRADING Of RO & SRO TRAINING AND QUAL. - SRO EXPER..........................................................
          "'J]. f.1.1.1      F015              AFS EVALUATION-ANALYSIS *..*.********....**..*..**...*****..*.**.***.***************** *********** .* ***********************
llllEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - SRO'S BE R0 1S lYR ********* G........................................
(SH NOTE 1)
IMMEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - 3 MO. TRAIHING ****.******* G.................................. ~.
..  (')  *II.E.1.1.2        F015              AFS EVALUATION-SHORT TERM t<<>DS *****.**.*.***...*..*.**.***.*******************c......................................... .
IfltEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - MODIFY TRAINING *******.... G *..***.** ******** * *: *.**.*..***.*** **.*
~o            (SH NOTE 2)                                                                                                                  c N
DllEDIATE UPGRADING OF RO & SllO TRAINING AND QUAL. - fACIUTY CERTIF ******.*** *&sect;........... *.............................
Il.E.l.1.3        F015              AFS -LONG TERM MOOS *******************************.*********** ** ** *******************************************************
AllllNISTRATION OF TRAINIMG PROGRAMS *****.......*...........**.**..********************.**.************.*******.*********
REVISE SCOPE & CRITERIA FOR LICENSING EXAMS - INCREASE SCOPE.....**..*.***.***. C *******.**.**..****.*..*****.***.******..
REVISE SCOPE & CRITERIA FOR LICENSllG EXAMS - INCREASE PASSING GRADE.**..***.** ~.**.*********.***.*******************..*
REVISE SCOPE &. CRIT. FOR UC. EXAMS - SUIJLATOR PLANTS WITH SIMULATORS *****.*. -~ *.*****..*.**..**.**.***.**.**.****.** <.
REVISE SCOPE & CRIT. FOR UC. EXAMS - SltlllATOR :. OTHER PLANTS....****.*****.* -~ **....***.******..***.*******.***...*.**
EVALUATION OF ORGANIZATION & MANAGEMENT *..*.*....*......*....**..*..*.*.***..*. C....*...*..*.. *.*..* ** *... ** * * * *.** * * * * * *
* SHORT-TERM ACCIDENT & PROCEDURES REVIEW - SB LOCA....*.*............*..********
C.. *************************** : * ***********
SHORT-TEllt ACCID. & PROCEDURES REV. - INADEQ. CORE COOL. REANAL. GUIOELINES **.* G.....*..................................
SHORT-TERM ACCID. & PROCEDURES REV. -
INMJEQ. CORE COOL. REVISE PROCEDURES ***** C.. *********************************..**..*
SHORT-TERM ACCID. & PROCEDURES REV - TRANSIENTS & ACCDTS. REA.MAL GUIDELINES (PROC. GEH. PKG.) ** %***********************
SHORT-TElltl ACCID. & PROCEDURES REV. - TRANSIENTS & ACCORS. REVISE PROCEDURES (UCPGRADED EOP'S) *********.***.****.**.*...*
SHIFT & RELIEF TURNOVER PROCEDURES **.*.*.... *.*.****************************** *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* SHIFT-SUPERVISOR RESPONSIBILITY *******. *.*..... * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* CONTROL -ROOM ACCESS ********* * *** * *. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * "c" * * * * * * * * * * * ** * *********************....*
FEEDBACK Of OPERATING EXPERIENCE ****.*..** *.*.. ******************************* *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * *. * * * * *. * *..
VERIFY CORIECT PUlFORMMCE OF OPERATING ACTIVITIES.*.....*.*.****** *********** *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* NSSS VENDOR REV. OF PIOC -
LOW POWER TEST PROGRAM.....*...**.*.* * **. * * * * * * * * * * *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* NSSS VENDOR REV. OF PROC - POWER ASCENSION & EMER. PROCS.**. * *.** * ** * * * * * * * * * * *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* PILOT tlJll Of SELECTED EMEAGENCY PROC FOR NTOLS *..*... * * *. * * * * * * * * * * * *** * * * * * * * * "$ * * -~ T * * * *.. * * * * * * * * * * * * * * * * * * * * * *.. *. *
.... CONTROL-ROOM DESIGN REVIEWS (EllTER DATA FDR MPA FOOS & ttPA F-071) *.*********** C~~--~-~~-*-**********************~***
PLANT-SAFETY PARMETER DISPLAY CONSOLE - DESCRIPTION **.*..**..****************** *************************************
If)
(')
"' I 0
U) **I
~ "*
Ni IJo,_
'ot,,
I~
.. (')
~o N
llJLTl-PLANT ISSUE NUMBER ACTION NO.
I. ll. 2. 2
: 1. ll. 2. 3
*I.G.1.1
"'I.G.1.2
"'I.G.1.3 11.B.l.l Jl.B.1.2 11.B.Ll 11.B.2.1
"'II.B.2.2
"'Il.B.2.3
*I I. B. 2.4 "Il.8.3.l
"'11.B.3.2
"'II.B.3.3
*ILB.3.4 ILB.4.1
*JI.B.4.2.A
"'II.B.4."2.B H.D.l.l
""Il.D.1.2.A
"'11.D.1.2.B 11.11.l.3
*11.D.3.1
*I I. D. 3. 2 F009 F009 FOlO FOlO FOll FOU F013 F013 F013 F014
"'J]. f.1.1.1 F015 (SH NOTE 1)
*II.E.1.1.2 F015 (SH NOTE 2)
Il.E.l.1.3 F015
{SEE. NOTE 3)
{SEE. NOTE 3)
SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICENSEE IMPLEMENTATIOH STATUS
'PLANT-SAFETY PARAMETER DISPLAY CONSOLE., INSTALLED..**....*****.**..**..*.***
* G *s.. 'N:.t.................................
PLANT-SAFETY PAAAMETER DISPLAY CONSOLE - FULL y IMPLEMENTED *..*..**.*********.. G.. ee..0. -~~ *....*.*.....*.......*.*.........
TRAINING DURING LOW-POWER TESTING -
PROPOSE TESTS *....*...*.*..***.**.*******. c; *****************************, *** *, ******
TRAINING DURING LOW-POWER TESTING - SlBIIT ANAL. & PROCS.*.***.******.***.***. G..*.*******.*****....**...******* : ***..*.
TRAINING DURING LOW-POWER TESTING - TRAINING & RESULTS...*.....**..*.********* G *.*..******.**.**.**.******.*********....
REACTOR-COOLANT SYSTEM VENTS - DESIGN VEllTS ***.*.***..*.*..**.******.********* G ***************************************.*
REACTOR-COOLANT SYSTEM VENTS -
INSTALL VENTS (LL CAT B) **...**.*.***.**..***** G ***.***************.********************.
..t' REACTOR-COOLANT SYSTEM VENTS -
PROCEDURES ****.***...**.*****.**.***.**..*****
* G..**.******************..**************.*
PLANT SHIELDING -
REVIEW OESIGMS *.**.*******.*...**.*..*..**..*****.**.******* G *********.*.************* ;..*.*.** a*..
PLANT SHIELDING - CORRECTIVE ACTIONS TO ASSURE ACCESS *.**..*.*..******.******* G *******************.****************.*.
PLANT SHIELDING - PLANT MODIFICATIONS (ll CAT B).........*.......***..*....*.* G *****************************************
PL.Alfl SHIELDJllG - EQUIPMENT QUALIFICATION-NOT TRACKED AS A TMI ACTION ITEM *** G.........................................
POSTACCIDENT SAMPLING - INTERIM SYSTEM *.**..**.**...***..*.**************.**** G.**************.*.****.*****...*.......*.
PDSTACCIDENT SAMPLING - CORRECTIVE ACTIONS.***.*..*..**.**.**..*..******..**** G ************************************.*.*.
POST.ACCIDENT SAMPLING -
PROCEDURES *****.**.**.******.*..**....***.**********.. G ** -~ *.************************.****.***.**
POSTACCIDENT SAMPLING - PLANT fllJDIFICATIONS (LL CAT B).....*.***.***.******.* Ji~~.. <?~~~- *......***...**..**.............
TRAINING FOR MITIGATING CORE DAMftGE - DEVELOP TRACNING PROGRAM **.***********.* G.........................................
TRAINING FOR MITIGATING CORE DAHAGE - INIHAL...**..*..*..**.**.*.***********
* G **.....*..**.*.***.******.. *-............
, TRAINING FOR HJTIGATING CORE DAMAGE - COMPLETE *.*.....**.*..**..******.***..* -~ ********.*....****.****.*..*..**.........
/REUEF & SAFETY VALVE TEST REQUIREMENTS - SUBMIT PROGRAM.*.****..****..***.***.***********.**.*************..**.........
.'RELIEF & SAFETY VALVE TEST REqlllREMEllTS - COMPLETE TESTING.*.*.*****.****..*** G ***********.**********.*****.***.*****.**
~RELIEF & SAFETY VALVE TEST REQUIREllENJS - PLANT SPECIFIC REPORT ******.****.*** &ee.Nates.........*.......................
RELIEF & SAFETY VAVLE TEST REQUIREMENTS - BLOCK-VALVE TESTJNG *****.********** *&.........................................
VALVE POSITION INDICATION - INSTALL DIRECT INDICATIONS Of VALVE POS.......... *c........................................
VALVE POSTION INDICATION - TECH SPECS ***. _..*******..*.***.***** * ***** * * * * * * ** *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* AFS EVALUATION-ANALYSIS *..*.********....**..*..**...*****..*.**.***.***************** ***********.* ***********************
AFS EVALUATION-SHORT TERM t<<>DS *****.**.*.***...*..*.**.***.******************* c..........................................
c AFS -LONG TERM MOOS *******************************.*********** ** ** *******************************************************
NOTE 1 - THE ITEM LISTED IS FROM NUREG-0737, ENCLOSURE 2 IUIJ IS APPLICABLE TO NTOLS'S ONLY NOlE 2 - THE HEM LISTED IS FOR All PLANTS (OPERATING REACTORS AND NTOL'S)
NOTE 1 - THE ITEM LISTED IS FROM NUREG-0737, ENCLOSURE 2 IUIJ IS APPLICABLE TO NTOLS'S ONLY NOlE 2 - THE HEM LISTED IS FOR All PLANTS (OPERATING REACTORS AND NTOL'S)
NOlf 3 - THE ITEM LISTED IS FOR ALL PLANTS (OPERATING REACTORS ANO NTOL'S)
NOlf 3 - THE ITEM LISTED IS FOR ALL PLANTS (OPERATING REACTORS ANO NTOL'S)
 
