* i:Lcu ,.7 | * i:Lcu,.7 consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 U. So Nuclear Regulatory Commission Mail and Records Section Washington, D. C., 20555 Gentlemen: | ||
Re: License Reports DPR-20 Docket No.: 50-255 July 2, 1975 Enclosed is a copy of the monthly operating data for the Palisades Nuclear Plant for the month of June, 1975* JAM: DB cc: J.G.Keppler, NRG R.L.Haueter R.B.Sewell Sincerely, James A. Meineke General Engineer 7 17'i J | Re: | ||
License Reports DPR-20 Docket No.: | |||
50-255 July 2, 1975 Enclosed is a copy of the monthly operating data for the Palisades Nuclear Plant for the month of June, 1975* | |||
JAM: DB cc: | |||
J.G.Keppler, NRG R.L.Haueter R.B.Sewell Sincerely, James A. Meineke General Engineer 7 17'i J | |||
\\-_ | |||
I | |||
~-*O | |||
* DOCKET NO. | ;.-:.h APPENDIX C | ||
* DOCKET NO. -~5_0-_2~5~5 __ | |||
DATE July -2, 1975 COMPLETED BY J .A.Meineke AVERAGE DAILY UNIT POWER LEVEL MONTH June 121'.2 AVERAGE DAILY POWER LEVEL A VERA GE DAILY POWER LEVEL DAY (MWc-net) | UNIT __ | ||
DAY (MWe-net) 1 505 17*. 495 2 504 18 I" 482 3 506 19' 488 4 494 20 408 5 427 21 0 6 504 22 7 507 23 0 B 503 24 . 0 9 504 25 0 . 10 5.DO 26 o* 11 428 27. 6 12 505 28 0 13 211 29 0 14 208 30 1"5 505 31 16 '204 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in t-.*1\Ve-net for each day in the reporting month. Compute to the nearest whole megawatt. | P_a_l_i_s_a_d_e_s_ | ||
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily | DATE July -2, 1975 COMPLETED BY J.A.Meineke AVERAGE DAILY UNIT POWER LEVEL MONTH June 121'.2 AVERAGE DAILY POWER LEVEL A VERA GE DAILY POWER LEVEL DAY (MWc-net) | ||
DAY (MWe-net) 1 505 17*. | |||
495 2 | |||
504 18 I" | |||
(9'' . . | 482 3 | ||
506 19' 488 4 | |||
494 20 408 5 | |||
l ! l .. | 427 21 0 | ||
* l;L,' | 6 504 22 7 | ||
........ _ . ..,.,: . ..o .. | 507 23 0 | ||
B 503 24 | |||
_........_. | . 0 9 | ||
\*,_.........., | 504 25 0 | ||
___ _ UNIT NAME Palisades | . 10 5.DO 26 o* | ||
* DATE July 2, 1975 COMPLETED BY J .A.Meineke REPORT MONTH _ _;.J;..;;u=n=e....::1=9'"""7""5 | 11 428 | ||
: 27. | |||
I-MANUAL B-MAINT. OR TEST 2-MANUAL C--REFUELING SCRAM D-REGULATORY RESTRICTION 3-A UTOMA TIC* E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE | 6 12 505 28 0 | ||
13 211 29 0 | |||
14 208 30 1"5 505 31 16 | |||
'204 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in t-.*1\\Ve-net for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily averJge power level exceeds the 100% line (or the restricted power level* line). In such cases, the | |||
*--~ | |||
Q*:**''. | |||
*: averJge daily unit power output sheet should be footnoted to explain the ap.parentanomaly. | |||
(9'' | |||
-~.. | |||
. L 1.10.C-l. | |||
.* r.~.:rn"l'l-*_ ** ~**'"'""""'~="'.,..~'''l"""."1'>1'"*"'''~:=~-~.,.~~'~-!1'1'\\~~"'."~~~'"!-"'''~">'i'"=~'?M"*.*<;l>"?'~.'.'."~~i -* | |||
*~. l ! | |||
*~ l.. | |||
:~ | |||
. j 0 | |||
