50-333 DATE Julv 1979 COMPLETED BY E.2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS | OPERATING DATA REPORT DOCKET NO. | ||
50-333 DATE Julv 1979 COMPLETED BY E. | |||
2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS Fit: Patrick Notes | |||
: 1. Unit Name: | |||
790601 - 790630 | 790601 - 790630 | ||
: 2. Reporting Period: | : 2. Reporting Period: | ||
2436 3. Licensed Thermal Power (MWt): | 2436 | ||
: 3. Licensed Thermal Power (MWt): | |||
: 4. Nameplate Rating (Gross MWe): | : 4. Nameplate Rating (Gross MWe): | ||
883 821 5. Design Electrical Rating (Net MWe): | 883 821 | ||
830 6. Maximum Dependable Capacity (Gross MWe): | : 5. Design Electrical Rating (Net MWe): | ||
830 | |||
: 6. Maximum Dependable Capacity (Gross MWe): | |||
: 7. Maximum Dependable Capacity (Net MWe): | : 7. Maximum Dependable Capacity (Net MWe): | ||
800 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | 800 | ||
None None 9. Power Level To Which Restricted,if Any (Net MWe): | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | ||
None None | |||
: 9. Power Level To Which Restricted,if Any (Net MWe): | |||
: 10. Reasons For Restrictions,1f Any: | : 10. Reasons For Restrictions,1f Any: | ||
Plant in cold shutdown in acco' 'arje with NRC"Show Cause" order of March 13, 1979. | Plant in cold shutdown in acco' 'arje with NRC "Show Cause" order of March 13, 1979. | ||
This Month Yr..to-Date Cumulative 720 4343 34416 i1. Hours In Reporting Period | |||
: 12. Numbe: Of Hours Reactor Was Critical 0 1767.3 23829.5 13. Reactor Rescrve Shutdown Hours 0 0 0 14. Hours Generator On.Line 0 1767.3 23054.4 15. Unit Reserve Shutdown Hours 0 0 0 16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308 | : 12. Numbe: Of Hours Reactor Was Critical 0 | ||
: 17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590 0 1.198,435 15,024,420 | 1767.3 23829.5 | ||
: 13. Reactor Rescrve Shutdown Hours 0 | |||
0 0 | |||
: 14. Hours Generator On.Line 0 | |||
1767.3 23054.4 | |||
: 15. Unit Reserve Shutdown Hours 0 | |||
0 0 | |||
: 16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308 | |||
: 17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590 0 | |||
1.198,435 15,024,420 | |||
: 18. Net E'ectrical Energy Generated (MWH) | : 18. Net E'ectrical Energy Generated (MWH) | ||
: 19. Unit Service Factor 0 40. ' %67. 0 $20. Unit Availability Factor 0 40.7 %67.0 %0 34.3 *i 61.1 *;21. Unit Capacity Factor (Using MDC Net) 0 33.6's 53.2%22. Unit Capacity Factor (Using DER Net) . | : 19. Unit Service Factor 0 | ||
: 23. Unit Forced Outage Rate 100*, 59.3*s 18,2%24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): | : 40. ' % | ||
: 67. 0 $ | |||
: 20. Unit Availability Factor 0 | |||
40.7 % | |||
67.0 % | |||
0 34.3 *i 61.1 *; | |||
: 21. Unit Capacity Factor (Using MDC Net) 0 33.6's 53.2% | |||
: 22. Unit Capacity Factor (Using DER Net). | |||
: 23. Unit Forced Outage Rate 100*, | |||
59.3*s 18,2% | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): | |||
Vene Unknown - pending completion of | Vene Unknown - pending completion of | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis | ||
: 26. Units in Test Status (Prior to Commercial Operation): | : 26. Units in Test Status (Prior to Commercial Operation): | ||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net)(SIWE-Net i 1 0 g7 0 2 0 g3 0 3 0 39 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 D 0 8 0 28 0 9 0 25 0 10 0 26 0 II O 27 0 12 0 0 23 | Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123 | ||
50-333 UNIT SilUIDOWNS AND POWER REDUCllONS UNIT N AME.I A FNPI DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111 ,Iu l y 1979 1ELEP ONE (315)342-3840 n.= | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net) | ||
(SIWE-Net i 1 | |||
0 g7 0 | |||
