ML19329B286: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.-
q TOLEDO
q TOLEDO EgiscN
('                                                                                                 w       EgiscN o                               -
('
w o
LOWELL E. ROE
LOWELL E. ROE
,                                                                                                                      %ce President Fecdotees Development 14l91 250-5242 November 1, 1976                   -
%ce President Fecdotees Development 14l91 250-5242 November 1, 1976 Serial No.142 4
Serial No.142 4
Docket No. 50-346 Mr. James G. Keppler Regional Director, Region III Directorate of Regulatory Operations U.S. Nuclear Regulatory Commission O
Docket No. 50-346 Mr. James G. Keppler                                   ,
g D
                        --      Regional Director, Region III                             .
b.
Directorate of Regulatory Operations U.S. Nuclear Regulatory Commission                       i    ,  g           D                 b.
i d
O                      d     u 799 Roosevelt Road
u 799 Roosevelt Road Glen Ellyn, Illinois 60137
          ,.                    Glen Ellyn, Illinois 60137                                   -


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
 
This letter is submitted in accordance with 10CFR 50.55(e) as a final 1 instrument report regarding the Davis-Besse Nuclear Power Station Unit riounting bracket deficiency, which was reported by telecon between our Mr. C. R. Domeck and your Mr. F. Jablonski on October 1, 1976.
This letter is submitted in accordance with 10CFR 50.55(e) as                           a final report regarding the Davis-Besse Nuclear Power Station Unit 1 instrument riounting bracket deficiency, which was reported by telecon between our Mr. C. R. Domeck and your Mr. F. Jablonski on October 1, 1976.
Description of the Deficiency Instrumentation associated with the NSSS has been supplied by Babcock &
Description of the Deficiency Instrumentation associated with the NSSS has been supplied by Babcock &
Wilco'x, but has been installed by our instrument contractor. Much of the instrumentation is nuclear safety related, and as a result, must be
Much of Wilco'x, but has been installed by our instrument contractor.
                                ' seismically installed. Nuclear safety related Bailey differential pressure transmitters uith the generic designation BY were supplied with standard Bailey mounting brackets and were installed using these brackets
the instrumentation is nuclear safety related, and as a result, must be
                          -      on seismically qualified instrument mounts. It was later discovered that the mounting brackets had not been scismically qualified.
' seismically installed. Nuclear safety related Bailey differential pressure transmitters uith the generic designation BY were supplied with standard Bailey mounting brackets and were installed using these brackets on seismically qualified instrument mounts. It was later discovered that the mounting brackets had not been scismically qualified.
Corrective Action Taken The mounting bracket design has been reviewed and analyzed by Bechtel
Corrective Action Taken The mounting bracket design has been reviewed and analyzed by Bechtel Company, our Architect-Engineer, and has been found to be adequate to withstand the worst condition that could occur during the maximum possibic carthquake as defined in the FSAR.
  -                                Company, our Architect-Engineer, and has been found to be adequate to withstand the worst condition that could occur during the maximum possibic carthquake as defined in the FSAR.
e
e
                                                                                        ,8002040661       - . .                                      .
,8002040661 THE TOLEDO EDISON CCMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. CH:0 43552 NOV 81976 m
300 MADISON AVENUE           TOLEDO. CH:0 43552 THE TOLEDO EDISON CCMPANY        EDISON PLAZA NOV   81976                                             .
**^
m         .    .        . . . .
*"=.+...,.4.
              **^           *"=.+...,.4.
.,n.
                                                                                                                                        .,n.


                    .                                                                          ~2-     .                                                      .
~2-s m
s m
.Sefsty Implications
      , ,        .                  .Sefsty Implications
..s
          . .s
-InAsmuchas'thesubsequentanalysisshowedthemountingbracketdesign t'o'be adequate to withstand the postulated earthquake conditions, there a're no safety implications involved; therefore, the health and safety of the public are not jeopardized.
                                    -InAsmuchas'thesubsequentanalysisshowedthemountingbracketdesign t'o'be adequate to withstand the postulated earthquake conditions, there a're no safety implications involved; therefore, the health and safety of the public are not jeopardized.
'Yours very truly,
                                  'Yours very truly,                                 -
./
                                    \
\\
                                                                                ./
/W I f pc29/33-34 cc:
* I f                                   /W                                                                                      -
Dr. Ernst Volgenau, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
pc29/33-34 cc:
20555
Dr. Ernst Volgenau, Director                                   ,
*h y
_          Office of Inspection and Enforcement                               '
+
U.S. Nuclear Regulatory Commission Washington, D.C. 20555
8 w
                                                            *h y                                                         *.
e n aul
                              +                           8                                                                     .
=
w
me e
_  me          e n aul               =     .
s a
e s
O e
a O
O '
e                                            O '
,o e
                                                                                                    ,o       e
' ~ ~ ~ ~ -
      '~~~~-       . . .                  .      _ . . .                          .                                              .            . . . . . .      ..}}
_...}}

Latest revision as of 06:58, 31 December 2024

Deficiency Rept Re Instrument Mounting Bracket.B&W Brackets Found Seismically Unqualified.Bechtel Analyzed Design & Found It Adequate to Withstand Max Earthquake Per FSAR
ML19329B286
Person / Time
Site: Davis Besse 
Issue date: 11/01/1976
From: Roe L
TOLEDO EDISON CO.
To:
Shared Package
ML19329B285 List:
References
142, NUDOCS 8002040681
Download: ML19329B286 (2)


Text

.-

q TOLEDO EgiscN

('

w o

LOWELL E. ROE

%ce President Fecdotees Development 14l91 250-5242 November 1, 1976 Serial No.142 4

Docket No. 50-346 Mr. James G. Keppler Regional Director, Region III Directorate of Regulatory Operations U.S. Nuclear Regulatory Commission O

g D

b.

i d

u 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

This letter is submitted in accordance with 10CFR 50.55(e) as a final 1 instrument report regarding the Davis-Besse Nuclear Power Station Unit riounting bracket deficiency, which was reported by telecon between our Mr. C. R. Domeck and your Mr. F. Jablonski on October 1, 1976.

Description of the Deficiency Instrumentation associated with the NSSS has been supplied by Babcock &

Much of Wilco'x, but has been installed by our instrument contractor.

the instrumentation is nuclear safety related, and as a result, must be

' seismically installed. Nuclear safety related Bailey differential pressure transmitters uith the generic designation BY were supplied with standard Bailey mounting brackets and were installed using these brackets on seismically qualified instrument mounts. It was later discovered that the mounting brackets had not been scismically qualified.

Corrective Action Taken The mounting bracket design has been reviewed and analyzed by Bechtel Company, our Architect-Engineer, and has been found to be adequate to withstand the worst condition that could occur during the maximum possibic carthquake as defined in the FSAR.

e

,8002040661 THE TOLEDO EDISON CCMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. CH:0 43552 NOV 81976 m

    • ^
  • "=.+...,.4.

.,n.

~2-s m

.Sefsty Implications

..s

-InAsmuchas'thesubsequentanalysisshowedthemountingbracketdesign t'o'be adequate to withstand the postulated earthquake conditions, there a're no safety implications involved; therefore, the health and safety of the public are not jeopardized.

'Yours very truly,

./

\\

/W I f pc29/33-34 cc:

Dr. Ernst Volgenau, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555

  • h y

+

8 w

e n aul

=

me e

s a

O e

O '

,o e

' ~ ~ ~ ~ -

_...