ML20010J360: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
50.55(e) Report Docket No. 50-362 Southern California Edison Company P. O BOX 800 | 50.55(e) Report Docket No. 50-362 Southern California Edison Company WE P. O BOX 800 2 2 44 W ALNUT GROVE AVENUE ROSE M E AD, C ALIFORNI A 91770 J. M. CU R R A N vagg,wong unmaora, evauty assumance ta s si spa.n ess Mr. R. H. Engelken, Director y | ||
U. S. Nuclear Regulatory Commission Region V | Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region V SEP2 9 iggy,3 Suite 202, Walnut Creek Plaza "8'Qp g | ||
1990 North California Boulevard Walnut Creek, California 94506 | |||
/ | |||
4 | 4 | ||
==Dear Mr. Engelken:== | ==Dear Mr. Engelken:== | ||
Subj ect: | |||
Subj ect: | Docket No. 50-362 San Onofre Nuclear Generating Station, Unit 3 This letter confirms verbal notification on Sep-tember 15, 1981, of a condition discoverrd in construction which is considered reportable in accordance with 10CFR50.- | ||
55 (e) . This condition involves pipe support material certified by a material supplier to be 304 stainless steel but determined actually after receipt at the jobsite to be Inconel 718 alloy. | 55 (e). | ||
We are performing an evaluation of this condition and will submit a report in accordance with 10CFR50.55(e)(3) . | This condition involves pipe support material certified by a material supplier to be 304 stainless steel but determined actually after receipt at the jobsite to be Inconel 718 alloy. | ||
If you have any questions or recuire additional information, | We are performing an evaluation of this condition and will submit a report in accordance with 10CFR50.55(e)(3). | ||
If you have any questions or recuire additional information, please let me know. | |||
l Very truly yours, | l Very truly yours, | ||
, 4. CLw ~ | |||
l l | l l | ||
cc: | cc: | ||
Dr. L. T. Papay A. E. Chaffee (NRC, San Onofre Units 2 and 3) | |||
? ?1 nlgggy A G Xf 9l d35 lcg; | |||
'8109300367 8109i'5" i 30 PDR ADOCK 05000362 - | |||
s B | |||
PDR | |||
- -. _.}} | |||
Latest revision as of 05:17, 21 December 2024
| ML20010J360 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 09/15/1981 |
| From: | Curran J SOUTHERN CALIFORNIA EDISON CO. |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8109300367 | |
| Download: ML20010J360 (1) | |
Text
-
50.55(e) Report Docket No. 50-362 Southern California Edison Company WE P. O BOX 800 2 2 44 W ALNUT GROVE AVENUE ROSE M E AD, C ALIFORNI A 91770 J. M. CU R R A N vagg,wong unmaora, evauty assumance ta s si spa.n ess Mr. R. H. Engelken, Director y
Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region V SEP2 9 iggy,3 Suite 202, Walnut Creek Plaza "8'Qp g
1990 North California Boulevard Walnut Creek, California 94506
/
4
Dear Mr. Engelken:
Subj ect:
Docket No. 50-362 San Onofre Nuclear Generating Station, Unit 3 This letter confirms verbal notification on Sep-tember 15, 1981, of a condition discoverrd in construction which is considered reportable in accordance with 10CFR50.-
55 (e).
This condition involves pipe support material certified by a material supplier to be 304 stainless steel but determined actually after receipt at the jobsite to be Inconel 718 alloy.
We are performing an evaluation of this condition and will submit a report in accordance with 10CFR50.55(e)(3).
If you have any questions or recuire additional information, please let me know.
l Very truly yours,
, 4. CLw ~
l l
cc:
Dr. L. T. Papay A. E. Chaffee (NRC, San Onofre Units 2 and 3)
? ?1 nlgggy A G Xf 9l d35 lcg;
'8109300367 8109i'5" i 30 PDR ADOCK 05000362 -
s B
- -. _.