W TN.)vs i 2 3 4 I l 'oi s c J Reason Method: lixinbit G - Inst r uctions S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat. | 2 0 | ||
g3 0 | |||
1;nti> Sn:ets tor 1.nensee. | 3 0 | ||
39 0 | |||
4 0 | |||
20 0 | |||
5 0 | |||
21 0 | |||
6 0 | |||
22 0 | |||
7 0 | |||
D 0 | |||
8 0 | |||
28 0 | |||
9 0 | |||
25 0 | |||
10 0 | |||
26 0 | |||
II O | |||
27 0 | |||
12 0 | |||
0 23 0 | |||
13 29 14 0 | |||
30 0 | |||
15 0 | |||
3, 16 0 | |||
SLNMARY: | |||
Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979. | |||
323 l2; | |||
s DOCKET NO. | |||
50-333 UNIT SilUIDOWNS AND POWER REDUCllONS UNIT N AME | |||
.I A FNPI DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111 | |||
,Iu l y 1979 1ELEP ONE (315)342-3840 n.= | |||
3w E | |||
=_ | |||
ri 2e E | |||
,eW l s.tensee vt Cause & Couettive c, | |||
g? | |||
lbic g | |||
3m j | |||
jgy 1:sent a? | |||
ct Atison in | |||
$E c2 559 liepin, u iR G Prevent itecuuente | |||
{ | |||
u e | |||
Q 5 | |||
790315 1: | |||
720 11 4 | |||
79-014 ZZ ZZZZZZ Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7) | |||
W TN.) | |||
vs i | |||
2 3 | |||
4 I l 'oi s c J Reason Method: | |||
lixinbit G - Inst r uctions S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat. | |||
li-Maintenance or lest 2-Manual Scrain. | |||
1;nti> Sn:ets tor 1.nensee | |||
.s l I,' | |||
C-Refuchng | |||
: 3. Autonutic Scrain. | : 3. Autonutic Scrain. | ||
1.sent Itepor t (l I It) I ile (Ntilti G- | 1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin 4-Otlier (lixplatii) 0161) | ||
I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC | |||
.i G ()perational I o er (I aplain) | |||
I sliibit ! S.nne Souite ll ()the r (1: spiano | I sliibit ! S.nne Souite ll ()the r (1: spiano | ||
Malfunction Malfunction Preclude Time Recurrence (flours)1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS | r | ||
Out of cal . | ) | ||
Calibration 4. | 0 0 | ||
Improper control Calibration 4.0 34 6/22/79 27-2 7- A0V- 12711 OPS Valve rebuilt Out of cal. | 0 0 | ||
Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal . | 0 i | ||
s 0 | |||
0 0 | |||
0 0 | |||
0 0 | |||
aer pmu 8 | |||
1 1 | |||
4 2 | |||
6 4 | |||
0 0 | |||
8 3 | |||
3 eio 9 | |||
6 1 | |||
1 0 | |||
8 RTl 4 | |||
l | |||
( | |||
d o | |||
r e | |||
er t | |||
e n | |||
e p | |||
e n | |||
n u | |||
n c | |||
o n | |||
t i | |||
n n | |||
d een C | |||
r n | |||
h s l | |||
a o | |||
o e | |||
p o | |||
gr a | |||
g c | |||
i c | |||
kd e | |||
/ | |||
aur Tl n | |||
c i o C | |||
t or tl r a | |||
oo t t | |||
/ | |||
ep d | |||
a cu dC ti d | |||
d d | |||
/ c d | |||
nm e | |||
r p | |||
nec e/ | |||
t e | |||
e e | |||
d e e | |||
i a n | |||
b e | |||
ore np hi c | |||
c r | |||
en c | |||
m-e i | |||
IPR eo cs a | |||
a i | |||
nn a | |||
r e t | |||
l c | |||
t t o t o l | |||
l a | |||
ao l | |||
er h | |||
a n | |||
c sL i p p | |||
p p | |||
ec p | |||
t p c | |||
c a | |||
h A | |||
a w | |||
e e | |||
e l | |||
e e | |||
i F | |||
S d | |||
R R | |||
C R | |||
D T | |||
C ya t | |||
l c | |||
n p | |||
a f o s | |||
t s | |||
n i | |||
n n | |||
t m o | |||
oi t | |||
d m | |||
o o | |||
na i | |||
sc s | |||
r c | |||
i er t | |||
t n t g t | |||
a t | |||
t c a | |||
T 3 | |||
l u cn n | |||
l r | |||
ra t s c | |||
A n | |||
S 8 | |||
uf ei pe a | |||
e ec i - | |||
i | |||
/ | |||
u 0 | |||
sl rd i r p | |||
pi mf d | |||
N n | |||
d ea ra rr t | |||
o od rl n | |||
n e | |||
9 RM oe t u f | |||
r rn ea i | |||
a l | |||
7 cr c | |||
i p | |||
pi t h i | |||
n o | |||
r m | |||
m n | |||
o o | |||
a R | |||
I N | |||
D I | |||
I I | |||
N N | |||
F O | |||
TNA L | |||
P r | |||
h r | |||
o c | |||
r o | |||
t R | |||
t r | |||
o t | |||
f r | |||
E n | |||
r n | |||
i o | |||
t r | |||
c i | |||
W o | |||
o 8 | |||
w t | |||
s o | |||
e r | |||
e O | |||