Ill m fl  
SALEM GENERATING STATION - UNITS 1 & 2
~ fl, l(*
    "'
a*,.,...  
Ill m fl MULTI-PLANT
*J*
    ~ fl,       ISSUE NUMBER        ACTION NO. ISSUE TITLE                                                                    LICENSEE IMPLEMENTATION STATUS l(*
    ,.,a*
    ...
    *J*
I=*
I=*
    *!*
UJ
11.E.l.2.l.A                      AFS INITIATION & FLOl11-CONTROL GRADE ***.*..*........*........*.**..*..*****.*.  -2 ........................................ .
l 1.E. l.2.1.B      F016          AFS INITIATION & FLOW - SAFETY GRADE ****....*.*.......*....*..*..*..**.*****...*************....*...****..**.**.*.*.....
: 11. f..1.2.2.A                    AFS INITIATION & FLOW - FLOW INDICATION COIUROL GRADE ..*..**.**.**.*..**..**.*C**..*.****.**........****..*****.***.**...
                *I 1. E.1.2.2.B                    AFS INITIATION & FLOW - LL CAT It TECH SPECS .**..*..*..*..*..**.**.**.**.*****.C********.****.***.*****.****..*******.....
                *ll.E.1.2.2.C F017                AFS INITIATION & FLOW - SAFETY GRADE .**..................*.*..**.**.**..*..***C******************************************
UJ   *ll.l.3.1.l                        EMERGENCY POWER FOR PRESSURIZER HEATERS - UPGRADE POWER SUPPLY *..*..**.****** ~***.*********.**..****..*...******.**.*...
    .,.    {~
                *IJ.E.3.1.2                        EMERGENCY POWER FOR PRESSURIZER HEATERS - TECH SPECS *..*.**.* ~ ***..*********.*C*************************.************..**
Co If)
N
            ..
I  11.E.4.l.l
                *ll.L4.L2 DEDICATED HYDROGEN PENETRATIONS - DESIGN ***..*..*..*...*.**.**.**..*.*******.*NJ.A. ***************.**********************.
DEDICATED HYDR<MiEN PENETRATIONS - REVIEW & REVISE HZ CONTROL PROC ***..*.******~ ***.***.*.**..****.************.*....*...
0
            "*I  *IL.E.4.1.3        F018          DEDICATED HYDROGEN PENETRATION - INSTALL *.**.*..**...*.*.......********.**** .NJ.A,. * ****.*.*******.**************** .A.. .
N CONTAINMENT ISOLATION DEPENDABILITY - It<P. DIVERSE ISOLATION .**.**.****.**.*..C******************** : * ************* 9 .. .
  ... *-,,,
I])
{~
{~
l I. E.4.2.1-4
I Co If)..
                *IJ.l.4.2.5.A                      CONTAINMENT ISOLAT. DEPENDABILITY - CNTMT PRESS. SETPT. SEECIFIY PRESS **.**** ~******.******...**.*********.***...*...**.
N 0
          ~     *II.E.4.2.5.B                      CONTAINMENT ISOLATION DEPENDABILITY - CNTMT PRESSURE SETPT. MODS ****.*****.***C******************************************
N I
(l     Jl.E.4.2.6          F019          CONTAINMENT ISOLATION DEPENDABILITY - CNTMT PURGE VALVES ....*.*.***.**..*..**.C***********************************.******
I]) *-
I     Il.E.4.2.7        f019          CONTAINMENT ISOLATION DEPENDABILITY - RADIATION SIGNAL ON PURGE VALVES ******. ~******..***.***.*********.***.*.**.***....
{~,,,
ti   "IL.E.4.2.8                        CONTAINMENT ISOLATION DEPENDABLITY - TECH SPECS .*..*...*..*.**.**..***********C***.**.*****************.********.****.. ;
~
* Ii:   *II.F.1.1            F020          ACCIDENT - MONITORING - PROCEDURES .*****.****..*..*..**.****..*...*****.******C**************************************.***
(l I
t;   *11.F.l.2.A          F020          ACCIDENT - tllNITORING - NOBLE GAS MONITOR *.*.**.........*.*..***.**.**.*******C****************************************.*
ti Ii:
:i:   w       *II.F.1.2.B        F021          ACCIDENT - MONITORJMG - IODINE/PARTICULATE SAMPLING .*..*..*..**.**.****.****..C********************.********-*************
t;
a.
:i: w
If)
: a. !J If) l!l..,
          !J    *ILF.1.2.C          F022          ACCIDENT - MONITORING - CONTAINMENT HIGH-RANGE MONITOR*..*.***.**..***********C*********************************.***.....
~
l!l
a>  
                *ll.F.1.2.0          F023          ACCIDENT - fl)NITORING - CONTAINMENT PRESSURE ......*......*..*..**.*****..*.***C**************************.*****.***.....*
~
  ..,      ~
ro "'
                  *Il.F.1.2.E        F024          ACCIDENT - MONITORING - CONTAlrtolENT WATER LEVEL .....**........****..*..***...*C.*********************.**.******.****...*.
I fl.
a>     ~       *II.r .1.2.F        F025          ACCIDENT - MONITORING - CONTAINMENT HYDROGEN *..*.*........*.***.*.*.***.*****.C************************************.*****
I  
ro                                                 INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE COOLING - PROCEDURES **.**.***. ~***.**..**.*.**..**..***.***........**....
.~
  ... fl."'
I             *II. F. 2. 1
                  *II.F.2.2                          IHSTRUMENTATIDM FOR DETECT. OF INADEQUATE CORE COOLING - SUBCOOL METER ......**S.e.e* .l'{q1;~~ **...*.*..*....*.................
I...    .~
INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE COOLING - OESC. OTHER ****..*** $~~*.~q1;~~--*******************************
Ill    *II.F.2.3          F026
                  *JI.I .2.4          F026          INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE.CLING INSTLL ADD'L INSTRUMENTATION *** ~~~-ijQte~ .......................... .
{')    11 11.G. l. l                      POWER SUPP. FOR PRESSURIZER RELIEF, BLOCK VALVES & LEVEL IND. - UPGRADE ***.** ~*.****.**..*****..****.**.*...*.*.........
l!l a>        0      *Il.G.L2                          POWER SUPP. FOR PRESSURIZER RELIEF, BLOCK VALVES & LEVEL IND. - TECH SP ****** ~*****.******.*....**.......****.*.*.......
: 11. K. .I (Op er. Reactors Only) IE BULLETINS 05. 79-06. 79-08 ***.**.**.*...*..*..*...*..****.*******.* ** ~- **..***.*** * * * * * .. * * * * * * * * * * * * * - * * * * * * * *
* N 0:        m w ID 0::
0                                                                                              u w
..J w
I-
          "'
rl x
          "'
0 0:
w 0 x
 
SALEM GENERATING STATION - UNITS 1      &2
      ,,
Ill
Ill
      ,,      ()
{')
MULTl -PLANT 1             l~SUE  NUMBER    ACTJON NO. ISSUE TITLE                                                                      LICENSEE IMPLEMENTATION STATUS
l!l 0 a>
    ,-,,.,    fl, n
N 0: m w ID 0::
    ~
0 u w
      .*,'
..J rl w
                  *Il.K.1.5
I-x 0 0: 0 w
                  *ll.K.l.10
x MULTI-PLANT ISSUE NUMBER ACTION NO.
                                                  'IE BULLETINS - REVIEW ESF VALVES ******. : *.*.**..........*.*..**.**.*********.
11.E.l.2.l.A l 1.E. l.2.1.B F016
* l *......................... *. ***. *........ .
: 11. f..1.2.2.A
IE BULLETIN~ ~ OPERABILITY STATUS ******..*....**.*..*.*......********..*.**** *r:( A............................. *.******..
*I 1. E.1.2.2.B
                  "'ILK. 1.20
*ll.E.1.2.2.C F017
                  *11. K.1. 21 IE BULLETIN IE BULLETINS - AUTO SG ANTICIPATORY REACTOR TRIP ..........................
*ll.l.3.1.l
r/ .............................. ,:.- ...... .
*IJ.E.3.1.2 11.E.4.l.l  
PROMPT MANUAL RE.ACTOR TRIP *.**.........*...*.*******.***.*****. A**********.**.***....*****.** *. t ...... .
*ll.L4.L2
                                                                                                                                  ****/A 10
*IL.E.4.1.3 F018 l I. E.4.2.1-4
                  *11. K. l. 22
*IJ.l.4.2.5.A
                  *II. K. 1.23 IE BULLETINS - AUX. HEAT REM SYSTEM, PROC ....................................     "f/ A..... ****************************** .. **
*II.E.4.2.5.B Jl.E.4.2.6 F019 Il.E.4.2.7 f019 "IL.E.4.2.8
IE BULLETINS - RV LEVEL, PROCEDURES ********..****.......*....**..********.*** -~~A ... *.***********************************
*II.F.1.1 F020
*11.F.l.2.A F020
*II.F.1.2.B F021
*ILF.1.2.C F022
*ll.F.1.2.0 F023
*Il.F.1.2.E F024
*II.r.1.2.F F025
*II. F. 2. 1  
*II.F.2.2
*II.F.2.3 F026
*JI.I.2.4 F026 11 11.G. l. l
*Il.G.L2
: 11. K..I (Op er. Reactors Only)
SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICENSEE IMPLEMENTATION STATUS AFS INITIATION & FLOl11-CONTROL GRADE ***.*..*........*........*.**..*..*****.*. -2.........................................
AFS INITIATION & FLOW - SAFETY GRADE ****....*.*.......*....*..*..*..**.*****...*************....*...****..**.**.*.*.....
AFS INITIATION & FLOW -
FLOW INDICATION COIUROL GRADE..*..**.**.**.*..**..**.* C **..*.****.**........****..*****.***.**...
AFS INITIATION & FLOW -
LL CAT It TECH SPECS.**..*..*..*..*..**.**.**.**.*****. C ********.****.***.*****.****..*******.....
AFS INITIATION & FLOW - SAFETY GRADE.**..................*.*..**.**.**..*..*** C ******************************************
EMERGENCY POWER FOR PRESSURIZER HEATERS - UPGRADE POWER SUPPLY *..*..**.****** ~ ***.*********.**..****..*...******.**.*...
EMERGENCY POWER FOR PRESSURIZER HEATERS - TECH SPECS *..*.**.* ~ ***..*********.* C *************************.************..**
DEDICATED HYDROGEN PENETRATIONS - DESIGN ***..*..*..*...*.**.**.**..*.*******.* NJ.A. ***************.**********************.
DEDICATED HYDR<MiEN PENETRATIONS - REVIEW & REVISE HZ CONTROL PROC ***..*.****** ~ ***.***.*.**..****.************.*....*...
DEDICATED HYDROGEN PENETRATION - INSTALL *.**.*..**...*.*.......********.****. NJ.A,. *****.*.*******.****************.A...
CONTAINMENT ISOLATION DEPENDABILITY -
It<P. DIVERSE ISOLATION.**.**.****.**.*.. C ******************** : ************** 9...
CONTAINMENT ISOLAT. DEPENDABILITY - CNTMT PRESS. SETPT. SEECIFIY PRESS **.**** ~ ******.******...**.*********.***...*...**.
CONTAINMENT ISOLATION DEPENDABILITY -
CNTMT PRESSURE SETPT. MODS ****.*****.*** C ******************************************
CONTAINMENT ISOLATION DEPENDABILITY -
CNTMT PURGE VALVES....*.*.***.**..*..**. C ***********************************.******
CONTAINMENT ISOLATION DEPENDABILITY - RADIATION SIGNAL ON PURGE VALVES ******. ~ ******..***.***.*********.***.*.**.***....
CONTAINMENT ISOLATION DEPENDABLITY - TECH SPECS.*..*...*..*.**.**..*********** C ***.**.*****************.********.****.. ;
* ACCIDENT - MONITORING - PROCEDURES.*****.****..*..*..**.****..*...*****.****** C **************************************.***
ACCIDENT - tllNITORING -
NOBLE GAS MONITOR *.*.**.........*.*..***.**.**.******* C ****************************************.*
ACCIDENT -
MONITORJMG - IODINE/PARTICULATE SAMPLING.*..*..*..**.**.****.****.. C ********************.******** -*************
ACCIDENT - MONITORING - CONTAINMENT HIGH-RANGE MONITOR *..*.***.**..*********** C *********************************.***.....
ACCIDENT - fl)NITORING - CONTAINMENT PRESSURE......*......*..*..**.*****..*.*** C **************************.*****.***.....*
ACCIDENT -
MONITORING - CONTAlrtolENT WATER LEVEL.....**........****..*..***...* C.*********************.**.******.****...*.
ACCIDENT - MONITORING - CONTAINMENT HYDROGEN *..*.*........*.***.*.*.***.*****. C ************************************.*****
INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE COOLING - PROCEDURES **.**.***. ~ ***.**..**.*.**..**..***.***........**....
IHSTRUMENTATIDM FOR DETECT. OF INADEQUATE CORE COOLING -
SUBCOOL METER......** S.e.e *.l'{q1;~~ **...*.*..*....*.................
INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE COOLING - OESC. OTHER ****..*** $~~ *. ~q1;~~--*******************************
INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE.CLING INSTLL ADD'L INSTRUMENTATION *** ~~~-ijQte~...........................
POWER SUPP. FOR PRESSURIZER RELIEF, BLOCK VALVES & LEVEL IND. -
UPGRADE ***.** ~ *.****.**..*****..****.**.*...*.*.........
POWER SUPP. FOR PRESSURIZER RELIEF, BLOCK VALVES & LEVEL IND. - TECH SP ****** ~ *****.******.*....**.......****.*.*.......
IE BULLETINS 05. 79-06. 79-08 ***.**.**.*...*..*..*...*..****.*******.* ** ~- **..***.*** * * * * *.. * * * * * * * * * * * * * -* * * * * * * *
* Ill
()
1 fl, n
~
10
(~
(~
                  *II.K.2.2                      ORDERS OM B&W PLANTS - PROCEDURES TO CONTROL AFW IND OF ICS *.**.**.***.**..*** Ni A"'.*....................................
I i.-*  
i'J .-*
'J fl,  
I  *Il.K.2.8                      ORDERS ON B&W PLANTS - UPGRADE AFW SYSTEM .....................................    *rr A................................... .
~  
11.K.2.9          F027          ORDERS ON B&W PLANTS - FEMA ON ICS ***.*..*.*.**.*........*.***.****.****...**** /. **..***...**.****...*******.****..*..
~ I 1
fl,
(<  
    ~
~
ll.K.2.10        F028          ORDERS ON 8&W PLANTS - SAFETY-GRADE TRIP .***....****.....**.**.***.*********** N,LA ********************.*********..*****.*
(1 I
    ,, I
ll II: z
    ~
:r UI L ::i 0
                  *II.K.2.11        F029          ORDERS ON B&W PLANTS - OPERATOR TRAINING ******.****...*....***************.** -~,LA *********.****.*****.****************..
I)  
1         *-
~
(<
II.K.2.13        F030          ORDERS Oii B&W PLANTS - THERMAL MECHANICAL REPORT (CE & WPLANTS ALSO) *..******..*****.*****.***.*.***.******..*..*......
            "'~   ll.K.2.14 II.K.2.15 F031          ORDERS ON B&W PLANTS - LIFT FREQUENCY OF PORV' S & SV's .**.**..*.**.***..****** ~/.I;\ ..*...*.***.**.....*.**.***............
ORDERS ON B&W PlANTS - EFFECTS Of SLUG FLOW *..**..****.*****.*.*************** ~/.I;\ ...................................... .
(1 I   II.K.2.16        F032          ORDERS ON B&W PLANTS - RCP SEAL DAMAGE ******.*...*....**.*..*********.******** ~/.I;\ ....*******..*....*....**...........*..
ll     ll.K.2.17        F033          ORDERS ON B&W PLANTS - VOIDING IN RCS (CE & W PLANTS ALSO) ..********..******.* C: *****.***********************************
II:   II.K.2.19                      BENCHMARK ANALYSIS OF SEQUENTIAL AFW FLOW TO ONCE THROUGH STM GENERATOR ******* ~/.I;\ ******.*....*.......*..***.............
z     *Jl.K.2.20        F035        ORDERS ON B&W PLAllTS - SYSUM RESPONSE TO SB LOCA ..***.***..*****.**.********* ~/.I;\ *.*...*****..***...**..... : ...*........
:r           UI   *I I. K. 3 ..1. A  F036          B&o TASK FORCE - AUTOMATIC PORV ISOLATION DESIGN .**..*.*...*..*****.******.*** ~/.I;\ *.**...*.*...**.......**....*..........
L
::i   *II.K.3.1.B                      FINAL RECOlttEHDATIDNS, 8&D TASK FORCE - AUTO PORV ISO TEST/INSTALL ****.****.** ~/.I;\ *........*.*...........................
I) 0 Jl.K.3.2          F037          B&O TASK FORCE - REPORT ON PORV FAILURES ****....**..*..*..*...*****.**.**.***. ~ ******.***..*******.*****..***..*.*......
.,                                                  B&O TASK FORCE - REPORTING SV & RV FAILURES AND CHALLENGES *.*..****.*****.**** ~ **********.**.*.*******.*.****.**.*......
11.K.3.3        F038
,:;                11.K.3.5.A        F039          B&o TASK FORCE - AUTO TRIP OF RCP' S PROPOSED l<<JOIFJCATIONS ****..*.* , *.******** ~ ........................................ .
u I
u I
            ~      II.K.3.5.B        F039          B&0 TASK FORCE - AUTO TRIP OF RCP' S l<<IDJFlCATlONS .*.**..**.**.******.*****..** ~ ***.**.******.***...****..**....*.**.....
II.  
~           II.
~
11.K.3.1                        8&0 TASK FORCE - EVALUATION OF PORV OPENING PROBABILITIES ..**.*****.***.****** ~/.I;\ .**.**.**...*.. ; ...................... .
U)
II. K. 3. 9      F040          B&0 TASK FORCE - PID CONTROLLER MODIFICATION .**..**.*.***..****.******.**.*** -~ ******.***.****.****.*..*....**..........
B&O TASK FORCE - PROPOSED ANTICIPATORY TRIP MODIFICATIONS ...******.**.******* -~ ..********.*********.*.***.***.*.........
U) ll.K.3.10        F041 ll.K.3.11                      B&O TASK FORCE - JUSTIFY USE OF CERTAIN PORV*.**.***..*.**..**.*************** ~/.~ ******.**********..*.*..***...***......
                                                                                                                                                                                .....
(')
(')
il n           0      11.K.3.12.A                    B&0 TASK FORCE - ANTICIPATORY TRIP ON TURBINE TRIP PROPOSED llJDS *******.*****. ~ ***********..****.****..*.**.*.........**
il 0 n  
  *J                                               B&O TASK FORCE - ANTICIPATORY TRIP IHI TURBINE TRIP INSTALL MODS *.*****.******* ~ **.***********.**.*********.*****.
*J t
t u
Ol u
Ol CD 11.K.3.12.B ll.K.3.13.A Il.K.3.13.B F042 F043 F043 B&O TASK FORCE - HPCI & RCIC SYSTEM INITIATION LEVELS ANALYSIS *.**.*********** ~/.~................................
CD qo oJ J...  
B&0 TASK FORCE - HPCI & RCIC INITIATION LEVELS MODIFICATION ***..************.* ~/. ****************.****..**..******. **** 9    ***
<.r J
-'oJ       qo                                                                                  ,,J ...
*-
<           .r J
(
(
u 0
0 u
<
MUL Tl -PLANT l~SUE NUMBER ACTJON NO.  
 
