ML19351E894: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:l | {{#Wiki_filter:l 0 -' g w w. bg :s o | ||
S | |||
) | |||
w@ | w@ | ||
l CPEZAT:NC DATA RI?CR" s | |||
l | 1 DCC:C7NO. | ||
CPEZAT:NC DATA RI?CR" | 50-316 DATI 12-3 A0 COMPL.. ; y, f W.T. G111ett 616-465-5901 7" ".*fCNI CP!aAT"NG 5"ATCS Donald C. Cook 2 | ||
No:= | |||
CP!aAT"NG 5"ATCS | g Novem0er 1980 | ||
Donald C. Cook | : g,,4 pg. | ||
g | 3391 | ||
Novem0er 1980 | ~ | ||
: g ,,4 pg . | : 3. L.sansedThs==al?swer(MWt): | ||
1133 | |||
: 3. L.sansedThs==al?swer(MWt): | : 4. Namesiase As:i=g (Csess 50Ve): | ||
: 4. Namesiase As:i=g (Csess 50Ve): | f l | ||
1100 | |||
: 5. Design "*W R::ing(Mes SDVe): | : 5. Design "*W R::ing(Mes SDVe): | ||
1110 | 1110 | ||
: 6. hum Dependshte Capaci:y (Cross 11Weg | : 6. hum Dependshte Capaci:y (Cross 11Weg 1082 | ||
) | |||
: 7. '.fazunan D-~~'* <*---~y (Nec Mwe): | : 7. '.fazunan D-~~'* <*---~y (Nec Mwe): | ||
: 5. If Champs ce=stin Capaci:7 Razf=gs (Itar=: Nu=ser 3 Th:ougi: 7) Sisca L::: Reper:. C;ve Ruscas: | |||
: 5. If Champs ce=stin Capaci:7 Razf=gs (Itar=: Nu=ser 3 Th:ougi: 7) Sisca L::: Reper:. C;ve Ruscas: | 1 | ||
. l i | |||
: 9. ?mver Level To Mi=h 2ar=- R If Any (Not 3Cve): | : 9. ?mver Level To Mi=h 2ar=- R If Any (Not 3Cve): | ||
: 10. Ransons For ?"-d- IfAsy: | : 10. Ransons For ?"-d-IfAsy: | ||
l | l This51oash Y to.Cata Cu:=n!= rave j | ||
Y to.Cata | 720 8,040 25,560 k | ||
: 11. ha.-s Is Rapor:iss Ped 0 | |||
6,160.4-17,240.3 w:C" r | |||
: 11. ha.-s Is Rapor:iss Ped | : 12. Nwasar Cf Esa:s Ranc:or s | ||
: 12. Nwasar Cf Esa:s Ranc:or | 0 0 | ||
: 13. Ra=c:ar Rasarve Shu= iowa Est=s | 0 i | ||
: 13. Ra=c:ar Rasarve Shu= iowa Est=s 0 | |||
1.' | 4 OAR A 14 c7n 9 I | ||
: 15. U=ic Raserve Shardown Eat =s | 1.' | ||
: 16. Censs Thennal!===3y c- d OtwH) | Eoans C-m Ca.L*ns 0 | ||
0 0 | |||
: 17. Cros EInc=fc=1Isargy C-~d G.twH) | : 15. U=ic Raserve Shardown Eat =s 0 | ||
ts. Nec :t | 19.906.4 % | ||
: 19. Unit | 52.130.876 | ||
: 23. Unic Ar ilmoi!Ly 7:c:or | : 16. Censs Thennal!===3y c-d OtwH) | ||
: 17. Cros EInc=fc=1Isargy C-~d G.twH) 0 __,, | |||
::. Unit Capaczy 7:snar(Using >lDC.Wr) | 6.457,370 16.611.780 0 | ||
::. Unis Caa city F:c:or(Using CER Nect | 6.228,971 15,996,383 ts. Nec :t i Isargy c | ||
: 23. Unic Forend Cu=ge Rac, | -,' g.:wE) 0 75.5-71.9 0 | ||
75.5 71.9 8 | |||
: 19. Unit Service se:or | |||
: 23. Unic Ar ilmoi!Ly 7:c:or 0 | |||
71.6 66.7 | |||
::. Unit Capaczy 7:snar(Using >lDC.Wr) 0 70.4 66.0 | |||
::. Unis Caa city F:c:or(Using CER Nect 100 15.6 14.6 | |||
: 23. Unic Forend Cu=ge Rac, | |||
: 24. Shutdowns M '"tu CverNex: 6 Ston:hs(Type. Oste.:sd Cic=: ion of E:ci::: | : 24. Shutdowns M '"tu CverNex: 6 Ston:hs(Type. Oste.:sd Cic=: ion of E:ci::: | ||
: 25. If Sh:: Cown At End Cr Repore ?sriod. I::ussed Oste of $cs.-==: | : 25. If Sh:: Cown At End Cr Repore ?sriod. I::ussed Oste of $cs.-==: | ||
Foreast | Foreast Achieved | ||
. 25. Caits is Tes: Sc: s IP:ior to C =arci:1 Ops;:: font: | |||
INITIA L C?.!TICALITY | INITIA L C?.!TICALITY INiTZAL I*a..a. 07:"f CO.*:*.:ZZC A :. C.*ER.GCN | ||
INiTZAL I*a ..a. 07:"f CO.*:*.:ZZC A :. C.*ER.GCN | |||
($8(~71 8012T9000$ | ($8(~71 8012T9000$ | ||
y--,_, | |||
v..- - . , , , , , , , _ , . . _ - , , . _ . , | - -._,-,,y._w,, | ||
..m,_,-,,,,u,,,m,,, | |||
,,-cy,y,-,,,,, | |||