t f i 8 | |||
sn c | |||
i t | |||
nr d | |||
P r | |||
ot Cn o | |||
e s | |||
c ne e | |||
a c | |||
r | |||
/ o 9 | |||
ri n | |||
p n | |||
e A | |||
od r | |||
R m | |||
en f | |||
Ti 7 | |||
et n | |||
i a | |||
n t | |||
/ | |||
cr e | |||
u A | |||
m su I | |||
t pi o | |||
l r | |||
w e | |||
N o | |||
d d | |||
F u | |||
uf ec R | |||
os c | |||
c T | |||
o d | |||
ec r | |||
e S | |||
al sa O | |||
ro n | |||
s e o | |||
c I | |||
C_ | |||
Ca os pp d | |||
d d | |||
k d | |||
or c | |||
o U | |||
e 9 | |||
M r | |||
o m | |||
a a | |||
a n | |||
a o | |||
e N | |||
c 7 | |||
L I | |||
B B | |||
B U | |||
B L | |||
R P | |||
n 9 | |||
K a | |||
1 C | |||
n 1 | |||
I e | |||
e R | |||
t n | |||
T n | |||
u d | |||
A i | |||
l e | |||
P a | |||
t Z | |||
M c | |||
T e | |||
I t | |||
S C | |||
C S | |||
S C | |||
S C | |||
C S | |||
S C | |||
F e | |||
P G | |||
G P | |||
P G | |||
P 6 | |||
S P | |||
P i | |||
D O | |||
I I | |||
O O | |||
I O | |||
I I | |||
O O | |||
H A | |||
wo l | |||
S l | |||
EM A | |||
J y | |||
y t | |||
a a | |||
s l | |||
l 8B t | |||
e 0 | |||
p p | |||
0 A | |||
25 l | |||
u t | |||
5 0 | |||
I s | |||
s 0 | |||
55 | |||
? | |||
tc n | |||
6 2 | |||
A P | |||
i i | |||
'( | |||
0 44 0 | |||
e e | |||
1 8 | |||
R D | |||
D "D | |||
"A 1 | |||
1 R | |||
n C | |||
7 S | |||
t I | |||
2 5 | |||
d d | |||
"I S. | |||
o R | |||
T I | |||
k p | |||
T T | |||
1 o | |||
o 1 | |||
R P | |||
r m | |||
U 1 | |||
5 R | |||
R M | |||
M M | |||
o 2 | |||
6 2 | |||
2 T | |||
8 4 | |||
8 1 | |||
3 R | |||
R 8 | |||
R 7 | |||
0 4 | |||
7 9 | |||
7 L | |||
5 0 | |||
6 0 | |||
2 A | |||
2 3 | |||
2 4 | |||
7 4 | |||
0 I | |||
8 S | |||
6 S | |||
3 1 | |||
2 1 | |||
3 7 | |||
1 6 | |||
6 2 | |||
1 8 | |||
7 2 | |||
5 6 | |||
6 6 | |||
4 1 | |||
1 1 | |||
1 1 | |||
1 7 | |||
1 1 | |||
1 1 | |||
me 3 | |||
t s | |||
3 2 | |||
2 3 | |||
3 3 | |||
7 7 | |||
7 0 | |||
7 7 | |||
y 0 | |||
0 0 | |||
0 0 | |||
0 0 | |||
0 0 | |||
1 1 | |||
2 S | |||
9 9 | |||
9 9 | |||
9 9 | |||
9 9 | |||
9 e | |||
7 7 | |||
7 7 | |||
7 7 | |||
9 7 | |||
7 9 | |||
7 9 | |||
t | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
7 | |||
/ | |||
/ | |||
7 | |||
/ | |||
7 2 | |||
3 0 | |||
0 6 | |||
/ | |||
8 8 | |||
/ | |||
1 | |||
/ | |||
u 1 | |||
1 2 | |||
2 2 | |||
2 6 | |||
1 1 | |||
4 1 | |||
4 l | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
6 6 | |||
6 6 | |||
6 6 | |||
6 6 | |||
6 6 | |||
6 6 | |||
UNu | |||
, 'C | |||
JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary | |||
. lune 1979 IfC N''l"'S' Cause of Results of Action taken to Repair Date System llow Detected Component # | |||
Malfunction Malfunction Preclude Time Recurrence (flours) 1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS 6.0 1873 | |||
(/23/79 27 27-PC-10lli Itic Out of cal. | |||
Out of cal. | |||
Calibration 4.0 11736 6/23/79 27 27-PCV-122B OPS Out of cal. | |||
Improper control Calibration 4.0 34 6/22/79 27 | |||
-2 7-A0V-12711 OPS Valve rebuilt Out of cal. | |||
Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal. | |||
Replaced / cal. | |||
4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal. | 4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal. | ||
6.0 (d 1695 bJ Replaced 5/29/79 99 Camera #1 Sec.Lightning No picture Balanced amp. | 6.0 (d | ||
40.0..q | 1695 bJ Replaced 5/29/79 99 Camera #1 Sec. | ||
Lightning No picture Balanced amp. | |||
40.0 | |||
..q 1604 6/4/79 99 Camera #1 Sec. | |||
Unknown No picture Adjusted 20.0 | |||
- s 852 6/4/79 99 Security printei Sec. | |||
Bad Diodes Will not print Repaired 40.0 860 6/9/79 99 55cu r i t y tei _ er 9ec Brol en Will not type G. li repair 1.0 | |||
r | |||
) | |||
i s | |||
0 aer pmu 6 | |||
eio RTl i | |||
( | |||
o t | |||
e n | |||
c een kd e aur tl rcu d | |||
nec e | |||
