{{#Wiki_filter:*Fiie Cy. U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:
{{#Wiki_filter:*Fiie Cy.
consumers Power company Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975* JAM:db cc: J.G.Keppler, NRC R.L.Haueter R.B.Sewell Sincerely, James A. Meineke
U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:
.-*.I . -.
consumers Power company Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975*
APPp.JDIX C I . (0 DOCKET NO. 50-255. UNIT Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 A VERA GE DAILY PO\\iER LEVEL AVERAGE DAILY POWER LEVEL. DAY (.MWe-net)
JAM:db cc:
DAY (MWe-nct) 1 0 17* 550 2 0 18 577 /./ / 3 4* 19 231 4 117. . 20. 268 5 162 21 216 6 131 22 560 0 .. *._._; 7 261 23 121 8 350 24 501. 9 388 25 266 10 446 26 531 11 389 27. 431 12 461 28 430 13 518 29 482 14 361 30 503 t5 . 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\Ve-net for each day in the reporting month. Compute to the nearest whole megawatt.
J.G.Keppler, NRC R.L.Haueter R.B.Sewell Sincerely, James A. Meineke  
* These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily
* average power le\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the ';. (.o av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly ..... . *L-.. .. --..
"" ' ' ! 
*,.--.o .. ** .. ( *. .
APPENDIX D* UNIT _P_a_.:_1_J_
.. s_a_cl_e_s
__ _ DATE lfJB.y 2, 1975 616-*764..:8913* . COMPLETED BY D.Bollnow . DOCKET N0. __ 5_0_-_2_5_5
___ _ OPERATiNG ST A TUS I. REPORTING PERIOD: . 750401 THROUGH __
______ _ HOURS IN REPORTl'.'\G PERIOD: ___ 7'-l__,9'-----------.,--------------,7'7"1""r--
: 2. CURRENTLY AUTHORIZED POWER.LEVEL
('.\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET)
_O_t3_l_!*
__ 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\Ve-NET):_--06:...3=0'-
1
: 4. REASONS FOR RESTRICTION (IF ANY): Power Restricted to 2100 .MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE
___________________
R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c.
TE.o.;.,;...'
____ T...:O._D_A_T_E_
: 5. HOURS REACTOR WAS CRITICAL.
........... . 6. REACTOR RESERVE SHUTDOWN HOURS ...... . 7. HOURS GENERATOR ON LINE.* ...........**.
: 8. lTNJT RESER VE Sil UTDOWN HOURS ........***
: 9. . GROSS THER'.\1AL ENERGY GENERATED
('.\1WH) .*.*..*****.*********
IO.. GROSS ELECTRICAL ENERGY 11. 12. 13. 14. -GENERATED
('.\l\VH)
.................... . NET ELECTRICAL ENERGY GENERATED (MWH) ..*.*...***..*..*.*.***.**.*.
RL\CTOR AVAILABILITY FACTOR (l) .... -.... UNIT A \'AILABILITY FACTOR (2) ..**..*..*.*
l 1 NIT CAPACITY FACTOR (3) ............*..
UNIT FORCED OllTAGE RATE (4) ......**.***
709.5 ,. 0 657.8 0 967;.872 291,04o 266,769 98.7% 91.5% 54.2% 8.6°/o 739.8 0 657.8 0 . 967,872 291,04o 266,769 25. 7% 22.8% 13.5% 77.'?} lG,976.7 0 9.978.9 0 15,081,432 4,795,290 4,520,474 37 .. 6%* .
.* '26.2% -63.2°/o IS. 16. S!ll 1 TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH): 17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________
_ IS. UNJTS IN TEST ST:\ TVS (PRIOR TO CO'.\i:l!ERCIAL OPERATION)
REPORT THE FOLLOWING: (I) REACTOR A\'AILABILITY FACTOR t:NIT AVAILABILITY FACTOR (3) UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\'FR GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWc*NET)
X HOURS IN RU'ORTIN<.;
l'E!UOD . l (4) t:NIT FORCEDOL'TAGE RATE . FORCED Ol:TAGE HOURS HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS . ., L ).16*D*l . . . 


