{{#Wiki_filter:'.OPERATING DATA REPORT DOCKET NO.
{{#Wiki_filter:'
50-333 DATE Julv 1979 COMPLETED BY E.2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.
'Fit: Patrick Notes 1. Unit Name:
50-333 DATE Julv 1979 COMPLETED BY E.
2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS Fit: Patrick Notes
: 1. Unit Name:
790601 - 790630
790601 - 790630
: 2. Reporting Period:
: 2. Reporting Period:
2436 3. Licensed Thermal Power (MWt):
2436
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
883 821 5. Design Electrical Rating (Net MWe):
883 821
830 6. Maximum Dependable Capacity (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
830
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
800 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
800
None None 9. Power Level To Which Restricted,if Any (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None None
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 10. Reasons For Restrictions,1f Any:
: 10. Reasons For Restrictions,1f Any:
Plant in cold shutdown in acco' 'arje with NRC"Show Cause" order of March 13, 1979.
Plant in cold shutdown in acco' 'arje with NRC "Show Cause" order of March 13, 1979.
__-This Month Yr..to-Date Cumulative 720 4343 34416 i1. Hours In Reporting Period
This Month Yr..to-Date Cumulative 720 4343 34416 i1. Hours In Reporting Period
: 12. Numbe: Of Hours Reactor Was Critical 0 1767.3 23829.5 13. Reactor Rescrve Shutdown Hours 0 0 0 14. Hours Generator On.Line 0 1767.3 23054.4 15. Unit Reserve Shutdown Hours 0 0 0 16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308
: 12. Numbe: Of Hours Reactor Was Critical 0
: 17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590 0 1.198,435 15,024,420
1767.3 23829.5
: 13. Reactor Rescrve Shutdown Hours 0
0 0
: 14. Hours Generator On.Line 0
1767.3 23054.4
: 15. Unit Reserve Shutdown Hours 0
0 0
: 16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308
: 17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590 0
1.198,435 15,024,420
: 18. Net E'ectrical Energy Generated (MWH)
: 18. Net E'ectrical Energy Generated (MWH)
: 19. Unit Service Factor 0 40. ' %67. 0 $20. Unit Availability Factor 0 40.7 %67.0 %0 34.3 *i 61.1 *;21. Unit Capacity Factor (Using MDC Net) 0 33.6's 53.2%22. Unit Capacity Factor (Using DER Net) .
: 19. Unit Service Factor 0
: 23. Unit Forced Outage Rate 100*, 59.3*s 18,2%24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
: 40. ' %
: 67. 0 $
: 20. Unit Availability Factor 0
40.7 %
67.0 %
0 34.3 *i 61.1 *;
: 21. Unit Capacity Factor (Using MDC Net) 0 33.6's 53.2%
: 22. Unit Capacity Factor (Using DER Net).
: 23. Unit Forced Outage Rate 100*,
59.3*s 18,2%
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Vene Unknown - pending completion of
Vene Unknown - pending completion of
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net)(SIWE-Net i 1 0 g7 0 2 0 g3 0 3 0 39 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 D 0 8 0 28 0 9 0 25 0 10 0 26 0 II O 27 0 12 0 0 23'0 13 29 14 0 30 0 15 0 3,-16 0 SLNMARY: Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979.
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123
323l2; s DOCKET NO.
 
50-333 UNIT SilUIDOWNS AND POWER REDUCllONS UNIT N AME.I A FNPI DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111 ,Iu l y 1979 1ELEP ONE (315)342-3840 n.=-3w E=_ri , 2e E ,eW l s.tensee vt Cause & Couettive c,-*g?%lbic g 3m j jgy 1:sent a?ct Atison in$E c2 559 liepin, u iR G$'Prevent itecuuente
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net)
*{u e Q.5 790315 1: 720 11 4 79-014 ZZ ZZZZZZ Continuing re-evaluation of stress
(SIWE-Net i 1
, calculation and to make modifica-tions if required (cumulative hours to date - 2575.7)
0 g7 0
W TN.)vs i 2 3 4 I l 'oi s c J Reason Method: lixinbit G - Inst r uctions S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat.
2 0
_.li-Maintenance or lest 2-Manual Scrain.
g3 0
1;nti> Sn:ets tor 1.nensee.sl I ,'C-Refuchng
3 0
39 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
D 0
8 0
28 0
9 0
25 0
10 0
26 0
II O
27 0
12 0
0 23 0
13 29 14 0
30 0
15 0
3, 16 0
SLNMARY:
Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979.
323 l2;
 