ore c | |||
IPR a | |||
t l | |||
c p | |||
A e | |||
R n | |||
mr f o oi a | |||
l t | |||
sc a | |||
t n t | |||
l u uf na sl t | |||
ea s | |||
RM no T | |||
C N | |||
A. | |||
l P | |||
R E | |||
n W | |||
o O | |||
y f i P | |||
r ot a | |||
c R | |||
m C | |||
en A | |||
m E | |||
su n | |||
E u | |||
uf I | |||
e L | |||
S al k | |||
C C a o | |||
U e | |||
9 M | |||
r N | |||
c 7 | |||
B n | |||
9 K | |||
a 6 | |||
1 C | |||
n I | |||
e e | |||
R t | |||
n T | |||
n u | |||
d A | |||
i J | |||
e P | |||
a t | |||
Z M | |||
c T | |||
e I | |||
t c | |||
F e | |||
e D | |||
S A | |||
wo l | |||
S l | |||
lM A | |||
J ts r | |||
e e | |||
u t | |||
d q | |||
n a | |||
e e | |||
e R | |||
n R | |||
op d | |||
r m | |||
r o | |||
8 C | |||
4 | |||
:a | |||
( | |||
9 1 | |||
me ts 9 | |||
y 9 | |||
S 9 | |||
e 7 | |||
t | |||
/ | |||
u 9 | |||
2 l | |||
/ | |||
6 CrN0 | |||
~ | |||
*g, T | |||
-( | |||
POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURPENCE TIME COMPONENT # | POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURPENCE TIME COMPONENT # | ||
l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type. | l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type. | ||
During initial b construction two (2) Type NCX-2550 cells were installt d instead of NCX-2250. | During initial b | ||
Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced | construction two (2) Type NCX-2550 cells were installt d instead of NCX-2250. | ||
Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced cracked case in 1977. | |||
1212 PM N/A Disconnected, cleaned, regreased, and 24 Jun | 1212 PM N/A Disconnected, cleaned, regreased, and 24 Jun 71 | ||
_Sil-1, S B-2 retorqued all battery connections. | |||
Rechecked torque valves following equalize charge. | Rechecked torque valves following equalize charge. | ||
27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6 SS- Atill- 14 bolt threads fi retorque | 27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6 | ||
SS-Atill-14 bolt threads fi retorque b | |||
) | |||
G 18 Jun 10 It>85 OPS Check valve noisy | |||
. Replaced disc holder 300 ItllR-4 2C p.s s. | |||
20 Jun 4 t3 167: | |||
N/A Unable to test anchor bolts Installed new anchors 51!2 11-46-34 | |||
PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST # | PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST # | ||
REPAIR DATE SYSTEF1 C0biPONENT # | REPAIR DATE SYSTEF1 C0biPONENT # | ||
110W DETECTED CAUSE OF b!ALFUNCTION | 110W DETECTED CAUSE OF b!ALFUNCTION | ||
.\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun | .\\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun 46 | ||
_1919 N/A Anchors loose 6 broken Installed new fasteners 114 11-46-42 21 Jun 71 1457 N/A N/A Performed electrical preventative 80 Bus 1i500 maintenance on llus 11500 23 Jun 46 1674 N/A NRC-79-02 Inspection Repaired IAW F1PT-15 190 11-46-39 19 Jun 93 1654 N/A Preventive maintenance Cleaned left G right air bank 8 | |||
EDG-A solenoid valves 19 Jun 93 1655 N/A Preventive maintenance Cleaned left 6 right air bank 12 EDG-C solenoid valves. | |||
Replaced right bank solenoid valve. | Replaced right bank solenoid valve. | ||
19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2 VJ S-5B b.sY ljl Jun 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24., | 19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2 | ||
VJ S-5B b | |||
110W DETECTED CAUSE OF btALFUNCTION ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1 EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin-Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt | .sY ljl Jun 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24 | ||
.,s | |||
_,il('u Valves D | |||
POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary WORK REQUEST 8 REPAIR DATE SYSTEh! | |||