%.m., | |||
,....,__,w-m.....,,_,,__,,,..,y,,... | |||
v..- -.,,,,,,, _,.. _ -,,. _., | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | ||
l | 50-316 UNIT 2 | ||
DATE 12-3-80 COMPLETED BY W.T. Gillett TELEPHONE 616-465-5901 MONTH November 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net) | |||
(MWe-Net) 1 0 | |||
17 0 | |||
2 0 | |||
18 0 | |||
3 0 | |||
19 0 | |||
4 0 | |||
20 0 | |||
5 0 | |||
21 0 | |||
l 6 | |||
0 22 0 | |||
l 7 | |||
0 23 0 | |||
8 0 | |||
24 0 | |||
9 0 | |||
25 0 | |||
10 0 | |||
26 0 | |||
11 0 | |||
27 0 | |||
12 0 | |||
28 0 | |||
13 0 | |||
29 0 | |||
14 0 | |||
30 0 | |||
15 0 | |||
31 0 | |||
16 0 | |||
1 i | |||
INSTRUCTIONS On this famat list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whola megawatt. | |||
l | l | ||
I | I | ||
.t | |||
. I i | |||
l 50 - 316 DOCKETNO. | |||
UNIT SilU1 DOWNS AND POWE:H REI)UCTIONS D.C. Cook - Unit 2 UNil' N AhlE I | |||
l | DATE 12-11-80 l | ||
50 - 316 | i i HEPORT &'lONill November, 1980 CohlPLiclED uy 8. A. Svensson lEl.LPilONE (616) 465-5901 j | ||
''L e | |||
w e | |||
CohlPLiclED uy 8. A. Svensson | g"1. | ||
.h 2 | |||
lEl.LPilONE (616) 465-5901 | $h I ICensee U$. | ||
g | |||
e | |||
g | |||
{ | { | ||
Attiam to 9; | Cause & Cossc(sive 3 | ||
Attiam to No. | |||
Date 9; | |||
89 | g s' o s se livent g,? | ||
gU l | |||
Cont'd. | a6 gE w@ | ||
is scheduled for the week of December | Hepois # | ||
La O Psevent Hecuencenc P | |||
) | |||
0 1 | |||
89 Cont'd. | |||
A-l'ilnipmens Failmo(1.nplain) | 801018 F | ||
l-blannal | 720 A | ||
D Hegulaimy itestsiclion | 3 N.A. | ||
IIA GENERA Electrical generator repair outage continued from previous month. The unit remained out of service at the end of the month. | |||
Return to service i | |||
is scheduled for the week of December 8, 1980. | |||
CcE2) | |||
GEED W e) 1 2 | |||
3 4 | |||
1;: Fenced Heason: | |||
hictinal: | |||
lixhibit G. Instantitons S: Stliedulcil A-l'ilnipmens Failmo(1.nplain) l-blannal for Psepasation of Data Il blalutenance oi Test 2 Manual Sciam, lintiy Slicens fm 1.icensee g | |||
C Hefueling 3 Automatic Sciam. | |||
Event l<cpust (I IIH) I'de INIIRIE D Hegulaimy itestsiclion 4-Oilies (E xpl.iin) 0161) pg I!-Opesato l'eahdng& License lixaminallon F Administrative 5 | |||
M G Opesasional llenos (lixplain) | |||
'lisinbis 1 - S.sme Soma y | |||
l'l/17) ll Othes (Emplain) | |||
V | V | ||
~ | |||
Docket No.: 50-316 Unit Nama: D. C. Cook Unit #2 Completed By: R. S. Keith Telephone: | Docket No.: 50-316 Unit Nama: | ||
D. C. Cook Unit #2 Completed By: | |||
R. S. Keith Telephone: | |||
(616) 465-5901 Date: December 12, 1980 Page: | |||
1 of 1 MONTHLY OPERATING ACTIVITIES - NOVEMBER, 1980 Highlights: | |||
The unplanned outage that started October 18, 1980 with a Generator trip from 1007. power continued the entire month. | The unplanned outage that started October 18, 1980 with a Generator trip from 1007. power continued the entire month. | ||
The Unit was in Mode 5 the entire month with the Reactor Coolant System at-the | The Unit was in Mode 5 the entire month with the Reactor Coolant System at-the loop level for modification to the Peactor Coolant Pump Motor Oil System. | ||
Summary: | Summary: | ||
Major repair work performed during this report period included: | Major repair work performed during this report period included: | ||
