ML20004F025: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_                       --
{{#Wiki_filter:_
TABLE 4.1-1 (Continued)
TABLE 4.1-1 (Continued)
CllANNEL DESCRIPTION            CllECK      TEST          CALIBRATE  REMARKS
[
[
ep 4
CllANNEL DESCRIPTION CllECK TEST CALIBRATE REMARKS ep CD 28.
: 28. Radiation Monitoring Systems     W(1)(3)     M(3)           Q(2)       (1) Using the installed check CD
Radiation Monitoring Systems W(1)(3)
    -.                                                                                    source when background is less cb                                                                                     than twice the expected increase
M(3)
3                                                                               .      in cpm which would result from
Q(2)
4h                                                                                     the check source alone. Back-C3                                                                                     ground readings greater than this
(1) Using the installed check 4
    'l                                                                                     value are sufficient in themselves to show that the monitor is functioning.
source when background is less cb than twice the expected increase 4
3 in cpm which would result from 4h the check source alone. Back-C3 ground readings greater than this
'l value are sufficient in themselves to show that the monitor is functioning.
(2) Except area gamma radiation monitors RM-C6, RM-07, and RM-C8 which are located in high radia-tion areas of the Reactor Building.
(2) Except area gamma radiation monitors RM-C6, RM-07, and RM-C8 which are located in high radia-tion areas of the Reactor Building.
i c-                                                                                These monitors will be calibrated i       &                                                                                  quarterly or at the next scheduled
These monitors will be calibrated i
        "                                                                                  reactor shutdown following the quarter in which calibration l                                                                                          would normally be due, if a shut-down during ehe quarter does not l                                                                                         occur.
c-i quarterly or at the next scheduled reactor shutdown following the l
I                                                                                     (3) Surveillances are to be performed only when containment integrity is required, This applies to monitors which initiate containment*
quarter in which calibration would normally be due, if a shut-down during ehe quarter does not l
isolation only.
occur.
: 29. liigh and Low Pressure Injection Systems:   Flow Channels           NA       NA               R i
I (3) Surveillances are to be performed only when containment integrity is required, This applies to monitors which initiate containment isolation only.
i 4
29.
i l
liigh and Low Pressure Injection Systems:
4}}
Flow Channels NA NA R
i i
4 i
l 4}}

Latest revision as of 10:38, 23 December 2024

Page 4-5a to Tech Specs Change Request 103
ML20004F025
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/10/1981
From:
METROPOLITAN EDISON CO.
To:
Shared Package
ML20004F021 List:
References
NUDOCS 8106160407
Download: ML20004F025 (1)


Text

_

TABLE 4.1-1 (Continued)

[

CllANNEL DESCRIPTION CllECK TEST CALIBRATE REMARKS ep CD 28.

Radiation Monitoring Systems W(1)(3)

M(3)

Q(2)

(1) Using the installed check 4

source when background is less cb than twice the expected increase 4

3 in cpm which would result from 4h the check source alone. Back-C3 ground readings greater than this

'l value are sufficient in themselves to show that the monitor is functioning.

(2) Except area gamma radiation monitors RM-C6, RM-07, and RM-C8 which are located in high radia-tion areas of the Reactor Building.

These monitors will be calibrated i

c-i quarterly or at the next scheduled reactor shutdown following the l

quarter in which calibration would normally be due, if a shut-down during ehe quarter does not l

occur.

I (3) Surveillances are to be performed only when containment integrity is required, This applies to monitors which initiate containment isolation only.

29.

liigh and Low Pressure Injection Systems:

Flow Channels NA NA R

i i

4 i

l 4