ML20004F115: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_                              _
{{#Wiki_filter:_
t o DUKE POWER COMPANY Powza Duitnixo 422 Socra Cnuncu Srazer,CnAntorre, N. C. asa-aa wn.uw o. ,4anca, sa.                   June 8, 1981 WCF PetSectse?                                                                       TELtPmoest:Asta 704 Setaae Paoowerion                                                                               373 4063 Mr. Harold R. Denton, Director A
t o
Office of Nuclear Reactor Regulation                                     @
DUKE POWER COMPANY Powza Duitnixo 422 Socra Cnuncu Srazer,CnAntorre, N. C. asa-aa June 8, 1981 wn.uw o.,4anca, sa.
U. S. Nuclear Regulatory Commission                               #\                 /.%
WCF PetSectse?
Washington, D. C. 20555
TELtPmoest:Asta 704 Setaae Paoowerion 373 4063 Mr. Harold R. Denton, Director A
                                                                                                ~
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission
Attention:       Ms. E. G. Adensam, Chief                 : -.
#\\
Licensing Branch No. 4                       ,
/.%
J[jfl y.,,   2 519S7 5      - o N,          hi;& ron s
Washington, D. C.
Re: McGuire Nuclear Station                                 $
20555
f,                     y/
~
Docket Nos. 50-369, 50-370                                 'e                  s//
Attention:
b
Ms. E. G. Adensam, Chief J[jfl 2 519S7 5 Licensing Branch No. 4
- o y.,, hi;&
N, s
ron y/
Re: McGuire Nuclear Station f,'e Docket Nos. 50-369, 50-370 b
s//


==Dear Mr. Denton:==
==Dear Mr. Denton:==
FAease find attached Revision 2 to the McGuire Nuclear Station's Inservice Pump and Valve Testing Program. This revision includes relief requests for the cycle and time testing of certain containment purge valves and requests fcr relief from certain code requirements for all pumps.
FAease find attached Revision 2 to the McGuire Nuclear Station's Inservice Pump and Valve Testing Program. This revision includes relief requests for the cycle and time testing of certain containment purge valves and requests fcr relief from certain code requirements for all pumps.
Please replace the affected pages with the Revision 2 pages.         ,
Please replace the affected pages with the Revision 2 pages.
Very truly youre, i
Very truly youre, i
William O. Parker, Jr.
William O. Parker, Jr.
RWO/djs Attachment cc:     (w/o attachments)                           (w/o attach.)
RWO/djs Attachment cc:
Ms. M. J. Graham                             Mr. James P. O'Reilly, Director Resident Inspector - NRC                     3. S. Nuclear Regulatory Commission McGuire Nuclear Station                     Region II (w/ attach. including 2 cys.                 (w/o attach.)
(w/o attachments)
of flow diagrams)                         Mr. Robert Bosnak, Chief Mr. R. E. Lyon                               Mechanical Engineering Branch Idaho National Engineering Lab.             U. S. Nuclear Regulatory Commission EG&G Inc.
(w/o attach.)
Ms. M. J. Graham Mr. James P. O'Reilly, Director Resident Inspector - NRC
: 3. S. Nuclear Regulatory Commission McGuire Nuclear Station Region II (w/ attach. including 2 cys.
(w/o attach.)
of flow diagrams)
Mr. Robert Bosnak, Chief Mechanical Engineering Branch Mr. R. E. Lyon Idaho National Engineering Lab.
U. S. Nuclear Regulatory Commission EG&G Inc.
81061606lT
81061606lT
                                  .-  _.                      -.                  .-                  --          - -    .}}
.}}

Latest revision as of 10:36, 23 December 2024

Forwards Revision 2 to Pump Inservice Testing Program Requesting Relief from Cycle/Time Testing of Select Containment Purge Valves & Code Requirements for All Pumps
ML20004F115
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 06/08/1981
From: Parker W
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20004F116 List:
References
NUDOCS 8106160518
Download: ML20004F115 (1)


Text

_

t o

DUKE POWER COMPANY Powza Duitnixo 422 Socra Cnuncu Srazer,CnAntorre, N. C. asa-aa June 8, 1981 wn.uw o.,4anca, sa.

WCF PetSectse?

TELtPmoest:Asta 704 Setaae Paoowerion 373 4063 Mr. Harold R. Denton, Director A

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission

  1. \\

/.%

Washington, D. C.

20555

~

Attention:

Ms. E. G. Adensam, Chief J[jfl 2 519S7 5 Licensing Branch No. 4

- o y.,, hi;&

N, s

ron y/

Re: McGuire Nuclear Station f,'e Docket Nos. 50-369, 50-370 b

s//

Dear Mr. Denton:

FAease find attached Revision 2 to the McGuire Nuclear Station's Inservice Pump and Valve Testing Program. This revision includes relief requests for the cycle and time testing of certain containment purge valves and requests fcr relief from certain code requirements for all pumps.

Please replace the affected pages with the Revision 2 pages.

Very truly youre, i

William O. Parker, Jr.

RWO/djs Attachment cc:

(w/o attachments)

(w/o attach.)

Ms. M. J. Graham Mr. James P. O'Reilly, Director Resident Inspector - NRC

3. S. Nuclear Regulatory Commission McGuire Nuclear Station Region II (w/ attach. including 2 cys.

(w/o attach.)

of flow diagrams)

Mr. Robert Bosnak, Chief Mechanical Engineering Branch Mr. R. E. Lyon Idaho National Engineering Lab.

U. S. Nuclear Regulatory Commission EG&G Inc.

81061606lT

.