dNIT      ocon n Unit 2                      ,,                              ,
D*dATE          August 10, 1974 OPERATINC              STATUS                                                                                    .
: 1. REPORTING PERIOD:      July 1                        TO      July 31, 1974 CROSS Il0URS IN REPORTING PERIOD:          744.0
~
~
: 2. CURRENTLY AUTliORIZED POWER LEVEL MWt 2568                   MWe-NET
dNIT ocon n Unit 2 D*dATE August 10, 1974 OPERATINC STATUS 1.
                                                                                          ~
REPORTING PERIOD:
: 3. POWER LEVEL TO Wi!ICil RESTRICTED (IF ANY): None
July 1 TO July 31, 1974 CROSS Il0URS IN REPORTING PERIOD:
: 4. REASONS FOR RESTRICTIONS (IF ANY): Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 9-13 are not applicable.
744.0
THIS                       CUMULATIVE MONTH     YR-TO-DATE           TO DATE
~
: 5. HOURS REACTOR WAS CRITICAL                         356.I       1264.6           1922.0
2.
: 6. h0URS GENERATOR ON-LINE                           306.2       1128,5               1641.7
CURRENTLY AUTliORIZED POWER LEVEL MWt 2568 MWe-NET
: 7. CROSS THERMAL POWER GENERATED (MWH)             399.375 1,866,012                 2468983
~
: 8. GROSS ELECTRICAL F0WER GENERATED (MWH)131.680 642,046               818.356~
3.
: 9. NET ELECTRICAL POWER GENERATED (M'.4H)             N/A
POWER LEVEL TO Wi!ICil RESTRICTED (IF ANY): None 4.
: 10. REACTOR AVAILABILITY FACTOR (1)                     N/A
REASONS FOR RESTRICTIONS (IF ANY): Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 9-13 are not applicable.
: 11. PLANT AVAILA3ILITY FACTOR (2)                       N/A
THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5.
: 12. PLANT CAPACITY FACTOR (3)                           N/A
HOURS REACTOR WAS CRITICAL 356.I 1264.6 1922.0 6.
: 13. FORCED OlfrAGE RATE (4)                             N/A
h0URS GENERATOR ON-LINE 306.2 1128,5 1641.7 7.
: 14. SitUTDONNS SCllEDUI ED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE AND DURATION OF EACH):                                                                                                 ,
CROSS THERMAL POWER GENERATED (MWH) 399.375 1,866,012 2468983 8.
i
GROSS ELECTRICAL F0WER GENERATED (MWH)131.680 642,046 818.356~
: 15. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
9.
l
NET ELECTRICAL POWER GENERATED (M'.4H)
: 16. PLANTS IN *.EST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:                                       ;
N/A 10.
DATE LAST             DATE       REASON FOR FORECAST           ACHIEVED       DIFFERENCE INITIAL CRITICALITY                                             11/11/73 INITIAL , ELECTRICAL                                           12/5/73 POWER GENERATION C0 rtERCLtL OPERATION       _._ _
REACTOR AVAILABILITY FACTOR (1)
9/I/74 (1) REACTOR AVAILABILITY FACTOR = HOURS REACTOR WAS CRITICAL                             *100 GROSS HOURS IN REPORTING PERIOD (2) PLANT AVAILABILITY FACTOR = UGURS GENERATOR ON-LINE                                 *100 GROSS HOURS IN REPORTING PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICENSED POWER LEVEL
N/A 11.
PLANT AVAILA3ILITY FACTOR (2)
N/A 12.
PLANT CAPACITY FACTOR (3)
N/A 13.
FORCED OlfrAGE RATE (4)
N/A 14.
SitUTDONNS SCllEDUI ED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE AND DURATION OF EACH):
i 15.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
16.
PLANTS IN *.EST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL, ELECTRICAL 12/5/73 POWER GENERATION C0 rtERCLtL OPERATION 9/I/74 (1) REACTOR AVAILABILITY FACTOR = HOURS REACTOR WAS CRITICAL
*100 GROSS HOURS IN REPORTING PERIOD (2) PLANT AVAILABILITY FACTOR = UGURS GENERATOR ON-LINE
*100 GROSS HOURS IN REPORTING PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICENSED POWER LEVEL
* GROSS HOURS IN REPORTING PERIO (4) FORCED OUTAGE RATE = FORCED OtiTAGE Il0URS
* GROSS HOURS IN REPORTING PERIO (4) FORCED OUTAGE RATE = FORCED OtiTAGE Il0URS
* 100 tt0URS GENERATOR ON-LINE + FORCED OUTAGE HOURS 7912180h[-
* 100 tt0URS GENERATOR ON-LINE + FORCED OUTAGE HOURS 7912180h[-