a) Replace 4 bars in main generator stator, b) Modification to main turbine bearing #2 housing. | a) Replace 4 bars in main generator stator, b) Modification to main turbine bearing #2 housing. | ||
c) | c) | ||
d) | Inspection of Main Transformer instrumentation. | ||
d) | |||
Ice Condenser Ice Basket Weighing. | |||
e) Repairs to "A" Low Pressure Turbine Stop and Intercept Valves. | e) Repairs to "A" Low Pressure Turbine Stop and Intercept Valves. | ||
~ | |||
f) Inspection of Moisture Separator. | ~~ | ||
g) | f) | ||
h) Numerous repairs to correct packing gland and body l | Inspection of Moisture Separator. | ||
g) | |||
Installed new fasteners in Reactor Coolant Pump fire protection casings. | |||
h) Numerous repairs to correct packing gland and body l | |||
to bonnet leaks on steam system valves. | |||
'~~ | '~~ | ||
i) Installed additional grating in all low pressure turbine | i) | ||
Installed additional grating in all low pressure turbine condensers. | |||
m. | |||
r 7 | |||
g ey g- | |||
DOCKET NO. | DOCKET NO. | ||
M-2 | 50 - 316 UNIT NAME D. C. Cook - Unit No. 2 DATE 12-11-80 COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE NOVEMBER, 1980 M-1 The steam inlet flange to the auxiliary feedpump turbine was leaking. | ||
M-3 | Replaced the flexitallic gasket. | ||
M-4 | Studs were checked for cracks by ncndestructive examination. | ||
M-2 No. 4 steam generator power operated relief valve, MRV-243 was leaking by. | |||
Replaced the cage and disc and machined,the pilot disc. | |||
Proper valve operation was verified. | |||
M-3 East containment spray heat exchanger inlet isolation valve, CTS-121E was leaking by. | |||
Machined valve seats and reassembled with new gaskets. | |||
M-4 Containment spray header drain isolation valve, 2-CTS-123E was leaking by. A new valve was installed. Necessary NDE was per-formed. | |||
C&I-l MRV-223, steam generator No. 2 power operated relief valve could only be opened 50% when controlled by the hand / auto station in the control room. The valve's positioner was repaired and the calibration was performed. | C&I-l MRV-223, steam generator No. 2 power operated relief valve could only be opened 50% when controlled by the hand / auto station in the control room. The valve's positioner was repaired and the calibration was performed. | ||
C&I-2 The low alarm for the AB diesel generator intake air filter was periodically received. The transmation thermostat control for the heater had failed. A failed capacitor was replaced. The thermostat and alarm unit were calibrated and returned _to ser vice. | C&I-2 The low alarm for the AB diesel generator intake air filter was periodically received. The transmation thermostat control for the heater had failed. A failed capacitor was replaced. The thermostat and alarm unit were calibrated and returned _to ser vice. | ||
m--e- w we | m--e-w we | ||
-*Me''*w-e | -*Me''*w-e eg- | ||
_sy N* | |||
ad=mm M- | |||
-D-N- | |||
g | |||
+==-- eww ege wegee}} | |||
Latest revision as of 17:53, 23 December 2024
| ML19351E894 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/03/1980 |
| From: | Gillett W INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML19351E889 | List: |
| References | |
| NUDOCS 8012190505 | |
| Download: ML19351E894 (6) | |
Text
l 0 -' g w w. bg :s o
S
)