s DOCKET NO.
50-333 UNIT SilUIDOWNS AND POWER REDUCllONS UNIT N AME
.I A FNPI DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111
,Iu l y 1979 1ELEP ONE (315)342-3840 n.=
3w E
=_
ri 2e E
,eW l s.tensee vt Cause & Couettive c,
g?
lbic g
3m j
jgy 1:sent a?
ct Atison in
$E c2 559 liepin, u iR G Prevent itecuuente
{
u e
Q 5
790315 1:
720 11 4
79-014 ZZ ZZZZZZ Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7)
W TN.)
vs i
2 3
4 I l 'oi s c J Reason Method:
lixinbit G - Inst r uctions S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat.
li-Maintenance or lest 2-Manual Scrain.
1;nti> Sn:ets tor 1.nensee
.s l I,'
C-Refuchng
: 3. Autonutic Scrain.
: 3. Autonutic Scrain.
1.sent Itepor t (l I It) I ile (Ntilti G-
1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin 4-Otlier (lixplatii) 0161)
'' 'I) Regulatory itesisitisoin 4-Otlier (lixplatii) 0161)I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC.i G ()perational I o er (I aplain)
I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC
.i G ()perational I o er (I aplain)
I sliibit ! S.nne Souite ll ()the r (1: spiano
I sliibit ! S.nne Souite ll ()the r (1: spiano
_r)0 0 0 0 0 i s 0 0 0 0 0 0 0 aer.pmu 8 1 1 4 2 6 4 0 0 8 3 3 eio 9 6 1 1 0 8 RTl 4 l (d o r e e r t e n e p.e n n u n c o n t.i n n d een C r n h s l a o o e p o gr a g c i c kd e/.aur Tl n c i o C t o r tl r a oo t t/ep d a cu dC-ti d d d/ c d nm e r p nec e/-t e e e d e e i a n b e ore np hi c c r en c m-e i IPR eo cs a a i nn a r e t l c t t o t o l l a ao l er h a n c sL i p p p p ec p t p c c a h A a w e e e l e e i F S d R R C R D T C*y a t l c n p a f o s t s n i n n t m o oi t d m o o na i sc s r c i er t t n t g t a t t c a T 3 l u cn-n l r ra t s c A n S 8 uf ei-pe a e ec i -i/u 0 sl rd i r p pi mf d N n d-ea ra rr t o od rl n n e 9 RM oe t u f r rn ea i a l 7 cr c i p pi t h i-n o r m m n o o a R I N D I I I N N F O T N A L P r h r o c r o t R t r o t f r E n r n i o t r c i W o o 8 w t s o e r e O t f i 8 sn c i t nr d P r ot Cn-o e s c ne e a c r/ o 9 ri n p n e A od r R m#en f Ti 7 et n i a n t/cr e u A m su I t-pi o l r w e N o d d F u uf ec R os c c T o d ec r e S al sa O ro n s e o c I C_Ca os pp d d d k d or c o U e 9 M r o m a a a n a o e N c 7 L I B B B U B L R P n 9 K a 1 C n 1 I e e R t n T n u d A i l e P a t Z M c T e I t S C C S S C S C C S S C F e P G G P P G P 6 S P P i D O I I O O I O I I O O H A w o l S l E M A J#y y t a a s#l l" 8B t e 0 p p 0 A 25 l u t 5 0 I s s , 0 55?t c n 6 2 A P i i'(0 44 0 e e 1-8 R D D"D"A , 1-1 R n-C 7-S-t I 2 5 d d"""I S.o R T I k p T T-1 o o 1 R P r m--U 1-5 R R M M M---o 2 6 2 2 T 8 4 8 1 3 R R 8 R 7 0 4 7 9 7 L 5 0 6 0 2 A 2 3 2 4 7 4 0 I 8 S 6 S 3 1 2 1 3 7 1 6 6 2 1 8 7 2 5 6 6 6 4 1 1 1 1 1 1 7 1 1 1 1 m e 3 t-s 3 2 2 3 3 3 7 7 7 0 7 7 y 0 0 0 0 0 0 0 0 0 1 1 2 S 9 9 9 9 9 9 9 9 9 e 7 7 7 7 7 7 9 7 7 9 7 9 t/////7//7/7'2 3 0 0'6/8 8/1/u 1 1 2 2 2 2 6 1 1 4 1 4 l////////////6 6 6 6 6 6 6 6 6 6 6 6 UNu , 'C JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary. lune 1979 IfC#N''l"'S'#Cause of Results of Action taken to Repair Date System llow Detected Component #
 