                                                  .                                        ~                         .
~
g3lT      oc:nas Unit 3
oc:nas Unit 3 g3lT
                                                                                                      ~
. DATE - August 10, 1974
          . DATE - August 10, 1974 0PERATING                 STATUC July 1                 TO     July 31, 1974
~
: 1. REPORTING PERIOD:
0PERATING STATUC 1.
GROSS I!OURS IN REPORTING PERIOD:           744.0
REPORTING PERIOD:
: 2. CURRENTLY AUTHORIZED POWER LEVEL MWt       2568     MWe-NET
July 1 TO July 31, 1974 GROSS I!OURS IN REPORTING PERIOD:
: 3.                                                       None POWER LEVEL TO WHICH RESTRICTED (IF ANY):
744.0 2.
: 4.     REASONS FOR RESTRICTIONS (IF ANY):
CURRENTLY AUTHORIZED POWER LEVEL MWt 2568 MWe-NET None 3.
                              ,,                                THIS                   CUMULATIVE MONTH   YR-TO-DATE       TO DATE
POWER LEVEL TO WHICH RESTRICTED (IF ANY):
: 5. HOURS REACTOR WAS CRITICAL                 N/A
4.
: 6. Il0URS GENERATOR ON-LINE                   N/A
REASONS FOR RESTRICTIONS (IF ANY):
: 7. GROSS THERMAL POWER GENERATED (MWH)         N/A b
THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5.
: 8. CROSS ELECTRICAL POWER GENERATED (MWH) N/A
HOURS REACTOR WAS CRITICAL N/A N/A 6.
: 9. NET ELECTRICAL POWER GENERATED (MWH)       N/A
Il0URS GENERATOR ON-LINE 7.
: 10.     REACTOR AVAILABILITY FACTOR (1)             N/A
GROSS THERMAL POWER GENERATED (MWH)
: 11.       PLANT AVAILABILITY FACTOR (2)             N/A
N/A 8.
: 12.                                                 N/A PLANT CAPACITY FACTOR (3)
CROSS ELECTRICAL POWER GENERATED (MWH) N/A b
: 13.       FORCED OLTTAGE RATE (4)
N/A 9.
N/A l '. . SIIUTDOWN$' SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):
NET ELECTRICAL POWER GENERATED (MWH)
: 15.       IF SHUTDOWN AT' END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A 10.
: 16.       PLANTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
REACTOR AVAILABILITY FACTOR (1)
DATE LAST       DATE       REASON FOR FORECAST       ACHIEVED     DIFFERENCE INITIAL CRITICALITY                 8/13/74 INITIAL ELECTRICAL                 8/27/74                                               __
N/A 11.
POWER GENERATION CD:t!ERCIAL OPERATION               10/1/74 (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITICAI,             *100 GROSS tl0URS IN REPORTING PERIOD (2) PLANT AVAILABILITY FACTOR = IUURS GENERATOR ON-LINE                   *100 GROSS liOURS IN REPORTING PERIOD                                       l f
PLANT AVAILABILITY FACTOR (2)
(3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED                                                 !
N/A 12.
ERREETLY LICENhEli POWERTEVELERdSS Il0EliS IN REPdRTING'PEitIO (4) FORCED OUTAGE RATE = FORCED OUTAGE I!OURS
PLANT CAPACITY FACTOR (3)
                            ~
N/A 13.
FORCED OLTTAGE RATE (4) l '.. SIIUTDOWN$' SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):
15.
IF SHUTDOWN AT' END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
16.
PLANTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY 8/13/74 INITIAL ELECTRICAL 8/27/74 POWER GENERATION CD:t!ERCIAL OPERATION 10/1/74 (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITICAI,
*100 GROSS tl0URS IN REPORTING PERIOD (2) PLANT AVAILABILITY FACTOR = IUURS GENERATOR ON-LINE
*100 GROSS liOURS IN REPORTING PERIOD l
f (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED ERREETLY LICENhEli POWERTEVELERdSS Il0EliS IN REPdRTING'PEitIO (4) FORCED OUTAGE RATE = FORCED OUTAGE I!OURS
* 100
* 100
                                          ~110CRS GENERATOR ON-LINE + FORCED OUTAGE HOURS i
~
                                                                                                                                ,}}
~110CRS GENERATOR ON-LINE + FORCED OUTAGE HOURS i
,}}

Latest revision as of 21:55, 1 January 2025

Monthly Operating Rept for Jul 1974
ML19317E623
Person / Time
Site: Oconee  
Issue date: 08/10/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E611 List:
References
NUDOCS 7912180816
Download: ML19317E623 (3)


Text

',

~

dNIT ocon n Unit 2 D*dATE August 10, 1974 OPERATINC STATUS 1.