I t.,,.\ e : .
*.I  
J . 0  
. -. :__,~
...  
APPp.JDIX C I. ~
............  
(0 DOCKET NO.
,,..., ___ .,.. ...............
50-255.
_, .... , .................  
UNIT Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 A VERA GE DAILY PO\\\\iER LEVEL AVERAGE DAILY POWER LEVEL.
-..... ..  
DAY
........ ,, ......  
(.MWe-net)
... ---.... *-> =-*"""* ,_ . ...., *.* _..._. -**  
DAY (MWe-nct) 1 0
.... ........ N-m-.  
17*
....... f j UNIT SHUTDOWNS UNIT NAME Palisades l *1.* I
550 2
* DATE 5-2-75 l !' COMPLETED BY *n.Bollnow t REPORT MONTH April 1975 ' TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVg ACTIONS/COMMENTS 3 . 741104 F 3662.1 B 1 Completion of Steam Gen. Repair/Inspection  
0 18 577
' 1 7504o6 F 2.6 A 1 Off-Line to Repair Leaking F.W.Heater Valve :.... 2 750422 F 14.l A 3 Trip due to E.H. oil Line failure on Turbine control system '->, (1) REASON (2) METHOD A*-EQUIPMENT FAILURE:(EXPLAIN) 1-MANUAL
/./
/
3 4*
19 231 4
117.
. 20.
268 5
162 21 216 6
131 22 560 0
c~*.. *._._;
7 261 23 121 8
350 24 501.
9 388 25 266 10 446 26 531 11 389
: 27.
431 12 461 28 430 13 518 29 482 14 361 30 503 t5
. 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the
(.o av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly......
*L-.. ~.. --..,,~**~ "" ~~~-~~&#xa5;<+~-*---~,n
~
 
*,.--.o
(
*-~:****
APPENDIX D*
UNIT _P_a_.:_1_J_
.. s_a_cl_e_s __ _
DATE lfJB.y 2, 1975 616-*764..:8913*
. COMPLETED BY D.Bollnow DOCKET N0. __ 5_0_-_2_5_5 ___ _
OPERATiNG ST A TUS I.
REPORTING PERIOD:  
. 750401 THROUGH __
7.J...,,5"-'0::...4..:....~""-'0::___ ______ _
HOURS IN REPORTl'.'\\G PERIOD: ___ 7'-l__,9'-----------.,--------------,7'7"1""r--
: 2.
CURRENTLY AUTHORIZED POWER.LEVEL ('.\\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET) _O_t3_l_!* __
: 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\\Ve-NET):_--06:...3=0'-
1 ---~---
: 4.
REASONS FOR RESTRICTION (IF ANY):
Power Restricted to 2100.MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c. TE.o.;.,;...' ____
T...:O._D_A_T_E_
: 5.
HOURS REACTOR WAS CRITICAL.............
: 6.
REACTOR RESERVE SHUTDOWN HOURS.......
: 7.
HOURS GENERATOR ON LINE.*...........**.
: 8.
lTNJT RESER VE Sil UTDOWN HOURS........***
: 9.
. GROSS THER'.\\1AL ENERGY GENERATED ('.\\1WH).*.*..*****.*********
IO..
GROSS ELECTRICAL ENERGY
: 11.
: 12.
: 13.
: 14.
-GENERATED ('.\\l\\VH).....................
NET ELECTRICAL ENERGY GENERATED (MWH)..*.*...***..*..*.*.***.**.*.
RL\\CTOR AVAILABILITY FACTOR (l).... -....
UNIT A \\'AILABILITY FACTOR (2)..**..*..*.*
l 1NIT CAPACITY FACTOR (3)............*..
UNIT FORCED OllTAGE RATE (4)......**.***
709.5
,. 0 657.8 0
967;.872 291,04o 266,769 98.7%
91.5%
54.2%
8.6&deg;/o 739.8 0
657.8 0
. 967,872 291,04o 266,769
: 25. 7%
22.8%
13.5%
77.'?}
lG,976.7 0
9.978.9 0
15,081,432 4,795,290 4,520,474 37.. 6%*.
34.2~.*
'26.2% -
63.2&deg;/o IS.
: 16.
S!ll1TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
: 17.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________
IS.
UNJTS IN TEST ST:\\ TVS (PRIOR TO CO'.\\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:
(I)
REACTOR A\\'AILABILITY FACTOR t:NIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
-----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\\\'FR GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD
. l f~~ (4) t:NIT FORCEDOL'TAGE RATE
(~\\.~.>3.
FORCED Ol:TAGE HOURS
-~-~---------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
.., ~~ L
).16*D*l
_.:~-*=-~~~7~*~-~~~-=~-~~~-~-
 
~.---
I t.,,.\\
e :.
.J~*
J.
0 '-k'"~"""""-"'"'""""
... ;"'"'";,,~............,,..., ___.,................. _,....,
~..............,.,~....,........,,...... *A*P(l-'pi~*-*----*---... ---.... *-> =-*"""*,_....., *.* _..._. -** -~-0-C-.K~E
.... ~
N-m-. --~~5~0~~*2=0*5:;...::5'-*-** _-_~
....... <.->'\\~*I
~
~
f j
UNIT SHUTDOWNS UNIT NAME Palisades l  
*1.*
I
* DATE 5-2-75 l
COMPLETED BY  
*n.Bollnow t
REPORT MONTH April 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.
DATE S-SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVg ACTIONS/COMMENTS 3  
. 741104 F
3662.1 B
1 Completion of Steam Gen. Repair/Inspection 1
7504o6 F
2.6 A
1 Off-Line to Repair Leaking F.W.Heater Valve 2
750422 F
14.l A
3 Trip due to E.H. oil Line failure on Turbine control system (1) REASON (2) METHOD A*-EQUIPMENT FAILURE:(EXPLAIN) 1-MANUAL
* B-MAlNT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC*
* B-MAlNT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC*
E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE . . G-OPERATIONAL ERROR {EXPLAIN)
E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR
{EXPLAIN)
H-OTHER (EXPLAIN)  
H-OTHER (EXPLAIN)  
.. .. ! *


==SUMMARY==
==SUMMARY==
: ' . Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a $team Generator flushing.program.
Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a  
Plant.is running at 80% power with F.W. Heaters #1 and 2 out of service which is restrictive*
$team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out of service which is restrictive* on power..
on power..
* t *
* t
~ r I et t
* r I et t [ I r r* [ r .. l .. ,. f ,. t,, . .. . r i: I [ r}}
[ I r
r*
[ r  
.. l f  
~,.
t,,.
r i:
I
[ r}}

Latest revision as of 08:33, 5 January 2025

Monthly Operating Data for April 1975
ML18347A839
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/02/1975
From: Meincke J
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A839 (4)


Text

  • Fiie Cy.

U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:

consumers Power company Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975*

JAM:db cc:

J.G.Keppler, NRC R.L.Haueter R.B.Sewell Sincerely, James A. Meineke

  • .I

. -. :__,~

APPp.JDIX C I. ~

(0 DOCKET NO.

50-255.

UNIT Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 A VERA GE DAILY PO\\\\iER LEVEL AVERAGE DAILY POWER LEVEL.

DAY

(.MWe-net)

DAY (MWe-nct) 1 0

17*

550 2

0 18 577

/./

/

3 4*

19 231 4

117.

. 20.

268 5

162 21 216 6

131 22 560 0

c~*.. *._._;

7 261 23 121 8

350 24 501.

9 388 25 266 10 446 26 531 11 389

27.

431 12 461 28 430 13 518 29 482 14 361 30 503 t5

. 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\\Ve-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the

(.o av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly......

  • L-.. ~.. --..,,~**~ "" ~~~-~~¥<+~-*---~,n

~

  • ,.--.o

(

  • -~:****

APPENDIX D*

UNIT _P_a_.:_1_J_

.. s_a_cl_e_s __ _

DATE lfJB.y 2, 1975 616-*764..:8913*

. COMPLETED BY D.Bollnow DOCKET N0. __ 5_0_-_2_5_5 ___ _

OPERATiNG ST A TUS I.

REPORTING PERIOD:

. 750401 THROUGH __

7.J...,,5"-'0::...4..:....~""-'0::___ ______ _

HOURS IN REPORTl'.'\\G PERIOD: ___ 7'-l__,9'-----------.,--------------,7'7"1""r--

2.

CURRENTLY AUTHORIZED POWER.LEVEL ('.\\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET) _O_t3_l_!* __

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\\Ve-NET):_--06:...3=0'-

1 ---~---

4.

REASONS FOR RESTRICTION (IF ANY):

Power Restricted to 2100.MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c. TE.o.;.,;...' ____

T...:O._D_A_T_E_

5.

HOURS REACTOR WAS CRITICAL.............

6.

REACTOR RESERVE SHUTDOWN HOURS.......

7.

HOURS GENERATOR ON LINE.*...........**.

8.

lTNJT RESER VE Sil UTDOWN HOURS........***

9.

. GROSS THER'.\\1AL ENERGY GENERATED ('.\\1WH).*.*..*****.*********

IO..

GROSS ELECTRICAL ENERGY

11.
12.
13.
14.

-GENERATED ('.\\l\\VH).....................

NET ELECTRICAL ENERGY GENERATED (MWH)..*.*...***..*..*.*.***.**.*.

RL\\CTOR AVAILABILITY FACTOR (l).... -....

UNIT A \\'AILABILITY FACTOR (2)..**..*..*.*

l 1NIT CAPACITY FACTOR (3)............*..

UNIT FORCED OllTAGE RATE (4)......**.***

709.5

,. 0 657.8 0

967;.872 291,04o 266,769 98.7%

91.5%

54.2%

8.6°/o 739.8 0

657.8 0

. 967,872 291,04o 266,769

25. 7%

22.8%

13.5%

77.'?}

lG,976.7 0

9.978.9 0

15,081,432 4,795,290 4,520,474 37.. 6%*.

34.2~.*

'26.2% -

63.2°/o IS.

16.

S!ll1TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________

IS.

UNJTS IN TEST ST:\\ TVS (PRIOR TO CO'.\\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:

(I)

REACTOR A\\'AILABILITY FACTOR t:NIT AVAILABILITY FACTOR (3)

UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE


~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\\\'FR GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD

. l f~~ (4) t:NIT FORCEDOL'TAGE RATE

(~\\.~.>3.

FORCED Ol:TAGE HOURS

-~-~---------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

.., ~~ L

).16*D*l

_.:~-*=-~~~7~*~-~~~-=~-~~~-~-

~.---

I t.,,.\\

e :.

.J~*

J.

0 '-k'"~"""""-"'"'""""

... ;"'"'";,,~............,,..., ___.,................. _,....,

~..............,.,~....,........,,...... *A*P(l-'pi~*-*----*---... ---.... *-> =-*"""*,_....., *.* _..._. -** -~-0-C-.K~E

.... ~

N-m-. --~~5~0~~*2=0*5:;...::5'-*-** _-_~

....... <.->'\\~*I

~

~

f j

UNIT SHUTDOWNS UNIT NAME Palisades l

  • 1.*

I

  • DATE 5-2-75 l

COMPLETED BY

  • n.Bollnow t

REPORT MONTH April 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVg ACTIONS/COMMENTS 3

. 741104 F

3662.1 B

1 Completion of Steam Gen. Repair/Inspection 1

7504o6 F

2.6 A

1 Off-Line to Repair Leaking F.W.Heater Valve 2

750422 F

14.l A

3 Trip due to E.H. oil Line failure on Turbine control system (1) REASON (2) METHOD A*-EQUIPMENT FAILURE:(EXPLAIN) 1-MANUAL

  • B-MAlNT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC*

E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR

{EXPLAIN)

H-OTHER (EXPLAIN)

SUMMARY

Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a

$team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out of service which is restrictive* on power..