ML19259B723: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 2: Line 2:
| number = ML19259B723
| number = ML19259B723
| issue date = 02/05/1979
| issue date = 02/05/1979
| title = Responds to NRC 790105 Ltr Re Violations Noted in IE Insp Repts 50-373/78-28 & 50-374/78-20.Corrective Actions:Record in Question Was for Info Only & Was Not Required.Weld Integrity Verified for Completed Weld
| title = Responds to NRC Re Violations Noted in IE Insp Repts 50-373/78-28 & 50-374/78-20.Corrective Actions:Record in Question Was for Info Only & Was Not Required.Weld Integrity Verified for Completed Weld
| author name = Reed C
| author name = Reed C
| author affiliation = COMMONWEALTH EDISON CO.
| author affiliation = COMMONWEALTH EDISON CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7903130608
| document report number = NUDOCS 7903130608
| title reference date = 01-05-1979
| package number = ML19259B721
| package number = ML19259B721
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:Commonwealth Edison Cne First National Plaza. Chicago. lihnots Address Reply to Post Office Box 767 Chicago. Illinois 60690 February 5, 1979 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission                                             -
{{#Wiki_filter:Commonwealth Edison Cne First National Plaza. Chicago. lihnots Address Reply to Post Office Box 767 Chicago. Illinois 60690 February 5, 1979 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn,' Illinois 60137
799 Roosevelt Road Glen Ellyn,' Illinois 60137


==Subject:==
==Subject:==
LaSalle County Station Units 1 and 2 Response to IE Inspection Report Nos.
LaSalle County Station Units 1 and 2 Response to IE Inspection Report Nos.
60-373/78- b nd 50-374/78-20 NRC Pocket Nos. 50-373 and 50-374 Reference (a):           R. F. Heishman letter to B. Lee, Jr.
60-373/78-b nd 50-374/78-20 NRC Pocket Nos. 50-373 and 50-374 Reference (a):
R. F. Heishman letter to B. Lee, Jr.
dated January 5, 1979
dated January 5, 1979


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
 
The following is in response to an inspection conducted by Mr. C. M. Erb on October 31 through November 3, 1978 of activities at LaSalle County Station.
The following is in response to an inspection conducted by Mr. C. M. Erb on October 31 through November 3, 1978 of activities at LaSalle County Station. Reference (a) indicated that certain activities appeared to be in noncompliance .Jith NRC requirements. These requirements are addressed in the enclosure to this letter.
Reference (a) indicated that certain activities appeared to be in noncompliance.Jith NRC requirements.
These requirements are addressed in the enclosure to this letter.
Please refer any questions you may ha7e on this matter to this office.
Please refer any questions you may ha7e on this matter to this office.
Very truly yours,
Very truly yours,
(   _ _ ,
(
Cordell Reed Assistant Vice-President enclosure 28 819D9 7003130 649%
Cordell Reed Assistant Vice-President enclosure 28 819D9 7003130 649%


Commonwealth Edison                                                         FB. 21. 1979 Company We expect to find in the site files, records of the grindout and repair or other records documenting disposition of your acceptance of the ASME Code unacceptable discontinuity. We will examine your corrective action during a future inspection.
Commonwealth Edison FB. 21. 1979 Company We expect to find in the site files, records of the grindout and repair or other records documenting disposition of your acceptance of the ASME Code unacceptable discontinuity. We will examine your corrective action during a future inspection.
Your cooperation with us is appreciated.
Your cooperation with us is appreciated.
Sincerely,
Sincerely, AMh' Caston Fiorelli, Chief Reactor Construction and Engineering Suppott Branch cc:
                                            %        AMh' Caston Fiorelli, Chief Reactor Construction and Engineering Suppott Branch cc:   Mr. L. J. Burke, Site Project Superintendent Mr, T. E. Quaka, Quality Assurance Supervisor Mr. Cordell Reed, Assistant Vice President cc w/ltr dtd 2/5/79:
Mr. L. J. Burke, Site Project Superintendent Mr, T. E. Quaka, Quality Assurance Supervisor Mr. Cordell Reed, Assistant Vice President cc w/ltr dtd 2/5/79:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC s' TIC Mr. Dean Hansell, Office of Assistant Attorney General}}
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC s' TIC Mr. Dean Hansell, Office of Assistant Attorney General}}

Latest revision as of 15:50, 3 January 2025

Responds to NRC Re Violations Noted in IE Insp Repts 50-373/78-28 & 50-374/78-20.Corrective Actions:Record in Question Was for Info Only & Was Not Required.Weld Integrity Verified for Completed Weld
ML19259B723
Person / Time
Site: LaSalle  
Issue date: 02/05/1979
From: Reed C
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19259B721 List:
References
NUDOCS 7903130608
Download: ML19259B723 (3)


Text

Commonwealth Edison Cne First National Plaza. Chicago. lihnots Address Reply to Post Office Box 767 Chicago. Illinois 60690 February 5, 1979 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn,' Illinois 60137

Subject:

LaSalle County Station Units 1 and 2 Response to IE Inspection Report Nos.

60-373/78-b nd 50-374/78-20 NRC Pocket Nos. 50-373 and 50-374 Reference (a):

R. F. Heishman letter to B. Lee, Jr.

dated January 5, 1979

Dear Mr. Keppler:

The following is in response to an inspection conducted by Mr. C. M. Erb on October 31 through November 3, 1978 of activities at LaSalle County Station.

Reference (a) indicated that certain activities appeared to be in noncompliance.Jith NRC requirements.

These requirements are addressed in the enclosure to this letter.

Please refer any questions you may ha7e on this matter to this office.

Very truly yours,

(

Cordell Reed Assistant Vice-President enclosure 28 819D9 7003130 649%

Commonwealth Edison FB. 21. 1979 Company We expect to find in the site files, records of the grindout and repair or other records documenting disposition of your acceptance of the ASME Code unacceptable discontinuity. We will examine your corrective action during a future inspection.

Your cooperation with us is appreciated.

Sincerely, AMh' Caston Fiorelli, Chief Reactor Construction and Engineering Suppott Branch cc:

Mr. L. J. Burke, Site Project Superintendent Mr, T. E. Quaka, Quality Assurance Supervisor Mr. Cordell Reed, Assistant Vice President cc w/ltr dtd 2/5/79:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC s' TIC Mr. Dean Hansell, Office of Assistant Attorney General