REPORTING PERIOD:

July 1 TO July 31, 1974 CROSS Il0URS IN REPORTING PERIOD:

744.0

~

2.

CURRENTLY AUTliORIZED POWER LEVEL MWt 2568 MWe-NET

~

3.

POWER LEVEL TO Wi!ICil RESTRICTED (IF ANY): None 4.

REASONS FOR RESTRICTIONS (IF ANY): Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 9-13 are not applicable.

THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5.

HOURS REACTOR WAS CRITICAL 356.I 1264.6 1922.0 6.

h0URS GENERATOR ON-LINE 306.2 1128,5 1641.7 7.

CROSS THERMAL POWER GENERATED (MWH) 399.375 1,866,012 2468983 8.

GROSS ELECTRICAL F0WER GENERATED (MWH)131.680 642,046 818.356~

9.

NET ELECTRICAL POWER GENERATED (M'.4H)

N/A 10.

REACTOR AVAILABILITY FACTOR (1)

N/A 11.

PLANT AVAILA3ILITY FACTOR (2)

N/A 12.

PLANT CAPACITY FACTOR (3)

N/A 13.

FORCED OlfrAGE RATE (4)

N/A 14.

SitUTDONNS SCllEDUI ED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE AND DURATION OF EACH):

i 15.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

16.

PLANTS IN *.EST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL, ELECTRICAL 12/5/73 POWER GENERATION C0 rtERCLtL OPERATION 9/I/74 (1) REACTOR AVAILABILITY FACTOR = HOURS REACTOR WAS CRITICAL

  • 100 GROSS HOURS IN REPORTING PERIOD (2) PLANT AVAILABILITY FACTOR = UGURS GENERATOR ON-LINE
  • 100 GROSS HOURS IN REPORTING PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICENSED POWER LEVEL
  • GROSS HOURS IN REPORTING PERIO (4) FORCED OUTAGE RATE = FORCED OtiTAGE Il0URS
  • 100 tt0URS GENERATOR ON-LINE + FORCED OUTAGE HOURS 7912180h[-

~

oc:nas Unit 3 g3lT

. DATE - August 10, 1974

~

0PERATING STATUC 1.

REPORTING PERIOD:

July 1 TO July 31, 1974 GROSS I!OURS IN REPORTING PERIOD:

744.0 2.

CURRENTLY AUTHORIZED POWER LEVEL MWt 2568 MWe-NET None 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):

4.

REASONS FOR RESTRICTIONS (IF ANY):

THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5.

HOURS REACTOR WAS CRITICAL N/A N/A 6.

Il0URS GENERATOR ON-LINE 7.

GROSS THERMAL POWER GENERATED (MWH)

N/A 8.

CROSS ELECTRICAL POWER GENERATED (MWH) N/A b

N/A 9.

NET ELECTRICAL POWER GENERATED (MWH)

N/A 10.

REACTOR AVAILABILITY FACTOR (1)

N/A 11.

PLANT AVAILABILITY FACTOR (2)

N/A 12.

PLANT CAPACITY FACTOR (3)

N/A 13.

FORCED OLTTAGE RATE (4) l '.. SIIUTDOWN$' SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):

15.

IF SHUTDOWN AT' END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

16.

PLANTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY 8/13/74 INITIAL ELECTRICAL 8/27/74 POWER GENERATION CD:t!ERCIAL OPERATION 10/1/74 (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITICAI,

  • 100 GROSS tl0URS IN REPORTING PERIOD (2) PLANT AVAILABILITY FACTOR = IUURS GENERATOR ON-LINE
  • 100 GROSS liOURS IN REPORTING PERIOD l

f (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED ERREETLY LICENhEli POWERTEVELERdSS Il0EliS IN REPdRTING'PEitIO (4) FORCED OUTAGE RATE = FORCED OUTAGE I!OURS

  • 100

~

~110CRS GENERATOR ON-LINE + FORCED OUTAGE HOURS i

,