COFIPONENT # | |||
110W DETECTED CAUSE OF btALFUNCTION ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1 | |||
EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin-Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt | |||
- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2 | |||
F-11B t | |||
.2 Jun 27 11039 OPS Valve sticks shut Freed brass bushing in manual 9 | |||
A0V-126B handwheel assembly 2 Jun 27 34 OPS Position indicator broken Replaced broken indicator 40 A0V-127B | |||
POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A. | |||
FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST # | |||
REPAIR DNI E SYSTEM liOW DIiTECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT # | REPAIR DNI E SYSTEM liOW DIiTECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT # | ||
liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14 . inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415 | liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14. inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415 14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2 | ||
'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6 A0V-131A,132A adjustment swit c he s i'.,1310 Visual MPT-15 repair Replaced angle 9 8 Jun 46 | FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3 | ||
Completed items to clear DCAR 4 ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint.Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902- 19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5 tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420*11 41-1 grouting rework t-i (a*Previously reported (Fliy 1979) | S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators | ||
POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary | 'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6 | ||
A0V-131A,132A adjustment swit c he s i' | |||
liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 | .,1310 Visual MPT-15 repair Replaced angle 9 | ||
8 Jun 46 1146-336 9 Jun o7 1595 OPS Dirty filters Replaced filters 4 | |||
s 'C - l b A T. ll | |||
POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary REPAIR WORK REQUEST 4 DNI.E SYSTEM | |||
!!OW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT 110URS 11 Jun 10 102 DCAR-001-79 Incompleta installatior. | |||
Completed items to clear DCAR 4 | |||
ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint. | |||
Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902-19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5 | |||
tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420* | |||
11 41-1 grouting rework t-i (a | |||
*Previously reported (Fliy 1979) | |||
POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary REPAIR WORK REQUEST s DAl,E SYSTEM 110W DETEC' LED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT # | |||
liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 _ | |||
N/A Snubber test for NRC 79-02 Removed, tested f. reinstalled 18 PFSK--1051 snubber 26 Jun 13 1915 N/A Snubber test for NRC 79-02 Removed, tested fa reinstalled 6 | |||
PFSK-1050 snubber 28.lun 10 1851 Si Valve operator torque Replaced torque switch and adjusted 10 MOV-258 switch binding prevented valve position rotors valve from opening 20 Jun 71 | |||
_1019 OPS Cell #6 had cracked case Replaced cell 6 | |||
SB-2 causing leak and resulting U | |||
battery ground IV v4 | |||
___i el | |||
,}} | |||
Latest revision as of 16:08, 4 January 2025
| ML19224D081 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 06/30/1979 |
| From: | Zufelt E POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | |
| Shared Package | |
| ML19224D079 | List: |
| References | |
| MOR-790630, NUDOCS 7907100609 | |
| Download: ML19224D081 (12) | |
Text
'
OPERATING DATA REPORT DOCKET NO.