Malfunction Malfunction Preclude Time Recurrence (flours)1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS""" 6.0-1873 (/23/79 27 27-PC-10lli Itic Out of cal .
r
Out of cal .
)
Calibration 4.0_11736 6/23/79 27 27-PCV-122B OPS Out of cal.
0 0
Improper control Calibration 4.0 34 6/22/79 27-2 7- A0V- 12711 OPS Valve rebuilt Out of cal.
0 0
Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal .
0 i
--Replaced / cal.
s 0
0 0
0 0
0 0
aer pmu 8
1 1
4 2
6 4
0 0
8 3
3 eio 9
6 1
1 0
8 RTl 4
l
(
d o
r e
er t
e n
e p
e n
n u
n c
o n
t i
n n
d een C
r n
h s l
a o
o e
p o
gr a
g c
i c
kd e
/
aur Tl n
c i o C
t or tl r a
oo t t
/
ep d
a cu dC ti d
d d
/ c d
nm e
r p
nec e/
t e
e e
d e e
i a n
b e
ore np hi c
c r
en c
m-e i
IPR eo cs a
a i
nn a
r e t
l c
t t o t o l
l a
ao l
er h
a n
c sL i p p
p p
ec p
t p c
c a
h A
a w
e e
e l
e e
i F
S d
R R
C R
D T
C ya t
l c
n p
a f o s
t s
n i
n n
t m o
oi t
d m
o o
na i
sc s
r c
i er t
t n t g t
a t
t c a
T 3
l u cn n
l r
ra t s c
A n
S 8
uf ei pe a
e ec i -
i
/
u 0
sl rd i r p
pi mf d
N n
d ea ra rr t
o od rl n
n e
9 RM oe t u f
r rn ea i
a l
7 cr c
i p
pi t h i
n o
r m
m n
o o
a R
I N
D I
I I
N N
F O
TNA L
P r
h r
o c
r o
t R
t r
o t
f r
E n
r n
i o
t r
c i
W o
o 8
w t
s o
e r
e O
t f i 8
sn c
i t
nr d
P r
ot Cn o
e s
c ne e
a c
r
/ o 9
ri n
p n
e A
od r
R m
en f
Ti 7
et n
i a
n t
/
cr e
u A
m su I
t pi o
l r
w e
N o
d d
F u
uf ec R
os c
c T
o d
ec r
e S
al sa O
ro n
s e o
c I
C_
Ca os pp d
d d
k d
or c
o U
e 9
M r
o m
a a
a n
a o
e N
c 7
L I
B B
B U
B L
R P
n 9
K a
1 C
n 1
I e
e R
t n
T n
u d
A i
l e
P a
t Z
M c
T e
I t
S C
C S
S C
S C
C S
S C
F e
P G
G P
P G
P 6
S P
P i
D O
I I
O O
I O
I I
O O
H A
wo l
S l
EM A
J y
y t
a a
s l
l 8B t
e 0
p p
0 A
25 l
u t
5 0
I s
s 0
55
?
tc n
6 2
A P
i i
'(
0 44 0
e e
1 8
R D
D "D
"A 1
1 R
n C
7 S
t I
2 5
d d
"I S.
o R
T I
k p
T T
1 o
o 1
R P
r m
U 1
5 R
R M
M M
o 2
6 2
2 T
8 4
8 1
3 R
R 8
R 7
0 4
7 9
7 L
5 0
6 0
2 A
2 3
2 4
7 4
0 I
8 S
6 S
3 1
2 1
3 7
1 6
6 2
1 8
7 2
5 6
6 6
4 1
1 1
1 1
1 7
1 1
1 1
me 3
t s
3 2
2 3
3 3
7 7
7 0
7 7
y 0
0 0
0 0
0 0
0 0
1 1
2 S
9 9
9 9
9 9
9 9
9 e
7 7
7 7
7 7
9 7
7 9
7 9
t
/
/
/
/
/
7
/
/
7
/
7 2
3 0
0 6
/
8 8
/
1
/
u 1
1 2
2 2
2 6
1 1
4 1
4 l
/
/
/
/
/
/
/
/
/
/
/
/
6 6
6 6
6 6
6 6
6 6
6 6
UNu
, 'C
 
JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary
. lune 1979 IfC N''l"'S' Cause of Results of Action taken to Repair Date System llow Detected Component #
Malfunction Malfunction Preclude Time Recurrence (flours) 1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS 6.0 1873
(/23/79 27 27-PC-10lli Itic Out of cal.
Out of cal.
Calibration 4.0 11736 6/23/79 27 27-PCV-122B OPS Out of cal.
Improper control Calibration 4.0 34 6/22/79 27
-2 7-A0V-12711 OPS Valve rebuilt Out of cal.
Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal.
Replaced / cal.
4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal.
4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal.
6.0 (d 1695 bJ Replaced 5/29/79 99 Camera #1 Sec.Lightning No picture Balanced amp.
6.0 (d
40.0..q'1604 6/4/79 99 Camera #1 Sec.Unknown No picture Adjusted 20.0 ,- s 852 6/4/79 99 Security printei Sec.Bad Diodes Will not print Repaired 40.0 860 6/9/79 99 55cu r i t y tei _ er 9ec Brol en Will not type G . li repair 1.0 r)i s 0 aer.pmu 6 eio RTl i (o t e n c een kd e aur tl r cu d nec e ore c IPR a t l c p A e R n m r f o oi a l t sc a t n t l u uf n a sl t ea s RM n o T C N A.l P R E n W o O y f i P r ot a c R m C en A m E su n E u uf I e L S al k C C a o U e 9 M r N c 7 B n 9 K a 6 1 C n I e e R t n T n u d A i J e P a t Z M c T e I t c F e e D S A w o l S l!l M A J#t s#r e e u t d q n a e e e R n R o p d r m r o 8 C 4:a (9 1 m e t s 9 y 9 S 9 e 7 t/u 9 2 l/6-CrN0~*g, T-(
1695 bJ Replaced 5/29/79 99 Camera #1 Sec.
Lightning No picture Balanced amp.
40.0
..q 1604 6/4/79 99 Camera #1 Sec.
Unknown No picture Adjusted 20.0
- s 852 6/4/79 99 Security printei Sec.
Bad Diodes Will not print Repaired 40.0 860 6/9/79 99 55cu r i t y tei _ er 9ec Brol en Will not type G. li repair 1.0
 
r
)
i s
0 aer pmu 6
eio RTl i
(
o t
e n
c een kd e aur tl rcu d
nec e
ore c
IPR a
t l
c p
A e
R n
mr f o oi a
l t
sc a
t n t
l u uf na sl t
ea s
RM no T
C N
A.
l P
R E
n W
o O
y f i P
r ot a
c R
m C
en A
m E
su n
E u
uf I
e L
S al k
C C a o
U e
9 M
r N
c 7
B n
9 K
a 6
1 C
n I
e e
R t
n T
n u
d A
i J
e P
a t
Z M
c T
e I
t c
F e
e D
S A
wo l
S l
lM A
J ts r
e e
u t
d q
n a
e e
e R
n R
op d
r m
r o
8 C
4
:a
(
9 1
me ts 9
y 9
S 9
e 7
t
/
u 9
2 l
/
6 CrN0
~
*g, T
-(
 
POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURPENCE TIME COMPONENT #
POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURPENCE TIME COMPONENT #
l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type.
l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type.
During initial b construction two (2) Type NCX-2550 cells were installt d instead of NCX-2250.
During initial b
Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced
construction two (2) Type NCX-2550 cells were installt d instead of NCX-2250.
-cracked case in 1977.
Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced cracked case in 1977.
1212 PM N/A Disconnected, cleaned, regreased, and 24 Jun 71_Sil- 1, S B- 2 retorqued all battery connections.
1212 PM N/A Disconnected, cleaned, regreased, and 24 Jun 71
_Sil-1, S B-2 retorqued all battery connections.
Rechecked torque valves following equalize charge.
Rechecked torque valves following equalize charge.
27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6 SS- Atill- 14 bolt threads fi retorque
27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6
, b)G 18 Jun 10 It>85 OPS Check valve noisy. Replaced disc holder 300--ItllR- 4 2C p .s s.20 Jun 4 t3 167: N/A Unable to test anchor bolts Installed new anchors 51!2 11-46-34.
SS-Atill-14 bolt threads fi retorque b
)
G 18 Jun 10 It>85 OPS Check valve noisy
. Replaced disc holder 300 ItllR-4 2C p.s s.
20 Jun 4 t3 167:
N/A Unable to test anchor bolts Installed new anchors 51!2 11-46-34
 
PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST #
PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST #
REPAIR DATE SYSTEF1 C0biPONENT #
REPAIR DATE SYSTEF1 C0biPONENT #
110W DETECTED CAUSE OF b!ALFUNCTION
110W DETECTED CAUSE OF b!ALFUNCTION
.\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun 46_1919 N/A Anchors loose 6 broken Installed new fasteners 114 11-46-42 21 Jun 71 1457 N/A N/A Performed electrical preventative 80 Bus 1i500 maintenance on llus 11500 23 Jun 46 1674 N/A NRC-79-02 Inspection Repaired IAW F1PT-15 190 11-46-39 19 Jun 93 1654 N/A Preventive maintenance Cleaned left G right air bank 8 EDG-A solenoid valves 19 Jun 93 1655 N/A Preventive maintenance Cleaned left 6 right air bank 12 EDG-C solenoid valves.
.\\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun 46
_1919 N/A Anchors loose 6 broken Installed new fasteners 114 11-46-42 21 Jun 71 1457 N/A N/A Performed electrical preventative 80 Bus 1i500 maintenance on llus 11500 23 Jun 46 1674 N/A NRC-79-02 Inspection Repaired IAW F1PT-15 190 11-46-39 19 Jun 93 1654 N/A Preventive maintenance Cleaned left G right air bank 8
EDG-A solenoid valves 19 Jun 93 1655 N/A Preventive maintenance Cleaned left 6 right air bank 12 EDG-C solenoid valves.
Replaced right bank solenoid valve.
Replaced right bank solenoid valve.
19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2 VJ S-5B b.sY ljl Jun 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24.,s_,il('u Valves
19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2
, D POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary WORK REQUEST 8 REPAIR DATE SYSTEh!COFIPONENT #
VJ S-5B b
110W DETECTED CAUSE OF btALFUNCTION ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1 EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin-Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt.- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2''F-11B-.t.2 Jun 27 11039 OPS Valve sticks shut Freed brass bushing in manual 9 A0V-126B handwheel assembly 2 Jun 27 34 OPS Position indicator broken Replaced broken indicator 40 A0V-127B POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A.FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST #
.sY ljl Jun 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24
.,s
_,il('u Valves D
 
POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary WORK REQUEST 8 REPAIR DATE SYSTEh!
COFIPONENT #
110W DETECTED CAUSE OF btALFUNCTION ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1
EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin-Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt
- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2
F-11B t
.2 Jun 27 11039 OPS Valve sticks shut Freed brass bushing in manual 9
A0V-126B handwheel assembly 2 Jun 27 34 OPS Position indicator broken Replaced broken indicator 40 A0V-127B
 
POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A.
FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST #
REPAIR DNI E SYSTEM liOW DIiTECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
REPAIR DNI E SYSTEM liOW DIiTECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14 . inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415-14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2 FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3 S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators
liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14. inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415 14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2
'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6 A0V-131A,132A adjustment swit c he s i'.,1310 Visual MPT-15 repair Replaced angle 9 8 Jun 46<1146-336 9 Jun o7 1595 OPS Dirty filters Replaced filters 4 s 'C - l b A T. ll POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary REPAIR WORK REQUEST 4 DNI.E SYSTEM!!OW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT 110URS.11 Jun 10 102 DCAR-001-79 Incompleta installatior.
FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3
Completed items to clear DCAR 4 ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint.Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902- 19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5 tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420*11 41-1 grouting rework t-i (a*Previously reported (Fliy 1979)
S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators
POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary
'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6
.REPAIR WORK REQUEST s DAl,E SYSTEM 110W DETEC' LED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
A0V-131A,132A adjustment swit c he s i'
liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 _N/A Snubber test for NRC 79-02 Removed, tested f. reinstalled 18 PFSK--1051 snubber 26 Jun 13 1915 N/A Snubber test for NRC 79-02 Removed, tested fa reinstalled 6 PFSK-1050 snubber 28 .lun 10 1851 Si Valve operator torque Replaced torque switch and adjusted 10 MOV-258 switch binding prevented valve position rotors valve from opening 20 Jun 71_1019 OPS Cell #6 had cracked case Replaced cell 6 SB-2 causing leak and resulting U battery ground IV v4___i el ,}}
.,1310 Visual MPT-15 repair Replaced angle 9
8 Jun 46 1146-336 9 Jun o7 1595 OPS Dirty filters Replaced filters 4
s 'C - l b A T. ll
 
POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary REPAIR WORK REQUEST 4 DNI.E SYSTEM
!!OW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT 110URS 11 Jun 10 102 DCAR-001-79 Incompleta installatior.
Completed items to clear DCAR 4
ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint.
Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902-19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5
tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420*
11 41-1 grouting rework t-i (a
*Previously reported (Fliy 1979)
 
POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary REPAIR WORK REQUEST s DAl,E SYSTEM 110W DETEC' LED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 _
N/A Snubber test for NRC 79-02 Removed, tested f. reinstalled 18 PFSK--1051 snubber 26 Jun 13 1915 N/A Snubber test for NRC 79-02 Removed, tested fa reinstalled 6
PFSK-1050 snubber 28.lun 10 1851 Si Valve operator torque Replaced torque switch and adjusted 10 MOV-258 switch binding prevented valve position rotors valve from opening 20 Jun 71
_1019 OPS Cell #6 had cracked case Replaced cell 6
SB-2 causing leak and resulting U
battery ground IV v4
___i el
,}}

Latest revision as of 16:08, 4 January 2025

Monthly Operating Rept for June 1979
ML19224D081
Person / Time
Site: FitzPatrick 
Issue date: 06/30/1979
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML19224D079 List:
References
MOR-790630, NUDOCS 7907100609
Download: ML19224D081 (12)


Text

'

OPERATING DATA REPORT DOCKET NO.

50-333 DATE Julv 1979 COMPLETED BY E.

2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS Fit: Patrick Notes

1. Unit Name:

790601 - 790630

2. Reporting Period:

2436

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

883 821

5. Design Electrical Rating (Net MWe):

830

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

800

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None None

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,1f Any:

Plant in cold shutdown in acco' 'arje with NRC "Show Cause" order of March 13, 1979.

This Month Yr..to-Date Cumulative 720 4343 34416 i1. Hours In Reporting Period

12. Numbe: Of Hours Reactor Was Critical 0

1767.3 23829.5

13. Reactor Rescrve Shutdown Hours 0

0 0

14. Hours Generator On.Line 0

1767.3 23054.4

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308
17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590 0

1.198,435 15,024,420

18. Net E'ectrical Energy Generated (MWH)
19. Unit Service Factor 0
40. ' %
67. 0 $
20. Unit Availability Factor 0

40.7 %

67.0 %

0 34.3 *i 61.1 *;

21. Unit Capacity Factor (Using MDC Net) 0 33.6's 53.2%
22. Unit Capacity Factor (Using DER Net).
23. Unit Forced Outage Rate 100*,

59.3*s 18,2%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Vene Unknown - pending completion of

25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net)

(SIWE-Net i 1

0 g7 0

2 0

g3 0

3 0

39 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

D 0

8 0

28 0

9 0

25 0

10 0

26 0

II O

27 0

12 0

0 23 0

13 29 14 0

30 0

15 0

3, 16 0

SLNMARY:

Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979.

323 l2;

s DOCKET NO.

50-333 UNIT SilUIDOWNS AND POWER REDUCllONS UNIT N AME

.I A FNPI DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111

,Iu l y 1979 1ELEP ONE (315)342-3840 n.=

3w E

=_

ri 2e E

,eW l s.tensee vt Cause & Couettive c,

g?

lbic g

3m j

jgy 1:sent a?

ct Atison in

$E c2 559 liepin, u iR G Prevent itecuuente

{

u e

Q 5

790315 1:

720 11 4

79-014 ZZ ZZZZZZ Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7)

W TN.)

vs i

2 3

4 I l 'oi s c J Reason Method:

lixinbit G - Inst r uctions S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat.

li-Maintenance or lest 2-Manual Scrain.

