| number = ML19329B390
| number = ML19329B390
| issue date = 04/03/1978
| issue date = 04/03/1978
| title = Responds to NRC 780313 Ltr Re Violations Noted in IE Insp Rept 50-346/78-02.Corrective Actions:Training Class Given to Chemistry & Health Physics Personnel,Stressing Seriousness of Missing Environ Samples
| title = Responds to NRC Re Violations Noted in IE Insp Rept 50-346/78-02.Corrective Actions:Training Class Given to Chemistry & Health Physics Personnel,Stressing Seriousness of Missing Environ Samples
| author name = Grant J
| author name = Grant J
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 1-17, NUDOCS 8002050597
| document report number = 1-17, NUDOCS 8002050597
| title reference date = 03-13-1978
| package number = ML19329B387
| package number = ML19329B387
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 18: Line 19:
=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:*
            .
'O Docket No. 50-346 License No. NPF-3 EDISON Serial No. 1-17 JAMES S. GAANT April 3, 1978 fl,,Z',"l 8419) 259 5232 Mr. k'. L. Fisher, ActiEig Chief Fuel Facility and Materials Safety Branch, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
      *
    -
        .
    'O Docket No. 50-346                                                     "
License No. NPF-3
                                                                            '
EDISON Serial No. 1-17                                                     .
JAMES S. GAANT April 3, 1978                                                         fl,,Z',"l 8419) 259 5232 Mr. k'. L. Fisher, ActiEig Chief Fuel Facility and Materials Safety Branch, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137


==Dear Mr. Fisher:==
==Dear Mr. Fisher:==
 
Toledo Edison acknowledges receipt of your {{letter dated|date=March 13, 1978|text=March 13, 1978, letter}} and report enclosure 78-02 referencing an apparent deviation from Davis-Besse Nuclear Power Station Unit No. 1 commitment to the NRC, listed as a " Deviation" under the heading " Notice of Deviation".
Toledo Edison acknowledges receipt of your March 13, 1978, letter and report enclosure 78-02 referencing an apparent deviation from Davis-Besse Nuclear Power Station Unit No. 1 commitment to the NRC, listed as a " Deviation" under the heading " Notice of Deviation".
Following a thorough examination of the item of concern, Toledo Edison herein offers information regarding this item, including corrective actions and the iates of corrective action.
Following a thorough examination of the item of concern, Toledo Edison herein offers information regarding this item, including corrective actions and the iates of corrective action.
Deviation:   Table 6.1-2 of the " Davis-Besse Nuclear Power Station, Unit 1, Supplement to Environmental Operating Stage" commits the licensee to the collection of airborne particulate sartples weekly at pre-scribed sampling stations.
Deviation:
Table 6.1-2 of the " Davis-Besse Nuclear Power Station, Unit 1, Supplement to Environmental Operating Stage" commits the licensee to the collection of airborne particulate sartples weekly at pre-scribed sampling stations.
Contrary to this commitment, the licensee collected airborne particulate i mples intermittently during the period September 20, 1976, through December 13, 1976, at several sample locations.
Contrary to this commitment, the licensee collected airborne particulate i mples intermittently during the period September 20, 1976, through December 13, 1976, at several sample locations.
Response:    The corrective action taken, the results achieved and the cor-rective action taken to avoid further noncoupliance are as follows:
 
===Response===
The corrective action taken, the results achieved and the cor-rective action taken to avoid further noncoupliance are as follows:
A training class, reviewing each missed sample, was given on March 29, 1978, to Chemistry and Health Physics personnel, stressing the seriousness of missing any environmental samples.
A training class, reviewing each missed sample, was given on March 29, 1978, to Chemistry and Health Physics personnel, stressing the seriousness of missing any environmental samples.
An additional training class on the same subject was given on March 22, 1978, to the sample collector for sample station T-23.
An additional training class on the same subject was given on March 22, 1978, to the sample collector for sample station T-23.
!
l Very truly yours,
Very truly yours, l
)
V
.[
          )        .[       A/                                               APR     5 1978 JSG/TDM/ daw 800205 THE TOLEDO EDISON COMPANY   EDISON PLAZA 300 MADISON AVENUE   TOLEDO, CHlO 43552}}
V A/
APR 5 1978 JSG/TDM/ daw 800205 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, CHlO 43552}}

Latest revision as of 06:56, 31 December 2024

Responds to NRC Re Violations Noted in IE Insp Rept 50-346/78-02.Corrective Actions:Training Class Given to Chemistry & Health Physics Personnel,Stressing Seriousness of Missing Environ Samples
ML19329B390
Person / Time
Site: Davis Besse 
Issue date: 04/03/1978
From: Jeffery Grant
TOLEDO EDISON CO.
To: Fisher W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19329B387 List:
References
1-17, NUDOCS 8002050597
Download: ML19329B390 (1)


Text

'O Docket No. 50-346 License No. NPF-3 EDISON Serial No. 1-17 JAMES S. GAANT April 3, 1978 fl,,Z',"l 8419) 259 5232 Mr. k'. L. Fisher, ActiEig Chief Fuel Facility and Materials Safety Branch, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Fisher:

Toledo Edison acknowledges receipt of your March 13, 1978, letter and report enclosure 78-02 referencing an apparent deviation from Davis-Besse Nuclear Power Station Unit No. 1 commitment to the NRC, listed as a " Deviation" under the heading " Notice of Deviation".

Following a thorough examination of the item of concern, Toledo Edison herein offers information regarding this item, including corrective actions and the iates of corrective action.

Deviation:

Table 6.1-2 of the " Davis-Besse Nuclear Power Station, Unit 1, Supplement to Environmental Operating Stage" commits the licensee to the collection of airborne particulate sartples weekly at pre-scribed sampling stations.

Contrary to this commitment, the licensee collected airborne particulate i mples intermittently during the period September 20, 1976, through December 13, 1976, at several sample locations.

Response

The corrective action taken, the results achieved and the cor-rective action taken to avoid further noncoupliance are as follows:

A training class, reviewing each missed sample, was given on March 29, 1978, to Chemistry and Health Physics personnel, stressing the seriousness of missing any environmental samples.

An additional training class on the same subject was given on March 22, 1978, to the sample collector for sample station T-23.

l Very truly yours,

)

.[

V A/

APR 5 1978 JSG/TDM/ daw 800205 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, CHlO 43552