*Il.K.1.5
SALEM GENERATING STATION - UNITS 1 &2
*ll.K.l.10
..      I                    ,_,LTI-PLANT 1(1      [l   ISSUL NlJolBER  ACTION NO. ISSUE TITLE                                                                                                  LICEHSEE IMPLEMENTATION STATUS
"'ILK. 1.20
~        ri.
*11. K.1. 21
If*
*11. K. l. 22
*7*
*II. K. 1.23
,,,"'"'        *ll.K.3.14      F044
*II.K.2.2
* B&O TASK FORCE - ISO CONDENSER ISOLAHOH ON HIGH RAD .**.**.**.************. NI.A. *.*.****.**..**.....**......*******..... _
*Il.K.2.8 11.K.2.9 F027 ll.K.2.10 F028
c:o U)            Jl.K.3.15        F045          B&O TASK FORCE - tEOIFY HPCI & RCIC BRK DETECTJON CIRCUITRY **.*...**.****.* NI.A. **..**....*.*...........*............*..
*II.K.2.11 F029 II.K.2.13 F030 ll.K.2.14 F031 II.K.2.15 II.K.2.16 F032 ll.K.2.17 F033 II.K.2.19
ll.K.3.16A      F046        -B&O TASK FORCE - CffALLEHGE & FAILURE OF RELIEF VALVES STUDY .*****.*.**.**** NIA .*.***.....****..****......*.****....... _
*Jl.K.2.20 F035
ll. K. 3.16. 8  F046          B&O TAS<< FORCE - CHALLENGE & FAILURE OF RELIEF VALVES tllDIFICATIONS ****..** NIA *.......*.*.**......**.**..******........
*I I. K. 3.. 1. A F036
Jl.K.3.17        F047          B&O TASK FORCE .,. ECC SYSTEM OUTAGES *****..*...*.......*.....*..*...*****.** ~- *..**.************...**.***..***..**...*.. _
*II.K.3.1.B Jl.K.3.2 F037 11.K.3.3 F038 11.K.3.5.A F039 II.K.3.5.B F039 11.K.3.1 II. K. 3. 9 F040 ll.K.3.10 F041 ll.K.3.11 11.K.3.12.A 11.K.3.12.B F042 ll.K.3.13.A F043 Il.K.3.13.B F043 SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICENSEE IMPLEMENTATION STATUS
Ill  JI. K. 3.18.A    F048          B&O TASK FORCE - ADS ACTUATION STIJDY *****.**......*.....*...*..*.***.***.** NIA .*..**.........*..*.*...**...*..........
'IE BULLETINS - REVIEW ESF VALVES ******. : *.*.**..........*.*..**.**.*********.
(~    TI.K.3.18.8      F048          B&O TASK FORCE - ADS ACTUATION PROPOSED llJDIFICATIONS ..**..****.*.********* WA ....................................... .
* l *......................... *. * * *. *.........
.,.           I I. K. 3.18. C  F048          e&o TASl FORCE - ADS ACTUATION MOOIFICATIONS .*.... ; .*.***********.***.***** NIA *....**....*...............*..**........ -
IE BULLETIN~ ~ OPERABILITY STATUS ******..*....**.*..*.*......********..*.**** *r:( A............................. *.******..
I C*
IE BULLETIN PROMPT MANUAL RE.ACTOR TRIP *.**.........*...*.*******.***.*****. r/ A **********.**.***....*****.** *. t.......
tD      ... *ll.K.3.19      F049          B&O TASK FORCE - INTERLOCK RECIRCULATORY PUMP tllDIFICATIONS ******.******.** NIA *.*..............................~ ... .
IE BULLETINS - AUTO SG ANTICIPATORY REACTOR TRIP.......................... ****/A..............................,:.-.......
N 0        fl,  *II. K. 3.20                  B&O TASK FORCE - LOSS OF SVC WATER AT BRP .*..**.....*.*..*.*.*.**..*..***** N/A ..................................-                                                          .. .
IE BULLETINS - AUX. HEAT REM SYSTEM, PROC.................................... "f/ A..... ******************************.. **
C\I      ,_I    f LK. 3.21. A  F050          B&O TASK FORCE - RESTART OF CSS & LPCI LOGIC DESlGfL .*..**.*****.********* NIA ..............*...*..*..................
IE BULLETINS - RV LEVEL, PROCEDURES ********..****.......*....**..********.*** -~~A... *.***********************************
... ,,,
ORDERS OM B&W PLANTS - PROCEDURES TO CONTROL AFW IND OF ICS *.**.**.***.**..*** Ni A"'.*....................................
ORDERS ON B&W PLANTS - UPGRADE AFW SYSTEM..................................... *rr A....................................
ORDERS ON B&W PLANTS - FEMA ON ICS ***.*..*.*.**.*........*.***.****.****...**** /. **..***...**.****...*******.****..*..
ORDERS ON 8&W PLANTS - SAFETY-GRADE TRIP.***....****.....**.**.***.*********** N,LA ********************.*********..*****.*
ORDERS ON B&W PLANTS - OPERATOR TRAINING ******.****...*....***************.** -~,LA *********.****.*****.****************..
ORDERS Oii B&W PLANTS - THERMAL MECHANICAL REPORT (CE & W PLANTS ALSO) *..******..*****.*****.***.*.***.******..*..*......
ORDERS ON B&W PLANTS - LIFT FREQUENCY OF PORV' S & SV's.**.**..*.**.***..****** ~/.I;\\..*...*.***.**.....*.**.***............
ORDERS ON B&W PlANTS - EFFECTS Of SLUG FLOW *..**..****.*****.*.*************** ~/.I;\\.......................................
ORDERS ON B&W PLANTS -
RCP SEAL DAMAGE ******.*...*....**.*..*********.******** ~/.I;\\....*******..*....*....**...........*..
ORDERS ON B&W PLANTS - VOIDING IN RCS (CE & W PLANTS ALSO)..********..******.* C: *****.***********************************
BENCHMARK ANALYSIS OF SEQUENTIAL AFW FLOW TO ONCE THROUGH STM GENERATOR ******* ~/.I;\\ ******.*....*.......*..***.............
ORDERS ON B&W PLAllTS - SYSUM RESPONSE TO SB LOCA..***.***..*****.**.********* ~/.I;\\ *.*...*****..***...**..... :...*........
B&o TASK FORCE - AUTOMATIC PORV ISOLATION DESIGN.**..*.*...*..*****.******.*** ~/.I;\\ *.**...*.*...**.......**....*..........
FINAL RECOlttEHDATIDNS, 8&D TASK FORCE - AUTO PORV ISO TEST/INSTALL ****.****.** ~/.I;\\ *........*.*...........................
B&O TASK FORCE -
REPORT ON PORV FAILURES ****....**..*..*..*...*****.**.**.***. ~ ******.***..*******.*****..***..*.*......
B&O TASK FORCE - REPORTING SV & RV FAILURES AND CHALLENGES *.*..****.*****.**** ~ **********.**.*.*******.*.****.**.*......
B&o TASK FORCE - AUTO TRIP OF RCP' S PROPOSED l<<JOIFJCATIONS ****..*.*, *.******** ~.........................................
B&0 TASK FORCE -
AUTO TRIP OF RCP' S l<<IDJFlCATlONS.*.**..**.**.******.*****..** ~ ***.**.******.***...****..**....*.**.....
8&0 TASK FORCE -
EVALUATION OF PORV OPENING PROBABILITIES..**.*****.***.****** ~/.I;\\.**.**.**...*.. ;.......................
B&0 TASK FORCE - PID CONTROLLER MODIFICATION.**..**.*.***..****.******.**.*** -~ ******.***.****.****.*..*....**..........
B&O TASK FORCE - PROPOSED ANTICIPATORY TRIP MODIFICATIONS...******.**.******* -~..********.*********.*.***.***.*.........
B&O TASK FORCE - JUSTIFY USE OF CERTAIN PORV *.**.***..*.**..**.*************** ~/.~ ******.**********..*.*..***...***......
B&0 TASK FORCE - ANTICIPATORY TRIP ON TURBINE TRIP PROPOSED llJDS *******.*****. ~ ***********..****.****..*.**.*.........**
B&O TASK FORCE - ANTICIPATORY TRIP IHI TURBINE TRIP INSTALL MODS *.*****.******* ~ **.***********.**.*********.*****. 9.....
B&O TASK FORCE - HPCI & RCIC SYSTEM INITIATION LEVELS ANALYSIS *.**.*********** ~/.~................................
B&0 TASK FORCE - HPCI & RCIC INITIATION LEVELS MODIFICATION ***..************.* ~/. ****************.****..**..******. ****
.. I 1(1
[l
~ ri.
If*
*7* "' "',,,
c:o U)
Ill
(~
I C*...
tD N
fl, 0
C\\I I
C1J
C1J
(~
(~,,,
11.K. 3.21.8    F050          B&O TASK FORCE - RESTART OF CSS & LPCI LOGIC DESIGN llJDIFICATIONS ********.* NIA .......*................................
~
IL K.3. 22.A    F051          B&O TASK FORCE - RCIC SUCTIOH VERIFICATION PROCEDURES .**.. - ..**.**.**.***.* NIA ...*...............**.................. - -
(1 I
          ~   JLK.3.22.8      F051          B&O TASK FORCE - RCIC SUCTION MODIFICATION *...*.......**.*****.************ N/A ......*.................................
ll p;
(1 I I. K. 3. 24  F052          8&0 TASK FORCE - SPACE COOLING FOR HPCI/RCI LOSS OF AC POWER *************** N/A ..............*......................*...
I                                  B&0 TASK FORCE - POWER OH PtllP SEALS PROPOSED lllDIFICATIONS .********.****** .C************************.*.*******.**......
ll ILK. 3.25.A p;   ll.K.3.25.B    F053          B&O TASK FORCE - POWER ON PllfP SEALS llJDIFICATIONS ....**.**..****...*****.* NIA .........*.......................*......
B&O TASK FORCE - COMMON REFERENCE LEVEL FOR BWRS ***.*************.*******.* NIA ......****.. -..........*.. : ............ .
          *-
(,
(,
        .{fl ILK. 3.27 ll.K.3.28 F054 F055          B&O TASK FORCE - QUALIFICATION OF ADS ACCtl4ULATORS ..*....******..*****.**** NIA .....**..................*..............
::i:  
::i:
.{fl a_
a_
::i
::i *l I.K.3.29      F056          BIO TASK FORCE - PERFORMANCE OF ISOLATION CONDENSERS *....**..**.*********** NIA ....*..*................................ -
['-
['-
Ill           II.K.3.30.A                    8&0 TASK FORCE - SCHEDULE FOR OUTLINE OF SB LOCA MODEL .................... .C.......................................... .
Ill
(")       )-   Jl.K.3.30.8    F057          BIO TASK FORCE - SB LOCA lllDEL, JUSTIFICATION **..**.**.**.**..*****.******* .C********....***.****........*.***.*........
(")  
ll.K.3.30.C                    B&O TASK FORCE - SB LOCA METHODS NEW ANALYSES .**.*..**.**.**.**.*********.* ~- ......................................... .
)-
C1J ID       ~    11. K. 3. 31    F058          B&D TASK FORCE - COMPLIANCE WITH CFR 50. 46 *.*....*..**.*..*..*...*****.***.*C**.************.*****.*..***.*.*. ~ ...*.....
C1J
...I p,...    *JLK.3.40                      B&O TASK FORCE - RCP SEAL DAMAGE - COVERED BY l I. K. 2. 16 AND II. K. 3. 25 *.***.*C*.**********.**..***.***....**.*.*...*.....
~
I                                             B&O TASK FORCE - EFFECTS OF SLUG FLOW - COVERED BY ll. K.2.15 **************. IVA ....................................... *
ID I
  ... Ul
p, I
                *I I. K. 3.43 B&O TASK FORCE - EVALUATE TRANSIENT WITH SINGLE FAILURE ****.***..*****.**** JV.A *****.*****.***.****...*.*.**.*...*..*..
Ul
Il.K.3.44      f059 I I. K. 3-45    FOGO          B&O TASK FORCE - ANALYSES TO SUPPORT .******.*******.****.*************.**** JV.I\. * * *.** * ** * * * * * * * . * * * * * * * * * * * * * * * * * * * * * * *
(')
(')
F061           RESPONSE TO LIST OF CONCEHftS FROM ACRS CONSULTANT ****.*..*.**************** JV.I\. ....................................... .
Ill 0 C1J C\\I ex m llJ ID 0::
e* . .
0 0
II. K. 3.46 Ill C1J C\I 0
<l' llJ
                *I I. K. 3. 57  F062          IDENTIFY WATER SOURCES PRIOR TO MANUAL ACTIVATION OF ADS ****.*.***.********                                 tt(l\....................................... ..
_J...
ex m          JIJ.A.1.1                    EMERGENCY PREPAREDNESS~ SHORT TERM******. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ******..***..
llJ I-x
llJ ID 0::
<l' 0 ex 0
0 0
llJ x
llJ      <l'                                                                            '.'" 5 -
,_,L TI-PLANT ISSUL NlJolBER ACTION NO.
_J llJ I-
*ll.K.3.14 F044 Jl.K.3.15 F045 ll.K.3.16A F046 ll. K. 3.16. 8 F046 Jl.K.3.17 F047 JI. K. 3.18.A F048 TI.K.3.18.8 F048 I I. K. 3.18. C F048
          ...
*ll.K.3.19 F049
x <l' 0
*II. K. 3.20 f LK. 3.21. A F050 11.K. 3.21.8 F050 IL K.3. 22.A F051 JLK.3.22.8 F051 I I. K. 3. 24 F052 ILK. 3.25.A ll.K.3.25.B F053 ILK. 3.27 F054 ll.K.3.28 F055
ex 0 llJ x
*l I.K.3.29 F056 II.K.3.30.A Jl.K.3.30.8 F057 ll.K.3.30.C
: 11. K. 3. 31 F058
*JLK.3.40
*I I. K. 3.43 Il.K.3.44 f059 I I. K. 3-45 FOGO II. K. 3.46 F061  
*I I. K. 3. 57 F062 JIJ.A.1.1 SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICEHSEE IMPLEMENTATION STATUS
* B&O TASK FORCE -
ISO CONDENSER ISOLAHOH ON HIGH RAD.**.**.**.************. NI.A. *.*.****.**..**.....**......*******..... _
B&O TASK FORCE - tEOIFY HPCI & RCIC BRK DETECTJON CIRCUITRY **.*...**.****.* NI.A. **..**....*.*...........*............*..
-B&O TASK FORCE - CffALLEHGE & FAILURE OF RELIEF VALVES STUDY.*****.*.**.**** NIA.*.***.....****..****......*.****....... _
B&O TAS<< FORCE - CHALLENGE & FAILURE OF RELIEF VALVES tllDIFICATIONS ****..** NIA *.......*.*.**......**.**..******........
B&O TASK FORCE.,. ECC SYSTEM OUTAGES *****..*...*.......*.....*..*...*****.** ~- *..**.************...**.***..***..**...*.. _
B&O TASK FORCE - ADS ACTUATION STIJDY *****.**......*.....*...*..*.***.***.** NIA.*..**.........*..*.*...**...*..........
B&O TASK FORCE - ADS ACTUATION PROPOSED llJDIFICATIONS..**..****.*.********* WA........................................
e&o TASl FORCE - ADS ACTUATION MOOIFICATIONS.*.... ;.*.***********.***.***** NIA *....**....*...............*..**........ -
B&O TASK FORCE -
INTERLOCK RECIRCULATORY PUMP tllDIFICATIONS ******.******.** NIA *.*.............................. ~
B&O TASK FORCE -
LOSS OF SVC WATER AT BRP.*..**.....*.*..*.*.*.**..*..***** N/A.................................. -
B&O TASK FORCE - RESTART OF CSS & LPCI LOGIC DESlGfL.*..**.*****.********* NIA..............*...*..*..................
B&O TASK FORCE - RESTART OF CSS & LPCI LOGIC DESIGN llJDIFICATIONS ********.* NIA.......*................................
B&O TASK FORCE - RCIC SUCTIOH VERIFICATION PROCEDURES.**.. -..**.**.**.***.* NIA...*...............**.................. --
B&O TASK FORCE - RCIC SUCTION MODIFICATION *...*.......**.*****.************ N/A......*.................................
8&0 TASK FORCE - SPACE COOLING FOR HPCI/RCI LOSS OF AC POWER *************** N/A..............*......................*...
B&0 TASK FORCE -
POWER OH PtllP SEALS PROPOSED lllDIFICATIONS.********.******.C ************************.*.*******.**......
B&O TASK FORCE -
POWER ON PllfP SEALS llJDIFICATIONS....**.**..****...*****.* NIA.........*.......................*......
B&O TASK FORCE -
COMMON REFERENCE LEVEL FOR BWRS ***.*************.*******.* NIA......****.. -..........*.. :.............
B&O TASK FORCE - QUALIFICATION OF ADS ACCtl4ULATORS..*....******..*****.**** NIA.....**..................*..............
BIO TASK FORCE -
PERFORMANCE OF ISOLATION CONDENSERS *....**..**.*********** NIA....*..*................................ -
8&0 TASK FORCE - SCHEDULE FOR OUTLINE OF SB LOCA MODEL.....................C...........................................
BIO TASK FORCE -
SB LOCA lllDEL, JUSTIFICATION **..**.**.**.**..*****.*******.C ********....***.****........*.***.*........
B&O TASK FORCE -
SB LOCA METHODS NEW ANALYSES.**.*..**.**.**.**.*********.* ~-..........................................
B&D TASK FORCE -
COMPLIANCE WITH CFR 50. 46 *.*....*..**.*..*..*...*****.***.* C **.************.*****.*..***.*.*. ~...*.....
B&O TASK FORCE -
RCP SEAL DAMAGE - COVERED BY l I. K. 2. 16 AND II. K. 3. 25 *.***.* C *.**********.**..***.***....**.*.*...*.....
B&O TASK FORCE - EFFECTS OF SLUG FLOW - COVERED BY ll. K.2.15 **************. IVA.......................................
* B&O TASK FORCE - EVALUATE TRANSIENT WITH SINGLE FAILURE ****.***..*****.**** JV.A *****.*****.***.****...*.*.**.*...*..*..
B&O TASK FORCE - ANALYSES TO SUPPORT.******.*******.****.*************.**** JV.I\\. * * *.** * ** * * * * * * *. * * * * * * * * * * * * * * * * * * * * * *
* RESPONSE TO LIST OF CONCEHftS FROM ACRS CONSULTANT ****.*..*.**************** JV.I\\.........................................
IDENTIFY WATER SOURCES PRIOR TO MANUAL ACTIVATION OF ADS ****.*.***.******** tt(l\\.........................................
EMERGENCY PREPAREDNESS~ SHORT TERM ******. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ******..***.. e*...  
'.'" 5 -