' TYPE F-FORCED NO. | |||
DATE S-SCHEDULED 3 | |||
750620 F. | |||
4 750630 F | |||
* "*W*****-'~iw->i'i*<rn1'"'1w | |||
* l;L,' | |||
....,,_,._.,...bc,.......... _...,.,:...o | |||
......... w.... *--~--.......,--,,_,. _........_. | |||
\\*,_.........., | |||
DURATION (HOURS) 227.3 7.9 | |||
~ | |||
0 APPENDIX E UNlT SHUTDOWNS | |||
.o DOCKETNO. --"-50_-_25~5 ___ _ | |||
UNIT NAME Palisades | |||
* DATE July 2, 1975 COMPLETED BY J.A.Meineke REPORT MONTH _ _;.J;..;;u=n=e....::1=9'"""7""5 __ | |||
METHOD OF | |||
$HUTTING DOWN REASON (1) | |||
THE REACTOR (2) | |||
CORRECTIVE ACTIONS/COMMENTS A | |||
l Shutdown to Repair CRDM Seal Leak R | |||
2 Feedwater Pump trip | |||
'\\ | |||
(1) REASON (2) METHOD A--EQUIPMENT FAILURE* (EXPLAIN) | |||
I-MANUAL B-MAINT. OR TEST 2-MANUAL C--REFUELING SCRAM D-REGULATORY RESTRICTION 3-A UTOMA TIC* | |||
E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR. | |||
(EXPLAIN) | |||
H-OTHER (EXPLAIN) | H-OTHER (EXPLAIN) | ||
I | I | ||
==SUMMARY== | ==SUMMARY== | ||
IJ:he unit operated at 80% power until June. 20t~ when a:leaking Control_ Rod seal caused the unit to shut down. | |||
when a:leaking Control_ Rod seal caused the unit to shut down. The unit was put on-line June 30th af'ter repairs, taken off when a feedwater pump tripped, and again put on-line at 25%. 'i'' | The unit was put on-line June 30th af'ter repairs, taken off when a feedwater pump tripped, and again put on-line andhold~ng at 25%. | ||
.... :-.. ....:...::.:::..o.\- | 'i'' | ||
... | |||
l 'j * . '. ... _; .-**e ( 0 | ~ | ||
>[*.* APPENDIX D* ,/ | ~ | ||
.... :-......:...::.:::..o.\\-... ~.-.-:--~*--.4..o~-...-------.....~~-~*---* | |||
* 616-764-8913 . ' COMPLETED BY __ J_._A_._M_e_in_c_k_e_ | l | ||
DOCKET N0. __ 5_0_-_2'--5 5'-----OPERATING STATt;S 1. REPORTING PERIOD: ___ 7_5_0_6_0_l | 'j *. '.... _;.- | ||
________ THROUGH ___ 7'-5_0_6-'3_0 | **e | ||
__ | ( 0 c;**,*Q.'. | ||
>[*.* | |||
APPENDIX D* | |||
,/ | |||
UNIT __ | |||
P_a_l_i_s_a_d_e_s __ | |||
DATE July 2 J.;975 | |||
* 616-764-8913. | |||
' COMPLETED BY __ | |||
J_._A_._M_e_in_c_k_e_ | |||
DOCKET N0. __ | |||
5_0_-_2'--5 5'----- | |||
OPERATING STATt;S | |||
: 1. | |||
REPORTING PERIOD: ___ | |||
7_5_0_6_0_l ________ THROUGH ___ | |||
7'-5_0_6-'3_0 __ ~---- | |||
HOURS IN REPORTl:-:G PERIOD: ____ 7'-2_0_---,--------------------..,--,--- | HOURS IN REPORTl:-:G PERIOD: ____ 7'-2_0_---,--------------------..,--,--- | ||
: 2. CURRENTLY ACTHORIZED POWER LEVEL ('.\1Wth). | : 2. | ||
2200 MAX. DEPENDABLE CAPACITY (l\!We-NET) 6R4 3. LOWEST POWER LEVEL TO WlllCI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): | CURRENTLY ACTHORIZED POWER LEVEL ('.\\1Wth). | ||
___ | 2200 MAX. DEPENDABLE CAPACITY (l\\!We-NET) 6R4 | ||
_____ _ | : 3. | ||
THIS CUMULATIVE REPORTING PERIOD S. HOURS REACTOR WAS CRITICAL. | LOWEST POWER LEVEL TO WlllCI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ___ | ||
.......*.... | 6_3~0 _____ _ | ||
