Florida                                                 2 April 1977 3-0-3-a-3 Power C O a P O n a 1 ao se Mr. Norman C. Moseley, Director                                 Docket No. 50-301 Office of Inspection and Enforcement                           License #DPR-72
Florida 2 April 1977 3-0-3-a-3 Power C O a P O n a 1 ao se Mr. Norman C. Moseley, Director Docket No. 50-301 Office of Inspection and Enforcement License #DPR-72 U. S. Nuclear Regulatory Commission 230 Peachtree St., N.W., Suite 818 Atlanta, Georgia 30303
:          U. S. Nuclear Regulatory Commission 230 Peachtree St. , N.W., Suite 818 Atlanta, Georgia 30303                       ,


==Subject:==
==Subject:==
Line 27: Line 27:


==Dear Mr. Moseley:==
==Dear Mr. Moseley:==
Subsequent to discussions with various Inspectors concerning the completeness of the original subject test, Florida Power Corpora-tion proposes to conduct an additional test as generally outlined on the attachment to this letter. It was verbally agreed by Mr.
Subsequent to discussions with various Inspectors concerning the completeness of the original subject test, Florida Power Corpora-tion proposes to conduct an additional test as generally outlined on the attachment to this letter. It was verbally agreed by Mr.
Lewis and Mr. McDermott that the successful conduct of the test as scoped by the attachment would satisfy the Commission's con-Cerns.
Lewis and Mr. McDermott that the successful conduct of the test as scoped by the attachment would satisfy the Commission's con-Cerns.
Very truly yours, FLORIDA POWER CORPORATION 1
Very truly yours, FLORIDA POWER CORPORATION 1
                                                                          -                k6, W. -P .-S t eva r i.
k6, W. -P.-S t eva r i.
Director, Power Production GPB/feh Attachment Nuclear Plant Manager                                   - - - -      -
Director, Power Production GPB/feh Attachment Nuclear Plant Manager s
80 03160 H %       3 s
80 03160 H %
General Office 32o1 Tnirty.iourtn street soutn. P O Box 14042. si Petersburg Ferca 33733 813-866-5151 M
3 M
General Office 32o1 Tnirty.iourtn street soutn. P O Box 14042. si Petersburg Ferca 33733 813-866-5151


  *  *,a                                                                 Crystal Rivsr Nuclear April 11, 1977 SCOPE OF OFF-SITE POWER TEST NORMAL LINEUP AT 15% REACTOR POWER.
*,a Crystal Rivsr Nuclear April 11, 1977 SCOPE OF OFF-SITE POWER TEST NORMAL LINEUP AT 15% REACTOR POWER.
: 1. All station power on SU transformer except ES-3B,
1.
: 2. ES-3B supplied from diesel 3B; ES-3B equipment running to supply seal water flow and NSCC.
All station power on SU transformer except ES-3B, 2.
: 3. Trip Turbine-Generator Lockout Auto-Reactor Trip; Trip SU transformer simultaneously.
ES-3B supplied from diesel 3B; ES-3B equipment running to supply seal water flow and NSCC.
4 .*~ Verify diesel generator 3A starts and assumes Block 1 loads.   (Allow s-15 min.)
3.
5.. Re-energize SU transformer.
Trip Turbine-Generator Lockout Auto-Reactor Trip; Trip SU transformer simultaneously.
: 6. Synchronize diesel generator 3B to SU transformer and retire diesel generator 3B; set up for normal ES start.
4.*~ Verify diesel generator 3A starts and assumes Block 1 loads.
: 7. Synchronize diesel generator 3A.
(Allow s-15 min.)
: 8. Align equipment as in #2 above except on ES-3A.
5..
: 9. Open ES-3A feed from SU transformer.
Re-energize SU transformer.
: 10. Trip SU transformer and verify diesel generator 3B starts and picks up Block 1 loads.
6.
: 11. Synchronize diesel generator 3A to SU transformer. Retire diesel generator 3A and set up for normal ES start. Perform same for diesel generator 3B.
Synchronize diesel generator 3B to SU transformer and retire diesel generator 3B; set up for normal ES start.
: 12. Restart RC pumps; return plant to operation.
7.
y,y ;     ' Vs .11
Synchronize diesel generator 3A.
                                                          . .}}
8.
Align equipment as in #2 above except on ES-3A.
9.
Open ES-3A feed from SU transformer.
10.
Trip SU transformer and verify diesel generator 3B starts and picks up Block 1 loads.
11.
Synchronize diesel generator 3A to SU transformer. Retire diesel generator 3A and set up for normal ES start. Perform same for diesel generator 3B.
12.
Restart RC pumps; return plant to operation.
y,y ;
' Vs.11
..}}

Latest revision as of 08:58, 31 December 2024

Forwards Proposed Loss of Offsite Power Test Outline
ML19326B283
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/12/1977
From: Stewart W
FLORIDA POWER CORP.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
3--3-A-3, 3-0-3-A-3, NUDOCS 8003160112
Download: ML19326B283 (2)


Text

.

, c ede. ~

e'c ' h L,'o u r :.-(a eC ( l

' ( <-

M (;)..M.Q yh d c~0:

Florida 2 April 1977 3-0-3-a-3 Power C O a P O n a 1 ao se Mr. Norman C. Moseley, Director Docket No. 50-301 Office of Inspection and Enforcement License #DPR-72 U. S. Nuclear Regulatory Commission 230 Peachtree St., N.W., Suite 818 Atlanta, Georgia 30303

Subject:

Loss of Offsite Power Test

Dear Mr. Moseley:

Subsequent to discussions with various Inspectors concerning the completeness of the original subject test, Florida Power Corpora-tion proposes to conduct an additional test as generally outlined on the attachment to this letter. It was verbally agreed by Mr.

Lewis and Mr. McDermott that the successful conduct of the test as scoped by the attachment would satisfy the Commission's con-Cerns.

Very truly yours, FLORIDA POWER CORPORATION 1

k6, W. -P.-S t eva r i.

Director, Power Production GPB/feh Attachment Nuclear Plant Manager s

80 03160 H %

3 M

General Office 32o1 Tnirty.iourtn street soutn. P O Box 14042. si Petersburg Ferca 33733 813-866-5151

  • ,a Crystal Rivsr Nuclear April 11, 1977 SCOPE OF OFF-SITE POWER TEST NORMAL LINEUP AT 15% REACTOR POWER.

1.

All station power on SU transformer except ES-3B, 2.

ES-3B supplied from diesel 3B; ES-3B equipment running to supply seal water flow and NSCC.

3.

Trip Turbine-Generator Lockout Auto-Reactor Trip; Trip SU transformer simultaneously.

4.*~ Verify diesel generator 3A starts and assumes Block 1 loads.

(Allow s-15 min.)

5..

Re-energize SU transformer.

6.

Synchronize diesel generator 3B to SU transformer and retire diesel generator 3B; set up for normal ES start.

7.

Synchronize diesel generator 3A.

8.

Align equipment as in #2 above except on ES-3A.

9.

Open ES-3A feed from SU transformer.

10.

Trip SU transformer and verify diesel generator 3B starts and picks up Block 1 loads.

11.

Synchronize diesel generator 3A to SU transformer. Retire diesel generator 3A and set up for normal ES start. Perform same for diesel generator 3B.

12.

Restart RC pumps; return plant to operation.

y,y ;

' Vs.11

..