SALEM GENERATING STATION - UNITS 1    &2
(()  
          ..
*11
          ..        (()
()
flt.IL TI-PLANT
fl, If*
          *11       ()
CJ*,...,,.
          ..        fl, JSSUE NUMBER      ACTION NO.          ISSUE TITLE                                                                    LICENSEE IMPLEMENTATION STATUS If*
        ,,....,.,
CJ*
      ,,,
(]*
(]*
0             II l. A. 1. 2 . 1                    'UPGRADE EMERGENCY SUPPORT FACILITIES - INTERIM TSC OSC & EOF ****.********.*** C......................................... .
0,,,
lll.A.1.2.2                            UPGRADE EMERGENCY SUPPORT FACILITIES-DESIGN-INCORP. INTO F063/F064/F065 ****.* ~~~-~9t~~---*******************************
Ill
(SEE F063, F064, f065)
II I. A. l. 2. 3                      UPGRADE EMER SUPPORT FACILITIES - tlJDS INCORPOR. INTO F063, F064    &F065 ****** ~~~-~9t~~ .....*...............*..* :;'. ...... .
(SlE F063, F064, F065)
Ill  Ill.A.2.1          F067                UPGRADE    PREPAREDNESS - UPGRADE EMERGENCY PLANS TO APP. E. 10 CFR 50 .........* ~ .......*..................................
(~
(~
111.A.2.2          F068                UPGRADE    PREPAREDNESS - METEOROLOGICAL DATA ................................... C*..****...**.****.********..**.........*..
1' I
                    ..
0 r\\I fl, 0
1' I *lll.0.1.1.1                          PRIMARY    COOLANT OUTSIDE CONTAINMENT - LEAK REDUCTION ......................... C**********..**.*******************.*......
l'll I
0 PRIMMY    COOLANT OUTSIDE CONTAINMENT - TECH SPECS ............................. C...................................            .. ..
      "'
0 r\I fl,
                        *llL0.1.1.2 IJI.0.3.3.1                            INPLANT RAD. l<<JNIT. - PROVIDE MEANS TO DETER. PRESENCE OF RADIOIOOINE .******
* l ....................................      A .. .
      '".
I l'll
                    **  III.0.3.3.2        F069                IMPLANT AADIATIOH MONIT. - tl>DIFICATIONS TO ACCURATELY MEAS. IODINE ******.*************************..*.***..**..* 9- .. .
CONTROL ROOM HABITABILITY - REVIEW********.*****.*******..*.***********.***** C. ; .................*......................
(,
(,
Jt, 111.0.3.4.1        F070
Jt,  
                    ~   *lll.D.3.4.2      F070                CONTROL ROOl'I HABITABILITY - SCHEDULE MODIFICATIONS ........................... C c*************.*****************.********..
~
                                                                                                                                                            . . ..
(1 I
(1   *IIl.0.3.4.3                          CONTROL ROOM HABITABILITY - IMPLEMENT llH>IFICATIONS .***..***********.*******.**. ~~- ****.**********************..*..*....*
(I I~..
I  MPA-fOOB          F008          1t I. 0.1.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN ...........*.....*.. -~~~ .~9t~~- rn.. J... Q.J ....................        r **
(I   MPA-F063          F063                III.A. I. 2 TECHNICAL SUPPORT CENTER ......................................*....~Etet .fiQt~~ ................................. .
                  ..
I~
(<
(<
HPA-F064 MPA-F065 F064 F065 111. A. 1. Z OPERATIONAL SUPPORT CENTER ****.**..*.*..**.****.**..*.***.**.****** C......................................... .
:L w
111.A. l.2 EMERGENCY OPERATIONS FACILITY ******..*.*..***....****.***.*.******* C.**********.*.****..**.*.......*..........
: a. :)
:L a.
ID tO I")  
w
~
:)   MPA-F07l          F071            *I. D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWP TO f-8) ..... ~ ................ -~~(;!. ~9t~~- !'~.*. J...Q** L ..................... .
m "'
MPA-8072          8072                lllJREG-0737 TECH SPECS (GENERIC LETTERS 82-16 & 83-02) ........................ C......................................... .
ID A
ID tO                  MPA-8083          8083            i'-TECH SPEC COVERED BY GENERIC LETTERS 83-26 & 83-37 FOR NlJREG-0737 ............ $~~-~9t~?................................. .
I II.
I")            ~
I
61.4.1            GOOl                REACTOR COOLANT PUMP TRIP (GENERIC LETTER 85-12) ........................*.... C......................................... .
.~
ID
(')
tO 0
m
m
    . "'
('\\I a: m w ([)
ID I
: a.
A II.
0 Iii
    .
<l' iil...
I            .~
~ <l' E5 0
ID
x flt.IL TI-PLANT JSSUE NUMBER ACTION NO.
    ..           (')
II l. A. 1. 2. 1 lll.A.1.2.2 (SEE F063, F064, f065)
tO m              0
II I. A. l. 2. 3 (SlE F063, F064, F065)
('\I a: m w ([)
Ill.A.2.1 F067 111.A.2.2 F068
: a.                                                                                                           0 Iii <l' iil... ...
*lll.0.1.1.1
    ~ <l' E5            0 x
*llL0.1.1.2 IJI.0.3.3.1 III.0.3.3.2 F069 111.0.3.4.1 F070
-------------------------------
*lll.D.3.4.2 F070
*IIl.0.3.4.3 MPA-fOOB MPA-F063 HPA-F064 MPA-F065 MPA-F07l MPA-8072 MPA-8083 61.4.1 F008 F063 F064 F065 F071 8072 8083 GOOl SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICENSEE IMPLEMENTATION STATUS
'UPGRADE EMERGENCY SUPPORT FACILITIES - INTERIM TSC OSC & EOF ****.********.*** C..........................................
UPGRADE EMERGENCY SUPPORT FACILITIES-DESIGN-INCORP. INTO F063/F064/F065 ****.* ~~~-~9t~~---*******************************
UPGRADE EMER SUPPORT FACILITIES - tlJDS INCORPOR. INTO F063, F064 & F065 ****** ~~~-~9t~~.....*...............*..* :;'........
UPGRADE PREPAREDNESS - UPGRADE EMERGENCY PLANS TO APP. E. 10 CFR 50.........* ~.......*..................................
UPGRADE PREPAREDNESS - METEOROLOGICAL DATA................................... C *..****...**.****.********..**.........*..
PRIMARY COOLANT OUTSIDE CONTAINMENT -
LEAK REDUCTION......................... C **********..**.*******************.*......
PRIMMY COOLANT OUTSIDE CONTAINMENT - TECH SPECS............................. C...................................
INPLANT RAD. l<<JNIT. - PROVIDE MEANS TO DETER. PRESENCE OF RADIOIOOINE.******
* l.................................... A...
IMPLANT AADIATIOH MONIT. - tl>DIFICATIONS TO ACCURATELY MEAS. IODINE ******.*************************..*.***..**..* 9-...
CONTROL ROOM HABITABILITY - REVIEW ********.*****.*******..*.***********.***** C. ;.................*......................
CONTROL ROOl'I HABITABILITY - SCHEDULE MODIFICATIONS........................... C *************.*****************.********..
c CONTROL ROOM HABITABILITY -
IMPLEMENT llH>IFICATIONS.***..***********.*******.**. ~~- ****.**********************..*..*....*
1t I. 0.1.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN...........*.....*.. -~~~.~9t~~- rn.. J... Q.J.................... r **
III.A. I. 2 TECHNICAL SUPPORT CENTER......................................*....  
~Etet.fiQt~~..................................
111. A. 1. Z OPERATIONAL SUPPORT CENTER ****.**..*.*..**.****.**..*.***.**.****** C..........................................
111.A. l.2 EMERGENCY OPERATIONS FACILITY ******..*.*..***....****.***.*.******* C.**********.*.****..**.*.......*..........
*I. D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWP TO f-8)..... ~................ -~~(;!. ~9t~~- !'~.*. J... Q ** L......................
lllJREG-0737 TECH SPECS (GENERIC LETTERS 82-16 & 83-02)........................ C..........................................
i'-TECH SPEC COVERED BY GENERIC LETTERS 83-26 & 83-37 FOR NlJREG-0737............ $~~-~9t~?..................................
REACTOR COOLANT PUMP TRIP (GENERIC LETTER 85-12)........................*.... C.......................................... -------------------------------