: 6. REACTOR RES!ORYE SHUTDOWN HOURS ......* 7. HOURS GENERA TOR ON LINE. * ...........*.* | : 4. | ||
: 8. UNJT RESERVE SHUTDOWN HOURS . * .. ......* 9. GROSS THERC\IAL ENERGY GENERATED(MWHJ | REASONS FOR RESTRICTION (IF AN,Y): | ||
.....*.......*.*...*. | Power.restricted to 2100 Mvrt due to reduced* | ||
: 10. GROSS ELECi:RICAL ENERGY 11. l :!. 13. 14. GENERA TED ('.\!Wll) | Pr:ilnary Coolant Flow as a result of Steam Generator Tube plugging. | ||
................*.... | THIS CUMULATIVE REPORTING PERIOD S. | ||
HOURS REACTOR WAS CRITICAL........*.... | |||
: 6. | |||
REACTOR RES!ORYE SHUTDOWN HOURS......* | |||
: 7. | |||
HOURS GENERA TOR ON LINE. *...........*.* | |||
: 8. | |||
UNJT RESERVE SHUTDOWN HOURS. *.. ~......* | |||
: 9. | |||
GROSS THERC\\IAL ENERGY GENERATED(MWHJ.....*.......*.*...*. | |||
: 10. | |||
GROSS ELECi:RICAL ENERGY | |||
: 11. | |||
l :!. | |||
: 13. | |||
: 14. | |||
GENERA TED ('.\\!Wll)................*.... | |||
NET ELECTRICAL ENERGY GENERATED | NET ELECTRICAL ENERGY GENERATED | ||
(!\!Will ...................*..*.*.... | (!\\!Will...................*..*.*.... | ||
REACTOR AVAILABILITY fACTOR (!) ........ . UNIT AVAILABILITY FACTOR (2) ...**.**.*.. | REACTOR AVAILABILITY fACTOR (!)......... | ||
l | UNIT AVAILABILITY FACTOR (2)...**.**.*.. | ||
UNIT FORCED OllTAGE RATE (4) ...*.....*.. | l 1NIT C-AP.*\\CITY FACTOR (3)............*.. | ||
492.7 /" 0 485.5 0 873,360 257,000 61.4' 0 48.4% 32.6% YR TO DATE 1,976.5 0 1,887.3 0 3,175,872 952,840 881,977 "45.5% ' | UNIT FORCED OllTAGE RATE (4)...*.....*.. | ||
29.7°/o _26.6% TO DATE 12,213.4 0 11, 208. 4 0 17,289,432 5,457,090 5 ,135 ,682 39.9%. | 492.7 | ||
28.J% 60.8% 15. 16. SllVTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH): Steam Generator 8 weeks_ | /" 0 485.5 0 | ||
873,360 257,000 68.4~ | |||
: 18. UNITS IN TEST STATUS (PRIOR TO COM:.IERCIAL OPERATION) | 61.4' 0 48.4% | ||
REPORT THE FOLLOWING: | 32.6% | ||
(1) R,EAC'TOR A \'AILABILITY FACTOR t:NIT A\' AlLABILITY FACTOR INITIAL CRITICALITY INITIAL ELECrRICAL POWER GENERATION | YR TO DATE 1,976.5 0 | ||
* . COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 _H_O_U_R_S | 1,887.3 0 | ||
__ G_l_:N_'E_*R_A_T_O_R_O_N_L_IN._'E | 3,175,872 952,840 881,977 "45.5% | ||
' 43*.4~ | |||
CAPACITY (l\!Wc-NET) | 29.7°/o | ||
X HOURS IN REPORTING l'EIUOD FORCED OUTAGE HOURS. ------------x 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 1.16-D-J}} | _26.6% | ||
TO DATE 12,213.4 0 | |||
11, 208. 4 0 | |||
17,289,432 5,457,090 5,135,682 39.9%. | |||
_,;.;36_._6%; | |||
28.J% | |||
60.8% | |||
: 15. | |||
: 16. | |||
SllVTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH): | |||
Steam Generator inspect1:si~l1~~st, 8 weeks_. | |||
: 17. | |||
IF SHt:T DOWN AT END OF. REPORT PERIOD, ESTIMATED DATE Of STARTUP:------------ | |||
: 18. | |||
UNITS IN TEST STATUS (PRIOR TO COM:.IERCIAL OPERATION) REPORT THE FOLLOWING: | |||
(1) | |||