w@
l CPEZAT:NC DATA RI?CR" s
1 DCC:C7NO.
50-316 DATI 12-3 A0 COMPL.. ; y, f W.T. G111ett 616-465-5901 7" ".*fCNI CP!aAT"NG 5"ATCS Donald C. Cook 2
No:=
g Novem0er 1980
- g,,4 pg.
3391
~
- 3. L.sansedThs==al?swer(MWt):
1133
- 4. Namesiase As:i=g (Csess 50Ve):
f l
1100
- 5. Design "*W R::ing(Mes SDVe):
1110
- 6. hum Dependshte Capaci:y (Cross 11Weg 1082
)
- 7. '.fazunan D-~~'* <*---~y (Nec Mwe):
- 5. If Champs ce=stin Capaci:7 Razf=gs (Itar=: Nu=ser 3 Th:ougi: 7) Sisca L::: Reper:. C;ve Ruscas:
1
. l i
- 9. ?mver Level To Mi=h 2ar=- R If Any (Not 3Cve):
- 10. Ransons For ?"-d-IfAsy:
l This51oash Y to.Cata Cu:=n!= rave j
720 8,040 25,560 k
- 11. ha.-s Is Rapor:iss Ped 0
6,160.4-17,240.3 w:C" r
- 12. Nwasar Cf Esa:s Ranc:or s
0 0
0 i
- 13. Ra=c:ar Rasarve Shu= iowa Est=s 0
4 OAR A 14 c7n 9 I
1.'
Eoans C-m Ca.L*ns 0
0 0
- 15. U=ic Raserve Shardown Eat =s 0
19.906.4 %
52.130.876
- 16. Censs Thennal!===3y c-d OtwH)
- 17. Cros EInc=fc=1Isargy C-~d G.twH) 0 __,,
6.457,370 16.611.780 0
6.228,971 15,996,383 ts. Nec :t i Isargy c
-,' g.:wE) 0 75.5-71.9 0
75.5 71.9 8
- 19. Unit Service se:or
- 23. Unic Ar ilmoi!Ly 7:c:or 0
71.6 66.7
- . Unit Capaczy 7:snar(Using >lDC.Wr) 0 70.4 66.0
- . Unis Caa city F:c:or(Using CER Nect 100 15.6 14.6
- 23. Unic Forend Cu=ge Rac,
- 24. Shutdowns M '"tu CverNex: 6 Ston:hs(Type. Oste.:sd Cic=: ion of E:ci:::
- 25. If Sh:: Cown At End Cr Repore ?sriod. I::ussed Oste of $cs.-==:
Foreast Achieved
. 25. Caits is Tes: Sc: s IP:ior to C =arci:1 Ops;:: font:
INITIA L C?.!TICALITY INiTZAL I*a..a. 07:"f CO.*:*.:ZZC A :. C.*ER.GCN
($8(~71 8012T9000$
y--,_,
- -._,-,,y._w,,
..m,_,-,,,,u,,,m,,,
,,-cy,y,-,,,,,
%.m.,
,....,__,w-m.....,,_,,__,,,..,y,,...
v..- -.,,,,,,, _,.. _ -,,. _.,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-316 UNIT 2
DATE 12-3-80 COMPLETED BY W.T. Gillett TELEPHONE 616-465-5901 MONTH November 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
l 6
0 22 0
l 7
0 23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
1 i
INSTRUCTIONS On this famat list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whola megawatt.
l
I
.t
. I i
l 50 - 316 DOCKETNO.