50-333 DATE Julv 1979 COMPLETED BY E.
2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS Fit: Patrick Notes
- 1. Unit Name:
790601 - 790630
- 2. Reporting Period:
2436
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
883 821
- 5. Design Electrical Rating (Net MWe):
830
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
800
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,1f Any:
Plant in cold shutdown in acco' 'arje with NRC "Show Cause" order of March 13, 1979.
This Month Yr..to-Date Cumulative 720 4343 34416 i1. Hours In Reporting Period
- 12. Numbe: Of Hours Reactor Was Critical 0
1767.3 23829.5
- 13. Reactor Rescrve Shutdown Hours 0
0 0
- 14. Hours Generator On.Line 0
1767.3 23054.4
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308
- 17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590 0
1.198,435 15,024,420
- 18. Net E'ectrical Energy Generated (MWH)
- 19. Unit Service Factor 0
- 40. ' %
- 67. 0 $
- 20. Unit Availability Factor 0
40.7 %
67.0 %
0 34.3 *i 61.1 *;
- 21. Unit Capacity Factor (Using MDC Net) 0 33.6's 53.2%
- 22. Unit Capacity Factor (Using DER Net).
- 23. Unit Forced Outage Rate 100*,
59.3*s 18,2%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Vene Unknown - pending completion of
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net)
(SIWE-Net i 1
0 g7 0
2 0
g3 0
3 0
39 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
D 0
8 0
28 0
9 0
25 0
10 0
26 0
II O
27 0
12 0
0 23 0
13 29 14 0
30 0
15 0
3, 16 0
SLNMARY:
Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979.
323 l2;
s DOCKET NO.
50-333 UNIT SilUIDOWNS AND POWER REDUCllONS UNIT N AME
.I A FNPI DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111
,Iu l y 1979 1ELEP ONE (315)342-3840 n.=
3w E
=_
ri 2e E
,eW l s.tensee vt Cause & Couettive c,
g?
lbic g
3m j
jgy 1:sent a?
ct Atison in
$E c2 559 liepin, u iR G Prevent itecuuente
{
u e
Q 5
790315 1:
720 11 4
79-014 ZZ ZZZZZZ Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7)
W TN.)
vs i
2 3
4 I l 'oi s c J Reason Method:
lixinbit G - Inst r uctions S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat.
li-Maintenance or lest 2-Manual Scrain.
1;nti> Sn:ets tor 1.nensee
.s l I,'
C-Refuchng
- 3. Autonutic Scrain.
1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin 4-Otlier (lixplatii) 0161)
I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC
.i G ()perational I o er (I aplain)
I sliibit ! S.nne Souite ll ()the r (1: spiano
r
)
0 0
0 0
0 i
s 0
0 0
0 0
0 0
aer pmu 8
1 1
4 2
6 4
0 0
8 3
3 eio 9
6 1
1 0
8 RTl 4
l
(
d o
r e
er t
e n
e p
e n
n u
n c
o n
t i
n n
d een C
r n
h s l
a o
o e
p o
gr a
g c
i c
kd e
/
aur Tl n
c i o C
t or tl r a
oo t t
/
ep d
a cu dC ti d
d d
/ c d
nm e
r p
nec e/
t e
e e
d e e
i a n
b e
ore np hi c
c r
en c
m-e i
IPR eo cs a
a i
nn a
r e t
l c
t t o t o l
l a
ao l
er h
a n
c sL i p p
p p
ec p
t p c
c a
h A
a w
e e
e l
e e
i F
S d
R R
C R
D T
C ya t
l c
n p
a f o s
t s
n i
n n
t m o
oi t
d m
o o
na i
sc s
r c
i er t
t n t g t
a t
t c a
T 3
l u cn n
l r
ra t s c
A n
S 8
uf ei pe a
e ec i -
i
/
u 0
sl rd i r p
pi mf d
N n
d ea ra rr t
o od rl n
n e
9 RM oe t u f
r rn ea i
a l
7 cr c
i p
pi t h i
n o
r m
m n
o o
a R
I N
D I
I I
N N
F O
TNA L
P r
h r
o c
r o
t R
t r
o t
f r
E n
r n
i o
t r
c i
W o
o 8
w t
s o
e r
e O
t f i 8
sn c
i t
nr d
P r
ot Cn o
e s
c ne e
a c
r
/ o 9
ri n
p n
e A
od r
R m
en f
Ti 7
et n
i a
n t
/
cr e
u A
m su I
t pi o
l r
w e
N o
d d
F u
uf ec R
os c
c T
o d
ec r
e S
al sa O
ro n
s e o
c I
C_
Ca os pp d
d d
k d
or c
o U
e 9
M r
o m
a a
a n
a o
e N
c 7
L I
B B
B U
B L
R P
n 9
K a
1 C
n 1
I e
e R
t n
T n
u d
A i
l e
P a
t Z
M c
T e
I t
S C
C S
S C
S C
C S
S C
F e
P G
G P
P G
P 6
S P
P i
D O
I I
O O
I O
I I
O O
H A
wo l
S l
EM A
J y
y t
a a
s l
l 8B t
e 0
p p
0 A
25 l
u t
5 0
I s
s 0
55
?
tc n
6 2
A P
i i
'(
0 44 0
e e
1 8
R D
D "D
"A 1
1 R
n C
7 S
t I
2 5
d d
"I S.
o R
T I
k p
T T
1 o
o 1
R P
r m
U 1
5 R
R M
M M
o 2
6 2
2 T
8 4
8 1
3 R
R 8
R 7
0 4
7 9
7 L
5 0
6 0
2 A
2 3
2 4
7 4
0 I
8 S
6 S
3 1
2 1
3 7
1 6
6 2
1 8
7 2
5 6
6 6
4 1
1 1
1 1
1 7
1 1
1 1
me 3
t s
3 2
2 3
3 3
7 7
7 0
7 7
y 0
0 0
0 0
0 0
0 0
1 1
2 S
9 9
9 9
9 9
9 9
9 e
7 7
7 7
7 7
9 7
7 9
7 9
t
/
/
/
/
/
7
/
/
7
/
7 2
3 0
0 6
/
8 8
/
1
/
u 1
1 2
2 2
2 6
1 1
4 1
4 l
/
/
/
/
/
/
/
/
/
/
/
/
6 6
6 6
6 6
6 6
6 6
6 6
UNu
, 'C
JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary
. lune 1979 IfC Nl"'S' Cause of Results of Action taken to Repair Date System llow Detected Component #
Malfunction Malfunction Preclude Time Recurrence (flours) 1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS 6.0 1873
(/23/79 27 27-PC-10lli Itic Out of cal.
Out of cal.
Calibration 4.0 11736 6/23/79 27 27-PCV-122B OPS Out of cal.
Improper control Calibration 4.0 34 6/22/79 27
-2 7-A0V-12711 OPS Valve rebuilt Out of cal.
Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal.
Replaced / cal.
4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal.
6.0 (d
1695 bJ Replaced 5/29/79 99 Camera #1 Sec.
Lightning No picture Balanced amp.
40.0
..q 1604 6/4/79 99 Camera #1 Sec.
Unknown No picture Adjusted 20.0
- s 852 6/4/79 99 Security printei Sec.
Bad Diodes Will not print Repaired 40.0 860 6/9/79 99 55cu r i t y tei _ er 9ec Brol en Will not type G. li repair 1.0
r
)
i s
0 aer pmu 6
eio RTl i
(
o t
e n
c een kd e aur tl rcu d
nec e
ore c
IPR a
t l
c p
A e
R n
mr f o oi a
l t
sc a
t n t
l u uf na sl t
ea s
RM no T
C N
A.
l P
R E
n W
o O
y f i P
r ot a
c R
m C
en A
m E
su n
E u
uf I
e L
S al k
C C a o
U e
9 M
r N
c 7
B n
9 K
a 6
1 C
n I
e e
R t
n T
n u
d A
i J
e P
a t
Z M
c T
e I
t c
F e
e D
S A
wo l
S l
lM A
J ts r
e e
u t
d q
n a
e e
e R
n R
op d
r m
r o
8 C
4
- a
(
9 1
me ts 9
y 9
S 9
e 7
t
/
u 9
2 l
/
6 CrN0
~
- g, T
-(
POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURPENCE TIME COMPONENT #
l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type.
During initial b
construction two (2) Type NCX-2550 cells were installt d instead of NCX-2250.
Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced cracked case in 1977.
1212 PM N/A Disconnected, cleaned, regreased, and 24 Jun 71
_Sil-1, S B-2 retorqued all battery connections.
Rechecked torque valves following equalize charge.
27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6
SS-Atill-14 bolt threads fi retorque b
)
G 18 Jun 10 It>85 OPS Check valve noisy
. Replaced disc holder 300 ItllR-4 2C p.s s.
20 Jun 4 t3 167:
N/A Unable to test anchor bolts Installed new anchors 51!2 11-46-34
PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST #
REPAIR DATE SYSTEF1 C0biPONENT #
110W DETECTED CAUSE OF b!ALFUNCTION
.\\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun 46
_1919 N/A Anchors loose 6 broken Installed new fasteners 114 11-46-42 21 Jun 71 1457 N/A N/A Performed electrical preventative 80 Bus 1i500 maintenance on llus 11500 23 Jun 46 1674 N/A NRC-79-02 Inspection Repaired IAW F1PT-15 190 11-46-39 19 Jun 93 1654 N/A Preventive maintenance Cleaned left G right air bank 8
EDG-A solenoid valves 19 Jun 93 1655 N/A Preventive maintenance Cleaned left 6 right air bank 12 EDG-C solenoid valves.
Replaced right bank solenoid valve.
19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2
VJ S-5B b
.sY ljl Jun 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24
.,s
_,il('u Valves D
POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary WORK REQUEST 8 REPAIR DATE SYSTEh!
COFIPONENT #
110W DETECTED CAUSE OF btALFUNCTION ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1
EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin-Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt
- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2
F-11B t
.2 Jun 27 11039 OPS Valve sticks shut Freed brass bushing in manual 9
A0V-126B handwheel assembly 2 Jun 27 34 OPS Position indicator broken Replaced broken indicator 40 A0V-127B
POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A.
FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST #
REPAIR DNI E SYSTEM liOW DIiTECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14. inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415 14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2
FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3
S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators
'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6
A0V-131A,132A adjustment swit c he s i'
.,1310 Visual MPT-15 repair Replaced angle 9
8 Jun 46 1146-336 9 Jun o7 1595 OPS Dirty filters Replaced filters 4
s 'C - l b A T. ll
POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary REPAIR WORK REQUEST 4 DNI.E SYSTEM
!!OW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT 110URS 11 Jun 10 102 DCAR-001-79 Incompleta installatior.
Completed items to clear DCAR 4
ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint.
Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902-19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5
tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420*
11 41-1 grouting rework t-i (a
- Previously reported (Fliy 1979)
POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary REPAIR WORK REQUEST s DAl,E SYSTEM 110W DETEC' LED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 _
N/A Snubber test for NRC 79-02 Removed, tested f. reinstalled 18 PFSK--1051 snubber 26 Jun 13 1915 N/A Snubber test for NRC 79-02 Removed, tested fa reinstalled 6
PFSK-1050 snubber 28.lun 10 1851 Si Valve operator torque Replaced torque switch and adjusted 10 MOV-258 switch binding prevented valve position rotors valve from opening 20 Jun 71
_1019 OPS Cell #6 had cracked case Replaced cell 6
SB-2 causing leak and resulting U
battery ground IV v4
___i el
,