R,EAC'TOR A \\'AILABILITY FACTOR t:NIT A\\' AlLABILITY FACTOR INITIAL CRITICALITY INITIAL ELECrRICAL POWER GENERATION *. | |||
COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 | |||
_H_O_U_R_S __ G_l_:N_'E_*R_A_T_O_R_O_N_L_IN._'E __ | |||
X I OO HOURS IN REPORTING PERIOD NET ELF.CTR IC' AL POWFR GE!'IERATED DATE LAST DA TE FORECAST ACHIEVED MAX. DEl'ENDABLI-: CAPACITY (l\\!Wc-NET) X HOURS IN REPORTING l'EIUOD FORCED OUTAGE HOURS. ------------x 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 1.16-D-J}} | |||
Latest revision as of 08:33, 5 January 2025
| ML18347A836 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/02/1975 |
| From: | Meincke J Consumers Power Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18347A836 (4) | |
Text
,...t.
'ti9-:---,_~*;;;::;;.::---.,
- i:Lcu,.7 consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 U. So Nuclear Regulatory Commission Mail and Records Section Washington, D. C., 20555 Gentlemen:
Re:
License Reports DPR-20 Docket No.:
50-255 July 2, 1975 Enclosed is a copy of the monthly operating data for the Palisades Nuclear Plant for the month of June, 1975*
JAM: DB cc:
J.G.Keppler, NRG R.L.Haueter R.B.Sewell Sincerely, James A. Meineke General Engineer 7 17'i J
\\-_
I
~-*O
- .-
- .h APPENDIX C
- DOCKET NO. -~5_0-_2~5~5 __
UNIT __
P_a_l_i_s_a_d_e_s_
DATE July -2, 1975 COMPLETED BY J.A.Meineke AVERAGE DAILY UNIT POWER LEVEL MONTH June 121'.2 AVERAGE DAILY POWER LEVEL A VERA GE DAILY POWER LEVEL DAY (MWc-net)
DAY (MWe-net) 1 505 17*.
495 2
504 18 I"
482 3
506 19' 488 4
494 20 408 5
427 21 0
6 504 22 7
507 23 0
B 503 24
. 0 9
504 25 0
. 10 5.DO 26 o*
11 428
- 27.
6 12 505 28 0
13 211 29 0
14 208 30 1"5 505 31 16
'204 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in t-.*1\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily averJge power level exceeds the 100% line (or the restricted power level* line). In such cases, the
- --~
Q*:**.
- averJge daily unit power output sheet should be footnoted to explain the ap.parentanomaly.
(9
-~..
. L 1.10.C-l.
.* r.~.:rn"l'l-*_ ** ~**'"'""""'~="'.,..~l"""."1'>1'"*"~:=~-~.,.~~'~-!1'1'\\~~"'."~~~'"!-"~">'i'"=~'?M"*.*<;l>"?'~.'.'."~~i -*
- ~. l !
- ~ l..
- ~
. j 0
' TYPE F-FORCED NO.
DATE S-SCHEDULED 3
750620 F.
4 750630 F
- "*W*****-'~iw->i'i*<rn1'"'1w
- l;L,'
....,,_,._.,...bc,.......... _...,.,:...o
......... w.... *--~--.......,--,,_,. _........_.
\\*,_..........,
DURATION (HOURS) 227.3 7.9
~
0 APPENDIX E UNlT SHUTDOWNS
.o DOCKETNO. --"-50_-_25~5 ___ _
UNIT NAME Palisades
- DATE July 2, 1975 COMPLETED BY J.A.Meineke REPORT MONTH _ _;.J;..;;u=n=e....::1=9'"""7""5 __
METHOD OF
$HUTTING DOWN REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS A
l Shutdown to Repair CRDM Seal Leak R
2 Feedwater Pump trip
'\\
(1) REASON (2) METHOD A--EQUIPMENT FAILURE* (EXPLAIN)
I-MANUAL B-MAINT. OR TEST 2-MANUAL C--REFUELING SCRAM D-REGULATORY RESTRICTION 3-A UTOMA TIC*
E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR.