'* .
NOTES II.B.3.4 POST ACCIDENT SAMPLING SYSTEM (PASS}
NOTES II.B.3.4   POST ACCIDENT SAMPLING SYSTEM (PASS}
This item was completed by PSE&G and the program was submitted to NRC.
This item was completed by PSE&G and the program was submitted to NRC. NRC reviewed and approved PSE&G PASS Program in SSER dated 11/4/83. In 1988, NRC informed PSE&G that the PASS design is deficient in that back-up grab sample capability was not provided. PSE&G is making modifications to the PASS to provide back-up capability by the first quarter 1990.
NRC reviewed and approved PSE&G PASS Program in SSER dated 11/4/83.
I.D.1     CONTROL ROOM DESIGN REVIEW (CRDR}
In 1988, NRC informed PSE&G that the PASS design is deficient in that back-up grab sample capability was not provided.
The control room design review program plan, summary report, and additional required reports were submitted and approved via SSER dated 3/2/87. Plant design modifications have been developed and the schedule for implementation was discussed at a NRC meeting on 5/21/87. At that meeting a three outage schedule was presented and agreed to by the NRC Staff. The results of this meeting are documented in a ~SE&G letter dated 6/4/87. Salem Unit 1 CRDR is scheduled for completion at the close of the 10th refueling outage and Salem Unit 2 CRDR is scheduled for completion at the close of the 6th refueling outage.
PSE&G is making modifications to the PASS to provide back-up capability by the first quarter 1990.
I.D.2.3   SAFETY PARAMETER DISPLAY SYSTEM (SPDS) - FULLY IMPLEMENTED SPDS is fully implemented; however, additional improvements are scheduled for completion by July l, 1989.
I.D.1 CONTROL ROOM DESIGN REVIEW (CRDR}
II.D.1.2.B     RELIEF AND SAFETY VALVE TESTING - PLANT SPECIFIC REPORT This item is still open pending NRC review of PSE&Gs response to RAI dated 3/31/89, and further response scheduled for 8/1/89.
The control room design review program plan, summary report, and additional required reports were submitted and approved via SSER dated 3/2/87.
II.F.2.2       INSTRUMENTATION FOR INADEQUATE CORE COOLING II.F.2.3 II.F.2.4 Items open against CETs, RVLIS, and SMM awaiting upgrade modifications and/or technical specification amendment approval from NRC.
Plant design modifications have been developed and the schedule for implementation was discussed at a NRC meeting on 5/21/87.
At that meeting a three outage schedule was presented and agreed to by the NRC Staff.
The results of this meeting are documented in a ~SE&G letter dated 6/4/87.
Salem Unit 1 CRDR is scheduled for completion at the close of the 10th refueling outage and Salem Unit 2 CRDR is scheduled for completion at the close of the 6th refueling outage.
I.D.2.3 SAFETY PARAMETER DISPLAY SYSTEM (SPDS) -
FULLY IMPLEMENTED SPDS is fully implemented; however, additional improvements are scheduled for completion by July l, 1989.
II.D.1.2.B RELIEF AND SAFETY VALVE TESTING -
PLANT SPECIFIC REPORT This item is still open pending NRC review of PSE&Gs response to RAI dated 3/31/89, and further response scheduled for 8/1/89.
II.F.2.2 II.F.2.3 II.F.2.4 INSTRUMENTATION FOR INADEQUATE CORE COOLING Items open against CETs, RVLIS, and SMM awaiting upgrade modifications and/or technical specification amendment approval from NRC.  


III.A.1.2.2   UPGRADE EMERGENCY SUPPORT FACILITIES - DESIGN III.A.1.2.3   UPGRADE EMERGENCY SUPPORT FACILITIES -
III.A.1.2.2 III.A.1.2.3 UPGRADE EMERGENCY SUPPORT FACILITIES -
MODIFICATIONS Items are still open pending implementation of design improvements and subsequent modification of the TSC. The scheduled completion date is October 1989.
DESIGN UPGRADE EMERGENCY SUPPORT FACILITIES -
MPA-B083       TECH SPECS COVERED BY GL 83-26 & 83-37 FOR NUREG 0737 Tech Specs for RVLIS and RCS Vents were submitted to NRC and are currently in the review process.
MODIFICATIONS Items are still open pending implementation of design improvements and subsequent modification of the TSC.
The scheduled completion date is October 1989.
MPA-B083 TECH SPECS COVERED BY GL 83-26 & 83-37 FOR NUREG 0737 Tech Specs for RVLIS and RCS Vents were submitted to NRC and are currently in the review process.
I}}
I}}

Latest revision as of 03:43, 6 January 2025

Forwards Rept Re Status of Implementation of TMI Action Plan Items,Per 890414 Request
ML18094A351
Person / Time
Site: Salem  
Issue date: 04/18/1989
From: Miltenberger S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-***, TASK-TM NLR-N89079, NUDOCS 8904260166
Download: ML18094A351 (10)


Text

Public Service Electric and Gas Company Steven E. Miltenberger Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4199 Vice President and Chief Nuclear Officer APR 1 8 1009 NLR-N89079 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

STATUS OF IMPLEMENTATION OF TMI ACTION PLAN ITEMS SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and Gas Company (PSE&G) hereby submits its response to your letter, dated April 14, 1989, which requested us to promptly review and report the status of the implementation of the TMI Action Plan Items for each of the Salem Units.

The enclosure to this letter contains Enclosure 1 of your letter with the status of each item updated as per your instructions.

Completion of the items in Enclosure 1 has been verified using our records on the TMI event.

In some cases, the item numbers in the enclosure did not correlate directly with NUREG 0737, NUREG 0737 Supplement 1, or the other related documents we reviewed.

In these cases we statused the item using the descriptive text of the TMI associated NUREGs (i.e., NUREG-0737, -0660, -0645, etc.),

as indicated in our response.

