ML20004F115

From kanterella
Jump to navigation Jump to search
Forwards Revision 2 to Pump Inservice Testing Program Requesting Relief from Cycle/Time Testing of Select Containment Purge Valves & Code Requirements for All Pumps
ML20004F115
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 06/08/1981
From: Parker W
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20004F116 List:
References
NUDOCS 8106160518
Download: ML20004F115 (1)


Text

_

t o

DUKE POWER COMPANY Powza Duitnixo 422 Socra Cnuncu Srazer,CnAntorre, N. C. asa-aa June 8, 1981 wn.uw o.,4anca, sa.

WCF PetSectse?

TELtPmoest:Asta 704 Setaae Paoowerion 373 4063 Mr. Harold R. Denton, Director A

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission

  1. \\

/.%

Washington, D. C.

20555

~

Attention:

Ms. E. G. Adensam, Chief J[jfl 2 519S7 5 Licensing Branch No. 4

- o y.,, hi;&

N, s

ron y/

Re: McGuire Nuclear Station f,'e Docket Nos. 50-369, 50-370 b

s//

Dear Mr. Denton:

FAease find attached Revision 2 to the McGuire Nuclear Station's Inservice Pump and Valve Testing Program. This revision includes relief requests for the cycle and time testing of certain containment purge valves and requests fcr relief from certain code requirements for all pumps.

Please replace the affected pages with the Revision 2 pages.

Very truly youre, i

William O. Parker, Jr.

RWO/djs Attachment cc:

(w/o attachments)

(w/o attach.)

Ms. M. J. Graham Mr. James P. O'Reilly, Director Resident Inspector - NRC

3. S. Nuclear Regulatory Commission McGuire Nuclear Station Region II (w/ attach. including 2 cys.

(w/o attach.)

of flow diagrams)

Mr. Robert Bosnak, Chief Mechanical Engineering Branch Mr. R. E. Lyon Idaho National Engineering Lab.

U. S. Nuclear Regulatory Commission EG&G Inc.

81061606lT

.