ML20002A845: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
(No difference)
|
Latest revision as of 15:59, 23 December 2024
| ML20002A845 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 10/15/1980 |
| From: | Houston M Office of Nuclear Reactor Regulation |
| To: | Zussman R ARGONNE NATIONAL LABORATORY |
| References | |
| CON-FIN-A-2118 NUDOCS 8011210700 | |
| Download: ML20002A845 (1) | |
Text
-
{j].,j]l ${'
P~f"' Di r nem-DISTRIBUTION: /,. &
Docket Fi1 F S. Bajwa A. Schwencer NRC PDR W. Regan M. Service Local PDR B. Grenier M. Houston LB #2 File D. Eisenhut R. Tedesco Docket No. 50-440/441 OCT 151980
' Mr. R. Zussman Argonne National Laboratory 9700 South Cass Avenue Argonne, Illinois 60439
Dear Mr. Zussman:
In accordance with the ANL technical assistance program (FIN A 2118) with the Division of Engineering (NRR), we are forwarding six copies of the Perry Nuclear Power Plant, Units 1 and 2 Environmental Report (0L Stage) to you for the acceptance review. This review has been scheduled by the NRC contract administrator, Singh Bajwa, to tentatively begin in February, 1981 with completion in April, 1981.
If you have any questions concerning this matter, please contact Singh Bajwa (FTS 492-8440)or me (FTS 492-8507).
/, /
3 M. Dean Houston, Project Manager Licensing Branch No. 2 Division of Licensing cc: Dr. Philip F. Gustafson, Director Division of Environmental Impact Studies Argonne National Laboratory 9700 South Cass Avenue Argonne, Illinois 60439 80112107@
d\\,
LB d2/DL SAB:DE s LB #JfDQ" AD'AYtislNTLU"SBajwa ASchweNcer suaN.sMe)
...... h. 4.....
10/
/80
-10/,4 /80 10/ cc /80 care)..........
NT.C FORM 318 (9 76) NRCM 0240 DU.S. GOVERNMENT PRINTING OFOCE: I??' 299 38.9