In addition, a verification of actual implementation of item responses was conducted to the fullest extent possible considering the time constraints imposed by your letter.

This verification compared our original response with the current plant configuration.

Verifications were performed to assure that this correspondence is as accurate as possible.

390426C> 166--;*==-9-u4re ___ J PDR ADOCK 05000272 p

F'DC

Document Control Desk NLR-N89079 2 -

APR 18 1900 PSE&Gs responses to the TMI Action Plan Items are being controlled within the Station Procedure and Design Control Processes.

Should you have any questions or comments concerning this response, please do not hesitate to contact us.

Enclosure c

Mr. J. c. Stone Licensing Project Manager Ms. K. Halvey Gibson Senior Resident Inspector Sincerely, Mr. w. T. Russell, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625

l'l

()

[I, If*

r*)

C*

<(*

0

<D N

0 m

l:

Cl If>

(')

m ID I "

I "

U) m N

Cl'. w a:

0 u w

_J w

I-x 0

Cl'. w x

Ill

(')

I fl, I,_

~.

i~

(!

I p;

h

~.

{ii

J

)

i~

d U1

(')

0 m

m

"<I'

~

0 MUlTI-PLAMT I ',Sul NUMBER ACTION NO.

I.A. l.1.1 "I.A.1.1.2 "I. A. L. 1. 3 FOOi

"'I.A.l.1.4 I. A. l. 2

l. A. 1. 3. l F002 J.A.1.3.2 F002 l.A.2.L.l 1.1\\.2.l.2 IA.2.l.3 J.A.?.1.4 F003 I. A. 2. 1. 5 I. f\\. 2. 3 I.A. 3. L 1 1.A.3.l.2 I. A. 1. l. 3.A 1.1\\.J.l.3.B

~1.B.1.2 l.C.1.1 I. C. L 2. A F004 J.C. L.7.B F004 i.C.1.3.A F005 l.C.1.3.B FOD5 I. c.?

I.[. 3 I. c. 4 l.C.~

F006 l.C.6 F007

'"l.C.1.1

"'I. C. 7. 2

"'!. C. B I. ll. l (See F008 & F071) 1.0.2. 1 FOD9 SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICENSEE IMPLEMEHTATIOM STATUS

=~~ ~~~lltlc:t ADVISOR - ON DUTY ******, *.*.**.*..............*....*****. ; **.*** ~ *********************..*************..**

SHI T HNIC ADVISOR - TEa! SPECS ******....**...........*...******.*.******* G *************************************.**

FT ECllUCAL ADVISGa - TRAllED t'Ell LL CAT 8................*.*..*.**.*.**..* G *****.*.*....**...**....*.**.*********...

SHIFT TECtlUCAL ADVISOR - DESCR111E* LONG TERM PROGRAM.*.*.....*.**************** G *.***************.***********

  • n<<;,* **....

SH~FT SUPERVISOR RESPONSIBILITIES ******.*.**.............*...***..*********.** -~ ***********.******.********* ~.,~~.. ~-***.*.

SH FT MANNING - LIMIT OVERTIMES **********...**.............*.**..******...*************.****.*.*.******.****** ~ ******...

SHIFT MNMIMG - MIN SHIFT CREW *********.*...*........*... *........****.***.**** -~ *.********.*********.***************....

IMMEDIATE UPGRADING Of RO & SRO TRAINING AND QUAL. - SRO EXPER..........................................................

llllEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - SRO'S BE R0 1S lYR ********* G........................................

IMMEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - 3 MO. TRAIHING ****.******* G.................................. ~.

IfltEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - MODIFY TRAINING *******.... G *..***.** ******** * *: *.**.*..***.*** **.*

DllEDIATE UPGRADING OF RO & SllO TRAINING AND QUAL. - fACIUTY CERTIF ******.*** *§........... *.............................

AllllNISTRATION OF TRAINIMG PROGRAMS *****.......*...........**.**..********************.**.************.*******.*********

REVISE SCOPE & CRITERIA FOR LICENSING EXAMS - INCREASE SCOPE.....**..*.***.***. C *******.**.**..****.*..*****.***.******..

REVISE SCOPE & CRITERIA FOR LICENSllG EXAMS - INCREASE PASSING GRADE.**..***.** ~.**.*********.***.*******************..*

REVISE SCOPE &. CRIT. FOR UC. EXAMS - SUIJLATOR PLANTS WITH SIMULATORS *****.*. -~ *.*****..*.**..**.**.***.**.**.****.** <.

REVISE SCOPE & CRIT. FOR UC. EXAMS - SltlllATOR :. OTHER PLANTS....****.*****.* -~ **....***.******..***.*******.***...*.**

EVALUATION OF ORGANIZATION & MANAGEMENT *..*.*....*......*....**..*..*.*.***..*. C....*...*..*.. *.*..* ** *... ** * * * *.** * * * * * *

  • SHORT-TERM ACCIDENT & PROCEDURES REVIEW - SB LOCA....*.*............*..********

C.. *************************** : * ***********

SHORT-TEllt ACCID. & PROCEDURES REV. - INADEQ. CORE COOL. REANAL. GUIOELINES **.* G.....*..................................

SHORT-TERM ACCID. & PROCEDURES REV. -

INMJEQ. CORE COOL. REVISE PROCEDURES ***** C.. *********************************..**..*

SHORT-TERM ACCID. & PROCEDURES REV - TRANSIENTS & ACCDTS. REA.MAL GUIDELINES (PROC. GEH. PKG.) ** %***********************

SHORT-TElltl ACCID. & PROCEDURES REV. - TRANSIENTS & ACCORS. REVISE PROCEDURES (UCPGRADED EOP'S) *********.***.****.**.*...*

SHIFT & RELIEF TURNOVER PROCEDURES **.*.*.... *.*.****************************** *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • SHIFT-SUPERVISOR RESPONSIBILITY *******. *.*..... * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • CONTROL -ROOM ACCESS ********* * *** * *. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * "c" * * * * * * * * * * * ** * *********************....*

FEEDBACK Of OPERATING EXPERIENCE ****.*..** *.*.. ******************************* *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * *. * * * * *. * *..

VERIFY CORIECT PUlFORMMCE OF OPERATING ACTIVITIES.*.....*.*.****** *********** *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • NSSS VENDOR REV. OF PIOC -

LOW POWER TEST PROGRAM.....*...**.*.* * **. * * * * * * * * * * *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • NSSS VENDOR REV. OF PROC - POWER ASCENSION & EMER. PROCS.**. * *.** * ** * * * * * * * * * * *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • PILOT tlJll Of SELECTED EMEAGENCY PROC FOR NTOLS *..*... * * *. * * * * * * * * * * * *** * * * * * * * * "$ * * -~ T * * * *.. * * * * * * * * * * * * * * * * * * * * * *.. *. *

.... CONTROL-ROOM DESIGN REVIEWS (EllTER DATA FDR MPA FOOS & ttPA F-071) *.*********** C~~--~-~~-*-**********************~***

PLANT-SAFETY PARMETER DISPLAY CONSOLE - DESCRIPTION **.*..**..****************** *************************************

If)

(')

"' I 0

U) **I

~ "*

Ni IJo,_

'ot,,

I~

.. (')

~o N

llJLTl-PLANT ISSUE NUMBER ACTION NO.

I. ll. 2. 2

1. ll. 2. 3
  • I.G.1.1

"'I.G.1.2

"'I.G.1.3 11.B.l.l Jl.B.1.2 11.B.Ll 11.B.2.1

"'II.B.2.2

"'Il.B.2.3

  • I I. B. 2.4 "Il.8.3.l

"'11.B.3.2

"'II.B.3.3

  • ILB.3.4 ILB.4.1
  • JI.B.4.2.A

"'II.B.4."2.B H.D.l.l

""Il.D.1.2.A

"'11.D.1.2.B 11.11.l.3

  • 11.D.3.1
  • I I. D. 3. 2 F009 F009 FOlO FOlO FOll FOU F013 F013 F013 F014

"'J]. f.1.1.1 F015 (SH NOTE 1)

  • II.E.1.1.2 F015 (SH NOTE 2)

Il.E.l.1.3 F015

{SEE. NOTE 3)

SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICENSEE IMPLEMENTATIOH STATUS

'PLANT-SAFETY PARAMETER DISPLAY CONSOLE., INSTALLED..**....*****.**..**..*.***

  • G *s.. 'N:.t.................................

PLANT-SAFETY PAAAMETER DISPLAY CONSOLE - FULL y IMPLEMENTED *..*..**.*********.. G.. ee..0. -~~ *....*.*.....*.......*.*.........

TRAINING DURING LOW-POWER TESTING -

PROPOSE TESTS *....*...*.*..***.**.*******. c; *****************************, *** *, ******

TRAINING DURING LOW-POWER TESTING - SlBIIT ANAL. & PROCS.*.***.******.***.***. G..*.*******.*****....**...******* : ***..*.

TRAINING DURING LOW-POWER TESTING - TRAINING & RESULTS...*.....**..*.********* G *.*..******.**.**.**.******.*********....

REACTOR-COOLANT SYSTEM VENTS - DESIGN VEllTS ***.*.***..*.*..**.******.********* G ***************************************.*

REACTOR-COOLANT SYSTEM VENTS -

INSTALL VENTS (LL CAT B) **...**.*.***.**..***** G ***.***************.********************.

..t' REACTOR-COOLANT SYSTEM VENTS -

PROCEDURES ****.***...**.*****.**.***.**..*****

  • G..**.******************..**************.*

PLANT SHIELDING -

REVIEW OESIGMS *.**.*******.*...**.*..*..**..*****.**.******* G *********.*.************* ;..*.*.** a*..

PLANT SHIELDING - CORRECTIVE ACTIONS TO ASSURE ACCESS *.**..*.*..******.******* G *******************.****************.*.

PLANT SHIELDING - PLANT MODIFICATIONS (ll CAT B).........*.......***..*....*.* G *****************************************

PL.Alfl SHIELDJllG - EQUIPMENT QUALIFICATION-NOT TRACKED AS A TMI ACTION ITEM *** G.........................................

POSTACCIDENT SAMPLING - INTERIM SYSTEM *.**..**.**...***..*.**************.**** G.**************.*.****.*****...*.......*.

PDSTACCIDENT SAMPLING - CORRECTIVE ACTIONS.***.*..*..**.**.**..*..******..**** G ************************************.*.*.

POST.ACCIDENT SAMPLING -

PROCEDURES *****.**.**.******.*..**....***.**********.. G ** -~ *.************************.****.***.**

POSTACCIDENT SAMPLING - PLANT fllJDIFICATIONS (LL CAT B).....*.***.***.******.* Ji~~.. <?~~~- *......***...**..**.............

TRAINING FOR MITIGATING CORE DAMftGE - DEVELOP TRACNING PROGRAM **.***********.* G.........................................

TRAINING FOR MITIGATING CORE DAHAGE - INIHAL...**..*..*..**.**.*.***********

  • G **.....*..**.*.***.******.. *-............

, TRAINING FOR HJTIGATING CORE DAMAGE - COMPLETE *.*.....**.*..**..******.***..* -~ ********.*....****.****.*..*..**.........

/REUEF & SAFETY VALVE TEST REQUIREMENTS - SUBMIT PROGRAM.*.****..****..***.***.***********.**.*************..**.........

.'RELIEF & SAFETY VALVE TEST REqlllREMEllTS - COMPLETE TESTING.*.*.*****.****..*** G ***********.**********.*****.***.*****.**

~RELIEF & SAFETY VALVE TEST REQUIREllENJS - PLANT SPECIFIC REPORT ******.****.*** &ee.Nates.........*.......................

RELIEF & SAFETY VAVLE TEST REQUIREMENTS - BLOCK-VALVE TESTJNG *****.********** *&.........................................

VALVE POSITION INDICATION - INSTALL DIRECT INDICATIONS Of VALVE POS.......... *c........................................

VALVE POSTION INDICATION - TECH SPECS ***. _..*******..*.***.***** * ***** * * * * * * ** *c * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • AFS EVALUATION-ANALYSIS *..*.********....**..*..**...*****..*.**.***.***************** ***********.* ***********************

AFS EVALUATION-SHORT TERM t<<>DS *****.**.*.***...*..*.**.***.******************* c..........................................

c AFS -LONG TERM MOOS *******************************.*********** ** ** *******************************************************

NOTE 1 - THE ITEM LISTED IS FROM NUREG-0737, ENCLOSURE 2 IUIJ IS APPLICABLE TO NTOLS'S ONLY NOlE 2 - THE HEM LISTED IS FOR All PLANTS (OPERATING REACTORS AND NTOL'S)

NOlf 3 - THE ITEM LISTED IS FOR ALL PLANTS (OPERATING REACTORS ANO NTOL'S)

Ill m fl

~ fl, l(*

a*,.,...