UNIT SilU1 DOWNS AND POWE:H REI)UCTIONS D.C. Cook - Unit 2 UNil' N AhlE I
DATE 12-11-80 l
i i HEPORT &'lONill November, 1980 CohlPLiclED uy 8. A. Svensson lEl.LPilONE (616) 465-5901 j
L e
w e
g"1.
.h 2
$h I ICensee U$.
g
{
Cause & Cossc(sive 3
Attiam to No.
Date 9;
g s' o s se livent g,?
gU l
a6 gE w@
Hepois #
La O Psevent Hecuencenc P
)
0 1
89 Cont'd.
801018 F
720 A
3 N.A.
IIA GENERA Electrical generator repair outage continued from previous month. The unit remained out of service at the end of the month.
Return to service i
is scheduled for the week of December 8, 1980.
CcE2)
GEED W e) 1 2
3 4
1;: Fenced Heason:
hictinal:
lixhibit G. Instantitons S: Stliedulcil A-l'ilnipmens Failmo(1.nplain) l-blannal for Psepasation of Data Il blalutenance oi Test 2 Manual Sciam, lintiy Slicens fm 1.icensee g
C Hefueling 3 Automatic Sciam.
Event l<cpust (I IIH) I'de INIIRIE D Hegulaimy itestsiclion 4-Oilies (E xpl.iin) 0161) pg I!-Opesato l'eahdng& License lixaminallon F Administrative 5
M G Opesasional llenos (lixplain)
'lisinbis 1 - S.sme Soma y
l'l/17) ll Othes (Emplain)
V
~
Docket No.: 50-316 Unit Nama:
D. C. Cook Unit #2 Completed By:
R. S. Keith Telephone:
(616) 465-5901 Date: December 12, 1980 Page:
1 of 1 MONTHLY OPERATING ACTIVITIES - NOVEMBER, 1980 Highlights:
The unplanned outage that started October 18, 1980 with a Generator trip from 1007. power continued the entire month.
The Unit was in Mode 5 the entire month with the Reactor Coolant System at-the loop level for modification to the Peactor Coolant Pump Motor Oil System.
Summary:
Major repair work performed during this report period included:
a) Replace 4 bars in main generator stator, b) Modification to main turbine bearing #2 housing.
c)
Inspection of Main Transformer instrumentation.
d)
Ice Condenser Ice Basket Weighing.
e) Repairs to "A" Low Pressure Turbine Stop and Intercept Valves.
~
~~
f)
Inspection of Moisture Separator.
g)
Installed new fasteners in Reactor Coolant Pump fire protection casings.
h) Numerous repairs to correct packing gland and body l
to bonnet leaks on steam system valves.
'~~
i)
Installed additional grating in all low pressure turbine condensers.
m.
r 7
g ey g-
DOCKET NO.
50 - 316 UNIT NAME D. C. Cook - Unit No. 2 DATE 12-11-80 COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE NOVEMBER, 1980 M-1 The steam inlet flange to the auxiliary feedpump turbine was leaking.
Replaced the flexitallic gasket.
Studs were checked for cracks by ncndestructive examination.
M-2 No. 4 steam generator power operated relief valve, MRV-243 was leaking by.
Replaced the cage and disc and machined,the pilot disc.
Proper valve operation was verified.
M-3 East containment spray heat exchanger inlet isolation valve, CTS-121E was leaking by.
Machined valve seats and reassembled with new gaskets.
M-4 Containment spray header drain isolation valve, 2-CTS-123E was leaking by. A new valve was installed. Necessary NDE was per-formed.
C&I-l MRV-223, steam generator No. 2 power operated relief valve could only be opened 50% when controlled by the hand / auto station in the control room. The valve's positioner was repaired and the calibration was performed.
C&I-2 The low alarm for the AB diesel generator intake air filter was periodically received. The transmation thermostat control for the heater had failed. A failed capacitor was replaced. The thermostat and alarm unit were calibrated and returned _to ser vice.