1;nti> Sn:ets tor 1.nensee

.s l I,'

C-Refuchng

3. Autonutic Scrain.

1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin 4-Otlier (lixplatii) 0161)

I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC

.i G ()perational I o er (I aplain)

I sliibit ! S.nne Souite ll ()the r (1: spiano

r

)

0 0

0 0

0 i

s 0

0 0

0 0

0 0

aer pmu 8

1 1

4 2

6 4

0 0

8 3

3 eio 9

6 1

1 0

8 RTl 4

l

(

d o

r e

er t

e n

e p

e n

n u

n c

o n

t i

n n

d een C

r n

h s l

a o

o e

p o

gr a

g c

i c

kd e

/

aur Tl n

c i o C

t or tl r a

oo t t

/

ep d

a cu dC ti d

d d

/ c d

nm e

r p

nec e/

t e

e e

d e e

i a n

b e

ore np hi c

c r

en c

m-e i

IPR eo cs a

a i

nn a

r e t

l c

t t o t o l

l a

ao l

er h

a n

c sL i p p

p p

ec p

t p c

c a

h A

a w

e e

e l

e e

i F

S d

R R

C R

D T

C ya t

l c

n p

a f o s

t s

n i

n n

t m o

oi t

d m

o o

na i

sc s

r c

i er t

t n t g t

a t

t c a

T 3

l u cn n

l r

ra t s c

A n

S 8

uf ei pe a

e ec i -

i

/

u 0

sl rd i r p

pi mf d

N n

d ea ra rr t

o od rl n

n e

9 RM oe t u f

r rn ea i

a l

7 cr c

i p

pi t h i

n o

r m

m n

o o

a R

I N

D I

I I

N N

F O

TNA L

P r

h r

o c

r o

t R

t r

o t

f r

E n

r n

i o

t r

c i

W o

o 8

w t

s o

e r

e O

t f i 8

sn c

i t

nr d

P r

ot Cn o

e s

c ne e

a c

r

/ o 9

ri n

p n

e A

od r

R m

en f

Ti 7

et n

i a

n t

/

cr e

u A

m su I

t pi o

l r

w e

N o

d d

F u

uf ec R

os c

c T

o d

ec r

e S

al sa O

ro n

s e o

c I

C_

Ca os pp d

d d

k d

or c

o U

e 9

M r

o m

a a

a n

a o

e N

c 7

L I

B B

B U

B L

R P

n 9

K a

1 C

n 1

I e

e R

t n

T n

u d

A i

l e

P a

t Z

M c

T e

I t

S C

C S

S C

S C

C S

S C

F e

P G

G P

P G

P 6

S P

P i

D O

I I

O O

I O

I I

O O

H A

wo l

S l

EM A

J y

y t

a a

s l

l 8B t

e 0

p p

0 A

25 l

u t

5 0

I s

s 0

55

?

tc n

6 2

A P

i i

'(

0 44 0

e e

1 8

R D

D "D

"A 1

1 R

n C

7 S

t I

2 5

d d

"I S.

o R

T I

k p

T T

1 o

o 1

R P

r m

U 1

5 R

R M

M M

o 2

6 2

2 T

8 4

8 1

3 R

R 8

R 7

0 4

7 9

7 L

5 0

6 0

2 A

2 3

2 4

7 4

0 I

8 S

6 S

3 1

2 1

3 7

1 6

6 2

1 8

7 2

5 6

6 6

4 1

1 1

1 1

1 7

1 1

1 1

me 3

t s

3 2

2 3

3 3

7 7

7 0

7 7

y 0

0 0

0 0

0 0

0 0

1 1

2 S

9 9

9 9

9 9

9 9

9 e

7 7

7 7

7 7

9 7

7 9

7 9

t

/

/

/

/

/

7

/

/

7

/

7 2

3 0

0 6

/

8 8

/

1

/

u 1

1 2

2 2

2 6

1 1

4 1

4 l

/

/

/

/

/

/

/

/

/

/

/

/

6 6

6 6

6 6

6 6

6 6

6 6

UNu

, 'C

JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary

. lune 1979 IfC Nl"'S' Cause of Results of Action taken to Repair Date System llow Detected Component #

Malfunction Malfunction Preclude Time Recurrence (flours) 1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS 6.0 1873

(/23/79 27 27-PC-10lli Itic Out of cal.

Out of cal.

Calibration 4.0 11736 6/23/79 27 27-PCV-122B OPS Out of cal.

Improper control Calibration 4.0 34 6/22/79 27

-2 7-A0V-12711 OPS Valve rebuilt Out of cal.

Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal.

Replaced / cal.

4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal.

6.0 (d

1695 bJ Replaced 5/29/79 99 Camera #1 Sec.

Lightning No picture Balanced amp.

40.0

..q 1604 6/4/79 99 Camera #1 Sec.

Unknown No picture Adjusted 20.0

- s 852 6/4/79 99 Security printei Sec.

Bad Diodes Will not print Repaired 40.0 860 6/9/79 99 55cu r i t y tei _ er 9ec Brol en Will not type G. li repair 1.0

r

)

i s

0 aer pmu 6

eio RTl i

(

o t

e n

c een kd e aur tl rcu d

nec e

ore c

IPR a

t l

c p

A e

R n

mr f o oi a

l t

sc a

t n t

l u uf na sl t

ea s

RM no T

C N

A.

l P

R E

n W

o O

y f i P

r ot a

c R

m C

en A

m E

su n

E u

uf I

e L

S al k

C C a o

U e

9 M

r N

c 7

B n

9 K

a 6

1 C

n I

e e

R t

n T

n u

d A

i J

e P

a t

Z M

c T

e I

t c

F e

e D

S A

wo l

S l

lM A

J ts r

e e

u t

d q

n a

e e

e R

n R

op d

r m

r o

8 C

4

a

(

9 1

me ts 9

y 9

S 9

e 7

t

/

u 9

2 l

/

6 CrN0

~

  • g, T

-(

POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURPENCE TIME COMPONENT #

l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type.

During initial b

construction two (2) Type NCX-2550 cells were installt d instead of NCX-2250.

Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced cracked case in 1977.

1212 PM N/A Disconnected, cleaned, regreased, and 24 Jun 71

_Sil-1, S B-2 retorqued all battery connections.

Rechecked torque valves following equalize charge.

27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6

SS-Atill-14 bolt threads fi retorque b

)

G 18 Jun 10 It>85 OPS Check valve noisy

. Replaced disc holder 300 ItllR-4 2C p.s s.

20 Jun 4 t3 167:

N/A Unable to test anchor bolts Installed new anchors 51!2 11-46-34

PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST #

REPAIR DATE SYSTEF1 C0biPONENT #

110W DETECTED CAUSE OF b!ALFUNCTION

.\\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun 46

_1919 N/A Anchors loose 6 broken Installed new fasteners 114 11-46-42 21 Jun 71 1457 N/A N/A Performed electrical preventative 80 Bus 1i500 maintenance on llus 11500 23 Jun 46 1674 N/A NRC-79-02 Inspection Repaired IAW F1PT-15 190 11-46-39 19 Jun 93 1654 N/A Preventive maintenance Cleaned left G right air bank 8

EDG-A solenoid valves 19 Jun 93 1655 N/A Preventive maintenance Cleaned left 6 right air bank 12 EDG-C solenoid valves.

Replaced right bank solenoid valve.

19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2

VJ S-5B b

.sY ljl Jun 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24

.,s

_,il('u Valves D

POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary WORK REQUEST 8 REPAIR DATE SYSTEh!

COFIPONENT #

110W DETECTED CAUSE OF btALFUNCTION ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1

EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin-Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt

- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2

F-11B t

.2 Jun 27 11039 OPS Valve sticks shut Freed brass bushing in manual 9

A0V-126B handwheel assembly 2 Jun 27 34 OPS Position indicator broken Replaced broken indicator 40 A0V-127B

POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A.

FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST #

REPAIR DNI E SYSTEM liOW DIiTECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #

liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14. inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415 14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2

FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3

S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators

'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6

A0V-131A,132A adjustment swit c he s i'

.,1310 Visual MPT-15 repair Replaced angle 9

8 Jun 46 1146-336 9 Jun o7 1595 OPS Dirty filters Replaced filters 4

s 'C - l b A T. ll

POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary REPAIR WORK REQUEST 4 DNI.E SYSTEM

!!OW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT 110URS 11 Jun 10 102 DCAR-001-79 Incompleta installatior.

Completed items to clear DCAR 4

ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint.

Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902-19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5

tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420*

11 41-1 grouting rework t-i (a

  • Previously reported (Fliy 1979)

POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary REPAIR WORK REQUEST s DAl,E SYSTEM 110W DETEC' LED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #

liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 _

N/A Snubber test for NRC 79-02 Removed, tested f. reinstalled 18 PFSK--1051 snubber 26 Jun 13 1915 N/A Snubber test for NRC 79-02 Removed, tested fa reinstalled 6

PFSK-1050 snubber 28.lun 10 1851 Si Valve operator torque Replaced torque switch and adjusted 10 MOV-258 switch binding prevented valve position rotors valve from opening 20 Jun 71

_1019 OPS Cell #6 had cracked case Replaced cell 6

SB-2 causing leak and resulting U

battery ground IV v4

___i el

,