  • J*

I=*

UJ

{~

I Co If)..

N 0

N I

I]) *-

{~,,,

~

(l I

ti Ii:

t;

i: w
a. !J If) l!l..,

~

a>

~

ro "'

I fl.

I

.~

Ill

{')

l!l 0 a>

N 0: m w ID 0::

0 u w

..J rl w

I-x 0 0: 0 w

x MULTI-PLANT ISSUE NUMBER ACTION NO.

11.E.l.2.l.A l 1.E. l.2.1.B F016

11. f..1.2.2.A
  • I 1. E.1.2.2.B
  • ll.E.1.2.2.C F017
  • ll.l.3.1.l
  • IJ.E.3.1.2 11.E.4.l.l
  • ll.L4.L2
  • IL.E.4.1.3 F018 l I. E.4.2.1-4
  • IJ.l.4.2.5.A
  • II.E.4.2.5.B Jl.E.4.2.6 F019 Il.E.4.2.7 f019 "IL.E.4.2.8
  • II.F.1.1 F020
  • 11.F.l.2.A F020
  • II.F.1.2.B F021
  • ILF.1.2.C F022
  • ll.F.1.2.0 F023
  • Il.F.1.2.E F024
  • II.r.1.2.F F025
  • II. F. 2. 1
  • II.F.2.2
  • II.F.2.3 F026
  • JI.I.2.4 F026 11 11.G. l. l
  • Il.G.L2
11. K..I (Op er. Reactors Only)

SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICENSEE IMPLEMENTATION STATUS AFS INITIATION & FLOl11-CONTROL GRADE ***.*..*........*........*.**..*..*****.*. -2.........................................

AFS INITIATION & FLOW - SAFETY GRADE ****....*.*.......*....*..*..*..**.*****...*************....*...****..**.**.*.*.....

AFS INITIATION & FLOW -

FLOW INDICATION COIUROL GRADE..*..**.**.**.*..**..**.* C **..*.****.**........****..*****.***.**...

AFS INITIATION & FLOW -

LL CAT It TECH SPECS.**..*..*..*..*..**.**.**.**.*****. C ********.****.***.*****.****..*******.....

AFS INITIATION & FLOW - SAFETY GRADE.**..................*.*..**.**.**..*..*** C ******************************************

EMERGENCY POWER FOR PRESSURIZER HEATERS - UPGRADE POWER SUPPLY *..*..**.****** ~ ***.*********.**..****..*...******.**.*...

EMERGENCY POWER FOR PRESSURIZER HEATERS - TECH SPECS *..*.**.* ~ ***..*********.* C *************************.************..**

DEDICATED HYDROGEN PENETRATIONS - DESIGN ***..*..*..*...*.**.**.**..*.*******.* NJ.A. ***************.**********************.

DEDICATED HYDR<MiEN PENETRATIONS - REVIEW & REVISE HZ CONTROL PROC ***..*.****** ~ ***.***.*.**..****.************.*....*...

DEDICATED HYDROGEN PENETRATION - INSTALL *.**.*..**...*.*.......********.****. NJ.A,. *****.*.*******.****************.A...

CONTAINMENT ISOLATION DEPENDABILITY -

It<P. DIVERSE ISOLATION.**.**.****.**.*.. C ******************** : ************** 9...

CONTAINMENT ISOLAT. DEPENDABILITY - CNTMT PRESS. SETPT. SEECIFIY PRESS **.**** ~ ******.******...**.*********.***...*...**.

CONTAINMENT ISOLATION DEPENDABILITY -

CNTMT PRESSURE SETPT. MODS ****.*****.*** C ******************************************

CONTAINMENT ISOLATION DEPENDABILITY -

CNTMT PURGE VALVES....*.*.***.**..*..**. C ***********************************.******

CONTAINMENT ISOLATION DEPENDABILITY - RADIATION SIGNAL ON PURGE VALVES ******. ~ ******..***.***.*********.***.*.**.***....

CONTAINMENT ISOLATION DEPENDABLITY - TECH SPECS.*..*...*..*.**.**..*********** C ***.**.*****************.********.****.. ;

  • ACCIDENT - MONITORING - PROCEDURES.*****.****..*..*..**.****..*...*****.****** C **************************************.***

ACCIDENT - tllNITORING -

NOBLE GAS MONITOR *.*.**.........*.*..***.**.**.******* C ****************************************.*

ACCIDENT -

MONITORJMG - IODINE/PARTICULATE SAMPLING.*..*..*..**.**.****.****.. C ********************.******** -*************

ACCIDENT - MONITORING - CONTAINMENT HIGH-RANGE MONITOR *..*.***.**..*********** C *********************************.***.....

ACCIDENT - fl)NITORING - CONTAINMENT PRESSURE......*......*..*..**.*****..*.*** C **************************.*****.***.....*

ACCIDENT -

MONITORING - CONTAlrtolENT WATER LEVEL.....**........****..*..***...* C.*********************.**.******.****...*.

ACCIDENT - MONITORING - CONTAINMENT HYDROGEN *..*.*........*.***.*.*.***.*****. C ************************************.*****

INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE COOLING - PROCEDURES **.**.***. ~ ***.**..**.*.**..**..***.***........**....

IHSTRUMENTATIDM FOR DETECT. OF INADEQUATE CORE COOLING -

SUBCOOL METER......** S.e.e *.l'{q1;~~ **...*.*..*....*.................

INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE COOLING - OESC. OTHER ****..*** $~~ *. ~q1;~~--*******************************

INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE.CLING INSTLL ADD'L INSTRUMENTATION *** ~~~-ijQte~...........................

POWER SUPP. FOR PRESSURIZER RELIEF, BLOCK VALVES & LEVEL IND. -

UPGRADE ***.** ~ *.****.**..*****..****.**.*...*.*.........

POWER SUPP. FOR PRESSURIZER RELIEF, BLOCK VALVES & LEVEL IND. - TECH SP ****** ~ *****.******.*....**.......****.*.*.......

IE BULLETINS 05. 79-06. 79-08 ***.**.**.*...*..*..*...*..****.*******.* ** ~- **..***.*** * * * * *.. * * * * * * * * * * * * * -* * * * * * * *

  • Ill

()

1 fl, n

~

10

(~

I i.-*

'J fl,

~

~ I 1

(<

~

(1 I

ll II: z

r UI L ::i 0

I)

~

u I

II.

~

U)

(')

il 0 n

  • J t

Ol u

CD qo oJ J...

<.r J

(

0 u

MUL Tl -PLANT l~SUE NUMBER ACTJON NO.

  • Il.K.1.5
  • ll.K.l.10

"'ILK. 1.20

  • 11. K.1. 21
  • 11. K. l. 22
  • II. K. 1.23
  • II.K.2.2
  • Il.K.2.8 11.K.2.9 F027 ll.K.2.10 F028
  • II.K.2.11 F029 II.K.2.13 F030 ll.K.2.14 F031 II.K.2.15 II.K.2.16 F032 ll.K.2.17 F033 II.K.2.19
  • Jl.K.2.20 F035
  • I I. K. 3.. 1. A F036
  • II.K.3.1.B Jl.K.3.2 F037 11.K.3.3 F038 11.K.3.5.A F039 II.K.3.5.B F039 11.K.3.1 II. K. 3. 9 F040 ll.K.3.10 F041 ll.K.3.11 11.K.3.12.A 11.K.3.12.B F042 ll.K.3.13.A F043 Il.K.3.13.B F043 SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICENSEE IMPLEMENTATION STATUS

'IE BULLETINS - REVIEW ESF VALVES ******. : *.*.**..........*.*..**.**.*********.

  • l *......................... *. * * *. *.........

IE BULLETIN~ ~ OPERABILITY STATUS ******..*....**.*..*.*......********..*.**** *r:( A............................. *.******..

IE BULLETIN PROMPT MANUAL RE.ACTOR TRIP *.**.........*...*.*******.***.*****. r/ A **********.**.***....*****.** *. t.......

IE BULLETINS - AUTO SG ANTICIPATORY REACTOR TRIP.......................... ****/A..............................,:.-.......

IE BULLETINS - AUX. HEAT REM SYSTEM, PROC.................................... "f/ A..... ******************************.. **

IE BULLETINS - RV LEVEL, PROCEDURES ********..****.......*....**..********.*** -~~A... *.***********************************

ORDERS OM B&W PLANTS - PROCEDURES TO CONTROL AFW IND OF ICS *.**.**.***.**..*** Ni A"'.*....................................

ORDERS ON B&W PLANTS - UPGRADE AFW SYSTEM..................................... *rr A....................................

ORDERS ON B&W PLANTS - FEMA ON ICS ***.*..*.*.**.*........*.***.****.****...**** /. **..***...**.****...*******.****..*..

ORDERS ON 8&W PLANTS - SAFETY-GRADE TRIP.***....****.....**.**.***.*********** N,LA ********************.*********..*****.*

ORDERS ON B&W PLANTS - OPERATOR TRAINING ******.****...*....***************.** -~,LA *********.****.*****.****************..

ORDERS Oii B&W PLANTS - THERMAL MECHANICAL REPORT (CE & W PLANTS ALSO) *..******..*****.*****.***.*.***.******..*..*......

ORDERS ON B&W PLANTS - LIFT FREQUENCY OF PORV' S & SV's.**.**..*.**.***..****** ~/.I;\\..*...*.***.**.....*.**.***............

ORDERS ON B&W PlANTS - EFFECTS Of SLUG FLOW *..**..****.*****.*.*************** ~/.I;\\.......................................

ORDERS ON B&W PLANTS -

RCP SEAL DAMAGE ******.*...*....**.*..*********.******** ~/.I;\\....*******..*....*....**...........*..

ORDERS ON B&W PLANTS - VOIDING IN RCS (CE & W PLANTS ALSO)..********..******.* C: *****.***********************************

BENCHMARK ANALYSIS OF SEQUENTIAL AFW FLOW TO ONCE THROUGH STM GENERATOR ******* ~/.I;\\ ******.*....*.......*..***.............

ORDERS ON B&W PLAllTS - SYSUM RESPONSE TO SB LOCA..***.***..*****.**.********* ~/.I;\\ *.*...*****..***...**..... :...*........

B&o TASK FORCE - AUTOMATIC PORV ISOLATION DESIGN.**..*.*...*..*****.******.*** ~/.I;\\ *.**...*.*...**.......**....*..........

FINAL RECOlttEHDATIDNS, 8&D TASK FORCE - AUTO PORV ISO TEST/INSTALL ****.****.** ~/.I;\\ *........*.*...........................

B&O TASK FORCE -

REPORT ON PORV FAILURES ****....**..*..*..*...*****.**.**.***. ~ ******.***..*******.*****..***..*.*......

B&O TASK FORCE - REPORTING SV & RV FAILURES AND CHALLENGES *.*..****.*****.**** ~ **********.**.*.*******.*.****.**.*......

B&o TASK FORCE - AUTO TRIP OF RCP' S PROPOSED l<<JOIFJCATIONS ****..*.*, *.******** ~.........................................

B&0 TASK FORCE -

AUTO TRIP OF RCP' S l<<IDJFlCATlONS.*.**..**.**.******.*****..** ~ ***.**.******.***...****..**....*.**.....

8&0 TASK FORCE -

EVALUATION OF PORV OPENING PROBABILITIES..**.*****.***.****** ~/.I;\\.**.**.**...*.. ;.......................

B&0 TASK FORCE - PID CONTROLLER MODIFICATION.**..**.*.***..****.******.**.*** -~ ******.***.****.****.*..*....**..........

B&O TASK FORCE - PROPOSED ANTICIPATORY TRIP MODIFICATIONS...******.**.******* -~..********.*********.*.***.***.*.........

B&O TASK FORCE - JUSTIFY USE OF CERTAIN PORV *.**.***..*.**..**.*************** ~/.~ ******.**********..*.*..***...***......

B&0 TASK FORCE - ANTICIPATORY TRIP ON TURBINE TRIP PROPOSED llJDS *******.*****. ~ ***********..****.****..*.**.*.........**

B&O TASK FORCE - ANTICIPATORY TRIP IHI TURBINE TRIP INSTALL MODS *.*****.******* ~ **.***********.**.*********.*****. 9.....

B&O TASK FORCE - HPCI & RCIC SYSTEM INITIATION LEVELS ANALYSIS *.**.*********** ~/.~................................

B&0 TASK FORCE - HPCI & RCIC INITIATION LEVELS MODIFICATION ***..************.* ~/. ****************.****..**..******. ****

.. I 1(1

[l

~ ri.

