ML19256G524: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:a OPERATING DATA REPORT DOCKET NO. 50-366 DATE 9-10-19 CONIPLETED isY | {{#Wiki_filter:a OPERATING DATA REPORT DOCKET NO. 50-366 DATE 9-10-19 CONIPLETED isY P. B. Allen TELErilONE 912-367-7781 OPERATING STATUS | ||
: 1. Unit Name: | : 1. Unit Name: | ||
: 2. Reporting Period: | Hatch 2 Note 5 | ||
: 3. Licensed Thermal Power Olbt): 2436 MWe | : 2. Reporting Period: | ||
: 4. Nameplate Rating (Gross alwe): | Aucust 1979 | ||
: 5. Design Electrical Rating (Net 31We): | : 3. Licensed Thermal Power Olbt): 2436 MWe 817.0 Gross MWe | ||
: 4. Nameplate Rating (Gross alwe): | |||
: 5. Design Electrical Rating (Net 31We): | |||
784.0 fiet fNe | |||
: 6. Staximum Dependable Capacity (Gross StWe): 782.O Gross Kle | : 6. Staximum Dependable Capacity (Gross StWe): 782.O Gross Kle | ||
: 7. Sfaximum Dependable Capacity (Net 31We): | : 7. Sfaximum Dependable Capacity (Net 31We): | ||
749.0 Net MWe | |||
: 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reasons: | : 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reasons: | ||
: 9. Power Lesel To hhich Restricted if Any (Net SIWE): | : 9. Power Lesel To hhich Restricted if Any (Net SIWE): | ||
: 10. Reasons For Restrictions.lf Any: | : 10. Reasons For Restrictions.lf Any: | ||
This alonth | This alonth Yr..to Date Cumulatise | ||
: 11. Ilours In Repor ing Period | : 11. Ilours In Repor ing Period 744 5831 10248 | ||
: 12. Number Of Houts Reactor Was Critical | : 12. Number Of Houts Reactor Was Critical 701.7 2269.0 4901.5 | ||
: 13. Reactor Resene Shutdown Hours | : 13. Reactor Resene Shutdown Hours 0.0 0.0 0.0 | ||
: 14. Hours Generator On Line | : 14. Hours Generator On Line 682.4 1675.0 3061.6 | ||
: 15. Unit Resene Shutdown Hours | : 15. Unit Resene Shutdown Hours 0.0 0.0 0.0 | ||
: 16. Gross Thermal Energy Generated (StWH) | : 16. Gross Thermal Energy Generated (StWH) 1349724 3144206 5150147 | ||
: 17. Gross Electrical Energy Generated (5 thin | : 17. Gross Electrical Energy Generated (5 thin 423830 023a70 la65070 | ||
: 18. Net Electrical Energy Generated (SIWH) | : 18. Net Electrical Energy Generated (SIWH) 406025 861466 1354998 | ||
: 19. Unir Senice Factor | : 19. Unir Senice Factor N/A N/A N/A | ||
: 20. Unit Availability Factor | : 20. Unit Availability Factor N/A N/A N/A | ||
: 21. Unit Capacity Factor (Using .\tDC Nett . | : 21. Unit Capacity Factor (Using.\\tDC Nett. | ||
: 22. Unit Capacity Factor IU>ing DER Neti | N/A N/A N/A | ||
: 23. Unit Forced Outage Rate | : 22. Unit Capacity Factor IU>ing DER Neti N/A N/A N/A | ||
: 23. Unit Forced Outage Rate N/A N/A N/A | |||
: 24. Shutdowns Seliedn:cd Oscr Nest 6 31onths t!>pe.Date.and Duration of Each 3: | : 24. Shutdowns Seliedn:cd Oscr Nest 6 31onths t!>pe.Date.and Duration of Each 3: | ||
: 25. If Shnt Down At Enti Of iteport Period. Estimated Date of Startup: | : 25. If Shnt Down At Enti Of iteport Period. Estimated Date of Startup: | ||
: 26. Units in rest Status iPrior to Commercial Operationi: | : 26. Units in rest Status iPrior to Commercial Operationi: | ||
9-22-78 | Forecast Achiesed INITIAL. CRIriCAtt rY 7-4-78 INI TI \\ L ELI:C TRICI TY 9-22-78 CO\\l%1ERCIAL Ol'I.It ATiON 9-5-79 0008 Oglgg 1657 155 | ||
CO\l%1ERCIAL Ol'I.It ATiON | ,,,g,, | ||
7912810 | 7912810 H33}} | ||
Latest revision as of 22:31, 3 January 2025
| ML19256G524 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/08/1979 |
| From: | Allen P GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML19256G523 | List: |
| References | |
| NUDOCS 7912310433 | |
| Download: ML19256G524 (1) | |
Text
a OPERATING DATA REPORT DOCKET NO. 50-366 DATE 9-10-19 CONIPLETED isY P. B. Allen TELErilONE 912-367-7781 OPERATING STATUS
- 1. Unit Name:
Hatch 2 Note 5
- 2. Reporting Period:
Aucust 1979
- 3. Licensed Thermal Power Olbt): 2436 MWe 817.0 Gross MWe
- 4. Nameplate Rating (Gross alwe):
- 5. Design Electrical Rating (Net 31We):
784.0 fiet fNe
- 6. Staximum Dependable Capacity (Gross StWe): 782.O Gross Kle
- 7. Sfaximum Dependable Capacity (Net 31We):
749.0 Net MWe
- 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reasons:
- 9. Power Lesel To hhich Restricted if Any (Net SIWE):
- 10. Reasons For Restrictions.lf Any:
This alonth Yr..to Date Cumulatise
- 11. Ilours In Repor ing Period 744 5831 10248
- 12. Number Of Houts Reactor Was Critical 701.7 2269.0 4901.5
- 13. Reactor Resene Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On Line 682.4 1675.0 3061.6
- 15. Unit Resene Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (StWH) 1349724 3144206 5150147
- 17. Gross Electrical Energy Generated (5 thin 423830 023a70 la65070
- 18. Net Electrical Energy Generated (SIWH) 406025 861466 1354998
- 19. Unir Senice Factor N/A N/A N/A
- 20. Unit Availability Factor N/A N/A N/A
- 21. Unit Capacity Factor (Using.\\tDC Nett.
N/A N/A N/A
- 22. Unit Capacity Factor IU>ing DER Neti N/A N/A N/A
- 23. Unit Forced Outage Rate N/A N/A N/A
- 24. Shutdowns Seliedn:cd Oscr Nest 6 31onths t!>pe.Date.and Duration of Each 3:
- 25. If Shnt Down At Enti Of iteport Period. Estimated Date of Startup:
- 26. Units in rest Status iPrior to Commercial Operationi:
Forecast Achiesed INITIAL. CRIriCAtt rY 7-4-78 INI TI \\ L ELI:C TRICI TY 9-22-78 CO\\l%1ERCIAL Ol'I.It ATiON 9-5-79 0008 Oglgg 1657 155
,,,g,,
7912810 H33