| number = ML18345A051 | | number = ML18345A051 | ||
| issue date = 12/05/2018 | | issue date = 12/05/2018 | ||
| title = | | title = The Independent Spent Fuel Storage Installation - Revised Emergency Plan Implementing Procedures | ||
| author name = Bates A | | author name = Bates A | ||
| author affiliation = Southern California Edison Co | | author affiliation = Southern California Edison Co | ||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:SOUTHERN CALIFORNIA | {{#Wiki_filter:SOUTHERN CALIFORNIA EDISON~ | ||
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 | An EDISON INTERNATIONAL Company U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 December 5, 2018 | ||
==Subject:== | ==Subject:== | ||
Docket Nos. 50-206, 50-361, 50-362, and 72-41 Revised Emergency Plan Implementing Procedures (EPIPs) | Docket Nos. 50-206, 50-361, 50-362, and 72-41 Al Bates Manager, Regulatory Affairs 10 CFR 50.54(q) | ||
San Onofre Nuclear Generating Station (SONGS) Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation | Revised Emergency Plan Implementing Procedures (EPIPs) | ||
San Onofre Nuclear Generating Station (SONGS) Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
Pursuant to 1 O CFR 50.54(q)(5), Attachment 1 of this letter provides a copy of the following. | |||
Pursuant to | |||
revised Emergency Plan documents: | revised Emergency Plan documents: | ||
Procedure | Procedure Rev. | ||
Effective Date S0123-VIII-ER0-6, Dose Assessments 3 | |||
November 6, 2018 S0123-VIII-ADMIN-1, Emergency 7 | |||
November 13, 2018 Preparedness Program Maintenance As specified in 10 CFR 50.54(q)(5), Attachment 2 provides a report and analysis summary for the EPIP changes. These changes do not reduce the effectiveness of the Emergency Plan or the EPIPs. | |||
There are no commitments contained in this letter or its attachments. | There are no commitments contained in this letter or its attachments. | ||
P. 0. Box 128 San Clemente, CA 92672 | |||
)/ '-lS | |||
;,/N5S L/p | |||
//I-ft.. | |||
/IJH~ s | |||
Document Control Desk | \\ | ||
Document Control Desk If you have any questions, please contact me at (949) 368-6945. | |||
Sincerely, Attachments: 1. Revised Emergency Plan Implementing Procedures | Sincerely, Attachments: 1. Revised Emergency Plan Implementing Procedures | ||
: 2. Report and Analysis Summaries cc: | : 2. Report and Analysis Summaries cc: | ||
K. M. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI | Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 1) | ||
K. M. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI}} | |||
Latest revision as of 08:40, 5 January 2025
| ML18345A051 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/05/2018 |
| From: | Bates A Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18345A066 | List: |
| References | |
| Download: ML18345A051 (2) | |
Text
SOUTHERN CALIFORNIA EDISON~
An EDISON INTERNATIONAL Company U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 December 5, 2018
Subject:
Docket Nos. 50-206, 50-361, 50-362, and 72-41 Al Bates Manager, Regulatory Affairs 10 CFR 50.54(q)
Revised Emergency Plan Implementing Procedures (EPIPs)
San Onofre Nuclear Generating Station (SONGS) Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation
Dear Sir or Madam:
Pursuant to 1 O CFR 50.54(q)(5), Attachment 1 of this letter provides a copy of the following.
revised Emergency Plan documents:
Procedure Rev.
Effective Date S0123-VIII-ER0-6, Dose Assessments 3
November 6, 2018 S0123-VIII-ADMIN-1, Emergency 7
November 13, 2018 Preparedness Program Maintenance As specified in 10 CFR 50.54(q)(5), Attachment 2 provides a report and analysis summary for the EPIP changes. These changes do not reduce the effectiveness of the Emergency Plan or the EPIPs.
There are no commitments contained in this letter or its attachments.
P. 0. Box 128 San Clemente, CA 92672
)/ '-lS
- ,/N5S L/p
//I-ft..
/IJH~ s
\\
Document Control Desk If you have any questions, please contact me at (949) 368-6945.
Sincerely, Attachments: 1. Revised Emergency Plan Implementing Procedures
- 2. Report and Analysis Summaries cc:
Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 1)
K. M. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI