ML18347A839: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:*Fiie Cy. U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen: | {{#Wiki_filter:*Fiie Cy. | ||
consumers Power company Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975* JAM:db cc: J.G.Keppler, NRC R.L.Haueter R.B.Sewell Sincerely, James A. Meineke | U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen: | ||
consumers Power company Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975* | |||
JAM:db cc: | |||
J.G.Keppler, NRC R.L.Haueter R.B.Sewell Sincerely, James A. Meineke | |||
I | *.I | ||
J . 0 | . -. :__,~ | ||
... | APPp.JDIX C I. ~ | ||
............ | (0 DOCKET NO. | ||
,,..., | 50-255. | ||
_, .... , ................. | UNIT Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 A VERA GE DAILY PO\\\\iER LEVEL AVERAGE DAILY POWER LEVEL. | ||
DAY | |||
........ ,, ...... | (.MWe-net) | ||
... ---.... *-> =-*"""* ,_ . ...., *.* _..._. -** | DAY (MWe-nct) 1 0 | ||
.... .... | 17* | ||
....... f j UNIT SHUTDOWNS UNIT NAME Palisades l *1.* I | 550 2 | ||
* DATE 5-2-75 l | 0 18 577 | ||
/./ | |||
/ | |||
3 4* | |||
19 231 4 | |||
117. | |||
. 20. | |||
268 5 | |||
162 21 216 6 | |||
131 22 560 0 | |||
c~*.. *._._; | |||
7 261 23 121 8 | |||
350 24 501. | |||
9 388 25 266 10 446 26 531 11 389 | |||
: 27. | |||
431 12 461 28 430 13 518 29 482 14 361 30 503 t5 | |||
. 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\\Ve-net for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the | |||
(.o av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly...... | |||
*L-.. ~.. --..,,~**~ "" ~~~-~~¥<+~-*---~,n | |||
~ | |||
*,.--.o | |||
( | |||
*-~:**** | |||
APPENDIX D* | |||
UNIT _P_a_.:_1_J_ | |||
.. s_a_cl_e_s __ _ | |||
DATE lfJB.y 2, 1975 616-*764..:8913* | |||
. COMPLETED BY D.Bollnow DOCKET N0. __ 5_0_-_2_5_5 ___ _ | |||
OPERATiNG ST A TUS I. | |||
REPORTING PERIOD: | |||
. 750401 THROUGH __ | |||
7.J...,,5"-'0::...4..:....~""-'0::___ ______ _ | |||
HOURS IN REPORTl'.'\\G PERIOD: ___ 7'-l__,9'-----------.,--------------,7'7"1""r-- | |||
: 2. | |||
CURRENTLY AUTHORIZED POWER.LEVEL ('.\\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET) _O_t3_l_!* __ | |||
: 3. | |||
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\\Ve-NET):_--06:...3=0'- | |||
1 ---~--- | |||
: 4. | |||
REASONS FOR RESTRICTION (IF ANY): | |||
Power Restricted to 2100.MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c. TE.o.;.,;...' ____ | |||
T...:O._D_A_T_E_ | |||
: 5. | |||
HOURS REACTOR WAS CRITICAL............. | |||
: 6. | |||
REACTOR RESERVE SHUTDOWN HOURS....... | |||
: 7. | |||
HOURS GENERATOR ON LINE.*...........**. | |||
: 8. | |||
lTNJT RESER VE Sil UTDOWN HOURS........*** | |||
: 9. | |||
. GROSS THER'.\\1AL ENERGY GENERATED ('.\\1WH).*.*..*****.********* | |||
IO.. | |||
GROSS ELECTRICAL ENERGY | |||
: 11. | |||
: 12. | |||
: 13. | |||
: 14. | |||
-GENERATED ('.\\l\\VH)..................... | |||
NET ELECTRICAL ENERGY GENERATED (MWH)..*.*...***..*..*.*.***.**.*. | |||
RL\\CTOR AVAILABILITY FACTOR (l).... -.... | |||
UNIT A \\'AILABILITY FACTOR (2)..**..*..*.* | |||
l 1NIT CAPACITY FACTOR (3)............*.. | |||
UNIT FORCED OllTAGE RATE (4)......**.*** | |||
709.5 | |||
,. 0 657.8 0 | |||
967;.872 291,04o 266,769 98.7% | |||
91.5% | |||
54.2% | |||
8.6°/o 739.8 0 | |||
657.8 0 | |||
. 967,872 291,04o 266,769 | |||
: 25. 7% | |||
22.8% | |||
13.5% | |||
77.'?} | |||
lG,976.7 0 | |||
9.978.9 0 | |||
15,081,432 4,795,290 4,520,474 37.. 6%*. | |||
34.2~.* | |||
'26.2% - | |||
63.2°/o IS. | |||
: 16. | |||
S!ll1TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH): | |||
: 17. | |||
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________ | |||
IS. | |||
UNJTS IN TEST ST:\\ TVS (PRIOR TO CO'.\\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING: | |||
(I) | |||
REACTOR A\\'AILABILITY FACTOR t:NIT AVAILABILITY FACTOR (3) | |||
UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE | |||
-----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\\\'FR GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD | |||
. l f~~ (4) t:NIT FORCEDOL'TAGE RATE | |||
(~\\.~.>3. | |||
FORCED Ol:TAGE HOURS | |||
-~-~---------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS | |||
.., ~~ L | |||
).16*D*l | |||
_.:~-*=-~~~7~*~-~~~-=~-~~~-~- | |||
~.--- | |||
I t.,,.\\ | |||
e :. | |||
.J~* | |||
J. | |||
0 '-k'"~"""""-"'"'"""" | |||
... ;"'"'";,,~............,,..., ___.,................. _,...., | |||
~..............,.,~....,........,,...... *A*P(l-'pi~*-*----*---... ---.... *-> =-*"""*,_....., *.* _..._. -** -~-0-C-.K~E | |||
.... ~ | |||
N-m-. --~~5~0~~*2=0*5:;...::5'-*-** _-_~ | |||
....... <.->'\\~*I | |||
~ | |||
~ | |||
f j | |||
UNIT SHUTDOWNS UNIT NAME Palisades l | |||
*1.* | |||
I | |||
* DATE 5-2-75 l | |||
COMPLETED BY | |||
*n.Bollnow t | |||
REPORT MONTH April 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO. | |||
DATE S-SCHEDULED (HOURS) | |||
REASON (1) | |||
THE REACTOR (2) | |||
CORRECTIVg ACTIONS/COMMENTS 3 | |||
. 741104 F | |||
3662.1 B | |||
1 Completion of Steam Gen. Repair/Inspection 1 | |||
7504o6 F | |||
2.6 A | |||
1 Off-Line to Repair Leaking F.W.Heater Valve 2 | |||
750422 F | |||
14.l A | |||
3 Trip due to E.H. oil Line failure on Turbine control system (1) REASON (2) METHOD A*-EQUIPMENT FAILURE:(EXPLAIN) 1-MANUAL | |||
* B-MAlNT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC* | * B-MAlNT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC* | ||
E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE | E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR | ||
{EXPLAIN) | |||
H-OTHER (EXPLAIN) | H-OTHER (EXPLAIN) | ||
==SUMMARY== | ==SUMMARY== | ||
Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a | |||
Plant.is running at 80% power with F.W. Heaters #1 and 2 out of service which is restrictive* | $team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out of service which is restrictive* on power.. | ||
on power.. | * t * | ||
* t | ~ r I et t | ||
[ I r | |||
r* | |||
[ r | |||
.. l f | |||
~,. | |||
t,,. | |||
r i: | |||
I | |||
[ r}} | |||
Latest revision as of 08:33, 5 January 2025
| ML18347A839 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 05/02/1975 |
| From: | Meincke J Consumers Power Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18347A839 (4) | |
Text
- Fiie Cy.
U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:
consumers Power company Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975*
JAM:db cc:
J.G.Keppler, NRC R.L.Haueter R.B.Sewell Sincerely, James A. Meineke
- .I
. -. :__,~
APPp.JDIX C I. ~
(0 DOCKET NO.
50-255.
UNIT Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 A VERA GE DAILY PO\\\\iER LEVEL AVERAGE DAILY POWER LEVEL.
DAY
(.MWe-net)
DAY (MWe-nct) 1 0
17*
550 2
0 18 577
/./
/
3 4*
19 231 4
117.
. 20.
268 5
162 21 216 6
131 22 560 0
c~*.. *._._;
7 261 23 121 8
350 24 501.
9 388 25 266 10 446 26 531 11 389
- 27.
431 12 461 28 430 13 518 29 482 14 361 30 503 t5
. 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the
(.o av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly......
- L-.. ~.. --..,,~**~ "" ~~~-~~¥<+~-*---~,n
~
- ,.--.o
(
- -~:****
APPENDIX D*
UNIT _P_a_.:_1_J_
.. s_a_cl_e_s __ _
DATE lfJB.y 2, 1975 616-*764..:8913*
. COMPLETED BY D.Bollnow DOCKET N0. __ 5_0_-_2_5_5 ___ _
OPERATiNG ST A TUS I.
REPORTING PERIOD:
. 750401 THROUGH __
7.J...,,5"-'0::...4..:....~""-'0::___ ______ _
HOURS IN REPORTl'.'\\G PERIOD: ___ 7'-l__,9'-----------.,--------------,7'7"1""r--
- 2.
CURRENTLY AUTHORIZED POWER.LEVEL ('.\\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET) _O_t3_l_!* __
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\\Ve-NET):_--06:...3=0'-
1 ---~---
- 4.
REASONS FOR RESTRICTION (IF ANY):
Power Restricted to 2100.MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c. TE.o.;.,;...' ____
T...:O._D_A_T_E_
- 5.
HOURS REACTOR WAS CRITICAL.............
- 6.
REACTOR RESERVE SHUTDOWN HOURS.......
- 7.
HOURS GENERATOR ON LINE.*...........**.
- 8.
lTNJT RESER VE Sil UTDOWN HOURS........***
- 9.
. GROSS THER'.\\1AL ENERGY GENERATED ('.\\1WH).*.*..*****.*********
IO..
GROSS ELECTRICAL ENERGY
- 11.
- 12.
- 13.
- 14.
-GENERATED ('.\\l\\VH).....................
NET ELECTRICAL ENERGY GENERATED (MWH)..*.*...***..*..*.*.***.**.*.
RL\\CTOR AVAILABILITY FACTOR (l).... -....
UNIT A \\'AILABILITY FACTOR (2)..**..*..*.*
l 1NIT CAPACITY FACTOR (3)............*..
UNIT FORCED OllTAGE RATE (4)......**.***
709.5
,. 0 657.8 0
967;.872 291,04o 266,769 98.7%
91.5%
54.2%
8.6°/o 739.8 0
657.8 0
. 967,872 291,04o 266,769
- 25. 7%
22.8%
13.5%
77.'?}
lG,976.7 0
9.978.9 0
15,081,432 4,795,290 4,520,474 37.. 6%*.
34.2~.*
'26.2% -
63.2°/o IS.
- 16.
S!ll1TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________
IS.
UNJTS IN TEST ST:\\ TVS (PRIOR TO CO'.\\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:
(I)
REACTOR A\\'AILABILITY FACTOR t:NIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\\\'FR GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD
. l f~~ (4) t:NIT FORCEDOL'TAGE RATE
(~\\.~.>3.
FORCED Ol:TAGE HOURS
-~-~---------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
.., ~~ L
).16*D*l
_.:~-*=-~~~7~*~-~~~-=~-~~~-~-
~.---
I t.,,.\\
e :.
.J~*
J.
0 '-k'"~"""""-"'"'""""
... ;"'"'";,,~............,,..., ___.,................. _,....,
~..............,.,~....,........,,...... *A*P(l-'pi~*-*----*---... ---.... *-> =-*"""*,_....., *.* _..._. -** -~-0-C-.K~E
.... ~
N-m-. --~~5~0~~*2=0*5:;...::5'-*-** _-_~
....... <.->'\\~*I
~
~
f j
UNIT SHUTDOWNS UNIT NAME Palisades l
- 1.*
I
- DATE 5-2-75 l
COMPLETED BY
- n.Bollnow t
REPORT MONTH April 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.
DATE S-SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVg ACTIONS/COMMENTS 3
. 741104 F
3662.1 B
1 Completion of Steam Gen. Repair/Inspection 1
7504o6 F
2.6 A
1 Off-Line to Repair Leaking F.W.Heater Valve 2
750422 F
14.l A
3 Trip due to E.H. oil Line failure on Turbine control system (1) REASON (2) METHOD A*-EQUIPMENT FAILURE:(EXPLAIN) 1-MANUAL
E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR
{EXPLAIN)
H-OTHER (EXPLAIN)
SUMMARY
Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a
$team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out of service which is restrictive* on power..