If*

  • 7* "' "',,,

c:o U)

Ill

(~

I C*...

tD N

fl, 0

C\\I I

C1J

(~,,,

~

(1 I

ll p;

(,

i:

.{fl a_

i

['-

Ill

(")

)-

C1J

~

ID I

p, I

Ul

(')

Ill 0 C1J C\\I ex m llJ ID 0::

0 0

<l' llJ

_J...

llJ I-x

<l' 0 ex 0

llJ x

,_,L TI-PLANT ISSUL NlJolBER ACTION NO.

  • ll.K.3.14 F044 Jl.K.3.15 F045 ll.K.3.16A F046 ll. K. 3.16. 8 F046 Jl.K.3.17 F047 JI. K. 3.18.A F048 TI.K.3.18.8 F048 I I. K. 3.18. C F048
  • ll.K.3.19 F049
  • II. K. 3.20 f LK. 3.21. A F050 11.K. 3.21.8 F050 IL K.3. 22.A F051 JLK.3.22.8 F051 I I. K. 3. 24 F052 ILK. 3.25.A ll.K.3.25.B F053 ILK. 3.27 F054 ll.K.3.28 F055
  • l I.K.3.29 F056 II.K.3.30.A Jl.K.3.30.8 F057 ll.K.3.30.C
11. K. 3. 31 F058
  • JLK.3.40
  • I I. K. 3.43 Il.K.3.44 f059 I I. K. 3-45 FOGO II. K. 3.46 F061
  • I I. K. 3. 57 F062 JIJ.A.1.1 SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICEHSEE IMPLEMENTATION STATUS
  • B&O TASK FORCE -

ISO CONDENSER ISOLAHOH ON HIGH RAD.**.**.**.************. NI.A. *.*.****.**..**.....**......*******..... _

B&O TASK FORCE - tEOIFY HPCI & RCIC BRK DETECTJON CIRCUITRY **.*...**.****.* NI.A. **..**....*.*...........*............*..

-B&O TASK FORCE - CffALLEHGE & FAILURE OF RELIEF VALVES STUDY.*****.*.**.**** NIA.*.***.....****..****......*.****....... _

B&O TAS<< FORCE - CHALLENGE & FAILURE OF RELIEF VALVES tllDIFICATIONS ****..** NIA *.......*.*.**......**.**..******........

B&O TASK FORCE.,. ECC SYSTEM OUTAGES *****..*...*.......*.....*..*...*****.** ~- *..**.************...**.***..***..**...*.. _

B&O TASK FORCE - ADS ACTUATION STIJDY *****.**......*.....*...*..*.***.***.** NIA.*..**.........*..*.*...**...*..........

B&O TASK FORCE - ADS ACTUATION PROPOSED llJDIFICATIONS..**..****.*.********* WA........................................

e&o TASl FORCE - ADS ACTUATION MOOIFICATIONS.*.... ;.*.***********.***.***** NIA *....**....*...............*..**........ -

B&O TASK FORCE -

INTERLOCK RECIRCULATORY PUMP tllDIFICATIONS ******.******.** NIA *.*.............................. ~

B&O TASK FORCE -

LOSS OF SVC WATER AT BRP.*..**.....*.*..*.*.*.**..*..***** N/A.................................. -

B&O TASK FORCE - RESTART OF CSS & LPCI LOGIC DESlGfL.*..**.*****.********* NIA..............*...*..*..................

B&O TASK FORCE - RESTART OF CSS & LPCI LOGIC DESIGN llJDIFICATIONS ********.* NIA.......*................................

B&O TASK FORCE - RCIC SUCTIOH VERIFICATION PROCEDURES.**.. -..**.**.**.***.* NIA...*...............**.................. --

B&O TASK FORCE - RCIC SUCTION MODIFICATION *...*.......**.*****.************ N/A......*.................................

8&0 TASK FORCE - SPACE COOLING FOR HPCI/RCI LOSS OF AC POWER *************** N/A..............*......................*...

B&0 TASK FORCE -

POWER OH PtllP SEALS PROPOSED lllDIFICATIONS.********.******.C ************************.*.*******.**......

B&O TASK FORCE -

POWER ON PllfP SEALS llJDIFICATIONS....**.**..****...*****.* NIA.........*.......................*......

B&O TASK FORCE -

COMMON REFERENCE LEVEL FOR BWRS ***.*************.*******.* NIA......****.. -..........*.. :.............

B&O TASK FORCE - QUALIFICATION OF ADS ACCtl4ULATORS..*....******..*****.**** NIA.....**..................*..............

BIO TASK FORCE -

PERFORMANCE OF ISOLATION CONDENSERS *....**..**.*********** NIA....*..*................................ -

8&0 TASK FORCE - SCHEDULE FOR OUTLINE OF SB LOCA MODEL.....................C...........................................

BIO TASK FORCE -

SB LOCA lllDEL, JUSTIFICATION **..**.**.**.**..*****.*******.C ********....***.****........*.***.*........

B&O TASK FORCE -

SB LOCA METHODS NEW ANALYSES.**.*..**.**.**.**.*********.* ~-..........................................

B&D TASK FORCE -

COMPLIANCE WITH CFR 50. 46 *.*....*..**.*..*..*...*****.***.* C **.************.*****.*..***.*.*. ~...*.....

B&O TASK FORCE -

RCP SEAL DAMAGE - COVERED BY l I. K. 2. 16 AND II. K. 3. 25 *.***.* C *.**********.**..***.***....**.*.*...*.....

B&O TASK FORCE - EFFECTS OF SLUG FLOW - COVERED BY ll. K.2.15 **************. IVA.......................................

  • B&O TASK FORCE - EVALUATE TRANSIENT WITH SINGLE FAILURE ****.***..*****.**** JV.A *****.*****.***.****...*.*.**.*...*..*..

B&O TASK FORCE - ANALYSES TO SUPPORT.******.*******.****.*************.**** JV.I\\. * * *.** * ** * * * * * * *. * * * * * * * * * * * * * * * * * * * * * *

  • RESPONSE TO LIST OF CONCEHftS FROM ACRS CONSULTANT ****.*..*.**************** JV.I\\.........................................

IDENTIFY WATER SOURCES PRIOR TO MANUAL ACTIVATION OF ADS ****.*.***.******** tt(l\\.........................................

EMERGENCY PREPAREDNESS~ SHORT TERM ******. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ******..***.. e*...

'.'" 5 -

(()

  • 11

()

fl, If*

CJ*,...,,.

(]*

0,,,

Ill

(~

1' I

0 r\\I fl, 0

l'll I

(,

Jt,

~

(1 I

(I I~..

(<

L w
a. :)

ID tO I")

~

m "'

ID A

I II.

I

.~

ID

(')

tO 0

m

('\\I a: m w ([)

a.

0 Iii

<l' iil...

~ <l' E5 0

x flt.IL TI-PLANT JSSUE NUMBER ACTION NO.

II l. A. 1. 2. 1 lll.A.1.2.2 (SEE F063, F064, f065)

II I. A. l. 2. 3 (SlE F063, F064, F065)

Ill.A.2.1 F067 111.A.2.2 F068

  • lll.0.1.1.1
  • llL0.1.1.2 IJI.0.3.3.1 III.0.3.3.2 F069 111.0.3.4.1 F070
  • lll.D.3.4.2 F070
  • IIl.0.3.4.3 MPA-fOOB MPA-F063 HPA-F064 MPA-F065 MPA-F07l MPA-8072 MPA-8083 61.4.1 F008 F063 F064 F065 F071 8072 8083 GOOl SALEM GENERATING STATION - UNITS 1 & 2 ISSUE TITLE LICENSEE IMPLEMENTATION STATUS

'UPGRADE EMERGENCY SUPPORT FACILITIES - INTERIM TSC OSC & EOF ****.********.*** C..........................................

UPGRADE EMERGENCY SUPPORT FACILITIES-DESIGN-INCORP. INTO F063/F064/F065 ****.* ~~~-~9t~~---*******************************

UPGRADE EMER SUPPORT FACILITIES - tlJDS INCORPOR. INTO F063, F064 & F065 ****** ~~~-~9t~~.....*...............*..* :;'........

UPGRADE PREPAREDNESS - UPGRADE EMERGENCY PLANS TO APP. E. 10 CFR 50.........* ~.......*..................................

UPGRADE PREPAREDNESS - METEOROLOGICAL DATA................................... C *..****...**.****.********..**.........*..

PRIMARY COOLANT OUTSIDE CONTAINMENT -

LEAK REDUCTION......................... C **********..**.*******************.*......

PRIMMY COOLANT OUTSIDE CONTAINMENT - TECH SPECS............................. C...................................

INPLANT RAD. l<<JNIT. - PROVIDE MEANS TO DETER. PRESENCE OF RADIOIOOINE.******

  • l.................................... A...

IMPLANT AADIATIOH MONIT. - tl>DIFICATIONS TO ACCURATELY MEAS. IODINE ******.*************************..*.***..**..* 9-...

CONTROL ROOM HABITABILITY - REVIEW ********.*****.*******..*.***********.***** C. ;.................*......................

CONTROL ROOl'I HABITABILITY - SCHEDULE MODIFICATIONS........................... C *************.*****************.********..

c CONTROL ROOM HABITABILITY -

IMPLEMENT llH>IFICATIONS.***..***********.*******.**. ~~- ****.**********************..*..*....*

1t I. 0.1.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN...........*.....*.. -~~~.~9t~~- rn.. J... Q.J.................... r **

III.A. I. 2 TECHNICAL SUPPORT CENTER......................................*....

~Etet.fiQt~~..................................

111. A. 1. Z OPERATIONAL SUPPORT CENTER ****.**..*.*..**.****.**..*.***.**.****** C..........................................

111.A. l.2 EMERGENCY OPERATIONS FACILITY ******..*.*..***....****.***.*.******* C.**********.*.****..**.*.......*..........

  • I. D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWP TO f-8)..... ~................ -~~(;!. ~9t~~- !'~.*. J... Q ** L......................

lllJREG-0737 TECH SPECS (GENERIC LETTERS 82-16 & 83-02)........................ C..........................................

i'-TECH SPEC COVERED BY GENERIC LETTERS 83-26 & 83-37 FOR NlJREG-0737............ $~~-~9t~?..................................

REACTOR COOLANT PUMP TRIP (GENERIC LETTER 85-12)........................*.... C.......................................... -------------------------------

NOTES II.B.3.4 POST ACCIDENT SAMPLING SYSTEM (PASS}

This item was completed by PSE&G and the program was submitted to NRC.

NRC reviewed and approved PSE&G PASS Program in SSER dated 11/4/83.

In 1988, NRC informed PSE&G that the PASS design is deficient in that back-up grab sample capability was not provided.

PSE&G is making modifications to the PASS to provide back-up capability by the first quarter 1990.

I.D.1 CONTROL ROOM DESIGN REVIEW (CRDR}

The control room design review program plan, summary report, and additional required reports were submitted and approved via SSER dated 3/2/87.

Plant design modifications have been developed and the schedule for implementation was discussed at a NRC meeting on 5/21/87.

At that meeting a three outage schedule was presented and agreed to by the NRC Staff.

The results of this meeting are documented in a ~SE&G letter dated 6/4/87.

Salem Unit 1 CRDR is scheduled for completion at the close of the 10th refueling outage and Salem Unit 2 CRDR is scheduled for completion at the close of the 6th refueling outage.

I.D.2.3 SAFETY PARAMETER DISPLAY SYSTEM (SPDS) -

FULLY IMPLEMENTED SPDS is fully implemented; however, additional improvements are scheduled for completion by July l, 1989.

II.D.1.2.B RELIEF AND SAFETY VALVE TESTING -

PLANT SPECIFIC REPORT This item is still open pending NRC review of PSE&Gs response to RAI dated 3/31/89, and further response scheduled for 8/1/89.

II.F.2.2 II.F.2.3 II.F.2.4 INSTRUMENTATION FOR INADEQUATE CORE COOLING Items open against CETs, RVLIS, and SMM awaiting upgrade modifications and/or technical specification amendment approval from NRC.

III.A.1.2.2 III.A.1.2.3 UPGRADE EMERGENCY SUPPORT FACILITIES -

DESIGN UPGRADE EMERGENCY SUPPORT FACILITIES -

MODIFICATIONS Items are still open pending implementation of design improvements and subsequent modification of the TSC.

The scheduled completion date is October 1989.

MPA-B083 TECH SPECS COVERED BY GL 83-26 & 83-37 FOR NUREG 0737 Tech Specs for RVLIS and RCS Vents were submitted to NRC and are currently in the review process.