(EXPLAIN)
H-OTHER (EXPLAIN)
I
SUMMARY
IJ:he unit operated at 80% power until June. 20t~ when a:leaking Control_ Rod seal caused the unit to shut down.
The unit was put on-line June 30th af'ter repairs, taken off when a feedwater pump tripped, and again put on-line andhold~ng at 25%.
'i
~
~
.... :-......:...::.:::..o.\\-... ~.-.-:--~*--.4..o~-...-------.....~~-~*---*
l
'j *. '.... _;.-
- e
( 0 c;**,*Q.'.
>[*.*
APPENDIX D*
,/
UNIT __
P_a_l_i_s_a_d_e_s __
DATE July 2 J.;975
- 616-764-8913.
' COMPLETED BY __
J_._A_._M_e_in_c_k_e_
DOCKET N0. __
5_0_-_2'--5 5'-----
OPERATING STATt;S
- 1.
REPORTING PERIOD: ___
7_5_0_6_0_l ________ THROUGH ___
7'-5_0_6-'3_0 __ ~----
HOURS IN REPORTl:-:G PERIOD: ____ 7'-2_0_---,--------------------..,--,---
- 2.
CURRENTLY ACTHORIZED POWER LEVEL ('.\\1Wth).
2200 MAX. DEPENDABLE CAPACITY (l\\!We-NET) 6R4
- 3.
LOWEST POWER LEVEL TO WlllCI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ___
6_3~0 _____ _
- 4.
REASONS FOR RESTRICTION (IF AN,Y):
Power.restricted to 2100 Mvrt due to reduced*
Pr:ilnary Coolant Flow as a result of Steam Generator Tube plugging.
THIS CUMULATIVE REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL........*....
- 6.
REACTOR RES!ORYE SHUTDOWN HOURS......*
- 7.
HOURS GENERA TOR ON LINE. *...........*.*
- 8.
UNJT RESERVE SHUTDOWN HOURS. *.. ~......*
- 9.
GROSS THERC\\IAL ENERGY GENERATED(MWHJ.....*.......*.*...*.
- 10.
GROSS ELECi:RICAL ENERGY
- 11.
l :!.
- 13.
- 14.
GENERA TED ('.\\!Wll)................*....
NET ELECTRICAL ENERGY GENERATED
(!\\!Will...................*..*.*....
REACTOR AVAILABILITY fACTOR (!).........
UNIT AVAILABILITY FACTOR (2)...**.**.*..
l 1NIT C-AP.*\\CITY FACTOR (3)............*..
UNIT FORCED OllTAGE RATE (4)...*.....*..
492.7
/" 0 485.5 0
873,360 257,000 68.4~
61.4' 0 48.4%
32.6%
YR TO DATE 1,976.5 0
1,887.3 0
3,175,872 952,840 881,977 "45.5%
' 43*.4~
29.7°/o
_26.6%
TO DATE 12,213.4 0
11, 208. 4 0
17,289,432 5,457,090 5,135,682 39.9%.
_,;.;36_._6%;
28.J%
60.8%
- 15.
- 16.
SllVTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH):
Steam Generator inspect1:si~l1~~st, 8 weeks_.
- 17.
IF SHt:T DOWN AT END OF. REPORT PERIOD, ESTIMATED DATE Of STARTUP:------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COM:.IERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
R,EAC'TOR A \\'AILABILITY FACTOR t:NIT A\\' AlLABILITY FACTOR INITIAL CRITICALITY INITIAL ELECrRICAL POWER GENERATION *.
COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
_H_O_U_R_S __ G_l_:N_'E_*R_A_T_O_R_O_N_L_IN._'E __
X I OO HOURS IN REPORTING PERIOD NET ELF.CTR IC' AL POWFR GE!'IERATED DATE LAST DA TE FORECAST ACHIEVED MAX. DEl'ENDABLI-: CAPACITY (l\\!Wc-NET) X HOURS IN REPORTING l'EIUOD FORCED OUTAGE HOURS. ------------x 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 1.16-D-J